Items with Index Term: contractor firm

Number of items: 22.

Alashwal, A M and Chew, M Y (2017) Simulation techniques for cost management and performance in construction projects in Malaysia. Built Environment Project and Asset Management, 7(5), pp. 534-545. ISSN 2044-124X

Ammar, A; Hanna, A S; Nordheim, E V and Russell, J S (2003) Indicator variables model of firm's size-profitability relationship of electrical contractors using financial and economic data. Journal of Construction Engineering and Management, 129(2), pp. 192-197. ISSN 0733-9364

Ammar, A I (2001) Profitability of electrical contractors using financial and economical data: The effect of company's size. PhD thesis, University of Wisconsin - Madison, USA.

Burati, J L; Matthews, M F and Kalidindi, S N (1991) Quality management in construction industry. Journal of Construction Engineering and Management, 117(2), pp. 341-359. ISSN 0733-9364

Chan, I Y S and Liu, A M M (2012) Antecedents of innovation climate in construction firms in Hong Kong. International Journal of Construction Management, 12(4), pp. 37-46. ISSN 1562-3599

Cho, W M and Hadikusumo, B H W (2024) Psychological contract between contractors and owners in construction projects: The mediating role of inter-organisational teamwork. Engineering, Construction and Architectural Management, 31(10), pp. 4001-4015. ISSN 0969-9988

El-Kholy, A M and Akal, A Y (2021) Determining the stationary financial cause of contracting firms failure. International Journal of Construction Management, 21(8), pp. 818-833. ISSN 1562-3599

Gibson, G E (1990) Data integration and transfer methodologies in industrial construction. PhD thesis, Auburn University, USA.

Hemström, K; Gustavsson, L and Mahapatra, K (2017) The sociotechnical regime and Swedish contractor perceptions of structural frames. Construction Management and Economics, 35(4), pp. 184-195. ISSN 01446193

Hwang, B G; Tan, H F and Sathish, S (2013) Capital project performance measurement and benchmarking in Singapore. Engineering, Construction and Architectural Management, 20(2), pp. 143-159. ISSN 0969-9988

Isa, S S M and Abidin, N Z (2021) Eco-innovation adoption in Malaysian contractor firms: Understanding the components and drivers. Construction Economics and Building, 21(3), pp. 221-242. ISSN 2204-9029

Johnsson, H (2013) Production strategies for pre-engineering in house-building: Exploring product development platforms. Construction Management and Economics, 31(9), pp. 941-958. ISSN 1466433X

Kjerulf, L and Haugbølle, K (2021) Circular prequalification and bidding practices at contractor firms. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Lee, C K; Yiu, T W and Cheung, S O (2021) Predicting intention to use alternative dispute resolution (ADR): An empirical test of theory of planned behaviour (TPB) model. International Journal of Construction Management, 21(1), pp. 27-40. ISSN 1562-3599

Mokhtar Azizi, Z; Cochrane, J; Thurairajah, N and Mokhtar Azizi, N S (2023) Remote working in construction: Assessing the affordance of digitisation. Built Environment Project and Asset Management, 13(1), pp. 5-19. ISSN 2044-124X

Santoso, D S and Bourpanus, N (2019) Moving to e-bidding: Examining the changes in the bidding process and the bid mark-up decisions of Thai contractors. Journal of Financial Management of Property and Construction, 24(1), pp. 2-18. ISSN 1366-4387

Shojaei, R S; Oti-Sarpong, K and Burgess, G (2023) Enablers for the adoption and use of BIM in main contractor companies in the UK. Engineering, Construction and Architectural Management, 30(4), pp. 1726-1745. ISSN 0969-9988

Sozen, Z (1985) Size, technology and aspects of structure in contractor firms in Turkey. Construction Management and Economics, 3(3), pp. 233-247. ISSN 01446193

Thunberg, M and Fredriksson, A (2023) A model for visualizing cost shifts when introducing construction logistics setups. Construction Innovation, 23(4), pp. 757-774. ISSN 1471-4175

Wong, P S P; Keough, J; Holdsworth, S and Kenny, D (2020) How may the organisations' readiness to change affect the uptake of off-site construction? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(1), pp. 16-26. ISSN 17514304

Wong, P S P; Whelan, B and Holdsworth, S (2021) Are contractors ready for greater use of prefabrication in projects? An empirical analysis on the role of unlearning and counter-knowledge. International Journal of Construction Management, 21(4), pp. 353-368. ISSN 1562-3599

Yip, H L; Wong, S Y; Ding, C S and Low, W W (2026) Ethical transgressions in the construction industry in sarawak, Malaysia: Perspectives of quantity surveyors. Engineering, Construction and Architectural Management, 33(1), pp. 435-451. ISSN 0969-9988

This list was generated on Sat Aug 22 02:21:25 2026 UTC.