Items with Index Term: concession period
Algarni, A M; Arditi, D and Polat, G (2007) Build-operate-transfer in infrastructure projects in the United States. Journal of Construction Engineering and Management, 133(10), pp. 728-735. ISSN 0733-9364
Asao, K; Miyamoto, T; Kato, H and Diaz, C E D (2013) Comparison of revenue guarantee programs in build-operation-transfer projects. Built Environment Project and Asset Management, 3(2), pp. 214-227. ISSN 2044-124X
Awodele, O A (2012) Framework for managing risk in privately financed market projects in Nigeria. PhD thesis, Heriot-Watt University, UK.
Badawy, M; El-Sheikh, R and Hamdy, K (2025) Sensitivity analysis of key factors influencing concession period estimation in PPP wastewater treatment projects: A system dynamics approach. Construction Economics and Building, 25(3-4), pp. 65-89. ISSN 2204-9029
Bao, F; Chen, C; Chan, A P C; Martek, I and Shrestha, A (2019) Dynamic framework transfer model for public-private partnerships: Lessons from a China water sector case study. Engineering, Construction and Architectural Management, 26(7), pp. 1218-1239. ISSN 0969-9988
Bayat, M; Khanzadi, M and Nasirzadeh, F (2020) Bargaining game model to determine concessionary items in build-operate-transfer contracts. Journal of Construction Engineering and Management, 146(2): 04019109, ISSN 0733-9364
Bayat, M; Khanzadi, M; Nasirzadeh, F and Chavoshian, A (2020) Financial conflict resolution model in BOT contracts using bargaining game theory. Construction Innovation, 20(1), pp. 18-42. ISSN 1471-4175
Castelblanco, G; Mangano, G; Zenezini, G and De Marco, A (2025) Once concessioned, twice shy? Asymmetries of "reconcession" in national PPP programs. Construction Management and Economics, 43(6), pp. 405-427. ISSN 0144-6193
Chen, S (2013) Improving value for money in public-private partnership infrastructure projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Chiara, N and Garvin, M (2008) Variance models for project financial risk analysis with applications to greenfield BOT highway projects. Construction Management and Economics, 26(9), pp. 925-939. ISSN 1466433X
De Marco, A and Mangano, G (2013) Risk and value in privately financed health care projects. Journal of Construction Engineering and Management, 139(8), pp. 918-926. ISSN 0733-9364
De Marco, A; Mangano, G; Cagliano, A C and Grimaldi, S (2012) Public financing into build-operate-transfer hospital projects in Italy. Journal of Construction Engineering and Management, 138(11), pp. 1294-1302. ISSN 0733-9364
Guo, J; Chen, J and Xie, Y (2022) Determining a reasonable concession period for risky transportation BOT projects with government subsidies based on cumulative prospect theory. Engineering, Construction and Architectural Management, 29(3), pp. 1396-1426. ISSN 0969-9988
Guo, K; Zhang, L and Wang, T (2021) Concession period optimisation in complex projects under uncertainty: A public-private partnership perspective. Construction Management and Economics, 39(2), pp. 156-172. ISSN 01446193
Guo, Y; Su, Y; Chen, C and Martek, I (2024) Inclusion of "managing flexibility" valuations in the pricing of PPP projects: A multi-objective decision-making method. Engineering, Construction and Architectural Management, 31(11), pp. 4562-4584. ISSN 0969-9988
Ho, S P and Liu, L Y (2002) An option pricing-based model for evaluating the financial viability of privatized infrastructure projects. Construction Management and Economics, 20(2), pp. 143-156. ISSN 01446193
Ho, S-P (2001) Real options and game theoretic valuation, financing and tendering for investments on build-operate-transfer projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Hu, H and Zhu, Y (2015) Social welfare-based concession model for build/operate/transfer contracts. Journal of Construction Engineering and Management, 141(1): 04014064, ISSN 0733-9364
Iyer, K C and Sagheer, M (2011) A real options based traffic risk mitigation model for build-operate-transfer highway projects in India. Construction Management and Economics, 29(8), pp. 771-779. ISSN 1466433X
Javed, A A; Lam, P T I and Chan, A P C (2014) Change negotiation in public-private partnership projects through output specifications: An experimental approach based on game theory. Construction Management and Economics, 32(4), pp. 323-348. ISSN 01446193
Jayasuriya, S; Zhang, G and Jing Yang, R (2019) Challenges in public private partnerships in construction industry: A review and further research directions. Built Environment Project and Asset Management, 9(2), pp. 172-185. ISSN 2044-124X
Jayasuriya, Sajani (2018) A systematic stakeholder management framework for managing public private partnership projects in Australia. PhD thesis, RMIT University, Australia.
Jefferies, M and Chen, S E (2004) Identifying risk factors of boot procurement: A case study of stadium Australia. Construction Economics and Building, 4(1), pp. 11-20. ISSN 2204-9029
Jin, H; Chan, M and Bai, Y (2025) Joint optimization of critical concession parameters for sustainable PPP contracts. Journal of Construction Engineering and Management, 151(6): 04025051, ISSN 0733-9364
Jin, H; Liu, S; Li, J and Liu, C (2020) A game-theoretic approach to developing a concession renegotiation framework for user-pays PPPs. International Journal of Construction Management, 20(6), pp. 642-652. ISSN 1562-3599
Jin, H; Liu, S; Liu, C and Udawatta, N (2019) Optimizing the concession period of PPP projects for fair allocation of financial risk. Engineering, Construction and Architectural Management, 26(10), pp. 2347-2363. ISSN 0969-9988
Jordan, M R C (2005) The design, use and implementation of maintenance management systems and pavement management systems for whole life costing. Unpublished PhD thesis, Curtin University of Technology, Australia.
Kamel, M; Khallaf, R and Nosaier, I (2023) Net present value-time curve behaviour of public private partnership projects. International Journal of Construction Management, 23(11), pp. 1924-1931. ISSN 1562-3599
Khoza, R B M (2021) Performance measurements on concession periods to forecast water infrastructure investment returns. PhD thesis, Walden University, USA.
Li, J and Zou, P X W (2011) Fuzzy AHP-based risk assessment methodology for PPP projects. Journal of Construction Engineering and Management, 137(12), pp. 1205-1209. ISSN 0733-9364
Li, S (1998) An investigation of the build operate transfer approach for infrastucture works in the People's Republic of China. PhD thesis, University of Reading, UK.
Li, S (2017) Modeling, optimizing, and impact analysis of incentive and regulation mechanisms in infrastructure privatization. PhD thesis, Purdue University, USA.
Liou, F M and Huang, C P (2008) Automated approach to negotiations of BOT contracts with the consideration of project risk. Journal of Construction Engineering and Management, 134(1), pp. 18-24. ISSN 0733-9364
Liu, S; Jin, H; Liu, C; Xie, B and Mills, A (2022) Development and testing of a rent determination framework for PPP rental villages. International Journal of Construction Management, 22(2), pp. 192-204. ISSN 1562-3599
Mangano, G; Castelblanco, G; De Marco, A and Ottaviani, F M (2025) Exploring the drivers of concession period in transport public–private partnerships. Built Environment Project and Asset Management, 15(2), pp. 193-210. ISSN 2044-124X
Nabil, A (2016) P.A.L.M. - physical asset lifecycle modelling in the healthcare sector. PhD thesis, University College London, UK.
Nayyer, M I; Aravindan, M R and Annamalai, T R (2024) Impact of transparency law on the post-award development phase of toll and annuity PPPs. Built Environment Project and Asset Management, 14(1), pp. 22-37. ISSN 2044-124X
Nguyen, N; Almarri, K and Boussabaine, H (2021) A risk-adjusted decoupled-net-present-value model to determine the optimal concession period of BOT projects. Built Environment Project and Asset Management, 11(1), pp. 4-21. ISSN 2044-124X
Nguyen, Tuan Anh (2019) Options and flexibility in PPP toll road projects. PhD thesis, University of New South Wales, Australia.
Opawole, A and Jagboro, G O (2018) Compensation mechanisms for minimizing private party risks in concession-based public-private partnership contracts. International Journal of Building Pathology and Adaptation, 36(1), pp. 93-120. ISSN 23984708
Patel, T D; Haupt, T C and Bhatt, T (2020) Fuzzy probabilistic approach for risk assessment of BOT toll roads in Indian context. Journal of Engineering, Design and Technology, 18(1), pp. 251-269. ISSN 1726-0531
Shalaby, A and Hassanein, A (2019) A decision support system (DSS) for facilitating the scenario selection process of the renegotiation of PPP contracts. Engineering, Construction and Architectural Management, 26(6), pp. 1004-1023. ISSN 0969-9988
Sharafi, A; Sadegh Amalnick, M and Allah Taleizadeh, A (2021) Outcome of financial conflicts in the operation phase of public-private partnership contracts. Journal of Construction Engineering and Management, 147(6): 78622011, ISSN 0733-9364
Shen, L Y; Bao, H J; Wu, Y Z and Lu, W S (2007) Using bargaining-game theory for negotiating concession period for BOT-type contract. Journal of Construction Engineering and Management, 133(5), pp. 385-392. ISSN 0733-9364
Shen, L Y; Li, H and Li, Q M (2002) Alternative concession model for build operate transfer contract projects. Journal of Construction Engineering and Management, 128(4), pp. 326-330. ISSN 0733-9364
Shen, L Y and Wu, Y Z (2005) Risk concession model for build/operate/transfer contract projects. Journal of Construction Engineering and Management, 131(2), pp. 211-220. ISSN 0733-9364
Song, J; Song, D and Zhang, D (2015) Modeling the concession period and subsidy for BOT waste-to-energy incineration projects. Journal of Construction Engineering and Management, 141(10): 04015033, ISSN 0733-9364
Sun, Y and Zhang, L (2015) Balancing public and private stakeholder interests in BOT concessions: Minimum revenue guarantee and royalty scheme applied to a water treatment project in China. Journal of Construction Engineering and Management, 141(2): 04014070, ISSN 0733-9364
Tharun, T; Thounaojam, N; Devkar, G and Laishram, B (2025) Proactive contract theory-based resilience framework development for public-private partnerships. Construction Economics and Building, 25(2), pp. 253-275. ISSN 2204-9029
Tiong, R L K (1990) BOT projects: Risks and securities. Construction Management and Economics, 8(3), pp. 315-328. ISSN 01446193
Ucbenli, C (2010) A bargaining mechanism with incomplete information and its application in trilateral BOT negotiations. PhD thesis, Columbia University, USA.
Ullah, F; Ayub, B; Siddiqui, S Q and Thaheem, M J (2016) A review of public-private partnership: Critical factors of concession period. Journal of Financial Management of Property and Construction, 21(3), pp. 269-300. ISSN 1366-4387
Ullah, F and Thaheem, M J (2018) Concession period of public private partnership projects: Industry-academia gap analysis. International Journal of Construction Management, 18(5), pp. 418-429. ISSN 1562-3599
Wang, Y and Jin, X (2019) Determine the optimal capital structure of BOT projects using interval numbers with Tianjin Binhai New District Metro Z4 line in China as an example. Engineering, Construction and Architectural Management, 26(7), pp. 1348-1366. ISSN 0969-9988
Wolfenden, Alison K (2004) Decision support system for the evaluation and comparison of concession project investments. PhD thesis, Griffith University, Australia.
Woodhead, R M and Downs, C G (2002) Facilitation as a research method to improve value management capabilities. Journal of Construction Research, 3(2), pp. 209-216. ISSN 1609-9451
Wu, M; Wing Chau, K; Shen, Q and Yin Shen, L (2012) Net asset value-based concession duration model for BOT contracts. Journal of Construction Engineering and Management, 138(2), pp. 304-308. ISSN 0733-9364
Xiong, W and Zhang, X (2014) Concession renegotiation models for projects developed through public-private partnerships. Journal of Construction Engineering and Management, 140(5): 04014008, ISSN 0733-9364
Xu, J W; Jiang, L and Moon, S (2017) Determination of the optimal concession period for BOT contract projects based on a discrete stochastic process model. Journal of Construction Engineering and Management, 143(4): 04016119, ISSN 0733-9364
Ye, S and Tiong, R L K (2003) The effect of concession period design on completion risk management of BOT projects. Construction Management and Economics, 21(5), pp. 471-482. ISSN 01446193
Ye, S and Tiong, R L K (2004) Public-private partnership for power projects: A case study of Hub power project. Journal of Financial Management of Property and Construction, 9(3), pp. 129-140. ISSN 1366-4387
Zhang, H; Yu, L and Zhang, W (2020) Dynamic performance incentive model with supervision mechanism for PPP projects. Engineering, Construction and Architectural Management, 27(9), pp. 2643-2659. ISSN 0969-9988
Zhang, X (2006) Toward innovative and efficient infrastructure delivery. PhD thesis, University of Alberta, Canada.
Zhang, X (2009) Win-win concession period determination methodology. Journal of Construction Engineering and Management, 135(6), pp. 550-558. ISSN 0733-9364
Zhang, Y; Yuan, J; Zhao, J; Cheng, L and Li, Q (2022) Hybrid dynamic pricing model for transport PPP projects during the residual concession period. Journal of Construction Engineering and Management, 148(2): 04021200, ISSN 0733-9364
Zhou, Y; Liu, J; Pu, X and Ding, Y (2025) Signaling game analysis of transfer mechanisms of PPP projects: Considering investors' moral hazard and adverse selection behavior. Journal of Construction Engineering and Management, 151(5): 04025030, ISSN 0733-9364
Şentürk, H A; Yazici, G and Kaplanoǧlu, S B (2004) Case study: Izmit domestic and industrial water supply build-operate- transfer project. Journal of Construction Engineering and Management, 130(3), pp. 449-454. ISSN 0733-9364