Items with Index Term: construction budget
Akeel, N F (1989) A database tool for statistically based construction cost estimate. PhD thesis, University of Colorado at Boulder, USA.
Bowen, R M (1978) Valuation of capitalized interest on construction expenditures in the electric utility industry. PhD thesis, Stanford University, USA.
Chua, D K H; Kog, Y C; Loh, P K and Jaselskis, E J (1997) Model for construction budget performance: neural network approach. Journal of Construction Engineering and Management, 123(3), pp. 214-222. ISSN 0733-9364
Cruz-Roveda, S (2022) A qualitative open-ended interview study using a comparative multiple case study approach of bus rapid transit (BRT) construction projects within the United States. DPA thesis, California Baptist University, USA.
Huang, X (2003) The owner's role in construction safety. PhD thesis, University of Florida, USA.
Kim, S and Hammad, A (2024) Decision support system (DSS) for selecting sustainable insulation material using Pareto search and novel fuzzy-modified technique for order of preference by similarity to ideal solution (TOPSIS) approach. International Journal of Construction Management, 24(7), pp. 734-747. ISSN 1562-3599
Mostofi, F; Tokdemir, O B and Toǧan, V (2023) Comprehensive root cause analysis of construction defects using semisupervised graph representation learning. Journal of Construction Engineering and Management, 149(9): 04023079, ISSN 0733-9364
Sadick, A M; Gurmu, A and Gunarathna, C (2025) Artificial intelligence-based pre-conception stage construction budget decision-making model and tool for residential buildings. Engineering, Construction and Architectural Management, 32(7), pp. 4552-4580. ISSN 0969-9988
Swaffield, L M and McDonald, A M (2008) The contractor's use of life cycle costing on PFI projects. Engineering, Construction and Architectural Management, 15(2), pp. 132-148. ISSN 0969-9988
Thal Jr, A E; Cook, J J and White Iii, E D (2010) Estimation of cost contingency for Air Force construction projects. Journal of Construction Engineering and Management, 136(11), pp. 1181-1188. ISSN 0733-9364
Touran, A (2010) Probabilistic approach for budgeting in portfolio of projects. Journal of Construction Engineering and Management, 136(3), pp. 361-366. ISSN 0733-9364
Woodhead, R M and Male, S P (2000) The conditioning effect of objective decision-making on the client's capital proposal. Engineering, Construction and Architectural Management, 7(3), pp. 300-306. ISSN 0969-9988
Up a level