Items with Index Term: concurrent engineering

Number of items: 66.

AbulHassan, H S (2001) A framework for applying concurrent engineering principles to the construction industry. PhD thesis, Pennsylvania State University, USA.

Anumba, C J and Evbuomwan, N F O (1997) Concurrent engineering in design-build projects. Construction Management and Economics, 15(3), pp. 271-281. ISSN 01446193

Appau, K A (1994) An integrated model of computer-aided cost estimating/scheduling in construction management. PhD thesis, Georgia Institute of Technology, USA.

Aquere, A L; Dinis-Carvalho, J and Lima, R M (2013) Project cell: Cellular organization of the building design process. Journal of Construction Engineering and Management, 139(5), pp. 538-546. ISSN 0733-9364

Attar, A; Boudjakdji, M A; Bhuiyan, N; Grine, K; Kenai, S and Aoubed, A (2009) Integrating numerical tools in underground construction process. Engineering, Construction and Architectural Management, 16(4), pp. 376-391. ISSN 0969-9988

Austin, R B; Pishdad-Bozorgi, P and De La Garza, J M (2016) Identifying and prioritizing best practices to achieve flash track projects. Journal of Construction Engineering and Management, 142(2): 04015077, ISSN 0733-9364

Baldwin, A N and McCaffer, R (2000) Identifying research requirements for collaborative design. Journal of Construction Procurement, 6(1), pp. 56-66. ISSN 1358-9180

Blacud, N A; Bogus, S M; Diekmann, J E and Molenaar, K R (2009) Sensitivity of construction activities under design uncertainty. Journal of Construction Engineering and Management, 135(3), pp. 199-206. ISSN 0733-9364

Bogus, S M (2004) Concurrent engineering strategies for reducing design delivery time. PhD thesis, University of Colorado at Boulder, USA.

Bogus, S M; Diekmann, J E; Molenaar, K R; Harper, C; Patil, S and Lee, J S (2011) Simulation of overlapping design activities in concurrent engineering. Journal of Construction Engineering and Management, 137(11), pp. 950-957. ISSN 0733-9364

Bogus, S M; Molenaar, K R and Diekmann, J E (2005) Concurrent engineering approach to reducing design delivery time. Journal of Construction Engineering and Management, 131(11), pp. 1179-1185. ISSN 0733-9364

Bogus, S M; Molenaar, K R and Diekmann, J E (2006) Strategies for overlapping dependent design activities. Construction Management and Economics, 24(8), pp. 829-837. ISSN 1466433X

Bouchlaghem, D; Shang, H; Anumba, C J; Cen, M; Miles, J and Taylor, M (2005) ICT-enabled collaborative working environment for concurrent conceptual design. Architectural Engineering and Design Management, 1(4), pp. 261-280. ISSN 1745-2007

Bowron, J (2002) Re-engineering the project procurement process through concurrent engineering. PhD thesis, Loughborough University, UK.

Camargo Júnior, Alceu Salles (2003) Simultaneous engineering: A comparison between "point-based" and "set-based" approaches. PhD thesis, Universidade de São Paulo, Brazil.

Choi, K C (1992) An object-oriented historical cost information base to support concurrent engineering. PhD thesis, University of California, Berkeley, USA.

Conroy, G (1997) CONSERV: A methodology for the management of capital projects and concurrent engineering design using knowledge based technology. PhD thesis, Cranfield University, UK.

Corley, J; Rowe, A; Tranfield, D; Smart, P; Levene, R; Rogerson, J and Deasley, P (2001) Customer-centred construction: Bringing a service approach through cultural change and team-working. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

De La Garza, J M and Pishdad-Bozorgi, P (2018) Workflow process model for flash track projects. Journal of Construction Engineering and Management, 144(6): 06018001, ISSN 0733-9364

Duke, A K (2001) A telepresence environment for concurrent life-cycle design and construction. PhD thesis, Loughborough University, UK.

Eldin, N N (1997) Concurrent engineering: A schedule reduction tool. Journal of Construction Engineering and Management, 123(3), pp. 354-362. ISSN 0733-9364

Engebø, A; Klakegg, O J; Lohne, J; Bohne, R A; Fyhn, H and Lædre, O (2022) High-performance building projects: How to build trust in the team. Architectural Engineering and Design Management, 18(6), pp. 774-790. ISSN 1745-2007

Eriksson, P E (2010) Partnering: What is it, when should it be used, and how should it be implemented? Construction Management and Economics, 28(9), pp. 905-917. ISSN 1466433X

Gil, N; Tommelein, I D; Kirkendall, R L and Ballard, G (2001) Leveraging specialty-contractor knowledge in design-build organizations. Engineering, Construction and Architectural Management, 8(5-6), pp. 355-367. ISSN 0969-9988

Graham, L D and Smith, S D (2004) A method for effectively implementing construction process productivity estimation models. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Grobler, K (2000) Improving the effectiveness and image of the building and civil construction process. EngD thesis, University of Johannesburg, South Africa.

Halfawy, M M R (1998) A multi-agent collaborative framework for concurrent design of constructed facilities. PhD thesis, Ohio State University, USA.

Jaafari, A L I and Manivong, K (1999) The need for life-cycle integration of project processes. Engineering, Construction and Architectural Management, 6(3), pp. 235-255. ISSN 0969-9988

Jamieson, I A (1997) Development of a concurrent engineering construction process protocol. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Jones, B K (1998) A model for collaborative engineering the construction industry. PhD thesis, University of Southampton, UK.

Jones, Barry Kenneth (1998) A model for collaborative engineering in the construction industry. PhD thesis, University of Southampton, UK.

Kalu, U G (2003) Optimizing the participation of suppliers and subcontractors in managing construction projects using concurrent engineering philosophy. PhD thesis, Golden Gate University, USA.

Kamara, J M; Anumba, C J and Evbuomwan, N F O (2000) Establishing and processing client requirements: A key aspect of concurrent engineering in construction. Engineering, Construction and Architectural Management, 7(1), pp. 15-28. ISSN 0969-9988

Karim, A and Adeli, H (1999) CONSCOM: An OO construction scheduling and change management system. Journal of Construction Engineering and Management, 125(5), pp. 368-376. ISSN 0733-9364

Karlsson, M; Lakka, A; Sulankivi, K; Hanna, A S and Thompson, B P (2008) Best practices for integrating the concurrent engineering environment into multipartner project management. Journal of Construction Engineering and Management, 134(4), pp. 289-299. ISSN 0733-9364

Kasim, N B; Anumba, C J and Dainty, A R J (2005) Improving materials management practices on fast-track construction projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Khalfan, M and Raja, N (2005) Improving construction process through integration and concurrent engineering. Construction Economics and Building, 5(1), pp. 58-66. ISSN 2204-9029

Khalfan, M M A (2001) Benchmarking and readiness assessment for concurrent engineering in construction (BEACON). PhD thesis, Loughborough University, UK.

Khalfan, M M A; Anumba, C J and Carrillo, P M (2001) Concurrent engineering readiness assessment of sub-contractors within the UK construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Khalfan, M M A; Anumba, C J and Carrillo, P M (2005) Concurrent engineering readiness assessment tool for construction. Architectural Engineering and Design Management, 1(3), pp. 163-179. ISSN 1745-2007

Kimmance, A G (2002) An integrated product and process information modelling system for on-site construction. PhD thesis, Loughborough University, UK.

Koskela, L; Huovila, P and Leinonene, J (2002) Design management in building construction: From theory to practice. Journal of Construction Research, 3(1), pp. 1-16. ISSN 1609-9451

Kunz, J and Fischer, M (2020) Virtual design and construction. Construction Management and Economics, 38(4), pp. 355-363. ISSN 01446193

Li, W (2008) An agent-based negotiation model for the sourcing of construction suppliers. PhD thesis, University of Hong Kong, Hong Kong.

Maheswari, J U; Varghese, K and Sridharan, T (2006) Application of dependency structure matrix for activity sequencing in concurrent engineering projects. Journal of Construction Engineering and Management, 132(5), pp. 482-490. ISSN 0733-9364

McCoy, A P (2008) Commercialization for innovative products in the residential construction industry. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Mecca, S (1999) A model of construction planning procedure according to contingency theory. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Mohamad, M I (1999) The application of concurrent engineering philosophy to the construction industry. PhD thesis, Loughborough University, UK.

Murray, M D and Langford, D A (1998) Construction procurement systems: A linkage with project organizational models. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Ngowi, A B (1998) Is construction procurement a key to sustainable development? Building Research & Information, 26(6), pp. 340-350. ISSN 0961-3218

Nicolini, D; Holti, R and Smalley, M (2001) Integrating project activities: the theory and practice of managing the supply chain through clusters. Construction Management and Economics, 19(1), pp. 37-47. ISSN 01446193

Peña-Mora, F and Li, M (2001) Dynamic planning and control methodology for design/build fast-track construction projects. Journal of Construction Engineering and Management, 127(1), pp. 1-17. ISSN 0733-9364

Pishdad-Bozorgi, P; De La Garza, J M and Austin, R B (2016) Readiness assessment for flash tracking. Journal of Construction Engineering and Management, 142(12): 06016005, ISSN 0733-9364

Raisbeck, P; Millie, R and Maher, A (2010) Assessing integrated project delivery: A comparative analysis of IPD and alliance contracting procurement routes. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Ren, Z (2002) A multi-agent systems approach to construction claims negotiation. PhD thesis, Loughborough University, UK.

Salazar-Kish, J M (2001) Modeling concurrency tradeoffs and their effects on project duration and rework. PhD thesis, Stanford University, USA.

Shammas-Toma, M; Seymour, D and Clark, L (1998) Obstacles to implementing total quality management in the UK construction industry. Construction Management and Economics, 16(2), pp. 177-192. ISSN 01446193

Tookey, J E; Bowen, P A and Hardcastle, C (2005) Concurrent engineering: A comparison between the aerospace and construction industries. Journal of Engineering, Design and Technology, 3(1), pp. 44-55. ISSN 1726-0531

Wang, T and Feng, J (2023) Optimal review strategy for concurrent execution of design-construction tasks in DB mode. Journal of Construction Engineering and Management, 149(1): 04022139, ISSN 0733-9364

Woksepp, S (2007) Virtual reality in construction tools, methods and processes. PhD thesis, Luleå University of Technology, Sweden.

Yang, H (2001) A web-based collaborative decision making system for construction project teams using fuzzy logic. PhD thesis, Loughborough University, UK.

Yang, Y (2004) Modeling a decision support system for buildable designs. PhD thesis, National University of Singapore, Singapore.

Yusof, I H M; An, M and Barghi, M H (2015) Integration of lean construction considerations into design process of construction projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Zanni, M; Ruikar, K and Soetanto, R (2020) Systematising multidisciplinary sustainable building design processes utilising BIM. Built Environment Project and Asset Management, 10(5), pp. 637-655. ISSN 2044-124X

Zanni, M A (2017) Communication of sustainability information and assessment within BIM-enabled collaborative environment. PhD thesis, Loughborough University, UK.

Zanni, M A; Soetanto, R and Ruikar, K (2017) Towards a BIM-enabled sustainable building design process: Roles, responsibilities, and requirements. Architectural Engineering and Design Management, 13(2), pp. 101-129. ISSN 1745-2007

This list was generated on Sat Aug 22 02:11:33 2026 UTC.