Items with Index Term: construction delay

Number of items: 115.

Abdul-Rahman, H; Yahya, I A; Berawi, M A and Wah, L W (2008) Conceptual delay mitigation model using a project learning approach in practice. Construction Management and Economics, 26(1), pp. 15-27. ISSN 1466433X

Abdulla, H S (2016) An investigation on the causes and remedial measures on the delays in the construction industry in the Kingdom of Bahrain. PhD thesis, Glasgow Caledonian University, UK.

Abu-Shabeen, N N (2008) Development of multi-criteria decision analysis models for bidding and contractor selection. PhD thesis, Edinburgh Napier University, UK.

Abubaker, A E; Greenwood, D and Osborne, A (2008) A study of project planning on Libyan construction projects. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Abujnah, M S (2010) Towards a risk management framework for Libyan house-building projects. PhD thesis, University of Salford, UK.

Adamtey, S (2021) Cost and time performance analysis of progressive design-build projects. Journal of Engineering, Design and Technology, 19(3), pp. 686-697. ISSN 1726-0531

Agyekum-Mensah, G and Knight, A D (2017) The professionals' perspective on the causes of project delay in the construction industry. Engineering, Construction and Architectural Management, 24(5), pp. 828-841. ISSN 0969-9988

Aibinu, A A and Odeyinka, H A (2006) Construction delays and their causative factors in Nigeria. Journal of Construction Engineering and Management, 132(7), pp. 667-677. ISSN 0733-9364

Akuhe, G; Tutesigensi, A and Kayondo, M (2023) Consequences of poor management of acculturation on large infrastructure projects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Al Dinah, M (2022) Coordination issues and unethical practices in comparison with other determinants of delays and cost overruns in the construction industry: how do the participants respond? PhD thesis, University of Portsmouth, UK.

Al Jashaami, Mohammed Ahmed Mohammed (2021) Improving delay management of construction projects by creating a systematic scoring scale to minimise/avoid delays. PhD thesis, Queensland University of Technology, Australia.

Al-Gahtani, K; Alsugair, A; Alsanabani, N; Alabduljabbar, A and Almutairi, B (2024) Forecasting delay-time model for Saudi construction projects using DEMATEL–sd technique. International Journal of Construction Management, 24(11), pp. 1225-1239. ISSN 1562-3599

Al-Gahtani, K S (2006) A comprehensive construction delay analysis technique: Enhanced with a float ownership concept. PhD thesis, State University of New York at Buffalo, USA.

Al-Gathafi, M M (2005) Riskness of time and cost overruns and the effectiveness of risk response measure strategies in the Libyan construction industry. PhD thesis, University of Liverpool, UK.

Al-Harthi, A S A (2016) Modelling the relationship between client activities and construction procurement performance in Oman. PhD thesis, Loughborough University, UK.

Alfeld, L E (1990) Construction delays: A simulation analysis. DSc thesis, Washington University in St. Louis, USA.

Alhabashi, M H (1991) Material management in the United States construction industry. DSc thesis, George Washington University, USA.

Alharbi, F (2020) Critical delay factors in housing construction projects in Saudi Arabia: Assessment and solutions. PhD thesis, Nottingham Trent University, UK.

Alkass, S; Mazerolle, M and Harris, F (1996) Construction delay analysis techniques. Construction Management and Economics, 14(5), pp. 375-394. ISSN 01446193

Alkass, S; Tribaldos, E; Mazerolle, M and Harris, F (1995) Computer aided construction delay analysis and claims preparation. Construction Management and Economics, 13(4), pp. 335-352. ISSN 01446193

Alkharmany, A (2017) Project management: The effect of saudi national culture on the attitudes of key stakeholders towards delay in construction projects in Saudi Arabia. PhD thesis, University of Brighton, UK.

Almalki, M (2024) Accelerated wastewater pipeline construction. PhD thesis, Syracuse University, USA.

Alshammari, S A R (2019) Developing a comprehensive construction delay analysis technique. PhD thesis, Brunel University, UK.

Amarkhil, Q; Elwakil, E; Hubbard, B and Byrd, V L (2023) A framework to standardize causes of construction delay. International Journal of Construction Management, 23(11), pp. 1791-1804. ISSN 1562-3599

Aoude, H S (1996) Computerized construction delay management system. PhD thesis, Polytechnic University (New York), USA.

Apipattanavis, S (2007) Stochastic nonparametric methods for multi-site weather generation and flood frequency estimation: Applications to construction delay, hydrology and agricultural modeling. PhD thesis, University of Colorado at Boulder, USA.

Apipattanavis, S; Sabol, K; Molenaar, K R; Rajagopalan, B; Xi, Y; Blackard, B and Patil, S (2010) Integrated framework for quantifying and predicting weather-related highway construction delays. Journal of Construction Engineering and Management, 136(11), pp. 1160-1168. ISSN 0733-9364

Arantes, A and Ferreira, L M D F (2020) Underlying causes and mitigation measures of delays in construction projects: An empirical study. Journal of Financial Management of Property and Construction, 25(2), pp. 165-181. ISSN 1366-4387

Arditi, D; Akan, G T and Gurdamar, S (1985) Reasons for delays in public projects in Turkey. Construction Management and Economics, 3(2), pp. 171-181. ISSN 01446193

Arora, J; Kar, S and Jha, K N (2023) Assessment of the significance of identified attributes affecting the rebar-fixing productivity using multiple regression. Journal of Construction Engineering and Management, 149(6): 04023039, ISSN 0733-9364

Asnaashari, E; Knight, A; Hurst, A and Farahani, S S (2009) Causes of construction delays in Iran: Project management, logistics, technology and environment. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Athanasopoulou, E (2008) Delays in construction projects using traditional contract forms: Causes and effects. PhD thesis, University College London, UK.

Bajjou, M S and Chafi, A (2020) Empirical study of schedule delay in Moroccan construction projects. International Journal of Construction Management, 20(7), pp. 783-800. ISSN 1562-3599

Ballesteros-Pérez, P; del Campo-Hitschfeld, M L; González-Naranjo, M A and González-Cruz, M C (2015) Climate and construction delays: Case study in Chile. Engineering, Construction and Architectural Management, 22(6), pp. 596-621. ISSN 0969-9988

Bayandor, S; Kalatehjari, R; Akherati, R and Kasebzadeh, J (2025) Causes, effects and solutions of delay and cost overruns in Iranian deep excavation projects. Built Environment Project and Asset Management, 15(2), pp. 309-336. ISSN 2044-124X

Birgonul, M T; Dikmen, I and Bektas, S (2015) Integrated approach to overcome shortcomings in current delay analysis practices. Journal of Construction Engineering and Management, 141(4): 04014088, ISSN 0733-9364

Braimah, N (2008) An investigation into the use of construction delay and disruption analysis methodologies. PhD thesis, University of Wolverhampton, UK.

Braimah, N and Ndekugri, I (2009) Consultants' perceptions on construction delay analysis methodologies. Journal of Construction Engineering and Management, 135(12), pp. 1279-1288. ISSN 0733-9364

Chaphalkar, N B (2007) Expert system for resolution of delay claims in construction contracts. PhD thesis, Indian Institute of Technology Delhi, India.

Chen, G X; Shan, M; Chan, A P C; Liu, X and Zhao, Y Q (2019) Investigating the causes of delay in grain bin construction projects: The case of China. International Journal of Construction Management, 19(1), pp. 1-14. ISSN 1562-3599

Chen, L (2019) An integrated construction schedule risk analysis approach for infrastructure projects under uncertainty. PhD thesis, University of Hong Kong, Hong Kong.

Das, D K and Emuze, F (2017) A dynamic model of contractor-induced delays in India. Journal of Construction in Developing Countries, 22(1), pp. 21-39. ISSN 1823-6499

Das, D K (2025) Mitigating construction delays in Indian real estate projects through effective organizational and project management. International Journal of Building Pathology and Adaptation, 43(6), pp. 1423-1438. ISSN 2398-4708

Delatte, N J (2017) Challenges of civil engineering megaprojects in North America. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(4), pp. 161-166. ISSN 17514304

Derakhshanfar, Hossein (2021) A delay risk management framework for construction projects: Learning from past experiences. PhD thesis, University of South Australia, Australia.

Do, S T; Nguyen, V T; Tran, C N N and Aung, Z M (2023) Identifying and evaluating the key claim causes leading to construction delays. International Journal of Construction Management, 23(12), pp. 1999-2011. ISSN 1562-3599

Egwim, C N; Alaka, H; Toriola-Coker, L O; Balogun, H; Ajayi, S and Oseghale, R (2023) Extraction of underlying factors causing construction projects delay in Nigeria. Journal of Engineering, Design and Technology, 21(5), pp. 1323-1342. ISSN 1726-0531

El-Rasas, T and Marzouk, M (2020) Fuzzy model for assessing delays in Egyptian residential projects. Journal of Financial Management of Property and Construction, 25(2), pp. 225-246. ISSN 1366-4387

Enshassi, A; Kumaraswamy, M and Jomah, A N (2010) Significant factors causing time and cost overruns in construction projects in the Gaza Strip: Contractors' perspective. International Journal of Construction Management, 10(1), pp. 35-60. ISSN 1562-3599

Fadiya, O O (2012) Development of an integrated decision analysis framework for selecting ICT-based logistics systems in the construction industry. PhD thesis, University of Wolverhampton, UK.

Fan, C; Binchao, D and Yin, Y (2023) Hierarchical structure and transfer mechanism to assess the scheduling-related risk in construction of prefabricated buildings: An integrated ISM–MICMAC approach. Engineering, Construction and Architectural Management, 30(7), pp. 2991-3013. ISSN 0969-9988

Faridi, A S and El-Sayegh, S M (2006) Significant factors causing delay in the UAE construction industry. Construction Management and Economics, 24(11), pp. 1167-1176. ISSN 1466433X

Farshchian, M M; Heravi, G and Abourizk, S (2017) Optimizing the owner's scenarios for budget allocation in a portfolio of projects using agent-based simulation. Journal of Construction Engineering and Management, 143(7): 04017022, ISSN 0733-9364

Fateh, M A M; Supian, A N and Goh, C S (2024) Managing emotional intelligence of construction players during COVID-19 in Malaysia. Journal of Construction in Developing Countries, 29(1), pp. 191-210. ISSN 1823-6499

Frimpong, Y and Oluwoye, J (2003) Significant factors causing delay and cost overruns in construction of groundwater projects in Ghana. Journal of Construction Research, 4(2), pp. 175-187. ISSN 1609-9451

Gunduz, M and Al-Naimi, N H (2022) Construction projects delay mitigation using integrated balanced scorecard and quality function deployment. Engineering, Construction and Architectural Management, 29(5), pp. 2073-2105. ISSN 0969-9988

Hegazy, T and Menesi, W (2008) Delay analysis under multiple baseline updates. Journal of Construction Engineering and Management, 134(8), pp. 575-582. ISSN 0733-9364

Henry Duncan John, M; Amoah, C and Ayesu-Koranteng, E (2022) Causes of road projects' delays: A case of blantyre, Malawi. Built Environment Project and Asset Management, 12(2), pp. 293-308. ISSN 2044-124X

Hoque, M I; Safayet, M A; Rana, M J; Bhuiyan, A Y and Quraishy, G S (2023) Analysis of construction delay for delivering quality project in Bangladesh. International Journal of Building Pathology and Adaptation, 41(2), pp. 401-421. ISSN 23984708

Hosny, F.; El-Damaty, M.; Mantha, B. R. K. and Abu Dabous, S. (2026) Analysis and modeling of delays during construction handover stage for building projects: A case study of United Arab Emirates. International Journal of Building Pathology and Adaptation, 44(3), pp. 658-684. ISSN 2398-4708

Hossain, M A; Raiymbekov, D; Nadeem, A and Kim, J R (2022) Delay causes in Kazakhstan's construction projects and remedial measures. International Journal of Construction Management, 22(5), pp. 801-819. ISSN 1562-3599

Hwang, B-G; Zhao, X and Tan, L L G (2015) Green building projects: Schedule performance, influential factors and solutions. Engineering, Construction and Architectural Management, 22(3), pp. 327-346. ISSN 0969-9988

Jung, Y J (2007) Subsurface utility engineering for highway projects: A study of utility impact rating and benefit-cost analysis. PhD thesis, Pennsylvania State University, USA.

Kadry, M; Osman, H and Georgy, M (2017) Causes of construction delays in countries with high geopolitical risks. Journal of Construction Engineering and Management, 143(2): 04016095, ISSN 0733-9364

Khajuria, A (1994) Quality assurance of concrete using a hybrid knowledge-based expert system. PhD thesis, Rutgers State University of New Jersey, School of Graduate Studies, USA.

Kim, Y; Kim, K and Shin, D (2005) Delay analysis method using delay section. Journal of Construction Engineering and Management, 131(11), pp. 1155-1164. ISSN 0733-9364

Kraiem, Z M and Diekmann, J E (1987) Concurrent delays in construction projects. Journal of Construction Engineering and Management, 113(4), pp. 591-602. ISSN 0733-9364

Krima, N (2009) Assessing the effectiveness of Libyan supervisors in dealing with construction delays. PhD thesis, University of Salford, UK.

Kumaraswamy, M M and Chan, D W M (1998) Contributors to construction delays. Construction Management and Economics, 16(1), pp. 17-29. ISSN 01446193

Laroza, F A R (2025) Investigating construction delays in cold storage projects in the Philippines. International Journal of Construction Management, 25(6), pp. 661-671. ISSN 1562-3599

Larsson, R (2021) Modelling and simulation of factors influencing on-site construction of concrete frameworks: Studying the effects of resource allocation, weather conditions, and climate-improved concrete. PhD thesis, Lund University, Sweden.

Lee, C (2023) Evaluating construction delays using productivity-based resource reallocation for economic feasibility. Engineering, Construction and Architectural Management, 30(4), pp. 1679-1696. ISSN 0969-9988

Lo, T Y; Fung, I W H and Tung, K C F (2006) Construction delays in Hong Kong civil engineering projects. Journal of Construction Engineering and Management, 132(6), pp. 636-649. ISSN 0733-9364

Maemura, Y; Kim, E and Ozawa, K (2018) Root causes of recurring contractual conflicts in international construction projects: Five case studies from Vietnam. Journal of Construction Engineering and Management, 144(8): 05018008, ISSN 0733-9364

Maslova, S and Burgess, G (2023) Delivering human-centred housing: Understanding the role of post-occupancy evaluation and customer feedback in traditional and innovative social housebuilding in England. Construction Management and Economics, 41(4), pp. 277-292. ISSN 01446193

Motaleb, O and Kishk, M (2010) An investigation into causes and effects of construction delays in UAE. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Motaleb, O H (2014) Development of a risk response model to handle delays of construction projects in the United Arab Emirates. PhD thesis, Robert Gordon University, UK.

Mpofu, B; Ochieng, E G; Moobela, C and Pretorius, A (2017) Profiling causative factors leading to construction project delays in the United Arab Emirates. Engineering, Construction and Architectural Management, 24(2), pp. 346-376. ISSN 0969-9988

Nafe Assafi, M; Hoque, M I and Hossain, M M (2024) Investigating the causes of construction delay on the perspective of organization-sectors involved in the construction industry of Bangladesh. International Journal of Building Pathology and Adaptation, 42(4), pp. 788-817. ISSN 23984708

Nafe Assafi, M; Hossain, M M; Chileshe, N and Datta, S D (2023) Development and validation of a framework for preventing and mitigating construction delay using 4D BIM platform in bangladeshi construction sector. Construction Innovation, 23(5), pp. 1255-1278. ISSN 1471-4175

Nee, T S; Xing, A C and Yong, L Y (2024) Assessing the post-disaster effects of COVID-19 pandemic towards Malaysian construction industry. Journal of Construction in Developing Countries, 29(2), pp. 59-75. ISSN 1823-6499

Nguyen, L d (2007) The dynamics of float, logic, resource allocation, and delay timing in forensic schedule analysis and construction delay claims. PhD thesis, University of California, Berkeley, USA.

Nguyen, T Q; Yeoh, J K W and Angelia, N (2023) Predicting percent plan complete through time series analysis. Journal of Construction Engineering and Management, 149(6): 04023038, ISSN 0733-9364

Odeyinka, H A and Yusif, A (1997) The causes and effects of construction delays on completion cost of housing projects in Nigeria. Journal of Financial Management of Property and Construction, 2(3), pp. 31-44. ISSN 1366-4387

Opoku, R A (2026) Antecedents of construction project time overrun in ghana's public sector: The moderating role of political connection. International Journal of Construction Management, 26(4), pp. 537-560. ISSN 1562-3599

Oyegoke, A S and Al Kiyumi, N (2017) The causes, impacts and mitigations of delay in megaprojects in the Sultanate of Oman. Journal of Financial Management of Property and Construction, 22(3), pp. 286-302. ISSN 1366-4387

Oztas, A (1995) The mitigation of the effects of delays in construction projects: A knowledge based system approach. PhD thesis, University of Manchester, UK.

Parchami, J M and Shoar, S (2017) A hybrid SD-DEMATEL approach to develop a delay model for construction projects. Engineering, Construction and Architectural Management, 24(4), pp. 629-651. ISSN 0969-9988

Peng, L.; Yang, H.; Ju, A.; Li, X. and Jiang, Z. (2026) Data-driven real-time digital twin framework for tunnel boring machine monitoring. Journal of Construction Engineering and Management, 152(9): 04026134, ISSN 0733-9364

Perera, B A K S; Wijewickrama, M K C S; Goonawardana, P J A and Jayalath, C (2021) Improving the efficacy of delay notification process of construction projects in Sri Lanka. International Journal of Construction Management, 21(7), pp. 755-768. ISSN 1562-3599

Popescu-Kohler, A I (1998) Improvements to construction delay analysis techniques. PhD thesis, University of Texas at Austin, USA.

Ramanathan, C; Narayanan, S P and Idrus, A B (2012) Construction delays causing risks on time and cost: a critical review. Construction Economics and Building, 12(1), pp. 37-57. ISSN 2204-9029

Rosenfeld, Y (2014) Root-cause analysis of construction-cost overruns. Journal of Construction Engineering and Management, 140(1): 04013039, ISSN 0733-9364

Sandhyavitri, A (2022) Stochastic analyses for managing risk of delay in duri oil construction projects, Indonesia. International Journal of Construction Management, 22(4), pp. 711-731. ISSN 1562-3599

Sanni-Anibire, M O; Mohamad Zin, R and Olatunji, S O (2022) Causes of delay in the global construction industry: A meta analytical review. International Journal of Construction Management, 22(8), pp. 1395-1407. ISSN 1562-3599

Scott, S (1993) The nature and effects of construction delays. Construction Management and Economics, 11(5), pp. 358-369. ISSN 01446193

Shahsavand, P; Marefat, A and Parchamijalal, M (2018) Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol. Engineering, Construction and Architectural Management, 25(4), pp. 497-533. ISSN 0969-9988

Shebob, A (2012) Development of a methodology for analysing and quantifying delay factors affecting construction projects in Libya. PhD thesis, Teesside University, UK.

Shebob, A; Dawood, N and Xu, Q (2011) Analysing construction delay factors: A case study of building construction project in Libya. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Shi, J J; Cheung, S O and Arditi, A (2001) Construction delay computation method. Journal of Construction Engineering and Management, 127(1), pp. 60-65. ISSN 0733-9364

Shirazi, D H and Toosi, H (2023) Deep multilayer perceptron neural network for the prediction of Iranian dam project delay risks. Journal of Construction Engineering and Management, 149(4): 04023011, ISSN 0733-9364

Tafazzoli, M (2017) Dynamic risk analysis of construction delays using fuzzy-failure mode effects analysis. PhD thesis, University of Nevada, Las Vegas, USA.

Tavakolan, M and Etemadinia, H (2017) Fuzzy weighted interpretive structural modeling: Improved method for identification of risk interactions in construction projects. Journal of Construction Engineering and Management, 143(11): 04017084, ISSN 0733-9364

Thadicaran, A B G (1997) Implementation strategies for water resources projects under uncertainties of completion time. PhD thesis, Colorado State University, USA.

Toor, S U R and Ogunlana, S (2008) Problems causing delays in major construction projects in Thailand. Construction Management and Economics, 26(4), pp. 395-408. ISSN 1466433X

Wang, H; Chen, X; Wang, J; Guan, W and Wei, S (2025) Multiobjective trade-off optimization of time, cost, quality, and carbon emission in the building construction stage. Journal of Construction Engineering and Management, 151(4): 04025009, ISSN 0733-9364

Wang, P; Fenn, P; Wang, K and Huang, Y (2022) A Bayesian belief network predictive model for construction delay avoidance in the UK. Engineering, Construction and Architectural Management, 29(5), pp. 2011-2026. ISSN 0969-9988

Wenzelberger, J P (1987) The economic analysis of tall buildings (Milwaukee, Wisconsin; Boston, Massachusetts; Kansas City, Missouri). DSc thesis, George Washington University, USA.

White, A (1985) The critical path method and construction contracts: A polemic. Construction Management and Economics, 3(1), pp. 15-24. ISSN 01446193

Wiguna, I P A (2005) The influence of risk on project performance in Indonesian building contracts. PhD thesis, University of Newcastle upon Tyne, UK.

Yap, J B H and Skitmore, M (2018) Investigating design changes in Malaysian building projects. Architectural Engineering and Design Management, 14(3), pp. 218-238. ISSN 1745-2007

Zeng, N; Liu, Y and König, M (2023) 4D BIM-enabled look-ahead scheduling for early warning of off-site supply chain disruptions. Journal of Construction Engineering and Management, 149(1): 04022154, ISSN 0733-9364

Zhang, Z.; Wang, Y.; Liu, J.; Wang, Y.; Liu, C. and Geng, X. (2026) Transport risk assessment for China's prefabricated construction supply chain: Integrating game theory and fuzzy Bayesian network. Engineering, Construction and Architectural Management, pp. 1-24. ISSN 0969-9988

ng, S T; Skitmore, M; Deng, M Z M and Nadeem, A (2004) Improving existing delay analysis techniques for the establishment of delay liabilities. Construction Innovation, 4(1), pp. 3-17. ISSN 1471-4175

Špačková, O (2012) Risk management of tunnel construction projects. PhD thesis, Czech Technical University, Czech Republic.

This list was generated on Sat Aug 22 02:12:37 2026 UTC.