Items with Index Term: contributory factor
Baiden, B K; Price, A D F and Dainty, A R J (2003) Looking beyond processes: Human factors in team integration. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Bryde, D J and Volm, J M (2009) Perceptions of owners in German construction projects: Congruence with project risk theory. Construction Management and Economics, 27(11), pp. 1059-1071. ISSN 1466433X
Coffey, M (1995) The propensity for participation in mechanical and electrical sub-contractors in the British construction industry. PhD thesis, University of Strathclyde, UK.
Coggins, J; Teng, B and Rameezdeen, R (2016) Construction insolvency in Australia: Reining in the beast. Construction Economics and Building, 16(3), pp. 38-56. ISSN 2204-9029
Cummings, A J G (1980) The York Buildings Company: A case study in eighteenth century corporation mismanagement. PhD thesis, University of Strathclyde, UK.
Dainty, A R J; Bagilhole, B M and Neale, R H (2000) Computer aided analysis of qualitative data in construction management research. Building Research & Information, 28(4), pp. 226-233. ISSN 0961-3218
Dissanayaka, S M and Kumaraswamy, M M (1999) Evaluation of factors affecting time and cost performance in Hong Kong building projects. Engineering, Construction and Architectural Management, 6(3), pp. 287-298. ISSN 0969-9988
Ebekozien, A; Aigbavboa, C; Ahmed, M A H; Samsurijan, M S and Aliu, J (2025) Appraising construction artisans health insurance enrolment to achieve sustainable development goal 3 in the informal sector: Issues and solutions. International Journal of Building Pathology and Adaptation, 43(8), pp. 26-40. ISSN 2398-4708
Edwards, D; Parn, E A; Sing, M C P and Thwala, W D (2019) Risk of excavators overturning: Determining horizontal centrifugal force when slewing freely suspended loads. Engineering, Construction and Architectural Management, 26(3), pp. 479-498. ISSN 0969-9988
Fong, Patrick Sik-wah (2001) Understanding knowledge creation: A study of the processes, interrelationships and contributory factors within multidisciplinary project teams. PhD thesis, University of Warwick, UK.
Ghadamsi, A (2016) Investigating the influence of procurement method selection on project performance in Libya. PhD thesis, Brunel University, UK.
Gibb, A; Hide, S; Haslam, R; Gyi, D; Pavitt, T; Atkinson, S and Duff, R (2005) Construction tools and equipment: their influence on accident causality. Journal of Engineering, Design and Technology, 3(1), pp. 12-23. ISSN 1726-0531
Hairstans, R and Smith, R E (2018) Offsite hub (Scotland): Establishing a collaborative regional framework for knowledge exchange in the UK. Architectural Engineering and Design Management, 14(1-2), pp. 60-77. ISSN 1745-2007
Jamieson, I A (1997) Development of a concurrent engineering construction process protocol. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Jamieson, I A (1998) The development of a concurrently engineered procurement process. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Kong, A T and Gray, J (2006) Traditional procurement is too slow. Construction Economics and Building, 6(1), pp. 51-62. ISSN 2204-9029
Lyu, S; Hon, C K H; Chan, A P C; Jiang, X and Skitmore, M (2023) Critical factors affecting the safety communication of ethnic minority construction workers. Journal of Construction Engineering and Management, 149(2): 04022173, ISSN 0733-9364
Manase, D (2008) An exploratory study of GIS based analysis of health and safety related information. PhD thesis, University of Wolverhampton, UK.
Masrom, M D A; Skitmore, M and Bridge, A (2013) Determinants of contractor satisfaction. Construction Management and Economics, 31(7), pp. 761-779. ISSN 1466433X
Moyo, T (2020) Integrating sustainability dimensions into construction labour productivity determinants in Zimbabwe. PhD thesis, Nelson Mandela University, South Africa.
O'Neill, T; McMahon, E; Spillane, J P and Bradley, J G (2023) Conflict as a contributory factor in built environment: Apprenticeship completion in the Republic of Ireland. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Oswald, D; Sherratt, F and Smith, S (2019) Managing production pressures through dangerous informality: A case study. Engineering, Construction and Architectural Management, 26(11), pp. 2581-2596. ISSN 0969-9988
Ramachandra, T; Rotimi, J O and Gunaratne, S (2014) Reasons for contractors' delay claims failures in Sri Lanka. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Scott, J N (2002) Facilitating the application of information technology in a UK piling contractor. PhD thesis, Lancaster University, UK.
Sherif, M A (2002) A framework for improving pre-project planning. PhD thesis, Loughborough University, UK.
Small, E P (1999) Development of a methodology for the integration of seismic risk mitigation activities in project and network level bridge management systems. PhD thesis, State University of New York at Buffalo, USA.
Tomlinson, J (1998) A premises occupancy cost forecasting model. PhD thesis, University of Liverpool, UK.
Turner, T J A (2010) The practice of financial project management in the consulting engineering industry. PhD thesis, University of Phoenix, USA.
Zahoor, H; Chan, A P C; Gao, R and Utama, W P (2017) The factors contributing to construction accidents in Pakistan: Their prioritization using the Delphi technique. Engineering, Construction and Architectural Management, 24(3), pp. 463-485. ISSN 0969-9988
Zhang, Q W; Liao, P C; Liang, M and Chan, A P C (2024) Critical factors influencing learning from quality failures in the construction of grid infrastructure. Engineering, Construction and Architectural Management, 31(4), pp. 1730-1750. ISSN 0969-9988
Up a level