Items with Index Term: cost increase
Art Chaovalitwongse, W; Wang, W; Williams, T P and Chaovalitwongse, P (2012) Data mining framework to optimize the bid selection policy for competitively bid highway construction projects. Journal of Construction Engineering and Management, 138(2), pp. 277-286. ISSN 0733-9364
Belay, A M and Torp, O (2023) Construction cost performance under quality-gated framework: The cases of Norwegian road constructions. International Journal of Construction Management, 23(6), pp. 1030-1043. ISSN 1562-3599
Borg, L and Song, H S (2015) Quality change and implications for productivity development: Housing construction in Sweden 1990-2010. Journal of Construction Engineering and Management, 141(1): 05014014, ISSN 0733-9364
Cantarelli, C C (2011) Cost overruns in large-scale transport infrastructure projects: A theoretical and empirical exploration for the Netherlands and worldwide. PhD thesis, Delft University of Technology, Netherlands.
Castelblanco, G; Fenoaltea, E M; De Marco, A and Chiaia, B (2025) Influence of macroeconomic factors on construction costs: An analysis of project cases. Construction Management and Economics, 43(3), pp. 196-212. ISSN 0144-6193
Chovichien, V and Suriyanon, N (2011) Attitudes of people in the Thai construction industry sector on issues related to delay in the approval of submittals. Journal of Construction in Developing Countries, 16(1), pp. 41-67. ISSN 1823-6499
Chua, D K H; Wang, Y and Tan, W T (2003) Impacts of obstacles in East Asian cross-border construction. Journal of Construction Engineering and Management, 129(2), pp. 131-141. ISSN 0733-9364
Coffey, M A (2010) An optimization model for subsurface utility engineering during the design process. PhD thesis, University of Florida, USA.
Cole, R J and Sterner, E (2000) Reconciling theory and practice of life-cycle costing. Building Research & Information, 28(5-6), pp. 368-375. ISSN 0961-3218
Farbarik, J J (1994) Evaluation of the efficacy of using bid data to predict construction cost overruns. PhD thesis, University of Washington, USA.
Forcada, N; MacArulla, M; Gangolells, M and Casals, M (2014) Assessment of construction defects in residential buildings in Spain. Building Research & Information, 42(5), pp. 629-640. ISSN 0961-3218
Hassanein, A A G and el Nemr, W (2007) Management of change order claims in the Egyptian industrial construction sector. Journal of Financial Management of Property and Construction, 12(1), pp. 45-60. ISSN 1366-4387
Ho, C T T (2019) Application of optimization to the production planning of construction prefabrication supply chains. PhD thesis, University of Washington, USA.
Holmes, S H and Reinhart, C F (2013) Assessing future climate change and energy price scenarios: Institutional building investment. Building Research & Information, 41(2), pp. 209-222. ISSN 0961-3218
Householder, J L and Rutland, H E (1990) Who owns float? Journal of Construction Engineering and Management, 116(1), pp. 130-133. ISSN 0733-9364
Huo, T; Ren, H; Cai, W; Shen, G Q; Liu, B; Zhu, M and Wu, H (2018) Measurement and dependence analysis of cost overruns in megatransport infrastructure projects: Case study in Hong Kong. Journal of Construction Engineering and Management, 144(3): 05018001, ISSN 0733-9364
Huynh, H T (2021) Game theory applications in construction project management. PhD thesis, Catholic University of America, USA.
Kim, S. and Liang, Y. (2026) Dissecting highway construction cost inflation: A two-decade analysis of inflation types using the national highway construction cost index. Journal of Construction Engineering and Management, 152(7): 04026087, ISSN 0733-9364
Kim, S (2023) Disaster management and recovery: Estimating the disaster impacts on construction costs and evaluating the policy effects on disaster recovery. PhD thesis, University of Texas at Arlington, USA.
Koushki, P A; Al-Rashid, K and Kartam, N (2005) Delays and cost increases in the construction of private residential projects in Kuwait. Construction Management and Economics, 23(3), pp. 285-294. ISSN 01446193
Liu, H (2013) Adaptive optimization methods in system-level bridge management. PhD thesis, University of California, Berkeley, USA.
Love, P E D; Edwards, D J and Smith, J (2005) Contract documentation and the incidence of rework in projects. Architectural Engineering and Design Management, 1(4), pp. 247-259. ISSN 1745-2007
Lundman, P (2011) Cost management for underground infrastructure projects a case study on cost increase and its causes. PhD thesis, Luleå University of Technology, Sweden.
Mkandawire, K; Kabiri, S; Mbugua, L and Connaughton, J (2022) Managing interfaces between offsite and onsite construction. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Moret, Y and Einstein, H H (2012) Modeling correlations in rail line construction. Journal of Construction Engineering and Management, 138(9), pp. 1075-1084. ISSN 0733-9364
Oyegoke, A S; Fisher, B W; Ajayi, S; Omotayo, T S and Ewuga, D (2024) The disruptive factors and longevity effects of covid-19 and brexit on the SMEs construction supply chain in the UK. Journal of Financial Management of Property and Construction, 29(1), pp. 115-134. ISSN 1366-4387
Park, J (2015) Essays on the delivery of public infrastructure projects: Empirical analyses on transportation projects in Florida. PhD thesis, George Washington University, USA.
Rezaee Arjroody, A; Hosseini, S A; Akhbari, M; Safa, E and Asadpour, J (2024) Accurate estimation of cost and time utilizing risk analysis and simulation (case study: Road construction projects in Iran). International Journal of Construction Management, 24(1), pp. 19-30. ISSN 1562-3599
Salas-Morera, L; Arauzo-Azofra, A; García-Hernández, L; Palomo-Romero, J M and Ayuso-Muñoz, J L (2018) New approach to the distribution of project completion time in PERT networks. Journal of Construction Engineering and Management, 144(10): 04018094, ISSN 0733-9364
Schönbeck, P (2022) Data based configuration decisions in hospital construction projects. PhD thesis, KTH Royal Institute of Technology, Sweden.
Seyis, S; Ergen, E and Pizzi, E (2016) Identification of waste types and their root causes in green-building project delivery process. Journal of Construction Engineering and Management, 142(2): 04015059, ISSN 0733-9364
Stamatiadis, N; Goodrum, P; Shocklee, E and Wang, C (2014) Quantitative analysis of state transportation agency's experience with constructability reviews. Journal of Construction Engineering and Management, 140(2): 04013043, ISSN 0733-9364
Stenbeck, T (2008) Quantifying effects of incentives in a rail maintenance performance-based contract. Journal of Construction Engineering and Management, 134(4), pp. 265-272. ISSN 0733-9364
Sterner, E (2002) Green procurement of buildings: Estimation of environmental impact and life-cycle cost. PhD thesis, Luleå University of Technology, Sweden.
Subedi, J; Ghimire, R M; Neupane, R P and Amatya, S (2016) Cost difference of buildings in Kathmandu constructed with and without earthquake safer features. International Journal of Disaster Resilience in the Built Environment, 7(5), pp. 444-459. ISSN 1759-5916
Tanko, B. L.; Oakley, J. T.; Jagun, Z. and Madanayake, U. (2026) Comparing 5D BIM costs: Stilt housing against conventional housing for flood management. Journal of Engineering, Design and Technology, 24(2), pp. 361-383. ISSN 1726-0531
Thadicaran, A B G (1997) Implementation strategies for water resources projects under uncertainties of completion time. PhD thesis, Colorado State University, USA.
Tobin, N Y (2017) A framework for knowledge capture and recovery in whole life costing practice. PhD thesis, Robert Gordon University, UK.
Torcellini, P; Pless, S and Leach, M (2014) A pathway for net-zero energy buildings: Creating a case for zero cost increase. Building Research & Information, 43(1), pp. 25-33. ISSN 0961-3218
Touran, A; Atgun, M and Bhurisith, I (2004) Analysis of the United States department of transportation prompt pay provisions. Journal of Construction Engineering and Management, 130(5), pp. 719-725. ISSN 0733-9364
Williams, T P (2002) Predicting completed project cost using bidding data. Construction Management and Economics, 20(3), pp. 225-235. ISSN 01446193
Williams, T P (2007) Application of treemaps to the analysis of competitively bid project cost overruns. Construction Innovation, 7(4), pp. 340-356. ISSN 1471-4175
Windapo, A; Odediran, S; Moghayedi, A; Adediran, A and Oliphant, D (2017) Determinants of building construction costs in South Africa. Journal of Construction Business and Management, 1(1), pp. 8-13. ISSN 2521-0165
Zuo, F; Zio, E and Yuan, Y (2022) Risk-response strategy optimization considering limited risk-related resource allocation and scheduling. Journal of Construction Engineering and Management, 148(11): 04022123, ISSN 0733-9364
Up a level