Items with Index Term: cost overrun

Number of items: 570.

Abaza, M and Kisi, K (2024) Improper risk management outcomes and lessons learned from an EPC water transmission project. Journal of Construction Engineering and Management, 150(11): 05024012, ISSN 0733-9364

Abdelalim, A M; Salem, M; Al-Sabah, R; Said, S O; ElShafei, H M and Galal Badawy, M (2025) Optimizing claim management process groups to enhance construction project success. International Journal of Construction Management, 25(13), pp. 1583-1595. ISSN 1562-3599

Abdi, A; Lind, H and Birgisson, B (2013) Payment mechanisms for winter road maintenance services. Construction Economics and Building, 13(4), pp. 18-31. ISSN 2204-9029

Abolkhair, K (2022) Cost certainty and timing of cost certainty in the construction projects of public universities. PhD thesis, University of Florida, USA.

Abotaleb, I S (2018) Construction dispute mitigation: quantitative and qualitative analytic approach with a focus on bidding, out-of-sequence work, and contract analysis. PhD thesis, University of Tennessee, USA.

Aboushiwa, M A A (2000) Promoter briefing on the procurement and selection of contract strategy offering the best value for money. PhD thesis, University of Manchester, UK.

Abu-Shabeen, N N (2008) Development of multi-criteria decision analysis models for bidding and contractor selection. PhD thesis, Edinburgh Napier University, UK.

Abujnah, M S (2010) Towards a risk management framework for Libyan house-building projects. PhD thesis, University of Salford, UK.

Adafin, J; Rotimi, J O B; Wilkinson, S and Mbachu, J (2019) An assessment of risk factors impacting budget variability in New Zealand commercial construction projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Adam, A; Josephson, P-E B and Lindahl, G (2017) Aggregation of factors causing cost overruns and time delays in large public construction projects: Trends and implications. Engineering, Construction and Architectural Management, 24(3), pp. 393-406. ISSN 0969-9988

Adepu, N; Kermanshachi, S; Pamidimukkala, A and Nwakpuda, E (2025) An analytical approach to understanding construction cost overruns during COVID-19. Smart and Sustainable Built Environment, 14(6), pp. 1780-1794. ISSN 2046-6099

Adepu, N (2023) Analysis of the impact of COVID-19 on construction cost and schedule overruns. PhD thesis, University of Texas at Arlington, USA.

Adigbo, F A (2020) Stakeholder engagement and construction project performance in Ghana. PhD thesis, Northcentral University, USA.

Adjei, K O (2020) A model for predicting cost control practice in the Ghanaian construction industry. DPhil thesis, University of Johannesburg, South Africa.

Adoko, M T (2016) Developing a cost overrun predictive model for complex systems development projects. PhD thesis, George Washington University, USA.

Afetornu, C and Edum-Fotwe, F T (2005) Characterising project contingency budget in construction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Afetornu, C; Edum-Fotwe, F T and McCaffer, R (2006) Estimating budget variability for road projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Afzal, F; Yunfei, S; Sajid, M and Afzal, F (2020) Integrated priority decision index for risk assessment in chaos: Cost overruns in transport projects. Engineering, Construction and Architectural Management, 27(4), pp. 825-849. ISSN 0969-9988

Aggiag, M A A (2005) The impact of client attributes on project success: a study of UK public construction projects. PhD thesis, Northumbria University, UK.

Aguocha, T (2023) Best practices for cost monitoring and control in construction projects: An exploratory case study. DBA thesis, National University, USA.

Agyekum-Mensah, G (2013) The development of an innovative sustainable total planning and control system for construction projects. PhD thesis, Nottingham Trent University, UK.

Ahadzi, M and Bowles, G (2004) Public-private partnerships and contract negotiations: An empirical study. Construction Management and Economics, 22(9), pp. 967-978. ISSN 01446193

Ahadzi, M K (2004) Public private partnerships in infrastructure procurement: A generic multi-attribute hierarchical model for minimising pre-contract time and cost overruns (GMAHM). PhD thesis, Heriot-Watt University, UK.

Ahiaga-Dagbui, D; Smith, S D; Love, P E D and Ackermann, F (2015) Spotlight on construction cost overrun research: Superficial, replicative and stagnated. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Ahiaga-Dagbui, D D (2014) Rethinking construction cost overruns: an artificial neural network approach to construction cost estimation. PhD thesis, University of Edinburgh, UK.

Ahiaga-Dagbui, D D and Smith, S D (2014) Exploring escalation of commitment in construction project management: Case study of the scottish parliament project. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Ahiaga-Dagbui, D D and Smith, S D (2014) Dealing with construction cost overruns using data mining. Construction Management and Economics, 32(7-8), pp. 682-694. ISSN 01446193

Ahiaga-Dagbui D D, S S D (2013) My cost runneth over: Data mining to reduce construction cost overruns. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Ahiaga-Dagbui D D, T O and Smith S D, W S (2013) A neuro-fuzzy hybrid model for predicting final cost of water infrastructure projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Ahmed, S; Haq, I and Anam, S M A (2024) Impacts of COVID-19 on the construction sector in the least developed countries. International Journal of Building Pathology and Adaptation, 42(6), pp. 1085-1105. ISSN 2398-4708

Ahmed, S; Mahmud, A; Akoh, S and Tariq, U (2024) Exploring IPD as an antidote to fragmentation within the UK construction sector. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Ahmed, S S (2018) Innovation of building processes in Syria by using BIM. PhD thesis, Czech Technical University, Czech Republic.

Ahmed, T; Hossain, S M and Hossain, M A (2021) Reducing completion time and optimizing resource use of resource-constrained construction operation by means of simulation modeling. International Journal of Construction Management, 21(4), pp. 404-415. ISSN 1562-3599

Aje, O I; Olatunji, O A and Olalusi, O A (2017) Overrun causations under advance payment regimes. Built Environment Project and Asset Management, 7(1), pp. 86-98. ISSN 2044-124X

Akampurira, E and Windapo, A (2019) Key quality attributes of design documentation: South African perspective. Journal of Engineering, Design and Technology, 17(2), pp. 362-382. ISSN 1726-0531

Akeremale, I D (2022) Supply chain management in prefabricated housing construction in Nigeria. PhD thesis, University of Newcastle, Australia.

Akpan, E O P and Igwe, O (2001) Methodology for determining price variation in project execution. Journal of Construction Engineering and Management, 127(5), pp. 367-373. ISSN 0733-9364

Al Ahbabi, M S (2014) Process protocol for the implementation of integrated project delivery in the UAE: A client perspective. PhD thesis, University of Salford, UK.

Al Ahbabi, M S M (2014) Process protocol for the implementation of integrated project delivery in the UAE: a client perspective. PhD thesis, University of Salford, UK.

Al Dinah, M (2022) Coordination issues and unethical practices in comparison with other determinants of delays and cost overruns in the construction industry: how do the participants respond? PhD thesis, University of Portsmouth, UK.

Al Juboori, A A (2021) Exploring project costs estimator practices that increase the budget estimate’s accuracy during the initial phase of construction project’s life cycle. DM thesis, Colorado Technical University, USA.

Al Omari, Mohammad K (2025) Application of the AI-enabled unmanned aerial systems in resolving highway construction claims. PhD thesis, University of Illinois at Chicago, USA.

Al-Derham, H R (1999) The establishment of performance criteria for the evaluation of procurement of senior staff and private housing projects in the State of Qatar. PhD thesis, University of Glamorgan, UK.

Al-Fadhali, N; Zainal, R; Kasim, N; Dodo, M; Kim Soon, N and Hasaballah, A H A (2019) The desirability of integrated influential factors (IIFS) model of internal stakeholder as a panacea to project completion delay in Yemen. International Journal of Construction Management, 19(2), pp. 128-136. ISSN 1562-3599

Al-Gathafi, M M (2005) Riskness of time and cost overruns and the effectiveness of risk response measure strategies in the Libyan construction industry. PhD thesis, University of Liverpool, UK.

Al-Harthi, A S A (2016) Modelling the relationship between client activities and construction procurement performance in Oman. PhD thesis, Loughborough University, UK.

Al-Keim, A (2017) Strategies to reduce cost overruns and schedule delays in construction projects. PhD thesis, Walden University, USA.

Al-Kofahi, Z G; Mahdavian, A and Oloufa, A (2022) System dynamics modeling approach to quantify change orders impact on labor productivity 1: Principles and model development comparative study. International Journal of Construction Management, 22(7), pp. 1355-1366. ISSN 1562-3599

Al-Momani, A H (1996) Construction cost prediction for public school buildings in Jordan. Construction Management and Economics, 14(4), pp. 311-317. ISSN 01446193

Al-Turfi, S (2017) Best practice project management for the sustainable regeneration of Holy Karbala Province in Iraq. PhD thesis, University of Bolton, UK.

Aladağ, H and Işık, Z (2019) Design and construction risks in BOT type mega transportation projects. Engineering, Construction and Architectural Management, 26(10), pp. 2223-2242. ISSN 0969-9988

Alao, O O; Jagboro, G O and Opawole, A (2018) Cost and time implications of abandoned project resuscitation: A case study of educational institutional buildings in Nigeria. Journal of Financial Management of Property and Construction, 23(2), pp. 185-201. ISSN 1366-4387

Albert, I (2020) A lean production approach to materials management in the Nigerian construction industry. PhD thesis, Nelson Mandela University, South Africa.

Albogamy, A and Dawood, N (2015) Development of a client-based risk management methodology for the early design stage of construction processes: Applied to the KSA. Engineering, Construction and Architectural Management, 22(5), pp. 493-515. ISSN 0969-9988

Alenazi, E O N (2018) Using BIM for delay management in public sector construction projects in KSA. PhD thesis, Loughborough University, UK.

Alhalafi, M (2021) Develop a lean project management framework for the construction companies in order to improve the time and cost efficiencies of their construction operations. PhD thesis, De Montfort University, UK.

Alhasan, S; Amoudi, O; Tong, M and Kumar, B (2019) Effectiveness of adopting BIM on quantity surveying profession during the project life cycle. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Alhumayn, S A (2018) Developing a framework for BIM implementation in the saudi arabian construction industry. PhD thesis, University of Wolverhampton, UK.

Alinaitwe, H; Apolot, R and Tindiwensi, D (2013) Investigation into the causes of delays and cost overruns in Uganda's public sector construction projects. Journal of Construction in Developing Countries, 18(2), pp. 33-47. ISSN 1823-6499

Aljohani, A (2019) Cost overrun causality model in Saudi Arabian public sector construction projects. PhD thesis, Robert Gordon University, UK.

Alkaissy, M; Arashpour, M; Zeynalian, M and Li, H (2022) Worksite accident impacts on construction and infrastructure: Nondeterministic analysis of subsectors and organization sizes. Journal of Construction Engineering and Management, 148(6): 04022023, ISSN 0733-9364

Allahaim, Fahad Saud Abdulaziz (2015) Improving cost contingency estimation for infrastructure projects based on the impact of cost overrun causes of similar projects – illustration using Saudi Arabia survey data. PhD thesis, University of Sydney, Australia.

Almarri, K; Boussabaine, H and Al Nauimi, H (2023) The influence of risks on the outturn cost of ICT infrastructure network projects. Construction Innovation, 23(1), pp. 85-104. ISSN 1471-4175

Almeida, Y. and Calejo, R. (2026) Innovation in public works management: Proposal for a performance evaluation model based on cost and deadline indicators. Construction Management and Economics, 44(9), pp. 721-740. ISSN 0144-6193

Alnuaimi, A S; Taha, R A; Al Mohsin, M and Al-Harthi, A S (2010) Causes, effects, benefits, and remedies of change orders on public construction projects in Oman. Journal of Construction Engineering and Management, 136(5), pp. 615-622. ISSN 0733-9364

Alotaibi, A B (2019) Project management: the implication of project management practices on project success in Saudi Arabia. PhD thesis, University of Portsmouth, UK.

Alsahly, F F M (2016) Improving the management of change requests in construction of large building projects in Saudi Arabia. PhD thesis, University of Hull, UK.

Alsamarraie, M M and Ghazali, F (2023) Evaluation of organizational procurement performance for public construction projects: Systematic review. International Journal of Construction Management, 23(14), pp. 2499-2508. ISSN 1562-3599

Alshammari, S A R (2019) Developing a comprehensive construction delay analysis technique. PhD thesis, Brunel University, UK.

Alshboul, O. and Shehadeh, A. (2026) Conflict resolution and negotiation in construction projects using game theory: Achieving win-win outcomes. International Journal of Construction Management, 26(7), pp. 1341-1364. ISSN 1562-3599

Alshdiefat, A S (2018) Developing an assessment model for the adoption of building information modelling to reduce the cost of change orders in the Jordanian construction industry. PhD thesis, University of Salford, UK.

Alshihre, F (2018) Development of a framework for client satisfaction in the Saudi construction industry. PhD thesis, University of Wolverhampton, UK.

Alshorafa, R and Ergen, E (2021) Determining the level of development for BIM implementation in large-scale projects: A multi-case study. Engineering, Construction and Architectural Management, 28(1), pp. 397-423. ISSN 0969-9988

Alsohiman, N K (2017) Modelling variation for improving the management of construction engineering project outcomes in the Kingdom of Saudi Arabia. PhD thesis, University of Liverpool, UK.

Alsulamy, S (2015) Developing a performance measurement framework for municipal construction projects in Saudi Arabia. PhD thesis, Edinburgh Napier University, UK.

Alzanati, A (2021) Complex building construction projects: reducing rework through facilitation of craftspeople's motivation in United Arab Emirates. PhD thesis, Bournemouth University, UK.

Alzara, M (2016) Measuring the construction performance in Saudi Arabia and proposing new procurement model based on BV PIPS (a university case study). PhD thesis, Arizona State University, USA.

Amadi, A (2023) Integration in a mixed-method case study of construction phenomena: From data to theory. Engineering, Construction and Architectural Management, 30(1), pp. 210-237. ISSN 0969-9988

Amadi, A and Higham, A (2016) Geotechnical characterization of cost overrun drivers in highway projects: Predicated on heterogeneous ground conditions in the Niger delta region of Nigeria. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Amadi, A I (2016) Explaining cost overruns in highway projects: a geo-spatial regression modelling and cognitive mapping of latent pathogens and contextual drivers. PhD thesis, University of Salford, UK.

Amadi, A I (2023) Towards methodological adventure in cost overrun research: Linking process and product. International Journal of Construction Management, 23(3), pp. 528-541. ISSN 1562-3599

Amadi, A I (2024) Investigating ground-related design deficiencies as potential triggers to cost overruns in highway projects. Journal of Financial Management of Property and Construction, 29(3), pp. 349-371. ISSN 1366-4387

Amadi, A I and Higham, A (2017) Latent geotechnical pathogens inducing cost overruns in highway projects. Journal of Financial Management of Property and Construction, 22(3), pp. 269-285. ISSN 1366-4387

Amadi, A I and Higham, A (2018) The trickle-down effect of psycho-social constructs and knowledge deficiencies as organizational barriers to cost performance on highway projects. Journal of Financial Management of Property and Construction, 23(1), pp. 57-72. ISSN 1366-4387

Amadi, A I and Higham, A (2019) Putting context to numbers: A geotechnical risk trajectory to cost overrun extremism. Construction Management and Economics, 37(4), pp. 217-237. ISSN 01446193

Amany, A; Taghizade, K and Noorzai, E (2020) Investigating conflicts of expert contractors using the last planner system in building information modeling process. Journal of Engineering, Design and Technology, 18(6), pp. 1381-1402. ISSN 1726-0531

Ameh, O J; Soyingbe, A A and Odusami, K T (2010) Significant factors causing cost overruns in telecommunication projects in Nigeria. Journal of Construction in Developing Countries, 15(2), pp. 49-67. ISSN 1823-6499

Amin, S H (2024) Predictive relationship in time and cost between planning and construction phases in capital projects. DBA thesis, Grand Canyon University, USA.

Amini, S; Rezvani, A; Tabassi, M and Malek Sadati, S S (2023) Causes of cost overruns in building construction projects in Asian countries; Iran as a case study. Engineering, Construction and Architectural Management, 30(7), pp. 2739-2766. ISSN 0969-9988

Amini Khafri, Amin (2018) A framework for forecasting project estimate at completion using historical and current performance data. PhD thesis, University of Alberta, Canada.

Aminorlah, A I; Rahim, N A; Mohamed, Z and Mazlan, A N (2023) Critical delay factors in typical physical projects: The case of the ministry of home affairs in Malaysia. Journal of Construction in Developing Countries, 28(2), pp. 57-79. ISSN 1823-6499

Ammar, T; Abdel-Monem, M and El-Dash, K (2025) Regression-based model predicting cost contingencies for road network projects. International Journal of Construction Management, 25(11), pp. 1273-1287. ISSN 1562-3599

Ampratwum, G; Tam, V W Y and Osei-Kyei, R (2023) Critical analysis of risks factors in using public-private partnership in building critical infrastructure resilience: A systematic review. Construction Innovation, 23(2), pp. 360-382. ISSN 1471-4175

Anastasopoulos, P C; Haddock, J E and Peeta, S (2014) Cost overrun in public-private partnerships: Toward sustainable highway maintenance and rehabilitation. Journal of Construction Engineering and Management, 140(6): 4014018, ISSN 0733-9364

Anastasopoulos, P C; Labi, S; Bhargava, A; Bordat, C and Mannering, F L (2010) Frequency of change orders in highway construction using alternate count-data modeling methods. Journal of Construction Engineering and Management, 136(8), pp. 886-893. ISSN 0733-9364

Ancell, D (2013) Construction studies in higher education and the use of digital technology. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Annamalaisami, C D and Kuppuswamy, A (2022) Reckoning construction cost overruns in building projects through methodological consequences. International Journal of Construction Management, 22(6), pp. 1079-1089. ISSN 1562-3599

Aramali, V; Gibson, G E; El Asmar, M and Sanboskani, H (2023) Novel earned value management system maturity framework and its relation to project performance. Journal of Construction Engineering and Management, 149(6): 04023031, ISSN 0733-9364

Arashida, R. and Horita, M. (2026) A data-driven framework for causal modeling of design change propagation in civil infrastructure. Journal of Construction Engineering and Management, 152(10): 04026158, ISSN 0733-9364

Art Chaovalitwongse, W; Wang, W; Williams, T P and Chaovalitwongse, P (2012) Data mining framework to optimize the bid selection policy for competitively bid highway construction projects. Journal of Construction Engineering and Management, 138(2), pp. 277-286. ISSN 0733-9364

Arun, C (2004) Development of a decision support tool for scheduling highway construction projects based on simulation studies. PhD thesis, Anna University, Chennai, India.

Asadi, R; Rotimi, J O B and Wilkinson, S (2023) Analyzing underlying factors of rework in generating contractual claims in construction projects. Journal of Construction Engineering and Management, 149(6): 04023036, ISSN 0733-9364

Asare, E; Owusu-Manu, D G; Ayarkwa, J; Edwards, D J and Martek, I (2023) Thematic literature review of working capital management in the construction industry: Trends and research opportunities. Construction Innovation, 23(4), pp. 775-791. ISSN 1471-4175

Asiedu, E M and Mkansi, M (2023) Critical factors contributing to budget overruns in Ghana's telecommunication industry construction projects. Journal of Construction in Developing Countries, 28(2), pp. 265-293. ISSN 1823-6499

Asiedu, R O; Adaku, E and Owusu-Manu, D-G (2017) Beyond the causes: Rethinking mitigating measures to avert cost and time overruns in construction projects. Construction Innovation, 17(3), pp. 363-380. ISSN 1471-4175

Asiedu, R O and Ameyaw, C (2021) A system dynamics approach to conceptualise causes of cost overrun of construction projects in developing countries. International Journal of Building Pathology and Adaptation, 39(5), pp. 831-851. ISSN 23984708

Asiedu, R O; Frempong, N K and Alfen, H W (2017) Predicting likelihood of cost overrun in educational projects. Engineering, Construction and Architectural Management, 24(1), pp. 21-39. ISSN 0969-9988

Assaad, R; El-Adaway, I H and Abotaleb, I S (2020) Predicting project performance in the construction industry. Journal of Construction Engineering and Management, 146(5): 04020030, ISSN 0733-9364

Atapattu, C N; Domingo, N and Sutrisna, M (2023) Significant factors affecting the New Zealand transportation infrastructure project cost: quantity surveyors' perception. Built Environment Project and Asset Management, 13(5), pp. 756-777. ISSN 2044-124X

Atapattu, C N; Domingo, N and Sutrisna, M (2024) A conceptual cost estimation model for the pre-design stage of road projects using multiple regression analysis. Journal of Financial Management of Property and Construction, 29(3), pp. 388-404. ISSN 1366-4387

Attalla, M and Hegazy, T (2003) Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression. Journal of Construction Engineering and Management, 129(4), pp. 405-411. ISSN 0733-9364

Attalla, M M A M (2000) Reconstruction of operating facilities: A model for project management. PhD thesis, University of Waterloo, Canada.

Attara, M G (2015) Predicting cost overrun of railroad bridge construction. PhD thesis, Rutgers The State University of New Jersey - New Brunswick, USA.

Awwad, R E (2010) Neutral and risk-sensitive models for competitive bidding methods based on average and order statistics. PhD thesis, University of Michigan, USA.

Aydinli, S (2024) Impact of unexpected conditions on construction cost forecasting performance: evidence from Europe. Construction Management and Economics, 42(9), pp. 787-801. ISSN 01446193

Babazadeh, N; Teizer, J; Bargstädt, H J and Melzner, J (2025) Predictive simulation of construction site noise emissions from heavy equipment. Smart and Sustainable Built Environment, 14(3), pp. 715-739. ISSN 2046-6099

Baghdadi, A M A (2017) The allocation of risks in the Saudi Arabian domestic and regional aviation construction projects. PhD thesis, Robert Gordon University, UK.

Baiden, B K (2006) Framework for the integration of the project delivery team. PhD thesis, Loughborough University, UK.

Baker, L M (1984) A labor market model to manage costs risk in construction project management. PhD thesis, Colorado School of Mines, USA.

Bakhshi Khayani, P (2011) A Bayesian model for controlling cost overrun in a portfolio of construction projects. PhD thesis, Northeastern University, USA.

Balali, A; Moehler, R C and Valipour, A (2022) Ranking cost overrun factors in the mega hospital construction projects using Delphi-swara method: An Iranian case study. International Journal of Construction Management, 22(13), pp. 2577-2585. ISSN 1562-3599

Ballal, T M A (1999) The use of artificial neural networks for modelling buildability in preliminary structural design. PhD thesis, Loughborough University, UK.

Ballesteros-Pérez, P; Sanz-Ablanedo, E; Soetanto, R; González-Cruz, M C; Larsen, G D and Cerezo-Narváez, A (2020) Duration and cost variability of construction activities: An empirical study. Journal of Construction Engineering and Management, 146(1): 04019093, ISSN 0733-9364

Ballesteros-Pérez, P; del Campo-Hitschfeld, M L; González-Naranjo, M A and González-Cruz, M C (2015) Climate and construction delays: Case study in Chile. Engineering, Construction and Architectural Management, 22(6), pp. 596-621. ISSN 0969-9988

Bayandor, S; Kalatehjari, R; Akherati, R and Kasebzadeh, J (2025) Causes, effects and solutions of delay and cost overruns in Iranian deep excavation projects. Built Environment Project and Asset Management, 15(2), pp. 309-336. ISSN 2044-124X

Bayram, S and Al-Jibouri, S (2018) Cost forecasting using RCF: A case study for planning public building projects costs in Turkey. International Journal of Construction Management, 18(5), pp. 405-417. ISSN 1562-3599

Bhargava, A (2009) A probabilistic evaluation of highway project costs. PhD thesis, Purdue University, USA.

Bhargava, A; Anastasopoulos, P C; Labi, S; Sinha, K C and Mannering, F L (2010) Three-stage least-squares analysis of time and cost overruns in construction contracts. Journal of Construction Engineering and Management, 136(11), pp. 1207-1218. ISSN 0733-9364

Boateng, P; Ahiaga-Dagbui, D; Chen, Z and Ogunlana, S (2015) Modelling economic risks in megaproject construction: A systemic approach. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Bonilla, M; Castelblanco, G and Rasdorf, W (2026) The paradox of project performance: The role of procurement, contextual, and contractor-related factors. Journal of Construction Engineering and Management, 152(6): 04026062, ISSN 0733-9364

Braimah, N (2008) An investigation into the use of construction delay and disruption analysis methodologies. PhD thesis, University of Wolverhampton, UK.

Brunes, F (2015) Essays on behavioural economics and cost overuns. PhD thesis, KTH Royal Institute of Technology, Sweden.

Calahorra Jiménez, M I (2020) Advancing knowledge of design-build and best-value in highway projects. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.

Calzadilla, E; Awinda, K and Parkin, A (2012) An examination of the risk management process in Venezuelan construction projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Cantarelli, C C (2011) Cost overruns in large-scale transport infrastructure projects: A theoretical and empirical exploration for the Netherlands and worldwide. PhD thesis, Delft University of Technology, Netherlands.

Cao, Q; Zou, X and Zhang, L (2022) Multiobjective robust optimization model for generating stable and makespan-protective repetitive schedules. Journal of Construction Engineering and Management, 148(9): 04022099, ISSN 0733-9364

Cepeda, D M; Sohail, M and Ogunlowo, O O (2018) Understanding the critical success factors for delivery of megaprojects in Colombia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(2), pp. 45-57. ISSN 17514304

Chadee, A A; Martin, H; Chadee, X T; Bahadoorsingh, S and Olutoge, F (2023) Root cause of cost overrun risks in public sector social housing programs in sids: Fuzzy synthetic evaluation. Journal of Construction Engineering and Management, 149(11): 04023106, ISSN 0733-9364

Chamikara, K L; Perera, B A K S; Raigama Acharige, D P and Ekanayake, B (2026) Adaptability of BIM technology to mitigate the cost overruns in design and build projects. Construction Innovation, 26(2), pp. 464-490. ISSN 1471-4175

Champion, R (2005) Acceleration in construction and engineering contracts. PhD thesis, University of London, UK.

Chan, P L (2004) Critical success factors for delivering healthcare projects in Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chaphalkar, N and Iyer, K C (2014) Factors influencing decisions on delay claims in construction contracts for Indian scenario. Construction Economics and Building, 14(1), pp. 32-44. ISSN 2204-9029

Chaphalkar, N B (2007) Expert system for resolution of delay claims in construction contracts. PhD thesis, Indian Institute of Technology Delhi, India.

Charles, S P R; Wanigarathna, N and Sherratt, F (2015) Construction project change: Investigating cost and benefits. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Che Haron, R (2017) Systems thinking paradigm in construction cost estimating reliability. PhD thesis, University of Reading, UK.

Chen, J. H.; Shen, L. and Yu, T. (2026) Predicting manpower allocation for landscape construction projects using xgboost and shap. Engineering, Construction and Architectural Management, pp. 1-19. ISSN 0969-9988

Chen, J. H.; Shen, L. and Yu, T. (2026) Predicting manpower allocation for landscape construction projects using xgboost and shap. Engineering, Construction and Architectural Management, pp. 1-19. ISSN 0969-9988

Chen, C (2015) A proactive approach for change management and control on construction projects. PhD thesis, University of California, Berkeley, USA.

Chen, Q; Jin, Z; Xia, B; Wu, P and Skitmore, M (2016) Time and cost performance of design-build projects. Journal of Construction Engineering and Management, 142(2): 04015074, ISSN 0733-9364

Chen, Qian (2020) A systematic approach to enabling digital supply chain coordination in construction projects. PhD thesis, ETH Zürich, Switzerland.

Chen, S (2013) Scheduling, contracting, and capacity planning in project-based supply chains. PhD thesis, Stanford University, USA.

Cheng, Y H and Hong, W T (2025) An analytical research tool for monitoring stakeholder conflicts in public-private partnership project delivery. Construction Management and Economics, 43(12), pp. 1060-1079. ISSN 0144-6193

Chileshe, N; Reza Hosseini, M and Jepson, J (2016) Critical barriers to implementing risk assessment and management practices in the Iranian construction sector. Journal of Construction in Developing Countries, 21(2), pp. 81-112. ISSN 1823-6499

Chinanuwatwong, S (1998) Scheduling overtime in construction using time-cost trade-off. PhD thesis, University of Texas at Austin, USA.

Choi, Seogjae (2024) Addressing material-related issues in industrial construction projects: The state of supplier involvement in project planning and the barriers to information sharing. PhD thesis, University of Texas at Austin, USA.

Choudhry, R M; Aslam, M A and Arain, F M (2014) Cost and schedule risk analysis of bridge construction in Pakistan: Establishing risk guidelines. Journal of Construction Engineering and Management, 140(7): 04014020, ISSN 0733-9364

Chritamara, S; Ogunlana, S O and Bach, N L (2002) System dynamics modeling of design and build construction projects. Construction Innovation, 2(4), pp. 269-295. ISSN 1471-4175

Chung, K-H J (2010) Development of a collaborative briefing approach for infrastructure projects in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.

Cirelli Jr., L R (2017) Impact of design fees and duration of design process on construction quality: Implications for quality management. PhD thesis, Baker College (Michigan), USA.

Coffie, G H (2018) Development of a cost-predicting model for construction projects in Ghana. PhD thesis, University of Johannesburg, South Africa.

Condon, E J (2006) The project game: Strategic estimating on major projects. PhD thesis, University of Calgary, Canada.

Creedy, G D (2006) Risk factors leading to cost overrun in the delivery of highway construction projects. PhD thesis, Queensland University of Technology, Australia.

Creedy, G D; Skitmore, M and Wong, J K W (2010) Evaluation of risk factors leading to cost overrun in delivery of highway construction projects. Journal of Construction Engineering and Management, 136(5), pp. 528-537. ISSN 0733-9364

Cristaudo, Rossana (2018) Essays on cost overruns in infrastructure provision. PhD thesis, Università degli Studi di Messina, Italy.

Dada, J O and Jagboro, G O (2007) An evaluation of the impact of risk on project cost overrun in the Nigerian construction industry. Journal of Financial Management of Property and Construction, 12(1), pp. 37-44. ISSN 1366-4387

Dada, M O (2014) The influence of project team relationships on cost growth. Journal of Financial Management of Property and Construction, 19(1), pp. 76-94. ISSN 1366-4387

Daoud, A. O.; Lal, R.; Gouda Mohamed, A.; Mohamed, M. and Wefki, H. (2026) An implementation framework for blockchain and smart contracts adoption in the egyptian construction sector. International Journal of Construction Management, 26(9), pp. 1707-1726. ISSN 1562-3599

Daoud, O E K (1997) The architect/engineer's role in rehabilitation work. Journal of Construction Engineering and Management, 123(1), pp. 1-5. ISSN 0733-9364

Datta, S D; Sobuz, M H R; Nafe Assafi, M; Sutan, N M; Islam, M N; Mannan, M B; Akid, A S M and Hasan, N M S (2025) Critical project management success factors analysis for the construction industry of Bangladesh. International Journal of Building Pathology and Adaptation, 43(3), pp. 482-511. ISSN 2398-4708

Davies, John P (2009) Alliance contracts and public sector governance. PhD thesis, Griffith University, Australia.

Dağkıran, G (2015) A multi agent risk analysis and sharing platform for international construction projects. PhD thesis, Middle East Technical University, Turkey.

De Ridder, H A J (1994) Design and construct of complex civil engineering systems: A new approach to organization and contracts. PhD thesis, Delft University of Technology, Netherlands.

Debella, F M (2020) Profitability improvement of construction firms through continuous improvement using rapid improvement principles and best practices. PhD thesis, Purdue University, USA.

Deep, S; Bhoola, V; Vidhani, J and Hampannaver, P R (2022) Evaluating the impact of constraints on project success: Empirical study of highway projects. Built Environment Project and Asset Management, 12(4), pp. 684-700. ISSN 2044-124X

Deepa, G; Niranjana, A J and Balu, A S (2025) A hybrid machine learning approach for early cost estimation of pile foundations. Journal of Engineering, Design and Technology, 23(1), pp. 306-322. ISSN 1726-0531

Delaney, J W (2018) The effect of competition on bid quality and final results on state dot projects. PhD thesis, State University of New York at Buffalo, USA.

Delatte, N J (2017) Challenges of civil engineering megaprojects in North America. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(4), pp. 161-166. ISSN 17514304

Deng, B; Lv, X; Du, Y; Li, X and Yin, Y (2025) Critical risk factors for construction supply chain in China: A fuzzy synthetic evaluation analysis. Engineering, Construction and Architectural Management, 32(1), pp. 483-506. ISSN 0969-9988

Di Maddaloni, F (2018) Stakeholder inclusiveness in megaprojects: Managing the locals for sustainable developments. PhD thesis, Kingston University, UK.

Diyagama, D; Victar, H C; Waidyasekara, A S and Rameezdeen, R (2024) Managing external stakeholders influences in mega construction projects. International Journal of Construction Management, 24(8), pp. 809-819. ISSN 1562-3599

Doloi, H (2008) Application of AHP in improving construction productivity from a management perspective. Construction Management and Economics, 26(8), pp. 841-854. ISSN 01446193

Doloi, H (2013) Cost overruns and failure in project management: Understanding the roles of key stakeholders in construction projects. Journal of Construction Engineering and Management, 139(3), pp. 267-279. ISSN 0733-9364

Dosumu, O (2018) Assessment of the likelihood of risk occurrence on tendering and procurement of construction projects. Journal of Construction Business and Management, 2(1), pp. 20-32. ISSN 2521-0165

Dzitouo, M (2024) Project performance of relational contracting: A critical success factors perspective. PhD thesis, Capella University, USA.

Ebekozien, A; Aigbavboa, C O; Thwala, W D; Hafez, M A and Samsurijan, M S (2024) Sustainable development goals under threat: the impact of inflation on construction projects. Engineering, Construction and Architectural Management, 31(13), pp. 323-341. ISSN 0969-9988

Edison, J C and Singla, H K (2020) Development of a scale for factors causing delays in infrastructure projects in India. Construction Economics and Building, 20(1), pp. 36-55. ISSN 2204-9029

Efebeli, T V (2021) Strategies for reducing project cost overruns in the oil and gas construction industry. PhD thesis, Walden University, USA.

Eizakshiri, F; Chan, P W and Emsley, M (2011) Delays, what delays? A critical review of the literature on delays in construction. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Eke, G (2017) Determining the probability distributions of cost and time overrun arising from different contractor selection strategies in construction projects. PhD thesis, Aston University, UK.

El-Kelesh, A M and Hassan, D A (2023) Impact of ground conditions and excavation depth on selection of excavation support system. International Journal of Construction Management, 23(15), pp. 2539-2550. ISSN 1562-3599

El-Kholy, A M (2021) Exploring the best ANN model based on four paradigms to predict delay and cost overrun percentages of highway projects. International Journal of Construction Management, 21(7), pp. 694-712. ISSN 1562-3599

ElAlem, M A; Mahdi, I M; Mohamadien, H A and Hosny, S (2025) Forecasting scope creep in Egyptian construction projects: An evaluation using artificial neural network (ANN) and random forest models. International Journal of Construction Management, 25(16), pp. 2082-2101. ISSN 1562-3599

Elazhary, M. and El-Adaway, I. H. (2026) Managing risks under nuclear power plant projects: A latent similarity-guided contract customization. Journal of Construction Engineering and Management, 152(7): 04026089, ISSN 0733-9364

Ellis, L; Martin, H and Ramcharitar, S (2019) Factors influencing triple constraints in public sector projects in Trinidad and Tobago. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(4), pp. 157-169. ISSN 17514304

Emere, C E (2024) An integrated sustainable building construction model for project delivery in South Africa. PhD thesis, University of Johannesburg, South Africa.

Emuze, F and Ravu, P (2014) Optimism bias, pathogens and cost overrun: The case of an RTS project in South Africa. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Emuze, F and Smallwood, J J (2012) Bridging public works project performance gaps in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(2), pp. 111-118. ISSN 17514312

Enshassi, A; Al-Najjar, J and Kumaraswamy, M (2009) Delays and cost overruns in the construction projects in the Gaza Strip. Journal of Financial Management of Property and Construction, 14(2), pp. 126-151. ISSN 1366-4387

Enshassi, A; Kumaraswamy, M and Jomah, A N (2010) Significant factors causing time and cost overruns in construction projects in the Gaza Strip: Contractors' perspective. International Journal of Construction Management, 10(1), pp. 35-60. ISSN 1562-3599

Enshassi, M S A; Walbridge, S; West, J S and Haas, C T (2020) Dynamic and proactive risk-based methodology for managing excessive geometric variability issues in modular construction projects using Bayesian theory. Journal of Construction Engineering and Management, 146(2): 04019096, ISSN 0733-9364

Eriksson, T and Kadefors, A (2012) Trust, control and knowledge integration in a rock tunnel project. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Eybpoosh, M; Dikmen, I and Birgonul, M T (2011) Identification of risk paths in international construction projects using structural equation modeling. Journal of Construction Engineering and Management, 137(12), pp. 1164-1175. ISSN 0733-9364

Famiyeh, S; Amoatey, C T; Adaku, E and Agbenohevi, C S (2017) Major causes of construction time and cost overruns: A case of selected educational sector projects in Ghana. Journal of Engineering, Design and Technology, 15(2), pp. 181-198.

Fang, Y and Ng, S T (2019) Genetic algorithm for determining the construction logistics of precast components. Engineering, Construction and Architectural Management, 26(10), pp. 2289-2306. ISSN 0969-9988

Farshchian, M M and Heravi, G (2018) Probabilistic assessment of cost, time, and revenue in a portfolio of projects using stochastic agent-based simulation. Journal of Construction Engineering and Management, 144(5): 4018028, ISSN 0733-9364

Feldbauer, R R (2019) Mindful project management: a framework to enhance underperformance managing large hospital builds by incorporating principles adapted from High Reliability Organizations. PhD thesis, University of Liverpool, UK.

Frimpong, Y and Oluwoye, J (2003) Significant factors causing delay and cost overruns in construction of groundwater projects in Ghana. Journal of Construction Research, 4(2), pp. 175-187. ISSN 1609-9451

Fu, Y (2019) Organizational governance and value creation: An empirical study in megaproject contexts. PhD thesis, University of Manchester, UK.

Funches Allen, Dawn (2025) Analyzing factors that contribute to cost overruns on department of defense (dod) contractor programs. DEngr thesis, George Washington University, USA.

Fung, W P (2015) Building information modeling (BIM) capabilities in quantity surveying practice during pre-construction stage: The relationship with project performance. PhD thesis, University of Malaya, Malaysia.

Gao, N and Touran, A (2020) Cost overruns and formal risk assessment program in US rail transit projects. Journal of Construction Engineering and Management, 146(5): 05020004, ISSN 0733-9364

Garcia-Lopez, N P (2017) An activity and flow-based construction model for managing on-site work. PhD thesis, Stanford University, USA.

Gashaw, T and Jilcha, K (2023) Design risk modeling and analysis for railway construction projects. International Journal of Construction Management, 23(14), pp. 2488-2498. ISSN 1562-3599

George, K M (2019) Key performance indicators' effects on public sector infrastructure project efficiency in Grenada. DPA thesis, Walden University, USA.

Ghadamsi, A (2016) Investigating the influence of procurement method selection on project performance in Libya. PhD thesis, Brunel University, UK.

Gharaibeh, H M (2013) Managing the cost of power transmission projects: Lessons learned. Journal of Construction Engineering and Management, 139(8), pp. 1063-1067. ISSN 0733-9364

Ghattas, R T (2018) Stakeholder perceptions of how to diminish cost overruns in large, United States government-financed construction projects under earned value management: A multiple case study. DBA thesis, Northcentral University, USA.

Ghazal, M M and Hammad, A (2022) Application of knowledge discovery in database (KDD) techniques in cost overrun of construction projects. International Journal of Construction Management, 22(9), pp. 1632-1646. ISSN 1562-3599

Gherbal, N E M (2015) The influence and evaluation of the project manager's performance in the Libyan construction industry. PhD thesis, Coventry University, UK.

Gkritza, K and Labi, S (2008) Estimating cost discrepancies in highway contracts: Multistep econometric approach. Journal of Construction Engineering and Management, 134(12), pp. 953-962. ISSN 0733-9364

Godawatte, G A G R (2021) Understanding the cost overrun causation in construction megaprojects: a grounded systems thinking approach. PhD thesis, Heriot-Watt University, UK.

Good, Tammy L (2023) Manager performance on public construction projects: A descriptive analysis study. DBA thesis, Keiser University (Florida), USA.

Greenwood, D J; Osborne, A N and Aggiag, M A (2001) A comparative analysis of administrative delays in hospital buildings. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Gunduz, M; Abumoza, A M and Aly, A A (2023) A structural equation model to assess the effects of strategic and project related potential risks on project delivery in qatar. Engineering, Construction and Architectural Management, 30(10), pp. 4782-4820. ISSN 0969-9988

Guo, H (2009) Rethinking construction project management using the VP-based manufacturing management model. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Gómez-Cabrera, A; Gutierrez-Bucheli, L and Muñoz, S (2024) Causes of time and cost overruns in construction projects: A scoping review. International Journal of Construction Management, 24(10), pp. 1107-1125. ISSN 1562-3599

Hagan, G; Bower, D and Smith, N (2011) Managing complex projects in multi-project environments. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Hagan, G N (2013) Managing complex construction projects in it multiproject environment by the contractor. PhD thesis, University of Leeds, UK.

Haidar, A (2011) Analysis and optimization of megaproject performance. PhD thesis, University of Florida, USA.

Hajarolasvadi, H and Shahhosseini, V (2022) A system-dynamic model for evaluating the effect of person-team fit on project performance. Journal of Construction Engineering and Management, 148(11): 04022126, ISSN 0733-9364

Haller, M; Lu, W; Stehn, L and Jansson, G (2015) An indicator for superfluous iteration in offsite building design processes. Architectural Engineering and Design Management, 11(5), pp. 360-375. ISSN 1745-2007

Hamide, M (2017) Schedule and cost performance analysis and prediction in Louisiana DOTD. PhD thesis, University of New Orleans, USA.

Hamouda, H and Abu-Shaaban, N (2014) Enhancing labour productivity within construction industry through analytical hierarchy process, the case of Gaza Strip. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Han, K; Degol, J and Golparvar-Fard, M (2018) Geometry- and appearance-based reasoning of construction progress monitoring. Journal of Construction Engineering and Management, 144(2): 04017110, ISSN 0733-9364

Han, S; Lee, S and Peña-Mora, F (2012) Identification and quantification of non-value-adding effort from errors and changes in design and construction projects. Journal of Construction Engineering and Management, 138(1), pp. 98-109. ISSN 0733-9364

Hanif, H; Khurshid, M B; Lindhard, S M and Aslam, Z (2016) Impact of variation orders on time and cost in mega hydropower projects of Pakistan. Journal of Construction in Developing Countries, 21(2), pp. 37-53. ISSN 1823-6499

Hanna, A S (2012) Using the earned value management system to improve electrical project control. Journal of Construction Engineering and Management, 138(3), pp. 449-457. ISSN 0733-9364

Hassan, F U; Le, T and Lv, X (2021) Addressing legal and contractual matters in construction using natural language processing: A critical review. Journal of Construction Engineering and Management, 147(9): 03121004, ISSN 0733-9364

Heaton, R; Martin, H; Chadee, A; Milling, A; Dunne, S and Borthwick, F (2022) The construction materials conundrum: Practical solutions to address integrated supply chain complexities. Journal of Construction Engineering and Management, 148(8): 04022071, ISSN 0733-9364

Hegazy, T and Moselhi, O (1994) Estimator: A prototype of an integrated bid preparation system. Engineering, Construction and Architectural Management, 1(1), pp. 51-67. ISSN 0969-9988

Heravi, G and Mohammadian, M (2021) Investigating cost overruns and delay in urban construction projects in Iran. International Journal of Construction Management, 21(9), pp. 958-968. ISSN 1562-3599

Hijazi, S A (2016) Developing a framework to enhance building handover practices in public sector construction projects in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.

Hlaing, N N; Singh, D; Tiong, R L K and Ehrlich, M (2008) Perceptions of Singapore construction contractors on construction risk identification. Journal of Financial Management of Property and Construction, 13(2), pp. 85-95. ISSN 1366-4387

Hong, Y; Xie, H; Agapaki, E and Brilakis, I (2023) Graph-based automated construction scheduling without the use of BIM. Journal of Construction Engineering and Management, 149(2): 05022020, ISSN 0733-9364

Hoque, M I; Safayet, M A; Rana, M J; Bhuiyan, A Y and Quraishy, G S (2023) Analysis of construction delay for delivering quality project in Bangladesh. International Journal of Building Pathology and Adaptation, 41(2), pp. 401-421. ISSN 23984708

Hu, M and Skibniewski, M (2022) The impact of the design team characteristics on the sustainable building construction cost: Structural equation model analysis. Architectural Engineering and Design Management, 18(5), pp. 614-630. ISSN 1745-2007

Huang, B (2017) A hierarchical multi-stakeholder principal-agent model for (anti-) corruption in public infrastructure procurement. PhD thesis, Cornell University, USA.

Huo, T; Ren, H; Cai, W; Shen, G Q; Liu, B; Zhu, M and Wu, H (2018) Measurement and dependence analysis of cost overruns in megatransport infrastructure projects: Case study in Hong Kong. Journal of Construction Engineering and Management, 144(3): 05018001, ISSN 0733-9364

Huynh, H T (2021) Game theory applications in construction project management. PhD thesis, Catholic University of America, USA.

Hwang, S; Blay, K; Osmani, M and Wang, M (2026) Blockchain-integrated relational project governance. Journal of Construction Engineering and Management, 152(3): 04026003, ISSN 0733-9364

Hwang, B G; Shan, M; Zhu, L and Lim, W C (2020) Cost control in megaprojects: Efficacy, tools and techniques, key knowledge areas and project comparisons. International Journal of Construction Management, 20(5), pp. 437-449. ISSN 1562-3599

Hwang, B G and Yang, S (2014) Rework and schedule performance: A profile of incidence, impact, causes and solutions. Engineering, Construction and Architectural Management, 21(2), pp. 190-205. ISSN 0969-9988

Ibironke, O T; Oladinrin, T O; Adeniyi, O and Eboreime, I V (2013) Analysis of non-excusable delay factors influencing contractors' performance in Lagos State, Nigeria. Journal of Construction in Developing Countries, 18(1), pp. 53-72. ISSN 1823-6499

Ibrahim, M W W (2018) Improving project performance by mitigating out-of-sequence work and assessing construction readiness. PhD thesis, University of Wisconsin - Madison, USA.

Ibrahim Khil, Mohammad Hashim (2025) Automated construction progress monitoring of buildings through mobile mapping and as-built modeling. PhD thesis, University of New South Wales, Australia.

Idoro, G I (2012) Influence of project plans on the outcome of construction projects procured by design-build in Nigeria. Journal of Construction in Developing Countries, 17(2), pp. 81-103. ISSN 1823-6499

Idoro, G I (2012) The influence of project documents on the outcome of construction projects procured by traditional contracts in Nigeria. Journal of Construction in Developing Countries, 17(1), pp. 1-19. ISSN 1823-6499

Igwe, U S; Mohamed, S F; Azwarie, M B M D; Nwofia, C M and Ihekweme, N M (2025) Assessment of post contract cost control issues in Nigeria: Quantity surveyors' perspective. International Journal of Construction Management, 25(14), pp. 1725-1735. ISSN 1562-3599

Inti, S (2016) A decision making approach for selection of sustainable pavements in Texas by integrating life cycle cost analysis (LCCA), life cycle assessment (LCA) of environmental and social impacts. PhD thesis, University of Texas at El Paso, USA.

Irfan, M; Malik, M S A and Kaka Khel, S S U H (2020) Effect of factors of organizational structure influencing nonphysical waste in road projects of developing countries. Engineering, Construction and Architectural Management, 27(10), pp. 3135-3153. ISSN 0969-9988

Iroroakpo, G I (2007) A comparative study of direct labour and design-tender-construct procurement systems in Nigeria. PhD thesis, University of Lagos, Nigeria.

Isah, M A and Kim, B S (2025) Question-answering system powered by knowledge graph and generative pretrained transformer to support risk identification in tunnel projects. Journal of Construction Engineering and Management, 151(1): 04024193, ISSN 0733-9364

Islam, M S; Mohandes, S R; Mahdiyar, A; Fallahpour, A and Olanipekun, A O (2022) A coupled genetic programming Monte Carlo simulation-based model for cost overrun prediction of thermal power plant projects. Journal of Construction Engineering and Management, 148(8): 04022073, ISSN 0733-9364

Islam, M S; Nepal, M and Skitmore, M (2025) Structuring risks for a comprehensive understanding of cost overruns in power plant projects. Construction Innovation, 25(3), pp. 1014-1032. ISSN 1471-4175

Islam, M S; Nepal, M P and Skitmore, M (2019) Modified fuzzy group decision-making approach to cost overrun risk assessment of power plant projects. Journal of Construction Engineering and Management, 145(2): 04018126, ISSN 0733-9364

Islam, M S; Salem, M; Tantawy, M and Salah, M (2024) Cost overrun risk assessment for healthcare projects: A modified fuzzy group decision-making approach. Journal of Construction Engineering and Management, 150(12): 04024168, ISSN 0733-9364

Islam, Muhammad Saiful (2019) Modelling cost overrun risks in power plant projects. PhD thesis, Queensland University of Technology, Australia.

Ismail, M Z; Mohamad Ramly, Z; Darmansah, N F and Misnan, M S (2025) Rail construction cost risk management with bow-tie analysis: Contractor’s perspective. Built Environment Project and Asset Management, 15(4), pp. 753-771. ISSN 2044-124X

Iyer, K C and Jha, K N (2003) Analysis of critical coordination activities of Indian construction projects. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Iyer, K C and Sagheer, M (2010) Hierarchical structuring of PPP risks using interpretative structural modeling. Journal of Construction Engineering and Management, 136(2), pp. 151-159. ISSN 0733-9364

Jackson, S (2002) Project cost overruns and risk management. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Jadhav, Ajay (2023) Development of scope of services for procurement of professional consultant services on transportation projects: A study of South carolina department of transportation. PhD thesis, Clemson University, USA.

Jain, R and Prakash, O (2024) Optimizing contractor's accruals under conditions of penalty imposition due to unforeseen delays. International Journal of Construction Management, 24(8), pp. 854-866. ISSN 1562-3599

Javid, M and Seneviratne, P N (2000) Investment risk analysis in airport parking facility development. Journal of Construction Engineering and Management, 126(4), pp. 298-305. ISSN 0733-9364

Jayasuriya, S; Zhang, G and Jing Yang, R (2019) Challenges in public private partnerships in construction industry: A review and further research directions. Built Environment Project and Asset Management, 9(2), pp. 172-185. ISSN 2044-124X

Jennings, W (2012) Why costs overrun: Risk, optimism and uncertainty in budgeting for the London 2012 Olympic Games. Construction Management and Economics, 30(6), pp. 455-462. ISSN 1466433X

Jiang, Ziang (2025) Advancing scan-vs-bim in progress monitoring of infrastructure construction. PhD thesis, University of New South Wales, Australia.

Jiang, Ziang (2025) Advancing scan-vs-BIM in progress monitoring of infrastructure construction. PhD thesis, University of New South Wales, Australia.

Johnson, A; Rotimi, J O B and Wilkinson, S (2021) An evaluation of risk factors impacting project budget performance in New Zealand. Journal of Engineering, Design and Technology, 19(1), pp. 41-61. ISSN 1726-0531

Johnson, R M and Babu, R I I (2020) Time and cost overruns in the UAE construction industry: A critical analysis. International Journal of Construction Management, 20(5), pp. 402-411. ISSN 1562-3599

Joukar, A (2016) Analysis and management of the price volatility in the construction industry. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Kakar, A S; Hasan, A; Jha, K N and Singh, A (2024) Project cost performance factors in the war-affected and conflict-sensitive Afghan construction industry. Journal of Engineering, Design and Technology, 22(5), pp. 1570-1590. ISSN 1726-0531

Kalu, T C U (1990) New approach to construction management. Journal of Construction Engineering and Management, 116(3), pp. 494-513. ISSN 0733-9364

Kamal, A; Abas, M; Khan, D and Azfar, R W (2022) Risk factors influencing the building projects in Pakistan: From perspective of contractors, clients and consultants. International Journal of Construction Management, 22(6), pp. 1141-1157. ISSN 1562-3599

Kaming, P F; Olomolaiye, P O; Holt, G D and Harris, F C (1997) Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics, 15(1), pp. 83-94. ISSN 01446193

Kang, Y; Kim, C; Son, H; Lee, S and Limsawasd, C (2013) Comparison of preproject planning for green and conventional buildings. Journal of Construction Engineering and Management, 139(11): 4013018, ISSN 0733-9364

Kapambwe, F C (2003) An evaluation of the implications of equity foreign direct investment risks in BOT infrastructure projects for overseas contractors in sub-Saharan Africa. PhD thesis, University of Reading, UK.

Kar, S and Jha, K N (2019) Assessment of criticality of materials in a construction project. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Kar, S and Jha, K N (2022) Assessing criticality of construction materials for prioritizing their procurement using ANP-TOPSIS. International Journal of Construction Management, 22(10), pp. 1852-1862. ISSN 1562-3599

Karimi, H (2017) Quantitative analysis of the impact of craft labor availability on construction project performance. PhD thesis, University of Kentucky, USA.

Karimi, H; Taylor, T R B; Dadi, G B; Goodrum, P M and Srinivasan, C (2018) Impact of skilled labor availability on construction project cost performance. Journal of Construction Engineering and Management, 144(7): 04018057, ISSN 0733-9364

Kazar, G; Mutlu, U and Tokdemir, O B (2023) Development of zero-based budgeting approach for multinational construction contractors. Engineering, Construction and Architectural Management, 30(10), pp. 5217-5232. ISSN 0969-9988

Khalafallah, A and Shalaby, Y (2019) Change orders: Automating comparative data analysis and controlling impacts in public projects. Journal of Construction Engineering and Management, 145(11): 04019064, ISSN 0733-9364

Khalifa, R I (2019) Evaluating project assessment techniques for high-profile transportation projects development and delivery: Case of state departments of transportation (DOTS) in the United States. PhD thesis, Portland State University, USA.

Khan, Mona (2025) System of systems framework for structured risk analysis in complex engineering projects involving alliance. PhD thesis, RMIT University, Australia.

Khazaeni, G and Khazaeni, A (2026) Multi-objective optimal allocation of construction project risks, ant colony optimization algorithm. International Journal of Building Pathology and Adaptation, 44(1), pp. 208-222. ISSN 2398-4708

Kheel, M (2024) The impact of risk and uncertainty on healthcare project delivery and its effect on intra-group conflict in the context of Saudi Arabia. PhD thesis, University of Manchester, UK.

Kian Manesh Rad, E (2016) Development of a project complexity assessment method for energy megaprojects. PhD thesis, Heriot-Watt University, UK.

Kim, B C and Reinschmidt, K F (2011) Combination of project cost forecasts in earned value management. Journal of Construction Engineering and Management, 137(11), pp. 958-966. ISSN 0733-9364

Kim, D Y; Han, S H and Kim, H (2008) Discriminant analysis for predicting ranges of cost variance in international construction projects. Journal of Construction Engineering and Management, 134(6), pp. 398-410. ISSN 0733-9364

Kim, J I (2016) Framework for dynamic generation and evaluation of excavation schedules for hard rock tunnels in preconstruction and construction. PhD thesis, Stanford University, USA.

Kim, J J; Miller, J A and Kim, S (2020) Cost impacts of change orders due to unforeseen existing conditions in building renovation projects. Journal of Construction Engineering and Management, 146(8): 04020094, ISSN 0733-9364

Kim, J-J (1993) A work package-based process model for petrochemical construction planning. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kiziltas, S (2008) An automated approach for developing integrated model-based construction project histories to support estimation of activity production rates. PhD thesis, Carnegie Mellon University, USA.

Knight, K and Fayek, A R (2002) Use of fuzzy logic for predicting design cost overruns on building projects. Journal of Construction Engineering and Management, 128(6), pp. 503-512. ISSN 0733-9364

Ko, C H and Chung, N F (2014) Lean design process. Journal of Construction Engineering and Management, 140(6): 4014011, ISSN 0733-9364

Koch, C (2012) Contested overruns and performance of offshore wind power plants. Construction Management and Economics, 30(8), pp. 609-622. ISSN 1466433X

Koch, C (2017) Reduction or revaluing in cost constrained design? -reverse innovation conceptualized. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Koirala, M P; Thapa, N; Giri, O P and Sha, R K (2025) Evaluation of variation orders on road construction projects in rural Nepal. Construction Economics and Building, 25(3-4), pp. 311-338. ISSN 2204-9029

Kometa, S T; Olomolaiye, P O and Harris, F C (1994) Attributes of UK construction clients influencing project consultants' performance. Construction Management and Economics, 12(5), pp. 433-443. ISSN 01446193

Koushki, P A; Al-Rashid, K and Kartam, N (2005) Delays and cost increases in the construction of private residential projects in Kuwait. Construction Management and Economics, 23(3), pp. 285-294. ISSN 01446193

Koushki, P A and Kartam, N (2004) Impact of construction materials on project time and cost in Kuwait. Engineering, Construction and Architectural Management, 11(2), pp. 126-132. ISSN 0969-9988

Kuoribo, E; Yomoah, R; Owusu-Manu, D G; Acheampong, A; John Edwards, D and Debrah, C (2023) Assessing the interactive effects of the ethics of construction professionals on project performance in the Ghanaian construction industry. Engineering, Construction and Architectural Management, 30(10), pp. 5233-5252. ISSN 0969-9988

Kurniawan, F; Ogunlana, S and Motawa, I (2014) Stakeholders' expectations in utilising financial models for public-private partnership projects. Built Environment Project and Asset Management, 4(1), pp. 4-21. ISSN 2044-124X

Kuttantharappel Soman, R (2020) Automated look-ahead schedule generation using linked-data based constraint checking for construction projects. PhD thesis, Imperial College London, UK.

Kwafo, D G (2021) Strategies for improving performance of project managers in Ghana to reduce delays. PhD thesis, Walden University, USA.

Kwon, N; Park, M; Lee, H S; Ahn, J and Kim, S (2017) Construction noise prediction model based on case-based reasoning in the preconstruction phase. Journal of Construction Engineering and Management, 143(6): 04017008, ISSN 0733-9364

Kwon, N; Park, M; Lee, H S; Ahn, J and Shin, M (2016) Construction noise management using active noise control techniques. Journal of Construction Engineering and Management, 142(7): 4016014, ISSN 0733-9364

Lambert, E L (2015) Complex factors related to capital construction project success: A case study. PhD thesis, Capella University, USA.

Laura-Portugal, C. and Hammad, A. (2026) Deep learning-based forecasting for construction project duration at completion. International Journal of Construction Management, 26(8), pp. 1543-1561. ISSN 1562-3599

Lee, J (2008) Dynamic project management methodology: Managing schedule compression. PhD thesis, University of Florida, USA.

Lee, J S (2016) Estimating cumulative damages due to disruptions in repetitive construction. Journal of Construction Engineering and Management, 142(11): 04016064, ISSN 0733-9364

Lee, S (2006) Dynamic planning and control methodology: Understanding and managing iterative error and change cycles in large-scale concurrent design and construction projects. PhD thesis, Massachusetts Institute of Technology, USA.

Lee, S; Tae, S; Jee, N and Shin, S (2015) LDA-based model for measuring impact of change orders in apartment projects and its application for prerisk assessment and postevaluation. Journal of Construction Engineering and Management, 141(7): 4015011, ISSN 0733-9364

Lester, D and Torero, J (2019) Using megaproject performance outcomes to enhance decision-making behaviors in civil engineering graduates. Construction Economics and Building, 19(1), pp. 96-110. ISSN 2204-9029

Leu, S S; Huang, K J; Hung, C C W and Wu, P L (2024) Revolutionizing steel building project cost overrun risk assessment by Bayesian network. Engineering, Construction and Architectural Management, 31(12), pp. 4975-4987. ISSN 0969-9988

Li, Y; Gao, R; Wu, H; Wen, J; Li, T and Dong, X (2026) Multiobjective construction schedule optimization with labor resource allocation: Coupling parameter-adaptive genetic algorithm and network flow. Journal of Construction Engineering and Management, 152(5): 04026053, ISSN 0733-9364

Li, H; Su, L; L.V, L and Xia, Q (2021) Detecting unbalanced bidding to achieve economic sustainability using fuzzy logic approach. Construction Innovation, 21(2), pp. 164-181. ISSN 1471-4175

Li, J; Moselhi, O and Alkass, S (2006) Forecasting project status by using fuzzy logic. Journal of Construction Engineering and Management, 132(11), pp. 1193-1202. ISSN 0733-9364

Li, M and Ashuri, B (2021) Proportional cox hazards model to quantify the likelihood of underestimation in transportation projects. Journal of Construction Engineering and Management, 147(10): 04021134, ISSN 0733-9364

Li, S; Cai, H and Kamat, V R (2016) Integrating natural language processing and spatial reasoning for utility compliance checking. Journal of Construction Engineering and Management, 142(12): 04016074, ISSN 0733-9364

Liang, Y; Ashuri, B and Li, M (2021) Forecasting the construction expenditure cash flow for transportation design-build projects with a case-based reasoning model. Journal of Construction Engineering and Management, 147(6): 04021043, ISSN 0733-9364

Liang, Y; Ashuri, B and Sun, W (2020) Analysis of the variability of project cost and schedule performance in the design-build environment. Journal of Construction Engineering and Management, 146(6): 04020060, ISSN 0733-9364

Lind, H and Borg, L (2010) Service-led construction: Is it really the future? Construction Management and Economics, 28(11), pp. 1145-1153. ISSN 1466433X

Lind, H and Brunes, F (2014) Policies to avoid cost overruns in infrastructure projects: Critical evaluation and recommendations. Construction Economics and Building, 14(3), pp. 74-85. ISSN 2204-9029

Lind, H and Brunes, F (2015) Explaining cost overruns in infrastructure projects: A new framework with applications to Sweden. Construction Management and Economics, 33(7), pp. 554-568. ISSN 01446193

Liu, H (2024) Enhancing accuracy and security in BIM-based construction cost management leveraging AI and blockchain technologies. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Liu, L and Napier, Z (2010) The accuracy of risk-based cost estimation for water infrastructure projects: Preliminary evidence from Australian projects. Construction Management and Economics, 28(1), pp. 89-100. ISSN 1466433X

Liu, M (2013) The application of BIM and IPD in public design and construction. PhD thesis, Polytechnic Institute of New York University, USA.

Lo, Y; Zhang, C; Ye, Z and Cui, C (2023) Monitoring road base course construction progress by photogrammetry-based 3D reconstruction. International Journal of Construction Management, 23(12), pp. 2087-2101. ISSN 1562-3599

Love, P E D (2025) Explaining cost overrun causation in transport projects: Drawing on evidential pluralism to develop theory. Journal of Construction Engineering and Management, 151(2): 06024003, ISSN 0733-9364

Love, P E D; Wang, X; Sing, C P and Tiong, R L K (2013) Determining the probability of project cost overruns. Journal of Construction Engineering and Management, 139(3), pp. 321-330. ISSN 0733-9364

Lozon, J P (2008) Evaluating value improving practices for large scale projects. PhD thesis, University of Calgary, Canada.

Lu, W; Hua, Y and Zhang, S (2017) Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects. Engineering, Construction and Architectural Management, 24(1), pp. 118-132. ISSN 0969-9988

Ma, L and Fu, H (2020) Exploring the influence of project complexity on the mega construction project success: A qualitative comparative analysis (QCA) method. Engineering, Construction and Architectural Management, 27(9), pp. 2429-2449. ISSN 0969-9988

Madihi, M H; Shirzadi Javid, A A and Nasirzadeh, F (2025) Enhancing risk assessment: An improved Bayesian network approach for analyzing interactions among risks. Engineering, Construction and Architectural Management, 32(3), pp. 2022-2043. ISSN 0969-9988

Mahalingam, A (2006) Understanding and mitigating institutional costs on global projects. PhD thesis, Stanford University, USA.

Mahdavian, A; Shojaei, A; Salem, M; Yuan, J S and Oloufa, A A (2021) Data-driven predictive modeling of highway construction cost items. Journal of Construction Engineering and Management, 147(3): 04020180, ISSN 0733-9364

Mahmud, A T (2021) Enhancing the understanding of cost overrun drivers in highway projects in Nigeria through system dynamics modelling. PhD thesis, Heriot-Watt University, UK.

Mahmud, A T; Ogunlana, S O and Hong, W T (2021) Key driving factors of cost overrun in highway infrastructure projects in Nigeria: A context-based perspective. Journal of Engineering, Design and Technology, 19(6), pp. 1530-1555. ISSN 1726-0531

Mahmud, A T; Ogunlana, S O and Hong, W T (2022) Understanding the dynamics of cost overrun triggers in highway infrastructure projects in Nigeria: A systems thinking modelling approach. Journal of Financial Management of Property and Construction, 27(1), pp. 29-56. ISSN 1366-4387

Malcomb, A P (2022) New universal law: Application of Tracy-Widom theory for construction network schedule resilience. PhD thesis, Catholic University of America, USA.

Mangu, S; Thillai Rajan, A and Deep, A (2021) Comparison of toll and annuity PPPs: A case study of highway projects in India. Built Environment Project and Asset Management, 11(1), pp. 103-120. ISSN 2044-124X

Maniar, H (2020) Contingency management in Indian construction projects. Journal of Construction Business and Management, 4(2), pp. 11-24. ISSN 2521-0165

Manoj, G and Shivaji, C Y (2010) Design interface management of airport projects. International Journal of Construction Management, 10(3), pp. 29-44. ISSN 1562-3599

Mante, J; Ndekugri, I; Ankrah, N and Hammond, F (2012) The influence of procurement methods on dispute resolution mechanism choice in construction. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Marisa, A and Yusof, N A (2020) Factors influencing the performance of architects in construction projects. Construction Economics and Building, 20(3), pp. 20-36. ISSN 2204-9029

Marmanillo, O Z (2021) Study of lean and complex adaptive mechanism to regulate the function of production planning and control in construction projects. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.

Martin, H; Lewis, T M and Petersen, A (2016) Factors affecting the choice of construction project delivery in developing oil and gas economies. Architectural Engineering and Design Management, 12(3), pp. 170-188. ISSN 1745-2007

Mashamba, T (2024) A system dynamics model to enhance on-time delivery of infrastructure projects within a power utility in South Africa. PhD thesis, University of South Africa, South Africa.

Masrom, M D A; Skitmore, M and Bridge, A (2013) Determinants of contractor satisfaction. Construction Management and Economics, 31(7), pp. 761-779. ISSN 1466433X

Mayo, R E and Liu, G (1995) Reform agenda of Chinese construction industry. Journal of Construction Engineering and Management, 121(1), pp. 80-85. ISSN 0733-9364

Mañelele, I and Muya, M (2008) Risk identification on community-based construction projects in Zambia. Journal of Engineering, Design and Technology, 6(2), pp. 145-161. ISSN 1726-0531

Mbabazi, A (2004) Quantification and analysis of construction claims. PhD thesis, University of Waterloo, Canada.

Mehany, M S H M (2014) Delay-caused claims in infrastructure projects under design-bid-build delivery systems. PhD thesis, Colorado State University, USA.

Mejia Aguilar, G (2013) Improving accuracy of project outcome predictions. PhD thesis, University of Alabama, USA.

Membah, J and Asa, E (2015) Estimating cost for transportation tunnel projects: A systematic literature review. International Journal of Construction Management, 15(3), pp. 196-218. ISSN 1562-3599

Membah, J F J (2016) Parametric cost estimating and risk analysis of transportation tunneling projects. PhD thesis, North Dakota State University, USA.

Memon, S A (2017) Hong Kong relational contracting : an investigation into the attitudes and behaviours of contractors' project teams. PhD thesis, University of Hong Kong, Hong Kong.

Menassa, C; Pea Mora, F and Pearson, N (2010) Study of real options with exogenous competitive entry to analyze dispute resolution ladder investments in architecture, engineering, and construction projects. Journal of Construction Engineering and Management, 136(3), pp. 377-390. ISSN 0733-9364

Minelli, P (2020) Improved methods for managing megaprojects. PhD thesis, Massachusetts Institute of Technology, USA.

Mishmish, M and El-Sayegh, S M (2018) Causes of claims in road construction projects in the UAE. International Journal of Construction Management, 18(1), pp. 26-33. ISSN 1562-3599

Mohamed, M; Abdelaty, A; Khresat, G and Abu El Rub, M (2026) Mapping the patterns of cost and time overruns in the U.S. Highway construction projects: A regional risk analysis. International Journal of Construction Management, 26(3), pp. 470-481. ISSN 1562-3599

Mohamed, Emad (2021) Decision-support system for construction risk management in onshore wind projects. PhD thesis, University of Alberta, Canada.

Mohamed, S F (2006) Improving construction site management practices through knowledge management. PhD thesis, Loughborough University, UK.

Momtazi, S (2021) Reducing cost overruns in construction projects using lean methodology. DEng thesis, George Washington University, USA.

Monyane, T G (2019) "A lean-led-evaluation" of infrastructure development improvement programme in South Africa. PhD thesis, Nelson Mandela University, South Africa.

Mora, R (2005) Representation and reasoning for integrated conceptual design of building structures. PhD thesis, Concordia University, Canada.

Moret, Y (2011) Modeling cost and time uncertainty in rail line construction. PhD thesis, Massachusetts Institute of Technology, USA.

Moret, Y and Einstein, H H (2016) Construction cost and duration uncertainty model: Application to high-speed rail line project. Journal of Construction Engineering and Management, 142(10): 05016010, ISSN 0733-9364

Moshtaghian, F and Noorzai, E (2023) Integration of risk management within the building information modeling (BIM) framework. Engineering, Construction and Architectural Management, 30(5), pp. 1951-1977. ISSN 0969-9988

Mosley Jr, J C and Bubshait, A A (2017) Project procurement systems for mechanical, electrical and piping projects in Saudi Arabia: An empirical assessment. Engineering, Construction and Architectural Management, 24(6), pp. 1004-1017. ISSN 0969-9988

Mousaei, A; Taghaddos, H; Nekouvaght Tak, A; Behzadipour, S and Hermann, U (2021) Optimized mobile crane path planning in discretized polar space. Journal of Construction Engineering and Management, 147(5): 04021036, ISSN 0733-9364

Moyo, T and Chigara, B (2023) Barriers to lean construction implementation in Zimbabwe. Journal of Engineering, Design and Technology, 21(3), pp. 733-757. ISSN 1726-0531

Musarat, M A; Alaloul, W S and Liew, M S (2022) Inflation rate and labours' wages in construction projects: Economic relation investigation. Engineering, Construction and Architectural Management, 29(6), pp. 2461-2494. ISSN 0969-9988

N, H. K. and Padala, S. P. S. (2026) A bibliometric review of digital twin-enabled technologies for construction project monitoring and control. Built Environment Project and Asset Management, 16(3), pp. 441-460. ISSN 2044-124X

Naghashian, M H (2015) Generalised cost benefit analysis for large infrastructure projects: the case of the Channel Tunnel rail link. PhD thesis, University of Birmingham, UK.

Naji, K K; Gunduz, M and Mansour, M M (2024) Development of an integrated hybrid risk assessment system for construction disputes during the preconstruction phase using the Delphi method. Journal of Construction Engineering and Management, 150(7): 04024068, ISSN 0733-9364

Naji, K K; Gunduz, M and Naser, A F (2022) The effect of change-order management factors on construction project success: A structural equation modeling approach. Journal of Construction Engineering and Management, 148(9): 04022085, ISSN 0733-9364

Naoum, S G (1994) Critical analysis of time and cost of management and traditional contracts. Journal of Construction Engineering and Management, 120(4), pp. 687-705. ISSN 0733-9364

Naoum, S G and Mustapha, F H (1995) Relationship between the building team, procurement methods and project performance. Journal of Construction Procurement, 1(1), pp. 50-63. ISSN 1358-9180

Nassar, K M; Nassar, W M and Hegab, M Y (2005) Evaluating cost overruns of asphalt paving project using statistical process control methods. Journal of Construction Engineering and Management, 131(11), pp. 1173-1178. ISSN 0733-9364

Ng, H S M N (2006) Dynamic decision support for contingency management and allocation for construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Nguyen, V T; Do, S T; Tran, C N N and van Pham, L (2025) Analysis of interrelationships among constructs of cost overrun causes in consortium projects between construction contractors. International Journal of Construction Management, 25(13), pp. 1596-1608. ISSN 1562-3599

Nguyen, F B T (2024) Quality control of front-end planning for electric power construction: A collaborative process-based approach using systems engineering. PhD thesis, Colorado State University, USA.

Nguyen, T; Chileshe, N; Ho, D T; Nguyen, V T and Tran, Q P (2024) Significant risks that trigger cost overruns and delays in urban rail projects: A typical case study of Vietnam. Built Environment Project and Asset Management, 14(2), pp. 278-295. ISSN 2044-124X

Nouh, A; Elkasaby, E and Hussein, K (2023) Establishment of prediction system for cost of defect liability phase in construction project. Construction Innovation, 23(2), pp. 467-486. ISSN 1471-4175

Nuako, F; Ghansah, F A and Adusei, T (2026) Critical success factors for cost overrun minimization in public construction projects in developing countries: The case of Ghana. Construction Innovation, 26(1), pp. 44-62. ISSN 1471-4175

Nyamagere Gladys, S; Rwelamila, P D and Gimbi, J J (2022) A conceptual framework for managing post-disaster reconstruction projects in emerging economies: The case of Angola. Built Environment Project and Asset Management, 12(2), pp. 205-222. ISSN 2044-124X

Nyqvist, Roope (2025) Data-driven transformation in construction management: From artificial intelligence to network modeling. PhD thesis, Aalto University, Finland.

Odeyinka, H A and Yusif, A (1997) The causes and effects of construction delays on completion cost of housing projects in Nigeria. Journal of Financial Management of Property and Construction, 2(3), pp. 31-44. ISSN 1366-4387

Ogbu, C P and Adindu, C C (2020) Direct risk factors and cost performance of road projects in developing countries: Contractors’ perspective. Journal of Engineering, Design and Technology, 18(2), pp. 326-342. ISSN 1726-0531

Ogwueleka, A C (2025) Supply chain integration in public sector construction projects: Adoption and barriers. Construction Economics and Building, 25(3-4), pp. 272-288. ISSN 2204-9029

Ojo, E O (2019) Project managers’ capacity-planning practices for infrastructure projects in qatar. PhD thesis, Walden University, USA.

Ojo, S O; Adeyemi, O Y and Ikpo, I J (2000) Effects of procurement methods on clients objectives of time and cost in the Nigerian construction industry. Journal of Financial Management of Property and Construction, 5(1-2), pp. 105-108. ISSN 1366-4387

Okakpu, A I (2019) Investigating the effectiveness of adopting building information modelling for refurbishment of complex buildings: Case study of auckland. PhD thesis, Auckland University of Technology, New Zealand.

Okonkwo, C; Evans, U F and Ekung, S (2023) Unearthing direct and indirect material waste-related factors underpinning cost overruns in construction projects. International Journal of Construction Management, 23(13), pp. 2298-2304. ISSN 1562-3599

Okpala, D C and Aniekwu, A N (1988) Causes of high costs of construction in Nigeria. Journal of Construction Engineering and Management, 114(2), pp. 233-244. ISSN 0733-9364

Olaniran, O J; Love, P E D; Edwards, D J; Olatunji, O and Matthews, J (2017) Chaos theory: Implications for cost overrun research in hydrocarbon megaprojects. Journal of Construction Engineering and Management, 143(2): 05016020, ISSN 0733-9364

Omaran, S M (2021) Improving leadership and decision-making skills of construction project managers through the development and use of simulation model and framework. PhD thesis, Western Michigan University, USA.

Onalaja, A A (2023) Improving costing in infrastructure projects to accommodate uncertainties. PhD thesis, Northumbria University, UK.

Osei-Asibey, D; Ayarkwa, J; Baah, B; Afful, A E; Anokye, G and Nkrumah, P A (2025) Impact of time-based delay on public-private partnership (PPP) construction project delivery: Construction stakeholders' perspective. Journal of Financial Management of Property and Construction, 30(1), pp. 88-110. ISSN 1366-4387

Osman, I A (2022) Impacts of global pandemics on construction projects and dispute resolution provisions. PhD thesis, University of Illinois at Chicago, USA.

Ottesen, J (2019) CPM schedule density: A new predictor for productivity loss. PhD thesis, University of Washington, USA.

Oyegoke, A S; Powell, R; Ajayi, S; Godawatte, G A G R and Akenroye, T (2022) Factors affecting the selection of effective cost control techniques in the UK construction industry. Journal of Financial Management of Property and Construction, 27(2), pp. 141-160. ISSN 1366-4387

Padala, S P S; Maheswari, J U and Hirani, H (2022) Identification and classification of change causes and effects in construction projects. International Journal of Construction Management, 22(14), pp. 2788-2807. ISSN 1562-3599

Palaneeswaran, E; Love, P E D; Kumaraswamy, M M and Ng, T S T (2008) Mapping rework causes and effects using artificial neural networks. Building Research & Information, 36(5), pp. 450-465. ISSN 0961-3218

Pandey, P (2019) Lean scheduling in construction projects: realistic milestone planning. PhD thesis, Indian Institute of Technology Delhi, India.

Panwar, A and Jha, K N (2021) Integrating quality and safety in construction scheduling time-cost trade-off model. Journal of Construction Engineering and Management, 147(2): 04020160, ISSN 0733-9364

Paquin, J P; Morin, P P; Lambert, A and Koplyay, T (2022) Assessing project contingency reserves with the expected cost overrun risk measure. Journal of Construction Engineering and Management, 148(10): 04022102, ISSN 0733-9364

Pararajasingam, R; Waidyasekara, A S and Victar, H C (2026) Exploring causes of ineffective material management and impact on successful project deliverables in civil engineering construction projects in Sri Lanka. Construction Innovation, 26(1), pp. 22-43. ISSN 1471-4175

Park, J. and Moon, S. (2026) Advancing BIM adoption in infrastructure: Addressing standard development, geographic coordinate systems, and common data environment. International Journal of Construction Management, 26(8), pp. 1584-1598. ISSN 1562-3599

Park, Y I and Papadopoulou, T C (2012) Causes of cost overruns in transport infrastructure projects in Asia: Their significance and relationship with project size. Built Environment Project and Asset Management, 2(2), pp. 195-216. ISSN 2044-124X

Patel, T; Bapat, H and Patel, D (2026) Assessing barriers of automation and robotics adoption in the Indian construction industry: A fuzzy DEMATEL approach. Construction Innovation, 26(3), pp. 935-957. ISSN 1471-4175

Patel, T.; Guo, B. H. W.; van der Walt, J. D. and Bapat, H. (2026) Vision-based automated road construction progress monitoring: Improved u-net segmentation approach. International Journal of Construction Management, 26(10), pp. 2154-2175. ISSN 1562-3599

Perera, B A K S and Shandraseharan, A (2023) A framework for aggregate base course waste control in road construction projects. International Journal of Construction Management, 23(6), pp. 1009-1020. ISSN 1562-3599

Perovic, Miljenka (2015) Overcoming the challenges of building heritage projects: Improvements to time, scope and cost performance. PhD thesis, Queensland University of Technology, Australia.

Perry, J G and Barnes, M (2000) Target cost contracts: An analysis of the interplay between fee, target, share and price. Engineering, Construction and Architectural Management, 7(2), pp. 202-208. ISSN 0969-9988

Peter, E; Love, D and Heng, L I (2000) Quantifying the causes and costs of rework in construction. Construction Management and Economics, 18(4), pp. 479-490. ISSN 01446193

Peña-Mora, F; Han, S; Lee, S and Park, M (2008) Strategic-operational construction management: Hybrid system dynamics and discrete event approach. Journal of Construction Engineering and Management, 134(9), pp. 701-710. ISSN 0733-9364

Pinheiro Catalão, F; Cruz, C O and Miranda Sarmento, J (2019) Exogenous determinants of cost deviations and overruns in local infrastructure projects. Construction Management and Economics, 37(12), pp. 697-711. ISSN 01446193

Påsse, D; Disney, O; Roupé, M and Johansson, M (2022) Cost-estimation in construction: Building information modelling versus total BIM. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Radzi, A R; Azmi, N F; Kamaruzzaman, S N and Rahman, R A (2025) Modeling the critical assessment criteria for construction readiness of BIM-based projects: PLS-SEM approach. Journal of Construction Engineering and Management, 151(6): 04025063, ISSN 0733-9364

Rahmani, F; Tadayon, A and van der Walt, J D (2025) Managing client-contractors' working relationship in construction projects: A holistic approach. Engineering, Construction and Architectural Management, 32(13), pp. 362-383. ISSN 0969-9988

Rai, H; Jagannathan, M and Venkata Santosh Kumar, D (2021) Claim tenability assessment in Indian real estate projects using ann and decision tree models. Built Environment Project and Asset Management, 11(3), pp. 468-487. ISSN 2044-124X

Rajak, S. and Vimal, K. E. K. (2026) Blockchain-based time impact analysis method for sustainable delay management in EPC projects. Journal of Construction Engineering and Management, 152(6): 04026074, ISSN 0733-9364

Rajala, P; Ylä-Kujala, A; Sinkkonen, T and Kärri, T (2022) Profitability in construction: How does building renovation business fare compared to new building business. Construction Management and Economics, 40(3), pp. 223-237. ISSN 01446193

Rajan, T A; Gopinath, G and Behera, M (2014) PPPs and project overruns: Evidence from road projects in India. Journal of Construction Engineering and Management, 140(5): 04013070, ISSN 0733-9364

Ramanathan, C; Narayanan, S P and Idrus, A B (2012) Construction delays causing risks on time and cost: a critical review. Construction Economics and Building, 12(1), pp. 37-57. ISSN 2204-9029

Ramanayaka, C and Rotimi, J (2011) Strategy: Towards its applicability for successful project delivery. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Ramanayaka, C D D (2013) Developing a strategy-led approach as a suitable methodology for construction project planning and implementation. PhD thesis, Auckland University of Technology, New Zealand.

Rao, G N (1997) Cost risk assessment in environmental remediation: Towards a causal-chain approach. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Raouf, A M and Al-Ghamdi, S G (2019) Effectiveness of project delivery systems in executing green buildings. Journal of Construction Engineering and Management, 145(10): 03119005, ISSN 0733-9364

Rasul, N; Malik, M S A; Bakhtawar, B and Thaheem, M J (2021) Risk assessment of fast-track projects: A systems-based approach. International Journal of Construction Management, 21(11), pp. 1099-1114. ISSN 1562-3599

Rathnayake, A P (2021) A framework to enhance the adoption of building information modelling amongst Sri Lankan quantity surveying organisations to increase the accuracy of pre-tender cost estimates. PhD thesis, University of Salford, UK.

Rezaee Arjroody, A; Hosseini, S A; Akhbari, M; Safa, E and Asadpour, J (2024) Accurate estimation of cost and time utilizing risk analysis and simulation (case study: Road construction projects in Iran). International Journal of Construction Management, 24(1), pp. 19-30. ISSN 1562-3599

Roachanakanan, K (2005) A case study of cost overruns in a Thai condominium project. PhD thesis, Texas A&M University, USA.

Rosenfeld, Y (2014) Root-cause analysis of construction-cost overruns. Journal of Construction Engineering and Management, 140(1): 04013039, ISSN 0733-9364

Ruwanpura, U D R E; Perera, B A K S and Ranadewa, T (2025) Lean tools used in administrative processes across sectors: a systematic review and insights for the construction industry. Construction Innovation, 25(4), pp. 1287-1314. ISSN 1471-4175

Sadat, H and Thomas, N (2025) An integrated approach to investigate the causes of time delays and cost overruns in Afghanistan construction projects. International Journal of Construction Management, 25(6), pp. 624-634. ISSN 1562-3599

Safapour, E; Kermanshachi, S and Kamalirad, S (2021) Analysis of effective project-based communication components within primary stakeholders in construction industry. Built Environment Project and Asset Management, 11(2), pp. 157-173. ISSN 2044-124X

Saffar, N (2020) The development of an offsite construction adoption strategic guideline for the Iraqi construction industry. PhD thesis, University of Salford, UK.

Said, H M and Reginato, J (2018) Impact of design changes on virtual design and construction performance for electrical contractors. Journal of Construction Engineering and Management, 144(1): 04017097, ISSN 0733-9364

Saidu, I; Shakantu, W; Adamu, A and Anugwo, I (2017) A bespoke approach for relating material waste to cost overrun in the construction indsutry. Journal of Construction Business and Management, 1(1), pp. 39-52. ISSN 2521-0165

Salam, M A; Sarkar, S; Blackwood, D J and Staines, H J (1999) High-rise building construction in Bangladesh: Experience of questionnaire development and on-site data collection. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Salam, Md Abdus (2007) Time and cost overruns on high-rise building construction in Bangladesh. PhD thesis, Abertay University, UK.

Salama, T; Salah, A and Moselhi, O (2021) Integrating critical chain project management with last planner system for linear scheduling of modular construction. Construction Innovation, 21(4), pp. 525-554. ISSN 1471-4175

Samarghandi, H; Tabatabaei, S M M; Taabayan, P; Hashemi, A M and Willoughby, K (2016) Studying the reasons for delay and cost overrun in construction projects: The case of Iran. Journal of Construction in Developing Countries, 21(1), pp. 51-84. ISSN 1823-6499

Samuel, D (2018) Risk-based tender evaluation using multicriteria decision analysis in Trinidad and Tobago. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(2), pp. 58-69. ISSN 17514304

Sanni-Anibire, M O; Mohamad Zin, R and Olatunji, S O (2022) Causes of delay in the global construction industry: A meta analytical review. International Journal of Construction Management, 22(8), pp. 1395-1407. ISSN 1562-3599

Sarhan, J G; Xia, B; Fawzia, S and Karim, A (2017) Lean construction implementation in the Saudi Arabian construction industry. Construction Economics and Building, 17(1), pp. 46-69. ISSN 2204-9029

Sassano, G (2022) Optimism bias and cost overruns: experimenting on the internal and external views in resources and time estimation. PhD thesis, University College London, UK.

Semaan, N and Salem, M (2017) A deterministic contractor selection decision-support system for competitive bidding. Engineering, Construction and Architectural Management, 24(1), pp. 61-77. ISSN 0969-9988

Semple, C; Hartman, F T and Jergeas, G (1994) Construction claims and disputes: Causes and cost/time overruns. Journal of Construction Engineering and Management, 120(4), pp. 785-795. ISSN 0733-9364

Senaratne, S (2005) A knowledge-based approach to managing project change in the construction phase within collaborative team settings. PhD thesis, University of Salford, UK.

Senaratne, S and Sexton, M G (2004) Managing construction project change in the knowledge age: A case study. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Senaratne, S and Sexton, M G (2009) Role of knowledge in managing construction project change. Engineering, Construction and Architectural Management, 16(2), pp. 186-200. ISSN 0969-9988

Senouci, A; Alsarraj, A; Gunduz, M and Eldin, N (2017) Analysis of change orders in Qatari construction projects. International Journal of Construction Management, 17(4), pp. 280-292. ISSN 1562-3599

Shah, R K (2011) Innovative methodology for location-based scheduling and visualisation of earthworks in road construction projects. PhD thesis, Teesside University, UK.

Shah, R K and Dawood, N (2011) An innovative approach for generation of a time location plan in road construction projects. Construction Management and Economics, 29(5), pp. 435-448. ISSN 1466433X

Sharma, V K; Sharma, S K and Singh, A P (2022) Risk enablers modelling for infrastructure projects using Bayesian belief network. International Journal of Construction Management, 22(6), pp. 993-1010. ISSN 1562-3599

Shash, A A and AbuAlnaja, F M (2023) Causes of material delays in capital projects in Saudi Arabia. International Journal of Construction Management, 23(7), pp. 1109-1117. ISSN 1562-3599

Sheamar, S; Wedawatta, G; Tennakoon, M; Palliyaguru, R and Antwi-Afari, M F (2024) The potential of new models of construction procurement to counter cost overruns in construction projects: An exploratory study from a contractors' perspective. Journal of Financial Management of Property and Construction, 29(2), pp. 211-228. ISSN 1366-4387

Shen, L Y (1990) Application of risk management to the Chinese construction industry. PhD thesis, University of Reading, UK.

Sherman, R; Parrish, K and Lamanna, A (2021) Identifying and categorizing risks incumbent in us nuclear power plant construction. Journal of Construction Engineering and Management, 147(4): 02018, ISSN 0733-9364

Sherman, Rachael Paige (2020) Assessing the impact of regulation on the performance of power and pipeline projects. PhD thesis, Arizona State University, USA.

Shiha, A; Dorra, E M and Nassar, K (2020) Neural networks model for prediction of construction material prices in Egypt using macroeconomic indicators. Journal of Construction Engineering and Management, 146(3): 04020010, ISSN 0733-9364

Shoar, S; Yiu, T W; Payan, S and Parchamijalal, M (2023) Modeling cost overrun in building construction projects using the interpretive structural modeling approach: A developing country perspective. Engineering, Construction and Architectural Management, 30(2), pp. 365-392. ISSN 0969-9988

Shrestha, P and Behzadan, A H (2018) Chaos theory-inspired evolutionary method to refine imperfect sensor data for data-driven construction simulation. Journal of Construction Engineering and Management, 144(3): 04018001, ISSN 0733-9364

Shrestha, P P; Shrestha, K K and Zeleke, H B (2019) Probability of change orders and the effect on cost and schedule for new public school buildings. Engineering, Construction and Architectural Management, 26(6), pp. 1087-1104. ISSN 0969-9988

Shrivastava, R (2020) Development of risk management model for construction of railway project in India. PhD thesis, University of Petroleum and Energy Studies, India.

Shugran, A A and Ghazali, F E M (2025) Understanding the effects of variation orders on construction project success: insights from the Jordanian context. International Journal of Construction Management, 25(5), pp. 519-529. ISSN 1562-3599

Signor, R; Love, P E D; Marchiori, F F and Felisberto, A D (2020) Underpricing in social infrastructure projects: Combating the institutionalization of the winner's curse. Journal of Construction Engineering and Management, 146(12), ISSN 0733-9364

Simpeh, E K; Ndihokubwayo, R; Love, P E D and Thwala, W D (2015) A rework probability model: A quantitative assessment of rework occurrence in construction projects. International Journal of Construction Management, 15(2), pp. 109-116. ISSN 1562-3599

Simushi, S and Wium, J (2020) Time and cost overruns on large projects: Understanding the root cause. Journal of Construction in Developing Countries, 25(1), pp. 129-146. ISSN 1823-6499

Sinesilassie, E G; Tabish, S Z S and Jha, K N (2018) Critical factors affecting cost performance: A case of Ethiopian public construction projects. International Journal of Construction Management, 18(2), pp. 108-119. ISSN 1562-3599

Sinha, A K and Jha, K N (2021) Financing constraints of public-private partnership projects in India. Engineering, Construction and Architectural Management, 28(1), pp. 246-269. ISSN 0969-9988

Soe, Y (2017) Construction supply chain risk management framework for construction projects: case studies in Myanmar. PhD thesis, University of Birmingham, UK.

Sohrabi, H and Noorzai, E (2024) Risk-supported case-based reasoning approach for cost overrun estimation of water-related projects using machine learning. Engineering, Construction and Architectural Management, 31(2), pp. 544-570. ISSN 0969-9988

Son, J and Rojas, E M (2011) Impact of optimism bias regarding organizational dynamics on project planning and control. Journal of Construction Engineering and Management, 137(2), pp. 147-157. ISSN 0733-9364

Song, X (2013) The application of insurance as a risk management tool for alternative dispute resolution (ADR) implementation in construction disputes. PhD thesis, Columbia University, USA.

Sousa, R L (2010) Risk analysis for tunneling projects. PhD thesis, Massachusetts Institute of Technology, USA.

Sreram, P K and Thomas, A (2026) A discrete event simulation-based value stream map implementation scheme for small and medium enterprises (SMEs). International Journal of Construction Management, 26(3), pp. 428-444. ISSN 1562-3599

Sridarran, P; Keraminiyage, K and Herszon, L (2017) Improving the cost estimates of complex projects in the project-based industries. Built Environment Project and Asset Management, 7(2), pp. 173-184. ISSN 2044-124X

Ssegawa-Kaggwa, J; Ngowi, A B and Ntshwene, K (2013) Using a situation analysis to identify the construction industry deficiencies in Botswana. Journal of Construction in Developing Countries, 18(1), pp. 1-18. ISSN 1823-6499

Ssimbwa, Edward (2023) Streamlining the management of building construction regulatory framework in Sub-Sahara africa's public service - a case for Uganda. DM thesis, Colorado Technical University, USA.

Staub-French, S A (2002) Feature-driven activity-based cost estimating. PhD thesis, Stanford University, USA.

Sun, M; Vidalakis, C and Oza, T (2009) A change management maturity model for construction projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Sundaram, T K (1989) Contract management: a rational approach to construction contract pricing. PhD thesis, Indian Institute of Technology Delhi, India.

Swiggum, K E; Anderson, S D and Russell, J S (1994) Case study of burlington cable-stayed bridge. Journal of Construction Engineering and Management, 120(3), pp. 649-666. ISSN 0733-9364

Tahir, H A (2015) A project control framework for the Libyan construction industry. PhD thesis, Sheffield Hallam University, UK.

Tao, Y; Hu, H; Xu, F and Zhang, Z (2023) Ergonomic risk assessment of construction workers and projects based on fuzzy Bayesian network and D-S evidence theory. Journal of Construction Engineering and Management, 149(6): 04023034, ISSN 0733-9364

Tembo, C K; Muleya, F and Kanyemba, A (2024) An appraisal of cost management techniques used in the construction industry. International Journal of Construction Management, 24(1), pp. 10-18. ISSN 1562-3599

Tembo, M; Kahanji, C and Mwanaumo, E M (2025) Socio-Political and Macro-Economic Impact of Tender Price Inflation in Zambian Public Construction Projects. Journal of Construction Business and Management, 7(2), pp. 67-97.

Tembo-Silungwe, C K and Khatleli, N (2018) Identification of enablers and constraints of risk allocation using structuration theory in the construction industry. Journal of Construction Engineering and Management, 144(5): 04018021, ISSN 0733-9364

Tembo-Silungwe, C K and Khatleli, N (2022) Development of risk misallocation causal networks using interpretive judgement in the construction industry. International Journal of Construction Management, 22(10), pp. 1935-1949. ISSN 1562-3599

Thal Jr, A E; Cook, J J and White Iii, E D (2010) Estimation of cost contingency for Air Force construction projects. Journal of Construction Engineering and Management, 136(11), pp. 1181-1188. ISSN 0733-9364

Thunberg, M and Fredriksson, A (2018) Bringing planning back into the picture: how can supply chain planning aid in dealing with supply chain-related problems in construction? Construction Management and Economics, 36(8), pp. 425-442. ISSN 01446193

Tian, S; Abdalla, A; Zhang, G; Tang, Y and Cao, X (2025) Pathways of construction dispute formation in China: A DEMATEL, AISM, and MICMAC-based approach. Journal of Construction Engineering and Management, 151(10): 05025013, ISSN 0733-9364

Tolani, O V (2013) An examination of risk perceptions and allocation preferences in public-private partnerships in Nigeria. PhD thesis, University of Calgary, Canada.

Touran, A (2003) Probabilistic model for cost contingency. Journal of Construction Engineering and Management, 129(3), pp. 280-284. ISSN 0733-9364

Touran, A (2010) Probabilistic approach for budgeting in portfolio of projects. Journal of Construction Engineering and Management, 136(3), pp. 361-366. ISSN 0733-9364

Touran, A and Lopez, R (2006) Modeling cost escalation in large infrastructure projects. Journal of Construction Engineering and Management, 132(8), pp. 853-860. ISSN 0733-9364

Tseladikae, T.; Agumba, J.; Ochieng, G.; Adebowale, O. J. and Edwards, D. (2026) Correlation analysis of project management practices and performance outcomes in social housing projects. International Journal of Construction Management, 26(10), pp. 2085-2100. ISSN 1562-3599

Tseng, C L; Zhao, T and Fu, C C (2009) Contingency estimation using a real options approach. Construction Management and Economics, 27(11), pp. 1073-1087. ISSN 1466433X

Uhanovita A.C, N; K.A.T.O, R and Parameswaran, A (2025) Poka-yoke to minimise variations: A framework for building projects. Construction Innovation, 25(3), pp. 972-993. ISSN 1471-4175

Vahabi, A; Nasirzadeh, F and Mills, A (2022) Impact of project briefing clarity on construction project performance. International Journal of Construction Management, 22(13), pp. 2504-2516. ISSN 1562-3599

Vahabi, A; Nasirzadeh, F and Mills, A (2022) Influence of briefing clarity on construction projects: A fuzzy hybrid simulation approach. Construction Management and Economics, 40(4), pp. 278-295. ISSN 01446193

Vahabi, A; Nasirzadeh, F and Mills, A (2023) Assessing the impact of project brief clarity using project definition rating index tool and system dynamic. Engineering, Construction and Architectural Management, 30(2), pp. 697-713. ISSN 0969-9988

Vahdatmanesh, M and Firouzi, A (2020) Construction material supply risk management using Asian option contracts: The case of a pipeline project. Engineering, Construction and Architectural Management, 27(10), pp. 3395-3414. ISSN 0969-9988

Venkateswaran, C B and Murugasan, R (2017) Time delay and cost overrun of road over bridge construction projects in India. Journal of Construction in Developing Countries, 22(S1), pp. 79-96. ISSN 1823-6499

Vick, S (2018) Automated spatial progress monitoring for asphalt road construction projects. PhD thesis, University of Cambridge, UK.

Vu, H A; Cu, V H; Min, L X and Wang, J Q (2017) Risk analysis of schedule delays in international highway projects in Vietnam using a structural equation model. Engineering, Construction and Architectural Management, 24(6), pp. 1018-1039. ISSN 0969-9988

Walker, A and Hughes, W P (1986) A conventionally-managed project: A systems- based case study. Construction Management and Economics, 4(1), pp. 57-74. ISSN 01446193

Wang, L; Lee, J; Nimawat, J; Han, K and Gupta, A (2024) Integrated 4D design change management model for construction projects. Journal of Construction Engineering and Management, 150(5): 04024023, ISSN 0733-9364

Wang, P; Wang, K; Huang, Y and Fenn, P (2025) Probability, formation, and prediction of large-size construction cost overruns governed by a power-law distribution. Journal of Construction Engineering and Management, 151(6): 04025062, ISSN 0733-9364

Wang, P; Wang, K; Huang, Y; Fenn, P and Stewart, I (2022) Auditing construction cost from an in-process perspective based on a Bayesian predictive model. Journal of Construction Engineering and Management, 148(4): 04022003, ISSN 0733-9364

Warsame, A (2011) Performance of construction projects: Essays on supplier structure, construction costs and quality improvement. PhD thesis, KTH Royal Institute of Technology, Sweden.

Watton, J; Unterhitzenberger, C; Locatelli, G and Invernizzi, D C (2023) The cost drivers of infrastructure projects: Definition, classification, and conceptualization. Journal of Construction Engineering and Management, 149(11): 03123006, ISSN 0733-9364

Whitely, Owen (2025) Strategies for reducing cost overruns on government-funded infrastructure projects in Jamaica. DBA thesis, Walden University, USA.

Wiguna, I P A (2005) The influence of risk on project performance in Indonesian building contracts. PhD thesis, University of Newcastle upon Tyne, UK.

Wiguna, I P A and Scott, S (2005) Nature of the critical risk factors affecting project performance in Indonesian building contracts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Williams, T P (2007) Application of treemaps to the analysis of competitively bid project cost overruns. Construction Innovation, 7(4), pp. 340-356. ISSN 1471-4175

Winata, L E and Gultom, Y M L (2024) The effects of governance on performance: The case of public-private partnership (PPP) toll roads in Indonesia. International Journal of Construction Management, 24(13), pp. 1398-1406. ISSN 1562-3599

Windapo, A; Moghayedi, A; Oliphant, D and Adediran, A (2018) Exploring the components of cost on construction projects. Journal of Construction Business and Management, 2(2), pp. 42-50. ISSN 2521-0165

Woldetsadik, E T (2025) A predictive model for estimating formwork and shoring removal time. DEngr thesis, George Washington University, USA.

Wu, C; Chen, C; Jiang, R; Wu, P; Xu, B and Wang, J (2019) Understanding laborers' behavioral diversities in multinational construction projects using integrated simulation approach. Engineering, Construction and Architectural Management, 26(9), pp. 2120-2146. ISSN 0969-9988

Yadav, S and Ray, G S (2015) Supply chain management in flyover projects in India. Journal of Construction in Developing Countries, 20(1), pp. 25-47. ISSN 1823-6499

Yap, J B H; Abdul-Rahman, H and Wang, C (2018) Preventive mitigation of overruns with project communication management and continuous learning: PLS-SEM approach. Journal of Construction Engineering and Management, 144(5): 4018025, ISSN 0733-9364

Yap, J B H; Lim, B L; Skitmore, M and Gray, J (2022) Criticality of project knowledge and experience in the delivery of construction projects. Journal of Engineering, Design and Technology, 20(3), pp. 800-822. ISSN 1726-0531

Yap, J B H and Lock, A (2017) Analysing the benefits, techniques, tools and challenges of knowledge management practices in the Malaysian construction SMEs. Journal of Engineering, Design and Technology, 15(6), pp. 803-825.

Yap, J B H; Low, P L and Wang, C (2017) Rework in Malaysian building construction: Impacts, causes and potential solutions. Journal of Engineering, Design and Technology, 15(5), pp. 591-618.

Yap, J B H and Shavarebi, K (2022) Enhancing project delivery performances in construction through experiential learning and personal constructs: Competency development. International Journal of Construction Management, 22(3), pp. 436-452. ISSN 1562-3599

Yap, J B H and Skitmore, M (2018) Investigating design changes in Malaysian building projects. Architectural Engineering and Design Management, 14(3), pp. 218-238. ISSN 1745-2007

Ye, Xuling (2025) Blockchain-based smart contract realization in BIM environment: Technical adoption for reliable and collaborative construction management. PhD thesis, Ruhr-Universität Bochum, Germany.

Yeh, Y C; Hsu, D S and Kuo, Y H (1991) Expert system for diagnosing damage of prestressed concrete pile. Journal of Construction Engineering and Management, 117(1), pp. 13-26. ISSN 0733-9364

Yilmaz, S; Kumar, D; Hada, S; Demirkesen, S; Zhang, C and Li, H (2025) A PMBOK-based construction cost management framework for BIM integration in construction projects. International Journal of Construction Management, 25(8), pp. 861-875. ISSN 1562-3599

Yip, H L; Wong, S Y; Ding, C S and Low, W W (2026) Ethical transgressions in the construction industry in sarawak, Malaysia: Perspectives of quantity surveyors. Engineering, Construction and Architectural Management, 33(1), pp. 435-451. ISSN 0969-9988

Yoo, W S (2007) An information-based decision making framework for evaluating and forecasting a project cost and completion date. PhD thesis, Ohio State University, USA.

Yoo, Wi Sung and Hadipriono Tan, Fabian (2007) An information-based decision making framework for evaluation and forecasting a project cost and completion date. PhD thesis, The Ohio State University, USA.

Yoon, Jong Han (2023) Blockchain-enabled smart contract system for creating system-based trust in subcontracting process. PhD thesis, Georgia Institute of Technology, USA.

You, X (2010) Risk analysis in tunneling with imprecise probabilities. PhD thesis, University of Texas at Austin, USA.

Youssefi, I and Celik, T (2024) Comparative analysis between different risk score calculation approaches. Engineering, Construction and Architectural Management, 31(10), pp. 4099-4124. ISSN 0969-9988

Yumul, John (2025) Evaluation of machine learning models to predict cost overruns for New York city capital projects. DEngr thesis, George Washington University, USA.

Zaalouk, A; Altaf, M S and Han, S (2025) Operations-oriented supply chain master planning in panelized construction using hybrid multiagent simulation. Journal of Construction Engineering and Management, 151(10): 04025206, ISSN 0733-9364

Zaneldin, E (2005) Construction claims in the united arab emirates: Types, causes, and frequency. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Zeng, S; Chung, F and Ashuri, B (2024) Forecasting right-of-way (ROW) acquisition timeline of transportation projects. Built Environment Project and Asset Management, 14(2), pp. 129-146. ISSN 2044-124X

Zhang, L.; Zhou, J. and Xue, H. (2026) Exploring the configurational effects of contractual and relational governance mechanisms on stakeholder collaboration in prefabricated building projects. Engineering, Construction and Architectural Management, 33(4), pp. 3220-3239. ISSN 0969-9988

Zhang, Z.; Wang, Y.; Liu, J.; Wang, Y.; Liu, C. and Geng, X. (2026) Transport risk assessment for China's prefabricated construction supply chain: Integrating game theory and fuzzy Bayesian network. Engineering, Construction and Architectural Management, pp. 1-24. ISSN 0969-9988

Zhang, J; Chen, F and Yuan, X X (2020) Comparison of cost and schedule performance of large public projects under P3 and traditional delivery models: A Canadian study. Construction Management and Economics, 38(8), pp. 739-755. ISSN 01446193

Zhang, L and Agapiou, A (2020) Influence diagrams for off-site construction manufacturing risk assessment in China. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(4), pp. 145-162. ISSN 17514304

Zhang, Y; Minchin, R E and Agdas, D (2017) Forecasting completed cost of highway construction projects using LASSO regularized regression. Journal of Construction Engineering and Management, 143(10): 04017071, ISSN 0733-9364

Zhao, X; Wu, P and Wang, X (2018) Risk paths in BIM adoption: Empirical study of China. Engineering, Construction and Architectural Management, 25(9), pp. 1170-1187. ISSN 0969-9988

Zhao, Z Y; Lv, Q L; Zuo, J and Zillante, G (2010) Prediction system for change management in construction project. Journal of Construction Engineering and Management, 136(6), pp. 659-669. ISSN 0733-9364

Zheng, R; Li, Z; Li, L; Dou, Y; Yuan, M and Yin, X (2024) Proposing a lean-optimized scheduling model of mixed-flow prefabricated component production in off-site construction. Journal of Construction Engineering and Management, 150(8): 04024088, ISSN 0733-9364

Zhu, F; Hu, H; Xu, F and Tang, N (2021) Predicting the impact of country-related risks on cost overrun for overseas infrastructure projects. Journal of Construction Engineering and Management, 147(2): 0012933, ISSN 0733-9364

Zuluaga, C M; Albert, A and Winkel, M A (2020) Improving safety, efficiency, and productivity: Evaluation of fall protection systems for bridge work using wearable technology and utility analysis. Journal of Construction Engineering and Management, 146(2): 04019107, ISSN 0733-9364

olde Scholtenhuis, Léon Luc (2015) Enhancing mindful coordination in fragmented utility construction practices: By developing, implementing and evaluating virtual design and construction models. PhD thesis, University of Twente, Netherlands.

van der Kuyp, D J (2018) Strategies construction managerial leaders use to counteract material cost overruns. PhD thesis, Walden University, USA.

Ünsal Altuncan, I and Tanyer, A M (2018) Context-dependent construction conflict management performance analysis based on competency theory. Journal of Construction Engineering and Management, 144(12): 04018112, ISSN 0733-9364