Items with Index Term: construction process
Abadi, M (2005) Issues and challenges in communication within design teams in the construction industry: Investigation the use of virtual teams and information and communication technologies in the UK construction industry. PhD thesis, University of Manchester, UK.
Abadi, M and Sammuneh, M A (2020) Integrating circular economy and constructability research: An initial development of a lifecycle "circularity" assessment framework and indicators. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Abanda, F H and Tah, J H M (2008) Towards developing a sustainable building technology ontology. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Abankwa, Derek Asante (2021) What drives technology adaptation in construction firms? An investigation of the antecedents, adaptive behaviours, and outcomes. PhD thesis, University of Hong Kong, Hong Kong.
Abas, N H; Blismas, N and Lingard, H (2021) Development of risk assessment tool using damaging energy and argumentation theory for evaluating construction occupational safety and health risks. Engineering, Construction and Architectural Management, 28(10), pp. 2967-2993. ISSN 0969-9988
Abbasi, S; Taghizade, K and Noorzai, E (2020) BIM-based combination of takt time and discrete event simulation for implementing just in time in construction scheduling under constraints. Journal of Construction Engineering and Management, 146(12): 04020143, ISSN 0733-9364
Abd Jamil, A H and Fathi, M S (2018) Contractual challenges for BIM-based construction projects: A systematic review. Built Environment Project and Asset Management, 8(4), pp. 372-385. ISSN 2044-124X
Abd Jamil, A H and Fathi, M S (2020) Enhancing BIM-based information interoperability: Dispute resolution from legal and contractual perspectives. Journal of Construction Engineering and Management, 146(7): 05020007, ISSN 0733-9364
Abdulhadi, N H (1997) Simulation as a tool for re-engineering construction processes. PhD thesis, University of Colorado at Boulder, USA.
Abeysinghe, G and Urand, D (1999) Why use enactable models of construction processes? Journal of Construction Engineering and Management, 125(6), pp. 437-447. ISSN 0733-9364
Abourizk, S M; Halpin, D W and Wilson, J R (1994) Fitting beta distributions based on sample data. Journal of Construction Engineering and Management, 120(2), pp. 288-305. ISSN 0733-9364
Abowitz, D A and Toole, T M (2010) Mixed method research: Fundamental issues of design, validity, and reliability in construction research. Journal of Construction Engineering and Management, 136(1), pp. 108-116. ISSN 0733-9364
Abrahams, G (2017) Constructing definitions of sustainable development. Smart and Sustainable Built Environment, 6(1), pp. 34-47. ISSN 2046-6099
Abuelmaatti, A and Ahmed, V (2010) The potential of collaborative environments implementation in small and medium enterprises for the construction industry. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Abukhder, J and Munns, A K (2003) Attributing management problems on construction projects to project information. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Abukhder, J S A (2004) A study of the management process on construction projects, and the development of a new notation system. PhD thesis, University of Dundee, UK.
Adio, Obafemi Adekunle (2022) An automated knowledge-based decision support system for managing non-conformances on australia's large infrastructure projects. PhD thesis, University of Melbourne, Australia.
Adjei-Kumi, T (1997) The development of an intelligent system for visual simulation of construction projects. PhD thesis, University of Strathclyde, UK.
Ahiakwo, O A (2015) Improving construction processes in Nigeria using the Last Planner® System. PhD thesis, University of Wolverhampton, UK.
Ahmad, I U; Russell, J S and Abou-Zeid, A (1995) Information technology (IT) and integration in the construction industry. Construction Management and Economics, 13(2), pp. 163-171. ISSN 01446193
Ahmad, S; Soetanto, R and Goodier, C (2019) Lean approach in precast concrete component production. Built Environment Project and Asset Management, 9(3), pp. 457-470. ISSN 2044-124X
Ahmadian Fard Fini, A; Maghrebi, M; Forsythe, P J and Waller, T S (2022) Using existing site surveillance cameras to automatically measure the installation speed in prefabricated timber construction. Engineering, Construction and Architectural Management, 29(2), pp. 573-600. ISSN 0969-9988
Ahmed, S and Sobuz, M H R (2020) Challenges of implementing lean construction in the construction industry in Bangladesh. Smart and Sustainable Built Environment, 9(2), pp. 174-207. ISSN 2046-6099
Ahmed, S M (1993) An integrated total quality management (TQM) model for the construction process. PhD thesis, Georgia Institute of Technology, USA.
Ahmed, V; Aziz, Z; Tezel, A and Riaz, Z (2018) Challenges and drivers for data mining in the AEC sector. Engineering, Construction and Architectural Management, 25(11), pp. 1436-1453. ISSN 0969-9988
Ajayi, S O (2017) Design, procurement and construction strategies for minimizing waste in construction projects. PhD thesis, University of the West of England, Bristol, UK.
Akanmu, A; Anumba, C and Messner, J (2014) Critical review of approaches to integrating virtual models and the physical construction. International Journal of Construction Management, 14(4), pp. 267-282. ISSN 1562-3599
Akanmu, A and Anumba, C J (2015) Cyber-physical systems integration of building information models and the physical construction. Engineering, Construction and Architectural Management, 22(5), pp. 516-535. ISSN 0969-9988
Akbas, R (2003) Geometry-based modeling and simulation of construction processes. PhD thesis, Stanford University, USA.
Akhavian, Reza (2015) Data-driven simulation modeling of construction and infrastructure operations using process knowledge discovery. PhD thesis, University of Central Florida, USA.
Akinradewo, O; Aigbavboa, C; Aghimien, D; Oke, A and Ogunbayo, B (2023) Modular method of construction in developing countries: The underlying challenges. International Journal of Construction Management, 23(8), pp. 1344-1354. ISSN 1562-3599
Akinsola, A O (1997) An intelligent model of variations' contingency on constructions projects. PhD thesis, University of Wolverhampton, UK.
Akintoye, A and Fitzgerald, E (2000) A survey of current cost estimating practices in the UK. Construction Management and Economics, 18(2), pp. 161-172. ISSN 01446193
Al Hosani, S (2022) A framework for the implementation of 'Lean' construction principles in Engineering, Procurement and Construction (EPC) in the oil and gas industry. PhD thesis, Aberystwyth University, UK.
Al Nasseri, H and Aulin, R (2016) Understanding management roles and organisational behaviours in planning and scheduling based on construction projects in Oman. Journal of Construction in Developing Countries, 21(1), pp. 1-18. ISSN 1823-6499
Al Sanad, S A (2014) The promotion of sustainable construction practices in Kuwait. PhD thesis, University of Manchester, UK.
Al-Bahar, J F (1988) Risk management in construction projects: A systematic analytical approach for contractors. PhD thesis, University of California, Berkeley, USA.
Al-Hammad, I A (1991) A knowledge-based framework for construction methods selection. PhD thesis, University of British Columbia, Canada.
Al-Hashimy, H. N. H.; Yao, J.; Pitchay, A. A. and Hussein, W. N. (2026) Linking computerised accounting information systems to innovation, resilience and performance in construction projects. Engineering, Construction and Architectural Management, pp. 1-21. ISSN 0969-9988
Al-Musallam, A A (2002) A web-based approach for coordinating architectural drawings with other construction documents. PhD thesis, Illinois Institute of Technology, USA.
Al-Omari, T (2004) Stochastic regression modelling of cost and duration overrun of construction projects implemented in Kuwait. PhD thesis, University of Liverpool, UK.
Al-Sedairy, S (1984) Large scale projects: management, design and execution. PhD thesis, University of Sheffield, UK.
Al-Sehali, J (2001) A framework for total quality management in the construction industry in Bahrain. PhD thesis, Loughborough University, UK.
Al-Sudairi, A A (2000) Evaluation of construction processes: Traditional practices versus lean principles. PhD thesis, University of Colorado at Boulder, USA.
Al-Sudairi, A A (2007) Evaluating the effect of construction process characteristics to the applicability of lean principles. Construction Innovation, 7(1), pp. 99-121. ISSN 1471-4175
Al-Zarooni, S (1997) Developing the construction industry in the United Arab Emirates with special reference to Abu Dhabi. PhD thesis, University of London, University College London, UK.
Alaboud, N S M (2016) Development of a framework to enhance communication practice for site-based construction workers in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.
Alamil, H M (2022) Knowledge sharing within the Kingdom of Saudi Arabia large construction organisations. PhD thesis, University of Wolverhampton, UK.
Albogamy, A and Dawood, N (2015) Development of a client-based risk management methodology for the early design stage of construction processes: Applied to the KSA. Engineering, Construction and Architectural Management, 22(5), pp. 493-515. ISSN 0969-9988
Alfeld, L E (1990) Construction delays: A simulation analysis. DSc thesis, Washington University in St. Louis, USA.
Alhumayn, S A (2018) Developing a framework for BIM implementation in the saudi arabian construction industry. PhD thesis, University of Wolverhampton, UK.
Ali, S A A; Arun, C and Krishnamurthy, K (2021) Re-defining flow in construction process for facilitating the identification and quantification of generic overruns existing in construction industry today. International Journal of Construction Management, 21(2), pp. 113-130. ISSN 1562-3599
Ali Amjad, A (2003) A causal path model to measure the effects of professional training upon time overruns in Saudi construction industry. PhD thesis, Heriot-Watt University, UK.
Alkoc, E and Erbatur, F (1998) Site expert: A prototype knowledge-based expert system. Engineering, Construction and Architectural Management, 5(3), pp. 238-251. ISSN 0969-9988
Allan, C; Sommerville, J; Kennedy, P and Robertson, H (2000) A business unit approach to construction process re-engineering. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Almasoud, A S (1996) A simulation model for repetitive project scheduling. PhD thesis, University of Colorado at Boulder, USA.
Alnsour, J A M (2006) Planning and managing the built environment in the context of compliance with residential standards in Jordan. PhD thesis, University of Huddersfield, UK.
Alves, T d C L; Neuman, Y; Walsh, K D; Needy, K L and AlMaian, R (2020) Highly effective companies in supplier quality surveillance practices: A quantitative analysis. Construction Management and Economics, 38(3), pp. 239-258. ISSN 01446193
Alzohbi, M G M (2015) A framework for evaluating material management performance in Jordanian concrete building projects. PhD thesis, Sheffield Hallam University, UK.
Amaratunga, D; Malalgoda, C I and Keraminiyage, K (2018) Contextualising mainstreaming of disaster resilience concepts in the construction process. International Journal of Disaster Resilience in the Built Environment, 9(4-5), pp. 348-367. ISSN 1759-5916
Ambrose, M D and Tucker, S N (2000) Procurement system evaluation for the construction industry. Journal of Construction Procurement, 6(2), ISSN 1358-9180
Amjad Mohammadi, A; Safaeipour, H; Chenaghlou, M R; Behnejad, A and Afghani Khoraskani, R (2024) Configuration processing and construction of large-span karbandi vaults: A case of the karbandi vaulting of haj-mohammad-qoli timche in tabriz historic bazaar. Engineering, Construction and Architectural Management, 31(1), pp. 432-468. ISSN 0969-9988
Ancell, D J (2007) Performance-based contracting in construction: innovation for the brave? PhD thesis, University of Reading, UK.
Andersson, N (2003) A mesoeconomic analysis of the construction sector. PhD thesis, Lund University, Sweden.
Ansah, S K (2018) An integrated total quality management model for the Ghanaian construction industry. DPhil thesis, University of Johannesburg, South Africa.
Anson, M; Ying, K C T and Siu, M F F (2019) Analytical models towards explaining the difficulty in efficiently matching site concrete supply resources with placing crew needs. Engineering, Construction and Architectural Management, 26(8), pp. 1672-1695. ISSN 0969-9988
Antunes, R; González, V A; Walsh, K; Rojas, O; O'Sullivan, M and Odeh, I (2018) Benchmarking project-driven production in construction using productivity function: Capacity and cycle time. Journal of Construction Engineering and Management, 144(3): 04017118, ISSN 0733-9364
Anukaenyi, V; Gbadamosi, A Q; Mahamadu, A M and Olawale, O (2023) Enhancing offsite construction for UK SMEs through building information modelling: A comprehensive analysis. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Aoieong, R T; Tang, S L and Ahmed, S M (2002) A process approach in measuring quality costs of construction projects: Model development. Construction Management and Economics, 20(2), pp. 179-192. ISSN 01446193
Aoieong, Raymond Taiman (2004) Capturing quality costs of construction processes using the construction process cost model (CPCM). PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Appau, K A (1994) An integrated model of computer-aided cost estimating/scheduling in construction management. PhD thesis, Georgia Institute of Technology, USA.
Arain, F M and Pheng, L S (2005) How design consultants perceive potential causes of variation orders for institutional buildings in Singapore. Architectural Engineering and Design Management, 1(3), pp. 181-196. ISSN 1745-2007
Aranda-Mena, G; Sher, W; Gameson, R and Ward, P (2005) Evolving trends in nD modelling: The 'construction planning workbench'. Architectural Engineering and Design Management, 1(2), pp. 111-126. ISSN 1745-2007
Arditi, D and Alavipour, S M R (2019) Trends in expectations about duties and responsibilities of construction managers. Journal of Construction Engineering and Management, 145(7): 04019037, ISSN 0733-9364
Arditi, D; Elhassan, A and Toklu, Y C (2002) Constructability analysis in the design firm. Journal of Construction Engineering and Management, 128(2), pp. 117-126. ISSN 0733-9364
Arditi, D and Ongkasuwan, D (2009) Duties and responsibilities of construction managers: Perceptions of parties involved in construction. Journal of Construction Engineering and Management, 135(12), pp. 1370-1374. ISSN 0733-9364
Arogundade, S; Dulaimi, M and Ajayi, S (2024) Exploring the challenges impeding construction process carbon reduction in the UK. International Journal of Construction Management, 24(4), pp. 422-431. ISSN 1562-3599
Arshad, H; Qasim, M; Thaheem, M J and Gabriel, H F (2017) Quantification of material wastage in construction industry of Pakistan: An analytical relationship between building types and waste generation. Journal of Construction in Developing Countries, 22(2), pp. 19-34. ISSN 1823-6499
Ashraf, Hassan (2018) Psychological conflict management climate in general contractor's project organization and its influence on project performance: exploring multiple psychosocial and behavioral pathways. PhD thesis, University of Hong Kong, Hong Kong.
Aslam, M; Gao, Z and Smith, G (2022) Framework for selection of lean construction tools based on lean objectives and functionalities. International Journal of Construction Management, 22(8), pp. 1559-1570. ISSN 1562-3599
Assaad, R; El-Adaway, I H; Hastak, M and Needy, K L (2020) Commercial and legal considerations of offsite construction projects and their hybrid transactions. Journal of Construction Engineering and Management, 146(12): 05020019, ISSN 0733-9364
Assadi, S O A (1997) An investigation of the records kept by supervisors on construction sites. PhD thesis, University of Newcastle upon Tyne, UK.
Athanasopoulou, E (2008) Delays in construction projects using traditional contract forms: Causes and effects. PhD thesis, University College London, UK.
Atkin, B L (1988) Time-cost planning of construction. PhD thesis, University of Reading, UK.
Attar, A; Boudjakdji, M A; Bhuiyan, N; Grine, K; Kenai, S and Aoubed, A (2009) Integrating numerical tools in underground construction process. Engineering, Construction and Architectural Management, 16(4), pp. 376-391. ISSN 0969-9988
Attarzadeh, M; Nath, T and Tiong, R L K (2015) Identifying key factors for building information modelling adoption in Singapore. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(5), pp. 220-231. ISSN 17514304
Atuahene, B T; Kanjanabootra, S and Gajendra, T (2020) Benefits of big data application experienced in the construction industry: A case of an Australian construction company. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Atuahene, B T; Kanjanabootra, S and Gajendran, T (2018) Towards an integrated framework of big data capabilities in the construction industry: A systematic literature review. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Atuahene, B T; Kanjanabootra, S and Gajendran, T (2022) Preliminary benefits of big data in the construction industry: a case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(2), pp. 67-77. ISSN 17514304
Atuahene, B T; Kanjanabootra, S and Gajendran, T (2023) Transformative role of big data through enabling capability recognition in construction. Construction Management and Economics, 41(3), pp. 208-231. ISSN 01446193
Awolusi, I G (2017) Active construction safety leading indicator data collection and evaluation. PhD thesis, University of Alabama, USA.
Awolusi, I G and Marks, E D (2017) Safety activity analysis framework to evaluate safety performance in construction. Journal of Construction Engineering and Management, 143(3): 05016022, ISSN 0733-9364
Aziz, N M and Zainon, N (2023) Driving factors for lean-BIM implementation in Malaysia's construction industry: Qualitative interview-based study. Smart and Sustainable Built Environment, 12(4), pp. 872-891. ISSN 2046-6099
Bademosi, F M (2019) Robotics and automation in construction: Assessment of knowledge, skills and abilities necessary for talent cultivation in industry and education. PhD thesis, University of Florida, USA.
Bajpai, A and Misra, S C (2024) Evaluation of success factors to implement digitalization in the construction industry. Construction Innovation, 24(4), pp. 865-891. ISSN 1471-4175
Bakkeren, W J C (1997) Computer-integrated structural engineering: Supporting the structural engineer's participation in a computer-integrated construction process. PhD thesis, Delft University of Technology, Netherlands.
Bakogiannis, A (2005) Managing stakeholders: A case study in Athens, Greece. PhD thesis, University College London, UK.
Baldry, D (1997) The image of construction and its influence upon clients, participants, and consumers. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Balina, C M (2002) Using labor productivity data to evaluate the application of lean principles to the concrete construction process. PhD thesis, Pennsylvania State University, USA.
Bamford, N; Charters, W; Lacey, R; Mills, A; Radovic, D; Robinson, J; Williams, P and Yencken, D (1998) Environment and sustainability in commercial office buildings. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Bamisile, A (1991) A communication system approach to the management of quality in construction. PhD thesis, Open University, UK.
Banawi, A and Bilec, M M (2014) A framework to improve construction processes: Integrating lean, green and six sigma. International Journal of Construction Management, 14(1), pp. 45-55. ISSN 1562-3599
Banawi, A A (2013) Improving construction processes by integrating lean, green, and six-sigma. PhD thesis, University of Pittsburgh, USA.
Bansal, V K and Pal, M (2011) Construction projects scheduling using GIS tools. International Journal of Construction Management, 11(1), pp. 1-18. ISSN 1562-3599
Barakat, T A H (2009) A hybrid model of communication and information management in mega construction projects in Dubai using a new critical success factor approach. PhD thesis, Loughborough University, UK.
Barcia, R M (1985) Construction production planning and optimal control. PhD thesis, University of Waterloo, Canada.
Barnes, C J (1999) A methodology for the concurrent design of products and their assembly sequence. PhD thesis, Cranfield University, UK.
Barnes, W C (2000) Defective workmanship: A transatlantic analysis of construction law and practice. PhD thesis, University of Birmingham, UK.
Bataw, A (2016) On the integration of building information modelling in undergraduate civil engineering programmes in the United Kingdom. PhD thesis, University of Manchester, UK.
Battikha, M (2000) A computer-based system for construction quality management with application to highway pavements. PhD thesis, University of British Columbia, Canada.
Bauer, E and Menches, C L (2011) Why we need renaissance engineers: Golden Gate bridge seismic retrofit Phase II case study. Journal of Construction Engineering and Management, 137(10), pp. 901-905. ISSN 0733-9364
Bavafa, M (2015) Enhancing information quality through building information modelling implementation within UK structural engineering organisations. PhD thesis, University of Salford, UK.
Beech, N (2012) Constructing everyday life: an architectural history of the South Bank in production, 1948-1951. PhD thesis, University College London, UK.
Behzadan, A H (2008) Arviscope: Georeferenced visualization of dynamic construction processes in three-dimensional outdoor augmented reality. PhD thesis, University of Michigan, USA.
Bello, A O; Abdulraheem, A A; Agboola, S A and Afolabi, O P (2025) Factors influencing the adoption of distributed ledger technology in developing countries: An examination of Nigerian construction industry. International Journal of Construction Education and Research, 21(3), pp. 290-320. ISSN 1557-8771
Bengtsson, S H (2017) Innovation in the construction industry: Factors, actors and the client's role. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Bengtsson, S H and Rosander, L (2018) Public clients' possibilities to initiate sustainable change: Exploring two Swedish clients' procurement strategies. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Benhaim, M (1997) Interfirm relationships within the construction industry: Towards the emergence of networks? A comparative study between France and the UK. PhD thesis, Brunel University, UK.
Bennett, Brian Kevin (2023) Increasing knowledge of scheduling activity sequencing in construction management education using interactive 3D gaming models. PhD thesis, University of Florida, USA.
Bentley, D (2000) Control and emergence: The paradox of construction management. PhD thesis, University of Hertfordshire, UK.
Bernold, L E (1985) Productivity transients in construction processes. PhD thesis, Georgia Institute of Technology, USA.
Bernold, L E (1989) Simulation of nonsteady construction processes. Journal of Construction Engineering and Management, 115(2), pp. 163-178. ISSN 0733-9364
Bernold, L E and Salim, M (1993) Placement-oriented design and delivery of concrete reinforcement. Journal of Construction Engineering and Management, 119(2), pp. 323-335. ISSN 0733-9364
Berry, M J (2000) An investigation into the incidence effect and management of conflict arising out of the construction process: A case study based approach. PhD thesis, University of Wales, UK.
Besklubova, S; Zhong, R Y and Tan, B Q (2025) An integrated model of a prefabrication hub feasibility assessment: A Hong Kong case. International Journal of Construction Management, 25(11), pp. 1300-1312. ISSN 1562-3599
Betts, M and Wood-Harper, T (1994) Re-engineering construction: A new management research agenda. Construction Management and Economics, 12(6), pp. 551-556. ISSN 01446193
Bhawani, S (2021) A function-based lean construction methods ontology supporting the lean implementation planning process developed for construction projects. PhD thesis, Pennsylvania State University, USA.
Bidarianzadeh, G R and Fortune, C J (2002) Lean thinking and the delivery of sustainable construction projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Bijleveld, F R and Dorée, A G (2014) Method-based learning: A case in the asphalt construction industry. Construction Management and Economics, 32(7-8), pp. 665-681. ISSN 01446193
Bijleveld, F R; Miller, S R and Dorée, A G (2015) Making operational strategies of asphalt teams explicit to reduce process variability. Journal of Construction Engineering and Management, 141(5): 04015002, ISSN 0733-9364
Bijleveld, Frank (2015) Professionalising the asphalt construction process: Aligning information technologies, operators' knowledge and laboratory practices. PhD thesis, University of Twente, Netherlands.
Bijleveld F R, D e A G (2013) Method-based learning: A case in the asphalt construction industry. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Bilec, M M (2007) A hybrid life cycle assessment model for construction processes. PhD thesis, University of Pittsburgh, USA.
Birnie, J and Yates, A (1991) Cost prediction using decision/risk analysis methodologies. Construction Management and Economics, 9(2), pp. 171-186. ISSN 01446193
Birrell, G S (1985) General contractors' management: How subs evaluate it. Journal of Construction Engineering and Management, 111(3), pp. 244-259. ISSN 0733-9364
Birrell, George Selbie (1978) The criteria by which construction prime and subcontractors evaluate the management performance of each other. DArch thesis, University of Michigan, USA.
Bjork, B-C (1996) Requirements and information structures for building product data models. DTech thesis, Teknillinen Korkeakoulu (Helsinki), Finland.
Björk, B (2002) A formalised model of the information and materials handling activities in the construction process. Construction Innovation, 2(3), pp. 133-149. ISSN 1471-4175
Björnfot, A and Jongeling, R (2007) Application of line-of-balance and 4D CAD for lean planning. Construction Innovation, 7(2), pp. 200-211. ISSN 1471-4175
Blaza, S (1995) Implementing an integrated management information system in a medium sized construction firm. PhD thesis, Sheffield Hallam University, UK.
Blismas, N and Wakefield, R (2009) Drivers, constraints and the future of offsite manufacture in Australia. Construction Innovation, 9(1), pp. 72-83. ISSN 1471-4175
Boby, P. R.; Mwanza, F. and Samuel, E. B. (2025) Use of building information modelling to reduce the carbon emissions of housing in Zambia. Architectural Engineering and Design Management, 21(5), pp. 1057-1072. ISSN 1745-2007
Borja, Luis Claudio Alves (2019) Development of a quantitative method for predicting environmental aspects generated by construction sites. PhD thesis, Universidade Federal da Bahia, Brazil.
Bos-de Vos, M; Volker, L and Wamelink, H (2015) Prioritizing quality over profit: Value trade-offs within architect-client relations. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Bourdeau, L (1999) Sustainable development and the future of construction: A comparison of visions from various countries. Building Research & Information, 27(6), pp. 354-366. ISSN 0961-3218
Bowron, J (2002) Re-engineering the project procurement process through concurrent engineering. PhD thesis, Loughborough University, UK.
Boyd, D (2011) An evaluation of a system change in the purchasing of construction materials by local authorities. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Boyd, P and Schweber, L (2018) Unintended consequences: Institutional artefacts, closure mechanisms and the performance gap. Building Research & Information, 46(1), pp. 10-22. ISSN 0961-3218
Boz, M A and El-Adaway, I H (2015) Creating a holistic systems framework for sustainability assessment of civil infrastructure projects. Journal of Construction Engineering and Management, 141(2): 04014067, ISSN 0733-9364
Br chner, J (1994) Precontractual investigation and risk aversion. Engineering, Construction and Architectural Management, 1(2), pp. 91-101. ISSN 0969-9988
Bradford, C W (2017) The impact of the systematic incorporation of tolerances on gypsum board installation. PhD thesis, Indiana State University, USA.
Brady, D A (2014) Using visual management to improve transparency in planning and control in construction. PhD thesis, University of Salford, UK.
Bragadin, M A and Kähkönen, K (2016) Schedule health assessment of construction projects. Construction Management and Economics, 34(12), pp. 875-897. ISSN 01446193
Brauner, M (2020) Developing an optimized sustainability assessment tool for building information modelling (BIM) systems: incorporation of hygrothermal modelling into BIM. PhD thesis, Auckland University of Technology, New Zealand.
Bremer, W and Kok, K (2000) The Dutch construction industry: A combination of competition and corporatism. Building Research & Information, 28(2), pp. 98-108. ISSN 0961-3218
Brockman, J L (2014) Interpersonal conflict in construction: Cost, cause, and consequence. Journal of Construction Engineering and Management, 140(2): 04013050, ISSN 0733-9364
Bruno, Silvana (2019) The implementation of automatic diagnostics and monitoring towards diagnosis-aided historic building information modelling and management. PhD thesis, Politecnico di Bari, Italy.
Bruun, E P G (2024) Structural scaffold-free cooperative robotic fabrication. PhD thesis, Princeton University, USA.
Bröchner, J (1990) Impacts of information technology on the structure of construction. Construction Management and Economics, 8(2), pp. 205-218. ISSN 01446193
Bröchner, J (2009) Construction metaphors in Aristotle: Knowledge, purpose, process. Construction Management and Economics, 27(5), pp. 515-523. ISSN 1466433X
Bullen, P A and Davis, P R (2003) Explorations in sustainable construction and procurement in western Australia. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Burrows, B G (1989) Organisation and quality of falsework construction: A socio-economic study of the organisational structure of the construction industry with respect to the falsework production process and the quality of workmanship attained. PhD thesis, University of Warwick, UK.
Burrows, B G and Seymour, D E (1983) The evaluation of change in the construction industry. Construction Management and Economics, 1(3), pp. 199-215. ISSN 01446193
Butkovic, B (2019) A framework for developing 4D level-of-detail on construction projects. PhD thesis, University of Wolverhampton, UK.
Bygballe, L E; Håkansson, H and Jahre, M (2013) A critical discussion of models for conceptualizing the economic logic of construction. Construction Management and Economics, 31(2), pp. 104-118. ISSN 1466433X
Bártolo, H M G (2000) Improving the value of design: A quality/cost approach. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Cai, Q Y; Ng, F F; Chen, H and Ding, Z K (2004) A framework for intelligent change management in the construction process. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Campagnac, E (2000) The contracting system in the French construction industry: Actors and institutions. Building Research & Information, 28(2), pp. 131-140. ISSN 0961-3218
Campbell, K; Clegg, D R; Perera, T; Stephenson, P and Stevens, A (1997) Simulation in the construction industry: A case-study review. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Casanovas-Rubio, M D M; Armengou, J and Ramos, G (2014) Occupational risk index for assessment of risk in construction work by activity. Journal of Construction Engineering and Management, 140(1): 04013035, ISSN 0733-9364
Castronovo, F (2016) Assessing problem-solving skills in construction education with the virtual construction simulator. PhD thesis, Pennsylvania State University, USA.
Cavalcante, Marcelo Gadelha (2019) Formation of operational risk in civil construction. PhD thesis, Universidade de Fortaleza, Brazil.
Ceric, A (2003) A framework for process-driven risk management in construction projects. PhD thesis, University of Salford, UK.
Chan, K Y (2012) Optimizing construction planning and scheduling by virtual prototyping enabled resource analysis. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Chang, D Y-M (1986) RESQUE: A resource based simulation system for construction process planning. PhD thesis, University of Michigan, USA.
Chang, H-H (2002) N-dimensional construction management information system (NDCON): System design and performance modeling through the zero -buffered project management philosophy. PhD thesis, Columbia University, USA.
Chang, R and Antwi-Afari, M F (2025) Critical success factors for implementing 3D printing technology in construction projects: Academics and construction practitioners' perspectives. Construction Innovation, 25(3), pp. 843-866. ISSN 1471-4175
Chapman, P H J (2009) Dispute boards on major infrastructure projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(1), pp. 7-16. ISSN 17514312
Chehayeb, N N (1996) Simulation-based project control. PhD thesis, University of Alberta, Canada.
Chen, B (2018) Contribution of process-technology fit to IT business value: the case of BIM in the construction industry. PhD thesis, University of Hong Kong, Hong Kong.
Chen, C (2019) Heterogeneous integration of BIM with low-cost indoor mobile laser scanning method for building fabric maintenance in China. PhD thesis, University of Nottingham, UK.
Chen, K (2018) The quest for the holy grail : bridging BIM and building for information management in construction. PhD thesis, University of Hong Kong, Hong Kong.
Chen, R; Tan, Y; Zhang, B; Shen, W; Liu, G and Wang, Z (2018) Installation of integral prefabricated bridge abutment and pier with flexible water stop curtain. Journal of Construction Engineering and Management, 144(9): 04018087, ISSN 0733-9364
Chen, S-M (2002) Intelligent scheduling model and multi-dimensional CM information system. PhD thesis, Columbia University, USA.
Chen, W; Yang, Z; Yan, H and Zhao, Y (2025) How to reduce construction risks in rural areas: an evolutionary game analysis. Engineering, Construction and Architectural Management, 32(7), pp. 4495-4521. ISSN 0969-9988
Chen, X; Chang-Richards, A Y; Pelosi, A; Jia, Y; Shen, X; Siddiqui, M K and Yang, N (2022) Implementation of technologies in the construction industry: A systematic review. Engineering, Construction and Architectural Management, 29(8), pp. 3181-3209. ISSN 0969-9988
Chen, Zhanliang (2024) Narrative carpentry: A study on conservation organisations for traditional Chinese timber structures. DDes thesis, Harvard University, USA.
Cheng, M Y; Su, C W and You, H Y (2003) Optimal project organizational structure for construction management. Journal of Construction Engineering and Management, 129(1), pp. 70-79. ISSN 0733-9364
Chew, A T W and Ling, F Y Y (2002) Increasing Singapore's construction productivity through construction process re-engineering. Journal of Construction Research, 3(1), pp. 123-45. ISSN 1609-9451
Chiang, Y H; Tang, B S and Wong, F (2008) Volume building as competitive strategy. Construction Management and Economics, 26(2), pp. 161-176. ISSN 1466433X
Chih, Y Y; Kiazad, K; Li, M; Capezio, A; Zhou, L and Restubog, S L D (2017) Broken promises: Implications for the job insecurity and job performance of Chinese construction workers. Journal of Construction Engineering and Management, 143(4): 04016114, ISSN 0733-9364
Chileshe, N and Dzisi, E (2012) Benefits and barriers of construction health and safety management (HSM): Perceptions of practitioners within design organisations. Journal of Engineering, Design and Technology, 10(2), pp. 276-298. ISSN 1726-0531
Cho, Y J (2003) A layered architecture supporting the collaborative design of virtual environments for science inquiry. PhD thesis, University of Illinois at Chicago, USA.
Choudhry, R M; Aslam, M A and Arain, F M (2014) Cost and schedule risk analysis of bridge construction in Pakistan: Establishing risk guidelines. Journal of Construction Engineering and Management, 140(7): 04014020, ISSN 0733-9364
Chowdhooree, I and Das, K K (2022) Indigenous knowledge of mud architecture: Experiences of surviving against multiple natural hazards. International Journal of Disaster Resilience in the Built Environment, 13(4), pp. 451-469. ISSN 1759-5916
Christofferson, J P (1996) Computer-integrated specification information flow through the residential construction process. PhD thesis, Colorado State University, USA.
Chua, D K H; Shen, L J and Bok, S H (2003) Constralnt-based planning with integrated production scheduler over internet. Journal of Construction Engineering and Management, 129(3), pp. 293-301. ISSN 0733-9364
Cirelli Jr., L R (2017) Impact of design fees and duration of design process on construction quality: Implications for quality management. PhD thesis, Baker College (Michigan), USA.
Clarke, L (2006) Valuing labour. Building Research & Information, 34(3), pp. 246-256. ISSN 0961-3218
Clarke, L and Herrmann, G (2004) Cost vs. Production: Labour deployment and productivity in social housing construction in England, Scotland, Denmark and Germany. Construction Management and Economics, 22(10), pp. 1057-1066. ISSN 01446193
Clarke, L; Sahin-Dikmen, M and Winch, C (2020) Transforming vocational education and training for nearly zero-energy building. Buildings & Cities, 1(1), pp. 650-661. ISSN 2632-6655
Clegg, D R (1999) A construction-specific simulation-based framework for earthworks. PhD thesis, Sheffield Hallam University, UK.
Clegg, D R; Campbell, K; Stephenson, P and Perera, T (1997) Planning road construction using simulation. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Clifford-Lindkvist, C and Elmualim, A (2008) The socio-technical shaping of innovation in facilities management. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Coble, R J and Haupt, T C (2000) Effecting safety in affordable housing projects using automation. Journal of Construction Research, 1(1), pp. 1-8. ISSN 1609-9451
Coenen, T B J; Volker, L and Visscher, K (2023) Circular infrastructure in terms of institutional logics. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Cole, R J (2000) Building environmental assessment methods: Assessing construction practices. Construction Management and Economics, 18(8), pp. 949-957. ISSN 01446193
Connaughton, J N (1993) Making and implementing industrial building investment decisions. PhD thesis, University of Greenwich, UK.
Cory, C A (2019) Building information modeling (BIM) - to prepare current construction management students for tomorrow’s construction careers. PhD thesis, Purdue University, USA.
Cotgrave, A J (2008) Achieving literacy in sustainability: shifting the paradigm for construction management education. PhD thesis, Liverpool John Moores University, UK.
Couto, A and Couto, J (2007) Why deconstruction is not adequately considered in Portuguese building refurbishment. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Cui, L Z; Liu, J; Luo, H; Wang, J; Zhang, X; Lv, G and Xie, Q (2024) Deformation measurement of tunnel shotcrete liner using the multiepoch lidar point clouds. Journal of Construction Engineering and Management, 150(6): 04024049, ISSN 0733-9364
Da Rocha, C G and Kemmer, S L (2013) Method to implement delayed product differentiation in construction of high-rise apartment building projects. Journal of Construction Engineering and Management, 139(10): 05013001, ISSN 0733-9364
Dabbas, M A A (1981) Computerized decision making in construction. PhD thesis, Georgia Institute of Technology, USA.
Dabirian, S; Moussazadeh, M; Khanzadi, M and Abbaspour, S (2023) Predicting the effects of congestion on labour productivity in construction projects using agent-based modelling. International Journal of Construction Management, 23(4), pp. 606-618. ISSN 1562-3599
Dai, J (2006) A latent analysis and prototype system to manage jobsite factors impacting construction labor productivity. PhD thesis, University of Kentucky, USA.
Damrianant, Jirawat (1999) Petri net-based systems for construction-process modelling and simulation. PhD thesis, University of New South Wales, Australia.
Daniel, E I (2017) Exploratory study into the use of Last Planner® System and collaborative planning for construction process improvement. PhD thesis, Nottingham Trent University, UK.
Daoud, A O E (2021) Materials procurement conceptual framework for minimising waste in the Egyptian construction industry. PhD thesis, London South Bank University, UK.
Datta, A; Ninan, J and Sankaran, S (2020) 4D visualization to bridge the knowing-doing gap in megaprojects: An Australian case study. Construction Economics and Building, 20(4), pp. 25-41. ISSN 2204-9029
Dauda, J A; Chavan, N N; Saka, A B; Ajayi, S O and Oyegoke, A S (2025) An appraisal of barriers to digitalisation of construction industry in developing countries: perspective from India. International Journal of Construction Management, 25(7), pp. 770-782. ISSN 1562-3599
Dave, B A (2013) Developing a construction management system based on lean construction and building information modelling. PhD thesis, University of Salford, UK.
Davenport, D M (1997) Client satisfaction with construction cost: A comparative study of French and UK performance. Journal of Financial Management of Property and Construction, 2(3), pp. 77-94. ISSN 1366-4387
Davidson, C H (2001) Technology watch in the construction sector: Why and how? Building Research & Information, 29(3), pp. 233-241. ISSN 0961-3218
Davies, P J; Emmitt, S and Firth, S K (2013) On-site energy management challenges and opportunities: A contractor's perspective. Building Research & Information, 41(4), pp. 450-468. ISSN 0961-3218
Davies, R and Harty, C F (2012) Control, surveillance and the 'dark side' of BIM. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Davies, R J (2003) Formulating competitive strategy in the UK housebuilding industry: Executive summary. EngD thesis, University of Warwick, UK.
Davtalab, O (2018) A data driven software platform for process automation, planning and inspection of contour crafting large-scale robotic 3D printing system. PhD thesis, University of Southern California, USA.
Dawood, N; Sikka, S; Marasini, R and Dean, J (2006) Development of key performance indicators to establish the benefits of 4D planning. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Dawood, N N and Bates, W (2000) A decision support system specification for out-turn cost and cost escalation in the heavy engineering industry. Engineering, Construction and Architectural Management, 7(4), pp. 330-346. ISSN 0969-9988
Dawood, N N; Yasuhara, T; Usuda, Y; Matsuda, C and Sawada, A (2001) Analysis of cost escalation and risk assessment of infrastructure projects: An application in Japanese civil engineering projects. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Day, K D (1989) The administration of the 'botched' FIDIC contract: the problems arising out of the administration of a wrongly 'slanted' contract for turnkey projects. PhD thesis, University of Southampton, UK.
De Azevedo, R C; De Oliveira Lacerda, R T; Ensslin, L; Jungles, A E and Ensslin, S R (2013) Performance measurement to aid decision making in the budgeting process for apartment-building construction: Case study using MCDA-c. Journal of Construction Engineering and Management, 139(2), pp. 225-235. ISSN 0733-9364
De Jarnette, V; McCarthy, L M; Bennert, T and Guercio, M C (2013) Use of mechanistic-empirical pavement design principles to assign asphalt pavement pay factor adjustments. Journal of Construction Engineering and Management, 139(11): 4013024, ISSN 0733-9364
De La Garza, J M; Prateapusanond, A and Ambani, N (2007) Preallocation of total float in the application of a critical path method based construction contract. Journal of Construction Engineering and Management, 133(11), pp. 836-845. ISSN 0733-9364
De Saram, D D (2002) Measuring the quality of contractors' co-ordination activities during the construction process. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Delgado-Hernández, D J (2005) A framework for building quality into construction projects. PhD thesis, University of Birmingham, UK.
Deng, H; Hong, H; Luo, D; Deng, Y and Su, C (2020) Automatic indoor construction process monitoring for tiles based on BIM and computer vision. Journal of Construction Engineering and Management, 146(1): 04019095, ISSN 0733-9364
Deng, Zhong Ming (1995) Extended state space modelling and influence diagrams for construction processes and aids. PhD thesis, University of New South Wales, Australia.
Derrington, P A (1981) Controlling the quality of professional performance in architectural practice. PhD thesis, University of California, Berkeley, USA.
Dharmapalan, V; Gambatese, J A; Fradella, J and Moghaddam Vahed, A (2015) Quantification and assessment of safety risk in the design of multistory buildings. Journal of Construction Engineering and Management, 141(4): 04014090, ISSN 0733-9364
Diaz-Murillo, M (1993) A strategy for the implementation of quality function deployment in the design-construction industry. PhD thesis, Texas A&M University, USA.
Dib, H Y (2006) Visual information access and management for life cycle project management. PhD thesis, University of Florida, USA.
Diekmann, J E and Kim, M P (1992) Superchange: Expert system for analysis of changes claims. Journal of Construction Engineering and Management, 118(2), pp. 399-411. ISSN 0733-9364
Din, Z U (2017) Teaching prevention through design (PTD) principles using a non-traditional pedagogical strategy. PhD thesis, Arizona State University, USA.
Ding, G and Forsythe, P J (2013) Sustainable construction: Life cycle energy analysis of construction on sloping sites for residential buildings. Construction Management and Economics, 31(3), pp. 254-265. ISSN 1466433X
Disney, O; Roupé, M; Johansson, M and Domenico Leto, A (2024) Embracing BIM in its totality: A total BIM case study. Smart and Sustainable Built Environment, 13(3), pp. 512-531. ISSN 2046-6099
Dobraszczyk, P A (2006) Into the belly of the beast: Exploring London's main drainage system, c.1848-1868. PhD thesis, University of Reading, UK.
Domdouzis, K (2007) Applications of wireless sensor technologies in construction. PhD thesis, Loughborough University, UK.
Donkoh, D and Aboagye-Nimo, E (2017) Stakeholders' role in improving Ghana's construction safety. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(2), pp. 68-76. ISSN 17514304
Donyavi, S (2013) Understanding the complexity of materials procurement and the role of technology for small and medium sized enterprises in the construction sector. PhD thesis, University of Reading, UK.
Du, Q; Qi, X; Zou, P X W and Zhang, Y (2024) Bi-objective optimization framework for prefabricated construction service combination selection using genetic simulated annealing algorithm. Engineering, Construction and Architectural Management, 31(10), pp. 3921-3945. ISSN 0969-9988
Du Toit, G J (1997) The potential of labour-intensive construction methods in the provision of urban infrastructure. PhD thesis, University of Pretoria, South Africa.
Duffy, K; Graham, B and Thomas, K (2007) Assessing the potential for construction collaboration technologies (cct) in small to medium enterprises in the Irish construction industry. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Duncan, R; Neale, R H and Bagilhole, B M (1999) Equal opportunities and the reconciliation of work and family within the construction process. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Dunlop, P G (2005) Investigation, modelling and planning of stochastic concrete placing operations. PhD thesis, University of Edinburgh, UK.
Dunlop, P G and Smith, S D (2002) Simulation analysis of the UK concrete delivery and placement process: A tool for planners. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Dunston, P S and Reed, A G (2000) Benefits of small projects team initiative. Journal of Construction Engineering and Management, 126(1), pp. 22-28. ISSN 0733-9364
Duyne Barenstein, J E (2015) Continuity and change in housing and settlement patterns in post-earthquake Gujarat, India. International Journal of Disaster Resilience in the Built Environment, 6(2), pp. 140-155. ISSN 1759-5916
Ebbert, T (2010) Re-face: Refurbishment strategies for the technical improvement of office façades. PhD thesis, Delft University of Technology, Netherlands.
Edirisinghe, R; Stranieri, A and Blismas, N (2016) Information visualisation for the wicked problem of safe construction design. Architectural Engineering and Design Management, 12(4), pp. 296-310. ISSN 1745-2007
Edum-Fotwe, F T; Thorpe, A and McCaffer, R (2000) Assessing potential of on-line transaction for information as a resource in the construction process. Journal of Construction Procurement, 6(2), ISSN 1358-9180
Egebjerg, C (2013) Learning from movie-sets coordination. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Egwunatum, S I; Anumudu, A C; Eze, E C and Awodele, I A (2022) Total quality management (TQM) implementation in the Nigerian construction industry. Engineering, Construction and Architectural Management, 29(1), pp. 354-382. ISSN 0969-9988
Ehsanifar, M and Hemesy, M (2021) A new hybrid multi-criteria decision-making model to prioritize risks in the construction process under fuzzy environment (case study: The Valiasr Street Underpass Project). International Journal of Construction Management, 21(5), pp. 508-523. ISSN 1562-3599
Eid, M E M (2004) Rethinking relationships in the construction industry: integrating sustainable development into project management processes. PhD thesis, University of Edinburgh, UK.
Eksteen, B and Bate, G (2002) The effects of construction on the environment: A case study. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
El Debs, L C; Brunese, P S and Shaurette, M (2018) Use of concept maps to illustrate barriers to construction industry inter-organizational communication: A comparative view from students and professionals. International Journal of Construction Education and Research, 14(2), pp. 77-94. ISSN 1557-8771
El Ghandour, W (2007) Integrated information-based construction simulation system. PhD thesis, University of Alberta, Canada.
El Ghandour, Wael (2007) Integrated information-based construction simulation system (iicss). PhD thesis, University of Alberta, Canada.
El-Choum, M K (1994) Identification and modelling of construction cost overruns parameters for public infrastructure projects using multivariate statistical methods. PhD thesis, Stevens Institute of Technology, USA.
El-Hamrawy, S A K; El-Maaty, A E A and Akal, A Y (2017) Proposed models to measure the quality of highway projects regression analysis vs statistical: fuzzy approach. Engineering, Construction and Architectural Management, 24(6), pp. 988-1003. ISSN 0969-9988
El-Hamrawy, S A-K; Abu El-Maaty, A E and Akal, A Y (2017) Proposed models to measure the quality of highway projects: Regression analysis vs statistical-fuzzy approach. Engineering, Construction and Architectural Management, 24(6), pp. 988-1003. ISSN 0969-9988
El-Sayegh, S M (1998) Linear construction planning model (LCPM): A new model for planning, and scheduling linear construction projects. PhD thesis, Texas A&M University, USA.
El-Shahhat, A M (1993) Safety of concrete high-rise buildings during construction. PhD thesis, Purdue University, USA.
El-adaway, I H (2008) Construction dispute mitigation through multi-agent based simulation and risk management modeling. PhD thesis, Iowa State University, USA.
Elbeltagi, E; Hosny, O A; Elhakeem, A; Abd-Elrazek, M E and Abdullah, A (2011) Selection of slab formwork system using fuzzy logic. Construction Management and Economics, 29(7), pp. 659-670. ISSN 1466433X
Eldukair, Z A R (1988) Safety assessment and optimization of construction operations based on fuzzy sets. PhD thesis, University of Maryland, College Park, USA.
Elghaish, F; Abrishami, S; Abu Samra, S; Gaterell, M; Hosseini, M R and Wise, R (2021) Cash flow system development framework within integrated project delivery (IPD) using BIM tools. International Journal of Construction Management, 21(6), pp. 555-570. ISSN 1562-3599
Elijah, O O and Oluwasuji, D J (2019) An evaluation of training needs of the Nigerian construction professionals in adopting building information modelling. Journal of Construction in Developing Countries, 24(2), pp. 63-81. ISSN 1823-6499
Emuze, F A (2011) Performance improvement in South African construction. PhD thesis, Nelson Mandela Metropolitan University, South Africa.
Emuze, F A and Smallwood, J J (2013) Reducing 'non-value-adding activities' when building infrastructure in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(3), pp. 121-127. ISSN 17514312
Enshassi, A; Ayash, A and Mohamed, S (2019) Energy management application in construction projects in the Gaza Strip, Palestine. Journal of Construction in Developing Countries, 24(1), pp. 1-21. ISSN 1823-6499
Era, B E; Satyanarayana Reddy, C N V and Mohan, V K (2024) Construction companies development programme: The case of URRAP in south regional state, Ethiopia. International Journal of Construction Management, 24(12), pp. 1326-1338. ISSN 1562-3599
Erikson, C A (1979) Risk sharing in construction contracts. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Everett, J G; Halkali, H and Schlaff, T G (1998) Time-lapse video applications for construction project management. Journal of Construction Engineering and Management, 124(3), pp. 204-209. ISSN 0733-9364
Ewuga, D and Adesi, M (2023) Integrating sustainability practices into the Irish construction supply chain: Main contractors' perspective. Built Environment Project and Asset Management, 13(1), pp. 105-122. ISSN 2044-124X
Ezzeldine, O Y (1995) Design of tunnels constructed using pressurized shield methods. PhD thesis, University of Alberta, Canada.
Fadiya, O; Georgakis, P; Chinyio, E and Nwagboso, C (2015) Decision-making framework for selecting ICT-based construction logistics systems. Journal of Engineering, Design and Technology, 13(2), pp. 260-281.
Fadiya, O O (2012) Development of an integrated decision analysis framework for selecting ICT-based logistics systems in the construction industry. PhD thesis, University of Wolverhampton, UK.
Fan, L C N (2001) Strategic quality management for construction organisations. DBA thesis, Brunel University, UK.
Fapohunda, J A (2009) Operational framework for optimal utilisation of construction resources during the production process. PhD thesis, Sheffield Hallam University, UK.
Faraj, I (2001) Verification and spatial clearance of features in a product modelling environment. Construction Innovation, 1(1), pp. 55-74. ISSN 1471-4175
Faraji, A; Homayoon Arya, S; Ghasemi, E; Rashidi, M; Perera, S; Tam, V and Rahnamayiezekavat, P (2024) A conceptual framework of decentralized blockchain integrated system based on building information modeling to steering digital administration of disputes in the IPD contracts. Construction Innovation, 24(1), pp. 384-406. ISSN 1471-4175
Farbarik, J J (1994) Evaluation of the efficacy of using bid data to predict construction cost overruns. PhD thesis, University of Washington, USA.
Farias, F (2013) Contemporary strategies for sustainable design. PhD thesis, Texas A&M University, USA.
Farid, F; Boyer, L T and Kangari, R (1989) Required return on investments in construction. Journal of Construction Engineering and Management, 115(1), pp. 109-125. ISSN 0733-9364
Farid, F and Koning, T L (1994) Simulation verifies queuing program for selecting loader-truck fleets. Journal of Construction Engineering and Management, 120(2), pp. 386-404. ISSN 0733-9364
Farnsworth, C B; Warr, R O; Weidman, J E and Mark Hutchings, D (2016) Effects of CM/GC project delivery on managing process risk in transportation construction. Journal of Construction Engineering and Management, 142(3): 04015091, ISSN 0733-9364
Farrell, P and Gale, A (2000) The site manager: Role, education and training in the UK. Journal of Construction Research, 1(1), pp. 43-52. ISSN 1609-9451
Favie, R (2010) Quality monitoring in infrastructural design-build projects: the analysis of an audit-based monitoring system. PhD thesis, Eindhoven University of Technology, Netherlands.
Fayek, A R (2020) Fuzzy logic and fuzzy hybrid techniques for construction engineering and management. Journal of Construction Engineering and Management, 146(7): 04020064, ISSN 0733-9364
Feng, C-W (1998) Applications of genetic algorithms for multi-objective resource allocation of construction projects under certainty. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Feng, K (2020) Environmentally friendly construction processes under uncertainty assessment, optimisation and robust decision-making. PhD thesis, Luleå University of Technology, Sweden.
Feng, P P-Y (2009) Causes and effects of rework on the delivery of healthcare facilities in California. PhD thesis, University of California, Berkeley, USA.
Feng, X; Ahmed, V and Mahdjoubi, L (2003) Spatial visualization of building components. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Fente, J; Schexnayder, C and Knutson, K (2000) Defining a probability distribution function for construction simulation. Journal of Construction Engineering and Management, 126(3), pp. 234-241. ISSN 0733-9364
Finne, C (2006) Publishing building product information: A value net perspective. Construction Innovation, 6(2), pp. 79-96. ISSN 1471-4175
Fitzpatrick, C (1992) Constructing lines-of-conduct: Theoretical explanations with empirical evidence. PhD thesis, Colorado State University, USA.
Flanagan, R (1980) Tender price and time prediction for construction work. PhD thesis, Aston University, UK.
Flores, M and Mourgues, C (2024) Impact of using a formalized methodology for conflict detection based on 4D-BIM. Journal of Construction Engineering and Management, 150(7): 04024059, ISSN 0733-9364
Fobiri, Godfred (2024) A framework to apply reality capture technology for interim payment valuation of construction projects. PhD thesis, University of Johannesburg, South Africa.
Forcael, E (2010) Buffering strategies for managing transportation construction projects. PhD thesis, University of Florida, USA.
Forsman, S; Björngrim, N; Bystedt, A; Laitila, L; Bomark, P and Öhman, M (2012) Need for innovation in supplying engineer-to-order joinery products to construction: A case study in Sweden. Construction Innovation, 12(4), pp. 464-491. ISSN 1471-4175
Forsythe, P (2015) Monitoring customer perceived service quality and satisfaction during the construction process. Construction Economics and Building, 15(1), pp. 19-42. ISSN 2204-9029
Forsythe, P and Ding, G (2014) Greenhouse gas emissions from excavation on residential construction sites. Construction Economics and Building, 14(4), pp. 1-10. ISSN 2204-9029
Fox, S; Marsh, L and Cockerham, G (2003) Assessing the capability of construction processes to realize building designs. Construction Management and Economics, 21(1), pp. 7-10. ISSN 01446193
Franco, Luiz Sergio (1992) Application of constructive rationalization guidelines for the technological development of constructive processes in unreinforced structural masonry. PhD thesis, Universidade de São Paulo, Brazil.
Fredslund, L; Søder, P H; Hansen, E J d P and Koch, C (2022) An institutional analysis of how the construction industry's complexity affects waste: An alternative response to future market demands for sustainability. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Freitas, Oracilda Aparecida de (2023) Corporate sustainability in construction and its socio-spatial implications: The example of MRV Engenharia in Uberlândia/MG. PhD thesis, Universidade Federal de Uberlândia, Brazil.
Fu, Y and Zhang, S (2015) The interaction of trust and contractual governance on dispute negotiation strategy in contractor-subcontractor relationships. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Furber, A M (2013) Social and cultural context of rural water and sanitation projects: Case studies from Ghana. PhD thesis, University of Edinburgh, UK.
Gai, X (2012) Fibre reinforced polymer (FRP) stay-in-place (SIP) participating formwork for new construction. PhD thesis, University of Bath, UK.
Gamal, A; Nashaat, B; Shahda, M M and Nosier, S R (2024) Ten questions concerning the integration of digital fabrication techniques into the architectural design process. Architectural Engineering and Design Management, 20(1), pp. 120-149. ISSN 1745-2007
Gameson, R; Suresh, S and Chinyio, E (2008) Project debriefing: A multi-domain review of practices and procedures. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Gangolells, M; Casals, M; Forcada, N; Fuertes, A and Roca, X (2013) Model for enhancing integrated identification, assessment, and operational control of on-site environmental impacts and health and safety risks in construction firms. Journal of Construction Engineering and Management, 139(2), pp. 138-147. ISSN 0733-9364
Gao, T; Ergan, S; Akinci, B and Garrett, J H (2014) Proactive productivity management at job sites: Understanding characteristics of assumptions made for construction processes during planning based on case studies and interviews. Journal of Construction Engineering and Management, 140(3): 4013054, ISSN 0733-9364
Gao, Z (2004) Investigation of technologies to improve the visualization of design documents and construction process. PhD thesis, Iowa State University, USA.
Garay, A; Ruiz, A and Guevara, J (2022) Dynamic evaluation of thermal comfort scenarios in a colombian large-scale social housing project. Engineering, Construction and Architectural Management, 29(5), pp. 1909-1930. ISSN 0969-9988
Garriss, S (2008) Efficient, usable proof-construction strategies for distributed access-control systems. PhD thesis, Carnegie Mellon University, USA.
Gasparin, M (2014) Management of design as a translation process. PhD thesis, University of Leicester, UK.
Georg, S and Tryggestad, K (2009) On the emergence of roles in construction: The qualculative role of project management. Construction Management and Economics, 27(10), pp. 969-981. ISSN 1466433X
Gerding, D P; Wamelink, H and Leclercq, E M (2021) Implementing circularity in the construction process: A case study examining the reorganization of multi-actor environment and the decision-making process. Construction Management and Economics, 39(7), pp. 617-635. ISSN 01446193
Gerth, R; Boqvist, A; Bjelkemyr, M and Lindberg, B (2013) Design for construction: Utilizing production experiences in development. Construction Management and Economics, 31(2), pp. 135-150. ISSN 1466433X
Ghanbari Parsa, A R (1989) The interaction of planning policies and construction technologies in Iran with reference to China & Japan. PhD thesis, University of Newcastle upon Tyne, UK.
Ghansah, F A; De-Graft, O-M and Ayarkwa, J (2021) Project management processes in the adoption of smart building technologies: A systematic review of constraints. Smart and Sustainable Built Environment, 10(2), pp. 208-226. ISSN 2046-6099
Gharaie, E; Lingard, H and Cooke, T (2015) Causes of fatal accidents involving cranes in the Australian construction industry. Construction Economics and Building, 15(2), pp. 1-12. ISSN 2204-9029
Ghosh, S and Burghart, J (2021) Lean construction: Experience of us contractors. International Journal of Construction Education and Research, 17(2), pp. 133-153. ISSN 1557-8771
Gibb, A G F and Isack, F (2001) Client drivers for construction projects: Implications for standardization. Engineering, Construction and Architectural Management, 8(1), pp. 46-58. ISSN 0969-9988
Gledson, B J (2017) Innovation diffusion within the UK construction sector: a study of the adoption of 4D BIM. PhD thesis, Northumbria University, UK.
Goedert, J D and Meadati, P (2008) Integrating construction process documentation into building information modeling. Journal of Construction Engineering and Management, 134(7), pp. 509-516. ISSN 0733-9364
Goh, E and Loosemore, M (2017) The impacts of industrialization on construction subcontractors: A resource-based view. Construction Management and Economics, 35(5), pp. 288-304. ISSN 0144-6193
Golparvar-Fard, M; Peña-Mora, F and Savarese, S (2011) Integrated sequential as-built and as-planned representation with D 4AR tools in support of decision-making tasks in the AEC/FM industry. Journal of Construction Engineering and Management, 137(12), pp. 1099-1116. ISSN 0733-9364
Gongming, M (2018) The influence of trust on risk allocation in Chinese PPP projects. PhD thesis, ISCTE - Instituto Universitario de Lisboa, Portugal.
Gonzalez-Quevedo, A A (1991) Sensitivity analysis of construction simulation. PhD thesis, Purdue University, USA.
Gonzalez-Quevedo, A A; Abourizk, S M; Iseley, D T and Halpin, D W (1993) Comparison of two simulation methodologies in construction. Journal of Construction Engineering and Management, 119(3), pp. 573-589. ISSN 0733-9364
Gonzlez, V; Alarcn, L F; Maturana, S and Bustamante, J A (2011) Site management of work-in-process buffers to enhance project performance using the reliable commitment model: Case study. Journal of Construction Engineering and Management, 137(9), pp. 707-715. ISSN 0733-9364
Goodier, C and Gibb, A (2007) Future opportunities for offsite in the UK. Construction Management and Economics, 25(6), pp. 585-595. ISSN 1466433X
Goonetillake, J F (2019) A framework for the integration of information requirements within infrastructure digital construction. PhD thesis, Cardiff University, UK.
Gorgolewski, M (2008) Designing with reused building components: Some challenges. Building Research & Information, 36(2), pp. 175-188. ISSN 0961-3218
Gorse, C; Stafford, A; Shenton, D M; Johnston, D; Sutton, R and Farmer, D (2012) Thermal performance of buildings and the management process. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Gorse, C A; Emmitt, S; Lowis, M and Howarth, A (2000) A critical examination of methodologies for studying human communication in the construction industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Gough, K (1992) From bamboo to bricks: Self-help housing and the building materials industry in urban Colombia. PhD thesis, University of London, University College London, UK.
Goulding, J; Aouad, G and Nadim, W (2007) The nD-based computer game: Engaging school children in the construction design process. Architectural Engineering and Design Management, 3(4), pp. 222-237. ISSN 1745-2007
Goulding, J S; Pour Rahimian, F; Arif, M and Sharp, M D (2015) New offsite production and business models in construction: Priorities for the future research agenda. Architectural Engineering and Design Management, 11(3), pp. 163-184. ISSN 1745-2007
Goulias, D (1992) Quality assurance and specifications. PhD thesis, University of Texas at Austin, USA.
Graham, D; Smith, S D and Crapper, M (2006) Refining the case-based reasoning model of construction processes. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Graham, D P (2005) Stochastic modelling and analysis of construction processes. PhD thesis, University of Edinburgh, UK.
Graham, J (2018) Governance of systems of social practice for sustainability: Developing a reflexive systems of practice approach for governance of sustainability. PhD thesis, University of East Anglia, UK.
Graham, L D and Smith, S D (2004) A method for effectively implementing construction process productivity estimation models. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Gray, C (1986) Intelligent' construction time and cost analysis. Construction Management and Economics, 4(2), pp. 135-150. ISSN 01446193
Green, S D (1998) The technocratic totalitarianism of construction process improvement: A critical perspective. Engineering, Construction and Architectural Management, 5(4), pp. 376-386. ISSN 0969-9988
Griffith, A (1984) A critical investigation of factors influencing buildability and productivity. PhD thesis, Heriot-Watt University, UK.
Grobler, K (2000) Improving the effectiveness and image of the building and civil construction process. EngD thesis, University of Johannesburg, South Africa.
Groák, S (1994) Is construction an industry? Notes towards a greater analytic emphasis on external linkages. Construction Management and Economics, 12(4), pp. 287-293. ISSN 01446193
Gruneberg, S (2005) The performance of major firms in the heating and ventilating industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Gschösser, F (2011) Environmental assessment of road constructions: Life cycle assessment of Swiss road pavements and an accompanying analysis of construction and maintenance costs. DSc thesis, ETH Zürich, Switzerland.
Guggemos, A A (2003) Environmental impacts of on-site construction processes: Focus on structural frames. PhD thesis, University of California, Berkeley, USA.
Gumusburun Ayalp, G (2022) Leadership styles and entrepreneurship orientations in Turkish construction industry. International Journal of Construction Management, 22(4), pp. 690-700. ISSN 1562-3599
Gumusburun Ayalp, G and Çivici, T (2023) Factors affecting the performance of construction industry during the COVID-19 pandemic: A case study in Turkey. Engineering, Construction and Architectural Management, 30(8), pp. 3160-3202. ISSN 0969-9988
Gunatilake, S (2013) The uptake and implementation of sustainable construction: transforming policy into practice. PhD thesis, University of Central Lancashire, UK.
Gunduz, M and Al-Naimi, N H (2022) Construction projects delay mitigation using integrated balanced scorecard and quality function deployment. Engineering, Construction and Architectural Management, 29(5), pp. 2073-2105. ISSN 0969-9988
Gunning, J G (1997) The costs and benefits of achieving business excellence in construction organisations. Journal of Financial Management of Property and Construction, 2(1), pp. 45-58. ISSN 1366-4387
Gunning, J G (2000) Models of customer satisfaction and service quality as research instruments in construction management. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Gunning, J G (2008) Towards a more playful approach to construction management. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Gunning, J G and Hanna, J I C (2001) The application of risk management principles to crisis management in construction. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Guo, Z; Wang, Q; Cao, X and Wang, Z (2026) Navigating BIM technological innovations for megaprojects: Insights from the toce framework. Journal of Construction Engineering and Management, 152(1): 04025235, ISSN 0733-9364
Guo, H (2009) Rethinking construction project management using the VP-based manufacturing management model. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Guo, Q; Amin, S; Wang, H and Yan, H (2024) Coupling simulation of human-environmental safety risk factors in metro construction: A case study of Rongjiazhai Station at xi’an Metro Line 5 in China. International Journal of Construction Education and Research, 20(1), pp. 26-42. ISSN 15578771
Gweon, G (2012) Assessment and support of the idea co-construction process that influences collaboration. PhD thesis, Carnegie Mellon University, USA.
Haas, C and Einstein, H H (2002) Updating the decision aids for tunneling. Journal of Construction Engineering and Management, 128(1), pp. 40-48. ISSN 0733-9364
Hadikusumo, B H W (2001) Virtually real construction site processes: hazard identification and accident precaution planning using design-for-safety-process (DFSP) tool. PhD thesis, University of Hong Kong, Hong Kong.
Haigh, R (2004) Continuous process improvement and learning on construction projects: The role of process capability assessments. PhD thesis, University of Salford, UK.
Hajarolasvadi, H and Shahhosseini, V (2022) A system-dynamic model for evaluating the effect of person-team fit on project performance. Journal of Construction Engineering and Management, 148(11): 04022126, ISSN 0733-9364
Hajifathalian, K; Wambeke, B W; Liu, M and Hsiang, S M (2012) Effects of production control strategy and duration variance on productivity and work in process: Simulation-based investigation. Journal of Construction Engineering and Management, 138(9), pp. 1035-1043. ISSN 0733-9364
Hajikarimi, M H; Hajikarimi, A A and Ghalambor, M A (2009) Utilisation of knowledge management in decreasing waste of steel structure construction via increasing effectiveness of welding process. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Hallowell, M R (2008) A formal model for construction safety and health risk management. PhD thesis, Oregon State University, USA.
Hallowell, M R and Gambatese, J A (2009) Activity-based safety risk quantification for concrete formwork construction. Journal of Construction Engineering and Management, 135(10), pp. 990-998. ISSN 0733-9364
Halpin, J E (1999) The impact of out-of-town stores on local wildlife habitats. PhD thesis, University of Southampton, UK.
Hamilton, E M (2018) Positive sustainable built environments: The cognitive and behavioral affordances of environmentally responsible behavior in green residence halls. PhD thesis, University of Michigan, USA.
Hamilton-MacLaren, F; Loveday, D and Mourshed, M (2009) The calculation of embodied energy in new build UK housing. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Hamma-Adama, M (2020) Framework for macro building information modelling (BIM) adoption in Nigeria. PhD thesis, Robert Gordon University, UK.
Hampson, K and Fischer, M (1997) Structural designs and construction technologies for California highway bridges. Journal of Construction Engineering and Management, 123(3), pp. 269-275. ISSN 0733-9364
Hamza, A (2002) Partnering in the construction industry: an empirical investigation into the critical success factors. PhD thesis, Nottingham Trent University, UK.
Handa, V K and Abdalla, O (1989) Forecasting productivity by work sampling. Construction Management and Economics, 7(1), pp. 19-28. ISSN 01446193
Hanif, H; Khurshid, M B; Lindhard, S M and Aslam, Z (2016) Impact of variation orders on time and cost in mega hydropower projects of Pakistan. Journal of Construction in Developing Countries, 21(2), pp. 37-53. ISSN 1823-6499
Hanna, A S; Mikhail, G and Iskandar, K A (2017) State of prefab practice in the electrical construction industry: Qualitative assessment. Journal of Construction Engineering and Management, 143(2): 04016097, ISSN 0733-9364
Hansen, G K and Olsson, N O E (2011) Layered project-layered process: Lean thinking and flexible solutions. Architectural Engineering and Design Management, 7(2), pp. 70-84. ISSN 1745-2007
Hansen, K L; Gann, D M and Gro K, S (1998) Information technology decision support and business process change in the USA. Engineering, Construction and Architectural Management, 5(2), pp. 115-126. ISSN 0969-9988
Harmon, K M J (2003) Dispute review boards and construction conflicts: Attitudes and opinions of construction industry members. PhD thesis, Nova Southeastern University, USA.
Harris, R; Romer, J; Kelly, O and Johnson, S (2003) Design and construction of the downland gridshell. Building Research & Information, 31(6), pp. 427-454. ISSN 0961-3218
Hartmann, T and Fischer, M (2007) Supporting the constructability review with 3D/4D models. Building Research & Information, 35(1), pp. 70-80. ISSN 0961-3218
Harty, C and Whyte, J (2010) Emerging hybrid practices in construction design work: Role of mixed media. Journal of Construction Engineering and Management, 136(4), pp. 468-476. ISSN 0733-9364
Hashem M. Mehany, M S and Gebken, R (2021) Assessing the importance and cognition level of acce’s student learning outcomes: Industry, educator, and student perceptions. International Journal of Construction Education and Research, 17(4), pp. 333-351. ISSN 1557-8771
Hassan, M M and Gruber, S (2008) Application of discrete-event simulation to study the paving operation of asphalt concrete. Construction Innovation, 8(1), pp. 7-22. ISSN 1471-4175
Hassan, M M and Gruber, S (2008) Simulation of concrete paving operations on Interstate-74. Journal of Construction Engineering and Management, 134(1), pp. 2-9. ISSN 0733-9364
Hassan, N M; Al Maazmi, T; Al Hadhrami, A and Al Hosani, M (2016) Discrete event simulation: A vital tool for a concurrent life cycle design. Construction Innovation, 16(1), pp. 67-80. ISSN 1471-4175
Hassan, T M; McCaffer, R O N and Thorpe, T (1999) Emerging clients' needs for large scale engineering projects. Engineering, Construction and Architectural Management, 6(1), pp. 21-29. ISSN 0969-9988
Hauenstein, A D (1966) Construction: A taxonomy and syllabus of production practices with implications for industrial arts. PhD thesis, Ohio State University, USA.
He, C (2022) Integrate human and engineering aspects to facilitate construction scheduling under uncertainty. PhD thesis, North Carolina State University, USA.
He, W; Li, W; Xu, S; Wang, W and An, X (2021) Time, cost, and energy consumption analysis on construction optimization in high-rise buildings. Journal of Construction Engineering and Management, 147(10): 04021128, ISSN 0733-9364
He, W; Shi, Y and Kong, D (2019) Construction of a 5D duration and cost optimisation model based on genetic algorithm and BIM. Journal of Engineering, Design and Technology, 17(5), pp. 929-942. ISSN 1726-0531
Heesom, D (2004) An analytical system for space planning on construction sites. PhD thesis, University of Wolverhampton, UK.
Hejducki, Z (2004) Sequencing problems in methods of organising construction processes. Engineering, Construction and Architectural Management, 11(1), pp. 20-32. ISSN 0969-9988
Hendriks, E (2020) Assessing knowledge adoption in post-disaster reconstruction. PhD thesis, Eindhoven University of Technology, Netherlands.
Hendy, A O A (2007) An approach to sustainable construction in post-disaster contexts: with specific reference to the Marmara region of Turkey. PhD thesis, Coventry University, UK.
Henrich, G (2010) Development of a tool for diagnosing production management efficiency on construction sites. PhD thesis, University of Salford, UK.
Heravi, G; Kebria, M F and Rostami, M (2021) Integrating the production and the erection processes of pre-fabricated steel frames in building projects using phased lean management. Engineering, Construction and Architectural Management, 28(1), pp. 174-195. ISSN 0969-9988
Herbsman, Z J; Chen, W T and Epstein, W C (1995) Time is money: Innovative contracting methods in highway construction. Journal of Construction Engineering and Management, 121(3), pp. 273-281. ISSN 0733-9364
Hiley, A and Gopsill, G (2000) The implementation of value management as a design management tool in the UK construction industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Hindmarch, H (2012) Design change management: Developing a software application to support the evaluation of construction design changes. DEng thesis, University of Manchester, UK.
Hinze, J; Godfrey, R and Sullivan, J (2013) Integration of construction worker safety and health in assessment of sustainable construction. Journal of Construction Engineering and Management, 139(6), pp. 594-600. ISSN 0733-9364
Hofmann, Giane Alfenas Antunes (2019) Parameters for the prevention of pathologies in steel-structured buildings. PhD thesis, Universidade Federal de Ouro Preto, Brazil.
Hogg, K (2000) The impact of information sequence in the construction domain. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Hollister, K C (1992) An extended structured query language incorporating object data types for the construction industry. PhD thesis, University of Florida, USA.
Holtström, J; Kenlind, S S and Nord, T (2024) Project-based business models in the construction industry: key success factors for sustainable timber extension projects. Construction Management and Economics, 42(7), pp. 656-669. ISSN 01446193
Hong, Z; Tam, C M and Shi, J J (2001) Resource allocation heuristic in construction simulation. Construction Management and Economics, 19(6), pp. 643-651. ISSN 01446193
Hossain, M M and Ahmed, S (2022) Developing an automated safety checking system using BIM: A case study in the Bangladeshi construction industry. International Journal of Construction Management, 22(7), pp. 1206-1224. ISSN 1562-3599
Hsieh, T Y (1998) Impact of subcontracting on site productivity: Lessons learned in Taiwan. Journal of Construction Engineering and Management, 124(2), pp. 91-100. ISSN 0733-9364
Huang, J; Ji, A; Xiao, Z and Zhang, L (2025) Schedule-cost optimization in high-rise buildings considering uncertainty. Engineering, Construction and Architectural Management, 32(9), pp. 5657-5681. ISSN 0969-9988
Huang, Z; Mao, C; Wang, J and Sadick, A M (2022) Understanding the key takeaway of construction robots towards construction automation. Engineering, Construction and Architectural Management, 29(9), pp. 3664-3688. ISSN 0969-9988
Hughes, W P (2003) A comparison of two editions of the RIBA plan of work. Engineering, Construction and Architectural Management, 10(5), pp. 302-311. ISSN 0969-9988
Huynh, N. M.; Bui, P. T.; Le-Hoai, L. and Tang, M. N. (2026) Prioritizing actions to mitigate causes of material waste in construction using quality function deployment. Construction Economics and Building, 26(2), ISSN 2204-9029
Hwang, S Y (2007) Proactive planning and control of construction productivity and cost using time series data. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Ibañez-Guzmán, J (1995) Modelling of on-site work cells for the simulation of automated and semi-automated construction. Construction Management and Economics, 13(5), pp. 427-434. ISSN 01446193
IbañezGuzmán, J and Malcolm, A A (2002) Autonomous vehicles in the construction process. Construction Innovation, 2(3), pp. 211-224. ISSN 1471-4175
Ibrahim, K; Okanlawon, T T; Oyewobi, L O; Badamasi, A; Dodo, M and Jimoh, R A (2026) Construction 4.0: Enhancing sustainable construction practices by evaluating digital twin barriers in the Nigerian AEC industry. Engineering, Construction and Architectural Management, 33(1), pp. 258-283. ISSN 0969-9988
Idan, C K (2003) Quality function deployment (QFD) in the UK construction industry. PhD thesis, Nottingham Trent University, UK.
Idowu, O S and Lam, K C (2020) Conceptual quantities estimation using bootstrapped support vector regression models. Journal of Construction Engineering and Management, 146(4): 04020018, ISSN 0733-9364
Igwe, U S; Mohamed, S F; Azwarie, M B M D; Nwofia, C M and Ihekweme, N M (2025) Assessment of post contract cost control issues in Nigeria: Quantity surveyors' perspective. International Journal of Construction Management, 25(14), pp. 1725-1735. ISSN 1562-3599
Ihsanallah, K O (1987) The management of superprojects. PhD thesis, University of Manchester Institute of Science and Technology, UK.
Ilhan, B and Yaman, H (2010) Measuring the effectiveness of it utilization in construction: A different point of view. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Ioannou, P G and Martinez, J C (1996) Comparison of construction alternatives using matched simulation experiments. Journal of Construction Engineering and Management, 122(3), pp. 231-241. ISSN 0733-9364
Ireland, V (1985) The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects. Construction Management and Economics, 3(1), pp. 59-87. ISSN 01446193
Iseley, D T (1988) Automated methods for the trenchless placement of underground utility systems. PhD thesis, Purdue University, USA.
Islam, R; Chowdhury, S; Jannat, N and Paul, P (2022) Carbon footprint evaluation of local dwellings in Bangladesh towards low carbon society. Built Environment Project and Asset Management, 12(3), pp. 433-446. ISSN 2044-124X
Jacobs, Y L (2024) Barriers to the implementation of lean construction in South Africa. PhD thesis, University of Pretoria, South Africa.
Jacques de Sousa, L; Poças Martins, J; Sanhudo, L and Santos Baptista, J (2024) Automation of text document classification in the budgeting phase of the construction process: A systematic literature review. Construction Innovation, 24(7), pp. 292-318. ISSN 1471-4175
Jaenglom, Kamonmarn (2014) Exploring construction supply chain management: A systematic perspective for creating sustainable performance. PhD thesis, Università degli Studi di Bergamo, Italy.
Jahren, C T and Johnston, D W (2011) Linkages between construction engineering education and research. Journal of Construction Engineering and Management, 137, pp. 887-894. ISSN 0733-9364
Jallow, A K; Demian, P; Baldwin, A and Anumba, C (2008) Life cycle approach to requirements information management in construction projects: State-of-the-art and future trends. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Jamieson, I A (1997) Development of a concurrent engineering construction process protocol. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Jamieson, I A (1998) The development of a concurrently engineered procurement process. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Jang, W S (2007) Embedded system for construction material tracking using combination of radio frequency and ultrasound signal. PhD thesis, University of Maryland, College Park, USA.
Janné, M and Fredriksson, A (2019) Construction logistics governing guidelines in urban development projects. Construction Innovation, 19(1), pp. 89-109. ISSN 1471-4175
Jaraskumjonkul, T (2020) A digital prototype for collaborative conceptual design in the Thai AEC sector. PhD thesis, University of Salford, UK.
Jaselskis, E J and El-Misalami, T (2003) Implementing radio frequency identification in the construction process. Journal of Construction Engineering and Management, 129(6), pp. 680-688. ISSN 0733-9364
Jaśkowski, P and Sobotka, A (2006) Scheduling construction projects using evolutionary algorithm. Journal of Construction Engineering and Management, 132(8), pp. 861-870. ISSN 0733-9364
Jeffrey, J H (2010) Recurrent problems in the construction process: an action research study of the design and construction quality of hospital en-suites. PhD thesis, University of Salford, UK.
Jen, H (2005) Web-based construction process simulation framework. PhD thesis, Purdue University, USA.
Jepson, A S (2009) Investigating cultural relationships within the festival planning and construction process in a local community festival context. PhD thesis, University of Derby, UK.
Jergeas, G F (1989) Detailed design and constructability. PhD thesis, Loughborough University, UK.
Jiang, S; Zhang, J; Shi, J and Wu, Y (2026) Adaptive information retrieval for enhanced building safety management leveraging BIM. Engineering, Construction and Architectural Management, 33(1), pp. 336-360. ISSN 0969-9988
Jiang, X; Wang, S; Liu, Y; Xia, B; Skitmore, M; Nepal, M and Ghanbaripour, A N (2023) A method for the ontology-based risk management of PPP construction projects. Construction Innovation, 23(5), pp. 1095-1129. ISSN 1471-4175
Jiang, X; Zhou, H; Li, M; Lu, K; Lyu, S; Omrani, S and Skitmore, M (2024) Sustainable construction projects management in the AEC industry: Analysis and visualization. International Journal of Construction Management, 24(4), pp. 384-399. ISSN 1562-3599
Jiang, Y; Chen, H and Li, S (2009) Computation of user costs at freeway work zones using weigh-in-motion traffic data. International Journal of Construction Education and Research, 5(3), pp. 197-219. ISSN 1557-8771
Jibrin, I M and Aminu, S M (2023) Information technology as catalyst for value re-engineering implementation in the Nigerian construction industry. Journal of Construction in Developing Countries, 28(2), pp. 189-216. ISSN 1823-6499
Jin, Z; Gambatese, J; Liu, D and Dharmapalan, V (2019) Using 4D BIM to assess construction risks during the design phase. Engineering, Construction and Architectural Management, 26(11), pp. 2637-2654. ISSN 0969-9988
Johansen, J B; Jensen, P A and Thuesen, C (2017) Maturity model for strategic collaboration in sustainable building renovation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Johnsson, H; Janols, H and Stehn, L (2006) 3D computer visualization in timber construction: some important parameters. Architectural Engineering and Design Management, 2(3), pp. 161-175. ISSN 1745-2007
Jongeling, R (2006) A process model for work-flow management in construction. PhD thesis, Luleå University of Technology, Sweden.
Josephson, P E and Chao, M (2014) Use and non-use of time in construction of new multi-dwelling buildings in Sweden. International Journal of Construction Management, 14(1), pp. 28-35. ISSN 1562-3599
Jung, Y (2009) An approach to organizational intelligence management (a framework for analyzing organizational intelligence within the construction process). PhD thesis, Virginia Polytechnic Institute and State University, USA.
Jung, Y; Oh, H and Jeong, M M (2019) An approach to automated detection of structural failure using chronological image analysis in temporary structures. International Journal of Construction Management, 19(2), pp. 178-185. ISSN 1562-3599
Jägbeck, A (1998) It support for construction planning: A system design based on integrated information. PhD thesis, KTH Royal Institute of Technology, Sweden.
Jørgensen, K and Rasmussen, G M G (2009) Critical events in construction process. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Kaatz, E; Root, D and Bowen, P (2005) Broadening project participation through a modified building sustainability assessment. Building Research & Information, 33(5), pp. 441-454. ISSN 0961-3218
Kadir Pakir, A H (2003) Integration: A study in the context of low cost housing projects in Malaysia with special reference to the state of penang. PhD thesis, University College London, UK.
Kalu, U G (2003) Optimizing the participation of suppliers and subcontractors in managing construction projects using concurrent engineering philosophy. PhD thesis, Golden Gate University, USA.
Kaluarachchi, Y and Jones, K (2004) Improving the delivery of social housing in UK- using the Amphion initiative as a case study. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Kam, C W (2000) Quality assurance of construction works in Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Kamal, E M; Lou, E C W; Yusof, N and Osmadi, A (2022) Absorptive capacity of Malaysian SME construction organisations. Architectural Engineering and Design Management, 18(3), pp. 313-324. ISSN 1745-2007
Kamat, V R; Martinez, J C; Fischer, M; Golparvar-Fard, M; Pea-Mora, F and Savarese, S (2011) Research in visualization techniques for field construction. Journal of Construction Engineering and Management, 137, pp. 853-862. ISSN 0733-9364
Kangari, R and Halpin, D W (1989) Potential robotics utilization in construction. Journal of Construction Engineering and Management, 115(1), pp. 126-143. ISSN 0733-9364
Kangari, R and Halpin, D W (1990) Identification of factors influencing implementation of construction robotics. Construction Management and Economics, 8(1), pp. 89-104. ISSN 01446193
Kaplinski, O (1993) Diminishing non-uniformity of construction processes. Construction Management and Economics, 11(1), pp. 53-61. ISSN 01446193
Karhu, V (2001) A generic construction process modelling method. PhD thesis, KTH Royal Institute of Technology, Sweden.
Karimidorabati, S; Haas, C T and Gray, J (2016) Evaluation of automation levels for construction change management. Engineering, Construction and Architectural Management, 23(5), pp. 554-570. ISSN 0969-9988
Karlsson, M; Lakka, A; Sulankivi, K; Hanna, A S and Thompson, B P (2008) Best practices for integrating the concurrent engineering environment into multipartner project management. Journal of Construction Engineering and Management, 134(4), pp. 289-299. ISSN 0733-9364
Karsten Winther, J; Nielsen, R; Schultz, C and Teizer, J (2021) Automated activity and progress analysis based on non-monotonic reasoning of construction operations. Smart and Sustainable Built Environment, 10(3), pp. 457-486. ISSN 2046-6099
Kartam, N A (1997) Integrating safety and health performance into construction CPM. Journal of Construction Engineering and Management, 123(2), pp. 121-126. ISSN 0733-9364
Kasim, T (2015) BIM-based smart compliance checking to enhance environmental sustainability. PhD thesis, Cardiff University, UK.
Kataoka, M (2008) Automated generation of construction plans from primitive geometries. Journal of Construction Engineering and Management, 134(8), pp. 592-600. ISSN 0733-9364
Kattein, J (2009) The architecture chronicle: Diary of an architectural practice. PhD thesis, University of London, University College London, UK.
Kawecki, L R (2010) Environmental performance of modular fabrication: Calculating the carbon footprint of energy used in the construction of a modular home. PhD thesis, Arizona State University, USA.
Keeble Kululanga, G (2009) Construction process improvement through cognitive power under team generative learning. Engineering, Construction and Architectural Management, 16(4), pp. 307-324. ISSN 0969-9988
Keraminiyage, K P (2009) Achieving high process capability maturity in construction organisations. PhD thesis, University of Salford, UK.
Khalef, R; Ali, G G; El-adaway, I H and Gad, G M (2022) Managing construction projects impacted by the COVID-19 pandemic: A contractual perspective. Construction Management and Economics, 40(4), pp. 313-330. ISSN 01446193
Khalfan, M and Raja, N (2005) Improving construction process through integration and concurrent engineering. Construction Economics and Building, 5(1), pp. 58-66. ISSN 2204-9029
Khalid, M A; Hassan, M U; Ullah, F and Ahmed, K (2025) Integrated building information modeling and blockchain system for decentralized progress payments in construction projects. Journal of Engineering, Design and Technology, 23(5), pp. 1770-1796. ISSN 1726-0531
Khanzode, A R (2011) An integrated virtual design and construction and lean (IVL) method for coordination of mechanical, electrical and plumbing (MEP) systems. PhD thesis, Stanford University, USA.
Khatib, J M; Chileshe, N and Sloan, S (2007) Antecedents and benefits of 3D and 4D modelling for construction planners. Journal of Engineering, Design and Technology, 5(2), pp. 159-172. ISSN 1726-0531
Kiamos, K (2006) Comparing the major project management bodies of knowledge with Greek practice in the construction industry. PhD thesis, University College London, UK.
Kiani, H (1998) A model for measuring effectiveness of building construction organisations: Owner's perspective. PhD thesis, University of Waterloo, USA.
Kim, J (2007) Temporary structure planning ontology. PhD thesis, Stanford University, USA.
Kim, J-J (1993) A work package-based process model for petrochemical construction planning. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kimmance, A G (2002) An integrated product and process information modelling system for on-site construction. PhD thesis, Loughborough University, UK.
Kiziltas, S; Dikmen, I and Birgonul, M T (2003) Organizational effectiveness in construction: A conceptual framework. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Koekemoer, V and Smallwood, J (2007) Information technology (it) in the construction process. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Kokkaew, N and Chiara, N (2010) Modelling completion risk using stochastic critical path-envelope method: A BOT highway project application. Construction Management and Economics, 28(12), pp. 1239-1254. ISSN 1466433X
Kometa, S T (1995) An evaluation of client-generated risks in construction consultancies. PhD thesis, University of Wolverhampton, UK.
Kometa, S T; Olomolaiye, P O and Harris, F C (1995) Quantifying client-generated risk by project consultants. Construction Management and Economics, 13(2), pp. 137-147. ISSN 01446193
Kometa, S T; Olomolaiye, P O and Harris, F C (1995) An evaluation of clients' needs and responsibilities in the construction process. Engineering, Construction and Architectural Management, 2(1), pp. 57-76. ISSN 0969-9988
Korkmaz, S; Riley, D and Horman, M (2010) Piloting evaluation metrics for sustainable high-performance building project delivery. Journal of Construction Engineering and Management, 136(8), pp. 877-885. ISSN 0733-9364
Krishnamoorthi, S and Raphael, B (2022) A review of methodologies for performance evaluation of automated construction processes. Built Environment Project and Asset Management, 12(5), pp. 719-737. ISSN 2044-124X
Krishnan, R (1987) Knowledge-based aids for model construction. PhD thesis, University of Texas at Austin, USA.
Kristiansen, K (2010) Taking care of caretaking. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Kucukvar, M (2013) Life cycle sustainability assessment framework for the U.S. Built environment. PhD thesis, University of Central Florida, USA.
Kuennen, S T (2002) Construction management practice in the execution of military construction projects. DEng thesis, Texas A&M University, USA.
Kulasekara, L B; Perera, B A K S and Perera, H A H P (2025) Impact of smart city system on the construction industry in Sri Lanka. Journal of Engineering, Design and Technology, 23(2), pp. 546-568. ISSN 1726-0531
Kulatunga, K J (2008) Construction client and innovation: effect of client characteristics. PhD thesis, University of Salford, UK.
Kulatunga, U (2008) Influence of performance measurement towards construction research and development. PhD thesis, University of Salford, UK.
Kumamoto, T; Kameda, H; Hoshiya, M and Ishii, K (1990) Construction of difficult dry dock in yokohama, Japan. Journal of Construction Engineering and Management, 116(2), pp. 201-220. ISSN 0733-9364
Kumari, T; Kulathunga, U; Hewavitharana, T and Madusanka, N (2022) Embodied carbon reduction strategies for high-rise buildings in Sri Lanka. International Journal of Construction Management, 22(13), pp. 2605-2613. ISSN 1562-3599
Kuttantharappel Soman, R (2020) Automated look-ahead schedule generation using linked-data based constraint checking for construction projects. PhD thesis, Imperial College London, UK.
Kwofie, T E; Aigbavboa, C O and Thwala, W D (2020) Measures to improve the adoption of life cycle assessment in the South African construction industry. Journal of Engineering, Design and Technology, 18(2), pp. 480-494. ISSN 1726-0531
Kwon, N; Park, M; Lee, H S; Ahn, J and Shin, M (2016) Construction noise management using active noise control techniques. Journal of Construction Engineering and Management, 142(7): 4016014, ISSN 0733-9364
Köseoğlu Balta, G Ç (2019) A Bayesian belief, network-based, delay risk assessment tool for tunnel projects: BBN tunnel. PhD thesis, Middle East Technical University, Turkey.
Labik, O; Nahmens, I; Ikuma, L and Harvey, C (2023) On-site versus in-factory installation of solar-plus-storage in modular construction. Journal of Construction Engineering and Management, 149(5): 05023003, ISSN 0733-9364
Lacey, W E (1964) Change order procedures and practices in California school construction. EdD thesis, University of Southern California, USA.
Laitinen, J (1998) Model based construction process management. PhD thesis, KTH Royal Institute of Technology, Sweden.
Lal, H (1999) The use of characteristic productivity modelling in the improvement of site performance and the evaluation of delay and disruption claims. PhD thesis, University of Dundee, UK.
Landin, A (2000) ISO 9001 within the Swedish construction sector. Construction Management and Economics, 18(5), pp. 509-518. ISSN 01446193
Landin, A (2000) Impact of quality management in the Swedish construction process. PhD thesis, Lund University, Sweden.
Landin, A and Nilsson, C H (2001) Do quality systems really make a difference? Building Research & Information, 29(1), pp. 12-20. ISSN 0961-3218
Langford, D; Martinez, V and Bititci, U (2003) Best value in construction: Towards an interpretation of value from client and constructor perspectives. Journal of Construction Procurement, 9(1), ISSN 1358-9180
Langston, C (2014) Construction efficiency: A tale of two developed countries. Engineering, Construction and Architectural Management, 21(3), pp. 320-335. ISSN 0969-9988
Larbi, J A; Tang, L C M; Ababio, B K and Antwi-Afari, P (2025) Developing an integrated digital delivery framework for designing and planning construction projects: a review of interoperable digital technologies. International Journal of Construction Management, 25(3), pp. 347-362. ISSN 1562-3599
Lawani, K; Sadeghineko, F; Tong, M and Bayraktar, M (2025) Methodology for retrospectively developing a BIM model from point cloud scans using ongoing building project as case study. Journal of Engineering, Design and Technology, 23(4), pp. 1243-1261. ISSN 1726-0531
Le, N. D.; Tran, D. and Williams, N. J. (2026) Exploring competencies for bridge construction inspectors. Journal of Construction Engineering and Management, 152(9): 04026137, ISSN 0733-9364
Lee, H S; Shin, J W; Park, M and Ryu, H G (2009) Probabilistic duration estimation model for high-rise structural work. Journal of Construction Engineering and Management, 135(12), pp. 1289-1298. ISSN 0733-9364
Lee, J (2008) Dynamic project management methodology: Managing schedule compression. PhD thesis, University of Florida, USA.
Lee, J; Park, M; Lee, H S and Hyun, H (2019) Classification of modular building construction projects based on schedule-driven approach. Journal of Construction Engineering and Management, 145(5): 04019031, ISSN 0733-9364
Lee, S (2006) Dynamic planning and control methodology: Understanding and managing iterative error and change cycles in large-scale concurrent design and construction projects. PhD thesis, Massachusetts Institute of Technology, USA.
Lee, Y S; Rashidi, A; Talei, A; Arashpour, M and Pour Rahimian, F (2022) Integration of deep learning and extended reality technologies in construction engineering and management: A mixed review method. Construction Innovation, 22(3), pp. 671-701. ISSN 1471-4175
Lei, Z; Sadiq Altaf, M; Cheng, Z; Liu, H and Tang, S (2023) Measurement of information loss and transfer impacts of technology systems in offsite construction processes. Journal of Construction Engineering and Management, 149(9): 05023011, ISSN 0733-9364
Lei, Zhen (2015) Automated simulation model for crane motion planning in heavy industrial projects. PhD thesis, University of Alberta, Canada.
Leicht, R M; Hunter, S T; Saluja, C and Messner, J I (2010) Implementing observational research methods to study team performance in construction management. Journal of Construction Engineering and Management, 136(1), pp. 76-86. ISSN 0733-9364
Leite, Regina Maria Cunha (2022) Gamification strategies and visual management: A model for disseminating production information and feedback to civil construction workers. PhD thesis, Universidade Senai Cimatec, Brazil.
Lema, N M and Price, A D F (1996) Construction process performance variability: Focus on labour productivity. Building Research & Information, 24(6), pp. 339-350. ISSN 0961-3218
Lensgraf, S E (2024) Towards scalable autonomous underwater construction with free-floating robots. PhD thesis, Dartmouth College, USA.
Leu, S S; Huang, K J; Hung, C C W and Wu, P L (2024) Revolutionizing steel building project cost overrun risk assessment by Bayesian network. Engineering, Construction and Architectural Management, 31(12), pp. 4975-4987. ISSN 0969-9988
Leung, M Y; Chan, Y S and Yu, J (2009) Integrated model for the stressors and stresses of construction project managers in Hong Kong. Journal of Construction Engineering and Management, 135(2), pp. 126-134. ISSN 0733-9364
Lewis, T (1998) Electronic data interchange in the construction industry. PhD thesis, Loughborough University, UK.
Li, Y.; Tai, S. and Tai, Z. (2024) Development of ANP-based greenness evaluation model of construction technologies in China. Journal of Engineering, Design and Technology, 24(2), pp. 602-630. ISSN 1726-0531
Li, H (1996) The role of IT manager in construction process re-engineering. Building Research & Information, 24(2), pp. 124-127. ISSN 0961-3218
Li, H; Chan, G; Skitmore, M and Huang, T (2015) A 4D automatic simulation tool for construction resource planning: A case study. Engineering, Construction and Architectural Management, 22(5), pp. 536-550. ISSN 0969-9988
Li, H; Chan, N K Y and Skitmore, M (2012) The use of virtual prototyping to rehearse the sequence of construction work involving mobile cranes. Construction Innovation, 12(4), pp. 429-446. ISSN 1471-4175
Li, H; Guo, H; Skibniewski, M J and Skitmore, M (2008) Using the IKEA model and virtual prototyping technology to improve construction process management. Construction Management and Economics, 26(9), pp. 991-1000. ISSN 1466433X
Li, H; Guo, H L; Skitmore, M; Huang, T; Chan, K Y N and Chan, G (2011) Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong. Construction Management and Economics, 29(3), pp. 233-245. ISSN 01446193
Li, H; Lu, W and Huang, T (2009) Rethinking project management and exploring virtual design and construction as a potential solution. Construction Management and Economics, 27(4), pp. 363-371. ISSN 1466433X
Li, J (2004) Web-based integrated project control. PhD thesis, Concordia University, Canada.
Li, Y (2013) Developing a sustainable construction waste estimation and management system. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Liang, Y and Xu, Z (2025) Intelligent inspection of appearance quality for precast concrete components based on improved YOLO model and multi-source data. Engineering, Construction and Architectural Management, 32(3), pp. 1691-1714. ISSN 0969-9988
Liao, L; Ye, Y; Wei, N; Li, H and Fan, C (2024) Exploring blockchain technology acceptance among non-managerial construction practitioners in Shenzhen, China. Engineering, Construction and Architectural Management, 31(5), pp. 2053-2076. ISSN 0969-9988
Lin, L-k (1994) Improving the productivity of roadway construction job sites with a portable expert system. PhD thesis, University of Utah, USA.
Lindblad, H and Gustavsson, T K (2018) Project managers as involuntary policy implementers? The case of implementing BIM. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Linderoth, H C J (2015) When big visions meet the pragmatic practice: Follow the institutional logic or personal benefits? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Lindgren, J (2018) Diffusion of systemic innovations in the construction sector. PhD thesis, Halmstad University, Sweden.
Lindgren, J; Emmitt, S and Widén, K (2018) Construction projects as mechanisms for knowledge integration: Mechanisms and effects when diffusing a systemic innovation. Engineering, Construction and Architectural Management, 25(11), pp. 1516-1533. ISSN 0969-9988
Lindgren, J and Widén, K (2018) Diffusing building information management-knowledge integration, mechanisms and knowledge development. Architectural Engineering and Design Management, 14(5), pp. 347-362. ISSN 1745-2007
Lindhard, S and Larsen, J K (2016) Identifying the key process factors affecting project performance. Engineering, Construction and Architectural Management, 23(5), pp. 657-673. ISSN 0969-9988
Lingard, H; Cooke, T and Gharaie, E (2013) The how and why of plant-related fatalities in the Australian construction industry. Engineering, Construction and Architectural Management, 20(4), pp. 365-380. ISSN 0969-9988
Lingard, H; Graham, P and Smithers, G (1997) Waste management in the Australian construction industry: A human factors approach. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Lingard, H and Holmes, N (2001) Understanding of occupational health and safety risk control in small business construction firms: Barriers to implementing technological controls. Construction Management and Economics, 19(2), pp. 217-226. ISSN 01446193
Lisco, M and Aulin, R (2024) Taxonomy supporting design strategies for reuse of building parts in timber-based construction. Construction Innovation, 24(1), pp. 221-241. ISSN 1471-4175
Lisø, K R (2006) Integrated approach to risk management of future climate change impacts. Building Research & Information, 34(1), pp. 1-10. ISSN 0961-3218
Liu, W.; Feng, Z.; Hu, Y. and Luo, X. (2026) Study on the measurement of the level of construction occupational health and safety management in prefabricated building: A case study of a practical training building. Engineering, Construction and Architectural Management, 33(4), pp. 3352-3374. ISSN 0969-9988
Liu, L-Y (1991) Coops: Construction object-oriented process simulation system. PhD thesis, University of Michigan, USA.
Liu, Y (2009) Critical factors for managing project communication among participants at the construction stage. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Longstaff, D and Johansen, E (2009) Mobile phones in project management: The pendulum of professionalism. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Lopes, J and Ribeiro, F L (2001) Working out a rational institutional framework for the development of the construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Louis, J and Dunston, P S (2017) Methodology for real-time monitoring of construction operations using finite state machines and discrete-event operation models. Journal of Construction Engineering and Management, 143(3): 04016106, ISSN 0733-9364
Love, P E D and Teo, P (2017) Statistical analysis of injury and nonconformance frequencies in construction: Negative binomial regression model. Journal of Construction Engineering and Management, 143(8): 05017011, ISSN 0733-9364
Lowe, J (1993) Construction productivity: an input-output approach. PhD thesis, Glasgow Caledonian University, UK.
Lowe, J G (1996) Technological change and construction. Journal of Financial Management of Property and Construction, 1(2), pp. 65-94. ISSN 1366-4387
Luigi, Guzzoni (2022) Construction management of cultural heritage. Conservation of cultural heritage during its construction site stage. Building information modelling supporting on site information collection and management for cost control. PhD thesis, Politecnico di Milano, Italy.
Luna, R and Wu, Y (2000) Simulation of temperature and stress fields during rcc dam construction. Journal of Construction Engineering and Management, 126(5), pp. 381-388. ISSN 0733-9364
Luo, J; Zadeh, P and Staub-French, S (2024) Ontology-based design features for representing constructability in architectural design: Toward BIM in off-site construction. Journal of Construction Engineering and Management, 150(10): 05024010, ISSN 0733-9364
Ly, E; Anumba, C J and Carrillo, P M (2005) Knowledge management practices of construction project managers. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Löfgren, A (2005) Socio-technical management of collaborative mobile computing in construction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Löwstedt, M and Sandberg, R (2020) Standardizing the free and independent professional: The case of construction site managers in Sweden. Engineering, Construction and Architectural Management, 27(6), pp. 1337-1355. ISSN 0969-9988
Ma, B; Cai, Y; Zhang, H; Fan, Y; Wang, F; Wang, P; Lyu, Z and Zhao, Z (2025) Evaluating construction risks of ultralarge diameter bored pile in deep water using combination weighting with two-dimensional cloud optimization. Journal of Construction Engineering and Management, 151(8): 05025007, ISSN 0733-9364
Ma, Z; Gu, J; Zhao, Q; Yang, M; Qian, C; He, M and Hei, X (2025) Intelligent optimization of blasting parameters in railroad tunnels based on blasting quality control. Journal of Construction Engineering and Management, 151(8): 04025094, ISSN 0733-9364
Mackenzie, D I (2010) A review of project controls in the UK and methodologies to improve the processes. DProf thesis, Teesside University, UK.
Mah, D; Manrique, J D; Yu, H; Al-Hussein, M and Nasseri, R (2011) House construction CODN2/DN footprint quantification: A BIM approach. Construction Innovation, 11(2), pp. 161-178. ISSN 1471-4175
Mah, D E (2011) Framework for rating the sustainability of the residential construction practice. PhD thesis, University of Alberta, Canada.
Mahdavinejad, M; Bemanian, M; Abolvardi, G and Elhamian, S M (2012) Analyzing the state of seismic consideration of architectural non-structural components (ANSCs) in design process (based on IBC). International Journal of Disaster Resilience in the Built Environment, 3(2), pp. 133-147. ISSN 1759-5916
Mahdi, H S and Afshar, E (2024) Performance of electronic devices for bridging existing information gaps at construction sites: The case of a developing country. International Journal of Construction Management, 24(14), pp. 1510-1520. ISSN 1562-3599
Majzoub, Omar (2025) A precursor to computation in architecture – an alternative to the current concept design process. PhD thesis, University of New South Wales, Australia.
Maloney, W F (1990) Framework for analysis of performance. Journal of Construction Engineering and Management, 116(3), pp. 399-415. ISSN 0733-9364
Malsane, S M (2015) The application of automated rule checking to existing UK building regulations using BIM technologies. PhD thesis, University of Northumbria at Newcastle, UK.
Manase, D (2008) An exploratory study of GIS based analysis of health and safety related information. PhD thesis, University of Wolverhampton, UK.
Manavazhi, M R (2000) Hybrid modelling framework for synthesizing virtual structures. Construction Management and Economics, 18(4), pp. 415-426. ISSN 01446193
Mangvwat, J S; Spillane, J P and Bradley, J G (2024) Unveiling the nexus: The impact of social factors on sustainability in construction procurement. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Manrique, J D; Al-Hussein, M; Bouferguene, A; Safouhi, H and Nasseri, R (2011) Combinatorial algorithm for optimizing wood waste in framing designs. Journal of Construction Engineering and Management, 137(3), pp. 188-197. ISSN 0733-9364
Manrique, J D; Al-Hussein, M; Telyas, A and Funston, G (2007) Case study-based challenges of quality concrete finishing for architecturally complex structures. Journal of Construction Engineering and Management, 133(3), pp. 208-216. ISSN 0733-9364
Manrique, J D; Al-Hussein, M; Telyas, A and Funston, G (2007) Constructing a complex precast tilt-up-panel structure utilizing an optimization model, 3D CAD, and animation. Journal of Construction Engineering and Management, 133(3), pp. 199-207. ISSN 0733-9364
Mao, Sheng (2016) Design and optimization of tunnel guidance systems for tunneling subject to constrained space and limited visibility. PhD thesis, University of Alberta, Canada.
Mao, X and Zhang, X (2008) Construction process reengineering by integrating lean principles and computer simulation techniques. Journal of Construction Engineering and Management, 134(5), pp. 371-381. ISSN 0733-9364
Marey Madi, H A (2024) Sustainability assessment of using green concrete materials for residential buildings in Egypt. PhD thesis, Debreceni Egyetem, Hungary.
Marique, Y (2013) Cooperation and competition in complex construction projects: Implementation of EU procurement rules in England and Belgium. International Journal of Law in the Built Environment, 5(1), pp. 53-70. ISSN 17561469
Martinez Lagunas, A J and Nik-Bakht, M (2024) Process mining, modeling, and management in construction: A critical review of three decades of research coupled with a current industry perspective. Journal of Construction Engineering and Management, 150(11): 04024158, ISSN 0733-9364
Mastrandrea, F (1991) The quantification of construction contractors' claims. PhD thesis, University of Reading, UK.
Masurier, J L; Rotimi, J O B and Wilkinson, S (2006) A comparison between routine construction and post-disaster reconstruction with case studies from New Zealand. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Matipa, W M; Kelliher, D and Keane, M (2004) Contending with the challenges of deploying building product models in the construction process. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Matsumoto, I T; Thorpe, A; Baldwin, A and McWilliams, R (2002) Linking process mapping and technology: A case study of teamwork 2001. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Mazari, M (2014) Studying the parameters involved with modulus-based construction quality control for compaction of unbound pavement layers. PhD thesis, University of Texas at El Paso, USA.
Mazzola, C; Zanelli, A; Stimpfle, B and Canobbio, R (2021) Temporactive pavilion: Second design-to-construction loop of an ultra-lightweight temporary architecture. Architectural Engineering and Design Management, 17(3-4), pp. 216-228. ISSN 1745-2007
McAfee, J A (1978) State agencies and higher education in the capital construction process in Colorado. EdD thesis, University of Northern Colorado, USA.
McCabe, A; Parker, R and Brown, K (2011) Social outcomes in the construction industry: The case of the Western Australian 'percent for art' policy. Construction Management and Economics, 29(9), pp. 929-941. ISSN 1466433X
McCahill, D F (1990) A practical model for simulation of earthwork construction, with applications for scheduling. PhD thesis, University of Maryland, College Park, USA.
McCahill, D F and Bernold, L E (1993) Resource-oriented modeling and simulation in construction. Journal of Construction Engineering and Management, 119(3), pp. 590-606. ISSN 0733-9364
McCarney, M and Gibb, A G (2012) Interface management from an offsite construction perspective. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
McCord, J; McCord, M; Davis, P T; Haran, M and Rodgers, W J (2015) Understanding delays in housing construction: Evidence from Northern Ireland. Journal of Financial Management of Property and Construction, 20(3), pp. 286-319. ISSN 1366-4387
McCormack, M; Treloar, G J; Palmowski, L and Crawford, R (2007) Modelling direct and indirect water requirements of construction. Building Research & Information, 35(2), pp. 156-162. ISSN 0961-3218
McMeel, D (2009) The artistry of construction: an investigation into construction as a creative process and the influence of mobile phones within domestic scale construction projects. PhD thesis, University of Edinburgh, UK.
Meacham, B J (2022) Fire performance and regulatory considerations with modern methods of construction. Buildings & Cities, 3(1), pp. 464-487. ISSN 2632-6655
Meadati, P K (2007) Integration of construction process documents into building information modeling. PhD thesis, University of Nebraska - Lincoln, USA.
Mecca, S (1999) A model of construction planning procedure according to contingency theory. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Mega, T (2008) Implications of quality management in the Greek construction industry. PhD thesis, University College London, UK.
Meglin, R (2022) Economic and environmental assessment of a regional construction and building materials industry in Switzerland: An applied combination of material-flow analysis, life-cycle assessment and input-output analysis. DSc thesis, ETH Zürich, Switzerland.
Mehta, V and Thakur, M S (2025) Enhancing precision and efficiency in English bond brick masonry: Novel unified templates approach. Engineering, Construction and Architectural Management, 32(9), pp. 6325-6350. ISSN 0969-9988
Meistad, Torill Randi (2015) Sustainable building: From role model projects to industrial transformation. PhD thesis, Norges Teknisk-Naturvitenskapelige Universitet, Norway.
Melgarejo, J A (1987) A decision model for human error in the design and construction process. PhD thesis, University of Michigan, USA.
Meng, F and Cao, X (2025) An intelligent framework for rework risk identification in prefabricated construction processes based on compliance checking. Engineering, Construction and Architectural Management, 32(8), pp. 5066-5098. ISSN 0969-9988
Meniru, K C U (2005) Computer-aided conceptual building design. PhD thesis, Concordia University, Canada.
Mertens, A.; Yönder, Ç; Hamarat, Y. and Elsen, C. (2026) Argumentation in co-design for architect-client interaction tools. Architectural Engineering and Design Management, 22(1), pp. 19-38. ISSN 1745-2007
Micelli, E (2000) Mobilizing the skills of specialist firms to reduce costs and enhance performance in the European construction industry: Two case studies. Construction Management and Economics, 18(6), pp. 651-656. ISSN 01446193
Miller, C; Packham, G and Thomas, B (2003) Inter-organisational relationships and their effect upon small construction enterprises in South Wales: Co-operation at a cost. Journal of Construction Procurement, 9(2), pp. 17-28. ISSN 1358-9180
Miller, C J M; Packham, G A and Thomas, B C (2002) Harmonization between main contractors and subcontractors: a prerequisite for lean construction? Journal of Construction Research, 3(01), 67–82. Journal of Construction Research, ISSN 1609-9451
Miller, C J M; Packham, G A and Williams, T (1999) Re-defining sub-contracting: Reducing transaction costs? In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Mills, Anthony John (2002) Client and contractor attitudes to prequalification and selection processes for construction work. PhD thesis, University of Melbourne, Australia.
Mishra, S P; Parbat, D K and Modak, J P (2014) Field data-based mathematical simulation of manual rebar cutting. Journal of Construction in Developing Countries, 19(1), pp. 111-126. ISSN 1823-6499
Mitchell, A; Frame, I; Coday, A and Hoxley, M (2011) A conceptual framework of the interface between the design and construction processes. Engineering, Construction and Architectural Management, 18(3), pp. 297-311. ISSN 0969-9988
Moghani, E (2013) A simulation-based framework for as-built documentation of construction process and product information. PhD thesis, University of Alberta, Canada.
Mogollon, J D M (2009) Automation of design and drafting for wood frame structures and construction waste minimization. PhD thesis, University of Alberta, Canada.
Mohamad, Saifulnizam Suhaimi (2014) Value management in design planning: A systems-based framework for multi-disciplinary team involvement. PhD thesis, Queensland University of Technology, Australia.
Mohammad Shamsudin, N A (2021) Perceptions of critical success factors in the management of dilapidated schools' reconstruction projects using Industrialised Building System method in rural areas in Sarawak. PhD thesis, University of Nottingham, UK.
Mohammadi, S; Tavakolan, M and Zahraie, B (2022) An intelligent simulation-based framework for automated planning of concrete construction works. Engineering, Construction and Architectural Management, 29(2), pp. 916-939. ISSN 0969-9988
Mohammadrezaytayebi, S; Sebt, M H and Afshar, M R (2023) Introducing a system dynamic–based model of quality estimation for construction industry subcontractors' works. International Journal of Construction Management, 23(4), pp. 586-595. ISSN 1562-3599
Moharrami, S; Taghaddos, M; RazaviAlavi, S R and AbouRizk, S (2021) A hybrid simulation approach for microtunneling construction planning. Construction Innovation, 21(3), pp. 363-378. ISSN 1471-4175
Mohieldin, Y A (1989) Analysis of construction processes with nonstationary work task durations. PhD thesis, University of Maryland, College Park, USA.
Mokhlesian, S and Holmén, M (2012) Business model changes and green construction processes. Construction Management and Economics, 30(9), pp. 761-775. ISSN 1466433X
Momtazi, S (2021) Reducing cost overruns in construction projects using lean methodology. DEng thesis, George Washington University, USA.
Moon, S; Ham, N; Kim, S; Hou, L; Kim, J H and Kim, J J (2020) Fourth industrialization-oriented offsite construction: Case study of an application to an irregular commercial building. Engineering, Construction and Architectural Management, 27(9), pp. 2271-2286. ISSN 0969-9988
Moon, Sungkon (2014) Dynamic control of supply chain quality to improve process performance in construction. PhD thesis, University of New South Wales, Australia.
Moore, D (1996) Buildability assessment and the development of an automated design aid for managing the transfer of construction process knowledge. Engineering, Construction and Architectural Management, 3(1-2), pp. 29-46. ISSN 0969-9988
Moore, D R (1996) Task difficulty assessment: a contribution towards improved buildability through simplification. PhD thesis, De Montfort University, UK.
Morad, A A (1990) Geometric-based reasoning system for project planning utilizing AI and CAD technologies. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Moreira, Lorena Claudia de Souza (2018) The building owner's manual assisted by augmented reality. PhD thesis, Universidade Estadual de Campinas, Brazil.
Moret, Y (2011) Modeling cost and time uncertainty in rail line construction. PhD thesis, Massachusetts Institute of Technology, USA.
Moret, Y and Einstein, H H (2016) Construction cost and duration uncertainty model: Application to high-speed rail line project. Journal of Construction Engineering and Management, 142(10): 05016010, ISSN 0733-9364
Morkos, R (2014) Operational efficiency frontier: Visualizing, manipulating, and navigating the construction scheduling state space with precedence, discrete, and disjunctive constraints. PhD thesis, Stanford University, USA.
Morland, K V and Breslin, D (2024) Resolving learning paradoxes within a UK new-build housebuilder. Construction Management and Economics, 42(4), pp. 307-327. ISSN 01446193
Morrow, S (2011) Health and safety: A designer's perspective. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Mostafa, S and Chileshe, N (2015) Discrete-event simulation model for offsite manufacturing in Australia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Motawa, I and Kaka, A (2008) Payment mechanisms for integrated teams in construction. Construction Economics and Building, 8(2), pp. 1-10. ISSN 2204-9029
Motawa, I A; Price, A D F and Sher, W (1998) The introduction and management of innovative construction processes and products. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Moura, Paula Kvitko de (2022) Guidelines for the development of innovative solutions in the construction industry. PhD thesis, Universidade Federal do Rio Grande do Sul, Brazil.
Moussavi Nadoushani, Z S; Hammad, A W A and Akbarnezhad, A (2017) Location optimization of tower crane and allocation of material supply points in a construction site considering operating and rental costs. Journal of Construction Engineering and Management, 143(1): 04016089, ISSN 0733-9364
Muneeswaran, G; Manoharan, P; Awoyera, P O and Adesina, A (2020) A statistical approach to assess the schedule delays and risks in Indian construction industry. International Journal of Construction Management, 20(5), pp. 450-461. ISSN 1562-3599
Murphy, M (2016) Exploration of the synergies between activity theory and the dmaic method in evaluating construction processes. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Musa, M M; Saleh, I M; Ibrahim, Y and Dandajeh, M A (2023) Assessment of awareness and barriers to the application of lean construction techniques in kano state, Nigeria. Journal of Construction Business and Management, 6(1), pp. 33-42. ISSN 2521-0165
Musallami, A A and Assaf, S (1996) Public owners' satisfaction with consultancy practices in Saudi Arabia. Building Research & Information, 24(3), pp. 148-151. ISSN 0961-3218
Muya, M (1999) A systematic approach for improving construction materials logistics. PhD thesis, Loughborough University, UK.
Nadi, E (2019) Construction labor productivity benchmarking: A comparison between on-site construction and prefabrication. PhD thesis, Marquette University, USA.
Nahmens, I and Reichel, C (2013) Adoption of high performance building systems in hot-humid climates: lessons learned. Construction Innovation, 13(2), pp. 186-201. ISSN 1471-4175
Nakajima, T (1972) Modeling and optimization of the building process for systems building. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Nelms, C E; Russell, A D and Lence, B J (2007) Assessing the performance of sustainable technologies: A framework and its application. Building Research & Information, 35(3), pp. 237-251. ISSN 0961-3218
Ng, Ming Shan (2022) Design for digital fabrication (dfdfab): Management for sustainable adoption of emerging technologies and innovations. PhD thesis, ETH Zürich, Switzerland.
Nguyen, H V (2010) Process-based cost modeling to support target value design. PhD thesis, University of California, Berkeley, USA.
Nicolini, D (2007) Studying visual practices in construction. Building Research & Information, 35(5), pp. 576-580. ISSN 0961-3218
Nielsen, Y and Erdogan, B (2004) Information visualisation in construction industry; a quality perspective. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Nielson, Y and Erdogan, B (2003) Expanding the envelope of visualization for communication in construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Nikolić, D (2011) Evaluating a simulation game in construction engineering education: The virtual construction simulator 3. PhD thesis, Pennsylvania State University, USA.
Nordin, A (2013) Constructing component-based systems directly from requirements using incremental composition. PhD thesis, University of Manchester, UK.
Noronha, S (2013) 3-d building detection and description from multiple intensity images using hierarchical grouping and matching of features. PhD thesis, University of Southern California, USA.
Noyce, D A and Hanna, A S (1997) Planned schedule compression concept file for electrical contractors. Journal of Construction Engineering and Management, 123(2), pp. 189-197. ISSN 0733-9364
Nugraheni, F and Scott, D (2006) An approach to define construction practice from construction images. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Nuntasunti, S (2004) The effects of visual-based information logistics in construction. PhD thesis, North Carolina State University, USA.
Nyakala, S; Pretorius, J and Vermeulen, A (2020) Construction quality process implementation as a source of competitive advantage in small and medium-sized construction projects. Journal of Construction Business and Management, 4(2), pp. 46-54. ISSN 2521-0165
O'Brien, M and Al-Soufi, A (1994) A survey of data communications in the UK construction industry. Construction Management and Economics, 12(5), pp. 457-465. ISSN 01446193
O'Grady, W (2013) A knowledge management system to optimise comfort throughout the building life-cycle. PhD thesis, University College Cork, Ireland.
Obiozo, R N (2018) The role of psychosocial recuperative therapy in enhancing construction performance on projects. PhD thesis, Nelson Mandela University, South Africa.
Obonyo, E A (2011) An agent-based intelligent virtual learning environment for construction management. Construction Innovation, 11(2), pp. 142-160. ISSN 1471-4175
Odeh, A M (1992) CIPROS: Knowledge-based construction integrated project and process planning simulation system. PhD thesis, University of Michigan, USA.
Offei, I; Kissi, E and Nani, G (2019) Factors affecting the capacity of small to medium enterprises building construction firms in Ghana. Journal of Construction in Developing Countries, 24(1), pp. 49-63. ISSN 1823-6499
Ofori, G (2003) Preparing Singapore's construction industry for the knowledge-based economy: Practices, procedures and performance. Construction Management and Economics, 21(2), pp. 113-125. ISSN 01446193
Ofori, G and Toor, S R (2012) Leadership and construction industry development in developing countries. Journal of Construction in Developing Countries, 17(S1), pp. 1-21. ISSN 1823-6499
Ogbeifun, E (2011) Training artisans on-site. Construction Economics and Building, 11(3), pp. 83-91. ISSN 2204-9029
Ogunmakinde, O E (2019) Developing a circular-economy-based construction waste minimisation framework for Nigeria. PhD thesis, University of Newcastle, Australia.
Okanlawon, T. T.; Oyewobi, L. O.; Kabir, I.; Badamasi, A.; Dodo, M. and Jimoh, R. A. (2026) Enhancing the integration of digital twin in construction phases: Key drivers for adoption in Nigeria. Journal of Engineering, Design and Technology, 24(1), pp. 124-150. ISSN 1726-0531
Oke, A E; Aliu, J; Fadamiro, P; Jamir Singh, P S; Samsurijan, M S and Yahaya, M (2024) Robotics and automation for sustainable construction: Microscoping the barriers to implementation. Smart and Sustainable Built Environment, 13(3), pp. 625-643. ISSN 2046-6099
Oladiran, O J; Ogunsanmi, O E and Dada, M O (2019) Frameworks for material waste minimization on Nigerian building projects. Journal of Construction Business and Management, 3(1), pp. 45-61. ISSN 2521-0165
Olasunkanmi, F. F. O. (2026) Structural equation modelling for the impacts of transactional leadership styles on project performance. Construction Economics and Building, 26(2), ISSN 2204-9029
Olawumi, T O and Chan, D W M (2020) Key drivers for smart and sustainable practices in the built environment. Engineering, Construction and Architectural Management, 27(6), pp. 1257-1281. ISSN 0969-9988
Oloke, D; Manase, D and Olomolaiye, P (2005) Construction health and safety (H&S) performance: A conceptual framework for enhancing information and communication technology (ICT) impacts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Olugboyega, O (2019) Specific roles of builders in building information modelling processes. Journal of Construction in Developing Countries, 23(2), pp. 27-42. ISSN 1823-6499
Ong, J (2019) Enabling lean through using shared mental models for precast construction in Singapore. PhD thesis, National University of Singapore, Singapore.
Onubi, H O; Yusof, N A and Hassan, A S (2019) Green site practices and environmental performance: How project complexity moderates the relationship. Construction Economics and Building, 19(1), pp. 75-95. ISSN 2204-9029
Op den Bosch, A (1994) Design/construction processes simulation in real-time object-oriented environments. PhD thesis, Georgia Institute of Technology, USA.
Orstavik, F and Dainty, A (2016) On the doing of building work. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Osborne, A N (2005) Social conflict in construction-related inter-organizational collectives: A comparative analysis and structural equation model. PhD thesis, Northumbria University, UK.
Osuizugbo, I C (2021) The need for and benefits of buildability analysis: Nigeria as a case study. Journal of Engineering, Design and Technology, 19(5), pp. 1207-1230. ISSN 1726-0531
Othman, A A E (2004) Value and risk management for dynamic brief development in construction. PhD thesis, Loughborough University, UK.
Othman, A A E and Abdelrahim, S M (2020) Achieving sustainability through reducing construction waste during the design process: A value management perspective. Journal of Engineering, Design and Technology, 18(2), pp. 362-377. ISSN 1726-0531
Othman, A A E and Abdelwahab, N M A (2018) Achieving sustainability through integrating risk management into the architectural design process. Journal of Engineering, Design and Technology, 16(1), pp. 25-43.
Othman, N (1997) Management of variations in construction contracts. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Othman, Z M Z (2007) Classifying the aptitude of Civil Engineering Project Managers using Multivariate Discriminant Analysis. PhD thesis, Loughborough University, UK.
Ottou, J A; Baiden, B K; Nani, G and Martin Morgan, T (2021) Benefits of implementing six sigma in competitive tendering process. Built Environment Project and Asset Management, 11(2), pp. 214-230. ISSN 2044-124X
Owolabi, A (2004) Development of an integrated product information management system. EngD thesis, Loughborough University, UK.
Oyediran, A; Oke, A E; Ikuabe, M; Aliu, J; Adeosun, F E and Aigbavboa, C O (2025) Exploring application areas of cyber-physical systems in the construction industry: A case of Nigeria. International Journal of Construction Management, 25(15), pp. 1811-1823. ISSN 1562-3599
Oyewobi, L; Okanlawon, T T; Ibrahim, K and Jimoh, R A (2025) Influence of blockchain adoption barriers and drivers on potential application areas in the construction lifecycle: Partial least squares structural equation modelling (PLS-SEM) approach. Engineering, Construction and Architectural Management, 32(3), pp. 1798-1815. ISSN 0969-9988
Oyeyipo, O; Adeyemi, B; Osuizugbo, I and Ojelabi, R (2022) Service quality of building services consultants in building project delivery; clients' perspectives. International Journal of Construction Management, 22(15), pp. 2886-2894. ISSN 1562-3599
Ozcan-Deniz, G (2011) An integrated multi-agent framework for optimizing time, cost and environmental impact of construction processes. PhD thesis, Florida International University, USA.
Oztas, A (1995) The mitigation of the effects of delays in construction projects: A knowledge based system approach. PhD thesis, University of Manchester, UK.
Pagdadis, S (1990) An advanced technologies assessment strategy for construction automation. PhD thesis, University of Texas at Austin, USA.
Palaniappan, S (2009) Environmental performance of on-site construction processes in post-tensioned slab foundation construction: A study of production home building in the Greater Phoenix area. PhD thesis, Arizona State University, USA.
Palaniappan, S; Bashford, H; Li, K; Fafitis, A and Stecker, L (2009) Carbon emissions based on transportation for post-tensioned slab foundation construction: A production home building study in the greater phoenix arizona area. International Journal of Construction Education and Research, 5(4), pp. 236-260. ISSN 1557-8771
Pan, H; Huang, H; Luo, Z; Wu, C and Yang, S (2025) Research on safety risk factors of metro shield tunnel construction in China based on social network analysis. Engineering, Construction and Architectural Management, 32(12), pp. 8114-8144. ISSN 0969-9988
Pan, L-J (1996) A study of risk management in dealing with contracts in the construction industry. PhD thesis, University of Glasgow, UK.
Pan, N-H (1996) Automatic data processing technologies and industry-wide information transfer standards in the construction industry. PhD thesis, State University of New York at Buffalo, USA.
Pandithawatta, T P W S I; Zainudeen, N and Perera, C S R (2020) An integrated approach of lean-green construction: Sri Lankan perspective. Built Environment Project and Asset Management, 10(2), pp. 200-214. ISSN 2044-124X
Papachristos, G; Jain, N; Burman, E; Zimmermann, N; Wu, X; Liu, P; Mumovic, D; Lin, B; Davies, M and Edkins, A (2020) Low carbon building performance in the construction industry: A multi-method approach of system dynamics and building performance modelling. Construction Management and Economics, 38(9), pp. 856-876. ISSN 01446193
Parisi, Fabio (2023) Automation and information approaches to support maintenance and production management in the construction industry. PhD thesis, Politecnico di Bari, Italy.
Park, J (2015) Essays on the delivery of public infrastructure projects: Empirical analyses on transportation projects in Florida. PhD thesis, George Washington University, USA.
Park, M (2001) Dynamic planning and control methodology for large-scale concurrent construction projects. PhD thesis, Massachusetts Institute of Technology, USA.
Park, T; Kim, M K; Kim, C and Kim, H (2009) Interactive 3D CAD for effective derrick crane operation in a cable-stayed bridge construction. Journal of Construction Engineering and Management, 135(11), pp. 1261-1270. ISSN 0733-9364
Pasquire, C (1999) The implications of environmental issues on UK construction management. Engineering, Construction and Architectural Management, 6(3), pp. 276-286. ISSN 0969-9988
Pasquire, C (2012) Positioning lean within an exploration of engineering construction. Construction Management and Economics, 30(8), pp. 673-685. ISSN 1466433X
Pasquire, C L and Gibb, A G F (2002) Considerations for assessing the benefits of standardisation and pre-assembly in construction. Journal of Financial Management of Property and Construction, 7(3), pp. 151-162. ISSN 1366-4387
Patton, J R (2013) Task diminishment: Construction value loss due to sub-optimal task execution. PhD thesis, Indiana State University, USA.
Patty, R M (1993) A construction engineering platform for the integration of constructability concepts and lessons learned at the point of design. PhD thesis, Purdue University, USA.
Peansupap, V and Walker, D H T (2004) Strategic adoption of information and communication technology (ICT): Case studies of construction contractors. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Pena Mora, F A (1994) Design rationale for computer supported conflict mitigation during the design-construction process of large-scale civil engineering systems. PhD thesis, Massachusetts Institute of Technology, USA.
Perera, C. S. R.; Francis, V. and Gao, S. (2025) A conceptual framework for industry 4.0 acceptance and adoption in the construction industry: A systematic review. Construction Innovation, 26(5), pp. 1498-1522. ISSN 1471-4175
Perera, U T G; Haigh, R and Amaratunga, D (2025) Integration of public health into road projects in Sri Lanka: Identifying barriers and enablers. Built Environment Project and Asset Management, 15(3), pp. 647-662. ISSN 2044-124X
Perkowski, J C (1988) Technical trends in the e and c business: The next 10 years. Journal of Construction Engineering and Management, 114(4), pp. 565-576. ISSN 0733-9364
Persson, U (2009) Management of sustainability in construction works. PhD thesis, Lund University, Sweden.
Pham, V H S and Pham, D H (2025) Dynamic multiobjective optimization model for construction site layout in prefabricated projects. Journal of Construction Engineering and Management, 151(10): 04025150, ISSN 0733-9364
Pillai, S (2022) Regulation of artificial intelligence technologies in the Indian construction industry. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Pirzadeh, P and Lingard, H (2017) Exploring the dynamic social interactions that underpin work health and safety related design decision-making. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Pirzadeh, P; Lingard, H and Blismas, N (2020) A multilevel socio-technical perspective on work health and safety related design decision making. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Pirzadeh, Payam (2018) A social network perspective on design for construction safety. PhD thesis, RMIT University, Australia.
Poirier, E; Staub-French, S; Pilon, A; Fallahi, A; Teshnizi, Z; Tannert, T and Froese, T (2022) Design process innovation on brock commons tallwood house. Construction Innovation, 22(1), pp. 23-40. ISSN 1471-4175
Ponton, H; Osborne, A; Thompson, N and Greenwood, D (2020) The power of humour to unite and divide: A case study of design coordination meetings in construction. Construction Management and Economics, 38(1), pp. 32-54. ISSN 01446193
Poon, J (2004) Development of an expert system modelling the construction process. Journal of Construction Research, 5(1), pp. 125-138. ISSN 1609-9451
Poon, J; Potts, K and Cooper, P (1999) Development of a new best practice model for building projects. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Poon, J L K (2001) Development of a process model for the design stage of building projects. PhD thesis, University of Wolverhampton, UK.
Potseluyko Amobi, L (2021) Improving business and technical operations within timber frame self-build housing sector by applying integrated VR/AR and BIM technologies. PhD thesis, Teesside University, UK.
Prateapusanond, Apirath (2003) A comprehensive practice of total float pre-allocation and management for the application of a CPM-based construction contract. PhD thesis, Virginia Tech, USA.
Presland, A J (2023) "Picturing construction, constructing identities: the photographic archive of John Laing & Son Ltd". PhD thesis, University College London, UK.
Prince, R F A (2011) The construction briefing process: evaluating the influence of personality traits on the performance of the consultant project manager. PhD thesis, Heriot-Watt University, UK.
Psilander, K (2012) Managing production costs of small and large developers in Sweden: A case study on multi-family construction. International Journal of Construction Education and Research, 8(1), pp. 47-62. ISSN 1557-8771
Pulket, T (2008) Universal prediction model for construction litigation. PhD thesis, Illinois Institute of Technology, USA.
Pérez, C T and Bastos Costa, D (2021) Increasing production efficiency through the reduction of transportation activities and time using 4D BIM simulations. Engineering, Construction and Architectural Management, 28(8), pp. 2222-2247. ISSN 0969-9988
Qasim, M (2018) Improving highways construction processes using computer-based simulation techniques. PhD thesis, University of Salford, UK.
Qin, B (2019) Change and continuity: making sense of marketization in the Chinese construction sector. PhD thesis, University of Reading, UK.
Raoufi, M and Fayek, A R (2020) Fuzzy Monte Carlo agent-based simulation of construction crew performance. Journal of Construction Engineering and Management, 146(5): 04020041, ISSN 0733-9364
Razavialavi, S and Abourizk, S (2017) Genetic algorithm-simulation framework for decision making in construction site layout planning. Journal of Construction Engineering and Management, 143(1): 04016084, ISSN 0733-9364
Reinschmidt, K F; Griffis, F H and Bronner, P L (1991) Integration of engineering, design, and construction. Journal of Construction Engineering and Management, 117(4), pp. 756-772. ISSN 0733-9364
Rekola, M; Kojima, J and Mäkeläinen, T (2010) Towards integrated design and delivery solutions: Pinpointed challenges of process change. Architectural Engineering and Design Management, 6(4), pp. 264-278. ISSN 1745-2007
Ren, X (2024) Human and organizational factors influencing structural safety: Analysing critical hofs behind human errors in structural design and construction. PhD thesis, Delft University of Technology, Netherlands.
Ren, Z; Chrysostomou, V and Price, T (2012) The measurement of carbon performance of construction activities: A case study of a hotel construction project in South Wales. Smart and Sustainable Built Environment, 1(2), pp. 153-171. ISSN 2046-6099
Render, N; Greenwood, D and Edge, J (2005) The other g.M.P: Good manufacturing practice and its importance in the validation of constructed pharmaceutical facilities. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Reyna, S M; Vanegas, J A and Khan, A H (1994) Construction technologies for sewer rehabilitation. Journal of Construction Engineering and Management, 120(3), pp. 467-487. ISSN 0733-9364
Rho, J-J (1994) A systems engineering model for implementing automation technology into a construction process. PhD thesis, University of Houston, USA.
Rich, D (2014) On-site application of self-compacting concrete. EngD thesis, Loughborough University, UK.
Rizzi, Dario (2025) Tools for sustainable design strategies: Optimization of integrated BIM-blockchain technologies and protocols for the application of minimum environmental criteria. PhD thesis, Università degli Studi di Ferrara, Italy.
Rodrigo, V (2016) Development of an e-business capability maturity model for construction organisations. PhD thesis, Northumbria University, UK.
Rodriguez Diaz, C R (2012) Development of a framework and a rating system tool, for sustainable infrastructure certification in developing countries, case study for Ecuador. PhD thesis, University of Florida, USA.
Rogan, A (1999) Inter-organisational relationships in the construction process. PhD thesis, University of the West of England, Bristol, UK.
Rooke, J A; Koskela, L and Seymour, D (2007) Producing things or production flows? Ontological assumptions in the thinking of managers and professionals in construction. Construction Management and Economics, 25(10), pp. 1077-1085. ISSN 1466433X
Root, D and Wachira, N (2009) A legacy of empire: The imposition, evolution and failure of construction skills training systems in Kenya and South Africa. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Root, D S (2001) The influence of professional and occupational cultures on project relationships mediated through standard forms and conditions of contract. PhD thesis, University of Bath, UK.
Root, D S; Thorpe, A; Thomson, D S; Austin, S A and Hammond, J W (2003) Design chains: Introducing supply chain management into the construction design process. Journal of Construction Procurement, 9(2), pp. 29-39. ISSN 1358-9180
Ross, A D and Goulding, J S (2006) The construction estimator's approach to the collection and assessment of supply chain price information. Journal of Construction Procurement, 12(1),
Rossi, Mônica Therezinha Bartie (2012) Social housing and associative management, evaluation of the programs promoted by the state government of São Paulo in the period of 1990 to 2008. PhD thesis, Universidade de São Paulo, Brazil.
Rouhi, S (2011) Framework for owner's project requirements for total structural systems (OPRTSS). PhD thesis, Georgia Institute of Technology, USA.
Rovers, R (2014) New energy retrofit concept: 'Renovation trains' for mass housing. Building Research & Information, 42(6), pp. 757-767. ISSN 0961-3218
Rowlinson, S M (1988) An analysis of factors affecting project performance in industrial buildings with particular reference to design build contracts. PhD thesis, Brunel University, UK.
Rowlinsson, S and Yates, D (2003) Ndcad: A virtual change agent for professions and procurement systems? Construction Management and Economics, 21(8), pp. 849-857. ISSN 01446193
Roy, R; Brown, J and Gaze, C (2003) Re-engineering the construction process in the speculative house-building sector. Construction Management and Economics, 21(2), pp. 137-146. ISSN 01446193
Roy, R; Low, M and Waller, J (2005) Documentation, standardization and improvement of the construction process in house building. Construction Management and Economics, 23(1), pp. 57-67. ISSN 01446193
Ruhl, V R (1997) Computer-aided design and manufacturing of complex-shaped concrete formwork. DDes thesis, Harvard University, USA.
Ruikar, D (2004) Design process improvement using a model based approach. PhD thesis, University of Nottingham, UK.
Ruiz, A; Vinke-De Kruijf, J; Santos, J; Keijzer, E; Volker, L and Dorée, A (2024) The slow implementation of sustainable innovations in the asphalt paving sector: the role of actors and their interactions. Construction Management and Economics, 42(10), pp. 902-925. ISSN 01446193
Ruiz, A; Vinke-de Kruijf, J; Santos, J; Volker, L and Dorée, A (2023) Sustainable innovation processes in the asphalt paving sector: A system innovation approach. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Ruiz, Phelipe Viana (2023) Game-based learning in the teaching of civil construction techniques. PhD thesis, Universidade Estadual de Campinas, Brazil.
Russell, A D; Tran, N and Staub-French, S (2014) Searching for value: Construction strategy exploration and linear planning. Construction Management and Economics, 32(6), pp. 520-547. ISSN 01446193
Russell, J S and Jaselskis, E J (1992) Quantitative study of contractor evaluation programs and their impact. Journal of Construction Engineering and Management, 118(3), pp. 612-624. ISSN 0733-9364
Rwamamara, R and Simonsson, P (2009) Health and safety in concrete casting processes. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Ryd, N V (2003) Exploring construction briefing: From document to process. PhD thesis, Chalmers Tekniska Hogskola, Sweden.
Rönnberg, N; Ringdahl, R and Fredriksson, A (2023) Measurement and sonification of construction site noise and particle pollution data. Smart and Sustainable Built Environment, 12(4), pp. 742-764. ISSN 2046-6099
Saad, A; Ajayi, S O and Alaka, H A (2023) Trends in BIM-based plugins development for construction activities: A systematic review. International Journal of Construction Management, 23(16), pp. 2756-2768. ISSN 1562-3599
Saad, A M; Zulu, S L and Dulaimi, M (2024) “It's your fault!”, said a public client to modernity advocates: An exploration of UK public sector’s viewpoints on the modern methods of construction. Construction Innovation, 24(6), pp. 1483-1504. ISSN 1471-4175
Saba, F (2012) A semantic-driven framework for facilitating reusability and interoperability of construction simulation modeling. PhD thesis, University of Alberta, Canada.
Sackey, E (2014) A Sociotechnical Systems Analysis of Building Information Modelling (STSaBIM) Implementation in Construction Organisations. PhD thesis, Loughborough University, UK.
Sacks, R (1997) Computer integrated construction: project data model representation and use. Unpublished PhD thesis, Technion Israel Institute of Technology, Israel.
Sacks, R (2016) What constitutes good production flow in construction? Construction Management and Economics, 34(9), pp. 641-656. ISSN 01446193
Sacks, R; Esquenazi, A and Goldin, M (2007) LEAPCON: Simulation of lean construction of high-rise apartment buildings. Journal of Construction Engineering and Management, 133(7), pp. 529-539. ISSN 0733-9364
Sacks, R; Koskela, L; Dave, B A and Owen, R (2010) Interaction of lean and building information modeling in construction. Journal of Construction Engineering and Management, 136(9), pp. 968-980. ISSN 0733-9364
Sadeghi, B (2024) Selecting Industry 4.0 technologies for construction activities using clustering analysis and text mining. PhD thesis, University of Wisconsin - Milwaukee, USA.
Sadri, S L (1993) An integrated information system for building construction projects. PhD thesis, Georgia Institute of Technology, USA.
Saha, S; Greville, C J and Mullins, T A (2001) Optimisation of construction process inspection rates using a learning approach. Construction Economics and Building, 1(2), pp. 1-13. ISSN 2204-9029
Saini, M (2015) A framework for transferring and sharing tacit knowledge in construction supply chains within lean and agile processes. PhD thesis, University of Salford, UK.
Saini, M; Arif, M and Kulonda, D J (2018) Critical factors for transferring and sharing tacit knowledge within lean and agile construction processes. Construction Innovation, 18(1), pp. 64-89. ISSN 1471-4175
Saini, M; Arif, M and Kulonda, D J (2019) Challenges to transferring and sharing of tacit knowledge within a construction supply chain. Construction Innovation, 19(1), pp. 15-33. ISSN 1471-4175
Salam, M A; Staines, H J; Blackwood, D J and Sarkar, S (2001) Analysis of the relationships between causes of delay in construction projects in Bangladesh. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Salam, Md Abdus (2007) Time and cost overruns on high-rise building construction in Bangladesh. PhD thesis, Abertay University, UK.
Salazar-Vela, J; Blay, K and Demian, P (2020) Social value in the digitalised construction environment. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Salem, O and Mohanty, S (2008) Project management practices and information technology research. Journal of Construction Engineering and Management, 134(7), pp. 501-508. ISSN 0733-9364
Salhab, D; Lindhard, S M and Hamzeh, F (2024) Schedule compression and emerging waste in construction: An assessment of overlapping activities. Engineering, Construction and Architectural Management, 31(12), pp. 4920-4941. ISSN 0969-9988
Sam, M; Franz, B W and Alwisy, A (2026) Comparing vulnerability to adverse events in construction processes performed by human-robot collaboration and traditional crews: A case study in drywall finishing. Journal of Construction Engineering and Management, 152(6): 05026005, ISSN 0733-9364
Sam, Mahya (2023) Exploring the relationship between human-robot collaboration (HRC) and the resilience of construction work processes. PhD thesis, University of Florida, USA.
Sampaio, A Z; Henriques, P G and Ferreira, P S (2004) Virtual reality technology applied in civil engineering education: Visual simulation of construction processes. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Santamaria Carrera, J L (2017) Quantifying the effect of construction site factors on concrete quality, costs and production rates. PhD thesis, University of New Mexico, USA.
Sanvido, V E (1988) Conceptual construction process model. Journal of Construction Engineering and Management, 114(2), pp. 294-310. ISSN 0733-9364
Sanvido, V E and Medeiros, D J (1990) Applying computer-integrated manufacturing concepts to construction. Journal of Construction Engineering and Management, 116(2), pp. 365-379. ISSN 0733-9364
Sanvido, V E and Paulson, B C (1992) Site-level construction information system. Journal of Construction Engineering and Management, 118(4), pp. 701-715. ISSN 0733-9364
Sarah Slaughter, E (1999) Assessment of construction processes and innovations through simulation. Construction Management and Economics, 17(3), pp. 341-350. ISSN 01446193
Sarden, Y and Stehn, L (2006) Industrialisation as a tool for reducing uncertainty in construction. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Sardén, Y and Engström, S (2010) Modern methods of construction: A solution for an industry characterized by uncertainty? In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Sardén, Y and Stehn, L (2005) Managing transformation, flow and value generation: A solid timber frame housing case. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Sari, K (2019) A framework for lean implementation in infrastructure construction in the UK. PhD thesis, University of Salford, UK.
Sarisley, E F (1990) Construction methods and costs of stress-laminated timber bridges. Journal of Construction Engineering and Management, 116(3), pp. 432-447. ISSN 0733-9364
Sarshar, M; Haigh, R; Finnemore, M; Aouad, G; Barrett, P; Baldry, D and Sexton, M (2000) Spice: A business process diagnostics tool for construction projects. Engineering, Construction and Architectural Management, 7(3), pp. 241-250. ISSN 0969-9988
Satish, S. and Umar, T. (2026) Bridging innovation and practice: Assessing the readiness for 3D printing in construction. Engineering, Construction and Architectural Management, 33(7), pp. 6014-6038. ISSN 0969-9988
Sattary, S and Thorpe, D (2011) Reducing embodied energy in Australian building construction. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Sattary, S and Thorpe, D (2012) Optimizing embodied energy of building construction through bioclimatic principles. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Saurin, T A; Formoso, C T and Guimaraes, L B M (2004) Safety and production: An integrated planning and control model. Construction Management and Economics, 22(2), pp. 159-169. ISSN 01446193
Sawhney, A; Walsh, K D; Bashford, H H and Palaniappan, S (2009) Impact of inspected buffers on production parameters of construction processes. Journal of Construction Engineering and Management, 135(4), pp. 319-329. ISSN 0733-9364
Sayed Suleiman, R (2019) Understanding site offices challenges to communicate and exchange information using technology in UK: main contractor perspective. PhD thesis, University of Salford, UK.
Schröpfer, V (2013) Social network analysis of knowledge transfer in sustainable office building projects in the UK and Germany. PhD thesis, Oxford Brookes University, UK.
Schultz, C (2012) The role of problem solving in construction management practices. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Schweber, L and Leiringer, R (2012) Beyond the technical: A snapshot of energy and buildings research. Building Research & Information, 40(4), pp. 481-492. ISSN 0961-3218
Scott, D and Yang, J (1991) Setting the pace with paces: A new concept of using an expert system for project analysis and control. Construction Management and Economics, 9(6), pp. 529-541. ISSN 01446193
Selinger, S (1983) Payment timing as a factor in bid evaluation. Journal of Construction Engineering and Management, 109(3), pp. 335-341. ISSN 0733-9364
Senior-Brown, B A (1993) A study of the planning and integrated cyclic analysis of serial system operations. PhD thesis, Purdue University, USA.
Seo, Y C and Hyan, C T (2004) Procurement system selection model reflecting past performance. Journal of Construction Procurement, 10(2),
Sepasgozar, S M E; Forsythe, P and Shirowzhan, S (2018) Evaluation of terrestrial and mobile scanner technologies for part-built information modeling. Journal of Construction Engineering and Management, 144(12): 04018110, ISSN 0733-9364
Seymour, D E and Rooke, J D (1998) Construction management research and the attempt to build a social science. Journal of Construction Procurement, 4(1), pp. 59-73. ISSN 1358-9180
Shah, R K; Dawood, N; Dean, J and Castro, S (2009) A virtual construction model of 4d planning in road project. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Shahin, A; Abourizk, S M and Mohamed, Y (2011) Modeling weather-sensitive construction activity using simulation. Journal of Construction Engineering and Management, 137(3), pp. 238-246. ISSN 0733-9364
Shahin, A A (2007) A framework for cold weather construction simulation. PhD thesis, University of Alberta, Canada.
Shakantu, M W (2004) An investigation into building material and waste logistics: The case of Cape Town. PhD thesis, Glasgow Caledonian University, UK.
Shakantu, W; Tookey, J E and Bowen, P A (2003) The hidden cost of transportation of construction materials: An overview. Journal of Engineering, Design and Technology, 1(1), pp. 103-118. ISSN 1726-0531
Shammas-Toma, M; Seymour, D and Clark, L (1998) Obstacles to implementing total quality management in the UK construction industry. Construction Management and Economics, 16(2), pp. 177-192. ISSN 01446193
Shanbari, H; Blinn, N and Issa, R R A (2016) Using augmented reality video in enhancing masonry and roof component comprehension for construction management students. Engineering, Construction and Architectural Management, 23(6), pp. 765-781. ISSN 0969-9988
Shaofeng, L; Jincai, F; Pinghua, Z and Xiang, L (2018) Stability analysis of two parallel closely spaced tunnels based on convergence-confinement principle. Journal of Construction Engineering and Management, 144(6): 04018041, ISSN 0733-9364
Sharrard, A L (2007) Greening construction processes using an input-output-based hybrid life cycle assessment method. PhD thesis, Carnegie Mellon University, USA.
Sharrard, A L; Matthews, H S and Roth, M (2007) Environmental implications of construction site energy use and electricity generation. Journal of Construction Engineering and Management, 133(11), pp. 846-854. ISSN 0733-9364
Shehadeh, Ali (2019) Multi-objective optimization for construction equipment fleet selection and management in highway construction projects based on time, cost, and quality objectives. PhD thesis, University of Central Florida, USA.
Shehata, A O; Megahed, N A; Hassan, A M and Shahda, M M (2024) Holistic SWOT based matrix of BIM adoption in heritage green retrofitting processes. Architectural Engineering and Design Management, 20(3), pp. 694-718. ISSN 1745-2007
Shelbourn, M; Bouchlaghem, N M; Anumba, C and Carrillo, P (2007) Planning and implementation of effective collaboration in construction projects. Construction Innovation, 7(4), pp. 357-377. ISSN 1471-4175
Shen, K; Li, X; Cao, X and Zhang, Z (2022) Prefabricated construction process optimization based on rework risk. Journal of Construction Engineering and Management, 148(6): 04022031, ISSN 0733-9364
Shen, K; Li, X; Cao, X and Zhihui, Z (2021) Research on the rework risk core tasks in prefabricated construction in China. Engineering, Construction and Architectural Management, 28(10), pp. 3299-3321. ISSN 0969-9988
Shen, X (2017) Location-based leading indicators in BIM for construction safety. PhD thesis, University of Alabama, USA.
Sherratt, F; Dowsett, R and Sherratt, S (2020) Construction 4.0 and its potential impact on people working in the construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(4), pp. 145-152. ISSN 17514304
Shi, G; Lu, D; Liu, Z; Du, X; Zhang, Q; Zhao, L and Wang, Z (2024) Material distribution planning method and experimental verification under multinode and multivehicle scene. Journal of Construction Engineering and Management, 150(11): 04024161, ISSN 0733-9364
Shi, J and Abourizk, S (1998) Continuous and combined event-process models for simulating pipeline construction. Construction Management and Economics, 16(4), pp. 489-498. ISSN 01446193
Shi, J J (1999) Activity-based construction (ABC) modeling and simulation method. Journal of Construction Engineering and Management, 125(5), pp. 354-360. ISSN 0733-9364
Shi, J J (2002) Three methods for verifying and validating the simulation of a construction operation. Construction Management and Economics, 20(6), pp. 483-491. ISSN 01446193
Shi, X; Liu, Y; Ma, K; Gu, Z; Qiao, Y; Ni, G; Ojum, C; Opoku, A and Liu, Y (2025) Evaluation of risk factors affecting the safety of coal mine construction projects using an integrated DEMATEL-ISM approach. Engineering, Construction and Architectural Management, 32(5), pp. 3432-3452. ISSN 0969-9988
Shields, R and West, K (2003) Innovation in clean-room construction: A case study of co-operation between firms. Construction Management and Economics, 21(4), pp. 337-344. ISSN 01446193
Shim, E and Kim, B C (2014) Batch-size based repetitive scheduling method (BRSM). International Journal of Construction Education and Research, 10(2), pp. 140-156. ISSN 1557-8771
Siddiqi, K M (1997) Framework for analyzing construction alternatives with respect to environmental laws. PhD thesis, Georgia Institute of Technology, USA.
Sikorsky, C S (1990) Product and process integration for the US design-construction industry. PhD thesis, Texas A&M University, USA.
Silva, Edson Neves da (2021) Proposal for a management system integrating the principles of lean construction with the aspects of quality, safety, environment and occupational health management, focusing on small civil construction companies. PhD thesis, Universidade Federal Fluminense, Brazil.
Simpson, K; Janda, K B and Owen, A (2020) Preparing 'middle actors' to deliver zero-carbon building transitions. Buildings & Cities, 1(1), pp. 610-624. ISSN 2632-6655
Sing, T F (2002) Time to build options in construction processes. Construction Management and Economics, 20(2), pp. 119-130. ISSN 01446193
Singh, A (1990) Development of process and mix flexibility in construction. PhD thesis, Purdue University, USA.
Singh, S; Chinyio, E and Suresh, S (2018) The implementation of stakeholder management and building information modelling (BIM) in UK construction projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Singh, V V and Tommelein, I D (2023) Visual workload leveling and zoning using work density method for construction process planning. Journal of Construction Engineering and Management, 149(10): 04023102, ISSN 0733-9364
Siva, J and London, K (2012) Client learning for successful architect-client relationships. Engineering, Construction and Architectural Management, 19(3), pp. 253-268. ISSN 0969-9988
Smallwood, J (2007) The influence of architectural designers on construction ergonomics. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Smith, J P; Miller, K; Christofferson, J and Hutchings, M (2011) Best practices for dealing with price volatility in utah's residential construction market. International Journal of Construction Education and Research, 7(3), pp. 210-225. ISSN 1557-8771
Smith, S (1998) Stochastic analysis of cyclic construction processes. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Smyth, H (2010) Construction industry performance improvement programmes: The UK case of demonstration projects in the 'continuous improvement' programme. Construction Management and Economics, 28(3), pp. 255-270. ISSN 1466433X
Sobieraj, J and Metelski, D (2023) Identification of the key investment project management factors in the housing construction sector in Poland. International Journal of Construction Management, 23(1), pp. 1-12. ISSN 1562-3599
Soemardi, B W (1993) Fuzzy neural network models for design/construction processes. PhD thesis, University of Kentucky, USA.
Soetanto, R; Dainty, A R J; Glass, J and Price, A D F (2006) Empirical evaluation of structural frame performance criteria: Realizing the potential of hybrid concrete construction. Journal of Construction Engineering and Management, 132(3), pp. 278-290. ISSN 0733-9364
Soman, R K and Whyte, J K (2020) Codification challenges for data science in construction. Journal of Construction Engineering and Management, 146(7): 04020072, ISSN 0733-9364
Son, J and Rojas, E M (2011) Impact of optimism bias regarding organizational dynamics on project planning and control. Journal of Construction Engineering and Management, 137(2), pp. 147-157. ISSN 0733-9364
Song, Y and Chua, D K H (2007) Temporal logic representation schema for intermediate function. Journal of Construction Engineering and Management, 133(4), pp. 277-286. ISSN 0733-9364
Songer, A D and Walker, B (2004) General contractor emotional intelligence in the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Sonkor, Muammer Semih (2026) A cybersecurity decision-support framework for technology integration in the built environment. PhD thesis, New York University Tandon School of Engineering, USA.
Ssegawa, J (2013) Developing a strategic perspective for construction industry of Botswana. Construction Economics and Building, 13(3), pp. 157-172. ISSN 2204-9029
Stanitsas, M and Kirytopoulos, K (2023) Investigating the significance of sustainability indicators for promoting sustainable construction project management. International Journal of Construction Management, 23(3), pp. 434-448. ISSN 1562-3599
Staub-French, S; Pilon, A; Poirier, E; Fallahi, A; Kasbar, M; Calderon, F; Teshnizi, Z and Froese, T (2022) Construction process innovation on brock commons tallwood house. Construction Innovation, 22(1), pp. 1-22. ISSN 1471-4175
Steed, A J (1996) Defining interaction within immersive virtual environments. PhD thesis, Queen Mary University of London, UK.
Sterner, E (2002) Green procurement of buildings: Estimation of environmental impact and life-cycle cost. PhD thesis, Luleå University of Technology, Sweden.
Stewart, R A and Spencer, C A (2006) Six-sigma as a strategy for process improvement on construction projects: A case study. Construction Management and Economics, 24(4), pp. 339-348. ISSN 01446193
Stockings, W H (2002) The process of construction planning. PhD thesis, Eindhoven University of Technology, Netherlands.
Stoy, C and Schalcher, H R (2007) Residential building projects: Building cost indicators and drivers. Journal of Construction Engineering and Management, 133(2), pp. 139-145. ISSN 0733-9364
Sturges, J and Bates, M (2000) Thriving on chaos: The result of poor planning: Some views from the housebuilding sector. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Subsomboon, K (2004) A procurement and material management (PMM) system based on the fully integrated and automated project process (FIAPP). PhD thesis, Columbia University, USA.
Sulaiman, M J (1997) Intesite: Intelligent site layout planning within an object-oriented integrated construction environment. PhD thesis, University of Salford, UK.
Sullivan, S (2007) Construction and behavior of precast bridge deck panel systems. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Sun, L (2012) Establishing confidence in safety assessment evidence. PhD thesis, University of York, UK.
Sundquist, V; Leto, A D; Gustafsson, M; Johansson, M and Roupé, M (2020) BIM in construction production: Gains and hinders for firms, projects and industry. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Suprun, Emiliya (2018) An integrated systems model of construction innovation in the Russian federation. PhD thesis, Griffith University, Russia.
Suraji, A (2001) Development and validation of a theory of construction accident causation. PhD thesis, University of Manchester, UK.
Suraji, A; Sulaiman, K; Mahyuddin, N and Mohamed, O (2006) Rethinking construction safety: An introduction to total safety management. Journal of Construction Research, 7(1), pp. 49-63. ISSN 1609-9451
Syal, M G (1992) Construction process knowledge model to assist method selection in project planning. PhD thesis, Pennsylvania State University, USA.
Syben, G (2000) Contractors take command: From a demand-based towards a producer oriented model in German construction. Building Research & Information, 28(2), pp. 119-130. ISSN 0961-3218
Tahmasebinia, F; M.E. Sepasgozar, S; Shirowzhan, S; Niemela, M; Tripp, A; Nagabhyrava, S; Mansuri, K Z and Alonso-Marroquin, F (2020) Criteria development for sustainable construction manufacturing in Construction Industry 4.0: Theoretical and laboratory investigations. Construction Innovation, 20(3), pp. 379-400. ISSN 1471-4175
Tam, V W Y and Shen, L Y (2010) On applications of an optimal price-time bidding model in Hong Kong foundation projects. Construction Innovation, 10(1), pp. 14-24. ISSN 1471-4175
Tambo, T (2010) Smooth operator: Mobile information technology for improved flow at the construction site. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Tambwe, O.; Aigbavboa, C. and Akinradewo, O. (2026) Influence of data longevity on data management in the South African construction industry. Construction Economics and Building, 26(2), ISSN 2204-9029
Tamimi, S T (1989) An influence diagramming based risk analysis system. PhD thesis, University of Colorado at Boulder, USA.
Tan, A H (2015) While stands the colosseum: A ground-up exploration of ancient Roman construction techniques using virtual reality. PhD thesis, Ohio State University, USA.
Tang, P (2013) Assessing decision making strategies in construction management by using a schedule-based simulation framework. PhD thesis, Michigan Technological University, USA.
Tang, S (2025) Natural language processing (NLP)-based framework for construction quantity take off from building information models. PhD thesis, Western Michigan University, USA.
Tang, S L; Aoieong, R T and Ahmed, S M (2004) The use of process cost model (PCM) for measuring quality costs of construction projects: Model testing. Construction Management and Economics, 22(3), pp. 263-275. ISSN 01446193
Tang, W; Qiang, M; Duffield, C F; Young, D M and Lu, Y (2008) Incentives in the Chinese construction industry. Journal of Construction Engineering and Management, 134(7), pp. 457-467. ISSN 0733-9364
Tariq, M (2012) Green supply chain assessment model for construction projects in the UAE. PhD thesis, University of Salford, UK.
Tatum, C B (1988) Classification system for construction technology. Journal of Construction Engineering and Management, 114(3), pp. 344-363. ISSN 0733-9364
Tatum, C B (2005) Building better: Technical support for construction. Journal of Construction Engineering and Management, 131(1), pp. 23-32. ISSN 0733-9364
Tatum, C B (2011) Core elements of construction engineering knowledge for project and career success. Journal of Construction Engineering and Management, 137, pp. 745-750. ISSN 0733-9364
Tatum, C B and Funke, A T (1988) Partially automated grading: Construction process innovation. Journal of Construction Engineering and Management, 114(1), pp. 19-35. ISSN 0733-9364
Tavakoli, A (1985) Productivity analysis of construction operations. Journal of Construction Engineering and Management, 111(1), pp. 31-39. ISSN 0733-9364
Tayeh, Ralph (2021) Augmented reality applications for BIM and GIS in online construction education. PhD thesis, University of Florida, USA.
Taylor, D A (2012) Featural and holistic processing in facial composite construction: The role of cognitive style and processing sets. PhD thesis, University of Westminster, UK.
Taylor, T (2014) Assessing the thermal performance of buildings at the construction stage using thermography: development and evaluation of a testing approach in the context of new housing in Wales. PhD thesis, Cardiff Metropolitan University, UK.
Tellam, I (2024) Culture change in the UK construction industry: an anthropological perspective. Buildings & Cities, 5(1), pp. 620-628. ISSN 2632-6655
Tennant, S; McCarney, M and Tong, M K L (2012) Re-engineering the construction supply chain: Transferring on-site activity off-site. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Teo, M M M and Loosemore, M (2012) A new research agenda into community-based protest in construction. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Terwel, K C (2014) Structural safety: Study into critical factors in the design and construction process. PhD thesis, Delft University of Technology, Netherlands.
Tesfagaber, G (2004) Application of PSL to construction process information specification and exchange. PhD thesis, Loughborough University, UK.
Tetteh, P A; Addy, M N; Acheampong, A; Akomea-Frimpong, I; Ayidana, E and Ghansah, F A (2026) Critical drivers for the adoption of wearable sensing technologies (wsts) for construction safety monitoring in Ghana: A fuzzy synthetic analysis. Construction Innovation, 26(1), pp. 173-197. ISSN 1471-4175
Thaesler-Garibaldi, M P (2005) A methodology to develop an integrated engineering system to estimate quantities for bridge repairs at the pre-design stage. PhD thesis, Georgia Institute of Technology, USA.
Thoradeniya, D; Jayasinghe, C; Ariyaratne, I E and Basnayake, G B M A (2026) Construction quality framework for school buildings: Damage detection and rectification prioritization. International Journal of Construction Management, 26(4), pp. 660-678. ISSN 1562-3599
Thuesen, C and Hvam, L (2011) Efficient on-site construction: Learning points from a German platform for housing. Construction Innovation, 11(3), pp. 338-355. ISSN 1471-4175
Thuesen, C; Jensen, J S and Gottlieb, S C (2009) Making the long tail work: Reflections on the development of the construction industry the past 25 years. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Thuesen, C and Koch, C (2003) Coordinating knowledge in building design. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Thunberg, M (2016) Developing a framework for supply chain planning in construction. PhD thesis, Linköping University, Sweden.
Thunberg, M; Rudberg, M and Gustavsson, T K (2014) Identifying and positioning construction supply chain planning problems. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Thunberg, M; Rudberg, M and Karrbom Gustavsson, T (2017) Categorising on-site problems: A supply chain management perspective on construction projects. Construction Innovation, 17(1), pp. 90-111. ISSN 1471-4175
Tian, F.; Zeng, N.; Li, Z.; Ge, Q.; Wang, Q. and Li, Q. (2026) Defect trigger identification in a construction digital twin using quality linked data and iterative deviation computation. Journal of Construction Engineering and Management, 152(8): 04026105, ISSN 0733-9364
Tiew, S Y (2025) A construction contract administration (cca) framework for graduate architects' professional development. Engineering, Construction and Architectural Management, 32(12), pp. 8056-8072. ISSN 0969-9988
Tijhuis, W (2015) Managing public-private partnerships: Dealing with business-culture influences. Built Environment Project and Asset Management, 5(1), pp. 22-34. ISSN 2044-124X
Tipple, C (1993) An analysis of the development of the construction industry since the 18th century. PhD thesis, University of Manchester, UK.
Tiruneh, G G and Fayek, A R (2022) Hybrid GA-manfis model for organizational competencies and performance in construction. Journal of Construction Engineering and Management, 148(4): 04022002, ISSN 0733-9364
Tiruneh, Getaneh Gezahegne (2021) Hybrid neuro-fuzzy model for construction organizational competencies and performance. PhD thesis, University of Alberta, Canada.
Toller, S; Carlsson, A; Wadeskog, A; Miliutenko, S and Finnveden, G (2013) Indicators for environmental monitoring of the Swedish building and real estate management sector. Building Research & Information, 41(2), pp. 146-155. ISSN 0961-3218
Tommelein, I D (1998) Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique. Journal of Construction Engineering and Management, 124(4), pp. 279-288. ISSN 0733-9364
Tommelein, I D (2022) Work density method for takt planning of construction processes with nonrepetitive work. Journal of Construction Engineering and Management, 148(12): 04022134, ISSN 0733-9364
Tommelein, I D; Carr, R I and Odeh, A M (1994) Assembly of simulation networks using designs, plans, and methods. Journal of Construction Engineering and Management, 120(4), pp. 796-815. ISSN 0733-9364
Tommelein, I D; Riley, D R and Howell, G A (1999) Parade game: Impact of work flow variability on trade performance. Journal of Construction Engineering and Management, 125(5), pp. 304-310. ISSN 0733-9364
Tookey, J E; Kulatunga, K; Kulatunga, U; Amaratunga, D and Haigh, R (2011) Client's championing characteristics that promote construction innovation. Construction Innovation, 11(4), pp. 380-398. ISSN 1471-4175
Toolanen, B (2008) Lean contracting relational contracting influenced by lean thinking. PhD thesis, Luleå University of Technology, Sweden.
Topal, C (2011) Risk construction at a public hearing: An application of socio-cultural theories into organizational risk. PhD thesis, University of Alberta, Canada.
Tran, D H (2020) Optimizing time-cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods. Engineering, Construction and Architectural Management, 27(9), pp. 2287-2313. ISSN 0969-9988
Trani, M L; Cassano, M; Minotti, M and Todaro, D (2014) Construction site BIM requirements. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Treloar, G J; Love, P E D; Faniran, O O and Iyer-Raniga, U (2000) A hybrid life cycle assessment method for construction. Construction Management and Economics, 18(1), pp. 5-9. ISSN 01446193
Trigunarsyah, Bambang (2001) Implementing constructability improvement into the Indonesian construction industry. PhD thesis, University of Melbourne, Australia.
Trinh, T T P and Sharif, N (1996) Assessing construction technology by integrating constructed product and construction process complexities: A case study of embankment dams in Thailand. Construction Management and Economics, 14(6), pp. 467-484. ISSN 01446193
Tryggestad, K; Georg, S and Hernes, T (2010) Constructing buildings and design ambitions. Construction Management and Economics, 28(6), pp. 695-705. ISSN 1466433X
Tsai, W-S (1995) Evaluation of geotextiles as separators in roadways. PhD thesis, University of Washington, USA.
Tuholski, S J; Gursel, A P; Tommelein, I D and Bomba, G (2009) Lean comparison using process charts of complex seismic retrofit projects. Journal of Construction Engineering and Management, 135(4), pp. 330-339. ISSN 0733-9364
Tuuli, M M and Rowlinson, S (2010) Impact of leadership style and team context on psychological empowerment in construction project teams. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Uggla, G (2021) Model and reality: Connecting BIM and the built environment. PhD thesis, KTH Royal Institute of Technology, Sweden.
Umer, M; Wetzel, E M and Powell, C (2026) Advancing toward automated material counting and localization using RFID, a boston dynamics spot robot, and a Bayesian filter algorithm. Journal of Construction Engineering and Management, 152(1): 04025213, ISSN 0733-9364
Vahabi, A; Nasirzadeh, F and Mills, A (2023) Assessing the impact of project brief clarity using project definition rating index tool and system dynamic. Engineering, Construction and Architectural Management, 30(2), pp. 697-713. ISSN 0969-9988
Vahabi, Ali (2018) Investigating the impact of project scope definition on design-build project performance: A system dynamics approach. PhD thesis, Queensland University of Technology, Australia.
Van Nederveen, S; Beheshti, R and De Ridder, H (2010) Supplier-driven integrated design. Architectural Engineering and Design Management, 6(4), pp. 241-253. ISSN 1745-2007
VanDemark, L P (2021) Mitigating risk of site development disputes. PhD thesis, University of Colorado at Denver, USA.
Vanegas Pabon, J A (1988) A model for design/construction integration during the initial phases of design for building construction projects. PhD thesis, Stanford University, USA.
Vennström, A (2008) The construction client as a change agent contextual support and obstacles. PhD thesis, Luleå University of Technology, Sweden.
Vennström, A and Erik Eriksson, P (2010) Client perceived barriers to change of the construction process. Construction Innovation, 10(2), pp. 126-137. ISSN 1471-4175
Verburg, Willem Hendrik (2021) The development of a design-for-assembly method for construction and infrastructure projects. PhD thesis, University of Twente, Netherlands.
Vernikos, V K; Goodier, C I; Broyd, T W; Robery, P C and Gibb, A G F (2014) Building information modelling and its effect on off-site construction in UK civil engineering. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(3), pp. 152-159. ISSN 17514304
Veselka, J (2023) BIM data structure in the building optimization: Methodology for model development. PhD thesis, Czech Technical University, Czech Republic.
Vigneshwar, R V K and Shanmugapriya, S (2023) Investigating the factors affecting construction site productivity: a case of India. Engineering, Construction and Architectural Management, 30(2), pp. 963-985. ISSN 0969-9988
Visscher, H; Suddle, S and Meijer, F (2008) Quantitative risk analysis as a supporting tool for safety protocols at multi-functional urban locations. Construction Innovation, 8(4), pp. 269-279. ISSN 1471-4175
Viswalekshmi, B R and Bendi, D (2026) Construction waste reduction measures for high-rise buildings in India – a stakeholder's perspective. Construction Innovation, 26(2), pp. 491-530. ISSN 1471-4175
Vo-Tran, Huan Cong (2014) Information management and sharing practices within a construction project process. PhD thesis, RMIT University, Australia.
Vogelius, P; Forman, M; Haugbølle, K and Storgaard, K (2009) Innovation in the kitchen line of business: Users, configuration and context. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Vogl, B and Abdel-Wahab, M (2015) Measuring the construction industry's productivity performance: Critique of international productivity comparisons at industry level. Journal of Construction Engineering and Management, 141(4): 04014085, ISSN 0733-9364
Voordijk, J T (2019) Technological mediation in construction: Postphenomenological inquiry into digital technologies. Journal of Construction Engineering and Management, 145(12): 04019084, ISSN 0733-9364
Wahedi, H (2016) Site practice: The role of design drawings within social communities. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Walker, D H T (1997) Construction time performance and traditional versus non-traditional procurement methods. Journal of Construction Procurement, 3(1), pp. 42-55. ISSN 1358-9180
Wall, C M (2004) New ways of building: Architects, operatives and industrialised production in britain 1940-70. PhD thesis, University of Cambridge, UK.
Walljee, L and Smallwood, J (2023) A framework for improving the performance of health and safety officers in the construction industry. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Walsh, K D; Sawhney, A and Bashford, H H (2007) Production equations for unsteady-state construction processes. Journal of Construction Engineering and Management, 133(3), pp. 254-261. ISSN 0733-9364
Wambeke, B W (2011) Identifying, prioritizing, and reducing variation of construction related tasks. PhD thesis, North Carolina State University, USA.
Wambeke, B W; Hsiang, S M and Liu, M (2011) Causes of variation in construction project task starting times and duration. Journal of Construction Engineering and Management, 137(9), pp. 663-677. ISSN 0733-9364
Wambeke, B W; Liu, M and Hsiang, S M (2012) Using last planner and a risk assessment matrix to reduce variation in mechanical related construction tasks. Journal of Construction Engineering and Management, 138(4), pp. 491-498. ISSN 0733-9364
Wambeke, B W; Liu, M and Hsiang, S M (2012) Using Pajek and centrality analysis to identify a social network of construction trades. Journal of Construction Engineering and Management, 138(10), pp. 1192-1201. ISSN 0733-9364
Wan Omar, Sabki (2015) Analysis of embodied energy and carbon in Malaysian building construction using hybrid life cycle assessment. PhD thesis, Griffith University, Malaysia.
Wandahl, S; Pérez, C T; Salling, S; Neve, H H; Lerche, J and Petersen, S (2021) The impact of construction labour productivity on the renovation wave. Construction Economics and Building, 21(3), pp. 11-32. ISSN 2204-9029
Wang, C; Zhang, S; Du, C; Pan, F and Xue, L (2016) A real-time online structure-safety analysis approach consistent with dynamic construction schedule of underground caverns. Journal of Construction Engineering and Management, 142(9): 04016042, ISSN 0733-9364
Wang, H-h (1998) Between self and others: A qualitative study of the career construction process of college-track students in Taiwan. EdD thesis, Harvard University, USA.
Wang, P (2006) Production-based large scale construction simulation modeling. PhD thesis, University of Alberta, Canada.
Wang, P (2019) The aetiology and progression of construction disputes between client and contractor in the UK. PhD thesis, University of Manchester, UK.
Wang, S-Y (2005) Computer experiment for improving construction processes. PhD thesis, Purdue University, USA.
Wang, X (2022) Enabling human-robot partnerships in digitally-driven construction work through integration of building information models, interactive virtual reality, and process-level digital twins. PhD thesis, University of Michigan, USA.
Wang, Xi (2018) Assessing the application of the unmanned aerial systems (uas) in earthwork volume measurement. PhD thesis, University of Kentucky, USA.
Waroonkun, Tanut (2007) Modelling international technology transfer in Thai construction projects. PhD thesis, Griffith University, Thailand.
Warszawski, A and Sangrey, D A (1985) Robotics in building construction. Journal of Construction Engineering and Management, 111(3), pp. 260-280. ISSN 0733-9364
Webb, N (2012) Digital re-analysis of lost or unbuilt architecture. PhD thesis, University of Liverpool, UK.
Webb, R M; Smallwood, J and Haupt, T C (2004) The potential of 4d cad as a tool for construction management. Journal of Construction Research, 5(1), pp. 43-60. ISSN 1609-9451
Weddikkara, C (2003) The impact of professional culture on dispute resolution in the building industries of Australia and Sri-Lanka. PhD thesis, Murdoch University, Australia.
Wei, Y; Choi, H and Lei, Z (2022) A generative design approach for modular construction in congested urban areas. Smart and Sustainable Built Environment, 11(4), pp. 1163-1181. ISSN 2046-6099
Weidman, J E; Miller, K R; Christofferson, J P and Newitt, J S (2011) Best practices for dealing with price volatility in commercial construction. International Journal of Construction Education and Research, 7(4), pp. 276-293. ISSN 1557-8771
Wells, E J (1986) The construction industry in developing countries: a strategy for development. PhD thesis, University College Swansea, UK.
Wetherington, L E (1992) The effect of variations in management techniques on construction productivity. PhD thesis, University of Florida, USA.
Whyte, J (2003) Innovation and users: Virtual reality in the construction sector. Construction Management and Economics, 21(6), pp. 565-572. ISSN 01446193
Wibby, R J (1985) Portland cement concrete thin-bonded overlay. Journal of Construction Engineering and Management, 111(3), pp. 281-292. ISSN 0733-9364
Wilkinson, S; Chang-Richards, A Y; Sapeciay, Z and Costello, S B (2016) Improving construction sector resilience. International Journal of Disaster Resilience in the Built Environment, 7(2), pp. 173-185. ISSN 1759-5916
Willetts, R (2013) Investigating the multiple influences affecting sustainability in a multidisciplinary engineering consultancy. PhD thesis, Loughborough University, UK.
Williamson, D; Orr, J and Fulford, D (2017) Biogas dome construction using pneumatics. Journal of Construction in Developing Countries, 22(2), pp. 35-53. ISSN 1823-6499
Winch, G M (2003) Models of manufacturing and the construction process: The genesis of re-engineering construction. Building Research & Information, 31(2), pp. 107-118. ISSN 0961-3218
Winch, G M and Carr, B (2001) Processes, maps and protocols: Understanding the shape of the construction process. Construction Management and Economics, 19(5), pp. 519-531. ISSN 01446193
Wing, C K (1997) The ranking of construction management journals. Construction Management and Economics, 15(4), pp. 387-398. ISSN 01446193
Wong, J K W; Bameri, F; Ahmadian Fard Fini, A and Maghrebi, M (2025) Tracking indoor construction progress by deep-learning-based analysis of site surveillance video. Construction Innovation, 25(2), pp. 461-489. ISSN 1471-4175
Wood, H L and Ashton, P (2010) Modelling project complexity. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Wood H L, P P F E R P (2013) Understanding complexity in the AEC industry. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Wu, R (2002) Computer -aided dimensional control in building construction. PhD thesis, Eindhoven University of Technology, Netherlands.
Wu, S (2004) IT tool for construction process management, process protocol toolkit. PhD thesis, University of Salford, UK.
Xi, J (2013) Evaluating the functional performance of small-scale public demountable buildings. PhD thesis, University of Liverpool, UK.
Xiao, H and Proverbs, D (2002) The performance of contractors in Japan, the UK and the USA: A comparative evaluation of construction cost. Construction Management and Economics, 20(5), pp. 425-435. ISSN 01446193
Xiao, H and Proverbs, D (2002) An investigation into factors influencing construction costs based on Japanese, UK and US contractor practice. Construction Economics and Building, 2(2), pp. 27-35. ISSN 2204-9029
Xie, W; Zhao, T; Wang, H and Tang, J (2017) Construction techniques used to automatically pass standard box girders through special passenger-line tunnels. Journal of Construction Engineering and Management, 143(5): 05016027, ISSN 0733-9364
Xu, J (2001) CAD-based integrated simulation environment (CAD-ise). PhD thesis, University of Alberta, Canada.
Xu, J and Song, X (2014) Suggestions for temporary construction facilities' layout problems in large-scale construction projects. Journal of Construction Engineering and Management, 140(5): 06014001, ISSN 0733-9364
Xu, Yuqing (2025) Enhancing reliability and efficiency of upfront embodied carbon assessment leveraging openbim, llm, DES, and blockchain. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Xu, Z; Liang, Y; Lu, H; Kong, W and Wu, G (2023) An approach for monitoring prefabricated building construction based on feature extraction and point cloud segmentation. Engineering, Construction and Architectural Management, 30(10), pp. 5302-5332. ISSN 0969-9988
Yahya, K and Boussabaine, H (2010) Quantifying environmental impacts and eco-costs from brick waste. Architectural Engineering and Design Management, 6(3), pp. 189-206. ISSN 1745-2007
Yang, F (2022) Ascending the pagoda: A ground-up exploration of the ancient construction methods of dayanta using virtual reality. PhD thesis, Ohio State University, USA.
Yang, K (2018) Sensing workers' responsive behaviors for identifying safety hazards in construction. PhD thesis, University of Nebraska - Lincoln, USA.
Yao, Y P; Ruan, Y Z; Chen, J; Geng, Y; Zhang, X; Liu, B Y; Zong, X P and Yu, G Z (2018) Research on a real-time monitoring platform for compaction of high embankment in airport engineering. Journal of Construction Engineering and Management, 144(1): 04017096, ISSN 0733-9364
Yasamis, F (1999) Contractor quality performance (CQP) evaluation model in pavement projects. PhD thesis, Illinois Institute of Technology, USA.
Yasamis, F; Arditi, D and Mohammadi, J (2002) Assessing contractor quality performance. Construction Management and Economics, 20(3), pp. 211-223. ISSN 01446193
Yates, J K (2013) Sustainable methods for waste minimisation in construction. Construction Innovation, 13(3), pp. 281-301. ISSN 1471-4175
Yates, J K and Battersby, L C (2003) Master builder project delivery system and designer construction knowledge. Journal of Construction Engineering and Management, 129(6), pp. 635-644. ISSN 0733-9364
Yeh, Y C; Hsu, D S and Kuo, Y H (1991) Expert system for diagnosing damage of prestressed concrete pile. Journal of Construction Engineering and Management, 117(1), pp. 13-26. ISSN 0733-9364
Yevu, S K; Yu, A T W; Darko, A and Addy, M N (2021) Evaluation model for influences of driving forces for electronic procurement systems application in Ghanaian construction projects. Journal of Construction Engineering and Management, 147(8): 04021076, ISSN 0733-9364
Young-Corbett, D E (2014) Prevention through design: Health hazards in asphalt roofing. Journal of Construction Engineering and Management, 140(9): 06014007, ISSN 0733-9364
Yu, A; Shen, Q P; Kelly, J and Hunter, K (2004) Development of a value management framework for the formation of project briefs. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Yu, H; Tweed, T; Al-Hussein, M and Nasseri, R (2009) Development of lean model for house construction using value stream mapping. Journal of Construction Engineering and Management, 135(8), pp. 782-790. ISSN 0733-9364
Yuan, Z and Khosrowshahi, F (2005) Information system for project managers in chinese construction small and medium sized enterprises. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Yun, G C (2008) The utility of knowledge mapping as an approach to improving corporate and project performance: a case study of a large South Korean consulting firm. PhD thesis, University of Salford, UK.
Yunus, Riduan (2012) Decision making guidelines for sustainable construction of industrialised building systems. PhD thesis, Queensland University of Technology, Australia.
Zadeh Kazemi, M (2022) Essays on sustainability reporting quality, sustainability-oriented innovation, disruptive technologies and resilience in the construction sector: The case of the UAE. PhD thesis, Brunel University, UK.
Zaeri, F (2017) Exploring the potential for the application of simulation methods in construction project delivery in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.
Zayed, T M (2001) Assessment of productivity for concrete bored pile construction. PhD thesis, Purdue University, USA.
Zayed, T M (2005) Productivity and cost assessment for continuous flight auger piles. Journal of Construction Engineering and Management, 131(6), pp. 677-688. ISSN 0733-9364
Zayed, T M and Halpin, D W (2004) Simulation as a tool for pile productivity assessment. Journal of Construction Engineering and Management, 130(3), pp. 394-404. ISSN 0733-9364
Zayed, T M and Halpin, D W (2005) Pile construction productivity assessment. Journal of Construction Engineering and Management, 131(6), pp. 705-714. ISSN 0733-9364
Zayed, T M and Halpin, D W (2005) Productivity and cost regression models for pile construction. Journal of Construction Engineering and Management, 131(7), pp. 779-789. ISSN 0733-9364
Zayed, T M and Halpin, D W (2005) Deterministic models for assessing productivity and cost of bored piles. Construction Management and Economics, 23(5), pp. 531-543. ISSN 01446193
Zeng, J; An, M; Chan, A H C and Lin, Y (2004) A methodology for assessing risks in the construction process. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Zerjav, V and Ceric, A (2009) Structuring communication within construction projects: A communication breakdown structure. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Zhai, X; Reed, R and Mills, A (2014) Addressing sustainable challenges in China: The contribution of off-site industrialisation. Smart and Sustainable Built Environment, 3(3), pp. 261-274. ISSN 2046-6099
Zhang, H and Lin, Y (2023) Prediction of ergonomic risks and impacts on construction schedule through agent-based simulation. Journal of Construction Engineering and Management, 149(3): 04022181, ISSN 0733-9364
Zhang, H and Tam, C M (2003) Fuzzy decision-making for dynamic resource allocation. Construction Management and Economics, 21(1), pp. 31-41. ISSN 01446193
Zhang, H and Tam, C M (2005) Consideration of break in modeling of construction processes. Engineering, Construction and Architectural Management, 12(4), pp. 373-390. ISSN 0969-9988
Zhang, K; Li, D; Shen, X; Hou, W; Li, Y and Xue, X (2023) Research on strengthening stone arch bridge with CFRP rebars. International Journal of Building Pathology and Adaptation, 41(5), pp. 1014-1028. ISSN 23984708
Zhang, N and Tiong, R (2003) Integrated electronic commerce model for the construction industry. Journal of Construction Engineering and Management, 129(5), pp. 578-585. ISSN 0733-9364
Zhang, S; Du, C; Sa, W; Wang, C and Wang, G (2014) Bayesian-based hybrid simulation approach to project completion forecasting for underground construction. Journal of Construction Engineering and Management, 140(1): 04013031, ISSN 0733-9364
Zhang, X; Sexton, M G; Goulding, J S; Aouad, G and Kagioglou, M (2005) Performance modelling for the design of a hybrid concrete structural frame. Architectural Engineering and Design Management, 1(2), pp. 83-91. ISSN 1745-2007
Zhang, Y; Lei, Z; Han, S; Bouferguene, A and Al-Hussein, M (2020) Process-oriented framework to improve modular and offsite construction manufacturing performance. Journal of Construction Engineering and Management, 146(9): 04020116, ISSN 0733-9364
Zhao, S.; Guo, Y.; Wen, S.; Guo, Z.; Miao, A.; Li, D. and Guo, C. (2026) Worker health and safety in high-altitude tunnel construction: A study on oxygen supply standards and measures based on physiological indicators. International Journal of Construction Management, 26(8), pp. 1562-1583. ISSN 1562-3599
Zhao, Y; Jing, H; Yu, M and Li, J (2025) Efficient project management of historical building groups: a BIM-based approach with critical chain method and 5D simulation. International Journal of Construction Management, 25(7), pp. 826-839. ISSN 1562-3599
Zhong, D; Li, J; Zhu, H and Song, L (2004) Geographic information system-based visual simulation methodology and its application in concrete dam construction processes. Journal of Construction Engineering and Management, 130(5), pp. 742-750. ISSN 0733-9364
Zhong, Q (1998) Building process modelling using product modelling methodology and its application to scheduling. PhD thesis, National University of Singapore, Singapore.
Zhou, J.; Zhou, Y.; Xiong, X. and Wang, F. (2026) Temperature monitoring and temperature control measures optimization of arch dam floor of flow channel during construction period. Engineering, Construction and Architectural Management, 33(7), pp. 5874-5900. ISSN 0969-9988
Zhou, H and Rezazadeh Azar, E (2019) BIM-based energy consumption assessment of the on-site construction of building structural systems. Built Environment Project and Asset Management, 9(1), pp. 2-14. ISSN 2044-124X
Zhou, H W; Zhou, Y H and Zhao, C J (2016) Fault-response mechanism of production system in concrete-dam-construction simulation. Journal of Construction Engineering and Management, 142(11): 04016065, ISSN 0733-9364
Zhou, M; Liu, Y; Wang, K and Fahmi Hassanein, M (2020) New asynchronous-pouring rapid-construction method for long-span prestressed concrete box girder bridges with corrugated steel webs. Journal of Construction Engineering and Management, 146(2): 05019021, ISSN 0733-9364
Zhou, W (2009) An investigation into a distributed virtual reality environment for real-time collaborative 4D construction planning and simulation. PhD thesis, University of Wolverhampton, UK.
Zhu, D; Wen, H and Deng, Y (2020) Pro-active warning system for the crossroads at construction sites based on computer vision. Engineering, Construction and Architectural Management, 27(5), pp. 1145-1168. ISSN 0969-9988
Zhu, K; Xiang, Y; Bu, J and Zhang, H (2021) The design and construction of public service building in developing rural regions during the post COVID-19 period: Cased on a Chinese village centre. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Zhu, Y and Ibrahim, M (2017) Application of structure–behavior–function (SBF) theory to construction education. International Journal of Construction Management, 17(4), pp. 264-279. ISSN 1562-3599
Zulu, S and Brown, A (2002) Construction project management process quality research: An exploratory examination. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
af Hällström, A and Bosch-Sijtsema, P (2019) Early contractor involvement in the construction industry: A literature review. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
de Solminihac Tampier, H E (1992) System analysis for expediting urban highway construction. PhD thesis, University of Texas at Austin, USA.
van Wyk, L; Kajimo-Shakantu, K and Opawole, A (2024) Adoption of innovative technologies in the South African construction industry. International Journal of Building Pathology and Adaptation, 42(3), pp. 410-429. ISSN 23984708
van der Ham, M and Opdenakker, R (2023) Overcoming process-related barriers in modular high-rise building projects. International Journal of Construction Management, 23(10), pp. 1779-1789. ISSN 1562-3599
Špačková, O (2012) Risk management of tunnel construction projects. PhD thesis, Czech Technical University, Czech Republic.
Up a level