Items with Index Term: commercial construction

Number of items: 73.

Adafin, J; Rotimi, J O B; Wilkinson, S and Mbachu, J (2019) An assessment of risk factors impacting budget variability in New Zealand commercial construction projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Aguocha, T (2023) Best practices for cost monitoring and control in construction projects: An exploratory case study. DBA thesis, National University, USA.

Akintoye, A and Skitmore, M (1994) Models of UK private sector quarterly construction demand. Construction Management and Economics, 12(1), pp. 3-13. ISSN 01446193

Al Taie, Mohsin Shareef (2022) Applications of lean in construction: Benefits from using the Last Planner system. PhD thesis, Liberty University, USA.

Auchterlounie, A C (2004) A new quality theory for UK private housebuilding based on definable quality principles, impression management and the control of cognitive dissonance. PhD thesis, Heriot-Watt University, UK.

Bee-Hua, G (1999) An evaluation of the accuracy of the multiple regression approach in forecasting sectoral construction demand in Singapore. Construction Management and Economics, 17(2), pp. 231-241. ISSN 01446193

Bellizzi, J A (1978) A multivariate analysis of buying in the commercial construction industry. PhD thesis, University of Nebraska - Lincoln, USA.

Bentil, K K (1990) A model approach for predicting commercial construction site accidents. PhD thesis, University of Florida, USA.

Bepari, M; Narkhede, B E and Raut, R D (2024) A comparative study of project risk management with risk breakdown structure (rbs): A case of commercial construction in India. International Journal of Construction Management, 24(6), pp. 673-682. ISSN 1562-3599

Berg, R and Hinze, J (2005) Theft and vandalism on construction sites. Journal of Construction Engineering and Management, 131(7), pp. 826-833. ISSN 0733-9364

Boateng, E B (2021) The role of human safety interventions on co-workers’ safety outcomes in construction projects. PhD thesis, University of Newcastle, Australia.

Booth, Peter Charles (2023) Digitally integrated material practice: Computational methods of engaging non-standardised plantation hardwood in architecture. PhD thesis, University of Technology Sydney, Australia.

Boyd, N J P (2016) From bicycles to buildings: a SCOT analysis of project level adoption of BIPV. PhD thesis, University of Reading, UK.

Burati, J L; Matthews, M F and Kalidindi, S N (1991) Quality management in construction industry. Journal of Construction Engineering and Management, 117(2), pp. 341-359. ISSN 0733-9364

Campbell, J L (1999) A baseline study of practices and perceptions of marketing and aftermarketing activities among commercial general contractors. PhD thesis, University of Idaho, USA.

Childs, B R; Weidman, J E; Farnsworth, C B and Christofferson, J P (2017) Use of personality profile assessments in the us commercial construction industry. International Journal of Construction Education and Research, 13(4), pp. 267-83. ISSN 1557-8771

Cline, R C (2008) Teaching key competencies of effective construction project managers to adults in higher education. PhD thesis, University of Idaho, USA.

Danforth, E M; Weidman, J E and Farnsworth, C B (2017) Strategies employed and lessons learned by commercial construction companies during economic recession and recovery. Journal of Construction Engineering and Management, 143(7): 04017027, ISSN 0733-9364

Davenport, P and Brand, M C (2013) The effectiveness of time bar clauses following the high court in decision in Andrews v. Australia and New Zealand Banking Group. International Journal of Law in the Built Environment, 5(3), pp. 241-252. ISSN 17561469

Dossick, C S and Neff, G (2010) Organizational divisions in BIM-enabled commercial construction. Journal of Construction Engineering and Management, 136(4), pp. 459-467. ISSN 0733-9364

El-Itr, Z M (1992) Equal business opportunity programs in the construction industry: A framework for development and implementation. PhD thesis, Georgia Institute of Technology, USA.

Everett, J G and Kelly, D L (1998) Drywall joint finishing: Productivity and ergonomics. Journal of Construction Engineering and Management, 124(5), pp. 347-353. ISSN 0733-9364

Farnsworth, C B; South, A J; Barrett-Rodriguez, T J; Wells, M B; Smith, J P and Bingham, E D (2025) Assessing the effects of hurricanes irma and maria on the commercial and civil construction industry in Puerto Rico. International Journal of Construction Education and Research, 21(4), pp. 461-481. ISSN 1557-8771

Farnsworth, C B; Beveridge, S; Miller, K R and Christofferson, J P (2015) Application, advantages, and methods associated with using BIM in commercial construction. International Journal of Construction Education and Research, 11(3), pp. 218-236. ISSN 1557-8771

Garrido Martins, C (2019) Assessment of project risks in fast-track construction projects. PhD thesis, University of New Mexico, USA.

Gatley, D (2004) A critical examination of building contracts in New Zealand: an investigation into the types of building contracts employed ; their formation and administration ; and into the incidence, nature and resolution of disputes resulting from their usage ; in the commercial and residential sectors of the construction industry in New Zealand. PhD thesis, RMIT University, Australia.

Glover, R W (1972) Developing and upgrading minority construction contractors: The Houston and Atlanta experiences. PhD thesis, University of Texas at Austin, USA.

Greenwood, J P (2007) An examination of the performance based building code on the design of a commercial building. Construction Economics and Building, 7(1), pp. 37-44. ISSN 2204-9029

Hamledari, H (2021) Impact assessment of blockchain-enabled smart contracts on the visibility of construction payments. PhD thesis, Stanford University, USA.

Hardie, M; Khan, S; O'Donnell, A and Miller, G (2007) The efficacy of waste management plans in Australian commercial construction refurbishment projects. Construction Economics and Building, 7(2), pp. 26-36. ISSN 2204-9029

Hewage, K N (2007) Construction productivity improvement by worker motivation and it based communication. PhD thesis, University of Calgary, Canada.

Hoekstra, T J (2021) Stakeholders’ perceptions of inefficiencies in commercial construction and development projects in the midwestern United States. PhD thesis, Concordia University Chicago, USA.

Holley, P W (2016) Learning styles and preferences of field managers in U.S. non-residential construction. PhD thesis, Auburn University, USA.

Hubner, Marilyn (2016) Constructing safety training: Foundations of attitudes and perceptions of the construction site supervisor. PhD thesis, Victoria University, Australia.

Katsimpalis, E; Adey, B T and Haas, C T (2026) Automatically transforming virtual realitysimulations into project schedules. Journal of Construction Engineering and Management, 152(6): 04026059, ISSN 0733-9364

Kelly, D and Ilozor, B (2019) A quantitative study of the relationship between project performance and BIM use on commercial construction projects in the USA. International Journal of Construction Education and Research, 15(1), pp. 3-18. ISSN 1557-8771

Kelly, D and Ilozor, B (2022) Performance outcome assessment of the integrated project delivery (IPD) method for commercial construction projects in USA. International Journal of Construction Management, 22(14), pp. 2808-2816. ISSN 1562-3599

Kereri, J O and Adamtey, S (2019) RFID use in residential/commercial construction industry. Journal of Engineering, Design and Technology, 17(3), pp. 591-612. ISSN 1726-0531

Kiziltas, S and Akinci, B (2009) Contextual information requirements of cost estimators from past construction projects. Journal of Construction Engineering and Management, 135(9), pp. 841-852. ISSN 0733-9364

Koo, B and Fischer, M (2000) Feasibility study of 4D CAD in commercial construction. Journal of Construction Engineering and Management, 126(4), pp. 251-260. ISSN 0733-9364

Leathem, T M (2020) Development and evaluation of a model for clarifying acce student learning outcomes. International Journal of Construction Education and Research, 16(1), pp. 43-60. ISSN 1557-8771

Mace, B K (2001) A production control model for commercial construction. PhD thesis, Pennsylvania State University, USA.

McCord, P J and Gunderson, D E (2014) Factors that most affect relationships with general contractors on commercial construction projects: Pacific Northwest subcontractor perspectives. International Journal of Construction Education and Research, 10(2), pp. 126-139. ISSN 1557-8771

Milner, Philip E (2025) A phenomenological study of lean labor method adoption in commercial construction projects. DBA thesis, California Southern University, USA.

Mulholland, S M; Boffy-Ramirez, E and Clevenger, C M (2026) Incentives and effort elicitation in construction contracting: Modeling strategic behavior under DBB and CMR/GMP contracts. Construction Management and Economics, 44(2), pp. 143-158. ISSN 0144-6193

Mulholland, S M (2021) Incentivizing effort in highly collaborative construction and design teams. PhD thesis, University of Colorado at Denver, USA.

Myrvang, R and Liu, C Y A (2025) Beyond traditional methods: Enhancing cost escalation forecasting in commercial construction amid economic turbulence. Journal of Construction Engineering and Management, 151(2): 04024201, ISSN 0733-9364

Naas, J D (1990) Identifying and predicting present and future occupational competencies for commercial construction superintendents in Illinois. PhD thesis, Southern Illinois University at Carbondale, USA.

Omole, O and Ghosh, S (2025) Application of data science in the us commercial construction industry: Current trends and future opportunities. International Journal of Construction Education and Research, 21(1), pp. 50-73. ISSN 1557-8771

Paap, K (1999) Masculinity under construction: Gender, class, and race in the construction industry. PhD thesis, University of Wisconsin - Madison, USA.

Patterson, D A; Farnsworth, C B; Hutchings, D M; Eggett, D L and Weidman, J E (2023) Comparing cost, schedule, and quality of CM/GC and DBB project delivery for repetitive commercial construction. International Journal of Construction Education and Research, 19(2), pp. 166-186. ISSN 1557-8771

Perez, D; Gray, J and Skitmore, M (2017) Perceptions of risk allocation methods and equitable risk distribution: A study of medium to large southeast Queensland commercial construction projects. International Journal of Construction Management, 17(2), pp. 132-141. ISSN 1562-3599

Perreira, A and Rankin, J H (2015) Adoption of knowledge management by Canadian housing charities. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(2), pp. 76-88. ISSN 17514304

Persad, A (2020) Strategies to retain skilled assistant project managers in construction industries. DBA thesis, Walden University, USA.

Rodger, R G (1976) Scottish urban housebuilding, 1870-1914. PhD thesis, University of Edinburgh, UK.

Ríos-Fernández, J C (2022) Thermal performance assessment of cool roofs on supermarkets through case analysis in 13 cities. Engineering, Construction and Architectural Management, 29(2), pp. 739-754. ISSN 0969-9988

Sadeh, H; Mirarchi, C and Pavan, A (2021) Integrated approach to construction risk management: Cost implications. Journal of Construction Engineering and Management, 147(10), ISSN 0733-9364

Senouci, A; Alsarraj, A; Gunduz, M and Eldin, N (2017) Analysis of change orders in Qatari construction projects. International Journal of Construction Management, 17(4), pp. 280-292. ISSN 1562-3599

Smith, J; Edwards, D J; Martek, I; Chileshe, N; Hayhow, S and Roberts, C J (2023) The antecedents of construction project change: An analysis of design and build procurement application. Journal of Engineering, Design and Technology, 21(3), pp. 655-689. ISSN 1726-0531

Sparer, E H (2015) Improving health and safety in construction: The intersection of programs and policies, work organization, and safety climate. DSc thesis, Harvard University, USA.

Suarez, J J (2004) A neural network model to predict business failure in construction companies, in the United States of America. PhD thesis, University of Florida, USA.

Taghaddos, H; Heydari, M H and Asgari, A H (2021) A hybrid simulation approach for site layout planning in construction projects. Construction Innovation, 21(3), pp. 417-440. ISSN 1471-4175

Thomas, H R and Yiakoumls, I (1987) Factor model of construction productivity. Journal of Construction Engineering and Management, 113(4), pp. 623-639. ISSN 0733-9364

Tonimoghadam, F (2021) A predictive model for reducing cost and time for the detection of clashes in residential and commercial constructions projects. DEng thesis, George Washington University, USA.

Torcellini, P; Pless, S and Leach, M (2014) A pathway for net-zero energy buildings: Creating a case for zero cost increase. Building Research & Information, 43(1), pp. 25-33. ISSN 0961-3218

Wang, T-K (2010) An information model for subcontractor resource allocation. PhD thesis, University of Texas at Austin, USA.

Wang, Y; Goodrum, P M; Haas, C T and Glover, R W (2008) Craft training issues in American industrial and commercial construction. Journal of Construction Engineering and Management, 134(10), pp. 795-803. ISSN 0733-9364

Weber, J R (2023) Commercial construction ethical decision making: Authentic case studies. PhD thesis, Colorado State University, USA.

Weidman, J E; Miller, K R; Christofferson, J P and Newitt, J S (2011) Best practices for dealing with price volatility in commercial construction. International Journal of Construction Education and Research, 7(4), pp. 276-293. ISSN 1557-8771

Welfare, K; Sherratt, F and Hallowell, M (2021) Perceptions of construction work: Views to consider to improve employee recruitment and retention. Journal of Construction Engineering and Management, 147(7): 04021053, ISSN 0733-9364

Williams, P (1999) The successful management of air conditioned environments for the construction industry. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Zhu, J (2016) A system-of-systems framework for assessment of resilience in complex construction projects. PhD thesis, Florida International University, USA.

Zolfagharian, S and Irizarry, J (2017) Constructability assessment model for commercial building designs in the United States. Journal of Construction Engineering and Management, 143(8): 04017031, ISSN 0733-9364

This list was generated on Sat Aug 22 01:59:19 2026 UTC.