Abuwarda, Z and Hegazy, T (2016) Flexible activity relations to support optimum schedule acceleration. Journal of Construction Engineering and Management, 142(11): 06016004, ISSN 0733-9364
Akin, F D; Polat, G; Turkoglu, H and Damci, A (2021) A crashing-based time-cost trade-off model considering quality cost and contract clauses. International Journal of Construction Management, 23(6), pp. 954-963. ISSN 1562-3599
Aminbakhsh, A and Sonmez, R (2015) Pareto oriented optimization of discrete time-cost trade-off problem using particle swarm optimization. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Badra, N; Hegazy, H; Zhang, J; Yahia, M; Fathy, M and AboulHaggag, S (2025) Application of fuzzy multi-objective model for crashing the construction of steel structure projects post-pandemic (Covid-19). International Journal of Construction Management, 25(3), pp. 363-374. ISSN 1562-3599
Chen, J H; Yang, L R; Chen, W H and Chang, C K (2008) Case-based allocation of onsite supervisory manpower for construction projects. Construction Management and Economics, 26(8), pp. 805-814. ISSN 01446193
Chinanuwatwong, S (1998) Scheduling overtime in construction using time-cost trade-off. PhD thesis, University of Texas at Austin, USA.
Cho, S (2000) Sequential estimation and decision-making in project management: A Bayesian way and heuristic approaches. PhD thesis, George Washington University, USA.
Chritamara, S; Ogunlana, S O and Bach, N L (2002) System dynamics modeling of design and build construction projects. Construction Innovation, 2(4), pp. 269-295. ISSN 1471-4175
Hegazy, T and Menesi, W (2012) Heuristic method for satisfying both deadlines and resource constraints. Journal of Construction Engineering and Management, 138(6), pp. 688-696. ISSN 0733-9364
Jain, R and Prakash, O (2024) Optimizing contractor's accruals under conditions of penalty imposition due to unforeseen delays. International Journal of Construction Management, 24(8), pp. 854-866. ISSN 1562-3599
Khataei, S (2024) A BIM-integrated agent-based simulation method for time-space conflict detection among mobile resources in construction projects. PhD thesis, Middle East Technical University, Turkey.
Khosrowshahi, F (1997) The optimum project duration and cost curve for Hong Kong public housing projects. Engineering, Construction and Architectural Management, 4(4), pp. 249-269. ISSN 0969-9988
Khosrowshahi, F (2002) Project cost-time optimal solutions. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Li, H; Love, P E D and Drew, D S (2000) Effects of overtime work and additional resources on project cost and quality. Engineering, Construction and Architectural Management, 7(3), pp. 211-220. ISSN 0969-9988
Lu, H; Wang, H; Yu, D and Ye, J (2023) Sharp schedule compression in urgent emergency construction projects via activity crashing, substitution and overlapping: A case study of huoshengshan and leishenshan hospital projects in wuhan. Engineering, Construction and Architectural Management, 30(8), pp. 3696-3712. ISSN 0969-9988
Mahdavian, S; Lu, M and Pereira, E (2023) Application framework for safety-centric construction acceleration planning. Engineering, Construction and Architectural Management, 30(4), pp. 1401-1422. ISSN 0969-9988
Moselhi, O and Roofigari-Esfahan, N (2013) Project schedule compression: A multi-objective methodology. Construction Innovation, 13(4), pp. 374-393. ISSN 1471-4175
Reda, R and Carr, R I (1989) Time-cost trade-off among related activities. Journal of Construction Engineering and Management, 115(3), pp. 475-486. ISSN 0733-9364
Rezakhani, P (2017) Hybrid fuzzy-bayesian dynamic decision support tool for resource-based scheduling of construction projects. PhD thesis, University of Missouri - Kansas City, USA.
Salman, A and Ahmad, W (2025) Implementation of augmented reality and mixed reality applications for smart facilities management: A systematic review. Smart and Sustainable Built Environment, 14(1), pp. 254-275. ISSN 2046-6099
Shrestha, K K (2016) Causes of change orders and its impact on road maintenance contracts. PhD thesis, University of Nevada, Las Vegas, USA.
Siddika, A and Lu, M (2023) Project schedule acceleration optimization integrated with energy source-based assessment of occupational health and safety risks. Journal of Construction Engineering and Management, 149(12): 04023120, ISSN 0733-9364
Sonmez, R; Iranagh, M A and Uysal, F (2016) Critical sequence crashing heuristic for resource-constrained discrete time-cost trade-off problem. Journal of Construction Engineering and Management, 142(3): 04015090, ISSN 0733-9364
Sundararajan, S K (2004) Project performance-based optimal capital structure for privately financed infrastructure projects. PhD thesis, University of Maryland, College Park, USA.
Tseng, C L; Zhao, T and Fu, C C (2009) Contingency estimation using a real options approach. Construction Management and Economics, 27(11), pp. 1073-1087. ISSN 1466433X
Turkoglu, H; Polat, G and Akin, F D (2023) Crashing construction projects considering schedule flexibility: An illustrative example. International Journal of Construction Management, 23(4), pp. 619-628. ISSN 1562-3599
Wang, R C and Liang, T F (2004) Project management decisions with multiple fuzzy goals. Construction Management and Economics, 22(10), pp. 1047-1056. ISSN 01446193