Items with Index Term: cost data

Number of items: 109.

Abdullatif, M I (1992) A system for quality-related costs for construction projects. PhD thesis, University of Kansas, USA.

Abubakar, A (1992) A quantitative approach to cost monitoring and control of construction projects. PhD thesis, Loughborough University, UK.

Adamtey, S (2021) Cost and time performance analysis of progressive design-build projects. Journal of Engineering, Design and Technology, 19(3), pp. 686-697. ISSN 1726-0531

Agyekum, B; Kissi, E; Yamoah Agyemang, D and Badu, E (2018) Examining barriers for the utilization of non-traditional cost estimating models in developing countries: Ghanaian quantity surveyors' perspectives. Journal of Engineering, Design and Technology, 16(6), pp. 814-827. ISSN 1726-0531

Aje, O I; Ogunsemi, D R and Odusami, K T (2009) The impact of contractors' management capability on cost and time performance of construction projects in Nigeria. Journal of Financial Management of Property and Construction, 14(2), pp. 171-187. ISSN 1366-4387

Akintoye, A S; Ajewole, O and Olomolaiye, P O (1992) Construction cost information management in Nigeria. Construction Management and Economics, 10(2), pp. 107-116. ISSN 01446193

Alavipour, S M R and Arditi, D (2019) Maximizing expected contractor profit using an integrated model. Engineering, Construction and Architectural Management, 26(1), pp. 118-138. ISSN 0969-9988

Aligamhe, V I; Mustapa, M; Ogbu, C P and Misnan, M S (2024) Modelling cost-risk impact on Nigerian highway projects using multiple linear regression and artificial neural networks. Journal of Construction in Developing Countries, 29(2), pp. 107-128. ISSN 1823-6499

Alolote Ibim, A and Dimkpa, K (2022) Assessing the cost accuracy of electrical works towards sustainable procurement of building services. International Journal of Construction Management, 22(10), pp. 1974-1982. ISSN 1562-3599

Amadi, A and Higham, A (2016) Geotechnical characterization of cost overrun drivers in highway projects: Predicated on heterogeneous ground conditions in the Niger delta region of Nigeria. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Amadi, A I (2016) Explaining cost overruns in highway projects: a geo-spatial regression modelling and cognitive mapping of latent pathogens and contextual drivers. PhD thesis, University of Salford, UK.

Arif, F; Lodi, S H and Azhar, N (2015) Factors influencing accuracy of construction project cost estimates in Pakistan: Perception and reality. International Journal of Construction Management, 15(1), pp. 59-70. ISSN 1562-3599

Babalola, O and Adesanya, D A (2007) An evaluation of the level of accuracy of electrical services cost estimates in Nigeria. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Bae, Y J (2016) Integrated design tool of building system optimization for building life cycle cost. PhD thesis, Purdue University, USA.

Banwo, O O (2022) Development of a framework for building cost information management in Nigeria. PhD thesis, Coventry University, UK.

Blackwood, D J (1998) Rationalisation of design cost estimation in the construction industry. PhD thesis, Abertay University, UK.

Blackwood, D J; Sarkar, S and Price, A D F (1997) A research methodology for modelling construction design service costs. Journal of Construction Procurement, 3(3), pp. 47-67. ISSN 1358-9180

Blampied, N B (2018) Parametric functions for conceptual and feasibility estimating in public highway project portfolios. PhD thesis, University of California, Berkeley, USA.

Boo, J H S (2001) Improving the accuracy of approximate estimates of building projects. Building Research & Information, 29(4), pp. 312-318. ISSN 0961-3218

Borja, Luis Claudio Alves (2019) Development of a quantitative method for predicting environmental aspects generated by construction sites. PhD thesis, Universidade Federal da Bahia, Brazil.

Bowen, P A and Edwards, P J (1998) Building cost planning and cost information management in South Africa. Journal of Construction Procurement, 4(1), pp. 16-26. ISSN 1358-9180

Bray Jr., H G (1994) Domestic construction contractors and ISO 9000 registration. DE thesis, Louisiana Tech University, USA.

Catalina, A J (2016) Development of a statistical theory-based capital cost estimating methodology for light rail transit corridor evaluation under varying alignment characteristics. PhD thesis, University of Kentucky, USA.

Chan, A P C (1999) Modelling building durations in Hong Kong. Construction Management and Economics, 17(2), pp. 189-196. ISSN 01446193

Chao, L C (2010) Estimating project overheads rate in bidding: DSS approach using neural networks. Construction Management and Economics, 28(3), pp. 287-299. ISSN 1466433X

Che Haron, R (2017) Systems thinking paradigm in construction cost estimating reliability. PhD thesis, University of Reading, UK.

Chovichien, V (1981) The discounted cost model and application to acquisition and utilization policies of construction equipment. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Collins, A; Blondel, A A; Mensah, S and Manu, E (2021) Assessing the cost of competitive tendering in Ghana using transaction cost theory. Built Environment Project and Asset Management, 11(5), pp. 835-850. ISSN 2044-124X

Corbett, P and Rowley, P (1999) The use of bcis elemental cost data by quantity surveyors as part of cost planning techniques: The practitioners' perspective. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Davies, A J (1995) Towards a method of measurement and cost control for civil engineering work in the petrochemical industry. PhD thesis, University of Northumbria at Newcastle, UK.

Dib, H Y (2006) Visual information access and management for life cycle project management. PhD thesis, University of Florida, USA.

Dixit, M K (2017) Embodied energy and cost of building materials: Correlation analysis. Building Research & Information, 45(5), pp. 508-523. ISSN 0961-3218

Doğan, S Z (2005) Using machine learning techniques for early cost prediction of structural systems of buildings. PhD thesis, Izmir Institute of Technology, Turkey.

Eamon, C; Shinki, K; Wong, K H and Alsendi, A (2025) Assessment of pay item specific case-based reasoning approach for bridge unit cost estimation. Journal of Construction Engineering and Management, 151(12): 04025188, ISSN 0733-9364

Elghaish, F; Abrishami, S; Abu Samra, S; Gaterell, M; Hosseini, M R and Wise, R (2021) Cash flow system development framework within integrated project delivery (IPD) using BIM tools. International Journal of Construction Management, 21(6), pp. 555-570. ISSN 1562-3599

Elghaish, F A K (2020) An automated IPD cost management system: BIM and blockchain based solution. PhD thesis, University of Portsmouth, UK.

Elhag, T M S (2004) Tender price modelling: artificial neural networks and regression techniques. PhD thesis, University of Liverpool, UK.

Eskander, A K (1998) Total project management delay analysis method (TPM-DAM) with emphasis on project preplanning. PhD thesis, Polytechnic University, USA.

Gao, N and Touran, A (2020) Cost overruns and formal risk assessment program in US rail transit projects. Journal of Construction Engineering and Management, 146(5): 05020004, ISSN 0733-9364

Geekiyanage, D; Ramachandra, T and Thurairajah, N (2018) A model for early stage estimation of operational expenses (opex) in commercial buildings. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Goodchild, B and Beatty, C (2000) Assessing the procurement practices of housing associations: A case study of new build in Scotland. Journal of Construction Procurement, 6(1), pp. 20-32. ISSN 1358-9180

Gowri, K (1990) Knowledge-based system approach to building envelope design. PhD thesis, Concordia University, Canada.

Gregory, R A (1992) Development of a knowledge-based system approach for decision-making in construction projects. PhD thesis, University of Florida, USA.

Hallowell, M (2010) Cost-effectiveness of construction safety programme elements. Construction Management and Economics, 28(1), pp. 25-34. ISSN 1466433X

Harding, A; Lowe, D; Hickson, A; Emsley, M and Duff, A R (1999) Implementation of a neural network model for the comparison of the cost of different procurement approaches. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Hegazy, T and Ayed, A (1998) Neural network model for parametric cost estimation of highway projects. Journal of Construction Engineering and Management, 124(3), pp. 210-218. ISSN 0733-9364

Hollar, D A (2011) Predicting preliminary engineering costs for highway projects. PhD thesis, North Carolina State University, USA.

Hu, M (2023) An evaluation of the retrofit net zero building performances: Life cycle energy, emissions and cost. Building Research & Information, 51(2), pp. 179-191. ISSN 0961-3218

Hu, M and Skibniewski, M (2022) The impact of the design team characteristics on the sustainable building construction cost: Structural equation model analysis. Architectural Engineering and Design Management, 18(5), pp. 614-630. ISSN 1745-2007

Ibbotson, K (2020) Prioritising carbon reduction in UK public sector flood and coastal risk management. PhD thesis, University of Bolton, UK.

Ikediashi, D I and Okolie, K C (2022) An assessment of risks associated with contractor's cash flow projections in South-South, Nigeria. International Journal of Construction Management, 22(11), pp. 2051-2058. ISSN 1562-3599

Illankoon, Illankoon Mudiyanselage Chethana Sanathani (2018) A life-cycle cost model for green commercial office buildings with optimal green star credits. PhD thesis, Western Sydney University, Australia.

Jagboro, G O and Alli, O R (1999) A study of the monetary value of extension of time in building project. Journal of Financial Management of Property and Construction, 4(3), pp. 39-46. ISSN 1366-4387

Jumas, D; Mohd-Rahim, F A; Zainon, N and Utama, W P (2018) Improving accuracy of conceptual cost estimation using MRA and ANFIS in Indonesian building projects. Built Environment Project and Asset Management, 8(4), pp. 348-357. ISSN 2044-124X

Kedarisetty, S (2025) Pavement management systems in local governments. PhD thesis, University of California, Davis, USA.

Kim, C S and Liu, L Y (2007) Cost information model for managing multiple projects. Journal of Construction Engineering and Management, 133(12), pp. 966-974. ISSN 0733-9364

Kirkham, R J; Boussabaine, A H and Awwad, B H (2002) Probability distributions of facilities management costs for whole life cycle costing in acute care nhs hospital buildings. Construction Management and Economics, 20(3), pp. 251-261. ISSN 01446193

Kishk, M; Al-Hajj, A; Pollock, R and Aouad, G F (2002) A generic database for whole life costing applications in construction. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Langston, C (2013) The application of data envelopment analysis to the benchmarking of construction performance in Australian and American high-rise buildings. International Journal of Construction Management, 13(3), pp. 55-75. ISSN 1562-3599

Langston, C (2014) Construction efficiency: A tale of two developed countries. Engineering, Construction and Architectural Management, 21(3), pp. 320-335. ISSN 0969-9988

Lee, H S and Yi, K J (1999) Application of mathematical matrix to integrate project schedule and cost. Journal of Construction Engineering and Management, 125(5), pp. 339-346. ISSN 0733-9364

Lee, J G; Lee, H S; Park, M and Seo, J (2022) Early-stage cost estimation model for power generation project with limited historical data. Engineering, Construction and Architectural Management, 29(7), pp. 2599-2614. ISSN 0969-9988

Levander, E and Sardén, Y (2009) Maintenance and operating costs in off-site timber framed housing. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Li, H and Love, P E D (1997) Combining rule-based expert systems and artificial neural networks for mark-up estimation. Construction Management and Economics, 17(2), pp. 169-176. ISSN 01446193

Lowe, D J (1996) Experiental learning in design cost estimating. PhD thesis, University of Manchester, UK.

Maaz, Z. N.; Jamaludin, A. F.; Mohd Rahim, F. A.; Rashidi, A. and Darmansah, N. F. (2026) Artificial intelligence capabilities in project cost management in the Malaysian construction industry: An exploratory study. Engineering, Construction and Architectural Management, pp. 1-22. ISSN 0969-9988

Madushika, U G D and Ramachandra, T (2024) A comparative assessment of indirect green façade and conventional walls: perspective of life cycle cost. Built Environment Project and Asset Management, 14(5), pp. 697-712. ISSN 2044-124X

Morrison, N (1984) The accuracy of quantity surveyors' cost estimating. Construction Management and Economics, 2(1), pp. 57-75. ISSN 01446193

Naderi, M; Nazari, A; Shafaat, A and Abrishami, S (2025) Enhancing accuracy in construction overhead cost estimation: A novel integration of activity-based costing and building information modelling. Smart and Sustainable Built Environment, 14(3), pp. 758-775. ISSN 2046-6099

Ng, S T; Cheung, S O; Skitmore, M and Wong, T C Y (2004) An integrated regression analysis and time series model for construction tender price index forecasting. Construction Management and Economics, 22(5), pp. 483-493. ISSN 01446193

Nguyen, H V (2010) Process-based cost modeling to support target value design. PhD thesis, University of California, Berkeley, USA.

Niknam, M (2015) A semantics-based approach to construction cost estimating. PhD thesis, Marquette University, USA.

Oduro Asamoah, R; Offei-Nyako, K and Twumasi-Ampofo, K (2023) Relative importance of triggers influencing cost contingency determination for building contracts: the perspective of quantity surveyors. International Journal of Construction Management, 23(5), pp. 790-798. ISSN 1562-3599

Ogunlana, S O (1989) Accuracy in design cost estimating. PhD thesis, Loughborough University, UK.

Ogunsemi, D R and Jagboro, G O (2006) Time-cost model for building projects in Nigeria. Construction Management and Economics, 24(3), pp. 253-258. ISSN 01446193

Pan, W (2006) A decision support tool for optimising the use of offsite technologies in housebuilding. PhD thesis, Loughborough University, UK.

Pan, W; Gibb, A F and Dainty, A R J (2007) Perspective of UK housebuilders on the use of offsite modern methods of construction. Construction Management and Economics, 25(2), pp. 183-194. ISSN 1466433X

Pan, W; Gibb, A G F and Sellars, A B (2008) Maintenance cost implications of utilizing bathroom modules manufactured offsite. Construction Management and Economics, 26(10), pp. 1067-1077. ISSN 1466433X

Rogan, A (1999) Inter-organisational relationships in the construction process. PhD thesis, University of the West of England, Bristol, UK.

Ross, A (2011) Supply chain management in an uncertain economic climate: A UK perspective. Construction Innovation, 11(1), pp. 5-13. ISSN 1471-4175

Russell, J S; Gugel, J G and Radtke, M W (1994) Comparative analysis of three constructability approaches. Journal of Construction Engineering and Management, 120(1), pp. 180-195. ISSN 0733-9364

Schexnayder, C J J (1980) Heavy construction equipment replacement economics. PhD thesis, Purdue University, USA.

Seydel, J and Olson, D L (1990) Bids considering multiple criteria. Journal of Construction Engineering and Management, 116(4), pp. 609-623. ISSN 0733-9364

Shapira, A (1995) Rational design of shoring-tower-based formwork. Journal of Construction Engineering and Management, 121(3), pp. 255-260. ISSN 0733-9364

Shrestha, K (2023) Cost comparison of highway rest area operations: In-house workforce versus outsourcing methods. Journal of Construction Engineering and Management, 149(8): 04023062, ISSN 0733-9364

Shrestha, K; Shrestha, P P and Lidder, M (2019) Life-cycle cost comparison of chip seal and striping: In-house workers versus private contractors. Engineering, Construction and Architectural Management, 26(6), pp. 927-944. ISSN 0969-9988

Sidwell, N C (1957) A critical examination of new constructional techniques and their influence on productivity in the building industry, with special reference to housing in south-east Scotland. PhD thesis, University of Edinburgh, UK.

Sinfield, J V and Einstein, H H (1998) Tunnel construction costs for tube transportation systems. Journal of Construction Engineering and Management, 124(1), pp. 48-57. ISSN 0733-9364

Soleimanifar, Meimanat (2016) Integrated project management framework for a pipe spool fabrication shop. PhD thesis, University of Alberta, Canada.

Son, J; Khwaja, N and Milligan, D S (2019) Planning-phase estimation of construction time for a large portfolio of highway projects. Journal of Construction Engineering and Management, 145(4): 04019018, ISSN 0733-9364

Sonmez, R (2004) Selection of a probability distribution function for construction cost estimation. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Suckarieh, G (1984) Construction management control with microcomputers. Journal of Construction Engineering and Management, 110(1), pp. 72-78. ISSN 0733-9364

Swaffield, L M and Pasquire, C L (1996) A critique of mechanical and electrical services cost planning: Existing methods and published information. Journal of Financial Management of Property and Construction, 1(3), pp. 23-42. ISSN 1366-4387

Swaffield, L M and Pasquire, C L (2000) Improving early cost advice for mechanical and electrical services by considering functions and client/design team communication. Journal of Financial Management of Property and Construction, 5(1-2), pp. 3-13. ISSN 1366-4387

Tam, V W Y and Le, K N (2008) On using the Gaussian and hyperbolic distributions to improve quality in construction. Journal of Engineering, Design and Technology, 6(2), pp. 112-123. ISSN 1726-0531

Tam, V W Y; Le, K N and Le, H N (2008) Using Gaussian and hyperbolic distributions for quality improvement in construction: Case study approach. Journal of Construction Engineering and Management, 134(7), pp. 555-561. ISSN 0733-9364

Taylor, R G and Bowen, P A (1987) Building price-level forecasting: An examination of techniques and applications. Construction Management and Economics, 5(1), pp. 21-44. ISSN 01446193

Tomlinson, J (1998) A premises occupancy cost forecasting model. PhD thesis, University of Liverpool, UK.

Uhlik III, F T (1984) Optimizing earthwork estimating for highway construction. PhD thesis, Pennsylvania State University, USA.

Vereen, S C (2013) Forecasting skilled labor demand in the US construction industry. PhD thesis, North Carolina State University, USA.

Vereen, S C; Rasdorf, W and Hummer, J E (2016) Development and comparative analysis of construction industry labor productivity metrics. Journal of Construction Engineering and Management, 142(7): 4016020, ISSN 0733-9364

Wang, Y; Zuo, J; Pan, M; Tu, B; Chang, R D; Liu, S; Xiong, F and Dong, N (2024) Cost prediction of building projects using the novel hybrid RA-ANN model. Engineering, Construction and Architectural Management, 31(6), pp. 2563-2582. ISSN 0969-9988

Wanigarathna, N; Jones, K; Pascale, F; Morga, M and Meslem, A (2023) Cost–benefit analysis to appraise technical mitigation options for earthquake-induced liquefaction disaster events. Journal of Financial Management of Property and Construction, 28(2), pp. 220-241. ISSN 1366-4387

Warszawski, A and Rosenfeld, Y (1994) Robot for interior-finishing works in building: Feasibility analysis. Journal of Construction Engineering and Management, 120(1), pp. 132-151. ISSN 0733-9364

Weerasinghe, A; Ramachandra, T and Rotimi, J O B (2016) A simplified model for predicting running cost of office buildings in Sri Lanka. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Windapo, A; Odediran, S; Moghayedi, A; Adediran, A and Oliphant, D (2017) Determinants of building construction costs in South Africa. Journal of Construction Business and Management, 1(1), pp. 8-13. ISSN 2521-0165

Wong, I L; Perera, S and Eames, P C (2010) Goal directed life cycle costing as a method to evaluate the economic feasibility of office buildings with conventional and TI-façades. Construction Management and Economics, 28(7), pp. 715-735. ISSN 1466433X

Yang, R J and Zou, P X W (2016) Building integrated photovoltaics (BIPV): Costs, benefits, risks, barriers and improvement strategy. International Journal of Construction Management, 16(1), pp. 39-53. ISSN 1562-3599

Yeung, D K L and Skitmore, M (2005) Data pooling for early-stage price forecasts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

This list was generated on Sat Aug 22 02:20:52 2026 UTC.