Items with Index Term: contractor selection
Abdelrahman, M; Zayed, T and Elyamany, A (2008) Best-value model based on project specific characteristics. Journal of Construction Engineering and Management, 134(3), pp. 179-188. ISSN 0733-9364
Abu-Shabeen, N N (2008) Development of multi-criteria decision analysis models for bidding and contractor selection. PhD thesis, Edinburgh Napier University, UK.
Acheamfour, V K; Adjei-Kumi, T and Kissi, E (2023) Contractor selection: A review of qualification and pre-qualification systems. International Journal of Construction Management, 23(2), pp. 338-348. ISSN 1562-3599
Acheamfour, V K; Kissi, E; Adjei-Kumi, T and Adinyira, E (2020) Review of empirical arguments on contractor pre-qualification criteria. Journal of Engineering, Design and Technology, 18(1), pp. 70-83. ISSN 1726-0531
Adebisi, E O; Ojo, S O and Alao, O O (2018) Assessment of factors influencing the failure and abandonment of multi-storey building projects in Nigeria. International Journal of Building Pathology and Adaptation, 36(2), pp. 210-231. ISSN 23984708
Ahmed, M O; El-Adaway, I H; Coatney, K T and Eid, M S (2016) Construction bidding and the winner's curse: Game theory approach. Journal of Construction Engineering and Management, 142(2): 04015076, ISSN 0733-9364
Al-Sedairy, S (1984) Large scale projects: management, design and execution. PhD thesis, University of Sheffield, UK.
Al-Sinaidi, A R (2005) Selecting the unit price bid: An analytical method. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Alhumaidi, H M (2015) Construction contractors ranking method using multiple decision-makers and multiattribute fuzzy weighted average. Journal of Construction Engineering and Management, 141(4): 04014092, ISSN 0733-9364
Alkhamali, K S H (2014) Leadership style, organisational culture and disputes in public construction. PhD thesis, Heriot-Watt University, UK.
Alpmen, A S (2013) Development and implementation of a proactive safety performance evaluation system for general contractors. PhD thesis, Wayne State University, USA.
Ambekar, S.; Dhaigude, A. S.; Chatterjee, D. and Tapar, A. V. (2025) Identifying and ranking critical success factors for contractor value addition in the construction sector using the ISM-IRP technique. Construction Innovation, 26(5), pp. 1582-1613. ISSN 1471-4175
Ariaratnam, S T; Lueke, J S and Allouche, E N (1999) Utilization of trenchless construction methods by Canadian municipalities. Journal of Construction Engineering and Management, 125(2), pp. 76-86. ISSN 0733-9364
Arowosafe, O I (2018) Contractors’ selection criteria for sustainable infrastructure delivery in Nigeria. PhD thesis, University of Derby, UK.
Ayegba, C and Root, D (2019) Application of signalling theory in contractor selection for long-term collaborative relationships in construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Ballesteros-Pérez, P; Skitmore, M; Pellicer, E and González-Cruz, M C (2015) Scoring rules and abnormally low bids criteria in construction tenders: A taxonomic review. Construction Management and Economics, 33(4), pp. 259-278. ISSN 01446193
Buertey, J T; Dadadzogbor, E and Atsrim, F (2021) Procurement path influencing factors in Ghana: Managing the challenge of cultural shift. International Journal of Construction Management, 21(1), pp. 78-92. ISSN 1562-3599
Cai, J; Li, Z; Dou, Y; Teng, Y and Yuan, M (2023) Contractor selection for green buildings based on the fuzzy kano model and TOPSIS: A developer satisfaction perspective. Engineering, Construction and Architectural Management, 30(10), pp. 5073-5108. ISSN 0969-9988
Challender, J; Farrell, P and Sherratt, F (2014) Partnering practices: An investigation of influences on project success. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Charlson J, C E (2013) A case study of joint procurement and provision of legal services to a group of a universities in the midlands. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Cheng, E W L and Li, H (2004) Contractor selection using the analytic network process. Construction Management and Economics, 22(10), pp. 1021-1032. ISSN 01446193
Davis, M R (2018) Achieving diversity on local publicly funded construction projects in the state of California: Knowledge, motivation, and organization factors influencing prime contractor selection of minority subcontractors. EdD thesis, University of Southern California, USA.
Dissanayake, N; Xia, B; Skitmore, M; Trigunarsyah, B and Menadue, V (2026) Developing a generic fuzzy multi-attribute analysis model for EPC contractor selection. Built Environment Project and Asset Management, 16(1), pp. 1-19. ISSN 2044-124X
Dissanayake, D M Nayana S (2017) Fuzzy multi-attribute analysis model for engineering-procurement-construction contractor selection. PhD thesis, Queensland University of Technology, Australia.
Dissanayake, N; Xia, B; Skitmore, M; Trigunarsyah, B and Menadue, V (2023) Ranked generic criteria for EPC contractor selection. Engineering, Construction and Architectural Management, 30(10), pp. 4933-4954. ISSN 0969-9988
Doloi, H (2009) Analysis of pre-qualification criteria in contractor selection and their impacts on project success. Construction Management and Economics, 27(12), pp. 1245-1263. ISSN 1466433X
Drew, D and Skitmore, M (1997) The effect of contract type and size on competitiveness in bidding. Construction Management and Economics, 15(5), pp. 469-489. ISSN 01446193
Eke, G (2017) Determining the probability distributions of cost and time overrun arising from different contractor selection strategies in construction projects. PhD thesis, Aston University, UK.
Eke, G; Elgy, J and Wedawatta, G (2019) Establishing a link between contractor selection strategy and project outcomes: Simulation study. Journal of Construction Engineering and Management, 145(10): 04019062, ISSN 0733-9364
El Korany, T. M.; Fouad, A. and Sanad, H. (2026) Identifying contractor selection criteria in Egyptian construction tenders: A SNA and PLS-SEM approach. Construction Innovation, 26(5), pp. 1356-1383. ISSN 1471-4175
El-Abbasy, M S; Zayed, T; Ahmed, M; Alzraiee, H and Abouhamad, M (2013) Contractor selection model for highway projects using integrated simulation and analytic network process. Journal of Construction Engineering and Management, 139(7), pp. 755-767. ISSN 0733-9364
El-Sayegh, S M; AbdRaboh, T; Elian, D; ElJarad, N and Ahmad, Y (2022) Developing a bi-parameter bidding model integrating price and sustainable construction practices. International Journal of Construction Management, 22(11), pp. 2191-2198. ISSN 1562-3599
El-Sayegh, S M; Basamji, M; Haj Ahmad, A and Zarif, N (2021) Key contractor selection criteria for green construction projects in the UAE. International Journal of Construction Management, 21(12), pp. 1240-1250. ISSN 1562-3599
Elsayah, O S (2016) A framework for improvement of contractor selection procedures on major construction project in Libya. PhD thesis, Edinburgh Napier University, UK.
Elyamany, A H M (2010) Developing a rational approach for contractor selection based on history of construction quality and long-term performance. PhD thesis, North Dakota State University, USA.
Fong, P S W and Choi, S K Y (2000) Final contractor selection using the analytical hierarchy process. Construction Management and Economics, 18(5), pp. 547-557. ISSN 01446193
Gouda Mohamed, A and Hathout, T (2025) Reinvigorating the process of contractor selection in adaptive reuse projects: a novel decision-making and evaluation paradigm. International Journal of Construction Management, 25(2), pp. 171-181. ISSN 1562-3599
Gransberg, D D and Molenaar, K (2003) A synthesis of design-builder selection methods for public infrastructure projects. Journal of Construction Procurement, 9(2), pp. 40-51. ISSN 1358-9180
Gurgun, A P and Koc, K (2020) Contractor prequalification for green buildings: Evidence from Turkey. Engineering, Construction and Architectural Management, 27(6), pp. 1377-1400. ISSN 0969-9988
Hardie, M and Saha, S (2009) Builders' perceptions of lowest cost procurement and its impact on quality. Construction Economics and Building, 9(1), pp. 1-8. ISSN 2204-9029
Hatush, Z and Skitmore, M (1997) Criteria for contractor selection. Construction Management and Economics, 15(1), pp. 19-38. ISSN 01446193
Hatush, Z A (1996) Contractor selection using the multiattribute utility theory. PhD thesis, University of Salford, UK.
Hoezen, M; van Rutten, J; Voordijk, H and Dewulf, G (2010) Towards better customized service-led contracts through the competitive dialogue procedure. Construction Management and Economics, 28(11), pp. 1177-1186. ISSN 1466433X
Holt, G D (1995) A methodology for predicting the performance of construction contractors. PhD thesis, University of Wolverhampton, UK.
Holt, G D (1997) Classifying construction contractors: A case study using cluster analysis. Building Research & Information, 25(6), pp. 374-382. ISSN 0961-3218
Holt, G D (2010) Contractor selection innovation: Examination of two decades' published research. Construction Innovation, 10(3), pp. 304-328. ISSN 1471-4175
Holt, G D (2018) Let's change tack, not wind direction: A response to Kog and Yaman (2016). Engineering, Construction and Architectural Management, 25(3), pp. 335-341. ISSN 0969-9988
Holt, G D; Olomolaiye, P O and Harris, F C (1994) Evaluating performance potential in the selection of construction contractors. Engineering, Construction and Architectural Management, 1(1), pp. 29-50. ISSN 0969-9988
Holt, G D; Olomolaiye, P O and Harris, F C (1996) Tendering procedures, contractual arrangements and latham: The contractors' view. Engineering, Construction and Architectural Management, 3(1-2), pp. 97-115. ISSN 0969-9988
Ilter, D (2012) Identification of the relations between dispute factors and dispute categories in construction projects. International Journal of Law in the Built Environment, 4(1), pp. 45-59. ISSN 1756-1450
Jafari, A (2013) A contractor pre-qualification model based on the quality function deployment method. Construction Management and Economics, 31(7), pp. 746-760. ISSN 1466433X
Kapote, M M and Pimplikar, S S (2025) Identification of challenges and shortcomings in the selection of bidders on road projects in India: a study. International Journal of Construction Management, 25(7), pp. 760-769. ISSN 1562-3599
Karakhan, A A; Rajendran, S; Gambatese, J and Nnaji, C (2018) Measuring and evaluating safety maturity of construction contractors: Multicriteria decision-making approach. Journal of Construction Engineering and Management, 144(7): 04018054, ISSN 0733-9364
Khalafallah, A; Kartam, N and Razeq, R A (2019) Bilevel standards-compliant platform for evaluating building contractor safety. Journal of Construction Engineering and Management, 145(10): 4019054, ISSN 0733-9364
Kjerulf, L and Haugbølle, K (2021) Circular prequalification and bidding practices at contractor firms. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Koc, K; Ekmekcioglu, Ö and Işlk, Z (2023) Developing a hybrid fuzzy decision-making model for sustainable circular contractor selection. Journal of Construction Engineering and Management, 149(10): 04023095, ISSN 0733-9364
Kog, F and Yaman, H (2016) A multi-agent systems-based contractor pre-qualification model. Engineering, Construction and Architectural Management, 23(6), pp. 709-726. ISSN 0969-9988
Kumaraswamy, M; Rowlinson, S and Phua, F (2002) Accelerating cultural changes through innovative procurement processes: A Hong Kong perspective. Journal of Construction Procurement, 8(1), pp. 3-16. ISSN 1358-9180
Kumaraswamy Associate Professor, M; Kong, H and Xue Qing Doctoral, Z (2004) Focusing on best value from a source selection perspective. Construction Economics and Building, 4(1), pp. 21-34. ISSN 2204-9029
Lahdenperä, P (2026) Design-build with a development phase: The underlying theory. Journal of Construction Engineering and Management, 152(4): 04026025, ISSN 0733-9364
Lahdenperä, P (2012) How to proportion capability and fee percentage for team comparison in competitive early involvement. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Lahdenperä, P (2024) Design–build with a development phase: An initiation and the first trials. Construction Economics and Building, 24(4-5), pp. 18-42. ISSN 2204-9029
Le, Nguyen Tran Khoi (2019) Identification of risk factors, success practices, and feasibility of the best value approach application to improve construction performance in Vietnam and other developing countries. PhD thesis, Arizona State University, USA.
Lee, F K S (2016) Construction contractor selection criteria: the effects of relational norms, price and prequalification. PhD thesis, University of Reading, UK.
Liang, R; Li, R and Chong, H Y (2023) Decision-making model for evaluating joint venture contractors in construction of complex infrastructure megaprojects. Journal of Construction Engineering and Management, 149(9): 04023071, ISSN 0733-9364
Liang, R; Zhang, J; Wu, C; Sheng, Z and Wang, X (2019) Joint-venture contractor selection using competitive and collaborative criteria with uncertainty. Journal of Construction Engineering and Management, 145(2): 04018123, ISSN 0733-9364
Ling, F Y Y (2004) Key determinants of performance of design-bid-build projects in Singapore. Building Research & Information, 32(2), pp. 128-139. ISSN 0961-3218
Lingard, H; Hughes, W P and Chinyio, E (1998) The impact of contractor selection method on transaction costs: a review. Journal of Construction Procurement, 4(2), pp. 89-102. ISSN 1358-9180
Mahdi, I M; Riley, M J; Fereig, S M and Alex, A P (2002) A multi-criteria approach to contractor selection. Engineering, Construction and Architectural Management, 9(1), pp. 29-37. ISSN 0969-9988
Maloney, W F (2002) Construction product/service and customer satisfaction. Journal of Construction Engineering and Management, 128(6), pp. 522-529. ISSN 0733-9364
Mangitung, D M (2005) Modelling the influence of periodic prequalification criteria on project performance. PhD thesis, University of Manchester, UK.
Martin, H; Koylass, J and Welch, F (2018) An exploration of the consistency limits of the analytical hierarchy process and its impact on contractor selection. International Journal of Construction Management, 18(1), pp. 14-25. ISSN 1562-3599
Martin, H and Ramjarrie, K (2021) Cloud contractor selection model for design-build open tender. Journal of Construction Engineering and Management, 147(4): 04021020, ISSN 0733-9364
Marzouk, M (2008) A superiority and inferiority ranking model for contractor selection. Construction Innovation, 8(4), pp. 250-268. ISSN 1471-4175
Matthewson, C (1992) The relationship between tactical management and contract procurement in the North American competitive lump sum bidding process. PhD thesis, Heriot-Watt University, UK.
Monteiro do Nascimento, F A; Neto, G D M P; Hazin Alencar, L and Valdes-Vasquez, R (2026) Multicriteria subcontractor selection model for construction activities in wind farm projects. International Journal of Construction Management, 26(5), pp. 772-788. ISSN 1562-3599
Moustafa, I M M (2001) A decision support system for the selection of the optimum contractor. PhD thesis, University of Southampton, UK.
Munaif, M A (1995) Multiple criteria decision-making in contractor selection and evaluation of construction bids in Saudi Arabia. PhD thesis, University of Missouri - Rolla, USA.
Muthelo, R G (2022) An integrated decision-making model for evaluating public sector construction bids. PhD thesis, University of Johannesburg, South Africa.
Muzondo, F T (2020) The limitations of the South African procurement policies and practices in relation to contractor selection criteria: The importance of technical qualifications and experience of established construction companies. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.
Ng, S T; Mak, M M Y; Skitmore, R M; Lam, K C and Varnam, M (2001) The predictive ability of bromilow's time-cost model. Construction Management and Economics, 19(2), pp. 165-173. ISSN 01446193
Nguyen, T; Nguyen, L H; Chileshe, N and Hallo, L (2023) Investigating critical risk factors of selecting joint venture contractors for infrastructure projects implementation in Vietnam. International Journal of Construction Management, 23(14), pp. 2438-2451. ISSN 1562-3599
Oladapo, A A (2011) Multi-criteria contractor selection: a practical application of analytic hierarchy process. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(2), pp. 79-88. ISSN 17514312
Olaniran, O J (2015) The effects of cost-based contractor selection on construction project performance. Journal of Financial Management of Property and Construction, 20(3), pp. 235-251. ISSN 1366-4387
Pakgohar, A (2014) Hierarchical multi-project planning and supply chain management: an integrated framework. PhD thesis, University of Exeter, UK.
Palaneeswaran, E; Kumaraswamy, M and Ng, T (2003) Targeting optimum value in public sector projects through "best value"-focused contractor selection. Engineering, Construction and Architectural Management, 10(6), pp. 418-431. ISSN 0969-9988
Palaneeswaran, E and Kumaraswamy, M M (2000) Benchmarking contractor selection practices in public-sector construction: A proposed model. Engineering, Construction and Architectural Management, 7(3), pp. 285-299. ISSN 0969-9988
Palaneeswaran, E and Kumaraswamy, M M (2000) Contractor selection for design/build projects. Journal of Construction Engineering and Management, 126(5), pp. 331-339. ISSN 0733-9364
Palaneeswaran, E and Kumaraswamy, M M (2003) Knowledge mining of information sources for research in construction management. Journal of Construction Engineering and Management, 129(2), pp. 182-191. ISSN 0733-9364
Phillips, S (2007) OVID-BV: optimising value in decision making for best value in the UK social housing sector. EngD thesis, Loughborough University, UK.
Phillips, S; Dainty, A and Price, A (2007) The development of a tender analysis support tool for use in social housing best value procurement. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Phillips, S; Martin, J; Dainty, A and Price, A (2008) Analysis of the quality attributes used in establishing best value tenders in the UK social housing sector. Engineering, Construction and Architectural Management, 15(4), pp. 307-320. ISSN 0969-9988
Phillips, S; Price, A and Dainty, A (2004) Achieving best value in social housing procurement. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Qian, J.; Siriwardana, C.; Shahzad, W. M. and Gunasekara, C. (2026) Integrating environmental, social and governance (ESG) principles into public sector construction procurement: A New Zealand case analysis of evaluation weightings and criteria. International Journal of Building Pathology and Adaptation, 44(5), pp. 1167-1190. ISSN 2398-4708
Qiao, Y; Fricker, J D and Labi, S (2019) Quantifying the similarity between different project types based on their pay item compositions: Application to bundling. Journal of Construction Engineering and Management, 145(9): 04019053, ISSN 0733-9364
Razak, N A (2024) Development of safety leading and lagging indicators framework for contractor selection in construction projects. PhD thesis, University of Manchester, UK.
Rutter, D and Potter, B (2003) The role of multi-criterion decision methods (MCDM) in securing best value from buildings procured through PPP/PFI. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
S Nmez, M; Yang, J B and Holt, G D (2001) Addressing the contractor selection problem using an evidential reasoning approach. Engineering, Construction and Architectural Management, 8(3), pp. 198-210. ISSN 0969-9988
San Cristóbal, J R (2012) Contractor selection using multicriteria decision-making methods. Journal of Construction Engineering and Management, 138(6), pp. 751-758. ISSN 0733-9364
Semaan, N and Salem, M (2017) A deterministic contractor selection decision-support system for competitive bidding. Engineering, Construction and Architectural Management, 24(1), pp. 61-77. ISSN 0969-9988
Shakantu, M W (2004) An investigation into building material and waste logistics: The case of Cape Town. PhD thesis, Glasgow Caledonian University, UK.
Shrestha, K and Shrestha, P P (2022) Framework to implement performance-based contracting for chip-seal road maintenance. Journal of Construction Engineering and Management, 148(1): 04021183, ISSN 0733-9364
Shwarka, M and Anigbogu, N A (2012) Impact of the public procurement reform on public building project delivery in Nigeria. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Singh, D and Tiong, R L K (2005) A fuzzy decision framework for contractor selection. Journal of Construction Engineering and Management, 131(1), pp. 62-70. ISSN 0733-9364
Singh, D and Tiong, R L K (2006) Contractor selection criteria: Investigation of opinions of Singapore construction practitioners. Journal of Construction Engineering and Management, 132(9), pp. 998-1008. ISSN 0733-9364
Snippert, T; Witteveen, W; Boes, H and Voordijk, H (2015) Barriers to realizing a stewardship relation between client and vendor: The best value approach. Construction Management and Economics, 33(7), pp. 569-586. ISSN 01446193
Soltanifar, M (2020) A framework to improve the performance of public tender evaluation procedures in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.
Sumner, S and Farrell, P (2003) The influence of clients on health and safety standards in construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Tam, C M (1992) Discriminant analysis model for predicting contractor performance in Hong Kong. PhD thesis, Loughborough University, UK.
Tamimi, S T (1989) An influence diagramming based risk analysis system. PhD thesis, University of Colorado at Boulder, USA.
Tao, L and Kumaraswamy, M (2012) Unveiling relationships between contractor inputs and performance outputs. Construction Innovation, 12(1), pp. 86-98. ISSN 1471-4175
Unsal, H I (2010) Modeling the hold-up problem and absorptive capacity of project networks. PhD thesis, Columbia University, USA.
Waara, F and Bröchner, J (2006) Price and nonprice criteria for contractor selection. Journal of Construction Engineering and Management, 132(8), pp. 797-804. ISSN 0733-9364
Walraven, A and de Vries, B (2009) From demand driven contractor selection towards value driven contractor selection. Construction Management and Economics, 27(6), pp. 597-604. ISSN 1466433X
Watt, David (2012) Critical contractor selection factors for major projects. PhD thesis, University of New South Wales, Australia.
White, A S (2005) Public sector tendering: Issues and analysis. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Witteveen, W and Dorée, A (2011) Quick and effective: An innovative procurement scheme for six Dutch highway projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Wong, C H (2001) A discriminant model for classifying contractor performance on public works projects. PhD thesis, University of Wolverhampton, UK.
Wong, C H (2001) Investigation of contractor selection criteria and development of contractor classification model: a UK case. PhD thesis, University of Wolverhampton, UK.
Wong, C H (2004) Contractor performance prediction model for the United Kingdom construction contractor: Study of logistic regression approach. Journal of Construction Engineering and Management, 130(5), pp. 691-698. ISSN 0733-9364
Wong, C H; Holt, G D and Harris, P (2001) Multi-criteria selection or lowest price? Investigation of UK construction clients' tender evaluation preferences. Engineering, Construction and Architectural Management, 8(4), pp. 257-271. ISSN 0969-9988
Wong, C H; Holt, G D and Harris, P T (1999) UK construction clients' opinions of the contractor selection process. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Wong, C H; Holt, G D and Harris, P T (2000) UK civil engineering practitioners' perceptions of contractor prequalification criteria. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Wong, C H; Nicholas, J and Holt, G D (2003) Using multivariate techniques for developing contractor classification models. Engineering, Construction and Architectural Management, 10(2), pp. 99-116. ISSN 0969-9988
Wu, M L and Lo, H P (2009) Optimal strategy modeling for price-time biparameter construction bidding. Journal of Construction Engineering and Management, 135(4), pp. 298-306. ISSN 0733-9364
Xia, B; Chan, A; Molenaar, K and Skitmore, M (2012) Determining the appropriate proportion of owner-provided design in design-build contracts: Content analysis approach. Journal of Construction Engineering and Management, 138(9), pp. 1017-1022. ISSN 0733-9364
Xia, B; Skitmore, M; Wu, P and Chen, Q (2014) How public owners communicate the sustainability requirements of green design-build projects. Journal of Construction Engineering and Management, 140(8): 04014036, ISSN 0733-9364
Yasamis, F; Arditi, D and Mohammadi, J (2002) Assessing contractor quality performance. Construction Management and Economics, 20(3), pp. 211-223. ISSN 01446193
Ye, K; Zhu, W; Shan, Y and Li, S (2015) Effects of market competition on the sustainability performance of the construction industry: China case. Journal of Construction Engineering and Management, 141(9): 4015025, ISSN 0733-9364
Yu, W D; Chang, H K; Hsu, Y Y; Cheng, S T and Wang, K W (2020) Pretendering decision model for contractor selection of public procurement projects. Journal of Construction Engineering and Management, 146(11): 04020126, ISSN 0733-9364
Yu, W D and Wang, K W (2012) Best value or lowest bid? A quantitative perspective. Journal of Construction Engineering and Management, 138(1), pp. 128-134. ISSN 0733-9364
Zhu, L; Wei, X and Liang, R (2024) Navigating uncertainty: Optimizing contractor selection for megaprojects in group decision-making with multiple criteria. Journal of Construction Engineering and Management, 150(11): 04024157, ISSN 0733-9364
Up a level