Items with Index Term: confidence interval

Number of items: 43.

Abourizk, S M and Halpin, D W (1990) Probabilistic simulation studies for repetitive construction processes. Journal of Construction Engineering and Management, 116(4), pp. 575-594. ISSN 0733-9364

Alasad, R (2015) Dynamic modelling of demand risk in PPP infrastructure projects: the case of toll roads. PhD thesis, Heriot-Watt University, UK.

Aviram Traubita, A (2009) Structural response and cost characterization of bridge construction using seismic performance enhancement strategies. PhD thesis, University of California, Berkeley, USA.

Bassioni, H A (2004) A framework for measuring business performance in construction contracting organisations. PhD thesis, Loughborough University, UK.

Carpenter, N (2014) Comparison of the design-bid-build and construction manager at risk project delivery methods utilized for the construction of public schools. PhD thesis, Clemson University, USA.

Chen, X; Zhang, Y; Zhao, B and Yang, S (2021) Investment probabilistic interval estimation for construction project using the hybrid model of SVR and GWO. Journal of Construction Engineering and Management, 147(5): 04021031, ISSN 0733-9364

Dai, F and Lu, M (2010) Assessing the accuracy of applying photogrammetry to take geometric measurements on building products. Journal of Construction Engineering and Management, 136(2), pp. 242-250. ISSN 0733-9364

Dang, C N and Le-Hoai, L (2018) Revisiting storey enclosure method for early estimation of structural building construction cost. Engineering, Construction and Architectural Management, 25(7), pp. 877-895. ISSN 0969-9988

Dauber, V F (2003) Measuring and minimising waste in construction by applying lean thinking. PhD thesis, University of Dundee, UK.

Dong, S.; Xu, S. and Zhang, Y. (2026) Understanding the factors influencing work-life conflict in construction practitioners: A meta-analysis study. International Journal of Building Pathology and Adaptation, 44(3), pp. 567-582. ISSN 2398-4708

Elbarkouky, M M G; Fayek, A R; Siraj, N B and Sadeghi, N (2016) Fuzzy arithmetic risk analysis approach to determine construction project contingency. Journal of Construction Engineering and Management, 142(12): 04016070, ISSN 0733-9364

Elliott, J W (2013) Development of the construction training attitudes and intentions scale. PhD thesis, Colorado State University, USA.

Gonzalez-Quevedo, A A; Abourizk, S M; Iseley, D T and Halpin, D W (1993) Comparison of two simulation methodologies in construction. Journal of Construction Engineering and Management, 119(3), pp. 573-589. ISSN 0733-9364

Harris, F C (1979) A model for evaluating the effects of weather on construction projects. PhD thesis, Loughborough University, UK.

Hasan, M and Lu, M (2021) Error propagation model for analyzing project labor cost budget risks in industrial construction. Journal of Construction Engineering and Management, 147(4): 2010, ISSN 0733-9364

Hove, G (2015) Perceptions of small business executives on determinants of performance in the construction industry in Gauteng, South Africa. DBL thesis, University of South Africa, South Africa.

Ioannou, P G and Martinez, J C (1996) Comparison of construction alternatives using matched simulation experiments. Journal of Construction Engineering and Management, 122(3), pp. 231-241. ISSN 0733-9364

Issariyanukula, A (2011) A probabilistic methodology for estimating transportation project costs using Bayesian models. PhD thesis, Purdue University, USA.

Jack, R; Loveday, D; Allinson, D and Lomas, K (2018) First evidence for the reliability of building co-heating tests. Building Research & Information, 46(4), pp. 383-401. ISSN 0961-3218

Jiang, Y and Wu, H (2007) A method for highway agency to estimate highway construction durations and set contract times. International Journal of Construction Education and Research, 3(3), pp. 199-216. ISSN 1557-8771

Kavanagh, D P (1985) SIREN: A repetitive construction simulation model. Journal of Construction Engineering and Management, 111(3), pp. 308-323. ISSN 0733-9364

Lucko, G; Anderson-Cook, C M and Vorster, M C (2006) Statistical considerations for predicting residual value of heavy equipment. Journal of Construction Engineering and Management, 132(7), pp. 723-732. ISSN 0733-9364

Martinez-Soto, A and Jentsch, M F (2020) A transferable energy model for determining the future energy demand and its uncertainty in a country's residential sector. Building Research & Information, 48(6), pp. 587-612. ISSN 0961-3218

Mostafa, S and Chileshe, N (2015) Discrete-event simulation model for offsite manufacturing in Australia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Othman, Z M Z (2007) Classifying the aptitude of Civil Engineering Project Managers using Multivariate Discriminant Analysis. PhD thesis, Loughborough University, UK.

Oyedele, L O; Wai Tham, K; Jaiyeoba, B E and Fadeyi, M O (2003) Model for predicting architect's performance in building delivery process. Journal of Engineering, Design and Technology, 1(2), pp. 168-186. ISSN 1726-0531

Pozzer, A E; Rausch, C and Leite, F (2025) Methodology for evaluating the uncertainty of embodied carbon assessments in construction projects across project phases. Journal of Construction Engineering and Management, 151(10): 04025158, ISSN 0733-9364

Salman, B and Gursoy, B (2022) Markov chain pavement deterioration prediction models for local street networks. Built Environment Project and Asset Management, 12(6), pp. 853-870. ISSN 2044-124X

Sandagomika, H; Bazli, M and Arashpour, M (2026) Quantifying embodied carbon reductions through mixed reality integration in prefabrication: A Monte Carlo-enhanced life cycle approach. Journal of Construction Engineering and Management, 152(5): 04026051, ISSN 0733-9364

Schofield, K E (2012) Risk factors for injuries in small and medium sized construction companies. PhD thesis, University of Minnesota, USA.

Shiha, A; Elazhary, M and El-Adaway, I H (2025) Price adjustment clauses: Enhanced price volatility forecasting for construction materials. Journal of Construction Engineering and Management, 151(9): 04025121, ISSN 0733-9364

Soltani, Z (2018) Investigating the persuasiveness of forensic information models for jurors in construction disputes. PhD thesis, Texas A&M University, USA.

Summerfield, A J; Lowe, R J and Oreszczyn, T (2010) Two models for benchmarking UK domestic delivered energy. Building Research & Information, 38(1), pp. 12-24. ISSN 0961-3218

Summerfield, A J; Pathan, A; Lowe, R J and Oreszczyn, T (2010) Changes in energy demand from low-energy homes. Building Research & Information, 38(1), pp. 42-49. ISSN 0961-3218

Szalay, Z (2008) Modelling building stock geometry for energy, emission and mass calculations. Building Research & Information, 36(6), pp. 557-567. ISSN 0961-3218

Taylor, J; Salmela, A; Täubel, M; Heimlander, A; Karvonen, A M; Pakkala, T; Lahdensivu, J and Pekkanen, J (2023) Risk factors for moisture damage presence and severity in Finnish homes. Buildings & Cities, 4(1), pp. 708-726. ISSN 2632-6655

Tirado Fabian, D R (2022) Contribution to the development of a model for the analysis of stocks and flows of waste materials from buildings at a territorial scale. DSc thesis, ETH Zürich, Switzerland.

Van Hove, M Y C; Deurinck, M; Lameire, W; Laverge, J; Janssens, A and Delghust, M (2023) Large-scale statistical analysis and modelling of real and regulatory total energy use in existing single-family houses in flanders. Building Research & Information, 51(2), pp. 203-222. ISSN 0961-3218

Wibowo, A and Kochendoerfer, B (2011) Selecting BOT/PPP infrastructure projects for government guarantee portfolio under conditions of budget and risk in the Indonesian context. Journal of Construction Engineering and Management, 137(7), pp. 512-522. ISSN 0733-9364

Yokouchi, N; Ambe, T; Fujisaki-Sueda-Sakai, M and Ozawa, K (2024) Workplace bullying and harassment in the Japanese construction industry: prevalence and associations with subjective health and work attractiveness. Construction Management and Economics, 42(8), pp. 741-757. ISSN 01446193

Zhang, H; Tam, C M; Li, H and Shi, J J (2006) Particle swarm optimization-supported simulation for construction operations. Journal of Construction Engineering and Management, 132(12), pp. 1267-1274. ISSN 0733-9364

Zhou, Yifan (2010) Asset life prediction and maintenance decision-making using a non-linear non-Gaussian state space model. PhD thesis, Queensland University of Technology, Australia.

Zou, P X W; Shi, V Y and Li, Z (2010) An econometric evaluation framework for investment in construction safety. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

This list was generated on Sat Aug 22 01:28:37 2026 UTC.