Abdal Noor, B and Yi, S (2018) Review of BIM literature in construction industry and transportation: meta-analysis. Construction Innovation, 18(4), pp. 433-452. ISSN 1471-4175
Abdul-Rahman, H; Berawi, M A; Berawi, A R; Mohamed, O; Othman, M and Yahya, I A (2006) Delay mitigation in the Malaysian construction industry. Journal of Construction Engineering and Management, 132(2), pp. 125-133. ISSN 0733-9364
Adamtey, S and Onsarigo, L (2018) Analysis of pipe-bursting construction risks using probability-impact model. Journal of Engineering, Design and Technology, 16(3), pp. 461-477. ISSN 1726-0531
Adebisi, E O; Alao, O O and Ojo, S O (2020) Assessment of early warning signs predisposing building projects to failure in Nigeria. Journal of Engineering, Design and Technology, 18(6), pp. 1403-1423. ISSN 1726-0531
Adekunye, O J and Oke, A E (2023) Applicable areas of biomimicry principles for sustainable construction in Nigeria. Construction Innovation, 23(4), pp. 713-732. ISSN 1471-4175
Agustí-Juan, I (2018) Sustainability assessment and development of guidelines for digital fabrication in construction. DSc thesis, ETH Zürich, Switzerland.
Ahadzie, D K (2007) A model for predicting the performance of project managers in mass house building projects in Ghana. PhD thesis, University of Wolverhampton, UK.
Ahadzie, D K; Proverbs, D G and Olomolaiye, P (2006) Development of research instrument for project managers' performance measures in mass house building projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Ahadzie, D K; Proverbs, D G and Olomolaiye, P O (2008) Model for predicting the performance of project managers at the construction phase of mass house building projects. Journal of Construction Engineering and Management, 134(8), pp. 618-629. ISSN 0733-9364
Ahadzie, D K; Proverbs, D G; Olomolaiye, P O and Ankrah, N (2009) Towards developing competency-based measures for project managers in mass house building projects in developing countries. Construction Management and Economics, 27(1), pp. 89-102. ISSN 1466433X
Akinyemi, A; Sun, M and Gray, A J G (2018) An ontology-based data integration framework for construction information management. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(3), pp. 111-125. ISSN 17514304
Al Khatib, B A (2021) Determining the delay factors for reconstructed mega-project’s phases and the associated challenges. PhD thesis, University of Malaya, Malaysia.
Al Rashdi, A (2012) A strategic framework for the further enhancement of the standard forms of construction contract in the Sultanate of Oman. PhD thesis, University of Salford, UK.
Al Subaih, A (2016) A framework for implementation of IPD principles in oil & gas projects. PhD thesis, University of Salford, UK.
Al-Derham, H R (1999) The establishment of performance criteria for the evaluation of procurement of senior staff and private housing projects in the State of Qatar. PhD thesis, University of Glamorgan, UK.
Al-Mansouri, O (1988) The relationship between the designer and contractor in Saudi Arabia. PhD thesis, University of Reading, UK.
Alabi, A S; Adegbile, M; Alabi, O; Abisuga, O; Oyewole, K and Oshodi, O (2017) Stakeholders' role in disaster-risk-reduction of fire occurrences in Lagos metropolis. International Journal of Disaster Resilience in the Built Environment, 8(4), pp. 425-440. ISSN 1759-5916
Alade, W A (2020) Environmental and socio-economic impacts of Ojodu-Berger Road upgrade, Lagos, Nigeria. Journal of Construction Business and Management, 4(1), pp. 24-33. ISSN 2521-0165
Aleithawe, I (2010) Acquisition of right of way for highway construction. PhD thesis, Mississippi State University, USA.
Aleithawe, I; Sinno, R R and McAnally, W H (2012) Right-of-way acquisition duration prediction model for highway construction projects. Journal of Construction Engineering and Management, 138(4), pp. 540-544. ISSN 0733-9364
Alhajeri, M A (2004) Post-construction liabilities for latent defects in building and construction contracts: the theoretical foundations and the allocation of risk, a comparative study in Kuwaiti, French, and English Law. PhD thesis, University of Essex, UK.
Alharbi, F (2020) Critical delay factors in housing construction projects in Saudi Arabia: Assessment and solutions. PhD thesis, Nottingham Trent University, UK.
Aljohani, A (2019) Cost overrun causality model in Saudi Arabian public sector construction projects. PhD thesis, Robert Gordon University, UK.
Alnaggar, Ahmed Mohamed Mohamed Moustafa (2022) Digital transformation in asset management organisations: towards a data driven approach for life cycle asset management. PhD thesis, University College London, UK.
Alsafouri, S (2017) Information technology and human factors to enhance design and constructability review processes in construction. PhD thesis, Arizona State University, USA.
Alshibani, A (2008) Optimizing and controlling earthmoving operations using spatial technologies. PhD thesis, Concordia University, Canada.
Altoryman, A (2014) Identification and assessment of risk factors affecting construction projects in the gulf region: Kuwait and Bahrain. PhD thesis, University of Manchester, UK.
Altoryman, A S (2014) Identification and assessment of risk factors affecting construction projects in the Gulf region: Kuwait and Bahrain. PhD thesis, University of Manchester, UK.
Alzayd, Rana (2016) A constructability methodology to integrate planning and design for workers' safety in construction management. DrIng thesis, University of Braunschweig & University of Florence, Germany.
Alzraiee, H (2024) Quantifying labour impact cost due to change orders. International Journal of Construction Management, 24(4), pp. 467-475. ISSN 1562-3599
Amin, S H (2024) Predictive relationship in time and cost between planning and construction phases in capital projects. DBA thesis, Grand Canyon University, USA.
Ammar, T; Abdel-Monem, M and El-Dash, K (2025) Regression-based model predicting cost contingencies for road network projects. International Journal of Construction Management, 25(11), pp. 1273-1287. ISSN 1562-3599
Amoah, C; Kajimo-Shakantu, K and Van Shalkwyk, T (2022) The level of participation of the end-users in the construction of the rdp houses: The case study of manguang municipality. International Journal of Construction Management, 22(5), pp. 949-960. ISSN 1562-3599
Anagnostou, E (2005) Investigation of risk management and uncertainty in Athens 2004 Olympic games: The Equestrian Centre case study. PhD thesis, University College London, UK.
Anumba, C J; Pan, J; Issa, R R A and Mutis, I (2008) Collaborative project information management in a semantic web environment. Engineering, Construction and Architectural Management, 15(1), pp. 78-94. ISSN 0969-9988
Arayici, Y (2004) Requirements engineering in innovative systems developments for the construction industry. PhD thesis, University of Salford, UK.
Araújo, C S; Ferreira, E A M and Costa, D B (2025) System for tracking and managing metallic formworks adopted in cast-in-place concrete wall systems by integrating IoT and BIM. Construction Innovation, 25(4), pp. 1315-1341. ISSN 1471-4175
Arditi, D and Ongkasuwan, D (2009) Duties and responsibilities of construction managers: Perceptions of parties involved in construction. Journal of Construction Engineering and Management, 135(12), pp. 1370-1374. ISSN 0733-9364
Arroteia, Aline Valverde (2022) Critical success factors of BIM in the design and construction interface. PhD thesis, Universidade de São Paulo, Brazil.
Arrotéia, Aline Valverde (2022) Critical success factors for BIM in the design and construction interface. PhD thesis, Universidade de São Paulo, Brazil.
Atin, A (2016) Project risk propagation modeling of engineering, procurement and construction. PhD thesis, Wayne State University, USA.
Atkinson, E; Spillane, J; Bradley, J and Brooks, T (2022) Challenges in the adoption of mobile information communication technology (m-ICT) in the construction phase of infrastructure projects in the UK. International Journal of Building Pathology and Adaptation, 40(3), pp. 327-344. ISSN 23984708
Awolusi, I G (2017) Active construction safety leading indicator data collection and evaluation. PhD thesis, University of Alabama, USA.
Badran, Y (2020) Analysis of construction and stakeholder risks for Public Private Partnership projects in developing countries: a comparative analysis using Artificial Neural Networks to determine the effect of poor stakeholder management and construction risks on the project's schedule (PPP vs. traditional projects). PhD thesis, University of Salford, UK.
Baghaei, M (2024) Developing a framework and understanding the key influencing factors for the implementation of the internet of things (IoT) in the UK construction sector. PhD thesis, University of Salford, UK.
Bajjou, M S and Chafi, A (2022) Exploring the critical waste factors affecting construction projects. Engineering, Construction and Architectural Management, 29(6), pp. 2268-2299. ISSN 0969-9988
Ballard, G; Harper, N and Zabelle, T (2003) Learning to see work flow: An application of lean concepts to precast concrete fabrication. Engineering, Construction and Architectural Management, 10(1), pp. 6-14. ISSN 0969-9988
Bambrick, B (1994) Construction of an island. Journal of Construction Engineering and Management, 120(1), pp. 223-227. ISSN 0733-9364
Banawi, A A (2013) Improving construction processes by integrating lean, green, and six-sigma. PhD thesis, University of Pittsburgh, USA.
Barbarosoglu, B V (2018) Early detection of maintainability issues in MEP systems using BIM. PhD thesis, Illinois Institute of Technology, USA.
Barbosa, Elisabeti de Fátima Teixeira (2024) Influence of user's behavior on thermoenergetic performance in higher education buildings. PhD thesis, Universidade Estadual de Campinas, Brazil.
Battikha, M (2000) A computer-based system for construction quality management with application to highway pavements. PhD thesis, University of British Columbia, Canada.
Bello, A O and Ayegba, C (2025) Drivers for the adoption of building information modelling (BIM) for post-construction management in the Nigerian aeco industry. Journal of Financial Management of Property and Construction, 30(1), pp. 137-153. ISSN 1366-4387
Bello, A O and Ayegba, C (2025) Adoption of building information modelling for post-construction in Nigeria: Examination of barriers and strategies development. International Journal of Building Pathology and Adaptation, 43(6), pp. 1501-1521. ISSN 2398-4708
Bilec, M M (2007) A hybrid life cycle assessment model for construction processes. PhD thesis, University of Pittsburgh, USA.
Bilec, Melissa M (2007) A hybrid life cycle assessment model for construction processess. PhD thesis, University of Pittsburgh, USA.
Bosch-Sijtsema, P and Buser, M (2017) Construction and demolition waste management on the building site: A literature review. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Bråthen, K and Moum, A (2016) Bridging the gap: Bringing BIM to construction workers. Engineering, Construction and Architectural Management, 23(6), pp. 751-764. ISSN 0969-9988
Bu-Qammaz, A S A S (2015) Risk management model for international public construction joint venture projects in Kuwait. PhD thesis, Ohio State University, USA.
Burati, J L; Farrington, J J and Ledbetter, W B (1992) Causes of quality deviations in design and construction. Journal of Construction Engineering and Management, 118(1), pp. 34-49. ISSN 0733-9364
Butkovic, B (2019) A framework for developing 4D level-of-detail on construction projects. PhD thesis, University of Wolverhampton, UK.
Böhme, T; Escribano, A; Heffernan, E E and Beazley, S (2018) Causes and mitigation for declining productivity in the Australian mid-rise residential construction sector. Built Environment Project and Asset Management, 8(3), pp. 253-266. ISSN 2044-124X
Carmo, Cristiano Saad Travassos do (2023) A hybrid solution using stochastic and neural networks modeling for the consideration of safety uncertainties in construction planning methods. PhD thesis, Pontifícia Universidade Católica do Rio de Janeiro, Brazil.
Cass, D and Mukherjee, A (2011) Calculation of greenhouse gas emissions for highway construction operations by using a hybrid life-cycle assessment approach: Case study for pavement operations. Journal of Construction Engineering and Management, 137(11), pp. 1015-1025. ISSN 0733-9364
Castañeda, J A; Tucker, R L and Haas, C T (2005) Workers' skills and receptiveness to operate under the Tier II construction management strategy. Journal of Construction Engineering and Management, 131(7), pp. 799-807. ISSN 0733-9364
Cepeda, D M; Sohail, M and Ogunlowo, O O (2018) Understanding the critical success factors for delivery of megaprojects in Colombia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(2), pp. 45-57. ISSN 17514304
Chalhoub, J (2019) Benefits of using augmented reality in planning, construction and post-construction phases in specialty contracting. PhD thesis, Arizona State University, USA.
Chang, H-H (2002) N-dimensional construction management information system (NDCON): System design and performance modeling through the zero -buffered project management philosophy. PhD thesis, Columbia University, USA.
Chang, J; Jaskula, K; Papadonikolaki, E; Rovas, D and Parlikad, A K (2024) Can blockchain prevent the deterioration of building handover information quality for higher education institutions? Built Environment Project and Asset Management, 14(4), pp. 509-528. ISSN 2044-124X
Charles, S P R; Wanigarathna, N and Sherratt, F (2015) Construction project change: Investigating cost and benefits. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Chen, S-M (2002) Intelligent scheduling model and multi-dimensional CM information system. PhD thesis, Columbia University, USA.
Chen, W; Yang, Z; Yan, H and Zhao, Y (2025) How to reduce construction risks in rural areas: an evolutionary game analysis. Engineering, Construction and Architectural Management, 32(7), pp. 4495-4521. ISSN 0969-9988
Cheng, Y M; Yu, C H and Wang, H T (2011) Short-interval dynamic forecasting for actual S-curve in the construction phase. Journal of Construction Engineering and Management, 137(11), pp. 933-941. ISSN 0733-9364
Chi, C S-F (2010) How host country and transnational institutions interact on international infrastructure projects in less developed countries: Case studies of high-speed rail projects in China and Taiwan. PhD thesis, Stanford University, USA.
Cho, N (2020) Using industry data to make an impact on construction practices over the project lifecycle. PhD thesis, Arizona State University, USA.
Christensen, A N (2019) Identifying private construction project owner inefficiencies that affect project goals. PhD thesis, Iowa State University, USA.
Clement, D; Aliabadi, A A; MacKey, J; Thé, J and Gharabaghi, B (2021) Dust emissions management model for construction sites. Journal of Construction Engineering and Management, 147(8): 04021092, ISSN 0733-9364
Cleveland, T G and Fashokun, A (2006) Construction-associated solids loads with a temporary sediment control bmp. Journal of Construction Engineering and Management, 132(10), pp. 1122-1125. ISSN 0733-9364
Close R, L M (2013) Community consultation during construction: Attitudes, experiences and skills. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Cruz-Roveda, S (2022) A qualitative open-ended interview study using a comparative multiple case study approach of bus rapid transit (BRT) construction projects within the United States. DPA thesis, California Baptist University, USA.
Daoud, A O; KhairEldin, M; Ibrahim, A H and Toma, H M (2026) Adaptive neuro-fuzzy inference system for Egyptian residential construction waste prediction. International Journal of Construction Management, 26(6), pp. 1059-1077. ISSN 1562-3599
Davey, C L; McDonald, J; Lowe, D; Duff, R; Powell, J A and Powell, J E (2006) Defects liability management by design. Building Research & Information, 34(2), pp. 145-153. ISSN 0961-3218
Davies, P J (2015) Assessing initial embodied energy in UK non-domestic construction projects. EngD thesis, Loughborough University, UK.
Davies, P J; Emmitt, S and Firth, S K (2014) Challenges for capturing and assessing initial embodied energy: A contractor's perspective. Construction Management and Economics, 32(3), pp. 290-308. ISSN 01446193
Delatte, G (2014) The effects of three dimensional modeling on labor productivity through enhancing visualization of craft workers in the industrial construction industry. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Deshpande, A S (2009) Best practices for the management of design in fast track industrial projects. PhD thesis, University of Cincinnati, USA.
Deshpande, A S; Salem, O M and Miller, R A (2012) Analysis of the higher-order partial correlation between CII best practices and performance of the design phase in fast-track industrial projects. Journal of Construction Engineering and Management, 138(6), pp. 716-724. ISSN 0733-9364
Dharwadkar, P V (1994) A prototype object-oriented system for three-dimensional CAD and schedule integration. PhD thesis, University of Texas at Austin, USA.
Dib, H; Adamo-Villani, N and Issa, R R A (2013) A GIS-based visual information model for buildng construction project management. International Journal of Construction Management, 13(1), pp. 1-18. ISSN 1562-3599
Dixit, V (2022) Risk assessment of different sourcing contract scenarios in project procurement. International Journal of Construction Management, 22(8), pp. 1537-1549. ISSN 1562-3599
Dosumu, O (2018) Assessment of the likelihood of risk occurrence on tendering and procurement of construction projects. Journal of Construction Business and Management, 2(1), pp. 20-32. ISSN 2521-0165
Eadie, R; Millar, P and Grant, R (2013) PFI/PPP, private sector perspectives of UK transport and healthcare. Built Environment Project and Asset Management, 3(1), pp. 89-104. ISSN 2044-124X
El. Reifi, M H and Emmitt, S (2013) Perceptions of lean design management. Architectural Engineering and Design Management, 9(3), pp. 195-208. ISSN 1745-2007
Eldin, N N (1988) Constructability improvement of project designs. Journal of Construction Engineering and Management, 114(4), pp. 631-640. ISSN 0733-9364
Elsherbiny, A (2021) Prediction of design error rework cost in EPC industrial projects. DEng thesis, George Washington University, USA.
Enshassi, A; Ayash, A and Mohamed, S (2018) Key barriers to the implementation of energy-management strategies in building construction projects. International Journal of Building Pathology and Adaptation, 36(1), pp. 15-40. ISSN 23984708
Erlita, A; Amin, M and Bintoro, B P K (2023) Multiphase project risk management on food factory building construction: Consultant perspective. Journal of Construction in Developing Countries, 28(1), pp. 1-17. ISSN 1823-6499
Faniran, O O and Caban, G (1998) Minimizing waste on construction project sites. Engineering, Construction and Architectural Management, 5(2), pp. 182-188. ISSN 0969-9988
Farahani, A; Wallbaum, H and Dalenbäck, J O (2019) Optimized maintenance and renovation scheduling in multifamily buildings: a systematic approach based on condition state and life cycle cost of building components. Construction Management and Economics, 37(3), pp. 139-155. ISSN 01446193
Feng, C-W (1998) Applications of genetic algorithms for multi-objective resource allocation of construction projects under certainty. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Firouzi, A and Vahdatmanesh, M (2019) Applicability of financial derivatives for hedging material price risk in highway construction. Journal of Construction Engineering and Management, 145(5): 04019023, ISSN 0733-9364
Forbes, Lincoln Harding (1999) An engineering management-based investigation of owner satisfaction, quality and performance variables in health care facilities construction. PhD thesis, University of Miami, USA.
Ford, D N; Anderson, S D; Damron, A J; De Las Casas, R; Gokmen, N and Kuennen, S T (2004) Managing constructibility reviews to reduce highway project durations. Journal of Construction Engineering and Management, 130(1), pp. 33-42. ISSN 0733-9364
Franco, Luiz Sergio (1992) Application of constructive rationalization guidelines for the technological development of constructive processes in unreinforced structural masonry. PhD thesis, Universidade de São Paulo, Brazil.
Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.
Gallardo, Amarilis Lucia Casteli Figueiredo (2004) Evaluation of the environmental management practices in the construction of the descending roadway of imigrantes highway. PhD thesis, Universidade de São Paulo, Brazil.
Gambatese, J A (1996) Addressing construction worker safety in the project design. PhD thesis, University of Washington, USA.
Gan, C E (1998) Organizational interactions in the management of development projects. PhD thesis, National University of Singapore, Singapore.
García de Soto, B; Agustí-Juan, I; Joss, S and Hunhevicz, J (2022) Implications of construction 4.0 to the workforce and organizational structures. International Journal of Construction Management, 22(2), pp. 205-217. ISSN 1562-3599
Gharaibeh, L; Eriksson, K and Lantz, B (2025) Quantifying BIM investment value: A systematic review. Journal of Engineering, Design and Technology, 23(5), pp. 1384-1403. ISSN 1726-0531
Gharouni Jafari, K and Noorzai, E (2021) Selecting the most appropriate project manager to improve the performance of the occupational groups in road construction projects in warm regions. Journal of Construction Engineering and Management, 147(10): 04021131, ISSN 0733-9364
Gharouni Jafari, K; Noorzai, E and Hosseini, M R (2021) Assessing the capabilities of computing features in addressing the most common issues in the AEC industry. Construction Innovation, 21(4), pp. 875-898. ISSN 1471-4175
Gidado, K and Barter, G (1996) The constraints to effective information flow in the construction management procurement system. Journal of Construction Procurement, 2(2), pp. 52-68. ISSN 1358-9180
Giel, B K (2013) Framework for evaluating the BIM competencies of building owners. PhD thesis, University of Florida, USA.
Gil, N A P d A P (2001) Product-process development simulation to support specialty contractor involvement in early design. PhD thesis, University of California, Berkeley, USA.
Gillespie, D and McIlwaine, S (2021) Reducing embodied carbon in the construction sector. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Giron Matute, W A (2018) Sustainability analysis for construction companies under the LEED code. PhD thesis, University of Alabama, USA.
Giustozzi, F (2012) Life cycle assessment of sustainable road pavements: Carbon footprinting and multi-attribute analysis. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Glavan, J R (1988) Analysis of design-related problems from an industrial project. PhD thesis, University of Texas at Austin, USA.
Glavan, J R and Tucker, R L (1991) Forecasting design-related problems-case study. Journal of Construction Engineering and Management, 117(1), pp. 47-65. ISSN 0733-9364
Goedert, J D and Meadati, P (2008) Integrating construction process documentation into building information modeling. Journal of Construction Engineering and Management, 134(7), pp. 509-516. ISSN 0733-9364
Golparvar-Fard, M; Peña-Mora, F and Savarese, S (2011) Integrated sequential as-built and as-planned representation with D 4AR tools in support of decision-making tasks in the AEC/FM industry. Journal of Construction Engineering and Management, 137(12), pp. 1099-1116. ISSN 0733-9364
Gorse, C A; Emmitt, S and Lowis, M (1999) Problem solving and appropriate communication medium. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Gottsche, J; Kelly, M and Taggart, M (2016) Assessing the impact of energy management initiatives on the energy usage during the construction phase of an educational building project in Ireland. Construction Management and Economics, 34(1), pp. 46-60. ISSN 01446193
Gould, C H (1988) Rolling fours: Novel work schedule. Journal of Construction Engineering and Management, 114(4), pp. 577-593. ISSN 0733-9364
Griffith, A (1984) A critical investigation of factors influencing buildability and productivity. PhD thesis, Heriot-Watt University, UK.
Gruneberg, S (2013) Strategy framework for post-construction contractor services. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Guggemos, A A (2003) Environmental impacts of on-site construction processes: Focus on structural frames. PhD thesis, University of California, Berkeley, USA.
Gupta, P and Elhag, T (2025) Applicability of lean techniques and processes on improving sustainability in construction projects. Built Environment Project and Asset Management, 15(2), pp. 247-270. ISSN 2044-124X
Gurmu, Argaw (2017) An investigation into construction management practices influencing labour productivity in multi-storey building projects. PhD thesis, University of Melbourne, Australia.
Guthrie, J L (2000) Group-level reengineering process. EngD thesis, University of Kansas, USA.
Hallowell, M and Toole, T M (2009) Contemporary design-bid-build model. Journal of Construction Engineering and Management, 135(6), pp. 540-549. ISSN 0733-9364
Hallowell, M R; Hinze, J W; Baud, K C and Wehle, A (2013) Proactive construction safety control: Measuring, monitoring, and responding to safety leading indicators. Journal of Construction Engineering and Management, 139(10): 04013010, ISSN 0733-9364
Han, F and Bogus, S M (2021) Resilience criteria for project delivery processes: An exploratory analysis for highway project development. Journal of Construction Engineering and Management, 147(11): 04021140, ISSN 0733-9364
Hardison, D C (2018) Hazard recognition in design: Evaluating the effects of design information on hazard recognition performance. PhD thesis, University of Colorado at Boulder, USA.
Hassan, A A A (2019) Risk management of repetitive construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Hassan, M E (2013) Assessing the impact of lean/integrated project delivery system on final project success. PhD thesis, George Mason University, USA.
Hassanain, M A; Al-Zahrani, M; Abdallah, A and Sayed, A M Z (2019) Assessment of factors affecting maintenance cost of public school facilities. International Journal of Building Pathology and Adaptation, 37(5), pp. 528-546. ISSN 23984708
Heaton, J (2020) Development of asset information requirements to support asset management. PhD thesis, University of Cambridge, UK.
Henderson, J R; Ruikar, K and Dainty, A R J (2010) The need for embedding 'learning' in healthcare projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Heravi Torbati, Amir Hossein (2014) Improving construction management: An investigation into the influences of effective stakeholder involvement on project quality outcomes. PhD thesis, Queensland University of Technology, Australia.
Hollar, D A (2011) Predicting preliminary engineering costs for highway projects. PhD thesis, North Carolina State University, USA.
Hong, T; Cho, K; Hyun, C and Han, S (2011) Simulation-based schedule estimation model for ACS-based core wall construction of high-rise building. Journal of Construction Engineering and Management, 137(6), pp. 393-402. ISSN 0733-9364
Hoque, M I; Safayet, M A; Rana, M J; Bhuiyan, A Y and Quraishy, G S (2023) Analysis of construction delay for delivering quality project in Bangladesh. International Journal of Building Pathology and Adaptation, 41(2), pp. 401-421. ISSN 23984708
Hu, J; Ren, Z and Shen, L Y (2008) Impacts of overseas management structures on project buyout management: Case studies of Chinese international contractors. Journal of Construction Engineering and Management, 134(11), pp. 864-875. ISSN 0733-9364
Hu, M and Skibniewski, M (2022) The impact of the design team characteristics on the sustainable building construction cost: Structural equation model analysis. Architectural Engineering and Design Management, 18(5), pp. 614-630. ISSN 1745-2007
Ibbs, C W (1997) Quantitative impacts of project change: Size issues. Journal of Construction Engineering and Management, 123(3), pp. 308-311. ISSN 0733-9364
Ibrahim, K I; Costello, S B; Wilkinson, S and Walker, D (2016) Project alliancing: The case of road infrastructure projects in New Zealand. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Ibrahim, M N (2022) Risk management in construction of megahousing projects in Egypt. PhD thesis, London South Bank University, UK.
Ibrahim Khil, Mohammad Hashim (2025) Automated construction progress monitoring of buildings through mobile mapping and as-built modeling. PhD thesis, University of New South Wales, Australia.
Inyang, E D (1983) Some aspects of risk analysis for decision making in engineering projects management. PhD thesis, University of Manchester, UK.
Jamieson, I A (1997) Development of a concurrent engineering construction process protocol. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Jamieson, I A (1998) The development of a concurrently engineered procurement process. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Jeyakumar, R (2013) The implementation and effectiveness of value engineering in the United Arab Emirates. PhD thesis, University of Glamorgan, UK.
Jin, X; Ekanayake, E M A C and Shen, G Q P (2022) Critical policy drivers for modular integrated construction projects in Hong Kong. Building Research & Information, 50(4), pp. 467-484. ISSN 0961-3218
Johnsson, H; Janols, H and Stehn, L (2006) 3D computer visualization in timber construction: some important parameters. Architectural Engineering and Design Management, 2(3), pp. 161-175. ISSN 1745-2007
Joseph, V R and Mustaffa, N K (2023) Carbon emissions management in construction operations: A systematic review. Engineering, Construction and Architectural Management, 30(3), pp. 1271-1299. ISSN 0969-9988
Kadir, M R b A (1996) Conceptual phase best practices. PhD thesis, Loughborough University, UK.
Kalasapudi, V S (2017) Automatic change-based diagnosis of structures using spatiotemporal data and as-designed model. PhD thesis, Arizona State University, USA.
Kamal, E M (2011) Absorptive capacity and implementation of new technology in Malaysian small and medium sized construction companies. PhD thesis, University of Reading, UK.
Kamal, E M and Flanagan, R (2012) Understanding absorptive capacity in Malaysian small and medium sized (SME) construction companies. Journal of Engineering, Design and Technology, 10(2), pp. 180-198. ISSN 1726-0531
Kamel Hedayat Abad, M E (2017) Integration and interoperability of building envelope information and energy modeling. PhD thesis, Pennsylvania State University, USA.
Kang, L S and Paulson, B C (1998) Information management to integrate cost and schedule for civil engineering projects. Journal of Construction Engineering and Management, 124(5), pp. 381-389. ISSN 0733-9364
Kartam, N A (1996) Making effective use of construction lessons learned in project life cycle. Journal of Construction Engineering and Management, 122(1), pp. 14-21. ISSN 0733-9364
Kashwani, G A (2017) Enhancing the implementation of safety engineering systems in oil and gas construction projects in the UAE. PhD thesis, Heriot-Watt University, UK.
Kermanshachi, S (2016) Decision making and uncertainty analysis in success of construction projects. PhD thesis, Texas A&M University, USA.
Khatatbeh, A A (2023) Quantifying the impact of ISO 9001 standard on the project and engineering management and success factors; a case of construction industry. Engineering, Construction and Architectural Management, 30(6), pp. 2564-2581. ISSN 0969-9988
Kim, B; Lee, H; Park, H and Kim, H (2012) Greenhouse gas emissions from onsite equipment usage in road construction. Journal of Construction Engineering and Management, 138(8), pp. 982-990. ISSN 0733-9364
Kirkham, R J (2002) A stochastic whole life cycle cost model for a national health service acute care hospital building. PhD thesis, University of Liverpool, UK.
Kordi, N E; Belayutham, S and Che Ibrahim, C K I (2025) Development and demonstration of a social sustainability assessment tool for the construction project life cycle. Construction Innovation, 25(1), pp. 161-186. ISSN 1471-4175
Koseoglu, O and Nurtan-Gunes, E T (2018) Mobile BIM implementation and lean interaction on construction site: A case study of a complex airport project. Engineering, Construction and Architectural Management, 25(10), pp. 1298-1321. ISSN 0969-9988
Koushki, P A; Al-Rashid, K and Kartam, N (2005) Delays and cost increases in the construction of private residential projects in Kuwait. Construction Management and Economics, 23(3), pp. 285-294. ISSN 01446193
Krishnan, R (1987) Knowledge-based aids for model construction. PhD thesis, University of Texas at Austin, USA.
Kucukvar, M (2013) Life cycle sustainability assessment framework for the U.S. Built environment. PhD thesis, University of Central Florida, USA.
Kwon, N; Park, M; Lee, H S; Ahn, J and Shin, M (2016) Construction noise management using active noise control techniques. Journal of Construction Engineering and Management, 142(7): 4016014, ISSN 0733-9364
Lam, E W M; Chan, A P C; Olawumi, T O; Wong, I and Kazeem, K O (2024) Sustainability concepts in global high-rise residential buildings: A scientometric and systematic review. Smart and Sustainable Built Environment, 13(2), pp. 425-443. ISSN 2046-6099
Lam, K C and Chow, W S (1999) The significance of financial risks in BOT procurement. Building Research & Information, 27(2), pp. 84-95. ISSN 0961-3218
Lam, T Y M and Siwingwa, N (2017) Risk management and contingency sum of construction projects. Journal of Financial Management of Property and Construction, 22(3), pp. 237-251. ISSN 1366-4387
Lamb, C M (2017) Current construction management methodologies employed by front-line supervisors and degree of understanding of six sigma principles. PhD thesis, Northcentral University, USA.
Lang, R; Goodier, C and Glass, J (2016) Are housebuilders' production strategies a barrier to offsite construction uptake in the UK? In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Larsson, R (2021) Modelling and simulation of factors influencing on-site construction of concrete frameworks: Studying the effects of resource allocation, weather conditions, and climate-improved concrete. PhD thesis, Lund University, Sweden.
Latorre, V (2009) Construction manager's influence on project success. PhD thesis, University of Plymouth, UK.
Laura-Portugal, C. and Hammad, A. (2026) Deep learning-based forecasting for construction project duration at completion. International Journal of Construction Management, 26(8), pp. 1543-1561. ISSN 1562-3599
Lazo, A G; Çidik, M S; Addyman, S and Rillie, I (2024) Perspectives on project management and asset management integration: A systematic review. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Le, M A T and Brønn, C (2007) Linking experience and learning: Application to multi-project building environments. Engineering, Construction and Architectural Management, 14(2), pp. 150-163. ISSN 0969-9988
Ledbetter, W B (1994) Quality performance on successful project. Journal of Construction Engineering and Management, 120(1), pp. 34-46. ISSN 0733-9364
Lee, B; Lee, H S; Park, M and Kim, H (2015) Influence factors of learning-curve effect in high-rise building constructions. Journal of Construction Engineering and Management, 141(8): 04015019, ISSN 0733-9364
Lee, H W (2012) Application of target value design to energy efficiency investments. PhD thesis, University of California, Berkeley, USA.
Leiringer, R (2003) Technological innovations in the context of public-private partnership projects. PhD thesis, KTH Royal Institute of Technology, Sweden.
Li, J.; Sun, J.; Cao, J. and Mao, L. (2026) Evolutionary dynamics of multiagent on-chain adoption strategies in blockchain-enabled smart construction. Journal of Construction Engineering and Management, 152(8): 04026113, ISSN 0733-9364
Li, Y and Taylor, T R B (2014) Modeling the impact of design rework on transportation infrastructure construction project performance. Journal of Construction Engineering and Management, 140(9): 04014044, ISSN 0733-9364
Liang, C-J (2021) Affecting fundamental transformation in future construction work through replication of the master-apprentice learning model in human-robot worker teams. PhD thesis, University of Michigan, USA.
Liang, Y and Xu, Z (2025) Intelligent inspection of appearance quality for precast concrete components based on improved YOLO model and multi-source data. Engineering, Construction and Architectural Management, 32(3), pp. 1691-1714. ISSN 0969-9988
Lin, C L; Chiang, W H; Weng, Y S and Wu, H P (2023) Assessing the anthropogenic carbon emission of wooden construction: An LCA study. Building Research & Information, 51(2), pp. 138-157. ISSN 0961-3218
Lind, H and Borg, L (2010) Service-led construction: Is it really the future? Construction Management and Economics, 28(11), pp. 1145-1153. ISSN 1466433X
Liu, G; Ma, Z; Li, J; Li, S; Zhou, X and Song, Y (2024) Framework of digital lean construction and implementation of its management platform for the construction phase. Journal of Construction Engineering and Management, 150(6): 04024051, ISSN 0733-9364
Liu, Z; Lu, Y; Nath, T; Wang, Q; Tiong, R L K and Peh, L L C (2022) Critical success factors for BIM adoption during construction phase: A Singapore case study. Engineering, Construction and Architectural Management, 29(9), pp. 3267-3287. ISSN 0969-9988
Louis, J and Dunston, P S (2017) Methodology for real-time monitoring of construction operations using finite state machines and discrete-event operation models. Journal of Construction Engineering and Management, 143(3): 04016106, ISSN 0733-9364
Low, W W; Wong, K S and Lee, J L (2022) Cost-influencing risk factors in infrastructure projects on soft soils. International Journal of Construction Management, 22(2), pp. 229-241. ISSN 1562-3599
Lu, Z (2018) Feasibility assessment framework for financing public-private partnership infrastructure projects through asset-backed security. PhD thesis, Columbia University, USA.
Mahdavian, A and Shojaei, A (2020) Hybrid genetic algorithm and constraint-based simulation framework for building construction project planning and control. Journal of Construction Engineering and Management, 146(12): 04020140, ISSN 0733-9364
Manu, P A (2012) An investigation into the accident causal influence of construction project features. PhD thesis, University of Wolverhampton, UK.
McAndrew, S T (2009) Collaborative technologies for mobile workers and virtual project teams. EngD thesis, Loughborough University, UK.
McDonald, B and Smithers, M (1998) Implementing a waste management plan during the construction phase of a project: A case study. Construction Management and Economics, 16(1), pp. 71-78. ISSN 01446193
Meadati, P K (2007) Integration of construction process documents into building information modeling. PhD thesis, University of Nebraska - Lincoln, USA.
Mecca, S and Masera, M (1999) Technical risk analysis in construction by means of fmea methodology. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Mega, T (2008) Implications of quality management in the Greek construction industry. PhD thesis, University College London, UK.
Menassa, C; Pea Mora, F and Pearson, N (2010) Study of real options with exogenous competitive entry to analyze dispute resolution ladder investments in architecture, engineering, and construction projects. Journal of Construction Engineering and Management, 136(3), pp. 377-390. ISSN 0733-9364
Menassa, C C (2009) Quantitative framework to evaluate alternative dispute resolution investments in architecture engineering and construction projects using option and real option theory. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Metham, M and Benjaoran, V (2015) The assessment of greenhouse gas emissions for evaluating actual road construction operations. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Michael Gbolagade, O; Inimbom Walter, I and Emuze, F (2021) Towards sustainability practices deployment in building construction projects in Nigeria. Smart and Sustainable Built Environment, 10(4), pp. 759-780. ISSN 2046-6099
Mirzaee, A M and Martek, I (2025) Improving project management "closeout" phase outcomes: Evidence from a large general contractor in Iran using "x-inefficiency theory". Engineering, Construction and Architectural Management, 32(8), pp. 5253-5271. ISSN 0969-9988
Mohamed, Emad (2021) Decision-support system for construction risk management in onshore wind projects. PhD thesis, University of Alberta, Canada.
Monteiro do Nascimento, F A; Neto, G D M P; Hazin Alencar, L and Valdes-Vasquez, R (2026) Multicriteria subcontractor selection model for construction activities in wind farm projects. International Journal of Construction Management, 26(5), pp. 772-788. ISSN 1562-3599
Moon, H; Kim, K; Lee, H S; Park, M; Williams, T P; Son, B and Chun, J Y (2020) Cost performance comparison of design-build and design-bid-build for building and civil projects using mediation analysis. Journal of Construction Engineering and Management, 146(9): 04020113, ISSN 0733-9364
Moore, D R and Dainty, A R J (2000) Work-group communication patterns in design and build project teams: An investigative framework. Journal of Construction Procurement, 6(1), pp. 44-55. ISSN 1358-9180
Morris, J; Rogerson, J and Jared, G (1998) A tool for modelling the briefing and design decision making processes in construction. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Mulhorn, W L (1987) Sources of conflict as perceived by architects and New Jersey public school officials when involved in a building project. EdD thesis, Temple University, USA.
Muniandy, Meenachi (2016) Assessing the economic impact of public investment in Malaysia: A case study on myrapid transit project using a dynamic computable general equilibrium model. PhD thesis, Monash University, Australia.
Mzyece, D (2015) An investigation into the implementation of the Construction (Design and Management) Regulations in the construction industry. PhD thesis, University of Wolverhampton, UK.
Mzyece, D; Ndekugri, I E; Ankrah, N and Hammond, F (2012) The principal contractor’s role under construction (design and management) regulations 2007: Areas for further research based on a qualitative inquiry. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Naji, K K; Gunduz, M and Mansour, M M (2024) Development of an integrated hybrid risk assessment system for construction disputes during the preconstruction phase using the Delphi method. Journal of Construction Engineering and Management, 150(7): 04024068, ISSN 0733-9364
Nassar, N K (2005) An integrated framework for evaluation, forecasting and optimization of performance of construction projects. PhD thesis, University of Alberta, Canada.
Navon, R; Shapira, A and Shechori, Y (2000) Automated rebar constructability diagnosis. Journal of Construction Engineering and Management, 126(5), pp. 389-397. ISSN 0733-9364
Nayyer, M I and Annamalai, T R (2024) Procuring authorities and project performance: A case study of PPP highway projects in India. Built Environment Project and Asset Management, 14(1), pp. 38-55. ISSN 2044-124X
Nayyer, M I; Aravindan, M R and Annamalai, T R (2024) Impact of transparency law on the post-award development phase of toll and annuity PPPs. Built Environment Project and Asset Management, 14(1), pp. 22-37. ISSN 2044-124X
Neufville, R D and Smith, J T (1994) Improving contractors' bids using preference reversal phenomenon. Journal of Construction Engineering and Management, 120(4), pp. 706-719. ISSN 0733-9364
Nguyen, V N; Peansupap, V and Tongthong, T (2025) Complexity measurement framework for change orders in construction projects: Case study of Vietnam. Journal of Engineering, Design and Technology, 23(6), pp. 2082-2104. ISSN 1726-0531
Nguyen, Duy Hung (2022) Evaluating risk factors in green building: The case of sustainable construction in Vietnam. PhD thesis, Università degli Studi di Padova, Italy.
Nikolov, A (2022) Exploring pathways for improving the supply chain integration of infrastructure projects. PhD thesis, University of Warwick, UK.
Noktehdan, M; Shahbazpour, M; Zare, M R and Wilkinson, S (2019) Innovation management and construction phases in infrastructure projects. Journal of Construction Engineering and Management, 145(2): 04018135, ISSN 0733-9364
Noorzai, E (2023) Evaluating lean techniques to improve success factors in the construction phase. Construction Innovation, 23(3), pp. 622-639. ISSN 1471-4175
Noruwa, B I; Arewa, A O and Merschbrock, C (2022) Effects of emerging technologies in minimising variations in construction projects in the UK. International Journal of Construction Management, 22(11), pp. 2199-2206. ISSN 1562-3599
Noyce, D A and Hanna, A S (1997) Planned schedule compression concept file for electrical contractors. Journal of Construction Engineering and Management, 123(2), pp. 189-197. ISSN 0733-9364
Nwadigo, O (2019) Real-time and dynamic planning and scheduling under disruption using multi-hybrid simulation and optimisation. PhD thesis, Auckland University of Technology, New Zealand.
O'Connor, J T; Leite, F and Ma, J W (2023) Expanding advanced work packaging to include commissioning and startup for industrial projects. Construction Innovation, 23(5), pp. 939-960. ISSN 1471-4175
O'Connor, J T; Torres, N and Woo, J (2016) Sustainability actions during the construction phase. Journal of Construction Engineering and Management, 142(7): 4016016, ISSN 0733-9364
Ochoa Franco, L A (2004) Life cycle assessment of residential buildings. PhD thesis, Carnegie Mellon University, USA.
Ogunba, O A; Dabara, D I and Gbadegesin, J T (2023) Sustainable real estate management practice: Exploring the priority of operational stage for actualizing sustainable built environment goal in Sub-Saharan Africa. International Journal of Construction Management, 23(10), pp. 1746-1755. ISSN 1562-3599
Ogunmakinde, O E (2019) Developing a circular-economy-based construction waste minimisation framework for Nigeria. PhD thesis, University of Newcastle, Australia.
Okanlawon, T. T.; Oyewobi, L. O.; Kabir, I.; Badamasi, A.; Dodo, M. and Jimoh, R. A. (2026) Enhancing the integration of digital twin in construction phases: Key drivers for adoption in Nigeria. Journal of Engineering, Design and Technology, 24(1), pp. 124-150. ISSN 1726-0531
Oke, A. E.; Aliu, J. O.; Timothy Jesudaju, O.; Thomas Fagbe, A.; Aghimien, D. and Aigbavboa, C. O. (2025) Building a sustainable future: The role of digitalization in Nigerian heavy engineering projects. Engineering, Construction and Architectural Management, 33(5), pp. 3957-3974. ISSN 0969-9988
Omotayo, T S (2017) Strategic realignment of the post-contract cost control process in the Nigerian construction industry using kaizen. PhD thesis, University of Salford, UK.
Onubi, H O; Yusof, N A and Hassan, A S (2019) Green site practices and environmental performance: How project complexity moderates the relationship. Construction Economics and Building, 19(1), pp. 75-95. ISSN 2204-9029
Opdyke, A (2017) Resilient and sustainable infrastructure systems: A comparative analysis of post-disaster shelter coordination, stakeholder participation, and training. PhD thesis, University of Colorado at Boulder, USA.
Otim, M A; Kyalisiima, C; Tutesigensi, A; Mutikanga, H E and Kayondo, M (2023) Avoiding disputes through effective procurement in large construction projects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Oyegoke, A S and Kiiras, J (2004) Two generic perspectives of CM contracting systems: A case of the US, the UK and Finland. Journal of Construction Procurement, 10(2),
Ozcan-Deniz, G (2011) An integrated multi-agent framework for optimizing time, cost and environmental impact of construction processes. PhD thesis, Florida International University, USA.
Padala, S P S and M Skanda, P (2025) BIM-based multi-objective optimization framework for volumetric analysis of building projects. Journal of Engineering, Design and Technology, 23(5), pp. 1326-1347. ISSN 1726-0531
Pan, H; Huang, H; Luo, Z; Wu, C and Yang, S (2025) Research on safety risk factors of metro shield tunnel construction in China based on social network analysis. Engineering, Construction and Architectural Management, 32(12), pp. 8114-8144. ISSN 0969-9988
Panwar, A and Jha, K N (2017) Trade-off between life cycle cost and greenhouse gas emission in construction projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Papadonikolaki, E and van Oel, C (2016) The actors' perceptions and expectations of their roles in BIM-based collaboration. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Park, A and Chang, C Y (2013) Impacts of construction events on the project equity value of the Channel Tunnel project. Construction Management and Economics, 31(3), pp. 223-237. ISSN 1466433X
Park, J (2017) Dynamic multi-dimensional BIM for total construction as-built documentation. PhD thesis, Purdue University, USA.
Payne, A S (2021) Impact of personality traits and team criteria on construction team performance. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Pennington, D E (1977) A cost analysis of the construction management method of school facility construction. EdD thesis, Indiana University, USA.
Perdomo-Rivera, J L (2004) A framework for a decision support model for supply chain management in the construction industry. PhD thesis, Virginia Tech, USA.
Perera, S; Davis, S and Marosszeky, M (2011) Head contractor role in construction value-based management: Australian building industry experience. Journal of Financial Management of Property and Construction, 16(1), pp. 31-41. ISSN 1366-4387
Piao, Y (2020) Case studies to determine the effect of applying blockchain technology and building information modeling on the workflow of water infrastructure projects. PhD thesis, Stanford University, USA.
Presland, A J (2023) "Picturing construction, constructing identities: the photographic archive of John Laing & Son Ltd". PhD thesis, University College London, UK.
Price, T (2010) Site waste management plans, the designer and the CDM principal contractor. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Price, T; Wamuziri, S and Gupta, N (2009) Magnet safety in magnetic resonance imaging suite construction. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Purushothaman, M B and Seadon, J (2024) System-wide construction waste and their connectivity to construction phases, impacting 5m factors and effects: A systematic review. Smart and Sustainable Built Environment, 13(2), pp. 354-369. ISSN 2046-6099
Radzi, A R; Azmi, N F; Kamaruzzaman, S N and Rahman, R A (2025) Modeling the critical assessment criteria for construction readiness of BIM-based projects: PLS-SEM approach. Journal of Construction Engineering and Management, 151(6): 04025063, ISSN 0733-9364
Rahmani, Farshid (2016) Conceptual models for selecting and managing early contractor involvement (ECI) delivery system by clients. PhD thesis, RMIT University, Australia.
Ren, Z; Anumba, G J and Ugwu, O O (2001) Construction claims management: Towards an agent-based approach. Engineering, Construction and Architectural Management, 8(3), pp. 185-197. ISSN 0969-9988
Riverso, M E (1984) A life cycle cost system for value engineering in building design and construction (economic, cost-codes, database). PhD thesis, Purdue University, USA.
Roberts, W E (1985) An analysis of conflict arising between architects and school personnel when planning, designing, and constructing school facilities. EdD thesis, Northern Arizona University, USA.
Rodrigues, F; Antunes, F and Matos, R (2021) Safety plugins for risks prevention through design resourcing BIM. Construction Innovation, 21(2), pp. 244-258. ISSN 1471-4175
Rodrigues, M R and Lindhard, S M (2023) Benefits and challenges to applying IPD: Experiences from a Norwegian mega-project. Construction Innovation, 23(2), pp. 287-305. ISSN 1471-4175
Rodrigues Aragao, R (2018) Using network theory to manage knowledge from unstructured data in construction projects: Application to a collaborative analysis of the energy consumption in the construction of oil and gas facilities. PhD thesis, University of Toronto, Canada.
Sandhyavitri, A (2022) Stochastic analyses for managing risk of delay in duri oil construction projects, Indonesia. International Journal of Construction Management, 22(4), pp. 711-731. ISSN 1562-3599
Santamaria Carrera, J L (2017) Quantifying the effect of construction site factors on concrete quality, costs and production rates. PhD thesis, University of New Mexico, USA.
Schiavi, B; Havard, V; Beddiar, K and Baudry, D (2023) A VR training scenario editor for operation in construction based on bim 4D and domain expert authoring. Smart and Sustainable Built Environment, 12(5), pp. 1074-1089. ISSN 2046-6099
Seadon, J and Tookey, J E (2019) Drivers for construction productivity. Engineering, Construction and Architectural Management, 26(6), pp. 945-961. ISSN 0969-9988
Senaratne, S (2005) A knowledge-based approach to managing project change in the construction phase within collaborative team settings. PhD thesis, University of Salford, UK.
Senaratne, S and Sexton, M G (2009) Role of knowledge in managing construction project change. Engineering, Construction and Architectural Management, 16(2), pp. 186-200. ISSN 0969-9988
Sepp nen, O (2009) Empirical research on the success of production control in building construction projects. PhD thesis, Helsinki University of Technology, Finland.
Seyis, S and Ozkan, S (2024) Benefits and challenges of implementing the common data environments in the construction phase of BIM-based projects. Journal of Construction Engineering and Management, 150(8): 04024091, ISSN 0733-9364
Shah, M N; Dixit, S; Kumar, R; Jain, R and Anand, K (2021) Causes of delays in slum reconstruction projects in India. International Journal of Construction Management, 21(5), pp. 452-467. ISSN 1562-3599
Shahtaheri, M; Nasir, H and Haas, C T (2015) Setting baseline rates for on-site work categories in the construction industry. Journal of Construction Engineering and Management, 141(5): 04014097, ISSN 0733-9364
Shalwani, A (2021) Empirical analysis of issue management in small vertical construction projects: Relationship between project performance, project team actions, and issue types. PhD thesis, University of Kansas, USA.
Shalwani, A and Lines, B C (2021) An empirical analysis of issue management in small building construction projects. International Journal of Construction Education and Research, 17(4), pp. 352-372. ISSN 1557-8771
Shehab, T; Blampied, N; Nasr, E and Sindhu, L (2024) Ann-based estimation model for the preconstruction cost of pavement rehabilitation projects. International Journal of Construction Management, 24(8), pp. 894-901. ISSN 1562-3599
Sherif, M A (2002) A framework for improving pre-project planning. PhD thesis, Loughborough University, UK.
Sheykhi, R (2016) Risk-based decision making support for construction corporate resource management. PhD thesis, Florida International University, USA.
Shin, D H (2007) Strategic development of AR systems for industrial construction. PhD thesis, Purdue University, USA.
Shipton C, H W P (2013) Making changes in practice: An ethnographic study of a hospital project. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Shirazi, A and Hampson, K (1998) Project manager competencies in a knowledge-based society. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Shrestha, P P; Shrestha, K K and Zeleke, H B (2019) Probability of change orders and the effect on cost and schedule for new public school buildings. Engineering, Construction and Architectural Management, 26(6), pp. 1087-1104. ISSN 0969-9988
Shrivastava, S (2012) Development of an energy information system for the construction phase of buildings: A contractor’s perspective. PhD thesis, University of Florida, USA.
Siddiqi, K M (1997) Framework for analyzing construction alternatives with respect to environmental laws. PhD thesis, Georgia Institute of Technology, USA.
Silveira, B F and Costa, D B (2024) Method for automating the processes of generating and using 4D BIM models integrated with location-based planning and Last Planner® System. Construction Innovation, 24(4), pp. 1005-1025. ISSN 1471-4175
Sinesilassie, E G (2017) Determinants of success of public construction projects in Ethiopia. PhD thesis, Indian Institute of Technology Delhi, India.
Smith, J; Edwards, D J; Martek, I; Chileshe, N; Hayhow, S and Roberts, C J (2023) The antecedents of construction project change: An analysis of design and build procurement application. Journal of Engineering, Design and Technology, 21(3), pp. 655-689. ISSN 1726-0531
Sohoni, P; Ghaffar, A and Jha, K N (2017) Cost optimisation for high-rise buildings considering number of levels of shores and reshores. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Sonet, U N and Klufallah, M (2024) Evaluation of indicators for participatory and collaborative design process for public parks in Malaysia: Analytical hierarchy process. Journal of Construction in Developing Countries, 29(2), pp. 1-18. ISSN 1823-6499
Songer, A D; Diekmann, J E; Rasheed, K A and Hays, B (2001) Construction scheduling using 3-D CAD and walk-thru. Construction Innovation, 1(3), pp. 191-207. ISSN 1471-4175
Sonkor, Muammer Semih (2026) A cybersecurity decision-support framework for technology integration in the built environment. PhD thesis, New York University Tandon School of Engineering, USA.
Sonkor, M S and García De Soto, B (2021) Operational technology on construction sites: A review from the cybersecurity perspective. Journal of Construction Engineering and Management, 147(12): 04021172, ISSN 0733-9364
Soon, C D (2009) Managing risk and uncertainty in transportation megaprojects. PhD thesis, University of Hawai'i at Manoa, USA.
Staples, C and Spillane, J (2019) Exploring the potential improvement of quality control in the construction industry with the use of digital technology. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Staub-French, S; Pilon, A; Poirier, E; Fallahi, A; Kasbar, M; Calderon, F; Teshnizi, Z and Froese, T (2022) Construction process innovation on brock commons tallwood house. Construction Innovation, 22(1), pp. 1-22. ISSN 1471-4175
Sumner, S and Farrell, P (2003) The influence of clients on health and safety standards in construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Suraji, A and Duff, A R (2000) Construction management actions: A stimulant of construction accident causation. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Suresh, M and Arun Ram Nathan, R B (2020) Readiness for lean procurement in construction projects. Construction Innovation, 20(4), pp. 587-608. ISSN 1471-4175
Sutrisna, M and Potts, K (2002) Analysing typical factors for the early prediction of variations. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Tabarroki, S; Nazari, A and Banihashemi, S (2024) Risk stages and factors in architectural design- a structural equation modelling. Architectural Engineering and Design Management, 20(1), pp. 79-101. ISSN 1745-2007
Taiebat, M (2011) Tuning up BIM for safety analysis proposing modeling logics for application of BIM in DfS. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Tengberg, C S (2022) A design-build contractor risk assessment framework for new technical solutions in the construction industry. PhD thesis, Chalmers University of Technology, Sweden.
Tetik, M; Peltokorpi, A; Seppänen, O; Leväniemi, M and Holmström, J (2021) Kitting logistics solution for improving on-site work performance in construction projects. Journal of Construction Engineering and Management, 147(1): 05020020, ISSN 0733-9364
Thakhtravachi, M (2017) Tacit knowledge integration within the traditional construction procurement system. PhD thesis, University of Salford, UK.
Thompson, M J (2023) Environmental sustainability of small wastewater treatment systems and pathways for improvement. PhD thesis, University of Nebraska - Lincoln, USA.
Thompson, R M (2006) An investigation of change to key provisions in the AIA A201 and its impact on perceptions of the value-added benefit of the design professional during construction. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Thunberg, M (2016) Developing a framework for supply chain planning in construction. PhD thesis, Linköping University, Sweden.
Tian, L; Wright, A; Painter, B and Pazhoohesh, M (2023) Factors influencing BIM use in green building construction project management in the UK and China. Building Research & Information, 51(7), pp. 853-870. ISSN 0961-3218
Tian, Y (2022) Financing infrastructure through blockchain tokenization. PhD thesis, University of Florida, USA.
Tjandra, K D; Irawan, F G; Nugraha, P and Sunindijo, R Y (2022) Drone readiness in the Indonesian construction industry. Construction Economics and Building, 22(4), pp. 36-58. ISSN 2204-9029
Toakley, A R and Marosszeky, M (2003) Towards total project quality - A review of research needs. Engineering, Construction and Architectural Management, 10(3), pp. 219-228. ISSN 0969-9988
Towles, C (2017) Maximizing economic returns for large, publicly funded road infrastructure investments through improved economic, engineering and construction information management. DEng thesis, Ecole de Technologie Superieure, Canada.
Tu, B; Zuo, J; Chang, R D; Webber, R J; Xiong, F and Dong, N (2023) A system dynamic model for assessing the level of BIM implementation in construction phase: A China case study. Engineering, Construction and Architectural Management, 30(4), pp. 1321-1343. ISSN 0969-9988
Umuhoza, E; Bitamba, B F and An, S H (2023) Causes and preventive strategies of scope creep for building construction projects in democratic republic of Congo and Rwanda. International Journal of Construction Management, 23(7), pp. 1264-1275. ISSN 1562-3599
Valentin, V (2011) Impact assessment of inter-organizational dynamics on the performance metrics of capital-intensive projects. PhD thesis, Purdue University, USA.
Vanichvatana, S (1993) Predicting consequential effects of construction project changes. PhD thesis, University of California, Berkeley, USA.
Vilasini, N (2014) Generating value in alliance contracts through the lean concept. PhD thesis, Auckland University of Technology, New Zealand.
Villa, J and Ariaratnam, S T (2013) Project management functions for the light industrial sector in Mexico. International Journal of Construction Education and Research, 9(3), pp. 163-182. ISSN 1557-8771
Vilventhan, A and Rajadurai, R (2020) 4D bridge information modelling for management of bridge projects: A case study from India. Built Environment Project and Asset Management, 10(3), pp. 423-435. ISSN 2044-124X
Wahedi, H (2016) Site practice: The role of design drawings within social communities. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Wandahl, S; Pérez, C T; Salling, S; Neve, H H; Lerche, J and Petersen, S (2021) The impact of construction labour productivity on the renovation wave. Construction Economics and Building, 21(3), pp. 11-32. ISSN 2204-9029
Wang, C H; Tsai, C H and Cheng, Y Y (2007) Knowledge-based diagnosis model for PCM executing problems in public construction. Construction Management and Economics, 25(2), pp. 129-142. ISSN 1466433X
Wang, H; Chen, X; Wang, J; Guan, W and Wei, S (2025) Multiobjective trade-off optimization of time, cost, quality, and carbon emission in the building construction stage. Journal of Construction Engineering and Management, 151(4): 04025009, ISSN 0733-9364
Wang, J; Luo, H; Pena-Mora, F; Zhou, W and Fang, W (2024) An integrated BIM-IoT framework for real-time quality monitoring in construction site. Journal of Construction Engineering and Management, 150(11): 05024013, ISSN 0733-9364
Wang, M; Yao, G; Yang, Y; Li, R and Deng, R (2025) A decision support tool for dust prevention and control in construction. Journal of Construction Engineering and Management, 151(5): 04025037, ISSN 0733-9364
Wang, T and Feng, J (2023) Optimal review strategy for concurrent execution of design-construction tasks in DB mode. Journal of Construction Engineering and Management, 149(1): 04022139, ISSN 0733-9364
Wang, T K; Ford, D N; Chong, H Y and Zhang, W (2018) Causes of delays in the construction phase of Chinese building projects. Engineering, Construction and Architectural Management, 25(11), pp. 1534-1551. ISSN 0969-9988
Wang, X and Chong, H-Y (2015) Setting new trends of integrated building information modelling for construction industry. Construction Innovation, 15(1), pp. 2-6. ISSN 1471-4175
Wang, Z; Jia, L; Lv, J and Huang, J (2024) Minimization of rebar cutting waste using BIM and cutting pattern-oriented multiobjective optimization. Journal of Construction Engineering and Management, 150(11): 04024166, ISSN 0733-9364
Welch, J A (2024) Ancient Maya labor relations: Constructing a palace at Ucanha, Yucatán, Mexico. PhD thesis, Yale University, USA.
Wesonga, R; Tutesigensi, A and Moodley, K (2024) A comparative review of energy aggregation policies for prosumerisation of green energy in the construction phase in UK and Uganda. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Whang, S W; Flanagan, R; Kim, S and Kim, S (2017) Contractor-led critical design management factors in high-rise building projects involving multinational design teams. Journal of Construction Engineering and Management, 143(5): 06016009, ISSN 0733-9364
Willenbrock, J H and Thomas, H R (2007) History of construction, engineering, and management in the department of civil and environmental engineering at penn state. Journal of Construction Engineering and Management, 133(9), pp. 644-651. ISSN 0733-9364
Williams, T (2013) The management of renewable energy technologies implementations within a contracting organisation's processes. EngD thesis, Loughborough University, UK.
Willmer, G (1988) Development of risk models for engineering construction projects. PhD thesis, University of Manchester, UK.
Willoughby, K A (1999) Modelling assistance for project procurement and disposal decisions. PhD thesis, University of Calgary, Canada.
Woo, Jeyoung (2024) Engineering design quality defects: Causal factors, interactions between causal factors, and mitigation strategies. PhD thesis, University of Texas at Austin, USA.
Xie, L.; Yu, Z. and Zhao, X. (2025) Assessing construction safety risks in large urban complex projects: An interval ordinal priority approach. Engineering, Construction and Architectural Management, 33(5), pp. 3996-4018. ISSN 0969-9988
Yao, D (2024) Enhancing cyber risk management in the construction industry. PhD thesis, New York University Tandon School of Engineering, USA.
Yao, Z; Zhang, L; Hua, Z and Luo, C (2025) Low-carbon multiobjective optimization for repetitive projects based on crew-based scheduling strategy. Journal of Construction Engineering and Management, 151(1): 04024183, ISSN 0733-9364
Yoo, W S (2007) An information-based decision making framework for evaluating and forecasting a project cost and completion date. PhD thesis, Ohio State University, USA.
Yoo, Wi Sung and Hadipriono Tan, Fabian (2007) An information-based decision making framework for evaluation and forecasting a project cost and completion date. PhD thesis, The Ohio State University, USA.
Yu, W-d (1996) A neuro-fuzzy knowledge-based multi-criterion decision model for constructability analysis and improvement of construction technologies. PhD thesis, Purdue University, USA.
Yuan, C; McClure, T; Cai, H and Dunston, P S (2017) Life-cycle approach to collecting, managing, and sharing transportation infrastructure asset data. Journal of Construction Engineering and Management, 143(6): 04017001, ISSN 0733-9364
Zaher, M; Greenwood, D and Marzouk, M (2018) Mobile augmented reality applications for construction projects. Construction Innovation, 18(2), pp. 152-166. ISSN 1471-4175
Zarghami, S A (2024) Measuring sensitivity to change orders in construction projects using eigenvector centrality and radius of gyration. Engineering, Construction and Architectural Management, 31(6), pp. 2478-2495. ISSN 0969-9988
Zarghami, S A and Zwikael, O (2024) Buffer allocation in construction projects: a disruption mitigation approach. Engineering, Construction and Architectural Management, 31(10), pp. 3946-3972. ISSN 0969-9988
Zhang, S; Zhang, S; Zhao, Z; Liu, H; Wang, C; Wang, X and Yan, L (2026) BIM and semantic web-based circular design system for sustainable construction management of hydropower engineering. Journal of Construction Engineering and Management, 152(3): 04026002, ISSN 0733-9364
Zhang, P; Sing, M C P; Guo, S; Chan, I Y S and Fung, I W H (2025) Causal factors of near misses and accidents in urban railway construction: A complex network approach. Journal of Construction Engineering and Management, 151(7): 04025081, ISSN 0733-9364
Zhang, X (2019) Integrating lean construction, BIM and quality: a new paradigm for the improvement of Chinese construction quality. PhD thesis, University of Bath, UK.
Zhang, X; Zhang, Z; Sun, W; Hu, J; Zhang, L and Zhu, W (2025) The mechanical deformation characteristics of the internal structure of large diameter shield tunnel in different construction stages. Engineering, Construction and Architectural Management, 32(4), pp. 2190-2209. ISSN 0969-9988
Zhang, Y; Chang, R; Mao, W; Zuo, J; Zhang, W E and Liu, L (2025) Low-cost ios-based automated detection of under-construction interior drywalls: An exploratory study. Journal of Construction Engineering and Management, 151(10): 05025012, ISSN 0733-9364
Zhou, L; Wang, C; Niu, P; Zhang, H; Zhang, N; Xie, Q; Wang, J; Zhang, X and Liu, J (2025) A morphology-euclidean-linear recognition method for rebar point clouds of highway tunnel linings during the construction phase. Engineering, Construction and Architectural Management, 32(10), pp. 6509-6535. ISSN 0969-9988
Zighan, S and Abualqumboz, M (2021) A project life-cycle readiness approach to manage construction waste in Jordan. Construction Economics and Building, 21(3), pp. 58-79. ISSN 2204-9029
Zoleykani, M J; Abbasianjahromi, H; Banihashemi, S; Tabadkani, S A and Hajirasouli, A (2024) Extended reality (XR) technologies in the construction safety: Systematic review and analysis. Construction Innovation, 24(4), pp. 1137-1164. ISSN 1471-4175
Zuniga-Garcia, N; Machemehl, R B; Khwaja, N A; Pruner, K D and Fu, M (2021) Estimation of road user costs for work zones in data-limited or time-constrained environments. Journal of Construction Engineering and Management, 147(3): 04020182, ISSN 0733-9364
Zwick, D C and Miller, K R (2004) Project buyout. Journal of Construction Engineering and Management, 130(2), pp. 245-248. ISSN 0733-9364