Items with Index Term: construction labour
Abedmousa, M (2023) Reframing construction labour productivity in a colonisation context: the West Bank as an example. PhD thesis, University of Westminster, UK.
Abu-Hijleh, S F (1991) A model for variance-based exception reporting with user-defined criteria. PhD thesis, University of California, Berkeley, USA.
Abu-Hijleh, S F and Ibbs, C W (1993) Systematic automated management exception reporting. Journal of Construction Engineering and Management, 119(1), pp. 87-104. ISSN 0733-9364
Adams, B J (1977) A study of the feasibility of using forecasting models to characterize the supply of contract construction labor. PhD thesis, Texas A&M University, USA.
Adebowale, O J and Agumba, J N (2023) A meta-analysis of factors affecting construction labour productivity in the middle East. Journal of Construction in Developing Countries, 28(1), pp. 193-220. ISSN 1823-6499
Adebowale, O J and Agumba, J N (2025) Construction SMEs labour productivity: Causal layered analysis. Journal of Engineering, Design and Technology, 23(2), pp. 501-524. ISSN 1726-0531
Agapiou, A (1996) Forecasting the supply of construction labour. PhD thesis, Loughborough University, UK.
Ahmad, S B S; Mazhar, M U; Bruland, A; Andersen, B S; Langlo, J A and Torp, O (2020) Labour productivity statistics: A reality check for the Norwegian construction industry. International Journal of Construction Management, 20(1), pp. 39-52. ISSN 1562-3599
Ahmad, S B S; Mazhar, M U; Laedre, O; Bruland, A and Torp, O (2022) Improvement measures to achieve sustainable construction labour performance. International Journal of Construction Management, 22(1), pp. 85-102. ISSN 1562-3599
Ahmadi Esfahani, N and Shahandashti, M (2020) Post-hazard labor wage fluctuations: A comparative empirical analysis among different sub-sectors of the U.S. Construction sector. Journal of Financial Management of Property and Construction, 25(3), pp. 313-330. ISSN 1366-4387
Al Jassmi, H; Al Ahmad, M and Ahmed, S (2021) Automatic recognition of labor activity: A machine learning approach to capture activity physiological patterns using wearable sensors. Construction Innovation, 21(4), pp. 555-575. ISSN 1471-4175
Al-Refaie, A; Alashwal, A; Abdul-Samad, Z; Salleh, H and Elshafie, A (2023) Evaluation of weather-productivity models of construction labour for tropics. Built Environment Project and Asset Management, 13(2), pp. 238-252. ISSN 2044-124X
Alaghbari, W; Al-Sakkaf, A A and Sultan, B (2019) Factors affecting construction labour productivity in Yemen. International Journal of Construction Management, 19(1), pp. 79-91. ISSN 1562-3599
Albattah, M A (2016) A critical analysis of the structural changes related to craft demographics influencing craft supply and demand in the United States across multiple dimensions. PhD thesis, University of Colorado at Boulder, USA.
Alipouri, Y; Bokharaeian, A and Monfared, E (2025) Construction labor activity recognition via an imu-implemented wristband. Journal of Construction Engineering and Management, 151(11): 04025182, ISSN 0733-9364
Allmon, E; Haas, C T; Borcherding, J D and Goodrum, P M (2000) U.S. Construction labor productivity trends, 1970-1998. Journal of Construction Engineering and Management, 126(2), pp. 97-104. ISSN 0733-9364
Alvi, M I A (1990) The low-income housing production process in Lahore, Pakistan. PhD thesis, City of Birmingham Polytechnic, UK.
An, T and Watanabe, T (2011) Towards the sustainable improvement in construction labour's employment in China: Cultivating subcontractor's role. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Annor, John (2025) Building pathways to the future: Leveraging collaborative instruction platforms to address global and regional challenges in construction workforce education. PhD thesis, University of Wyoming, USA.
Anumba, C (2006) Application of GIS to labour market planning in construction. EngD thesis, Loughborough University, UK.
Anumba, C; Dainty, A R J; Ison, S G and Sergeant, A (2005) The application of GIS to construction labour market planning. Construction Innovation, 5(4), pp. 219-230. ISSN 1471-4175
Aramvareekul, P (2003) An analysis of labor productivity in the United States construction industry. PhD thesis, State University of New York at Buffalo, USA.
Assaad, R A (1991) Structured labor markets: The case of the construction sector in Egypt. PhD thesis, Cornell University, USA.
Assaad, R H; El-Adaway, I H; Hastak, M and Lascola Needy, K (2023) Key factors affecting labor productivity in offsite construction projects. Journal of Construction Engineering and Management, 149(1): 04022158, ISSN 0733-9364
Ayodele, O A; Chang-Richards, Y and González, V A (2022) A framework for addressing construction labour turnover in New Zealand. Engineering, Construction and Architectural Management, 29(2), pp. 601-618. ISSN 0969-9988
Briscoe, G (1982) Recent trends in the construction occupations. Construction Papers, 1(3), pp. 55-63. ISSN 0144-8587
Briscoe, G (2005) Women and minority groups in UK construction: Recent trends. Construction Management and Economics, 23(10), pp. 1001-1005. ISSN 01446193
Briscoe, G (2008) Studies of the UK labour market with special reference to the construction sector. PhD thesis, Coventry University, UK.
Burgoon, J M (2020) Exploring the equity climate of construction education in the land grant system: A mixed methods study. PhD thesis, Colorado State University, USA.
Chan, A P C; Nwaogu, J M and Naslund, J A (2020) Mental ill-health risk factors in the construction industry: Systematic review. Journal of Construction Engineering and Management, 146(3): 04020004, ISSN 0733-9364
Chan, A P C; Wong, J M W and Chiang, Y H (2003) Modelling labour demand at project level: An empirical study in Hong Kong. Journal of Engineering, Design and Technology, 1(2), pp. 135-150. ISSN 1726-0531
Chan, P (2002) Factors affecting labour productivity in the construction industry. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Chan, P and Kaka, A (2003) A blue-collar insight into improving construction labour productivity. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Chan, P and Kaka, A (2004) Construction productivity measurement: A comparison of two case studies. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Chan, P W (2005) An interpretivistic approach to understand the factors that affect construction labour productivity. PhD thesis, Heriot-Watt University, UK.
Chan, P W (2013) A 'zombie' existence: Exploring Ulrich Beck's zombie categories and construction management research. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Chan, P W and McCabe, S (2010) Emerging disparities: Exploring the impacts of the financial crisis on the UK construction labour market. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Chan, T K (2011) Comparison of precast construction costs: Case studies in Australia and Malaysia. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Chang, C K; Hanna, A S; Lackney, J A and Sullivan, K T (2007) Quantifying the impact of schedule compression on labor productivity for mechanical and sheet metal contractor. Journal of Construction Engineering and Management, 133(4), pp. 287-296. ISSN 0733-9364
Chang, C K and Sullivan, K T (2006) Workload ratio as an indicator of schedule acceleration and its relationship with labour efficiency. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Chang, C-K (2004) Quantifying the impact of schedule compression on construction labor productivity. PhD thesis, University of Wisconsin - Madison, USA.
Chaparro, D A; Ying, F J; Rotimi, F E and Egbelakin, T (2020) Commute and labour productivity: Investigation of inner city construction sites. Journal of Engineering, Design and Technology, 18(5), pp. 1305-1319. ISSN 1726-0531
Chia, F C; Skitmore, M; Gray, J and Bridge, A (2018) International comparisons of nominal and real construction labour productivity. Engineering, Construction and Architectural Management, 25(7), pp. 896-915. ISSN 0969-9988
Chia, Fah Choy (2011) Economic fluctuations and productivity in the Malaysian construction sector. PhD thesis, Queensland University of Technology, Australia.
Chui, K W (2010) Comparison of construction labor productivity between U.S. and China: Using on-site productivity measurement methods. PhD thesis, University of Kansas, USA.
Clarke, L (2006) Valuing labour. Building Research & Information, 34(3), pp. 246-256. ISSN 0961-3218
Clarke, L and Gribling, M (2008) Obstacles to diversity in construction: The example of Heathrow Terminal 5. Construction Management and Economics, 26(10), pp. 1055-1065. ISSN 1466433X
Dadi, G B (2013) Applying cognitive principles to the delivery of engineering information by different mediums. PhD thesis, University of Kentucky, USA.
Dai, J (2006) A latent analysis and prototype system to manage jobsite factors impacting construction labor productivity. PhD thesis, University of Kentucky, USA.
Dai, J; Goodrum, P M and Maloney, W F (2007) Analysis of craft workers' and foremen's perceptions of the factors affecting construction labour productivity. Construction Management and Economics, 25(11), pp. 1139-1152. ISSN 01446193
Dai, J; Goodrum, P M; Maloney, W F and Srinivasan, C (2009) Latent structures of the factors affecting construction labor productivity. Journal of Construction Engineering and Management, 135(5), pp. 397-406. ISSN 0733-9364
Dainty, A R J; Ison, S G and Briscoe, G H (2005) The construction labour market skills crisis: The perspective of small-medium-sized firms. Construction Management and Economics, 23(4), pp. 387-398. ISSN 01446193
Duncan, K; Case, A and Manzo IV, F (2024) Prevailing wages, school construction costs, and bids by out-of-state contractors: evidence from the Minneapolis–Saint Paul metropolitan area. Construction Management and Economics, 42(8), pp. 695-713. ISSN 01446193
Dyer, B D (2010) Construction industry productivity: Examining the effects of omitted variable bias in the census construction price index models. PhD thesis, University of Kentucky, USA.
Ejohwomu, O A; Proverbs, D G and Olomolaiye, P (2005) A conceptual demand led model founded on theories of labour market mismatch for the construction and building services industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
El-Gohary, K M; Aziz, R F and Abdel-Khalek, H A (2017) Engineering approach using ANN to improve and predict construction labor productivity under different influences. Journal of Construction Engineering and Management, 143(8): 04017045, ISSN 0733-9364
Elbashbishy, T and El-Adaway, I H (2023) System dynamic modeling to study the impact of construction industry characteristics and associated macroeconomic indicators on workforce size and labor retention rate. Journal of Construction Engineering and Management, 149(10): 04023100, ISSN 0733-9364
Farooghi, F (2020) The effect of natural disasters on construction labor wage fluctuations: A spatial difference-in-difference analysis. PhD thesis, University of Texas at Arlington, USA.
Firman, Tommy (1988) Labor flows and the construction industry: The case of housing development in Bandung, Indonesia. PhD thesis, University of Hawaii at Manoa, USA.
Gelisen, G (2010) Automated productivity based schedule animation (APBSA). PhD thesis, Polytechnic Institute of New York University, USA.
Gelisen, G and Griffis, F H (2014) Automated productivity-based schedule animation: Simulation-based approach to time-cost trade-off analysis. Journal of Construction Engineering and Management, 140(4): B4013007, ISSN 0733-9364
Georgy, M E; Chang, L M and Zhang, L (2005) Prediction of engineering performance: A neurofuzzy approach. Journal of Construction Engineering and Management, 131(5), pp. 548-557. ISSN 0733-9364
Gerami Seresht, N and Fayek, A R (2018) Dynamic modeling of multifactor construction productivity for equipment-intensive activities. Journal of Construction Engineering and Management, 144(9): 04018091, ISSN 0733-9364
Goodarzizad, P; Mohammadi Golafshani, E and Arashpour, M (2023) Predicting the construction labour productivity using artificial neural network and grasshopper optimisation algorithm. International Journal of Construction Management, 23(5), pp. 763-779. ISSN 1562-3599
Gouett, M C; Haas, C T; Goodrum, P M and Caldas, C H (2011) Activity analysis for direct-work rate improvement in construction. Journal of Construction Engineering and Management, 137(12), pp. 1117-1124. ISSN 0733-9364
Gurmu, A T (2026) Econometric analysis of macroeconomic factors influencing construction labour productivity at industry level: Evidence from Australia. Construction Management and Economics, 44(1), pp. 23-40. ISSN 0144-6193
Gurmu, A T and Ongkowijoyo, C S (2020) Predicting construction labor productivity based on implementation levels of human resource management practices. Journal of Construction Engineering and Management, 146(3): 04019115, ISSN 0733-9364
Hamza, M; Shahid, S; Bin Hainin, M R and Nashwan, M S (2022) Construction labour productivity: Review of factors identified. International Journal of Construction Management, 22(3), pp. 413-425. ISSN 1562-3599
Hanna, A S; Chang, C K; Sullivan, K T and Lackney, J A (2008) Impact of shift work on labor productivity for labor intensive contractor. Journal of Construction Engineering and Management, 134(3), pp. 197-204. ISSN 0733-9364
Hanna, A S; Russell, J S and Vandenberg, P J (1999) The impact of change orders on mechanical construction labour efficiency. Construction Management and Economics, 17(6), pp. 721-730. ISSN 01446193
Hanna, A S; Taylor, C S and Sullivan, K T (2005) Impact of extended overtime on construction labor productivity. Journal of Construction Engineering and Management, 131(6), pp. 734-739. ISSN 0733-9364
Hanus, V P (2025) Predicting critical management-controlled factors to increase productivity within the construction industry. DEngr thesis, George Washington University, USA.
Hayford, J K T; Eccles, T and Fong, D (2023) Development of conceptual motivation framework to enhance construction labour productivity in the UK. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Hazrati, A (2016) Predicting construction labor productivity with Bayesian belief networks. PhD thesis, University of Nebraska - Lincoln, USA.
Hinkel, M P (2022) Three essays on labor market regulation in the American construction industry. PhD thesis, Michigan State University, USA.
Hinze, J; Bren, D C and Piepho, N (1995) Experience modification rating as measure of safety performance. Journal of Construction Engineering and Management, 121(4), pp. 455-458. ISSN 0733-9364
Hiyassat, M A; Hiyari, M A and Sweis, G J (2016) Factors affecting construction labour productivity: A case study of Jordan. International Journal of Construction Management, 16(2), pp. 138-149. ISSN 1562-3599
Holborough, A M (2015) Ethnicity, education and the transition to the construction labour market: developing an equality framework using a capability approach. PhD thesis, University of Westminster, UK.
Horman, M J and Thomas, H R (2005) Role of inventory buffers in construction labor performance. Journal of Construction Engineering and Management, 131(7), pp. 834-843. ISSN 0733-9364
Hwang, B G; Krishnankutty, P; Zhu, L; Caldas, C H; Shounak, A and Mulva, S (2020) Improving labour productivity in process construction maintenance and shutdown/turnaround projects. International Journal of Construction Management, 20(7), pp. 822-836. ISSN 1562-3599
Jarkas, A M (2005) An investigation into the influence of buildability factors on productivity of in situ reinforced concrete construction. PhD thesis, University of Dundee, UK.
Jarkas, A M (2010) The influence of buildability factors on rebar fixing labour productivity of beams. Construction Management and Economics, 28(5), pp. 527-543. ISSN 1466433X
Jarkas, A M (2010) Buildability factors influencing formwork labour productivity of walls. International Journal of Construction Management, 10(4), pp. 101-117. ISSN 1562-3599
Jarkas, A M; Al Balushi, R A and Raveendranath, P K (2015) Determinants of construction labour productivity in Oman. International Journal of Construction Management, 15(4), pp. 332-344. ISSN 1562-3599
Jarkas, A M and Bitar, C G (2014) Factors affecting construction labor productivity in Kuwait. Journal of Construction Engineering and Management, 138(7), pp. 811-820. ISSN 0733-9364
Johari, S (2021) Effect of socioemotional cognitive, and technical competencies of workers on construction labor productivity. PhD thesis, Indian Institute of Technology Delhi, India.
Kar, S (2021) Developing a decision support system for effective material management in construction. PhD thesis, Indian Institute of Technology Delhi, India.
Karatas, I and Budak, A (2024) Development and comparative of a new meta-ensemble machine learning model in predicting construction labor productivity. Engineering, Construction and Architectural Management, 31(3), pp. 1123-1144. ISSN 0969-9988
Khalafallah, A and El-Rayes, K (2006) Minimizing construction-related hazards in airport expansion projects. Journal of Construction Engineering and Management, 132(6), pp. 562-572. ISSN 0733-9364
Killingsworth, J; Mehany, M H and Ladhari, H (2021) General contractors’ experience using off-site structural framing systems. Construction Innovation, 21(1), pp. 40-63. ISSN 1471-4175
Kim, S. and Liang, Y. (2026) Dissecting highway construction cost inflation: A two-decade analysis of inflation types using the national highway construction cost index. Journal of Construction Engineering and Management, 152(7): 04026087, ISSN 0733-9364
King-Lewis, A (2020) Diversity and inclusion of women in the construction industry. PhD thesis, Oklahoma State University, USA.
Kongchasing, N and Sua-iam, G (2022) The main issue working with migrant construction labor: A case study in Thailand. Engineering, Construction and Architectural Management, 29(4), pp. 1715-1730. ISSN 0969-9988
Kuipers, E J (1976) A method of forecasting the efficiency of construction labor in any climatological conditions. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kuo, Y. C. (2026) Interactive relationships among factors influencing skilled labor shortages in the construction industry. Engineering, Construction and Architectural Management, 33(3), pp. 2625-2648. ISSN 0969-9988
Laufer, A (1980) Assessment of financial incentive programs for the construction labor force: A Delphi analysis. PhD thesis, University of Texas at Austin, USA.
Lee, B; Lee, H S; Park, M and Kim, H (2015) Influence factors of learning-curve effect in high-rise building constructions. Journal of Construction Engineering and Management, 141(8): 04015019, ISSN 0733-9364
Lee, S (2007) Understanding and quantifying the impact of changes on construction labor productivity: Integration of productivity factors and quantification methods. PhD thesis, University of California, Berkeley, USA.
Lema, N M (1996) Construction labour productivity analysis and benchmarking: the case of Tanzania. PhD thesis, Loughborough University, UK.
Loganathan, S and Forsythe, P (2020) Unravelling the influence of teamwork on trade crew productivity: A review and a proposed framework. Construction Management and Economics, 38(11), pp. 1040-1060. ISSN 01446193
Loganathan, Santhosh (2023) A framework for analysing the influence of teamwork processes of onsite construction trade crews on productivity. PhD thesis, University of Technology Sydney, Australia.
Lu, M (2000) Productivity studies using advanced ANN models. PhD thesis, University of Alberta, Canada.
Luo, M; Fan, H Q and Liu, G (2020) Measuring regional differences of construction productive efficiency in China: A distance friction minimization approach. Engineering, Construction and Architectural Management, 27(4), pp. 952-974. ISSN 0969-9988
Ma, L and Liu, C (2014) Did the late-2000s financial crisis influence construction labour productivity? Construction Management and Economics, 32(10), pp. 1030-1047. ISSN 01446193
Ma, L and Liu, C (2018) Decomposition of temporal changes in construction labour productivity. International Journal of Construction Management, 18(1), pp. 65-77. ISSN 1562-3599
Ma, L; Liu, C and Mills, A (2016) Construction labor productivity convergence: A conditional frontier approach. Engineering, Construction and Architectural Management, 23(3), pp. 283-301. ISSN 0969-9988
Mani, N; Kisi, K P; Rojas, E M and Foster, E T (2017) Estimating construction labor productivity frontier: Pilot study. Journal of Construction Engineering and Management, 143(10): 04017077, ISSN 0733-9364
Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2023) A constructive system to assess the performance-based grading of construction labour through work-based training components and applications. Construction Economics and Building, 23(3-4), pp. 107-124. ISSN 2204-9029
Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, M M D R and Silva, R (2024) Assessing the competencies of construction supervisors in providing work-based training components for construction labour: Sri Lankan perspective. Journal of Engineering, Design and Technology, 22(5), pp. 1655-1681. ISSN 1726-0531
Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, M M D R and Silva, R (2024) Assessing the competencies of construction supervisors in providing work-based training components for construction labour – Sri Lankan perspective. Journal of Engineering, Design and Technology, 22(5), pp. 1655-1681. ISSN 1726-0531
McFillen, J M and Maloney, W F (1986) Human resource data in the construction industry. Journal of Construction Engineering and Management, 112(1), pp. 22-32. ISSN 0733-9364
Mewomo, M C (2022) Construction labour productivity in South Africa: Challenges and possible remedies. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Milner, Philip E (2025) A phenomenological study of lean labor method adoption in commercial construction projects. DBA thesis, California Southern University, USA.
Mohlasedi, K M and Nkado, R N (1997) The role of stakeholders in the delivery of affordable housing schemes in South Africa. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Momade, M H; Shahid, S; Falah, G; Syamsunur, D and Estrella, D (2023) Review of construction labor productivity factors from a geographical standpoint. International Journal of Construction Management, 23(4), pp. 697-707. ISSN 1562-3599
Momade, M H; Shahid, S; Hainin, M R B; Nashwan, M S and Tahir Umar, A (2022) Modelling labour productivity using SVM and rf: A comparative study on classifiers performance. International Journal of Construction Management, 22(10), pp. 1924-1934. ISSN 1562-3599
Moselhi, O and Khan, Z (2012) Significance ranking of parameters impacting construction labour productivity. Construction Innovation, 12(3), pp. 272-296. ISSN 1471-4175
Moyo, T (2020) Integrating sustainability dimensions into construction labour productivity determinants in Zimbabwe. PhD thesis, Nelson Mandela University, South Africa.
Moyo, T; Crafford, G and Emuze, F (2022) Significant decent work objectives for monitoring construction workers' productivity performance in Zimbabwe. Journal of Construction in Developing Countries, 27(1), pp. 95-110. ISSN 1823-6499
Nadi, E (2019) Construction labor productivity benchmarking: A comparison between on-site construction and prefabrication. PhD thesis, Marquette University, USA.
Neve, H H; Wandahl, S; Lindhard, S; Teizer, J and Lerche, J (2020) Determining the relationship between direct work and construction labor productivity in North America: Four decades of insights. Journal of Construction Engineering and Management, 146(9): 04020110, ISSN 0733-9364
Nguyen, L D and Nguyen, H T (2013) Relationship between building floor and construction labor productivity a case of structural work. Engineering, Construction and Architectural Management, 20(6), pp. 563-575. ISSN 0969-9988
O'Neill, T; Spillane, J P and Carmody, S (2022) The composition and classification of interpersonal conflict in Irish construction small and medium-sized enterprises: A case study. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Odesola, I A and Idoro, G I (2014) Influence of labour-related factors on construction labour productivity in the South-South geo-political zone of Nigeria. Journal of Construction in Developing Countries, 19(1), pp. 93-109. ISSN 1823-6499
Ofori, G and Debrah, Y A (1998) Flexible management of workers: Review of employment practices in the construction industry in Singapore. Construction Management and Economics, 16(4), pp. 397-408. ISSN 01446193
Oladimeji, O (2022) Influence of COVID-19 pandemic on local construction firms' viability. Journal of Engineering, Design and Technology, 20(1), pp. 201-221. ISSN 1726-0531
Ottesen, J (2019) CPM schedule density: A new predictor for productivity loss. PhD thesis, University of Washington, USA.
Parchami Jalal, M and Shoar, S (2019) A hybrid framework to model factors affecting construction labour productivity: Case study of Iran. Journal of Financial Management of Property and Construction, 24(3), pp. 630-654. ISSN 1366-4387
Price, M (2005) State prevailing wage laws and construction labor markets. PhD thesis, University of Utah, USA.
Radosavljević M, M W (2002) The evidence of complex variability in construction labour productivity. Construction Management and Economics, 20(1), pp. 3-12. ISSN 01446193
Ramsaran, R and Hosein, R (2006) Growth, employment and the construction industry in Trinidad and Tobago. Construction Management and Economics, 24(5), pp. 465-474. ISSN 1466433X
Rashidi, M H and Kashani, H (2023) Bayesian modeling of labor earnings in construction. Journal of Construction Engineering and Management, 149(2): 4022168, ISSN 0733-9364
Rojas, E M and Aramvareekul, P (2003) Is construction labor productivity really declining? Journal of Construction Engineering and Management, 129(1), pp. 41-46. ISSN 0733-9364
Rosenfeld, Y and Warszawski, A (1993) Forecasting methodology of national demand for construction labour. Construction Management and Economics, 11(1), pp. 18-29. ISSN 01446193
Sanboskani, H and Srour, I (2022) Using advanced statistical methods to identify the drivers of knowledge sharing intention among construction workers. Journal of Construction Engineering and Management, 148(2): 04021201, ISSN 0733-9364
Sandbhor, S and Botre, R (2014) Applying total interpretive structural modeling to study factors affecting construction labour productivity. Construction Economics and Building, 14(1), pp. 20-31. ISSN 2204-9029
Sarihi, M; Shahhosseini, V and Banki, M T (2023) Development and comparative analysis of the fuzzy inference system-based construction labor productivity models. International Journal of Construction Management, 23(3), pp. 423-433. ISSN 1562-3599
Sathvik, S; Krishnaraj, L and Awuzie, B O (2023) An assessment of prevalence of poor sleep quality among construction workers in southern India. Built Environment Project and Asset Management, 13(2), pp. 290-305. ISSN 2044-124X
Selvam, G; Madhavi, T C; Naazeema Begum, T P and Sudheesh, M (2020) Impact of labour productivity in estimating the duration of construction projects. International Journal of Construction Management, 22(12), pp. 2398-2404. ISSN 1562-3599
Shiha, A and El-Adaway, I H (2025) Localized multivariate statistical assessment of United States construction labor shortages. Journal of Construction Engineering and Management, 151(8): 04025097, ISSN 0733-9364
Shiha, A and El-adaway, I H (2025) Identifying early warning signs of construction labor shortages. Construction Management and Economics, 43(10), pp. 765-793. ISSN 0144-6193
Shiha, A and El-adaway, I H (2025) Forecasting state-level construction labor earnings for enhanced project cost control: An econometric and deep-learning analysis of the leading economic indicators. Journal of Construction Engineering and Management, 151(12): 04025198, ISSN 0733-9364
Sobotka, S P (1952) The influence of unions on wages and earnings of labor in the construction industry. PhD thesis, University of Chicago, USA.
Soliman, E; Al-Tabtabai, H; Almusalam, A and Hussein, M (2023) Impact of COVID-19 on labor's motivational factors and construction productivity. International Journal of Construction Management, 23(15), pp. 2699-2708. ISSN 1562-3599
Sonmez, R and Rowings, J E (1998) Construction labor productivity modeling with neural networks. Journal of Construction Engineering and Management, 124(6), pp. 498-504. ISSN 0733-9364
Srour, I M (2005) A linear programming approach to optimize strategic investment in the construction workforce. PhD thesis, University of Texas at Austin, USA.
Srour, I M; Haas, C T and Morton, D P (2006) Linear programming approach to optimize strategic investment in the construction workforce. Journal of Construction Engineering and Management, 132(11), pp. 1158-1166. ISSN 0733-9364
Sun, K (2020) Three essays on the construction labor market: Getting to work; safety at work; regulation work. PhD thesis, University of Utah, USA.
Talhouni, B T K (1990) Measurement and analysis of construction labour productivity. PhD thesis, University of Dundee, UK.
Talton, V (2023) Examining the relationship between culture and the construction labor shortage: An explanatory case study. DBA thesis, Northcentral University, USA.
Tarekegn Gurmu, A (2023) Preconstruction phase management practices enhancing labor productivity in multistory building projects. Journal of Construction Engineering and Management, 149(6): 04023032, ISSN 0733-9364
Tekin, H (2022) The impact of COVID-19 on construction labor productivity: The case of Turkey. Engineering, Construction and Architectural Management, 29(9), pp. 3775-3806. ISSN 0969-9988
Thomas, A V and Sudhakumar, J (2013) Critical analysis of the key factors affecting construction labour productivity: An Indian perspective. International Journal of Construction Management, 13(4), pp. 103-125. ISSN 1562-3599
Thomas, A V and Sudhakumar, J (2014) Modelling masonry labour productivity using multiple regression. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Thomas, H R (2000) Schedule acceleration, work flow, and labor productivity. Journal of Construction Engineering and Management, 126(4), pp. 261-267. ISSN 0733-9364
Thomas, H R; Maloney, W F; Horner, R M W; Smith, G R; Handa, V K and Sanders, S R (1990) Modeling construction labor productivity. Journal of Construction Engineering and Management, 116(4), pp. 705-726. ISSN 0733-9364
Thomas, H R and Završki, I (1999) Construction baseline productivity: Theory and practice. Journal of Construction Engineering and Management, 125(5), pp. 295-303. ISSN 0733-9364
Thomson, W (2015) China constructs: Architecture, labor, and value on a Chinese construction site. PhD thesis, New York University, USA.
Torres Calderon, W (2022) Video representation learning for vision-driven activity analysis in construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Tran, V and Tookey, J (2011) Labour productivity in the New Zealand construction industry: A thorough investigation. Construction Economics and Building, 11(1), pp. 41-60. ISSN 2204-9029
Tsehayae, A A and Fayek, A R (2016) System model for analysing construction labour productivity. Construction Innovation, 16(2), pp. 203-228. ISSN 1471-4175
Tsehayae, A A and Fayek, A R (2016) Developing and optimizing context-specific fuzzy inference system-based construction labor productivity models. Journal of Construction Engineering and Management, 142(7): 4016017, ISSN 0733-9364
Ugulu, R; Arewa, A and Stephen, A (2019) Relationship between labour productivity and curved wall construction in high-rise building projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
V Nithyapriyadharshini (2017) A study on the workplace issues faced by women labours in the construction industry in Chennai city. PhD thesis, Mother Teresa Womens University, India.
Van Tam, N (2025) Impact of self-efficacy on construction labor productivity: The mediating role of work motivation. Engineering, Construction and Architectural Management, 32(5), pp. 3407-3431. ISSN 0969-9988
Vereen, S C (2013) Forecasting skilled labor demand in the US construction industry. PhD thesis, North Carolina State University, USA.
Wandahl, S; Pérez, C T; Salling, S; Neve, H H; Lerche, J and Petersen, S (2021) The impact of construction labour productivity on the renovation wave. Construction Economics and Building, 21(3), pp. 11-32. ISSN 2204-9029
Wang, C H and Mei, Y H (1998) Model for forecasting construction cost indices in Taiwan. Construction Management and Economics, 16(2), pp. 147-157. ISSN 01446193
Wang, X; Wang, X and Huang, Y (2019) Chinese construction worker reluctance toward vocational skill training. Journal of Engineering, Design and Technology, 17(1), pp. 155-171. ISSN 1726-0531
Watkins, M; Mukherjee, A; Onder, N and Mattila, K (2009) Using agent-based modeling to study construction labor productivity as an emergent property of individual and crew interactions. Journal of Construction Engineering and Management, 135(7), pp. 657-667. ISSN 0733-9364
Wilmot, C G and Cheng, G (2003) Estimating future highway construction costs. Journal of Construction Engineering and Management, 129(3), pp. 272-279. ISSN 0733-9364
Wilmot, C G and Mei, B (2005) Neural network modeling of highway construction costs. Journal of Construction Engineering and Management, 131(7), pp. 765-771. ISSN 0733-9364
Wong, J M W; Chan, A P C and Chiang, Y H (2005) Time series forecasts of the construction labour market in Hong Kong: The Box-Jenkins approach. Construction Management and Economics, 23(9), pp. 979-991. ISSN 01446193
Wong, J M W; Chan, A P C and Chiang, Y H (2008) Modeling and forecasting construction labor demand: Multivariate analysis. Journal of Construction Engineering and Management, 134(9), pp. 664-672. ISSN 0733-9364
Wong, J M W; Chan, A P C and Chiang, Y H (2010) Modeling construction occupational demand: Case of Hong Kong. Journal of Construction Engineering and Management, 136(9), pp. 991-1002. ISSN 0733-9364
Wong, J M W; Chan, A P C and Chiangn, Y H (2006) The changing construction labour market: A case of Hong Kong. Journal of Engineering, Design and Technology, 4(1), pp. 1-17. ISSN 1726-0531
Wu, C; Chen, C; Jiang, R; Wu, P; Xu, B and Wang, J (2019) Understanding laborers' behavioral diversities in multinational construction projects using integrated simulation approach. Engineering, Construction and Architectural Management, 26(9), pp. 2120-2146. ISSN 0969-9988
Zhai, D; Goodrum, P M; Haas, C T and Caldas, C H (2009) Relationship between automation and integration of construction information systems and labor productivity. Journal of Construction Engineering and Management, 135(8), pp. 746-753. ISSN 0733-9364
Zhu, D (2002) The production characteristics in Hong Kong's construction industry. PhD thesis, University of Hong Kong, Hong Kong.
Çınar, S (2020) Construction labour, subcontracting and masculinity: "Construction is a man's job". Construction Management and Economics, 38(3), pp. 275-290. ISSN 01446193
Up a level