Items with Index Term: control system
Abdullatif, M I (1992) A system for quality-related costs for construction projects. PhD thesis, University of Kansas, USA.
Abeid, J and Arditi, D (2003) Photo-net: An integrated system for controlling construction progress. Engineering, Construction and Architectural Management, 10(3), pp. 162-171. ISSN 0969-9988
Abu-Hijleh, S F (1991) A model for variance-based exception reporting with user-defined criteria. PhD thesis, University of California, Berkeley, USA.
Abubakar, A (1992) A quantitative approach to cost monitoring and control of construction projects. PhD thesis, Loughborough University, UK.
Agapiou, A (2020) Drones in construction: An international review of the legal and regulatory landscape. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(3), pp. 118-125. ISSN 17514304
Agyekum-Mensah, G (2013) The development of an innovative sustainable total planning and control system for construction projects. PhD thesis, Nottingham Trent University, UK.
Al Nasseri, H A; Widen, K and Aulin, R (2016) A taxonomy of planning and scheduling methods to support their more efficient use in construction project management. Journal of Engineering, Design and Technology, 14(3), pp. 580-601.
Al-Jibouri, S and Mawdesley, M J (2001) Development and application of a stochastic based cost prediction model for construction. Journal of Financial Management of Property and Construction, 6(1), pp. 61-69. ISSN 1366-4387
Al-Tabtabai, H M (1989) PROCON: A knowledge-based approach to construction project control. PhD thesis, University of Colorado at Boulder, USA.
Ali, Atif (2010) Investigating project management practices in public sector organisations of a less developed country. PhD thesis, RMIT University, Australia.
Alzoubi, Y; Locatelli, G and Tristano, S (2024) The ugly side of construction: Modern slavery in the 2022 fifa world cup program. Construction Management and Economics, 42(5), pp. 412-430. ISSN 01446193
Arida, M A (2024) Enhancing thermal comfort in commercial buildings: Contributions of machine learning algorithms for optimizing predictive thermal comfort indices. PhD thesis, North Carolina Agricultural and Technical State University, USA.
Azimi, R (2011) An integrated real-time control system for structural steel fabrication projects. PhD thesis, University of Alberta, Canada.
Bahram, D. (2025) Briefing: Importance of trust when adopting an intelligent environment. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(1), pp. 3-6. ISSN 1751-4304
Ballard, H G (2000) The last planner system of production control. PhD thesis, University of Birmingham, UK.
Barcia, R M (1985) Construction production planning and optimal control. PhD thesis, University of Waterloo, Canada.
Bataglin, Fernanda Saidelles (2023) Prescriptive conceptual framework for planning and controlling engineer-to-order industrialized building systems. PhD thesis, Universidade Federal do Rio Grande do Sul, Brazil.
Beliveau, Y; Dixit, S and Dal, T (1993) Dynamic damping of payload motion for cranes. Journal of Construction Engineering and Management, 119(3), pp. 631-644. ISSN 0733-9364
Beliveau, Y J (1984) A cost control model for on-site work activities for construction (estimating, cost-codes, forms). PhD thesis, Purdue University, USA.
Bender, W J (2000) A risk-based cost control methodology for constructing complex structures with the mobile offshore base as a case study. PhD thesis, University of Maryland, College Park, USA.
Bhat, V S; Indiran, T; Selvanathan, S P and Bhat, S (2025) Designing multivariable pi controller with multi-response optimization for a pilot plant binary distillation column: A robust design approach. Journal of Engineering, Design and Technology, 23(1), pp. 207-227. ISSN 1726-0531
Black, Warren (2023) Investigating a complex systems theory approach to controlling risk within complex projects. PhD thesis, Queensland University of Technology, Australia.
Bordass, B; Cohen, R; Standeven, M and Leaman, A (2001) Assessing building performance in use 2: Technical performance of the Probe buildings. Building Research & Information, 29(2), pp. 103-113. ISSN 0961-3218
Borja, Luis Claudio Alves (2019) Development of a quantitative method for predicting environmental aspects generated by construction sites. PhD thesis, Universidade Federal da Bahia, Brazil.
Branco Pedro, J; Meijer, F and Visscher, H (2009) The Portuguese building regulation system: A critical review. International Journal of Law in the Built Environment, 1(2), pp. 156-171. ISSN 1756-1450
Branco Pedro, J; Meijer, F and Visscher, H (2010) Building control systems of European Union countries: A comparison of tasks and responsibilities. International Journal of Law in the Built Environment, 2(1), pp. 45-59. ISSN 1756-1450
Buckman, A H; Mayfield, M and Beck, S B M (2014) What is a smart building? Smart and Sustainable Built Environment, 3(2), pp. 92-109. ISSN 2046-6099
Butler, L J and Bright, G (2010) Control strategy for a mobile self-balancing materials handling platform. Journal of Engineering, Design and Technology, 8(1), pp. 6-27. ISSN 1726-0531
Byrd, R H (1981) The mathematical modelling of the environmental performance of buildings as an aid in the design process. PhD thesis, Aston University, UK.
Challender, J (2017) Trust in collaborative construction procurement strategies. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(3), pp. 115-124. ISSN 17514304
Challender, J; Farrell, P and Sherratt, F (2014) Partnering in practice: An analysis of collaboration and trust. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(6), pp. 255-264. ISSN 17514304
Challender, J; Farrell, P and Sherratt, F (2016) Effects of an economic downturn on construction partnering. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(4), pp. 159-167. ISSN 17514304
Chan, E H W and Chan, A T S (1999) Imposing ISO 9000 quality assurance system on statutory agents in Hong Kong. Journal of Construction Engineering and Management, 125(4), pp. 285-291. ISSN 0733-9364
Chandrasiri, A P and Geekiyanage, D (2018) Real-time object detection system for building energy conservation: An IP camera-based system. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Charoenngam, C (1993) A knowledge-base representation for a construction measurement control information system (CMCIS). PhD thesis, University of Texas at Austin, USA.
Chen, B; Yu, X; Dong, F; Zheng, C; Ding, G and Wu, W (2021) Compaction quality evaluation of asphalt pavement based on intelligent compaction technology. Journal of Construction Engineering and Management, 147(9): 04021099, ISSN 0733-9364
Chen, S; Zeng, N; Li, F; Yue, H; Wang, Q and Li, Q (2025) Proactive safety risk control system for deep foundation pit construction: Situational tailoring of integrated cybernetics and dual-system theory. Journal of Construction Engineering and Management, 151(4): 04025018, ISSN 0733-9364
Chen, Y-T (2008) Automated on-site productivity evaluation using RFID and GPS. PhD thesis, Purdue University, USA.
Chua, D K H; Kog, Y C; Loh, P K and Jaselskis, E J (1997) Model for construction budget performance: neural network approach. Journal of Construction Engineering and Management, 123(3), pp. 214-222. ISSN 0733-9364
Dair, C M (2000) An evaluation of the UK regulatory system for the redevelopment of contaminated land. PhD thesis, University of Sussex, UK.
De Ridder, H A J (1994) Design and construct of complex civil engineering systems: A new approach to organization and contracts. PhD thesis, Delft University of Technology, Netherlands.
Dhandapani, K and Reddy Sathi, R (2011) Embedded controlled low-frequency AC to high-frequency AC converter fed induction heater. Journal of Engineering, Design and Technology, 9(1), pp. 7-18. ISSN 1726-0531
Dimitrov, D S (2024) The new work of building operations in the digital age: The impact of IoT and digital twins on facility management and operational practices. PhD thesis, University of Washington, USA.
Dong, H (2024) Impact of sensing and occupancy parameters to achieve comfort and demand side management in buildings. PhD thesis, Michigan State University, USA.
Donyavi, S and Flanagan, R (2009) The impact of effective material management on construction site performance for small and medium sized construction enterprises. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Dunston, P S and Bernold, L E (2000) Adaptive control for safe and quality rebar fabrication. Journal of Construction Engineering and Management, 126(2), pp. 122-129. ISSN 0733-9364
Eccles, T S (2009) The English building industry in late modernity: an empirical investigation of the definition, construction and meaning of profession. PhD thesis, London School of Economics and Political Science, UK.
Ed Koehn, E; Kothari, R K and Pan, C S (1995) Safety in developing countries: Professional and bureaucratic problems. Journal of Construction Engineering and Management, 121(3), pp. 261-265. ISSN 0733-9364
El-Omari, S (2008) Automated data acquisition for tracking and control of construction projects. PhD thesis, Concordia University, Canada.
El-Omari, S and Moselhi, O (2009) Data acquisition from construction sites for tracking purposes. Engineering, Construction and Architectural Management, 16(5), pp. 490-503. ISSN 0969-9988
El-Sabek, L M (2017) Framework for managing integration challenges of production planning and control in international construction mega-projects. PhD thesis, University of Toronto, Canada.
El-Sabek, L M and McCabe, B Y (2018) Coordination challenges of production planning in the construction of international mega-projects in the middle East. International Journal of Construction Education and Research, 14(2), pp. 118-40. ISSN 1557-8771
Elrod, M T (2017) A novel approach to determining real-time risk probabilities in critical infrastructure industrial control systems. PhD thesis, Nova Southeastern University, USA.
Enshassi, A (1996) A monitoring and controlling system in managing infrastructure projects. Building Research & Information, 24(3), pp. 183-189. ISSN 0961-3218
Eriksson, P E (2025) How clients choose procurement strategies and organizational control systems in the Swedish housing sector. Journal of Financial Management of Property and Construction, 30(1), pp. 22-41. ISSN 1366-4387
Fang, Y.; Minati, L.; Cosentino, S.; Voltolini, S.; Sadler, G. and Yoshimura, Y. (2025) Redefining walking: A bio-inspired kinetic architecture. Architectural Engineering and Design Management, 21(6), pp. 1562-1581. ISSN 1745-2007
Foskett, F. and Alwisy, A. (2026) Socio-industrial analysis of cross-sector robotics adoption obstacles for light-gauge steel construction. Engineering, Construction and Architectural Management, pp. 1-40. ISSN 0969-9988
Foskett, F. and Alwisy, A. (2026) Socio-industrial analysis of cross-sector robotics adoption obstacles for light-gauge steel construction. Engineering, Construction and Architectural Management, pp. 1-40. ISSN 0969-9988
Francis, A (2013) The chronographical approach for construction project modelling. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(4), pp. 188-204. ISSN 17514312
Fuller, R J and Luther, M B (2002) Thermal simulation of an Australian university building. Building Research & Information, 30(4), pp. 255-263. ISSN 0961-3218
Garriss, S (2008) Efficient, usable proof-construction strategies for distributed access-control systems. PhD thesis, Carnegie Mellon University, USA.
George, T. and Ganesan, V. (2026) Advanced cuttlefish optimizer-random decision forest (acordf) based design of fractional order pid controller for higher-order time-delay system. Journal of Engineering, Design and Technology, 24(4), pp. 1-34. ISSN 1726-0531
Georgy, M E; Chang, L M and Zhang, L (2005) Prediction of engineering performance: A neurofuzzy approach. Journal of Construction Engineering and Management, 131(5), pp. 548-557. ISSN 0733-9364
Ghanem, A (2007) Real-time construction project progress tracking: A hybrid model for wireless technologies selection, assessment, and implementation. PhD thesis, Florida State University, USA.
González, V; Alarcón, L F; Maturana, S; Mundaca, F and Bustamante, J (2010) Improving planning reliability and project performance using the reliable commitment model. Journal of Construction Engineering and Management, 136(10), pp. 1129-1139. ISSN 0733-9364
Goyal, S and Routroy, S (2023) Analyzing environmental sustainability enablers for an Indian steel manufacturing supply chain. Journal of Engineering, Design and Technology, 21(1), pp. 1-22. ISSN 1726-0531
Gram-Hanssen, K (2010) Residential heat comfort practices: Understanding users. Building Research & Information, 38(2), pp. 175-186. ISSN 0961-3218
Greed, C and Reeves, D (2005) Mainstreaming equality into strategic spatial policy making: Are town planners losing sight of gender? Construction Management and Economics, 23(10), pp. 1059-1070. ISSN 01446193
Gunay, H B; O'Brien, W; Beausoleil-Morrison, I and Huchuk, B (2014) On adaptive occupant-learning window blind and lighting controls. Building Research & Information, 42(6), pp. 739-756. ISSN 0961-3218
Guo, X; Wu, H; Chen, Y; Chang, Y and Ao, Y (2023) Gauging the impact of personal lifestyle, indoor environmental quality and work-related factors on occupant productivity when working from home. Engineering, Construction and Architectural Management, 30(8), pp. 3713-3730. ISSN 0969-9988
Habibi, S (2020) A review of ICT-based applications to monitor environmental parameters. Construction Innovation, 20(1), pp. 112-127. ISSN 1471-4175
Hammad, M M (2001) CPDICenter: Web-based virtual construction project document information center in support of claims preparation. PhD thesis, Concordia University, Canada.
Handa, V K and Barcia, R M (1986) Linear scheduling using optimal control theory. Journal of Construction Engineering and Management, 112(3), pp. 387-393. ISSN 0733-9364
Hendy, C R; Spencer, P C and Sundaram, M (2013) Technical networks: The framework for disseminating knowledge. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(2), pp. 77-85. ISSN 17514312
Herrero, J J (2003) Columbus: a solution using metadata for integrating document management, project hosting and document control in the construction industry. PhD thesis, University of Greenwich, UK.
Hopkin, C and Lay, S (2024) Conceptual arguments on the use of unlatched reverse swing "flappy" door smoke control systems in residential buildings. International Journal of Building Pathology and Adaptation, 42(4), pp. 618-636. ISSN 23984708
Howes, R (1983) Project management control utilising innovative forecasting and computerised data bases. PhD thesis, Brunel University, UK.
Hu, W and Panthi, K (2020) Project status reporting system (PSRS) for pipeline relocation programs. Built Environment Project and Asset Management, 10(5), pp. 693-708. ISSN 2044-124X
Huang, X; Zhang, J; Meng, X; Wang, R; Li, J; Tao, X; Yang, Z and Li, L (2025) Verifiable safety path planning: Utilizing planar analysis for improved lifting operations. Journal of Construction Engineering and Management, 151(9): 04025123, ISSN 0733-9364
Huchuk, B; Gunay, H B; O'Brien, W and Cruickshank, C A (2016) Model-based predictive control of office window shades. Building Research & Information, 44(4), pp. 445-455. ISSN 0961-3218
Hughes, P J; O’Connor, J T and Traver, A E (1989) Pipe manipulator enhancements for increased automation. Journal of Construction Engineering and Management, 115(3), pp. 412-423. ISSN 0733-9364
Isaac, S and Navon, R (2008) Feasibility study of an automated tool for identifying the implications of changes in construction projects. Journal of Construction Engineering and Management, 134(2), pp. 139-145. ISSN 0733-9364
Ismaeel, W S E (2020) An integrated model for energy-efficient building opening design. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Jaselskis, E J (1988) Achieving construction project success through predictive discrete choice models. PhD thesis, University of Texas at Austin, USA.
Jayaram, S (2010) Design of template to fabricate magnetic torquer coils for nano and picosatellite missions. Journal of Engineering, Design and Technology, 8(2), pp. 158-167. ISSN 1726-0531
Jeong, J G (2006) A framework for supply chain modeling and optimization for the manufactured housing industry. PhD thesis, Purdue University, USA.
Johnston, J O D (1975) Development of a computerised library system in the construction industry. PhD thesis, Aston University, UK.
Järvenpää, A T; Eriksson, P E and Larsson, J (2022) Exploring a public client's control systems in infrastructure projects from a relationship history perspective. Construction Management and Economics, 40(1), pp. 56-71. ISSN 01446193
Järvenpää, A-T (2022) How to promote innovation from an organizational control perspective a case study of a public infrastructure client. PhD thesis, Luleå University of Technology, Sweden.
Kan, C; Fang, Y; Anumba, C J and Messner, J I (2018) A cyber-physical system (CPS) for planning and monitoring mobile cranes on construction sites. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(6), pp. 240-250. ISSN 17514304
Kelso M, R (2003) Automated commissioning of HVAC systems using first principle models. PhD thesis, Loughborough University, UK.
Key, M A (2016) Regulating sustainable development: An enabling model for consistent collaboration between planning and building control services in England. DProf thesis, University of Salford, UK.
Kong, T-M S (2011) Organizational culture of safety in the Hong Kong construction industry. PhD thesis, University of Hong Kong, Hong Kong.
Kukoyi, P O; Simpeh, F; Adebowale, O J and Agumba, J N (2022) Managing the risk and challenges of COVID-19 on construction sites in Lagos, Nigeria. Journal of Engineering, Design and Technology, 20(1), pp. 99-144. ISSN 1726-0531
Lasebikan, B A; Akisanya, A R and Deans, W F (2015) Autoclave design for high pressure-high temperature corrosion studies. Journal of Engineering, Design and Technology, 13(4), pp. 539-555.
Le, A T H and Sutrisna, M (2024) Project cost control system and enabling-factors model: PLS-SEM approach and importance-performance map analysis. Engineering, Construction and Architectural Management, 31(6), pp. 2513-2535. ISSN 0969-9988
LeBlond, D; Owen, F; Gibson Jr, G E; Haas, C T and Traver, A E (1998) Control improvement for advanced construction equipment. Journal of Construction Engineering and Management, 124(4), pp. 289-296. ISSN 0733-9364
Li, J (2004) Web-based integrated project control. PhD thesis, Concordia University, Canada.
Li, Shuyang (2020) Proactive design approaches for energy-efficient buildings. PhD thesis, University of California, USA.
Lindhard, S and Wandahl, S (2014) Exploration of the reasons for delays in construction. International Journal of Construction Management, 14(1), pp. 36-44. ISSN 1562-3599
Lins, G (1992) Controlling in construction management. DrTech thesis, Leopold-Franzens Universitaet Innsbruck, Austria.
Littlefair, P; Ortiz, J and Bhaumik, C D (2010) A simulation of solar shading control on UK office energy use. Building Research & Information, 38(6), pp. 638-646. ISSN 0961-3218
Loosemore, M (1994) Dealing with unexpected problems-do contracts help? A comparison of the NEC and JCT 80 forms. Engineering, Construction and Architectural Management, 1(2), pp. 115-137. ISSN 0969-9988
Lord, A M (1989) An investigation into the role of the project manager: A comparative study of project leadership, organisation and culture in UK defence contractors and engineering constructors. PhD thesis, Henley Business School, UK.
Lundberg, E J and Beliveau, Y J (1989) Automated lay-down yard control system: ALYC. Journal of Construction Engineering and Management, 115(4), pp. 535-544. ISSN 0733-9364
Luo, Q.; Sun, C.; Li, G.; Li, Y.; Xue, J. and Zhang, G. (2026) Hierarchical schedule risk structures and mitigation strategies in prefabricated building projects: An integrated SNA-ISM approach. Engineering, Construction and Architectural Management, 33(7), pp. 5737-5759. ISSN 0969-9988
Lv, Y; Feng, J; Wang, G and Li, H (2024) Stability characteristics and experiment of hydraulic drive four-wheel chassis. Journal of Engineering, Design and Technology, 22(2), pp. 598-612. ISSN 1726-0531
Mackenzie, D I (2010) A review of project controls in the UK and methodologies to improve the processes. DProf thesis, Teesside University, UK.
Madhlopa, A (2016) Effect of controlling airflow in a solar chimney on thermal load in a built environment. Journal of Engineering, Design and Technology, 14(2), pp. 286-309.
Marasini, R and Dawood, N (2006) Innovative managerial control system (IMCS): An application in precast concrete building products industry. Construction Innovation, 6(2), pp. 97-120. ISSN 1471-4175
Matipa, W M and Siamuzwe, V M M (2005) Information and communication technology (ICT) supported supply chain management: Benefits for construction business in landlocked developing nations. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Matsebe, O; Mpofu, K; Agee, J T and Ayodeji, S P (2015) Corner features extraction: Underwater SLAM in structured environments. Journal of Engineering, Design and Technology, 13(4), pp. 556-569.
McCahill, D F (1990) A practical model for simulation of earthwork construction, with applications for scheduling. PhD thesis, University of Maryland, College Park, USA.
Mecca, S (1999) A model of construction planning procedure according to contingency theory. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Mejia Aguilar, G (2013) Improving accuracy of project outcome predictions. PhD thesis, University of Alabama, USA.
Mejlænder-Larsen, Ø (2017) Using a change control system and building information modelling to manage change in design. Architectural Engineering and Design Management, 13(1), pp. 39-51. ISSN 1745-2007
Mekid, S and Shang, M (2015) Concept of dependent joints in functional reconfigurable robots. Journal of Engineering, Design and Technology, 13(3), pp. 400-418.
Moloney, J; Globa, A; Wang, R; Khoo, C K and Tokede, O (2019) Hybrid environmental-media facades: Rationale and feasibility. Architectural Engineering and Design Management, 15(5), pp. 313-333. ISSN 1745-2007
Moon, S and Bernold, L E (1998) Graphic-based human-machine interface for construction manipulator control. Journal of Construction Engineering and Management, 124(4), pp. 305-314. ISSN 0733-9364
Nahvi, A (2019) Integrated stochastic economics performance evaluation of horizontal infrastructure systems. PhD thesis, Iowa State University, USA.
Nasr, E B (2005) An integrated project planning and control system approach for measuring project performance. PhD thesis, University of Colorado at Boulder, USA.
Nassar, K and Hosny, O (2012) Solving the least-cost route cut and fill sequencing problem using particle swarm. Journal of Construction Engineering and Management, 138(8), pp. 931-942. ISSN 0733-9364
Nathan, P (1991) Project planning and control systems: An investigation into their application and implications of usage in the UK construction industry. PhD thesis, Brunel University, UK.
Nieto-Morote, A and Ruz-Vila, F (2012) Last planner control system applied to a chemical plant construction. Journal of Construction Engineering and Management, 138(2), pp. 287-293. ISSN 0733-9364
Ning, Y and Ling, F Y Y (2023) Selecting control strategies in projects of intangible outputs: Empirical evidence from architectural and engineering design projects. Engineering, Construction and Architectural Management, 30(10), pp. 4695-4714. ISSN 0969-9988
Ninos, G E (1983) Control of construction contracts: analysis of systems for the control of progress, quality and cost of construction to the client, based upon six cases in building or civil engineering in the UK. PhD thesis, University of Bradford, UK.
Obonyo, E; Anumba, C and Thorpe, T (2005) Apron: An agent-based specification and procurement system for construction products. Engineering, Construction and Architectural Management, 12(4), pp. 329-350. ISSN 0969-9988
Ofosu, K (2010) An integrated approach to transportation infrastructure management. PhD thesis, Florida State University, USA.
Ohueri, C C; Enegbuma, W I and Kenley, R (2018) Energy efficiency practices for Malaysian green office building occupants. Built Environment Project and Asset Management, 8(2), pp. 134-146. ISSN 2044-124X
Parisi, F; Sangiorgio, V; Parisi, N; Mangini, A M; Fanti, M P and Adam, J M (2024) A new concept for large additive manufacturing in construction: Tower crane-based 3D printing controlled by deep reinforcement learning. Construction Innovation, 24(1), pp. 8-32. ISSN 1471-4175
Pieters, W D and Tzoneva, R (2021) Investigation of an iec 61850 standard-based process bus implementation of a protection and control scheme for parallelly connected transformers. Journal of Engineering, Design and Technology, 19(4), pp. 850-875. ISSN 1726-0531
Poleacovschi, C (2017) The role of social and governance mechanisms on the process of knowledge seeking in engineering organizations. PhD thesis, University of Colorado at Boulder, USA.
Poleacovschi, C; Javernick-Will, A; Tong, T and Wanberg, J (2019) Engineers seeking knowledge: Effect of control systems on accessibility of tacit and codified knowledge. Journal of Construction Engineering and Management, 145(2): 04018128, ISSN 0733-9364
Poon, S-W (2002) Analysing and predicting falsework failure in Hong Kong. PhD thesis, Loughborough University, UK.
Potts, K (2009) Construction during World War II: Management and financial administration. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Premraj, P (2017) Assessment of project controls for shutdowns/turnarounds/outages. PhD thesis, University of Alabama, USA.
Raji, B (2018) Sustainable high-rises: Design strategies for energy-efficient and comfortable tall office buildings in various climates. PhD thesis, Delft University of Technology, Netherlands.
Rasdorf, W J and Abudayyeh, O Y (1991) Cost-and schedule-control integration: Issues and needs. Journal of Construction Engineering and Management, 117(3), pp. 486-502. ISSN 0733-9364
Rayburn, L M (1989) Productivity database and job cost control using microcomputers. Journal of Construction Engineering and Management, 115(4), pp. 585-601. ISSN 0733-9364
Razak, N A (2024) Development of safety leading and lagging indicators framework for contractor selection in construction projects. PhD thesis, University of Manchester, UK.
Roachanakanan, K (2005) A case study of cost overruns in a Thai condominium project. PhD thesis, Texas A&M University, USA.
Rockett, P and Hathway, E A (2017) Model-predictive control for non-domestic buildings: A critical review and prospects. Building Research & Information, 45(5), pp. 556-571. ISSN 0961-3218
Roupé, M (2013) Development and implementations of virtual reality for decision-making in urban planning and building design. PhD thesis, Chalmers University of Technology, Sweden.
Rowings, J E (1991) Project-controls systems opportunities. Journal of Construction Engineering and Management, 117(4), pp. 691-697. ISSN 0733-9364
Rustom, R N and Amer, M I (2006) Modeling the factors affecting quality in building construction projects in Gaza Strip. Journal of Construction Research, 7(1), pp. 33-47. ISSN 1609-9451
Saket, M M (1986) Cost-significance applied to estimating and control of construction projects. PhD thesis, University of Dundee, UK.
Salgado, C A (2005) Construction project organizational structuring. PhD thesis, University of Maryland, College Park, USA.
Salman, S H (1991) Planning and control in the small business: Case studies from construction industry. PhD thesis, Swansea University, UK.
Sanusi, I E (2019) Optimal and adaptive control frameworks using reinforcement learning for time-varying dynamical systems. PhD thesis, University of Sheffield, UK.
Sanvido, V E (1984) Designing productivity management and control systems for construction projects. PhD thesis, Stanford University, USA.
Sanvido, V E (1988) Conceptual construction process model. Journal of Construction Engineering and Management, 114(2), pp. 294-310. ISSN 0733-9364
Sastry, M K S and Seekumar, L (2012) Automation of real time monitoring and controlling of a marine loading arm. Journal of Engineering, Design and Technology, 10(2), pp. 217-227. ISSN 1726-0531
Sheikhkhoshkar, M; Bril El Haouzi, H; Aubry, A and Hamzeh, F (2024) An advanced exploration of functionalities as the underlying principles of construction control metrics. Smart and Sustainable Built Environment, 13(3), pp. 644-676. ISSN 2046-6099
Shipworth, M; Firth, S K; Gentry, M I; Wright, A J; Shipworth, D T and Lomas, K J (2010) Central heating thermostat settings and timing: Building demographics. Building Research & Information, 38(1), pp. 50-69. ISSN 0961-3218
Soleimanifar, Meimanat (2016) Integrated project management framework for a pipe spool fabrication shop. PhD thesis, University of Alberta, Canada.
Song, L (2004) Productivity modeling for steel fabrication projects. PhD thesis, University of Alberta, Canada.
Sonkor, M S and García De Soto, B (2021) Operational technology on construction sites: A review from the cybersecurity perspective. Journal of Construction Engineering and Management, 147(12): 04021172, ISSN 0733-9364
Spataru, C and Gauthier, S (2014) How to monitor people 'smartly' to help reducing energy consumption in buildings? Architectural Engineering and Design Management, 10(1-2), pp. 60-78. ISSN 1745-2007
Ssenyimba, S; Kigozi, J; Tumutegyereize, P; Muyonga, J H and Mutumba, R (2022) Design and evaluation of a refractance window lab-scale dryer. Journal of Engineering, Design and Technology, 20(6), pp. 1499-1518. ISSN 1726-0531
Stanton, W A and Willenbrock, J H (1990) Conceptual framework for computer-based construction safety control. Journal of Construction Engineering and Management, 116(3), pp. 383-398. ISSN 0733-9364
Stephen, S.; Bello, J.; Aigbavboa, C.; Oke, A. E.; Adekunle, S. and Tambwe, O. (2026) Bibliometric review of gyroscopic mechanisms for adaptive indoor environmental quality control in buildings. Built Environment Project and Asset Management, pp. 1-17. ISSN 2044-124X
Stephenson, P (1988) Estimating, planning and control systems based on production data in the construction industry. PhD thesis, Sheffield City Polytechnic, UK.
Styhre, A; Josephson, P E and Knauseder, I (2004) Learning capabilities in organizational networks: Case studies of six construction projects. Construction Management and Economics, 22(9), pp. 957-966. ISSN 01446193
Suresh, N S; Kumar, M and Arul Daniel, S (2020) Multi-agent strategy for low voltage DC supply for a smart home. Smart and Sustainable Built Environment, 9(2), pp. 73-90. ISSN 2046-6099
Sweetnam, T; Fell, M; Oikonomou, E and Oreszczyn, T (2019) Domestic demand-side response with heat pumps: Controls and tariffs. Building Research & Information, 47(4), pp. 344-361. ISSN 0961-3218
Sweetnam, T; Spataru, C; Barrett, M and Carter, E (2019) Domestic demand-side response on district heating networks. Building Research & Information, 47(4), pp. 330-343. ISSN 0961-3218
Tatum, C B; Vorster, M; Klingler, M G and Paulson Jr, B C (2006) Systems analysis of technical advancement in earthmoving equipment. Journal of Construction Engineering and Management, 132(9), pp. 976-986. ISSN 0733-9364
Tenah, K A (1979) Construction management information control systems (CMICS). PhD thesis, Texas A&M University, USA.
Thomson, C S (2006) A study of the innovation process within the construction project environment. PhD thesis, University of Dundee, UK.
Thurairajah, N (2013) Leadership practices to address cultural and behavioural challenges in construction partnering projects. PhD thesis, University of Salford, UK.
Touran, A (1986) Computer packages for construction data acquisition and processing. Construction Management and Economics, 4(3), pp. 233-243. ISSN 01446193
Traynor, E H (1980) The application of factor analysis in the design of a cost control system. Construction Papers, 1(1), pp. 29-43. ISSN 0144-8587
Vahabi, A; Nasirzadeh, F and Mills, A (2022) Influence of briefing clarity on construction projects: A fuzzy hybrid simulation approach. Construction Management and Economics, 40(4), pp. 278-295. ISSN 01446193
Valitabar, M; GhaffarianHoseini, A; GhaffarianHoseini, A and Attia, S (2022) Advanced control strategy to maximize view and control discomforting glare: A complex adaptive façade. Architectural Engineering and Design Management, 18(6), pp. 829-849. ISSN 1745-2007
Viana, D D; Formoso, C T and Bataglin, F S (2022) Requirements for developing production planning and control systems for engineer-to-order industrialized building systems. Construction Management and Economics, 40(7-8), pp. 638-652. ISSN 01446193
Vine, R (2018) The intelligent client: learning to govern through numbers at Heathrow. PhD thesis, University of Sussex, UK.
Vukomanovic, M; Ceric, A and Radujković, M (2007) BSC-efqm based approach for performance benchmarking in construction industry. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Wade, F; Shipworth, M and Hitchings, R (2017) How installers select and explain domestic heating controls. Building Research & Information, 45(4), pp. 371-383. ISSN 0961-3218
Wang, C; Zou, F; Yap, J B H; Wood, L C; Li, H and Ding, L (2023) System dynamics tool for entropy-based risk control on sleeve grouting in prefabricated buildings. Engineering, Construction and Architectural Management, 30(2), pp. 538-567. ISSN 0969-9988
Wang, L (2020) Home intelligent lighting control system based on wireless sensor. Journal of Engineering, Design and Technology, 18(5), pp. 1231-1240. ISSN 1726-0531
Wang, M-T (1989) Knowledge processing for a construction management database. PhD thesis, Massachusetts Institute of Technology, USA.
Wang, Y (2022) Monitoring, modelling and analysis of occupants' operation of windows, use of air purifiers and smart air quality control in low-energy residential buildings. PhD thesis, University College London, UK.
Weiss, T (2021) Energy flexibility and shiftable heating power of building components and technologies. Smart and Sustainable Built Environment, 10(4), pp. 740-758. ISSN 2046-6099
Wong, K W J (2007) Development of selection evaluation and system intelligence analytic models for the intelligent building control systems. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Xie, W; Zhao, T; Wang, H and Tang, J (2017) Construction techniques used to automatically pass standard box girders through special passenger-line tunnels. Journal of Construction Engineering and Management, 143(5): 05016027, ISSN 0733-9364
Yean, F; Ling, Y and Ang, W T (2013) Using control systems to improve construction project outcomes. Engineering, Construction and Architectural Management, 20(6), pp. 576-588. ISSN 0969-9988
Yeung, A T (2017) A mobile biometric authentication system for site management in Hong Kong. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(4), pp. 172-180. ISSN 17514304
Zhou, S and Gheisari, M (2018) Unmanned aerial system applications in construction: a systematic review. Construction Innovation, 18(4), pp. 453-468. ISSN 1471-4175
Up a level