Items with Index Term: computing
Abdessalem, J; Fakhreddine, D; Said, A and Mohamed, H (2014) Shape optimization for a hyperelastic axisymmetric structure. Journal of Engineering, Design and Technology, 12(2), pp. 177-194. ISSN 1726-0531
Abdul-Rahman, H and Alidrisyi, M N (1994) A perspective of material management practices in fast developing economy: The case of Malaysia. Construction Management and Economics, 12(5), pp. 413-422. ISSN 01446193
Abeysekera, W V K M (1997) A strategy for managing brickwork in Sri Lanka. PhD thesis, Loughborough University, UK.
Abourizk, S M; Halpin, D W and Wilson, J R (1991) Visual interactive fitting of beta distributions. Journal of Construction Engineering and Management, 117(4), pp. 589-605. ISSN 0733-9364
Aghimien, E I; Aghimien, L M; Petinrin, O O and Aghimien, D O (2021) High-performance computing for computational modelling in built environment-related studies: A scientometric review. Journal of Engineering, Design and Technology, 19(5), pp. 1138-1157. ISSN 1726-0531
Ahuja, V and Thiruvengadam, V (2004) Project scheduling and monitoring: Current research status. Construction Innovation, 4(1), pp. 19-31. ISSN 1471-4175
Al-Nasser, A A (2001) Optimisation of construction implemented as a manufacturing process. PhD thesis, University of Sussex, UK.
Alkass, S and Harris, F (1991) Development of an integrated system for planning earthwork operations in road construction. Construction Management and Economics, 9(3), pp. 263-289. ISSN 01446193
Alkass, S; Mazerolle, M and Harris, F (1996) Construction delay analysis techniques. Construction Management and Economics, 14(5), pp. 375-394. ISSN 01446193
Alkass, S; Tribaldos, E; Mazerolle, M and Harris, F (1995) Computer aided construction delay analysis and claims preparation. Construction Management and Economics, 13(4), pp. 335-352. ISSN 01446193
Andam, K A (1979) Computer aided design of precast concrete industrial buildings. PhD thesis, University of Newcastle upon Tyne, UK.
Aravindraj, S and Vinodh, S (2014) Forty criteria based agility assessment using scoring approach in an Indian relays manufacturing organization. Journal of Engineering, Design and Technology, 12(4), pp. 507-518.
Arowoiya, V A; Oke, A E; Akanni, P O; Kwofie, T E and Enih, P I (2023) Augmented reality for construction revolution–analysis of critical success factors. International Journal of Construction Management, 23(11), pp. 1867-1874. ISSN 1562-3599
Aziz, Z; Anumba, C J and Peña-Mora, F (2010) Using context-aware wireless technologies to support teaching and learning in built environment. International Journal of Construction Education and Research, 6(1), pp. 18-29. ISSN 1557-8771
Badra, N; Hegazy, H; Mousa, M; Zhang, J; Syed Zakaria, S A; Aboul Haggag, S and Abdul-Rashied, I (2025) Preliminary cost forecasting and optimization for the construction of steel pedestrian bridges in Egypt. Engineering, Construction and Architectural Management, 32(4), pp. 2210-2241. ISSN 0969-9988
Baghaei, M (2024) Developing a framework and understanding the key influencing factors for the implementation of the internet of things (IoT) in the UK construction sector. PhD thesis, University of Salford, UK.
Bai, L (2013) RFID sensor-driven structural condition monitoring in integrated building information modeling environment. PhD thesis, University of Maryland, College Park, USA.
Bajar, K; Kamat, A; Shanker, S and Barve, A (2024) Blockchain technology: A catalyst for reverse logistics of the automobile industry. Smart and Sustainable Built Environment, 13(1), pp. 133-178. ISSN 2046-6099
Basri, H (1994) An expert system for preliminary landfill design in developing countries. PhD thesis, University of Leeds, UK.
Behzadan, A H (2008) Arviscope: Georeferenced visualization of dynamic construction processes in three-dimensional outdoor augmented reality. PhD thesis, University of Michigan, USA.
Bjork, B-C (1996) Requirements and information structures for building product data models. DTech thesis, Teknillinen Korkeakoulu (Helsinki), Finland.
Bofang, Z and Jianbo, C (1989) Finite element analysis of effect of pipe cooling in concrete dams. Journal of Construction Engineering and Management, 115(4), pp. 487-498. ISSN 0733-9364
Borg, L and Song, H S (2015) Quality change and implications for productivity development: Housing construction in Sweden 1990-2010. Journal of Construction Engineering and Management, 141(1): 05014014, ISSN 0733-9364
Brosque, C; Skeie, G and Fischer, M (2021) Comparative analysis of manual and robotic concrete drilling for installation hangers. Journal of Construction Engineering and Management, 147(3): 05021001, ISSN 0733-9364
Cai, K Q (2007) Business process model for process improvement: an investigation of the tendering process in aconstruction company. PhD thesis, University of Hong Kong, Hong Kong.
Cao, W (2019) Data interpretation for infrastructure system diagnosis and prognosis based on model falsification. PhD thesis, National University of Singapore, Singapore.
Chan, C M R and Harris, F C (1989) A database/spreadsheet application for equipment selection. Construction Management and Economics, 7(3), pp. 235-247. ISSN 01446193
Chen, C (2007) Soft computing-based life-cycle cost analysis tools for transportation infrastructure management. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Chen, X B and Kim, T W (2017) Automated mapping of user activities onto flexible space in space-use analysis. Journal of Construction Engineering and Management, 143(8): 04017034, ISSN 0733-9364
Chen, Y (2008) Using mobile computing for construction site information management. PhD thesis, University of Newcastle upon Tyne, UK.
Chevallier, N J and Russell, A D (2001) Developing a draft schedule using templates and rules. Journal of Construction Engineering and Management, 127(5), pp. 391-398. ISSN 0733-9364
Chiang, Y H; Cheng, E W L and Lam, P T I (2010) Employing the net present value-consistent IRR methods for PFI contracts. Journal of Construction Engineering and Management, 136(7), pp. 811-814. ISSN 0733-9364
Choo, H J (2003) Distributed planning and coordination to support lean construction. PhD thesis, University of California, Berkeley, USA.
Chou, J-S (2005) Item-level quantity-based preliminary cost estimating system for highway earthwork, landscape, subgrade treatments, base, surface courses, pavement and traffic control. PhD thesis, University of Texas at Austin, USA.
Choudhary, K; Sangwa, N R and Sangwan, K S (2025) Comparative life cycle assessment of flooring options for sustainable buildings. Construction Innovation, 25(4), pp. 1108-1126. ISSN 1471-4175
Cusack, M M (1985) A simplified approach to the planning and control of cost and project duration. Construction Management and Economics, 3(3), pp. 183-198. ISSN 01446193
Damirchilo, F (2021) Use of machine learning and data science on infrastructure transportation and construction projects. PhD thesis, Arizona State University, USA.
Dawood, N N (1994) Developing a production management modelling approach for precast concrete building products. Construction Management and Economics, 12(5), pp. 393-412. ISSN 01446193
Dawood, N N (1995) An integrated knowledge-based/simulation approach to production planning: An application to the pre-cast industry. Construction Management and Economics, 13(1), pp. 53-64. ISSN 01446193
De Marco, A; Briccarello, D and Rafele, C (2009) Cost and schedule monitoring of industrial building projects: Case study. Journal of Construction Engineering and Management, 135(9), pp. 853-862. ISSN 0733-9364
Deepa, G; Niranjana, A J and Balu, A S (2025) A hybrid machine learning approach for early cost estimation of pile foundations. Journal of Engineering, Design and Technology, 23(1), pp. 306-322. ISSN 1726-0531
Domingo, L (2023) Influence of method and media interventions in creative remote design team collaboration. PhD thesis, Stanford University, USA.
Dunston, P S and Wang, X (2005) Mixed reality-based visualization interfaces for architecture, engineering, and construction industry. Journal of Construction Engineering and Management, 131(12), pp. 1301-1309. ISSN 0733-9364
El-Anwar, O and Chen, L (2013) Computing a displacement distance equivalent to optimize plans for postdisaster temporary housing projects. Journal of Construction Engineering and Management, 139(2), pp. 174-184. ISSN 0733-9364
Elhag, T M S (2004) Tender price modelling: artificial neural networks and regression techniques. PhD thesis, University of Liverpool, UK.
Elijah, O O and Oluwasuji, D J (2019) An evaluation of training needs of the Nigerian construction professionals in adopting building information modelling. Journal of Construction in Developing Countries, 24(2), pp. 63-81. ISSN 1823-6499
Elmousalami, H H (2020) Artificial intelligence and parametric construction cost estimate modeling: State-of-the-art review. Journal of Construction Engineering and Management, 146(1): 03119008, ISSN 0733-9364
Epstein, W C (1995) Development of a systematic approach for knowledge acquisition and experience capture of veteran practitioners in the highway construction industry. PhD thesis, University of Florida, USA.
Erişen, S (2021) Incremental transformation of spatial intelligence from smart systems to sensorial infrastructures. Building Research & Information, 49(1), pp. 113-126. ISSN 0961-3218
Fahdah, I (2008) Distributed IT for integration and communication of engineering information for collaborative building design. PhD thesis, University of Nottingham, UK.
Fan, X (2024) Artificial intelligence aided resilient and sustainable water infrastructure systems. PhD thesis, Case Western Reserve University, USA.
Fathi, M S (2009) Micro- and macro-level context-aware information delivery for construction programme managers. PhD thesis, Loughborough University, UK.
Feng, K; Chen, S; Lu, W; Wang, S; Yang, B; Sun, C and Wang, Y (2023) Embedding ensemble learning into simulation-based optimisation: A learning-based optimisation approach for construction planning. Engineering, Construction and Architectural Management, 30(1), pp. 259-295. ISSN 0969-9988
Fischer, M A (1991) Using construction knowledge during preliminary design of reinforced concrete structures. PhD thesis, Stanford University, USA.
Fisher, D J; Anderson, S D and Rahman, S P (2000) Integrating constructability tools into constructability review process. Journal of Construction Engineering and Management, 126(2), pp. 89-96. ISSN 0733-9364
French, T R (2012) Evolutionary optimisation of network flow plans for emergency movement in the built environment. PhD thesis, University of Edinburgh, UK.
Garg, Arun (2022) Quantifying resilient safety culture using complex network theory. PhD thesis, Griffith University, Australia.
Gbadamosi, S L and Nwulu, N I (2020) Optimal planning of renewable energy systems for power loss reduction in transmission expansion planning. Journal of Engineering, Design and Technology, 18(5), pp. 1209-1222. ISSN 1726-0531
Georgy, M E (2000) Utility-based neurofuzzy approach for engineering performance assessment in industrial construction projects. PhD thesis, Purdue University, USA.
Ghanem, A (2007) Real-time construction project progress tracking: A hybrid model for wireless technologies selection, assessment, and implementation. PhD thesis, Florida State University, USA.
Ghansah, F A and Lu, W (2025) Cyber-physical systems and digital twins for "cognitive building" in the construction industry. Construction Innovation, 25(3), pp. 787-818. ISSN 1471-4175
Gharouni Jafari, K; Noorzai, E and Hosseini, M R (2021) Assessing the capabilities of computing features in addressing the most common issues in the AEC industry. Construction Innovation, 21(4), pp. 875-898. ISSN 1471-4175
Ghorai, S (2017) Accelerated construction of roadways: Life cycle assessment and environmental impacts. PhD thesis, Syracuse University, USA.
Giustozzi, F (2012) Life cycle assessment of sustainable road pavements: Carbon footprinting and multi-attribute analysis. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Glavinich, T E (1990) Development of a model microcomputer-based project management system. DrEng thesis, University of Kansas, USA.
Gong, J (2009) An object recognition, tracking, and contextual reasoning based video interpretation methodology for rapid productivity analysis of construction operations. PhD thesis, University of Texas at Austin, USA.
Gray, C and Little, J (1985) A systematic approach to the selection of an appropriate crane for a construction site. Construction Management and Economics, 3(2), pp. 121-144. ISSN 01446193
Grey Rodriguez, F C (2019) Space-mate: A framework to harmonize occupant well-being and building sustainability. PhD thesis, Stanford University, USA.
Gugssa, M; Li, L; Pu, L; Gurbuz, A; Luo, Y and Wang, J (2025) Enabling near-real-time safety glove detection through edge computing and transfer learning: comparative analysis of edge and cloud computing-based methods. Engineering, Construction and Architectural Management, 32(7), pp. 4700-4717. ISSN 0969-9988
Hachem, A A K; Khatib, J M and Ezzedine El Dandachy, M (2025) Assessment of interfacial mortar-mortar bond and pure shear strength of metakaolin-based geopolymer. International Journal of Building Pathology and Adaptation, 43(4), pp. 732-748. ISSN 2398-4708
Halfawy, M M R (1998) A multi-agent collaborative framework for concurrent design of constructed facilities. PhD thesis, Ohio State University, USA.
Hamayat, F.; Ahmad, R. F.; Ghaban, W.; Saeed, F.; Ahmad, J.; Anwar, S. M. and Zubair, S. (2026) Data-driven stnet and stprophet models for secure edge-based indoor air temperature prediction in smart buildings. Building Research & Information, 54(4), pp. 492-509. ISSN 0961-3218
Han, S-H (2004) A working prototype of distributed collaborative architectural design system. PhD thesis, University of Michigan, USA.
Hastak, M (1994) Decision support system for project cost control strategy and planning. PhD thesis, Purdue University, USA.
Hesse, K A (2006) Development of information communication technologies in construction project management: The relationship between theory and technology and its application to the construction industry, including a retrospective on the development of technology that demonstrates how theory was altered and how practice was influenced. PhD thesis, University College London, UK.
Hicks, J C (1993) Haul-unit performance. Journal of Construction Engineering and Management, 119(3), pp. 646-653. ISSN 0733-9364
Hong, Z; Tam, C M and Shi, J J (2001) Resource allocation heuristic in construction simulation. Construction Management and Economics, 19(6), pp. 643-651. ISSN 01446193
Hossain, L (2010) An optimization model for the dynamic multi-project environment in construction. PhD thesis, University of Calgary, Canada.
Hu, W and Panthi, K (2020) Project status reporting system (PSRS) for pipeline relocation programs. Built Environment Project and Asset Management, 10(5), pp. 693-708. ISSN 2044-124X
Huebner, G M; Watson, N E; Direk, K; McKenna, E; Webborn, E; Hollick, F; Elam, S and Oreszczyn, T (2021) Survey study on energy use in UK homes during COVID-19. Buildings & Cities, 2(1), pp. 952-969. ISSN 2632-6655
Husam, S; Laishram, B and Johari, S (2024) Determining the extent of attributes contributing to gender inclusion of workers in the construction industry. Journal of Construction Engineering and Management, 150(10): 04024145, ISSN 0733-9364
Ibrahim Mahmoud, M M (2005) An xml initiative of transferring architectural information to the construction site based on the BIM object concept. PhD thesis, Illinois Institute of Technology, USA.
Imriyas, K; Pheng, L S and Teo, E A L (2007) A framework for computing workers' compensation insurance premiums in construction. Construction Management and Economics, 25(6), pp. 563-584. ISSN 1466433X
Jafar, S. S. and Mohammed, S. R. (2026) Identifying the significant factors influencing bridge maintenance prioritization in Iraq. Built Environment Project and Asset Management, 16(3), pp. 484-502. ISSN 2044-124X
Jones, B K (1998) A model for collaborative engineering the construction industry. PhD thesis, University of Southampton, UK.
Jones, Barry Kenneth (1998) A model for collaborative engineering in the construction industry. PhD thesis, University of Southampton, UK.
Joyce, S (2016) Performance driven design systems in practice. EngD thesis, University of Bath, UK.
Kale, S and Arditi, D (1998) Business failures: Liabilities of newness, adolescence, and smallness. Journal of Construction Engineering and Management, 124(6), pp. 458-464. ISSN 0733-9364
Kale, S and Arditi, D (1999) Age-dependent business failures in the US construction industry. Construction Management and Economics, 17(4), pp. 493-503. ISSN 01446193
Kandil, A; El-Rayes, K and El-Anwar, O (2010) Optimization research: Enhancing the robustness of large-scale multiobjective optimization in construction. Journal of Construction Engineering and Management, 136(1), pp. 17-25. ISSN 0733-9364
Kandil, A A (2005) Multi-objective optimization for large-scale highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Karaiskos, P; Munian, Y; Martinez-Molina, A and Alamaniotis, M (2026) Indoor air quality prediction modeling for a naturally ventilated fitness building using rnn-LSTM artificial neural networks. Smart and Sustainable Built Environment, 15(1), pp. 384-406. ISSN 2046-6099
Karamoozian, A; Wu, D and Luo, C (2023) Green supplier selection in the construction industry using a novel fuzzy decision-making approach. Journal of Construction Engineering and Management, 149(6): 04023033, ISSN 0733-9364
Keane, P J (1994) A computer-aided systematic approach to time delay analysis for extension of time claims on construction projects. PhD thesis, Loughborough University, UK.
Kelly, S (2004) Making it work and making do: A study of best practice, computing and routine work in building firms. PhD thesis, Lancaster University, UK.
Khan, K I A (2016) Management of information complexity using system dynamics for small and medium-sized enterprises (SMEs) on construction projects. PhD thesis, University of Reading, UK.
Khoury, H M (2009) Context-aware information access and retrieval for rapid on-site decision making in construction, inspection and maintenance of constructed facilities. PhD thesis, University of Michigan, USA.
Kibwami, N and Tutesigensi, A (2014) Mathematical modelling of embodied carbon emissions of building projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Kobayashi, Y (2001) Three-dimensional city modeler with fuzzy multiple layers perceptron: Application of soft computing in computer-aided architectural design systems. PhD thesis, University of California, Los Angeles, USA.
Kostourou, F (2021) Housing growth: Impacts on density, space consumption and urban morphology. Buildings & Cities, 2(1), pp. 55-78. ISSN 2632-6655
Kumar, A; Jain, S and Yadav, D (2020) A novel simulation-annealing enabled ranking and scaling statistical simulation constrained optimization algorithm for internet-of-things (IoT). Smart and Sustainable Built Environment, 9(4), pp. 675-693. ISSN 2046-6099
Kunieda, Y; Codinhoto, R and Emmitt, S (2019) Increasing the efficiency and efficacy of demolition through computerised 4D simulation. Engineering, Construction and Architectural Management, 26(10), pp. 2186-2205. ISSN 0969-9988
Lee, J S (2021) Life cycle costing for exterior materials on building façade. Journal of Construction Engineering and Management, 147(7): 2068, ISSN 0733-9364
Lee, Y-I (1994) Short-term resource-constrained scheduling for construction projects. PhD thesis, University of Texas at Austin, USA.
Li, R and Roberti, R (2017) Optimal scheduling of railway track possessions in large-scale projects with multiple construction works. Journal of Construction Engineering and Management, 143(6): 04017007, ISSN 0733-9364
Li, Y (2013) Developing a sustainable construction waste estimation and management system. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Liang, X (2012) Development of a framework for real-time 3D positioning and visualization of construction resources. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Liddiard, R (2014) Room-scale profiles of space use and electricity consumption in non-domestic buildings. Building Research & Information, 42(1), pp. 72-94. ISSN 0961-3218
Liu, P (2024) Trustworthy civil infrastructure inspection through human-machine intelligence integration. PhD thesis, Carnegie Mellon University, USA.
Liu, Y (2023) Worker-centric human-robot co-adaptation in construction. PhD thesis, Pennsylvania State University, USA.
Lo, T Y J (2021) Innovation management in the construction industry: Innovation performance indicators for AECOO organizations. PhD thesis, Stanford University, USA.
Lu, M and AbouRizk, S M (2000) Simplified CPM/PERT simulation model. Journal of Construction Engineering and Management, 126(3), pp. 219-226. ISSN 0733-9364
Lu, Z; Liu, J and Bu, Z (2025) Influencing factors of the government's willingness to compensate in the early termination of PPP projects: Based on multiple cases in China. Construction Management and Economics, 43(10), pp. 823-848. ISSN 0144-6193
Luo, Xiaowei (2013) Requirements, specifications and deployment models for autonomous jobsite safety proximity monitoring. PhD thesis, University of Texas at Austin, USA.
Luth, G P (2011) VDC and the engineering continuum. Journal of Construction Engineering and Management, 137, pp. 906-915. ISSN 0733-9364
Löfgren, A (2008) Making mobile meaning: Expectations and experiences of mobile computing usefulness in construction site management practice. PhD thesis, KTH Royal Institute of Technology, Sweden.
Mahamadu, A-M; Manu, P; Booth, C; Olomolaiye, P; Coker, A; Ibrahim, A and Lamond, J (2018) Infrastructure procurement skills gap amongst procurement personnel in Nigeria's public sector. Journal of Engineering, Design and Technology, 16(1), pp. 2-24.
Mahmoudi, E; Stepien, M and König, M (2021) Optimisation of geotechnical surveys using a BIM-based geostatistical analysis. Smart and Sustainable Built Environment, 10(3), pp. 420-437. ISSN 2046-6099
Mani, N; Kisi, K P; Rojas, E M and Foster, E T (2017) Estimating construction labor productivity frontier: Pilot study. Journal of Construction Engineering and Management, 143(10): 04017077, ISSN 0733-9364
Mardikoraem, M (2021) Essays on decision problems under uncertainty. PhD thesis, University of Wisconsin - Milwaukee, USA.
Matel, E; Vahdatikhaki, F; Hosseinyalamdary, S; Evers, T and Voordijk, H (2022) An artificial neural network approach for cost estimation of engineering services. International Journal of Construction Management, 22(7), pp. 1274-1287. ISSN 1562-3599
Maver, T W (2020) The architectural and engineering design of buildings aided by computer: A personal memoir with selected publications. DSc thesis, University of Glasgow, UK.
McAleenan, P (2020) Moral responsibility and action in the use of artificial intelligence in construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(4), pp. 166-174. ISSN 17514304
Mirzaei, Z (2015) An investigation of methodologies to determine the most sustainable bridge work programs. DSc thesis, ETH Zürich, Switzerland.
Miskawi, Z (1993) A numerical analysis method for computing schedule and resource forecasting for industrial projects. Construction Management and Economics, 11(6), pp. 411-420. ISSN 01446193
Mitchell Finnigan, S J (2020) Human-centred smart buildings: Reframing smartness through the lens of human-building interaction. PhD thesis, University of Newcastle upon Tyne, UK.
Moore, N (2013) A model based system for contextual on-site construction planning in augmented reality. PhD thesis, University of Wolverhampton, UK.
Moore, N J (2013) A contextual AR model based system on-site construction planning. PhD thesis, University of Wolverhampton, UK.
Moteleb, M (2010) Risk based decision making tools for sewer infrastructure management. PhD thesis, University of Cincinnati, USA.
Mutis-Sin, I A (2007) Framework for interpretation of construction concept representations. PhD thesis, University of Florida, USA.
Nath, N D (2021) Human-centered computing and visual analytics for future of work in construction. PhD thesis, Texas A&M University, USA.
Nikolić, D (2011) Evaluating a simulation game in construction engineering education: The virtual construction simulator 3. PhD thesis, Pennsylvania State University, USA.
Noorian Talouki, R; Hosseini Shirvani, M and Motameni, H (2022) A hybrid meta-heuristic scheduler algorithm for optimization of workflow scheduling in cloud heterogeneous computing environment. Journal of Engineering, Design and Technology, 20(6), pp. 1581-1605. ISSN 1726-0531
Obonyo, E A (2011) An agent-based intelligent virtual learning environment for construction management. Construction Innovation, 11(2), pp. 142-160. ISSN 1471-4175
Oke, A E; Farouk Kineber, A; Abdel-Tawab, M; Abubakar, A S; Albukhari, I and Kingsley, C (2023) Barriers to the implementation of cloud computing for sustainable construction in a developing economy. International Journal of Building Pathology and Adaptation, 41(5), pp. 988-1013. ISSN 23984708
Pahwa, J S (2009) MDSSF: a federated architecture for product procurement. PhD thesis, Cardiff University, UK.
Palaneeswaran, E and Kumaraswamy, M M (2003) Knowledge mining of information sources for research in construction management. Journal of Construction Engineering and Management, 129(2), pp. 182-191. ISSN 0733-9364
Pandey, S; Paudel, S; Devkota, K; Kshetri, K and Asteris, P G (2025) Machine learning unveils the complex nonlinearity of concrete materials' uniaxial compressive strength. International Journal of Construction Management, 25(6), pp. 635-649. ISSN 1562-3599
Pasley, G P (1997) Steelteam: Creating a collaborative design environment for the steel building industry. PhD thesis, University of Kansas, USA.
Patel, D A; Kikani, K D and Jha, K N (2016) Hazard assessment using consistent fuzzy preference relations approach. Journal of Construction Engineering and Management, 142(12): 04016067, ISSN 0733-9364
Perkinson, C L (2008) The use of computing technology in highway construction contractor companies as a total jobsite management tool (TJMT). PhD thesis, Florida International University, USA.
Plotnick, F L (2008) Rdm: Relationship diagramming method. PhD thesis, Drexel University, USA.
Poh, Y P (2005) Knowledge-based integrated project duration-cost risk simulation model. PhD thesis, London South Bank University, UK.
Poudel, O and Assaad, R H (2025) A real-time intelligent acoustic IoT-enabled embedded construction site monitoring and alert system: Integrating deep learning-based machine-listening algorithms, edge computing, and cloud computing. Journal of Construction Engineering and Management, 151(7): 04025075, ISSN 0733-9364
Qu, T (2006) The usability of graphical user interfaces of mobile computing devices designed for construction foremen: Icons and pre-defined text lists compared. PhD thesis, University of Florida, USA.
Rakesh Kumar, G (2025) Seismic vulnerability assessment of buildings using rapid visual screening for hybrid UMNN-RFO approach. International Journal of Construction Management, 25(10), pp. 1177-1185. ISSN 1562-3599
Rampini, Luca (2023) Artificial intelligence enhances digital asset management. PhD thesis, Politecnico di Milano, Italy.
Rashidi, A; Jazebi, F and Brilakis, I (2011) Neurofuzzy genetic system for selection of construction project managers. Journal of Construction Engineering and Management, 137(1), pp. 17-29. ISSN 0733-9364
Reinhardt, J (2003) Navigational models for effective and efficient interaction with integrated product and process models on construction sites. PhD thesis, Carnegie Mellon University, USA.
Renault, B Y; Agumba, J N and Ansary, N (2020) Establishing core factors of risk management influencing performance outcome of small and medium firm's construction projects in Gauteng. Journal of Construction in Developing Countries, 25(2), pp. 93-127. ISSN 1823-6499
Rihani, R A (2006) An investigation of critical success factors for robotic masonry. PhD thesis, North Carolina State University, USA.
Rojas, E M and Aramvareekul, P (2003) Is construction labor productivity really declining? Journal of Construction Engineering and Management, 129(1), pp. 41-46. ISSN 0733-9364
Rowings, J E (1991) Project-controls systems opportunities. Journal of Construction Engineering and Management, 117(4), pp. 691-697. ISSN 0733-9364
Sadeghi, J; Ahmadi, A and Phipps, R (2026) Internet of things in construction: Trends and adoption insights from a scientometric perspective. International Journal of Construction Management, 26(1), pp. 113-130. ISSN 1562-3599
Sadoun, B I (1992) A modeling methodology for energy-conserving site design. PhD thesis, Ohio State University, USA.
Salem, O and Mohanty, S (2008) Project management practices and information technology research. Journal of Construction Engineering and Management, 134(7), pp. 501-508. ISSN 0733-9364
Salman, S H (1991) Planning and control in the small business: Case studies from construction industry. PhD thesis, Swansea University, UK.
Sanusi, I E (2019) Optimal and adaptive control frameworks using reinforcement learning for time-varying dynamical systems. PhD thesis, University of Sheffield, UK.
Saoud, E A B (1996) Expert systems for management training in the construction industry. PhD thesis, University of Edinburgh, UK.
Sawhney, A and Mund, A (2002) Adaptive probabilistic neural network-based crane type selection system. Journal of Construction Engineering and Management, 128(3), pp. 265-273. ISSN 0733-9364
Senior, B A (1995) Late-time computation for task chains using discrete-event simulation. Journal of Construction Engineering and Management, 121(4), pp. 397-403. ISSN 0733-9364
Shanmuganayagam, V (1989) Current float techniques for resources scheduling. Journal of Construction Engineering and Management, 115(3), pp. 401-411. ISSN 0733-9364
Shapira, A; Simcha, M and Goldenberg, M (2012) Integrative model for quantitative evaluation of safety on construction sites with tower cranes. Journal of Construction Engineering and Management, 138(11), pp. 1281-1293. ISSN 0733-9364
Shen, X; Lu, M and Chen, W (2011) Tunnel-boring machine positioning during microtunneling operations through integrating automated data collection with real-time computing. Journal of Construction Engineering and Management, 137(1), pp. 72-85. ISSN 0733-9364
Shi, J J; Cheung, S O and Arditi, A (2001) Construction delay computation method. Journal of Construction Engineering and Management, 127(1), pp. 60-65. ISSN 0733-9364
Shirzad Talatappeh, S and Lakzi, A (2020) Developing a model for investigating the impact of cloud-based systems on green supply chain management. Journal of Engineering, Design and Technology, 18(4), pp. 741-760. ISSN 1726-0531
Sing, M C P; Edwards, D J; Leung, A W T; Liu, H and Roberts, C J (2022) A theoretical framework for classifying project complexity at the preconstruction stage using cluster analysis techniques. Engineering, Construction and Architectural Management, 29(9), pp. 3754-3774. ISSN 0969-9988
Singh, M M; Sawhney, A and Sharma, V (2017) Utilising building component data from BIM for formwork planning. Construction Economics and Building, 17(4), pp. 20-36. ISSN 2204-9029
Singh, V V and Tommelein, I D (2023) Visual workload leveling and zoning using work density method for construction process planning. Journal of Construction Engineering and Management, 149(10): 04023102, ISSN 0733-9364
Sinoeurn, D and Panuwatwanich, K (2023) Development and evaluation of cloud-based virtual reality for design evaluation: Multicriteria comparative analysis. Smart and Sustainable Built Environment, 12(5), pp. 1198-1225. ISSN 2046-6099
Sloan, B (1995) In search of excellence in learning: The strategic value of computer-assisted learning (CAL). Construction Management and Economics, 13(5), pp. 435-439. ISSN 01446193
Soltani, M; Aouag, H and Mouss, M D (2020) An integrated framework using VSM, AHP and TOPSIS for simplifying the sustainability improvement process in a complex manufacturing process. Journal of Engineering, Design and Technology, 18(1), pp. 211-229. ISSN 1726-0531
Ssegawa-Kaggwa, J; Ngowi, A B and Ntshwene, K (2013) Using a situation analysis to identify the construction industry deficiencies in Botswana. Journal of Construction in Developing Countries, 18(1), pp. 1-18. ISSN 1823-6499
Stouffs, R (2001) Visualizing information structures and its impact on project teams: An information architecture for the virtual AEC company. Building Research & Information, 29(3), pp. 218-232. ISSN 0961-3218
Struck, C (2012) Uncertainty propagation and sensitivity analysis techniques in building performance simulation to support conceptual building and system design. PhD thesis, Eindhoven University of Technology, Netherlands.
Sun, M (1993) Technology transfer, architectural design and integrated building design systems. PhD thesis, University of Newcastle upon Tyne, UK.
Tansley, D S W (1989) A knowledge-based system approach to helping engineers understand codes of practice. PhD thesis, Loughborough University, UK.
Terry, N and Palmer, J (2016) Trends in home computing and energy demand. Building Research & Information, 44(2), pp. 175-187. ISSN 0961-3218
Thomas, A (2017) Modeling occupant behavior, systems life cycle performance, and energy consumption nexus in buildings using multi-method distributed simulation. PhD thesis, University of Michigan, USA.
Tiruneh, G G and Fayek, A R (2022) Hybrid GA-manfis model for organizational competencies and performance in construction. Journal of Construction Engineering and Management, 148(4): 04022002, ISSN 0733-9364
Tiruneh, Getaneh Gezahegne (2021) Hybrid neuro-fuzzy model for construction organizational competencies and performance. PhD thesis, University of Alberta, Canada.
Ullah, F; Olatunji, O and Qayyum, S (2026) A scoping review of green internet of things in construction and smart cities: Current applications, adoption strategies and future directions. Smart and Sustainable Built Environment, 15(1), pp. 294-318. ISSN 2046-6099
Umer, M; Wetzel, E M and Powell, C (2026) Advancing toward automated material counting and localization using RFID, a boston dynamics spot robot, and a Bayesian filter algorithm. Journal of Construction Engineering and Management, 152(1): 04025213, ISSN 0733-9364
Uysal, F (2014) Hybrid meta-heuristic algorithms for the resource constrained multi-project scheduling problem. PhD thesis, Middle East Technical University, Turkey.
Villacis Jr., J E (1999) The component architecture toolkit. PhD thesis, Indiana University, USA.
Vitiello, Umberto (2017) A sustainable framework for the optimization of retrofit strategies of existing buildings. PhD thesis, Università degli Studi di Napoli Federico II, Italy.
Wahab, A (2024) Integrating building information modeling (BIM) and blockchain technology in the pre-construction planning processes. PhD thesis, Mississippi State University, USA.
Walker, D H T (2016) Reflecting on 10 years of focus on innovation, organisational learning and knowledge management literature in a construction project management context. Construction Innovation, 16(2), pp. 114-126. ISSN 1471-4175
Wang, J; Xiahou, X; Lin, Y; Liu, Y; Han, Z and Song, Y (2025) A novel approach for pipeline generation using a mixed GA and tree strategy. Journal of Construction Engineering and Management, 151(9): 04025122, ISSN 0733-9364
Wang, K (2017) Real options models for better investment decisions in road infrastructure under demand uncertainty. PhD thesis, University of California, Irvine, USA.
Wang, P (2006) Production-based large scale construction simulation modeling. PhD thesis, University of Alberta, Canada.
Wang, R D; Zayed, T; Eltoukhy, A E E and Wu, H (2024) Integrated planning approach for optimizing tower crane and truck locations in modular integrated construction. Journal of Construction Engineering and Management, 150(9): 04024121, ISSN 0733-9364
Ward, M J (2004) The capture and integration of construction site data. EngD thesis, Loughborough University, UK.
Weber, R E (2024) Spatial computing for building performance and design. PhD thesis, Massachusetts Institute of Technology, USA.
West, Omona-a (2024) Cloud-based digital technology platform for improving productivity performance of construction small medium enterprises. PhD thesis, Bond University, Australia.
Wu, Lingzi (2021) Enhancing data-driven applications in construction. PhD thesis, University of Alberta, Canada.
Wuni, I Y; Shen, G Q and Saka, A B (2023) Computing the severities of critical onsite assembly risk factors for modular integrated construction projects. Engineering, Construction and Architectural Management, 30(5), pp. 1864-1882. ISSN 0969-9988
Xu, Y; Shen, X; Lim, S and Li, X (2021) Three-dimensional object detection with deep neural networks for automatic as-built reconstruction. Journal of Construction Engineering and Management, 147(9): 04021098, ISSN 0733-9364
Yamaura, J T (2018) The value of cloud computing technology in public transportation construction. PhD thesis, University of Washington, USA.
Yamusa, M. A.; Dandago, A. A.; Lawal, H. S.; Saka, A. B.; Abubakar, M. and Abdullahi, M. (2025) Quantitative evaluation and modelling of uncertainty factors impacting duration of building renovation projects. Engineering, Construction and Architectural Management, 33(5), pp. 4181-4210. ISSN 0969-9988
Yang, I T; Hsieh, Y M and Kung, L O (2012) Parallel computing platform for multiobjective simulation optimization of bridge maintenance planning. Journal of Construction Engineering and Management, 138(2), pp. 215-226. ISSN 0733-9364
Yang, N (2010) Optimization of highway work zone decisions considering short-term and long-term impacts. PhD thesis, University of Maryland, College Park, USA.
Yao, D (2024) Enhancing cyber risk management in the construction industry. PhD thesis, New York University Tandon School of Engineering, USA.
You, H; Xu, F and Du, J (2023) Improved boundary identification of stacked objects with sparse lidar augmentation scanning. Journal of Construction Engineering and Management, 149(11): 04023104, ISSN 0733-9364
Zech, W C (2004) Enhancing work zone safety. PhD thesis, State University of New York at Buffalo, USA.
Zhang, J (2015) Automated code compliance checking in the construction domain using semantic natural language processing and logic-based reasoning. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Zhang, Z (2021) Participatory ergonomics in construction: Enabling practice-to-research-to-practice via the 2safemodel. PhD thesis, University of Washington, USA.
Zhao, J (2014) Performance modeling and optimization solutions for networking systems. PhD thesis, University of Hong Kong, Hong Kong.
Zhong, Q (1998) Building process modelling using product modelling methodology and its application to scheduling. PhD thesis, National University of Singapore, Singapore.
Zhou, W (2009) An investigation into a distributed virtual reality environment for real-time collaborative 4D construction planning and simulation. PhD thesis, University of Wolverhampton, UK.
olde Scholtenhuis, L L; Dorée, A G and Hartmann, T (2011) Challenges for construction it adoption on project level. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Up a level