Items with Index Term: contractor performance
Adediran, A (2018) Modelling targeted procurement strategies and relationship quality criteria influencing the development of small contractors in South Africa. PhD thesis, University of Cape Town, South Africa.
Al-Otaibi, M (2011) Evaluation of contractor performance for pre-selection in the Kingdom of Saudi Arabia. PhD thesis, Loughborough University, UK.
Al-Otaibi, S (2010) A framework for improving the performance of standard design models in the Saudi Ministry of Interior projects. PhD thesis, Loughborough University, UK.
Almutairi, S (2017) Assessment and develop the Saudi's contractors classification system. PhD thesis, Arizona State University, USA.
Ameyaw, E E; Edwards, D J; Kumar, B; Thurairajah, N; Owusu-Manu, D G and Oppong, G D (2023) Critical factors influencing adoption of blockchain-enabled smart contracts in construction projects. Journal of Construction Engineering and Management, 149(3): 04023003, ISSN 0733-9364
Butcher, D C A (2011) Learning organization principles and processes: UK construction organization experiences. PhD thesis, University of South Wales, UK.
Butcher, D C A and Sheehan, M J (2010) Excellent contractor performance in the UK construction industry. Engineering, Construction and Architectural Management, 17(1), pp. 35-45. ISSN 0969-9988
El Sawalhi, N I H (2007) Developing a model for construction contractors pre-qualification in the Gaza Strip and West Bank. PhD thesis, University of Salford, UK.
El-Sawalhi, N; Eaton, D and Rustom, R (2008) Forecasting contractor performance using a neural network and genetic algorithm in a pre-qualification model. Construction Innovation, 8(4), pp. 280-298. ISSN 1471-4175
Gajjar, D (2016) Use of customer satisfaction to minimize risks. PhD thesis, Arizona State University, USA.
Holt, G D; Olomolaiye, P O and Harris, F C (1994) Evaluating performance potential in the selection of construction contractors. Engineering, Construction and Architectural Management, 1(1), pp. 29-50. ISSN 0969-9988
Hong, X (2002) A comparative study of contractor performance based on Japanese, UK and US construction practice. PhD thesis, University of Wolverhampton, UK.
Hong, X and Proverbs, D (2003) Contractor relationships: A comparison in Japan, the UK and the US. Journal of Construction Procurement, 9(2), pp. 52-64. ISSN 1358-9180
Howard, W E (1996) Innovative strategies for compensation of engineering and construction contractors. PhD thesis, Clemson University, USA.
Kasabreh, N S S and Tarawneh, S A (2021) Investigating the impact of contractor's performance on the success of Jordanian residential construction projects. International Journal of Construction Management, 21(5), pp. 468-475. ISSN 1562-3599
Kidd, A; Appelbe, S and Morgan, A (2015) The use and abuse of programmes in construction contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 294-301. ISSN 17514304
Lai, A W Y and Lai, W M (2013) Users' satisfaction survey on building maintenance in public housing. Engineering, Construction and Architectural Management, 20(4), pp. 420-440. ISSN 0969-9988
Lai, A W Y and Pang, P S M (2010) Measuring performance for building maintenance providers. Journal of Construction Engineering and Management, 136(8), pp. 864-876. ISSN 0733-9364
Le, Nguyen Tran Khoi (2019) Identification of risk factors, success practices, and feasibility of the best value approach application to improve construction performance in Vietnam and other developing countries. PhD thesis, Arizona State University, USA.
Ming Tam, C and Harris, F (1996) Model for assessing building contractors' project performance. Engineering, Construction and Architectural Management, 3(3), pp. 187-203. ISSN 0969-9988
Ozorhon, B. and Karakurt, C. (2026) Navigating retail construction projects in Türkiye: Critical enablers and barriers. Engineering, Construction and Architectural Management, pp. 1-20. ISSN 0969-9988
Ozorhon, B. and Karakurt, C. (2026) Navigating retail construction projects in Türkiye: Critical enablers and barriers. Engineering, Construction and Architectural Management, pp. 1-20. ISSN 0969-9988
Proverbs, D G (1998) A best practice for high-rise insitu concrete construction based on French, German and UK contractor performance measures. PhD thesis, University of Wolverhampton, UK.
Proverbs, D G and Faniran, O O (2001) International construction performance comparisons: A study of European' and Australian contractors. Engineering, Construction and Architectural Management, 8(4), pp. 284-291. ISSN 0969-9988
Proverbs, D G; Olomolaiye, P O and Harris, F C (1996) Planned construction times and labour utilization: a comparison of UK and French contractors. Engineering, Construction and Architectural Management, 3(3), pp. 219-232. ISSN 0969-9988
Rad, Mahyar Habibi (2022) Impact of lean construction on contractor performance and organisational resilience in post-disaster infrastructure projects. PhD thesis, University of New South Wales, Australia.
Sanni, A A and Windapo, A O (2008) Evaluation of contractor’s quality control practices on construction sites in Nigeria. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Shetterly, D R (1998) The influence of contract design on contractor performance: A multivariate analysis. PhD thesis, University of Maryland, Baltimore County, USA.
Soetanto, R and Proverbs, D G (2001) Modelling client satisfaction levels: A comparison of multiple regression and artificial neural network techniques. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Soetanto, R and Proverbs, D G (2002) Modelling client satisfaction levels: The impact of contractor performance. Construction Economics and Building, 2(1), pp. 13-27. ISSN 2204-9029
Soetanto, R and Proverbs, D G (2004) Intelligent models for predicting levels of client satisfaction. Journal of Construction Research, 5(2), pp. 233-253. ISSN 1609-9451
Swarnadhipathi, K and Boyd, D (2007) An investigation of construction project performance in Botswana using time predictability. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Tam, C M (1992) Discriminant analysis model for predicting contractor performance in Hong Kong. PhD thesis, Loughborough University, UK.
Tan, Y; Shen, L and Langston, C (2012) Competition environment, strategy, and performance in the Hong Kong construction industry. Journal of Construction Engineering and Management, 138(3), pp. 352-360. ISSN 0733-9364
Tao, L and Kumaraswamy, M (2012) Unveiling relationships between contractor inputs and performance outputs. Construction Innovation, 12(1), pp. 86-98. ISSN 1471-4175
Thompson, N J (2003) Relationship marketing and client trust towards contractors within the large private building sector of the UK construction industry. PhD thesis, Oxford Brookes University, UK.
Trethewy, R W (2003) OHS performance: improved indicators for construction contractors. Journal of Construction Research, 4(1), pp. 17-27. ISSN 1609-9451
Tuffaha, F M; Assaf, S; Yasar Zakaria, Z and Hadidi, L A (2021) A framework for the performance assessment of construction contractors in Saudi Arabia. Built Environment Project and Asset Management, 11(2), pp. 195-213. ISSN 2044-124X
Wong, C H (2001) Investigation of contractor selection criteria and development of contractor classification model: a UK case. PhD thesis, University of Wolverhampton, UK.
Wong, C H (2001) A discriminant model for classifying contractor performance on public works projects. PhD thesis, University of Wolverhampton, UK.
Wong, C H (2004) Contractor performance prediction model for the United Kingdom construction contractor: Study of logistic regression approach. Journal of Construction Engineering and Management, 130(5), pp. 691-698. ISSN 0733-9364
Wong, C H; Nicholas, J and Holt, G D (2003) Using multivariate techniques for developing contractor classification models. Engineering, Construction and Architectural Management, 10(2), pp. 99-116. ISSN 0969-9988
Xiao, H and Proverbs, D (2001) A comparison of contractor performance in Japan, the UK and the USA: Some preliminary findings from a new approach. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Xiao, H and Proverbs, D (2002) The performance of contractors in Japan, the UK and the USA: A comparative evaluation of construction cost. Construction Management and Economics, 20(5), pp. 425-435. ISSN 01446193
Xiao, H and Proverbs, D (2002) Construction time performance: An evaluation of contractors from Japan, the UK and the US. Engineering, Construction and Architectural Management, 9(2), pp. 81-89. ISSN 0969-9988
Xiao, H and Proverbs, D (2003) Factors influencing contractor performance: An international investigation. Engineering, Construction and Architectural Management, 10(5), pp. 322-332. ISSN 0969-9988
Xiao, H and Proverbs, D G (2003) Cost certainty and time certainty: An international investigation. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Xiao, H; Proverbs, D G; Shaw, T and Holt, G D (2000) A new approach to comparing the performance of contractors internationally. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Up a level