Items with Index Term: computer program
Abourizk, S M; Halpin, D W and Wilson, J R (1994) Fitting beta distributions based on sample data. Journal of Construction Engineering and Management, 120(2), pp. 288-305. ISSN 0733-9364
Ahmed, V S (2000) The effectiveness of computer assisted learning in construction. PhD thesis, Loughborough University, UK.
Al-Saggaf, A; Hegazy, T; Nasir, H and Taha, M (2022) Computerized DSS for evaluating design performance of residential buildings using additive weighting approach. Architectural Engineering and Design Management, 18(5), pp. 631-651. ISSN 1745-2007
Albayyaa, H; Hagare, D and Saha, S (2021) Energy conservation assessment of traditional and modern houses in sydney. Building Research & Information, 49(6), pp. 613-623. ISSN 0961-3218
Alcantara Jr., P T (1996) Development of a computer-understandable representation of design rationale to support value engineering. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Alhumaidi, H M (2015) Construction contractors ranking method using multiple decision-makers and multiattribute fuzzy weighted average. Journal of Construction Engineering and Management, 141(4): 04014092, ISSN 0733-9364
Alkass, S and Harris, F (1988) Expert system for earthmoving equipment selection in road construction. Journal of Construction Engineering and Management, 114(3), pp. 426-440. ISSN 0733-9364
Alkass, S and Harris, F (1991) Development of an integrated system for planning earthwork operations in road construction. Construction Management and Economics, 9(3), pp. 263-289. ISSN 01446193
Aoude, H S (1996) Computerized construction delay management system. PhD thesis, Polytechnic University (New York), USA.
Arafat, G H (1991) Concept evaluation in structural design utilizing multiattribute utility theory and a knowledge-based approach. PhD thesis, Wayne State University, USA.
Arditi, D; Tokdemir, O B and Suh, K (2001) Scheduling system for repetitive unit construction using line-of-balance technology. Engineering, Construction and Architectural Management, 8(2), pp. 90-103. ISSN 0969-9988
Assaf, S A-E (1982) A systematic approach to the selection of a risk retention level for construction insurance. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Ayyub, B M and Haidar, A (1984) Project scheduling using fuzzy set concepts. Journal of Construction Engineering and Management, 110(2), pp. 189-204. ISSN 0733-9364
Barroso-Aguilar, L F (1973) An integrated modeling methodology for project-site management. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Batie, D L (1996) The incorporation of construction history into architectural history education: The "histcon" interactive computer program. PhD thesis, Texas A&M University, USA.
Baxendale, T (1984) Construction resource models by Monte Carlo simulation. Construction Management and Economics, 2(3), pp. 201-217. ISSN 01446193
Beg, M A (1999) An economic based decision support system for project level pavement type selection. PhD thesis, University of Texas at Austin, USA.
Bell, L C and Stukhart, G (1986) Attributes of materials management systems. Journal of Construction Engineering and Management, 112(1), pp. 14-21. ISSN 0733-9364
Bello, M A (2012) Minimizing impediments to design for construction safety (DFCS) implementation on capital projects. PhD thesis, Carnegie Mellon University, USA.
Bennett, F L (1966) Some approaches to the critical path scheduling resource allocation problem. PhD thesis, Cornell University, USA.
Bennett, J and Ormerod, R N (1984) Simulation applied to construction projects. Construction Management and Economics, 2(3), pp. 225-263. ISSN 01446193
Bofang, Z and Jianbo, C (1989) Finite element analysis of effect of pipe cooling in concrete dams. Journal of Construction Engineering and Management, 115(4), pp. 487-498. ISSN 0733-9364
Bowlby, W and Cohn, L F (1983) Prediction of highway construction noise levels. Journal of Construction Engineering and Management, 109(2), pp. 163-180. ISSN 0733-9364
Bray Jr., H G (1994) Domestic construction contractors and ISO 9000 registration. DE thesis, Louisiana Tech University, USA.
Cable, J K; Jaselskis, E J; Walters, R C; Li, L and Bauer, C R (2009) Stringless Portland cement concrete paving. Journal of Construction Engineering and Management, 135(11), pp. 1253-1260. ISSN 0733-9364
Caetano, L F; de Souza, H A and Gomes, A P (2022) Effect of the exposed steel structure on the thermal performance of buildings. Architectural Engineering and Design Management, 18(1), pp. 38-55. ISSN 1745-2007
Cheng, J (2005) A simulation access language and framework with applications to project management. PhD thesis, Stanford University, USA.
Cheung, F K T; Kuen, J L F and Skitmore, M (2002) Multi-criteria evaluation model for the selection of architectural consultants. Construction Management and Economics, 20(7), pp. 569-580. ISSN 01446193
Chinanuwatwong, S (1998) Scheduling overtime in construction using time-cost trade-off. PhD thesis, University of Texas at Austin, USA.
Choo, H J; Tommelein, I D; Ballard, G and Zabelle, T R (1999) Workplan: Constraint-based database for work package scheduling. Journal of Construction Engineering and Management, 125(3), pp. 151-160. ISSN 0733-9364
Chowdhury, A A (1994) An object-oriented finite element formulation for construction simulation. PhD thesis, Lehigh University, USA.
Christofferson, J P (1996) Computer-integrated specification information flow through the residential construction process. PhD thesis, Colorado State University, USA.
Darlow, M J (1968) Investigations into line of balance scheduling house building. PhD thesis, Loughborough University, UK.
Dawood, N N (2000) Forecasting of cost indices in the Greek construction industry: A joint methodology approach. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Dawood, N N (2001) Development of a forecasting methodology for cost indices: An application to the Greek construction industry. Journal of Construction Procurement, 7(1), pp. 42-50. ISSN 1358-9180
Deshpande, S D (1988) Some facility planning techniques for construction site layouts. PhD thesis, Indian Institute of Technology Delhi, India.
Dong, S (2012) A single element based modeling approach for simulating construction operations. PhD thesis, University of Nebraska - Lincoln, USA.
Easa, S M (1987) Earthwork allocations with nonconstant unit costs. Journal of Construction Engineering and Management, 113(1), pp. 34-50. ISSN 0733-9364
El-Samadony, A A E-Y (1986) Development of an improved construction bidding model incorporating multiple objective functions. PhD thesis, University of Leeds, UK.
Elazouni, A and Salem, O A (2011) Progress monitoring of construction projects using pattern recognition techniques. Construction Management and Economics, 29(4), pp. 355-370. ISSN 1466433X
Eskander, A K (1998) Total project management delay analysis method (TPM-DAM) with emphasis on project preplanning. PhD thesis, Polytechnic University, USA.
Gambatese, J A (1996) Addressing construction worker safety in the project design. PhD thesis, University of Washington, USA.
Gautam, K P (2009) Life-cycle cost analysis of home-ownership. PhD thesis, University of Hawai'i at Manoa, USA.
Gidado, K (1993) Numerical index of complexity in building construction with particular consideration to its effect on production time. PhD thesis, University of Brighton, UK.
Guzman de la Cruz, A L (1998) Cost-performance criteria for seismic retrofitting. PhD thesis, University of Puerto Rico, Mayaguez, Puerto Roco.
Haeusler, M H; Hespanhol, L and Hoggenmueller, M (2018) Participationplus: Documenting a design process of a media architecture installation in the second digital turn era. Smart and Sustainable Built Environment, 7(1), pp. 133-149. ISSN 2046-6099
Han, Sang Hyeok (2014) BIM-based motion planning of mobile crane operation in modular-based heavy construction sites. PhD thesis, University of Alberta, Canada.
Harris, F C (1979) A model for evaluating the effects of weather on construction projects. PhD thesis, Loughborough University, UK.
Harun, Z B (1993) Computer simulation in decision support systems for management of construction projects. PhD thesis, University of Leeds, UK.
Hicks, J C (1993) Haul-unit performance. Journal of Construction Engineering and Management, 119(3), pp. 646-653. ISSN 0733-9364
Ho, P H K (2010) Forecasting construction manpower demand by gray model. Journal of Construction Engineering and Management, 136(12), pp. 1299-1305. ISSN 0733-9364
Hudson, R (2010) Strategies for parametric design in architecture: an application of practice-led research. PhD thesis, University of Bath, UK.
Ioannou, P G and Yang, I T (2016) Repetitive scheduling method: Requirements, modeling, and implementation. Journal of Construction Engineering and Management, 142(5): 04016002, ISSN 0733-9364
Izzat, R M (1977) A computerised approach to bidding strategy in civil engineering. PhD thesis, Aston University, UK.
Jarrah, R; Kulkarni, D and O'Connor, J T (2007) Cash flow projections for selected TxDoT highway projects. Journal of Construction Engineering and Management, 133(3), pp. 235-241. ISSN 0733-9364
Kang, L S; Park, I C and Lee, B H (2001) Optimal schedule planning for multiple, repetitive construction process. Journal of Construction Engineering and Management, 127(5), pp. 382-390. ISSN 0733-9364
Karunaratne, Banneka Mudiyanselage (1994) A new method of analysis for cyclic construction operations using systems engineering approach. PhD thesis, University of New South Wales, Australia.
Kawal, D E (1970) A systems model of a construction firm. PhD thesis, Iowa State University, USA.
Kim, J-L (2006) A multiheuristic approach to resource constrained project scheduling: An adaptive hybrid genetic algorithm. PhD thesis, University of Florida, USA.
Kong, J S (2001) Lifetime maintenance strategies for deteriorating structures. PhD thesis, University of Colorado at Boulder, USA.
Kähkönen, K E E (1993) Modelling activity dependencies for building construction project scheduling. PhD thesis, University of Reading, UK.
Le, Y; Wang, Y; Luo, C and Peng, Y (2013) Integration of financial and contract management on the Shanghai Expo construction program. Journal of Construction Engineering and Management, 139(6), pp. 738-748. ISSN 0733-9364
Littlefair, P J (1998) Predicting lighting energy use under daylight linked lighting controls. Building Research & Information, 26(4), pp. 208-222. ISSN 0961-3218
Mahmoud, H M (1998) Applying a fuzzy logic expert system in the selection of bridge deck joints. PhD thesis, University of Central Florida, USA.
Mbabazi, A (2004) Quantification and analysis of construction claims. PhD thesis, University of Waterloo, Canada.
McGartland, M R and Hendrickson, C T (1985) Expert systems for construction project monitoring. Journal of Construction Engineering and Management, 111(3), pp. 293-307. ISSN 0733-9364
Mora, R (2005) Representation and reasoning for integrated conceptual design of building structures. PhD thesis, Concordia University, Canada.
Naderpajouh, N and Afshar, A (2008) A case-based reasoning approach to application of value engineering methodology in the construction industry. Construction Management and Economics, 26(4), pp. 363-372. ISSN 1466433X
Navon, R (1996) Company-level cash-flow management. Journal of Construction Engineering and Management, 122(1), pp. 22-35. ISSN 0733-9364
Navon, R; Arkin, H and Burg, I (1997) Economic evaluation of HVAC systems with ice storage designed using an optimization technique. Construction Management and Economics, 15(5), pp. 429-439. ISSN 01446193
Ogunlana, S O; Bhokha, S and Pinnemitr, N (2001) Application of artifical neural network (ANN) to forecast construction cost of buildings at the pre-design stage. Journal of Financial Management of Property and Construction, 6(3), pp. 179-192. ISSN 1366-4387
Pandey, A R (2016) Heuristic decision-making model for electrical foremen when workflow is disrupted. PhD thesis, Illinois Institute of Technology, USA.
Pasiphol, S (1994) New concepts for total float distribution in CPM project scheduling. PhD thesis, University of Texas at Austin, USA.
Peacock, W S (1990) Site investigation procedures and risk analysis. PhD thesis, University of Manchester, UK.
Petcherdchoo, A (2004) Maintaining condition and safety of deteriorating bridges by probabilistic models and optimization. PhD thesis, University of Colorado at Boulder, USA.
Rampini, Luca (2023) Artificial intelligence enhances digital asset management. PhD thesis, Politecnico di Milano, Italy.
Ranasinghe, M (2000) Impact of correlation and induced correlation on the estimation of project cost of buildings. Construction Management and Economics, 18(4), pp. 395-406. ISSN 01446193
Ridyard, James (1976) Computer based management games for the building industry. PhD thesis, University of New South Wales, Australia.
Rowe, G M; Meegoda, J N; Jumikis, A; Sharrock, M J; Bandara, N and Hettiarachchi, C H (2004) NJTxtr: a computer program based on laser to monitor asphalt segregation. Journal of Construction Engineering and Management, 130(6), pp. 924-934. ISSN 0733-9364
Sacks, R (1997) Computer integrated construction: project data model representation and use. Unpublished PhD thesis, Technion Israel Institute of Technology, Israel.
Salem, O; Shahin, A and Khalifa, Y (2007) Minimizing cutting wastes of reinforcement steel bars using genetic algorithms and integer programming models. Journal of Construction Engineering and Management, 133(12), pp. 982-992. ISSN 0733-9364
Samo, S R (1999) Energy conservation in UK housing and the effect of building regulations. PhD thesis, University of Manchester, UK.
Sarhan, M (2008) Risk-based approach in highway geometric design. PhD thesis, Carleton University, Canada.
Scott, S (1991) Project plans and record-keeping on construction sites in the United Kingdom. PhD thesis, University of Newcastle upon Tyne, UK.
Sedaghati, R (2000) Investigations in structural optimization of nonlinear problems using the finite element method. PhD thesis, University of Victoria, Canada.
Selinger, S and Stamler, H (1983) Computerized method for quantity surveying. Construction Management and Economics, 1(1), pp. 75-87. ISSN 01446193
Sharqi, R I A (2017) Developing a system for health and safety enhancement and automation in construction sites. PhD thesis, Heriot-Watt University, UK.
Shen, L Y (1990) Application of risk management to the Chinese construction industry. PhD thesis, University of Reading, UK.
Shi, J J; Cheung, S O and Arditi, A (2001) Construction delay computation method. Journal of Construction Engineering and Management, 127(1), pp. 60-65. ISSN 0733-9364
Shin, H J (1994) Fuzzy approach to construction activity estimation. PhD thesis, Loughborough University, UK.
Shirong, L (1996) New approach for optimization of overall construction schedule. Journal of Construction Engineering and Management, 122(1), pp. 7-13. ISSN 0733-9364
Smith, I G N (1995) Rainfall patterns and the acceptability of soils for earthworking. PhD thesis, Heriot-Watt University, UK.
Smith, J (2005) An approach to developing a performance brief at the project inception stage. Architectural Engineering and Design Management, 1(1), pp. 3-20. ISSN 1745-2007
Soemardi, B W (1993) Fuzzy neural network models for design/construction processes. PhD thesis, University of Kentucky, USA.
Soliman, E M (2005) Delay hierarchy propagation model. PhD thesis, University of Plymouth, UK.
Suh, K (1993) RUSS: A scheduling system for repetitive-unit construction using line-of-balance technology. PhD thesis, Illinois Institute of Technology, USA.
Suhail, S A (1995) CPM/LOB: new methodology to integrate CPM and line of balance. PhD thesis, Loughborough University, UK.
Tang, S L; Ying, K C; Anson, M and Lu, M (2005) Rmcsim: A simulation model of a ready-mixed concrete plant serving multiple sites using multiple truckmixers. Construction Management and Economics, 23(1), pp. 15-31. ISSN 01446193
Tansley, D S W (1989) A knowledge-based system approach to helping engineers understand codes of practice. PhD thesis, Loughborough University, UK.
Tommelein, I D; Levitt, R E and Hayes-Roth, B (1992) Site-layout modeling: How can artificial intelligence help? Journal of Construction Engineering and Management, 118(3), pp. 594-611. ISSN 0733-9364
Touran, A (1981) Construction operations data acquisition and processing via time-lapse photography interfaced to a minicomputer. PhD thesis, Stanford University, USA.
Touran, A and Taher, K A H (1988) Optimum fleet size determination by queuing and simulation. Construction Management and Economics, 6(4), pp. 295-306. ISSN 01446193
Tripathi, K K (2018) Critical success factors for construction organizations in India. PhD thesis, Indian Institute of Technology Delhi, India.
Tseng, C-H (2006) Safety performance analyzer for constructed environments (SPACE). PhD thesis, Ohio State University, USA.
Vidalis, S M (2005) Relation between cost, quality, and risk in portland cement concrete pavement construction. PhD thesis, University of Florida, USA.
Wong, J M W; Kong, H and Chiang, Y H (2004) A critical review of forecasting models to predict manpower demand. Construction Economics and Building, 4(2), pp. 43-56. ISSN 2204-9029
Yates-Suver, J K (1986) A cross-cultural evaluation of the behavior and training of American engineering and construction professionals who operate in the international marketplace. PhD thesis, Texas A&M University, USA.
Zhang, Z (1996) A GIS-based and multimedia integrated infrastructure management system. PhD thesis, University of Texas at Austin, USA.
de Solminihac Tampier, H E (1992) System analysis for expediting urban highway construction. PhD thesis, University of Texas at Austin, USA.
Up a level