Items with Index Term: cash flow

Number of items: 280.

Abas, M; Khattak, S B; Habib, T and Nadir, U (2022) Assessment of critical risk and success factors in construction supply chain: A case of Pakistan. International Journal of Construction Management, 22(12), pp. 2258-2266. ISSN 1562-3599

Abdi, A; Lind, H and Birgisson, B (2013) Payment mechanisms for winter road maintenance services. Construction Economics and Building, 13(4), pp. 18-31. ISSN 2204-9029

Abujnah, M S (2010) Towards a risk management framework for Libyan house-building projects. PhD thesis, University of Salford, UK.

Abuzaid, G (2010) Determining the competitiveness of UK's consulting engineering firms through the dynamic capabilities view. PhD thesis, University of Reading, UK.

Adafin, J; Rotimi, J O B and Wilkinson, S (2016) Risk impact assessments in project budget development: Architects' perspectives. Architectural Engineering and Design Management, 12(3), pp. 189-204. ISSN 1745-2007

Adinyira, E; Adjei, E A G; Agyekum, K and Fugar, F D K (2021) Application of machine learning in predicting construction project profit in Ghana using support vector regression algorithm (svra). Engineering, Construction and Architectural Management, 28(5), pp. 1491-1514. ISSN 0969-9988

Aibinu, A A and Papadonikolaki, E (2020) Conceptualizing and operationalizing team task interdependences: BIM implementation assessment using effort distribution analytics. Construction Management and Economics, 38(5), pp. 420-446. ISSN 01446193

Aje, O I; Olatunji, O A and Olalusi, O A (2017) Overrun causations under advance payment regimes. Built Environment Project and Asset Management, 7(1), pp. 86-98. ISSN 2044-124X

Akintoye, A; Renukappa, S and Lal, H (2012) The abolition of the contracts in writing rule in the 2009 Construction Act: Potential implications for UK adjudication. International Journal of Law in the Built Environment, 4(2), pp. 140-156. ISSN 1756-1450

Akintoye, A and Sommerville, J (1995) Distributed lag relationships between UK construction orders and output. Construction Management and Economics, 13(1), pp. 33-42. ISSN 01446193

Akunyumu, S; Fugar, F and Adinyira, E (2024) Evaluation of risks affecting international construction joint venture (ICJV) projects in Ghana. Journal of Engineering, Design and Technology, 22(6), pp. 1797-1824. ISSN 1726-0531

Al-Sharif, F and Kaka, A (2005) Private finance intiative project's financial modelling. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Al-Sharif, F F A (2007) Financial model for private finance initiative projects applied to school buildings. PhD thesis, Heriot-Watt University, UK.

Alaka, H A; Oyedele, L O; Owolabi, H A; Oyedele, A A; Akinade, O O; Bilal, M and Ajayi, S O (2017) Critical factors for insolvency prediction: Towards a theoretical model for the construction industry. International Journal of Construction Management, 17(1), pp. 25-49. ISSN 1562-3599

Alavipour, S M R and Arditi, D (2018) Optimizing financing cost in construction projects with fixed project duration. Journal of Construction Engineering and Management, 144(4): 04018012, ISSN 0733-9364

Alhosani, Y (2017) An empirical investigation of the demographics of top management team (TMT) and its influence in forecasting organizational outcome in international architecture, engineering and construction (AEC) firms: A fuzzy set approach. DEng thesis, Ecole de Technologie Superieure, Canada.

Ali, M M and Elazouni, A (2009) Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities. Construction Management and Economics, 27(9), pp. 839-856. ISSN 1466433X

Alinaitwe, H; Apolot, R and Tindiwensi, D (2013) Investigation into the causes of delays and cost overruns in Uganda's public sector construction projects. Journal of Construction in Developing Countries, 18(2), pp. 33-47. ISSN 1823-6499

Alzoubi, Y; Locatelli, G and Tristano, S (2024) The ugly side of construction: Modern slavery in the 2022 fifa world cup program. Construction Management and Economics, 42(5), pp. 412-430. ISSN 01446193

Aminuddin, F A B (2019) The compatibility of dispute resolution mechanisms with national culture in the construction industry: a case study of the Malaysian statutory adjudication regime. PhD thesis, University of Salford, UK.

Amoah, C; Bamfo-Agyei, E and Simpeh, F (2022) The COVID-19 pandemic: The woes of small construction firms in Ghana. Smart and Sustainable Built Environment, 11(4), pp. 1099-1115. ISSN 2046-6099

Andalib, R; Hoseini, A and Gatmiri, B (2018) A stochastic model of cash flow forecasting considering delays in owners' payments. Construction Management and Economics, 36(10), pp. 545-564. ISSN 01446193

Arboleda, C A and Abraham, D M (2006) Evaluation of flexibility in capital investments of infrastructure systems. Engineering, Construction and Architectural Management, 13(3), pp. 254-274. ISSN 0969-9988

Arman, M H R (2014) Using option theory to manage risks in highway winter operations. PhD thesis, Purdue University, USA.

Asadujjaman, Md (2023) Planning and scheduling supply chain integrated projects. PhD thesis, University of New South Wales, Australia.

Assaad, R H; Jezzini, Y and Assaf, G (2026) Proposing and exploring integrated trade delivery as a new project delivery method: Assessing the drivers and barriers to its implementation in construction projects. Journal of Construction Engineering and Management, 152(1): 04025215, ISSN 0733-9364

Awad, A M (2005) The interaction between project finance of a large-scale construction project and macroeconomic indicators and policies. PhD thesis, University of Nottingham, UK.

Awodele, O A; Aghimien, D O; Akinkunmi, O G and Aigbavboa, C O (2019) Labour-only procurement: A veritable surviving strategy for contractors in a challenging economy. Journal of Engineering, Design and Technology, 17(2), pp. 347-361. ISSN 1726-0531

Balatbat, M C A; Lin, C Y and Carmichael, D G (2011) Management efficiency performance of construction businesses: Australian data. Engineering, Construction and Architectural Management, 18(2), pp. 140-158. ISSN 0969-9988

Barbosa, P S F and Pimentel, P R (2001) A linear programming model for cash flow management in the Brazilian construction industry. Construction Management and Economics, 19(5), pp. 469-479. ISSN 01446193

Bell, L C and Stukhart, G (1986) Attributes of materials management systems. Journal of Construction Engineering and Management, 112(1), pp. 14-21. ISSN 0733-9364

Bell, L C and Stukhart, G (1987) Costs and benefits of materials management systems. Journal of Construction Engineering and Management, 113(2), pp. 222-234. ISSN 0733-9364

Bennett, J and Ormerod, R N (1984) Simulation applied to construction projects. Construction Management and Economics, 2(3), pp. 225-263. ISSN 01446193

Beran, V and Dlask, P (2007) Nonlinear optimisation and rational cash flow. Engineering, Construction and Architectural Management, 14(3), pp. 277-292. ISSN 0969-9988

Bikitsha, L and Amoah, C (2022) Assessment of challenges and risk factors influencing the operation of emerging contractors in the Gauteng province, South Africa. International Journal of Construction Management, 22(11), pp. 2027-2036. ISSN 1562-3599

Blyth, K and Kaka, A (1999) The industry's view of stage payments and the Latham recommendations. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Blyth, K and Kaka, A (2006) A novel multiple linear regression model for forecasting S-curves. Engineering, Construction and Architectural Management, 13(1), pp. 82-95. ISSN 0969-9988

Blyth, K; Lewis, J and Kaka, A (2004) Developing a framework for a standardized works programme for building projects. Construction Innovation, 4(4), pp. 193-210. ISSN 1471-4175

Blyth, K A (2002) A computer model that forecasts the cash flow of building projects at the tender stage using stage payments. PhD thesis, University of Liverpool, UK.

Boateng, P; Ahiaga-Dagbui, D; Chen, Z and Ogunlana, S (2015) Modelling economic risks in megaproject construction: A systemic approach. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Boussabaine, A H and Elhag, T (1999) Applying fuzzy techniques to cash flow analysis. Construction Management and Economics, 17(6), pp. 745-755. ISSN 01446193

Cao, Q; Zou, X and Zhang, L (2022) Multiobjective robust optimization model for generating stable and makespan-protective repetitive schedules. Journal of Construction Engineering and Management, 148(9): 04022099, ISSN 0733-9364

Carmichael, D G and Balatbat, M C A (2008) The influence of extra projects on overall investment feasibility. Journal of Financial Management of Property and Construction, 13(3), pp. 161-175. ISSN 1366-4387

Carmichael, D G and Balatbat, M C A (2010) A contractor's analysis of the likelihood of payment of claims. Journal of Financial Management of Property and Construction, 15(2), pp. 102-117. ISSN 1366-4387

Carmichael, D G; Nguyen, T A and Shen, X (2019) Single treatment of PPP road project options. Journal of Construction Engineering and Management, 145(2): 04018122, ISSN 0733-9364

Cattell, D W (2012) An overview of component unit pricing theory. Construction Management and Economics, 30(1), pp. 81-92. ISSN 1466433X

Cevikcan, E and Kose, Y (2021) Optimization of profitability and liquidity for residential projects under debt and equity financing. Built Environment Project and Asset Management, 11(2), pp. 369-391. ISSN 2044-124X

Cheetham, D W; Kaka, A P and Humphreys, G (1997) Development and implementation of a system of financial planning and control for a medium sized building contractor. Journal of Financial Management of Property and Construction, 2(1), pp. 5-34. ISSN 1366-4387

Chen, H L; O'Brien, W J and Herbsman, Z J (2005) Assessing the accuracy of cash flow models: The significance of payment conditions. Journal of Construction Engineering and Management, 131(6), pp. 669-676. ISSN 0733-9364

Chiang, Y H; Cheng, E W L and Lam, P T I (2010) Employing the net present value-consistent IRR methods for PFI contracts. Journal of Construction Engineering and Management, 136(7), pp. 811-814. ISSN 0733-9364

Christodoulou, S E (2008) A bid-unbalancing method for lowering a contractor's financial risk. Construction Management and Economics, 26(12), pp. 1291-1302. ISSN 1466433X

Chung, J H (2015) Optimizing financial structure of transportation public-private partnership infrastructure projects based on traffic revenue risks: Case study of US DBFOM project. PhD thesis, University of Florida, USA.

Clapp, D; Shuler, S; Nobe, M D; Demiranda, M and Nobe, M E C (2007) Capital equipment acquisition in heavy construction. International Journal of Construction Education and Research, 3(3), pp. 159-178. ISSN 1557-8771

Coggins, J; Elliott, R F and Bell, M (2010) Towards harmonisation of construction industry payment legislation: A consideration of the success afforded by the East and West coast models in Australia. Construction Economics and Building, 10(3), pp. 14-35. ISSN 2204-9029

Crandell, D (2018) Enhancing traditional earned value management with three-point estimates to produce probability based performance forecasts and contingency funding projections for engineering-construction projects. DEngr thesis, George Washington University, USA.

Cui, Q; Hastak, M and Halpin, D (2010) Systems analysis of project cash flow management strategies. Construction Management and Economics, 28(4), pp. 361-376. ISSN 1466433X

D'Amato, M and Kauko, T (2012) Sustainability and risk premium estimation in property valuation and assessment of worth. Building Research & Information, 40(2), pp. 174-185. ISSN 0961-3218

Dabirian, S; Ahmadi, M and Abbaspour, S (2023) Analyzing the impact of financial policies on construction projects performance using system dynamics. Engineering, Construction and Architectural Management, 30(3), pp. 1201-1221. ISSN 0969-9988

Das, D K and Emuze, F (2017) A dynamic model of contractor-induced delays in India. Journal of Construction in Developing Countries, 22(1), pp. 21-39. ISSN 1823-6499

Dayanand, N (1996) Scheduling payments in projects: An optimization framework. PhD thesis, Carnegie Mellon University, USA.

Deng, B; Lv, X; Du, Y; Li, X and Yin, Y (2025) Critical risk factors for construction supply chain in China: A fuzzy synthetic evaluation analysis. Engineering, Construction and Architectural Management, 32(1), pp. 483-506. ISSN 0969-9988

Deng, F (2004) Expert and decision-support system approaches for construction project financing and cash flow management for large infrastructure projects. PhD thesis, State University of New York at Buffalo, USA.

Dong, F (2010) Essays in advanced risk management and quantitative strategies in infrastructure finance. PhD thesis, Columbia University, USA.

Donyavi, S; Flanagan, R; Assadi-Langroudi, A and Parisi, L (2024) Understanding the complexity of materials procurement in construction projects to build a conceptual framework influencing supply chain management of msmes. International Journal of Construction Management, 24(2), pp. 177-186. ISSN 1562-3599

Dorrah, D H (2024) Development of integrated decision support framework for payment management and negotiation in construction projects. PhD thesis, University of Toronto, Canada.

Durdyev, S and Mbachu, J (2018) Key constraints to labour productivity in residential building projects: Evidence from Cambodia. International Journal of Construction Management, 18(5), pp. 385-393. ISSN 1562-3599

Dzeng, R J and Wu, J S (2013) Efficiency measurement of the construction industry in Taiwan: A stochastic frontier cost function approach. Construction Management and Economics, 31(4), pp. 335-344. ISSN 1466433X

Egger, H S (1986) Business techniques and skills utilized by small residential contractors with one to four employees in six high growth areas of Texas. EdD thesis, Texas A&M University, USA.

Ehrlich, M; Woodward, D and Tiong, R (2012) A state-of-practice survey on managing fx exposure in project companies, construction companies and SMEs. Journal of Financial Management of Property and Construction, 17(1), pp. 29-48. ISSN 1366-4387

Elazouni, A (2009) Heuristic method for multi-project finance-based scheduling. Construction Management and Economics, 27(2), pp. 199-211. ISSN 1466433X

Elbeltagi, E; Ammar, M; Sanad, H and Kassab, M (2016) Overall multiobjective optimization of construction projects scheduling using particle swarm. Engineering, Construction and Architectural Management, 23(3), pp. 265-282. ISSN 0969-9988

Elghaish, F; Abrishami, S; Abu Samra, S; Gaterell, M; Hosseini, M R and Wise, R (2021) Cash flow system development framework within integrated project delivery (IPD) using BIM tools. International Journal of Construction Management, 21(6), pp. 555-570. ISSN 1562-3599

Elghaish, F A K (2020) An automated IPD cost management system: BIM and blockchain based solution. PhD thesis, University of Portsmouth, UK.

Elsherif, E M (2007) A decision aid model for the selection of appropriate payment and pricing systems for construction projects. PhD thesis, Heriot-Watt University, UK.

Evans, R C (2002) Dynamic cash flow forecasting model for construction contractors. PhD thesis, University of Liverpool, UK.

Evans, R C; Kaka, A P and Lewis, J (1997) Adopting a semi-ideographic approach to cash flow forecasting. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Fahmy, A; Hassan, T; Bassioni, H and McCaffer, R (2020) Dynamic scheduling model for the construction industry. Built Environment Project and Asset Management, 10(3), pp. 313-330. ISSN 2044-124X

Fares, A; Elazouni, A and Al-Alawi, M (2025) Using game theory to negotiate win-win payment terms between contractors and subcontractors. Journal of Construction Engineering and Management, 151(5): 04025023, ISSN 0733-9364

Farid, F (1990) Pricing construction contracts under Tax Reform Act of 1986. Journal of Construction Engineering and Management, 116(2), pp. 300-315. ISSN 0733-9364

Felllows, R F (1988) Escalation management. PhD thesis, University of Reading, UK.

Fellows, R F (1991) Escalation management: Forecasting the effects of inflation on building projects. Construction Management and Economics, 9(2), pp. 187-204. ISSN 01446193

Fu, X (2010) Refinancing and restructuring projects utilising project finance in developing countries. PhD thesis, University of Manchester, UK.

Gajpal, Y; Islam, M A and Elazouni, A (2026) Towards competitive contractors' bids: Optimizing selections of subcontractors and payment lags using branch and bound algorithm. Construction Management and Economics, 44(4), pp. 260-278. ISSN 0144-6193

Gambo, N; Said, I and Ismail, R (2016) Influences of cost factors affecting technical performance of local government projects in Nigeria: A partial least square-structural equation modeling approach. Journal of Construction in Developing Countries, 21(1), pp. 85-111. ISSN 1823-6499

Gambo, N; Said, I and Ismail, R (2017) Mediation model for improving cost factors that affect performance of small-scale building construction contract business in Nigeria: A PLS-SEM approach. International Journal of Construction Education and Research, 13(1), pp. 24-46. ISSN 1557-8771

Gamil, Y and Abdul Rahman, I (2020) Assessment of critical factors contributing to construction failure in Yemen. International Journal of Construction Management, 20(5), pp. 429-436. ISSN 1562-3599

Gori, E (1996) Portfolio selection of capital investment projects in the Durban Metropolitan Region. Construction Management and Economics, 14(5), pp. 451-456. ISSN 01446193

Green, S D (1989) Tendering: Optimization and rationality. Construction Management and Economics, 7(1), pp. 53-63. ISSN 01446193

Gumusburun Ayalp, G and Çivici, T (2023) Factors affecting the performance of construction industry during the COVID-19 pandemic: A case study in Turkey. Engineering, Construction and Architectural Management, 30(8), pp. 3160-3202. ISSN 0969-9988

Guo, Q L (2001) Development of risk analysis models for decision-making in project management. PhD thesis, Edinburgh Napier University, UK.

Guo, Y; Liu, J; Chen, C; Luo, X and Martek, I (2024) PPP project price mode typologies: A China-based comparative case study. Engineering, Construction and Architectural Management, 31(5), pp. 2034-2052. ISSN 0969-9988

Guo, Y; Su, Y; Chen, C and Martek, I (2024) Inclusion of "managing flexibility" valuations in the pricing of PPP projects: A multi-objective decision-making method. Engineering, Construction and Architectural Management, 31(11), pp. 4562-4584. ISSN 0969-9988

Halim, M S A; Jaafar, M; Osman, O and Shariff Haniff, M (2012) Financial ratio analysis: An assessment of Malaysian contracting firms. Journal of Construction in Developing Countries, 17(S1), pp. 71-78. ISSN 1823-6499

Hamledari, H (2021) Impact assessment of blockchain-enabled smart contracts on the visibility of construction payments. PhD thesis, Stanford University, USA.

Hassim, S; Kadir, M R A; Lew, Y L and Sim, Y C (2003) Estimation of minimum working capital for construction projects in Malaysia. Journal of Construction Engineering and Management, 129(4), pp. 369-374. ISSN 0733-9364

Hawas, F and Cifuentes, A (2014) Valuation of projects with stochastic cash flows and intertemporal correlations: Practical modeling guidelines. Journal of Construction Engineering and Management, 140(6): 6014003, ISSN 0733-9364

Hegazy, T and Moselhi, O (1994) Estimator: A prototype of an integrated bid preparation system. Engineering, Construction and Architectural Management, 1(1), pp. 51-67. ISSN 0969-9988

Hegazy, T M (1994) Integrated bid preparation with emphases on risk assessment using neural networks. PhD thesis, Concordia University, Canada.

Hong-minh, S M T (2002) Re-engineering the UK private house building supply chain. PhD thesis, University of Wales College of Cardiff, UK.

Huang, W H; Tserng, H P; Jaselskis, E J and Lee, S Y (2014) Dynamic threshold cash flow-based structural model for contractor financial prequalification. Journal of Construction Engineering and Management, 140(10): 04014047, ISSN 0733-9364

Ibrahim, W A B (2016) Regulatory framework for adjudicators in the Malaysian construction industry. PhD thesis, University of Strathclyde, UK.

Ibrahim, Y M (2010) On the measurement of work in progress using computer vision: A computerised reporting model. Journal of Engineering, Design and Technology, 8(1), pp. 45-63. ISSN 1726-0531

Ikediashi, D I and Okolie, K C (2022) An assessment of risks associated with contractor's cash flow projections in South-South, Nigeria. International Journal of Construction Management, 22(11), pp. 2051-2058. ISSN 1562-3599

Ioannou, P G (1989) Dynamic probabilistic decision processes. Journal of Construction Engineering and Management, 115(2), pp. 237-257. ISSN 0733-9364

Islam, M M and Mohamed, S (2009) Bid-winning potential optimization for concession schemes with imprecise investment parameters. Journal of Construction Engineering and Management, 135(8), pp. 690-700. ISSN 0733-9364

Islam, Md Mainul M (2009) Optimizing concessionary items' values for procuring privately financed infrastructure projects. PhD thesis, Griffith University, Australia.

Ismail, I A (2014) Financial cash flow determinants of company failure in the construction industry. PhD thesis, University of Michigan, USA.

Jagannathan, M and Delhi, V S K (2023) Decoding a construction organisation's tendency to litigate: An understanding through financial statements. Built Environment Project and Asset Management, 13(3), pp. 453-470. ISSN 2044-124X

Jagboro, G O (1998) The effect of payment for advance purchase of building materials on contractor's cash-flow projections. Journal of Financial Management of Property and Construction, 3(3), pp. 71-83. ISSN 1366-4387

Jarrah, R; Kulkarni, D and O'Connor, J T (2007) Cash flow projections for selected TxDoT highway projects. Journal of Construction Engineering and Management, 133(3), pp. 235-241. ISSN 0733-9364

Javid, M and Seneviratne, P N (2000) Investment risk analysis in airport parking facility development. Journal of Construction Engineering and Management, 126(4), pp. 298-305. ISSN 0733-9364

Jiang, A (2012) Negotiating construction contracts through practical cash flow planning and analysis model. International Journal of Construction Management, 12(2), pp. 23-33. ISSN 1562-3599

Kaka, A and Lewis, J (2003) Development of a company-level dynamic cash flow forecasting model. Construction Management and Economics, 21(7), pp. 693-705. ISSN 01446193

Kaka, A and Price, A D F (1991) Relationship between value and duration of construction projects. Construction Management and Economics, 9(4), pp. 383-400. ISSN 01446193

Kaka, A P (1996) Towards more flexible and accurate cash flow forecasting. Construction Management and Economics, 14(1), pp. 35-44. ISSN 01446193

Kaka, A P (1996) Decision support system for plant-hirers' financial strategies. Journal of Financial Management of Property and Construction, 1(1), pp. 21-36. ISSN 1366-4387

Kaka, A P (2001) Turnover forecasting for contracting companies based on published information. Journal of Financial Management of Property and Construction, 6(3), pp. 217-229. ISSN 1366-4387

Kaka, A P (2001) The case for re-engineering contract payment mechanisms. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Kaka, A P and Boussabaine, A H (1999) Updating techniques for cumulative cost forecasting on construction projects. Journal of Construction Procurement, 5(2), pp. 141-158. ISSN 1358-9180

Kaka, A P and Cheetham, D W (1997) The effect of some tendering and payment strategies on contractors' financial performance. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Kaka, A P and Fortune, C (2002) Net cash flow models: Towards the black box approach. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Kaka, A P and Khosrowshahi, F (1996) Effect of different procurement routes on contractors' cash flows. Engineering, Construction and Architectural Management, 3(1-2), pp. 133-145. ISSN 0969-9988

Kaka, A P and Khosrowshahi, F (2009) A mathematical-based model for company-level budgeting incorporating future unknown contracts. Engineering, Construction and Architectural Management, 16(1), pp. 48-60. ISSN 0969-9988

Kaka, A P and Price, A D F (1991) Net cashflow models: Are they reliable? Construction Management and Economics, 9(3), pp. 291-308. ISSN 01446193

Kaka, A P and Price, A D F (1993) Modelling standard cost commitment curves for contractors' cash flow forecasting. Construction Management and Economics, 11(4), pp. 271-283. ISSN 01446193

Kawal, D E (1970) A systems model of a construction firm. PhD thesis, Iowa State University, USA.

Kazar, G (2025) A data-driven approach for predicting cash flow performance of public owners in building projects: Insights from Turkish cases. Engineering, Construction and Architectural Management, 32(11), pp. 7507-7538. ISSN 0969-9988

Kenley, R (1999) Cash farming in building and construction: A stochastic analysis. Construction Management and Economics, 17(3), pp. 393-401. ISSN 01446193

Kenley, R (2001) In-project end-date forecasting: An idiographic, deterministic approach, using cash-flow modelling. Journal of Financial Management of Property and Construction, 6(3), pp. 209-216. ISSN 1366-4387

Kenley, R and Wilson, O D (1986) A construction project cash flow model: an idiographic approach. Construction Management and Economics, 4(3), pp. 213-232. ISSN 01446193

Kenley, R and Wilson, O D (1989) A construction project net cash flow model. Construction Management and Economics, 7(1), pp. 3-18. ISSN 01446193

Kenley, Russell (1986) Construction project cash flow modelling. PhD thesis, University of Melbourne, Australia.

Kern, A P and Formoso, C T (2006) A model for integrating cost management and production planning and control in construction. Journal of Financial Management of Property and Construction, 11(2), pp. 75-90. ISSN 1366-4387

Khalid, M A; Hassan, M U; Ullah, F and Ahmed, K (2025) Integrated building information modeling and blockchain system for decentralized progress payments in construction projects. Journal of Engineering, Design and Technology, 23(5), pp. 1770-1796. ISSN 1726-0531

Khosrowshahi, F (1996) Value profile analysis of contruction projects. Journal of Financial Management of Property and Construction, 1(1), pp. 55-76. ISSN 1366-4387

Khosrowshahi, F (2000) A radical approach to risk in project financial management. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Khosrowshahi, F (2001) Project cash flow forecasting: A mathematical approach. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Kim, B C and Reinschmidt, K F (2011) Combination of project cost forecasts in earned value management. Journal of Construction Engineering and Management, 137(11), pp. 958-966. ISSN 0733-9364

Kim, C S and Liu, L Y (2007) Cost information model for managing multiple projects. Journal of Construction Engineering and Management, 133(12), pp. 966-974. ISSN 0733-9364

Kishore, V; Abraham, D M and Sinfield, J V (2011) Portfolio cash assessment using fuzzy systems theory. Journal of Construction Engineering and Management, 137(5), pp. 333-343. ISSN 0733-9364

Konno, Y (2014) An empirical analysis of the exit of SMEs tendering for public works in the Japanese construction industry. Journal of Financial Management of Property and Construction, 19(2), pp. 101-116. ISSN 1366-4387

Kumar, R (2020) Risk management framework for construction projects aligned to actualities. PhD thesis, Indian Institute of Technology Delhi, India.

Kumar Sharma, R and Bhalla, N (2025) Enlightening the critical factors affecting the solvency of Indian construction industry: An empirical analysis using multivariate discriminant analysis and logistic regression. Construction Economics and Building, 25(2), pp. 276-302. ISSN 2204-9029

Kurniawan, F (2013) An integrated project evaluation tool for public-private partnership projects. PhD thesis, Heriot-Watt University, UK.

Kurniawan, F; Ogunlana, S and Motawa, I (2014) Stakeholders' expectations in utilising financial models for public-private partnership projects. Built Environment Project and Asset Management, 4(1), pp. 4-21. ISSN 2044-124X

Lam, K A and Runeson, G (1999) Modelling financial decisions in construction firms. Construction Management and Economics, 17(5), pp. 589-602. ISSN 01446193

Lam, K C; Hu, T; Cheung, S O; Yuen, R K K and Deng, Z M (2001) Multi-project cash flow optimization: Non-inferior solution through neuro-multiobjective algorithm. Engineering, Construction and Architectural Management, 8(2), pp. 130-144. ISSN 0969-9988

Lam, K C; So, A T P; Hu, T; Ng, T; Yuen, R K K; Lo, S M; Cheung, S O and Yang, H (2001) An integration of the fuzzy reasoning technique and the fuzzy optimization method in construction project management decision-making. Construction Management and Economics, 19(1), pp. 63-76. ISSN 01446193

Lam, K C; Song Hu, T I E; Ng, T; Yuen, R K K; Lo, S M and Wong, C T C (2001) Using an adaptive genetic algorithm to improve construction finance decisions. Engineering, Construction and Architectural Management, 8(1), pp. 31-45. ISSN 0969-9988

Lam, Ka-Chi (1997) The optimisation of financial decisions in a contracting firm. PhD thesis, University of New South Wales, Australia.

Lamb, D J and Merna, T (2004) Reappraisal of public private partnerships: An overview of refinancing, restructuring and termination. Journal of Financial Management of Property and Construction, 9(3), pp. 155-162. ISSN 1366-4387

Lang, R; Goodier, C and Glass, J (2016) Are housebuilders' production strategies a barrier to offsite construction uptake in the UK? In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Lau, C H (2019) The global trading activities of consulting engineering firms: managing risk and geographical choice. PhD thesis, University of Oxford, UK.

Le, P T; Chileshe, N; Kirytopoulos, K and Rameezdeen, R (2020) Investigating the significance of risks in BOT transportation projects in Vietnam. Engineering, Construction and Architectural Management, 27(6), pp. 1401-1425. ISSN 0969-9988

Leviäkangas, P; Wigan, M and Haapasalo, H (2013) Financial anatomy of E4 Helsinki-Lahti shadow toll PPP project. Built Environment Project and Asset Management, 3(2), pp. 165-180. ISSN 2044-124X

Li, H; Xia, Q; Wang, L and Ma, Y (2020) Sustainability assessment of urban water environment treatment public-private partnership projects using fuzzy logic. Journal of Engineering, Design and Technology, 18(5), pp. 1251-1267. ISSN 1726-0531

Liang, Y; Ashuri, B and Li, M (2021) Forecasting the construction expenditure cash flow for transportation design-build projects with a case-based reasoning model. Journal of Construction Engineering and Management, 147(6): 04021043, ISSN 0733-9364

Lim, B T H; Oo, B L and Ling, F (2010) The survival strategies of Singapore contractors in prolonged recession. Engineering, Construction and Architectural Management, 17(4), pp. 387-403. ISSN 0969-9988

Liou, F M and Huang, C P (2008) Automated approach to negotiations of BOT contracts with the consideration of project risk. Journal of Construction Engineering and Management, 134(1), pp. 18-24. ISSN 0733-9364

Liu, J and Cheah, C Y J (2009) Real option application in PPP/PFI project negotiation. Construction Management and Economics, 27(4), pp. 331-342. ISSN 1466433X

Liu, S S and Wang, C J (2009) Two-stage profit optimization model for linear scheduling problems considering cash flow. Construction Management and Economics, 27(11), pp. 1023-1037. ISSN 1466433X

Liu, S S and Wang, C J (2010) Profit optimization for multiproject scheduling problems considering cash flow. Journal of Construction Engineering and Management, 136(12), pp. 1268-1278. ISSN 0733-9364

Liu, W; Zhang, J and Liu, W (2021) Heuristic methods for finance-based and resource-constrained project scheduling problem. Journal of Construction Engineering and Management, 147(11): 04021141, ISSN 0733-9364

Lowe, J G (1997) Insolvency in the UK construction industry. Journal of Financial Management of Property and Construction, 2(1), pp. 83-112. ISSN 1366-4387

Lu, M; Lau, S C and Poon, C S (2009) Simulation approach to evaluating cost efficiency of selective demolition practices: Case of Hong Kong's Kai Tak Airport demolition. Journal of Construction Engineering and Management, 135(6), pp. 448-457. ISSN 0733-9364

Lu, Z (2018) Feasibility assessment framework for financing public-private partnership infrastructure projects through asset-backed security. PhD thesis, Columbia University, USA.

Lucko, G (2011) Optimizing cash flows for linear schedules modeled with singularity functions by simulated annealing. Journal of Construction Engineering and Management, 137(7), pp. 523-535. ISSN 0733-9364

Lucko, G (2013) Supporting financial decision-making based on time value of money with singularity functions in cash flow models. Construction Management and Economics, 31(3), pp. 238-253. ISSN 1466433X

Luigi, Guzzoni (2022) Construction management of cultural heritage. Conservation of cultural heritage during its construction site stage. Building information modelling supporting on site information collection and management for cost control. PhD thesis, Politecnico di Milano, Italy.

Lützkendorf, T and Lorenz, D (2007) Integrating sustainability into property risk assessments for market transformation. Building Research & Information, 35(6), pp. 644-661. ISSN 0961-3218

Magdy, M; Abdel-Monem, M and El Dash, K (2022) Float loss impact on project cost. International Journal of Construction Management, 22(9), pp. 1647-1656. ISSN 1562-3599

Maharjan, S; Shrestha, P P and Srirangam, D (2023) Impact of mobilization costs on schedule performance of highway projects. Engineering, Construction and Architectural Management, 30(5), pp. 2008-2025. ISSN 0969-9988

Mahdavi, A (2016) A system-of-systems approach to ex-ante analysis of profit potential of a project portfolio. PhD thesis, Purdue University, USA.

Mangezi, W (2019) Red tape in upgrading of informal settlements in Nelson Mandela Bay. PhD thesis, Nelson Mandela University, South Africa.

Marzouk, M and Hamdala, D (2025) Phasing real estate projects considering profitability and customer satisfaction. Engineering, Construction and Architectural Management, 32(5), pp. 2942-2970. ISSN 0969-9988

Mayouf, M and Gilligan, C (2024) Synthesis towards unveiling the complexity underlying underpayment for subcontractors in construction. Journal of Financial Management of Property and Construction, 29(1), pp. 168-192. ISSN 1366-4387

Mbachu, J (2011) Sources of contractor's payment risks and cash flow problems in the New Zealand construction industry: Project team's perceptions of the risks and mitigation measures. Construction Management and Economics, 29(10), pp. 1027-1041. ISSN 01446193

Menassa, C C (2009) Quantitative framework to evaluate alternative dispute resolution investments in architecture engineering and construction projects using option and real option theory. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Menassa, C C; Mora, F P and Pearson, N (2009) Option pricing model to analyze cost-benefit trade-offs of adr investments in AEC projects. Journal of Construction Engineering and Management, 135(3), pp. 156-168. ISSN 0733-9364

Mewomo, M C (2019) The construction industry stakeholders preliminary views on the proposed South African prompt payment and statutory adjudication regulations. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Mohammed, Miswan Abdul Hakim (1994) An investigation into firms' strategies and their financial performance in the UK construction industry. PhD thesis, University College London, UK.

Morrison, S and Trushell, I (2016) Payment for offsite goods and materials: The Scottish perspective. Construction Management and Economics, 34(10), pp. 679-687. ISSN 0144-6193

Motawa, I and Kaka, A (2008) Payment mechanisms for integrated teams in construction. Construction Economics and Building, 8(2), pp. 1-10. ISSN 2204-9029

Motawa, I and Kaka, A (2009) Modelling payment mechanisms for supply chain in construction. Engineering, Construction and Architectural Management, 16(4), pp. 325-336. ISSN 0969-9988

Motawa, I; Kaka, A and Hong Wong, C (2008) Development of transparent payment systems. Journal of Financial Management of Property and Construction, 13(2), pp. 143-156. ISSN 1366-4387

Motawa, I A; Khosrowshahi, F and Kaka, A P (2005) Development and evaluation of a company-level budgeting technique incorporating future construction contracts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Musonda, I and Gambo, N (2021) Mediation effect of partnership on procurement strategy factors influencing sustainable smart housing development, Nigeria. Built Environment Project and Asset Management, 11(3), pp. 454-467. ISSN 2044-124X

Mustapa, F D (2014) Managing immigrant construction workers in peninsular Malaysia: The economic perspective. PhD thesis, Loughborough University, UK.

Mutti, C d N and Hughes, W P (2002) Cash flow management in construction firms. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Navon, R (1995) Resource-based model for automatic cash-flow forecasting. Construction Management and Economics, 13(6), pp. 501-510. ISSN 01446193

Navon, R (1996) Company-level cash-flow management. Journal of Construction Engineering and Management, 122(1), pp. 22-35. ISSN 0733-9364

Nesan, L J (2006) Project finance model for small contractors in USA. Construction Economics and Building, 6(1), pp. 25-41. ISSN 2204-9029

Nguyen, Tuan Anh (2019) Options and flexibility in PPP toll road projects. PhD thesis, University of New South Wales, Australia.

Odebode, O M (2004) Consideration of investment risk in build operate transfer infrastructure projects in Africa: Lenders' perspective. PhD thesis, University of Reading, UK.

Odeyinka, H A (2003) The development and validation of models for assessing risk impacts on construction cash flow forecast. PhD thesis, Glasgow Caledonian University, UK.

Odeyinka, H A and Kaka, A (2005) An evaluation of contractors' satisfaction with payment terms influencing construction cash flow. Journal of Financial Management of Property and Construction, 10(3), pp. 171-180. ISSN 1366-4387

Odeyinka, H A; Kaka, A and Marledge, R (2003) An evaluation of construction cash flow management approaches in contracting oraganizations. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Odeyinka, H A; Lowe, J and Kaka, A (2008) An evaluation of risk factors impacting construction cash flow forecast. Journal of Financial Management of Property and Construction, 13(1), pp. 5-17. ISSN 1366-4387

Odeyinka, H A; Lowe, J and Kaka, A P (2013) Artificial neural network cost flow risk assessment model. Construction Management and Economics, 31(5), pp. 423-439. ISSN 01446193

Odeyinka, H A and Lowe, J G (2000) An assessment of risk factors involved in modelling cash flow forecasting. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Odeyinka, H A and Lowe, J G (2001) An evaluation of methodological issues for assessing risk impacts on construction cash flow forecast. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Odeyinka, H A; Lowe, J G and Kaka, A P (2002) A construction cost flow risk assessment model. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Ogunbayo, B F; Ohis Aigbavboa, C; Thwala, W D and Akinradewo, O I (2022) Assessing maintenance budget elements for building maintenance management in Nigerian built environment: A Delphi study. Built Environment Project and Asset Management, 12(4), pp. 649-666. ISSN 2044-124X

Okudan, O; Demirdöğen, G and Işık, Z (2025) A decision-support framework for suspension of public infrastructure projects: A combined use of neutrosophic AHP and TOPSIS. Engineering, Construction and Architectural Management, 32(5), pp. 3187-3216. ISSN 0969-9988

Oladimeji, O (2022) Influence of COVID-19 pandemic on local construction firms' viability. Journal of Engineering, Design and Technology, 20(1), pp. 201-221. ISSN 1726-0531

Oladimeji, O and Aina, O O (2021) Cash flow management techniques practices of local firms in Nigeria. International Journal of Construction Management, 21(4), pp. 395-403. ISSN 1562-3599

Olanrewaju, O I; Chileshe, N; Adekunle, E O and Salihu, C (2024) Modelling the environmental, economic and social impacts of coronavirus pandemic on the construction industry. International Journal of Construction Management, 24(14), pp. 1485-1498. ISSN 1562-3599

Olowa, T; Witt, E and Lill, I (2023) Building information modelling (BIM)–enabled construction education: Teaching project cash flow concepts. International Journal of Construction Management, 23(9), pp. 1494-1505. ISSN 1562-3599

Omopariola, E D and Windapo, A (2019) Financial management strategies that influence project and organisation performance. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Omopariola, E D; Windapo, A; Edwards, D J and Thwala, W D (2020) Contractors’ perceptions of the effects of cash flow on construction projects. Journal of Engineering, Design and Technology, 18(2), pp. 308-325. ISSN 1726-0531

Omopariola, E D and Windapo, A O (2019) Domino effect of timely payment of contractors on project and organisation performance. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Owusu-Manu, D G; Holt, G D; Edwards, D J and Badu, E (2014) Determinants of trade credit supply among the Ghanaian construction sector. Built Environment Project and Asset Management, 4(4), pp. 368-383. ISSN 2044-124X

Park, H-K (2001) Cash flow forecasting model using moving weights of cost categories for general contractor on jobsite. PhD thesis, University of Wisconsin - Madison, USA.

Patsiadas, P (2006) Public private partnership in motorway service areas: Decision making, investment analysis and best practice tools. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Pivo, G (2014) Unequal access to energy efficiency in us multifamily rental housing: Opportunities to improve. Building Research & Information, 42(5), pp. 551-573. ISSN 0961-3218

Pudney, Steven Grant (2010) Asset renewal decision modelling with application to the water utility industry. PhD thesis, Queensland University of Technology, Australia.

Ramachandra, T (2013) Exploring feasible solutions to payment problems in the construction industry in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.

Ramachandra, T and Rotimi, J O (2011) The nature of payment problems in the New Zealand construction industry. Construction Economics and Building, 11(2), pp. 22-33. ISSN 2204-9029

Ranasinghe, M (1996) Total project cost: A simplified model for decision makers. Construction Management and Economics, 14(6), pp. 497-505. ISSN 01446193

Rho, J-J (1994) A systems engineering model for implementing automation technology into a construction process. PhD thesis, University of Houston, USA.

Rosenfeld, Y and Geltner, D (1991) Cost-plus and incentive contracting: Some false benefits and inherent drawbacks. Construction Management and Economics, 9(5), pp. 481-490. ISSN 01446193

Sacks, R; Esquenazi, A and Goldin, M (2007) LEAPCON: Simulation of lean construction of high-rise apartment buildings. Journal of Construction Engineering and Management, 133(7), pp. 529-539. ISSN 0733-9364

Sacks, R and Goldin, M (2007) Lean management model for construction of high-rise apartment buildings. Journal of Construction Engineering and Management, 133(5), pp. 374-384. ISSN 0733-9364

Sadeghpour, F (2004) A CAD-based model for site layout. PhD thesis, Concordia University, Canada.

Salam, Md Abdus (2007) Time and cost overruns on high-rise building construction in Bangladesh. PhD thesis, Abertay University, UK.

Samarghandi, H; Tabatabaei, S M M; Taabayan, P; Hashemi, A M and Willoughby, K (2016) Studying the reasons for delay and cost overrun in construction projects: The case of Iran. Journal of Construction in Developing Countries, 21(1), pp. 51-84. ISSN 1823-6499

Scott, Denis James (2025) A proof of concept of a project bank account (PBA) blockchain payment application for the construction industry. PhD thesis, University College London, UK.

Shalaby, A and Ezeldin, A S (2022) A model for work packages optimization in results-based-finance projects. Engineering, Construction and Architectural Management, 29(7), pp. 2810-2835. ISSN 0969-9988

Sherif, E and Kaka, A (2003) Factors influencing the selection of payment systems in construction projects. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Sherif, E h and Kaka, A (2004) A multi criteria mode for the selection of the payments systems in construction projects. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Siew, R Y J (2015) Alternative framework for assessing sustainable building funds: Green building fund. Building Research & Information, 43(2), pp. 160-169. ISSN 0961-3218

Sing, T F (2002) Time to build options in construction processes. Construction Management and Economics, 20(2), pp. 119-130. ISSN 01446193

Singla, H K and Samanta, P K (2019) Determinants of dividend payout of construction companies: A panel data analysis. Journal of Financial Management of Property and Construction, 24(1), pp. 19-38. ISSN 1366-4387

Skaik, Samer Hisham (2017) Introducing review mechanisms into statutory construction adjudication. PhD thesis, Deakin University, Australia.

Skitmore, M (1992) Parameter prediction for cash flow forecasting models. Construction Management and Economics, 10(5), pp. 397-413. ISSN 01446193

Su, Y (2017) Unified quantitative modeling for integrated multi-objective project management with singularity functions. PhD thesis, Catholic University of America, USA.

Su, Y and Lucko, G (2015) Optimum present value scheduling based on synthetic cash flow model with singularity functions. Journal of Construction Engineering and Management, 141(11): 04015036, ISSN 0733-9364

Su, Y and Lucko, G (2015) Synthetic cash flow model with singularity functions. I: Theory for periodic phenomena and time value of money. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Su, Y and Lucko, G (2015) Synthetic cash flow model with singularity functions. II: Feasible prompt payment discount scenarios. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Su, Y and Lucko, G (2015) Synthetic cash flow model with singularity functions for unbalanced bidding scenarios. Construction Management and Economics, 33(1), pp. 35-54. ISSN 01446193

Sundaram, T K (1989) Contract management: a rational approach to construction contract pricing. PhD thesis, Indian Institute of Technology Delhi, India.

Swai, L (2022) Development of a conceptual framework for enhancing payment practices in the UK construction industry. PhD thesis, Coventry University, UK.

Swai, L L P and Arewa, A O (2018) Potentiality of emerging technologies to minimise late-payments quandary in construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Sweis, R; Moarefi, A; Hoseini-Amiri, S M and Moarefi, S (2019) Delay factors of the schedule of strategic industrial projects. International Journal of Building Pathology and Adaptation, 37(1), pp. 69-86. ISSN 23984708

Tan, X.; Xue, X.; Wang, R.; Fan, H. and Ji, A. (2026) Exploring digital-real integration in the construction industry: Driving force of digital technology innovation network embedding. Journal of Construction Engineering and Management, 152(6): 04026070, ISSN 0733-9364

Tang, C M and Leung, A Y T (2005) An impartial decision model for financial risk and decision analysis in construction projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Tang, C M; Leung, A Y T and Lam, K C (2006) Entropy application to improve construction finance decisions. Journal of Construction Engineering and Management, 132(10), pp. 1099-1113. ISSN 0733-9364

Tang, L C M and Leung, A Y T (2009) An entropy-based financial decision support system (E-FDSS) for project analysis in construction SMEs. Construction Management and Economics, 27(5), pp. 499-513. ISSN 1466433X

Tavakolan, M; Chokan, F and Dadashi Haji, M (2024) Simultaneous project portfolio selection and scheduling from contractor perspective. International Journal of Construction Management, 24(3), pp. 298-313. ISSN 1562-3599

Tavakolan, M and Nikoukar, S (2022) Developing an optimization financing cost-scheduling trade-off model in construction project. International Journal of Construction Management, 22(2), pp. 262-277. ISSN 1562-3599

Taylor, M D; Wamuziri, S C and Smith, I G N (2001) Strategic mechatronics investment: Understanding the managerial options. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Tembo, C K; Muleya, F and Kanyemba, A (2024) An appraisal of cost management techniques used in the construction industry. International Journal of Construction Management, 24(1), pp. 10-18. ISSN 1562-3599

Tembo, M; Kahanji, C and Mwanaumo, E M (2024) Cultivating procurement strategies to manage the tender price level for public infrastructure: : A case study of IRCP (World Bank) projects in Zambia. Journal of Construction Business and Management, 7(1), pp. 16-33. ISSN 2521-0165

Tiong, R L K (1995) Competitive advantage of equity in BOT tender. Journal of Construction Engineering and Management, 121(3), pp. 282-289. ISSN 0733-9364

Tokede O, S B B A (2013) Preserving continuity in whole-life cost models for net-zero carbon buildings. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Touran, A; Atgun, M and Bhurisith, I (2004) Analysis of the United States department of transportation prompt pay provisions. Journal of Construction Engineering and Management, 130(5), pp. 719-725. ISSN 0733-9364

Tran, H and Carmichael, D G (2013) A contractor's classification of owner payment practices. Engineering, Construction and Architectural Management, 20(1), pp. 29-45. ISSN 0969-9988

Tran, Hanh Van (2013) Contractor internal profiling of owners. PhD thesis, University of New South Wales, Australia.

Tucker, S N (1986) Formulating construction cash flow curves using a reliability theory analogy. Construction Management and Economics, 4(3), pp. 179-188. ISSN 01446193

Tucker, S N (1988) A single alternative formula for department of health and social security S-curves. Construction Management and Economics, 6(1), pp. 13-23. ISSN 01446193

Viljoen, P S (1981) Incentive management techniques for pavement rehabilitation construction. PhD thesis, University of California, Berkeley, USA.

Wang, X; Shi, L; Wang, B and Kan, M (2020) A method to evaluate credit risk for banks under PPP project finance. Engineering, Construction and Architectural Management, 27(2), pp. 483-501. ISSN 0969-9988

Wang, Y; Chen, L and Zhuang, J (2023) Pricing of credit default swaps from the perspective of credit enhancement in PPP projects. Journal of Construction Engineering and Management, 149(6): 05023006, ISSN 0733-9364

Wasi, D and Skitmore, M (2001) Factors affecting the performance of small indigenous contractors in Papau New Guinea. Construction Economics and Building, 1(1), pp. 80-90. ISSN 2204-9029

Westmoreland, G (1979) Electric utilities' accounting for construction work in progress the effects of alternative methods on the financial statements, utility rates and market to book ratio. PhD thesis, University of Florida, USA.

Wibowo, A and Kochendörfer, B (2005) Financial risk analysis of project finance in Indonesian toll roads. Journal of Construction Engineering and Management, 131(9), pp. 963-972. ISSN 0733-9364

Wong, W F and Cheah, C Y J (2004) Issues of contractual chain and sub-contracting in the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Xiong, W and Zhang, X (2014) Concession renegotiation models for projects developed through public-private partnerships. Journal of Construction Engineering and Management, 140(5): 04014008, ISSN 0733-9364

Xu, B (2014) Corporate financing decisions: the role of managerial overconfidence. PhD thesis, Loughborough University, UK.

Xu, T and Tiong, R L K (2001) Risk assessment on contractors' pricing strategies. Construction Management and Economics, 19(1), pp. 77-84. ISSN 01446193

Yang, W; Firouzi, A and Li, C Q (2023) Risk transfer in project finance loans for toll road using credit default swaps. Journal of Financial Management of Property and Construction, 28(1), pp. 1-21. ISSN 1366-4387

Yizhe, T and Youjie, L (1992) Unbalanced bidding on contracts with. Variation trends in client-provided quantities. Construction Management and Economics, 10(1), pp. 69-80. ISSN 01446193

Zahed, S E; Shahooei, S; Farooghi, F; Shahandashti, M and Ardekani, S (2019) Life-cycle cost analysis of a short-haul underground freight transportation system for the DFW airport. Built Environment Project and Asset Management, 9(3), pp. 440-456. ISSN 2044-124X

Zapata Quimbayo, C A and Mejía Vega, C A (2023) Credit risk in infrastructure PPP projects under the real options approach. Construction Management and Economics, 41(4), pp. 293-306. ISSN 01446193

Zayed, T and Liu, Y (2014) Cash flow modeling for construction projects. Engineering, Construction and Architectural Management, 21(2), pp. 170-189. ISSN 0969-9988

Zhang, X and Liu, J (2022) Incentive mechanism and value-added in PPP projects considering financial institutions' early intervention. Journal of Construction Engineering and Management, 148(4): 4022001, ISSN 0733-9364

Zhao, F.; Shi, S. and Fu, X. (2026) Research on decision-making of project financing models based on tri-reference point theory: Evidence from public-private partnerships (PPPs) in China. Engineering, Construction and Architectural Management, 27(5), pp. 1-28. ISSN 0969-9988

de Leeuw, C P (1988) The pre-estimation of compensation payable in accordance with the contract price adjustment provisions of the building industry advisory council. DSc thesis, University of Pretoria, South Africa.

van den Boomen, M (2020) Replacement optimisation for public infrastructure assets: Quantitative optimisation modelling taking typical public infrastructure related features into account. PhD thesis, Delft University of Technology, Netherlands.

van den Boomen, M; Leontaris, G and Wolfert, A R M (2019) Replacement optimization of ageing infrastructure under differential inflation. Construction Management and Economics, 37(11), pp. 659-674. ISSN 01446193

This list was generated on Sat Aug 22 01:42:06 2026 UTC.