Items with Index Term: client requirements

Number of items: 72.

Abdalla, S B; Mushtaha, E; Rashid, M; Opoku, A; Hamad, R; Dweiri, F and Elmualim, A (2023) Pre-design CSFs (critical success factors) of building projects for dubai's development boom. Built Environment Project and Asset Management, 13(3), pp. 359-374. ISSN 2044-124X

Adams, J D and Brown, A W (2002) Project management in public sector construction projects: Assessing value for money. Journal of Construction Procurement, 8(2), pp. 84-100. ISSN 1358-9180

Adjei, S D (2016) Review of waste management in the UK construction industry. PhD thesis, University of Wolverhampton, UK.

Akintoye, A and Main, J (2007) Collaborative relationships in construction: The UK contractors' perception. Engineering, Construction and Architectural Management, 14(6), pp. 597-617. ISSN 0969-9988

Aloyce, D; Monko, R J and Luvara, V G M (2024) Critical audit indicators for assessing construction projects performance (CPP) at pre-contract stage in Tanzania. International Journal of Construction Management, 24(5), pp. 530-539. ISSN 1562-3599

Alwisy, A; Bouferguene, A and Al-Hussein, M (2020) Framework for target cost modelling in construction projects. International Journal of Construction Management, 20(2), pp. 89-104. ISSN 1562-3599

Anumba, C J and Evbuomwan, N F O (1997) Concurrent engineering in design-build projects. Construction Management and Economics, 15(3), pp. 271-281. ISSN 01446193

Arab, M Z M (2011) A function-based cost model for early cost advice on new-build schools projects. PhD thesis, Heriot-Watt University, UK.

Attrill, R and Mickovski, S B (2020) Issues to be addressed with current BIM adoption, prior to the implementation of BIM level 3. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Baldauf, J P; Formoso, C T and Tzortzopoulos, P (2021) Method for managing requirements in healthcare projects using building information modelling. Engineering, Construction and Architectural Management, 28(8), pp. 2090-2118. ISSN 0969-9988

Baldwin, A N and McCaffer, R (2000) Identifying research requirements for collaborative design. Journal of Construction Procurement, 6(1), pp. 56-66. ISSN 1358-9180

Bates, William (1999) A strategy for the development of a knowledge based system for predicting out-turn costs of heavy engineering works within a multi-national cost consultancy. PhD thesis, Teesside University, UK.

Castell, L (2005) Empowering the client in the briefing process. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Cheong, S P (2004) Functional briefing for whole life performance. PhD thesis, Loughborough University, UK.

Collinge, W H (2014) Briefing as meaning making practice through signs: client requirement representations and transformations in construction project design. PhD thesis, University of Reading, UK.

Collinge, W H (2017) Client requirement representations and transformations in construction project design. Journal of Engineering, Design and Technology, 15(2), pp. 222-241.

Dowd, V G (1996) The effect of economic cycles on the development and use of alternative procurement systems in the UK construction industry during the period 1965-1995. Journal of Construction Procurement, 2(1), pp. 11-29. ISSN 1358-9180

Ekyalimpa, Ronald (2015) A distributed simulation approach for contractor company performance management in the construction industry. PhD thesis, University of Alberta, Canada.

Forgues, D (2008) Using boundary objects to generate better value in the construction industry. PhD thesis, University of Salford, UK.

Forgues, Daniel (2008) Using boundary objects to generate better value in the construction industry: Interpreting cases from an activity theory perspective. PhD thesis, University of Salford, UK.

Formoso, C; Leite, F and Miron, L (2011) Client requirements management in social housing: A case study on the residential leasing program in Brazil. Journal of Construction in Developing Countries, 16(2), pp. 47-67. ISSN 1823-6499

Frederiksen, N; Gottlieb, S C; de Gier, A; Johansen, P and Sørensen, A S (2022) Understanding the marketing department's role in the social and environmental ventures of construction companies. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Gruneberg, S L; Hughes, W P and Ancell, D J (2007) Risk under performance-based contracting in the UK construction sector. Construction Management and Economics, 25(7), pp. 691-699. ISSN 1466433X

Hansen, K L and Vanegas, J A (2003) Improving design quality through briefing automation. Building Research & Information, 31(5), pp. 379-386. ISSN 0961-3218

Hassan, T M; McCaffer, R O N and Thorpe, T (1999) Emerging clients' needs for large scale engineering projects. Engineering, Construction and Architectural Management, 6(1), pp. 21-29. ISSN 0969-9988

Havenvid, M I; Hulthén, K; Linné, Å and Sundquist, V (2016) Renewal in construction projects: Tracing effects of client requirements. Construction Management and Economics, 34(11), pp. 790-807. ISSN 01446193

Henjewele, C (2010) Modelling client's value for money uncertainties in PFI projects. PhD thesis, University of the West of England, Bristol, UK.

Henjewele, C; Sun, M and Fewings, P (2008) Uncertainties and the challenge of long-term value for money in the delivery of PFI projects. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Henjewele, C; Sun, M and Fewings, P (2011) Value for money optimisation and sustainability in PFI projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Isaac, S and Navon, R (2008) Feasibility study of an automated tool for identifying the implications of changes in construction projects. Journal of Construction Engineering and Management, 134(2), pp. 139-145. ISSN 0733-9364

Jallow, A K (2011) Integrated lifecycle requirements information management in construction. PhD thesis, Loughborough University, UK.

Jallow, A K; Demian, P; Baldwin, A and Anumba, C (2008) Life cycle approach to requirements information management in construction projects: State-of-the-art and future trends. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Kale, S and Arditi, D (2006) Diffusion of ISO 9000 certification in the precast concrete industry. Construction Management and Economics, 24(5), pp. 485-495. ISSN 1466433X

Kamara, J M (2017) Maintaining focus on clients' requirements using the DQI tool: Towards a requirements-oriented project process. Built Environment Project and Asset Management, 7(3), pp. 271-283. ISSN 2044-124X

Kamara, J M; Anumba, C J and Evbuomwan, N F O (2000) Establishing and processing client requirements: A key aspect of concurrent engineering in construction. Engineering, Construction and Architectural Management, 7(1), pp. 15-28. ISSN 0969-9988

Kamara, J M; Anumba, C J and Hobbs, B (1999) From briefing to client requirements processing. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Kao, C-C (2004) The briefing process: an organizational knowledge-creation perspective. PhD thesis, University of Reading, UK.

Karim, J A; Demian, P; Baldwin, A and Anumba, C (2014) An empirical study of the complexity of requirements management in construction projects. Engineering, Construction and Architectural Management, 21(5), pp. 505-531. ISSN 0969-9988

Kartam, N A (1999) Design/construction integration: Issues and illustrative prototype. Engineering, Construction and Architectural Management, 6(3), pp. 299-314. ISSN 0969-9988

Kiviniemi, A (2005) Requirements management interface to building product models. PhD thesis, Stanford University, USA.

Landin, A (2000) Impact of quality management in the Swedish construction process. PhD thesis, Lund University, Sweden.

Lee, C C T and Egbu, C (2005) Capturing client needs in refurbishment projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Ling, F Y Y; Ibbs, C W and Cuervo, J C (2005) Entry and business strategies used by international architectural, engineering and construction firms in China. Construction Management and Economics, 23(5), pp. 509-520. ISSN 01446193

Lingard, H; Wakefield, R and Walker, D (2020) The client's role in promoting work health and safety in construction projects: Balancing contracts and relationships to effect change. Construction Management and Economics, 38(11), pp. 993-1008. ISSN 01446193

Lu, S L (2005) A theory of innovation in small knowledge-intensive professional service firms. PhD thesis, University of Salford, UK.

Maftei, L (2015) The use of immersive virtual reality technology in the design process: a reflective practice approach. PhD thesis, University of Reading, UK.

Maftei, L and Harty, C F (2012) Exploring cave: Using immersive environments for design work. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Murphy, M E (2014) Implementing innovation: A stakeholder competency-based approach for BIM. Construction Innovation, 14(4), pp. 433-452. ISSN 1471-4175

Olivera, E L; Booth, C; Agyekum, K; Al-Tarazi, D and Pittri, H (2024) A phenomenological inquiry of Building Information Modelling macro-adoption in Uruguay. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(3), pp. 137-149. ISSN 17514304

Omar, M R; Ayob, A; Zakaria, M H; Rahim, N S A; Mokhtar, H; Rani, H A and Rahman, F A (2023) Perspective of construction building professionals on low-carbon materials in Malaysia. Journal of Construction in Developing Countries, 28(2), pp. 139-162. ISSN 1823-6499

Omopariola, E D; Olugboyega, O; Windapo, A O and Albert, I (2022) Establishing the cost and time performances of projects executed by South African construction companies using different payment systems. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Othman, A A E (2004) Value and risk management for dynamic brief development in construction. PhD thesis, Loughborough University, UK.

Othman, A A E and El-Saeidy, Y A (2024) Early supplier involvement framework for reducing construction waste during the design process. Journal of Engineering, Design and Technology, 22(2), pp. 578-597. ISSN 1726-0531

Pellicer, E; Yepes, V; Correa, C L and Alarcón, L F (2014) Model for systematic innovation in construction companies. Journal of Construction Engineering and Management, 140(4): B4014001, ISSN 0733-9364

Prince, R F A (2011) The construction briefing process: evaluating the influence of personality traits on the performance of the consultant project manager. PhD thesis, Heriot-Watt University, UK.

Schade, J (2013) A design process perspective on the energy performance of buildings. PhD thesis, Luleå University of Technology, Sweden.

Schweber, L. and Green, M. (2026) Negotiating net-zero carbon: An ant analysis of two buildings. Buildings & Cities, 7(1), pp. 791-807. ISSN 2632-6655

Sha'ar, K. Z.; Assaf, S. A.; Bambang, T.; Babsail, M. and Fattah, A. M. A. E. (2017) Design-construction interface problems in large building construction projects. International Journal of Construction Management, 17(3), pp. 238-250. ISSN 1562-3599

Sha'ar, K Z; Assaf, S A; Bambang, T; Babsail, M and Fattah, A M A E (2017) Design–construction interface problems in large building construction projects. International Journal of Construction Management, 17(3), pp. 238-250. ISSN 1562-3599

Shahrin, F and Udeaja, C (2019) Evaluation of the challenges in using building information modelling to improve client’s requirements delivery. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Shen, Q; Li, H; Chung, J and Hui, P Y (2004) A framework for identification and representation of client requirements in the briefing process. Construction Management and Economics, 22(2), pp. 213-221. ISSN 01446193

Shipton, C (2013) Making changes: an ethnography of client changes on a construction project. PhD thesis, University of Reading, UK.

Shipton, C; Hughes, W P and Tutt, D (2014) Change management in practice: An ethnographic study of changes to contract requirements on a hospital project. Construction Management and Economics, 32(7-8), pp. 787-803. ISSN 01446193

Shipton C, H W P (2013) Making changes in practice: An ethnographic study of a hospital project. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Sutrisna, M and Goulding, J (2019) Managing information flow and design processes to reduce design risks in offsite construction projects. Engineering, Construction and Architectural Management, 26(2), pp. 267-284. ISSN 0969-9988

Thomson, D (2011) A pilot study of client complexity, emergent requirements and stakeholder perceptions of project success. Construction Management and Economics, 29(1), pp. 69-82. ISSN 1466433X

Tuuli, M M and Rowlinson, S (2007) Towards a conceptual framework of empowerment and job performance in project teams. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Vahabi, A; Nasirzadeh, F and Mills, A (2023) Assessing the impact of project brief clarity using project definition rating index tool and system dynamic. Engineering, Construction and Architectural Management, 30(2), pp. 697-713. ISSN 0969-9988

Yu, A; Shen, Q P; Kelly, J and Hunter, K (2004) Development of a value management framework for the formation of project briefs. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Yu, A T W; Shen, Q; Kelly, J and Hunter, K (2008) Comparative study of the variables in construction project briefing/architectural programming. Journal of Construction Engineering and Management, 134(2), pp. 122-138. ISSN 0733-9364

Yu, A T W; Shen, Q; Kelly, J and Lin, G (2006) A value management approach to strategic briefing: An exploratory study. Architectural Engineering and Design Management, 2(4), pp. 245-259. ISSN 1745-2007

Yu, T W (2007) A value management framework for systematic identification and precise representation of client requirements in the briefing process. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

This list was generated on Sat Aug 22 01:41:15 2026 UTC.