Items with Index Term: contract document

Number of items: 77.

Abbasian-Hosseini, S A; Hsiang, S M; Leming, M L and Liu, M (2014) From social network to data envelopment analysis: Identifying benchmarks at the site management level. Journal of Construction Engineering and Management, 140(8): 04014028, ISSN 0733-9364

Abdi, A; Lind, H and Birgisson, B (2013) Payment mechanisms for winter road maintenance services. Construction Economics and Building, 13(4), pp. 18-31. ISSN 2204-9029

Ahmed, S M; Yaris, C; Farooqui, R U and Saqib, M (2014) Key attributes and skills for curriculum improvement for undergraduate construction management programs. International Journal of Construction Education and Research, 10(4), pp. 240-254. ISSN 1557-8771

Al Rashdi, A (2012) A strategic framework for the further enhancement of the standard forms of construction contract in the Sultanate of Oman. PhD thesis, University of Salford, UK.

Al-Jibouri, S and Ogink, G (2009) Proposed model for integrating rams method in the design process in construction. Architectural Engineering and Design Management, 5(4), pp. 179-192. ISSN 1745-2007

Almarri, K; Aljarman, M and Boussabaine, H (2019) Emerging contractual and legal risks from the application of building information modelling. Engineering, Construction and Architectural Management, 26(10), pp. 2307-2325. ISSN 0969-9988

Aloyce, D; Monko, R J and Luvara, V G M (2024) Critical audit indicators for assessing construction projects performance (CPP) at pre-contract stage in Tanzania. International Journal of Construction Management, 24(5), pp. 530-539. ISSN 1562-3599

Alshdiefat, A S (2018) Developing an assessment model for the adoption of building information modelling to reduce the cost of change orders in the Jordanian construction industry. PhD thesis, University of Salford, UK.

Alsofyani, S (2021) An analysis of how culture influences the arbitration process used to resolve disputes on construction projects in Saudi Arabia. PhD thesis, University of Plymouth, UK.

Arar, A J; Papineau, C and Poirier, E (2024) An empirical evaluation of the causes leading to binding dispute resolution mechanisms in the quebec construction industry. International Journal of Construction Management, 24(7), pp. 761-770. ISSN 1562-3599

Assaad, R; El-Adaway, I H; El Hakea, A H; Parker, M J; Henderson, T I; Salvo, C R and Ahmed, M O (2020) Contractual perspective for BIM utilization in US construction projects. Journal of Construction Engineering and Management, 146(12): 04020128, ISSN 0733-9364

Assadi, S O A (1997) An investigation of the records kept by supervisors on construction sites. PhD thesis, University of Newcastle upon Tyne, UK.

Awuzie, B O (2014) A viable infrastructure delivery systems model for achieving socio-economic benefits in the Nigerian oil and gas industry. PhD thesis, University of Salford, UK.

Babaeian Jelodar, M; Yiu, T W and Wilkinson, S (2022) Empirical modeling for conflict causes and contractual relationships in construction projects. Journal of Construction Engineering and Management, 148(5): 04022017, ISSN 0733-9364

Badenfelt, U (2008) The selection of sharing ratios in target cost contracts. Engineering, Construction and Architectural Management, 15(1), pp. 54-65. ISSN 0969-9988

Balogun, O J (2019) Innovation in quantity surveying practice firms: an investigation of innovation response during compressed pre-contract timelines in Nigeria. PhD thesis, University of Salford, UK.

Birgonul, M T; Dikmen, I and Bektas, S (2015) Integrated approach to overcome shortcomings in current delay analysis practices. Journal of Construction Engineering and Management, 141(4): 04014088, ISSN 0733-9364

Cakmak, P I (2022) The stakeholders' perspective on the factors contributing to construction disputes. International Journal of Building Pathology and Adaptation, 40(5), pp. 712-727. ISSN 23984708

Candaş, A B (2022) Multipurpose semantic analysis of construction text documentation. PhD thesis, Middle East Technical University, Turkey.

Carr, P G (2000) An investigation of the relationship between personality traits and performance for engineering and architectural professionals providing design services to the building sector of the construction industry. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Chigara, B. and Smallwood, J. (2026) The impact of procurement on construction health and safety (H&S) in Zimbabwe. Journal of Engineering, Design and Technology, 24(4), pp. 943-962. ISSN 1726-0531

Coleman, E; Nooni, I K; Fianko, S K; Dadzie, L; Neequaye, E N; Owusu-Agyemang, J and Ansa-Asare, E O (2020) Assessing contract management as a strategic tool for achieving quality of work in Ghanaian construction industry: A case study of FPMU and MMDAS. Journal of Financial Management of Property and Construction, 25(1), pp. 41-60. ISSN 1366-4387

Cooke, John Richard (1973) Methods of documentation and administration of building contracts. PhD thesis, University of New South Wales, Australia.

Cooper, T E (1994) A knowledge-based construction claims advisor for the A.I.A. A201 general conditions document. PhD thesis, Auburn University, USA.

Corbett, D I (1997) Quantifying quality in industrial construction. PhD thesis, Pennsylvania State University, USA.

Craig, R (2000) Re-engineering the tender code for construction works. Construction Management and Economics, 18(1), pp. 91-100. ISSN 01446193

Craig, R W (2000) Controversial aspects of Commonwealth Construction and Engineering Procurement Law. PhD thesis, Loughborough University, UK.

Dosumu, O; Idoro, G and Onukwube, H (2017) Causes of errors in construction contract documents in Southwestern, Nigeria. Journal of Construction Business and Management, 1(2), pp. 11-23. ISSN 2521-0165

Dosumu, O S (2018) Perceived effects of prevalent errors in contract documents on construction projects. Construction Economics and Building, 18(1), pp. 1-26. ISSN 2204-9029

Eken, G (2022) Using natural language processing for automated construction contract review during risk assessment at the bidding stage. PhD thesis, Middle East Technical University, Turkey.

Erbas, I (2013) Construction management project delivery system as a form of project implementation in Turkish public procurement. PhD thesis, Istanbul Technical University, Turkey.

Fatokun, A O (2018) Value for money integration in the renegotiation of public private partnership road projects. PhD thesis, University of Central Lancashire, UK.

Gao, Y; Gan, Y; Chen, Y and Chen, Y (2025) Application of large language models to intelligently analyze long construction contract texts. Construction Management and Economics, 43(3), pp. 226-242. ISSN 0144-6193

Geng, L; Herath, N; Hui, F K P; Liu, X; Duffield, C and Zhang, L (2023) Evaluating uncertainties to deliver enhanced service performance in education PPPs: A hierarchical reliability framework. Engineering, Construction and Architectural Management, 30(9), pp. 4464-4485. ISSN 0969-9988

Habyalimana, J-B (1989) Change orders and construction projects characteristics: A relational quantitative study. PhD thesis, University of Missouri - Columbia, USA.

Hamida, M B; Hassanain, M A and Al-Hammad, A M (2022) Review and assessment of factors affecting adaptive reuse of commercial projects in Saudi Arabia. International Journal of Building Pathology and Adaptation, 40(1), pp. 1-19. ISSN 23984708

Hanioglu, M N (2014) Influence of owner-organization impression and contract framing on construction contractors' risk perceptions. PhD thesis, Illinois Institute of Technology, USA.

Hanna, A S; Tadt, E J and Whited, G C (2012) Request for information: Benchmarks and metrics for major highway projects. Journal of Construction Engineering and Management, 138(12), pp. 1347-1352. ISSN 0733-9364

Harris, R A and Scott, S (2001) UK practice in dealing with claims for delay. Engineering, Construction and Architectural Management, 8(5-6), pp. 317-324. ISSN 0969-9988

Hasan, A and Jha, K N (2016) Acceptance of the incentive/disincentive contracting strategy in developing construction markets: Empirical study from India. Journal of Construction Engineering and Management, 142(2): 04015064, ISSN 0733-9364

Hassan, Fahad Ul (2022) Digitalization of construction project requirements using natural language processing (NLP) techniques. PhD thesis, Clemson University, USA.

Hassanein, A A G and Afify, H M F (2006) Contractors' risk identification behaviour: A case study. Journal of Construction Procurement, 12(1),

Heaphy, I (2013) NEC versus fidic. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(1), pp. 21-30. ISSN 17514304

Indrastuti (2014) Unit cost modelling of public building project in Kepulauan Riau, Indonesia. PhD thesis, University of Malaya, Malaysia.

Iseley, D T (1988) Automated methods for the trenchless placement of underground utility systems. PhD thesis, Purdue University, USA.

Jackson, J T (1990) Technical specifications' effect on construction. Journal of Construction Engineering and Management, 116(3), pp. 463-467. ISSN 0733-9364

Jafari, Parinaz (2021) A framework for enhancing contract-related documentation in construction. PhD thesis, University of Alberta, Canada.

King, R (1987) Designing plans for constructibility. Journal of Construction Engineering and Management, 113(1), pp. 1-5. ISSN 0733-9364

Kirby, J G; Furry, D A and Hicks, D K (1988) Improvements in design review management. Journal of Construction Engineering and Management, 114(1), pp. 69-82. ISSN 0733-9364

Krizek, R J; Wei, L and Ahmad, H (1996) Lessons learned from multiphase reconstruction project. Journal of Construction Engineering and Management, 122(1), pp. 44-54. ISSN 0733-9364

Kyalisiima, C; Tutesigensi, A and Kayondo, M (2022) Is the competence of internal stakeholders in construction projects an antidote to construction contract disputes? In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Lacey, W E (1964) Change order procedures and practices in California school construction. EdD thesis, University of Southern California, USA.

Maharjan, R (2017) Effects of contract procurement factors on performance of transportation projects. PhD thesis, University of Nevada, Las Vegas, USA.

Mahfouz, T S (2009) Construction legal support for differing site conditions (DSC) through statistical modeling and machine learning (ML). PhD thesis, Iowa State University, USA.

Marzuki, P; Oktavianus, A; Regina, A and Hasiholan, B (2019) Interface problems in change order-challenged projects. Journal of Construction in Developing Countries, 24(2), pp. 1-22. ISSN 1823-6499

Mason, G E (1973) A quantitative risk management approach to the selection of construction contract provisions. PhD thesis, Stanford University, USA.

Matarneh, S (2024) Construction disputes causes and resolution methods: A case study from a developing country. Journal of Construction in Developing Countries, 29(1), pp. 139-161. ISSN 1823-6499

Mbabazi, A (2004) Quantification and analysis of construction claims. PhD thesis, University of Waterloo, Canada.

McCarthy, S C (1991) BOT and OMT contracts for infrastructure in developing countries. PhD thesis, University of Birmingham, UK.

Miura, K (2017) International joint ventures in the US military construction programs in Japan: An exploratory case study investigation. PhD thesis, Northcentral University, USA.

Muir Jr., R W (2015) Application of lean construction principles to highway projects: Analysis of barriers to timely delivery of service. PhD thesis, Drexel University, USA.

Ndekugri, I; Ankrah, N A; Adaku, E and Mzyece, D (2021) An analysis of health and safety provisions in NEC contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(2), pp. 65-75. ISSN 17514304

Nielsen, L-H K; Akanmu, A and Anumba, C J (2015) Comparative analysis of back-to-back subcontracts in the construction and telecommunications industries. Built Environment Project and Asset Management, 5(4), pp. 446-460. ISSN 2044-124X

Patil, S K (2016) Determining influencing factors and predicting dispute outcome of variation claims in Indian construction contracts/ by Smita Krishnarao Patil. PhD thesis, Indian Institute of Technology Delhi, India.

Rahman, M M (2002) Joint risk management through transactionally efficient relational contracting. Construction Management and Economics, 20(1), pp. 45-54. ISSN 01446193

Rameezdeen, R and Rajapakse, C (2007) Contract interpretation: The impact of readability. Construction Management and Economics, 25(7), pp. 729-737. ISSN 1466433X

Rameezdeen, R and Rodrigo, A (2014) Modifications to standard forms of contract: The impact on readability. Construction Economics and Building, 14(2), pp. 31-40. ISSN 2204-9029

Rodrigues, M R and Lindhard, S M (2023) Benefits and challenges to applying IPD: Experiences from a Norwegian mega-project. Construction Innovation, 23(2), pp. 287-305. ISSN 1471-4175

Saeed, A M; Duffield, C and Hui, F K P (2018) An enhanced framework for assessing the operational performance of public-private partnership school projects. Built Environment Project and Asset Management, 8(2), pp. 194-214. ISSN 2044-124X

Shrestha, K (2016) Framework of performance-based contracting for chip seal and striping maintenance activities. PhD thesis, University of Nevada, Las Vegas, USA.

Shrestha, Rabin (2024) Prediction of cost and schedule changes in transportation projects through historical bid and change order document analysis – using Oklahoma dot project cases. PhD thesis, University of Nevada, Las Vegas, USA.

Smith, G R and Roth, R D (1991) Safety programs and the construction manager. Journal of Construction Engineering and Management, 117(2), pp. 360-371. ISSN 0733-9364

Soon, C D (2009) Managing risk and uncertainty in transportation megaprojects. PhD thesis, University of Hawai'i at Manoa, USA.

Taggart, M; Koskela, L and Rooke, J (2014) The role of the supply chain in the elimination and reduction of construction rework and defects: An action research approach. Construction Management and Economics, 32(7-8), pp. 829-842. ISSN 01446193

Taggart M, K L R R (2013) The role of the supply chain in elimination and reduction of construction rework and defects: An action research approach. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Wang, Y (2024) Towards automated contract analysis: Applying language models to risk identification in the context of public-private partnerships. PhD thesis, University of Maryland, College Park, USA.

Zahoor, H; Chan, A P C; Masood, R; Choudhry, R M; Javed, A A and Utama, W P (2016) Occupational safety and health performance in the Pakistani construction industry: Stakeholders' perspective. International Journal of Construction Management, 16(3), pp. 209-219. ISSN 1562-3599

This list was generated on Sat Aug 22 02:07:52 2026 UTC.