Items with Index Term: claim management
Abdelalim, A M; Salem, M; Al-Sabah, R; Said, S O; ElShafei, H M and Galal Badawy, M (2025) Optimizing claim management process groups to enhance construction project success. International Journal of Construction Management, 25(13), pp. 1583-1595. ISSN 1562-3599
Ali, B; Aibinu, A A and Paton-Cole, V (2024) Closing the information gaps: A systematic review of research on delay and disruption claims. Construction Innovation, 24(3), pp. 790-810. ISSN 1471-4175
Asadi, R; Rotimi, J O B and Wilkinson, S (2023) Analyzing underlying factors of rework in generating contractual claims in construction projects. Journal of Construction Engineering and Management, 149(6): 04023036, ISSN 0733-9364
Cevikbas, M; Okudan, O and Işık, Z (2024) Identification and assessment of disruption claim management risks in construction projects: A life cycle-based approach. Engineering, Construction and Architectural Management, 31(1), pp. 1-27. ISSN 0969-9988
Chaphalkar, N and Iyer, K C (2014) Factors influencing decisions on delay claims in construction contracts for Indian scenario. Construction Economics and Building, 14(1), pp. 32-44. ISSN 2204-9029
Dağkıran, G (2015) A multi agent risk analysis and sharing platform for international construction projects. PhD thesis, Middle East Technical University, Turkey.
Enshassi, A; Mohamed, S and El-Ghandour, S (2009) Problems associated with the process of claim management in Palestine: Contractors' perspective. Engineering, Construction and Architectural Management, 16(1), pp. 61-72. ISSN 0969-9988
Kululanga, G K; Kuotcha, W; McCaffer, R and Edum-Fotwe, F (2001) Construction contractors' claim process framework. Journal of Construction Engineering and Management, 127(4), pp. 309-314. ISSN 0733-9364
Kumar, R (2020) Risk management framework for construction projects aligned to actualities. PhD thesis, Indian Institute of Technology Delhi, India.
Kumar, R; Iyer, K C and Singh, S P (2021) Understanding relationship between risks and claims for assessing risks with project data. Engineering, Construction and Architectural Management, 28(4), pp. 1014-1037. ISSN 0969-9988
Le-Hoai, L; Dang, C N; Lee, S B and Lee, Y D (2019) Benchmarking claim causes against contractors in emerging markets: Empirical case study. International Journal of Construction Management, 19(4), pp. 307-316. ISSN 1562-3599
Li, J; Mao, L and Cao, J (2025) Process model for claim and payment management in a construction supply chain based on smart contracts. Journal of Construction Engineering and Management, 151(11): 04025172, ISSN 0733-9364
Mehany, M S H M (2014) Delay-caused claims in infrastructure projects under design-bid-build delivery systems. PhD thesis, Colorado State University, USA.
Mirzaee, A M and Martek, I (2025) Improving project management "closeout" phase outcomes: Evidence from a large general contractor in Iran using "x-inefficiency theory". Engineering, Construction and Architectural Management, 32(8), pp. 5253-5271. ISSN 0969-9988
Mirzaee, A M and Martek, I (2026) Utilizing multiple intelligences as a means to improving claim performance outcomes in project-based organizations. Engineering, Construction and Architectural Management, 33(1), pp. 532-551. ISSN 0969-9988
Nosheen, A (2022) Development of an effective claim management framework for the UK construction industry. PhD thesis, Coventry University, UK.
Okudan, O; Cevikbas, M and Işık, Z (2025) Selection framework of disruption analysis methods for megaprojects: An integrated fuzzy multi-criteria decision-making approach. Engineering, Construction and Architectural Management, 32(1), pp. 59-86. ISSN 0969-9988
Olanrewaju, A A and Anavhe, P J (2014) Perceived claim sources in the Nigerian construction industry. Built Environment Project and Asset Management, 4(3), pp. 281-295. ISSN 2044-124X
Pan, J; Anumba, C J and Ren, Z (2004) Potential application of the semantic web in construction. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Parchami Jalal, M; Yavari Roushan, T; Noorzai, E and Alizadeh, M (2020) A BIM-based construction claim management model for early identification and visualization of claims. Smart and Sustainable Built Environment, 10(2), pp. 227-257. ISSN 2046-6099
Parchamijalal, M; Moradi, S and Zabihi Shirazi, M (2023) Claim management office maturity model (cmomm) in project-oriented organizations in the construction industry. Engineering, Construction and Architectural Management, 30(1), pp. 74-104. ISSN 0969-9988
Sami Ur Rehman, M; Shafiq, M T; Ullah, F and Galal Ahmed, K (2023) A critical appraisal of traditional methods of construction progress monitoring. Built Environment Project and Asset Management, 13(6), pp. 830-845. ISSN 2044-124X
Shahhosseini, V and Hajarolasvadi, H (2021) A conceptual framework for developing a BIM-enabled claim management system. International Journal of Construction Management, 21(2), pp. 208-222. ISSN 1562-3599
Up a level