Items with Index Term: construction client

Number of items: 196.

Adam, A (2019) Exploring construction challenges of the public client: A dynamic capabilities approach. PhD thesis, Chalmers University of Technology, Sweden.

Addy, M N; Adinyira, E; Dadzoe, F and Opoku, D (2022) The market for green buildings in Sub-Saharan Africa: Experts' perspective on the economic benefits in Ghana. Journal of Construction in Developing Countries, 27(1), pp. 173-188. ISSN 1823-6499

Adetunji, I O (2006) Sustainable construction: a web-based performance assessment tool. EngD thesis, Loughborough University, UK.

Agbesi, K; Fugar, F D and Adjei-Kumi, T (2018) Modelling the adoption of sustainable procurement in construction organisations. Built Environment Project and Asset Management, 8(5), pp. 461-476. ISSN 2044-124X

Ahiaga-Dagbui, D D (2014) Rethinking construction cost overruns: an artificial neural network approach to construction cost estimation. PhD thesis, University of Edinburgh, UK.

Ahiaga-Dagbui, D D and Smith, S D (2014) Dealing with construction cost overruns using data mining. Construction Management and Economics, 32(7-8), pp. 682-694. ISSN 01446193

Ahmed Namadi, S i (2019) A framework for collaborative costing in the UK construction industry. PhD thesis, Nottingham Trent University, UK.

Albayoudh, K A F (2003) Assessment of total quality management in the Saudi construction industry organisations. PhD thesis, Loughborough University, UK.

Aliakbarlou, S; Wilkinson, S and Costello, S B (2017) Exploring construction client values and qualities: Are these two distinct concepts in construction studies? Built Environment Project and Asset Management, 7(3), pp. 234-252. ISSN 2044-124X

Alnasseri N, O A S G (2013) Organizational culture, leadership style and effectiveness: A case study of middle eastern construction clients. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Alshawi, M; Engström, S and Hedgren, E (2012) Sustaining inertia? Construction clients' decision-making and information-processing approach to industrialized building innovations. Construction Innovation, 12(4), pp. 393-413. ISSN 1471-4175

Alshihre, F (2018) Development of a framework for client satisfaction in the Saudi construction industry. PhD thesis, University of Wolverhampton, UK.

Alshihre, F; Chinyio, E; Nzekwe-Excel, C and Daniel, E I (2023) Pursuing alignment of clients' and contractors' perceptions of client satisfaction in Saudi Arabian projects. Built Environment Project and Asset Management, 13(3), pp. 341-358. ISSN 2044-124X

Arabiat, A (2013) Modelling construction client risk performance using organisation behaviour parameters. PhD thesis, Loughborough University, UK.

Arewa, A O; Olubodun, F and Peter Swai, L (2024) Exploring nuanced approach to criminalization of late payers in the construction sector. International Journal of Construction Management, 24(10), pp. 1136-1144. ISSN 1562-3599

Aritua, B; Male, S and Bower, D (2009) Defining the intelligent public sector construction client. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(2), pp. 75-82. ISSN 17514312

Aritua, B; Male, S; Bower, D and Madter, N (2011) Competencies for the intelligent public sector construction client. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(4), pp. 193-201. ISSN 17514304

Atkins, J and Wild, A (2000) Automotive facilities procurement and the new construction paradigm. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Awuzie, B; McDermott, P and Farag, F (2018) Achieving social value through construction frameworks: the effect of client attributes. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(1), pp. 25-31. ISSN 17514304

Ayegba, C (2018) Duties and required competencies of a management contractor. Journal of Construction Business and Management, 2(1), pp. 1-9. ISSN 2521-0165

Badenfelt, U (2008) The selection of sharing ratios in target cost contracts. Engineering, Construction and Architectural Management, 15(1), pp. 54-65. ISSN 0969-9988

Banik, G C (2001) Construction productivity improvement: Current US perspective. Journal of Construction Procurement, 7(2), pp. 60-71. ISSN 1358-9180

Blismas, N; Gibb, A and Pasquire, C (2005) Assessing project suitability for off-site production. Construction Economics and Building, 5(1), pp. 9-15. ISSN 2204-9029

Blismas, N; Sher, W; Thorpe, A and Baldwin, A (2004) A typology for clients' multi-project environments. Construction Management and Economics, 22(4), pp. 357-371. ISSN 01446193

Blismas, N G (2001) Multi project environments of construction clients. PhD thesis, Loughborough University, UK.

Blismas, N G; Sher, W D; Thorpe, A and Baldwin, A N (2004) Factors influencing project delivery within construction clients' multi-project environments. Engineering, Construction and Architectural Management, 11(2), pp. 113-125. ISSN 0969-9988

Browne, M (2007) Towards a thematic approach to research within a taught postgraduate programme in construction and project management: A Northern Ireland context. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Candel, M; Gustavsson, T K and Eriksson, P E (2019) Beyond national building regulations: Exploring public-private negotiations over sustainability requirements. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Challender, J; Farrell, P and Sherratt, F (2014) Partnering in practice: An analysis of collaboration and trust. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(6), pp. 255-264. ISSN 17514304

Challender, J; Farrell, P and Sherratt, F (2016) Effects of an economic downturn on construction partnering. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(4), pp. 159-167. ISSN 17514304

Cheng, J (2008) The impact of strategic decisions on construction client satisfaction: An assessment framework. PhD thesis, University of Wolverhampton, UK.

Cheng, J; Proverbs, D; Oduoza, C and Potts, K (2008) Investigating the interrelationship of strategic decisions and client satisfaction: A conceptual framework. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Cheng, J and Proverbs, D G (2004) The impact of strategic decisions on construction client satisfaction. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Cheng, J; Proverbs, D G; Oduoza, C and Fleming, C (2005) A conceptual model towards the measurement of construction client satisfaction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Cheng, J; Proverbs, D G and Oduoza, C F (2006) The satisfaction levels of UK construction clients based on the performance of consultants: Results of a case study. Engineering, Construction and Architectural Management, 13(6), pp. 567-583. ISSN 0969-9988

Cheung, S-O (1998) Project dispute resolution satisfaction of construction clients in Hong Kong. PhD thesis, University of Wolverhampton, UK.

Chinyio, E (1999) An evaluation of construction clients' needs and preferences. PhD thesis, University of Wolverhampton, UK.

Chinyio, E A; Olomolaiye, P O; Kometa, S T and Harris, F C (1998) A needs-based methodology for classifying construction clients and selecting contractors. Construction Management and Economics, 16(1), pp. 91-98. ISSN 01446193

Chung, K-H J (2010) Development of a collaborative briefing approach for infrastructure projects in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.

Coupar, G (2009) Modern approaches to repairs and maintenance procurement within the social housing sector. PhD thesis, Nottingham Trent University, UK.

Dakhil, A J (2017) Building information modelling (BIM) maturity-benefits assessment relationship framework for UK construction clients. PhD thesis, University of Salford, UK.

Davenport, D M (1997) Client satisfaction with construction cost: A comparative study of French and UK performance. Journal of Financial Management of Property and Construction, 2(3), pp. 77-94. ISSN 1366-4387

Davenport, D M (1998) A comparative study of the effectiveness of the UK and French construction industries in the achievement of satisfaction with performance as perceived by the construction client. PhD thesis, University of Central Lancashire, UK.

De Blois, M; Herazo-Cueto, B; Latunova, I and Lizarralde, G (2011) Relationships between construction clients and participants of the building industry: Structures and mechanisms of coordination and communication. Architectural Engineering and Design Management, 7(1), pp. 3-22. ISSN 1745-2007

Demirkesen, S and Tezel, A (2022) Investigating major challenges for industry 4.0 adoption among construction companies. Engineering, Construction and Architectural Management, 29(3), pp. 1470-1503. ISSN 0969-9988

Dissanayaka, S M and Kumaraswamy, M M (1999) Evaluation of factors affecting time and cost performance in Hong Kong building projects. Engineering, Construction and Architectural Management, 6(3), pp. 287-298. ISSN 0969-9988

Donohoe, S and Coggins, J K (2016) Framework agreements in a post-recession economy. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Drew, D; Kwong, C; Zou, P and Shen, L Y (2002) Determining the optimal fee-technical proposal combination in two envelope fee bidding. Construction Economics and Building, 2(2), pp. 1-9. ISSN 2204-9029

Drew, D; Li, H and Shen, L Y (2000) Feedback in competitive fee tendering. Journal of Construction Procurement, 6(2), ISSN 1358-9180

Duff, A R; Emsley, M; Gregory, M; Lowe, D and Masterman, J (1998) Development of a model of total building procurement costs for construction clients. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Dunne, K O (2006) Effective leadership in the multi-faceted client organisation: A case study on the Olympic client coalition. PhD thesis, University College London, UK.

Dyas, V (2008) Constituents of performance: investigating relational contracting in a construction industry setting to establish a framework for drivers of performance. PhD thesis, Kingston University, UK.

Edwards, D J and Holt, G D (2000) Quantifying the cost of plant operators' productivity. Journal of Financial Management of Property and Construction, 5(1-2), pp. 85-92. ISSN 1366-4387

Edwards, P J and Bowen, P A (1998) Risk and risk management in construction: towards more appropriate research techniques. Journal of Construction Procurement, 4(2), pp. 103-115. ISSN 1358-9180

Egbu, C O; Sturges, J and Bates, M (1999) Learning from knowledge management and trans-organizational innovations in diverse project management environments. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Egbu, C O; Young, B A and Torrance, V B (1996) Refurbishment management practices in the shipping and construction industries: lessons to be learned. Building Research & Information, 24(6), pp. 329-338. ISSN 0961-3218

Eisma, P and Volker, L (2014) Exploring the field of public construction clients by a graphical network analysis. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Elsherif, E M (2007) A decision aid model for the selection of appropriate payment and pricing systems for construction projects. PhD thesis, Heriot-Watt University, UK.

Enshassi, A; Mohamed, S and Ekarriri, A (2009) Essential skills and training provisions for building project stakeholders in Palestine. Journal of Construction in Developing Countries, 14(1), pp. 31-50. ISSN 1823-6499

Eriksson, P E (2008) Procurement effects on coopetition in client-contractor relationships. Journal of Construction Engineering and Management, 134(2), pp. 103-111. ISSN 0733-9364

Eriksson, P E (2025) How clients choose procurement strategies and organizational control systems in the Swedish housing sector. Journal of Financial Management of Property and Construction, 30(1), pp. 22-41. ISSN 1366-4387

Eriksson, P E; Atkin, B and Nilsson, T (2009) Overcoming barriers to partnering through cooperative procurement procedures. Engineering, Construction and Architectural Management, 16(6), pp. 598-611. ISSN 0969-9988

Eriksson, P E and Laan, A (2007) Procurement effects on trust and control in client-contractor relationships. Engineering, Construction and Architectural Management, 14(4), pp. 387-399. ISSN 0969-9988

Eriksson, P E; Nilsson, T and Atkin, B (2008) Client perceptions of barriers to partnering. Engineering, Construction and Architectural Management, 15(6), pp. 527-539. ISSN 0969-9988

Eriksson, P E and Pesämaa, O (2007) Modelling procurement effects on cooperation. Construction Management and Economics, 25(8), pp. 893-901. ISSN 1466433X

Farag, F (2018) Understanding social value creation in public construction projects using systems thinking. PhD thesis, University of Salford, UK.

Fong, P S W and Choi, S K Y (2000) Final contractor selection using the analytical hierarchy process. Construction Management and Economics, 18(5), pp. 547-557. ISSN 01446193

Fortune, C and Lees, M (2001) Systematic errors of judgement and the formulation of strategic cost advice for construction clients. Journal of Financial Management of Property and Construction, 6(2), pp. 81-93. ISSN 1366-4387

Fox, P W (2003) Construction industry development: Analysis and synthesis of contributing factors. PhD thesis, Queensland University of Technology, Australia.

Frödell, M; Josephson, P E and Lindahl, G (2008) Swedish construction clients' views on project success and measuring performance. Journal of Engineering, Design and Technology, 6(1), pp. 21-32. ISSN 1726-0531

Fu, W K (2004) The effect of experience in construction contract bidding. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Gameson, R and Sher, W (2002) An investigation into project team dynamics and the utilization of virtual environments. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Gameson, R and Sher, W (2009) An investigation into perceptions of client- professional interactions at project inception: An australian clients perspective: Pilot study results. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Gardiner, P D (1993) Conflict analysis in construction project management. PhD thesis, Durham University, UK.

Gibb, A G F and Isack, F (2001) Client drivers for construction projects: Implications for standardization. Engineering, Construction and Architectural Management, 8(1), pp. 46-58. ISSN 0969-9988

Gibb, A G F and Isack, F (2003) Re-engineering through pre-assembly: Client expectations and drivers. Building Research & Information, 31(2), pp. 146-160. ISSN 0961-3218

Gluch, P and Svensson, I (2016) The organizational nexus of changing management practices for sustainable renovation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Griffith, A (1995) The current status of environmental management systems in construction. Engineering, Construction and Architectural Management, 2(1), pp. 3-16. ISSN 0969-9988

Guribie, F L; Akubah, J T; Tengan, C and Blay Jnr, A V K (2022) Demand for green building in Ghana: A conceptual modeling and empirical study of the impediments. Construction Innovation, 22(2), pp. 342-360. ISSN 1471-4175

Haroglu, H; Glass, J and Thorpe, T (2009) A study of professional perspectives on structural frame selection. Construction Management and Economics, 27(12), pp. 1209-1217. ISSN 1466433X

Haroglu, H and Leiringer, R (2010) Achieving whole-life value: The challenges of service-led construction. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Hartmann, A; Reymen, I M M J and Van Oosterom, G (2008) Factors constituting the innovation adoption environment of public clients. Building Research & Information, 36(5), pp. 436-449. ISSN 0961-3218

Havenvid, M I; Hulthén, K; Linné, Å and Sundquist, V (2016) Renewal in construction projects: Tracing effects of client requirements. Construction Management and Economics, 34(11), pp. 790-807. ISSN 01446193

Hedborg, S (2022) ”It’s in the between”: Inter-project organising in project ecologies. PhD thesis, KTH Royal Institute of Technology, Sweden.

Hedborg, S and Karrbom Gustavsson, T (2020) Developing a neighbourhood: Exploring construction projects from a project ecology perspective. Construction Management and Economics, 38(10), pp. 964-976. ISSN 01446193

Hermans, M; Veldhuis, H; Huizing, D and Rots, S (2019) The embedding of the construction client role in Dutch municipalities and its effects on professionalism and organisational learning. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Hermans, M; Volker, L and Eisma, P (2014) A public commissioning maturity model for construction clients. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Higham, A and Fortune, C (2011) Sustainable asset management (SAM) decision making: An exploration of current practice. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Hogg, K (2003) The role of the quantity surveying profession in accommodating client risk. Journal of Financial Management of Property and Construction, 8(1), pp. 49-56. ISSN 1366-4387

Holder, L and Coffey, M (1997) Customer feedback and contractor appraisal in construction. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Holt, G D (1995) A methodology for predicting the performance of construction contractors. PhD thesis, University of Wolverhampton, UK.

Howard, Robert W (2021) Of incentive, bias, and behaviour: an empirical economic investigation into project delivery constructs influencing the adoption of building information modelling. PhD thesis, University College London, UK.

Ibem, E O and Laryea, S (2017) E-tendering in the South African construction industry. International Journal of Construction Management, 17(4), pp. 310-328. ISSN 1562-3599

Ireland, P N (2005) Supply chain management in construction: an analysis of the appropriateness of proactive supply chain management thinking for the construction industry. PhD thesis, University of Birmingham, UK.

Ismail, M R; Sun, M and Bowles, G (2021) A risk-oriented tender evaluation system for construction projects in Malaysia. Engineering, Construction and Architectural Management, 28(7), pp. 1887-1907. ISSN 0969-9988

Jabour Al Hazmi, H S (2011) National culture and knowledge sharing practices: Empirical study in the context of the procurement of educational building projects in Saudi Arabia. PhD thesis, Griffith University, Australia.

Johannes, K; Theodorus Voordijk, J; Marias Adriaanse, A and Aranda-Mena, G (2021) Identifying maturity dimensions for smart maintenance management of constructed assets: A multiple case study. Journal of Construction Engineering and Management, 147(9): 05021007, ISSN 0733-9364

Johannes, K; Voordijk, H and Aranda-Mena, G (2023) The role of purchasing in raising the maturity of smart maintenance management. Built Environment Project and Asset Management, 13(2), pp. 324-340. ISSN 2044-124X

Johannes, Koos (2023) Crafting intrapreneurial stewardship: An institutional perspective on client-led innovation in smart building maintenance. PhD thesis, University of Twente, Netherlands.

Kelly, J; Male, S and Gronqvist, M (2000) Characteristics of refurbishing retailers as clients of the construction industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Kelly, J R (2005) Managing client value at the strategic briefing stage of construction projects. PhD thesis, Heriot-Watt University, UK.

Kometa, S T (1995) An evaluation of client-generated risks in construction consultancies. PhD thesis, University of Wolverhampton, UK.

Kometa, S T; Olomolaiye, P O and Harris, F C (1994) Attributes of UK construction clients influencing project consultants' performance. Construction Management and Economics, 12(5), pp. 433-443. ISSN 01446193

Kometa, S T; Olomolaiye, P O and Harris, F C (1995) Quantifying client-generated risk by project consultants. Construction Management and Economics, 13(2), pp. 137-147. ISSN 01446193

Kometa, S T; Olomolaiye, P O and Harris, F C (1995) An evaluation of clients' needs and responsibilities in the construction process. Engineering, Construction and Architectural Management, 2(1), pp. 57-76. ISSN 0969-9988

Konukcu, S (2011) A knowledge chain framework for construction supply chains. PhD thesis, Loughborough University, UK.

Kuitert, L; Volker, L and Hermans, M (2016) Safeguarding public values by project-based construction clients: Leads for future research. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Kuitert, L; Volker, L and Hermans, M (2018) The impact of shifting values on the role and responsibilities of the construction client in delivering public goods. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Kuitert, L; Volker, L and Hermans, M H (2017) Public commissioning in a new era: Public value interests of construction clients. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Kuitert, L; Volker, L and Hermans, M H (2019) Taking on a wider view: Public value interests of construction clients in a changing construction industry. Construction Management and Economics, 37(5), pp. 257-277. ISSN 01446193

Kulatunga, K J (2008) Construction client and innovation: effect of client characteristics. PhD thesis, University of Salford, UK.

Kumaraswamy, M; Mahesh, G; Mahalingam, A; Loganathan, S and Kalidindi, S N (2017) Developing a clients' charter and construction project KPIs to direct and drive industry improvements. Built Environment Project and Asset Management, 7(3), pp. 253-270. ISSN 2044-124X

Kurokawa, M (2015) Tracing client interests in the course of a project: Why are some client interests incorporated whereas others are not? PhD thesis, University of Reading, UK.

Kussl, S and Wald, A (2025) The role of construction clients in digital innovation: Insights from scenario analysis. Construction Management and Economics, 43(5), pp. 381-404. ISSN 0144-6193

Kussl, S; Wald, A and Flak, L S (2025) Change must come from within: Study of digital transformation in construction client organizations. Journal of Construction Engineering and Management, 151(3): 05024017, ISSN 0733-9364

Lam, K C; Lam, M C K and Wang, D (2008) MBNQA-oriented self-assessment quality management system for contractors: Fuzzy AHP approach. Construction Management and Economics, 26(5), pp. 447-461. ISSN 1466433X

Lam, T Y M and Siwingwa, N (2017) Risk management and contingency sum of construction projects. Journal of Financial Management of Property and Construction, 22(3), pp. 237-251. ISSN 1366-4387

Lam, W M (2005) A conceptual model of success for design and build projects in the public sector of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Lan, O B; Ling, F Y Y and Soo, A (2014) Information feedback and bidders' competitiveness in construction bidding. Engineering, Construction and Architectural Management, 21(5), pp. 571-585. ISSN 0969-9988

Lau, E and Rowlinson, S (2009) The expectations, needs, risks and constraints for project performance. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Lee, A (2002) The development of a project process evaluation (PPE) framework that aims to measure the effectiveness of implementing a new design and construction project process. PhD thesis, University of Salford, UK.

Lee, F-P B (2009) Factors affecting the profitability of construction companies in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.

Lefebvre, G (2009) The influence of the psychological characteristics of the team members on construction project performance. PhD thesis, University of Salford, UK.

Levander, E; Engström, S; Sardén, Y and Stehn, L (2011) Construction clients' ability to manage uncertainty and equivocality. Construction Management and Economics, 29(7), pp. 753-764. ISSN 1466433X

Ling, F Y Y; Hartmann, A; Kumaraswamy, M and Dulaimi, M (2007) Influences on innovation benefits during implementation: Client's perspective. Journal of Construction Engineering and Management, 133(4), pp. 306-315. ISSN 0733-9364

Loganathan, S; Srinath, P; Kumaraswamy, M; Kalidindi, S and Varghese, K (2017) Identifying and addressing critical issues in the Indian construction industry: Perspectives of large building construction clients. Journal of Construction in Developing Countries, 22(S1), pp. 121-144. ISSN 1823-6499

Loosemore, M; Alkilani, S Z and Mathenge, R (2019) Barriers to employment faced by disadvantaged groups targeted by new social procurement policies. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Löfgren, P and Eriksson, P E (2009) Effects of collaboration in projects on construction project performance. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Martin, H; Lewis, T; Peters, E and Petersen, A (2017) Construction project delivery cloud decisionsupport model. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(1), pp. 6-26. ISSN 17514304

McClements, S (2013) Modelling construction consultant selection based on attributes of trust. PhD thesis, University of Ulster, UK.

McClements, S; Odeyinka, H and Eadie, R (2012) Pre-selection of construction consultants based on attributes of trust. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Musonda, I (2012) Construction health and safety (H&S) performance improvement: a client-centred model. PhD thesis, University of Johannesburg, South Africa.

Naoum, S G and Langford, D (1987) Management contracting: the client's view. Journal of Construction Engineering and Management, 113(3), pp. 369-384. ISSN 0733-9364

Nkomo, M W (2020) Assessment of mentoring of construction workers in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.

North, Steve (2003) Clients' 3D visualisation of construction performance: from s-curves to data surfaces. PhD thesis, University College London, UK.

Nzekwe-Excel, C; Nwagboso, C; Georgakis, P and Proverbs, D (2010) Integrated framework for satisfaction assessment in construction sector. Journal of Engineering, Design and Technology, 8(2), pp. 168-188. ISSN 1726-0531

Odiba, E (2018) A model for effective quality management practices in construction organisations: The case of Nigeria. PhD thesis, Loughborough University, UK.

Ogbu, C P and Imafidon, M O (2022) Influence of selection criteria on clients' satisfaction with construction consultancy services in Nigeria. Journal of Engineering, Design and Technology, 20(6), pp. 1519-1537. ISSN 1726-0531

Oo, B L (2017) Release of construction clients' pre-tender cost estimates: An experimental study. Construction Economics and Building, 17(4), pp. 37-47. ISSN 2204-9029

Oo, B L; Abdul-Aziz, A R and Lim, Y M (2011) Information feedback and learning in construction bidding. Construction Economics and Building, 11(3), pp. 33-44. ISSN 2204-9029

Oo, B L; Lim, B T H and Runeson, G (2023) Mark-up on construction projects: what have we learnt in the last 20 years? Engineering, Construction and Architectural Management, 30(9), pp. 4319-4338. ISSN 0969-9988

Oo, B L and Tang, O S (2023) Information feedback in construction contract bidding: Perceptions of Hong Kong contractors. International Journal of Construction Management, 23(6), pp. 1044-1052. ISSN 1562-3599

Oo, B L; Nguyen, A T; Ahn, Y and Lim, B T H (2025) Predicting the number of bidders in construction competitive bidding using explainable machine learning models. Construction Innovation, 25(7), pp. 158-188. ISSN 1471-4175

Osipova, E and Eriksson, P E (2009) The effects of procurement procedures on joint risk management. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Otasowie, O. K.; Aigbavboa, C. O.; Oke, A. E.; Aghimien, D. and Adekunle, P. (2026) Closing the loop with construction clients: Relationship strategies for circular economy business model adoption. Journal of Engineering, Design and Technology, 24(5), pp. 1195-1214. ISSN 1726-0531

Othman, A A E (2004) Value and risk management for dynamic brief development in construction. PhD thesis, Loughborough University, UK.

Palaneeswaran, E; Kumaraswamy, M M and Ng, S T (2003) Formulating a framework for relationally integrated construction supply chains. Journal of Construction Research, 4(2), pp. 189-205. ISSN 1609-9451

Pasquire, C L and Gibb, A G F (2002) Considerations for assessing the benefits of standardisation and pre-assembly in construction. Journal of Financial Management of Property and Construction, 7(3), pp. 151-162. ISSN 1366-4387

Poon, J; Potts, K and Cooper, P (1999) Development of a new best practice model for building projects. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Rahmani, F (2021) Challenges and opportunities in adopting early contractor involvement (ECI): Client's perception. Architectural Engineering and Design Management, 17(1-2), pp. 67-76. ISSN 1745-2007

Rahmani, F; Khalfan, M M A and Maqsood, T (2016) Lessons learnt from the use of relationship-based procurement methods in Australia: Clients' perspectives. Construction Economics and Building, 16(2), pp. 1-13. ISSN 2204-9029

Rahmani, Farshid (2016) Conceptual models for selecting and managing early contractor involvement (ECI) delivery system by clients. PhD thesis, RMIT University, Australia.

Rose, T and Manley, K (2010) Client recommendations for financial incentives on construction projects. Engineering, Construction and Architectural Management, 17(3), pp. 252-267. ISSN 0969-9988

Ryd, N V (2003) Exploring construction briefing: From document to process. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

S Nmez, M; Yang, J B and Holt, G D (2001) Addressing the contractor selection problem using an evidential reasoning approach. Engineering, Construction and Architectural Management, 8(3), pp. 198-210. ISSN 0969-9988

Sackey, E (2014) A Sociotechnical Systems Analysis of Building Information Modelling (STSaBIM) Implementation in Construction Organisations. PhD thesis, Loughborough University, UK.

San Cristóbal, J R (2012) Contractor selection using multicriteria decision-making methods. Journal of Construction Engineering and Management, 138(6), pp. 751-758. ISSN 0733-9364

Sazalli, S A H; Greenwood, D; Morton, D and Agnew, B (2012) Industrialized building system in Malaysian housing: An emerging innovation system explanation. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Shen, L; Drew, D and Zhang, Z (1999) Optimal bid model for price-time biparameter construction contracts. Journal of Construction Engineering and Management, 125(3), pp. 204-209. ISSN 0733-9364

Sherif, E h and Kaka, A (2004) A multi criteria mode for the selection of the payments systems in construction projects. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Sherif, M A (2002) A framework for improving pre-project planning. PhD thesis, Loughborough University, UK.

Singh, D and Tiong, R L K (2005) A fuzzy decision framework for contractor selection. Journal of Construction Engineering and Management, 131(1), pp. 62-70. ISSN 0733-9364

Singh, D and Tiong, R L K (2006) Contractor selection criteria: Investigation of opinions of Singapore construction practitioners. Journal of Construction Engineering and Management, 132(9), pp. 998-1008. ISSN 0733-9364

Skitmore, M and Mills, A (1999) A needs based methodology for classifying construction clients and selecting contractors: Comment. Construction Management and Economics, 17(1), pp. 5-7. ISSN 01446193

Smyth, H J and Thompson, N J (2005) Developing conditions of trust within a framework of trust. Journal of Construction Procurement, 11(2),

Soo, A and Oo, B L (2014) The effect of construction demand on contract auctions: An experiment. Engineering, Construction and Architectural Management, 21(3), pp. 276-290. ISSN 0969-9988

Soo, Alexander (2015) The effect of construction demand on inexperienced bidders' bidding behaviour. PhD thesis, University of Sydney, Australia.

Sullivan, K T; Kashiwagi, M; Badger, W W; Kashiwagi, D; Egbu, C and Chang, C K (2006) Leadership, the information environment, and the performance measuring project manager. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Sumner, S and Farrell, P (2003) The influence of clients on health and safety standards in construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Sunindijo, R Y and Kamardeen, I (2017) Antecedents to mental health symptoms in the Australian construction industry. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Swaffield, L M (1998) Improving early cost advice for mechanical and electrical services. PhD thesis, Loughborough University, UK.

Swai, L (2022) Development of a conceptual framework for enhancing payment practices in the UK construction industry. PhD thesis, Coventry University, UK.

Tao, L and Kumaraswamy, M (2012) Unveiling relationships between contractor inputs and performance outputs. Construction Innovation, 12(1), pp. 86-98. ISSN 1471-4175

Tembo Silungwe, C K and Khatleli, N (2020) An analysis of the allocation of pertinent risks in the Zambian building sector using Pareto analysis. International Journal of Construction Management, 20(4), pp. 321-334. ISSN 1562-3599

Tembo-Silungwe, C K and Khatleli, N (2022) Development of risk misallocation causal networks using interpretive judgement in the construction industry. International Journal of Construction Management, 22(10), pp. 1935-1949. ISSN 1562-3599

Tennant, S and Fernie, S (2010) A contemporary examination of framework agreements. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Tennant, S and Fernie, S (2012) The commercial currency of construction framework agreements. Building Research & Information, 40(2), pp. 209-220. ISSN 0961-3218

Tennant, S and Fernie, S (2013) Organizational learning in construction supply chains. Engineering, Construction and Architectural Management, 20(1), pp. 83-98. ISSN 0969-9988

Tookey, J E; Kulatunga, K; Kulatunga, U; Amaratunga, D and Haigh, R (2011) Client's championing characteristics that promote construction innovation. Construction Innovation, 11(4), pp. 380-398. ISSN 1471-4175

Tuuli, M M and Rowlinson, S (2010) Impact of leadership style and team context on psychological empowerment in construction project teams. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Upstill-Goddard, J D (2016) Towards a framework to enable construction small and medium-sized enterprises (SMEs) to manage sustainability. EngD thesis, Loughborough University, UK.

Vennström, A (2008) The construction client as a change agent contextual support and obstacles. PhD thesis, Luleå University of Technology, Sweden.

Vennström, A and Erik Eriksson, P (2010) Client perceived barriers to change of the construction process. Construction Innovation, 10(2), pp. 126-137. ISSN 1471-4175

Votano, S and Sunindijo, R Y (2014) Client safety roles in small and medium construction projects in Australia. Journal of Construction Engineering and Management, 140(9): 04014045, ISSN 0733-9364

Wong, C H (2001) Investigation of contractor selection criteria and development of contractor classification model: a UK case. PhD thesis, University of Wolverhampton, UK.

Wong, C H (2001) A discriminant model for classifying contractor performance on public works projects. PhD thesis, University of Wolverhampton, UK.

Wong, C H; Holt, G D and Harris, P (2001) Multi-criteria selection or lowest price? Investigation of UK construction clients' tender evaluation preferences. Engineering, Construction and Architectural Management, 8(4), pp. 257-271. ISSN 0969-9988

Wong, C H; Holt, G D and Harris, P T (1999) UK construction clients' opinions of the contractor selection process. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Wong, E O W and Yip, R C P (2004) Promoting sustainable construction waste management in Hong Kong. Construction Management and Economics, 22(6), pp. 563-566. ISSN 01446193

Yasamis, F (1999) Contractor quality performance (CQP) evaluation model in pavement projects. PhD thesis, Illinois Institute of Technology, USA.

Yasamis, F; Arditi, D and Mohammadi, J (2002) Assessing contractor quality performance. Construction Management and Economics, 20(3), pp. 211-223. ISSN 01446193

Yirenkyi-Fianko, A B and Chileshe, N (2015) An analysis of risk management in practice: The case of Ghana's construction industry. Journal of Engineering, Design and Technology, 13(2), pp. 240-259.

Zhang, Y; Oo, B L and Lim, B T H (2023) Factors affecting contractors' bid or no-bid and mark-up decisions: A case of the jilin province, China. Construction Innovation, 23(5), pp. 1232-1254. ISSN 1471-4175

de Gier, A; Gottlieb, S C and Frederiksen, N (2025) Construction clients as drivers of change? How communities filter institutional pressures for sustainability. Construction Management and Economics, 43(8), pp. 599-616. ISSN 0144-6193

de Ridder, H and Vrijhoef, R (2008) Developing a strategy for 'living buildings': Beyond cradle to cradle with living building concept. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

ng, S T (2005) Performance of engineering consultants in ISO 9000-based quality management systems implementation. Engineering, Construction and Architectural Management, 12(6), pp. 519-532. ISSN 0969-9988

This list was generated on Sat Aug 22 01:31:21 2026 UTC.