Items with Index Term: construction scheduling
Abbasi, S; Taghizade, K and Noorzai, E (2020) BIM-based combination of takt time and discrete event simulation for implementing just in time in construction scheduling under constraints. Journal of Construction Engineering and Management, 146(12): 04020143, ISSN 0733-9364
AbdElMottaleb, Mohamed (2025) AI in project management: Machine learning application for construction scheduling. PhD thesis, University of Salford, UK.
Adeli, H and Karim, A (1997) Scheduling/cost optimization and neural dynamics model for construction. Journal of Construction Engineering and Management, 123(4), pp. 450-458. ISSN 0733-9364
Ahuja, V and Thiruvengadam, V (2004) Project scheduling and monitoring: Current research status. Construction Innovation, 4(1), pp. 19-31. ISSN 1471-4175
Al Hattab, M; Zankoul, E; Barakat, M and Hamzeh, F (2018) Crane overlap and operational flexibility: Balancing utilization, duration, and safety. Construction Innovation, 18(1), pp. 43-63. ISSN 1471-4175
Alemu, S K (2022) Construction time prediction model for public building projects. Engineering, Construction and Architectural Management, 29(5), pp. 2183-2206. ISSN 0969-9988
Allam, S I G (1988) Multi-project scheduling: A new categorization for heuristic scheduling rules in construction scheduling problems. Construction Management and Economics, 6(2), pp. 93-115. ISSN 01446193
Amarkhil, Q.; Alroomi, A. S. and Narimani, M. R. (2026) Leveraging BIM, EPS and constraint programming for automated scheduling: A methodology for structured scheduling data and combinatorial optimization. Engineering, Construction and Architectural Management, 33(3), pp. 1980-2006. ISSN 0969-9988
Ammar, M. A. and Alattyih, W. (2026) Lingo optimization modelling of construction scheduling. International Journal of Construction Management, 26(9), pp. 1746-1760. ISSN 1562-3599
Ballesteros-Pérez, P; Smith, S T; Lloyd-Papworth, J G and Cooke, P (2018) Incorporating the effect of weather in construction scheduling and management with sine wave curves: Application in the United Kingdom. Construction Management and Economics, 36(12), pp. 666-682. ISSN 01446193
Bansal, V K and Pal, M (2011) Construction projects scheduling using GIS tools. International Journal of Construction Management, 11(1), pp. 1-18. ISSN 1562-3599
Benjaoran, V; Tabyang, W and Sooksil, N (2015) Precedence relationship options for the resource levelling problem using a genetic algorithm. Construction Management and Economics, 33(9), pp. 711-723. ISSN 01446193
Bennett, Brian Kevin (2023) Increasing knowledge of scheduling activity sequencing in construction management education using interactive 3D gaming models. PhD thesis, University of Florida, USA.
Bi, L; Ren, B; Zhong, D and Hu, L (2015) Real-time construction schedule analysis of long-distance diversion tunnels based on lithological predictions using a markov process. Journal of Construction Engineering and Management, 141(2): 04014076, ISSN 0733-9364
Bonnal, P; Gourc, D; Hameri, A P and Lacoste, G (2005) A linear-discrete scheduling model for the resource-constrained project scheduling problem. Construction Management and Economics, 23(8), pp. 797-814. ISSN 01446193
Chau, K W; Anson, M and Zhang, J P (2004) Four-dimensional visualization of construction scheduling and site utilization. Journal of Construction Engineering and Management, 130(4), pp. 598-606. ISSN 0733-9364
Christodoulou, S (2005) Construction scheduling with artificial agents and the ant colony optimization metaheuristic. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Cole, L J R (1991) Construction scheduling: Principles, practices, and six case studies. Journal of Construction Engineering and Management, 117(4), pp. 579-588. ISSN 0733-9364
Dawood, N and Sriprasert, E (2006) Construction scheduling using multi-constraint and genetic algorithms approach. Construction Management and Economics, 24(1), pp. 19-30. ISSN 01446193
De La Garza-Rodriguez, J M (1988) A knowledge engineering approach to the analysis and evaluation of schedules for mid-rise construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Dharwadkar, P V (1994) A prototype object-oriented system for three-dimensional CAD and schedule integration. PhD thesis, University of Texas at Austin, USA.
Echeverry, D (1991) Factors for generating initial construction schedules. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Echeverry, D; Ibbs, C W and Kim, S (1991) Sequencing knowledge for construction scheduling. Journal of Construction Engineering and Management, 117(1), pp. 118-130. ISSN 0733-9364
Elazouni, A M and Gab-Allah, A A (2004) Finance-based scheduling of construction projects using integer programming. Journal of Construction Engineering and Management, 130(1), pp. 15-24. ISSN 0733-9364
Elghaish, F and Abrishami, S (2020) Developing a framework to revolutionise the 4D BIM process: IPD-based solution. Construction Innovation, 20(3), pp. 401-420. ISSN 1471-4175
Elliott, B R (2000) Investigation of the construction scheduling communication process: Problems, foreman's role, means of improvement and use of information technology. PhD thesis, University of Florida, USA.
Fahmie, M M (1994) A knowledge-based expert system approach to analyze and evaluate highway construction schedules. PhD thesis, Florida University, USA.
Fahmy, A (2014) A dynamic scheduling model for construction enterprises. PhD thesis, Loughborough University, UK.
Fan, C; Binchao, D and Yin, Y (2023) Hierarchical structure and transfer mechanism to assess the scheduling-related risk in construction of prefabricated buildings: An integrated ISM–MICMAC approach. Engineering, Construction and Architectural Management, 30(7), pp. 2991-3013. ISSN 0969-9988
Francis, A (2016) A chronographic protocol for modelling construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(4), pp. 168-177. ISSN 17514304
Gledson, B (2022) Enhanced model of the innovation-decision process, for modular-technological-process innovations in construction. Construction Innovation, 22(4), pp. 1085-1103. ISSN 1471-4175
Gledson, B J and Greenwood, D (2014) The implementation and use of 4D BIM and virtual construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Golabchi, H and Hammad, A (2024) Estimating labor resource requirements in construction projects using machine learning. Construction Innovation, 24(4), pp. 1048-1065. ISSN 1471-4175
Hajiashrafi, R (2025) Streamlined shapley value models for contribution-based compensation allocation in scheduling networks in construction project management. PhD thesis, Catholic University of America, USA.
Hatipkarasulu, Y (2020) A conceptual approach to graphically compare construction schedules. Construction Innovation, 20(1), pp. 43-60. ISSN 1471-4175
He, C (2022) Integrate human and engineering aspects to facilitate construction scheduling under uncertainty. PhD thesis, North Carolina State University, USA.
Hollister, K C (1992) An extended structured query language incorporating object data types for the construction industry. PhD thesis, University of Florida, USA.
Huang, J; Ji, A; Xiao, Z and Zhang, L (2025) Schedule-cost optimization in high-rise buildings considering uncertainty. Engineering, Construction and Architectural Management, 32(9), pp. 5657-5681. ISSN 0969-9988
Huang, T (2009) Virtual prototyping technologies enhanced construction planning. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Jaiswal, S and Kar, S (2025) A decision support system for optimizing labor acquisition in construction. Journal of Construction Engineering and Management, 151(12): 04025211, ISSN 0733-9364
Jin, R; Yang, T; Piroozfar, P; Kang, B G; Wanatowski, D; Hancock, C M and Tang, L (2018) Project-based pedagogy in interdisciplinary building design adopting BIM. Engineering, Construction and Architectural Management, 25(10), pp. 1376-1397. ISSN 0969-9988
Joannides, M M; Olbina, S and Issa, R R A (2012) Implementation of building information modeling into accredited programs in architecture and construction education. International Journal of Construction Education and Research, 8(2), pp. 83-100. ISSN 1557-8771
Jordan Srour, F; Kiomjian, D and Srour, I M (2018) Automating the use of learning curve models in construction task duration estimates. Journal of Construction Engineering and Management, 144(7): 04018055, ISSN 0733-9364
Jun, D H and El-Rayes, K (2011) Multiobjective optimization of resource leveling and allocation during construction scheduling. Journal of Construction Engineering and Management, 137(12), pp. 1080-1088. ISSN 0733-9364
Kang, H-Y (2001) Web-based four-dimensional visualization for constuction scheduling. PhD thesis, Texas A&M University, USA.
Kang, L S; Park, I C and Lee, B H (2001) Optimal schedule planning for multiple, repetitive construction process. Journal of Construction Engineering and Management, 127(5), pp. 382-390. ISSN 0733-9364
Karim, A and Adeli, H (1999) OO information model for construction project management. Journal of Construction Engineering and Management, 125(5), pp. 361-367. ISSN 0733-9364
Karim, A and Adeli, H (1999) A new generation software for construction scheduling and management. Engineering, Construction and Architectural Management, 6(4), pp. 380-390. ISSN 0969-9988
Karim, A and Adeli, H (1999) CONSCOM: An OO construction scheduling and change management system. Journal of Construction Engineering and Management, 125(5), pp. 368-376. ISSN 0733-9364
Kim, J (2007) An investigation of activity duration input modeling by duration variance ratio for simulation-based construction scheduling. PhD thesis, Rutgers The State University of New Jersey - New Brunswick, USA.
Lee, E B (2000) Constructability and productivity analysis for long life pavement rehabilitation strategies (LLPRS). PhD thesis, University of California, Berkeley, USA.
Lee, Y-I (1994) Short-term resource-constrained scheduling for construction projects. PhD thesis, University of Texas at Austin, USA.
Leu, S S and Hung, T H (2002) A genetic algorithm-based optimal resource-constrained scheduling simulation model. Construction Management and Economics, 20(2), pp. 131-141. ISSN 01446193
Leu, S S and Yang, C H (1999) GA-based multicriteria optimal model for construction scheduling. Journal of Construction Engineering and Management, 125(6), pp. 420-427. ISSN 0733-9364
Leu, S S and Yang, C H (1999) A genetic-algorithm-based resource-constrained construction scheduling system. Construction Management and Economics, 17(6), pp. 767-776. ISSN 01446193
Li, Y; Gao, R; Wu, H; Wen, J; Li, T and Dong, X (2026) Multiobjective construction schedule optimization with labor resource allocation: Coupling parameter-adaptive genetic algorithm and network flow. Journal of Construction Engineering and Management, 152(5): 04026053, ISSN 0733-9364
Liu, J and Lu, M (2018) Constraint programming approach to optimizing project schedules under material logistics and crew availability constraints. Journal of Construction Engineering and Management, 144(7): 04018049, ISSN 0733-9364
Lorterapong, P and Ussavadilokrit, M (2013) Construction scheduling using the constraint satisfaction problem method. Journal of Construction Engineering and Management, 139(4), pp. 414-422. ISSN 0733-9364
Ma, G; Wang, A; Li, N; Gu, L and Ai, Q (2014) Improved critical chain project management framework for scheduling construction projects. Journal of Construction Engineering and Management, 140(12): 04014055, ISSN 0733-9364
Maghrebi, M; Shamsoddini, A and Waller, S T (2016) Fusion-based learning approach for predicting concrete pouring productivity based on construction and supply parameters. Construction Innovation, 16(2), pp. 185-202. ISSN 1471-4175
Mariaca Clavel, Israel Simon (2025) Dynamic construction scheduling: Utilizing AI data automation in a BIM-integrated serious game framework. PhD thesis, University College London, UK.
McCann, M (1986) An application of convex programming to construction scheduling. PhD thesis, Iowa State University, USA.
Morkos, R (2014) Operational efficiency frontier: Visualizing, manipulating, and navigating the construction scheduling state space with precedence, discrete, and disjunctive constraints. PhD thesis, Stanford University, USA.
Moselhi, O and Roofigari-Esfahan, N (2013) Project schedule compression: A multi-objective methodology. Construction Innovation, 13(4), pp. 374-393. ISSN 1471-4175
Nikolić, D (2011) Evaluating a simulation game in construction engineering education: The virtual construction simulator 3. PhD thesis, Pennsylvania State University, USA.
O'Brien, P J (2007) Timely completion of school construction projects in Ohio as a function of compliance with contractual schedule development timelines. PhD thesis, Walden University, USA.
Orczyk, J J (1989) Parametric construction scheduling. PhD thesis, Purdue University, USA.
Pan, N-F S (2001) Fuzzy reasoning expert scheduling system (FRESS) for highway construction subject to rain impact: A case study in Taiwan. PhD thesis, Ohio State University, USA.
Panwar, A (2019) Development of a many-objective model based on NSGA-III for construction projects. PhD thesis, Indian Institute of Technology Delhi, India.
Panwar, A and Jha, K N (2019) A many-objective optimization model for construction scheduling. Construction Management and Economics, 37(12), pp. 727-739. ISSN 01446193
Panwar, A and Jha, K N (2021) Integrating quality and safety in construction scheduling time-cost trade-off model. Journal of Construction Engineering and Management, 147(2): 04020160, ISSN 0733-9364
Pultar, M (1990) Progress-based construction scheduling. Journal of Construction Engineering and Management, 116(4), pp. 670-688. ISSN 0733-9364
Que, B C (2002) Incorporating practicability into genetic algorithm-based time-cost optimization. Journal of Construction Engineering and Management, 128(2), pp. 139-143. ISSN 0733-9364
Said, H M M and Lucko, G (2016) Float types in construction spatial scheduling. Journal of Construction Engineering and Management, 142(12): 04016077, ISSN 0733-9364
Sarkar, D; Jha, K N and Patel, S (2021) Critical chain project management for a highway construction project with a focus on theory of constraints. International Journal of Construction Management, 21(2), pp. 194-207. ISSN 1562-3599
Schied Jr., E P (2012) Geometric information scheduling to identify and resolve spatial conflicts and increase efficiency of space use on construction projects. PhD thesis, Catholic University of America, USA.
Shah, R K; Dawood, N; Dean, J and Castro, S (2009) A virtual construction model of 4d planning in road project. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Shahedi, F. and Abrishami, S. (2026) Adaptive construction scheduling with AI in 4D/5D BIM: Integrating weather data and activity-based costing. Smart and Sustainable Built Environment, pp. 1-15. ISSN 2046-6099
Son, J (1997) Multi-heuristic approach to resource leveling in construction: A hybrid model. PhD thesis, Purdue University, USA.
Son, J and Skibniewski, M J (1999) Multiheuristic approach for resource leveling problem in construction engineering: Hybrid approach. Journal of Construction Engineering and Management, 125(1), pp. 23-31. ISSN 0733-9364
Songer, A D; Diekmann, J E; Rasheed, K A and Hays, B (2001) Construction scheduling using 3-D CAD and walk-thru. Construction Innovation, 1(3), pp. 191-207. ISSN 1471-4175
Sonmez, R; Iranagh, M A and Uysal, F (2016) Critical sequence crashing heuristic for resource-constrained discrete time-cost trade-off problem. Journal of Construction Engineering and Management, 142(3): 04015090, ISSN 0733-9364
Su, Y; Isaac, S and Lucko, G (2018) Integrated temporal-spatial model for construction plans with boolean logic operators. Journal of Construction Engineering and Management, 144(4): 04018009, ISSN 0733-9364
Su, Y; Lucko, G and Thompson, R C (2018) Application of voting theory to the float ownership problem. Journal of Construction Engineering and Management, 144(1): 04017094, ISSN 0733-9364
Tomczak, M and Jaśkowski, P (2020) New approach to improve general contractor crew's work continuity in repetitive construction projects. Journal of Construction Engineering and Management, 146(5): 1824, ISSN 0733-9364
Torres, A (2023) Using large peer-teaching groups to learn construction management software packages. International Journal of Construction Education and Research, 19(4), pp. 426-442. ISSN 1557-8771
Touran, A (1986) Computer packages for construction data acquisition and processing. Construction Management and Economics, 4(3), pp. 233-243. ISSN 01446193
Wang, Z and Rezazadeh Azar, E (2019) BIM-based draft schedule generation in reinforced concrete-framed buildings. Construction Innovation, 19(2), pp. 280-294. ISSN 1471-4175
Waugh, L M (1990) A construction planner. PhD thesis, Stanford University, USA.
Woldetsadik, E T (2025) A predictive model for estimating formwork and shoring removal time. DEngr thesis, George Washington University, USA.
Woolery, J C and Crandall, K C (1983) Stochastic network model for planning scheduling. Journal of Construction Engineering and Management, 109(3), pp. 342-354. ISSN 0733-9364
Wu, R W K and Hadipriono, F C (1994) Fuzzy modus ponens deduction technique for construction scheduling. Journal of Construction Engineering and Management, 120(1), pp. 162-179. ISSN 0733-9364
Yau, N-J (1992) An object-oriented project model for integrating building design, construction scheduling, and cost estimating for mid-rise construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Yılmaz, M and Dede, T (2026) Multi-objective time-cost-safety risk trade-off optimization for the construction scheduling problem. Engineering, Construction and Architectural Management, 33(1), pp. 380-412. ISSN 0969-9988
Zolfagharian, S; Irizarry, J; Ressang, A; Nourbakhsh, M and Gheisari, M (2014) Automated safety planning approach for residential construction sites in Malaysia. International Journal of Construction Management, 14(3), pp. 134-147. ISSN 1562-3599
Zou, Y; Kiviniemi, A and Jones, S W (2016) Developing a tailored rbs linking to BIM for risk management of bridge projects. Engineering, Construction and Architectural Management, 23(6), pp. 727-750. ISSN 0969-9988
Up a level