Items with Index Term: construction cost

Number of items: 650.

Abd El-Razek, M E and Basha, I M (2001) Constructability improvement of bridges using stepping formwork. Journal of Construction Engineering and Management, 127(3), pp. 206-213. ISSN 0733-9364

Abdelmohsen, A Z (2016) Optimizing the construction planning of highway work zones. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Abdelmohsen, A Z and El-Rayes, K (2016) Optimal trade-offs between construction cost and traffic delay for highway work zones. Journal of Construction Engineering and Management, 142(7): 5016004, ISSN 0733-9364

Abdenour, J I (2021) A cost estimation model for improving the budget estimates of industrial plant construction projects. DEng thesis, George Washington University, USA.

Abdou, A; Lewis, J and Alzarooni, S (2004) Modelling risk for construction cost estimating and forecasting: A review. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Abolkhair, K (2022) Cost certainty and timing of cost certainty in the construction projects of public universities. PhD thesis, University of Florida, USA.

Aboseif, E and Hanna, A S (2024) Benchmarking of construction projects performance for comparative assessment and performance improvement: A statistical quantitative approach. Engineering, Construction and Architectural Management, 31(7), pp. 2829-2851. ISSN 0969-9988

Abu-Mahfouz, E; Al-Dahidi, S; Gharaibeh, E and Alahmer, A (2025) A novel feature engineering-based hybrid approach for precise construction cost estimation using fuzzy-AHP and artificial neural networks. International Journal of Construction Management, 25(15), pp. 1800-1810. ISSN 1562-3599

Ade, R and Rehm, M (2020) Reaching for the stars: Green construction cost premiums for homestar certification. Construction Management and Economics, 38(6), pp. 570-580. ISSN 01446193

Adedokun, O; Egbelakin, T and Omotayo, T (2024) Random forest and path diagram taxonomies of risks influencing higher education construction projects. International Journal of Construction Management, 24(1), pp. 66-74. ISSN 1562-3599

Adeli, H and Karim, A (1997) Scheduling/cost optimization and neural dynamics model for construction. Journal of Construction Engineering and Management, 123(4), pp. 450-458. ISSN 0733-9364

Adeli, H and Wu, M (1998) Regularization neural network for construction cost estimation. Journal of Construction Engineering and Management, 124(1), pp. 18-23. ISSN 0733-9364

Adepu, N; Kermanshachi, S; Pamidimukkala, A and Nwakpuda, E (2025) An analytical approach to understanding construction cost overruns during COVID-19. Smart and Sustainable Built Environment, 14(6), pp. 1780-1794. ISSN 2046-6099

Adepu, N (2023) Analysis of the impact of COVID-19 on construction cost and schedule overruns. PhD thesis, University of Texas at Arlington, USA.

Ahiaga-Dagbui, D; Smith, S D; Love, P E D and Ackermann, F (2015) Spotlight on construction cost overrun research: Superficial, replicative and stagnated. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Ahiaga-Dagbui, D D (2014) Rethinking construction cost overruns: an artificial neural network approach to construction cost estimation. PhD thesis, University of Edinburgh, UK.

Ahiaga-Dagbui, D D and Smith, S D (2014) Dealing with construction cost overruns using data mining. Construction Management and Economics, 32(7-8), pp. 682-694. ISSN 01446193

Ahiaga-Dagbui D D, S S D (2013) My cost runneth over: Data mining to reduce construction cost overruns. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Ahiaga-Dagbui D D, T O and Smith S D, W S (2013) A neuro-fuzzy hybrid model for predicting final cost of water infrastructure projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Ahmadi Esfahani, N and Shahandashti, M (2020) Post-hazard labor wage fluctuations: A comparative empirical analysis among different sub-sectors of the U.S. Construction sector. Journal of Financial Management of Property and Construction, 25(3), pp. 313-330. ISSN 1366-4387

Akan, G T; Imre, M and Arditi, D (1984) Priority ranking of highway improvement projects. Construction Management and Economics, 2(1), pp. 49-55. ISSN 01446193

Akeel, N F (1989) A database tool for statistically based construction cost estimate. PhD thesis, University of Colorado at Boulder, USA.

Akintoye, A S; Ajewole, O and Olomolaiye, P O (1992) Construction cost information management in Nigeria. Construction Management and Economics, 10(2), pp. 107-116. ISSN 01446193

Akyol, B and Resatoglu, R (2019) Investigating the effect of solid and lightweight hollow block slabs on construction cost. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(2), pp. 70-79. ISSN 17514304

Al-Ghzawi, M and El-Rayes, K (2023) Optimizing the planning of airport airside expansion projects to minimize air traffic disruptions and construction cost. Journal of Construction Engineering and Management, 149(4): 04023013, ISSN 0733-9364

Al-Harthi, A S A (2016) Modelling the relationship between client activities and construction procurement performance in Oman. PhD thesis, Loughborough University, UK.

Al-Kaisy, A and Nassar, K (2009) Developing a decision support tool for nighttime construction in highway projects. Journal of Construction Engineering and Management, 135(2), pp. 119-125. ISSN 0733-9364

Al-Momani, A H (1996) Construction cost prediction for public school buildings in Jordan. Construction Management and Economics, 14(4), pp. 311-317. ISSN 01446193

Al-Omari, T (2004) Stochastic regression modelling of cost and duration overrun of construction projects implemented in Kuwait. PhD thesis, University of Liverpool, UK.

Al-Sharif, F F A (2007) Financial model for private finance initiative projects applied to school buildings. PhD thesis, Heriot-Watt University, UK.

AlTalhoni, A; Alwashah, Z; Liu, H; Abudayyeh, O; Kwigizile, V and Kirkpatrick, K (2026) Data-driven identification of key pricing factors in highway construction cost estimation during economic volatility. International Journal of Construction Management, 26(1), pp. 152-167. ISSN 1562-3599

Alananga, S; Lucian, C and Kusiluka, M M (2015) Significant cost-push factors in owner-built incremental housing construction in Tanzania. Construction Management and Economics, 33(8), pp. 671-688. ISSN 01446193

Alarcón, L F; Ashley, D B; De Hanily, A S; Molenaar, K R and Ungo, R (2011) Risk planning and management for the Panama Canal expansion program. Journal of Construction Engineering and Management, 137(10), pp. 762-771. ISSN 0733-9364

Alhumayani, H (2022) The feasibility of 3D printing technology as a new construction method for houses in Saudi Arabia. PhD thesis, Cardiff University, UK.

Allam, A; Elbeltagi, E; Abouelsaad, M N and E. El Madawy, M (2026) Integrated BIM-GA approach for slab formwork design optimization. Construction Innovation, 26(2), pp. 631-651. ISSN 1471-4175

Alnajjar, A (1995) Hyper automated estimating support system. PhD thesis, Illinois Institute of Technology, USA.

Alqahtani, F K; Alkhaldi, M; Alsaqer, T; Abotaleb, I S; Mohamed, A G and Dirar, S (2022) A comparative assessment of advanced construction systems incorporating green concrete. Journal of Construction Engineering and Management, 148(9): 04022083, ISSN 0733-9364

Alsulamy, S; Wamuziri, S and Taylor, M (2012) Evaluation of key metrics for measurement of project performance. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Alumbugu, P O (2019) Construction material logistics management: the case of north-central Nigeria. PhD thesis, Nelson Mandela University, South Africa.

Alzubi, Y; Aljaafreh, A and Khatatbeh, A (2024) Application of machine learning techniques in estimating the construction cost of residential buildings in the middle East region. International Journal of Construction Management, 24(9), pp. 946-958. ISSN 1562-3599

Amadi, A (2023) The statistical sensitivity of highway project cost to geo-heterogeneity in the tropics. International Journal of Building Pathology and Adaptation, 41(4), pp. 875-902. ISSN 23984708

Amadi, A and Higham, A P (2020) A cost trajectory to environmentally adaptive building construction in wet humid settings. International Journal of Building Pathology and Adaptation, 38(1), pp. 68-88. ISSN 23984708

An, X; Li, H; Zuo, J; Ojuri, O; Wang, Z and Ding, J (2018) Identification and prevention of unbalanced bids using the unascertained model. Journal of Construction Engineering and Management, 144(11): 05018013, ISSN 0733-9364

Annamalaisami, C D and Kuppuswamy, A (2022) Reckoning construction cost overruns in building projects through methodological consequences. International Journal of Construction Management, 22(6), pp. 1079-1089. ISSN 1562-3599

Antoniou, F; Konstantinidis, D; Aretoulis, G and Xenidis, Y (2018) Preliminary construction cost estimates for motorway underpass bridges. International Journal of Construction Management, 18(4), pp. 321-330. ISSN 1562-3599

Arab, M Z M (2011) A function-based cost model for early cost advice on new-build schools projects. PhD thesis, Heriot-Watt University, UK.

Araujo, Luís Otávio Cocito de (2005) Method to propose directions improving labor productivity in the steel reinforcement activities. PhD thesis, Universidade de São Paulo, Brazil.

Arditi, D and Chotibhongs, R (2009) Detection and prevention of unbalanced bids. Construction Management and Economics, 27(8), pp. 721-732. ISSN 1466433X

Ashuri, B and Lu, J (2010) Time series analysis of ENR construction cost index. Journal of Construction Engineering and Management, 136(11), pp. 1227-1237. ISSN 0733-9364

Ashuri, B; Shahandashti, S M and Lu, J (2012) Empirical tests for identifying leading indicators of ENR construction cost index. Construction Management and Economics, 30(11), pp. 917-927. ISSN 1466433X

Ashuri, B and Tavakolan, M (2012) Fuzzy enabled hybrid genetic algorithm-particle swarm optimization approach to solve tcro problems in construction project planning. Journal of Construction Engineering and Management, 138(9), pp. 1065-1074. ISSN 0733-9364

Aslay, S E and Dede, T (2024) Reduce the construction cost of a 7-story RC public building with metaheuristic algorithms. Architectural Engineering and Design Management, 20(2), pp. 214-229. ISSN 1745-2007

Asmar, M E; Hanna, A S and Whited, G C (2011) New approach to developing conceptual cost estimates for highway projects. Journal of Construction Engineering and Management, 137(11), pp. 942-949. ISSN 0733-9364

Atkin, B L (1988) Time-cost planning of construction. PhD thesis, University of Reading, UK.

Attara, M G (2015) Predicting cost overrun of railroad bridge construction. PhD thesis, Rutgers The State University of New Jersey - New Brunswick, USA.

Aulich, H T (2013) The role of effective communication in the construction industry: A guide for education and health clients. Construction Economics and Building, 13(4), pp. 92-101. ISSN 2204-9029

Avetisyan, H G; Miller-Hooks, E and Melanta, S (2012) Decision models to support greenhouse gas emissions reduction from transportation construction projects. Journal of Construction Engineering and Management, 138(5), pp. 631-641. ISSN 0733-9364

Aviram Traubita, A (2009) Structural response and cost characterization of bridge construction using seismic performance enhancement strategies. PhD thesis, University of California, Berkeley, USA.

Aydinli, S (2024) Impact of unexpected conditions on construction cost forecasting performance: evidence from Europe. Construction Management and Economics, 42(9), pp. 787-801. ISSN 01446193

Ayodele, E O (2017) Development of a framework in minimising errors in construction documents in Nigeria. PhD thesis, University of Salford, UK.

Ayodele, T R (2025) Cost of selected smart building elements and its level of implementation in Abuja. Journal of Financial Management of Property and Construction, 30(2), pp. 335-355. ISSN 1366-4387

Azadeh, A; Kalantari, M; Ahmadi, G and Eslami, H (2019) A flexible genetic algorithm-fuzzy regression approach for forecasting: The case of bitumen consumption. Construction Innovation, 19(1), pp. 71-88. ISSN 1471-4175

Azambuja, M M B (2009) A decision support system for rapid evaluation and selection of engineered equipment suppliers. PhD thesis, University of Texas at Austin, USA.

Back, W E; Boles, W W and Fry, G T (2000) Defining triangular probability distributions from historical cost data. Journal of Construction Engineering and Management, 126(1), pp. 29-37. ISSN 0733-9364

Badawy, M; El-Sheikh, R and Hamdy, K (2025) Sensitivity analysis of key factors influencing concession period estimation in PPP wastewater treatment projects: A system dynamics approach. Construction Economics and Building, 25(3-4), pp. 65-89. ISSN 2204-9029

Badra, N; Hegazy, H; Mousa, M; Zhang, J; Syed Zakaria, S A; Aboul Haggag, S and Abdul-Rashied, I (2025) Preliminary cost forecasting and optimization for the construction of steel pedestrian bridges in Egypt. Engineering, Construction and Architectural Management, 32(4), pp. 2210-2241. ISSN 0969-9988

Bae, J (2025) Supervised learning to covering cost risk through post-construction evaluation of transportation projects by project delivery methods. Engineering, Construction and Architectural Management, 32(9), pp. 5863-5884. ISSN 0969-9988

Bae, Y J (2016) Integrated design tool of building system optimization for building life cycle cost. PhD thesis, Purdue University, USA.

Baek, M and Ashuri, B (2019) Analysis of the variability of submitted unit price bids for asphalt line items in highway projects. Journal of Construction Engineering and Management, 145(4): 04019020, ISSN 0733-9364

Bai, S; Li, M; Lu, Q; Tian, H and Qin, L (2022) Global time optimization method for dredging construction cycles of trailing suction hopper dredger based on grey system model. Journal of Construction Engineering and Management, 148(2): 04021198, ISSN 0733-9364

Bala, K; Bustani, S A and Waziri, B S (2014) A computer-based cost prediction model for institutional building projects in Nigeria: An artificial neural network approach. Journal of Engineering, Design and Technology, 12(4), pp. 519-530.

Balogun, T B (2018) Integrating bridge maintenance life cycle assessments into bridge design for improved sustainable decision making. PhD thesis, University of the West of England, Bristol, UK.

Baloi, D (2002) A framework for managing global risk factors affecting construction cost performance. PhD thesis, Loughborough University, UK.

Barbachyn, S M; Devine, R D; Thrall, A P and Kurama, Y C (2017) Economic evaluation of high-strength materials in stocky reinforced concrete shear walls. Journal of Construction Engineering and Management, 143(10): 04017074, ISSN 0733-9364

Barnes, N M L (1971) The design and use of experimental bills of quantities for civil engineering contracts. PhD thesis, University of Manchester, UK.

Barra, B. Q.; Soares, C. A. P.; de Castro, I. P. and Longo, O. C. (2026) Framework for extracting project quantities for construction cost estimation using 5D BIM in an openBIM environment. Journal of Engineering, Design and Technology, pp. 1-24. ISSN 1726-0531

Barraza, G A; Back, W E and Mata, F (2000) Probabilistic monitoring of project performance using ss-curves. Journal of Construction Engineering and Management, 126(2), pp. 142-148. ISSN 0733-9364

Basha, I M and Gab-Allah, A A (1991) Value engineering in Egyptian bridge construction. Journal of Construction Engineering and Management, 117(3), pp. 393-401. ISSN 0733-9364

Beadle, K (2008) Analysis of the design process for low-energy housing. PhD thesis, De Montfort University, UK.

Becker, T C (2012) Improving the predictability of construction project outcomes through project level indirect construction cost practices. PhD thesis, North Carolina State University, USA.

Becker, T C; Jaselskis, E J and El-Gafy, M (2014) Improving predictability of construction project outcomes through intentional management of indirect construction costs. Journal of Construction Engineering and Management, 140(6): 4014014, ISSN 0733-9364

Belay, A M and Torp, O (2023) Construction cost performance under quality-gated framework: The cases of Norwegian road constructions. International Journal of Construction Management, 23(6), pp. 1030-1043. ISSN 1562-3599

Belniak, S; Leśniak, A; Plebankiewicz, E and Zima, K (2013) The influence of the building shape on the costs of its construction. Journal of Financial Management of Property and Construction, 18(1), pp. 90-102. ISSN 1366-4387

Bender, W J (2000) A risk-based cost control methodology for constructing complex structures with the mobile offshore base as a case study. PhD thesis, University of Maryland, College Park, USA.

Benjamin, Neal B H (1969) Competitive bidding for building construction contracts. PhD thesis, Stanford University, USA.

Berg, R and Hinze, J (2005) Theft and vandalism on construction sites. Journal of Construction Engineering and Management, 131(7), pp. 826-833. ISSN 0733-9364

Best, Eric A (2008) The development and testing of a purchasing power parity method for comparing construction costs internationally. PhD thesis, University of Technology Sydney, Australia.

Best, R (2010) Using purchasing power parity to assess construction productivity. Construction Economics and Building, 10(4), pp. 1-10. ISSN 2204-9029

Best, R (2011) Developing a basket of resources as a tool for collecting construction cost data internationally. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Best, R (2012) International comparisons of cost and productivity in construction: A bad example. Construction Economics and Building, 12(3), pp. 82-88. ISSN 2204-9029

Bettemir, Ö H and Birgonul, M T (2025) Solution of discrete time–cost trade-off problem with adaptive search domain. Engineering, Construction and Architectural Management, 32(2), pp. 1032-1052. ISSN 0969-9988

Bhargava, A (2009) A probabilistic evaluation of highway project costs. PhD thesis, Purdue University, USA.

Bhargava, A; Anastasopoulos, P C; Labi, S; Sinha, K C and Mannering, F L (2010) Three-stage least-squares analysis of time and cost overruns in construction contracts. Journal of Construction Engineering and Management, 136(11), pp. 1207-1218. ISSN 0733-9364

Blackman, I Q and Picken, D H (2010) Height and construction costs of residential high-rise buildings in Shanghai. Journal of Construction Engineering and Management, 136(11), pp. 1169-1180. ISSN 0733-9364

Blomberg, D; Cotellesso, P; Sitzabee, W and Thal, A E (2014) Discovery of internal and external factors causing military construction cost premiums. Journal of Construction Engineering and Management, 140(3): 4013060, ISSN 0733-9364

Bogenstätter, U (2000) Prediction and optimization of life-cycle costs in early design. Building Research & Information, 28(5-6), pp. 376-386. ISSN 0961-3218

Borja, Luis Claudio Alves (2019) Development of a quantitative method for predicting environmental aspects generated by construction sites. PhD thesis, Universidade Federal da Bahia, Brazil.

Boussabaine, A H and Elhag, T M S (1999) Knowledge discovery in residential construction project cost data. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Brown, D C (2003) Novel method of excavation. Journal of Construction Engineering and Management, 129(2), pp. 222-225. ISSN 0733-9364

Budawara, N (2009) Key performance indicators to measure design performance in construction. PhD thesis, Concordia University, Canada.

Buli, L G (2017) Strategies for improving labor productivity in construction companies. PhD thesis, Walden University, USA.

Bullen, P and Love, P (2011) A new future for the past: A model for adaptive reuse decision-making. Built Environment Project and Asset Management, 1(1), pp. 32-44. ISSN 2044-124X

Butcher, D C A (2011) Learning organization principles and processes: UK construction organization experiences. PhD thesis, University of South Wales, UK.

Cao, M T; Cheng, M Y and Wu, Y W (2015) Hybrid computational model for forecasting Taiwan construction cost index. Journal of Construction Engineering and Management, 141(4): 04014089, ISSN 0733-9364

Carpenter, N (2014) Comparison of the design-bid-build and construction manager at risk project delivery methods utilized for the construction of public schools. PhD thesis, Clemson University, USA.

Carr, R I (2000) Construction congestion cost (CO3) basic model. Journal of Construction Engineering and Management, 126(2), pp. 105-113. ISSN 0733-9364

Carr, R I (2000) Construction congestion cost (CO3) traffic impact and construction cost. Journal of Construction Engineering and Management, 126(2), pp. 114-121. ISSN 0733-9364

Castelblanco, G; Fenoaltea, E M; De Marco, A and Chiaia, B (2025) Influence of macroeconomic factors on construction costs: An analysis of project cases. Construction Management and Economics, 43(3), pp. 196-212. ISSN 0144-6193

Catalina, A J (2016) Development of a statistical theory-based capital cost estimating methodology for light rail transit corridor evaluation under varying alignment characteristics. PhD thesis, University of Kentucky, USA.

Cattell, D W; Bowen, P A and Kaka, A P (2007) Review of unbalanced bidding models in construction. Journal of Construction Engineering and Management, 133(8), pp. 562-573. ISSN 0733-9364

Chan, A P C; Chiang, Y H; Wong, F K W; Liang, S and Abidoye, F A (2020) Work-life balance for construction manual workers. Journal of Construction Engineering and Management, 146(5): 04020031, ISSN 0733-9364

Chan, A P C; Lai, M K; Tam, C M and Akintoye, A (2001) Analysis of construction cost variation factors. Journal of Financial Management of Property and Construction, 6(1), pp. 51-60. ISSN 1366-4387

Chan, D W M and Kumaraswamy, M M (1995) A study of the factors affecting construction durations in Hong Kong. Construction Management and Economics, 13(4), pp. 319-333. ISSN 01446193

Chan, J K W; Tam, C M and Cheung, R K C (2005) Construction firms at the crossroads in Hong Kong: Going insolvency or seeking opportunity. Engineering, Construction and Architectural Management, 12(2), pp. 111-124. ISSN 0969-9988

Chan, T K (2011) Comparison of precast construction costs: Case studies in Australia and Malaysia. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Charles, S P R; Wanigarathna, N and Sherratt, F (2015) Construction project change: Investigating cost and benefits. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Chassiakos, A P and Sakellaropoulos, S P (2005) Time-cost optimization of construction projects with generalized activity constraints. Journal of Construction Engineering and Management, 131(10), pp. 1115-1124. ISSN 0733-9364

Chau, K W (1993) Estimating industry-level productivity trends in the building industry from building cost and price data. Construction Management and Economics, 11(5), pp. 370-383. ISSN 01446193

Chau, K W (1995) Monte Carlo simulation of construction costs using subjective data. Construction Management and Economics, 13(5), pp. 369-383. ISSN 01446193

Chau, K W (1995) The validity of the triangular distribution assumption in Monte Carlo simulation of construction costs: Empirical evidence from Hong Kong. Construction Management and Economics, 13(1), pp. 15-21. ISSN 01446193

Chau, K W (1998) The implications of the difference in the growth rates of the prices of building resources and outputs in Hong Kong. Engineering, Construction and Architectural Management, 5(1), pp. 38-50. ISSN 0969-9988

Chau, K W and Walker, A (1988) The measurement of total factor productivity of the Hong Kong construction industry. Construction Management and Economics, 6(3), pp. 209-224. ISSN 01446193

Che Haron, R (2017) Systems thinking paradigm in construction cost estimating reliability. PhD thesis, University of Reading, UK.

Chen, J H; Su, M C and Huang, D Y (2010) Application of a SOM-based optimization algorithm in minimizing construction time for secant pile wall. Journal of Construction Engineering and Management, 136(11), pp. 1189-1195. ISSN 0733-9364

Chen, S (2013) Improving value for money in public-private partnership infrastructure projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Chen, Y; Fang, Q and Lan, Y (2025) Development of a modular assembling, suspended, and sliding scaffold. Journal of Construction Engineering and Management, 151(9): 04025131, ISSN 0733-9364

Cheng, M. Y.; Sholeh, M. N. and Poetra, B. A. (2026) Predicting the construction cost-time tradeoff using optimized hybrid deep learning for risk preference decision making. International Journal of Construction Management, 26(10), pp. 2018-2044. ISSN 1562-3599

Cheng, G and Wilmot, C G (2009) Louisiana highway construction cost trend after hurricanes Katrina and Rita. Journal of Construction Engineering and Management, 135(7), pp. 594-600. ISSN 0733-9364

Choi, C Y; Ryu, K R and Shahandashti, M (2021) Predicting city-level construction cost index using linear forecasting models. Journal of Construction Engineering and Management, 147(2): 0001973, ISSN 0733-9364

Choi, J; Hong, D H; Lee, S H; Lee, H Y; Hong, T; Lee, D E and Park, H S (2023) Multi-objective green design model for prestressed concrete slabs in long-span buildings. Architectural Engineering and Design Management, 19(5), pp. 531-549. ISSN 1745-2007

Choi, K; Lee, H W; Mao, Z; Lavy, S and Ryoo, B Y (2016) Environmental, economic, and social implications of highway concrete rehabilitation alternatives. Journal of Construction Engineering and Management, 142(2): 04015079, ISSN 0733-9364

Cirelli Jr., L R (2017) Impact of design fees and duration of design process on construction quality: Implications for quality management. PhD thesis, Baker College (Michigan), USA.

Cirilovic, J; Vajdic, N; Mladenovic, G and Queiroz, C (2014) Developing cost estimation models for road rehabilitation and reconstruction: Case study of projects in Europe and Central Asia. Journal of Construction Engineering and Management, 140(3): 4013065, ISSN 0733-9364

Cockerill, J E (1993) The construction industry in belfast 1800-1914. PhD thesis, Queen's University Belfast, UK.

Coopman, J T (1998) Superintendent motivation and satisfaction related to the use of construction management for school facility projects. EdD thesis, Ball State University, USA.

Corbett, P and Rowley, P (1999) The use of bcis elemental cost data by quantity surveyors as part of cost planning techniques: The practitioners' perspective. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Creedy, G D; Skitmore, M and Wong, J K W (2010) Evaluation of risk factors leading to cost overrun in delivery of highway construction projects. Journal of Construction Engineering and Management, 136(5), pp. 528-537. ISSN 0733-9364

Crespo Vallejo, L G (2018) Project manager strategies to improve the delivery of construction projects. PhD thesis, Walden University, USA.

Dahanayake, B; Ramachandra, T and Thurairajah, N (2016) Assessment on rework costs probability of housing projects in Sri Lanka. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Dang, C N and Le-Hoai, L (2018) Revisiting storey enclosure method for early estimation of structural building construction cost. Engineering, Construction and Architectural Management, 25(7), pp. 877-895. ISSN 0969-9988

Dang-Trinh, N; Duc-Thang, P; Nguyen-Ngoc Cuong, T and Duc-Hoc, T (2023) Machine learning models for estimating preliminary factory construction cost: Case study in southern Vietnam. International Journal of Construction Management, 23(16), pp. 2879-2887. ISSN 1562-3599

Daoud, A O; KhairEldin, M; Ibrahim, A H and Toma, H M (2026) Adaptive neuro-fuzzy inference system for Egyptian residential construction waste prediction. International Journal of Construction Management, 26(6), pp. 1059-1077. ISSN 1562-3599

Dave, N; Guduru, R; Misra, A K and Sharma, A K (2022) Experimental evaluation of bond behavior in controlled, binary and quaternary concretes developed using scms. Journal of Engineering, Design and Technology, 20(6), pp. 1430-1448. ISSN 1726-0531

Davenport, D M (1997) Client satisfaction with construction cost: A comparative study of French and UK performance. Journal of Financial Management of Property and Construction, 2(3), pp. 77-94. ISSN 1366-4387

Davtalab, O (2018) A data driven software platform for process automation, planning and inspection of contour crafting large-scale robotic 3D printing system. PhD thesis, University of Southern California, USA.

Dawood, N N (1998) A framework of integrating design and production system for the off-site building product industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

De Lima, R X; Júnior, E F N; Prata, B D A and Weissmann, J (2013) Distribution of materials in road earthmoving and paving: Mathematical programming approach. Journal of Construction Engineering and Management, 139(8), pp. 1046-1054. ISSN 0733-9364

Demirel, H Ç; Leendertse, W; Volker, L and Hertogh, M (2017) Flexibility in PPP contracts: Dealing with potential change in the pre-contract phase of a construction project. Construction Management and Economics, 35(4), pp. 196-206. ISSN 0144-6193

Demirkesen, S. (2025) Exploring the causes of sunk cost fallacy in the construction industry: Case of mega projects. Engineering, Construction and Architectural Management, 33(5), pp. 3761-3776. ISSN 0969-9988

Devine, R D; Barbachyn, S M; Thrall, A P and Kurama, Y C (2018) Effect of tripping prefabricated rebar assemblies on bar spacing. Journal of Construction Engineering and Management, 144(11): 04018099, ISSN 0733-9364

Diab, M F (2011) Analyses of highway project construction risks, performance, and contingency. PhD thesis, North Dakota State University, USA.

Dlakwa, M M (1990) Analysis of some problems in the management and cost control of public sector construction projects in Nigeria. PhD thesis, University of Stirling, UK.

Doğan, S Z (2005) Using machine learning techniques for early cost prediction of structural systems of buildings. PhD thesis, Izmir Institute of Technology, Turkey.

Dong, N (2012) Automated look-ahead schedule generation and optimization for the finishing phase of complex construction projects. PhD thesis, Stanford University, USA.

Donyavi, S (2013) Understanding the complexity of materials procurement and the role of technology for small and medium sized enterprises in the construction sector. PhD thesis, University of Reading, UK.

Donyavi, S and Flanagan, R (2009) The impact of effective material management on construction site performance for small and medium sized construction enterprises. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Donyavi, S; Flanagan, R; Assadi-Langroudi, A and Parisi, L (2024) Understanding the complexity of materials procurement in construction projects to build a conceptual framework influencing supply chain management of msmes. International Journal of Construction Management, 24(2), pp. 177-186. ISSN 1562-3599

Doǧan, S Z; Arditi, D and Murat Günaydin, H (2006) Determining attribute weights in a CBR model for early cost prediction of structural systems. Journal of Construction Engineering and Management, 132(10), pp. 1092-1098. ISSN 0733-9364

Doǧan, S Z; Arditi, D and Murat Günaydin, H (2008) Using decision trees for determining attribute weights in a case-based model of early cost prediction. Journal of Construction Engineering and Management, 134(2), pp. 146-152. ISSN 0733-9364

Duncan, K; Case, A and Manzo IV, F (2024) Prevailing wages, school construction costs, and bids by out-of-state contractors: evidence from the Minneapolis–Saint Paul metropolitan area. Construction Management and Economics, 42(8), pp. 695-713. ISSN 01446193

Duncan, K; Philips, P and Prus, M (2009) The effects of prevailing wage regulations on construction efficiency in British columbia. International Journal of Construction Education and Research, 5(2), pp. 63-78. ISSN 1557-8771

Duncan, K; Philips, P and Prus, M (2012) Using stochastic frontier regression to estimate the construction cost inefficiency of prevailing wage laws. Engineering, Construction and Architectural Management, 19(3), pp. 320-334. ISSN 0969-9988

Dunston, P S; Sinfield, J V and Lee, T Y (2007) Technology development decision economics for real-time rolling resistance monitoring of haul roads. Journal of Construction Engineering and Management, 133(5), pp. 393-402. ISSN 0733-9364

Dursun, O and Stoy, C (2016) Conceptual estimation of construction costs using the multistep ahead approach. Journal of Construction Engineering and Management, 142(9): 04016038, ISSN 0733-9364

Duzkale, A K and Lucko, G (2016) Exposing uncertainty in bid preparation of steel construction cost estimating: I. Conceptual framework and qualitative C-I-V-I-L classification. Journal of Construction Engineering and Management, 142(10): 04016049, ISSN 0733-9364

Dzeng, R J and Wu, J S (2013) Efficiency measurement of the construction industry in Taiwan: A stochastic frontier cost function approach. Construction Management and Economics, 31(4), pp. 335-344. ISSN 1466433X

Ebekozien, A; Abdul-Aziz, A R and Jaafar, M (2022) Moderating effect of government support policy on the relationship between Malaysian LCH leakages, high construction cost and LCH demand-supply: A proposed framework. International Journal of Construction Management, 22(4), pp. 600-611. ISSN 1562-3599

Ebekozien, A; Abdul-Aziz, A R and Jaafar, M (2023) Mitigating high development cost of low-cost housing: Findings from an empirical investigation. International Journal of Construction Management, 23(3), pp. 472-483. ISSN 1562-3599

Ebekozien, A; Aigbavboa, C; Thwala, W D; Samsurijan, M S; Hafez Ahmed, M A; Aliu, J and Adekunle, S (2025) Assessment of low-cost housing provision as government social responsibility towards achievement of sustainable development goal 11: stakeholders' perspective. International Journal of Construction Management, 25(7), pp. 802-812. ISSN 1562-3599

Ebekozien, A; Aigbavboa, C O; Thwala, W D; Hafez, M A and Samsurijan, M S (2024) Sustainable development goals under threat: the impact of inflation on construction projects. Engineering, Construction and Architectural Management, 31(13), pp. 323-341. ISSN 0969-9988

Edwards, D J and Holt, G D (2000) Quantifying the cost of plant operators' productivity. Journal of Financial Management of Property and Construction, 5(1-2), pp. 85-92. ISSN 1366-4387

El Said, S F (2022) A modeling approach to indexing the cost of highway construction and maintenance projects to a responsive highway user fee using bid items data. PhD thesis, Vanderbilt University, USA.

El-Choum, M K (1994) Identification and modelling of construction cost overruns parameters for public infrastructure projects using multivariate statistical methods. PhD thesis, Stevens Institute of Technology, USA.

El-Kholy, A M and Akal, A Y (2021) Assessing and allocating the financial viability risk factors in public-private partnership wastewater treatment plant projects. Engineering, Construction and Architectural Management, 28(10), pp. 3014-3040. ISSN 0969-9988

El-Mashaleh, M; O'Brien, W J and Minchin Jr, R E (2006) Firm performance and information technology utilization in the construction industry. Journal of Construction Engineering and Management, 132(5), pp. 499-507. ISSN 0733-9364

El-Rayes, K and Kandil, A (2005) Time-cost-quality trade-off analysis for highway construction. Journal of Construction Engineering and Management, 131(4), pp. 477-486. ISSN 0733-9364

El-Sayegh, S M; AbdRaboh, T; Elian, D; ElJarad, N and Ahmad, Y (2022) Developing a bi-parameter bidding model integrating price and sustainable construction practices. International Journal of Construction Management, 22(11), pp. 2191-2198. ISSN 1562-3599

Elhag, T M S (2004) Tender price modelling: artificial neural networks and regression techniques. PhD thesis, University of Liverpool, UK.

Elhag, T M S and Boussabaine, A H (1999) Evaluation of construction cost and time attributes. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Elinwa, A U and Buba, S A (1993) Construction cost factors in Nigeria. Journal of Construction Engineering and Management, 119(4), pp. 698-713. ISSN 0733-9364

Elmousalami, H H (2020) Artificial intelligence and parametric construction cost estimate modeling: State-of-the-art review. Journal of Construction Engineering and Management, 146(1): 03119008, ISSN 0733-9364

Elmousalami, H H; Elyamany, A H and Ibrahim, A H (2018) Predicting conceptual cost for field canal improvement projects. Journal of Construction Engineering and Management, 144(11): 04018102, ISSN 0733-9364

Emere, C E (2024) An integrated sustainable building construction model for project delivery in South Africa. PhD thesis, University of Johannesburg, South Africa.

Emsley, M W; Lowe, D J; Duff, A R; Harding, A and Hickson, A (2002) Data modelling and the application of a neural network approach to the prediction of total construction costs. Construction Management and Economics, 20(6), pp. 465-472. ISSN 01446193

Erbatur, O C (2012) A methodology for estimating construction unit bid prices. DEng thesis, Texas A&M University, USA.

Fan, S L; Yeh, I C and Chi, W S (2021) Improvement in estimating durations for building projects using artificial neural network and sensitivity analysis. Journal of Construction Engineering and Management, 147(7): 04021050, ISSN 0733-9364

Fang, Y and Ng, S T (2011) Applying activity-based costing approach for construction logistics cost analysis. Construction Innovation, 11(3), pp. 259-281. ISSN 1471-4175

Farbarik, J J (1994) Evaluation of the efficacy of using bid data to predict construction cost overruns. PhD thesis, University of Washington, USA.

Fares, A; Elazouni, A and Al-Alawi, M (2025) Using game theory to negotiate win-win payment terms between contractors and subcontractors. Journal of Construction Engineering and Management, 151(5): 04025023, ISSN 0733-9364

Farghal, S H and Everett, J G (1997) Learning curves: Accuracy in predicting future performance. Journal of Construction Engineering and Management, 123(1), pp. 41-45. ISSN 0733-9364

Farokhnia, K (2013) Nonstructural vulnerability functions for building categories. PhD thesis, University of Colorado at Boulder, USA.

Farooghi, F (2020) The effect of natural disasters on construction labor wage fluctuations: A spatial difference-in-difference analysis. PhD thesis, University of Texas at Arlington, USA.

Farshchian, M M; Heravi, G and Abourizk, S (2017) Optimizing the owner's scenarios for budget allocation in a portfolio of projects using agent-based simulation. Journal of Construction Engineering and Management, 143(7): 04017022, ISSN 0733-9364

Fazlipour, M and Samadzad, M (2026) Engineering and economic feasibility of a new prefabrication ecosystem for steel construction in diverse low-rise residential buildings. Journal of Construction Engineering and Management, 152(2): 04025238, ISSN 0733-9364

Fereidouni, H G (2011) Factors contributing to the fluctuation in residential construction in Iran. Construction Economics and Building, 11(4), pp. 77-86. ISSN 2204-9029

Fernando, N; T.A, K D and Zhang, H (2024) An artificial neural network (ann) approach for early cost estimation of concrete bridge systems in developing countries: The case of Sri Lanka. Journal of Financial Management of Property and Construction, 29(1), pp. 23-51. ISSN 1366-4387

Firouzi, A; Yang, W and Li, C Q (2016) Prediction of total cost of construction project with dependent cost items. Journal of Construction Engineering and Management, 142(12): 04016072, ISSN 0733-9364

Fisher, D J; O'Neill, M W and Contreras, J C (1995) DS^2: Drilled shaft decision support system. Journal of Construction Engineering and Management, 121(1), pp. 86-94. ISSN 0733-9364

Fobiri, Godfred (2024) A framework to apply reality capture technology for interim payment valuation of construction projects. PhD thesis, University of Johannesburg, South Africa.

Fortune, C and Hinks, J (1997) Model selection criteria in building project price forecast formulation. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Foster, R D (1982) Does pictorial documentation improve construction cost control? PhD thesis, Texas A&M University, USA.

Gan, V J L (2022) BIM-based building geometric modeling and automatic generative design for sustainable offsite construction. Journal of Construction Engineering and Management, 148(10): 04022111, ISSN 0733-9364

Gardner, B J; Gransberg, D D and Jeong, H D (2016) Reducing data-collection efforts for conceptual cost estimating at a highway agency. Journal of Construction Engineering and Management, 142(11): 04016057, ISSN 0733-9364

Geekiyanage, D and Ramachandra, T (2021) Running costs indices for commercial buildings using the hedonic price imputation approach: A case of Sri Lanka. Construction Management and Economics, 39(8), pp. 704-721. ISSN 01446193

George, A; Aboagye-Nimo, E and Mamphey, S (2021) The effects of skills shortages on construction costs in the UK. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(2), pp. 78-86. ISSN 17514304

Georgekutty, C K (2014) Optimization of construction cost in construction materials. Unpublished PhD thesis, Cochin University of Science and Technology, India.

Ghaeli, M R (1998) Pavement and bridge cost allocation analysis of the Intario intercity highway network. PhD thesis, University of Waterloo, USA.

Ghimire, Prashna (2025) Framework for integrating industry knowledge into a large language model to assist construction cost estimation. PhD thesis, University of Nebraska - Lincoln, USA.

Gholami Bavil Olyai, Farshid (2018) A framework for enhancing engineering deliverables to improve construction performance in oil and gas projects. PhD thesis, University of Calgary, Canada.

Ghulman, B A (2000) Predicting construction cost growth in ODOT's paving projects using information available at the bidding time. PhD thesis, Oklahoma State University, USA.

Goh, B H (2016) Designing a whole-life building cost index in Singapore. Built Environment Project and Asset Management, 6(2), pp. 159-173. ISSN 2044-124X

Gongming, M (2018) The influence of trust on risk allocation in Chinese PPP projects. PhD thesis, ISCTE - Instituto Universitario de Lisboa, Portugal.

Gouda Mohamed, A; Helmy Ammar, M and Nabawy, M (2023) Risks assessment using structural equation modeling: Mega housing projects construction in Egypt. International Journal of Construction Management, 23(16), pp. 2717-2728. ISSN 1562-3599

Gransberg, D D; Lopez Del Puerto, C and Humphrey, D (2007) Relating cost growth from the initial estimate to design fee for transportation projects. Journal of Construction Engineering and Management, 133(6), pp. 404-408. ISSN 0733-9364

Grau, D and Back, W E (2015) Predictability index: Novel metric to assess cost and schedule performance. Journal of Construction Engineering and Management, 141(12): 04015043, ISSN 0733-9364

Gregori, T and Pietroforte, R (2015) An input-output analysis of the construction sector in emerging markets. Construction Management and Economics, 33(2), pp. 134-145. ISSN 01446193

Gregory, R A (1992) Development of a knowledge-based system approach for decision-making in construction projects. PhD thesis, University of Florida, USA.

Guo, K (2006) Risk of pavement warranties to contractors. PhD thesis, University of Florida, USA.

Gurmu, A. (2026) Forecasting building cost index with vecm: Integrating output-based indexes and macroeconomic indicators. Journal of Engineering, Design and Technology, 24(4), pp. 1012-1036. ISSN 1726-0531

Gurmu, A and Miri, M P (2025) Machine learning regression for estimating the cost range of building projects. Construction Innovation, 25(2), pp. 577-593. ISSN 1471-4175

Haas, C and Einstein, H H (2002) Updating the decision aids for tunneling. Journal of Construction Engineering and Management, 128(1), pp. 40-48. ISSN 0733-9364

Habibi, S (2019) Design concepts for the integration of bamboo in contemporary vernacular architecture. Architectural Engineering and Design Management, 15(6), pp. 475-489. ISSN 1745-2007

Hale, D R; Shrestha, P P; Gibson, G E and Migliaccio, G C (2009) Empirical comparison of design/build and design/bid/build project delivery methods. Journal of Construction Engineering and Management, 135(7), pp. 579-587. ISSN 0733-9364

Halim, M S A; Jaafar, M; Osman, O and Shariff Haniff, M (2012) Financial ratio analysis: An assessment of Malaysian contracting firms. Journal of Construction in Developing Countries, 17(S1), pp. 71-78. ISSN 1823-6499

Hampton, G; Baldwin, A N and Holt, G D (2012) Project delays and cost: Stakeholder perceptions of traditional v. PPP procurement. Journal of Financial Management of Property and Construction, 17(1), pp. 73-91. ISSN 1366-4387

Hanid, M (2014) Design science research as an approach to develop conceptual solutions for improving cost management in construction. PhD thesis, University of Salford, UK.

Hanna, B A (1988) Role expectations of superintendents and architects in the state of Kansas relative to experience in school construction. EdD thesis, University of Kansas, USA.

Hao, J X (2007) Infrastructure investment and economic development. PhD thesis, University of Maryland, College Park, USA.

Hassanein, A A G and Khalil, B N L (2006) Developing general indicator cost indices for the Egyptian construction industry. Journal of Financial Management of Property and Construction, 11(3), pp. 181-194. ISSN 1366-4387

Hassanein, A A G and Khalil, B N L (2006) Building Egypt 1: a general indicator cost index for the Egyptian construction industry. Engineering, Construction and Architectural Management, 13(5), pp. 463-480. ISSN 0969-9988

Hegazy, T and Ayed, A (1998) Neural network model for parametric cost estimation of highway projects. Journal of Construction Engineering and Management, 124(3), pp. 210-218. ISSN 0733-9364

Hegazy, T and Wassef, N (2001) Cost optimization in projects with repetitive nonserial activities. Journal of Construction Engineering and Management, 127(3), pp. 183-191. ISSN 0733-9364

Helaly, H.; El-Rayes, K. and Ignacio, E. J. (2026) Multiobjective optimization for the planning of prefabricated bridge construction projects. Journal of Construction Engineering and Management, 152(8): 04026103, ISSN 0733-9364

Henjewele, C; Sun, M and Fewings, P (2012) Analysis of factors affecting value for money in UK PFI projects. Journal of Financial Management of Property and Construction, 17(1), pp. 9-28. ISSN 1366-4387

Heravi, G; Taherkhani, A H; Sobhkhiz, S; Mashhadi, A H and Zahiri-Hashemi, R (2022) Integrating risk management's best practices to estimate deep excavation projects' time and cost. Built Environment Project and Asset Management, 12(2), pp. 180-204. ISSN 2044-124X

Herbsman, Z J; Chen, W T and Epstein, W C (1995) Time is money: Innovative contracting methods in highway construction. Journal of Construction Engineering and Management, 121(3), pp. 273-281. ISSN 0733-9364

Hinkel, M P (2022) Three essays on labor market regulation in the American construction industry. PhD thesis, Michigan State University, USA.

Hogan, D B (1998) Modeling construction cost performance: A comprehensive approach using statistical, artificial neural network and simulation methods. PhD thesis, Columbia University, USA.

Hollar, D A (2011) Predicting preliminary engineering costs for highway projects. PhD thesis, North Carolina State University, USA.

Hollar, D A; Rasdorf, W; Liu, M; Hummer, J E; Arocho, I and Hsiang, S M (2013) Preliminary engineering cost estimation model for bridge projects. Journal of Construction Engineering and Management, 139(9), pp. 1259-1267. ISSN 0733-9364

Hong, X (2002) A comparative study of contractor performance based on Japanese, UK and US construction practice. PhD thesis, University of Wolverhampton, UK.

Hu, M (2022) Influence of project design team characteristics on construction cost of sustainable buildings. PhD thesis, University of Maryland, College Park, USA.

Hu, M and Milner, D (2021) Factors influencing existing medium-sized commercial building energy retrofits to achieve the net zero energy goal in the United States. Building Research & Information, 49(5), pp. 525-542. ISSN 0961-3218

Hu, M; Nippala, E; Kallioharju, K and Pelsmakers, S (2022) Monte Carlo simulation approach to understand the cost variance for energy retrofit projects: Comparative study of Finland and the United States. Construction Management and Economics, 40(3), pp. 207-222. ISSN 01446193

Hu, M and Skibniewski, M (2022) The impact of the design team characteristics on the sustainable building construction cost: Structural equation model analysis. Architectural Engineering and Design Management, 18(5), pp. 614-630. ISSN 1745-2007

Huang, X and Hinze, J (2003) Analysis of construction worker fall accidents. Journal of Construction Engineering and Management, 129(3), pp. 262-271. ISSN 0733-9364

Hughes, W P; Ancell, D; Gruneberg, S and Hirst, L (2004) Exposing the myth of the 1:5:200 ratio relating initial cost, maintenance and staffing costs of office buildings. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Hussain, R S (2017) Investigating the business process implications of managing road works and street works. PhD thesis, Loughborough University, UK.

Hussein, M; Darko, A; Eltoukhy, A E E and Zayed, T (2022) Sustainable logistics planning in modular integrated construction using multimethod simulation and taguchi approach. Journal of Construction Engineering and Management, 148(6): 04022022, ISSN 0733-9364

Hussey, H and Atanasov, V (2024) Improving the methods of description of building works in the UK. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Hwang, B G; Thomas, S R; Haas, C T and Caldas, C H (2009) Measuring the impact of rework on construction cost performance. Journal of Construction Engineering and Management, 135(3), pp. 187-198. ISSN 0733-9364

Hwang, S (2009) Dynamic regression models for prediction of construction costs. Journal of Construction Engineering and Management, 135(5), pp. 360-367. ISSN 0733-9364

Hwang, S (2011) Time series models for forecasting construction costs using time series indexes. Journal of Construction Engineering and Management, 137(9), pp. 656-662. ISSN 0733-9364

Hwang, S; Park, M; Lee, H S and Kim, H (2012) Automated time-series cost forecasting system for construction materials. Journal of Construction Engineering and Management, 138(11), pp. 1259-1269. ISSN 0733-9364

Hwang, S Y (2007) Proactive planning and control of construction productivity and cost using time series data. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hyari, K; El-Mashaleh, M and Kandil, A (2010) Optimal assignment of multiskilled labor in building construction projects. International Journal of Construction Education and Research, 6(1), pp. 70-80. ISSN 1557-8771

Hyung, W G; Kim, S and Jo, J K (2020) Improved similarity measure in case-based reasoning: A case study of construction cost estimation. Engineering, Construction and Architectural Management, 27(2), pp. 561-578. ISSN 0969-9988

Ibrahim, M N (2022) Risk management in construction of megahousing projects in Egypt. PhD thesis, London South Bank University, UK.

Ibrahim, M W; Hanna, A S; Russell, J S; Abotaleb, I S and El-Adaway, I H (2020) Quantitative analysis of the impacts of out-of-sequence work on project performance. Journal of Construction Engineering and Management, 146(8): 04020090, ISSN 0733-9364

Idowu, O S and Lam, K C (2020) Conceptual quantities estimation using bootstrapped support vector regression models. Journal of Construction Engineering and Management, 146(4): 04020018, ISSN 0733-9364

Idrus, A and Newman, J (2003) Ifess: A computer tool to aid structural engineers at the conceptual design stage. Construction Innovation, 3(3), pp. 127-143. ISSN 1471-4175

Igwe, U S; Mohamed, S F; Azwarie, M B M D; Nwofia, C M and Ihekweme, N M (2025) Assessment of post contract cost control issues in Nigeria: Quantity surveyors' perspective. International Journal of Construction Management, 25(14), pp. 1725-1735. ISSN 1562-3599

Igwe, U S; Mohamed, S F; Dzahir, M A M; Yusof, Z M and Khiyon, N A (2022) Towards a framework of automated resource model for post contract cost control of construction projects. International Journal of Construction Management, 22(16), pp. 3088-3097. ISSN 1562-3599

Ikuabe, M; Oke, A E and Aigbavboa, C (2020) Impact of contractors' opportunism on construction project transaction costs: Construction professionals' perception. Journal of Financial Management of Property and Construction, 25(1), pp. 125-141. ISSN 1366-4387

Inti, S (2016) A decision making approach for selection of sustainable pavements in Texas by integrating life cycle cost analysis (LCCA), life cycle assessment (LCA) of environmental and social impacts. PhD thesis, University of Texas at El Paso, USA.

Inyang, N; Al-Hussein, M; El-Rich, M and Al-Jibouri, S (2012) Ergonomic analysis and the need for its integration for planning and assessing construction tasks. Journal of Construction Engineering and Management, 138(12), pp. 1370-1376. ISSN 0733-9364

Ioannidou, D; Zerbi, S; García de Soto, B and Habert, G (2018) Where does the money go? Economic flow analysis of construction projects. Building Research & Information, 46(4), pp. 348-366. ISSN 0961-3218

Ioannou, P G and Carr, R I (1988) Advanced building technology matrix system. Journal of Construction Engineering and Management, 114(4), pp. 517-531. ISSN 0733-9364

Ismail, M Z; Mohamad Ramly, Z; Darmansah, N F and Misnan, M S (2025) Rail construction cost risk management with bow-tie analysis: Contractor’s perspective. Built Environment Project and Asset Management, 15(4), pp. 753-771. ISSN 2044-124X

Ismail, Noor Akmal Adillah Binti (2017) Construction cost estimating incorporating building information modelling in the Malaysian construction industry. PhD thesis, Queensland University of Technology, Australia.

Issa, M H; Attalla, M; Rankin, J H and Christian, A J (2011) Energy consumption in conventional, energyretrofitted and green LEED Toronto schools. Construction Management and Economics, 29(4), pp. 383-395. ISSN 1466433X

Ive, G (2006) Re-examining the costs and value ratios of owning and occupying buildings. Building Research & Information, 34(3), pp. 230-245. ISSN 0961-3218

Jafary, P.; Shojaei, D.; Rajabifard, A. and Ngo, T. (2026) AI-augmented construction cost estimation: An ensemble natural language processing (NLP) model to align quantity take-offs with cost indexes. International Journal of Construction Management, 26(8), pp. 1508-1526. ISSN 1562-3599

Jafarzadeh, R; Ingham, J M; Walsh, K Q; Hassani, N and Ghodrati Amiri, G R (2015) Using statistical regression analysis to establish construction cost models for seismic retrofit of confined masonry buildings. Journal of Construction Engineering and Management, 141(5): 04014098, ISSN 0733-9364

Jafarzadeh, R; Ingham, J M; Wilkinson, S; González, V and Aghakouchak, A A (2014) Application of artificial neural network methodology for predicting seismic retrofit construction costs. Journal of Construction Engineering and Management, 140(2): 04013044, ISSN 0733-9364

Jafarzadeh, R; Wilkinson, S; González, V; Ingham, J M and Amiri, G G (2014) Predicting seismic retrofit construction cost for buildings with framed structures using multilinear regression analysis. Journal of Construction Engineering and Management, 140(3): 4013062, ISSN 0733-9364

Jarkas, A M (2013) Primary factors influencing bid mark-up size decisions of general contractors in Kuwait. Journal of Financial Management of Property and Construction, 18(1), pp. 53-75. ISSN 1366-4387

Jarkas, A M and Horner, R M W (2015) Creating a baseline for labour productivity of reinforced concrete building construction in Kuwait. Construction Management and Economics, 33(8), pp. 625-639. ISSN 01446193

Jaya, N M (2014) An activity-based cost controlling model for improving the management of construction project overheads. PhD thesis, University of Salford, UK.

Jayaraj, S; Doerfel, M L and Williams, T (2022) Clique to win: Impact of cliques, competition, and resources on team performance. Journal of Construction Engineering and Management, 148(7): 04022047, ISSN 0733-9364

Jegede, O E and Taki, A (2022) Optimization of building envelopes using indigenous materials to achieve thermal comfort and affordable housing in Abuja, Nigeria. International Journal of Building Pathology and Adaptation, 40(2), pp. 219-247. ISSN 23984708

Ji, S H; Park, M and Lee, H S (2012) Case adaptation method of case-based reasoning for construction cost estimation in Korea. Journal of Construction Engineering and Management, 138(1), pp. 43-52. ISSN 0733-9364

Jia, J (2017) Multi-criteria evaluation in support of the decision-making process in highway construction projects. PhD thesis, Florida International University, USA.

Jin, R; Han, S; Hyun, C and Kim, J (2014) Improving accuracy of early stage cost estimation by revising categorical variables in a case-based reasoning model. Journal of Construction Engineering and Management, 140(7): 04014025, ISSN 0733-9364

Jolly Cyril, E (2026) Mediating effect of innovation on the relationship between project financing and construction cost efficiency: Innovation integrated cost efficiency perspective. Journal of Construction Engineering and Management, 152(1): 04025226, ISSN 0733-9364

Joukar, A (2016) Analysis and management of the price volatility in the construction industry. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Jrade, A (2004) Integrated conceptual cost estimating and life cycle costing system for building projects. PhD thesis, Concordia University, Canada.

Kalamaras, G S (1996) A case method approach for interactive risk analysis of tunnel "design-for-constructability" concept. PhD thesis, Pennsylvania State University, USA.

Kang, S and Seo, J (2013) GIS method for haul road layout planning in large earthmoving projects: Framework and analysis. Journal of Construction Engineering and Management, 139(2), pp. 236-246. ISSN 0733-9364

Kang, Y; O'Brien, W J; Thomas, S and Chapman, R E (2008) Impact of information technologies on performance: Cross study comparison. Journal of Construction Engineering and Management, 134(11), pp. 852-863. ISSN 0733-9364

Kantianis, D D (2022) Design morphology complexity and conceptual building project cost forecasting. Journal of Financial Management of Property and Construction, 27(3), pp. 387-414. ISSN 1366-4387

Karam, K S; Karam, J S and Einstein, H H (2007) Decision analysis applied to tunnel exploration planning. II: Consideration of uncertainty. Journal of Construction Engineering and Management, 133(5), pp. 354-363. ISSN 0733-9364

Karim, A and Adeli, H (1999) A new generation software for construction scheduling and management. Engineering, Construction and Architectural Management, 6(4), pp. 380-390. ISSN 0969-9988

Karim, A and Adeli, H (1999) OO information model for construction project management. Journal of Construction Engineering and Management, 125(5), pp. 361-367. ISSN 0733-9364

Karimi, H (2017) Quantitative analysis of the impact of craft labor availability on construction project performance. PhD thesis, University of Kentucky, USA.

Kashiwagi, D and Savicky, J (2003) A case study of the transaction cost and value of the delivering of construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Kazar, G; Mutlu, U and Tokdemir, O B (2023) Development of zero-based budgeting approach for multinational construction contractors. Engineering, Construction and Architectural Management, 30(10), pp. 5217-5232. ISSN 0969-9988

Keller, E C (1999) Prevailing wage rates: The effects on school construction, levels of taxation, and state reimbursements. DEd thesis, Pennsylvania State University, USA.

Kermanshachi, S (2016) Decision making and uncertainty analysis in success of construction projects. PhD thesis, Texas A&M University, USA.

Kern, A P; Postay, R; Schneck, E R; Mancio, M; González, M A S and Guerra, G (2021) Cost and environmental impacts reduction through building compactness. Engineering, Construction and Architectural Management, 28(4), pp. 1176-1195. ISSN 0969-9988

Khanzadi, M; Sheikhkhoshkar, M and Banihashemi, S (2020) BIM applications toward key performance indicators of construction projects in Iran. International Journal of Construction Management, 20(4), pp. 305-320. ISSN 1562-3599

Kim, B S and Hong, T (2012) Revised case-based reasoning model development based on multiple regression analysis for railroad bridge construction. Journal of Construction Engineering and Management, 138(1), pp. 154-162. ISSN 0733-9364

Kim, C S and Liu, L Y (2007) Cost information model for managing multiple projects. Journal of Construction Engineering and Management, 133(12), pp. 966-974. ISSN 0733-9364

Kim, C-S (2002) An information model for real-time project cost integration. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kim, J J; Miller, J A and Kim, S (2020) Cost impacts of change orders due to unforeseen existing conditions in building renovation projects. Journal of Construction Engineering and Management, 146(8): 04020094, ISSN 0733-9364

Kim, J L; Greene, M and Kim, S (2014) Cost comparative analysis of a new green building code for residential project development. Journal of Construction Engineering and Management, 140(5): 05014002, ISSN 0733-9364

Kim, S (2013) Hybrid EVAS-CBR system for the preliminary cost estimation of high-rise buildings. PhD thesis, University of Reading, UK.

Kim, S (2023) Disaster management and recovery: Estimating the disaster impacts on construction costs and evaluating the policy effects on disaster recovery. PhD thesis, University of Texas at Arlington, USA.

Kiziltas, S (2008) An automated approach for developing integrated model-based construction project histories to support estimation of activity production rates. PhD thesis, Carnegie Mellon University, USA.

Kiziltas, S and Akinci, B (2009) Contextual information requirements of cost estimators from past construction projects. Journal of Construction Engineering and Management, 135(9), pp. 841-852. ISSN 0733-9364

Knost, Benjamin (2022) Incorporating resilience in infrastructure investment decisions: Developed framework, specifications, estimations, and evaluation. PhD thesis, Ohio State University, USA.

Koehn, E and Musser, K (1983) OSHA regulations effects on construction. Journal of Construction Engineering and Management, 109(2), pp. 233-244. ISSN 0733-9364

Kohn, M J (1970) The stock of unfinished construction in the USSR, 1950-1965: An efficiency problem in a centrally planned economy. PhD thesis, Yale University, USA.

Koskisto, O (1997) Reliability-based optimization of plant precast concrete building systems. PhD thesis, Johns Hopkins University, USA.

Kulshrestha, M (1997) Total Value Control in Construction through Multiple Criteria Decision Making (MCDM). PhD thesis, Indian Institute of Technology Delhi, India.

Kurniawan, F (2013) An integrated project evaluation tool for public-private partnership projects. PhD thesis, Heriot-Watt University, UK.

Lam, K C; Ning, X and Lam, M C K (2009) Conjoining MMAS to GA to solve construction site layout planning problem. Journal of Construction Engineering and Management, 135(10), pp. 1049-1057. ISSN 0733-9364

Langford, D A; Kennedy, P; Conlin, J and McKenzie, N (2003) Comparison of construction costs on motorway projects using measure and value and alternative tendering initiative contractual arrangements. Construction Management and Economics, 21(8), pp. 831-840. ISSN 01446193

Langston, C (2013) The application of data envelopment analysis to the benchmarking of construction performance in Australian and American high-rise buildings. International Journal of Construction Management, 13(3), pp. 55-75. ISSN 1562-3599

Langston, C (2014) Construction efficiency: A tale of two developed countries. Engineering, Construction and Architectural Management, 21(3), pp. 320-335. ISSN 0969-9988

Langston, C; Chan, E H W and Yung, E H K (2018) Embodied carbon and construction cost differences between Hong Kong and Melbourne buildings. Construction Economics and Building, 18(4), pp. 84-102. ISSN 2204-9029

Langston, Y L and Langston, C (2007) Building energy and cost performance: An analysis of thirty Melbourne case studies. Construction Economics and Building, 7(1), pp. 1-18. ISSN 2204-9029

Langston, Y L and Langston, C A (2008) Reliability of building embodied energy modelling: An analysis of 30 Melbourne case studies. Construction Management and Economics, 26(2), pp. 147-160. ISSN 1466433X

Laovisutthichai, V; Lu, W and Bao, Z (2022) Design for construction waste minimization: Guidelines and practice. Architectural Engineering and Design Management, 18(3), pp. 279-298. ISSN 1745-2007

Lashgari, Martin (2014) Comparative study of base-isolated and fixed-base buildings using a damage/cost approach. PhD thesis, University of Nebraska - Lincoln, USA.

Le, Y; Wang, Y; Luo, C and Peng, Y (2013) Integration of financial and contract management on the Shanghai Expo construction program. Journal of Construction Engineering and Management, 139(6), pp. 738-748. ISSN 0733-9364

Lee, B-H (2011) Forecasting wheat yield and quality conditional on weather information and estimating construction costs of agricultural facilities. PhD thesis, Oklahoma State University, USA.

Lee, C; Won, J and Lee, E B (2018) Method for predicting raw material prices for product production over long periods. Journal of Construction Engineering and Management, 145(1): 05018017, ISSN 0733-9364

Lee, F-P B (2009) Factors affecting the profitability of construction companies in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.

Lee, H-S (1992) Automated interactive cost estimating system for reinforced concrete building structures. PhD thesis, University of Michigan, USA.

Lee, J-R (1997) The object-oriented project system for pavement construction management and visualization. PhD thesis, Ohio State University, USA.

Lee, S (2007) Entry decision for unsolicited build-operate-transfer (BOT) highway projects: Real options approach. PhD thesis, University of Colorado at Boulder, USA.

Lee, S; Tae, S; Jee, N and Shin, S (2015) LDA-based model for measuring impact of change orders in apartment projects and its application for prerisk assessment and postevaluation. Journal of Construction Engineering and Management, 141(7): 4015011, ISSN 0733-9364

Lee, S H; Thomas, S R and Tucker, R L (2005) Web-based benchmarking system for the construction industry. Journal of Construction Engineering and Management, 131(7), pp. 790-798. ISSN 0733-9364

Leslie, S E (1997) Forecasting the funding needs of infrastructure renewal: A construction estimating technique. PhD thesis, University of Cincinnati, USA.

Leung, M Y; Skitmore, M and Chan, Y S (2007) Subjective and objective stress in construction cost estimation. Construction Management and Economics, 25(10), pp. 1063-1075. ISSN 1466433X

Lhee, S C; Issa, R R A and Flood, I (2012) Prediction of financial contingency for asphalt resurfacing projects using artificial neural networks. Journal of Construction Engineering and Management, 138(1), pp. 22-30. ISSN 0733-9364

Li, M (2024) Dfma-oriented rebar design optimization for reinforced concrete structures using graph neural network. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Li, M G; Chen, J J; Xu, A J; Xia, X H and Wang, J H (2014) Case study of innovative top-down construction method with channel-type excavation. Journal of Construction Engineering and Management, 140(5): 05014003, ISSN 0733-9364

Li, R and Roberti, R (2017) Optimal scheduling of railway track possessions in large-scale projects with multiple construction works. Journal of Construction Engineering and Management, 143(6): 04017007, ISSN 0733-9364

Li, W (1995) Benefit and cost analysis: Three-dimensional computer models with integrated databases in the management of construction. PhD thesis, Columbia University, USA.

Li, Y and Taylor, T R B (2014) Modeling the impact of design rework on transportation infrastructure construction project performance. Journal of Construction Engineering and Management, 140(9): 04014044, ISSN 0733-9364

Licher, Monica Katherine (2016) Estimating post-construction costs of a changing urban stormwater program. PhD thesis, Virginia Tech, USA.

Lim, B; Nepal, M P; Skitmore, M and Xiong, B (2016) Drivers of the accuracy of developers' early stage cost estimates in residential construction. Journal of Financial Management of Property and Construction, 21(1), pp. 4-20. ISSN 1366-4387

Lim, J N and Ofori, G (2007) Classification of innovation for strategic decision making in construction businesses. Construction Management and Economics, 25(9), pp. 963-978. ISSN 1466433X

Lim, J N; Schultmann, F and Ofori, G (2010) Tailoring competitive advantages derived from innovation to the needs of construction firms. Journal of Construction Engineering and Management, 136(5), pp. 568-580. ISSN 0733-9364

Lind, H and Brunes, F (2015) Explaining cost overruns in infrastructure projects: A new framework with applications to Sweden. Construction Management and Economics, 33(7), pp. 554-568. ISSN 01446193

Lines, B C; Sullivan, K T; Hurtado, K C and Savicky, J (2015) Planning in construction: Longitudinal study of pre-contract planning model demonstrates reduction in project cost and schedule growth. International Journal of Construction Education and Research, 11(1), pp. 21-39. ISSN 1557-8771

Liu, H (2024) Enhancing accuracy and security in BIM-based construction cost management leveraging AI and blockchain technologies. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Liu, H; Kwigizile, V and Huang, W C (2021) Holistic framework for highway construction cost index development based on inconsistent pay items. Journal of Construction Engineering and Management, 147(7): 04021052, ISSN 0733-9364

Liu, J and London, K (2011) Analysing the relationship between new housing supply and residential construction costs with the regional heterogeneities. Construction Economics and Building, 11(3), pp. 58-67. ISSN 2204-9029

Liu, L and Zhu, K (2007) Improving cost estimates of construction projects using phased cost factors. Journal of Construction Engineering and Management, 133(1), pp. 91-95. ISSN 0733-9364

Liu, M and Luo, M (2025) Cost estimation model of prefabricated construction for general contractors based on system dynamics. Engineering, Construction and Architectural Management, 32(1), pp. 621-638. ISSN 0969-9988

Liu, Z; Wang, H and Li, H (2018) Model of equipment sharing between contractors on construction projects. Journal of Construction Engineering and Management, 144(6): 04018039, ISSN 0733-9364

Lloyd, C A (2020) Modular manufacture and construction of small nuclear power generation systems. PhD thesis, University of Cambridge, UK.

Lopez, R and Love, P E D (2012) Design error costs in construction projects. Journal of Construction Engineering and Management, 138(5), pp. 585-593. ISSN 0733-9364

Lopez de Ortigosa, D A (1993) Forecasting construction costs in hyper-inflated economies. PhD thesis, University of Texas at Austin, USA.

Love, P E D; Edwards, D J; Watson, H and Davis, P (2010) Rework in civil infrastructure projects: Determination of cost predictors. Journal of Construction Engineering and Management, 136(3), pp. 275-282. ISSN 0733-9364

Love, P E D; Wang, X; Sing, C P and Tiong, R L K (2013) Determining the probability of project cost overruns. Journal of Construction Engineering and Management, 139(3), pp. 321-330. ISSN 0733-9364

Lowe, D J; Emsley, M W and Harding, A (2006) Relationships between total construction cost and project strategic, site related and building definition variable. Journal of Financial Management of Property and Construction, 11(3), pp. 165-180. ISSN 1366-4387

Lowe, D J; Emsley, M W and Harding, A (2006) Predicting construction cost using multiple regression techniques. Journal of Construction Engineering and Management, 132(7), pp. 750-758. ISSN 0733-9364

Lowe, D J; Emsley, M W and Harding, A (2007) Relationships between total construction cost and design related variables. Journal of Financial Management of Property and Construction, 12(1), pp. 11-24. ISSN 1366-4387

Lu, H; Wang, H; Yu, D and Ye, J (2023) Sharp schedule compression in urgent emergency construction projects via activity crashing, substitution and overlapping: A case study of huoshengshan and leishenshan hospital projects in wuhan. Engineering, Construction and Architectural Management, 30(8), pp. 3696-3712. ISSN 0969-9988

Luo, J; Zadeh, P and Staub-French, S (2024) Ontology-based design features for representing constructability in architectural design: Toward BIM in off-site construction. Journal of Construction Engineering and Management, 150(10): 05024010, ISSN 0733-9364

Ma, M; Tam, V W Y; Le, K N and Osei-Kyei, R (2024) A systematic literature review on price forecasting models in construction industry. International Journal of Construction Management, 24(11), pp. 1191-1200. ISSN 1562-3599

Ma, S; Li, Z and Shen, Y (2025) Decision-making framework for selecting sustainable prefabricated residential building technology schemes under minimum assembly rate constraints. Journal of Construction Engineering and Management, 151(8): 04025100, ISSN 0733-9364

Maharjan, R (2017) Effects of contract procurement factors on performance of transportation projects. PhD thesis, University of Nevada, Las Vegas, USA.

Mahdavian, A; Shojaei, A; Salem, M; Yuan, J S and Oloufa, A A (2021) Data-driven predictive modeling of highway construction cost items. Journal of Construction Engineering and Management, 147(3): 04020180, ISSN 0733-9364

Mahdi, I M; Al-Reshaid, K and Fereig, S M (2006) Optimum house delivery decision model from the government's and recipients' point-of-view. Engineering, Construction and Architectural Management, 13(4), pp. 413-430. ISSN 0969-9988

Mahmoodzadeh, A; Nejati, H R; Flaih, L R; Ibrahim, H H; Alenizi, F A and Alassaf, Y (2024) A rigorous examination of twelve cutting-edge machine-learning techniques for predicting time and cost in tunneling projects. Journal of Construction Engineering and Management, 150(12): 04024176, ISSN 0733-9364

Manrique, J D; Al-Hussein, M; Bouferguene, A; Safouhi, H and Nasseri, R (2011) Combinatorial algorithm for optimizing wood waste in framing designs. Journal of Construction Engineering and Management, 137(3), pp. 188-197. ISSN 0733-9364

Marchiori, Fernanda Fernandes (2009) Developing a method to prepare unit cost item nets for buildings estimating. PhD thesis, Universidade de São Paulo, Brazil.

Marenjak, S (2004) A generic approach to minimising whole life costs in the building industry. PhD thesis, University of Dundee, UK.

Marzouk, M and Amin, A (2013) Predicting construction materials prices using fuzzy logic and neural networks. Journal of Construction Engineering and Management, 139(9), pp. 1190-1198. ISSN 0733-9364

Matthews, J C (2010) Integrated, multi-attribute decision support system for the evaluation of underground utility construction methods. PhD thesis, Louisiana Tech University, USA.

Mayorga Amaya, C F (2020) Moving forecasting error: A risk-based cost forecasting approach. PhD thesis, Auburn University, USA.

McCaffer, R; McCaffrey, M J and Thorpe, A (1983) The disparity between construction cost and tender-price movements. Construction Papers, 2(2), pp. 17-27. ISSN 0144-8587

McQuillen, J L and Gary Hicks, R (1987) Construction of rubber-modified asphaut pavements. Journal of Construction Engineering and Management, 113(4), pp. 537-553. ISSN 0733-9364

Membah, J F J (2016) Parametric cost estimating and risk analysis of transportation tunneling projects. PhD thesis, North Dakota State University, USA.

Menassa, C; Pea Mora, F and Pearson, N (2010) Study of real options with exogenous competitive entry to analyze dispute resolution ladder investments in architecture, engineering, and construction projects. Journal of Construction Engineering and Management, 136(3), pp. 377-390. ISSN 0733-9364

Menassa, C C; Mora, F P and Pearson, N (2009) Option pricing model to analyze cost-benefit trade-offs of adr investments in AEC projects. Journal of Construction Engineering and Management, 135(3), pp. 156-168. ISSN 0733-9364

Migliaccio, G C; Guindani, M; D'Incognito, M and Zhang, L (2013) Empirical assessment of spatial prediction methods for location cost-adjustment factors. Journal of Construction Engineering and Management, 139(7), pp. 858-869. ISSN 0733-9364

Mills, A; Love, P E D and Williams, P (2009) Defect costs in residential construction. Journal of Construction Engineering and Management, 135(1), pp. 12-16. ISSN 0733-9364

Mirzadeh, I (2014) More roads for the money. PhD thesis, KTH Royal Institute of Technology, Sweden.

Mohsenijam, Arash (2019) Advancing regression based analytics for steel fabrication productivity modeling. PhD thesis, University of Alberta, Canada.

Mok, C K; Rao Tummala, V M and Leung, H M (1997) Practices, barriers and benefits of risk management process in building services cost estimation. Construction Management and Economics, 15(2), pp. 161-175. ISSN 01446193

Mollaei, A; Bachmann, C and Haas, C (2025) Evaluating the potential impact of building design strategies on material recovery during deconstruction. Journal of Construction Engineering and Management, 151(6): 04025065, ISSN 0733-9364

Moore, J E; Kuprenas, J; Lee, J J; Gordon, P; Richardson, H and Pan, Q (2004) Cost analysis methodology for advanced treatment of stormwater: The Los Angeles case. Journal of Construction Research, 5(2), pp. 149-170. ISSN 1609-9451

Moret, Y (2011) Modeling cost and time uncertainty in rail line construction. PhD thesis, Massachusetts Institute of Technology, USA.

Moret, Y and Einstein, H H (2012) Modeling correlations in rail line construction. Journal of Construction Engineering and Management, 138(9), pp. 1075-1084. ISSN 0733-9364

Moret, Y and Einstein, H H (2016) Construction cost and duration uncertainty model: Application to high-speed rail line project. Journal of Construction Engineering and Management, 142(10): 05016010, ISSN 0733-9364

Morgado, J and Neves, J (2014) Work zone planning in pavement rehabilitation: Integrating cost, duration, and user effects. Journal of Construction Engineering and Management, 140(11): 4014050, ISSN 0733-9364

Moscati, A and Engström, S (2019) Digitalization and industrialization: Exploration of the current and future challenges in the Swedish built environment sector. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Mostofi, F; Tokdemir, O B; Toǧan, V and Arditi, D (2024) Predicting the cost of rework in high-rise buildings using graph convolutional networks. Journal of Construction Engineering and Management, 150(8): 04024085, ISSN 0733-9364

Mostofi, F; Toǧan, V; Başaǧa, H B; Çltlpltloǧlu, A and Tokdemir, O B (2023) Multiedge graph convolutional network for house price prediction. Journal of Construction Engineering and Management, 149(11): 04023112, ISSN 0733-9364

Moynihan, G; Zhou, H and Cui, Q (2009) Stochastic modeling for pavement warranty cost estimation. Journal of Construction Engineering and Management, 135(5), pp. 352-359. ISSN 0733-9364

Mselle, J and Sanga, S A (2018) Constraints facing incremental housing construction in Dar es Salaam, Tanzania. Journal of Construction in Developing Countries, 23(1), pp. 1-20. ISSN 1823-6499

Munir, M; Kiviniemi, A; Jones, S and Finnegan, S (2021) BIM business value for asset owners: Key issues and challenges. International Journal of Building Pathology and Adaptation, 39(1), pp. 135-151. ISSN 23984708

Myrvang, R and Liu, C Y A (2025) Beyond traditional methods: Enhancing cost escalation forecasting in commercial construction amid economic turbulence. Journal of Construction Engineering and Management, 151(2): 04024201, ISSN 0733-9364

Nabawy, M and Gouda Mohamed, A (2024) Risks assessment in the construction of infrastructure projects using artificial neural networks. International Journal of Construction Management, 24(4), pp. 361-373. ISSN 1562-3599

Nabi, M A; El-Adaway, I H and Assaad, R H (2024) Modeling inflation transmission among different construction materials. Journal of Construction Engineering and Management, 150(5): 04024024, ISSN 0733-9364

Naderpajouh, N; Hastak, M; Gokhale, S; Bayraktar, M E; Iyer, A and Arif, F (2015) Counterfeiting risk governance in the capital projects supply chain. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Nagashima, M; Tsuchiya, M and Asada, M (2011) Reducing the economic risk of lng tank construction under conditions of fluctuating resource prices. Journal of Construction Engineering and Management, 137(5), pp. 382-391. ISSN 0733-9364

Naghashian, M H (2015) Generalised cost benefit analysis for large infrastructure projects: the case of the Channel Tunnel rail link. PhD thesis, University of Birmingham, UK.

Nassar, K M; Nassar, W M and Hegab, M Y (2005) Evaluating cost overruns of asphalt paving project using statistical process control methods. Journal of Construction Engineering and Management, 131(11), pp. 1173-1178. ISSN 0733-9364

Neil, J M (1978) Construction cost estimating concepts and their application. PhD thesis, Texas A&M University, USA.

Newman, W H (1934) The building industry and business cycles. PhD thesis, University of Chicago, USA.

Newton, L A (2004) The impact of quality on building life cycle costs. PhD thesis, University of New Brunswick, Canada.

Ng, K F (2017) Sustainable housing and railway developments over space and time. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Nguyen, F B T (2024) Quality control of front-end planning for electric power construction: A collaborative process-based approach using systems engineering. PhD thesis, Colorado State University, USA.

Nguyen, H V (2010) Process-based cost modeling to support target value design. PhD thesis, University of California, Berkeley, USA.

Niknam, M (2015) A semantics-based approach to construction cost estimating. PhD thesis, Marquette University, USA.

Nixon, A M (2002) The selection of architectural firms in Indiana school construction projects. EdD thesis, Ball State University, USA.

Noruwa, B I (2020) Application and effects of emerging technologies on variation minimisation in the UK construction projects. PhD thesis, Coventry University, UK.

O'Brien, W J (1998) Capacity costing approaches for construction supply-chain management. PhD thesis, Stanford University, USA.

O'Brien, W J and Fischer, M A (2000) Importance of capacity constraints to construction cost and schedule. Journal of Construction Engineering and Management, 126(5), pp. 366-373. ISSN 0733-9364

Obunwo, C U C (2016) A framework for enhancing project quality and customer satisfaction in government road construction projects in Rivers State, Nigeria. PhD thesis, University of Wolverhampton, UK.

Odewole, A O (2020) Development of a collaborative innovation management framework to assist in the utilisation of agricultural waste as building materials in Nigeria. PhD thesis, University of Salford, UK.

Odeyinka, H; Lowe, J and Kaka, A (2012) Regression modelling of risk impacts on construction cost flow forecast. Journal of Financial Management of Property and Construction, 17(3), pp. 203-221. ISSN 1366-4387

Odeyinka, H A; Lowe, J G and Kaka, A P (2002) A construction cost flow risk assessment model. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Odusami, K T (2003) Criteria for measuring project performance by construction professionals in Nigerian construction industry. Journal of Financial Management of Property and Construction, 8(1), pp. 39-48. ISSN 1366-4387

Ofek, S (2021) Stimulating key stakeholders to promote residential green building in Israel. PhD thesis, University of Haifa, Israel.

Ogunlana, S O; Bhokha, S and Pinnemitr, N (2001) Application of artifical neural network (ANN) to forecast construction cost of buildings at the pre-design stage. Journal of Financial Management of Property and Construction, 6(3), pp. 179-192. ISSN 1366-4387

Ogunsina, O; Ekwus Obiegbu, M and Adeniyi, O (2018) Factors confronting quantity surveying practice: The case of Nigeria. Journal of Engineering, Design and Technology, 16(5), pp. 767-782. ISSN 1726-0531

Okpala, D C and Aniekwu, A N (1988) Causes of high costs of construction in Nigeria. Journal of Construction Engineering and Management, 114(2), pp. 233-244. ISSN 0733-9364

Okuwoga, A A (1994) Construction cost escalation and resource planning in Nigeria: A case study of public sector housing projects 1975-90. PhD thesis, University College London, UK.

Oladapo, A A (2007) A quantitative assessment of the cost and time impact of variation orders on construction projects. Journal of Engineering, Design and Technology, 5(1), pp. 35-48. ISSN 1726-0531

Olatunde, N. A.; Gento, A. M.; Awodele, I. A.; Adebayo, B. O.; Makanjuola, S. S. and Oyewo, O. W. (2026) Extent of specialized software usage in the delivery of quantity surveying services in South West Nigeria. International Journal of Building Pathology and Adaptation, 44(3), pp. 740-756. ISSN 2398-4708

Olatunde, N A and Alao, O O (2017) Quantitative appraisal of cost and time performance of construction projects in public and private universities in Osun State, Nigeria. Journal of Engineering, Design and Technology, 15(5), pp. 619-634.

Olatunde, N A; Awodele, I A; Adebayo, B O and Makanjuola, S S (2025) Assessment of factors inhibiting engagement of quantity surveyors on private residential building projects in Ado-Ekiti, Nigeria. Journal of Financial Management of Property and Construction, 30(2), pp. 318-334. ISSN 1366-4387

Olatunde, N A; Ogunsemi, D R and Oke, A E (2017) Impact of team members' composition on construction projects delivery in selected higher institutions in Nigeria. Journal of Engineering, Design and Technology, 15(3), pp. 355-377.

Olatunji, O A (2008) A comparative analysis of tender sums and final costs of public construction and supply projects in Nigeria. Journal of Financial Management of Property and Construction, 13(1), pp. 60-79. ISSN 1366-4387

Olatunji, O A (2010) The impact of oil price regimes on construction cost in Nigeria. Construction Management and Economics, 28(7), pp. 747-759. ISSN 1466433X

Omotayo, T S (2017) Strategic realignment of the post-contract cost control process in the Nigerian construction industry using kaizen. PhD thesis, University of Salford, UK.

Onsarigo, L; Duncan, K and Atalah, A (2020) The effect of prevailing wages on building costs, bid competition, and bidder behaviour: Evidence from Ohio school construction. Construction Management and Economics, 38(10), pp. 917-933. ISSN 01446193

Oteng-Abayie, E F and Dramani, J B (2019) Time-frequency domain causality of prime building cost and macroeconomic indicators in Ghana: Implications for project selection. Construction Management and Economics, 37(5), pp. 243-256. ISSN 01446193

Owusu-Manu, D-G; John, E D; Adesi, M; Badu, E and Love, P E D (2016) Attaining fairness in construction cost consultancy pricing services: A case study in Ghana. Journal of Engineering, Design and Technology, 14(4), pp. 699-712.

Oyenubi, A. and Oyeyipo, O. O. (2026) Cost-carbon trade-offs in green infrastructure: A case of Nigeria. Journal of Engineering, Design and Technology, 24(3), pp. 805-830. ISSN 1726-0531

Oyenubi, A. and Oyeyipo, O. O. (2026) Overcoming GenAI adoption barriers in construction cost management: Evidence from Nigeria. Construction Innovation, pp. 1-26. ISSN 1471-4175

O’brien, W J; Fischer, M A and Jucker, J V (1995) An economic view of project coordination. Construction Management and Economics, 13(5), pp. 393-400. ISSN 01446193

Padala, S P S and M Skanda, P (2025) BIM-based multi-objective optimization framework for volumetric analysis of building projects. Journal of Engineering, Design and Technology, 23(5), pp. 1326-1347. ISSN 1726-0531

Paek, J H; Lee, Y W and Napier, T R (1992) Selection of design/build proposal using fuzzy-logic system. Journal of Construction Engineering and Management, 118(2), pp. 303-317. ISSN 0733-9364

Pakalapati, K; Khalafalla, M and Rueda-Benavides, J (2022) Using moving-window cross-validation algorithm to optimize bid-based cost estimating data usage. International Journal of Construction Management, 22(15), pp. 2855-2863. ISSN 1562-3599

Palmer, A C (1992) An investigative study of value engineering in the United States of America and its relationship to United Kingdom cost control procedures. PhD thesis, Loughborough University, UK.

Panwar, A (2019) Development of a many-objective model based on NSGA-III for construction projects. PhD thesis, Indian Institute of Technology Delhi, India.

Park, A and Chang, C Y (2013) Impacts of construction events on the project equity value of the Channel Tunnel project. Construction Management and Economics, 31(3), pp. 223-237. ISSN 1466433X

Park, T i (2009) A comprehensive asset management system for sewer infrastructures. PhD thesis, Pennsylvania State University, USA.

Pasha, A H S (1984) The provision of affordable housing in Central Sudan. PhD thesis, University of Bristol, UK.

Pasquire, C L (1991) Builders quantities for contractors' management. PhD thesis, Loughborough University, UK.

Patterson, D A; Farnsworth, C B; Hutchings, D M; Eggett, D L and Weidman, J E (2023) Comparing cost, schedule, and quality of CM/GC and DBB project delivery for repetitive commercial construction. International Journal of Construction Education and Research, 19(2), pp. 166-186. ISSN 1557-8771

Patty, R M (1993) A construction engineering platform for the integration of constructability concepts and lessons learned at the point of design. PhD thesis, Purdue University, USA.

Peckham, G E (1971) The systems approach to school construction: the potential benefits, the necessary conditions, and the implications for Michigan schools. PhD thesis, Michigan State University, USA.

Perng, Y H and Chang, C L (2004) How does government procurement law affect bidding price competition in Taiwan? Building Research & Information, 32(6), pp. 497-509. ISSN 0961-3218

Petroutsatou, K; Georgopoulos, E; Lambropoulos, S and Pantouvakis, J P (2012) Early cost estimating of road tunnel construction using neural networks. Journal of Construction Engineering and Management, 138(6), pp. 679-687. ISSN 0733-9364

Phaobunjong, K (2002) Parametric cost estimating model for conceptual cost estimating of building construction projects. PhD thesis, University of Texas at Austin, USA.

Pichura, A C (2004) The phenomenon of innovation and its influence on changing project delivery models in construction in Japan. PhD thesis, University of Tokyo, Japan.

Picken, D H and Ilozor, B D (2003) Height and construction costs of buildings in Hong Kong. Construction Management and Economics, 21(2), pp. 107-111. ISSN 01446193

Poh, P S H and Chen, J (1998) The Singapore buildable design appraisal system: A preliminary review of the relationship between buildability, site productivity and cost. Construction Management and Economics, 16(6), pp. 681-692. ISSN 01446193

Pontikis, K L (1998) Apartment building process: The design and construction of the korinthos apartment building in Cyprus. PhD thesis, University of California, Berkeley, USA.

Porwal, A; Parsamehr, M; Szostopal, D; Ruparathna, R and Hewage, K (2023) The integration of building information modeling (BIM) and system dynamic modeling to minimize construction waste generation from change orders. International Journal of Construction Management, 23(1), pp. 156-166. ISSN 1562-3599

Pourghazian, H (2008) Industrial construction methods for cost-effective and sustainable multi-storey buildings. PhD thesis, KTH Royal Institute of Technology, Sweden.

Psilander, K (2012) Managing production costs of small and large developers in Sweden: A case study on multi-family construction. International Journal of Construction Education and Research, 8(1), pp. 47-62. ISSN 1557-8771

Rafiei, M H and Adeli, H (2018) Novel machine-learning model for estimating construction costs considering economic variables and indexes. Journal of Construction Engineering and Management, 144(12): 04018106, ISSN 0733-9364

Rahman, S; Perera, S; Odeyinka, H and Bi, Y (2008) A conceptual knowledge-based cost model for optimizing the selection of materials and technology for building design. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Rai, H; Jagannathan, M and Venkata Santosh Kumar, D (2021) Claim tenability assessment in Indian real estate projects using ann and decision tree models. Built Environment Project and Asset Management, 11(3), pp. 468-487. ISSN 2044-124X

Rajan, T A; Gopinath, G and Behera, M (2014) PPPs and project overruns: Evidence from road projects in India. Journal of Construction Engineering and Management, 140(5): 04013070, ISSN 0733-9364

Rampini, Luca (2023) Artificial intelligence enhances digital asset management. PhD thesis, Politecnico di Milano, Italy.

Ranawaka, I and Mallawaarachchi, H (2018) A risk-responsive framework for green retrofit projects in Sri Lanka. Built Environment Project and Asset Management, 8(5), pp. 477-490. ISSN 2044-124X

Rao, G N (1997) Cost risk assessment in environmental remediation: Towards a causal-chain approach. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Rashidi, M H and Kashani, H (2023) Bayesian modeling of labor earnings in construction. Journal of Construction Engineering and Management, 149(2): 4022168, ISSN 0733-9364

Rasmussen, F. N.; Birkved, M. and Birgisdóttir, H. (2020) Low-carbon design strategies for new residential buildings: Lessons from architectural practice. Architectural Engineering and Design Management, 16(5), pp. 374-390. ISSN 1745-2007

Rasmussen, F N; Birkved, M and Birgisdóttir, H (2020) Low- carbon design strategies for new residential buildings: lessons from architectural practice. Architectural Engineering and Design Management, 16(5), pp. 374-390. ISSN 1745-2007

Razak, D S A; Mills, G and Roberts, A (2016) External failure cost in construction supply chains. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Razkenari, M A (2019) Framework for measuring industrialized construction maturity. PhD thesis, University of Florida, USA.

Reaney, M; Griffith, A; Watson, P A and Ellis, C (2001) Construction cost control implications for the planning application process. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Rehm, M and Ade, R (2013) Construction costs comparison between green and conventional office buildings. Building Research & Information, 41(2), pp. 198-208. ISSN 0961-3218

Ren, H (1992) Risk management in construction cost and inflation. PhD thesis, University of Reading, UK.

Ribas, D A and Cachim, P (2019) Economic sustainability of buildings: Assessment of economic performance and sustainability index. Engineering, Construction and Architectural Management, 26(1), pp. 2-28. ISSN 0969-9988

Righetto, E.; Micelli, E. and Pellegrino, M. (2026) Can the deep retrofit of the housing stock cost less? Learning curves and the costs of off-site industrialised construction in France. Construction Management and Economics, 44(5), pp. 359-380. ISSN 0144-6193

Roachanakanan, K (2005) A case study of cost overruns in a Thai condominium project. PhD thesis, Texas A&M University, USA.

Roberts, J (1987) The business roundtable construction industry cost effectiveness task force. Construction Management and Economics, 5(2), pp. 95-100. ISSN 01446193

Robson, A; Boyd, D and Thurairajah, N (2016) Studying 'cost as information' to account for construction improvements. Construction Management and Economics, 34(6), pp. 418-431. ISSN 01446193

Rojas, E M (2008) Single versus multiple prime contracting. Journal of Construction Engineering and Management, 134(10), pp. 758-765. ISSN 0733-9364

Rojas, E M and Kell, I (2008) Comparative analysis of project delivery systems cost performance in Pacific Northwest public schools. Journal of Construction Engineering and Management, 134(6), pp. 387-397. ISSN 0733-9364

Rueda-Benavides, J; Gransberg, D; Khalafalla, M and Mayorga, C (2024) Probabilistic cost-based decision-making matrix: IDIQ vs. DBB contracting. Construction Management and Economics, 42(1), pp. 1-15. ISSN 01446193

Rueda-Benavides, J A (2016) Indefinite delivery/indefinite quantity project selection framework using stochastic techniques. PhD thesis, Iowa State University, USA.

Sadeghpour, F (2004) A CAD-based model for site layout. PhD thesis, Concordia University, Canada.

Sadeh, H; Mirarchi, C and Pavan, A (2021) Integrated approach to construction risk management: Cost implications. Journal of Construction Engineering and Management, 147(10), ISSN 0733-9364

Sadick, A M; Gurmu, A and Gunarathna, C (2025) Artificial intelligence-based pre-conception stage construction budget decision-making model and tool for residential buildings. Engineering, Construction and Architectural Management, 32(7), pp. 4552-4580. ISSN 0969-9988

Saeidlou, S and Ghadiminia, N (2024) A construction cost estimation framework using DNN and validation unit. Building Research & Information, 52(1-2), pp. 38-48. ISSN 0961-3218

Sahu, A and Shanmugapriya, S (2025) A practical approach of partial striking technique in high-rise buildings. Engineering, Construction and Architectural Management, 32(2), pp. 987-1009. ISSN 0969-9988

Said, H M M (2010) Optimizing site layout and material logistics planning during the construction of critical infrastructure projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Salamah, A A A (1989) COAD: A knowledge-based expert system for conceptual estimates and designs. PhD thesis, University of Colorado at Boulder, USA.

San Cristóbal, J R (2009) Time, cost, and quality in a road building project. Journal of Construction Engineering and Management, 135(11), pp. 1271-1274. ISSN 0733-9364

Sandy, G C (1981) An evaluative comparison of the satisfaction with the utility of new buildings versus library additions and addition/renovations. PhD thesis, Florida State University, USA.

Sanga, S A and Lucian, C (2016) Cost shares and factor-cost ratios in owner-built incremental housing in Dar es Salaam, Tanzania. Journal of Construction in Developing Countries, 21(1), pp. 113-130. ISSN 1823-6499

Sanyal, A P and Bhattacharya, S P (2024) A comparative analysis between CBR based prediction models and mra models for high-rise construction delay prediction. International Journal of Construction Management, 24(2), pp. 124-136. ISSN 1562-3599

Sarkar, D (2018) Hybrid approach for resource optimization and management of bridge projects using bootstrap technique and genetic algorithm. International Journal of Construction Management, 18(3), pp. 207-220. ISSN 1562-3599

Sayed, A M Z; Assaf, S; Aldosary, A S; Hassanain, M A and Abdallah, A (2020) Drivers of e-bidding implementation in the Saudi Arabian construction industry. Built Environment Project and Asset Management, 10(1), pp. 16-27. ISSN 2044-124X

Sazalli, S A H; Greenwood, D; Morton, D and Agnew, B (2012) Industrialized building system in Malaysian housing: An emerging innovation system explanation. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Schade, J (2013) A design process perspective on the energy performance of buildings. PhD thesis, Luleå University of Technology, Sweden.

Scheublin, F J M (2001) Project alliance contract in the Netherlands. Building Research & Information, 29(6), pp. 451-455. ISSN 0961-3218

Schexnayder, C J; Weber, S L and David, S A (2004) Transportation agency use of owner-controlled insurance programs. Journal of Construction Engineering and Management, 130(4), pp. 517-524. ISSN 0733-9364

Schied Jr., E P (2012) Geometric information scheduling to identify and resolve spatial conflicts and increase efficiency of space use on construction projects. PhD thesis, Catholic University of America, USA.

Schuldt, S and El-Rayes, K (2018) Optimizing the planning of remote construction sites to minimize facility destruction from explosive attacks. Journal of Construction Engineering and Management, 144(5): 04018020, ISSN 0733-9364

Segol, G (1990) An option pricing model with three stochastic variables and its application to risky projects. PhD thesis, Golden Gate University, USA.

Selĺs, M E S; Rubio, J A C and Mullor, J R (2008) Development of a quantification proposal for hidden quality costs: Applied to the construction sector. Journal of Construction Engineering and Management, 134(10), pp. 749-757. ISSN 0733-9364

Senanayake, S M A H; Gunawardana, P A M; Perera, B A K S and Rajaratnam, D (2024) Examining the potential use of augmented reality in construction cost management tools and techniques. Journal of Engineering, Design and Technology, 22(6), pp. 1847-1869. ISSN 1726-0531

Severn, B W (1980) A simplified methodology for evaluating rural road proposals for less developed countries. PhD thesis, University of New Mexico, USA.

Shah, K L (1969) Techniques for estimating construction costs of waste treatment plants. PhD thesis, University of Oklahoma, USA.

Shahandashti, S M and Ashuri, B (2013) Forecasting Engineering News-Record construction cost index using multivariate time series models. Journal of Construction Engineering and Management, 139(9), pp. 1237-1243. ISSN 0733-9364

Shakantu, W; Tookey, J E and Bowen, P A (2003) The hidden cost of transportation of construction materials: An overview. Journal of Engineering, Design and Technology, 1(1), pp. 103-118. ISSN 1726-0531

Shamsai, M; Whitlatch, E and Sezen, H (2007) Economic evaluation of reinforced concrete structures with columns reinforced with prefabricated cage system. Journal of Construction Engineering and Management, 133(11), pp. 864-870. ISSN 0733-9364

Shapira, A and Raz, Y (2005) Comparative analysis of shoring towers for high-clearance construction. Journal of Construction Engineering and Management, 131(3), pp. 293-301. ISSN 0733-9364

Sharma, V; Zaki, M; Jha, K N and Krishnan, N M A (2022) Machine learning-aided cost prediction and optimization in construction operations. Engineering, Construction and Architectural Management, 29(3), pp. 1241-1257. ISSN 0969-9988

Sheamar, S; Wedawatta, G; Tennakoon, M; Palliyaguru, R and Antwi-Afari, M F (2024) The potential of new models of construction procurement to counter cost overruns in construction projects: An exploratory study from a contractors' perspective. Journal of Financial Management of Property and Construction, 29(2), pp. 211-228. ISSN 1366-4387

Shehab, T; Blampied, N; Nasr, E and Sindhu, L (2024) Ann-based estimation model for the preconstruction cost of pavement rehabilitation projects. International Journal of Construction Management, 24(8), pp. 894-901. ISSN 1562-3599

Shehab, T and Farooq, M (2013) Neural network cost estimating model for utility rehabilitation projects. Engineering, Construction and Architectural Management, 20(2), pp. 118-126. ISSN 0969-9988

Shehadeh, A; Alshboul, O and Hamedat, O (2022) Risk assessment model for optimal gain-pain share ratio in target cost contract for construction projects. Journal of Construction Engineering and Management, 148(2): 04021197, ISSN 0733-9364

Shen, L Y (1990) Application of risk management to the Chinese construction industry. PhD thesis, University of Reading, UK.

Shen, Y; Lin, Z and Wang, Z (2022) Single-side accumulative jacking construction method for large-span arched latticed shells. Journal of Construction Engineering and Management, 148(12): 06022001, ISSN 0733-9364

Shi, G; Lu, D; Liu, Z; Du, X; Zhang, Q; Zhao, L and Wang, Z (2024) Material distribution planning method and experimental verification under multinode and multivehicle scene. Journal of Construction Engineering and Management, 150(11): 04024161, ISSN 0733-9364

Shiha, A; Dorra, E M and Nassar, K (2020) Neural networks model for prediction of construction material prices in Egypt using macroeconomic indicators. Journal of Construction Engineering and Management, 146(3): 04020010, ISSN 0733-9364

Shirong, L (1996) New approach for optimization of overall construction schedule. Journal of Construction Engineering and Management, 122(1), pp. 7-13. ISSN 0733-9364

Short, C A; Song, J; Mottet, L; Chen, S; Wu, J and Ge, J (2018) Challenges in the low-carbon adaptation of China's apartment towers. Building Research & Information, 46(8), pp. 899-930. ISSN 0961-3218

Shr, J F and Chen, W T (2004) Setting maximum incentive for incentive/disincentive contracts for highway projects. Journal of Construction Engineering and Management, 130(1), pp. 84-93. ISSN 0733-9364

Shr, J F; Ran, B and Sung, C W (2004) Method to determine minimum contract bid for A + B+ I/D highway projects. Journal of Construction Engineering and Management, 130(4), pp. 509-516. ISSN 0733-9364

Shrestha, K P (2016) Data analytics and visualization for enhanced highway construction cost indexes and as-built schedules. PhD thesis, Iowa State University, USA.

Sing, T F (2002) Time to build options in construction processes. Construction Management and Economics, 20(2), pp. 119-130. ISSN 01446193

Singh, J (2021) BIM-based automatic piping layout design and schedule optimization. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Slaughter, E S (2001) Design strategies to increase building flexibility. Building Research & Information, 29(3), pp. 208-217. ISSN 0961-3218

Smith, J P; Miller, K; Christofferson, J and Hutchings, M (2011) Best practices for dealing with price volatility in utah's residential construction market. International Journal of Construction Education and Research, 7(3), pp. 210-225. ISSN 1557-8771

Smith, R E; Griffin, G; Rice, T and Hagehofer-Daniell, B (2018) Mass timber: Evaluating construction performance. Architectural Engineering and Design Management, 14(1-2), pp. 127-138. ISSN 1745-2007

Sohail, M and Cavill, S (2008) Accountability to prevent corruption in construction projects. Journal of Construction Engineering and Management, 134(9), pp. 729-738. ISSN 0733-9364

Sonmez, R (2004) Selection of a probability distribution function for construction cost estimation. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Sonmez, R (2008) Parametric range estimating of building costs using regression models and bootstrap. Journal of Construction Engineering and Management, 134(12), pp. 1011-1016. ISSN 0733-9364

Staub-French, S A (2002) Feature-driven activity-based cost estimating. PhD thesis, Stanford University, USA.

Stemp, B A and Walewski, J (2011) Lampson transi-lift mobile crane: Concept, design, and use. Journal of Construction Engineering and Management, 137, pp. 785-792. ISSN 0733-9364

Stocks, S N and Singh, A (1999) Studies on the impact of functional analysis concept design on reduction in change orders. Construction Management and Economics, 17(3), pp. 251-267. ISSN 01446193

Stone, M L C (2013) Development of unit cost estimating models with respect to scale economies and material price volatility for use in probabilistic life cycle cost analyses. PhD thesis, University of Alabama, USA.

Stoy, C and Schalcher, H R (2007) Residential building projects: Building cost indicators and drivers. Journal of Construction Engineering and Management, 133(2), pp. 139-145. ISSN 0733-9364

Sultan, B and Alaghbari, W (2023) Construction industry sustainable development indicator for low-income developing countries: Yemen as a case study. International Journal of Construction Management, 23(6), pp. 1053-1060. ISSN 1562-3599

Susanti, B; Kadarsa, E; Foralisa, M and Juliantina, I (2023) Non-toll revenue potential to increase funding sources for toll road maintenance. Construction Economics and Building, 23(3-4), pp. 170-185. ISSN 2204-9029

Swei, O (2018) Long-run construction cost trends: Baumol's cost disease and a disaggregate look at building material price dynamics. Journal of Construction Engineering and Management, 144(7): 04018058, ISSN 0733-9364

Szamocki, N; Kim, M K; Ahn, C R and Brilakis, I (2019) Reducing greenhouse gas emission of construction equipment at construction sites: Field study approach. Journal of Construction Engineering and Management, 145(9): 05019012, ISSN 0733-9364

Tabatabai-Gargari, M and Elzarka, H M (1998) Integrated CAD/KBS approach for automating preconstruction activities. Journal of Construction Engineering and Management, 124(4), pp. 257-262. ISSN 0733-9364

Taemthong, W (2002) Accounting for the impact of learning and scheduled overtime: Developing dynamic models to estimate and control labor time and labor cost. PhD thesis, University of Michigan, USA.

Tait, P D and Swaffield, L M (2003) Construction site waste: The real cost and benefits available from waste reduction. Journal of Financial Management of Property and Construction, 8(1), pp. 3-16. ISSN 1366-4387

Takim, R and Akintoye, A (2002) Performance indicators for successful construction project performance. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Tanaka, M (2008) Essays on durability and the Japanese housing market. PhD thesis, Johns Hopkins University, USA.

Tang, S (2025) Natural language processing (NLP)-based framework for construction quantity take off from building information models. PhD thesis, Western Michigan University, USA.

Tavafzadeh Haghi, N; Ahmadian Nezhad Monfared, M; Hashemian, L and Bayat, A (2019) Capital cost comparison of pavements comprised of insulation layers: Case study in Edmonton, Canada. Journal of Construction Engineering and Management, 145(7): 04019038, ISSN 0733-9364

Thadicaran, A B G (1997) Implementation strategies for water resources projects under uncertainties of completion time. PhD thesis, Colorado State University, USA.

Thal Jr, A E; Cook, J J and White Iii, E D (2010) Estimation of cost contingency for Air Force construction projects. Journal of Construction Engineering and Management, 136(11), pp. 1181-1188. ISSN 0733-9364

Thomas, H R and Ellis, R D (2007) Contractor prebid planning principles. Journal of Construction Engineering and Management, 133(8), pp. 542-552. ISSN 0733-9364

Thomas, H R; Sanvido, V E and Sanders, S R (1989) Impact of material management on productivity: a case study. Journal of Construction Engineering and Management, 115(3), pp. 370-384. ISSN 0733-9364

Thomas, S R; Lee, S H; Spencer, J D; Tucker, R L and Chapman, R E (2004) Impacts of design/information technology on project outcomes. Journal of Construction Engineering and Management, 130(4), pp. 586-597. ISSN 0733-9364

Thuse, D G (1988) Road transport investment model using dynamic programming. PhD thesis, Indian Institute of Technology, Bombay, India.

Tischer, T E and Kuprenas, J A (2003) Bridge falsework productivity: measurement and influences. Journal of Construction Engineering and Management, 129(3), pp. 243-250. ISSN 0733-9364

Tolani, O V (2013) An examination of risk perceptions and allocation preferences in public-private partnerships in Nigeria. PhD thesis, University of Calgary, Canada.

Toliver, B L (2018) Implementing project management plans to control construction costs on military projects in Korea. DEng thesis, George Washington University, USA.

Torcellini, P; Pless, S and Leach, M (2014) A pathway for net-zero energy buildings: Creating a case for zero cost increase. Building Research & Information, 43(1), pp. 25-33. ISSN 0961-3218

Touran, A (1993) Probabilistic cost estimating with subjective correlations. Journal of Construction Engineering and Management, 119(1), pp. 58-71. ISSN 0733-9364

Touran, A (2010) Probabilistic approach for budgeting in portfolio of projects. Journal of Construction Engineering and Management, 136(3), pp. 361-366. ISSN 0733-9364

Touran, A and Lopez, R (2006) Modeling cost escalation in large infrastructure projects. Journal of Construction Engineering and Management, 132(8), pp. 853-860. ISSN 0733-9364

Touran, A and Suphot, L (1997) Rank correlations in simulating construction costs. Journal of Construction Engineering and Management, 123(3), pp. 297-301. ISSN 0733-9364

Touran, A and Wiser, E P (1992) Monte Carlo technique with correlated random variables. Journal of Construction Engineering and Management, 118(2), pp. 258-272. ISSN 0733-9364

Tse, R Y C; Ganesan, S and So, H M (1998) Property cycles in Hong Kong: Causes and impacts. Journal of Financial Management of Property and Construction, 3(2), pp. 2-26. ISSN 1366-4387

Tucker, S N (1986) Formulating construction cash flow curves using a reliability theory analogy. Construction Management and Economics, 4(3), pp. 179-188. ISSN 01446193

Tucker, S N (1988) A single alternative formula for department of health and social security S-curves. Construction Management and Economics, 6(1), pp. 13-23. ISSN 01446193

Tuffaha, F M; Assaf, S; Yasar Zakaria, Z and Hadidi, L A (2021) A framework for the performance assessment of construction contractors in Saudi Arabia. Built Environment Project and Asset Management, 11(2), pp. 195-213. ISSN 2044-124X

Vereen, S C (2013) Forecasting skilled labor demand in the US construction industry. PhD thesis, North Carolina State University, USA.

Vermande, H M and Van Mulligen, P H (1999) Construction costs in the Netherlands in an international context. Construction Management and Economics, 17(3), pp. 269-283. ISSN 01446193

Visser, A T (1981) An evaluation of unpaved road performance and maintenance. PhD thesis, University of Texas at Austin, USA.

Wahab, A and Wang, J (2022) Factors-driven comparison between BIM-based and traditional 2D quantity takeoff in construction cost estimation. Engineering, Construction and Architectural Management, 29(2), pp. 702-715. ISSN 0969-9988

Wall, D M (1997) Distributions and correlations in Monte Carlo simulation. Construction Management and Economics, 15(3), pp. 241-258. ISSN 01446193

Walsh, K D; Sawhney, A and Brown Iv, A (2005) International comparison of cost for the construction sector: Purchasing power parity. Journal of Construction Engineering and Management, 131(2), pp. 160-167. ISSN 0733-9364

Walsh, K D; Sawhney, A and Vachris, M A (2006) Improving inter-spatial comparison of construction costs. Engineering, Construction and Architectural Management, 13(2), pp. 123-135. ISSN 0969-9988

Wang, J.; Qu, Z.; Lee, C. Y. and Skitmore, M. (2025) Highway construction cost index forecasting: A hybrid VMD–LSTM–GRU method. Construction Management and Economics, 43(10), pp. 849-863. ISSN 0144-6193

Wang, J; Qu, Z and Skitmore, M (2026) Predicting construction cost index using a VMD-GRU framework with the mhsa mechanism. Journal of Construction Engineering and Management, 152(1): 04025236, ISSN 0733-9364

Wang, C H and Mei, Y H (1998) Model for forecasting construction cost indices in Taiwan. Construction Management and Economics, 16(2), pp. 147-157. ISSN 01446193

Wang, J and Ashuri, B (2017) Predicting ENR construction cost index using machine-learning algorithms. International Journal of Construction Education and Research, 13(1), pp. 47-63. ISSN 1557-8771

Wang, J; Qu, Z; Lee, C Y and Skitmore, M (2025) Highway construction cost index forecasting: A hybrid VMD-LSTM-GRU method. Construction Management and Economics, 43(10), pp. 849-863. ISSN 0144-6193

Wang, P; Wang, K; Huang, Y and Fenn, P (2025) Probability, formation, and prediction of large-size construction cost overruns governed by a power-law distribution. Journal of Construction Engineering and Management, 151(6): 04025062, ISSN 0733-9364

Wang, P; Wang, K; Huang, Y; Fenn, P and Stewart, I (2022) Auditing construction cost from an in-process perspective based on a Bayesian predictive model. Journal of Construction Engineering and Management, 148(4): 04022003, ISSN 0733-9364

Wang, Y-R (2002) Applying the PDRI in project risk management. PhD thesis, University of Texas at Austin, USA.

Warsame, A (2011) Performance of construction projects: Essays on supplier structure, construction costs and quality improvement. PhD thesis, KTH Royal Institute of Technology, Sweden.

Weerasekara, G K T; Shandraseharan, A; Perera, B A K S and Disaratna, V (2023) The impact of building morphology factors on the cost and aesthetical appearance of urban detached residential buildings in Sri Lanka. Journal of Engineering, Design and Technology, 21(1), pp. 58-74. ISSN 1726-0531

Weerasinghe, A S and Ramachandra, T (2018) Economic sustainability of green buildings: A comparative analysis of green vs non-green. Built Environment Project and Asset Management, 8(5), pp. 528-543. ISSN 2044-124X

Weerasinghe, A S; Ramachandra, T and Thurairajah, N (2017) Life cycle cost analysis: Green vs conventional buildings in Sri Lanka. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Weerasooriya, D; Ranadewa, K A T O and Perera, B A K S (2025) Facilitating the role of quantity surveyors through integration of cyber-physical systems. Journal of Engineering, Design and Technology, 23(3), pp. 871-894. ISSN 1726-0531

Wei, H and Xu, X (1997) Composite masonry buildings in China. Building Research & Information, 25(1), pp. 15-17. ISSN 0961-3218

Weinert, R A (1989) A study of the agency construction management method of project delivery as a viable alternative when building new schools. DPA thesis, University of La Verne, USA.

Westling, H (1991) Technology procurement for innovation in Swedish construction. TaknDr thesis, Kungliga Tekniska Hogskolan, Sweden.

Whalen, T M; Gopal, S and Abraham, D M (2004) Cost-benefit model for the construction of tornado shelters. Journal of Construction Engineering and Management, 130(6), pp. 772-779. ISSN 0733-9364

Wibowo, A (2005) Estimating general threshold traffic levels of typical build, operate, and transfer toll road projects in Indonesia. Construction Management and Economics, 23(6), pp. 621-630. ISSN 01446193

Wijewickreme, S P (2016) A framework for providing a lifelong social security system for the operational workforce in the construction industry in Sri Lanka. PhD thesis, University of Salford, UK.

Wilmot, C G and Cheng, G (2003) Estimating future highway construction costs. Journal of Construction Engineering and Management, 129(3), pp. 272-279. ISSN 0733-9364

Wilmot, C G and Mei, B (2005) Neural network modeling of highway construction costs. Journal of Construction Engineering and Management, 131(7), pp. 765-771. ISSN 0733-9364

Windapo, A; Moghayedi, A; Oliphant, D and Adediran, A (2018) Exploring the components of cost on construction projects. Journal of Construction Business and Management, 2(2), pp. 42-50. ISSN 2521-0165

Windapo, A; Odediran, S; Moghayedi, A; Adediran, A and Oliphant, D (2017) Determinants of building construction costs in South Africa. Journal of Construction Business and Management, 1(1), pp. 8-13. ISSN 2521-0165

Wing, C K (1997) Monte Carlo simulation of construction costs using subjective data: Response. Construction Management and Economics, 15(1), pp. 109-115. ISSN 01446193

Wing, C K (1999) On the issue of plan shape complexity: Plan shape indices revisited. Construction Management and Economics, 17(4), pp. 473-482. ISSN 01446193

Wirahadikusumah, R; Abraham, D M and Castello, J (1999) Markov decision process for sewer rehabilitation. Engineering, Construction and Architectural Management, 6(4), pp. 358-370. ISSN 0969-9988

Wong, J M W; Chan, A P C and Chiang, Y H (2008) Modeling and forecasting construction labor demand: Multivariate analysis. Journal of Construction Engineering and Management, 134(9), pp. 664-672. ISSN 0733-9364

Wong, K C; So, A T P and Yu, N H W (2001) The financial viablity of intelligent buildings: A Faustmann approach of assessment. Journal of Financial Management of Property and Construction, 6(1), pp. 41-50. ISSN 1366-4387

Wu, C; Wu, P; Jiang, R; Wang, J; Wang, X and Wan, M (2022) Evaluating the economic and social benefits of multiutility tunnels with an agent-based simulation approach. Engineering, Construction and Architectural Management, 29(1), pp. 1-25. ISSN 0969-9988

Wu, M L and Lo, H P (2009) Optimal strategy modeling for price-time biparameter construction bidding. Journal of Construction Engineering and Management, 135(4), pp. 298-306. ISSN 0733-9364

Wyke, S; Lindhard, S M and Larsen, J K (2024) Using principal component analysis to identify latent factors affecting cost and time overrun in public construction projects. Engineering, Construction and Architectural Management, 31(6), pp. 2415-2436. ISSN 0969-9988

Wyrick, D A and Eschenbach, T G (1989) Remote oil and gas facility construction. Journal of Construction Engineering and Management, 115(2), pp. 228-236. ISSN 0733-9364

Xiao, H and Proverbs, D (2002) An investigation into factors influencing construction costs based on Japanese, UK and US contractor practice. Construction Economics and Building, 2(2), pp. 27-35. ISSN 2204-9029

Xiao, H and Proverbs, D (2002) The performance of contractors in Japan, the UK and the USA: A comparative evaluation of construction cost. Construction Management and Economics, 20(5), pp. 425-435. ISSN 01446193

Xiao, H and Proverbs, D (2003) Factors influencing contractor performance: An international investigation. Engineering, Construction and Architectural Management, 10(5), pp. 322-332. ISSN 0969-9988

Xiao, Xue (2021) Improving the long-term use of case-based reasoning model in early construction cost estimation. PhD thesis, Queensland University of Technology, Australia.

Xie, W; Zhao, T; Tang, J and Zhang, Y (2017) Arch first and beam later: Arch-rib integral installation construction technology for large-span tied-arch bridge. Journal of Construction Engineering and Management, 143(8): 04017059, ISSN 0733-9364

Xiong, B; Skitmore, M and Xia, B (2014) Exploring the internal dimensions of work stress: Evidence from construction cost estimators in China. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Xiong, B; Skitmore, M and Xia, B (2015) Exploring and validating the internal dimensions of occupational stress: Evidence from construction cost estimators in China. Construction Management and Economics, 33(5-6), pp. 495-507. ISSN 01446193

Xiong, Bo (2016) Improving cost estimation performance: An investigation of prediction technique and person-environment interaction. PhD thesis, Queensland University of Technology, Australia.

Xu, T and Tiong, R L K (2001) Risk assessment on contractors' pricing strategies. Construction Management and Economics, 19(1), pp. 77-84. ISSN 01446193

Yadollahi, M; Ebrahimi Saryazdi, S M; Shafaat, A and Hafezi, M (2023) Life cycle cost analysis of near zero energy buildings benefited from earth-sheltering. International Journal of Construction Management, 23(15), pp. 2670-2682. ISSN 1562-3599

Yamusa, M. A.; Lawal, H. S.; Abdulrahman, R. S.; Salisu, A. S.; Saka, A.; Abubakar, M. and Abdullahi, M. (2026) A machine-learning model for estimating construction renovation costs. International Journal of Building Pathology and Adaptation, 44(3), pp. 757-772. ISSN 2398-4708

Ye, K; Jiang, W and Shen, L (2008) Project competition intensity (PCI) in the construction market: A case study in China. Construction Management and Economics, 26(5), pp. 463-470. ISSN 01446193

Yemoh, O O; Opoku, R; Takyi, G; Adomako, E K; Uba, F and Obeng, G (2025) Green building adaptation in hot-humid climates: Assessment of coconut and corn husk fiber composite bricks as energy-efficient building envelopes. International Journal of Building Pathology and Adaptation, 43(6), pp. 1522-1540. ISSN 2398-4708

Yeung, D K L and Skitmore, M (2005) Data pooling for early-stage price forecasts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Yi, J; Chen, H and Li, S (2010) Determination of contract time and incentive and disincentive values of highway construction projects. International Journal of Construction Education and Research, 6(4), pp. 285-302. ISSN 1557-8771

Yilmaz, S; Kumar, D; Hada, S; Demirkesen, S; Zhang, C and Li, H (2025) A PMBOK-based construction cost management framework for BIM integration in construction projects. International Journal of Construction Management, 25(8), pp. 861-875. ISSN 1562-3599

Yohanis, Y G and Norton, B (1998) Estimating at the earliest stages of design the financial cost and operational energy requirement of buildings. Journal of Financial Management of Property and Construction, 3(2), pp. 41-58. ISSN 1366-4387

Yoon, Y and Gangarao, H (2021) Prioritization framework for rockfall countermeasures for rock-cut slopes for rural roads. Journal of Construction Engineering and Management, 147(10), ISSN 0733-9364

Yu, K W (2014) The economics of construction price inflation: measurement, output and productivity. PhD thesis, University College London, UK.

Yu, W D (2006) PIREM: A new model for conceptual cost estimation. Construction Management and Economics, 24(3), pp. 259-270. ISSN 01446193

Yu, W D and Lo, S S (2005) Time-dependent construction social costs model. Construction Management and Economics, 23(3), pp. 327-337. ISSN 01446193

Yu, Y (2021) Road network maintenance and repair considering day-to-day traffic dynamics and transient congestion. PhD thesis, Imperial College London, UK.

Zhan, W and Pan, W (2020) Formulating systemic construction productivity enhancement strategies. Journal of Construction Engineering and Management, 146(8): 05020008, ISSN 0733-9364

Zhang, J and Jiang, S (2026) Review of artificial intelligence applications in construction management over the last five years. Engineering, Construction and Architectural Management, 33(1), pp. 361-379. ISSN 0969-9988

Zhang, C; Chen, K; Yang, J; Fu, J; Wang, S and Xie, Y (2022) Reuse of discharged soil from slurry shield tunnel construction as synchronous grouting material. Journal of Construction Engineering and Management, 148(2): 04021193, ISSN 0733-9364

Zhang, J and El-Diraby, T E (2006) Constructability analysis of the bridge superstructure rotation construction method in China. Journal of Construction Engineering and Management, 132(4), pp. 353-362. ISSN 0733-9364

Zhang, R; Xing, J; Ye, K; Lu, W and Shan, Y (2019) Synchronicity of global construction cost indexes. Engineering, Construction and Architectural Management, 26(3), pp. 367-385. ISSN 0969-9988

Zhang, S; Bogus, S M; Lippitt, C D and Migliaccio, G C (2017) Estimating location-adjustment factors for conceptual cost estimating based on nighttime light satellite imagery. Journal of Construction Engineering and Management, 143(1): 04016087, ISSN 0733-9364

Zhang, S; Migliaccio, G C; Zandbergen, P A and Guindani, M (2014) Empirical assessment of geographically based surface interpolation methods for adjusting construction cost estimates by project location. Journal of Construction Engineering and Management, 140(6): 4014015, ISSN 0733-9364

Zhang, X (2009) Win-win concession period determination methodology. Journal of Construction Engineering and Management, 135(6), pp. 550-558. ISSN 0733-9364

Zhang, Y; Peng, Z; Lu, W and Webster, C (2025) Profit-sensitive generative design for high-rise building morphologies: Innovations in 3D form generation and cost-revenue assessment. Building Research & Information, 53(4), pp. 435-457. ISSN 0961-3218

Zheng, D X M; Ng, S T and Kumaraswamy, M M (2002) Applying genetic algorithm techniques for time-cost optimization. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Zheng, D X M; Ng, S T and Kumaraswamy, M M (2005) Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization. Journal of Construction Engineering and Management, 131(1), pp. 81-91. ISSN 0733-9364

Zhou, X (2011) Managing commodity risks in highway contracts: Quantifying premiums, accounting for correlations among risk factors, and designing optimal price-adjustment contracts. PhD thesis, Texas A&M University, USA.

Zimina, D; Ballard, G and Pasquire, C (2012) Target value design: Using collaboration and a lean approach to reduce construction cost. Construction Management and Economics, 30(5), pp. 383-398. ISSN 1466433X

al Abo Omar, E and Mangin, J (2002) A new cost control model and indicators to measure productivity on building sites. Construction Innovation, 2(2), pp. 83-101. ISSN 1471-4175

van den Boomen, M; Spaan, M T J; Schoenmaker, R and Wolfert, A R M (2019) Untangling decision tree and real options analyses: A public infrastructure case study dealing with political decisions, structural integrity and price uncertainty. Construction Management and Economics, 37(1), pp. 24-43. ISSN 01446193

Ökmen, O and Öztas, A (2010) Construction cost analysis under uncertainty with correlated cost risk analysis model. Construction Management and Economics, 28(2), pp. 203-212. ISSN 1466433X

Ökmen, Ö and Öztaş, A (2015) Scenario based evaluation of a cost risk model through sensitivity analysis. Engineering, Construction and Architectural Management, 22(4), pp. 403-423. ISSN 0969-9988

Špačková, O (2012) Risk management of tunnel construction projects. PhD thesis, Czech Technical University, Czech Republic.

This list was generated on Sat Aug 22 01:46:30 2026 UTC.