Items with Index Term: computational model

Number of items: 28.

Abdelgader, S H; Kurpinska, M; Abdelgader, H S; Omidi Moaf, F and Amran, M (2025) Study the impact of design method preference on the usefulness of concrete and on CO2 emissions. International Journal of Building Pathology and Adaptation, 43(4), pp. 804-825. ISSN 2398-4708

Abdelgader, S H; Kurpinska, M; Abdelgader, H S; Omidi Moaf, F and Amran, M (2025) Study the impact of design method preference on the usefulness of concrete and on CO₂ emissions. International Journal of Building Pathology and Adaptation, 43(4), pp. 804-825. ISSN 2398-4708

Abu Samra, S; Ahmed, M; Hammad, A and Zayed, T (2018) Multiobjective framework for managing municipal integrated infrastructure. Journal of Construction Engineering and Management, 144(1): 04017091, ISSN 0733-9364

Adeli, H and Wu, M (1998) Regularization neural network for construction cost estimation. Journal of Construction Engineering and Management, 124(1), pp. 18-23. ISSN 0733-9364

Aghimien, E I; Aghimien, L M; Petinrin, O O and Aghimien, D O (2021) High-performance computing for computational modelling in built environment-related studies: A scientometric review. Journal of Engineering, Design and Technology, 19(5), pp. 1138-1157. ISSN 1726-0531

Al-Subaihawi, S W (2023) Real-time hybrid simulation of complex structural systems subjected to multi-natural hazards. PhD thesis, Lehigh University, USA.

Cao, M T; Cheng, M Y and Wu, Y W (2015) Hybrid computational model for forecasting Taiwan construction cost index. Journal of Construction Engineering and Management, 141(4): 04014089, ISSN 0733-9364

Eleftheriadis, E (2018) Decision-based and BIM-embedded optimisation framework for material, cost and carbon efficiency of RC building structures. PhD thesis, University College London, UK.

Esmalian, A (2022) Understanding social equity in infrastructure systems resilience. PhD thesis, Texas A&M University, USA.

Halfawy, M M R (1998) A multi-agent collaborative framework for concurrent design of constructed facilities. PhD thesis, Ohio State University, USA.

Hsu, S-C (2013) A complexity-based approach to intra-organizational team selection. PhD thesis, University of Maryland, College Park, USA.

Isaacs, J; Falconer, R; Gilmour, D and Blackwood, D (2010) Modelling and visualizing sustainability assessment in urbanenvironments. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Kanoglu, A (2003) An integrated system for duration estimation in design/build projects and organizations. Engineering, Construction and Architectural Management, 10(4), pp. 272-282. ISSN 0969-9988

Lataniotis, C (2019) Data-driven uncertainty quantification for high-dimensional engineering problems. DSc thesis, ETH Zürich, Switzerland.

Lather, J I (2019) A hybrid modeling approach using discrete event simulation and layout optimization for healthcare layout planning problems. PhD thesis, Pennsylvania State University, USA.

Mendes, J R; Fernando, L; Heineck, M and Vaca, O L (1998) New applications of line of balance on scheduling of multi-storey buildings. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Mucheti, Alexsander Silva (2025) Experimental and numerical analysis of nailed soil structures in urban areas. PhD thesis, Universidade Estadual de Campinas, Brazil.

Ng, F P (2003) Quantity and pricing decisions in the presence of advance contracts. PhD thesis, Stanford University, USA.

Platt, L S; Chen, X; Sabo-Attwood, T; Iovine, N; Brown, S and Pollitt, B (2024) Improving infection prevention briefing through predictive predesign: A computational approach to architectural programming by evaluating socioecological risk factors. Architectural Engineering and Design Management, 20(4), pp. 776-788. ISSN 1745-2007

Prieto, A J (2021) Fuzzy systems in the digital management of heritage timber buildings in South Chile. Building Research & Information, 49(8), pp. 878-892. ISSN 0961-3218

Salazar-Kish, J M (2001) Modeling concurrency tradeoffs and their effects on project duration and rework. PhD thesis, Stanford University, USA.

Serag-Eldin, Gamil M (2010) A conflict management model for architectural design collaboration. PhD thesis, University of California, USA.

Singh, V and Bolpagni, M (2023) Effects of trigger events on innovation behaviour: Insights from the data collected from construction professionals during COVID-19. Construction Management and Economics, 41(7), pp. 587-607. ISSN 01446193

Torfi, F and Rashidi, A (2011) Selection of project managers in construction firms using analytic hierarchy process and fuzzy TOPSIS: A case study. Journal of Construction in Developing Countries, 16(1), pp. 69-89. ISSN 1823-6499

Torres Calderon, W (2022) Video representation learning for vision-driven activity analysis in construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Tran, D Q and Molenaar, K R (2015) Risk-based project delivery selection model for highway design and construction. Journal of Construction Engineering and Management, 141(12): 04015041, ISSN 0733-9364

Zarrinmehr, S (2016) A computational model for simulation, visualization and evaluation of mandatory and optional building occupancy scenarios. PhD thesis, Texas A&M University, USA.

Zuluaga Mayorga, S (2024) Exploring the value of infrastructure systems and its impacts on decision-making for sustainability. PhD thesis, University of Toronto, Canada.

This list was generated on Sat Aug 22 02:13:35 2026 UTC.