Items with Index Term: commissioning
Abdullahi, I (2000) Development of a funding model for allocating capital grants to the federal universities in Nigeria. PhD thesis, Abertay University, UK.
Abdulrahman, A (2010) The development of a performance measurement framework for FE/HE co-location construction projects. PhD thesis, Heriot-Watt University, UK.
Adam, A (2019) Exploring construction challenges of the public client: A dynamic capabilities approach. PhD thesis, Chalmers University of Technology, Sweden.
Adeleke, A (2017) Linking effective project management to business strategy in oil and gas industry through decision-making processes. PhD thesis, Northcentral University, USA.
Adu-Amankwa, N. A. N. and Rahimian, F. (2026) Harnessing blockchain-enabled digital twins for building commissioning: Examining practitioners' perspectives. Engineering, Construction and Architectural Management, 33(3), pp. 1891-1906. ISSN 0969-9988
Afzali Borujeni, S H; Zare, M and Adelzade Saadabadi, L (2024) Comparison of factors affecting the acceptance of the trenchless technology and open-trench method using ANP and AHP: Case study in Iran. Journal of Construction Engineering and Management, 150(1): 04023145, ISSN 0733-9364
Al Ahbabi, M S (2014) Process protocol for the implementation of integrated project delivery in the UAE: A client perspective. PhD thesis, University of Salford, UK.
Al Ahbabi, M S M (2014) Process protocol for the implementation of integrated project delivery in the UAE: a client perspective. PhD thesis, University of Salford, UK.
Alghamdi, A M (2022) A systemic approach for construction contract claims settlement in the Kingdom of Saudi Arabia. PhD thesis, University of Reading, UK.
Aouad, G F; Bakis, N; Amaratunga, D; Osbaldiston, S; Sun, M; Kishk, M; Al-Hajj, A and Pollock, R (2001) An integrated life cycle costing database: A conceptual framework. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Augenbroe, G; Castro, D and Ramkrishnan, K (2009) Decision model for energy performance improvements in existing buildings. Journal of Engineering, Design and Technology, 7(1), pp. 21-36. ISSN 1726-0531
Barbarosoglu, B V (2018) Early detection of maintainability issues in MEP systems using BIM. PhD thesis, Illinois Institute of Technology, USA.
Bolier, I (2025) From tinkering to transitioning: Cultivating innovation within public agencies operating in the construction industry. PhD thesis, Delft University of Technology, Netherlands.
Bordass, B (2020) Metrics for energy performance in operation: The fallacy of single indicators. Buildings & Cities, 1(1), pp. 260-276. ISSN 2632-6655
Buckingham, H (2010) Accommodating change? An investigation of the impacts of government contracting processes on third sector providers of homelessness services in South East England. PhD thesis, University of Southampton, UK.
Chow, L K and Ng, S T (2010) Delineating the performance standards of engineering consultants at design stage. Construction Management and Economics, 28(1), pp. 3-11. ISSN 1466433X
Coram, W R (1997) The privatisaton of the property services agency. PhD thesis, University of Manchester, UK.
Davies, R (2013) Healthcare built environment impacts, construction projects and organisational change. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Farmer, H K (2003) Managing maintenance of multiple domestic accommodation. PhD thesis, Loughborough University, UK.
Fernández, A I; Jarufe, J; Segarra, P and Cavieres, P (2025) Management of construction planning process in massive underground mining by integrating LPS and cit through action research. Journal of Construction Engineering and Management, 151(5): 04025024, ISSN 0733-9364
Frommweiler, C and Poirier, E (2025) Facilitating the building commissioning process using building information modeling: An action-research project. Engineering, Construction and Architectural Management, 32(1), pp. 601-620. ISSN 0969-9988
George, M G (2003) The implementation of project management in the building construction field in the United Arab Emirates. PhD thesis, University of South Wales, UK.
Gharehbaghi, K; McManus, K; Georgy, M; Farnes, K; Pagliara, F and Myers, M (2024) Verifying the sustainability factors of mega transportation infrastructure: Sydney metro's commissioning through the "significance matrix" methodology. Journal of Engineering, Design and Technology, 22(1), pp. 22-41. ISSN 1726-0531
Gillis III, W L (2013) Development of an integrative commissioning methodology for new-building construction. PhD thesis, Missouri University of Science and Technology, USA.
Goins, J and Moezzi, M (2013) Linking occupant complaints to building performance. Building Research & Information, 41(3), pp. 361-372. ISSN 0961-3218
Gram-Hanssen, K; Georg, S; Christiansen, E and Heiselberg, P (2018) What next for energy-related building regulations? The occupancy phase. Building Research & Information, 46(7), pp. 790-803. ISSN 0961-3218
Hansen, D E (2021) Including commissioning during design phase benefits new construction: A qualitative case study. PhD thesis, Northcentral University, USA.
Harding, A M (1999) A global approach to project optimisation. PhD thesis, University of Edinburgh, UK.
He, C; Liu, M; Alves, T D C L; Scala, N M and Hsiang, S M (2022) Prioritizing collaborative scheduling practices based on their impact on project performance. Construction Management and Economics, 40(7-8), pp. 618-637. ISSN 01446193
Heffernan, E E (2015) Delivering zero carbon homes and sustainable communities: The potential of group self-build housing in England. PhD thesis, University of Plymouth, UK.
Hermans, M; Veldhuis, H; Huizing, D and Rots, S (2019) The embedding of the construction client role in Dutch municipalities and its effects on professionalism and organisational learning. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Hermans, M; Volker, L and Eisma, P (2014) A public commissioning maturity model for construction clients. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Hermans, M; van Zoest, S and Volker, L (2016) Assessing the maturity of public construction client organisations. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Hitchcock, R J (1996) Improving life-cycle information management through documentation of project objectives and design rationale. PhD thesis, University of California, Berkeley, USA.
Inayat, A; Melhem, H and Esmaeily, A (2015) Critical success factors in an agency construction management environment. Journal of Construction Engineering and Management, 141(1): 06014010, ISSN 0733-9364
Ioannidou, D; Zerbi, S; García de Soto, B and Habert, G (2018) Where does the money go? Economic flow analysis of construction projects. Building Research & Information, 46(4), pp. 348-366. ISSN 0961-3218
Islam, M S; Nepal, M P and Skitmore, M (2019) Modified fuzzy group decision-making approach to cost overrun risk assessment of power plant projects. Journal of Construction Engineering and Management, 145(2): 04018126, ISSN 0733-9364
Ismaeel, W S E (2020) An integrated model for energy-efficient building opening design. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Jabang, S-W (2017) An investigation into the use of public procurement and commissioning to deliver community (societal) value. PhD thesis, University of Birmingham, UK.
Jaggar, D and Ross, A (2003) A survey into the effectiveness of web-based teaching of building design cost management. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Jain, Nishesh (2021) Reducing the performance gap using calibrated simulation models. PhD thesis, University College London, UK.
Jensen, P A (2012) Knowledge transfer from facilities management to building projects: A typology of transfer mechanisms. Architectural Engineering and Design Management, 8(3), pp. 170-179. ISSN 1745-2007
Johannes, Koos (2023) Crafting intrapreneurial stewardship: An institutional perspective on client-led innovation in smart building maintenance. PhD thesis, University of Twente, Netherlands.
Kantola, M and Saari, A (2014) Commissioning for nearly zero-energy building projects. Construction Innovation, 14(3), pp. 370-382. ISSN 1471-4175
Kazemi, R M; Riley, D; Asadi, S and Delgoshaei, P (2017) Improving the performance profile of energy conservation measures at the Penn State University Park campus. Engineering, Construction and Architectural Management, 24(4), pp. 610-628. ISSN 0969-9988
Kelso M, R (2003) Automated commissioning of HVAC systems using first principle models. PhD thesis, Loughborough University, UK.
Kim, J H and Fisher, N (2001) Knowledge management for small occasional construction industry clients: A theoretical framework. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Koo, Hyun Jeong (2021) Building design quality: Design complexity and BIM applications. Doctor thesis, University of Texas at Austin, USA.
Kuitert, L; Volker, L and Hermans, M (2016) Safeguarding public values by project-based construction clients: Leads for future research. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Kuitert, L; Volker, L and Hermans, M (2018) The impact of shifting values on the role and responsibilities of the construction client in delivering public goods. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Kuitert, L; Volker, L and Hermans, M H (2017) Public commissioning in a new era: Public value interests of construction clients. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Kuitert, L; Volker, L and Hermans, M H (2019) Taking on a wider view: Public value interests of construction clients in a changing construction industry. Construction Management and Economics, 37(5), pp. 257-277. ISSN 01446193
Kuitert, L; Volker, L and Hermans, M H (2020) The public construction client of the future: Network-based collaborator in a traditional public administrative system. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Kuitert, Lizet (2021) The balancing act: How public construction clients safeguard public values in a changing construction industry. PhD thesis, Delft University of Technology, Netherlands.
Kumara, W H C D; Waidyasekara, K G A S and Weerasinghe, R P N P (2016) Building management system for sustainable built environment in Sri Lanka. Built Environment Project and Asset Management, 6(3), pp. 302-316. ISSN 2044-124X
Lahdenperä, P and Koppinen, T (2009) Financial analysis of road project delivery systems. Journal of Financial Management of Property and Construction, 14(1), pp. 61-78. ISSN 1366-4387
Laroza, F A R (2025) Investigating construction delays in cold storage projects in the Philippines. International Journal of Construction Management, 25(6), pp. 661-671. ISSN 1562-3599
Larsen, J K; Lindhard, S M; Brunoe, T D and Jensen, K N (2018) The relation between pre-planning, commissioning and enhanced project performance. Construction Economics and Building, 18(2), pp. 1-14. ISSN 2204-9029
Lee, K J (2013) A formal and ontological approach to embed commissioning test protocol into building information model. PhD thesis, Carnegie Mellon University, USA.
Li, Shuyang (2020) Proactive design approaches for energy-efficient buildings. PhD thesis, University of California, USA.
Lomas, K J; Cook, M J and Short, C A (2009) Commissioning hybrid advanced naturally ventilated buildings: A US case study. Building Research & Information, 37(4), pp. 397-412. ISSN 0961-3218
Lord, S-F; Noye, S; Ure, J; Tennant, M G and Fisk, D J (2016) Comparative review of building commissioning regulation: A quality perspective. Building Research & Information, 44(5-6), pp. 630-643. ISSN 0961-3218
Ma, A (2009) Engineer's role in resolving disputes in offshore projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 191-196. ISSN 17514312
Mahadkar, S; Mills, G and Price, A D F (2012) Stakeholder consultation practices within healthcare infrastructure planning: A conceptual approach to strategic asset management. Built Environment Project and Asset Management, 2(2), pp. 127-145. ISSN 2044-124X
Millett, S J; Dainty, A R J and Briscoe, G H (2001) Client procurement strategies: A cross-sectoral analysis. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Mirzaie, S (2022) Influence of BREEAM, BIM, and Soft Landings on lifecycle performance of two non-domestic buildings. PhD thesis, Heriot-Watt University, UK.
Mock, B and O'Connor, J (2022) Taxonomic categories for commissioning and startup hot spot strategies. Construction Innovation, 22(1), pp. 120-140. ISSN 1471-4175
Mock, B and O'Connor, J T (2019) High-value, low-effort industrial plant commissioning solution strategies. Construction Innovation, 19(4), pp. 653-671. ISSN 1471-4175
Mock, B and O’Connor, J T (2019) Owner and contractor solution strategies for industrial commissioning. Construction Innovation, 19(2), pp. 256-279. ISSN 1471-4175
Morsi, D M A; Ismaeel, W S E; El Hamed, A E A and Othman, A A E (2020) Applying LCA-BIM integration for a sustainable management process. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
O'Connor, J T; Choi, J O and Winkler, M (2016) Critical success factors for commissioning and start-up of capital projects. Journal of Construction Engineering and Management, 142(11): 04016060, ISSN 0733-9364
O'Connor, J T; Leite, F and Ma, J W (2023) Expanding advanced work packaging to include commissioning and startup for industrial projects. Construction Innovation, 23(5), pp. 939-960. ISSN 1471-4175
O'Connor, J T and Mock, B (2020) Responsibilities and accountabilities for industrial facility commissioning and startup activities. Construction Innovation, 20(4), pp. 625-645. ISSN 1471-4175
O'Connor, J T and Mock, B D (2019) Construction, commissioning, and startup execution: Problematic activities on capital projects. Journal of Construction Engineering and Management, 145(4): 04019009, ISSN 0733-9364
O'Connor, J T; Shrestha, B K; Winkler, M and Ouk Choi, J (2021) Relationship between commissioning and start-up success factors achievement and performance in capital projects. Journal of Construction Engineering and Management, 147(3): 04021001, ISSN 0733-9364
Papamichael, K (1999) Application of information technologies in building design decisions. Building Research & Information, 27(1), pp. 20-34. ISSN 0961-3218
Pasquire, C (2012) Positioning lean within an exploration of engineering construction. Construction Management and Economics, 30(8), pp. 673-685. ISSN 1466433X
Pieters, W D and Tzoneva, R (2021) Investigation of an iec 61850 standard-based process bus implementation of a protection and control scheme for parallelly connected transformers. Journal of Engineering, Design and Technology, 19(4), pp. 850-875. ISSN 1726-0531
Potemans, A; Volker, L and Hermans, M (2018) From agents to stewards? Experiences from a Dutch infrastructure case study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Potts, K and Wall, M (2002) Managing the commissioning of building services. Engineering, Construction and Architectural Management, 9(4), pp. 336-344. ISSN 0969-9988
Raouf, A M and Al-Ghamdi, S G (2023) Framework to evaluate quality performance of green building delivery: Construction and operational stage. International Journal of Construction Management, 23(2), pp. 253-267. ISSN 1562-3599
Render, N; Greenwood, D and Edge, J (2005) The other g.M.P: Good manufacturing practice and its importance in the validation of constructed pharmaceutical facilities. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Rouhi, S (2011) Framework for owner's project requirements for total structural systems (OPRTSS). PhD thesis, Georgia Institute of Technology, USA.
Saari, A and Aalto, L (2006) Indoor environment quality contracts in building projects. Building Research & Information, 34(1), pp. 66-74. ISSN 0961-3218
Sadri, S L (1993) An integrated information system for building construction projects. PhD thesis, Georgia Institute of Technology, USA.
Salah Eldeen Ismaeel Elsayed Ahmed, Walaa (2014) Developing a systemic framework for applying LEED system: Managing energy and materials credits. PhD thesis, Politecnico di Milano, Italy.
Shakoorian, A (2006) Performance assessment of building commissioning process as a quality assurance system. PhD thesis, Georgia Institute of Technology, USA.
Short, C A; Cook, M and Lomas, K J (2009) Delivery and performance of a low-energy ventilation and cooling strategy. Building Research & Information, 37(1), pp. 1-30. ISSN 0961-3218
Sigonda, G G G (2000) The impact of infrastructural projects on the environment in Tanzania: The case of mindu dam. PhD thesis, University of Manchester, UK.
Singh, J and Anumba, C J (2024) Building commissioning process and documentation: A literature review and directions for future research. International Journal of Construction Management, 24(1), pp. 75-85. ISSN 1562-3599
Stout, Timothy J (2023) Schedule forecast optimization for the construction and commissioning of nuclear power plants. DEngr thesis, George Washington University, USA.
Takim, R (2005) A framework for successful construction project performance. PhD thesis, Glasgow Caledonian University, UK.
Tavassolirizi, M; Sarvari, H; Chan, D W M and Olawumi, T O (2022) Factors affecting delays in rail transportation projects using analytic network process: The case of Iran. International Journal of Construction Management, 22(14), pp. 2712-2723. ISSN 1562-3599
Thawanapong, C and Tachakitkachorn, T (2026) The sequence of activities for digital twin implementation for building operations by industrial practitioners: A multiple case study analysis in Thailand. International Journal of Construction Management, 26(5), pp. 825-839. ISSN 1562-3599
Volker, L (2010) Dutch architectural design tenders explained from a sensemaking perspective. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Volker, L (2010) Deciding about design quality: value judgements and decision making in the selection of architects by public clients under European tendering regulations. PhD thesis, Delft University of Technology, Netherlands.
Wade, F and Han, Y (2024) Mapping supply chains for energy retrofit. Buildings & Cities, 5(1), pp. 388-399. ISSN 2632-6655
Weerasinghe, A S and Ramachandra, T (2018) Economic sustainability of green buildings: A comparative analysis of green vs non-green. Built Environment Project and Asset Management, 8(5), pp. 528-543. ISSN 2044-124X
Whyte, J; Davies, A and Sexton, C (2022) Systems integration in infrastructure projects: seven lessons from Crossrail. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(3), pp. 103-109. ISSN 17514304
Woodhead, R (1997) Exploring the hurdle rate in preparation for a value management workshop planning session. Journal of Financial Management of Property and Construction, 2(2), pp. 21-38. ISSN 1366-4387
Yadavalli, H V; Krishna Mohan, T V; Rangarajan, S and Albert, S K (2022) Design, fabrication, testing and operation of a simulation facility for high temperature molten salt studies. Journal of Engineering, Design and Technology, 20(6), pp. 1369-1387. ISSN 1726-0531
Ye, K M (2013) A conceptual model to improve building commissioning in construction projects: Case studies of a public institution of higher learning in Malaysia. PhD thesis, University of Malaya, Malaysia.
Up a level