Items with Index Term: construction time

Number of items: 173.

Abarinda, J; Kibwami, N and Tutesigensi, A (2019) Towards improving schedule performance of construction projects in Uganda with lean construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Abdollahipour, S (2013) Multi-parameter bidding in highway construction and rehabilitation projects. PhD thesis, Oklahoma State University, USA.

Abubakri, S; Mangat, P S; Grigoriadis, K and Starinieri, V (2025) Pore properties and moisture loss of repair mortars under low-impact microwave curing. International Journal of Building Pathology and Adaptation, 43(4), pp. 749-765. ISSN 2398-4708

Agapiou, A; Price, A D F and McCaffer, R (1995) Planning future construction skill requirements: Understanding labour resource issues. Construction Management and Economics, 13(2), pp. 149-161. ISSN 01446193

Ahmadu, H A; Ibrahim, Y M; Ibrahim, A D and Abdullahi, M (2015) Modelling building construction durations. Journal of Financial Management of Property and Construction, 20(1), pp. 65-84. ISSN 1366-4387

Al-Gathafi, M M (2005) Riskness of time and cost overruns and the effectiveness of risk response measure strategies in the Libyan construction industry. PhD thesis, University of Liverpool, UK.

Al-Saggaf, A; Hegazy, T; Nasir, H and Taha, M (2022) Computerized DSS for evaluating design performance of residential buildings using additive weighting approach. Architectural Engineering and Design Management, 18(5), pp. 631-651. ISSN 1745-2007

Alarcón-Ramirez, D; Oliveros-Romero, J and Mahn, D (2026) Performance comparison of public–private partnerships and traditionally procured hospitals. Construction Management and Economics, 44(2), pp. 79-97. ISSN 0144-6193

Alemu, S K (2022) Construction time prediction model for public building projects. Engineering, Construction and Architectural Management, 29(5), pp. 2183-2206. ISSN 0969-9988

Ali, A H; Kineber, A F; Elyamany, A; Hussein Ibrahim, A and Daoud, A O (2025) Exploring stationary and major modular construction challenges in developing countries: A case study of Egypt. Journal of Engineering, Design and Technology, 23(2), pp. 569-598. ISSN 1726-0531

Alshibani, A (2008) Optimizing and controlling earthmoving operations using spatial technologies. PhD thesis, Concordia University, Canada.

Amarasinghe, A A S R; Agdas, D and Dawes, L (2025) Evaluating labour productivity and profitability in precast concrete manufacturing. Engineering, Construction and Architectural Management, 32(13), pp. 148-173. ISSN 0969-9988

Amin, S H (2024) Predictive relationship in time and cost between planning and construction phases in capital projects. DBA thesis, Grand Canyon University, USA.

Anumba, C J and Evbuomwan, N F O (1997) Concurrent engineering in design-build projects. Construction Management and Economics, 15(3), pp. 271-281. ISSN 01446193

Aouad, G F and Barrett, P S (1998) The feasibility of using hybrid concrete structures within the context of cost and time. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Arai, K and Morimoto, E (2020) Renovation of the Japanese construction industry: Evaluation of i-Construction from the perspective of construction management. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Asiedu, R O and Gyadu-Asiedu, W (2020) Assessing the predictability of construction time overruns using multiple linear regression and Markov chain Monte Carlo. Journal of Engineering, Design and Technology, 18(3), pp. 583-600. ISSN 1726-0531

Assaad, R H; Omran, A; Soliman, N and Assaf, G (2024) Prediction of the lateral pressure of self-consolidating concrete on construction formwork systems using machine-learning algorithms. Journal of Construction Engineering and Management, 150(9): 04024110, ISSN 0733-9364

Atout, M M M (2008) Causes of delays in construction projects & how the project manager can act to avoid delays. PhD thesis, University of South Wales, UK.

Ayeni, Reuben Ebenmosi (2025) Intelligent project duration estimating system: An AI-based predictive approach for construction time estimation. PhD thesis, London South Bank University, UK.

Bearup, W K (1995) An environment to support computer-assisted design review. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Blomberg, D; Cotellesso, P; Sitzabee, W and Thal, A E (2014) Discovery of internal and external factors causing military construction cost premiums. Journal of Construction Engineering and Management, 140(3): 4013060, ISSN 0733-9364

Burns, S A; Liu, L and Feng, C W (1996) The LP/IP hybrid method for construction time-cost trade-off analysis. Construction Management and Economics, 14(3), pp. 265-276. ISSN 01446193

Chan, A P C (1999) Modelling building durations in Hong Kong. Construction Management and Economics, 17(2), pp. 189-196. ISSN 01446193

Chan, Albert P C (1996) Determinants of project success in the construction industry of Hong Kong. PhD thesis, University of South Australia, Australia.

Chan, D W M (1998) Modelling construction durations for public housing projects. PhD thesis, University of Hong Kong, Hong Kong.

Chan, D W M and Kumaraswamy, M M (1999) Modelling and predicting construction durations in Hong Kong public housing. Construction Management and Economics, 17(3), pp. 351-362. ISSN 01446193

Chen, J H; Su, M C and Huang, D Y (2010) Application of a SOM-based optimization algorithm in minimizing construction time for secant pile wall. Journal of Construction Engineering and Management, 136(11), pp. 1189-1195. ISSN 0733-9364

Chien, H-J (2003) Developing a digital nervous system for enhancing effectiveness of construction management and increasing commercial benefit in the UK construction industry. PhD thesis, University of Glamorgan, UK.

Choi, K (2008) A new decision-support model for innovative contracting strategies through a quantitative analysis on aspects of project performance. PhD thesis, University of California, Berkeley, USA.

Choudhury, I (2009) The effect of political unrest on construction time for food grain warehouses in Bangladesh. Construction Management and Economics, 27(7), pp. 619-624. ISSN 1466433X

Cruz Ortiz, M R P (2019) Expanding modular design: All-rise mass timber residences in Hawaii. DArch thesis, University of Hawai'i at Manoa, USA.

Deep, A; Nayyer, M I and Annamalai, T R (2025) When sauce for the goose is not sauce for the gander—the divergent impact of transparency law in infrastructure procurement: Evidence from EPC and PPP road projects in India. Construction Management and Economics, 43(11), pp. 922-937. ISSN 0144-6193

Echeverry, D; Ibbs, C W and Kim, S (1991) Sequencing knowledge for construction scheduling. Journal of Construction Engineering and Management, 117(1), pp. 118-130. ISSN 0733-9364

El-Rayes, K (2001) Optimum planning of highway construction under A+B bidding method. Journal of Construction Engineering and Management, 127(4), pp. 261-269. ISSN 0733-9364

El-Rayes, K and Kandil, A (2005) Time-cost-quality trade-off analysis for highway construction. Journal of Construction Engineering and Management, 131(4), pp. 477-486. ISSN 0733-9364

Elias, A M (1998) Development of a systematic approach for the inclusion of accident risk factors in the calculation of road user costs for construction zones. PhD thesis, University of Florida, USA.

Famiyeh, S; Amoatey, C T; Adaku, E and Agbenohevi, C S (2017) Major causes of construction time and cost overruns: A case of selected educational sector projects in Ghana. Journal of Engineering, Design and Technology, 15(2), pp. 181-198.

Fang, X; Yang, L; Zhang, C; Yang, J and Zhou, W (2025) Large diameter shafts in fractured strata: Equipment and construction procedures. Journal of Construction Engineering and Management, 151(9): 06025001, ISSN 0733-9364

Flanagan, R (1980) Tender price and time prediction for construction work. PhD thesis, Aston University, UK.

Flores Salas, A (2016) Evaluation of the use of lightweight concrete panels for post disaster house reconstruction using Building Information Modelling. PhD thesis, University of Manchester, UK.

Gao, S; Low, S P and Nair, K (2018) Design for manufacturing and assembly (DFMA): A preliminary study of factors influencing its adoption in Singapore. Architectural Engineering and Design Management, 14(6), pp. 440-456. ISSN 1745-2007

Gledson, B (2015) Investigating the diffusion of 4D BIM innovation. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Gray, C (1986) Intelligent' construction time and cost analysis. Construction Management and Economics, 4(2), pp. 135-150. ISSN 01446193

Greenwood, D J and Shaglouf, A A (1997) Comparison between planned and actual durations in medium sized building projects. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Guo, H (2009) Rethinking construction project management using the VP-based manufacturing management model. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Hamid, Z A and Anuar Mohamad Kamar, K (2012) Aspects of off-site manufacturing application towards sustainable construction in Malaysia. Construction Innovation, 12(1), pp. 4-10. ISSN 1471-4175

Han, T; Zhou, G; Xie, Y; Qiao, F; Feng, J; Liu, P and Wang, S (2026) Time-cost trade-off optimization in ultralong tunnel construction based on working face planning. Journal of Construction Engineering and Management, 152(3): 04026007, ISSN 0733-9364

Hegazy, T and Kassab, M (2003) Resource optimization using combined simulation and genetic algorithms. Journal of Construction Engineering and Management, 129(6), pp. 698-705. ISSN 0733-9364

Helaly, H; El-Rayes, K; Ignacio, E J and Joan, H J (2025) Comparison of machine-learning algorithms for estimating cost of conventional and accelerated bridge construction methods during early design phase. Journal of Construction Engineering and Management, 151(3): 04025004, ISSN 0733-9364

Herbsman, Z J (1995) A+B bidding method: hidden success story for highway construction. Journal of Construction Engineering and Management, 121(4), pp. 430-437. ISSN 0733-9364

Herbsman, Z J; Chen, W T and Epstein, W C (1995) Time is money: Innovative contracting methods in highway construction. Journal of Construction Engineering and Management, 121(3), pp. 273-281. ISSN 0733-9364

Hong, X (2002) A comparative study of contractor performance based on Japanese, UK and US construction practice. PhD thesis, University of Wolverhampton, UK.

Hong-minh, S M T (2002) Re-engineering the UK private house building supply chain. PhD thesis, University of Wales College of Cardiff, UK.

Huh, Y (2004) Highway bridge construction production rates for time estimation. PhD thesis, University of Texas at Austin, USA.

Ibrahim, M N (2022) Risk management in construction of megahousing projects in Egypt. PhD thesis, London South Bank University, UK.

Idrus, A and Newman, J (2003) Ifess: A computer tool to aid structural engineers at the conceptual design stage. Construction Innovation, 3(3), pp. 127-143. ISSN 1471-4175

Ireland, V (1985) The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects. Construction Management and Economics, 3(1), pp. 59-87. ISSN 01446193

Isaksson, T (2002) Model for estimation of time and cost based on risk evaluation applied on tunnel projects. PhD thesis, Kungliga Tekniska Hogskolan, Sweden.

Ismail, Z A (2023) Improving failure risk by better planning and safety for precast beam-to-column connection elements using physical internet-enabled building information modeling technology: A Malaysian case study. International Journal of Building Pathology and Adaptation, 41(3), pp. 517-532. ISSN 23984708

Jaillon, L C (2009) The evolution of the use of prefabrication techniques in Hong Kong construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Jaraiedi, M; Plummer, R W and Aber, M S (1995) Incentive/disincentive guidelines for highway construction contracts. Journal of Construction Engineering and Management, 121(1), pp. 112-120. ISSN 0733-9364

Jin, Y (2018) Supervised learning for back analysis of excavations in the observational method. PhD thesis, University of Cambridge, UK.

Johnson, B T (2007) Exploring the use of virtual construction to capture knowledge and reduce waste for residential projects. PhD thesis, Colorado State University, USA.

Jonsson, J (1996) Construction site productivity measurements selection, application and evaluation of methods and measures. PhD thesis, Luleå University of Technology, Sweden.

Kaming, P F; Olomolaiye, P O; Holt, G D and Harris, F C (1997) Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics, 15(1), pp. 83-94. ISSN 01446193

Kanai, Júlia (2025) Systematic management model based on lean construction through a mobile app for industrialized buildings in the frame system. PhD thesis, Universidade Estadual de Campinas, Brazil.

Kandil, A; El-Rayes, K and El-Anwar, O (2010) Optimization research: Enhancing the robustness of large-scale multiobjective optimization in construction. Journal of Construction Engineering and Management, 136(1), pp. 17-25. ISSN 0733-9364

Kandil, A A (2005) Multi-objective optimization for large-scale highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kangari, R; Pruitt, J D and Cheema, T S (1988) Slipforming IBM tower. Journal of Construction Engineering and Management, 114(3), pp. 472-488. ISSN 0733-9364

Kashiwagi, D and Savicky, J (2003) A case study of the transaction cost and value of the delivering of construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Kenley, R (2001) The predictive ability of bromilow's time-cost model: A comment. Construction Management and Economics, 19(8), pp. 759-764. ISSN 01446193

Khalfan, M M A; Anumba, C J and Carrillo, P M (2005) Concurrent engineering readiness assessment tool for construction. Architectural Engineering and Design Management, 1(3), pp. 163-179. ISSN 1745-2007

Kittinaraporn, W; Tuprakay, S and Prasittisopin, L (2022) Effective modeling for construction activities of recycled aggregate concrete using artificial neural network. Journal of Construction Engineering and Management, 148(3): 04021206, ISSN 0733-9364

Kumaraswamy, M M and Chan, D W M (1998) Contributors to construction delays. Construction Management and Economics, 16(1), pp. 17-29. ISSN 01446193

Kumaraswamy, M M; Chan, D W M; Dissanayaka, S M and Yogeswaran, K (1997) Mapping methodologies and mixing methods in construction management research. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Kuo, Y-c (2004) Highway earthwork and pavement production rates for construction time estimation. PhD thesis, University of Texas at Austin, USA.

Kwok, T W; Chang, S and Li, H (2024) Factors affecting unitized curtain wall system adoption for hong kong's high-rise residential buildings: A multi-stakeholder perspective. Engineering, Construction and Architectural Management, 31(2), pp. 526-543. ISSN 0969-9988

Kwok, T W; Chang, S and Li, H (2025) Understanding client satisfaction of prefabricated curtain wall in Hong Kong using xgboost and Pearson correlation. Engineering, Construction and Architectural Management, 32(2), pp. 1254-1277. ISSN 0969-9988

Lagerkvist, Johan (2025) A design approach for cost effective, climate smart and buildable bridges. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Lam, P T I and Wong, F W H (2009) Improving building project performance: How buildability benchmarking can help. Construction Management and Economics, 27(1), pp. 41-52. ISSN 1466433X

Larsson, R (2021) Modelling and simulation of factors influencing on-site construction of concrete frameworks: Studying the effects of resource allocation, weather conditions, and climate-improved concrete. PhD thesis, Lund University, Sweden.

Laufer, A; Shapira, A and Goren, I (1998) Implementing an integrative approach to project schedule compression. Engineering, Construction and Architectural Management, 5(1), pp. 82-92. ISSN 0969-9988

Li, Y; Gao, R; Wu, H; Wen, J; Li, T and Dong, X (2026) Multiobjective construction schedule optimization with labor resource allocation: Coupling parameter-adaptive genetic algorithm and network flow. Journal of Construction Engineering and Management, 152(5): 04026053, ISSN 0733-9364

Li, D; Li, X; Feng, H; Wang, Y and Fan, S (2022) ISM-based relationship among critical factors that affect the choice of prefabricated concrete buildings in China. International Journal of Construction Management, 22(6), pp. 977-992. ISSN 1562-3599

Li, M G; Chen, J J; Xu, A J; Xia, X H and Wang, J H (2014) Case study of innovative top-down construction method with channel-type excavation. Journal of Construction Engineering and Management, 140(5): 05014003, ISSN 0733-9364

Liu, L; Burns, S A and Feng, C W (1995) Construction time-cost trade-off analysis using LP/IP hybrid method. Journal of Construction Engineering and Management, 121(4), pp. 446-454. ISSN 0733-9364

Lu, W (2015) Collaboration in BIM-enabled projects: a socio-technical perspective. PhD thesis, University of Hong Kong, Hong Kong.

Mackenzie, D I (2010) A review of project controls in the UK and methodologies to improve the processes. DProf thesis, Teesside University, UK.

Mahdavian, S; Lu, M and Pereira, E (2023) Application framework for safety-centric construction acceleration planning. Engineering, Construction and Architectural Management, 30(4), pp. 1401-1422. ISSN 0969-9988

Mahmoodzadeh, A; Nejati, H R; Flaih, L R; Ibrahim, H H; Alenizi, F A and Alassaf, Y (2024) A rigorous examination of twelve cutting-edge machine-learning techniques for predicting time and cost in tunneling projects. Journal of Construction Engineering and Management, 150(12): 04024176, ISSN 0733-9364

Mak, M Y; Ng, S T; Chen, S E and Varnam, M (2000) The relationship between economic indicators and Bromilow's time-cost model: A pilot study. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Mandala, R S K and Nayaka, R R (2025) A state of art review on time, cost and sustainable benefits of modern construction techniques for affordable housing. Construction Innovation, 25(2), pp. 363-380. ISSN 1471-4175

Mehany, M S H M (2014) Delay-caused claims in infrastructure projects under design-bid-build delivery systems. PhD thesis, Colorado State University, USA.

Moret, Y (2011) Modeling cost and time uncertainty in rail line construction. PhD thesis, Massachusetts Institute of Technology, USA.

Moscati, A and Engström, S (2019) Digitalization and industrialization: Exploration of the current and future challenges in the Swedish built environment sector. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Murtaza, M B (1993) A decision support model integrating neural networks and an expert system for construction modularization. PhD thesis, University of Houston, USA.

Naoum, S G (1994) Critical analysis of time and cost of management and traditional contracts. Journal of Construction Engineering and Management, 120(4), pp. 687-705. ISSN 0733-9364

Naoum, S G and Mustapha, F H (1995) Relationship between the building team, procurement methods and project performance. Journal of Construction Procurement, 1(1), pp. 50-63. ISSN 1358-9180

Nemati, Saeed (2019) Foam-filled structural panels using pneumatic fabric formwork for rapidly assembled buildings. PhD thesis, Western Sydney University, Australia.

Ng, S T and Zhang, Y (2008) Optimizing construction time and cost using ant colony optimization approach. Journal of Construction Engineering and Management, 134(9), pp. 721-728. ISSN 0733-9364

Nguyen, L D; Phan, D H and Tang, L C M (2013) Simulating construction duration for multistory buildings with controlling activities. Journal of Construction Engineering and Management, 139(8), pp. 951-959. ISSN 0733-9364

Nkado, R N (1991) A construction time information system for the building industry. PhD thesis, University of Reading, UK.

Nkado, R N (1995) Construction time-influencing factors: The contractor's perspective. Construction Management and Economics, 13(1), pp. 81-89. ISSN 01446193

Nkado, R N (1992) Construction time information system for the building industry. Construction Management and Economics, 10(6), pp. 489-509. ISSN 01446193

Nwadigo, O (2019) Real-time and dynamic planning and scheduling under disruption using multi-hybrid simulation and optimisation. PhD thesis, Auckland University of Technology, New Zealand.

Nwadigo, O; Naismith, N N; Ghaffarianhoseini, A; Ghaffarian Hoseini, A and Tookey, J (2021) Dynamic Bayesian network modelling for predicting adaptability of time performance during time influencing factors disruptions in construction enterprise. Engineering, Construction and Architectural Management, 28(10), pp. 2994-3013. ISSN 0969-9988

O'Connor, J T and Huh, Y (2005) Crew production rates for contract time estimation: Bent footing, column, and cap of highway bridges. Journal of Construction Engineering and Management, 131(9), pp. 1013-1020. ISSN 0733-9364

O'Connor, J T and Huh, Y (2006) Crew production rates for contract time estimation: Beam erection, deck, and rail of highway bridges. Journal of Construction Engineering and Management, 132(4), pp. 408-415. ISSN 0733-9364

Ochoa Paniagua, J J (2011) Production planning approach for implementing sustainable building projects. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Ofori-Boadu, A N; Bryant, D; Bock-Hyeng, C; Assefa, Z; Aryeetey, F; Munkaila, S and Fini, E (2022) Physiochemical characterization of agricultural waste biochars for partial cement replacement. International Journal of Building Pathology and Adaptation, 40(4), pp. 569-586. ISSN 23984708

Othman, A A; Torrance, J V and Hamid, M A (2006) Factors influencing the construction time of civil engineering projects in Malaysia. Engineering, Construction and Architectural Management, 13(5), pp. 481-501. ISSN 0969-9988

Paek, J H and Ock, J H (1996) Innovative building construction technique: Modified up/down method. Journal of Construction Engineering and Management, 122(2), pp. 141-146. ISSN 0733-9364

Patel, T D; Haupt, T C and Bhatt, T (2020) Fuzzy probabilistic approach for risk assessment of BOT toll roads in Indian context. Journal of Engineering, Design and Technology, 18(1), pp. 251-269. ISSN 1726-0531

Patterson, D A; Farnsworth, C B; Hutchings, D M; Eggett, D L and Weidman, J E (2023) Comparing cost, schedule, and quality of CM/GC and DBB project delivery for repetitive commercial construction. International Journal of Construction Education and Research, 19(2), pp. 166-186. ISSN 1557-8771

Petroutsatou, K (2022) A proposal of project management practices in public institutions through a comparative analyses of critical path method and critical chain. International Journal of Construction Management, 22(2), pp. 242-251. ISSN 1562-3599

Pourghazian, H (2008) Industrial construction methods for cost-effective and sustainable multi-storey buildings. PhD thesis, KTH Royal Institute of Technology, Sweden.

Prasad K V; Vasugi V; Venkatesan R and Bhat, N (2019) Analysis of causes of delay in Indian construction projects and mitigation measures. Journal of Financial Management of Property and Construction, 24(1), pp. 58-78. ISSN 1366-4387

Proverbs, D G (1998) A best practice for high-rise insitu concrete construction based on French, German and UK contractor performance measures. PhD thesis, University of Wolverhampton, UK.

Proverbs, D G; Olomolaiye, P O and Harris, F C (1996) Planned construction times and labour utilization: a comparison of UK and French contractors. Engineering, Construction and Architectural Management, 3(3), pp. 219-232. ISSN 0969-9988

Pyeon, J-H (2005) Development of a simulation model to predict the impact of incentive contracts on transportation construction project time performance. PhD thesis, University of Florida, USA.

Rich, D (2014) On-site application of self-compacting concrete. EngD thesis, Loughborough University, UK.

San Cristóbal, J R (2009) Time, cost, and quality in a road building project. Journal of Construction Engineering and Management, 135(11), pp. 1271-1274. ISSN 0733-9364

Satish, S. and Umar, T. (2026) Bridging innovation and practice: Assessing the readiness for 3D printing in construction. Engineering, Construction and Architectural Management, 33(7), pp. 6014-6038. ISSN 0969-9988

Scheublin, F J M (2001) Project alliance contract in the Netherlands. Building Research & Information, 29(6), pp. 451-455. ISSN 0961-3218

Senouci, A and El-Rayes, K (2009) Time-profit trade-off analysis for construction projects. Journal of Construction Engineering and Management, 135(8), pp. 718-725. ISSN 0733-9364

Shaker, R A; Elbeltagi, E; Motawa, I; Elmasoudi, I and Elnabwy, M T (2024) Social network analysis for identifying the significant drivers of off-site construction adoption in Egypt. Built Environment Project and Asset Management, 14(4), pp. 607-625. ISSN 2044-124X

Shamsai, M; Whitlatch, E and Sezen, H (2007) Economic evaluation of reinforced concrete structures with columns reinforced with prefabricated cage system. Journal of Construction Engineering and Management, 133(11), pp. 864-870. ISSN 0733-9364

Shash, A A H (1988) A probabilistic model for U.S. Nuclear power construction times. PhD thesis, University of Texas at Austin, USA.

Shr, J-F (1999) Model development for cost-plus-time bidding applied to Florida department of transportation highway construction. PhD thesis, University of Wisconsin - Madison, USA.

Smailes, R L (2000) Building chan chan: The application of construction project management to the analysis of ancient architecture. PhD thesis, University of Florida, USA.

Son, J; Khwaja, N and Milligan, D S (2019) Planning-phase estimation of construction time for a large portfolio of highway projects. Journal of Construction Engineering and Management, 145(4): 04019018, ISSN 0733-9364

Srijaroen, C; Hoy, M; Horpibulsuk, S; Rachan, R and Arulrajah, A (2021) Soil-cement screw pile: Alternative pile for low- and medium-rise buildings in soft bangkok clay. Journal of Construction Engineering and Management, 147(2): 1988, ISSN 0733-9364

Staub-French, S A (2002) Feature-driven activity-based cost estimating. PhD thesis, Stanford University, USA.

Stevens, J D (1981) A study of the relationship between perturbations in construction time schedules and potential construction claims. PhD thesis, University of Washington, USA.

Suprun, Emiliya (2018) An integrated systems model of construction innovation in the Russian federation. PhD thesis, Griffith University, Russia.

Suárez, J L; Gosselin, L and Lehoux, N (2023) Analysing value creation in social housing construction in remote communities: application to nunavik (Canada). Built Environment Project and Asset Management, 13(4), pp. 493-508. ISSN 2044-124X

Takim, R and Akintoye, A (2002) Performance indicators for successful construction project performance. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Thadicaran, A B G (1997) Implementation strategies for water resources projects under uncertainties of completion time. PhD thesis, Colorado State University, USA.

Tolani, O V (2013) An examination of risk perceptions and allocation preferences in public-private partnerships in Nigeria. PhD thesis, University of Calgary, Canada.

Upadhyay, A K and Jain, K (2016) Modularity in nuclear power plants: A review. Journal of Engineering, Design and Technology, 14(3), pp. 526-542.

Valinejadshoubi, M; Sacks, R; Valdivieso, F; Corneau-Gauvin, C and Kaptué, A (2025) Digital twin construction in practice: A case study of closed-loop production control integrating BIM, GIS, and IoT sensors. Journal of Construction Engineering and Management, 151(11): 05025014, ISSN 0733-9364

Verburg, Willem Hendrik (2021) The development of a design-for-assembly method for construction and infrastructure projects. PhD thesis, University of Twente, Netherlands.

Walker, D H T (1994) An investigation into factors that determine building construction time performance. PhD thesis, Royal Melbourne Institute of Technology, Australia.

Walker, D H T (1995) An investigation into construction time performance. Construction Management and Economics, 13(3), pp. 263-274. ISSN 01446193

Walker, D H T (1995) The influence of client and project team relationships upon construction time performance. Journal of Construction Procurement, 1(1), pp. 4-20. ISSN 1358-9180

Walker, D H T (1996) The contribution of the construction management team to good construction time performance: An Australian experience. Journal of Construction Procurement, 2(2), pp. 4-18. ISSN 1358-9180

Walker, D H T (1997) Construction time performance and traditional versus non-traditional procurement methods. Journal of Construction Procurement, 3(1), pp. 42-55. ISSN 1358-9180

Walker, D H T (1997) Choosing an appropriate research methodology. Construction Management and Economics, 15(2), pp. 149-159. ISSN 01446193

Walker, D H T (1998) The contribution of the client representative to the creation and maintenance of good project inter-team relationships. Engineering, Construction and Architectural Management, 5(1), pp. 51-57. ISSN 0969-9988

Walker, D H T and Vines, M W (1997) Construction time performance in multi-unit residential construction: Insight into the role of procurement methods. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Walker, D H T and Vines, M W (2000) Australian multi-unit residential project construction time performance factors. Engineering, Construction and Architectural Management, 7(3), pp. 278-284. ISSN 0969-9988

Walker D.H.T, S Y J (2002) Project understanding, planning, flexibility of management action and construction time performance: Two Australian case studies. Construction Management and Economics, 20(1), pp. 31-44. ISSN 01446193

Wang, C H and Huang, Y C (1998) Controlling activity interval times in LOB scheduling. Construction Management and Economics, 16(1), pp. 5-16. ISSN 01446193

Wang, Q (2017) Automated geometry quality assessment of precast concrete elements using 3D laser scan data. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Warszawski, A; Avraham, M and Carmel, D (1984) Utilization of precast concrete elements in building. Journal of Construction Engineering and Management, 110(4), pp. 476-485. ISSN 0733-9364

Wetherington, L E (1992) The effect of variations in management techniques on construction productivity. PhD thesis, University of Florida, USA.

Wiguna, I P A and Scott, S (2005) Nature of the critical risk factors affecting project performance in Indonesian building contracts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Wu, M L and Lo, H P (2009) Optimal strategy modeling for price-time biparameter construction bidding. Journal of Construction Engineering and Management, 135(4), pp. 298-306. ISSN 0733-9364

Wuni, I Y; Shen, G Q; Ogungbile, A J and Ayitey, J Z (2022) Four-pronged decision support framework for implementing industrialized construction projects. Construction Innovation, 22(2), pp. 263-283. ISSN 1471-4175

Xiao, H and Proverbs, D (2002) Construction time performance: An evaluation of contractors from Japan, the UK and the US. Engineering, Construction and Architectural Management, 9(2), pp. 81-89. ISSN 0969-9988

Xiao, H and Proverbs, D (2003) Factors influencing contractor performance: An international investigation. Engineering, Construction and Architectural Management, 10(5), pp. 322-332. ISSN 0969-9988

Xie, H; Hong, Y; Xin, M; Brilakis, I and Shi, O (2025) Identification and analysis of communication barriers for construction projects with time uncertainties. Engineering, Construction and Architectural Management, 32(1), pp. 305-331. ISSN 0969-9988

Xiong, Y and Kuang, Y (2008) Applying an ant colony optimization algorithm-based multiobjective approach for time-cost trade-off. Journal of Construction Engineering and Management, 134(2), pp. 153-156. ISSN 0733-9364

Yap, J B H and Chow, I N (2020) Investigating the managerial "nuts and bolts" for the construction industry. Built Environment Project and Asset Management, 10(3), pp. 331-348. ISSN 2044-124X

Yap, J B H; Lim, B L; Skitmore, M and Gray, J (2022) Criticality of project knowledge and experience in the delivery of construction projects. Journal of Engineering, Design and Technology, 20(3), pp. 800-822. ISSN 1726-0531

Yi, J; Chen, H and Li, S (2010) Determination of contract time and incentive and disincentive values of highway construction projects. International Journal of Construction Education and Research, 6(4), pp. 285-302. ISSN 1557-8771

Yllmaz, M and Dede, T (2025) Optimizing multiobjective time-cost-quality problems in construction projects: Efficacy of strength Pareto-based rao algorithms. Journal of Construction Engineering and Management, 151(5): 04025036, ISSN 0733-9364

Zhang, H and Li, H (2010) Multi-objective particle swarm optimization for construction time-cost tradeoff problems. Construction Management and Economics, 28(1), pp. 75-88. ISSN 1466433X

Zheng, D X M; Ng, S T and Kumaraswamy, M M (2002) Applying genetic algorithm techniques for time-cost optimization. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Zolghadr, Ali (2023) Innovative offsite construction uptake in the housebuilding sector: A systemic approach to economic justifiability for volume builders. PhD thesis, RMIT University, Australia.

Zouein, P P (1995) MoveSchedule: a planning tool for scheduling space use on construction sites. PhD thesis, University of Michigan, USA.

Špačková, O (2012) Risk management of tunnel construction projects. PhD thesis, Czech Technical University, Czech Republic.

This list was generated on Sat Aug 22 02:13:20 2026 UTC.