Items with Index Term: concrete formwork
Bernold, L E (2002) Spatial integration in construction. Journal of Construction Engineering and Management, 128(5), pp. 400-408. ISSN 0733-9364
Christian, J and Mir, S U (1987) Use of integrated microcomputer package for formwork design. Journal of Construction Engineering and Management, 113(4), pp. 603-610. ISSN 0733-9364
Hallowell, M R (2008) A formal model for construction safety and health risk management. PhD thesis, Oregon State University, USA.
Hallowell, M R and Gambatese, J A (2009) Activity-based safety risk quantification for concrete formwork construction. Journal of Construction Engineering and Management, 135(10), pp. 990-998. ISSN 0733-9364
Irizarry, J; Meadati, P; Barham, W S and Akhnoukh, A (2012) Exploring applications of building information modeling for enhancing visualization and information access in engineering and construction education environments. International Journal of Construction Education and Research, 8(2), pp. 119-145. ISSN 1557-8771
Jin, Z and Gambatese, J (2020) Exploring the potential of technological innovations for temporary structures: A survey study. Journal of Construction Engineering and Management, 146(6): 04020049, ISSN 0733-9364
Jin, Z; Gambatese, J A and Nnaji, C (2024) Musculoskeletal disorder risk assessment in modern ready-made concrete formwork construction. Journal of Construction Engineering and Management, 150(6): 05024005, ISSN 0733-9364
John, S T; Mohan, A; Philip, M S; Sarkar, P and Davis, R (2022) An IoT device for striking of vertical concrete formwork. Engineering, Construction and Architectural Management, 29(5), pp. 1991-2010. ISSN 0969-9988
Lang, R; Goodier, C and Glass, J (2016) Are housebuilders' production strategies a barrier to offsite construction uptake in the UK? In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Moon, S; Yang, B and Choi, E (2018) Safety guideline for safe concrete placement utilizing the information on the structural behavior of formwork. Journal of Construction Engineering and Management, 144(12): 04018108, ISSN 0733-9364
Portas, J and AbouRizk, S (1997) Neural network model for estimating construction productivity. Journal of Construction Engineering and Management, 123(4), pp. 399-410. ISSN 0733-9364
Ruhl, V R (1997) Computer-aided design and manufacturing of complex-shaped concrete formwork. DDes thesis, Harvard University, USA.
Safa, M; Reinsma, S; Haas, C T; Goodrum, P M and Caldas, C H (2018) A decision-making method for choosing concrete forming systems. International Journal of Construction Management, 18(1), pp. 53-64. ISSN 1562-3599
Thomas, H R; Horman, M J; De Souza, U E L and Zavřski, I (2002) Reducing variability to improve performance as a lean construction principle. Journal of Construction Engineering and Management, 128(2), pp. 144-154. ISSN 0733-9364
Thomas, H R and Završki, I (1999) Construction baseline productivity: Theory and practice. Journal of Construction Engineering and Management, 125(5), pp. 295-303. ISSN 0733-9364
Yu, W-d (1996) A neuro-fuzzy knowledge-based multi-criterion decision model for constructability analysis and improvement of construction technologies. PhD thesis, Purdue University, USA.
Up a level