Items with Index Term: construction professional
AbdElMottaleb, Mohamed (2025) AI in project management: Machine learning application for construction scheduling. PhD thesis, University of Salford, UK.
Abdalla, A; Li, X; Yang, F and Lou, Q (2026) Fuzzy synthetic evaluation of intervention measures to enhance the psychological health and well-being of expatriate construction professionals. Engineering, Construction and Architectural Management, 33(1), pp. 732-762. ISSN 0969-9988
Abdalla, A; Li, X and Yang, F (2024) Expatriate construction professionals' performance in international construction projects: The role of cross-cultural adjustment and job burnout. Journal of Construction Engineering and Management, 150(3): 04024005, ISSN 0733-9364
Abdalla, A; Li, X and Yang, F (2025) Stressors and job burnout of Chinese expatriate construction professionals. Engineering, Construction and Architectural Management, 32(2), pp. 705-731. ISSN 0969-9988
Abdel-Razek, R H (1998) Factors affecting construction quality in Egypt: Identification and relative importance. Engineering, Construction and Architectural Management, 5(3), pp. 220-227. ISSN 0969-9988
Abdelaal, A; Ma, J; Zhang, H; Shobeiri, V and Xie, Y M (2026) Bio-stabilized modular rammed earth blocks for sustainable and aesthetic construction. Construction Innovation, 26(9), pp. 1-20. ISSN 1471-4175
Abdul Nabi, M and El-Adaway, I H (2021) Risk-based approach to predict the cost performance of modularization in construction projects. Journal of Construction Engineering and Management, 147(10): 04021133, ISSN 0733-9364
Abdul-Rahman, H (1996) Some observations on the management of quality among construction professionals in the UK. Construction Management and Economics, 14(6), pp. 485-495. ISSN 01446193
Abdurezake, S K; Mengistu, D G; Abdela, S A and Tesfaye, B Z (2026) Construction professionals' retention practice in construction companies. International Journal of Construction Management, 26(3), pp. 365-380. ISSN 1562-3599
Abkar, M M A; Yunus, R; Harouache, A; Gamil, Y and Al-Shameri, A S A S (2025) The adoption of automation technology for the mitigation of material waste on construction sites in the Malaysian construction industry. International Journal of Construction Management, 25(5), pp. 530-541. ISSN 1562-3599
Aboagye-Nimo, E; Painting, N and Piroozfar, P (2024) Picking up where we left off: A 'temporary' safety culture. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Aboagye-Nimo, E; Wood, H and Collison, J (2019) Complexity of women's modern-day challenges in construction. Engineering, Construction and Architectural Management, 26(11), pp. 2550-2565. ISSN 0969-9988
Aboelyousr, M; El-Sayegh, S and Ahmed, S (2025) Multi-criteria decision support model for selecting the appropriate construction management firm. International Journal of Construction Management, 25(5), pp. 552-561. ISSN 1562-3599
Abu-Reishah, L and Hiyassat, M A (2023) The severity of design-construction interface risks in Jordanian construction industry. International Journal of Construction Management, 23(9), pp. 1540-1548. ISSN 1562-3599
Abudayyeh, O (2003) Undergraduate research mentoring model in construction engineering and management. Journal of Construction Engineering and Management, 129(1), pp. 65-69. ISSN 0733-9364
Abujnah, M S (2010) Towards a risk management framework for Libyan house-building projects. PhD thesis, University of Salford, UK.
Acheampong, A; Adjei, E K; Asiedu, R O; Atibila, D W and Abu, I M A (2025) Evaluating the factors influencing artificial intelligence technology uptake in health and safety management within the Ghanaian construction industry. Journal of Engineering, Design and Technology, 23(6), pp. 2060-2081. ISSN 1726-0531
Adafin, J; Rotimi, J O B; Wilkinson, S and Mbachu, J (2019) An assessment of risk factors impacting budget variability in New Zealand commercial construction projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Adam, V; Manu, P; Mahamadu, A M; Dziekonski, K; Kissi, E; Emuze, F and Lee, S (2022) Building information modelling (BIM) readiness of construction professionals: The context of the Seychelles construction industry. Journal of Engineering, Design and Technology, 20(3), pp. 823-840. ISSN 1726-0531
Adams, F K (2006) Expert elicitation and Bayesian analysis of construction contract risks: An investigation. Construction Management and Economics, 24(1), pp. 81-96. ISSN 01446193
Adams, O (1997) Contractor development in Nigeria: Perceptions of contractors and professionals. Construction Management and Economics, 15(1), pp. 95-108. ISSN 01446193
Addy, M N; Addo, E T; Kwofie, T E and Yartey, J E (2023) Predicting the adoption of e-procurement in construction project delivery in Sub-Saharan Africa: An application of utaut2. Construction Innovation, 23(5), pp. 1038-1053. ISSN 1471-4175
Adebisi, E O; Alao, O O and Ojo, S O (2020) Assessment of early warning signs predisposing building projects to failure in Nigeria. Journal of Engineering, Design and Technology, 18(6), pp. 1403-1423. ISSN 1726-0531
Adegoke, A.; Akanmu, A. and Terreno, S. (2026) Aligning visual data practices with construction decision making: Delphi-based investigation. Journal of Construction Engineering and Management, 152(8): 04026119, ISSN 0733-9364
Adeosun, F E and Oke, A E (2024) Examining the awareness and usage of cyber physical systems for construction projects in Nigeria. Journal of Engineering, Design and Technology, 22(1), pp. 281-294. ISSN 1726-0531
Adeyemi, B S and Aigbavboa, C O (2020) Conflict factors investigation among construction professionals in Nigeria. Journal of Engineering, Design and Technology, 18(5), pp. 1121-1137. ISSN 1726-0531
Adeyemi, B S and Aigbavboa, C O (2024) An evaluation of the impacts of construction professionals' conflict on performance in the Nigerian construction industry. International Journal of Building Pathology and Adaptation, 42(3), pp. 469-482. ISSN 23984708
Afolabi, A; Oyeyipo, O; Ojelabi, R and Patience, T O (2019) Balancing the female identity in the construction industry. Journal of Construction in Developing Countries, 24(2), pp. 83-104. ISSN 1823-6499
Afolabi, A O; Tunji-Olayeni, P F; Oyeyipo, O O and Ojelabi, R A (2017) The socio-economics of women inclusion in green construction. Construction Economics and Building, 17(1), pp. 70-89. ISSN 2204-9029
Afuye, O O; Oladimeji, O; Aina, O O; Tam, V W Y and Haddad, A N (2025) Factors influencing safety behaviours of construction tradesmen. International Journal of Construction Management, 25(4), pp. 375-384. ISSN 1562-3599
Agapiou, A (2013) UK construction participants' experiences of adjudication. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(3), pp. 137-144. ISSN 17514312
Agapiou, A (2020) Factors influencing the selection of a procurement route for UK off-site housebuilding. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(1), pp. 3-15. ISSN 17514304
Agarwal, U A; Baral, R and Rastogi, M (2025) Work–family conflict and work engagement among construction professionals: Role of psychological contract breach and gender. Engineering, Construction and Architectural Management, 32(4), pp. 2507-2532. ISSN 0969-9988
Agboola Abdulazeez, S; Faruq, M Y; Kolawole, M A; Abdulraheem, A A; Aliyu, H D and Zulfat, M O (2025) Impact of consultant performance indicators on project success in public construction projects. Journal of Construction Business and Management, 7(2), pp. 16-32.
Aggor, K K (2017) Relationship between budget and project success factors in the Ghanaian building construction sector. PhD thesis, Walden University, USA.
Aghimien, D; Aigbavboa, C; Meno, T and Ikuabe, M (2021) Unravelling the risks of construction digitalisation in developing countries. Construction Innovation, 21(3), pp. 456-475. ISSN 1471-4175
Aghimien, D; Aigbavboa, C; Oke, A and Aghimien, L (2022) Latent institutional environment factors influencing construction digitalization in South Africa. International Journal of Construction Education and Research, 18(2), pp. 142-158. ISSN 1557-8771
Aghimien, D; Aigbavboa, C; Oke, A; Thwala, W and Moripe, P (2022) Digitalization of construction organisations: A case for digital partnering. International Journal of Construction Management, 22(10), pp. 1950-1959. ISSN 1562-3599
Aghimien, D O; Aghimien, E I; Fadiyimu, A O and Adegbembo, T F (2018) Survival strategies of built environment organisations in a challenging economy. Engineering, Construction and Architectural Management, 25(7), pp. 861-876. ISSN 0969-9988
Aghimien, D O; Oke, A E and Aigbavboa, C O (2018) Barriers to the adoption of value management in developing countries. Engineering, Construction and Architectural Management, 25(7), pp. 818-834. ISSN 0969-9988
Agyakwa-Baah, A and Chileshe, N (2010) Construction professionals perception of risk assesssment and management practices: Does length of service in construction industry matter. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Agyekum, K; Adinyira, E and Amudjie, J (2021) Ethical misconducts within the invitation to tender and tender evaluation and award stages of construction contracts in Ghana. Journal of Engineering, Design and Technology, 19(5), pp. 1101-1123. ISSN 1726-0531
Agyekum, K; Opoku, A; Oppon, A J and Opoku, D G J (2022) Obstacles to green building project financing: An empirical study in Ghana. International Journal of Construction Management, 22(15), pp. 2922-2930. ISSN 1562-3599
Ahmed, S and El-Sayegh, S (2022) The challenges of sustainable construction projects delivery–evidence from the UAE. Architectural Engineering and Design Management, 18(3), pp. 299-312. ISSN 1745-2007
Ahmed, S and El-Sayegh, S (2024) Relevant criteria for selecting project delivery methods in sustainable construction. International Journal of Construction Management, 24(5), pp. 512-520. ISSN 1562-3599
Ahmed, S; Haq, I and Anam, S M A (2024) Impacts of COVID-19 on the construction sector in the least developed countries. International Journal of Building Pathology and Adaptation, 42(6), pp. 1085-1105. ISSN 2398-4708
Ahuja, V; Yang, J and Shankar, R (2009) Benefits of collaborative ICT adoption for building project management. Construction Innovation, 9(3), pp. 323-340. ISSN 1471-4175
Aibinu, A A; Dassanayake, D; Chan, T-K and Thangaraj, R (2015) Cost estimation for electric light and power elements during building design: A neural network approach. Engineering, Construction and Architectural Management, 22(2), pp. 190-213. ISSN 0969-9988
Aigbavboa, C and Thwala, W (2014) An assessment of critical success factors for the reduction of the cost of poor quality from construction projects in South Africa. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Aigbavboa, C O; Oke, A E; Aghimien, D O and Akinradewo, O I (2020) Improving resilience of cities through smart city drivers. Construction Economics and Building, 20(2), pp. 45-64. ISSN 2204-9029
Ajayi, S; Brinklow-Harris, J; Alaka, H A and Dauda, J A (2019) Managing the benefits and impediments to offsite construction in the UK construction industry. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Ajayi, S O; Jones, W and Unuigbe, M (2019) Occupational stress management for UK construction professionals: Understanding the causes and strategies for improvement. Journal of Engineering, Design and Technology, 17(4), pp. 819-832. ISSN 1726-0531
Aje, I O; Oladinrin, T O and Nwaole, A N C (2016) Factors influencing success rate of contractors in competitive bidding for construction works in South-East, Nigeria. Journal of Construction in Developing Countries, 21(1), pp. 19-34. ISSN 1823-6499
Aka, A; Bello, A O; Bamgbade, A A and Bilau, A A (2024) Age-performance consideration in the recruitment of tradespeople in Nigerian construction industry. Engineering, Construction and Architectural Management, 31(1), pp. 386-404. ISSN 0969-9988
Akinbo, T F; Fagbenle, O I and Amusan, L M (2024) Assessment of knowledge management barriers and improvement strategies on public-private partnership projects in Nigeria. International Journal of Construction Management, 24(9), pp. 1018-1028. ISSN 1562-3599
Akindeinde, A S; Akinola, J A; Ojo, L D and Kenechukwu, O A (2024) Impact of modular integrated construction indicators on sustainable performance metrics in Nigeria. Construction Economics and Building, 24(4-5), pp. 81-97. ISSN 2204-9029
Akiner, I and Tijhuis, W (2007) Work goal orientation of construction professionals in Turkey: Comparison of architects and civil engineers. Construction Management and Economics, 25(11), pp. 1165-1175. ISSN 01446193
Akinradewo, O; Aigbavboa, C; Aghimien, D; Oke, A and Ogunbayo, B (2023) Modular method of construction in developing countries: The underlying challenges. International Journal of Construction Management, 23(8), pp. 1344-1354. ISSN 1562-3599
Akintola, A; Venkatachalam, S and Root, D (2017) New BIM roles' legitimacy and changing power dynamics on BIM-enabled projects. Journal of Construction Engineering and Management, 143(9): 04017066, ISSN 0733-9364
Akintola, B F; Jagboro, G O; Ojo, G K and Odediran, S J (2020) Effectiveness of mechanisms for enforcement of ethical standards in the construction industry. Journal of Construction Business and Management, 4(1), pp. 1-12. ISSN 2521-0165
Akintoye, A; Bowen, P and Hardcastle, C (1998) Macro-economic leading indicators of construction contract prices. Construction Management and Economics, 16(2), pp. 159-175. ISSN 01446193
Akter, J; Datta, S D; Islam, M; Tayeh, B A; Sraboni, S A and Das, N (2025) Assessment and analysis of the effects of implementing building information modelling as a lean management tool in construction management. International Journal of Building Pathology and Adaptation, 43(4), pp. 877-894. ISSN 2398-4708
Al Mousli, M H and El-Sayegh, S M (2016) Assessment of the design-construction interface problems in the UAE. Architectural Engineering and Design Management, 12(5), pp. 353-366. ISSN 1745-2007
Al kailani, H.; Bhattacharjee, K.; Bonilla, M. and Nnaji, C. (2026) Tailoring perceived workforce sustainability strategies in the US construction industry. Built Environment Project and Asset Management, pp. 1-18. ISSN 2044-124X
Al kailani, H.; Bhattacharjee, K.; Bonilla, M. and Nnaji, C. (2026) Tailoring perceived workforce sustainability strategies in the US construction industry. Built Environment Project and Asset Management, pp. 1-18. ISSN 2044-124X
Al-Abbadi, G M and Agyekum-Mensah, G (2022) The effects of motivational factors on construction professionals productivity in Jordan. International Journal of Construction Management, 22(5), pp. 820-831. ISSN 1562-3599
Al-Bayati, A J; Abudayyeh, O; Fredericks, T and Butt, S E (2017) Reducing fatality rates of the Hispanic workforce in the U.S. Construction industry: Challenges and strategies. Journal of Construction Engineering and Management, 143(3): 04016105, ISSN 0733-9364
Al-Bayati, A J and Chellappa, V (2025) Identifying desirable safety actions of upper management to foster higher levels of construction safety culture. Journal of Construction Engineering and Management, 151(7): 04025077, ISSN 0733-9364
Al-Hashimy, H. N. H. and Yao, J. (2026) The moderating effect of internet of things and wearable technologies on enhancing safety management in construction sites. Construction Innovation, 26(5), pp. 1384-1412. ISSN 1471-4175
Al-Hashimy, H. N. H.; Yao, J.; Pitchay, A. A. and Hussein, W. N. (2026) Linking computerised accounting information systems to innovation, resilience and performance in construction projects. Engineering, Construction and Architectural Management, pp. 1-21. ISSN 0969-9988
Al-Jarallah, M I (1983) Construction industry in Saudi Arabia. Journal of Construction Engineering and Management, 109(4), pp. 355-368. ISSN 0733-9364
Al-Meshekeh, H S S (1991) The relationship between conflict management style and construction project effectiveness. PhD thesis, University of Strathclyde, UK.
Al-Mhdawi, M K S; O'Connor, A; Qazi, A; Rahimian, F and Dacre, N (2025) Review of studies on risk factors in critical infrastructure projects from 2011 to 2023. Smart and Sustainable Built Environment, 14(2), pp. 342-376. ISSN 2046-6099
Al-Omari, T (2004) Stochastic regression modelling of cost and duration overrun of construction projects implemented in Kuwait. PhD thesis, University of Liverpool, UK.
Al-Shammari, M A (2014) An appraisal of the protocol that was published by the construction industry council (CIC) to facilitate the use of building information modelling (BIM) on projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Al-Zahrani, J I (2013) The impact of contractors' attributes on construction project success. PhD thesis, University of Manchester, UK.
AlMemari, M; Khalid, K and Osman, A (2025) Job crafting-job embeddedness linkage of construction professionals: Moderating effect of career stages. Journal of Engineering, Design and Technology, 23(1), pp. 108-125. ISSN 1726-0531
Alajmani, H; Ahmed, S and El-Sayegh, S M (2024) Factors causing delays in the UAE construction industry amid the covid-19 pandemic. Journal of Financial Management of Property and Construction, 29(1), pp. 135-151. ISSN 1366-4387
Alaqad, M; Gidado, K; Piroozfar, P; Alkhadim, M and Dorgham, A (2020) Efficacy of value management system in building projects: A UK perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Alashwal, A M and Chew, M Y (2017) Simulation techniques for cost management and performance in construction projects in Malaysia. Built Environment Project and Asset Management, 7(5), pp. 534-545. ISSN 2044-124X
Albert, A and Hallowel, M R (2013) Revamping occupational safety and health training: Integrating andragogical principles for the adult learner. Construction Economics and Building, 13(3), pp. 128-140. ISSN 2204-9029
Albert, A; Jeelani, I and Han, K (2020) Developing hazard recognition skill among the next-generation of construction professionals. Construction Management and Economics, 38(11), pp. 1024-1039. ISSN 01446193
Albert, I (2020) A lean production approach to materials management in the Nigerian construction industry. PhD thesis, Nelson Mandela University, South Africa.
Aldaiyat, R M R E (2017) Perception eccentricities in risk time dimension of construction professionals in the state of Kuwait. PhD thesis, Loughborough University, UK.
Alemayehu, S; Nejat, A; Ghebrab, T and Ghosh, S (2022) A multivariate regression approach toward prioritizing BIM adoption barriers in the Ethiopian construction industry. Engineering, Construction and Architectural Management, 29(7), pp. 2635-2664. ISSN 0969-9988
Alhamoudi, A. M. and Osunsanmi, T. O. (2026) Modelling the training strategies for reskilling UK construction workers in the Fourth Industrial Revolution era: A structural equation model approach. Smart and Sustainable Built Environment, 15(5), pp. 1967-1990. ISSN 2046-6099
Alhawamdeh, M (2020) An interpretivist approach for the development of a behavioural framework to support the adoption of waste minimisation behaviour of contractors: the case study of Jordan. PhD thesis, University of Salford, UK.
Ali, A.; Zhifeng, S.; Tahir, M.; Ye, Y.; Wang, G.; Wei, X. and Zang, X. (2026) Enhancing megaproject performance by integrating artificial intelligence, human-robot collaboration, and BIM-integration management: The moderating role of top management support. Journal of Construction Engineering and Management, 152(7): 04026094, ISSN 0733-9364
Aliu, J; Oke, A E; Oluwasogo Oyediran, A; Kanya, R A and Ukaha Onyeukwu, S (2026) From isolation to interaction: Evaluating social media awareness and adoption in a developing construction industry. Smart and Sustainable Built Environment, 15(1), pp. 273-293. ISSN 2046-6099
Aliu, J and Aigbavboa, C (2023) Reviewing the trends of construction education research in the last decade: A bibliometric analysis. International Journal of Construction Management, 23(9), pp. 1571-1580. ISSN 1562-3599
Aliu, J and Oke, A E (2023) Construction in the digital age: Exploring the benefits of digital technologies. Built Environment Project and Asset Management, 13(3), pp. 412-429. ISSN 2044-124X
Aliu, J; Oke, A E; Abayomi, T; Aigbavboa, C and Makanjuola, S (2024) Exploring the critical success factors for adopting gamification in the Nigerian construction sector. Built Environment Project and Asset Management, 14(2), pp. 184-200. ISSN 2044-124X
Alkilani, S and Loosemore, M (2022) Project performance measurement for small-and-medium sized construction contractors in the Jordanian construction industry. Construction Management and Economics, 40(10), pp. 743-769. ISSN 01446193
Allender, C; Sutrisna, M and Zaman, A U (2017) Towards developing robust climate risk management strategies in the estuarine park of the Swan River, Western Australia. International Journal of Disaster Resilience in the Built Environment, 8(4), pp. 441-462. ISSN 1759-5916
Alqershy, M T and Kishore, R (2023) Construction claims prediction using ann models: A case study of the Indian construction industry. International Journal of Construction Management, 23(6), pp. 1097-1108. ISSN 1562-3599
Alsehaimi, A O and Sanni-Anibire, M O (2026) Industry 4.0 technologies: An examination of benefits, challenges and critical success factors for implementation in the Saudi construction industry. Construction Innovation, 26(2), pp. 607-630. ISSN 1471-4175
Alshawi, M and Faraj, I (2002) Integrated construction environments: Technology and implementation. Construction Innovation, 2(1), pp. 33-51. ISSN 1471-4175
Altawil, Shadi N A (2017) Multi-level knowledge extraction and modeling to support job hazard analysis process for oil and gas pipeline projects. PhD thesis, University of Alberta, Canada.
Alumbugu, P O (2019) Construction material logistics management: the case of north-central Nigeria. PhD thesis, Nelson Mandela University, South Africa.
Amaratunga, D; Malalgoda, C I and Keraminiyage, K (2018) Contextualising mainstreaming of disaster resilience concepts in the construction process. International Journal of Disaster Resilience in the Built Environment, 9(4-5), pp. 348-367. ISSN 1759-5916
Ameh, O J and Daniel, E I (2017) Human resource management in the Nigerian construction firms: Practices and challenges. Journal of Construction Business and Management, 1(2), pp. 47-54. ISSN 2521-0165
Ameh, O J and Odusami, K T (2014) Nigerian construction professional's education and deficiencies in the area of project management. Journal of Construction in Developing Countries, 19(1), pp. 1-14. ISSN 1823-6499
Ameyaw, C; Mensah, S; Abaitey, B A and Asamoah-Duodu, A (2026) Adequacy of defects liability periods for public construction projects in Ghana. International Journal of Building Pathology and Adaptation, 44(1), pp. 55-69. ISSN 2398-4708
Amies, P; Jin, X and Senaratne, S (2025) Success in construction management of dams: An empirical study. International Journal of Construction Management, 25(10), pp. 1207-1217. ISSN 1562-3599
Amiri, Mojtaba and Saghatforoush, Ehsan (2026) From exploration to prioritization: Advancing BIM-IOT integration for construction health and safety improvement. Journal of Construction Business and Management, 8(S1), pp. 125-139. ISSN 2521-0165
Amoah, C (2023) Quality management framework for government social housing construction in South Africa. International Journal of Building Pathology and Adaptation, 41(6), pp. 217-236. ISSN 23984708
Amoah, C and Nkosazana, H (2022) Effective management strategies for construction contract disputes. International Journal of Building Pathology and Adaptation, 41(6), pp. 70-84. ISSN 23984708
Amoah, C and Steyn, D (2022) Barriers to unethical and corrupt practices avoidance in the construction industry. International Journal of Building Pathology and Adaptation, 41(6), pp. 85-101. ISSN 23984708
Amudjie, J; Agyekum, K; Adinyira, E; Amos-Abanyie, S and Kumah, V M A (2023) Awareness and practice of the principles of circular economy among built environment professionals. Built Environment Project and Asset Management, 13(1), pp. 140-156. ISSN 2044-124X
Anderson, P M (2006) Construction collaboration: a QFD approach. PhD thesis, Loughborough University, UK.
Antwi Afari, E. N.; Acquah, I. S. K.; Issau, K. and Arko-Folson, G. (2026) Modelling the nexus between sustainable project management and project success: Evidence from Ghana. Journal of Engineering, Design and Technology, 24(5), pp. 1279-1297. ISSN 1726-0531
Anvuur, A M; Kumaraswamy, M and Fellows, R (2012) Perceptions of status and TMO workgroup cooperation: Implications for project governance. Construction Management and Economics, 30(9), pp. 719-737. ISSN 1466433X
Arain, F M (2009) Leveraging on information technology to teach construction law to built environment students: A knowledge-based system approach. Journal of Construction in Developing Countries, 14(2), pp. 77-102. ISSN 1823-6499
Ariyachandra, M R M F; Jayasena, H S and Perera, B A K S (2022) Competencies expected from an information manager working in BIM based projects. International Journal of Construction Education and Research, 18(1), pp. 49-66. ISSN 1557-8771
Arogundade, S; Dulaimi, M and Ajayi, S (2024) Exploring the challenges impeding construction process carbon reduction in the UK. International Journal of Construction Management, 24(4), pp. 422-431. ISSN 1562-3599
Arowoiya, V.; Oke, A.; Chan, M. and Adelusi, A. (2026) Benefits of adopting digital twin technology (dtt) in the Nigerian construction industry. International Journal of Construction Management, 26(7), pp. 1134-1148. ISSN 1562-3599
Arowoiya, V A; Oke, A E; Aigbavboa, C O and Aliu, J (2020) An appraisal of the adoption internet of things (IoT) elements for sustainable construction. Journal of Engineering, Design and Technology, 18(5), pp. 1193-1208. ISSN 1726-0531
Arowoiya, V A; Oke, A E; Akanni, P O; Kwofie, T E and Enih, P I (2023) Augmented reality for construction revolution–analysis of critical success factors. International Journal of Construction Management, 23(11), pp. 1867-1874. ISSN 1562-3599
Arowosafe, O I (2018) Contractors’ selection criteria for sustainable infrastructure delivery in Nigeria. PhD thesis, University of Derby, UK.
Asaad, A and El-Sayegh, S M (2021) Key criteria for selecting green suppliers for construction projects in the UAE. Journal of Financial Management of Property and Construction, 26(2), pp. 201-218. ISSN 1366-4387
Asadian, E; Azeez, S; Leicht, R M and Asadi, S (2024) Exploring the barriers to women in construction and the opportunities presented through lean. Journal of Construction Engineering and Management, 150(5): 04024029, ISSN 0733-9364
Asah-Kissiedu, M (2019) Development of an integrated safety, health and environmental management capability maturity model for Ghanaian construction companies. PhD thesis, University of the West of England, Bristol, UK.
Asiedu, R. O.; Amoakwa, A. B.; Ameyaw, C.; Owusu-Manu, D. G.; Daniels, P. A. and Gyimah, S. (2026) Environmental, social, and governance considerations in sustainable construction project delivery. Construction Economics and Building, 26(2), ISSN 2204-9029
Assaad, R H; El-Adaway, I H; Hastak, M and Lascola Needy, K (2023) Key factors affecting labor productivity in offsite construction projects. Journal of Construction Engineering and Management, 149(1): 04022158, ISSN 0733-9364
Assaf, S; Hassanain, M A; Abdallah, A; Sayed, A M Z and Alshahrani, A (2019) Significant causes of claims and disputes in construction projects in Saudi Arabia. Built Environment Project and Asset Management, 9(5), pp. 597-615. ISSN 2044-124X
Attalla, M and Hegazy, T (2003) Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression. Journal of Construction Engineering and Management, 129(4), pp. 405-411. ISSN 0733-9364
Attalla, M M A M (2000) Reconstruction of operating facilities: A model for project management. PhD thesis, University of Waterloo, Canada.
Atuahene, B T; Kanjanabootra, S and Gajendran, T (2022) Preliminary benefits of big data in the construction industry: a case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(2), pp. 67-77. ISSN 17514304
Atuahene, B T; Kanjanabootra, S and Gajendran, T (2023) Transformative role of big data through enabling capability recognition in construction. Construction Management and Economics, 41(3), pp. 208-231. ISSN 01446193
Ayodele, E O (2017) Development of a framework in minimising errors in construction documents in Nigeria. PhD thesis, University of Salford, UK.
Ayodele, T O and Kajimo-Shakantu, K (2022) Challenges and drivers to data sharing among stakeholders in the South African construction industry. Journal of Engineering, Design and Technology, 20(6), pp. 1698-1715. ISSN 1726-0531
Ayodele, T R (2025) Cost of selected smart building elements and its level of implementation in Abuja. Journal of Financial Management of Property and Construction, 30(2), pp. 335-355. ISSN 1366-4387
Azhar, S and Choudhry, R M (2016) Capacity building in construction health and safety research, education, and practice in Pakistan. Built Environment Project and Asset Management, 6(1), pp. 92-105. ISSN 2044-124X
Azmat, Y (2020) Influence of human factors on the safety performance in Saudi Arabian construction industry. PhD thesis, University of Salford, UK.
Babalola, H I and Aliu, J O (2026) Lean construction practices for enhancing project delivery in the construction industry: Examining the beneficial outcomes. International Journal of Construction Management, 26(6), pp. 1097-1111. ISSN 1562-3599
Babalola, A and Harinarain, N (2024) Policy barriers to sustainable construction practice in the Nigerian construction industry: An exploratory factor analysis. Journal of Engineering, Design and Technology, 22(1), pp. 214-234. ISSN 1726-0531
Babalola, I H; Aigbavboa, C O; Aliu, J and Oke, A E (2025) Influence of emotional intelligence attributes on human resource management practices implementation in the Nigerian construction industry. Journal of Engineering, Design and Technology, 23(3), pp. 935-952. ISSN 1726-0531
Babatunde, S O; Ekundayo, D; Adekunle, A O and Bello, W (2020) Comparative analysis of drivers to BIM adoption among AEC firms in developing countries: A case of Nigeria. Journal of Engineering, Design and Technology, 18(6), pp. 1425-1447. ISSN 1726-0531
Baby, S.; Talebi, S.; Lai, J. H. K.; Tien, P. W. and Kagioglou, M. M. (2026) Mitigating cost estimation challenges in bahrain's construction industry: A problem-solving approach. Built Environment Project and Asset Management, 16(3), pp. 542-560. ISSN 2044-124X
Badamasi, A A; Aryal, K R; Makarfi, U U and Dodo, M (2022) Drivers and barriers of virtual reality adoption in UK AEC industry. Engineering, Construction and Architectural Management, 29(3), pp. 1307-1318. ISSN 0969-9988
Bademosi, F and Issa, R R A (2021) Factors influencing adoption and integration of construction robotics and automation technology in the US. Journal of Construction Engineering and Management, 147(8): 04021075, ISSN 0733-9364
Baghaei, M (2024) Developing a framework and understanding the key influencing factors for the implementation of the internet of things (IoT) in the UK construction sector. PhD thesis, University of Salford, UK.
Bajjou, M S and Chafi, A (2018) Lean construction implementation in the Moroccan construction industry: Awareness, benefits and barriers. Journal of Engineering, Design and Technology, 16(4), pp. 533-556. ISSN 1726-0531
Baldry, D (1997) The image of construction and its influence upon clients, participants, and consumers. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Banawi, A and Bilec, M M (2014) A framework to improve construction processes: Integrating lean, green and six sigma. International Journal of Construction Management, 14(1), pp. 45-55. ISSN 1562-3599
Barrett, P (1992) Measuring the ability gap for construction professionals. Construction Management and Economics, 10(4), pp. 321-342. ISSN 01446193
Barros D'Sa, A A J (2003) Changes in the liabilities and concerns of the construction professions at the turn of the 21st century. PhD thesis, University of Manchester, UK.
Bartlett, E and Howard, N (2000) Informing the decision makers on the cost and value of green building. Building Research & Information, 28(5-6), pp. 315-324. ISSN 0961-3218
Bastien, A N (2002) Successful organisational and human practices in the UK construction industry: proposing the CONSTRUCT framework of good practice. PhD thesis, University of Warwick, UK.
Batra, S and Halder, A (2025) Toward a flourishing workplace: Exploring the impact of digitalization on young construction professionals' physical-mental well-being. Engineering, Construction and Architectural Management, 32(10), pp. 6760-6786. ISSN 0969-9988
Batra, S (2020) Framework of socialisation, authentic leadership and affective commitment for construction professionals. Construction Economics and Building, 20(1), pp. 77-95. ISSN 2204-9029
Bell, L C and Stukhart, G (1987) Costs and benefits of materials management systems. Journal of Construction Engineering and Management, 113(2), pp. 222-234. ISSN 0733-9364
Bello, A O; Olanrewaju, O I; Gbenga, P O; Khan, A A and Isa, R B (2025) Exploring the barriers to digital twin adoption in the Nigerian construction industry: A structural equation modelling approach. Journal of Engineering, Design and Technology, 23(5), pp. 1541-1572. ISSN 1726-0531
Besaiso, H; Fenn, P and Emsley, M (2016) Alternative dispute resolution in Palestine: The myth and dilemma of construction mediation. International Journal of Law in the Built Environment, 8(3), pp. 269-286. ISSN 1756-1450
Bin Asad, S.; Purushothaman, M. B. and Poshdar, M. (2026) Interactions of factors affecting the implementation of integrated project delivery in the New Zealand construction industry: A system dynamics and network analysis approach. Construction Management and Economics, 44(6), pp. 453-479. ISSN 0144-6193
Bing, L; Tiong, R L K; Fan, W W and Chew, D A S (1999) Risk management in international construction joint ventures. Journal of Construction Engineering and Management, 125(4), pp. 277-284. ISSN 0733-9364
Bishop, J (2009) Managing technical knowledge to enhance organisational best practice. PhD thesis, Loughborough University, UK.
Blacud, N A; Bogus, S M; Diekmann, J E and Molenaar, K R (2009) Sensitivity of construction activities under design uncertainty. Journal of Construction Engineering and Management, 135(3), pp. 199-206. ISSN 0733-9364
Bo, X and Chan, A P C (2012) Investigation of barriers to entry into the design-build market in the people's republic of China. Journal of Construction Engineering and Management, 138(1), pp. 120-127. ISSN 0733-9364
Boamah, F A; Zhang, J; Shehzad, M U; Sherani, S and Wen, D (2024) Exploring the impact of social capitals and knowledge creation on construction firms performance in the COVID-19 era. Journal of Engineering, Design and Technology, 22(2), pp. 404-421. ISSN 1726-0531
Boateng, R. K.; Booth, C. A.; Horry, R. E.; Wiejak-Roy, G. A.; Agyekum, K.; Al-Tarazi, D.; Joseph, R.; Manu, P. and Prabhakaran, A. (2025) Implementing environmental management systems (ISO 14001) in the construction sector of Ghana. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(4), pp. 244-254. ISSN 1751-4304
Boby, P. R.; Mwanza, F. and Samuel, E. B. (2025) Use of building information modelling to reduce the carbon emissions of housing in Zambia. Architectural Engineering and Design Management, 21(5), pp. 1057-1072. ISSN 1745-2007
Bondinuba, F K; Blay, A V K and Jin, R (2026) Project managers' sociocultural traits driving Sustainable Development Goals in the construction industry. Construction Economics and Building, 26(1), ISSN 2204-9029
Borg, J and Scott-Young, C M (2022) Contributing factors to turnover intentions of early career project management professionals in construction. Construction Management and Economics, 40(10), pp. 835-853. ISSN 01446193
Borg, J; Scott-Young, C M and Maqsood, T (2025) Preparing project management professionals for construction careers: Australian stakeholders' perceptions of educators' role. International Journal of Construction Education and Research, 21(3), pp. 346-370. ISSN 1557-8771
Borthwick, F and McAndrew, P (2012) Cultural interpretation of health and safety and its appropriateness in the United Arab Emirates. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Bowen, P.; Govender, R.; Edwards, P. and Cattell, K. (2018) Work-related contact, work–family conflict, psychological distress and sleep problems experienced by construction professionals: An integrated explanatory model. Construction Management and Economics, 36(3), pp. 153-174. ISSN 0144-6193
Bowen, P; Akintoye, A; Pearl, R and Edwards, P J (2007) Ethical behaviour in the South African construction industry. Construction Management and Economics, 25(6), pp. 631-648. ISSN 1466433X
Bowen, P; Edwards, P and Cattell, K (2012) Corruption in the South African construction industry: A mixed methods study. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Bowen, P; Edwards, P and Cattell, K (2015) Perceptions of the relative importance of job control and support factors, as moderators of workplace stress, among South African construction professionals: Preliminary findings. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Bowen, P; Edwards, P and Lingard, H (2013) Workplace stress among construction professionals in South Africa the role of harassment and discrimination. Engineering, Construction and Architectural Management, 20(6), pp. 620-635. ISSN 0969-9988
Bowen, P; Edwards, P and Lingard, H (2013) Workplace stress experienced by construction professionals in South Africa. Journal of Construction Engineering and Management, 139(4), pp. 393-403. ISSN 0733-9364
Bowen, P; Edwards, P; Lingard, H and Cattell, K (2011) Workplace harassment and discrimination for South African construction professionals. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Bowen, P; Edwards, P; Lingard, H and Cattell, K (2014) Predictive modeling of workplace stress among construction professionals. Journal of Construction Engineering and Management, 140(3): 4013055, ISSN 0733-9364
Bowen, P; Edwards, P; Lingard, H and Cattell, K (2014) Workplace stress, stress effects, and coping mechanisms in the construction industry. Journal of Construction Engineering and Management, 140(3): 4013059, ISSN 0733-9364
Bowen, P; Govender, R and Edwards, P (2014) Structural equation modeling of occupational stress in the construction industry. Journal of Construction Engineering and Management, 140(9): 04014042, ISSN 0733-9364
Bowen, P; Govender, R; Edwards, P and Cattell, K (2014) Workplace stress in the construction industry: An explanatory model. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Bowen, P; Govender, R; Edwards, P and Cattell, K (2017) The role of after-hours, work-related contact in work-to-family conflict and sleep problems experienced by construction professionals. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Bowen, P; Govender, R; Edwards, P and Cattell, K (2018) Work-related contact, work-family conflict, psychological distress and sleep problems experienced by construction professionals: An integrated explanatory model. Construction Management and Economics, 36(3), pp. 153-174. ISSN 0144-6193
Bowen, P; Peihua Zhang, R and Edwards, P (2021) An investigation of work-related strain effects and coping mechanisms among South African construction professionals. Construction Management and Economics, 39(4), pp. 298-322. ISSN 01446193
Bowen, P and Zhang, R P (2020) Cross-boundary contact, work-family conflict, antecedents, and consequences: Testing an integrated model for construction professionals. Journal of Construction Engineering and Management, 146(3): 04020005, ISSN 0733-9364
Bowen, P A; Edwards, P J and Cattell, K (2009) Value management practice in South Africa: The built environment professions compared. Construction Management and Economics, 27(11), pp. 1039-1057. ISSN 1466433X
Bowes, D (2007) Practitioners' perception of adjudication in UK construction. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Bowes, D (2008) Identifying barriers to the establishment of dispute boards in UK construction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Boyd, D and Pierce, D (2001) Implicit knowledge in construction professional practice. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Brewster, D (2023) Strategies for reducing employee turnover in the construction industry. DBA thesis, Walden University, USA.
Brooks, T and Spillane, J P (2015) The impact of the recent economic recession on the NEC contract in Northern Ireland: A preliminary study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Brooks, T; Zantinge, R and Elghaish, F (2023) Investigating the future of model-based construction in the UK. Smart and Sustainable Built Environment, 12(5), pp. 1174-1197. ISSN 2046-6099
Buniya, M K; Wuni, I Y; Yousif, O S and Al-Mhdawi, M K S (2026) Quantifying the impact index of key barriers to safety program initiatives in the Iraqi construction industry. Construction Innovation, 26(1), pp. 286-309. ISSN 1471-4175
Candaş, A B and Tokdemir, O B (2022) Automating coordination efforts for reviewing construction contracts with multilabel text classification. Journal of Construction Engineering and Management, 148(6): 04022027, ISSN 0733-9364
Caprario, Rick (2025) Interpersonal communication, relationships, and collaboration among construction specialty contractor project management professionals: A single case study. EdD thesis, Baylor University, USA.
Carrillo, P (1994) Technology transfer: A survey of international construction companies. Construction Management and Economics, 12(1), pp. 45-51. ISSN 01446193
Cattell, K; Bowen, P and Edwards, P (2016) Stress among South African construction professionals: A job demand-control-support survey. Construction Management and Economics, 34(10), pp. 700-723. ISSN 01446193
Challender, J; Farrell, P and Sherratt, F (2014) Partnering in practice: An analysis of collaboration and trust. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(6), pp. 255-264. ISSN 17514304
Challender, J; Farrell, P and Sherratt, F (2015) Exploration of factors which affect trust within the context of construction partnering. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Chan, E H W and Chan, A T S (2002) Development of professional system in the construction industry of China. Journal of Construction Research, 3(2), pp. 271-284. ISSN 1609-9451
Chan, E H W; Suen, H C H and Chan, C K L (2006) Maut-based dispute resolution selection model prototype for international construction projects. Journal of Construction Engineering and Management, 132(5), pp. 444-451. ISSN 0733-9364
Chan, E H W; Suen, H C H and Chan, S L (2005) An integrated project extranet design prototype: E-AEC for architects, engineers and contractors in Hong Kong and Mainland China. Journal of Construction Research, 6(2), pp. 253-271. ISSN 1609-9451
Chan, I Y S; Leung, M Y and Yu, S S W (2012) Managing the stress of Hong Kong expatriate construction professionals in mainland China: Focus group study exploring individual coping strategies and organizational support. Journal of Construction Engineering and Management, 138(10), pp. 1150-1160. ISSN 0733-9364
Chan, I Y S; Leung, M Y and Yuan, T (2014) Structural relationships between cultural values and coping behaviors of professionals in the stressful construction industry. Engineering, Construction and Architectural Management, 21(2), pp. 133-151. ISSN 0969-9988
Chan, I Y S and Liu, A M M (2012) Antecedents of innovation climate in construction firms in Hong Kong. International Journal of Construction Management, 12(4), pp. 37-46. ISSN 1562-3599
Chan, M-W (1997) The relationship between project funding and construction systems. PhD thesis, University of Hong Kong, Hong Kong.
Chan, Man-Yin Ede (2018) Enablers for knowledge management implementation by large construction organisations in Hong Kong. PhD thesis, Griffith University, Australia.
Chandramohan, A; Perera, B A K S and Dewagoda, K G (2022) Diversification of professional quantity surveyors' roles in the construction industry: The skills and competencies required. International Journal of Construction Management, 22(7), pp. 1374-1381. ISSN 1562-3599
Chang, Y; Wilkinson, S; Potangaroa, R and Seville, E (2012) Managing resources in disaster recovery projects. Engineering, Construction and Architectural Management, 19(5), pp. 557-580. ISSN 0969-9988
Chaphalkar, N B (2007) Expert system for resolution of delay claims in construction contracts. PhD thesis, Indian Institute of Technology Delhi, India.
Charlson, J (2014) Law for engineering undergraduates on accredited courses 1. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(4), pp. 201-206. ISSN 17514304
Charlson, J (2021) Emerging trends in construction law at the confluence of academia and industry. PhD thesis, University of Wolverhampton, UK.
Che Ibrahim, C K I; Rahmat, A; Belayutham, S and Costello, S B (2020) Developing a temporary multi-organization integration performance index for delivering construction projects in Malaysia. International Journal of Construction Management, 20(5), pp. 412-428. ISSN 1562-3599
Chen, H and Chan, I Y S (2024) Effects of automation and transparency on human psychophysiological states and perceived system performance in construction safety automation: An electroencephalography experiment. Journal of Construction Engineering and Management, 150(7): 04024055, ISSN 0733-9364
Chen, L and Mohamed, S (2007) Empirical study of interactions between knowledge management activities. Engineering, Construction and Architectural Management, 14(3), pp. 242-260. ISSN 0969-9988
Chen, L and Mohamed, S (2008) Contribution of knowledge management activities to organisational business performance. Journal of Engineering, Design and Technology, 6(3), pp. 269-285. ISSN 1726-0531
Chen, Z; Zhao, Y; Zhou, X; Hao, S and Li, J (2023) Identifying the risk factors and their interactions of human–robot collaboration implementation during engineering project construction: Evidence from China. Engineering, Construction and Architectural Management, 30(7), pp. 3073-3094. ISSN 0969-9988
Chen, Z; Zhou, X; Zhang, Z; Yan, H; Niu, X and Li, Y (2025) Using the decomposed theory of planned behavior and a structural equation model with partial least squares to investigate construction and demolition waste reduction behavior. Journal of Construction Engineering and Management, 151(8): 04025105, ISSN 0733-9364
Cheng, M.; Chong, H. Y.; Xu, Y. and Wu, H. (2026) Exploring the determinants of generative artificial intelligence use intention: A mixed methods study. Journal of Construction Engineering and Management, 152(7): 04026091, ISSN 0733-9364
Cheng, E W L and Li, H (2005) Analytic network process applied to project selection. Journal of Construction Engineering and Management, 131(4), pp. 459-466. ISSN 0733-9364
Cheng, J (2008) The impact of strategic decisions on construction client satisfaction: An assessment framework. PhD thesis, University of Wolverhampton, UK.
Cheng, J; Proverbs, D G; Oduoza, C and Fleming, C (2005) A conceptual model towards the measurement of construction client satisfaction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Cheng, J; Proverbs, D G and Oduoza, C F (2006) The satisfaction levels of UK construction clients based on the performance of consultants: Results of a case study. Engineering, Construction and Architectural Management, 13(6), pp. 567-583. ISSN 0969-9988
Cheong, C S (2010) Contractors business development for overseas markets. PhD thesis, Loughborough University, UK.
Cheung, S O and Ma, Q (2026) Economic incentives and psychological empowerment in construction contracting: Complementing or undermining. Journal of Construction Engineering and Management, 152(4): 04026022, ISSN 0733-9364
Cheung, C M; Bowen, P; Cattell, K and Davis, J (2020) Construction professionals' commitment to the organisation, work-life balance, and well-being. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Cheung, E; Loosemore, M and Chandra, D C (2014) Assessing risk dynamics in public private partnership projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Cheung, S O and Chow, P T (2011) Withdrawal in construction project dispute negotiation. Journal of Construction Engineering and Management, 137(12), pp. 1071-1079. ISSN 0733-9364
Cheung, S O and Li, K (2019) Biases in construction project dispute resolution. Engineering, Construction and Architectural Management, 26(2), pp. 321-348. ISSN 0969-9988
Cheung, S O and Tsang, K F (1997) Professional liabilities in construction: Exposures and responses. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Cheung, S O; Yiu, T W Y and Yeung, S F (2006) A study of styles and outcomes in construction dispute negotiation. Journal of Construction Engineering and Management, 132(8), pp. 805-814. ISSN 0733-9364
Cheung, S O; Zhu, L and Yu, K I (2022) The value of apology in construction dispute negotiation. International Journal of Construction Management, 22(10), pp. 1910-1923. ISSN 1562-3599
Chigara, B. and Smallwood, J. (2026) The impact of procurement on construction health and safety (H&S) in Zimbabwe. Journal of Engineering, Design and Technology, 24(4), pp. 943-962. ISSN 1726-0531
Chigara, B and Moyo, T (2022) Factors affecting the delivery of optimum health and safety on construction projects during the covid-19 pandemic in Zimbabwe. Journal of Engineering, Design and Technology, 20(1), pp. 24-46. ISSN 1726-0531
Chigara, B and Moyo, T (2023) The impact of COVID-19 on the construction sector in Zimbabwe. Journal of Construction in Developing Countries, 28(1), pp. 91-111. ISSN 1823-6499
Chileshe, N and John Kikwasi, G (2014) Risk assessment and management practices (ramp) within the Tanzania construction industry: Implementation barriers and advocated solutions. International Journal of Construction Management, 14(4), pp. 239-254. ISSN 1562-3599
Chileshe, N and Kikwasi, G J (2014) Critical success factors for implementation of risk assessment and management practices within the Tanzanian construction industry. Engineering, Construction and Architectural Management, 21(3), pp. 291-319. ISSN 0969-9988
Chileshe N, K G J (2013) Perception of barriers to implementing risk assessment and management practices by construction professionals in Tanzania. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Chiponde, D B; Gledson, B and Greenwood, D (2025) The impact of project-related failures on team members and support mechanisms: A narrative analysis. Journal of Engineering, Design and Technology, 23(6), pp. 1838-1855. ISSN 1726-0531
Chiponde, D B (2023) Learning from project-related failures in UK construction project based organisations: an examination of actor approaches, intentions and behaviours. PhD thesis, Northumbria University, UK.
Chiponde, D B; Gledson, B and Greenwood, D (2024) Challenges and opportunities of learning from failure: Looking backwards to move forward using vignettes. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Cho, M; Bugg, R; Sattineni, A and Redden, L (2021) Wood waste minimization practices in residential construction. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Cho, W M and Hadikusumo, B H W (2024) Psychological contract between contractors and owners in construction projects: The mediating role of inter-organisational teamwork. Engineering, Construction and Architectural Management, 31(10), pp. 4001-4015. ISSN 0969-9988
Chou, J S; Irawan, N and Pham, A D (2013) Project management knowledge of construction professionals: Cross-country study of effects on project success. Journal of Construction Engineering and Management, 139(11): 4013015, ISSN 0733-9364
Close, R and Loosemore, M (2014) Breaking down the site hoardings: Attitudes and approaches to community consultation during construction. Construction Management and Economics, 32(7-8), pp. 816-828. ISSN 01446193
Close R, L M (2013) Community consultation during construction: Attitudes, experiences and skills. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Coleman, E; Nooni, I K; Fianko, S K; Dadzie, L; Neequaye, E N; Owusu-Agyemang, J and Ansa-Asare, E O (2020) Assessing contract management as a strategic tool for achieving quality of work in Ghanaian construction industry: A case study of FPMU and MMDAS. Journal of Financial Management of Property and Construction, 25(1), pp. 41-60. ISSN 1366-4387
Collinge, W H (2011) Understanding stakeholder requirements on an NHS hospital project: Application of semiotics-rooted theories. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Collinge W H, H C F (2013) Evolving designs and stakeholder contributions to the briefing process. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Connaughton, J and Meikle, J (2013) The changing nature of UK construction professional service firms. Building Research & Information, 41(1), pp. 95-109. ISSN 0961-3218
Connaughton, J; Meikle, J and Teerikangas, S (2015) Mergers, acquisitions and the evolution of construction professional services firms. Construction Management and Economics, 33(2), pp. 146-159. ISSN 01446193
Cooke, T (2013) Can knowledge sharing mitigate the effect of construction project complexity? Construction Innovation, 13(1), pp. 5-9. ISSN 1471-4175
Corbett, D I (1997) Quantifying quality in industrial construction. PhD thesis, Pennsylvania State University, USA.
Corbett, P and Rowley, P (1999) The use of bcis elemental cost data by quantity surveyors as part of cost planning techniques: The practitioners' perspective. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Cotgrave, A J (2008) Achieving literacy in sustainability: shifting the paradigm for construction management education. PhD thesis, Liverpool John Moores University, UK.
Cox, David George (2002) Construction professionals and management in English local government: A triangulated investigation. PhD thesis, Durham University, UK.
Craig, R W and Barnes, W C (2007) Professional employees' exposure to risk of negligence claims from the client. Construction Management and Economics, 25(7), pp. 811-819. ISSN 1466433X
Crosthwaite, D (2001) The internationalisation of construction professional services: Consulting engineers overseas. PhD thesis, University of Reading, UK.
Curran, M; Spillane, J and Clarke-Hagan, D (2018) External stakeholders in urban construction development projects: Who are they and how are they engaged? In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Curran, M and Spillane, J P (2020) External stakeholder management and engagement on urban construction projects in Ireland. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(2), pp. 59-68. ISSN 17514304
Curran, M; Spillane, J P and Clarke-Hagan, D (2019) The considerate constructors scheme: Improving the image of construction, but how considerate are they to contractors? In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Dadzoe, F; Addy, M; Duah, D Y A and Adesi, M (2024) Towards a circular economy: A knowledge-attitude gap between demand and supply-side operators on green building construction in Ghana. Smart and Sustainable Built Environment, 13(4), pp. 763-779. ISSN 2046-6099
Dainty, A R J; Bagilhole, B M and Neale, R H (1998) Improving the retention of construction professionals: A soft HRM approach. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Dandago, A A; Yamusa, M A; Lawal, H S; Abubakar, M; Abdullahi, M and Zailani, B M (2025) Impact of uncertainty factors on the performance of building renovation projects. Journal of Engineering, Design and Technology, 23(6), pp. 1875-1897. ISSN 1726-0531
Daniel, E I; Nwankwo, N; Adah, C; Oshodi, O; Emuze, F; Chinyio, E and Umeokafor, N (2026) An exploratory study into UK construction industry response to digitalised health and safety management. Journal of Engineering, Design and Technology, 24(1), pp. 45-63. ISSN 1726-0531
Danso, A. K.; Edwards, D. J.; Adjei, E. K.; Adjei-Kumi, T.; Owusu-Manu, D. G.; Fianoo, S. I. and Thwala, W. D. (2026) Analysis of the underlying factors affecting BIM-LCA integration in the Ghanaian construction industry: A factor analysis approach. Construction Innovation, 26(3), pp. 871-891. ISSN 1471-4175
Datta, S D; Rana, M J; Assafi, M N; Mim, N J and Ahmed, S (2023) Investigation on the generation of construction wastes in Bangladesh. International Journal of Construction Management, 23(13), pp. 2260-2269. ISSN 1562-3599
Dauda, J A; Chavan, N N; Saka, A B; Ajayi, S O and Oyegoke, A S (2025) An appraisal of barriers to digitalisation of construction industry in developing countries: perspective from India. International Journal of Construction Management, 25(7), pp. 770-782. ISSN 1562-3599
De Silva, N; Samanmali, R and De Silva, H L (2017) Managing occupational stress of professionals in large construction projects. Journal of Engineering, Design and Technology, 15(4), pp. 488-504.
De Silva, S H; Ranadewa, K A T O and Rathnasinghe, A P (2025) Barriers and strategies for implementing lean six sigma in small- and medium sized enterprises (SMEs) in construction industry: A fuzzy TOPSIS analysis. Construction Innovation, 25(2), pp. 510-551. ISSN 1471-4175
Demian, P and Walters, D (2014) The advantages of information management through building information modelling. Construction Management and Economics, 32(12), pp. 1153-1165. ISSN 01446193
Demirkesen, S and Tezel, A (2022) Investigating major challenges for industry 4.0 adoption among construction companies. Engineering, Construction and Architectural Management, 29(3), pp. 1470-1503. ISSN 0969-9988
Deng, B; Lv, X; Du, Y; Li, X and Yin, Y (2025) Critical risk factors for construction supply chain in China: A fuzzy synthetic evaluation analysis. Engineering, Construction and Architectural Management, 32(1), pp. 483-506. ISSN 0969-9988
Deshapriya, L A M; Perera, B A K S; Ilangakoon, I W M A D and Weerasooriya, D (2025) Management of adverse effects of construction digitalization on the quantity surveying key roles: A qualitative Delphi study. Journal of Engineering, Design and Technology, 23(6), pp. 1815-1837. ISSN 1726-0531
Dhakal, S; Zhang, L and Lv, X (2022) Ontology-based semantic modelling to support knowledge-based document classification on disaster-resilient construction practices. International Journal of Construction Management, 22(11), pp. 2059-2078. ISSN 1562-3599
Dhanasekar, Y and Anandh, K S (2025) Deciphering the role of age and gender in perceiving organizational politics in construction. Built Environment Project and Asset Management, 15(2), pp. 354-370. ISSN 2044-124X
Dickens, G (2002) Teamworking, perceptions and communication within construction projects. PhD thesis, University of Nottingham, UK.
Dithebe, K; Thwala, W D D; Aigbavboa, C O; Edwards, D J; Hayhow, S and Talebi, S (2023) Stakeholder management in the alleviation of legal and regulatory disputes in public-private partnership projects in South Africa. Journal of Engineering, Design and Technology, 21(2), pp. 325-342. ISSN 1726-0531
Doan, D T; GhaffarianHoseini, A; Naismith, N; GhaffarianHoseini, A; Zhang, T and Tookey, J (2025) Structural equation modelling of building information modelling (BIM) adoption framework in New Zealand. Engineering, Construction and Architectural Management, 32(13), pp. 426-444. ISSN 0969-9988
Doan, D T; GhaffarianHoseini, A; Naismith, N; Ghaffarianhoseini, A; Zhang, T and Tookey, J (2023) An empirical examination of green star certification uptake and its relationship with BIM adoption in New Zealand. Smart and Sustainable Built Environment, 12(1), pp. 84-104. ISSN 2046-6099
Dobrucali, E; Demirkesen, S; Sadikoglu, E; Zhang, C and Damci, A (2024) Investigating the impact of emerging technologies on construction safety performance. Engineering, Construction and Architectural Management, 31(3), pp. 1322-1347. ISSN 0969-9988
Dodanwala, T C and Santoso, D S (2022) The mediating role of job stress on the relationship between job satisfaction facets and turnover intention of the construction professionals. Engineering, Construction and Architectural Management, 29(4), pp. 1777-1796. ISSN 0969-9988
Dosumu, O S; Mahame, C; Niyitegeka, S and Hahiirwuwambaza, J A (2023) Applications and challenges of adopting the internet of things (IoT) in the Rwandan construction industry. Journal of Construction in Developing Countries, 28(2), pp. 81-100. ISSN 1823-6499
Dowsett, R; Green, M; Sexton, M and Harty, C (2019) Projecting at the project level: MMC supply chain integration roadmap for small housebuilders. Construction Innovation, 19(2), pp. 193-211. ISSN 1471-4175
Dowsett, R M; Green, M S and Harty, C F (2022) Speculation beyond technology: Building scenarios through storytelling. Buildings & Cities, 3(1), pp. 534-553. ISSN 2632-6655
Draleti, G; Sengonzi, R and Kakitahi, J (2024) Improvement of risk management in cost estimation in the building construction industry in Uganda. Journal of Construction in Developing Countries, 29(1), pp. 111-138. ISSN 1823-6499
Du, W; M.E. Sepasgozar, S; Khan, A; Shirowzhan, S and Garzon Romero, J (2025) Developing an interactive pile training module for construction risk management and gaging users' intentions. Construction Innovation, 25(3), pp. 893-911. ISSN 1471-4175
Duckworth, J; Hasan, A and Kamardeen, I (2024) Mental health challenges of manual and trade workers in the construction industry: A systematic review of causes, effects and interventions. Engineering, Construction and Architectural Management, 31(4), pp. 1497-1516. ISSN 0969-9988
Duffy, F and Rabeneck, A (2013) Professionalism and architects in the 21st century. Building Research & Information, 41(1), pp. 115-122. ISSN 0961-3218
Durdyev, S; Hosseini, M R; Martek, I; Ismail, S and Arashpour, M (2020) Barriers to the use of integrated project delivery (IPD): A quantified model for Malaysia. Engineering, Construction and Architectural Management, 27(1), pp. 186-204. ISSN 0969-9988
Durdyev, S; Mohamed, S; Lay, M L and Ismail, S (2017) Key factors affecting construction safety performance in developing countries: Evidence from Cambodia. Construction Economics and Building, 17(4), pp. 48-65. ISSN 2204-9029
Eaglestone, F N (1993) An improved method of requesting insurance under UK construction contracts. PhD thesis, City, University of London, UK.
Edike, U E; Ameh, O J; Adenuga, O A and Akintunde, O P (2024) Life cycle energy analysis of houses incorporating conventional and alternative masonry units. Architectural Engineering and Design Management, 20(5), pp. 1079-1099. ISSN 1745-2007
Edirisinghe, V R D (2023) Framework for improved alternatives dispute resolution practice in the Sri Lankan constructions industry. PhD thesis, Liverpool John Moores University, UK.
Egebjerg, C (2013) Learning from movie-sets coordination. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Egwunatum, S I; Anumudu, A C; Eze, E C and Awodele, I A (2022) Total quality management (TQM) implementation in the Nigerian construction industry. Engineering, Construction and Architectural Management, 29(1), pp. 354-382. ISSN 0969-9988
Ejidike, C C; Mewomo, M C and Anugwo, I C (2024) Assessment of construction professionals' awareness of the smart building concepts in the Nigerian construction industry. Journal of Engineering, Design and Technology, 22(5), pp. 1491-1504. ISSN 1726-0531
Ejidike, C C; Mewomo, M C; Olawumi, T O; Wang, S and Buniya, M K (2025) Barriers to the adoption of smart building technology in developing countries: An empirical survey. Journal of Construction Engineering and Management, 151(6): 04025067, ISSN 0733-9364
Ekung, S; Odesola, I and Oladokun, M (2022) Dimensions of cost misperceptions obstructing the adoption of sustainable buildings. Smart and Sustainable Built Environment, 11(4), pp. 852-869. ISSN 2046-6099
El Asmar, L (2019) Assessing experiential learning in construction education by modeling student performance. PhD thesis, Arizona State University, USA.
El Korany, T. M.; Fouad, A. and Sanad, H. (2026) Identifying contractor selection criteria in Egyptian construction tenders: A SNA and PLS-SEM approach. Construction Innovation, 26(5), pp. 1356-1383. ISSN 1471-4175
El Sawalhi, N I H (2007) Developing a model for construction contractors pre-qualification in the Gaza Strip and West Bank. PhD thesis, University of Salford, UK.
El-Sayegh, S M (2009) Multi-criteria decision support model for selecting the appropriate construction management at risk firm. Construction Management and Economics, 27(4), pp. 385-398. ISSN 1466433X
ElAlem, M A; Mahdi, I M; Mohamadien, H A and Hosny, S (2025) Forecasting scope creep in Egyptian construction projects: An evaluation using artificial neural network (ANN) and random forest models. International Journal of Construction Management, 25(16), pp. 2082-2101. ISSN 1562-3599
Elijah, O O and Oluwasuji, D J (2019) An evaluation of training needs of the Nigerian construction professionals in adopting building information modelling. Journal of Construction in Developing Countries, 24(2), pp. 63-81. ISSN 1823-6499
Enegbuma, W I; Aliagha, G U; Ali, K N and Badiru, Y Y (2016) Confirmatory strategic information technology implementation for building information modelling adoption model. Journal of Construction in Developing Countries, 21(2), pp. 113-129. ISSN 1823-6499
Enshassi, A and Al Swaity, E (2015) Key stressors leading to construction professionals' stress in the Gaza Strip, Palestine. Journal of Construction in Developing Countries, 20(2), pp. 53-79. ISSN 1823-6499
Enshassi, A; Al-Swaity, E; Abdul Aziz, A R and Choudhry, R (2018) Coping behaviors to deal with stress and stressor consequences among construction professionals: A case study at the Gaza Strip, Palestine. Journal of Financial Management of Property and Construction, 23(1), pp. 40-56. ISSN 1366-4387
Enshassi, A; El-Rayyes, Y and Alkilani, S (2015) Job stress, job burnout and safety performance in the Palestinian construction industry. Journal of Financial Management of Property and Construction, 20(2), pp. 170-187. ISSN 1366-4387
Enshassi, A; Mohamed, S and Modough, Z (2013) Contractors' selection criteria: Opinions of Palestinian construction professionals. International Journal of Construction Management, 13(1), pp. 19-37. ISSN 1562-3599
Enshassi, A; Saleh, N and Mohamed, S (2021) Barriers to the application of lean construction techniques concerning safety improvement in construction projects. International Journal of Construction Management, 21(10), pp. 1044-1060. ISSN 1562-3599
Enshassi, A A; Arain, F and El-Rayyes, Y (2014) Post-evaluation system in construction projects in Gaza Strip-Palestine. Journal of Construction in Developing Countries, 19(2), pp. 51-73. ISSN 1823-6499
Erdis, E; Genç, O and Aydınlı, S (2021) Mobbing on construction professionals: Causes, consequences, and precautions. International Journal of Construction Management, 21(10), pp. 987-996. ISSN 1562-3599
Ernstsen, S N; Whyte, J; Thuesen, C and Maier, A (2021) How innovation champions frame the future: Three visions for digital transformation of construction. Journal of Construction Engineering and Management, 147(1): 1928, ISSN 0733-9364
Ershadi, M.; Jefferies, M.; Davis, P. and Mojtahedi, M. (2021) Achieving sustainable procurement in construction projects: The pivotal role of a project management office. Construction Economics and Building, 21(1), pp. 45-64. ISSN 2204-9029
Ertugral, Z A E (2017) Understanding radical innovation: A case example from the Turkish housing market. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Esangbedo, O; Bilge, E and Yasemin, N (2024) Factors analysis on stakeholder management to achieve sustainable buildings. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Etemadi, R; Hon, C K H; Manley, K and Murphy, G (2022) Mechanisms for enhancing the use of social media for knowledge sharing by the construction professionals. Construction Innovation, 22(2), pp. 284-304. ISSN 1471-4175
Etemadi, R; Hon, C K H; Murphy, G and Manley, K (2020) The use of social media for work-related knowledge sharing by construction professionals. Architectural Engineering and Design Management, 16(6), pp. 426-440. ISSN 1745-2007
Etemadi, Ramtin (2019) Adoption of social media for professional knowledge sharing by construction professionals in Australia. PhD thesis, Queensland University of Technology, Australia.
Eze, E C; Aghimien, D O; Aigbavboa, C O and Sofolahan, O (2024) Building information modelling adoption for construction waste reduction in the construction industry of a developing country. Engineering, Construction and Architectural Management, 31(6), pp. 2205-2223. ISSN 0969-9988
Eze, E C; Sofolahan, O; Ugulu, R A and Ameyaw Effah, E E (2025) Bolstering circular economy in construction through digitalisation. Construction Innovation, 25(6), pp. 1774-1796. ISSN 1471-4175
Fang, Y and Gao, S (2026) Construction 4.0 technology and lean construction ambidexterity capability in China's construction industry: A sociotechnical systems perspective. Construction Innovation, 26(3), pp. 653-673. ISSN 1471-4175
Farrell, P and Middlemass, R (2005) Barriers to disabled students in built environment degree programmes. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Farrow, C B (2016) Problem-solving styles in the Southeast construction industry. EdD thesis, Auburn University, USA.
Faulkner, A J (1996) Achieving exemplary quality in the UK construction professions. PhD thesis, University of Salford, UK.
Fazio, P; Théberge, P; revay, S and Moselhi, O (1988) Design impact of construction fast-track. Construction Management and Economics, 6(3), pp. 195-208. ISSN 01446193
Finnie, D; Ali, N A and Park, K (2019) Design development post contract signing in New Zealand: Client's or contractor's cost? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(4), pp. 146-156. ISSN 17514304
Fitriani, H and Ajayi, S (2023) Investigation of requisite measures for enhancing sustainable construction practices in Indonesia. Engineering, Construction and Architectural Management, 30(6), pp. 2602-2620. ISSN 0969-9988
Forbes, D R; Smith, S D and Horner, R M W (2008) A comparison of techniques for identifying risks in sustainability assessment of housing. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Fordjour, G A; Chan, A P C and Tuffour-Kwarteng, L (2021) Exploring construction employees’ perspectives on the potential causes of psychological health conditions in the construction industry: A study in Ghana. International Journal of Construction Education and Research, 17(4), pp. 373-393. ISSN 1557-8771
Foroughi Sabzevar, M; Gheisari, M and Lo, J (2025) Analyzing the pros and cons of paper-based 2D drawings in construction: a survey of U.S. construction professionals. International Journal of Construction Management, 25(4), pp. 428-438. ISSN 1562-3599
Fortune, C and Hinks, J (1998) Strategic building project price forecasting models in use: Paradigm shift postponed. Journal of Financial Management of Property and Construction, 3(1), pp. 5-26. ISSN 1366-4387
Fortune, C and Lees, M (1998) Quality in strategic cost advice: The effect of anchoring and adjustment. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Fortune, C and Lees, M (2000) Strategic cost advice and the effect of cognitive error. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Fortune, C and Lees, M (2001) Systematic errors of judgement and the formulation of strategic cost advice for construction clients. Journal of Financial Management of Property and Construction, 6(2), pp. 81-93. ISSN 1366-4387
Francis, V and Lingard, H (2002) The case for family-friendly work practices in the Australian construction industry. Construction Economics and Building, 2(1), pp. 28-36. ISSN 2204-9029
Franklin, M; Walsh, M; Clarke, N; Spillane, J P and Bradley, J G (2022) Mental health in construction: The awareness of the impact of stress on construction professionals' mental health in Ireland and the UK. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Frimpong S, D A (2013) A phenomenological study of private homebuilders' perceptions on the employment of professional services. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Galea, N; Powell, A and Salignac, F (2023) The role of homosociality in maintaining men's powerfulness in construction companies. Construction Management and Economics, 41(2), pp. 172-182. ISSN 01446193
Galea, Natalie R (2018) Built for men: Institutional privilege in the Australian construction industry. PhD thesis, University of New South Wales, Australia.
Galha, H M (1999) Economic quality design. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Gameson, R (1992) An investigation into the interaction between potential building clients and construction professionals. PhD thesis, University of Reading, UK.
Gameson, R and Sher, W (2002) An investigation into project team dynamics and the utilization of virtual environments. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Gameson, R and Sher, W (2009) An investigation into perceptions of client- professional interactions at project inception: An australian clients perspective: Pilot study results. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Gao, T; Ergan, S; Akinci, B and Garrett, J H (2014) Proactive productivity management at job sites: Understanding characteristics of assumptions made for construction processes during planning based on case studies and interviews. Journal of Construction Engineering and Management, 140(3): 4013054, ISSN 0733-9364
Garmston, H; Pan, W and de Wilde, P (2012) Decision-making in façade selection for multi-storey buildings. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Gasue, R; Aklashie, S; Dompey, A M A; Agyekum, K and Opoku, D (2026) Implementing materials passports in the construction industry: Empirical evidence from Ghana. International Journal of Building Pathology and Adaptation, 44(1), pp. 15-35. ISSN 2398-4708
Geekiyanage, D and Ramachandra, T (2020) Nexus between running costs and building characteristics of commercial buildings: Hedonic regression modelling. Built Environment Project and Asset Management, 10(3), pp. 389-406. ISSN 2044-124X
Geekiyanage, D; Ramachandra, T and Thurairajah, N (2018) A model for early stage estimation of operational expenses (opex) in commercial buildings. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Ghansah, F A; Owusu-Manu, D G; Ayarkwa, J; Darko, A and Edwards, D J (2022) Underlying indicators for measuring smartness of buildings in the construction industry. Smart and Sustainable Built Environment, 11(1), pp. 126-142. ISSN 2046-6099
Ghansah, F A; Owusu-Manu, D G; Ayarkwa, J; Edwards, D J and Hosseini, M R (2022) Assessing the level of awareness of smart building technologies (sbts) in the developing countries. Journal of Engineering, Design and Technology, 20(3), pp. 696-711. ISSN 1726-0531
Ghostin, M (2020) Exploring an implementation framework for building information modelling to support sustainable development in the Lebanese construction industry: a qualitative approach. PhD thesis, Coventry University, UK.
Giesekam, J; Barrett, J R and Taylor, P (2016) Construction sector views on low carbon building materials. Building Research & Information, 44(4), pp. 423-444. ISSN 0961-3218
Giesekam, J J (2016) The contribution to UK climate mitigation targets from reducing embodied carbon in the construction sector. PhD thesis, University of Leeds, UK.
Gines, J A (2024) Mass timber utilization in architecture: Carbon sequestration, building materials and construction practices. PhD thesis, Mississippi State University, USA.
Giritli, H and Civan, I (2008) Personality study of construction professionals in the Turkish construction industry. Journal of Construction Engineering and Management, 134(8), pp. 630-634. ISSN 0733-9364
Giritli, H and Oraz, G T (2004) Leadership styles: Some evidence from the Turkish construction industry. Construction Management and Economics, 22(3), pp. 253-262. ISSN 01446193
Gorse, C; Dickinson, I; Ashraf, I; Whitehead, P; Shepherd, T; Smith, M and Platten, A (2010) Distribution and use of digital learning materials: An evaluation of a virtual maths website and surrounding activities. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Gorse, C; Glew, D; Miles-Shenton, D and Farmer, D (2015) Addressing the thermal performance gap: Possible performance control tools for the construction manager. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Gorse, C A and Emmitt, S (2007) Communication behaviour during management and design team meetings: A comparison of group interaction. Construction Management and Economics, 25(11), pp. 1197-1213. ISSN 01446193
Gorse, C A; Emmitt, S and Lowis, M (1999) Problem solving and appropriate communication medium. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Gorse, C A; Emmitt, S; Lowis, M and Howarth, A (2002) Interaction characteristics of successful contractors' representatives. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Gouda Mohamed, A; Helmy Ammar, M and Nabawy, M (2023) Risks assessment using structural equation modeling: Mega housing projects construction in Egypt. International Journal of Construction Management, 23(16), pp. 2717-2728. ISSN 1562-3599
Gould, N (1998) Alternative dispute resolution in the UK construction industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Govender, N; Laryea, S and Watermeyer, R (2025) Factors influencing the quality of project documents produced by construction professionals in South Africa. International Journal of Construction Education and Research, 21(4), pp. 585-613. ISSN 1557-8771
Govender, N.; Laryea, S. and Watermeyer, R. (2025) To what extent does professional service fees influence the quality of project documents? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(1), pp. 16-28. ISSN 1751-4304
Green, S D and Simister, S J (1999) Modelling client business processes as an aid to strategic briefing. Construction Management and Economics, 17(1), pp. 63-76. ISSN 01446193
Greenwood, D J; Osborne, A N and Aggiag, M A (2001) A comparative analysis of administrative delays in hospital buildings. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Griffiths, R; Lord, W and Coggins, J (2017) Project bank accounts: The second wave of security of payment? Journal of Financial Management of Property and Construction, 22(3), pp. 322-338. ISSN 1366-4387
Grosse, H (2024) Exploring heuristics of sustainability: Their use and impact. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Gumusburun Ayalp, G (2022) Critical predictors of burnout among civil engineers at construction sites: A structural equation modelling. Engineering, Construction and Architectural Management, 29(9), pp. 3547-3573. ISSN 0969-9988
Gunaydin, H M (1999) Impact of information technologies on project management functions. PhD thesis, Illinois Institute of Technology, USA.
Gunderson, D E and Gloeckner, G W (2011) Superintendent competencies and attributes required for success: A national study comparing construction professionals' opinions. International Journal of Construction Education and Research, 7(4), pp. 294-311. ISSN 1557-8771
Gunduz, M and Al-Ajji, I (2022) Employment of CHAID and crt decision tree algorithms to develop bid/no-bid decision-making models for contractors. Engineering, Construction and Architectural Management, 29(9), pp. 3712-3736. ISSN 0969-9988
Gunduz, M; Birgonul, M T and Ozdemir, M (2017) Fuzzy structural equation model to assess construction site safety performance. Journal of Construction Engineering and Management, 143(4): 04016112, ISSN 0733-9364
Gunduz, M and Elsherbeny, H A (2020) Critical assessment of construction contract administration using fuzzy structural equation modeling. Engineering, Construction and Architectural Management, 27(6), pp. 1233-1255. ISSN 0969-9988
Gunning, J G and Cooke, E (1996) The influence of occupational stress on construction professionals. Building Research & Information, 24(4), pp. 213-221. ISSN 0961-3218
Gunning, J G and Keaveney, M (1998) A transverse examination of occupational stress among a cross-disciplinary population of Irish construction professionals. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Guribie, F L; Owusu-Manu, D D G; Badu, E and Edwards, D J (2026) The effects of the different dimensions of social capital on situated learning processes in projects. Construction Innovation, 26(3), pp. 916-934. ISSN 1471-4175
Guribie, F L; Owusu-Manu, D G; Badu, E and Edwards, D J (2023) Fuzzy synthetic evaluation of the systemic obstacles to personalizing knowledge flows within and across projects. Construction Innovation, 23(3), pp. 546-566. ISSN 1471-4175
Hadi, A; Cheung, F; Adjei, S and Dulaimi, A (2023) Evaluation of lean off-site construction literature through the lens of industry 4.0 and 5.0. Journal of Construction Engineering and Management, 149(12): 03123007, ISSN 0733-9364
Hajji, A M (2013) Development of a productivity-based economic, energy, environmental model for heavy duty diesel construction equipment. PhD thesis, Oklahoma State University, USA.
Halder, S; Afsari, K and Akanmu, A (2026) Factors affecting the adoption of a robotic cyber-physical system in construction progress monitoring. Journal of Construction Engineering and Management, 152(3): 04026005, ISSN 0733-9364
Hall, M A (1999) International construction management: the cultural dimension. PhD thesis, Liverpool John Moores University, UK.
Hall, M A and Jaggar, D M (1998) The importance of cultural differences to British construction professionals working internationally. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Hampson, K and Tatum, C B (1997) Technology strategy and competitive performance in bridge construction. Journal of Construction Engineering and Management, 123(2), pp. 153-161. ISSN 0733-9364
Hamzeh, F R; Faek, F and AlHussein, H (2019) Understanding improvisation in construction through antecedents, behaviours and consequences. Construction Management and Economics, 37(2), pp. 61-71. ISSN 01446193
Hardison, D C (2018) Hazard recognition in design: Evaluating the effects of design information on hazard recognition performance. PhD thesis, University of Colorado at Boulder, USA.
Haruna, A.; Likhitruangsilp, V.; Pinich, S. and Ioannou, P. G. (2025) Critical success factors for circular economy implementation toward sustainable construction: An iterative stationary approach. Architectural Engineering and Design Management, 21(6), pp. 1416-1434. ISSN 1745-2007
Hasan, A; Rameezdeen, R; Baroudi, B and Ahn, S (2021) Mobile ICT-induced informal work in the construction industry: Boundary management approaches and consequences. Journal of Construction Engineering and Management, 147(9): 04021109, ISSN 0733-9364
Hatush, Z A (1996) Contractor selection using the multiattribute utility theory. PhD thesis, University of Salford, UK.
Heffernan, E; Pan, W and Liang, X (2012) Delivering zero carbon homes in the UK. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Hemström, K; Gustavsson, L and Mahapatra, K (2017) The sociotechnical regime and Swedish contractor perceptions of structural frames. Construction Management and Economics, 35(4), pp. 184-195. ISSN 01446193
Hendriks, E (2020) Assessing knowledge adoption in post-disaster reconstruction. PhD thesis, Eindhoven University of Technology, Netherlands.
Higham, A and Thomson, C (2015) An evaluation of construction professionals sustainability literacy in North West England. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Hiley, A and Gopsill, G (2000) The implementation of value management as a design management tool in the UK construction industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Hillig, J B; Dan-Asabe, D; Donyavi, S; Dursun, O and Thampuratty, A (2010) Fidic's red book 1999 edition: A study review. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(3), pp. 129-133. ISSN 17514312
Hitt, S J; Hairstans, R; Oloke, D; Bertasso, S; Tamagnone, G and Shirley, B (2024) Developing modern construction professionals with a focus on timber – a UK case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(1), pp. 32-40. ISSN 17514304
Hopkin, C and Lay, S (2024) Conceptual arguments on the use of unlatched reverse swing "flappy" door smoke control systems in residential buildings. International Journal of Building Pathology and Adaptation, 42(4), pp. 618-636. ISSN 23984708
Hoque, M I and Hasan, M (2025) Factors affecting the construction quality in Bangladesh. International Journal of Building Pathology and Adaptation, 43(3), pp. 321-337. ISSN 2398-4708
Horvath, A (1997) Estimation of environmental implications of construction materials and designs using life cycle assessment techniques. PhD thesis, Carnegie Mellon University, USA.
Hossain, M A; Raiymbekov, D; Nadeem, A and Kim, J R (2022) Delay causes in Kazakhstan's construction projects and remedial measures. International Journal of Construction Management, 22(5), pp. 801-819. ISSN 1562-3599
Hossain, M M and Ahmed, S (2022) Developing an automated safety checking system using BIM: A case study in the Bangladeshi construction industry. International Journal of Construction Management, 22(7), pp. 1206-1224. ISSN 1562-3599
Hosseini, M R; Chileshe, N; Jepson, J and Arashpour, M (2016) Critical success factors for implementing risk management systems in developing countries. Construction Economics and Building, 16(1), pp. 18-32. ISSN 2204-9029
Hoxley, M (1998) The impact of competitive fee tendering on construction professional service quality. PhD thesis, University of Salford, UK.
Hoxley, M (2000) Are competitive fee tendering and construction professional service quality mutually exclusive? Construction Management and Economics, 18(5), pp. 599-605. ISSN 01446193
Hughes, M L (2020) Evaluating the impact of knowledge transfer on project delays for construction project delivery: A qualitative case study. PhD thesis, Northcentral University, USA.
Hughes, W P; Ancell, D; Gruneberg, S and Hirst, L (2004) Exposing the myth of the 1:5:200 ratio relating initial cost, maintenance and staffing costs of office buildings. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Hulls, P M (2022) The epidemiology of health and wellbeing in the workplace: managing and measuring occupational stress and behavioural factors in a male-dominated industry. PhD thesis, University of Bristol, UK.
Hymes, S J (2011) Front-end specifications and construction claims. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(3), pp. 139-146. ISSN 17514312
Ibrahim, A D; Price, A D F and Dainty, A R J (2006) An analysis of success factors for public private partnerships in infrastructure projects in Nigeria. Journal of Construction Procurement, 12(1),
Ibrahim, A D; Price, A D F and Dainty, A R J (2006) The analysis and allocation of risks in public private partnerships in infrastructure projects in Nigeria. Journal of Financial Management of Property and Construction, 11(3), pp. 149-164. ISSN 1366-4387
Ibrahim, W A B (2016) Regulatory framework for adjudicators in the Malaysian construction industry. PhD thesis, University of Strathclyde, UK.
Idoro, G I (2009) Clients' perception of construction project leaders in the Nigerian banking industry. Journal of Engineering, Design and Technology, 7(3), pp. 264-281. ISSN 1726-0531
Igwe, U S; Mohamed, S F; Dzahir, M A M; Yusof, Z M and Khiyon, N A (2022) Towards a framework of automated resource model for post contract cost control of construction projects. International Journal of Construction Management, 22(16), pp. 3088-3097. ISSN 1562-3599
Ijaola, I A (2017) Training practices and task performance of professionals in construction firms in Lagos and Abuja, Nigeria. PhD thesis, University of Lagos, Nigeria.
Ikuabe, M; Aigbavboa, C and Kissi, E (2023) Potential applications and benefits of humanoids in the construction industry: A south African perspective. International Journal of Building Pathology and Adaptation, 41(6), pp. 254-268. ISSN 23984708
Ikuabe, M; Aigbavboa, C; Thwala, W; Chiyangwa, D and Oke, A (2023) Risks of joint venture formation in the South African construction industry. International Journal of Construction Management, 23(14), pp. 2391-2399. ISSN 1562-3599
Ikuabe, M; Oke, A E and Aigbavboa, C (2020) Impact of contractors' opportunism on construction project transaction costs: Construction professionals' perception. Journal of Financial Management of Property and Construction, 25(1), pp. 125-141. ISSN 1366-4387
Ikuabe, M O and Oke, A E (2019) Contractors’ opportunism: construction professionals’ awareness of influencing factors. Journal of Engineering, Design and Technology, 17(1), pp. 102-114. ISSN 1726-0531
Ilesanmi, O O; Oke, A E; Moyanga, D T; Aliu, J and Ojo, L D (2025) Innovative strategies to prevent flooding in buildings and infrastructure in Nigeria. International Journal of Disaster Resilience in the Built Environment, 16(5), pp. 688-710. ISSN 1759-5908
Imoudu, E W; Godwin, A U and Nita, A K (2014) Preliminary building information modelling adoption model in Malaysia: A strategic information technology perspective. Construction Innovation, 14(4), pp. 408-432. ISSN 1471-4175
Inayat, A; Melhem, H and Esmaeily, A (2015) Critical success factors in an agency construction management environment. Journal of Construction Engineering and Management, 141(1): 06014010, ISSN 0733-9364
Ishak, N and Abdul-Aziz, A R (2014) Malaysian construction professionals: Why are they leaving? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Isingizwe, Josiane (2025) Retention and employment discrimination in construction: Exploring causal factors for the African American workforce. PhD thesis, Arizona State University, USA.
Iyer, K C and Jha, K N (2003) Analysis of critical coordination activities of Indian construction projects. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Iyer, K C and Jha, K N (2006) Critical factors affecting schedule performance: Evidence from Indian construction projects. Journal of Construction Engineering and Management, 132(8), pp. 871-881. ISSN 0733-9364
Jadallah, H (2021) Educational theory-embedded training for construction industry professionals. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Jagannathan, M and Delhi, V S K (2022) Identifying focus areas to decode the decision to litigate contractual disputes in construction. Engineering, Construction and Architectural Management, 29(8), pp. 2976-2998. ISSN 0969-9988
Jaillon, L and Poon, C S (2010) Design issues of using prefabrication in Hong Kong building construction. Construction Management and Economics, 28(10), pp. 1025-1042. ISSN 1466433X
Jaiswal, A; Laishram, B and Johari, S (2025) A measuring tool to quantify the level of gender inclusion in a construction organization. Journal of Construction Engineering and Management, 151(10): 04025143, ISSN 0733-9364
James, M; Moyo, T and Moyo, C (2025) Climate change literacy objectives for construction professionals in Zimbabwe. Built Environment Project and Asset Management, 15(1), pp. 85-105. ISSN 2044-124X
James, P and Matipa, W M (2004) Sustainable construction in a developing country: An assessment of how the professional's practice impact the environment. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Jamieson, I A (1998) The development of a concurrently engineered procurement process. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Jamir Singh, P S; Oke, A E; Aliu, J; Isaiah Kayode, T; Azura Ramli, R; Haizzan Yahaya, M and Idris, A (2026) A study on substance abuse awareness and usage trends within the construction sector. Construction Innovation, 26(3), pp. 674-692. ISSN 1471-4175
Jatau, T S; Emuze, F and Smallwood, J (2023) Rethinking health and safety training to serve people in the construction industry better. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(3), pp. 97-103. ISSN 17514304
Jeelani, I; Han, K and Albert, A (2020) Development of virtual reality and stereo-panoramic environments for construction safety training. Engineering, Construction and Architectural Management, 27(8), pp. 1853-1876. ISSN 0969-9988
Jewell, C and Flanagan, R (2012) Measuring construction professional services exports: A case for change. Building Research & Information, 40(3), pp. 337-347. ISSN 0961-3218
Jewell, C; Flanagan, R and Anac, C (2010) Understanding UK construction professional services exports: Definitions and characteristics. Construction Management and Economics, 28(3), pp. 231-239. ISSN 1466433X
Jewell, C; Flanagan, R and Lu, W (2014) The dilemma of scope and scale for construction professional service firms. Construction Management and Economics, 32(5), pp. 473-486. ISSN 01446193
Jewell, C A (2011) A typology of construction professional service firms: A consulting engineering perspective. PhD thesis, University of Reading, UK.
Jeyakumar, R (2013) The implementation and effectiveness of value engineering in the United Arab Emirates. PhD thesis, University of Glamorgan, UK.
Jha, K N (2005) Attributes of a project coordinator. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Jha, K N and Devaya, M N (2008) Modelling the risks faced by Indian construction companies assessing international projects. Construction Management and Economics, 26(4), pp. 337-348. ISSN 1466433X
Jha, K N and Iyer, C K (2006) What attributes should a project coordinator possess? Construction Management and Economics, 24(9), pp. 977-988. ISSN 1466433X
Jha, K N and Misra, S (2007) Ranking and classification of construction coordination activities in Indian projects. Construction Management and Economics, 25(4), pp. 409-421. ISSN 1466433X
John, G (2007) Assessment of the use of resource scheduling facilities in project management software packages for large contractors. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Johnson, R M and Babu, R I I (2020) Time and cost overruns in the UAE construction industry: A critical analysis. International Journal of Construction Management, 20(5), pp. 402-411. ISSN 1562-3599
Jones, S M; Ross, A and Sertyesilisik, B (2010) Testing the unfolding model of voluntary turnover on construction professionals. Construction Management and Economics, 28(3), pp. 271-285. ISSN 1466433X
Joseph Oladiran, O and Rogers Simeon, D (2023) Consciousness and prospects of autoclaved aerated concrete (aac) blocks for wall construction: Comparative study Nigeria and South Africa. Journal of Construction Business and Management, 6(2), pp. 1-10. ISSN 2521-0165
Juliana, A; Oladimeji, O; Abiodun, A O; Haddad, A N and Tam, V W Y (2024) Influence of rework on construction project performance in Nigeria. International Journal of Construction Management, 24(8), pp. 888-893. ISSN 1562-3599
Kakar, A S and Hasan, A (2024) Exploring the combined effects of socio-political conflicts and patriarchic society on a construction career path: Evidence from Afghan female professionals. International Journal of Construction Education and Research, 20(1), pp. 98-118. ISSN 15578771
Kakar, A S; Hasan, A; Jha, K N and Singh, A (2024) Project cost performance factors in the war-affected and conflict-sensitive Afghan construction industry. Journal of Engineering, Design and Technology, 22(5), pp. 1570-1590. ISSN 1726-0531
Kamal, A; Abas, M; Khan, D and Azfar, R W (2022) Risk factors influencing the building projects in Pakistan: From perspective of contractors, clients and consultants. International Journal of Construction Management, 22(6), pp. 1141-1157. ISSN 1562-3599
Kamardeen, I (2022) Work stress related cardiovascular diseases among construction professionals. Built Environment Project and Asset Management, 12(2), pp. 223-242. ISSN 2044-124X
Kamardeen, I and Sunindijo, R Y (2017) Personal characteristics moderate work stress in construction professionals. Journal of Construction Engineering and Management, 143(10): 04017072, ISSN 0733-9364
Kamewor Tetteh, F; Kwatia, D A; Asante, D; Kyeremeh, A and Nyame, P E (2025) Leveraging procurement capabilities and planning for project success in the construction industry in Ghana. Built Environment Project and Asset Management, 15(1), pp. 18-32. ISSN 2044-124X
Kamma, R C and Jha, K N (2026) Significant causes of construction waste in road projects. International Journal of Construction Management, 26(6), pp. 944-959. ISSN 1562-3599
Kangari, R (1995) Construction documentation in arbitration. Journal of Construction Engineering and Management, 121(2), pp. 201-208. ISSN 0733-9364
Kanjanabootra, S and Corbitt, B (2016) Reproducing knowledge in construction expertise: A reflexive theory, critical approach. Construction Management and Economics, 34(7-8), pp. 561-577. ISSN 01446193
Kanoglu, A (2003) An integrated system for duration estimation in design/build projects and organizations. Engineering, Construction and Architectural Management, 10(4), pp. 272-282. ISSN 0969-9988
Kaplanoglu, S B (2007) Impact of pre-project peer review on project success. PhD thesis, Illinois Institute of Technology, USA.
Kar, S and Jha, K N (2022) Assessing criticality of construction materials for prioritizing their procurement using ANP-TOPSIS. International Journal of Construction Management, 22(10), pp. 1852-1862. ISSN 1562-3599
Karamoozian, M. and Zhang, H. (2026) Pushing the boundaries of prefabricated shell building design with building information modeling (BIM) and ultra-high performance concrete (uhpc). Engineering, Construction and Architectural Management, 33(3), pp. 2564-2585. ISSN 0969-9988
Karim, M. T.; Ahmed, S.; Iorio, J.; Hoque, M. N.; Nnaji, C. A.; Liu, H. and Abudayyeh, O. (2026) Exposure levels of discrimination-induced psychosocial stressors and intervention strategies among the US construction practitioners: An exploratory research. Engineering, Construction and Architectural Management, pp. 1-26. ISSN 0969-9988
Karim, M. T.; Ahmed, S.; Iorio, J.; Hoque, M. N.; Nnaji, C. A.; Liu, H. and Abudayyeh, O. (2026) Exposure levels of discrimination-induced psychosocial stressors and intervention strategies among the US construction practitioners: An exploratory research. Engineering, Construction and Architectural Management, pp. 1-26. ISSN 0969-9988
Karim, M T; Ahmed, S; Hoque, M N; Iorio, J and Abudayyeh, O (2025) Evaluating the management's role in addressing gender and racial disparities to promote DEI in the US construction industry: Exploratory study. Journal of Construction Engineering and Management, 151(9): 05025010, ISSN 0733-9364
Karimi, Rozi (2026) The impact of social media use on team feedback and team performance in construction site management practices. PhD thesis, Monash University, Australia.
Karnasuta, P (2004) An examination of the effects of web-based virtual working environments on team effectiveness within construction projects. PhD thesis, University of Reading, UK.
Karunasena, G and Rajagalgoda, G K (2017) A decision-making formula for value engineering applications in the Sri Lankan construction industry. Journal of Financial Management of Property and Construction, 22(1), pp. 77-91. ISSN 1366-4387
Karvonen, A (2013) Towards systemic domestic retrofit: A social practices approach. Building Research & Information, 41(5), pp. 563-574. ISSN 0961-3218
Kashwani, G A (2017) Enhancing the implementation of safety engineering systems in oil and gas construction projects in the UAE. PhD thesis, Heriot-Watt University, UK.
Kavvouras, G (2010) A holistic systemic model for decision support in sustainable construction. PhD thesis, University of Nottingham, UK.
Ke, Y; Davis, P and Jefferies, M (2016) A conceptual model of psychological contracts in construction projects. Construction Economics and Building, 16(3), pp. 20-37. ISSN 2204-9029
Kent, D C and Becerik-Gerber, B (2010) Understanding construction industry experience and attitudes toward integrated project delivery. Journal of Construction Engineering and Management, 136(8), pp. 815-825. ISSN 0733-9364
Khalid, M A; Hassan, M U; Ullah, F and Ahmed, K (2025) Integrated building information modeling and blockchain system for decentralized progress payments in construction projects. Journal of Engineering, Design and Technology, 23(5), pp. 1770-1796. ISSN 1726-0531
Khalid, U (2022) Investigation into the development of a human reliability analysis framework for the safety management of construction projects. PhD thesis, Nottingham Trent University, UK.
Khawaja, E U R and Mustapha, A (2021) Mitigating disputes and managing legal issues in the era of building information modelling. Journal of Construction in Developing Countries, 26(1), pp. 111-130. ISSN 1823-6499
Kiamos, K (2006) Comparing the major project management bodies of knowledge with Greek practice in the construction industry. PhD thesis, University College London, UK.
Kim, K; Tiedmann, H R and Faust, K M (2025) Construction industry changes induced by the COVID-19 pandemic. Engineering, Construction and Architectural Management, 32(7), pp. 4413-4438. ISSN 0969-9988
Kim, K P and Park, K S (2016) Exploratory research on bim integration in housing refurbishment in the UK. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Kim, K P and Park, K S (2016) Primary BIM dataset for refurbishing flood risk vulnerable housing in the UK. Built Environment Project and Asset Management, 6(4), pp. 365-378. ISSN 2044-124X
Kim, S; Ghimire, P; Jeong, H D and Barutha, P (2024) Comparative analysis of project risks across construction sectors. Journal of Construction Engineering and Management, 150(6): 04024038, ISSN 0733-9364
Kirby, M; Rotimi, F E and Naismith, N (2025) Factors for improving productivity in the New Zealand residential construction sector. Journal of Engineering, Design and Technology, 23(5), pp. 1712-1728. ISSN 1726-0531
Kissi, E; Adjei-Kumi, T; Badu, E and Boateng, E B (2017) Factors affecting tender price in the Ghanaian construction industry. Journal of Financial Management of Property and Construction, 22(3), pp. 252-268. ISSN 1366-4387
Kissi, E; Agyekum, K; Musah, L; Owusu-Manu, D G and Debrah, C (2020) Linking supply chain disruptions with organisational performance of construction firms: The moderating role of innovation. Journal of Financial Management of Property and Construction, 26(1), pp. 158-180. ISSN 1366-4387
Kissi, E; Aigbavboa, C; Eluerkeh, K; Karikari, V A and Danquah, E S (2025) Establishing the nexus between green human resource management and construction project environmental performance. International Journal of Construction Education and Research, 21(2), pp. 230-255. ISSN 1557-8771
Kissi, E; Boateng, E B; Adjei-Kumi, T and Badu, E (2017) Principal component analysis of challenges facing the implementation of value engineering in public projects in developing countries. International Journal of Construction Management, 17(2), pp. 142-150. ISSN 1562-3599
Kissi, J (2012) Improving innovation and project performance in construction professional services firms: the leadership role of middle managers. PhD thesis, Loughborough University, UK.
Kissi, J; Dainty, A and Liu, A (2012) Examining middle managers' influence on innovation in construction professional services firms: A tale of three innovations. Construction Innovation, 12(1), pp. 11-28. ISSN 1471-4175
Kivrak, S; Ross, A; Arslan, G and Tuncan, M (2010) Construction professionals' perspectives on cross-cultural training for international construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Koc, K; Durdyev, S; Tleuken, A; Ekmekcioglu, O; Mbachu, J and Karaca, F (2024) Critical success factors for construction industry transition to circular economy: Developing countries' perspectives. Engineering, Construction and Architectural Management, 31(12), pp. 4955-4974. ISSN 0969-9988
Kog, Y C and Loh, P K (2012) Critical success factors for different components of construction projects. Journal of Construction Engineering and Management, 138(4), pp. 520-528. ISSN 0733-9364
Kokkarinen, N I A (2012) Development of a measurement tool to assess sustainability in the built environment curriculum using psychological constructs. PhD thesis, Liverpool John Moores University, UK.
Kramer, S W and Dillard, C (2009) Why do american construction professionals choose to work abroad on U.S. Embassy projects? International Journal of Construction Education and Research, 5(2), pp. 95-107. ISSN 1557-8771
Kramer, S W and Sommer, J (2013) An initial look at motivations & personality traits of American construction professionals working for international firms. International Journal of Construction Education and Research, 9(1), pp. 39-60. ISSN 1557-8771
Kumar, S and Bansal, V K (2021) GIS-based locational evaluation of infrastructure facilities in hilly regions: A case study of an institute campus. International Journal of Construction Management, 21(11), pp. 1165-1184. ISSN 1562-3599
Kumi, L; Jeong, J; Jeong, J and Mun, H (2025) Development of multimodal recommender system for advancing design for safety with expert validation. Journal of Construction Engineering and Management, 151(9): 04025114, ISSN 0733-9364
Kunkcu, H; Koc, K and Gurgun, A P (2026) Unveiling communication quality in the construction industry: A multilevel evaluation of project, group, and individual outcomes. Journal of Construction Engineering and Management, 152(2): 04025259, ISSN 0733-9364
Kunkcu, H.; Koc, K. and Gurgun, A. P. (2026) Technology-enhanced communication and contract management in construction projects. International Journal of Construction Education and Research, 22(2), pp. 254-283. ISSN 1557-8771
Kunkcu, H; Koc, K and Gurgun, A P (2025) Work-family conflict and high-quality relationships in construction project management: The effect of job and life satisfaction. Engineering, Construction and Architectural Management, 32(6), pp. 3937-3962. ISSN 0969-9988
Kuoribo, E; Owusu-Manu, D G; Yomoah, R; Debrah, C; Acheampong, A and Edwards, D J (2023) Ethical and unethical behaviour of built environment professionals in the Ghanaian construction industry. Journal of Engineering, Design and Technology, 21(3), pp. 840-861. ISSN 1726-0531
Kuoribo, E; Yomoah, R; Owusu-Manu, D G; Acheampong, A; John Edwards, D and Debrah, C (2023) Assessing the interactive effects of the ethics of construction professionals on project performance in the Ghanaian construction industry. Engineering, Construction and Architectural Management, 30(10), pp. 5233-5252. ISSN 0969-9988
Kurokawa, M; Schweber, L and Hughes, W P (2015) Tracing client interests in the course of the project: Why are some client interests incorporated whereas others are not? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Kwofie, T E; Aigbavboa, C O and Mpambela, J S (2018) Improving continuing professional development compliance among construction professionals through integrated strategies in South Africa. Journal of Engineering, Design and Technology, 16(4), pp. 637-653. ISSN 1726-0531
Kwofie, T E; Botchway, E A and Amos-Abanyie, S (2018) Examining the performance level of project management competencies of architects in Ghana using gap analysis approach. Journal of Construction in Developing Countries, 23(1), pp. 125-147. ISSN 1823-6499
Kyalisiima, C; Tutesigensi, A and Kayondo, M (2022) Is the competence of internal stakeholders in construction projects an antidote to construction contract disputes? In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Laguarda Mallo, M F (2017) Critical factors in the willingness to adopt innovative woodbased building materials in the construction industry: The case of CLT. PhD thesis, University of Minnesota, USA.
Lam, K-C (2003) Co-ordination of building services and procurement methods for highly serviced buildings. PhD thesis, Loughborough University, UK.
Lam, T Y M (2022) Driving sustainable construction development through post-contract key performance indicators and drivers. Smart and Sustainable Built Environment, 11(3), pp. 483-499. ISSN 2046-6099
Lan, R; Adenuga, O and Awolusi, I (2025) Impact of construction project failure on key project stakeholders: Assessing the perspectives of professionals in Lagos metropolis. Construction Economics and Building, 25(3-4), pp. 90-120. ISSN 2204-9029
Lan, R; Adenuga, O and Awolusi, I (2026) Professionals' perspectives on the factors causing construction project failures in developing countries: A case study of Lagos metropolis. International Journal of Construction Management, 26(3), pp. 511-535. ISSN 1562-3599
Latorre, V and Riley, M (2010) Utilizing analytical hierarchy process to prioritize critical success factors in construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Lau, C H; Mesthrige, J W; Lam, P T I and Javed, A A (2019) The challenges of adopting new engineering contract: A Hong Kong study. Engineering, Construction and Architectural Management, 26(10), pp. 2389-2409. ISSN 0969-9988
Laurell-Stenlund, K (2010) Value creation in development and construction of public buildings: The case of houses of culture. PhD thesis, Luleå University of Technology, Sweden.
Laurell-Stenlund, K and Eriksson, P E (2010) Design factors' influence on value creation when building houses of culture. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Lavin G, S J P (2019) Implementing a compressed working week in the Irish construction industry: Perceived impact on health and well-being of employees. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Lawani, A and Moore, D R (2021) Propositions for utilising emotional intelligence in construction organisations. International Journal of Construction Management, 21(2), pp. 153-166. ISSN 1562-3599
Lee, J. S. (2026) Visualising the impact of change orders on productivity in construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 134-142. ISSN 1751-4304
Lee, A and Sexton, M G (2007) ND modelling: Industry uptake considerations. Construction Innovation, 7(3), pp. 288-302. ISSN 1471-4175
Lello, D; Huang, Y; Emuze, F and Alananga, S (2024) Professional knowledge infusion and service performance within outbound consultant-supplier interfaces in Tanzania's construction industry: Can networking and stakeholder support play cards? International Journal of Construction Management, 24(15), pp. 1643-1654. ISSN 1562-3599
Leo-olagbaye, F and Odeyinka, H A (2018) Evaluation of risk factors and their impact on road projects. Journal of Construction Business and Management, 2(2), pp. 24-35. ISSN 2521-0165
Leung, M Y; Ahmed, K and Famakin, I O (2024) Impact of mindfulness-based stress reduction intervention on the performance of construction professionals. Engineering, Construction and Architectural Management, 31(2), pp. 662-680. ISSN 0969-9988
Leung, M Y; Bowen, P; Liang, Q and Famakin, I (2015) Development of a job-stress model for construction professionals in south Africa and Hong Kong. Journal of Construction Engineering and Management, 141(2): 04014077, ISSN 0733-9364
Leung, M Y and Chan, H (2007) Antecedents of commitment in construction management. Construction Management and Economics, 25(2), pp. 113-127. ISSN 1466433X
Leung, M Y and Chan, I Y S (2012) Exploring stressors of Hong Kong expatriate construction professionals in mainland China: Focus group study. Journal of Construction Engineering and Management, 138(1), pp. 78-88. ISSN 0733-9364
Leung, M Y; Chan, Y S and Chong, A M L (2010) Chinese values and stressors of construction professionals in Hong Kong. Journal of Construction Engineering and Management, 136(12), pp. 1289-1298. ISSN 0733-9364
Leung, M Y; Chan, Y S I and Dongyu, C (2011) Structural linear relationships between job stress, burnout, physiological stress, and performance of construction project managers. Engineering, Construction and Architectural Management, 18(3), pp. 312-328. ISSN 0969-9988
Leung, M Y; Chen, D and Yu, J (2008) Demystifying moderate variables of the interrelationships among affective commitment, job performance, and job satisfaction of construction professionals. Journal of Construction Engineering and Management, 134(12), pp. 963-971. ISSN 0733-9364
Leung, M Y; Liang, Q and Chan, I Y S (2017) Development of a stressors-stress-performance-outcome model for expatriate construction professionals. Journal of Construction Engineering and Management, 143(5): 04016121, ISSN 0733-9364
Leung, M Y; Wei, X and Ojo, L D (2024) Developing a value-risk management model for construction projects. Journal of Construction Engineering and Management, 150(1): 04023148, ISSN 0733-9364
Leung, M Y; Wei, X and Wang, C (2023) Demystifying critical success factors for applying value management in construction projects along the belt and road regions: Focus group study. Journal of Construction Engineering and Management, 149(8): 04023066, ISSN 0733-9364
Leung, M Y; Yu, J and Chan, Y S (2014) Focus group study to explore critical factors of public engagement process for mega development projects. Journal of Construction Engineering and Management, 140(3): 4013061, ISSN 0733-9364
Lewis, J A; Odeyinka, H and Eadie, R (2011) Innovative construction procurement selection through an artificial intelligence approach. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Li, K and Cheung, S O (2019) Unveiling cognitive biases in construction project dispute resolution through the lenses of third-party neutrals. Journal of Construction Engineering and Management, 145(11): 04019070, ISSN 0733-9364
Liang, E.; Li, H. and Xinxu, S. (2026) How digital government influences firms' ESG performance in Chinese construction industry? A cross-boundary collaboration perspective. Engineering, Construction and Architectural Management, pp. 1-30. ISSN 0969-9988
Liang, Q and Leung, M Y (2015) Analysis of the relationships between mindfulness and stress for construction professionals. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Liao, L and Wu, Z (2024) Untangling the relationship between work pressure and emotions in social media: A quantitative empirical study of construction industry. Engineering, Construction and Architectural Management, 31(2), pp. 767-788. ISSN 0969-9988
Liao, M C; Hsieh, T Y and Wang, W H (2024) Management of gross negligence manslaughter liability construction for professionals and lessons learned. Engineering, Construction and Architectural Management, 31(12), pp. 4942-4954. ISSN 0969-9988
Liberatore, M J; Pollack-Johnson, B and Smith, C A (2001) Project management in construction: Software use and research directions. Journal of Construction Engineering and Management, 127(2), pp. 101-107. ISSN 0733-9364
Lim, T H B (2009) Organizational flexibility management in construction. PhD thesis, National University of Singapore, Singapore.
Lindhard, S M (2024) Danish contractor's application of the budget: Identifying purpose and comparing the budgets application level across job-position. Construction Economics and Building, 24(4-5), pp. 1-17. ISSN 2204-9029
Lindhard, S M; Neve, H; Terje Kalsaas, B; Møller, D E and Wandahl, S (2022) Ranking and comparing key factors causing time-overruns in on-site construction. International Journal of Construction Management, 22(14), pp. 2724-2730. ISSN 1562-3599
Ling, F Y Y and Lee, S Y (2012) Careers development in construction firms: Application of Sun Tzu's Art of War principles. Engineering, Construction and Architectural Management, 19(2), pp. 173-191. ISSN 0969-9988
Lingard, H and Francis, V (2005) Does work-family conflict mediate the relationship between job schedule demands and burnout in male construction professionals and managers? Construction Management and Economics, 23(7), pp. 733-745. ISSN 01446193
Lingard, H and Francis, V (2006) Does a supportive work environment moderate the relationship between work-family conflict and burnout among construction professionals? Construction Management and Economics, 24(2), pp. 185-196. ISSN 01446193
Lingard, H and Francis, V (2007) "Negative interference" between Australian construction professionals' work and family roles: Evidence of an asymmetrical relationship. Engineering, Construction and Architectural Management, 14(1), pp. 79-93. ISSN 0969-9988
Lingard, H; Zhang, R P; Blismas, N; Wakefield, R and Kleiner, B (2015) Are we on the same page? Exploring construction professionals' mental models of occupational health and safety. Construction Management and Economics, 33(1), pp. 73-84. ISSN 01446193
Lingard, H C; Yip, B; Rowlinson, S and Kvan, T (2007) The experience of burnout among future construction professionals: A cross-national study. Construction Management and Economics, 25(4), pp. 345-357. ISSN 1466433X
Liu, G W (2003) A framework for implementing value management in China's construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Liu, Y (2009) Critical factors for managing project communication among participants at the construction stage. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Liu, Z; Lu, Y; Nath, T; Wang, Q; Tiong, R L K and Peh, L L C (2022) Critical success factors for BIM adoption during construction phase: A Singapore case study. Engineering, Construction and Architectural Management, 29(9), pp. 3267-3287. ISSN 0969-9988
Love, P; Edwards, D and Wood, E (2011) Loosening the Gordian knot: The role of emotional intelligence in construction. Engineering, Construction and Architectural Management, 18(1), pp. 50-65. ISSN 0969-9988
Love, P E D; Edwards, D J and Irani, Z (2010) Work stress, support, and mental health in construction. Journal of Construction Engineering and Management, 136(6), pp. 650-658. ISSN 0733-9364
Lu, W; Ye, K; Flanagan, R and Jewell, C (2014) Nexus between contracting and construction professional service businesses: Empirical evidence from international market. Journal of Construction Engineering and Management, 140(2): 04013049, ISSN 0733-9364
Lukhele, T M (2023) A systematic risk management model for construction project management: a case study of the new infrastructure project in the University of Mpumalanga. PhD thesis, Nelson Mandela University, South Africa.
Lukhele, T M; Botha, B and Mbanga, S (2023) Exploring the nexus between professional ethics and occupational health and safety in construction projects: A case study approach. International Journal of Construction Management, 23(12), pp. 2048-2057. ISSN 1562-3599
Lulyalya, L P; Kikwasi, G J and Sospeter, N G (2026) Adequacy of contractor's financial capability weighing criteria in Tanzania construction projects: A quadratic and gap analysis. Journal of Engineering, Design and Technology, 24(1), pp. 24-44. ISSN 1726-0531
Ma, Q; Li, S and Cheung, S O (2022) Unveiling embedded risks in integrated project delivery. Journal of Construction Engineering and Management, 148(1): 04021180, ISSN 0733-9364
Magill, L J; Jafarifar, N; Watson, A and Omotayo, T (2022) 4D BIM integrated construction supply chain logistics to optimise on-site production. International Journal of Construction Management, 22(12), pp. 2325-2334. ISSN 1562-3599
Mahapatra, K; Gustavsson, L and Hemstrm, K (2012) Multi-storey wood-frame buildings in Germany, Sweden and the UK. Construction Innovation, 12(1), pp. 62-85. ISSN 1471-4175
Maiti, S and Choi, J H (2021) Investigation and implementation of conflict management strategies to minimize conflicts in the construction industry. International Journal of Construction Management, 21(4), pp. 337-352. ISSN 1562-3599
Mak, S and Wong, L (1997) Estimating using risk analysis for construction. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Mak, S W K (1992) Risk management in construction: A study of subjective judgments. PhD thesis, London, External, UK.
Manamperi, S; Munmulla, T; Navaratnam, S and Zhang, G (2026) Impact of economic inflation on the mental health of construction professionals: A quantitative study. Journal of Construction Engineering and Management, 152(1): 04025228, ISSN 0733-9364
Manege, S L and Kennedy, C J (2022) Investigating whole life costing awareness in Tanzania building construction industry. International Journal of Construction Management, 22(15), pp. 2914-2921. ISSN 1562-3599
Mangas Jr., David L (2025) Building a knowledge bridge: School counselors collaborating with construction professionals on career development. EdD thesis, Youngstown State University, USA.
Mangvwat, J. S.; Spillane, J. P. and Bradley, J. G. (2026) Integrating social value into public procurement: A strategic framework for sustainable construction in Nigerian tertiary institutions. International Journal of Building Pathology and Adaptation, 44(5), pp. 1145-1166. ISSN 2398-4708
Mangvwat, J S and Spillane, J P (2021) Social sustainability in procurement of construction projects: A literature review from a Nigerian perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Manivannan, J; Loganathan, S; Kamalanabhan T J and Kalidindi, S N (2022) Investigating the relationship between occupational stress and work-life balance among Indian construction professionals. Construction Economics and Building, 22(2), pp. 27-51. ISSN 2204-9029
Mannarino, J A (2001) Evaluation of the construction management delivery system and establishing a model for selection: A qualitative approach. PhD thesis, State University of New York at Buffalo, USA.
Mansour, H; Aminudin, E and Mansour, T (2023) Implementing industry 4.0 in the construction industry- strategic readiness perspective. International Journal of Construction Management, 23(9), pp. 1457-1470. ISSN 1562-3599
Mansour, H; Aminudin, E; Omar, B and Al-Sarayreh, A (2022) Development of an impact-on-performance index (ipi) for construction projects in Malaysia: A Delphi study. International Journal of Construction Management, 22(11), pp. 2003-2012. ISSN 1562-3599
Manu, P; Ankrah, N; Proverbs, D and Suresh, S (2014) The health and safety impact of construction project features. Engineering, Construction and Architectural Management, 21(1), pp. 65-93. ISSN 0969-9988
Manu, P A (2012) An investigation into the accident causal influence of construction project features. PhD thesis, University of Wolverhampton, UK.
Mariaca Clavel, Israel Simon (2025) Dynamic construction scheduling: Utilizing AI data automation in a BIM-integrated serious game framework. PhD thesis, University College London, UK.
Marsh, R (2016) LCA profiles for building components: Strategies for the early design process. Building Research & Information, 44(4), pp. 358-375. ISSN 0961-3218
Marsh, R (2017) Building lifespan: Effect on the environmental impact of building components in a Danish perspective. Architectural Engineering and Design Management, 13(2), pp. 80-100. ISSN 1745-2007
Matipa, W M; Kelliher, D and Keane, M (2009) A strategic view of ICT supported cost management for green buildings in the quantity surveying practice. Journal of Financial Management of Property and Construction, 14(1), pp. 79-89. ISSN 1366-4387
Mba, M F B and Agumba, J N (2018) Critical success factors influencing performance outcome of joint venture construction projects in South Africa: Comparison of first and second order models. Construction Economics and Building, 18(3), pp. 74-94. ISSN 2204-9029
McAleenan, P (2016) A novel approach to health and safety in construction: culture, ethics reasoning and leadership. PhD thesis, University of South Wales, UK.
McLean, J and Murray, M (2003) The construction of the new Scottish parliament in edinburgh: An opinion poll of the Scottish public and construction industry professionals. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Memon, F A (2023) Stakeholder engagement in managing scope change during the execution phase of UK construction projects. PhD thesis, University of Bedfordshire, UK.
Menoka, B (2014) Stakeholder engagement and sustainability-related project performance in construction. PhD thesis, Liverpool John Moores University, UK.
Mensah, I; Adjei-Kumi, T and Nani, G (2016) Duration determination for rural roads using the principal component analysis and artificial neural network. Engineering, Construction and Architectural Management, 23(5), pp. 638-656. ISSN 0969-9988
Mewomo, M C; Aigbavboa, C and Lesalane, P (2018) An examination of the key drivers of amendments to the standard forms of contract in the South African construction industry. Journal of Construction in Developing Countries, 23(1), pp. 115-124. ISSN 1823-6499
Michael Gbolagade, O; Inimbom Walter, I and Emuze, F (2021) Towards sustainability practices deployment in building construction projects in Nigeria. Smart and Sustainable Built Environment, 10(4), pp. 759-780. ISSN 2046-6099
Mireku, E K; Kissi, E; Abu, I M A; Acheampong, A and Armah, N K P (2025) Strategies for the development of mental toughness of construction professionals: The case of Ghana. Journal of Engineering, Design and Technology, 23(5), pp. 1447-1462. ISSN 1726-0531
Mireku, E. K.; Kissi, E.; Ikuabe, M.; Arkoh-Clayman, E. and Musah, L. (2026) Encumbrances of integrating sustainability concepts and practices in rural community buildings: Empirical evidence from Ghana. International Journal of Building Pathology and Adaptation, 44(5), pp. 1232-1245. ISSN 2398-4708
Mireku, E K; Kissi, E; Badu, E; Aigbavboa, C O; Kwofie, T and Eluerkeh, K (2025) Establishing the characteristics of mental toughness among construction professionals. Engineering, Construction and Architectural Management, 32(6), pp. 3700-3726. ISSN 0969-9988
Mishmish, M and El-Sayegh, S M (2018) Causes of claims in road construction projects in the UAE. International Journal of Construction Management, 18(1), pp. 26-33. ISSN 1562-3599
Missa, P and Ahmed, V (2010) Bme migrants' employment in construction: A multicultural perspective. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Mo, Y Y (2010) Measuring and enhancing the emotional intelligence of built environment students. PhD thesis, Loughborough University, UK.
Mogaji, I J; Mewomo, M C and Bondinuba, F K (2024) Assessment of barriers to the adoption of innovative building materials (IBM) for sustainable construction in the Nigerian construction industry. Engineering, Construction and Architectural Management, 32(13), pp. 1-26. ISSN 0969-9988
Mohamed, A H (2016) Lean construction as an innovative approach for minimising risks in mega-Construction projects in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.
Mohamed, I F; Edwards, D J; Mateo-Garcia, M; Costin, G and Thwala, W D D (2020) An investigation into the construction industry's view on fire prevention in high-rise buildings post Grenfell. International Journal of Building Pathology and Adaptation, 38(3), pp. 451-471. ISSN 23984708
Mohyin, N (2011) Managing commitment in small construction professional services firms. PhD thesis, Loughborough University, UK.
Mohyin, N A; Dainty, A R J and Carrillo, P M (2009) Managing knowledge workers commitment in small construction professional firms. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Mokhtar Azizi, Z; Cochrane, J; Thurairajah, N and Mokhtar Azizi, N S (2023) Remote working in construction: Assessing the affordance of digitisation. Built Environment Project and Asset Management, 13(1), pp. 5-19. ISSN 2044-124X
Molwus, J J (2014) Stakeholder management in construction projects: a life cycle based framework. PhD thesis, Heriot-Watt University, UK.
Moore, D (1996) Buildability assessment and the development of an automated design aid for managing the transfer of construction process knowledge. Engineering, Construction and Architectural Management, 3(1-2), pp. 29-46. ISSN 0969-9988
Moore, N (2013) A model based system for contextual on-site construction planning in augmented reality. PhD thesis, University of Wolverhampton, UK.
Moore, N J (2013) A contextual AR model based system on-site construction planning. PhD thesis, University of Wolverhampton, UK.
Moore, S I and Elmualim, A (2010) Culture and its impact on British construction professionals practicing in the United Arab Emirates. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Morgan Tuuli, M and Rowlinson, S (2010) What empowers individuals and teams in project settings? A critical incident analysis. Engineering, Construction and Architectural Management, 17(1), pp. 9-20. ISSN 0969-9988
Morris, J (1999) Improving construction design: the lean thinking paradigm. PhD thesis, Cranfield University, UK.
Mostofi, F; Tokdemir, O B; Toǧan, V and Arditi, D (2024) Predicting the cost of rework in high-rise buildings using graph convolutional networks. Journal of Construction Engineering and Management, 150(8): 04024085, ISSN 0733-9364
Motaleb, O H (2014) Development of a risk response model to handle delays of construction projects in the United Arab Emirates. PhD thesis, Robert Gordon University, UK.
Moyo, T; Omer, M; Chigara, B and Edwards, D J (2025) An innovative technical support system for sustainable construction indicators in Zimbabwe. Smart and Sustainable Built Environment, 14(6), pp. 1879-1907. ISSN 2046-6099
Moyo, T.; Raliile, M.; Edwards, D. J. and Chigara, B. (2026) Construct validation for technical sustainability as the fourth pillar for achieving sustainable construction: A case for Zimbabwe. Construction Innovation, 26(9), pp. 233-263. ISSN 1471-4175
Moyo, Cynthia; Moyo, Tirivavi and Mudombo, Mabel Vongai (2026) Integrating sustainable materials into construction: A review of Zimbabwe’s model building by-laws. Journal of Construction Business and Management, 8(S1), pp. 99-110. ISSN 2521-0165
Moyo, T and Chigara, B (2023) Barriers to lean construction implementation in Zimbabwe. Journal of Engineering, Design and Technology, 21(3), pp. 733-757. ISSN 1726-0531
Muneeswaran, G; Manoharan, P; Awoyera, P O and Adesina, A (2020) A statistical approach to assess the schedule delays and risks in Indian construction industry. International Journal of Construction Management, 20(5), pp. 450-461. ISSN 1562-3599
Murphy, M E; Perera, R S and Heaney, S G (2008) Building design innovation: Expansion of classification linkages through case study analysis. Journal of Engineering, Design and Technology, 6(2), pp. 99-111. ISSN 1726-0531
Murphy, R (2013) Strategic planning in construction professional service firms: A study of Irish QS practices. Construction Management and Economics, 31(2), pp. 151-166. ISSN 1466433X
Murray, M (2003) Building perceptions with metaphors: A study of the communication and decision making behaviour of construction professionals within projects. PhD thesis, University of Strathclyde, UK.
Musa, M M; Amirudin, R B; Sofield, T and Musa, M A (2015) Influence of external environmental factors on the success of public housing projects in developing countries. Construction Economics and Building, 15(4), pp. 30-44. ISSN 2204-9029
Musa, M M; Saleh, I M; Ibrahim, Y and Dandajeh, M A (2023) Assessment of awareness and barriers to the application of lean construction techniques in kano state, Nigeria. Journal of Construction Business and Management, 6(1), pp. 33-42. ISSN 2521-0165
Naji, K; Gunduz, M and Salat, F (2021) Assessment of preconstruction factors in sustainable project management performance. Engineering, Construction and Architectural Management, 28(10), pp. 3060-3077. ISSN 0969-9988
Naji, K K; Gunduz, M and Mansour, M M (2024) Development of an integrated hybrid risk assessment system for construction disputes during the preconstruction phase using the Delphi method. Journal of Construction Engineering and Management, 150(7): 04024068, ISSN 0733-9364
Nam, C H (1990) The process of product innovation in the building and heavy sectors of the U.S. construction industry. PhD thesis, Stanford University, USA.
Namian, M (2017) Factors affecting construction hazard recognition and safety risk perception. PhD thesis, North Carolina State University, USA.
Namian, M; Taherpour, F; Ghiasvand, E and Turkan, Y (2021) Insidious safety threat of fatigue: Investigating construction workers' risk of accident due to fatigue. Journal of Construction Engineering and Management, 147(12): 2180, ISSN 0733-9364
Nani, G; Mensah, I and Adjei-Kumi, T (2017) Duration estimation model for bridge construction projects in Ghana. Journal of Engineering, Design and Technology, 15(6), pp. 754-777.
Navarro, E (2009) A review of Maslow, Herzberg and Vroom in the construction industry over the last 25 years. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Navarro-Astor, E (2010) Job perception of Spanish qualified construction professionals. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Navarro-Astor, E (2011) Work-family balance issues among construction professionals in Spain. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Navon, R and Kolton, O (2006) Model for automated monitoring of fall hazards in building construction. Journal of Construction Engineering and Management, 132(7), pp. 733-740. ISSN 0733-9364
Ndekugri, I and Turner, A (1994) Building procurement by design and build approach. Journal of Construction Engineering and Management, 120(2), pp. 243-256. ISSN 0733-9364
Ndoni, D and Elhag, T M S (2012) Improving project performance of PPP/PFI project-based organisations. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Ng, C-W V (2007) Managing power, conflict and change: an analytical model for construction contract procurement. PhD thesis, University of Hong Kong, Hong Kong.
Ngowi, A B (1998) Is construction procurement a key to sustainable development? Building Research & Information, 26(6), pp. 340-350. ISSN 0961-3218
Nguyen, M V; Ha, K D and Nguyen, K V (2026) Linking corporate social responsibility and project performance: Role of collaboration and trust. International Journal of Construction Management, 26(6), pp. 960-973. ISSN 1562-3599
Nguyen, M. V.; Khanh, H. D.; Phan, C. T. and Thuc, L. D. (2026) Investigating the impacts of psychological safety climate on mental ill health in the Vietnamese construction industry. Engineering, Construction and Architectural Management, 33(4), pp. 3240-3263. ISSN 0969-9988
Nguyen, Duy Hung (2022) Evaluating risk factors in green building: The case of sustainable construction in Vietnam. PhD thesis, Università degli Studi di Padova, Italy.
Nguyen, H D; Do, Q N H and Macchion, L (2023) Influence of practitioners' characteristics on risk assessment in green building projects in emerging economies: A case of Vietnam. Engineering, Construction and Architectural Management, 30(2), pp. 833-852. ISSN 0969-9988
Nguyen, H D; Nguyen, T A; Doan, V V and Dang, C N (2025) Assessing critical barriers and success factors of PPP projects in emerging economies: A case of Vietnam. Journal of Engineering, Design and Technology, 23(3), pp. 792-811. ISSN 1726-0531
Nguyen, Hong Trang (2018) Formulating supportive instruments for green building development in Vietnam. PhD thesis, Queensland University of Technology, Australia.
Nguyen, L H (2019) Relationships between critical factors related to team behaviors and client satisfaction in construction project organizations. Journal of Construction Engineering and Management, 145(3): 04019002, ISSN 0733-9364
Nguyen, M V (2024) Barriers to corporate social responsibility performance in construction organizations. Engineering, Construction and Architectural Management, 31(4), pp. 1473-1496. ISSN 0969-9988
Nguyen T P, C N (2013) Revisiting the critical factors causing failure of construction projects in Vietnam. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Ning, X; Shan, M; Li, Z and Nie, Z (2025) Prediction of construction material prices based on the sliding window catboost model. Journal of Construction Engineering and Management, 151(12): 04025196, ISSN 0733-9364
Niroshana, N; Siriwardana, C and Jayasekara, R (2023) The impact of COVID-19 on the construction industry and lessons learned: A case of Sri Lanka. International Journal of Construction Management, 23(15), pp. 2521-2538. ISSN 1562-3599
Nkoba, N. and Amoah, C. (2026) Curbing corruption and unethical practices in construction projects. International Journal of Construction Management, 26(9), pp. 1799-1814. ISSN 1562-3599
Nkomo, M W (2020) Assessment of mentoring of construction workers in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.
Nnaji, C; Gambatese, J; Karakhan, A and Osei-Kyei, R (2020) Development and application of safety technology adoption decision-making tool. Journal of Construction Engineering and Management, 146(4): 04020028, ISSN 0733-9364
Nourbakhsh, M; Mohamad Zin, R; Irizarry, J; Zolfagharian, S and Gheisari, M (2012) Mobile application prototype for onsite information management in construction industry. Engineering, Construction and Architectural Management, 19(5), pp. 474-494. ISSN 0969-9988
Novieto, D T (2023) Safety climate and occupational safety behaviours: The mediating role of psychological ownership among construction professionals. Engineering, Construction and Architectural Management, 30(2), pp. 853-868. ISSN 0969-9988
Novieto, D T and Kportufe, G S (2022) Work-family conflict and project performance of construction professionals in a developing country: Testing the mediating–moderating effect of project management self-efficacy. Engineering, Construction and Architectural Management, 29(9), pp. 3331-3344. ISSN 0969-9988
O'Brien, M and Al-Soufi, A (1994) A survey of data communications in the UK construction industry. Construction Management and Economics, 12(5), pp. 457-465. ISSN 01446193
Obasa, A J; Akinradewo, O F and Olanipekun, A O (2024) Impact of technologies towards addressing stress-related problems among practicing quantity surveyors in Lagos, Nigeria. International Journal of Construction Management, 24(6), pp. 623-632. ISSN 1562-3599
Obunwo, C U C (2016) A framework for enhancing project quality and customer satisfaction in government road construction projects in Rivers State, Nigeria. PhD thesis, University of Wolverhampton, UK.
Ochieng, J A and Chileshe, N (2016) Engagement strategies and challenges for adoption of stakeholder management approaches (SMA) in South Australian construction industry: Preliminary observations. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Odewole, A O (2020) Development of a collaborative innovation management framework to assist in the utilisation of agricultural waste as building materials in Nigeria. PhD thesis, University of Salford, UK.
Odeyinka, H A; Lowe, J and Kaka, A P (2013) Artificial neural network cost flow risk assessment model. Construction Management and Economics, 31(5), pp. 423-439. ISSN 01446193
Odimabo, O (2016) Risk management system to guide building construction projects in developing countries: a case study of Nigeria. PhD thesis, University of Wolverhampton, UK.
Oduro, S; Pittri, H; Simons, B; Baah, B; Anteh, E D and Oduro, J A (2025) Awareness of net zero energy buildings among construction professionals in the Ghanaian construction industry. Built Environment Project and Asset Management, 15(5), pp. 988-1003. ISSN 2044-124X
Odusami, K T (2003) Criteria for measuring project performance by construction professionals in Nigerian construction industry. Journal of Financial Management of Property and Construction, 8(1), pp. 39-48. ISSN 1366-4387
Ofori-Boadu, A N; Owusu-Manu, D G; Edwards, D J and Asiseh, F (2021) A conceptual model of subcontractor development practices for LEED projects. Engineering, Construction and Architectural Management, 28(4), pp. 1196-1213. ISSN 0969-9988
Ogunbiyi, O; Goulding, J S and Oladapo, A (2014) An empirical study of the impact of lean construction techniques on sustainable construction in the UK. Construction Innovation, 14(1), pp. 88-107. ISSN 1471-4175
Ogunbiyi, O E (2014) Implementation of the lean approach in sustainable construction: a conceptual framework. PhD thesis, University of Central Lancashire, UK.
Ogunmakinde, O E; Egbelakin, T; Sher, W; Omotayo, T and Ogunnusi, M (2024) Establishing the limitations of sustainable construction in developing countries: A systematic literature review using prisma. Smart and Sustainable Built Environment, 13(3), pp. 609-624. ISSN 2046-6099
Ogwueleka, A C (2025) Supply chain integration in public sector construction projects: Adoption and barriers. Construction Economics and Building, 25(3-4), pp. 272-288. ISSN 2204-9029
Ohueri, C C; Bamgbade, J A; Chuin, A L S; Hing, M W N and Enegbuma, W I (2022) Best practices in building information modelling process implementation in green building design: Architects' insights. Journal of Construction in Developing Countries, 27(1), pp. 79-93. ISSN 1823-6499
Ohueri, C C; Enegbuma, W I and Habil, H (2020) MyCREST embedded framework for enhancing the adoption of green office building development in Sarawak. Built Environment Project and Asset Management, 10(2), pp. 215-230. ISSN 2044-124X
Ohueri, C C; Enegbuma, W I and Kenley, R (2018) Energy efficiency practices for Malaysian green office building occupants. Built Environment Project and Asset Management, 8(2), pp. 134-146. ISSN 2044-124X
Ohueri, C C; Enegbuma, W I; Wong, N H; Kuok, K K and Kenley, R (2018) Labour productivity motivation framework for Iskandar Malaysia. Built Environment Project and Asset Management, 8(3), pp. 293-304. ISSN 2044-124X
Ojo, L. D.; Chan, A. P. C.; Sing, M. C. P. and Kazeem, K. O. (2026) Impact of integrity-based approach to ethics management on project performance. Journal of Engineering, Design and Technology, ISSN 1726-0531
Ojo, L D and Ogunsemi, D R (2019) Critical drivers (CDs) of value management adoption in the Nigerian construction industry: A Delphi study. Journal of Engineering, Design and Technology, 17(1), pp. 250-264. ISSN 1726-0531
Ojo, L D; Ogunsemi, D R; Elyamany, A and Oke, A E (2025) Profound barriers to value management adoption on construction projects in a developing nation. Journal of Engineering, Design and Technology, 23(1), pp. 264-286. ISSN 1726-0531
Ojo, L D; Ogunsemi, D R and Ogunsina, O (2022) Conceptual framework of value management adoption in the Nigerian construction industry. Construction Innovation, 22(4), pp. 939-961. ISSN 1471-4175
Okakpu, A; GhaffarianHoseini, A; Tookey, J; Haar, J and Ghaffarianhoseini, A (2020) Exploring the environmental influence on BIM adoption for refurbishment project using structural equation modelling. Architectural Engineering and Design Management, 16(1), pp. 41-57. ISSN 1745-2007
Oke, A. E.; Adekunye, O. J.; Adeosun, F. E.; Aliu, J.; Akanni, P. O.; Aghimien, D. and Aigbavboa, C. O. (2026) Assessment of the challenges of integrating cyber-physical systems in Nigerian construction. Engineering, Construction and Architectural Management, 33(4), pp. 3146-3163. ISSN 0969-9988
Oke, A E; Aliu, J; Ehiosun, L U; Kineber, A F and Stephen, S S (2025) Adoption of distributed ledger technology for construction projects: A study of the challenges in a developing country. Journal of Engineering, Design and Technology, 23(5), pp. 1364-1383. ISSN 1726-0531
Oke, A. E.; Aliu, J.; Ukaha Onyeukwu, S.; Jamir Singh, P. S.; Azura Ramli, R. and Shaharudin Samsurijan, M. (2026) An empirical study on the implications of social media for sustainable construction and productivity in Lagos state, Nigeria. Construction Innovation, 26(3), pp. 720-744. ISSN 1471-4175
Oke, A. E.; Aliu, J. O.; Timothy Jesudaju, O.; Thomas Fagbe, A.; Aghimien, D. and Aigbavboa, C. O. (2025) Building a sustainable future: The role of digitalization in Nigerian heavy engineering projects. Engineering, Construction and Architectural Management, 33(5), pp. 3957-3974. ISSN 0969-9988
Oke, A; Omoraka, A and Olatunbode, A (2020) Appraisal of factors affecting bidding decisions in Nigeria. International Journal of Construction Management, 20(2), pp. 169-175. ISSN 1562-3599
Oke, A E and Aghimien, D O (2018) Drivers of value management in the Nigerian construction industry. Journal of Engineering, Design and Technology, 16(2), pp. 270-284. ISSN 1726-0531
Oke, A E; Aghimien, D O; Aigbavboa, C O and Akinradewo, O I (2020) Appraisal of the drivers of smart city development in South Africa. Construction Economics and Building, 20(2), pp. 109-126. ISSN 2204-9029
Oke, A E and Aliu, J (2025) Strategies for the implementation of environmental economic practices for sustainable construction in a developing economy. International Journal of Construction Management, 25(5), pp. 542-551. ISSN 1562-3599
Oke, A E; Aliu, J; Ehiosun, L U; Ebekozien, A and Rotimi, A A (2024) From hurdles to heights: Blueprint for tackling distributed ledger technology challenges in the construction sector of a developing economy. Journal of Financial Management of Property and Construction, 29(3), pp. 405-424. ISSN 1366-4387
Oke, A E; Aliu, J; Fadamiro, P; Akanni, P; Jamir Singh, P S and Shaharudin Samsurijan, M (2025) Unpacking the strategies to promote the implementation of automation techniques in the construction industry. Construction Innovation, 25(2), pp. 381-399. ISSN 1471-4175
Oke, A E; Aliu, J; Fadamiro, P; Jamir Singh, P S; Samsurijan, M S and Yahaya, M (2024) Robotics and automation for sustainable construction: Microscoping the barriers to implementation. Smart and Sustainable Built Environment, 13(3), pp. 625-643. ISSN 2046-6099
Oke, A E; Aliu, J; Fadamiro, P; Leo-Olagbaye, F; Jamir Singh, P S and Samsurijan, M S (2023) Evaluating the drivers for the implementation of automation techniques in the Nigerian construction sector. Built Environment Project and Asset Management, 13(6), pp. 913-928. ISSN 2044-124X
Oke, A E; Aliu, J; Ifedolapo Babalola, H; Jamir Singh, P S; Tunji-Olayeni, P and Ukaha Onyeukwu, S (2025) From building blocks to digital networks: Analyzing critical drivers for social media adoption in the construction sector. International Journal of Construction Management, 25(9), pp. 1047-1057. ISSN 1562-3599
Oke, A E; Aliu, J; Jamir Singh, P S; Onajite, S A; Shaharudin Samsurijan, M and Azura Ramli, R (2024) Appraisal of awareness and usage of digital technologies for sustainable wellbeing among construction workers in a developing economy. International Journal of Construction Management, 24(5), pp. 521-529. ISSN 1562-3599
Oke, A E; Aliu, J; Mwanaumo, E M; Odia, O A; Kahanji, C and Tengan, C (2024) From awareness to action: a study of the effectiveness of environmental economic practices for sustainable construction in Nigeria. Smart and Sustainable Built Environment, 13(5), pp. 1194-1212. ISSN 2046-6099
Oke, A E; Aliu, J; Mwanaumo, E M M; Abayomi, T and Kahanji, C (2023) Leveraging gamification to enhance productivity and employee engagement in the Nigerian construction industry. Built Environment Project and Asset Management, 13(6), pp. 813-829. ISSN 2044-124X
Oke, A E; Aliu, J; Onajite, S and Simeon, M (2024) Success factors of digital technologies (DT) tools adoption for sustainable construction in a developing economy. Construction Innovation, 24(4), pp. 950-964. ISSN 1471-4175
Oke, A E; Aliu, J and Onajite, S A (2024) Barriers to the adoption of digital technologies for sustainable construction in a developing economy. Architectural Engineering and Design Management, 20(3), pp. 431-447. ISSN 1745-2007
Oke, A E; Aliu, J; Oni, S B and Ilesanmi, O O (2025) The complexities of embracing mechatronics in the Nigerian construction industry. Construction Innovation, 25(4), pp. 1188-1209. ISSN 1471-4175
Oke, A E; Aliu, J; Tunji-Olayeni, P and Abayomi, T (2024) Application of gamification for sustainable construction: An evaluation of the challenges. Construction Innovation, 24(4), pp. 1066-1084. ISSN 1471-4175
Oke, A E and Arowoiya, V A (2021) Evaluation of internet of things (IoT) application areas for sustainable construction. Smart and Sustainable Built Environment, 10(3), pp. 387-402. ISSN 2046-6099
Oke, A E and Arowoiya, V A (2022) An analysis of the application areas of augmented reality technology in the construction industry. Smart and Sustainable Built Environment, 11(4), pp. 1081-1098. ISSN 2046-6099
Oke, A E; Akintola, O A; Oluwatobiloba, O M; Aliu, J and Omoyajowo, N I (2025) Study on the awareness and practice of circular economy principles among construction stakeholders in Nigeria. Construction Economics and Building, 25(2), pp. 24-42. ISSN 2204-9029
Oko, J A (2008) Ethical behaviour of Nigerian building industry professionals in the procurement of building projects. PhD thesis, University of Lagos, Nigeria.
Oladinrin, O T and Ojo, L D (2022) Characterisation of the drivers of environmental management system implementation. Engineering, Construction and Architectural Management, 29(10), pp. 3868-3892. ISSN 0969-9988
Oladiran, O J (2009) Innovative waste management through the use of waste management plans on construction projects in Nigeria. Architectural Engineering and Design Management, 5(3), pp. 165-176. ISSN 1745-2007
Oladiran, O J; Bayewun, A A and Aderogba, A M (2021) Awareness and usage of environmental waste management practices of contractors on construction sites. Journal of Construction Business and Management, 5(1), pp. 17-27. ISSN 2521-0165
Olaniran, O J (2015) The effects of cost-based contractor selection on construction project performance. Journal of Financial Management of Property and Construction, 20(3), pp. 235-251. ISSN 1366-4387
Olanrewaju, A A and Anavhe, P J (2014) Perceived claim sources in the Nigerian construction industry. Built Environment Project and Asset Management, 4(3), pp. 281-295. ISSN 2044-124X
Olanrewaju, O I; Bello, A O; Semiu, M A and Mudashiru, S A (2025) Critical barriers to effective communication in the construction industry: evidence from Nigeria. International Journal of Construction Management, 25(7), pp. 783-801. ISSN 1562-3599
Olanrewaju, O I; Chileshe, N; Adekunle, E O and Salihu, C (2024) Modelling the environmental, economic and social impacts of coronavirus pandemic on the construction industry. International Journal of Construction Management, 24(14), pp. 1485-1498. ISSN 1562-3599
Olanrewaju, O I; Chileshe, N; Babarinde, S A and Sandanayake, M (2020) Investigating the barriers to building information modeling (BIM) implementation within the Nigerian construction industry. Engineering, Construction and Architectural Management, 27(10), pp. 2931-2958. ISSN 0969-9988
Olasunkanmi, F. F. O. (2026) Structural equation modelling for the impacts of transactional leadership styles on project performance. Construction Economics and Building, 26(2), ISSN 2204-9029
Olatokun, E O (2017) Requirement elicitation using knowledge capturing techniques during the client briefing process for improved client satisfaction in the UK construction industry. PhD thesis, University of Salford, UK.
Olatokun, E O (2017) Requirement elicitation using knowledge capturing (kc) techniques during the client briefing process for improved client satisfaction in the UK construction industry. PhD thesis, University of Salford, UK.
Olatunde, N A; Awodele, I A and Ramabodu, M S (2026) Delivery strategies of private building projects amid hyper-inflationary trends in Southwest Nigeria. International Journal of Construction Management, 26(3), pp. 482-495. ISSN 1562-3599
Olatunji, O A (2008) A comparative analysis of tender sums and final costs of public construction and supply projects in Nigeria. Journal of Financial Management of Property and Construction, 13(1), pp. 60-79. ISSN 1366-4387
Olatunji, O A and Sher, W (2014) Perspectives on modelling BIM-enabled estimating practices. Construction Economics and Building, 14(4), pp. 32-53. ISSN 2204-9029
Olawumi, T O and Chan, D W M (2020) Key drivers for smart and sustainable practices in the built environment. Engineering, Construction and Architectural Management, 27(6), pp. 1257-1281. ISSN 0969-9988
Olivieri, H; Seppänen, O; Alves, T D C L; Scala, N M; Schiavone, V; Liu, M and Granja, A D (2019) Survey comparing critical path method, last planner system, and location-based techniques. Journal of Construction Engineering and Management, 145(12): 04019077, ISSN 0733-9364
Olivieri, Hylton (2016) Integrating production planning and controlling systems for construction projects. PhD thesis, Universidade Estadual de Campinas, Brazil.
Olugboyega, O.; Marvellous, O.; Ajayi, A. O. and Ogunniyi, O. O. (2026) Work process attachment forms and styles influencing organizational BIM transformation. Construction Economics and Building, 26(2), ISSN 2204-9029
Olugboyega, O and Aina, O O (2018) Examination of the levels of development of building information models in the Nigerian construction industry. Journal of Construction Business and Management, 2(2), pp. 1-14. ISSN 2521-0165
Olugboyega, O; Ilesanmi, K E; Oseghale, G E and Aigbavboa, C (2024) The link between construction apps’ acceptance and digital attributes of construction professionals: Perspectives from digital competence model. Construction Innovation, 24(4), pp. 912-932. ISSN 1471-4175
Omar, H (2020) Towards an automated photogrammetry-based approach for monitoring and controlling construction site activities. PhD thesis, University of the West of England, Bristol, UK.
Omar, H and Mahdjoubi, L (2023) Practical solutions for improving the suboptimal performance of construction projects using Dubai construction projects as an example. Engineering, Construction and Architectural Management, 30(6), pp. 2185-2205. ISSN 0969-9988
Omopariola, E D; Olanrewaju, O I; Albert, I; Oke, A E and Ibiyemi, S B (2024) Sustainable construction in the Nigerian construction industry: Unsustainable practices, barriers and strategies. Journal of Engineering, Design and Technology, 22(4), pp. 1158-1184. ISSN 1726-0531
Omopariola, E D; Windapo, A; Edwards, D J and Thwala, W D (2020) Contractors’ perceptions of the effects of cash flow on construction projects. Journal of Engineering, Design and Technology, 18(2), pp. 308-325. ISSN 1726-0531
Omoraka, A E (2022) A principal component analysis of supply chain management skills for the Nigerian construction industry. International Journal of Construction Management, 22(12), pp. 2413-2421. ISSN 1562-3599
Ong, Eric Mei Siang (2008) Trust, commitment, satisfaction and learning in construction project teams. PhD thesis, University of New South Wales, Australia.
Oni, O Z; Olanrewaju, A and Khor, S C (2024) Fuzzy synthetic evaluation of the factors affecting health and safety practices in Malaysia construction industry. Journal of Engineering, Design and Technology, 22(6), pp. 1773-1796. ISSN 1726-0531
Onukwube, H N (2008) Construction professionals motivation and job performance: A comparison of indigenous and expatriate construction contractors in Nigeria. PhD thesis, University of Lagos, Nigeria.
Onukwube, H N (2012) Leader influences on training effectiveness of construction professionals: The case of Nigeria. Journal of Construction in Developing Countries, 17(2), pp. 67-79. ISSN 1823-6499
Onukwube, H N and Iyagba, R (2011) Construction professionals job performance and characteristics: A comparison of indigenous and expatriate construction companies in Nigeria. Construction Economics and Building, 11(2), pp. 72-83. ISSN 2204-9029
Onwuegbuchulam, G; Cheung, C M; Yeow, J and Manu, P (2024) Exploring the interplay of job-related and personal factors in the well-being of construction project professionals: A conceptual framework. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Onyia, U (2019) Improving the supervisory and managerial skills and competences required in construction management in Nigeria. PhD thesis, London South Bank University, UK.
Onyia, U; Egbu, C; Suresh, S and Renukappa, S (2023) The critical success factors to remote development of construction management skills and competencies in Nigeria. Journal of Engineering, Design and Technology, 21(2), pp. 343-357. ISSN 1726-0531
Opawole, A; Babatunde, S O; Kajimo-Shakantu, K and Ateji, O A (2020) Analysis of barriers to the application of life cycle costing in building projects in developing countries: A case of Nigeria. Smart and Sustainable Built Environment, 9(4), pp. 503-521. ISSN 2046-6099
Opoku, A and Mills, S A (2019) Exploring the use of standardised design in addressing the shortage of primary school places in the UK. Journal of Engineering, Design and Technology, 17(2), pp. 383-401. ISSN 1726-0531
Opoku, A; Zhao, S; Lok, K L; Chen, C and Umar, T (2020) Promoting employee safety performance in the Chinese construction industry. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Osei-Tutu, S; Ayarkwa, J; Nani, G; Osei-Asibey, D and Abu, I M A (2025) Stakeholders' role towards circular economy implementation: A scientometric review. Construction Innovation, 25(6), pp. 1633-1656. ISSN 1471-4175
Osuizugbo, I. C.; Awuzie, B. O. and Olorunlogbon, O. O. (2026) Assessing the proficiency and application of artificial intelligence skills among construction professionals in a developing country: Evidence from Nigeria. Journal of Engineering, Design and Technology, ISSN 1726-0531
Osuizugbo, I. C.; Oyeyipo, O. O.; Ojelabi, R. A. and Oshodi, O. S. (2021) Factors inhibiting corporate social responsibility initiatives among construction companies. Construction Economics and Building, 21(1), pp. 83-99. ISSN 2204-9029
Osuizugbo, I C (2021) The need for and benefits of buildability analysis: Nigeria as a case study. Journal of Engineering, Design and Technology, 19(5), pp. 1207-1230. ISSN 1726-0531
Osuizugbo, I C (2025) Measures for improving the buildability of building designs in construction industry. Construction Innovation, 25(2), pp. 490-509. ISSN 1471-4175
Osuizugbo, I C; Onokwai, A O and Faleti, O O (2025) Principal factor analysis of project designers' roles in improving construction projects buildability in Nigeria. Journal of Engineering, Design and Technology, 23(1), pp. 88-107. ISSN 1726-0531
Osuizugbo, I C; Oshodi, O S; Kukoyi, P O; Yohanna, H S and Edike, U E (2025) Implementation of work-life balance strategies among construction companies in Lagos, Nigeria: Construction workers' perspectives. Journal of Engineering, Design and Technology, 23(3), pp. 998-1016. ISSN 1726-0531
Osunsanmi, T O; Aigbavboa, C O; Emmanuel Oke, A and Liphadzi, M (2020) Appraisal of stakeholders' willingness to adopt construction 4.0 technologies for construction projects. Built Environment Project and Asset Management, 10(4), pp. 547-565. ISSN 2044-124X
Otasowie, K and Oke, A (2022) An assessment of exhibited drivers of mentoring in construction professional firms: A case of Nigerian quantity surveying firms. Journal of Construction in Developing Countries, 27(2), pp. 63-86. ISSN 1823-6499
Othman, A and Abdellatif, M (2011) Partnership for integrating the corporate social responsibility of project stakeholders towards affordable housing development: A South African perspective. Journal of Engineering, Design and Technology, 9(3), pp. 273-295. ISSN 1726-0531
Othman, A A E (2004) Value and risk management for dynamic brief development in construction. PhD thesis, Loughborough University, UK.
Othman, A A E (2007) Generating sustainable values and achieving client satisfaction in construction projects through maintenance management: The case of housing projects in abu dhabi, united arab emirates. Architectural Engineering and Design Management, 3(3), pp. 145-159. ISSN 1745-2007
Othman, A A E (2013) Investigating the competency of property development graduates towards satisfying the requirements of the construction industry in South Africa: The case of the University of KwaZulu-Natal. International Journal of Construction Management, 13(4), pp. 75-102. ISSN 1562-3599
Othman, A A E and Abdelwahab, N M A (2018) Achieving sustainability through integrating risk management into the architectural design process. Journal of Engineering, Design and Technology, 16(1), pp. 25-43.
Oti, A H; Tah, J H M and Abanda, F H (2018) Integration of lessons learned knowledge in building information modeling. Journal of Construction Engineering and Management, 144(9): 04018081, ISSN 0733-9364
Owoha, F; Simpeh, E K; Fapohunda, J A; Ahadzie, D K and Mensah, H (2022) Categorising green building features in developing countries: The case of South Africa. Journal of Engineering, Design and Technology, 20(6), pp. 1627-1647. ISSN 1726-0531
Owusu-Manu, D G; Babon-Ayeng, P; Kissi, E; Edwards, D J; Okyere-Antwi, D and Elgohary, H (2023) Green construction and environmental performance: An assessment framework. Smart and Sustainable Built Environment, 12(3), pp. 565-583. ISSN 2046-6099
Owusu-Manu, D G; Debrah, C; Amissah, L; Edwards, D J and Chileshe, N (2021) Exploring the linkages between project managers' mindset behaviour and project leadership style in the Ghanaian construction industry. Engineering, Construction and Architectural Management, 28(9), pp. 2690-2711. ISSN 0969-9988
Oyemomi, B; Hare, B and Tong, M (2018) Exploring public-private partnership challenges and the effects on the construction workforce: A Scotland study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Oyenubi, A. and Oyeyipo, O. O. (2026) Overcoming GenAI adoption barriers in construction cost management: Evidence from Nigeria. Construction Innovation, pp. 1-26. ISSN 1471-4175
Oyewobi, L O; Oke, A E; Adeneye, T D and Jimoh, R A (2019) Influence of organizational commitment on work-life balance and organizational performance of female construction professionals. Engineering, Construction and Architectural Management, 26(10), pp. 2243-2263. ISSN 0969-9988
Oyewobi, L O; Oke, A E; Adeneye, T D; Jimoh, R A and Windapo, A O (2022) Impact of work–life policies on organizational commitment of construction professionals: Role of work–life balance. International Journal of Construction Management, 22(10), pp. 1795-1805. ISSN 1562-3599
Oyewole, E O and Dada, J O (2019) Training gaps in the adoption of building information modelling by Nigerian construction professionals. Built Environment Project and Asset Management, 9(3), pp. 399-411. ISSN 2044-124X
Ozcan-Deniz, G (2011) An integrated multi-agent framework for optimizing time, cost and environmental impact of construction processes. PhD thesis, Florida International University, USA.
Paing, K K; Dodanwala, T C and Santoso, D S (2025) Cultural intelligence and cooperation in the construction industry: The mediating role of trust. Journal of Engineering, Design and Technology, 23(6), pp. 1940-1957. ISSN 1726-0531
Palliyaguru, R; Amaratunga, D and Haigh, R (2010) Integration of "disaster risk reduction" into infrastructure reconstruction sector: Policy vs practise gaps. International Journal of Disaster Resilience in the Built Environment, 1(3), pp. 277-296. ISSN 1759-5916
Panas, A; Pantouvakis, J P and Edum-Fotwe, F T (2005) Potential for using process approach to manage construction projects in Greece. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Panojan, P; Perera, B A K S and Dilakshan, R (2022) Work-life balance of professional quantity surveyors engaged in the construction industry. International Journal of Construction Management, 22(5), pp. 751-768. ISSN 1562-3599
Panwar, A (2019) Development of a many-objective model based on NSGA-III for construction projects. PhD thesis, Indian Institute of Technology Delhi, India.
Panwar, A and Jha, K N (2021) Integrating quality and safety in construction scheduling time-cost trade-off model. Journal of Construction Engineering and Management, 147(2): 04020160, ISSN 0733-9364
Pararajasingam, R; Waidyasekara, A S and Victar, H C (2026) Exploring causes of ineffective material management and impact on successful project deliverables in civil engineering construction projects in Sri Lanka. Construction Innovation, 26(1), pp. 22-43. ISSN 1471-4175
Parra, H A; Zuñiga-Collazos, A and Cruz-Caicedo, L F (2023) Impact of external risks on international construction projects success: Evidence from commonwealth caribbean islands. Journal of Construction in Developing Countries, 28(1), pp. 113-132. ISSN 1823-6499
Parvaneh, F and El-Sayegh, S M (2016) Project selection using the combined approach of AHP and LP. Journal of Financial Management of Property and Construction, 21(1), pp. 39-53. ISSN 1366-4387
Patil, S V; Balakrishna Rao, K and Nayak, G (2023) Prediction of recycled coarse aggregate concrete mechanical properties using multiple linear regression and artificial neural network. Journal of Engineering, Design and Technology, 21(6), pp. 1690-1709. ISSN 1726-0531
Patlakas, P (2022) Techniques for the utilisation and management of post occupancy evaluation data by non-experts. PhD thesis, Birmingham City University, UK.
Perera, S; Hayles, C S and Kerlin, S (2011) An analysis of value management in practice: The case of Northern Ireland's construction industry. Journal of Financial Management of Property and Construction, 16(2), pp. 94-110. ISSN 1366-4387
Pesantes-Tavares, E R (2011) Construction worker health: A web-based approach to selecting alternatives to hazardous procedures. PhD thesis, University of Florida, USA.
Pesek, A E (2017) Impact of construction document deficiencies on heavy/civil low-bid infrastructure projects and the introduction of a contractor document review assessment. PhD thesis, Arizona State University, USA.
Phua, F T T (2012) Do national cultural differences affect the nature and characteristics of HRM practices? Evidence from Australian and Hong Kong construction firms on remuneration and job autonomy. Construction Management and Economics, 30(7), pp. 545-556. ISSN 1466433X
Phung, Q; Erdogan, B and Nielsen, Y (2023) Project management for sustainable buildings: A comprehensive insight into the relationship to project success. Engineering, Construction and Architectural Management, 30(7), pp. 2862-2878. ISSN 0969-9988
Pittri, H; Agyekum, K; Kukah, A S; Asamoah, E; Gasue, R and Botchway, B (2026) Adoption strategies for health and safety technologies in the construction industry. Construction Economics and Building, 26(1), ISSN 2204-9029
Pittri, H; Oduro, S; Atibila, D W; Kwasafo, O K; Abdallah, A and Anteh, E D (2025) Examining the critical barriers to nzebs' implementation in the Ghanaian construction industry. Journal of Engineering, Design and Technology, 23(6), pp. 1898-1918. ISSN 1726-0531
Polat, F and Demirkesen, S (2025) Measuring the impact of lean implementation on BIM and project success: Case of construction firms. Engineering, Construction and Architectural Management, 32(9), pp. 5839-5862. ISSN 0969-9988
Polmear, M and Simmons, D R (2022) Industry perspective on the role of visualization technology in construction safety training. International Journal of Construction Education and Research, 18(4), pp. 352-373. ISSN 1557-8771
Poon, S-W (2002) Analysing and predicting falsework failure in Hong Kong. PhD thesis, Loughborough University, UK.
Porter, D and Glick, S (2022) Spatial visualization in construction management education: A review and validation of the literature using professionals and related practitioners. International Journal of Construction Education and Research, 18(1), pp. 17-31. ISSN 1557-8771
Porter, D S (2018) Spatial abilities of construction and related professionals. PhD thesis, Colorado State University, USA.
Porwal, A; Parsamehr, M; Szostopal, D; Ruparathna, R and Hewage, K (2023) The integration of building information modeling (BIM) and system dynamic modeling to minimize construction waste generation from change orders. International Journal of Construction Management, 23(1), pp. 156-166. ISSN 1562-3599
Pouraghajan, M; Omrani, S and Drogemuller, R (2025) Enhancing decision-making in Australian concrete construction: A decision support model using an entropy-TOPSIS approach. Engineering, Construction and Architectural Management, 32(9), pp. 5913-5942. ISSN 0969-9988
Powell, A; Dainty, A R J; Bagilhole, B M and Neale, R H (2005) Coping in construction: Female students' perspectives. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Powell, A; Galea, N; Salignac, F; Loosemore, M and Chappell, L (2018) Masculinity and workplace wellbeing in the Australian construction industry. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Powell, R and Copping, A (2010) Construction worker sleep deprivation and its effects on personal safety. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Pryke, S; Lunic, D and Badi, S (2015) The effect of leader emotional intelligence on leader–follower chemistry: A study of construction project managers. Construction Management and Economics, 33(8), pp. 603-624. ISSN 01446193
Qin, B (2016) Discourses of competitiveness in the Chinese construction sector. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Qu, T (2006) The usability of graphical user interfaces of mobile computing devices designed for construction foremen: Icons and pre-defined text lists compared. PhD thesis, University of Florida, USA.
Quigley, D; Heaney, G and Odeyinka, H (2012) Factors of sustainability in building design: Establishing their relative significance. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Rahmani, F (2021) Challenges and opportunities in adopting early contractor involvement (ECI): Client's perception. Architectural Engineering and Design Management, 17(1-2), pp. 67-76. ISSN 1745-2007
Rajeh, M; Tookey, J E; Olabode, J and Rotimi, B (2015) Estimating transaction costs in the New Zealand construction procurement a structural equation modelling methodology. Engineering, Construction and Architectural Management, 22(2), pp. 242-267. ISSN 0969-9988
Rajeh, M A; Tookey, J E and Rotimi, J O B (2015) Developing a procurement path determination chart SEM-based approach. Construction Management and Economics, 33(11-12), pp. 921-941. ISSN 01446193
Rajput, B; Kore, S and Agarwal, A (2024) Competencies of civil engineering graduates: Indian construction professionals' perspective. International Journal of Construction Management, 24(11), pp. 1240-1248. ISSN 1562-3599
Raliile, M.; Haupt, T. C. and Kajimo-Shakantu, K. (2026) The mediating and moderating role of coping on occupational stress and psychological well-being among the construction workforce in South Africa: The psychological stress theory approach. Journal of Engineering, Design and Technology, 24(2), pp. 427-447. ISSN 1726-0531
Raphael, A O; Samuel, O S and Dipeolu, A A (2022) Evaluation of service quality gaps in construction professional service firms in Nigeria. Journal of Construction in Developing Countries, 27(1), pp. 25-40. ISSN 1823-6499
Rasdorf, W; Grasso, B and Bridgers, M (2010) Public versus private perceptions on hiring an external program manager. Journal of Construction Engineering and Management, 136(2), pp. 219-226. ISSN 0733-9364
Rasheed, U; Ordaz, C; Xu, X; Hu, Y; Li, S; Sutton, T and Cai, J (2025) Understanding the impact of teleoperation technology on the construction industry: Adoption dynamics, workforce perception, and the role of broader workforce participation. Journal of Construction Engineering and Management, 151(7): 04025085, ISSN 0733-9364
Rashidi, A; Yong, W Y; Maxwell, D and Fang, Y (2023) Construction planning through 4D BIM-based virtual reality for light steel framing building projects. Smart and Sustainable Built Environment, 12(5), pp. 1153-1173. ISSN 2046-6099
Rastogi, A and Singla, H K (2024) Exploration of exhaustion in early-career construction professionals in India. Engineering, Construction and Architectural Management, 31(10), pp. 3853-3875. ISSN 0969-9988
Rawlins, J and Marasini, R (2011) Are the construction graduates on ciob accredited degree courses meeting the skills required by the industry? In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Razak, N A (2024) Development of safety leading and lagging indicators framework for contractor selection in construction projects. PhD thesis, University of Manchester, UK.
Redmond, A and West, R (2012) The use of cloud enabled building information models: an expert analysis. Construction Economics and Building, 12(4), pp. 53-67. ISSN 2204-9029
Renuka, S M and Umarani, C (2019) Effect of critical risk factors causing cost deviation in medium sized construction projects. Journal of Construction in Developing Countries, 23(2), pp. 63-85. ISSN 1823-6499
Reyes Veras, P; Renukappa, S and Suresh, S (2022) Awareness of big data concept in the Dominican Republic construction industry: An empirical study. Construction Innovation, 22(3), pp. 465-486. ISSN 1471-4175
Reynoso Vanderhorst, H D; Heesom, D; Suresh, S; Renukappa, S and Burnham, K (2023) Barriers and cost model of implementing unmanned aerial system (uas) services in a decentralised system: Case of the Dominican Republic. Construction Innovation, 23(4), pp. 833-857. ISSN 1471-4175
Rooke, J and Clark, L (2005) Learning, knowledge and authority on site: A case study of safety practice. Building Research & Information, 33(6), pp. 561-570. ISSN 0961-3218
Rotimi, E O O; Rotimi, F E; Silva, C W C and Aigwi, I E (2024) BIM knowledge transfer in construction industry: A partial least square analysis. Journal of Engineering, Design and Technology, 22(4), pp. 1393-1411. ISSN 1726-0531
Rowlinson, S and Croker, N (2006) IT sophistication, performance and progress towards formal electronic communication in the Hong Kong construction industry. Engineering, Construction and Architectural Management, 13(2), pp. 154-170. ISSN 0969-9988
Sacks, R; Whyte, J; Swissa, D; Raviv, G; Zhou, W and Shapira, A (2015) Safety by design: Dialogues between designers and builders using virtual reality. Construction Management and Economics, 33(1), pp. 55-72. ISSN 01446193
Sadeh, H; Zhang, R; Gaedicke, C; Shahbodaghlou, F; Lee, M J and Todorov, D (2026) Embracing generative AI in construction through a quantitative analysis and weighted score ranking of perceptions, applications, and complexities. Journal of Construction Engineering and Management, 152(5): 04026041, ISSN 0733-9364
Saidu, I; Shakantu, W; Adamu, A and Anugwo, I (2017) A bespoke approach for relating material waste to cost overrun in the construction indsutry. Journal of Construction Business and Management, 1(1), pp. 39-52. ISSN 2521-0165
Salari, M; Ghanbari, M; Skitmore, M and Alipour, M (2026) Developing a framework for selecting alternative materials for construction projects using BIM and the particle swarm optimization algorithm. Construction Innovation, 26(3), pp. 745-767. ISSN 1471-4175
Salary, S and Reyes, M (2025) Identifying the impact of preconstruction elements on project budget. Journal of Construction Engineering and Management, 151(6): 04025058, ISSN 0733-9364
Sami Ur Rehman, M; Shafiq, M T and Afzal, M (2022) Impact of COVID-19 on project performance in the UAE construction industry. Journal of Engineering, Design and Technology, 20(1), pp. 245-266. ISSN 1726-0531
Sandaruwan, I P T; Bihara Janardana, J A and Manoharan, K (2024) Job attributes of key Sri Lankan construction professionals in addressing the challenges associated with climate change. International Journal of Disaster Resilience in the Built Environment, 15(3), pp. 370-394. ISSN 1759-5916
Sanni-Anibire, M O; Zin, R M and Olatunji, S O (2022) Machine learning model for delay risk assessment in tall building projects. International Journal of Construction Management, 22(11), pp. 2134-2143. ISSN 1562-3599
Sarhan, S; Pretlove, S; Elghaish, F; Matarneh, S and Mossman, A (2025) Sources of occupational stress in UK construction projects: An empirical investigation and agenda for future research. Smart and Sustainable Built Environment, 14(6), pp. 1701-1728. ISSN 2046-6099
Sarhan, J; Xia, B; Fawzia, S; Karim, A and Olanipekun, A (2018) Barriers to implementing lean construction practices in the Kingdom of Saudi Arabia (KSA) construction industry. Construction Innovation, 18(2), pp. 246-272. ISSN 1471-4175
Sarhan, J G; Xia, B; Fawzia, S and Karim, A (2017) Lean construction implementation in the Saudi Arabian construction industry. Construction Economics and Building, 17(1), pp. 46-69. ISSN 2204-9029
Sarhan, J G; Xia, B; Fawzia, S; Karim, A; Olanipekun, A O and Coffey, V (2020) Framework for the implementation of lean construction strategies using the interpretive structural modelling (ISM) technique: A case of the Saudi construction industry. Engineering, Construction and Architectural Management, 27(1), pp. 1-23. ISSN 0969-9988
Schamne, Annelise Nairne (2022) Building information modeling in construction waste management: Proposal of a conceptual model in the IFC standard. PhD thesis, Universidade Tecnológica Federal do Paraná, Brazil.
Schweber, L (2013) The effect of BREEAM on clients and construction professionals. Building Research & Information, 41(2), pp. 129-145. ISSN 0961-3218
Schweber, L; Lees, T and Torriti, J (2015) Framing evidence: Policy design for the zero-carbon home. Building Research & Information, 43(4), pp. 420-434. ISSN 0961-3218
Scott, D and Pang, C K (1999) Helping professionals make good use of the internet. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Scott, L and Kanjanabootra, S (2018) The acquisition of knowledge and expertise in construction: Understanding construction professionals. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Scott, L M (2016) Theory and research in construction education: The case for pragmatism. Construction Management and Economics, 34(7-8), pp. 552-560. ISSN 01446193
Scott-Young, C M; Turner, M and Holdsworth, S (2020) Male and female mental health differences in built environment undergraduates. Construction Management and Economics, 38(9), pp. 789-806. ISSN 01446193
Selcuk, O; Turkoglu, H; Polat, G and Hajdu, M (2024) An integrative literature review on the causes of delays in construction projects: Evidence from developing countries. International Journal of Construction Management, 24(6), pp. 610-622. ISSN 1562-3599
Seriki, O. O. and Murphy, R. (2025) Strategy-as-practice in Irish construction professional service firms. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(1), pp. 41-49. ISSN 1751-4304
Seriki, O and Murphy, R (2018) A comparative analysis of key elements of the strategic decision-making process across construction professional services firms: Evidence from the Irish construction industry. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Seriki, O and Murphy, R (2019) Competitive strategies in small and medium sized enterprises (SMEs): A cross-case analysis of Irish construction professional service firms. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Shahid, M. U.; Thaheem, M. J. and Arshad, H. (2023) Quantification and benchmarking of construction waste and its impact on cost: A case of Pakistan. Engineering, Construction and Architectural Management, 30(6), pp. 2304-2333. ISSN 0969-9988
Shahid, M U; Thaheem, M J and Arshad, H (2023) Quantification and benchmarking of construction waste and its impact on cost: a case of Pakistan. Engineering, Construction and Architectural Management, 30(6), pp. 2304-2333. ISSN 0969-9988
Shaker, R A; Elbeltagi, E; Motawa, I; Elmasoudi, I and Elnabwy, M T (2024) Social network analysis for identifying the significant drivers of off-site construction adoption in Egypt. Built Environment Project and Asset Management, 14(4), pp. 607-625. ISSN 2044-124X
Shanmugapriya, S (2016) Structural equation modelling to investigate the factors influencing quality safety and productivity in construction projects. PhD thesis, Anna University, Chennai, India.
Shapira, A and Elbaz, A (2014) Tower crane cycle times: Case study of remote-control versus cab-control operation. Journal of Construction Engineering and Management, 140(12): 05014010, ISSN 0733-9364
Shaw, N (2010) Improving innovation management in construction. EngD thesis, Loughborough University, UK.
Shaw, N; Bouchlaghem, D and Demian, P (2010) Key influences of innovation magnitude and mode. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(4), pp. 161-169. ISSN 17514312
Shayan, S; Pyung Kim, K and Tam, V W Y (2022) Critical success factor analysis for effective risk management at the execution stage of a construction project. International Journal of Construction Management, 22(3), pp. 379-386. ISSN 1562-3599
Shehab, L; Lee, G and Hamzeh, F (2026) Minds at work: A design for an experimental approach to assessing cognitive abilities in construction. Journal of Construction Engineering and Management, 152(1): 04025221, ISSN 0733-9364
Shen, L Y; Li, Q M; Drew, D and Shen, Q P (2004) Awarding construction contracts on multicriteria basis in China. Journal of Construction Engineering and Management, 130(3), pp. 385-393. ISSN 0733-9364
Shen, L Y; Lu, W S and Yam, M C H (2006) Contractor key competitiveness indicators: A China study. Journal of Construction Engineering and Management, 132(4), pp. 416-424. ISSN 0733-9364
Shen, L Y; Zhao, Z Y and Drew, D S (2006) Strengths, weaknesses, opportunities, and threats for foreign-invested construction enterprises: A China study. Journal of Construction Engineering and Management, 132(9), pp. 966-975. ISSN 0733-9364
Shen, Q and Liu, G (2002) Value management applications in China's construction industry. Journal of Construction Procurement, 8(1), pp. 35-47. ISSN 1358-9180
Sher, W D (2012) Tertiary construction management education: the lived experience of academic staff in Australia. PhD thesis, University of Newcastle, Australia.
Shi, W (2009) Framework for integration of BIM and RFID in steel construction. PhD thesis, University of Florida, USA.
Shrestha, R; Ko, T and Lee, J (2025) Quantifying project uncertainties: Leveraging historical bid and change order data for automated detection of cost and schedule impacts in new projects. Journal of Construction Engineering and Management, 151(4): 04025017, ISSN 0733-9364
Shuang, Q; Liu, X; Wang, Z and Xu, X (2024) Automatically categorizing construction accident narratives using the deep-learning model with a class-imbalance treatment technique. Journal of Construction Engineering and Management, 150(9): 04024107, ISSN 0733-9364
Shugran, A A and Ghazali, F E M (2025) Understanding the effects of variation orders on construction project success: insights from the Jordanian context. International Journal of Construction Management, 25(5), pp. 519-529. ISSN 1562-3599
Shurrab, J and Hussain, M (2018) An empirical study of the impact of lean on the performance of the construction industry in UAE. Journal of Engineering, Design and Technology, 16(5), pp. 694-710. ISSN 1726-0531
Shwarka, M and Anigbogu, N A (2012) Impact of the public procurement reform on public building project delivery in Nigeria. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Sidoli del Ceno, J (2012) A process account of construction mediation. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Silverio, A K; Suresh, S; Renukappa, S and Heesom, D (2023) Status of BIM implementation in the Dominican Republic construction industry: an empirical study. Journal of Engineering, Design and Technology, 21(2), pp. 417-441. ISSN 1726-0531
Simister, S J (1994) An investigation into the influences on construction professionals' working practices. PhD thesis, University of Reading, UK.
Simmons, D R; Iorio, J; Taylor, J E and Li, D (2018) Work values across generations among construction professionals in the United States. Journal of Construction Engineering and Management, 144(10): 04018096, ISSN 0733-9364
Simmons, D R; McCall, C and Clegorne, N A (2020) Leadership competencies for construction professionals as identified by construction industry executives. Journal of Construction Engineering and Management, 146(9), ISSN 0733-9364
Simons, A E; Redden, L and Collins, W (2023) Sitework knowledge for entry-level construction professionals: Academic and industry perceptions. International Journal of Construction Education and Research, 19(2), pp. 199-220. ISSN 1557-8771
Simpeh, E K; Ndihokubwayo, R; Love, P E D and Thwala, W D (2015) A rework probability model: A quantitative assessment of rework occurrence in construction projects. International Journal of Construction Management, 15(2), pp. 109-116. ISSN 1562-3599
Simpeh, E K; Smallwood, J J; Ahadzie, D K and Mensah, H (2023) Analytical taxonomy of challenges to the implementation of green building projects in South Africa. International Journal of Construction Management, 23(2), pp. 286-296. ISSN 1562-3599
Sims, B L (1999) Program assessment of the mechanical contractors association of America's Construction Continuing Education Project Management Course. PhD thesis, Purdue University, USA.
Sinesilassie, E G (2017) Determinants of success of public construction projects in Ethiopia. PhD thesis, Indian Institute of Technology Delhi, India.
Sinesilassie, E G; Tabish, S Z S and Jha, K N (2018) Critical factors affecting cost performance: A case of Ethiopian public construction projects. International Journal of Construction Management, 18(2), pp. 108-119. ISSN 1562-3599
Sinesilassie, E G; Tripathi, K K; Tabish, S Z S and Jha, K N (2019) Modeling success factors for public construction projects with the SEM approach: Engineer's perspective. Engineering, Construction and Architectural Management, 26(10), pp. 2410-2431. ISSN 0969-9988
Singh, V and Bolpagni, M (2023) Effects of trigger events on innovation behaviour: Insights from the data collected from construction professionals during COVID-19. Construction Management and Economics, 41(7), pp. 587-607. ISSN 01446193
Sirotiak, T L (2008) The effect of problem/project-based learning on a desired skill set for construction professionals. PhD thesis, Iowa State University, USA.
Skaik, S and Oweineh, H (2014) Assessing the practice of project-based jv between local and international contractors in the UAE. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Slattery, D K and Sumner, M R (2011) Leadership characteristics of rising stars in construction project management. International Journal of Construction Education and Research, 7(3), pp. 159-174. ISSN 1557-8771
Smithers, G L (2000) The effect of the site environment on motivation and demotivation of construction professionals. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Smithers, G L and Walker, D H T (2000) The effect of the workplace on motivation and demotivation of construction professionals. Construction Management and Economics, 18(7), pp. 833-841. ISSN 01446193
Solanki, A; Sarkar, D and Shah, D (2024) Evaluation of factors affecting the effective implementation of internet of things and cloud computing in the construction industry through waspas and TOPSIS methods. International Journal of Construction Management, 24(2), pp. 226-239. ISSN 1562-3599
Son, J and Mattila, K G (2004) Binary resource leveling model: Activity splitting allowed. Journal of Construction Engineering and Management, 130(6), pp. 887-894. ISSN 0733-9364
Son, J; Mattila, K G and Myers, D S (2005) Determination of haul distance and direction in mass excavation. Journal of Construction Engineering and Management, 131(3), pp. 302-309. ISSN 0733-9364
Song, Z; Yang, F; Boezeman, E J and Li, X (2020) Do new-generation construction professionals be provided what they desire at work? A study on work values and supplies-values fit. Engineering, Construction and Architectural Management, 27(10), pp. 2835-2858. ISSN 0969-9988
Spellacy, J; Edwards, D J; Roberts, C J; Hayhow, S and Shelbourn, M (2021) An investigation into the role of the quantity surveyor in the value management workshop process. Journal of Engineering, Design and Technology, 19(2), pp. 423-445. ISSN 1726-0531
Spielholz, P; Davis, G and Griffith, J (2006) Physical risk factors and controls for musculoskeletal disorders in construction trades. Journal of Construction Engineering and Management, 132(10), pp. 1059-1068. ISSN 0733-9364
Staples, C and Spillane, J (2019) Exploring the potential improvement of quality control in the construction industry with the use of digital technology. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Stenlund, K L; Ryd, N and Vennström, A (2009) Client's decisions in strategic briefs and their impact on user values. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Stewardson, A; Edwards, D J; Asamoah, E; Aigbavboa, C O; Lai, J H K and El-Gohary, H (2023) The late payment epidemic in UK construction. Journal of Financial Management of Property and Construction, 28(3), pp. 374-397. ISSN 1366-4387
Stewart, R A (2003) Lifecycle management of information technology (IT) projects in construction. PhD thesis, Griffith University, Australia.
Stewart, R A; Mohamed, S and Marosszeky, M (2004) An empirical investigation into the link between information technology implementation barriers and coping strategies in the Australian construction industry. Construction Innovation, 4(3), pp. 155-171. ISSN 1471-4175
Stoneman, G; Hill, C J; Howarth, T and McNamara, T (1999) Construction planning software selection for improving the planning process. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Sumner, M and Slattery, D (2010) The impact of leadership effectiveness and team processes on team performance in construction. International Journal of Construction Education and Research, 6(3), pp. 179-201. ISSN 1557-8771
Sun, M; Fleming, A; Senaratne, S; Motawa, I and Yeoh, M L (2006) A change management toolkit for construction projects. Architectural Engineering and Design Management, 2(4), pp. 261-271. ISSN 1745-2007
Sun, M; Zhu, F and Sun, X (2020) Influencing factors of construction professionals' burnout in China: A sequential mixed-method approach. Engineering, Construction and Architectural Management, 27(10), pp. 3215-3233. ISSN 0969-9988
Sun, M; Liu, M; Guan, J; Zhu, F and Zhang, Z (2025) Influence of the fit between the receiving and giving of helping behavior on construction professionals' workplace well-being: Self-determination perspective. Journal of Construction Engineering and Management, 151(12): 04025192, ISSN 0733-9364
Sun, Y; Gheisari, M and Jeelani, I (2024) Robosite: An educational virtual site visit featuring the safe integration of four-legged robots in construction. Journal of Construction Engineering and Management, 150(10): 04024126, ISSN 0733-9364
Sunindijo, R Y and Kamardeen, I (2017) Work stress is a threat to gender diversity in the construction industry. Journal of Construction Engineering and Management, 143(10): 04017073, ISSN 0733-9364
Sunindijo, R Y and Kamardeen, I (2017) Antecedents to mental health symptoms in the Australian construction industry. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Sunindijo, R Y and Kamardeen, I (2017) Attracting and retaining women professionals in construction: A work-stress management perspective. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Sunindijo, R Y and Kamardeen, I (2020) Psychological challenges confronting graduate construction students in Australia. International Journal of Construction Education and Research, 16(3), pp. 151-166. ISSN 1557-8771
Sunkanmi, A B (2023) An integrated conflict management model for the South African construction industry. PhD thesis, University of Johannesburg, South Africa.
Swai, L L P and Arewa, A O (2018) Potentiality of emerging technologies to minimise late-payments quandary in construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Swallow, M and Zulu, S (2020) Students’ awareness and perception of the value of BIM and 4D for site health and safety management. Journal of Engineering, Design and Technology, 18(2), pp. 414-430. ISSN 1726-0531
Swallow, M and Zulu, S L (2025) Investigating the implementation of immersive technologies within on-site construction safety processes. Journal of Engineering, Design and Technology, 23(1), pp. 323-343. ISSN 1726-0531
Tabish, S Z S and Jha, K N (2018) Beyond the iron triangle in public construction projects. Journal of Construction Engineering and Management, 144(8): 04018067, ISSN 0733-9364
Tam, V W Y; Shen, L Y; Fung, I W H and Wang, J Y (2007) Controlling construction waste by implementing governmental ordinances in Hong Kong. Construction Innovation, 7(2), pp. 149-166. ISSN 1471-4175
Tambwe, O.; Aigbavboa, C. and Akinradewo, O. (2026) Influence of data longevity on data management in the South African construction industry. Construction Economics and Building, 26(2), ISSN 2204-9029
Tambwe, O T; Aigbavboa, C O and Akinradewo, O (2025) Benefits of construction data risks management in the construction industry. Journal of Engineering, Design and Technology, 23(2), pp. 458-476. ISSN 1726-0531
Tanko, B. L.; Oakley, J. T.; Jagun, Z. and Madanayake, U. (2026) Comparing 5D BIM costs: Stilt housing against conventional housing for flood management. Journal of Engineering, Design and Technology, 24(2), pp. 361-383. ISSN 1726-0531
Tanko, B L; Abdullah, F; Mohamad Ramly, Z and Enegbuma, W I (2018) An implementation framework of value management in the Nigerian construction industry. Built Environment Project and Asset Management, 8(3), pp. 305-319. ISSN 2044-124X
Taroun, A (2012) Decision support system (DSS) for construction project risk analysis and evaluation via evidential reasoning (ER). PhD thesis, University of Manchester, UK.
Tarpio, J; de la Rosa, R C and Pelsmakers, S (2025) Promoting resilience in Finland: Built environment professionals' perspectives. Building Research & Information, 53(3), pp. 305-322. ISSN 0961-3218
Tatum, C B (1983) Decision-making in structuring construction project organizations. PhD thesis, Stanford University, USA.
Tehrani, B M; BuHamdan, S and Alwisy, A (2024) Robotics in industrialized construction: An activity-based ranking system for assembly manufacturing tasks. Engineering, Construction and Architectural Management, 31(6), pp. 2264-2285. ISSN 0969-9988
Tembo-Silungwe, C K and Khatleli, N (2022) Development of risk misallocation causal networks using interpretive judgement in the construction industry. International Journal of Construction Management, 22(10), pp. 1935-1949. ISSN 1562-3599
Tennakoon, G A; Rameezdeen, R and Chileshe, N (2023) Why not reprocessed: Identifying factors limiting the uptake of reprocessed structural timber. Built Environment Project and Asset Management, 13(3), pp. 471-487. ISSN 2044-124X
Tennakoon, G A; Rameezdeen, R and Chileshe, N (2024) Walking the talk towards sustainable consumption: Interventions to promote the uptake of reprocessed construction materials. Engineering, Construction and Architectural Management, 31(7), pp. 2878-2899. ISSN 0969-9988
Tennakoon, G A; Waidyasekara, A and Ekanayake, B J (2020) Revisiting the role of professionals in designing buildings with low embodied and operational energy. Built Environment Project and Asset Management, 10(1), pp. 110-123. ISSN 2044-124X
Terzioglu, T and Polat, G (2026) Evaluating interactions between formwork system selection criteria for building construction projects: A rough DEMATEL approach. Journal of Construction Engineering and Management, 152(1): 04025225, ISSN 0733-9364
Tetteh, P A; Addy, M N; Acheampong, A; Akomea-Frimpong, I; Ayidana, E and Ghansah, F A (2026) Critical drivers for the adoption of wearable sensing technologies (wsts) for construction safety monitoring in Ghana: A fuzzy synthetic analysis. Construction Innovation, 26(1), pp. 173-197. ISSN 1471-4175
Thangaraj, R K and Chan, T K (2012) The effects of the global financial crisis on the Australian building construction supply chain. Construction Economics and Building, 12(3), pp. 16-30. ISSN 2204-9029
Thneibat, M; Thneibat, M and Al-Tamimi, B (2022) Establishing the synergy between the perceptions of construction professionals and the phases of value management. Engineering, Construction and Architectural Management, 29(4), pp. 1835-1860. ISSN 0969-9988
Thneibat, M M and Al-Shattarat, B (2023) Critical success factors for value management techniques in construction projects: Case in Jordan. International Journal of Construction Management, 23(4), pp. 669-678. ISSN 1562-3599
Tighnavard Balasbaneh, A and Ramadan, B S (2026) Integrating three pillars of sustainability for evaluating the modular construction building. Construction Innovation, 26(2), pp. 328-352. ISSN 1471-4175
Tobin, A G V (2009) Conflict-resolution competencies for the construction professional. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 181-184. ISSN 17514312
Tokede, O and Wamuziri, S (2012) Perceptions of fuzzy set theory in construction risk analysis. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Tokede O, S B B A (2013) Preserving continuity in whole-life cost models for net-zero carbon buildings. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Toland, M D; Bowen, P and Dueber, D M (2020) Multidimensional item response theory analysis of work-related, after-hours contact, and psychosocial measurement scales for construction professionals. Journal of Construction Engineering and Management, 146(7): 04020062, ISSN 0733-9364
Toor, S U R and Ogunlana, S O (2009) Construction professionals' perception of critical success factors for large-scale construction projects. Construction Innovation, 9(2), pp. 149-167. ISSN 1471-4175
Toyin, J O and Mewomo, M C (2023) An investigation of barriers to the application of building information modelling in Nigeria. Journal of Engineering, Design and Technology, 21(2), pp. 442-468. ISSN 1726-0531
Tracey, P G (2020) The influence of national culture on the preparation, evaluation and negotiation of claims on international construction projects: a constructivist grounded theory. PhD thesis, University of Salford, UK.
Treloar, G J; Love, P E D and Holt, G D (2001) Using national input–output data for embodied energy analysis of individual residential buildings. Construction Management and Economics, 19(1), pp. 49-61. ISSN 01446193
Tucker, J R; Pearce, A R; Bruce, R D; McCoy, A P and Mills, T H (2012) The perceived value of green professional credentials to credential holders in the US building design and construction community. Construction Management and Economics, 30(11), pp. 963-979. ISSN 1466433X
Tunji-Olayeni, P; Kajimo-Shakantu, K and Ayodele, T O (2024) Factors influencing the intention to adopt green construction: An application of the theory of planned behaviour. Smart and Sustainable Built Environment, 13(2), pp. 291-308. ISSN 2046-6099
Tunji-Olayeni, P F; Kajimo–Shakantu, K; Ayodele, T O and Philips, B I (2023) Students' perception of sustainable construction: Accelerating progress towards construction education for sustainable development. International Journal of Construction Management, 23(2), pp. 276-285. ISSN 1562-3599
Turner, M and Holdsworth, S (2023) Developing resilience: Examining the protective factors of early career construction professionals. Construction Management and Economics, 41(10), pp. 805-819. ISSN 01446193
Tutesigensi, A; Kibwami, N and Matege, S B (2021) The status of value management practice on construction projects in Uganda and strategies for improvement. Journal of Construction in Developing Countries, 26(2), pp. 251-267. ISSN 1823-6499
Ubesingha, B; Ofori, G; Agyekum-Mensah, G and Frings, D (2024) Professionalism and ethics: Challenges in post-disaster reconstruction. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Ubesingha, Buddhinie (2025) Professionalism and ethics in post-disaster reconstruction projects. PhD thesis, London South Bank University, UK.
Ugural, M and Giritli, H (2021) Three-way interaction model for turnover intention of construction professionals: Some evidence from Turkey. Journal of Construction Engineering and Management, 147(4): 04021008, ISSN 0733-9364
Uhanovita A.C, N; K.A.T.O, R and Parameswaran, A (2025) Poka-yoke to minimise variations: A framework for building projects. Construction Innovation, 25(3), pp. 972-993. ISSN 1471-4175
Umar, A A; Zawawi, N A W A and Abdul Aziz, A R (2024) Do regional characteristics influence PPP contract governance skills requirements? Engineering, Construction and Architectural Management, 31(10), pp. 4146-4161. ISSN 0969-9988
Umar, A A; Zawawi, N A W A and Abdul-Aziz, A R (2019) Exploratory factor analysis of skills requirement for PPP contract governance. Built Environment Project and Asset Management, 9(2), pp. 277-290. ISSN 2044-124X
Umar, T and Egbu, C (2018) Perceptions on safety climate: A case study in the Omani construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(6), pp. 251-263. ISSN 17514304
Vakeva-Baird, S; Tahmasebi, F; Williams, J J and Mumovic, D (2025) Effective interdisciplinary stakeholder engagement in net zero building design. Buildings & Cities, 6(1), pp. 654-673. ISSN 2632-6655
Van Tam, N (2025) Mitigating digital transformation risks for circular construction in emerging economies: An empirical investigation in Vietnam. International Journal of Construction Management, 25(10), pp. 1130-1140. ISSN 1562-3599
Vaz-Serra, P; Edwards, P and Aranda-Mena, G (2022) An early-stage project complexity assessment tool for the AEC industry. Construction Innovation, 22(2), pp. 242-262. ISSN 1471-4175
Venu Jaya, S.; Swarnakar, V.; Acquaye, A.; Khalfan, M. and El Fadel, M. (2026) Unlocking 3r-driven value engineering potential in sustainable construction: An empirical analysis of drivers, challenges, benefits, tools and techniques. Journal of Engineering, Design and Technology, 24(6), ISSN 1726-0531
Vereen, S C (2013) Forecasting skilled labor demand in the US construction industry. PhD thesis, North Carolina State University, USA.
Vereen, S C; Rasdorf, W and Hummer, J E (2016) Development and comparative analysis of construction industry labor productivity metrics. Journal of Construction Engineering and Management, 142(7): 4016020, ISSN 0733-9364
Verwey, J; Cumberlege, R and Crafford, G J (2023) Exploring the interplay between quantity surveyors' conflict-handling styles and personality traits. Journal of Construction Business and Management, 6(2), pp. 38-49. ISSN 2521-0165
Victar, H C; Perera, B A K S; Palihakkara, A D and Dewagod, K G (2024) Roles and competencies of quantity surveyors in achieving a circular built environment: An investigation according to 3r principles. Smart and Sustainable Built Environment, 13(4), pp. 1015-1040. ISSN 2046-6099
Vohmann, B and Frame, I (2016) Professional practice and construction undergraduates employability skills. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Wadu Mesthrige, J and Kwong, H Y (2018) Criteria and barriers for the application of green building features in Hong Kong. Smart and Sustainable Built Environment, 7(3-4), pp. 251-276. ISSN 2046-6099
Wall, D M (1997) Distributions and correlations in Monte Carlo simulation. Construction Management and Economics, 15(3), pp. 241-258. ISSN 01446193
Wall, J (2009) The development of technology facilitated learning for continuing professional development of construction managers. PhD thesis, University of Salford, UK.
Wall, J and Ahmed, V (2005) Issues in developing a blended learning initiative to meet continuing professional development needs of construction professionals in Ireland. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Wall, J and Ahmed, V (2006) Delivering continuing professional development for construction management using e-learning. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Wall, J and Ahmed, V (2007) Blended lifelong learning delivery: Lessons learned from a pilot study. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Wall, J and Ahmed, V (2008) Lessons learned from a case study in deploying blended learning continuing professional development. Engineering, Construction and Architectural Management, 15(2), pp. 185-202. ISSN 0969-9988
Wang, L.; Hwang, J.; Han, K. and Gupta, A. (2026) Generative AI-assisted compliance checking for construction requirements. Journal of Construction Engineering and Management, 152(8): 04026117, ISSN 0733-9364
Wang, P; Haron, N A; Law, T H; Ales@Alias, A H and Qi, Y (2025) Unveiling the mechanisms between project manager leadership competencies and team performance: An empirical study. Journal of Engineering, Design and Technology, 23(6), pp. 1979-2004. ISSN 1726-0531
Wang, Y; Xiao, B; Mueller, S T and Yi, W (2026) Task–taxon–task framework for modeling and predicting the cognitive impact of collaborative robots on worker performance in modular construction. Journal of Construction Engineering and Management, 152(4): 04026033, ISSN 0733-9364
Wang, D; Dai, F and Ning, X (2015) Risk assessment of work-related musculoskeletal disorders in construction: State-of-the-art review. Journal of Construction Engineering and Management, 141(6): 04015008, ISSN 0733-9364
Wang, D; Dai, F; Ning, X; Dong, R G and Wu, J Z (2017) Assessing work-related risk factors on low back disorders among roofing workers. Journal of Construction Engineering and Management, 143(7): 04017026, ISSN 0733-9364
Wang, J (2022) BIM and construction dispute management. PhD thesis, University of Manchester, UK.
Wang, K; Guo, F; Zhang, C and Schaefer, D (2024) From industry 4.0 to construction 4.0: Barriers to the digital transformation of engineering and construction sectors. Engineering, Construction and Architectural Management, 31(1), pp. 136-158. ISSN 0969-9988
Wang, Liannian (2025) Advancing construction requirements management through 4D BIM and generative AI. PhD thesis, North Carolina State University, USA.
Wao, J O and Flood, I (2016) The role of quantity surveyors in the international construction arena. International Journal of Construction Management, 16(2), pp. 126-137. ISSN 1562-3599
Warrner, J (2018) Transitioning from college to career: Skills needed for success for construction professionals. EdD thesis, Ball State University, USA.
Watts, G (2024) The engagement of the UK construction industry towards achievement of the sustainable development goals. Built Environment Project and Asset Management, 14(3), pp. 384-398. ISSN 2044-124X
Watts, G; McDermott, P and Kolo, S (2023) Framing the barriers to construction industry transformation. Built Environment Project and Asset Management, 13(1), pp. 185-199. ISSN 2044-124X
Weerasooriya, D; Perera, B A K S; Ranadewa, K A T O and Gallage, S D (2025) Scrutinizing the shift: investigating quantity surveyors' adaptability to cyber-physical systems. International Journal of Construction Management, 25(2), pp. 139-148. ISSN 1562-3599
Wijayarathne, N.; Gunawan, I. and Schultmann, F. (2026) An integrated framework of dynamic capabilities, digital transformation, and organizational resilience: A multimethod qualitative study in the construction sector. Journal of Construction Engineering and Management, 152(9): 04026151, ISSN 0733-9364
Wijewansha, A S; Tennakoon, G A; Waidyasekara, K and Ekanayake, B J (2021) Implementation of circular economy principles during pre-construction stage: The case of Sri Lanka. Built Environment Project and Asset Management, 11(4), pp. 750-766. ISSN 2044-124X
Willan, C M (2019) Life in the gap: how does a construction company respond to the challenge of targets for energy and carbon in-use? PhD thesis, University College London, UK.
Willan, Catherine M (2019) Life in the gap: How does a construction company respond to the challenge of targets for energy and carbon in-use? PhD thesis, University College London, UK.
Williams, J.; Ibrahim, K.; Simpeh, F. and Amoah, C. (2026) Evaluating sensing technology adaptation benefits in construction: A cross-cultural view. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 124-133. ISSN 1751-4304
Williams, N M (2021) An investigation of client loyalty in the construction professional services sector. PhD thesis, University of Wolverhampton, UK.
Williams, T (2013) The management of renewable energy technologies implementations within a contracting organisation's processes. EngD thesis, Loughborough University, UK.
Won, S (2002) A model for work function characteristics-based prioritization of technologies for capital projects. PhD thesis, University of Texas at Austin, USA.
Wong, C H (2007) ICT implementation and evolution: Case studies of intranets and extranets in UK construction enterprises. Construction Innovation, 7(3), pp. 254-273. ISSN 1471-4175
Wu, G; Hu, Z; Zheng, J; Zhao, X and Zuo, J (2021) Effects of structure characteristics of project network on conflicts and project success. Engineering, Construction and Architectural Management, 28(1), pp. 101-124. ISSN 0969-9988
Wu, Z; Wang, Y and Liu, M (2024) Job stress and burnout among construction professionals: The moderating role of online emotions. Engineering, Construction and Architectural Management, 31(12), pp. 4831-4851. ISSN 0969-9988
Wusu, G; Alaka, H; Oseghale, R; Yusuf, W; Funlade, S and Saheed, A (2026) A qualitative assessment of offsite construction awareness in the United Kingdom: Construction industry experts' view. Building Research & Information, 54(3), pp. 359-377. ISSN 0961-3218
Xia, B; Rosly, N; Wu, P; Bridge, A and Pienaar, J (2016) Improving sustainability literacy of future quantity surveyors. Smart and Sustainable Built Environment, 5(4), pp. 325-339. ISSN 2046-6099
Xiao, Bo (2021) Deep learning-based framework of summarizing construction videos for vision-based monitoring of construction sites. PhD thesis, University of Alberta, Canada.
Xiao, H and Boyd, D (2007) A cross-culture analysis of construction practice through knowledge events. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Xiong, B; Newton, S and Skitmore, M (2022) Towards a conceptual model of the job performance of construction professionals: A person-environment fit perspective. International Journal of Construction Management, 22(7), pp. 1308-1322. ISSN 1562-3599
Xu, Y; Chi, M; Lee, C Y; Chong, H Y and Wu, H (2025) Effects of the blockchain and artificial intelligence on value cocreation in construction projects: A mixed methods study. Journal of Construction Engineering and Management, 151(8): 04025091, ISSN 0733-9364
Yakubu, S (2019) Determinants of non-compliance with structural building code standards in Nigeria. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(2), pp. 47-59. ISSN 17514304
Yamusa, M. A.; Dandago, A. A.; Lawal, H. S.; Saka, A. B.; Abubakar, M. and Abdullahi, M. (2025) Quantitative evaluation and modelling of uncertainty factors impacting duration of building renovation projects. Engineering, Construction and Architectural Management, 33(5), pp. 4181-4210. ISSN 0969-9988
Yan, L; Chen, Y and Cao, T (2024) Integrated construction consulting project performance improvement in China using network structure and team boundary-spanning behavior: A configurational analysis. Engineering, Construction and Architectural Management, 31(11), pp. 4462-4481. ISSN 0969-9988
Yang, J; Zhong, B; Gao, H and Wang, Y (2023) Task decomposition and service composition on an innovative blockchain-based construction service trading platform to select construction services. Journal of Construction Engineering and Management, 149(12): 04023130, ISSN 0733-9364
Yap, J B H; Tan, K L and Skitmore, M (2026) Constructing ethics resilience: Unveiling preventive strategies for compliance in the Malaysian construction industry. Construction Management and Economics, 44(1), pp. 41-60. ISSN 0144-6193
Yap, J B H and Lim, S Y (2023) Collaborative project procurement in the construction industry: Investigating the drivers and barriers in Malaysia. Journal of Construction in Developing Countries, 28(1), pp. 171-192. ISSN 1823-6499
Yap, J B H; Rou Chong, J; Skitmore, M and Lee, W P (2020) Rework causation that undermines safety performance during production in construction. Journal of Construction Engineering and Management, 146(9): 04020106, ISSN 0733-9364
Yap, J B H; Skitmore, M; Lam, C G Y; Lee, W P and Lew, Y L (2024) Advanced technologies for enhanced construction safety management: Investigating Malaysian perspectives. International Journal of Construction Management, 24(6), pp. 633-642. ISSN 1562-3599
Yates, J K and Battersby, L C (2003) Master builder project delivery system and designer construction knowledge. Journal of Construction Engineering and Management, 129(6), pp. 635-644. ISSN 0733-9364
Yates-Suver, J K (1986) A cross-cultural evaluation of the behavior and training of American engineering and construction professionals who operate in the international marketplace. PhD thesis, Texas A&M University, USA.
Yip, B and Rowlinson, S (2009) Job redesign as an intervention strategy of burnout: Organizational perspective. Journal of Construction Engineering and Management, 135(8), pp. 737-745. ISSN 0733-9364
Yip, B L P (2007) Job burnout among construction professionals in Hong Kong: A moderator model with coping strategies. PhD thesis, University of Hong Kong, Hong Kong.
Yirenkyi-Fianko, A B and Chileshe, N (2012) Job satisfaction of professionals within the Ghanaian construction industry. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Yirenkyi-Fianko, A B and Chileshe, N (2015) An analysis of risk management in practice: The case of Ghana's construction industry. Journal of Engineering, Design and Technology, 13(2), pp. 240-259.
Yiu, T W; Liu, T and Kwok, L C (2018) Explicating the role of relationship in construction claim negotiations. Journal of Construction Engineering and Management, 144(2): 04017114, ISSN 0733-9364
Yogeswaran, K; Kumaraswamy, M M and Miller, D R A (1997) Perceived sources and causes of construction claims. Journal of Construction Procurement, 3(3), pp. 3-26. ISSN 1358-9180
Youssefi, I and Celik, T (2024) Comparative analysis between different risk score calculation approaches. Engineering, Construction and Architectural Management, 31(10), pp. 4099-4124. ISSN 0969-9988
Yue, H; Ye, G; Liu, Q; Yang, X; Xiang, Q and Luo, Y (2024) Impact of cognitive fatigue on attention and the implications for construction safety: A neuroscientific perspective. Journal of Construction Engineering and Management, 150(8): 04024102, ISSN 0733-9364
Yung, P and Rafferty, K (2015) Statutory adjudication in Western Australia: Adjudicators' views. Engineering, Construction and Architectural Management, 22(1), pp. 54-72. ISSN 0969-9988
Yusuf, A O; Opawole, A; Musa, N A; Kadiri, D S and Ebunoluwa, E I (2024) Factors influencing the organisational capabilities of the public sector for implementation of building information modelling in construction projects. International Journal of Building Pathology and Adaptation, 42(5), pp. 1058-1083. ISSN 2398-4708
Yuvaraj, Y and K. S, K S (2025) Gender's moderating effect on perceived organizational politics and withdrawal dimensions among construction professionals. Construction Economics and Building, 25(2), pp. 69-88. ISSN 2204-9029
Yıldırım, A; Genç, O and Aydınlı, S (2026) An examination of the perceptions of occupational work ethics among construction professionals working in the public and private sectors: A factor analysis (fa) and hypothesis testing approach. International Journal of Construction Management, 26(4), pp. 604-620. ISSN 1562-3599
Zaid Alkilani, Suhair (2018) Performance measurement and improvement model for small and medium contractors in developing countries. PhD thesis, University of New South Wales, Australia.
Zainal Abidin, N A (2018) Resilience of Malaysian public sector construction industry to supply chain disruptions. PhD thesis, University of Huddersfield, UK.
Zainal Abidin, N A and Ingirige, B (2018) The dynamics of vulnerabilities and capabilities in improving resilience within Malaysian construction supply chain. Construction Innovation, 18(4), pp. 412-432. ISSN 1471-4175
Zaman, A A U; Abdelaty, A; Yamany, M S; Jacobs, F and Marzouk, M (2025) Integrating 3D photogrammetry and game engine for construction safety training. Built Environment Project and Asset Management, 15(4), pp. 844-862. ISSN 2044-124X
Zami, M S (2010) Understanding the factors that influence the adoption of stabilised earth by construction professionals to address the Zimbabwe urban low cost housing crisis. PhD thesis, University of Salford, UK.
Zami, M S (2021) Enablers supporting acceptance of earth-based material in UK urban housing sector. Architectural Engineering and Design Management, 17(1-2), pp. 92-109. ISSN 1745-2007
Zami, M S (2022) Barriers hindering acceptance of earth construction in the urban context of the United Kingdom. Architectural Engineering and Design Management, 18(6), pp. 941-958. ISSN 1745-2007
Zampese, Ednei Rogerio de Souza (2013) Green marketing as a mediating factor between green supply chain management and organizational performance in Brazilian civil construction. PhD thesis, Universidade Presbiteriana Mackenzie, Brazil.
Zaray, A H; Hasan, A; Johari, S; Hashmat, P A and Jha, K N (2023) Client and contractor perspectives on attributes affecting construction quality in a war-affected region. Engineering, Construction and Architectural Management, 30(10), pp. 4762-4781. ISSN 0969-9988
Zhai, X; Reed, R and Mills, A (2014) Factors impeding the offsite production of housing construction in China: An investigation of current practice. Construction Management and Economics, 32(1-2), pp. 40-52. ISSN 01446193
Zhai, X; Reed, R and Mills, A (2014) Addressing sustainable challenges in China: The contribution of off-site industrialisation. Smart and Sustainable Built Environment, 3(3), pp. 261-274. ISSN 2046-6099
Zhang, S.; Duan, J. and Sunindijo, R. Y. (2026) Mental health outcomes and psychosocial hazards experienced by construction professionals with different demographic characteristics during the COVID-19 pandemic. Engineering, Construction and Architectural Management, 33(4), pp. 3424-3451. ISSN 0969-9988
Zhang, S; Duan, J; Sunindijo, R Y and Xu, Q (2026) Building psychological resilience to improve the mental health of construction professionals. Journal of Construction Engineering and Management, 152(4): 04026030, ISSN 0733-9364
Zhang, S.; Wang, J.; Ke, Y. and Xu, H. (2026) The impact of inter-stakeholder knowledge sharing on project performance in the construction industry. Engineering, Construction and Architectural Management, pp. 1-26. ISSN 0969-9988
Zhang, Y.; Chang, R. D.; Omrany, H.; Zuo, J.; Li, L.; Bamborough, C. E. and Haeusler, H. M. (2026) Exploring professional attitudes on automated construction progress monitoring: A q methodology approach. Engineering, Construction and Architectural Management, 33(15), pp. 386-413. ISSN 0969-9988
Zhang, Y.; Yue, H. and Xia, X. (2026) Impact of punishment on safety behavior and the implications for construction safety: A neuroscientific perspective. Journal of Construction Engineering and Management, 152(8): 04026112, ISSN 0733-9364
Zhang, L and Agapiou, A (2020) Influence diagrams for off-site construction manufacturing risk assessment in China. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(4), pp. 145-162. ISSN 17514304
Zhang, L and El-Gohary, N M (2016) Epistemology-based context-aware semantic model for sustainable construction practices. Journal of Construction Engineering and Management, 142(3): 04015084, ISSN 0733-9364
Zhang, N; Li, X and Yang, F (2025) Dual pathways of mindfulness in construction occupational psychological health: Long- and short-term mechanisms of positive emotions and psychological capital. Journal of Construction Engineering and Management, 151(12): 04025200, ISSN 0733-9364
Zhang, R P and Bowen, P (2021) Work-family role blurring and conflict among South African construction professionals. Construction Management and Economics, 39(6), pp. 475-492. ISSN 01446193
Zhang, R P; Bowen, P and Edwards, P (2020) Work-related strain effects and coping strategies among South African construction professionals. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Zhang, S; Hua, X and Shi, X (2024) Measurement for risk perception ability. Journal of Construction Engineering and Management, 150(5): 04024036, ISSN 0733-9364
Zhang, S; Loosemore, M; Sunindijo, R Y and Gu, D (2023) An investigation of safety climate in Chinese major construction projects. International Journal of Construction Management, 23(8), pp. 1365-1375. ISSN 1562-3599
Zhang, S; Sunindijo, R Y; Loosemore, M; Wang, S; Gu, Y and Li, H (2021) Identifying critical factors influencing the safety of Chinese subway construction projects. Engineering, Construction and Architectural Management, 28(7), pp. 1863-1886. ISSN 0969-9988
Zhang, X (2019) Integrating lean construction, BIM and quality: a new paradigm for the improvement of Chinese construction quality. PhD thesis, University of Bath, UK.
Zhao, T and Dungan, J M (2014) Improved baseline method to calculate lost construction productivity. Journal of Construction Engineering and Management, 140(2): 06013006, ISSN 0733-9364
Zhao, Z Y and Shen, L Y (2008) Are Chinese contractors competitive in international markets? Construction Management and Economics, 26(3), pp. 225-236. ISSN 1466433X
Zheng, J; Zhang, Z; Wu, G; Yang, Y; Xia, N and Liu, B (2021) Daily self-efficacy, work engagement, and deviance behavior among construction professionals and workers: Cross-level moderating role of job control. Journal of Construction Engineering and Management, 147(4): 04021018, ISSN 0733-9364
Zheng, Y; Debs, L; Besiktepe, D and Oh, H J (2025) Insights for key professional competencies of us entry-level construction positions: A structural topic modeling approach. Journal of Construction Engineering and Management, 151(8): 04025103, ISSN 0733-9364
Zhou, W (2009) An investigation into a distributed virtual reality environment for real-time collaborative 4D construction planning and simulation. PhD thesis, University of Wolverhampton, UK.
Zuhaib, S; Manton, R; Hajdukiewicz, M; Keane, M M and Goggins, J (2017) Attitudes and approaches of Irish retrofit industry professionals towards achieving nearly zero-energy buildings. International Journal of Building Pathology and Adaptation, 35(1), pp. 16-40.
Zulu, S L; Saad, A; Ajayi, S; Unuigbe, M and Dulaimi, M (2024) A thematic analysis of the organisational influences on digitalisation in construction firms. Journal of Engineering, Design and Technology, 22(6), pp. 1755-1772. ISSN 1726-0531
Zulu, S L; Zulu, E; Chabala, M and Chunda, N (2023) Drivers and barriers to sustainability practices in the Zambian construction industry. International Journal of Construction Management, 23(12), pp. 2116-2125. ISSN 1562-3599
Zuppa, D; Olbina, S and Issa, R (2016) Perceptions of trust in the US construction industry. Engineering, Construction and Architectural Management, 23(2), pp. 211-236. ISSN 0969-9988
van Heerden, A; Boulic, M; McDonald, B W and Chawynski, G (2025) Gender-perceived workplace stressors by New Zealand construction professionals. International Journal of Construction Management, 25(3), pp. 289-300. ISSN 1562-3599
van Wyk, L; Kajimo-Shakantu, K and Opawole, A (2024) Adoption of innovative technologies in the South African construction industry. International Journal of Building Pathology and Adaptation, 42(3), pp. 410-429. ISSN 23984708
Up a level