Items with Index Term: construction contractor
Abankwa, Derek Asante (2021) What drives technology adaptation in construction firms? An investigation of the antecedents, adaptive behaviours, and outcomes. PhD thesis, University of Hong Kong, Hong Kong.
Abdul-Rashid, I; Bassioni, H and Bawazeer, F (2007) Factors affecting safety performance in large construction contractors in Egypt. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Abu Bakar, R (1998) The management practices and organisational culture of large Malaysian construction contractors. PhD thesis, University of Reading, UK.
Abusnina, H (2019) Combining engineering and data-driven approaches to model the risk of excavation damage to underground natural gas facilities. PhD thesis, Rutgers The State University of New Jersey, School of Graduate Studies, USA.
Ahmad, S B S; Mazhar, M U; Laedre, O; Bruland, A and Torp, O (2022) Improvement measures to achieve sustainable construction labour performance. International Journal of Construction Management, 22(1), pp. 85-102. ISSN 1562-3599
Ahmed, A; Mohammed, H A; Gambatese, J and Hurwitz, D (2021) Effects of flashing blue lights mounted on paving equipment on vehicle speed behavior in work zones. Journal of Construction Engineering and Management, 147(9): 04021101, ISSN 0733-9364
Ahmed, S M; Ahmad, R and Darshi De Saram, D (1999) Risk management trends in the Hong Kong construction industry: A comparison of contractors and owners perceptions. Engineering, Construction and Architectural Management, 6(3), pp. 225-234. ISSN 0969-9988
Aje, O I; Ogunsemi, D R and Odusami, K T (2009) The impact of contractors' management capability on cost and time performance of construction projects in Nigeria. Journal of Financial Management of Property and Construction, 14(2), pp. 171-187. ISSN 1366-4387
Akintoye, A (1995) Just-in-time application and implementation for building material management. Construction Management and Economics, 13(2), pp. 105-113. ISSN 01446193
Akintoye, A; Bowen, P and Hardcastle, C (1998) Macro-economic leading indicators of construction contract prices. Construction Management and Economics, 16(2), pp. 159-175. ISSN 01446193
Akintoye, A and Skitmore, M (1991) Profitability of UK construction contractors. Construction Management and Economics, 9(4), pp. 311-325. ISSN 01446193
Akintoye, A and Sommerville, J (1995) Distributed lag relationships between UK construction orders and output. Construction Management and Economics, 13(1), pp. 33-42. ISSN 01446193
Akintoye, S A (1991) Construction tender price index: modelling and forecasting trends. PhD thesis, University of Salford, UK.
Al-Mhdawi, M K S (2022) Risk management of construction projects under extreme conditions: a case study of Iraq. PhD thesis, University of Southampton, UK.
Al-Otaibi, M (2011) Evaluation of contractor performance for pre-selection in the Kingdom of Saudi Arabia. PhD thesis, Loughborough University, UK.
Al-Otaibi, M and Price, A D F (2010) Analysis and evaluation of criteria for pre-selecting contractors in the Saudi Arabian construction sector. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Al-Otaibi, S (2010) A framework for improving the performance of standard design models in the Saudi Ministry of Interior projects. PhD thesis, Loughborough University, UK.
Al-Sinaidi, A A (2002) Computation of construction contractor capability. PhD thesis, Florida Institute of Technology, USA.
Albalkhy, W and Sweis, R (2022) Assessing lean construction conformance amongst the second-grade Jordanian construction contractors. International Journal of Construction Management, 22(5), pp. 900-912. ISSN 1562-3599
Alhumaidi, H M (2015) Construction contractors ranking method using multiple decision-makers and multiattribute fuzzy weighted average. Journal of Construction Engineering and Management, 141(4): 04014092, ISSN 0733-9364
Alkilani, S and Loosemore, M (2022) Project performance measurement for small-and-medium sized construction contractors in the Jordanian construction industry. Construction Management and Economics, 40(10), pp. 743-769. ISSN 01446193
Alkilani, S Z; Jupp, J and Sawhney, A (2013) Issues of construction health and safety in developing countries: A case of Jordan. Construction Economics and Building, 13(3), pp. 141-156. ISSN 2204-9029
Amiri, O; Rahimi, M; Ayazi, A and Khazaeni, G (2024) Multi-criteria decision-making model for EPC contractor prequalification: A hybrid approach. International Journal of Building Pathology and Adaptation, 42(3), pp. 369-385. ISSN 23984708
Anderson, P M (2006) Construction collaboration: a QFD approach. PhD thesis, Loughborough University, UK.
Anderson, S; Shane, J S and Schexnayder, C (2011) Strategies for planned project acceleration. Journal of Construction Engineering and Management, 137(5), pp. 372-381. ISSN 0733-9364
Anderson, S d (1989) Potential for construction industry improvement. PhD thesis, University of Texas at Austin, USA.
Andi (2006) The importance and allocation of risks in Indonesian construction projects. Construction Management and Economics, 24(1), pp. 69-80. ISSN 01446193
Anugwo, I C; Shakantu, W; Saidu, I and Adamu, A (2018) Potentiality of the South African construction smme contractors globalising within and beyond the SADC construction markets. Journal of Construction Business and Management, 2(1), pp. 41-49. ISSN 2521-0165
Arias, S (2014) Engineer manual 385 effectiveness: A study of predictive analytics. PhD thesis, Indiana State University, USA.
Arowosafe, O; Ceranic, B and Dean, A M (2015) A sustainable infrastructure delivery model: Value added strategy in the Nigerian construction industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Arowosafe, O I (2018) Contractors’ selection criteria for sustainable infrastructure delivery in Nigeria. PhD thesis, University of Derby, UK.
Arvanitis, L.; Al-Tarazi, D.; Agyekum, K.; Kissi, E.; Manu, P.; Mahamadu, A. M.; Booth, C.; Prabhakaran, A. and Pittri, H. (2025) BIM maturity and its influence on BIM implementation challenges: The perspectives of UK contractors. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(4), pp. 231-243. ISSN 1751-4304
Assaf, S A; Al-Hammad, A M and Ubaid, A (1996) Factors effecting construction contractors' performance. Building Research & Information, 24(3), pp. 157-163. ISSN 0961-3218
Athapaththu, K I and Karunasena, G (2018) Framework for sustainable construction practices in Sri Lanka. Built Environment Project and Asset Management, 8(1), pp. 51-63. ISSN 2044-124X
Atout, M M M (2008) Causes of delays in construction projects & how the project manager can act to avoid delays. PhD thesis, University of South Wales, UK.
Awil, A U; Rashid, A and Aziz, A (2002) International markets: Malaysian construction contractors and the stage theory. Construction Economics and Building, 2(1), pp. 94-106. ISSN 2204-9029
Awodele, O A; Aghimien, D O; Akinkunmi, O G and Aigbavboa, C O (2019) Labour-only procurement: A veritable surviving strategy for contractors in a challenging economy. Journal of Engineering, Design and Technology, 17(2), pp. 347-361. ISSN 1726-0531
Bageis, A S and Fortune, C (2009) Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors. Construction Management and Economics, 27(1), pp. 53-71. ISSN 1466433X
Bajaj, D; Oluwoye, J and Lenard, D (1997) An analysis of contractors' approaches to risk identification in New South Wales, Australia. Construction Management and Economics, 15(4), pp. 363-369. ISSN 01446193
Baloi, D (2002) A framework for managing global risk factors affecting construction cost performance. PhD thesis, Loughborough University, UK.
Barnes, L R and Croker, N (2013) The relevance of the ISO 26000 social responsibility issues to the Hong Kong construction industry. Construction Economics and Building, 13(3), pp. 37-50. ISSN 2204-9029
Bartley, E A (2013) Assessing the potential application of online social networks for the construction industry. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Bassioni, H A; Hassan, T M and Price, A D F (2008) Evaluation and analysis of criteria and sub-criteria of a construction excellence model. Engineering, Construction and Architectural Management, 15(1), pp. 21-41. ISSN 0969-9988
Bell, L C and McCullouch, B G (1983) Microcomputer spreadsheet applications. Journal of Construction Engineering and Management, 109(2), pp. 214-223. ISSN 0733-9364
Bell, L C and Stukhart, G (1987) Costs and benefits of materials management systems. Journal of Construction Engineering and Management, 113(2), pp. 222-234. ISSN 0733-9364
Besiktepe, D; Bayhan, H G and Valdes-Vasquez, R (2025) Diversity, equity, and inclusion practices among select contractors: Insights from social media analysis and interviews. International Journal of Construction Education and Research, 21(3), pp. 382-407. ISSN 1557-8771
Best, R and Langston, C (2006) Evaluation of construction contractor performance: A critical analysis of some recent research. Construction Management and Economics, 24(4), pp. 439-445. ISSN 01446193
Bhutto, K H (2004) The application of integrated management systems by contracting organisations. PhD thesis, Sheffield Hallam University, UK.
Bhutto, Khalid Hussain (2004) The application of integrated management systems (IMS) by contracting organisations. PhD thesis, Sheffield Hallam University, UK.
Birrell, George Selbie (1978) The criteria by which construction prime and subcontractors evaluate the management performance of each other. DArch thesis, University of Michigan, USA.
Boyd, D (2011) An evaluation of a system change in the purchasing of construction materials by local authorities. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Bray Jr., H G (1994) Domestic construction contractors and ISO 9000 registration. DE thesis, Louisiana Tech University, USA.
Bröchner, J (2010) Construction contractors as service innovators. Building Research & Information, 38(3), pp. 235-246. ISSN 0961-3218
Buhamizo, I; Muhwezi, L and Sengonzi, R (2023) A regression model to enhance the profitability of local construction contractors in Uganda. Journal of Construction in Developing Countries, 28(1), pp. 221-241. ISSN 1823-6499
Butcher, D C A (2011) Learning organization principles and processes: UK construction organization experiences. PhD thesis, University of South Wales, UK.
Butler, R D (1989) Minority ownership in the construction industry of the puget sound region of Washington state and its struggle for equality. PhD thesis, United States International University, USA.
Campbell, J L (1999) A baseline study of practices and perceptions of marketing and aftermarketing activities among commercial general contractors. PhD thesis, University of Idaho, USA.
Chen, C; Wang, Q; Martek, I and Li, H (2016) International market selection model for large Chinese contractors. Journal of Construction Engineering and Management, 142(10): 04016044, ISSN 0733-9364
Chen, L and Fong, P S W (2013) Visualizing evolution of knowledge management capability in construction firms. Journal of Construction Engineering and Management, 139(7), pp. 839-851. ISSN 0733-9364
Chen, L and Mohamed, S (2008) Contribution of knowledge management activities to organisational business performance. Journal of Engineering, Design and Technology, 6(3), pp. 269-285. ISSN 1726-0531
Chen, L and Mohamed, S (2008) Impact of the internal business environment on knowledge management within construction organisations. Construction Innovation, 8(1), pp. 61-81. ISSN 1471-4175
Chen, L and Mohamed, S (2010) The strategic importance of tacit knowledge management activities in construction. Construction Innovation, 10(2), pp. 138-163. ISSN 1471-4175
Chen, P; Qiang, M and Wang, J N (2009) Project management in the Chinese construction industry: Six-case study. Journal of Construction Engineering and Management, 135(10), pp. 1016-1026. ISSN 0733-9364
Cheong, C S (2010) Contractors business development for overseas markets. PhD thesis, Loughborough University, UK.
Cheung, C M and Qingbin, C (2016) Setting the stage for effective safety leadership in construction: The antecedents of safety-specific transformational leadership behaviours. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Chileshe, N; Edwards, D J; Kavishe, N and Haupt, T C (2020) Perception on challenges impacting bid decision of indigenous building contractors in Dar es Salaam, Tanzania. Journal of Engineering, Design and Technology, 18(6), pp. 1641-1662. ISSN 1726-0531
Chileshe, N; Kavishe, N and Edwards, D J (2021) Critical factors influencing the bid or no-bid decision of the indigenous small building contractors in Tanzania. Construction Innovation, 21(2), pp. 182-202. ISSN 1471-4175
Chin, K S and Choi, T W (2003) Construction in Hong Kong: Success factors for iso9000 implementation. Journal of Construction Engineering and Management, 129(6), pp. 599-609. ISSN 0733-9364
Coffey, M (2010) The attitude of construction employees towards authority and employers. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Collins, F (2013) 2nd generation concrete construction: Carbon footprint accounting. Engineering, Construction and Architectural Management, 20(4), pp. 330-344. ISSN 0969-9988
Crespin-Mazet, F (2007) Co-Development as an alternative to competitive bidding in project business. PhD thesis, University of Manchester, UK.
Dawood, N N and Dalakleidis, G D A (2002) Industrial review and development of a cost management system for the Greek construction industry. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Dissanayake, D M Nayana S (2017) Fuzzy multi-attribute analysis model for engineering-procurement-construction contractor selection. PhD thesis, Queensland University of Technology, Australia.
Dorji, K and Hadikusumo, B H W (2006) Safety management practices in the Bhutanese construction industry. Journal of Construction in Developing Countries, 11(2), pp. 53-75. ISSN 1823-6499
Dozzi, S P; Abourizk, S M and Schroeder, S L (1996) Utility-theory model for bid markup decisions. Journal of Construction Engineering and Management, 122(2), pp. 119-124. ISSN 0733-9364
Duodo, B (2017) Intellectual capital and innovation in construction firms: the role of learning capability. PhD thesis, University of Hong Kong, Hong Kong.
Dyas, V (2008) Constituents of performance: investigating relational contracting in a construction industry setting to establish a framework for drivers of performance. PhD thesis, Kingston University, UK.
Eadie, R; Perera, S; Heaney, G and Carlisle, J (2007) Construction contractor's perspective on web-based advertising of public sector construction contracts. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Ebekozien, A.; Thwala, W. D. and Samsurijan, M. S. (2026) Appraising circular economy business model adoption in construction projects to achieving Sustainable Development Goal 11. International Journal of Building Pathology and Adaptation, 44(3), pp. 685-703. ISSN 2398-4708
Ebekozien, A; Aigbavboa, C; Samsurijan, M S; Ahmed, M A H; Akinradewo, O and Omoh-Paul, I (2024) Managing construction project risks in turbulent times: a stakeholders' perspective. International Journal of Building Pathology and Adaptation, 42(7), pp. 35-54. ISSN 23984708
Ebekozien, A; Aigbavboa, C; Samsurijan, M S; Amadi, G C and Duru, O D S (2023) Moderating effect of Nigerian government policy support on the relationship between project management framework and emerging construction contractors' sustainability. International Journal of Building Pathology and Adaptation, 41(6), pp. 269-289. ISSN 23984708
Ebrahiminejad, M; Shakeri, E and Ardeshir, A (2014) Establishing abatement alternatives in construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Edum-Fotwe, F T (1995) A framework for improving the strategic management of construction contractors. PhD thesis, Loughborough University, UK.
Edwards, D J and Holt, G D (2001) Predicting construction plant maintenance expenditure. Building Research & Information, 29(6), pp. 417-427. ISSN 0961-3218
Edwards, D J; Holt, G D and Harris, F C (1999) Predicting maintenance expenditure on construction plant: Model development and performance analysis. Journal of Financial Management of Property and Construction, 4(1), pp. 31-46. ISSN 1366-4387
El Korany, T. M.; Fouad, A. and Sanad, H. (2026) Identifying contractor selection criteria in Egyptian construction tenders: A SNA and PLS-SEM approach. Construction Innovation, 26(5), pp. 1356-1383. ISSN 1471-4175
El Sawalhi, N I H (2007) Developing a model for construction contractors pre-qualification in the Gaza Strip and West Bank. PhD thesis, University of Salford, UK.
El-Mashaleh, M S; Hyari, K H; Bdour, A N and Rababeh, S M (2016) A multi-attribute decision-making model for construction enterprise resource planning system selection. International Journal of Construction Education and Research, 12(1), pp. 66-79. ISSN 1557-8771
Elazouni, A; Alghazi, A and Selim, S Z (2015) Finance-based scheduling using meta-heuristics: Discrete versus continuous optimization problems. Journal of Financial Management of Property and Construction, 20(1), pp. 85-104. ISSN 1366-4387
Elazouni, A M (2006) Classifying construction contractors using unsupervised-learning neural networks. Journal of Construction Engineering and Management, 132(12), pp. 1242-1253. ISSN 0733-9364
Elazouni, A M and Metwally, F G (2007) Expanding finance-based scheduling to devise overall-optimized project schedules. Journal of Construction Engineering and Management, 133(1), pp. 86-90. ISSN 0733-9364
Elder, John (2007) The history of the master builders association of NSW: The first hundred years. PhD thesis, University of Sydney, Australia.
Enshassi, A; Ayash, A and Mohamed, S (2018) Factors driving contractors to implement energy management strategies in construction projects. Journal of Financial Management of Property and Construction, 23(3), pp. 295-311. ISSN 1366-4387
Enshassi, A; Rashid Abdul Aziz, A and Karriri, A (2008) Investigating the overhead costs in construction projects in Palestine. Journal of Financial Management of Property and Construction, 13(1), pp. 35-47. ISSN 1366-4387
Ershadi, M; Jefferies, M; Davis, P and Mojtahedi, M (2021) Enhancing productivity in infrastructure development: The key role of project management offices. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Evans, R C (2002) Dynamic cash flow forecasting model for construction contractors. PhD thesis, University of Liverpool, UK.
Everett, J G and Yang, I T (1997) Workers' comp. Premiums: Disparities in penalties for identical losses. Journal of Construction Engineering and Management, 123(3), pp. 312-317. ISSN 0733-9364
Ezulike, E I; Perry, J G and Hawwash, K (1997) The barriers to entry into the PFI market. Engineering, Construction and Architectural Management, 4(3), pp. 179-193. ISSN 0969-9988
Fatayer, F A; Issa, A Z; Abunemeh, M and Dwikat, M A M (2022) Investigating the causes preventing the fulfillment of construction contract requirements. Engineering, Construction and Architectural Management, 29(7), pp. 2577-2598. ISSN 0969-9988
Fong, P S W and Chen, L (2012) Governance of learning mechanisms: Evidence from construction firms. Journal of Construction Engineering and Management, 138(9), pp. 1053-1064. ISSN 0733-9364
Forsythe, P (2015) Monitoring customer perceived service quality and satisfaction during the construction process. Construction Economics and Building, 15(1), pp. 19-42. ISSN 2204-9029
Foulds, C; Royston, S; Aggeli, A; Crowther, A and Robison, R (2026) Sharing energy renovations know-how through citizen–professional knowledge networks. Buildings & Cities, 7(1), pp. 341-359. ISSN 2632-6655
Gajpal, Y and Elazouni, A (2015) Enhanced heuristic for finance-based scheduling of construction projects. Construction Management and Economics, 33(7), pp. 531-553. ISSN 01446193
Gidado, K (2000) Flowcharted model for information flow in design and build projects. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Glover, R W (1972) Developing and upgrading minority construction contractors: The Houston and Atlanta experiences. PhD thesis, University of Texas at Austin, USA.
Gogo, S E (2021) The role of leadership in the transformation of health and safety culture in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.
Goh, Y L (2004) The effect of higher workers' compensation premium rates on construction worker wages and the reporting of injuries. PhD thesis, University of Utah, USA.
Gong, X (2019) Vertical integration and reputation: the case of real estate companies. PhD thesis, University of Hong Kong, Hong Kong.
Gravitt, D D (2004) The development and validation of a bar code based residential construction quality inspection procedure. PhD thesis, Indiana State University, USA.
Griffith, A (2011) Fulfilling contractors' corporate social responsibilities using standards-based management systems. International Journal of Construction Management, 11(2), pp. 37-47. ISSN 1562-3599
Grosse, H (2019) Lévinas' ethics in practice: A construction contractor’s account. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Grosse, H (2022) Exploring sustainability and identities from an investor's perspective: An autoethnography. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Gruneberg, S (2013) Strategy framework for post-construction contractor services. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Guan, Z; Millard, S and Yang, Z (2008) CDIO and the Liverpool Constructionarium. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(2), pp. 77-83. ISSN 17514312
Habib, M R (1988) The relative effectiveness of large-scale public and private construction contractors: The case of Egypt. DSc thesis, George Washington University, USA.
Hagan, G; Bower, D and Smith, N (2011) Managing complex projects in multi-project environments. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Hagan, G; Bower, D A and Smith, N (2012) Delivery of complex construction multi-projects in contractor-led procurement. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Hamani, K (2019) Developing a corporate sustainability performance evaluation model of the UAE construction contractors. PhD thesis, Heriot-Watt University, UK.
Hanioglu, M N (2014) Influence of owner-organization impression and contract framing on construction contractors' risk perceptions. PhD thesis, Illinois Institute of Technology, USA.
Hanna, A S; Menches, C L; Sullivan, K T and Sargent, J R (2005) Factors affecting absenteeism in electrical construction. Journal of Construction Engineering and Management, 131(11), pp. 1212-1218. ISSN 0733-9364
Harris, R B and Ioannou, P G (1998) Scheduling projects with repeating activities. Journal of Construction Engineering and Management, 124(4), pp. 269-278. ISSN 0733-9364
Harvey, J (1979) Competitive bidding on Canadian public construction contracts: Stochastic analysis for optimization. PhD thesis, University of Western Ontario, Canada.
Hassanein, A and Melin, J (1997) Crew design methodology for construction contractors. Journal of Construction Engineering and Management, 123(3), pp. 203-207. ISSN 0733-9364
Hassanein, A A G (1996) Factors affecting the bidding behaviour of contractors in Egypt. Building Research & Information, 24(4), pp. 228-236. ISSN 0961-3218
Hassanein, A A G and Hakam, Z H R (1996) A bidding decision index for construction contractors. Building Research & Information, 24(4), pp. 237-244. ISSN 0961-3218
Hauptfleisch, A C and Verster, J J P (2007) Mentoring: A key intervention in small construction contractor capacity building in South Africa. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Hinze, J and Antal, T (1991) Construction contract provisions for preservation of artifacts. Journal of Construction Engineering and Management, 117(1), pp. 106-117. ISSN 0733-9364
Hinze, J and Wiegand, F (1992) Role of designers in construction worker safety. Journal of Construction Engineering and Management, 118(4), pp. 677-684. ISSN 0733-9364
Hlaing, N N; Singh, D; Tiong, R L K and Ehrlich, M (2008) Perceptions of Singapore construction contractors on construction risk identification. Journal of Financial Management of Property and Construction, 13(2), pp. 85-95. ISSN 1366-4387
Holt, G D (1995) A methodology for predicting the performance of construction contractors. PhD thesis, University of Wolverhampton, UK.
Holt, G D (1997) Classifying construction contractors: A case study using cluster analysis. Building Research & Information, 25(6), pp. 374-382. ISSN 0961-3218
Holt, G D; Olomolaiye, P O and Harris, F C (1994) Evaluating performance potential in the selection of construction contractors. Engineering, Construction and Architectural Management, 1(1), pp. 29-50. ISSN 0969-9988
Holt, G D; Olomolaiye, P O and Harris, F C (1996) Tendering procedures, contractual arrangements and latham: The contractors' view. Engineering, Construction and Architectural Management, 3(1-2), pp. 97-115. ISSN 0969-9988
Hong, Y; Hammad, A W A; Sepasgozar, S and Akbarnezhad, A (2019) BIM adoption model for small and medium construction organisations in Australia. Engineering, Construction and Architectural Management, 26(2), pp. 154-183. ISSN 0969-9988
Hosny, O; Nassar, K and Esmail, Y (2013) Prequalification of Egyptian construction contractors using fuzzy-AHP models. Engineering, Construction and Architectural Management, 20(4), pp. 381-405. ISSN 0969-9988
Howard, W E (1996) Innovative strategies for compensation of engineering and construction contractors. PhD thesis, Clemson University, USA.
Huang, W H; Tserng, H P; Jaselskis, E J and Lee, S Y (2014) Dynamic threshold cash flow-based structural model for contractor financial prequalification. Journal of Construction Engineering and Management, 140(10): 04014047, ISSN 0733-9364
Hubbard, B and Hubbard, S (2023) Utilization of uas data by transportation agencies: Building on the experience of construction contractors. International Journal of Construction Management, 23(4), pp. 679-685. ISSN 1562-3599
Ibbs, C W and Terveer, K R (1984) Integrated construction preventive maintenance system. Journal of Construction Engineering and Management, 110(1), pp. 43-59. ISSN 0733-9364
Idoro, G I (2011) Comparing occupational health and safety management efforts and performance of Nigerian construction contractors. Journal of Construction in Developing Countries, 16(2), pp. 151-173. ISSN 1823-6499
Ikuabe, M; Oke, A E and Aigbavboa, C (2020) Impact of contractors' opportunism on construction project transaction costs: Construction professionals' perception. Journal of Financial Management of Property and Construction, 25(1), pp. 125-141. ISSN 1366-4387
Ikuabe, M O and Oke, A E (2019) Contractors’ opportunism: construction professionals’ awareness of influencing factors. Journal of Engineering, Design and Technology, 17(1), pp. 102-114. ISSN 1726-0531
Ingirige, M J B (2004) A study of knowledge sharing in multinational construction alliances. PhD thesis, University of Salford, UK.
Jaafari, A and Mateffy, V K (1986) Games people play with cost control in Australia. Journal of Construction Engineering and Management, 112(4), pp. 566-581. ISSN 0733-9364
Jaafari, A and Schub, A (1990) Surviving failures: Lessons from field study. Journal of Construction Engineering and Management, 116(1), pp. 68-86. ISSN 0733-9364
Jafari, A (2013) A contractor pre-qualification model based on the quality function deployment method. Construction Management and Economics, 31(7), pp. 746-760. ISSN 1466433X
Jang, Y; Jeong, I and Cho, Y K (2021) Identifying impact of variables in deep learning models on bankruptcy prediction of construction contractors. Engineering, Construction and Architectural Management, 28(10), pp. 3282-3298. ISSN 0969-9988
Jang, Y; Jeong, I B; Cho, Y K and Ahn, Y (2019) Predicting business failure of construction contractors using long short-term memory recurrent neural network. Journal of Construction Engineering and Management, 145(11): 04019067, ISSN 0733-9364
Jannadi, M O (1996) Factors affecting the safety of the construction industry. Building Research & Information, 24(2), pp. 108-112. ISSN 0961-3218
Jaselskis, E J and Russell, J S (1992) Risk analysis approach to selection of contractor evaluation method. Journal of Construction Engineering and Management, 118(4), pp. 814-821. ISSN 0733-9364
Jennings, P and Holt, G D (1998) Prequalification and multi-criteria selection: A measure of contractors' opinions. Construction Management and Economics, 16(6), pp. 651-660. ISSN 01446193
Jiang, H; Xu, Y and Liu, C (2013) Construction price prediction using vector error correction models. Journal of Construction Engineering and Management, 139(11): 4013022, ISSN 0733-9364
Jiang, H; Xu, Y and Liu, C (2014) Market effects on forecasting construction prices using vector error correction models. International Journal of Construction Management, 14(2), pp. 101-112. ISSN 1562-3599
Kaka, A P and Khosrowshahi, F (2009) A mathematical-based model for company-level budgeting incorporating future unknown contracts. Engineering, Construction and Architectural Management, 16(1), pp. 48-60. ISSN 0969-9988
Kaka, A P F (1990) Corporate financial model for construction contractors. PhD thesis, Loughborough University, UK.
Karakhan, A A; Rajendran, S; Gambatese, J and Nnaji, C (2018) Measuring and evaluating safety maturity of construction contractors: Multicriteria decision-making approach. Journal of Construction Engineering and Management, 144(7): 04018054, ISSN 0733-9364
Kazar, G; Mutlu, U and Tokdemir, O B (2023) Development of zero-based budgeting approach for multinational construction contractors. Engineering, Construction and Architectural Management, 30(10), pp. 5217-5232. ISSN 0969-9988
Keeble Kululanga, G (2009) Construction process improvement through cognitive power under team generative learning. Engineering, Construction and Architectural Management, 16(4), pp. 307-324. ISSN 0969-9988
Kiet, T T (2024) Problematic issues emerging during BIM implementation process in construction organizations. Built Environment Project and Asset Management, 14(6), pp. 892-913. ISSN 2044-124X
Kim, H J and Reinschmidt, K F (2006) A dynamic competition model for construction contractors. Construction Management and Economics, 24(9), pp. 955-965. ISSN 1466433X
Kim, S (1997) Organization and managerial environment of the Korean construction industry. Construction Management and Economics, 15(5), pp. 409-419. ISSN 01446193
Kishore, V; Abraham, D M and Sinfield, J V (2011) Portfolio cash assessment using fuzzy systems theory. Journal of Construction Engineering and Management, 137(5), pp. 333-343. ISSN 0733-9364
Kongchasing, N and Sua-iam, G (2022) The main issue working with migrant construction labor: A case study in Thailand. Engineering, Construction and Architectural Management, 29(4), pp. 1715-1730. ISSN 0969-9988
Kululanga, G and Kuotcha, W (2010) Measuring project risk management process for construction contractors with statement indicators linked to numerical scores. Engineering, Construction and Architectural Management, 17(4), pp. 336-351. ISSN 0969-9988
Kululanga, G K (1999) A framework to facilitate construction contractors' learning. PhD thesis, Loughborough University, UK.
Kululanga, G K; Edum-Fotwe, F T and McCaffer, R (2001) Measuring construction contractors' organizational learning. Building Research & Information, 29(1), pp. 21-29. ISSN 0961-3218
Kululanga, G K; Edum-Fotwe, F T; McCaffer, R and Price, A D F (1997) Learning techniques employed by construction contractors' organisations. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Kululanga, G K; Edum-Fotwe, F T; McCaffer, R and Price, A D F (1998) Learning mechanisms for addressing improvement in construction companies. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Kululanga, G K; Kuotcha, W; McCaffer, R and Edum-Fotwe, F (2001) Construction contractors' claim process framework. Journal of Construction Engineering and Management, 127(4), pp. 309-314. ISSN 0733-9364
Kululanga, G K and Kuotcha, W S (2008) Measuring organisational learning through project reviews. Engineering, Construction and Architectural Management, 15(6), pp. 580-595. ISSN 0969-9988
Kululanga, G K; McCaffer, R; Price, A D F and Edum-Fotwe, F (1999) Learning mechanisms employed by construction contractors. Journal of Construction Engineering and Management, 125(4), pp. 215-223. ISSN 0733-9364
Kululanga, G K and Price, A D F (2005) Measuring quality of writing of construction specifications. Journal of Construction Engineering and Management, 131(8), pp. 859-865. ISSN 0733-9364
Kululanga, G K; Price, A D F and McCaffer, R (2002) Empirical investigation of construction contractors' organizational learning. Journal of Construction Engineering and Management, 128(5), pp. 385-391. ISSN 0733-9364
Kuprenas, J A (1988) Use of influence diagrams to assess the cost and schedule impact of construction changes. DEng thesis, University of California, Berkeley, USA.
Lam, H-C R (2003) An investigation into the implementation of safety management systems by Hong Kong construction contractors. PhD thesis, University of Hong Kong, Hong Kong.
Lam, K C; Lam, M C K and Wang, D (2008) MBNQA-oriented self-assessment quality management system for contractors: Fuzzy AHP approach. Construction Management and Economics, 26(5), pp. 447-461. ISSN 1466433X
Lam, K C and Oshodi, O S (2015) The capital budgeting evaluation practices (2014) of contractors in the Hong Kong construction industry. Construction Management and Economics, 33(7), pp. 587-600. ISSN 01446193
Lam, Y T (1995) A knowledge-based system for planning and scheduling ready-mixed concrete. PhD thesis, Loughborough University, UK.
Lammie, J L and Shah, D P (1984) Construction management: MARTA in retrospect. Journal of Construction Engineering and Management, 110(4), pp. 459-475. ISSN 0733-9364
Langston, C (2023) The empirical relationship between contractor success and project innovation. Engineering, Construction and Architectural Management, 30(6), pp. 2231-2254. ISSN 0969-9988
Lee, F K S (2016) Construction contractor selection criteria: the effects of relational norms, price and prequalification. PhD thesis, University of Reading, UK.
Li, D (2012) Development of a framework of competitive advantage in non-state construction contractors in China. PhD thesis, University of Leeds, UK.
Li, J; Chiang, Y H; Choi, T N Y and Man, K F (2013) Determinants of efficiency of contractors in Hong Kong and China: Panel data model analysis. Journal of Construction Engineering and Management, 139(9), pp. 1211-1223. ISSN 0733-9364
Li, Y; Nie, X and Chen, S (2007) Fuzzy approach to prequalifying construction contractors. Journal of Construction Engineering and Management, 133(1), pp. 40-49. ISSN 0733-9364
Lindhard, S M (2024) Danish contractor's application of the budget: Identifying purpose and comparing the budgets application level across job-position. Construction Economics and Building, 24(4-5), pp. 1-17. ISSN 2204-9029
Lines, B C and Ravi Kumar, G G (2018) Developing more competitive proposals: Relationship between contractor qualifications-based proposal content and owner evaluation scores. Journal of Construction Engineering and Management, 144(5): 04018030, ISSN 0733-9364
Liska, R W and Snell, B (1992) Financial incentive programs for average-size construction firm. Journal of Construction Engineering and Management, 118(4), pp. 667-676. ISSN 0733-9364
Liu, H; Jazayeri, E and Dadi, G B (2017) Establishing the influence of owner practices on construction safety in an operational excellence model. Journal of Construction Engineering and Management, 143(6): 04017005, ISSN 0733-9364
Liu, J (2005) Organisational learning of risk management for Chinese contractors. PhD thesis, University of Reading, UK.
Lockwood, M (1991) A study of national competitive advantage in construction: the European construction industry. PhD thesis, Heriot-Watt University, UK.
Loforte Robeiro, F and Love, P E D (2003) Value creation through an e-business strategy: Implication for SMEs in construction. Construction Innovation, 3(1), pp. 3-14. ISSN 1471-4175
Long, N L M and Le Minh Long, V T (2025) Evaluating of attributes affecting contractors' sustainability productivity management in developing countries based on the balanced scorecard perspectives. International Journal of Construction Management, 25(15), pp. 1834-1846. ISSN 1562-3599
Loosemore, M and Reid, S (2019) The social procurement practices of tier-one construction contractors in Australia. Construction Management and Economics, 37(4), pp. 183-200. ISSN 01446193
Love, P E D; Irani, Z; li, H; Cheng, E W L and Tse, R Y C (2001) An empirical analysis of the barriers to implementing e-commerce in small-medium sized construction contractors in the state of Victoria, Australia. Construction Innovation, 1(1), pp. 31-41. ISSN 1471-4175
Lowe, D J; Parvar, J and Emsley, M W (2004) Development of a decision support system (DSS) for the contractor's decision to bid: Regression analysis and neural networks solutions. Journal of Financial Management of Property and Construction, 9(1), pp. 27-42. ISSN 1366-4387
Lucko, G (2011) Optimizing cash flows for linear schedules modeled with singularity functions by simulated annealing. Journal of Construction Engineering and Management, 137(7), pp. 523-535. ISSN 0733-9364
Lundkvist, R; Meiling, J and Vennström, A (2010) Digitalization of inspection data: A means for enhancing learning and continuous improvements? In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Mahdavi, A (2016) A system-of-systems approach to ex-ante analysis of profit potential of a project portfolio. PhD thesis, Purdue University, USA.
Mahoney, J J and Tatum, C B (1994) Construction site applications of CAD. Journal of Construction Engineering and Management, 120(3), pp. 617-631. ISSN 0733-9364
Maqsood, T; Walker, D H T and Finegan, A D (2007) Facilitating knowledge pull to deliver innovation through knowledge management: A case study. Engineering, Construction and Architectural Management, 14(1), pp. 94-109. ISSN 0969-9988
Maqsood, Tayyab (2006) Role of knowledge management in supporting innovation and learning in construction. PhD thesis, RMIT University, Australia.
Markus, A M (1988) A research discrepancy model for building trades training programs. PhD thesis, University of Florida, USA.
Marsh, K and Fayek, A R (2010) SuretyAssist: Fuzzy expert system to assist surety underwriters in evaluating construction contractors for bonding. Journal of Construction Engineering and Management, 136(11), pp. 1219-1226. ISSN 0733-9364
Marzouk, M and Amin, A (2013) Predicting construction materials prices using fuzzy logic and neural networks. Journal of Construction Engineering and Management, 139(9), pp. 1190-1198. ISSN 0733-9364
Marzouk, M and Moamen, M (2009) A framework for estimating negotiation amounts in construction projects. Construction Innovation, 9(2), pp. 133-148. ISSN 1471-4175
Marzouk, M and Mohamed, E (2018) Modeling bid/no bid decisions using fuzzy fault tree. Construction Innovation, 18(1), pp. 90-108. ISSN 1471-4175
Masrom, M D A; Skitmore, M and Bridge, A (2013) Determinants of contractor satisfaction. Construction Management and Economics, 31(7), pp. 761-779. ISSN 1466433X
Mastrandrea, F (1991) The quantification of construction contractors' claims. PhD thesis, University of Reading, UK.
Mayo, R E (1992) Improved optimum bid markup estimation through work load related bid distribution functions. PhD thesis, Stevens Institute of Technology, USA.
McAnulty, S and Baroudi, B (2010) Construction challenges in remote Australian locations. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
McCabe, S; Crook, D; Rooke, J and Seymour, D (1997) Construction's experiences of attempting to become world class: The role of academics in assisting practitioners. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
McConnell, William J (2026) Termination-for-default risk for construction contractors. PhD thesis, University of Colorado at Denver, USA.
McErlane, A; Heaney, G; Haran, M and McClements, S (2016) The application of stakeholder theory to UK PPP stakeholders. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
McLellan, R (1994) The use of project management procedures by construction contractors. PhD thesis, University of Strathclyde, UK.
Melbourne, R E (1996) Advance base construction by civilian contractors in war zones. PhD thesis, University of Southern California, USA.
Meng, K (2021) Performance measurement for UK construction projects. PhD thesis, University of Manchester, UK.
Miller, R H (1973) Life cycle system model for estimating construction equipment ownership costs. PhD thesis, Oklahoma State University, USA.
Miura, K (2017) International joint ventures in the US military construction programs in Japan: An exploratory case study investigation. PhD thesis, Northcentral University, USA.
Mohamed, E; Jafari, P and Hammad, A (2022) Mixed qualitative–quantitative approach for bidding decisions in construction. Engineering, Construction and Architectural Management, 29(6), pp. 2328-2357. ISSN 0969-9988
Mohamed, O; Abd-Karim, S B; Roslan, N H; Mohd Danuri, M S and Zakaria, N (2015) Risk management: Looming the modus operandi among construction contractors in Malaysia. International Journal of Construction Management, 15(1), pp. 82-93. ISSN 1562-3599
Mohammadi, A; Igwe, C; Amador-Jimenez, L and Nasiri, F (2020) Applying lean construction principles in road maintenance planning and scheduling. International Journal of Construction Management, 22(12), pp. 2364-2374. ISSN 1562-3599
Motawa, I A; Khosrowshahi, F and Kaka, A P (2005) Development and evaluation of a company-level budgeting technique incorporating future construction contracts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Ndekugri, I E and McCaffer, R (1988) Management information flow in construction companies. Construction Management and Economics, 6(4), pp. 273-294. ISSN 01446193
Neil, J M (1978) Construction cost estimating concepts and their application. PhD thesis, Texas A&M University, USA.
Nesan, L J (1997) A generic model for effective implementation of empowerment in construction contractor organisations. PhD thesis, University of Wolverhampton, UK.
Ng, T; Palaneeswaran, E and Kumaraswamy, M (2008) Costs and benefits of ISO 9000-based quality management systems to construction contractors. Construction Economics and Building, 8(2), pp. 23-29. ISSN 2204-9029
Ngamthampunpol, D (2008) An assessment of safety management in the Thai construction industry. DSc thesis, George Washington University, USA.
Nguyen, V T; Do, S T; Tran, C N N and van Pham, L (2025) Analysis of interrelationships among constructs of cost overrun causes in consortium projects between construction contractors. International Journal of Construction Management, 25(13), pp. 1596-1608. ISSN 1562-3599
Nguyen, P H D; Lines, B C and Tran, D Q (2018) Best-value procurement in design-bid-build construction projects: Empirical analysis of selection outcomes. Journal of Construction Engineering and Management, 144(10): 04018093, ISSN 0733-9364
Nguyen, T; Nguyen, L H; Chileshe, N and Hallo, L (2023) Investigating critical risk factors of selecting joint venture contractors for infrastructure projects implementation in Vietnam. International Journal of Construction Management, 23(14), pp. 2438-2451. ISSN 1562-3599
Nicholas, J (2000) A risk analysis system for evaluating construction contractors by potential creditors. PhD thesis, University of Wolverhampton, UK.
Nicholas, J and Edwards, D J (2003) A model to evaluate materials suppliers' and contractors' business interactions. Construction Management and Economics, 21(3), pp. 237-245. ISSN 01446193
Nicholas, J; Holt, G D and Edwards, D J (2001) Towards a risk assessment model for evaluating construction contractors' creditworthiness. Journal of Financial Management of Property and Construction, 6(1), pp. 31-40. ISSN 1366-4387
Nicholas, J; Holt, G D and Harris, P T (2000) An investigation into predicting materials suppliers' profits. Journal of Construction Procurement, 6(2), ISSN 1358-9180
Nicholas, J; Holt, G D and Harris, P T (2000) Suppliers' debt collection and contractor creditworthiness evaluation. Building Research & Information, 28(4), pp. 268-279. ISSN 0961-3218
Nicholas, J; Holt, G D and Mihsein, M (2000) Forecasting construction materials suppliers' financial turnover. Engineering, Construction and Architectural Management, 7(3), pp. 221-231. ISSN 0969-9988
Nnedinma, U (2016) Approaches, drivers and motivators of health and safety self-regulation in the Nigerian construction industry: A scoping study. Architectural Engineering and Design Management, 12(6), pp. 460-475. ISSN 1745-2007
Odeyinka, H; Lowe, J and Kaka, A (2012) Regression modelling of risk impacts on construction cost flow forecast. Journal of Financial Management of Property and Construction, 17(3), pp. 203-221. ISSN 1366-4387
Odeyinka, H A (2003) The development and validation of models for assessing risk impacts on construction cash flow forecast. PhD thesis, Glasgow Caledonian University, UK.
Odeyinka, H A and Kaka, A (2005) An evaluation of contractors' satisfaction with payment terms influencing construction cash flow. Journal of Financial Management of Property and Construction, 10(3), pp. 171-180. ISSN 1366-4387
Odeyinka, H A; Lowe, J and Kaka, A (2008) An evaluation of risk factors impacting construction cash flow forecast. Journal of Financial Management of Property and Construction, 13(1), pp. 5-17. ISSN 1366-4387
Odeyinka, H A; Lowe, J and Kaka, A P (2013) Artificial neural network cost flow risk assessment model. Construction Management and Economics, 31(5), pp. 423-439. ISSN 01446193
Odeyinka, H A and Lowe, J G (2001) An evaluation of methodological issues for assessing risk impacts on construction cash flow forecast. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Oke, A E (2018) Bonding capability of Nigerian contracting firms. Engineering, Construction and Architectural Management, 25(6), pp. 707-720. ISSN 0969-9988
Okonkwo, P N and Wium, J (2020) Health and safety management systems within construction contractor organizations: Case study of South Africa. Journal of Construction Engineering and Management, 146(5): 05020003, ISSN 0733-9364
Oladiran, O J; Bayewun, A A and Aderogba, A M (2021) Awareness and usage of environmental waste management practices of contractors on construction sites. Journal of Construction Business and Management, 5(1), pp. 17-27. ISSN 2521-0165
Olaniran, O J (2015) The effects of cost-based contractor selection on construction project performance. Journal of Financial Management of Property and Construction, 20(3), pp. 235-251. ISSN 1366-4387
Olatunji, O A; Aje, O I and Makanjuola, S (2017) Bid or no-bid decision factors of indigenous contractors in Nigeria. Engineering, Construction and Architectural Management, 24(3), pp. 378-392. ISSN 0969-9988
Olbina, S; Hinze, J and Arduengo, C (2011) Drug testing practices in the US construction industry in 2008. Construction Management and Economics, 29(10), pp. 1043-1057. ISSN 01446193
Omoregbe, A O (2020) Immigration policy and the U.S. shortage of construction workers in the skilled trades. PhD thesis, Northcentral University, USA.
Onubi, H O and Carpio, M (2025) Voluntary workplace proenvironmental behavior on construction project sites: Antecedent roles of green human resource management practices, environmental awareness, and job control. Journal of Construction Engineering and Management, 151(4): 04025007, ISSN 0733-9364
Onukwube, H N (2008) Construction professionals motivation and job performance: A comparison of indigenous and expatriate construction contractors in Nigeria. PhD thesis, University of Lagos, Nigeria.
Opoku, A and Fortune, C (2011) The implementation of sustainable practices through leadership in construction organizations. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Owoyemi, J A (2018) Performance evaluation of higway transportation design-build project delivery: A case study. PhD thesis, University of Maryland, College Park, USA.
Owusu-Manu, D G; Holt, G D; Edwards, D J and Badu, E (2014) Determinants of trade credit supply among the Ghanaian construction sector. Built Environment Project and Asset Management, 4(4), pp. 368-383. ISSN 2044-124X
Oyeyipo, O O; Odusami, K T; Ojelabi, R A and Afolabi, A O (2016) Factors affecting contractors' bidding decisions for construction projects in Nigeria. Journal of Construction in Developing Countries, 21(2), pp. 21-35. ISSN 1823-6499
Ozols, R S (2015) A strategic framework to aid the success of small and micro sized UK construction contractors. DProf thesis, University of Salford, UK.
Palojärvi, L (2009) Managing risks in the international growth business of Finnish construction contractors and building product suppliers. PhD thesis, Helsinki University of Technology, Finland.
Pan, L-J (1996) A study of risk management in dealing with contracts in the construction industry. PhD thesis, University of Glasgow, UK.
Pan, N-F S (2001) Fuzzy reasoning expert scheduling system (FRESS) for highway construction subject to rain impact: A case study in Taiwan. PhD thesis, Ohio State University, USA.
Peansupap, V and Walker, D H T (2004) Strategic adoption of information and communication technology (ICT): Case studies of construction contractors. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Peansupap, V and Walker, D H T (2006) Innovation diffusion at the implementation stage of a construction project: A case study of information communication technology. Construction Management and Economics, 24(3), pp. 321-332. ISSN 01446193
Perdomo-Rivera, J L (2004) A framework for a decision support model for supply chain management in the construction industry. PhD thesis, Virginia Tech, USA.
Perera, C S R and Gunatilake, S (2022) Value chain management in Sri Lankan construction industry: Contractor's perspective. International Journal of Construction Management, 22(16), pp. 3137-3147. ISSN 1562-3599
Perkinson, C L (2008) The use of computing technology in highway construction contractor companies as a total jobsite management tool (TJMT). PhD thesis, Florida International University, USA.
Pinto Nunez, M D C (2017) Comprehensive partnering management model for highway construction projects delivered using traditional and alternative methods. PhD thesis, Iowa State University, USA.
Plebankiewicz, E and Kubek, D (2016) Multicriteria selection of the building material supplier using AHP and fuzzy AHP. Journal of Construction Engineering and Management, 142(1): 04015057, ISSN 0733-9364
Pornthepkasemsant, P and Charoenpornpattana, S (2019) Identification of factors affecting productivity in Thailand’s construction industry and proposed maturity model for improvement of the productivity. Journal of Engineering, Design and Technology, 17(5), pp. 849-861. ISSN 1726-0531
Potts, K F (1988) An alternative payment system for major 'fast track' construction projects. Construction Management and Economics, 6(1), pp. 25-33. ISSN 01446193
Pratas, J D G (2000) Comparison of the use and success of budgetary and schedule-based management information systems (MIS) in construction. PhD thesis, University of Manchester, UK.
Price, A D F and Shawa, H (1997) Survey of project related finance in United Arab Emirates. Journal of Construction Engineering and Management, 123(3), pp. 223-232. ISSN 0733-9364
Proverbs, D G (1998) A best practice for high-rise insitu concrete construction based on French, German and UK contractor performance measures. PhD thesis, University of Wolverhampton, UK.
Proverbs, D G and Faniran, O O (2001) International construction performance comparisons: A study of European' and Australian contractors. Engineering, Construction and Architectural Management, 8(4), pp. 284-291. ISSN 0969-9988
Proverbs, D G; Holt, G D and Olomolaiye, P O (1998) A comparative evaluation of concrete placing productivity rates amongst French, German and UK construction contractors. Engineering, Construction and Architectural Management, 5(2), pp. 174-181. ISSN 0969-9988
Proverbs, D G; Holt, G D and Olomolaiye, P O (1998) A comparative evaluation of reinforcement fixing productivity rates amongst French, German and UK construction contractors. Engineering, Construction and Architectural Management, 5(4), pp. 350-358. ISSN 0969-9988
Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) European construction contractors: A productivity appraisal of in situ concrete operations. Construction Management and Economics, 17(2), pp. 221-230. ISSN 01446193
Pulaski, M H and Horman, M J (2005) Organizing constructability knowledge for design. Journal of Construction Engineering and Management, 131(8), pp. 911-919. ISSN 0733-9364
Raidén, A B; Dainty, A R J and Neale, R H (2004) Exemplary human resource development (hrd) within a large construction contractor. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Rollo, Michael John (2020) Managing mega infrastructure projects: Linking theory with practice. PhD thesis, University of Sydney, Australia.
Russell, J S (1992) Decision models for analysis and evaluation of construction contractors. Construction Management and Economics, 10(3), pp. 185-202. ISSN 01446193
Russell, J S and Jaselskis, E J (1992) Predicting construction contractor failure prior to contract award. Journal of Construction Engineering and Management, 118(4), pp. 791-811. ISSN 0733-9364
Russell, J S; Jaselskis, E J and Lawrence, S P (1997) Continuous assessment of project performance. Journal of Construction Engineering and Management, 123(1), pp. 64-71. ISSN 0733-9364
Sadeh, H; Mirarchi, C; Shahbodaghlou, F and Pavan, A (2023) Predicting the trends and cost impact of COVID-19 OSHA citations on US construction contractors using machine learning and simulation. Engineering, Construction and Architectural Management, 30(8), pp. 3461-3479. ISSN 0969-9988
Sadeh, H; Mirarchi, C; Shahbodaghlou, F and Pavan, A (2023) BIM feasibility for small and medium-sized contractors and subcontractors. International Journal of Construction Management, 23(6), pp. 999-1008. ISSN 1562-3599
Saka, N (2011) An assessment of the level of adoption of e-business practices by Nigerian construction contractors. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Saka, N and Ajayi, O M (2010) A comparative assessment of incentive scheme between indigenous and multinational construction contractors in Nigeria. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Sawalhi, N and Enshassi, A (2005) Application of project time management tools and techniques to the construction industry in the Gaza Strip. Construction Economics and Building, 5(1), pp. 1-8. ISSN 2204-9029
Schexnayder, C J J (1980) Heavy construction equipment replacement economics. PhD thesis, Purdue University, USA.
Senaratne, S and Jayarathna, T (2012) Quality planning process of construction contractors: Case studies in Sri Lanka. Journal of Construction in Developing Countries, 17(1), pp. 103-115. ISSN 1823-6499
Severson, G D; Jaselskis, E J and Russell, J S (1993) Trends in construction contractor financial data. Journal of Construction Engineering and Management, 119(4), pp. 854-858. ISSN 0733-9364
Sezer, A A (2015) Contractor use of productivity and sustainability indicators for building refurbishment. Built Environment Project and Asset Management, 5(2), pp. 141-153. ISSN 2044-124X
Shamsai, M; Whitlatch, E and Sezen, H (2007) Economic evaluation of reinforced concrete structures with columns reinforced with prefabricated cage system. Journal of Construction Engineering and Management, 133(11), pp. 864-870. ISSN 0733-9364
Shash, A A and Abdul-Hadi, N H (1993) The effect of contractor size on mark-up size decision in Saudi Arabia. Construction Management and Economics, 11(6), pp. 421-429. ISSN 01446193
Shash, A A and Ahcom, J (2005) Organizational aspects of safety management subsystem. Journal of Construction Research, 6(2), pp. 237-252. ISSN 1609-9451
Shash, A A and Ahcom, J (2006) Organizational aspects of planning and scheduling subsystem. Journal of Construction Research, 7(1), pp. 247-265. ISSN 1609-9451
Shawa, H H (1995) Project related finance for construction contractors operating in the United Arab Emirates. PhD thesis, Loughborough University, UK.
Sherratt, F (2013) Et in arcadia ego? 'Zero target' safety programmes in the UK construction industry. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Sherratt, F (2014) Exploring 'zero target' safety programmes in the UK construction industry. Construction Management and Economics, 32(7-8), pp. 737-748. ISSN 01446193
Shiha, A; Dorra, E M and Nassar, K (2020) Neural networks model for prediction of construction material prices in Egypt using macroeconomic indicators. Journal of Construction Engineering and Management, 146(3): 04020010, ISSN 0733-9364
Shokri-Ghasabeh, M and Chileshe, N (2014) Knowledge management: Barriers to capturing lessons learned from Australian construction contractors' perspectives. Construction Innovation, 14(1), pp. 108-134. ISSN 1471-4175
Shokri-Ghasabeh, M and Chileshe, N (2016) Critical factors influencing the bid/no bid decision in the Australian construction industry. Construction Innovation, 16(2), pp. 127-157. ISSN 1471-4175
Simu, K and Lidelöw, H (2019) Middle managers' perceptions of operations strategies at construction contractors. Construction Management and Economics, 37(6), pp. 351-366. ISSN 01446193
Singh, D and Tiong, R L K (2005) A fuzzy decision framework for contractor selection. Journal of Construction Engineering and Management, 131(1), pp. 62-70. ISSN 0733-9364
Singla, H. K. and Phadtare, M. (2026) Measuring construction contractor satisfaction from the lens of client performance: Empirical investigation in India. Journal of Construction Engineering and Management, 152(9): 04026133, ISSN 0733-9364
Stevens, M S (2012) Impact of key management practices on overhead to direct cost ratio for specialty construction contractors. PhD thesis, University of Florida, USA.
Stringfellow, P (2014) Construction contractors involvement in disaster management planning. Construction Economics and Building, 14(2), pp. 120-132. ISSN 2204-9029
Su, Y and Lucko, G (2015) Synthetic cash flow model with singularity functions for unbalanced bidding scenarios. Construction Management and Economics, 33(1), pp. 35-54. ISSN 01446193
Sumanarathna, N and Rowlinson, R (2019) Examining construction contractors' innovation through the lens of exploration and exploitation. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Sundaram, T K (1989) Contract management: a rational approach to construction contract pricing. PhD thesis, Indian Institute of Technology Delhi, India.
Swaffield, L M and Johnson, G A (2005) The financial benefits of implementing ISO 14001 within construction contracting organizations. Architectural Engineering and Design Management, 1(3), pp. 197-210. ISSN 1745-2007
Swai, L (2022) Development of a conceptual framework for enhancing payment practices in the UK construction industry. PhD thesis, Coventry University, UK.
Swai, L L P and Arewa, A O (2018) Potentiality of emerging technologies to minimise late-payments quandary in construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Swallow, M and Zulu, S (2024) Enhancing collaboration and engagement using virtual reality within site safety planning. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 223-231. ISSN 17514304
Taha, M A-E (1994) Applying distributed artificial intelligence to the prequalification of construction contractors. PhD thesis, University of Wisconsin - Madison, USA.
Taimu, M (2020) A contractor-driven stakeholder relationship management framework for botswana's construction industry. DBL thesis, University of South Africa, South Africa.
Tamtana, J S (2001) How technology strategy affects technology transfer and competitive performance in the Indonesian construction industry. PhD thesis, Nova Southeastern University, USA.
Tansey, P and Spillane, J (2016) From crisis to opportunity: Turnaround strategies of large Irish construction contractors during the period 2007-2015. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Tansey, P; Spillane, J P and Brooks, T (2018) Creating opportunities in the face of an environmental jolt: Exploring turnaround strategizing practices within large Irish construction contractors. Construction Management and Economics, 36(4), pp. 217-241. ISSN 01446193
Tansey, P; Spillane, J P and Meng, X (2014) Linking response strategies adopted by construction firms during the 2007 economic recession to Porter's generic strategies. Construction Management and Economics, 32(7-8), pp. 705-724. ISSN 01446193
Tansey P, M X C D (2013) A critical review of response strategies adopted by construction companies during an economic recession. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Teng, Y; Li, X; Wu, P and Wang, X (2019) Using cooperative game theory to determine profit distribution in IPD projects. International Journal of Construction Management, 19(1), pp. 32-45. ISSN 1562-3599
Thalagala Achchi Maddumage, Kasun G (2021) Methodology to predict construction contractors' performance using non-price measures. PhD thesis, Western Sydney University, Australia.
Towner, M and Baccarini, D (2008) Risk pricing in construction tenders: how, who, what. Construction Economics and Building, 8(1), pp. 49-60. ISSN 2204-9029
Trethewy, R W (2003) OHS performance: improved indicators for construction contractors. Journal of Construction Research, 4(1), pp. 17-27. ISSN 1609-9451
Trigunarsyah, B (2004) Constructability practices among construction contractors in Indonesia. Journal of Construction Engineering and Management, 130(5), pp. 656-669. ISSN 0733-9364
Trigunarsyah, Bambang (2001) Implementing constructability improvement into the Indonesian construction industry. PhD thesis, University of Melbourne, Australia.
Tserng, H P; Liao, H H; Jaselskis, E J; Tsai, L K and Chen, P C (2012) Predicting construction contractor default with barrier option model. Journal of Construction Engineering and Management, 138(5), pp. 621-630. ISSN 0733-9364
Tserng, H P; Liao, H H; Tsai, L K and Chen, P C (2011) Predicting construction contractor default with option-based credit models-models' performance and comparison with financial ratio models. Journal of Construction Engineering and Management, 137(6), pp. 412-420. ISSN 0733-9364
Tuffaha, F M; Assaf, S; Yasar Zakaria, Z and Hadidi, L A (2021) A framework for the performance assessment of construction contractors in Saudi Arabia. Built Environment Project and Asset Management, 11(2), pp. 195-213. ISSN 2044-124X
Tutesigensi, A and Oak, D P (2007) Feasibility of collaborative working at the second tier subcontractor level in a prime contract. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Tutesigensi, A and Parcell, K (2007) Benefits of mobile telephones for construction contractors in the United Kingdom. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Ugwuoke, A A (2018) Innovation persistence during economic crisis by Nigeria's construction contracting firms: an investigation of the critical success factors. PhD thesis, University of Salford, UK.
Umeokafor, N I (2017) Realities of construction health and safety regulation in Nigeria. PhD thesis, University of Greenwich, UK.
Urquhart, S and Whyte, A (2018) Contractor tendering research: Going beyond bid/no-bid and markup models. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(6), pp. 255-262. ISSN 17514304
Urquhart, S and Whyte, A (2018) Impact of contractor internal tendering procedure governance on tender win-rates: How procedures can be improved. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Urquhart, S; Whyte, A and Lloyd, N (2017) The development of a more efficient internal tender procedure framework for Australian construction contractors. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Waara, F (2008) Mitigating contractual hazards in public procurement: A study of Swedish local authorities. Construction Management and Economics, 26(2), pp. 137-145. ISSN 1466433X
Walraven, A and de Vries, B (2009) From demand driven contractor selection towards value driven contractor selection. Construction Management and Economics, 27(6), pp. 597-604. ISSN 1466433X
Wamuziri, S (2009) Using electronic reverse auctions in project procurement: Perceptions of construction contractors. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Wang, Z and Feng, L (2026) Strategic resource amalgamation and diversified business operations: Unraveling competitive advantage in Chinese construction contractors. Engineering, Construction and Architectural Management, 33(1), pp. 602-619. ISSN 0969-9988
Wang, B; Zhang, S; Wang, X and Feng, Z (2018) The influence of quality benefit and marginal contribution on the optimal equity structure of the PPP projects: Balancing public and private benefits. Construction Management and Economics, 36(11), pp. 611-622. ISSN 01446193
Wang, C; Loo, S C; Yap, J B H and Abdul-Rahman, H (2019) Novel capability-based risk assessment calculator for construction contractors venturing overseas. Journal of Construction Engineering and Management, 145(10): 04019059, ISSN 0733-9364
Wang, H; Meng, X and McGetrick, P J (2018) Incorporating knowledge of construction and facility management into the design in the BIM environment. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Wang, J; Li, X; Memari, A; Skitmore, M; Zhong, Y; Ashuri, B; Chen, J and Cao, J (2025) Assessing the implementation and effectiveness of China's social credit system of the construction industry: a case study of Nanjing. International Journal of Construction Management, 25(7), pp. 850-859. ISSN 1562-3599
Wang, X; Tang, L; Guo, S and Gao, Y (2025) Configurations of factors affecting the equity structure in PPP projects: A resource-dependent perspective. Construction Management and Economics, 43(7), pp. 483-501. ISSN 0144-6193
Wang, X; Wang, S and Gao, Y (2023) Optimal equity structure of PPP projects when private-sector shareholders' "investor-contractor" dual roles is considered. Construction Management and Economics, 41(11-12), pp. 910-925. ISSN 01446193
Wang, Zhuoyuan (2019) Effects of main contractors' service quality on subcontractors' behaviours and project outcomes in the Chinese construction industry. PhD thesis, University of New South Wales, Australia.
Wanous, M; Boussabaine, A H and Lewis, J (1998) Tendering factors considered by Syrian contractors. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Watts, G; Dainty, A and Fernie, S (2019) Measuring social value in UK construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Watts, G; Fernie, S and Dainty, A (2019) Paradox and legitimacy in construction: How CSR reports restrict CSR practice. International Journal of Building Pathology and Adaptation, 37(2), pp. 231-246. ISSN 23984708
Williams, T; Bernold, L and Lu, H (2007) Adoption patterns of advanced information technologies in the construction industries of the United States and Korea. Journal of Construction Engineering and Management, 133(10), pp. 780-790. ISSN 0733-9364
Williams Jr., G H (2003) An evaluation of public construction contracting methods for the public building sector in Oregon using data envelopment analysis. PhD thesis, Portland State University, USA.
Wimalasena, N N and Gunatilake, S (2018) The readiness of construction contractors and consultants to adopt e-tendering: The case of Sri Lanka. Construction Innovation, 18(3), pp. 350-370. ISSN 1471-4175
Wong, C H (2004) Contractor performance prediction model for the United Kingdom construction contractor: Study of logistic regression approach. Journal of Construction Engineering and Management, 130(5), pp. 691-698. ISSN 0733-9364
Wong, K D (1993) An integrated information system for Hong Kong construction contractors. PhD thesis, Loughborough University, UK.
Wood, H L and Ashton, P (2010) Modelling project complexity. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Wu, D; Chan, E H W and Shen, L (2004) Scoring system for measuring contractor's environmental performance. Journal of Construction Research, 5(1), pp. 139-147. ISSN 1609-9451
Xiong, B; Skitmore, M; Xia, P; Ballesteros-Pérez, P; Ye, K and Zhang, X (2019) Impact of corporate credit scoring on construction contractors in China. Journal of Construction Engineering and Management, 145(4): 05019002, ISSN 0733-9364
Ye, S and Tiong, R L K (2004) Public-private partnership for power projects: A case study of Hub power project. Journal of Financial Management of Property and Construction, 9(3), pp. 129-140. ISSN 1366-4387
Yearsley, W S (2007) How differences in heavy civil project set-up practices impact performance. PhD thesis, Colorado State University, USA.
Yisa, S B; Holt, G D and Zakeri, M (2000) Factors affecting management motivation in the Iranian construction industry: A survey of site managers. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Zaid Alkilani, Suhair (2018) Performance measurement and improvement model for small and medium contractors in developing countries. PhD thesis, University of New South Wales, Australia.
Zhai, H and Russell, J S (1999) Stochastic modelling and prediction of contractor default risk. Construction Management and Economics, 17(5), pp. 563-576. ISSN 01446193
Zhang, Y; Yi, X; Li, S and Qiu, H (2023) Evolutionary game of government safety supervision for prefabricated building construction using system dynamics. Engineering, Construction and Architectural Management, 30(7), pp. 2947-2968. ISSN 0969-9988
Zhao, Y; Hao, S; Chen, Z; Zhou, X; Zhang, L and Guo, Z (2025) Critical factors influencing the internet of things technology adoption behavior of construction companies: Evidence from China. Engineering, Construction and Architectural Management, 32(2), pp. 760-784. ISSN 0969-9988
Zhao, Z-Y; Zhao, X-J; Zuo, J and Zillante, G (2016) Corporate social responsibility for construction contractors: A China study. Journal of Engineering, Design and Technology, 14(3), pp. 614-640.
Zhou, H (2021) Institution building, organisational restructuring and everyday negotiations in Uganda's roads sector. PhD thesis, SOAS, University of London, UK.
Zughaibi, A M (1987) Construction productivity in Saudi Arabia: The influence of multinational labor force. PhD thesis, University of Texas at Austin, USA.
de Neufville, R and King, D (1991) Risk and need-for-work premiums in contractor bidding. Journal of Construction Engineering and Management, 117(4), pp. 659-673. ISSN 0733-9364
Up a level