Items with Index Term: construction plant
Bartram, N (1981) Evaluation and development of drainage and pipeline construction processes. PhD thesis, Aston University, UK.
Cabahug, R R; Edwards, D J and Nicholas, J (2004) Classifying plant operator maintenance proficiency: Examining personal variables. Building Research & Information, 32(2), pp. 119-127. ISSN 0961-3218
Edwards, D J (1999) A methodology for predicting the total average hourly maintenance cost of tracked hydraulic excavators operating in the UK opencast mining industry. PhD thesis, University of Wolverhampton, UK.
Edwards, D J (2003) Accident trends involving construction plant: an exploratory analysis. Journal of Construction Research, 4(2), pp. 161-173. ISSN 1609-9451
Edwards, D J; Cabahug, R R and Nicholas, J (2003) The impact of training and education characteristics upon plant operator maintenance proficiency. Journal of Engineering, Design and Technology, 1(2), pp. 119-134. ISSN 1726-0531
Edwards, D J and Holt, G D (2000) Estivate: A model for calculating excavator productivity and output costs. Engineering, Construction and Architectural Management, 7(1), pp. 52-62. ISSN 0969-9988
Edwards, D J and Holt, G D (2001) Predicting construction plant maintenance expenditure. Building Research & Information, 29(6), pp. 417-427. ISSN 0961-3218
Edwards, D J and Holt, G D (2009) Construction plant and equipment management research: Thematic review. Journal of Engineering, Design and Technology, 7(2), pp. 186-206. ISSN 1726-0531
Edwards, D J; Holt, G D and Harris, F C (1998) Financial management of construction plant: Conceptualising cost prediction. Journal of Financial Management of Property and Construction, 3(2), pp. 59-74. ISSN 1366-4387
Edwards, D J; Holt, G D and Harris, F C (1999) Predicting maintenance expenditure on construction plant: Model development and performance analysis. Journal of Financial Management of Property and Construction, 4(1), pp. 31-46. ISSN 1366-4387
Edwards, D J; Holt, G D and Harris, F C (2000) Estimating life cycle plant maintenance costs. Construction Management and Economics, 18(4), pp. 427-435. ISSN 01446193
Edwards, D J; Holt, G D and Harris, F C (2000) A model for predicting plant maintenance costs. Construction Management and Economics, 18(1), pp. 65-75. ISSN 01446193
Edwards, D J; Holt, G D and Harris, F C (2002) Predicting downtime costs of tracked hydraulic excavators operating in the UK opencast mining industry. Construction Management and Economics, 20(7), pp. 581-591. ISSN 01446193
Edwards, D J and Nicholas, J (2001) Telescopic handler machine park prediction using sales trends. Journal of Financial Management of Property and Construction, 6(2), pp. 109-118. ISSN 1366-4387
Edwards, D J; Nicholas, J and Sharp, R (2001) Forecasting UK construction plant sales. Engineering, Construction and Architectural Management, 8(3), pp. 171-176. ISSN 0969-9988
Edwards, D J; Thorpe, T and Love, P (2004) Financial implications of poorly utilised construction plant and equipment. Journal of Financial Management of Property and Construction, 9(1), pp. 3-12. ISSN 1366-4387
Edwards, D J; Yang, J; Cabahug, R and Love, P E D (2005) Intelligence and maintenance proficiency: An examination of plant operators. Construction Innovation, 5(4), pp. 243-254. ISSN 1471-4175
Enshassi, A; Ayash, A and Mohamed, S (2018) Key barriers to the implementation of energy-management strategies in building construction projects. International Journal of Building Pathology and Adaptation, 36(1), pp. 15-40. ISSN 23984708
Fadiya, O O; Georgakis, P; Chinyio, E and Akadiri, P (2013) Analysing the perceptions of UK building contractors on the contributors to the cost of construction plant theft. Journal of Financial Management of Property and Construction, 18(2), pp. 128-141. ISSN 1366-4387
Holt, G D (2016) Opposing influences on construction plant and machinery health and safety innovations. Construction Innovation, 16(3), pp. 390-414. ISSN 1471-4175
Holt, G D and Edwards, D J (2012) Innovation or business survival? A preliminary, qualitative study of UK construction plant supply chains. Construction Innovation, 12(1), pp. 99-122. ISSN 1471-4175
Kululanga, G K and McCaffer, R (2001) Measuring knowledge management for construction organizations. Engineering, Construction and Architectural Management, 8(5-6), pp. 346-354. ISSN 0969-9988
Li, H; Chan, G and Skitmore, M (2013) Integrating real time positioning systems to improve blind lifting and loading crane operations. Construction Management and Economics, 31(6), pp. 596-605. ISSN 1466433X
Luo, M; Fan, H Q and Liu, G (2020) Measuring regional differences of construction productive efficiency in China: A distance friction minimization approach. Engineering, Construction and Architectural Management, 27(4), pp. 952-974. ISSN 0969-9988
Mohamed, S F and Anumba, C J (2004) Towards a framework for integrating knowledge management processes into site management practices. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Muleya, F (2014) Modelling wheeled construction plant performance in clay and sandy terrain: a terramechanics perspective. PhD thesis, Anglia Ruskin University, UK.
Oloke, D A; Edwards, D J and Li, B (2001) Intelligent construction plant information management. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Oloke, D A; Edwards, D J and Thorpe, T A (2003) Predicting construction plant breakdown time using time series modelling. Journal of Engineering, Design and Technology, 1(2), pp. 202-221. ISSN 1726-0531
Price, A D F (1986) An evaluation of production output for in situ concrete work. PhD thesis, Loughborough University, UK.
Riaz, Z (2008) Improving construction plant safety using advanced ICT. PhD thesis, Loughborough University, UK.
Riaz, Z; Edwards, D J; Holt, G D and Thorpe, T (2011) Data flow analysis of plant and equipment health and safety management. Journal of Engineering, Design and Technology, 9(2), pp. 178-203. ISSN 1726-0531
Taghaddos, H; Heydari, M H and Asgari, A H (2021) A hybrid simulation approach for site layout planning in construction projects. Construction Innovation, 21(3), pp. 417-440. ISSN 1471-4175
Tam, C M; Tong, T K L and Lau, C T (2003) ELECTRE III in evaluating performance of construction plants: Case study on concrete vibrators. Construction Innovation, 3(1), pp. 45-61. ISSN 1471-4175
Tam, C M; Tong, T K L and Wong, Y W (2004) Selection of concrete pump using the superiority and inferiority ranking method. Journal of Construction Engineering and Management, 130(6), pp. 827-834. ISSN 0733-9364
Zhang, N; Wang, J; Al-Hussein, M and Yin, X (2023) BIM-based automated design of drainage systems for panelized residential buildings. International Journal of Construction Management, 23(15), pp. 2683-2698. ISSN 1562-3599
Up a level