Items with Index Term: concreting

Number of items: 61.

Abreu, M M and Lordsleem, A C (2019) Aluminum formwork system: Loss and productivity. Built Environment Project and Asset Management, 9(5), pp. 616-627. ISSN 2044-124X

Ailabouni, N (2010) Factors affecting employee productivity in the UAE construction industry. PhD thesis, University of Brighton, UK.

Ailabouni, N; Painting, N and Ashton, P (2009) Factors affecting employee productivity in the UAE construction industry. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Alkass, S; Arouian, A and Moselhi, O (1993) Computer-aided equipment selection for transporting and placing concrete. Journal of Construction Engineering and Management, 119(3), pp. 445-465. ISSN 0733-9364

Alkoc, E and Erbatur, F (1997) Productivity improvement in concreting operations through simulation models. Building Research & Information, 25(2), pp. 82-91. ISSN 0961-3218

Alkoc, E and Erbatur, F (1998) Simulation in concreting operations: A comparison of models and resource combinations. Engineering, Construction and Architectural Management, 5(2), pp. 159-173. ISSN 0969-9988

Amarasinghe, A A S R; Agdas, D and Dawes, L (2025) Evaluating labour productivity and profitability in precast concrete manufacturing. Engineering, Construction and Architectural Management, 32(13), pp. 148-173. ISSN 0969-9988

Anson, M and Siu, M F F (2020) Augmented balance point diagrams for matching site and concrete-supply resources. Journal of Construction Engineering and Management, 146(4): 04020021, ISSN 0733-9364

Anson, M; Tang, S L and Ying, K C (2002) Measurement of the performance of ready mixed concreting resources as data for system simulation. Construction Management and Economics, 20(3), pp. 237-250. ISSN 01446193

Anson, M and Wang, S Q (1998) Performance of concrete placing in Hong Kong buildings. Journal of Construction Engineering and Management, 124(2), pp. 116-124. ISSN 0733-9364

Anson, M; Ying, K C T and Siu, M F F (2019) Analytical models towards explaining the difficulty in efficiently matching site concrete supply resources with placing crew needs. Engineering, Construction and Architectural Management, 26(8), pp. 1672-1695. ISSN 0969-9988

Aouad, G F (1991) Integrated planning systems for the construction industry. PhD thesis, Loughborough University, UK.

Celik, T (1989) Improving concrete quality by using an expert system. PhD thesis, Loughborough University, UK.

Dunlop, P and Smith, S (2000) Stochastic modelling of concrete operations. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Dunlop, P G (2005) Investigation, modelling and planning of stochastic concrete placing operations. PhD thesis, University of Edinburgh, UK.

Dunlop, P G and Smith, S D (2002) Simulation analysis of the UK concrete delivery and placement process: A tool for planners. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Elbashbishy, T and El-Adaway, I H (2026) Assessing the criticality of construction trades: Skilled labor shortages and their cost and schedule impacts. Journal of Construction Engineering and Management, 152(1): 04025230, ISSN 0733-9364

Ezeldin, A S and Sharara, L M (2006) Neural networks for estimating the productivity of voncreting activities. Journal of Construction Engineering and Management, 132(6), pp. 650-656. ISSN 0733-9364

Fagbenle, O I; Adeyemi, A Y and Adesanya, D A (2004) The impact of non-financial incentives on bricklayers' productivity in Nigeria. Construction Management and Economics, 22(9), pp. 899-911. ISSN 01446193

Fini, A A F; Akbarnezhad, A; Rashidi, T H and Travis Waller, S (2017) Job assignment based on brain demands and human resource strategies. Journal of Construction Engineering and Management, 143(5): 04016123, ISSN 0733-9364

Forbes, D R; McGurnaghan, H; Graham, L D and Smith, S D (2004) Concrete placing productivity using a novel neural network design. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Graham, D; Tommelein, I D and Smith, S D (2005) Cost reduction through vertical integration of the in-situ concrete supply chain. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Graham, L D and Smith, S D (2003) A hybrid model to improve the estimation of concreting operations. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Hadipriono, F C and Wang, H K (1986) Analysis of causes of falsework failures in concrete structures. Journal of Construction Engineering and Management, 112(1), pp. 112-121. ISSN 0733-9364

Idoro, G I (2011) Effect of mechanisation on occupational health and safety performance in the Nigerian construction industry. Journal of Construction in Developing Countries, 16(2), pp. 27-45. ISSN 1823-6499

Ikaheimonen, J (1998) Construction loads on shores and stability of horizontal formwork. TaknDr thesis, Kungliga Tekniska Hogskolan, Sweden.

Jarkas, A M (2005) An investigation into the influence of buildability factors on productivity of in situ reinforced concrete construction. PhD thesis, University of Dundee, UK.

Jarkas, A M (2010) Buildability factors influencing formwork labour productivity of isolated foundations. Journal of Engineering, Design and Technology, 8(3), pp. 274-295. ISSN 1726-0531

Jarkas, A M (2012) Buildability factors influencing concreting labor productivity. Journal of Construction Engineering and Management, 138(1), pp. 89-97. ISSN 0733-9364

Kuennen, S T (2002) Construction management practice in the execution of military construction projects. DEng thesis, Texas A&M University, USA.

Kumaraswamy, M M (1997) Productivity matters. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Lema, N M and Price, A D F (1996) Construction process performance variability: Focus on labour productivity. Building Research & Information, 24(6), pp. 339-350. ISSN 0961-3218

Leung, A W T and Tam, C M (1999) Prediction of hoisting time for tower cranes for public housing construction in Hong Kong. Construction Management and Economics, 17(3), pp. 305-314. ISSN 01446193

Lim, E C (1996) The analysis of productivity in building construction. PhD thesis, Loughborough University, UK.

Lu, M and Anson, M (2004) Establish concrete placing rates using quality control records from Hong Kong building construction projects. Journal of Construction Engineering and Management, 130(2), pp. 216-224. ISSN 0733-9364

Lu, M; Anson, M; Tang, S L and Ying, Y C (2003) Hkconsim: A practical simulation solution to planning concrete plant operations in Hong Kong. Journal of Construction Engineering and Management, 129(5), pp. 547-554. ISSN 0733-9364

Lu, M; Shen, X and Chen, W (2009) Automated collection of mixer truck operations data in highly dense urban areas. Journal of Construction Engineering and Management, 135(1), pp. 17-23. ISSN 0733-9364

Madhubhashana, H S A; Perera, B A K S and Perera, C S R (2019) Post-tensioned concreting: its suitability for and acceptability in Sri Lanka. Journal of Engineering, Design and Technology, 17(4), pp. 719-735. ISSN 1726-0531

Maurya, T; Kalita, J D and Kar, S (2026) Assessing safety scores of multimodal activities to integrate safety into construction planning. Journal of Construction Engineering and Management, 152(5): 04026039, ISSN 0733-9364

Moussavi Nadoushani, Zahra Sadat (2018) A computational approach for estimating and minimizing construction-related and end-of-life carbon footprint of concrete structures. PhD thesis, University of New South Wales, Australia.

Mustaffa, N K and Carmichael, D G (2019) Concreting operations: the relationship between unit costs and unit emissions. International Journal of Construction Management, 19(5), pp. 427-435. ISSN 1562-3599

Mustaffa, Nur Kamaliah (2018) Emissions, production and cost in construction operations. PhD thesis, University of New South Wales, Australia.

Naderi, S; Shabanlou, S; Javaheri-Tafti, M R and Yaghoubi, B (2025) Optimal design of diversion dams based on Upgraded Multi-Objective Particle Swarm Optimization (UMOPSO). International Journal of Construction Management, 25(8), pp. 876-886. ISSN 1562-3599

Nguyen, L D; Nguyen, T K N; Tran, D Q and Villiers, C (2014) Productivity in daytime and nighttime construction of urban sewer systems. Journal of Construction Engineering and Management, 140(7): 04014021, ISSN 0733-9364

Opawole, A; Alao, O O; Yusuf, A O; Adu, E T and Ofoetan, M A (2022) Evaluation of compliance of concreting materials to standards in building projects in Lagos state, Nigeria. Journal of Construction Business and Management, 5(2), pp. 1-19. ISSN 2521-0165

Palaniappan, S (2009) Environmental performance of on-site construction processes in post-tensioned slab foundation construction: A study of production home building in the Greater Phoenix area. PhD thesis, Arizona State University, USA.

Pareek, P; Han, S and Misra, S (2016) Application of Bayesian updating for real-time schedule estimation in a concreting operation. International Journal of Construction Management, 16(1), pp. 54-66. ISSN 1562-3599

Parthasarathy, M K; Murugasan, R and Murugesan, K (2017) A critical review of factors affecting manpower and equipment productivity in tall building construction projects. Journal of Construction in Developing Countries, 22(S1), pp. 1-18. ISSN 1823-6499

Pellegrino, R and Costantino, N (2018) An empirical investigation of the learning effect in concrete operations. Engineering, Construction and Architectural Management, 25(3), pp. 342-357. ISSN 0969-9988

Price, A D F (1986) An evaluation of production output for in situ concrete work. PhD thesis, Loughborough University, UK.

Ramaswamy, S D and Pertusier, E M (1986) Construction of barrettes for high-rise foundations. Journal of Construction Engineering and Management, 112(4), pp. 455-462. ISSN 0733-9364

Shi, J J (2002) Three methods for verifying and validating the simulation of a construction operation. Construction Management and Economics, 20(6), pp. 483-491. ISSN 01446193

Shi, Q; Yu, J; Zhang, L; Su, Y; Wang, J and Kong, Q (2025) An optimization model for the duration of workshop production processes for precast concrete components for highway projects. International Journal of Construction Management, 25(7), pp. 813-825. ISSN 1562-3599

Smith, S (1998) Stochastic analysis of cyclic construction processes. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Tam, V W Y and Hao, J J L (2014) Prefabrication as a mean of minimizing construction waste on site. International Journal of Construction Management, 14(2), pp. 113-121. ISSN 1562-3599

Tam, V W Y; Tam, C M and Ng, W C Y (2007) On prefabrication implementation for different project types and procurement methods in Hong Kong. Journal of Engineering, Design and Technology, 5(1), pp. 68-80. ISSN 1726-0531

Tang, S L; Ying, K C; Anson, M and Lu, M (2005) Rmcsim: A simulation model of a ready-mixed concrete plant serving multiple sites using multiple truckmixers. Construction Management and Economics, 23(1), pp. 15-31. ISSN 01446193

Tsehayae, A A and Fayek, A R (2016) System model for analysing construction labour productivity. Construction Innovation, 16(2), pp. 203-228. ISSN 1471-4175

Wang, S Q (1995) A methodology for comparing the productivities of the ready mixed concrete industries in major cities. Unpublished PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Wang, S Q and Anson, M (2000) Comparison of the concreting productivities in Hong Kong and Beijing and a proposed comparison methodology. Construction Management and Economics, 18(3), pp. 363-372. ISSN 01446193

Xie, W; Zhao, T; Tang, J and Zhang, Y (2017) Arch first and beam later: Arch-rib integral installation construction technology for large-span tied-arch bridge. Journal of Construction Engineering and Management, 143(8): 04017059, ISSN 0733-9364