Items with Index Term: construction method

Number of items: 354.

Aalami, F B (1998) Using construction method models to generate four-dimensional production models. PhD thesis, Stanford University, USA.

Abd El Halim, A E H O and Haas, R (2004) Process and case illustration of construction innovation. Journal of Construction Engineering and Management, 130(4), pp. 570-575. ISSN 0733-9364

Abdollahipour, S; Jeong, D H S; Burman, R R and Gunsaulis, F (2012) Performance assessment of on-grade horizontal directional drilling. Journal of Construction Engineering and Management, 138(3), pp. 458-468. ISSN 0733-9364

Abdul Nabi, M (2023) Promoting enhanced decision-making and proactive management for modularization in the construction industry using risk-based approach, analytical hierarchy process, and graph theory. PhD thesis, Missouri University of Science and Technology, USA.

Abdulla, H S (2016) An investigation on the causes and remedial measures on the delays in the construction industry in the Kingdom of Bahrain. PhD thesis, Glasgow Caledonian University, UK.

Abo Kanon, H (2017) The motivations, possibilities and constrains of flexible housing practices in the UK and Turkey. PhD thesis, Heriot-Watt University, UK.

AbouRizk, S and Mather, K (2000) Simplifying simulation modeling through integration with 3D CAD. Journal of Construction Engineering and Management, 126(6), pp. 475-483. ISSN 0733-9364

Adamtey, S and Onsarigo, L (2018) Analysis of pipe-bursting construction risks using probability-impact model. Journal of Engineering, Design and Technology, 16(3), pp. 461-477. ISSN 1726-0531

Adebayo, A K; Price, A D F and Gibb, A G F (2006) Impact of modern methods of construction on healthcare infrastructure. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Adrian, J J (1974) Modeling construction method productivity. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Ahn, S; Crouch, L; Wan Kim, T and Rameezdeen, R (2020) Comparison of worker safety risks between onsite and offsite construction methods: A site management perspective. Journal of Construction Engineering and Management, 146(9): 0001890, ISSN 0733-9364

Akeremale, I D (2022) Supply chain management in prefabricated housing construction in Nigeria. PhD thesis, University of Newcastle, Australia.

Akinci, B; Fischer, M and Kunz, J (2002) Automated generation of work spaces required by construction activities. Journal of Construction Engineering and Management, 128(4), pp. 306-315. ISSN 0733-9364

Akinci, B; Fischer, M; Kunz, J and Levitt, R (2002) Representing work spaces generically in construction method models. Journal of Construction Engineering and Management, 128(4), pp. 296-305. ISSN 0733-9364

Akinci, B H (2000) Automatic generation of work spaces and analysis of time-space conflicts at construction sites. PhD thesis, Stanford University, USA.

Al Hosani, S (2022) A framework for the implementation of 'Lean' construction principles in Engineering, Procurement and Construction (EPC) in the oil and gas industry. PhD thesis, Aberystwyth University, UK.

Al Sanad, S A (2014) The promotion of sustainable construction practices in Kuwait. PhD thesis, University of Manchester, UK.

Al-Hammad, I A (1991) A knowledge-based framework for construction methods selection. PhD thesis, University of British Columbia, Canada.

Albert, A; Hallowell, M R and Kleiner, B M (2014) Experimental field testing of a real-time construction hazard identification and transmission technique. Construction Management and Economics, 32(10), pp. 1000-1016. ISSN 01446193

Alhumayani, H (2022) The feasibility of 3D printing technology as a new construction method for houses in Saudi Arabia. PhD thesis, Cardiff University, UK.

Allouche, E N (2001) A decision-support model for selection of a trenchless construction method. PhD thesis, University of Alberta, Canada.

Almalki, M; Salman, B; Salem, O and Ammoury, M (2026) A decision-support framework for accelerated wastewater pipeline construction: Integrating economic, social, environmental, and technical criteria. Journal of Construction Engineering and Management, 152(3): 04025263, ISSN 0733-9364

Amer, F; Koh, H Y and Golparvar-Fard, M (2021) Automated methods and systems for construction planning and scheduling: Critical review of three decades of research. Journal of Construction Engineering and Management, 147(7): 0002093, ISSN 0733-9364

Amjad Mohammadi, A; Safaeipour, H; Chenaghlou, M R; Behnejad, A and Afghani Khoraskani, R (2024) Configuration processing and construction of large-span karbandi vaults: A case of the karbandi vaulting of haj-mohammad-qoli timche in tabriz historic bazaar. Engineering, Construction and Architectural Management, 31(1), pp. 432-468. ISSN 0969-9988

Anand, K B and Ramamurthy, K (2003) Laboratory-based productivity study on alternative masonry systems. Journal of Construction Engineering and Management, 129(3), pp. 237-242. ISSN 0733-9364

Arbabian, H (1998) Changes in building construction in an earthquake country. PhD thesis, University of Manchester, UK.

Ariaratnam, S T; Lueke, J S and Allouche, E N (1999) Utilization of trenchless construction methods by Canadian municipalities. Journal of Construction Engineering and Management, 125(2), pp. 76-86. ISSN 0733-9364

Arowoiya, V A and Oyefusi, O N (2023) An analysis of the benefits of adopting modular construction: A Nigerian construction industry context. Journal of Construction in Developing Countries, 28(1), pp. 243-265. ISSN 1823-6499

Ashcroft, D; Egbelakin, T; Jing, J and Rasheed, E O (2019) Cost comparison of seismic damage resisting systems for modules in multi-storey buildings. Journal of Engineering, Design and Technology, 17(2), pp. 330-346. ISSN 1726-0531

Ashdown, M M A; Crawley, J; Biddulph, P; Wingfield, J; Lowe, R and Elwell, C A (2020) Characterising the airtightness of dwellings: Its improvement over time and relationship to construction technique. International Journal of Building Pathology and Adaptation, 38(1), pp. 89-106. ISSN 23984708

Asimakopoulou, E; Anumba, C J and Bouchlaghem, N M (2004) Emergency response management: A review of current approaches. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Asnaashari, E (2011) A holistic conceptual model for managing construction logistics in building projects: the case of Iran. PhD thesis, Nottingham Trent University, UK.

Assaad, R; El-Adaway, I H; Hastak, M and Needy, K L (2020) Commercial and legal considerations of offsite construction projects and their hybrid transactions. Journal of Construction Engineering and Management, 146(12): 05020019, ISSN 0733-9364

Assaad, R H; El-Adaway, I H; Hastak, M and Lascola Needy, K (2022) Quantification of the state of practice of offsite construction and related technologies: Current trends and future prospects. Journal of Construction Engineering and Management, 148(7): 04022055, ISSN 0733-9364

Assaad, R H; El-Adaway, I H; Hastak, M and Lascola Needy, K (2023) Key factors affecting labor productivity in offsite construction projects. Journal of Construction Engineering and Management, 149(1): 04022158, ISSN 0733-9364

Atanasov, V; Greenwood, D J; Madebwe, T M and Cox, R (2023) Building time, cost and quality performance of modern methods of construction in a live research project. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Awodele, I A; Mewomo, M C and Eze, E C (2023) Inhibitors to the adoption of building information modelling in modular construction: A case study of the Nigerian construction industry. Journal of Construction in Developing Countries, 28(2), pp. 19-36. ISSN 1823-6499

Azhar, S; Lukkad, M Y and Ahmad, I (2013) An investigation of critical factors and constraints for selecting modular construction over conventional stick-built technique. International Journal of Construction Education and Research, 9(3), pp. 203-225. ISSN 1557-8771

Babalola, H I and Aliu, J O (2026) Lean construction practices for enhancing project delivery in the construction industry: Examining the beneficial outcomes. International Journal of Construction Management, 26(6), pp. 1097-1111. ISSN 1562-3599

Baghaei, M (2024) Developing a framework and understanding the key influencing factors for the implementation of the internet of things (IoT) in the UK construction sector. PhD thesis, University of Salford, UK.

Bailey, D (2016) A performance evaluation of mainstream timber framed and traditional masonry housing in the UK. PhD thesis, University of Nottingham, UK.

Bakhaty, Y and Kaluarachchi, Y (2020) Critical success factors, barriers and challenges for adopting offsite prefabrication: A systematic literature review. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Baldwin, A; Li, H; Huang, T; Kong, C W; Guo, H L; Chan, N and Wong, J (2009) Supporting pre-tender construction planning with virtual prototyping. Engineering, Construction and Architectural Management, 16(2), pp. 150-161. ISSN 0969-9988

Bartram, N (1981) Evaluation and development of drainage and pipeline construction processes. PhD thesis, Aston University, UK.

Bashat, I M; Gab-Allah, A A and Amer, M I (1995) Construction of ameria caisson in Egypt. Journal of Construction Engineering and Management, 121(1), pp. 13-19. ISSN 0733-9364

Bello, W (2018) Project performance diagnostics: A model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.

Bello, W A (2017) Project performance diagnostics: a model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.

Bhawani, S (2021) A function-based lean construction methods ontology supporting the lean implementation planning process developed for construction projects. PhD thesis, Pennsylvania State University, USA.

Boussabaine, A (1991) An expert system prototype for construction planning and productivity analysis. PhD thesis, University of Manchester, UK.

Carlin, M C (2014) A comparative analysis of horizontal directional drilling construction methods in mainland China. PhD thesis, Arizona State University, USA.

Carr, R I (2000) Construction congestion cost (CO3) traffic impact and construction cost. Journal of Construction Engineering and Management, 126(2), pp. 114-121. ISSN 0733-9364

Carter, G and Smith, S D (2006) Safety hazard identification on construction projects. Journal of Construction Engineering and Management, 132(2), pp. 197-205. ISSN 0733-9364

Castelblanco, G; Fenoaltea, E M; De Marco, A and Chiaia, B (2025) Influence of macroeconomic factors on construction costs: An analysis of project cases. Construction Management and Economics, 43(3), pp. 196-212. ISSN 0144-6193

Chasey, A D and Merchant, S (2000) Issues for construction of 300-mm fab. Journal of Construction Engineering and Management, 126(6), pp. 451-457. ISSN 0733-9364

Chavan, A. P.; Ghosh, S. and McCuen, T. (2026) Use of virtual reality in construction education: USA educators' perspectives. International Journal of Building Pathology and Adaptation, 44(4), pp. 849-866. ISSN 2398-4708

Chen, X; Chang-Richards, A Y; Pelosi, A; Jia, Y; Shen, X; Siddiqui, M K and Yang, N (2022) Implementation of technologies in the construction industry: A systematic review. Engineering, Construction and Architectural Management, 29(8), pp. 3181-3209. ISSN 0969-9988

Chia, Fah Choy (2011) Economic fluctuations and productivity in the Malaysian construction sector. PhD thesis, Queensland University of Technology, Australia.

Chiadighikaobi, P C and Ubani-Wokoma, B C (2025) Suitability of basalt textile-reinforced granite–periwinkle shell concrete for sustainable construction in Nigeria. Construction Economics and Building, 25(1), pp. 171-202. ISSN 2204-9029

Chileshe, N; Boadua, A and Yirenkyi, F (2011) Perceptions of threat risk frequency and impact on construction projects in Ghana: Opinion survey findings. Journal of Construction in Developing Countries, 16(2), pp. 115-149. ISSN 1823-6499

Chileshe, N and Boadua Yirenkyi-Fianko, A (2012) An evaluation of risk factors impacting construction projects in Ghana. Journal of Engineering, Design and Technology, 10(3), pp. 306-329. ISSN 1726-0531

Choi, Y S; Lim, I; Kim, T; Cho, H and Kang, K I (2016) Case study of the core structure succeeding method for tall building construction. Journal of Construction Engineering and Management, 142(12): 05016017, ISSN 0733-9364

Chritamara, S; Ogunlana, S O and Bach, N L (2002) System dynamics modeling of design and build construction projects. Construction Innovation, 2(4), pp. 269-295. ISSN 1471-4175

Chung, T H; Abraham, D M and Gokhale, S B (2004) Decision support system for microtunneling applications. Journal of Construction Engineering and Management, 130(6), pp. 835-843. ISSN 0733-9364

Codarin, Sara (2020) Innovative construction systems within building processes: An approach to large-scale robotic additive layer manufacturing for the conservation of cultural heritage. PhD thesis, University of Ferrara, Italy.

Correia, J M; Sutrisna, M and Zaman, A U (2020) Factors influencing the implementation of off-site manufacturing in commercial projects in Western Australia: A proposed research agenda. Journal of Engineering, Design and Technology, 18(6), pp. 1449-1468. ISSN 1726-0531

Cruz Ortiz, M R P (2019) Expanding modular design: All-rise mass timber residences in Hawaii. DArch thesis, University of Hawai'i at Manoa, USA.

Dabbas, M A A (1981) Computerized decision making in construction. PhD thesis, Georgia Institute of Technology, USA.

Dadzoe, F; Addy, M; Duah, D Y A and Adesi, M (2024) Towards a circular economy: A knowledge-attitude gap between demand and supply-side operators on green building construction in Ghana. Smart and Sustainable Built Environment, 13(4), pp. 763-779. ISSN 2046-6099

Daniel, E I; Oshodi, O; Dabara, D and Dimka, N (2024) Towards closing the housing gap in the UK: Exploration of the influencing factors and the way forward. Construction Innovation, 24(4), pp. 965-985. ISSN 1471-4175

Das, D K and Emuze, F (2017) A dynamic model of contractor-induced delays in India. Journal of Construction in Developing Countries, 22(1), pp. 21-39. ISSN 1823-6499

Dawood, I (2010) Decision support system (DSS) model to facilitate strategic planning of the housing industry in the developing world. PhD thesis, University of Salford, UK.

Dawood, N and Sriprasert, E (2006) Construction scheduling using multi-constraint and genetic algorithms approach. Construction Management and Economics, 24(1), pp. 19-30. ISSN 01446193

De La Garza, J M and Mitropoulos, P (1991) Technology-transfer (t2) model for expert systems. Journal of Construction Engineering and Management, 117(4), pp. 736-755. ISSN 0733-9364

Devine, R D; Barbachyn, S M; Thrall, A P and Kurama, Y C (2018) Effect of tripping prefabricated rebar assemblies on bar spacing. Journal of Construction Engineering and Management, 144(11): 04018099, ISSN 0733-9364

Dewlaney, K S; Hallowell, M R and Fortunato Iii, B R (2012) Safety risk quantification for high performance sustainable building construction. Journal of Construction Engineering and Management, 138(8), pp. 964-971. ISSN 0733-9364

Dharwadkar, P V (1994) A prototype object-oriented system for three-dimensional CAD and schedule integration. PhD thesis, University of Texas at Austin, USA.

Ding, G and Forsythe, P (2016) A comparative study of floor construction on sloping sites: An analysis of cumulative energy demand and greenhouse gas emissions. Construction Economics and Building, 16(1), pp. 33-49. ISSN 2204-9029

Ding, G and Forsythe, P J (2013) Sustainable construction: Life cycle energy analysis of construction on sloping sites for residential buildings. Construction Management and Economics, 31(3), pp. 254-265. ISSN 1466433X

Do, S T; Nguyen, V T and Nguyen, N H (2023) Relationship networks between variation orders and claims/disputes causes on construction project performance and stakeholder performance. Engineering, Construction and Architectural Management, 30(9), pp. 3817-3839. ISSN 0969-9988

Du, J J; Zhou, J; Liu, C and Picken, D (2006) Exploring turnover intention of construction managers in China. Journal of Construction Research, 7(1), pp. 191-205. ISSN 1609-9451

Du, Q; Zhang, Y; Zeng, L; Ma, Y and Li, S (2025) Dynamic assessment of the abatement effects of the low-carbon practices in the prefabricated building supply chain. Engineering, Construction and Architectural Management, 32(7), pp. 4918-4945. ISSN 0969-9988

Du Toit, G J (1997) The potential of labour-intensive construction methods in the provision of urban infrastructure. PhD thesis, University of Pretoria, South Africa.

El Kholy, S M (1991) Time and architecture: Problems of duration and sequence in architectural design. PhD thesis, University of Pennsylvania, USA.

El-Razek, M E A (1999) New method for construction of diaphragm walls. Journal of Construction Engineering and Management, 125(4), pp. 233-241. ISSN 0733-9364

ElMenshawy, M and Marzouk, M (2021) Automated BIM schedule generation approach for solving time–cost trade-off problems. Engineering, Construction and Architectural Management, 28(10), pp. 3346-3367. ISSN 0969-9988

Elmisalami, T; Walters, R and Jaselskis, E J (2006) Construction IT decision making using multiattribute utility theory for use in a laboratory information management system. Journal of Construction Engineering and Management, 132(12), pp. 1275-1283. ISSN 0733-9364

Elnaas H, A P G K (2013) A decision evaluation model to choose between manufacturing off-site or on-site methods for construction of house building projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Esa, Mohd Reza (2018) Moving towards sustainable construction in Malaysia: A holistic model for construction and demolition (c&d) waste management. PhD thesis, University of Queensland, Australia.

Esmaeili, B; Hallowell, M R and Rajagopalan, B (2015) Attribute-based safety risk assessment. I: Analysis at the fundamental level. Journal of Construction Engineering and Management, 141(8): 04015021, ISSN 0733-9364

Evarist, C; G.M. Luvara, V and Chileshe, N (2025) Rethinking the recruitment and selection practices of indigenous building contractors in Dar es Salaam, Tanzania: criteria and methods. International Journal of Construction Management, 25(2), pp. 149-160. ISSN 1562-3599

Fadoul, A (2020) A BIM-based model for constructability assessment of buildings design. PhD thesis, University of Nottingham, UK.

Falaq Assad, N; Edwards, D J; Shelbourn, M; Martek, I; Wellington Didibhuku Didibhuku, T and El-Gohary, H (2021) Comparison of modular and traditional UK housing construction: A bibliometric analysis. Journal of Engineering, Design and Technology, 19(1), pp. 164-186. ISSN 1726-0531

Fang, X; Yang, L; Zhang, C; Yang, J and Zhou, W (2025) Large diameter shafts in fractured strata: Equipment and construction procedures. Journal of Construction Engineering and Management, 151(9): 06025001, ISSN 0733-9364

Faniran, O O; Oluwoye, J O and Lenard, D (1994) Effective construction planning. Construction Management and Economics, 12(6), pp. 485-499. ISSN 01446193

Feldmann, F G (2022) Novel perspectives on sustainable value creation: Challenging the status quo by implementing advanced technologies into supply chain processes. PhD thesis, Friedrich-Alexander-Universitaet Erlangen-Nuernberg, Germany.

Feng, C-W (1998) Applications of genetic algorithms for multi-objective resource allocation of construction projects under certainty. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Ferrada, X and Serpell, A (2014) Selection of construction methods for construction projects: A knowledge problem. Journal of Construction Engineering and Management, 140(4): B4014002, ISSN 0733-9364

Fischer, M A (1991) Using construction knowledge during preliminary design of reinforced concrete structures. PhD thesis, Stanford University, USA.

Fischer, M A and Aalami, F B (1996) Scheduling with computer-interpretable construction method models. Journal of Construction Engineering and Management, 122(4), pp. 337-347. ISSN 0733-9364

Fischer, M A and Tatum, C B (1997) Characteristics of design-relevant constructability knowledge. Journal of Construction Engineering and Management, 123(3), pp. 253-260. ISSN 0733-9364

Fisher, D J; O'Neill, M W and Contreras, J C (1995) DS^2: Drilled shaft decision support system. Journal of Construction Engineering and Management, 121(1), pp. 86-94. ISSN 0733-9364

Francis, A; Padmanabhan, V and Thomas, A (2025) A life cycle assessment-based case study analysis of the sustainability of "vernacular" versus contemporary construction techniques. Engineering, Construction and Architectural Management, 32(9), pp. 6187-6212. ISSN 0969-9988

Gao, T; Ergan, S; Akinci, B and Garrett, J H (2014) Proactive productivity management at job sites: Understanding characteristics of assumptions made for construction processes during planning based on case studies and interviews. Journal of Construction Engineering and Management, 140(3): 4013054, ISSN 0733-9364

Gatton, T M (1991) Designing for construction automation: Advanced automation technologies for computer integrated construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Goodrum, P M; Wan, Y and Fenouil, P C (2009) A decision-making system for accelerating roadway construction. Engineering, Construction and Architectural Management, 16(2), pp. 116-135. ISSN 0969-9988

Goto, Y (2012) Sustainable wooden building concept for central Japan. DSc thesis, ETH Zürich, Switzerland.

Graser, Konrad (2023) From invention to innovation: Socio-technical processes in the adoption of digital fabrication to architecture, engineering and construction praxis. PhD thesis, ETH Zürich, Switzerland.

Gurmu, A T; Aibinu, A A and Chan, T K (2016) A study of best management practices for enhancing productivity in building projects: Construction methods perspectives. Construction Economics and Building, 16(3), pp. 1-19. ISSN 2204-9029

Gurmu, Argaw (2017) An investigation into construction management practices influencing labour productivity in multi-storey building projects. PhD thesis, University of Melbourne, Australia.

Gyadu-Asiedu, W; Anewuoh, F and Appiadu-Boakye, K (2023) The real estate market in Ghana: The nexus between price and income levels. Built Environment Project and Asset Management, 13(1), pp. 56-72. ISSN 2044-124X

Ha, D. K. (2026) An evaluation and comparison of critical factors contributing to falls-from-height hazards in Vietnamese building projects. Journal of Engineering, Design and Technology, 24(3), pp. 831-858. ISSN 1726-0531

Hadikusumo, B H W and Tobgay, S (2015) Construction claim types and causes for a large-scale hydropower project in Bhutan. Journal of Construction in Developing Countries, 20(1), pp. 49-63. ISSN 1823-6499

Hadjri, K (1992) The viability of 'no-fines' for the production of appropriate housing in Algeria. PhD thesis, CNAA, Oxford Polytechnic, UK.

Ham, Y (2015) Vision-based building energy diagnostics and retrofit analysis using 3D thermography and building information modeling. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hamilton-MacLaren, F (2013) Alternative, more sustainable, wall construction techniques than brick and block, for new housing in England and Wales. PhD thesis, Loughborough University, UK.

Hammad, A W; Grzybowska, H; Sutrisna, M; Akbarnezhad, A and Haddad, A (2020) A novel mathematical optimisation model for the scheduling of activities in modular construction factories. Construction Management and Economics, 38(6), pp. 534-551. ISSN 01446193

Hamzeh, F; Abdul, G O; Saleh, B M B and Abbas, Y (2017) Modular concrete construction: The differing perspectives of designers, manufacturers, and contractors in Lebanon. Engineering, Construction and Architectural Management, 24(6), pp. 935-949. ISSN 0969-9988

Hanna, A; Boodai, F and El Asmar, M (2013) State of practice of building information modeling in mechanical and electrical construction industries. Journal of Construction Engineering and Management, 139(10): 04013009, ISSN 0733-9364

Hanna, A S; Mikhail, G and Iskandar, K A (2017) State of prefab practice in the electrical construction industry: Qualitative assessment. Journal of Construction Engineering and Management, 143(2): 04016097, ISSN 0733-9364

Hanna, A S and Skiffington, M A (2010) Effect of preconstruction planning effort on sheet metal project performance. Journal of Construction Engineering and Management, 136(2), pp. 235-241. ISSN 0733-9364

Harris, R B (1992) A challenge for research. Journal of Construction Engineering and Management, 118(3), pp. 422-434. ISSN 0733-9364

Harryson, P (2008) Industrial bridge engineering: structural developments for more efficient bridge construction. PhD thesis, Chalmers University of Technology, Sweden.

Hasselaar, E (2009) Health issues and the building stock. Building Research & Information, 37(5-6), pp. 669-678. ISSN 0961-3218

He, J.; Chen, H.; Yang, H.; Li, P. and Zheng, Z. (2026) Text2Onto-Agent: An llm agent-based end-to-end automated ontology construction method anda case study of green building domain modeling. Journal of Construction Engineering and Management, 152(9): 04026153, ISSN 0733-9364

Hegazy, T; Elhakeem, A and Elbeltagi, E (2004) Distributed scheduling model for infrastructure networks. Journal of Construction Engineering and Management, 130(2), pp. 160-167. ISSN 0733-9364

Hegazy, T and Kamarah, E (2008) Efficient repetitive scheduling for high-rise construction. Journal of Construction Engineering and Management, 134(4), pp. 253-264. ISSN 0733-9364

Hegazy, T and Petzold, K (2003) Genetic optimization for dynamic project control. Journal of Construction Engineering and Management, 129(4), pp. 396-404. ISSN 0733-9364

Hegazy, T and Wassef, N (2001) Cost optimization in projects with repetitive nonserial activities. Journal of Construction Engineering and Management, 127(3), pp. 183-191. ISSN 0733-9364

Helaly, H; El-Rayes, K; Ignacio, E J and Joan, H J (2025) Comparison of machine-learning algorithms for estimating cost of conventional and accelerated bridge construction methods during early design phase. Journal of Construction Engineering and Management, 151(3): 04025004, ISSN 0733-9364

Heravi, G; Kebria, M F and Rostami, M (2021) Integrating the production and the erection processes of pre-fabricated steel frames in building projects using phased lean management. Engineering, Construction and Architectural Management, 28(1), pp. 174-195. ISSN 0969-9988

Hermawan, F (2015) A strategic approach to enhancing sustainable practices in public building projects: a case study of Indonesian local authorities. PhD thesis, Coventry University, UK.

Hitchcock, R J (1996) Improving life-cycle information management through documentation of project objectives and design rationale. PhD thesis, University of California, Berkeley, USA.

Hou, L; Tan, Y; Luo, W; Xu, S; Mao, C and Moon, S (2022) Towards a more extensive application of off-site construction: A technological review. International Journal of Construction Management, 22(11), pp. 2154-2165. ISSN 1562-3599

Howes, R (2000) Improving the performance of earned value analysis as a construction project management tool. Engineering, Construction and Architectural Management, 7(4), pp. 399-411. ISSN 0969-9988

Hsieh, H Y and Forster, J (2006) Residential construction quality and production levels in Taiwan. Engineering, Construction and Architectural Management, 13(5), pp. 502-520. ISSN 0969-9988

Hsieh, T-Y (1993) Functional requirements for large-scale manipulators in industrial construction. PhD thesis, University of Texas at Austin, USA.

Hu, M; Nippala, E; Kallioharju, K and Pelsmakers, S (2022) Monte Carlo simulation approach to understand the cost variance for energy retrofit projects: Comparative study of Finland and the United States. Construction Management and Economics, 40(3), pp. 207-222. ISSN 01446193

Huang, T (2009) Virtual prototyping technologies enhanced construction planning. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Högberg, L (2014) Building sustainability: Studies on incentives in construction and management of real estate. PhD thesis, KTH Royal Institute of Technology, Sweden.

Ioannou, P G and Martinez, J C (1996) Comparison of construction alternatives using matched simulation experiments. Journal of Construction Engineering and Management, 122(3), pp. 231-241. ISSN 0733-9364

Iseley, D T (1991) Trenchless excavation construction methods: Classification and evaluation. Journal of Construction Engineering and Management, 117(3), pp. 521-536. ISSN 0733-9364

Ishaak, F F (2025) Improving commercial property price statistics. PhD thesis, Delft University of Technology, Netherlands.

Itard, L and Klunder, G (2007) Comparing environmental impacts of renovated housing stock with new construction. Building Research & Information, 35(3), pp. 252-267. ISSN 0961-3218

Jaillon, L and Poon, C S (2008) Sustainable construction aspects of using prefabrication in dense urban environment: A Hong Kong case study. Construction Management and Economics, 26(9), pp. 953-966. ISSN 1466433X

Jergeas, G F (1989) Detailed design and constructability. PhD thesis, Loughborough University, UK.

Jiang, X; Wang, S; Liu, Y; Xia, B; Skitmore, M; Nepal, M and Ghanbaripour, A N (2023) A method for the ontology-based risk management of PPP construction projects. Construction Innovation, 23(5), pp. 1095-1129. ISSN 1471-4175

Jongeling, R (2006) A process model for work-flow management in construction. PhD thesis, Luleå University of Technology, Sweden.

Kabo, F W (2006) Low-cost housing design and provision: A case study of Kenya. PhD thesis, University of Michigan, USA.

Karami, H and Olatunji, O A (2019) Key value engineering protocols in marine projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(1), pp. 21-31. ISSN 17514304

Karunaratne, Roshan (2022) Optimisation of prefabricated modular-integrated residential construction using hybrid customisation methods. PhD thesis, University of Melbourne, Australia.

Kasbar, M; Staub-French, S; Pilon, A; Poirier, E; Teshnizi, Z and Froese, T (2021) Construction productivity assessment on brock commons tallwood house. Construction Innovation, 21(4), pp. 951-968. ISSN 1471-4175

Kataoka, M (2008) Automated generation of construction plans from primitive geometries. Journal of Construction Engineering and Management, 134(8), pp. 592-600. ISSN 0733-9364

Khanzode, A R (2011) An integrated virtual design and construction and lean (IVL) method for coordination of mechanical, electrical and plumbing (MEP) systems. PhD thesis, Stanford University, USA.

Khural, R A; Ertz, M and Cerchione, R (2024) Moving toward sustainability and circularity in hill road construction: A study of barriers, practices and performance. Engineering, Construction and Architectural Management, 31(4), pp. 1608-1641. ISSN 0969-9988

Killingsworth, J; Mehany, M H and Ladhari, H (2021) General contractors’ experience using off-site structural framing systems. Construction Innovation, 21(1), pp. 40-63. ISSN 1471-4175

Kim, C W; Kim, T; Lee, U K; Cho, H and Kang, K I (2016) Advanced steel beam assembly approach for improving safety of structural steel workers. Journal of Construction Engineering and Management, 142(4): 05015019, ISSN 0733-9364

Kim, J I (2016) Framework for dynamic generation and evaluation of excavation schedules for hard rock tunnels in preconstruction and construction. PhD thesis, Stanford University, USA.

Kim, S; Hwang, S and Son, J (2022) Safety management guidelines for precast concrete production plants using importance-performance analysis. Journal of Construction Engineering and Management, 148(7): 04022038, ISSN 0733-9364

Kissi, E; Aigbavboa, C; Eluerkeh, K; Karikari, V A and Danquah, E S (2025) Establishing the nexus between green human resource management and construction project environmental performance. International Journal of Construction Education and Research, 21(2), pp. 230-255. ISSN 1557-8771

Koc, K; Ekmekcioglu, Ö and Işlk, Z (2023) Developing a hybrid fuzzy decision-making model for sustainable circular contractor selection. Journal of Construction Engineering and Management, 149(10): 04023095, ISSN 0733-9364

Koranteng, C; Simons, B and Manu, F W (2021) A thermal performance study of four communities in Ghana's savannah region. Engineering, Construction and Architectural Management, 28(10), pp. 3261-3281. ISSN 0969-9988

Krechowicz, M (2020) Comprehensive risk management in horizontal directional drilling projects. Journal of Construction Engineering and Management, 146(5): 04020034, ISSN 0733-9364

Lam, E W M; Chan, A P C and Chan, D M W (2006) Drivers for design-build applications in the public sector of Hong Kong. Journal of Construction Procurement, 12(1),

Lang, R; Goodier, C and Glass, J (2016) Are housebuilders' production strategies a barrier to offsite construction uptake in the UK? In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Larsson, J; Lu, W; Krantz, J and Olofsson, T (2016) Discrete event simulation analysis of product and process platforms: A bridge construction case study. Journal of Construction Engineering and Management, 142(4): 04015097, ISSN 0733-9364

Larsson, J and Simonsson, P (2012) Barriers and drivers for increased use of off-site bridge construction in Sweden. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Le, A T H; Domingo, N; Rasheed, E and Park, K S (2018) Building maintenance cost planning and estimating: A literature review. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Lee, H S; Lee, J Y and Lee, J S (1999) Nonshored formwork system for top-down construction. Journal of Construction Engineering and Management, 125(6), pp. 392-399. ISSN 0733-9364

Lee, H-S (1992) Automated interactive cost estimating system for reinforced concrete building structures. PhD thesis, University of Michigan, USA.

Lei, Zhen (2015) Automated simulation model for crane motion planning in heavy industrial projects. PhD thesis, University of Alberta, Canada.

Leung, W Y (2006) A study of the competitiveness of local contractors in Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Li, Z and Mok Paik, S (2025) Resource cost optimization strategies in off-site manufacturing for modern construction methods: A lean theory perspective case study in Ireland. International Journal of Construction Management, 25(16), pp. 1892-1900. ISSN 1562-3599

Li, L; Luan, H; Yin, X; Dou, Y; Yuan, M and Li, Z (2022) Understanding sustainability in off-site construction management: State of the art and future directions. Journal of Construction Engineering and Management, 148(11): 03122008, ISSN 0733-9364

Li, M G; Chen, J J; Xu, A J; Xia, X H and Wang, J H (2014) Case study of innovative top-down construction method with channel-type excavation. Journal of Construction Engineering and Management, 140(5): 05014003, ISSN 0733-9364

Liang, X (2012) Development of a framework for real-time 3D positioning and visualization of construction resources. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Lingard, H; Pirzadeh, P; Blismas, N; Wakefield, R and Kleiner, B (2014) Exploring the link between early constructor involvement in project decision-making and the efficacy of health and safety risk control. Construction Management and Economics, 32(9), pp. 918-931. ISSN 01446193

Lisco, M and Aulin, R (2024) Taxonomy supporting design strategies for reuse of building parts in timber-based construction. Construction Innovation, 24(1), pp. 221-241. ISSN 1471-4175

Lisø, K R; Myhre, L; Kvande, T; Thue, J V and Nordvik, V (2007) A Norwegian perspective on buildings and climate change. Building Research & Information, 35(4), pp. 437-449. ISSN 0961-3218

Liu, G; Huang, R; Li, K; Shrestha, A and Fu, X (2022) Greenhouse gas emissions management in prefabrication and modular construction based on earned value management. Journal of Construction Engineering and Management, 148(6): 04022034, ISSN 0733-9364

Lu, H; Behbahani, S; Azimi, M; Matthews, J C; Han, S and Iseley, T (2020) Trenchless construction technologies for oil and gas pipelines: State-of-the-art review. Journal of Construction Engineering and Management, 146(6): 03120001, ISSN 0733-9364

Lueke, J S and Ariaratnam, S T (2005) Surface heave mechanisms in horizontal directional drilling. Journal of Construction Engineering and Management, 131(5), pp. 540-547. ISSN 0733-9364

Lueprasert, K (1996) Constructability knowledge acquisition: A machine learning approach. PhD thesis, Purdue University, USA.

Lundkvist, R (2015) Experience feedback in industrialised house-building: The impact of production strategies. PhD thesis, Luleå University of Technology, Sweden.

Luo, Y Z; Shen, Y B and Xu, X (2007) Construction method for cylindrical latticed shells based on expandable mechanisms. Journal of Construction Engineering and Management, 133(11), pp. 912-915. ISSN 0733-9364

Luong, D L; Tran, D H and Nguyen, P T (2021) Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution. International Journal of Construction Management, 21(3), pp. 271-283. ISSN 1562-3599

Läufer, A; Howell, G A and Rosenfeld, Y (1992) Three modes of short-term construction planning. Construction Management and Economics, 10(3), pp. 249-262. ISSN 01446193

Mahdy, M M M (2014) Applying architecture simulation tools to assess building sustainable design: adapting the Egyptian residential energy code for climate change. PhD thesis, University of Kent, UK.

Malik, N; Ahmad, R; Chen, Y; Altaf, M S and Al-Hussein, M (2021) Minimizing joist cutting waste through dynamic waste allocation in panelized floor manufacturing. International Journal of Construction Management, 21(10), pp. 1011-1023. ISSN 1562-3599

Mandujano Rodríguez, M G (2016) A method to identify virtual design and construction implementation strategies from a lean construction perspective. DEng thesis, Pontificia Universidad Catolica de Chile, Chile.

Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2023) A constructive system to assess the performance-based grading of construction labour through work-based training components and applications. Construction Economics and Building, 23(3-4), pp. 107-124. ISSN 2204-9029

Manrique, J D; Al-Hussein, M; Bouferguene, A; Safouhi, H and Nasseri, R (2011) Combinatorial algorithm for optimizing wood waste in framing designs. Journal of Construction Engineering and Management, 137(3), pp. 188-197. ISSN 0733-9364

Massyn, M and Jeune, K L (2010) Health and safety practices of contractors working on the expanded public works programme (epwp): A South African perspective. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Matthews, J C (2010) Integrated, multi-attribute decision support system for the evaluation of underground utility construction methods. PhD thesis, Louisiana Tech University, USA.

Matthews, J C and Stowe, R (2015) Critical data needs associated with asbestos cement pipe renewal methods. Journal of Construction Engineering and Management, 141(1): 06014009, ISSN 0733-9364

Matthewson, C (1992) The relationship between tactical management and contract procurement in the North American competitive lump sum bidding process. PhD thesis, Heriot-Watt University, UK.

McCabe, B Y (1997) An automated modeling approach for construction performance improvement using simulation and belief networks. PhD thesis, University of Alberta, Canada.

McKay, L J; Gibb, A G F; Haslam, R and Pendlebury, M (2002) Implications for the effect of standardization and pre-assembly on health, safety and accident causality: Preliminary results. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Meacham, B J (2022) Fire performance and regulatory considerations with modern methods of construction. Buildings & Cities, 3(1), pp. 464-487. ISSN 2632-6655

Meeampol, S and Ogunlan, S O (2006) Factors affecting cost and time performance on highway construction projects: Evidence from Thailand. Journal of Financial Management of Property and Construction, 11(1), pp. 3-20. ISSN 1366-4387

Metham, M; Benjaoran, V and Sedthamanop, A (2022) An evaluation of green road incentive procurement in road construction projects by using the AHP. International Journal of Construction Management, 22(3), pp. 501-513. ISSN 1562-3599

Michael Gbolagade, O; Inimbom Walter, I and Emuze, F (2021) Towards sustainability practices deployment in building construction projects in Nigeria. Smart and Sustainable Built Environment, 10(4), pp. 759-780. ISSN 2046-6099

Mondorf, P E; Kuprenas, J A and Kordahi, E N (1997) Segmental cantilever bridge construction case study. Journal of Construction Engineering and Management, 123(1), pp. 79-84. ISSN 0733-9364

Morrissey, D; Goodier, C and Demian, P (2024) Offsite construction in ireland’s hospitals: Unveiling the complexities of OSC adoption. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Moselhi, O and Khan, Z (2010) Analysis of labour productivity of formwork operations in building construction. Construction Innovation, 10(3), pp. 286-303. ISSN 1471-4175

Mostafa, S; Chileshe, N and Zuo, J (2014) A synergistic supply chain enhancing offsite manufacturing uptake in Australian house building. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Mourgues, C (2009) Method to produce field instructions from product and process models. PhD thesis, Stanford University, USA.

Moynihan, G; Zhou, H and Cui, Q (2009) Stochastic modeling for pavement warranty cost estimation. Journal of Construction Engineering and Management, 135(5), pp. 352-359. ISSN 0733-9364

Moyo, T.; Raliile, M.; Edwards, D. J. and Chigara, B. (2026) Construct validation for technical sustainability as the fourth pillar for achieving sustainable construction: A case for Zimbabwe. Construction Innovation, 26(9), pp. 233-263. ISSN 1471-4175

Mulville, M and Stravoravdis, S (2016) The impact of regulations on overheating risk in dwellings. Building Research & Information, 44(5-6), pp. 520-534. ISSN 0961-3218

Mwanaki Alinaitwe, H (2008) Improvement of labour performance and productivity in Uganda's building industry. PhD thesis, Lund University, Sweden.

Nakajima, T (1972) Modeling and optimization of the building process for systems building. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Nanayakkara, L (1999) An interpretive research methodology for assessing the appicability of western productivity techniques in Sri Lanka. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Naumets, S; Lu, M and Ali, M (2022) Project schedule development under environment-induced time-window constraints: Case of constructing river-crossing bridge in remote Northern region. Journal of Construction Engineering and Management, 148(12): 04022129, ISSN 0733-9364

Navon, R (1995) Economic benefits of lightweight versus conventional construction methods. Journal of Construction Engineering and Management, 121(1), pp. 27-36. ISSN 0733-9364

Nguyen, V T and Do, S T (2023) Assessing the relationship chain among causes of variation orders, project performance, and stakeholder performance in construction projects. International Journal of Construction Management, 23(9), pp. 1592-1602. ISSN 1562-3599

Nima, M A; Abdul-Kadir, M R; Jaafar, M S and Alghulami, R G (2004) Constructability concepts in Kuala Selangor cable-stayed bridge in Malaysia. Journal of Construction Engineering and Management, 130(3), pp. 315-321. ISSN 0733-9364

Noorzai, E; Gharouni Jafari, K and Moslemi Naeni, L (2022) Lessons learned on selecting the best mass housing method based on performance evaluation criteria in Iran. International Journal of Construction Education and Research, 18(2), pp. 123-141. ISSN 1557-8771

Noorzai, E and Golabchi, M (2020) Selecting a proper construction system in small and medium mass housing projects, considering success criteria and construction volume and height. Journal of Engineering, Design and Technology, 18(4), pp. 883-903. ISSN 1726-0531

Nordby, A S; Berge, B; Hakonsen, F and Hestnes, A G (2009) Criteria for salvageability: The reuse of bricks. Building Research & Information, 37(1), pp. 55-67. ISSN 0961-3218

Noyce, D A and Hanna, A S (1997) Planned schedule compression concept file for electrical contractors. Journal of Construction Engineering and Management, 123(2), pp. 189-197. ISSN 0733-9364

Nzabonimpa, J D and Hong, W K (2018) Novel precast erection method of interlocking mechanical joints using couplers. Journal of Construction Engineering and Management, 144(6): 04018036, ISSN 0733-9364

Odimabo, O (2016) Risk management system to guide building construction projects in developing countries: a case study of Nigeria. PhD thesis, University of Wolverhampton, UK.

Ofori-Kuragu, J K and Osei-Kyei, R (2021) Mainstreaming pre-manufactured offsite processes in construction: are we nearly there? Construction Innovation, 21(4), pp. 743-760. ISSN 1471-4175

Oloufa, A A; Eltahan, A A and Papacostas, C S (1994) Integrated GIS for construction site investigation. Journal of Construction Engineering and Management, 120(1), pp. 211-222. ISSN 0733-9364

Onsarigo, L M (2016) Cost comparison of horizontal auger boring and open-cut construction methods for culvert installations. PhD thesis, Indiana State University, USA.

Opoku, A (2016) Sdg2030: A sustainable built environment's role in achieving the post-2015 united nations Sustainable Development Goals. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Owusu-Manu, D G; Ghansah, F A; Darko, A; Asiedu, R O and Edwards, D J (2020) Insurable and non-insurable risks in complex project deals: Case of the Ghanaian construction industry. Journal of Engineering, Design and Technology, 18(6), pp. 1971-1995. ISSN 1726-0531

Oyebode, A and Daniel, E (2024) Addressing the housing shortage gap in Nigeria: An exploration of dry construction method. Journal of Construction Business and Management, 7(1), pp. 57-71. ISSN 2521-0165

Oztemir, A E (2003) Skill-driven optimization of construction operations. PhD thesis, Arizona State University, USA.

Paek, J H and Ock, J H (1996) Innovative building construction technique: Modified up/down method. Journal of Construction Engineering and Management, 122(2), pp. 141-146. ISSN 0733-9364

Pan, W; Dainty, A R J and Gibb, A G F (2012) Establishing and weighting decision criteria for building system selection in housing construction. Journal of Construction Engineering and Management, 138(11), pp. 1239-1250. ISSN 0733-9364

Pan, W; Gibb, A F and Dainty, A R J (2007) Perspective of UK housebuilders on the use of offsite modern methods of construction. Construction Management and Economics, 25(2), pp. 183-194. ISSN 1466433X

Pan, W; Gibb, A G F and Dainty, A R J (2008) Leading UK housebuilders' utilization of offsite construction methods. Building Research & Information, 36(1), pp. 56-67. ISSN 0961-3218

Pan, W and Sidwell, R (2011) Demystifying the cost barriers to offsite construction in the UK. Construction Management and Economics, 29(11), pp. 1081-1099. ISSN 1466433X

Pan, Y H (2007) Application of industrialized housing system in major cities in China: A case study of Chongqing. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Park, J; Brown, J; Al-Hasani, L E; Gentry, T R; Kurtis, K E and Cho, Y K (2024) Cost-effective thermal control planning for mass concrete construction using nomograms. Journal of Construction Engineering and Management, 150(10): 06024001, ISSN 0733-9364

Pasquire, C L (1991) Builders quantities for contractors' management. PhD thesis, Loughborough University, UK.

Patel, K R (2024) Comparative assessment of interior wall construction: A life cycle thinking based evaluation. PhD thesis, University of Windsor, Canada.

Paunikar, A (1983) Performance constraints of housing prefabricators in India: 3 case studies. ArchD thesis, University of Michigan, USA.

Pennington, D E (1977) A cost analysis of the construction management method of school facility construction. EdD thesis, Indiana University, USA.

Piroozfar, P; Altan, H and Popovic-Larsen, O (2012) Design for sustainability: A comparative study of a customized modern method of construction versus conventional methods of construction. Architectural Engineering and Design Management, 8(1), pp. 55-75. ISSN 1745-2007

Poon, S-W (2002) Analysing and predicting falsework failure in Hong Kong. PhD thesis, Loughborough University, UK.

Pour Aghajan, Marjan (2025) Supporting early decision-making between precast and in-situ concrete in construction industry. PhD thesis, Queensland University of Technology, Australia.

Pourghazian, H (2008) Industrial construction methods for cost-effective and sustainable multi-storey buildings. PhD thesis, KTH Royal Institute of Technology, Sweden.

Proverbs, D G (1998) A best practice for high-rise insitu concrete construction based on French, German and UK contractor performance measures. PhD thesis, University of Wolverhampton, UK.

Proverbs, D G; Holt, G D and Olomolaiye, P O (1997) Factors influencing the choice of concrete supply methods. Building Research & Information, 25(3), pp. 176-184. ISSN 0961-3218

Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) Construction resource/method factors influencing productivity for high rise concrete construction. Construction Management and Economics, 17(5), pp. 577-587. ISSN 01446193

Qi, X; Du, Q; Zou, P X W and Huang, N (2024) Developing a weighted synergy network-based model for selecting prefabricated construction services. Engineering, Construction and Architectural Management, 31(6), pp. 2306-2326. ISSN 0969-9988

Qui, N T (2013) Automated schedule generation and analysis from a construction requirement perspective. PhD thesis, National University of Singapore, Singapore.

Raisbeck, P and Aibinu, A A (2010) Early stage cost estimation and the relationship of architects to quantity surveyors. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Ramaji, I J and Memari, A M (2016) Product architecture model for multistory modular buildings. Journal of Construction Engineering and Management, 142(10): 04016047, ISSN 0733-9364

Rauf, A; Shafiq, M T; Khalfan, M M A and Ulhaq, I (2024) Sustainable water management in construction: Life-cycle embodied water assessment of residential buildings. Built Environment Project and Asset Management, 14(5), pp. 682-696. ISSN 2044-124X

Reynolds, M F (1990) Facilities planning and construction internship. DEng thesis, Texas A&M University, USA.

Riverso, M E (1984) A life cycle cost system for value engineering in building design and construction (economic, cost-codes, database). PhD thesis, Purdue University, USA.

Robertson, C M (2018) Migrant worker perceptions of life, work, health and safety in Kuwait: A construction industry perspective. PhD thesis, Auckland University of Technology, New Zealand.

Robinson, P and McIlwaine, S (2020) Losing ground: Adapting construction management approaches to permafrost retreat. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Robson, A (2017) 'Cost as information' for construction supply chain improvements. PhD thesis, Birmingham City University, UK.

Rohani, M; Shafabakhsh, G; Haddad, A and Asnaashari, E (2018) Strategy management of construction workspaces by conflict resolution algorithm and visualization model. Engineering, Construction and Architectural Management, 25(8), pp. 1053-1074. ISSN 0969-9988

Ruhl, V R (1997) Computer-aided design and manufacturing of complex-shaped concrete formwork. DDes thesis, Harvard University, USA.

Russell, R C (2016) The development of a design and construction process protocol to support occupational therapists in delivering effective home modifications. PhD thesis, University of Salford, UK.

Rwamamara, R A (2007) Planning the healthy construction workplace through risk assessment and design methods. PhD thesis, Luleå University of Technology, Sweden.

Sahu, A and Shanmugapriya, S (2025) A practical approach of partial striking technique in high-rise buildings. Engineering, Construction and Architectural Management, 32(2), pp. 987-1009. ISSN 0969-9988

Sanders, S R and Thomas, H R (1991) Factors affecting masonry-lahok productivity. Journal of Construction Engineering and Management, 117(4), pp. 626-644. ISSN 0733-9364

Sanna, F (2018) Timber modern methods of construction: a comparative study. PhD thesis, Edinburgh Napier University, UK.

Sarisley, E F (1990) Construction methods and costs of stress-laminated timber bridges. Journal of Construction Engineering and Management, 116(3), pp. 432-447. ISSN 0733-9364

Scott, D and Krishnan, V (1983) Appropriate technology for Fiji. Construction Papers, 2(1), pp. 51-61. ISSN 0144-8587

Seo, J W and Choi, H H (2008) Risk-based safety impact assessment methodology for underground construction projects in Korea. Journal of Construction Engineering and Management, 134(1), pp. 72-81. ISSN 0733-9364

Shan, Y (2014) Integrated information modeling of construction project productivity. PhD thesis, University of Colorado at Boulder, USA.

Shararah, H H (1981) Evaluation of wall construction techniques based upon economical factors influencing labor and materials. PhD thesis, Oklahoma State University, USA.

Shen, L Y (1990) Application of risk management to the Chinese construction industry. PhD thesis, University of Reading, UK.

Shen, Y; Lin, Z and Wang, Z (2022) Single-side accumulative jacking construction method for large-span arched latticed shells. Journal of Construction Engineering and Management, 148(12): 06022001, ISSN 0733-9364

Shen, Y B and Luo, Y Z (2010) Accumulative sliding construction method for large-span latticed shells. Journal of Construction Engineering and Management, 136(10), pp. 1154-1157. ISSN 0733-9364

Sidwell, N C (1957) A critical examination of new constructional techniques and their influence on productivity in the building industry, with special reference to housing in south-east Scotland. PhD thesis, University of Edinburgh, UK.

Sihabuddin, S S and Ariaratnam, S T (2009) Methodology for estimating emissions in underground utility construction operations. Journal of Engineering, Design and Technology, 7(1), pp. 37-64. ISSN 1726-0531

Silva, Alcides Belfort da (2023) Proposal for sustainable civil construction in the city of Ribeirão Preto/SP from the perspective of environmental preservation. PhD thesis, Universidade de Ribeirão Preto, Brazil.

Simukonda, W T (2024) Modelling offsite construction to control hazards and direct cost of accidents. PhD thesis, Nelson Mandela University, South Africa.

Sing, M; Chan, J; Liu, H and Ngai, N N H (2023) Developing an analytic hierarchy process-based decision model for modular construction in urban areas. Journal of Engineering, Design and Technology, 21(4), pp. 1212-1229. ISSN 1726-0531

Sirajuddin, A M Y (1991) An automated project planner. PhD thesis, University of Nottingham, UK.

Skibniewski, M J and Kassouf, P J (1990) Potential for application of plastic liner plates in tunnelling works. Construction Management and Economics, 8(1), pp. 3-11. ISSN 01446193

Smailes, R L (2000) Building chan chan: The application of construction project management to the analysis of ancient architecture. PhD thesis, University of Florida, USA.

Smith, N J (1986) The study of criticality: An investigation based on network theory into the relationship between time and cost in civil engineering bridgeworks contracts and the measurement of the effects of change. PhD thesis, University of Manchester Institute of Science and Technology, UK.

Song, J; Fagerlund, W R; Haas, C T; Tatum, C B and Vanegas, J A (2005) Considering prework on industrial projects. Journal of Construction Engineering and Management, 131(6), pp. 723-733. ISSN 0733-9364

Song, Y (2007) Intermediate function analysis for improving constructability. PhD thesis, National University of Singapore, Singapore.

Song, Y and Chua, D K H (2007) Temporal logic representation schema for intermediate function. Journal of Construction Engineering and Management, 133(4), pp. 277-286. ISSN 0733-9364

Sousa, R L (2010) Risk analysis for tunneling projects. PhD thesis, Massachusetts Institute of Technology, USA.

Stella, C; Ceppi, G and D’Appolonia, E (1990) Temporary tunnel support using jet-grouted cylinders. Journal of Construction Engineering and Management, 116(1), pp. 35-53. ISSN 0733-9364

Stewart, W S and Tatum, C B (1988) Segmental placement of Renton outfall: Construction innovation. Journal of Construction Engineering and Management, 114(3), pp. 390-407. ISSN 0733-9364

Suprun, Emiliya (2018) An integrated systems model of construction innovation in the Russian federation. PhD thesis, Griffith University, Russia.

Sutton, R M (2019) The development of a sustainable construction design process. PhD thesis, University of Liverpool, UK.

Swiggum, K E; Anderson, S D and Russell, J S (1994) Case study of burlington cable-stayed bridge. Journal of Construction Engineering and Management, 120(3), pp. 649-666. ISSN 0733-9364

Syal, M G (1992) Construction process knowledge model to assist method selection in project planning. PhD thesis, Pennsylvania State University, USA.

Tam, V W Y; Tam, C M and Ng, W C Y (2007) On prefabrication implementation for different project types and procurement methods in Hong Kong. Journal of Engineering, Design and Technology, 5(1), pp. 68-80. ISSN 1726-0531

Tan, A H (2015) While stands the colosseum: A ground-up exploration of ancient Roman construction techniques using virtual reality. PhD thesis, Ohio State University, USA.

Tang, S (2025) Natural language processing (NLP)-based framework for construction quantity take off from building information models. PhD thesis, Western Michigan University, USA.

Tatum, C B (1987) Improving constructibility during conceptual planning. Journal of Construction Engineering and Management, 113(2), pp. 191-207. ISSN 0733-9364

Tatum, C B (1987) Process or innovation in construction firm. Journal of Construction Engineering and Management, 113(4), pp. 648-663. ISSN 0733-9364

Tatum, C B (2005) Building better: Technical support for construction. Journal of Construction Engineering and Management, 131(1), pp. 23-32. ISSN 0733-9364

Tatum, C B (2018) Construction engineering research: Integration and innovation. Journal of Construction Engineering and Management, 144(3): 04018005, ISSN 0733-9364

Tatum, C B; Bauer, M F and Meade, A W (1989) Process of innovation for up/down construction at Rowes Wharf. Journal of Construction Engineering and Management, 115(2), pp. 179-195. ISSN 0733-9364

Taylor, J; Salmela, A; Täubel, M; Heimlander, A; Karvonen, A M; Pakkala, T; Lahdensivu, J and Pekkanen, J (2023) Risk factors for moisture damage presence and severity in Finnish homes. Buildings & Cities, 4(1), pp. 708-726. ISSN 2632-6655

Thomas, H R (2002) 2000 Peurifoy lecture: Construction practices in developing countries. Journal of Construction Engineering and Management, 128(1), pp. 1-7. ISSN 0733-9364

Tommelein, I D; Carr, R I and Odeh, A M (1994) Assembly of simulation networks using designs, plans, and methods. Journal of Construction Engineering and Management, 120(4), pp. 796-815. ISSN 0733-9364

Touran, A and Asai, T (1987) Simulation of tunneling operations. Journal of Construction Engineering and Management, 113(4), pp. 554-568. ISSN 0733-9364

Trigunarsyah, Bambang (2001) Implementing constructability improvement into the Indonesian construction industry. PhD thesis, University of Melbourne, Australia.

Tuholski, S J; Gursel, A P; Tommelein, I D and Bomba, G (2009) Lean comparison using process charts of complex seismic retrofit projects. Journal of Construction Engineering and Management, 135(4), pp. 330-339. ISSN 0733-9364

Ugwu, O O; Tah, J and Howes, R (1998) Optimizing construction method selection strategies in an integrated decision support environment: Results of application to earthworks operations. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Vaidya, R (1981) The role of the construction industry in economic development: The case of Nepal. PhD thesis, Cornell University, USA.

Vanegas, J A; Bravo, E B and Halpin, D W (1993) Simulation technologies for planning heavy construction processes. Journal of Construction Engineering and Management, 119(2), pp. 336-354. ISSN 0733-9364

Vanegas Pabon, J A (1988) A model for design/construction integration during the initial phases of design for building construction projects. PhD thesis, Stanford University, USA.

Vigneshwar, R V K and Shanmugapriya, S (2023) Investigating the factors affecting construction site productivity: a case of India. Engineering, Construction and Architectural Management, 30(2), pp. 963-985. ISSN 0969-9988

Walker D.H.T, S Y J (2002) Project understanding, planning, flexibility of management action and construction time performance: Two Australian case studies. Construction Management and Economics, 20(1), pp. 31-44. ISSN 01446193

Wang, H; Yi, W; Zhen, L; Song, Y and Wu, P (2025) Designing optimal government-contractor subsidy policy for promoting modular construction: Bilevel stochastic program. Journal of Construction Engineering and Management, 151(10): 04025136, ISSN 0733-9364

Wang, M; Altaf, M S; Al-Hussein, M and Ma, Y (2020) Framework for an IoT-based shop floor material management system for panelized homebuilding. International Journal of Construction Management, 20(2), pp. 130-145. ISSN 1562-3599

Wang, R D; Zayed, T; Eltoukhy, A E E and Wu, H (2024) Integrated planning approach for optimizing tower crane and truck locations in modular integrated construction. Journal of Construction Engineering and Management, 150(9): 04024121, ISSN 0733-9364

Wang, Y; Zhu, S and Wong, A S T (2014) Cooling time estimation of newly placed hot-mix asphalt pavement in different weather conditions. Journal of Construction Engineering and Management, 140(5): 04014009, ISSN 0733-9364

Warszawski, A (1984) Construction management program. Journal of Construction Engineering and Management, 110(3), pp. 297-310. ISSN 0733-9364

Weidman, J; Dickerson, D E and Koebel, C T (2015) Intervention to improve purchasing decision-maker perceptions of ventilated tools. Journal of Construction Engineering and Management, 141(6): 04015007, ISSN 0733-9364

Weidman, J; Dickerson, D E and Koebel, C T (2016) Effective intervention strategy to improve worker readiness to adopt ventilated tools. Journal of Construction Engineering and Management, 142(8): 4016028, ISSN 0733-9364

Weidman, J E; Dickerson, D E and Koebel, C T (2016) Technology champions: A theory-based intervention to improve adoption of occupational safety innovations. International Journal of Construction Education and Research, 12(3), pp. 193-207. ISSN 1557-8771

Wibowo, M A (2004) Modelling labour intensive construction and its effect on a developing economy. PhD thesis, University of Nottingham, UK.

Williams, J M (1991) Interfaces: Integrating product design and process engineering in manufacturing and construction. PhD thesis, Stanford University, USA.

Woodroffe, N J A and Ariaratnam, S T (2009) Contractor perspective on factors for evaluating installation options for small-diameter utilities. Journal of Construction Engineering and Management, 135(2), pp. 75-87. ISSN 0733-9364

Wright, C E (1980) The energy requirements of residential developments. PhD thesis, University of Surrey, UK.

Wu, D; Chan, E H W and Shen, L (2004) Scoring system for measuring contractor's environmental performance. Journal of Construction Research, 5(1), pp. 139-147. ISSN 1609-9451

Wu, R (2002) Computer -aided dimensional control in building construction. PhD thesis, Eindhoven University of Technology, Netherlands.

Wu, W; Wen, C; Yuan, Q; Chen, Q and Cao, Y (2025) Construction and application of knowledge graph for construction accidents based on deep learning. Engineering, Construction and Architectural Management, 32(2), pp. 1097-1121. ISSN 0969-9988

Wuni, I Y and Mazher, K M (2024) Ending the suitability quantification dilemma: Intelligent decision support system for modular integrated construction in a high-density metropolis. Construction Innovation, 24(4), pp. 1026-1047. ISSN 1471-4175

Wuni, I Y and Shen, G Q (2022) Towards a decision support for modular integrated construction: An integrative review of the primary decision-making actors. International Journal of Construction Management, 22(5), pp. 929-948. ISSN 1562-3599

Wuni, I Y; Shen, G Q and Osei-Kyei, R (2020) Evaluating the critical success criteria for prefabricated prefinished volumetric construction projects. Journal of Financial Management of Property and Construction, 26(2), pp. 279-297. ISSN 1366-4387

Xia, B and Chan, A P C (2012) Measuring complexity for building projects: A Delphi study. Engineering, Construction and Architectural Management, 19(1), pp. 7-24. ISSN 0969-9988

Xie, W; Zhao, T; Tang, J and Zhang, Y (2017) Arch first and beam later: Arch-rib integral installation construction technology for large-span tied-arch bridge. Journal of Construction Engineering and Management, 143(8): 04017059, ISSN 0733-9364

Yang, F (2022) Ascending the pagoda: A ground-up exploration of the ancient construction methods of dayanta using virtual reality. PhD thesis, Ohio State University, USA.

Yang, S; Zhang, J; Xu, S; Deng, T; He, Q and Wang, P (2025) Work section planning for accompanying construction of extra-long tunnel and ballastless track of mountainous high-speed railways. Journal of Construction Engineering and Management, 151(9): 04025126, ISSN 0733-9364

Yao, Y and Gurmu, A (2025) Consumer education strategies for overcoming prefabricated housing challenges in China: A systematic review. Built Environment Project and Asset Management, 15(3), pp. 717-732. ISSN 2044-124X

Yeoh, J K W and Chua, D K H (2017) Optimizing crane selection and location for multistage construction using a four-dimensional set cover approach. Journal of Construction Engineering and Management, 143(8): 04017029, ISSN 0733-9364

Yi, W; Wang, H; Zhen, L and Liu, Y (2023) Automated generation of horizontal precast slab stacking plans. Journal of Construction Engineering and Management, 149(12): 04023121, ISSN 0733-9364

Yin, X (2018) Development of straw bale building in northern China. PhD thesis, University of Bath, UK.

Young-Corbett, D E (2014) Prevention through design: Health hazards in asphalt roofing. Journal of Construction Engineering and Management, 140(9): 06014007, ISSN 0733-9364

Yunus, Riduan (2012) Decision making guidelines for sustainable construction of industrialised building systems. PhD thesis, Queensland University of Technology, Australia.

Zayed, T M (2005) Productivity and cost assessment for continuous flight auger piles. Journal of Construction Engineering and Management, 131(6), pp. 677-688. ISSN 0733-9364

Zayed, T M and Halpin, D W (2005) Deterministic models for assessing productivity and cost of bored piles. Construction Management and Economics, 23(5), pp. 531-543. ISSN 01446193

Zhang, S; Zhong, B; Wu, H; Tang, B and Sepasgozar, S M E (2026) Impact of industry 4.0 digital technologies on optimal construction strategies: Owner preference perspective on construction service perception and unreliability costs. Journal of Construction Engineering and Management, 152(1): 04025222, ISSN 0733-9364

Zhang, H and Li, H (2010) Multi-objective particle swarm optimization for construction time-cost tradeoff problems. Construction Management and Economics, 28(1), pp. 75-88. ISSN 1466433X

Zhang, J and El-Diraby, T E (2006) Constructability analysis of the bridge superstructure rotation construction method in China. Journal of Construction Engineering and Management, 132(4), pp. 353-362. ISSN 0733-9364

Zhang, L (2022) Risk management framework to guide off-site manufacturing process: a Chinese perspective. PhD thesis, University of Strathclyde, UK.

Zhang, S; Liu, C; Feng, K; Xia, C; Wang, Y and Wang, Q (2025) Computer vision-based real-time monitoring for swivel construction of bridges: From laboratory study to a pilot application. Engineering, Construction and Architectural Management, 32(6), pp. 3630-3658. ISSN 0969-9988

Zhang, W (2021) Construction productivity improvement through industrialized construction methods. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Zhang, X; Li, Y and Wu, D (2020) Developing an underground utility occupation index for efficient urban utilities planning. Journal of Construction Engineering and Management, 146(5): 04020036, ISSN 0733-9364

Zhang, X; Wang, M; Zhou, B and Wang, X (2018) Influence of factors on collapse risk of loess tunnel: A multi-index assessment model. Journal of Engineering, Design and Technology, 16(5), pp. 734-749. ISSN 1726-0531

Zhang, Y (2009) Research on hydraulic engineering construction management decision support system based on network analysis method (in Chinese). PhD thesis, Beijing University of Aeronautics and Astronautics, China.

Zhang, Z J; Li, M G; Chen, J J; Wang, J H and Zeng, F Y (2017) Innovative construction method for oversized excavations with bipartition walls. Journal of Construction Engineering and Management, 143(8): 04017056, ISSN 0733-9364

Zhou, M; Liu, Y; Wang, K and Fahmi Hassanein, M (2020) New asynchronous-pouring rapid-construction method for long-span prestressed concrete box girder bridges with corrugated steel webs. Journal of Construction Engineering and Management, 146(2): 05019021, ISSN 0733-9364

Zouein, P P and Tommelein, I D (2001) Improvement algorithm for limited space scheduling. Journal of Construction Engineering and Management, 127(2), pp. 116-124. ISSN 0733-9364

da Rocha, C G and Kemmer, S (2018) Integrating product and process design in construction. Construction Management and Economics, 36(9), pp. 535-543. ISSN 01446193

This list was generated on Sat Aug 22 02:08:09 2026 UTC.