Items with Index Term: cost performance

Number of items: 167.

Abdelazeem, A S and Ibrahim, A H (2022) Evaluation of project cost and schedule performance using fuzzy theory-based polynomial function. International Journal of Construction Management, 22(13), pp. 2564-2576. ISSN 1562-3599

Abdul Nabi, M and El-Adaway, I H (2021) Risk-based approach to predict the cost performance of modularization in construction projects. Journal of Construction Engineering and Management, 147(10): 04021133, ISSN 0733-9364

Adamtey, S (2021) Cost and time performance analysis of progressive design-build projects. Journal of Engineering, Design and Technology, 19(3), pp. 686-697. ISSN 1726-0531

Adamtey, S A (2022) An empirical study to assist owners in selecting the right procurement method for design-build projects. International Journal of Construction Education and Research, 18(1), pp. 67-84. ISSN 1557-8771

Ahiaga-Dagbui, D D (2014) Rethinking construction cost overruns: an artificial neural network approach to construction cost estimation. PhD thesis, University of Edinburgh, UK.

Alashwal, A M and Chew, M Y (2017) Simulation techniques for cost management and performance in construction projects in Malaysia. Built Environment Project and Asset Management, 7(5), pp. 534-545. ISSN 2044-124X

Ali, A S; Azmi, N F and Baaki, T K (2018) Cost performance of building refurbishment works: The case of Malaysia. International Journal of Building Pathology and Adaptation, 36(1), pp. 41-62. ISSN 23984708

Aligamhe, V I; Mustapa, M; Ogbu, C P and Misnan, M S (2024) Modelling cost-risk impact on Nigerian highway projects using multiple linear regression and artificial neural networks. Journal of Construction in Developing Countries, 29(2), pp. 107-128. ISSN 1823-6499

Amadi, A I and Higham, A (2018) The trickle-down effect of psycho-social constructs and knowledge deficiencies as organizational barriers to cost performance on highway projects. Journal of Financial Management of Property and Construction, 23(1), pp. 57-72. ISSN 1366-4387

Amini, S; Rezvani, A; Tabassi, M and Malek Sadati, S S (2023) Causes of cost overruns in building construction projects in Asian countries; Iran as a case study. Engineering, Construction and Architectural Management, 30(7), pp. 2739-2766. ISSN 0969-9988

Amini Khafri, Amin (2018) A framework for forecasting project estimate at completion using historical and current performance data. PhD thesis, University of Alberta, Canada.

Arviso, B (2022) Development of the project definition rating index (PDRI) for tribal building projects. PhD thesis, Arizona State University, USA.

Attalla, M and Hegazy, T (2003) Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression. Journal of Construction Engineering and Management, 129(4), pp. 405-411. ISSN 0733-9364

Au-Yong, C P; Chua, S J L; Ali, A S and Tucker, M (2019) Optimising maintenance cost by prioritising maintenance of facilities services in residential buildings. Engineering, Construction and Architectural Management, 26(8), pp. 1593-1607. ISSN 0969-9988

Baccarini, D (2004) Estimating project cost contingency: A model and exploration of research questions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Baccarini, D and Love, P E D (2014) Statistical characteristics of cost contingency in water infrastructure projects. Journal of Construction Engineering and Management, 140(3): 4013063, ISSN 0733-9364

Badran, S S and Abdallah, A B (2025) Lean vs agile project management in construction: Impacts on project performance outcomes. Engineering, Construction and Architectural Management, 32(5), pp. 2844-2869. ISSN 0969-9988

Balasubramanian, S (2017) Green supply chain management: an investigation on the construction sector. PhD thesis, Middlesex University, UK.

Baloi, D (2002) A framework for managing global risk factors affecting construction cost performance. PhD thesis, Loughborough University, UK.

Becker, T C; Jaselskis, E J and El-Gafy, M (2014) Improving predictability of construction project outcomes through intentional management of indirect construction costs. Journal of Construction Engineering and Management, 140(6): 4014014, ISSN 0733-9364

Bello, W (2018) Project performance diagnostics: A model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.

Bello, W A (2017) Project performance diagnostics: a model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.

Beran, V; Dlask, P; Eaton, D; Hromada, E and Zindulka, O (2011) Mapping of synchronous activities through virtual management momentum simulation. Construction Innovation, 11(2), pp. 190-211. ISSN 1471-4175

Best, Eric A (2008) The development and testing of a purchasing power parity method for comparing construction costs internationally. PhD thesis, University of Technology Sydney, Australia.

Bingham, E; Gibson, G E and Asmar, M E (2018) Measuring user perceptions of popular transportation project delivery methods using least significant difference intervals and multiple range tests. Journal of Construction Engineering and Management, 144(6): 04018033, ISSN 0733-9364

Carpenter, N (2014) Comparison of the design-bid-build and construction manager at risk project delivery methods utilized for the construction of public schools. PhD thesis, Clemson University, USA.

Chan, A P C; Ho, D C K and Tam, C M (2001) Design and build project success factors: Multivariate analysis. Journal of Construction Engineering and Management, 127(2), pp. 93-100. ISSN 0733-9364

Chen, Q; Jin, Z; Xia, B; Wu, P and Skitmore, M (2016) Time and cost performance of design-build projects. Journal of Construction Engineering and Management, 142(2): 04015074, ISSN 0733-9364

Chen, Y Q; Zhang, Y B and Zhang, S J (2014) Impacts of different types of owner-contractor conflict on cost performance in construction projects. Journal of Construction Engineering and Management, 140(6): 4014017, ISSN 0733-9364

Chmielewski, H T (2023) Overcoming modeling barriers in long-term interdependent infrastructure systems planning. PhD thesis, North Carolina State University, USA.

Choi, J O; O'Connor, J T and Kim, T W (2016) Recipes for cost and schedule successes in industrial modular projects: Qualitative comparative analysis. Journal of Construction Engineering and Management, 142(10): 04016055, ISSN 0733-9364

Chritamara, S; Ogunlana, S O and Bach, N L (2002) System dynamics modeling of design and build construction projects. Construction Innovation, 2(4), pp. 269-295. ISSN 1471-4175

Chritamara, S; Ogunlana, S O and Luong Bach, N (2001) Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling. Engineering, Construction and Architectural Management, 8(5-6), pp. 381-392. ISSN 0969-9988

Collins, Wesley A (2015) Development of the project definition rating index (PDRI) for small industrial projects. PhD thesis, Arizona State University, USA.

Crandell, D (2018) Enhancing traditional earned value management with three-point estimates to produce probability based performance forecasts and contingency funding projections for engineering-construction projects. DEngr thesis, George Washington University, USA.

De Marco, A; Briccarello, D and Rafele, C (2009) Cost and schedule monitoring of industrial building projects: Case study. Journal of Construction Engineering and Management, 135(9), pp. 853-862. ISSN 0733-9364

Demetracopoulou, Vassiliki A (2023) Risk and innovation in project delivery method selection for complex highway projects. PhD thesis, University of Texas at Austin, USA.

Diab, A A (2009) Risk management of building services modularisation: Knowledge management perspective. PhD thesis, University of Manchester, UK.

Dissanayaka, S M and Kumaraswamy, M M (1999) Evaluation of factors affecting time and cost performance in Hong Kong building projects. Engineering, Construction and Architectural Management, 6(3), pp. 287-298. ISSN 0969-9988

Doloi, H (2013) Cost overruns and failure in project management: Understanding the roles of key stakeholders in construction projects. Journal of Construction Engineering and Management, 139(3), pp. 267-279. ISSN 0733-9364

Dow, I; Ross, A D and Sertyesilisik, B (2009) An investigation on the cost implications of methodology of subcontract work pricing. Journal of Financial Management of Property and Construction, 14(2), pp. 98-125. ISSN 1366-4387

Dow, I; Ross, A D and Sertyesilisik, B (2009) An investigation on the cost implications of methodology of subcontract work pricing. Journal of Financial Management of Property and Construction, 14(2), pp. 98-125. ISSN 1366-4387

Draleti, G; Sengonzi, R and Kakitahi, J (2024) Improvement of risk management in cost estimation in the building construction industry in Uganda. Journal of Construction in Developing Countries, 29(1), pp. 111-138. ISSN 1823-6499

Du, J; Kim, B C and Zhao, D (2016) Cost performance as a stochastic process: EAC projection by Markov chain simulation. Journal of Construction Engineering and Management, 142(6): 04016009, ISSN 0733-9364

Egbu, C O (1999) Mechanisms for exploiting construction innovations to gain competitive advantage. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

El-Mashaleh, M; O'Brien, W J and Minchin Jr, R E (2006) Firm performance and information technology utilization in the construction industry. Journal of Construction Engineering and Management, 132(5), pp. 499-507. ISSN 0733-9364

El-Rayes, K; Ramanathan, R and Moselhi, O (2002) An object-oriented model for planning and control of housing construction. Construction Management and Economics, 20(3), pp. 201-210. ISSN 01446193

ElZomor, M A (2017) Development of the project definition rating index (PDRI) for small infrastructure projects. PhD thesis, Arizona State University, USA.

Franz, B; Molenaar, K R and Roberts, B A M (2020) Revisiting project delivery system performance from 1998 to 2018. Journal of Construction Engineering and Management, 146(9): 04020100, ISSN 0733-9364

Fung, W P (2015) Building information modeling (BIM) capabilities in quantity surveying practice during pre-construction stage: The relationship with project performance. PhD thesis, University of Malaya, Malaysia.

Gambo, N; Said, I and Ismail, R (2017) Mediation model for improving cost factors that affect performance of small-scale building construction contract business in Nigeria: A PLS-SEM approach. International Journal of Construction Education and Research, 13(1), pp. 24-46. ISSN 1557-8771

Ghattas, R T (2018) Stakeholder perceptions of how to diminish cost overruns in large, United States government-financed construction projects under earned value management: A multiple case study. DBA thesis, Northcentral University, USA.

Ghazal, M M and Hammad, A (2022) Application of knowledge discovery in database (KDD) techniques in cost overrun of construction projects. International Journal of Construction Management, 22(9), pp. 1632-1646. ISSN 1562-3599

Haidar, A (2011) Analysis and optimization of megaproject performance. PhD thesis, University of Florida, USA.

Hamide, M (2017) Schedule and cost performance analysis and prediction in Louisiana DOTD. PhD thesis, University of New Orleans, USA.

Hammad, Mohammed (2018) Estimating, allocating and managing schedule and cost contingency in construction projects. PhD thesis, University of New South Wales, Australia.

Horman, Michael J (2000) Process dynamics: Buffer management in building project operations. PhD thesis, University of Melbourne, Australia.

Huo, T; Ren, H; Cai, W; Shen, G Q; Liu, B; Zhu, M and Wu, H (2018) Measurement and dependence analysis of cost overruns in megatransport infrastructure projects: Case study in Hong Kong. Journal of Construction Engineering and Management, 144(3): 05018001, ISSN 0733-9364

Islam, R; Nazifa, T H and Mohamed, S F (2021) Evaluation of facilities management sustainable parameters for improving operational efficiency. International Journal of Construction Management, 21(5), pp. 538-554. ISSN 1562-3599

Ismail, M Z; Mohamad Ramly, Z; Darmansah, N F and Misnan, M S (2025) Rail construction cost risk management with bow-tie analysis: Contractor’s perspective. Built Environment Project and Asset Management, 15(4), pp. 753-771. ISSN 2044-124X

Johnson, R M and Babu, R I I (2020) Time and cost overruns in the UAE construction industry: A critical analysis. International Journal of Construction Management, 20(5), pp. 402-411. ISSN 1562-3599

Kakar, A S; Hasan, A; Jha, K N and Singh, A (2024) Project cost performance factors in the war-affected and conflict-sensitive Afghan construction industry. Journal of Engineering, Design and Technology, 22(5), pp. 1570-1590. ISSN 1726-0531

Kamal, A; Abas, M; Khan, D and Azfar, R W (2022) Risk factors influencing the building projects in Pakistan: From perspective of contractors, clients and consultants. International Journal of Construction Management, 22(6), pp. 1141-1157. ISSN 1562-3599

Kang, Y; Kim, C; Son, H; Lee, S and Limsawasd, C (2013) Comparison of preproject planning for green and conventional buildings. Journal of Construction Engineering and Management, 139(11): 4013018, ISSN 0733-9364

Kang, Y; O'Brien, W J; Thomas, S and Chapman, R E (2008) Impact of information technologies on performance: Cross study comparison. Journal of Construction Engineering and Management, 134(11), pp. 852-863. ISSN 0733-9364

Kar, S (2021) Developing a decision support system for effective material management in construction. PhD thesis, Indian Institute of Technology Delhi, India.

Kar, S and Jha, K N (2020) Examining the effect of material management issues on the schedule and cost performance of construction projects based on a structural equation model: Survey of Indian experiences. Journal of Construction Engineering and Management, 146(9): 05020011, ISSN 0733-9364

Karimi, H (2017) Quantitative analysis of the impact of craft labor availability on construction project performance. PhD thesis, University of Kentucky, USA.

Karimi, H; Taylor, T R B; Dadi, G B; Goodrum, P M and Srinivasan, C (2018) Impact of skilled labor availability on construction project cost performance. Journal of Construction Engineering and Management, 144(7): 04018057, ISSN 0733-9364

Kazar, G; Mutlu, U and Tokdemir, O B (2023) Development of zero-based budgeting approach for multinational construction contractors. Engineering, Construction and Architectural Management, 30(10), pp. 5217-5232. ISSN 0969-9988

Kim, D Y; Han, S H and Kim, H (2008) Discriminant analysis for predicting ranges of cost variance in international construction projects. Journal of Construction Engineering and Management, 134(6), pp. 398-410. ISSN 0733-9364

Lahdenperä, P and Koppinen, T (2009) Financial analysis of road project delivery systems. Journal of Financial Management of Property and Construction, 14(1), pp. 61-78. ISSN 1366-4387

Langston, Y L and Langston, C (2007) Building energy and cost performance: An analysis of thirty Melbourne case studies. Construction Economics and Building, 7(1), pp. 1-18. ISSN 2204-9029

Langston, Y L and Langston, C (2009) The inherent building energy-cost relationship: An analysis of thirty Melbourne case studies. Construction Economics and Building, 9(1), pp. 9-18. ISSN 2204-9029

Langston, Y L and Langston, C A (2008) Reliability of building embodied energy modelling: An analysis of 30 Melbourne case studies. Construction Management and Economics, 26(2), pp. 147-160. ISSN 1466433X

Laryea, S and Watermeyer, R B (2018) Comparison of two infrastructure project implementation models in a developing country. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(1), pp. 3-17. ISSN 17514304

Leo-Olagbaye, F and Odeyinka, H A (2020) An assessment of risk impact on road projects in Osun State, Nigeria. Built Environment Project and Asset Management, 10(5), pp. 673-691. ISSN 2044-124X

Liang, Y; Ashuri, B and Sun, W (2020) Analysis of the variability of project cost and schedule performance in the design-build environment. Journal of Construction Engineering and Management, 146(6): 04020060, ISSN 0733-9364

Ling, F Y Y and Tran, P Q (2012) Effects of interpersonal relations on public sector construction contracts in Vietnam. Construction Management and Economics, 30(12), pp. 1087-1101. ISSN 1466433X

Liu, Jing (2018) Dual-level resource-constrained multi-project scheduling framework for prefabrication in construction. PhD thesis, University of Alberta, Canada.

Liu, Y; Chang, R D; Zuo, J; Xiong, F and Dong, N (2023) What leads to the high capital cost of prefabricated construction in China: Perspectives of stakeholders. Engineering, Construction and Architectural Management, 30(2), pp. 805-832. ISSN 0969-9988

Love, P E D; Tse, R Y C and Edwards, D J (2005) Time-cost relationships in Australian building construction projects. Journal of Construction Engineering and Management, 131(2), pp. 187-194. ISSN 0733-9364

Lu, W; Hua, Y and Zhang, S (2017) Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects. Engineering, Construction and Architectural Management, 24(1), pp. 118-132. ISSN 0969-9988

Ma, Q and Cheung, S O (2025) Augmenting the incentivizing power of target cost contracting in integrated project delivery. Journal of Construction Engineering and Management, 151(7): 04025069, ISSN 0733-9364

Maddah, R (2019) An analysis of risks faced by foreign construction firms in India and their effect on project performance. PhD thesis, Indian Institute of Technology Delhi, India.

Madushika, U G D and Ramachandra, T (2024) A comparative assessment of indirect green façade and conventional walls: perspective of life cycle cost. Built Environment Project and Asset Management, 14(5), pp. 697-712. ISSN 2044-124X

Mahmud, A; Ogunlana, S O; Hong, W T; Yahaya, I W and Akoh, S R (2023) Adopting qualitative data in conceptual system dynamic modelling. Construction Economics and Building, 23(3-4), pp. 71-86. ISSN 2204-9029

Mahmud, A T (2021) Enhancing the understanding of cost overrun drivers in highway projects in Nigeria through system dynamics modelling. PhD thesis, Heriot-Watt University, UK.

Mahmud, A T; Ogunlana, S O and Hong, W T (2022) Understanding the dynamics of cost overrun triggers in highway infrastructure projects in Nigeria: A systems thinking modelling approach. Journal of Financial Management of Property and Construction, 27(1), pp. 29-56. ISSN 1366-4387

Manley, K and Chen, L (2016) The impact of client characteristics on the time and cost performance of collaborative infrastructure projects. Engineering, Construction and Architectural Management, 23(4), pp. 511-532. ISSN 0969-9988

Manu, E; Ankrah, N; Chinyio, E and Proverbs, D (2013) A cognitive approach to trust management in construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(5), pp. 232-239. ISSN 17514312

Meeampol, S and Ogunlan, S O (2006) Factors affecting cost and time performance on highway construction projects: Evidence from Thailand. Journal of Financial Management of Property and Construction, 11(1), pp. 3-20. ISSN 1366-4387

Momaya, K S (1996) International competitiveness of the Canadian construction industry: A comparison with Japan and the United States. PhD thesis, University of Toronto, Canada.

Monyane, T G (2019) "A lean-led-evaluation" of infrastructure development improvement programme in South Africa. PhD thesis, Nelson Mandela University, South Africa.

Moon, H; Kim, K; Lee, H S; Park, M; Williams, T P; Son, B and Chun, J Y (2020) Cost performance comparison of design-build and design-bid-build for building and civil projects using mediation analysis. Journal of Construction Engineering and Management, 146(9): 04020113, ISSN 0733-9364

Naderi, M; Nazari, A; Shafaat, A and Abrishami, S (2025) Enhancing accuracy in construction overhead cost estimation: A novel integration of activity-based costing and building information modelling. Smart and Sustainable Built Environment, 14(3), pp. 758-775. ISSN 2046-6099

Nassar, K M; Gunnarsson, H G and Hegab, M Y (2005) Using weibull analysis for evaluation of cost and schedule performance. Journal of Construction Engineering and Management, 131(12), pp. 1257-1262. ISSN 0733-9364

Nguyen, L D; Le-Hoai, L; Tran, D Q; Dang, C N and Nguyen, C V (2019) Effect of project complexity on cost and schedule performance in transportation projects. Construction Management and Economics, 37(7), pp. 384-399. ISSN 01446193

Nguyen, P H D (2020) Development of fuzzy hybrid approaches to project delivery method selection in highway construction. PhD thesis, University of Kansas, USA.

Nguyen, P H D; Tran, D and Lines, B C (2020) Fuzzy set theory approach to classify highway project characteristics for delivery selection. Journal of Construction Engineering and Management, 146(5): 04020044, ISSN 0733-9364

Nguyen, P H D; Tran, D Q and Bypaneni, S P K (2021) Exploring the impact of project size on design-bid-build and design-build project delivery performance in highways. Construction Management and Economics, 39(11), pp. 879-893. ISSN 01446193

Nguyen, P H D; Tran, D Q and Lines, B C (2020) Empirical inference system for highway project delivery selection using fuzzy pattern recognition. Journal of Construction Engineering and Management, 146(12): 04020141, ISSN 0733-9364

Nguyen, T Q; Yeoh, J K W and Angelia, N (2023) Predicting percent plan complete through time series analysis. Journal of Construction Engineering and Management, 149(6): 04023038, ISSN 0733-9364

Ning, Y; Feng, M; Feng, J and Liu, X (2019) Understanding clients' experience of trust and distrust in dwelling fit-out projects: An ambivalence approach. Engineering, Construction and Architectural Management, 26(3), pp. 444-461. ISSN 0969-9988

Ning, Y and Ling, F Y Y (2014) Boosting public construction project outcomes through relational transactions. Journal of Construction Engineering and Management, 140(1): 04013037, ISSN 0733-9364

Obi, L I (2017) Development of a system model for cost management in low-cost housing projects in Nigeria. PhD thesis, University of Salford, UK.

Obi, L I; Arif, M; Awuzie, B; Islam, R; Gupta, A D and Walton, R (2021) Critical success factors for cost management in public-housing projects. Construction Innovation, 21(4), pp. 625-647. ISSN 1471-4175

Oey, M (2001) Effects of selected practices on the cost performance of building projects. PhD thesis, University of Texas at Austin, USA.

Ogbu, C P and Adindu, C C (2020) Direct risk factors and cost performance of road projects in developing countries: Contractors’ perspective. Journal of Engineering, Design and Technology, 18(2), pp. 326-342. ISSN 1726-0531

Oke, A; Omoraka, A and Olatunbode, A (2020) Appraisal of factors affecting bidding decisions in Nigeria. International Journal of Construction Management, 20(2), pp. 169-175. ISSN 1562-3599

Okonkwo, C; Evans, U F and Ekung, S (2023) Unearthing direct and indirect material waste-related factors underpinning cost overruns in construction projects. International Journal of Construction Management, 23(13), pp. 2298-2304. ISSN 1562-3599

Olatunde, N A and Alao, O O (2017) Quantitative appraisal of cost and time performance of construction projects in public and private universities in Osun State, Nigeria. Journal of Engineering, Design and Technology, 15(5), pp. 619-634.

Omopariola, E D; Olugboyega, O; Windapo, A O and Albert, I (2022) Establishing the cost and time performances of projects executed by South African construction companies using different payment systems. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Pan, W and Sidwell, R (2011) Demystifying the cost barriers to offsite construction in the UK. Construction Management and Economics, 29(11), pp. 1081-1099. ISSN 1466433X

Park, J (2015) Essays on the delivery of public infrastructure projects: Empirical analyses on transportation projects in Florida. PhD thesis, George Washington University, USA.

Park, Y I and Papadopoulou, T C (2012) Causes of cost overruns in transport infrastructure projects in Asia: Their significance and relationship with project size. Built Environment Project and Asset Management, 2(2), pp. 195-216. ISSN 2044-124X

Perovic, Miljenka (2015) Overcoming the challenges of building heritage projects: Improvements to time, scope and cost performance. PhD thesis, Queensland University of Technology, Australia.

Proverbs, D G (1998) A best practice for high-rise insitu concrete construction based on French, German and UK contractor performance measures. PhD thesis, University of Wolverhampton, UK.

Rachmawati, F; Mudjahidin, M and Dewi Widowati, E (2024) Work rate modeling of building construction projects using system dynamic to optimize project cost and time performance. International Journal of Construction Management, 24(2), pp. 213-225. ISSN 1562-3599

Raghib, A T; Belayutham, S; Mohammad, M Z and Ibrahim, C K I C (2023) Causes, effects and potential measures of cost deviations in high-rise building projects in Egypt. International Journal of Construction Management, 23(11), pp. 1875-1885. ISSN 1562-3599

Raisbeck, P; Duffield, C and Xu, M (2010) Comparative performance of PPPs and traditional procurement in Australia. Construction Management and Economics, 28(4), pp. 345-359. ISSN 1466433X

Raouf, A M and Al-Ghamdi, S G (2019) Effectiveness of project delivery systems in executing green buildings. Journal of Construction Engineering and Management, 145(10): 03119005, ISSN 0733-9364

Rojas, E M and Kell, I (2008) Comparative analysis of project delivery systems cost performance in Pacific Northwest public schools. Journal of Construction Engineering and Management, 134(6), pp. 387-397. ISSN 0733-9364

Safapour, E; Kermanshachi, S and Rouhanizadeh, B (2022) Key components of successful post–hurricane reconstruction of transportation infrastructures. Built Environment Project and Asset Management, 12(5), pp. 775-791. ISSN 2044-124X

Salih, F; Eissa, R and El-Adaway, I H (2024) Data-driven analysis of progressive design build in water and wastewater infrastructure projects. Journal of Construction Engineering and Management, 150(1): 04023149, ISSN 0733-9364

Salih, F and El-Adaway, I H (2024) Quantifying the impact of technology utilization on schedule and cost performance in construction projects. Journal of Construction Engineering and Management, 150(8): 04024078, ISSN 0733-9364

Seo, J; Lee, S and Seo, J (2016) Simulation-based assessment of workers' muscle fatigue and its impact on construction operations. Journal of Construction Engineering and Management, 142(11): 04016063, ISSN 0733-9364

Serugga, J; Kagioglou, M; Edwards, D; Talebi, S and Johns, N (2024) Key influences to cost modelling and analysis in off-site construction: Research trends and gap analysis. Architectural Engineering and Design Management, 20(6), pp. 1335-1356. ISSN 1745-2007

Shahedi, F; Etemadfard, H; Omrani, F and Ghalehnovi, M (2024) Cost performance modeling for steel fabrication shops with machine learning algorithms. Journal of Construction Engineering and Management, 150(9): 04024114, ISSN 0733-9364

She, L (2013) Trust, mistrust and distrust in alliancing. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

She, Ling-Ye (2014) Understanding the conditions of trust between governance and management within project alliancing. PhD thesis, University of Melbourne, Australia.

Shrestha, B (2024) Assessment of success factors and comparative analysis of public private partnership (P3) project performances against design-build and design-bid-build project delivery. PhD thesis, University of Nevada, Las Vegas, USA.

Sinesilassie, E G (2017) Determinants of success of public construction projects in Ethiopia. PhD thesis, Indian Institute of Technology Delhi, India.

Sinesilassie, E G; Tabish, S Z S and Jha, K N (2018) Critical factors affecting cost performance: A case of Ethiopian public construction projects. International Journal of Construction Management, 18(2), pp. 108-119. ISSN 1562-3599

Srijaroen, C; Hoy, M; Horpibulsuk, S; Rachan, R and Arulrajah, A (2021) Soil-cement screw pile: Alternative pile for low- and medium-rise buildings in soft bangkok clay. Journal of Construction Engineering and Management, 147(2): 1988, ISSN 0733-9364

Tabish, S Z S (2011) Critical success factors and fair performance in public construction projects. PhD thesis, Indian Institute of Technology Delhi, India.

Tahir, H A (2015) A project control framework for the Libyan construction industry. PhD thesis, Sheffield Hallam University, UK.

Thomas, H R; Horman, M J; De Souza, U E L and Zavřski, I (2002) Reducing variability to improve performance as a lean construction principle. Journal of Construction Engineering and Management, 128(2), pp. 144-154. ISSN 0733-9364

Thomas, H R; Horman, M J; Minchin Jr, R E and Chen, D (2003) Improving labor flow reliability for better productivity as lean construction principle. Journal of Construction Engineering and Management, 129(3), pp. 251-261. ISSN 0733-9364

Tokede, O. O.; Weththasinghe, K. K.; Kumer Shill, S.; Wijayasundara, M. and Subhani, M. (2025) Comparative evaluation of different material options for moment-resisting framing systems in buildings. Architectural Engineering and Design Management, 21(6), pp. 1541-1561. ISSN 1745-2007

Tuan Son, N; Sherif, M and Mostafa, S (2021) Project stakeholder's engagement and performance: A comparison between complex and non-complex projects using SEM. Built Environment Project and Asset Management, 11(5), pp. 804-818. ISSN 2044-124X

Vidalakis, C; Tookey, J E and Sommerville, J (2011) Logistics simulation modelling across construction supply chains. Construction Innovation, 11(2), pp. 212-228. ISSN 1471-4175

Viswanathan, S K; Tripathi, K K and Jha, K N (2020) Influence of risk mitigation measures on international construction project success criteria: A survey of Indian experiences. Construction Management and Economics, 38(3), pp. 207-222. ISSN 01446193

Waziri, B S (2018) Pareto analysis of critical risk factors of build operate and transfer projects in Nigeria. Journal of Construction Business and Management, 2(1), pp. 33-40. ISSN 2521-0165

Weerasinghe, A; Ramachandra, T and Rotimi, J O B (2016) A simplified model for predicting running cost of office buildings in Sri Lanka. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Wong, I L; Perera, S and Eames, P C (2010) Goal directed life cycle costing as a method to evaluate the economic feasibility of office buildings with conventional and TI-façades. Construction Management and Economics, 28(7), pp. 715-735. ISSN 1466433X

Wuni, I Y; Shen, G Q and Osei-Kyei, R (2020) Evaluating the critical success criteria for prefabricated prefinished volumetric construction projects. Journal of Financial Management of Property and Construction, 26(2), pp. 279-297. ISSN 1366-4387

Wyke, S; Lindhard, S M and Larsen, J K (2024) Using principal component analysis to identify latent factors affecting cost and time overrun in public construction projects. Engineering, Construction and Architectural Management, 31(6), pp. 2415-2436. ISSN 0969-9988

Xiao, H and Proverbs, D (2002) An investigation into factors influencing construction costs based on Japanese, UK and US contractor practice. Construction Economics and Building, 2(2), pp. 27-35. ISSN 2204-9029

Xiao, H and Proverbs, D (2002) The performance of contractors in Japan, the UK and the USA: A comparative evaluation of construction cost. Construction Management and Economics, 20(5), pp. 425-435. ISSN 01446193

Yamusa, M. A.; Lawal, H. S.; Abdulrahman, R. S.; Salisu, A. S.; Saka, A.; Abubakar, M. and Abdullahi, M. (2026) A machine-learning model for estimating construction renovation costs. International Journal of Building Pathology and Adaptation, 44(3), pp. 757-772. ISSN 2398-4708

Yang, L-R (2003) Influence of technology on project success measures. PhD thesis, University of Texas at Austin, USA.

Yap, J B H; Low, P L and Wang, C (2017) Rework in Malaysian building construction: Impacts, causes and potential solutions. Journal of Engineering, Design and Technology, 15(5), pp. 591-618.

Yap, J B H and Skitmore, M (2018) Investigating design changes in Malaysian building projects. Architectural Engineering and Design Management, 14(3), pp. 218-238. ISSN 1745-2007

Yeung, J F Y; Chan, A P C and Chan, D W M (2008) Establishing quantitative indicators for measuring the partnering performance of construction projects in Hong Kong. Construction Management and Economics, 26(3), pp. 277-301. ISSN 1466433X

Yeung, J F Y; Chan, A P C; Chan, D W M; Chiang, Y H and Yang, H (2013) Developing a benchmarking model for construction projects in Hong Kong. Journal of Construction Engineering and Management, 139(6), pp. 705-716. ISSN 0733-9364

Yeung, J F Y; Chan, A P C; Chan, D W M and Li, L K (2007) Development of a partnering performance index (PPI) for construction projects in Hong Kong: A Delphi study. Construction Management and Economics, 25(12), pp. 1219-1237. ISSN 1466433X

Yeung, J F Y; Chan, D W M; Chan, J H L and Lok, K L (2023) Development of a composite project performance index for the New Engineering Contract (necppi) of construction projects in Hong Kong: A Delphi study. International Journal of Construction Management, 23(16), pp. 2804-2817. ISSN 1562-3599

Yoo, W S (2007) An information-based decision making framework for evaluating and forecasting a project cost and completion date. PhD thesis, Ohio State University, USA.

Yumul, John (2025) Evaluation of machine learning models to predict cost overruns for New York city capital projects. DEngr thesis, George Washington University, USA.

Yun, L; Wan, J; Wang, G; Bai, J and Zhang, B (2020) Exploring the missing link between top management team characteristics and megaproject performance. Engineering, Construction and Architectural Management, 27(5), pp. 1039-1064. ISSN 0969-9988

Zadawa, A N; Hussin, A A and Osmadi, A (2018) Mediating effects of enforcement on public procurement guidelines' compliance barriers and cost performance of construction projects in Nigerian federal universities: A process macro approach. Journal of Construction in Developing Countries, 23(1), pp. 81-102. ISSN 1823-6499

Zhang, K; Cui, Q and DeCorla-Souza, P (2025) Performance and efficiency diffusion of us surface transportation public-private partnerships. Journal of Construction Engineering and Management, 151(1): 04024192, ISSN 0733-9364

Zhang, X (2009) Win-win concession period determination methodology. Journal of Construction Engineering and Management, 135(6), pp. 550-558. ISSN 0733-9364

Zhang, Y; Liu, Y; Yu, R; Zuo, J and Dong, N (2025) Managing the high capital cost of prefabricated construction through stakeholder collaboration: A two-mode network analysis. Engineering, Construction and Architectural Management, 32(1), pp. 556-577. ISSN 0969-9988

Zou, Y and Lee, S H (2008) The impacts of change management practices on project change cost performance. Construction Management and Economics, 26(4), pp. 387-393. ISSN 1466433X

fu, C; Kaya, S and Aouad, M K G (2007) The development of an IFC-based lifecycle costing prototype tool for building construction and maintenance: Integrating lifecycle costing to nD modelling. Construction Innovation, 7(1), pp. 85-98. ISSN 1471-4175

This list was generated on Sat Aug 22 01:31:31 2026 UTC.