Items with Index Term: construction planner

Number of items: 58.

Aalami, F B (1998) Using construction method models to generate four-dimensional production models. PhD thesis, Stanford University, USA.

Abdelmohsen, A Z (2016) Optimizing the construction planning of highway work zones. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Al-Ghzawi, M and El-Rayes, K (2023) Optimizing the planning of airport airside expansion projects to minimize air traffic disruptions and construction cost. Journal of Construction Engineering and Management, 149(4): 04023013, ISSN 0733-9364

Ali, K S (2006) Construction project planning: Improving effectiveness of resources allocation. PhD thesis, University College London, UK.

Almashaqbeh, M and El-Rayes, K (2022) Minimizing transportation cost of prefabricated modules in modular construction projects. Engineering, Construction and Architectural Management, 29(10), pp. 3847-3867. ISSN 0969-9988

Arora, J; Kar, S and Jha, K N (2023) Assessment of the significance of identified attributes affecting the rebar-fixing productivity using multiple regression. Journal of Construction Engineering and Management, 149(6): 04023039, ISSN 0733-9364

Ballesteros-Pérez, P; del Campo-Hitschfeld, M L; González-Naranjo, M A and González-Cruz, M C (2015) Climate and construction delays: Case study in Chile. Engineering, Construction and Architectural Management, 22(6), pp. 596-621. ISSN 0969-9988

Bansal, V K (2020) Use of GIS to consider spatial aspects in construction planning process. International Journal of Construction Management, 20(3), pp. 207-222. ISSN 1562-3599

Boussabaine, A (1991) An expert system prototype for construction planning and productivity analysis. PhD thesis, University of Manchester, UK.

Burns, S A; Liu, L and Feng, C W (1996) The LP/IP hybrid method for construction time-cost trade-off analysis. Construction Management and Economics, 14(3), pp. 265-276. ISSN 01446193

Chan, K Y (2012) Optimizing construction planning and scheduling by virtual prototyping enabled resource analysis. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Dzeng, R-J (1995) Caseplan: A case-based planner and scheduler for construction using product modeling. PhD thesis, University of Michigan, USA.

El-Rayes, K and Hyari, K (2005) Conlight: Lighting design model for nighttime highway construction. Journal of Construction Engineering and Management, 131(4), pp. 467-476. ISSN 0733-9364

Elghamrawy, T M (2011) Optimizing work zone practices for highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Fang, Y and Ng, S T (2019) Genetic algorithm for determining the construction logistics of precast components. Engineering, Construction and Architectural Management, 26(10), pp. 2289-2306. ISSN 0969-9988

Faniran, O O; Oluwoye, J O and Lenard, D (1994) Effective construction planning. Construction Management and Economics, 12(6), pp. 485-499. ISSN 01446193

Formoso, C T (1991) A knowledge based framework for planning house building projects. PhD thesis, University of Salford, UK.

Gregory, R A (1992) Development of a knowledge-based system approach for decision-making in construction projects. PhD thesis, University of Florida, USA.

Harmelink, D J (2001) Linear scheduling model: Float characteristics. Journal of Construction Engineering and Management, 127(4), pp. 255-260. ISSN 0733-9364

Hassan, A and El-Rayes, K (2020) Quantifying the interruption impact of activity delays in non-serial repetitive construction projects. Construction Management and Economics, 38(6), pp. 515-533. ISSN 01446193

Hassan, A; El-Rayes, K and Attalla, M (2023) Stochastic scheduling optimization of repetitive construction projects to minimize project duration and cost. International Journal of Construction Management, 23(9), pp. 1447-1456. ISSN 1562-3599

Hassan, A A A (2019) Risk management of repetitive construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Heesom, D (2004) An analytical system for space planning on construction sites. PhD thesis, University of Wolverhampton, UK.

Heesom, D and Mahdjoubi, L (2004) Trends of 4D CAD applications for construction planning. Construction Management and Economics, 22(2), pp. 171-182. ISSN 01446193

Hosny, O A (1991) An intelligent decision support system for construction planning and scheduling. PhD thesis, University of Missouri - Rolla, USA.

Hyari, K H; El-Mashaleh, M S and Rababeh, S M (2015) Framework for managing the traffic impacts of building construction projects. Journal of Construction in Developing Countries, 20(2), pp. 97-113. ISSN 1823-6499

Idowu, O S and Lam, K C (2020) Conceptual quantities estimation using bootstrapped support vector regression models. Journal of Construction Engineering and Management, 146(4): 04020018, ISSN 0733-9364

John, G (2007) Assessment of the use of resource scheduling facilities in project management software packages for large contractors. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Jongeling, R (2006) A process model for work-flow management in construction. PhD thesis, Luleå University of Technology, Sweden.

Jun, D H (2010) Multi-objective optimization for resource driven scheduling in construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Jun, D H and El-Rayes, K (2011) Multiobjective optimization of resource leveling and allocation during construction scheduling. Journal of Construction Engineering and Management, 137(12), pp. 1080-1088. ISSN 0733-9364

Kandil, A A (2005) Multi-objective optimization for large-scale highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Khalafallah, A and El-Rayes, K (2008) Minimizing construction-related security risks during airport expansion projects. Journal of Construction Engineering and Management, 134(1), pp. 40-48. ISSN 0733-9364

Khatib, J M; Chileshe, N and Sloan, S (2007) Antecedents and benefits of 3D and 4D modelling for construction planners. Journal of Engineering, Design and Technology, 5(2), pp. 159-172. ISSN 1726-0531

Kim, J I (2016) Framework for dynamic generation and evaluation of excavation schedules for hard rock tunnels in preconstruction and construction. PhD thesis, Stanford University, USA.

Koo, B (2004) Formalizing construction sequence constraints for the rapid generation of scheduling alternatives. PhD thesis, Stanford University, USA.

Li, H; Chan, N K Y and Skitmore, M (2012) The use of virtual prototyping to rehearse the sequence of construction work involving mobile cranes. Construction Innovation, 12(4), pp. 429-446. ISSN 1471-4175

Liu, L; Burns, S A and Feng, C W (1995) Construction time-cost trade-off analysis using LP/IP hybrid method. Journal of Construction Engineering and Management, 121(4), pp. 446-454. ISSN 0733-9364

Marshall, H E (1985) A graphical approach to discounted payback. Construction Management and Economics, 3(2), pp. 105-120. ISSN 01446193

Masih, S and Kar, S (2025) Assessing social sustainability for multimodal activities in construction: An FAHP-TOPSIS approach. Journal of Construction Engineering and Management, 151(12): 04025210, ISSN 0733-9364

Maurya, T; Kalita, J D and Kar, S (2026) Assessing safety scores of multimodal activities to integrate safety into construction planning. Journal of Construction Engineering and Management, 152(5): 04026039, ISSN 0733-9364

Moore, N (2013) A model based system for contextual on-site construction planning in augmented reality. PhD thesis, University of Wolverhampton, UK.

Moore, N J (2013) A contextual AR model based system on-site construction planning. PhD thesis, University of Wolverhampton, UK.

Morad, A A (1990) Geometric-based reasoning system for project planning utilizing AI and CAD technologies. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Ng, S T; Shi, J and Fang, Y (2009) Enhancing the logistics of construction materials through activity-based simulation approach. Engineering, Construction and Architectural Management, 16(3), pp. 224-237. ISSN 0969-9988

Olomolaiye, P O and Ogunlana, S O (1989) An evaluation of production outputs in key building trades in Nigeria. Construction Management and Economics, 7(1), pp. 75-86. ISSN 01446193

Pawan, P and Lorterapong, P (2016) A fuzzy-based integrated framework for assessing time contingency in construction projects. Journal of Construction Engineering and Management, 142(3): 04015083, ISSN 0733-9364

Reda, R and Carr, R I (1989) Time-cost trade-off among related activities. Journal of Construction Engineering and Management, 115(3), pp. 475-486. ISSN 0733-9364

Riley, D R (1994) Modeling the space behavior of construction activities. PhD thesis, Pennsylvania State University, USA.

Riley, D R and Sanvido, V E (1997) Space planning method for multistory building construction. Journal of Construction Engineering and Management, 123(2), pp. 171-180. ISSN 0733-9364

Sacks, R; Esquenazi, A and Goldin, M (2007) LEAPCON: Simulation of lean construction of high-rise apartment buildings. Journal of Construction Engineering and Management, 133(7), pp. 529-539. ISSN 0733-9364

Said, H M M (2010) Optimizing site layout and material logistics planning during the construction of critical infrastructure projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Stockings, W H (2002) The process of construction planning. PhD thesis, Eindhoven University of Technology, Netherlands.

Stoneman, G; Hill, C J; Howarth, T and McNamara, T (1999) Construction planning software selection for improving the planning process. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Torres Formoso, C (1991) A knowledge-based framework for planning house building projects. PhD thesis, University of Salford, UK.

Waugh, L M (1990) A construction planner. PhD thesis, Stanford University, USA.

Winch, G M and North, S (2006) Critical space analysis. Journal of Construction Engineering and Management, 132(5), pp. 473-481. ISSN 0733-9364

Zhang, Z; Pan, W and Pan, M (2022) Critical considerations on tower crane layout planning for high-rise modular integrated construction. Engineering, Construction and Architectural Management, 29(7), pp. 2615-2634. ISSN 0969-9988

This list was generated on Sat Aug 22 02:24:02 2026 UTC.