Items with Index Term: constraint programming

Number of items: 22.

Abuwarda, Z and Hegazy, T (2016) Flexible activity relations to support optimum schedule acceleration. Journal of Construction Engineering and Management, 142(11): 06016004, ISSN 0733-9364

Abuwarda, Z; Mostafa, K; Morita, P and Hegazy, T (2024) Optimizing construction work-rest schedules and worker reassignment utilizing wristband physiological data. Journal of Construction Engineering and Management, 150(11): 04024149, ISSN 0733-9364

Ahmadian Fard Fini, A; Rashidi, T H; Akbarnezhad, A and Travis Waller, S (2016) Incorporating multiskilling and learning in the optimization of crew composition. Journal of Construction Engineering and Management, 142(5): 04015106, ISSN 0733-9364

Ahmadian Fard Fini, Alireza (2017) Optimizing crew performance through integration of human resource strategies into planning of construction activities. PhD thesis, University of New South Wales, Australia.

Amarkhil, Q.; Alroomi, A. S. and Narimani, M. R. (2026) Leveraging BIM, EPS and constraint programming for automated scheduling: A methodology for structured scheduling data and combinatorial optimization. Engineering, Construction and Architectural Management, 33(3), pp. 1980-2006. ISSN 0969-9988

Cao, Q; Zou, X and Zhang, L (2025) A flexible scheduling framework for repetitive construction projects based on constraint programming. Journal of Construction Engineering and Management, 151(7): 04025073, ISSN 0733-9364

Chan, W T and Hu, H (2002) Constraint programming approach to precast production scheduling. Journal of Construction Engineering and Management, 128(6), pp. 513-521. ISSN 0733-9364

Dal Borgo, Eleonora (2017) Sustainable production planning optimisation for project-based enterprises. PhD thesis, Università degli Studi di Udine, Italy.

Karsten Winther, J; Nielsen, R; Schultz, C and Teizer, J (2021) Automated activity and progress analysis based on non-monotonic reasoning of construction operations. Smart and Sustainable Built Environment, 10(3), pp. 457-486. ISSN 2046-6099

Kong, F and Dou, D (2021) Resource-constrained project scheduling problem under multiple time constraints. Journal of Construction Engineering and Management, 147(2): 04020170, ISSN 0733-9364

Kong, F; Guo, J and Lv, X (2021) Project resource input optimization problem with combined time constraints based on node network diagram and constraint programming. Journal of Construction Engineering and Management, 147(12): 2192, ISSN 0733-9364

Li, J; Huang, W; Song, D; Zhou, L and Yang, B (2025) A constrained planning method: Considering storage space limitations and soft logic for cruise cabin assembly scheduling. Journal of Construction Engineering and Management, 151(8): 04025102, ISSN 0733-9364

Liu, J and Lu, M (2018) Constraint programming approach to optimizing project schedules under material logistics and crew availability constraints. Journal of Construction Engineering and Management, 144(7): 04018049, ISSN 0733-9364

Liu, S S and Wang, C J (2009) Two-stage profit optimization model for linear scheduling problems considering cash flow. Construction Management and Economics, 27(11), pp. 1023-1037. ISSN 1466433X

Liu, S S and Wang, C J (2010) Profit optimization for multiproject scheduling problems considering cash flow. Journal of Construction Engineering and Management, 136(12), pp. 1268-1278. ISSN 0733-9364

Menesi, W; Golzarpoor, B and Hegazy, T (2013) Fast and near-optimum schedule optimization for large-scale projects. Journal of Construction Engineering and Management, 139(9), pp. 1117-1124. ISSN 0733-9364

Okojie, D E; Jimoh, A A G; Hamam, Y and Yusuff, A A (2019) Optimal capacity utilisation of transmission lines network in power flow operations: A survey. Journal of Engineering, Design and Technology, 17(5), pp. 1056-1076. ISSN 1726-0531

Roofigari-Esfahan, N and Razavi, S (2017) Uncertainty-aware linear schedule optimization: A space-time constraint-satisfaction approach. Journal of Construction Engineering and Management, 143(5): 04016132, ISSN 0733-9364

Sarihi, M; Shahhosseini, V and Banki, M T (2020) Multiskilled project management workforce assignment across multiple projects regarding competency. Journal of Construction Engineering and Management, 146(12): 04020134, ISSN 0733-9364

Tang, Y; Liu, R and Sun, Q (2014) Two-stage scheduling model for resource leveling of linear projects. Journal of Construction Engineering and Management, 140(7): 04014022, ISSN 0733-9364

Zou, X and Rong, Z (2025) Resource-constrained repetitive project scheduling with soft logic. Engineering, Construction and Architectural Management, 32(4), pp. 2397-2429. ISSN 0969-9988

Zou, X; Zhang, L and Zhang, Q (2022) Time-cost optimization in repetitive project scheduling with limited resources. Engineering, Construction and Architectural Management, 29(2), pp. 669-701. ISSN 0969-9988