Items with Index Term: case study

Number of items: 6063.

A Kassem, M; Khoiry, M A and Hamzah, N (2020) Assessment of the effect of external risk factors on the success of an oil and gas construction project. Engineering, Construction and Architectural Management, 27(9), pp. 2767-2793. ISSN 0969-9988

Aalto, L; Sirola, P; Kalliomäki-Levanto, T; Lahtinen, M; Ruohomäki, V; Salonen, H and Reijula, K (2019) User-centric work environments in modular healthcare facilities. Engineering, Construction and Architectural Management, 26(6), pp. 1047-1062. ISSN 0969-9988

Ababutain, A Y (2002) A multi-criteria decision-making model for selection of BOT toll road proposals within the public sector. PhD thesis, University of Pittsburgh, USA.

Abadi, M (2005) Issues and challenges in communication within design teams in the construction industry: Investigation the use of virtual teams and information and communication technologies in the UK construction industry. PhD thesis, University of Manchester, UK.

Abanda, F H (2011) Knowledge modelling of emerging technologies for sustainable building development. PhD thesis, Oxford Brookes University, UK.

Abanomi, W M (2005) Environmental design of prototype school buildings in hot, arid regions with special reference to Riyadh, Saudi Arabia. PhD thesis, Cardiff University, UK.

Abas, N H; Blismas, N and Lingard, H (2021) Development of risk assessment tool using damaging energy and argumentation theory for evaluating construction occupational safety and health risks. Engineering, Construction and Architectural Management, 28(10), pp. 2967-2993. ISSN 0969-9988

Abaza, M and Kisi, K (2024) Improper risk management outcomes and lessons learned from an EPC water transmission project. Journal of Construction Engineering and Management, 150(11): 05024012, ISSN 0733-9364

Abbas, G. M.; Meral Akgül, Ç and Dino, I. G. (2025) Resilient cooling of the Mediterranean office spaces under climate change. Architectural Engineering and Design Management, 21(6), pp. 1165-1186. ISSN 1745-2007

Abbas, G M and Gursel Dino, I (2022) The impact of natural ventilation on airborne biocontaminants: A study on COVID-19 dispersion in an open office. Engineering, Construction and Architectural Management, 29(4), pp. 1609-1641. ISSN 0969-9988

Abbasi, M H (2024) Phasing out fossil fuel heating in UK homes: A multi-dimensional framework for sustainability assessment of alternatives and their lifecycle implications. PhD thesis, Liverpool John Moores University, UK.

Abbasi, Mostafa (2017) Enhance the construction industry performance through lean applications. PhD thesis, Politecnico di Milano, Italy.

Abbasian-Hosseini, S A (2015) Social and engineering aspects of construction site management using simulation and social network analysis. PhD thesis, North Carolina State University, USA.

Abbasian-Hosseini, S A; Hsiang, S M; Leming, M L and Liu, M (2014) From social network to data envelopment analysis: Identifying benchmarks at the site management level. Journal of Construction Engineering and Management, 140(8): 04014028, ISSN 0733-9364

Abbasianjahromi, H and Talebian, R (2021) Identifying the most important occupational diseases in the construction industry: Case study of building industry in Iran. International Journal of Construction Management, 21(3), pp. 235-245. ISSN 1562-3599

Abbott, C and Allen, S (2004) Exploring how regional construction activity can be supported by community benefit initiatives. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Abbott, C; Jeong, K and Allen, S (2006) The economic motivation for innovation in small construction companies. Construction Innovation, 6(3), pp. 187-196. ISSN 1471-4175

Abbsaian-Hosseini, S A; Liu, M and Hsiang, S M (2019) Social network analysis for construction crews. International Journal of Construction Management, 19(2), pp. 113-127. ISSN 1562-3599

Abd Elsalam, M F (2021) Breaking through the classical determinants in the field of hyper urban planning. Construction Innovation, 21(4), pp. 818-836. ISSN 1471-4175

Abd Jamil, A H and Fathi, M S (2020) Enhancing BIM-based information interoperability: Dispute resolution from legal and contractual perspectives. Journal of Construction Engineering and Management, 146(7): 05020007, ISSN 0733-9364

Abd-Elnaby, A-E H A and Reffat, R M (2024) Enhancing BIM-BEM integration: Solutions for efficient data exchange and energy performance assessment. Architectural Engineering and Design Management, 20(3), pp. 596-623. ISSN 1745-2007

Abdalla, A; Li, X; Yang, F and Lou, Q (2026) Fuzzy synthetic evaluation of intervention measures to enhance the psychological health and well-being of expatriate construction professionals. Engineering, Construction and Architectural Management, 33(1), pp. 732-762. ISSN 0969-9988

Abdalla, A (2007) Meeting housing needs in Libya: towards a responsive owner-built housing with particular reference to Benghazi City. PhD thesis, University of Newcastle upon Tyne, UK.

Abdalla, S B; Mushtaha, E; Rashid, M; Opoku, A; Hamad, R; Dweiri, F and Elmualim, A (2023) Pre-design CSFs (critical success factors) of building projects for dubai's development boom. Built Environment Project and Asset Management, 13(3), pp. 359-374. ISSN 2044-124X

Abdallah, M A A (2014) Optimizing the selection of sustainability measures for existing buildings. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Abdallah, M A A; El-Rayes, K and Liu, L (2016) Minimizing upgrade cost to achieve LEED certification for existing buildings. Journal of Construction Engineering and Management, 142(2): 04015073, ISSN 0733-9364

Abdel Meguid, T A (1998) Managed claims procurement strategy (MCPS): A comparative study of the performance of alternate building procurement strategies. PhD thesis, Universite de Montreal, Canada.

Abdel-Hamid, M and Abdelhaleem, H M (2023) Project cost control using five dimensions building information modelling. International Journal of Construction Management, 23(3), pp. 405-409. ISSN 1562-3599

Abdel-Salam, A N (2018) Corporate social responsibility of construction and real estate development companies in developing countries: An assessment model. PhD thesis, Purdue University, USA.

Abdel-Wahab, M S; Moore, D R; Gibbons-Woods, D; Kearny, G and Pirie, T (2009) An evaluation framework for training: A case study in the northeast of scotland. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Abdelaty, A; Jeong, H D; Dannen, B and Todey, F (2016) Enhancing life cycle cost analysis with a novel cost classification framework for pavement rehabilitation projects. Construction Management and Economics, 34(10), pp. 724-736. ISSN 0144-6193

Abdelgawad, M A M (2011) Hybrid decision support system for risk criticality assessment and risk analysis. PhD thesis, University of Alberta, Canada.

Abdelgawad, M A M and Fayek, A R (2010) Risk management in the construction industry using combined fuzzy FMEA and fuzzy AHP. Journal of Construction Engineering and Management, 136(9), pp. 1028-1036. ISSN 0733-9364

Abdelgawad, M A M and Fayek, A R (2011) Fuzzy reliability analyzer: Quantitative assessment of risk events in the construction industry using fuzzy fault-tree analysis. Journal of Construction Engineering and Management, 137(4), pp. 294-302. ISSN 0733-9364

Abdelgawad, M A M and Fayek, A R (2012) Comprehensive hybrid framework for risk analysis in the construction industry using combined failure mode and effect analysis, fault trees, event trees, and fuzzy logic. Journal of Construction Engineering and Management, 138(5), pp. 642-651. ISSN 0733-9364

Abdelghafar, A (2024) Identifying challenges, best practices, and potential solutions to NYCSCA project delays. DBA thesis, Touro University Worldwide, USA.

Abdelghani, Mohammad (2021) Towards a generalized value stream mapping and domain ontology to support the enabling of industry 4.0 in construction. PhD thesis, University of Alberta, Canada.

Abdelhady, I A I (2013) A new business process model for enhancing BIM implementation in architectural design. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Abdelmageed, S; Abdelkhalek, S I F M; Hussien, M and Zayed, T (2024) A hybrid simulation model for modules installation in modular integrated construction projects. International Journal of Construction Management, 24(13), pp. 1407-1418. ISSN 1562-3599

Abdelmassih, A; Faddoul, R and Geara, F (2023) Impact of autonomous solutions on earthmoving electrification using machine learning: Case study. Construction Innovation, 23(3), pp. 606-621. ISSN 1471-4175

Abdelmohsen, A Z (2016) Optimizing the construction planning of highway work zones. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Abdelshafy, A and Walther, G (2023) Using dynamic-locational material flow analysis to model the development of urban stock. Building Research & Information, 51(1), pp. 5-20. ISSN 0961-3218

Abdelwahab, M A and Nassar, A H (2024) Legal barriers and associated solutions of BIM implementation in the Egyptian AEC industry. International Journal of Construction Management, 24(13), pp. 1431-1443. ISSN 1562-3599

Abdirad, H and Dossick, C S (2019) Restructuration of architectural practice in integrated project delivery (IPD): Two case studies. Engineering, Construction and Architectural Management, 26(1), pp. 104-117. ISSN 0969-9988

Abdirad, H; Dossick, C S; Johnson, B R and Migliaccio, G (2021) Disruptive information exchange requirements in construction projects: Perception and response patterns. Building Research & Information, 49(2), pp. 161-178. ISSN 0961-3218

Abdollahipour, S; Jeong, D H S; Burman, R R and Gunsaulis, F (2012) Performance assessment of on-grade horizontal directional drilling. Journal of Construction Engineering and Management, 138(3), pp. 458-468. ISSN 0733-9364

Abdollahzadeh, N; Farahani, A V; Soleimani, K and Zomorodian, Z S (2023) Indoor environmental quality improvement of student dormitories in Tehran, Iran. International Journal of Building Pathology and Adaptation, 41(1), pp. 258-278. ISSN 23984708

Abdul Nasir, N A B; Hassan, A S; Khozaei, F and Abdul Nasir, M H B (2021) Investigation of spatial configuration management on social distancing of recreational clubhouse for COVID-19 in Penang, Malaysia. International Journal of Building Pathology and Adaptation, 39(5), pp. 782-810. ISSN 23984708

Abdul-Aziz, A R (2001) Unraveling of BOT scheme: Malaysia's indah water konsortium. Journal of Construction Engineering and Management, 127(6), pp. 457-460. ISSN 0733-9364

Abdul-Aziz, A R (2012) Control mechanisms exercised in Malaysian housing public-private partnerships. Construction Management and Economics, 30(1), pp. 37-55. ISSN 1466433X

Abdul-Aziz, A R and How, Y M (2012) To-be-reclaimed land swap for new highway: The Jelutong expressway case. International Journal of Construction Management, 12(4), pp. 1-16. ISSN 1562-3599

Abdul-Aziz, A R; Jaafar, M and Hussin, A A (2007) Are government-linked construction companies in Malaysia still valid? The indigenous contractors' perspective. Construction Management and Economics, 25(10), pp. 1009-1019. ISSN 1466433X

Abdul-Rahman, H (1995) The cost of non-conformance during a highway project: A case study. Construction Management and Economics, 13(1), pp. 23-32. ISSN 01446193

Abdul-Rahman, H; Yahya, I A; Berawi, M A and Wah, L W (2008) Conceptual delay mitigation model using a project learning approach in practice. Construction Management and Economics, 26(1), pp. 15-27. ISSN 1466433X

Abdulai, R T (2025) Financial viability decision rules in residual valuation method of property development appraisal: Case study of London, England. Journal of Financial Management of Property and Construction, 30(1), pp. 154-173. ISSN 1366-4387

Abdulhadi, N H (1997) Simulation as a tool for re-engineering construction processes. PhD thesis, University of Colorado at Boulder, USA.

Abdulla, H S (2016) An investigation on the causes and remedial measures on the delays in the construction industry in the Kingdom of Bahrain. PhD thesis, Glasgow Caledonian University, UK.

Abdullah, A-N M (2019) Assessing economic, social, political and environmental issues related to mega-projects : A case study of Merowe Dam in Sudan. PhD thesis, University of Plymouth, UK.

Abdullah, R Z (1988) Integrated systems for site management. PhD thesis, Loughborough University, UK.

Abedmousa, M (2023) Reframing construction labour productivity in a colonisation context: the West Bank as an example. PhD thesis, University of Westminster, UK.

Abeid, J and Arditi, D (2003) Photo-net: An integrated system for controlling construction progress. Engineering, Construction and Architectural Management, 10(3), pp. 162-171. ISSN 0969-9988

Abejide, O S (1997) Solid soilcrete blocks for low-cost buildings: A Nigerian case study. Building Research & Information, 25(2), pp. 115-119. ISSN 0961-3218

Abeysekera, W V K M (1997) A strategy for managing brickwork in Sri Lanka. PhD thesis, Loughborough University, UK.

Abiodun, I (2012) The role of public private partnership in highway infrastructure development and sustainability in Nigeria. PhD thesis, University of Salford, UK.

Abisuga, Olatunji (2020) Integrated collaborative facilities management framework for post-occupancy evaluation of higher education facilities. PhD thesis, University of New South Wales, Australia.

AboMoslim, S and Russell, A (2014) Screening design and construction technologies of skyscrapers. Construction Innovation, 14(3), pp. 307-345. ISSN 1471-4175

Aboagye-Nimo, E; Raiden, A; King, A and Tietze, S (2015) Using tacit knowledge in training and accident prevention. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(5), pp. 232-240. ISSN 17514304

Aboagye-Nimo, E; Raidén, A B and Tietze, S (2011) Investigating good health and safety practices in small construction firms in the United Kingdom. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Aboelyousr, M; El-Sayegh, S and Ahmed, S (2025) Multi-criteria decision support model for selecting the appropriate construction management firm. International Journal of Construction Management, 25(5), pp. 552-561. ISSN 1562-3599

Abotaleb, I S and El-Adaway, I H (2017) Construction bidding markup estimation using a multistage decision theory approach. Journal of Construction Engineering and Management, 143(1): 04016079, ISSN 0733-9364

AbouMoemen, A A (2022) A BIM maturity-KPI assessment framework for a UK public sector local authority client. PhD thesis, University of Salford, UK.

Abouhamad, M and Zayed, T (2019) Risk-based asset management framework for subway systems. Journal of Construction Engineering and Management, 145(11): 04019071, ISSN 0733-9364

Abourizk, S; Halpin, D; Mohamed, Y and Hermann, U (2011) Research in modeling and simulation for improving construction engineering operations. Journal of Construction Engineering and Management, 137(10), pp. 843-852. ISSN 1943-7862

Abraham, D M; Wirahadikusumah, R; Short, T J and Shahbahrami, S (1998) Optimization modeling for sewer network management. Journal of Construction Engineering and Management, 124(5), pp. 402-410. ISSN 0733-9364

Abreu, M M and Lordsleem, A C (2019) Aluminum formwork system: Loss and productivity. Built Environment Project and Asset Management, 9(5), pp. 616-627. ISSN 2044-124X

Abu Aisheh, Y (2011) Climate change and the built environment: an evaluation of sustainable refurbishment options for higher education buildings in the UK. PhD thesis, University of Birmingham, UK.

Abu Arqoub, M; Ghanbaripour, A N; Langston, C and Skulmoski, G (2023) Beyond design and delivery: Developing a model to measure end-user satisfaction (delight) in projects. Built Environment Project and Asset Management, 13(4), pp. 509-534. ISSN 2044-124X

Abu Arqoub, Muath (2022) Measuring end-user delight: Is success in project design and delivery enough? PhD thesis, Bond University, Australia.

Abu Awwad, K (2020) The implementation of building information modelling Level 2 in the UK construction industry: the case of small and medium enterprises. PhD thesis, Coventry University, UK.

Abu Dabous, S and Alkass, S (2008) Decision support method for multi-criteria selection of bridge rehabilitation strategy. Construction Management and Economics, 26(8), pp. 883-893. ISSN 01446193

Abu Dabous, S; Zadeh, T and Ibrahim, F (2024) A failure mode, effects and criticality analysis-based method for formwork assessment and selection in building construction. International Journal of Building Pathology and Adaptation, 42(5), pp. 1019-1040. ISSN 2398-4708

Abu-Shabeen, N N (2008) Development of multi-criteria decision analysis models for bidding and contractor selection. PhD thesis, Edinburgh Napier University, UK.

Abubakar, M E; Hasan, A and Jha, K N (2022) Delays and financial implications of COVID-19 for contractors in irrigation projects. Journal of Construction Engineering and Management, 148(9): 05022006, ISSN 0733-9364

Abubakar, S Y (1998) Investigation of factors affecting rural road maintenance: the case of Sokoto State, Nigeria. PhD thesis, Loughborough University, UK.

Abubaker, A E (2010) Improvement of project planning in Libya. PhD thesis, University of Newcastle upon Tyne, UK.

Abuelma'atti, A (2012) A strategic approach to the implementation of information technologies in small and medium-sized architecture, engineering and construction enterprises. PhD thesis, University of Salford, UK.

Abuelmaatti, A and Ahmed, V (2010) The potential of collaborative environments implementation in small and medium enterprises for the construction industry. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Abuezhayeh, S W; Ruddock, L and Shehabat, I (2022) Integration between knowledge management and business process management and its impact on the decision making process in the construction sector: A case study of Jordan. Construction Innovation, 22(4), pp. 987-1010. ISSN 1471-4175

Abuhussain, M (2020) An assessment of the Saudi Residential Buildings Envelope Code under the current and future climate change scenarios: the case for Jeddah in the hot and humid climate region. PhD thesis, University of Liverpool, UK.

Abuimara, T; O’Brien, W; Gunay, B and Carrizo, J S (2019) Towards occupant-centric simulation-aided building design: A case study. Building Research & Information, 47(8), pp. 866-882. ISSN 0961-3218

Abukhder, J and Munns, A K (2003) Attributing management problems on construction projects to project information. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Abukhder, J S A (2004) A study of the management process on construction projects, and the development of a new notation system. PhD thesis, University of Dundee, UK.

AbulHassan, H S (2001) A framework for applying concurrent engineering principles to the construction industry. PhD thesis, Pennsylvania State University, USA.

Abuzaid, G (2010) Determining the competitiveness of UK's consulting engineering firms through the dynamic capabilities view. PhD thesis, University of Reading, UK.

Acheampong, A; Owusu-Manu, D G; Kissi, E and Tetteh, P A (2023) Assessing the influence of emotional intelligence (EI) on project performance in developing countries: The case of Ghana. International Journal of Construction Management, 23(7), pp. 1163-1173. ISSN 1562-3599

Achour, N and Price, A D F (2010) Resilience strategies of healthcare facilities: Present and future. International Journal of Disaster Resilience in the Built Environment, 1(3), pp. 264-276. ISSN 1759-5916

Acosta, D (1986) Application of production planning methods to improve productivity: Issues from the Venezuelan construction industry. PhD thesis, University of California, Berkeley, USA.

Acre, F and Wyckmans, A (2015) The impact of dwelling renovation on spatial quality: The case of the Arlequin neighbourhood in Grenoble, France. Smart and Sustainable Built Environment, 4(3), pp. 268-309. ISSN 2046-6099

Adafin, J; Rotimi, J O B and Wilkinson, S (2015) Why do the design stage elemental cost plan and final tender sum differ in New Zealand? Journal of Financial Management of Property and Construction, 20(2), pp. 116-131. ISSN 1366-4387

Adafin, J; Wilkinson, S; Rotimi, J O B; MacGregor, C; Tookey, J and Potangaroa, R (2022) Creating a case for innovation acceleration in the New Zealand building industry. Construction Innovation, 22(1), pp. 185-204. ISSN 1471-4175

Adam, A (2019) Exploring construction challenges of the public client: A dynamic capabilities approach. PhD thesis, Chalmers University of Technology, Sweden.

Adam, A; Gluch, P and Julin, J (2014) Using actor-network theory to understand knowledge sharing in an architecture firm. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Adam, A and Lindahl, G (2017) Applying the dynamic capabilities framework in the case of a large public construction client. Construction Management and Economics, 35(7), pp. 420-431. ISSN 01446193

Adami, V S; Verschoore, J R and Antunes, J A V (2019) Effect of relational characteristics on management of wind farm interorganizational construction projects. Journal of Construction Engineering and Management, 145(3): 05018019, ISSN 0733-9364

Adams, J (2019) Dynamic criticality analysis of industrial assets and system. PhD thesis, University of Cambridge, UK.

Adamtey, S A (2021) A case study performance analysis of design-build and integrated project delivery methods. International Journal of Construction Education and Research, 17(1), pp. 68-84. ISSN 1557-8771

Addyman, S (2019) The timing of patterning or the patterning of timing?: organisational routines in temporary organisations. PhD thesis, University College London, UK.

Adedayo, O; Michieletto, M; Bamidele, E and Ntigulirwa, M (2020) Application of hybrid green fences for security in public building designs in Nigeria: Lessons from Kigali, Rwanda and Abuja, Nigeria. Journal of Construction in Developing Countries, 25(1), pp. 147-162. ISSN 1823-6499

Adefila, A; Abuzeinab, A; Whitehead, T and Oyinlola, M (2020) Bottle house: Utilising appreciative inquiry to develop a user acceptance model. Built Environment Project and Asset Management, 10(4), pp. 567-583. ISSN 2044-124X

Adegun, O B (2023) Climatic disasters within a flood-prone coastal slum in Lagos: Coping capacities and adaptation prospects. International Journal of Disaster Resilience in the Built Environment, 14(2), pp. 212-228. ISSN 1759-5916

Adekanye, O G (2019) Evaluation of building policies, programs, and potential for energy efficiency in the United States. PhD thesis, Carnegie Mellon University, USA.

Adekunle, O O (2019) A linear programming-based optimization model to address skilled labor shortages through strategic investments in the construction industry. DEng thesis, Morgan State University, USA.

Adekunle, T O (2019) Summer performance, comfort, and heat stress in structural timber buildings under moderate weather conditions. Smart and Sustainable Built Environment, 8(3), pp. 220-242. ISSN 2046-6099

Adekunle, T O (2020) Occupants' comfort and stress indices in a structural timber school building in the Northeast US in different seasons. Building Research & Information, 48(3), pp. 331-348. ISSN 0961-3218

Adel Ahmadian, A (2020) Computational design for cooperative robotic assembly of nonstandard timber frame buildings. DSc thesis, ETH Zürich, Switzerland.

Adelekan, S; Wamuziri, S and Binsardi, B (2013) Evaluation of islamic financing products for housing and infrastructure development. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Adeniyi, O (2017) Capability maturity model for assessing flood resilience capabilities of the built environment. PhD thesis, University of Northumbria, UK.

Aderinlewo, O and Alade, G A (2014) Reliability-based analysis and design of steel frames with different supports. Journal of Engineering, Design and Technology, 12(1), pp. 39-52. ISSN 1726-0531

Adesiyan, B (2016) Exploring leadership strategies to maximize profitability in the Nigerian housing sector. DBA thesis, Walden University, USA.

Adetunji, I O (2006) Sustainable construction: a web-based performance assessment tool. EngD thesis, Loughborough University, UK.

Adewunmi, O A; Ibem, E and Amole, D (2014) Satisfaction of first-time residential clients with architectural services. Journal of Engineering, Design and Technology, 12(3), pp. 316-335.

Adewunmi, Y; Famuyiwa, F and Harrison, E (2009) Post occupancy evaluation of facilities in Nigerian private universities: A case study. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Adey, B T; Lethanh, N; Hartmann, A and Viti, F (2014) Evaluation of intervention strategies for a road link in the Netherlands. Built Environment Project and Asset Management, 4(2), pp. 180-198. ISSN 2044-124X

Adeyeye, K and Emmitt, S (2017) Multi-scale, integrated strategies for urban flood resilience. International Journal of Disaster Resilience in the Built Environment, 8(5), pp. 494-520. ISSN 1759-5916

Adham, A (2018) The political economy of work in Saudi Arabia: a comparative labour process analysis in two firms. PhD thesis, De Montfort University, UK.

Adia, I (2019) Strategies to secure sustainable funding for the successful conclusion of infrastructure projects. PhD thesis, Walden University, USA.

Adibfar, A and Costin, A M (2022) Creation of a mock-up bridge digital twin by fusing intelligent transportation systems (ITS) data into bridge information model (brim). Journal of Construction Engineering and Management, 148(9): 04022094, ISSN 0733-9364

Adinyira, E; Agyekum, K; Baiden, B K; Ebohon, O J and Ampratwum, G (2020) Regeneration of Sub-Saharan africa's open market places: A case for guileless stakeholder participation. Construction Economics and Building, 20(2), pp. 165-180. ISSN 2204-9029

Adjei, S; Ankrah, N; Ndekugri, I and Searle, D (2015) Investigating the extent to which waste management legislation affects waste management practices within the UK construction industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Adjei, S D (2016) Review of waste management in the UK construction industry. PhD thesis, University of Wolverhampton, UK.

Adjei, S D; Ankrah, N A; Adukpo, S E; Ndekugri, I and Searle, D (2024) Factors influencing the extent of waste management on construction sites. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Adjei, S D; Ankrah, N A; Ndekugri, I and Searle, D (2018) Sustainable construction and demolition waste management: Comparison of corporate and project level drivers. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Adukpo, Emmanuel Selorm (2018) The development of governance capabilities for project owners and operators : a dynamic capabilities perspective. PhD thesis, University of Hong Kong, Hong Kong.

Adzande, P; Gyuse, T T and Atser, J (2018) Correlates of crime in urban Makurdi, Nigeria. African Journal of Built Environment Research, 2(1), pp. 21-40. ISSN 2414-0236

Adzroe, E K (2015) A study of e-business technology transfer via foreign direct investment in the Ghanaian construction industry. PhD thesis, University of Salford, UK.

Afifi, M; Fotouh, A; Al-Hussein, M and Abourizk, S (2022) Integrated lean concepts and continuous/discrete-event simulation to examine productivity improvement in door assembly-line for residential buildings. International Journal of Construction Management, 22(13), pp. 2423-2434. ISSN 1562-3599

Afolayan, A S (2024) Gentrification-related buyouts and sustainable public low-income housing delivery in Lagos, Nigeria. Construction Economics and Building, 24(3), pp. 23-39. ISSN 2204-9029

Afshari, A R (2017) Methods for selection of construction project manager: Case study. Journal of Construction Engineering and Management, 143(12): 06017003, ISSN 0733-9364

Aftab, U; Hassan, M U; Ullah, F; Nasir, A R and Thaheem, M J (2026) BIM-based search and selection of construction material suppliers: A dedicated framework and prototype. Construction Innovation, 26(3), pp. 892-915. ISSN 1471-4175

Afxentiadis, D E (2010) Interpreting a major event organization's efforts to reliably manage information security risks: the case of the Athens 2004 Olympics. PhD thesis, London School of Economics and Political Science, UK.

Afzali Borujeni, S H; Zare, M and Adelzade Saadabadi, L (2024) Comparison of factors affecting the acceptance of the trenchless technology and open-trench method using ANP and AHP: Case study in Iran. Journal of Construction Engineering and Management, 150(1): 04023145, ISSN 0733-9364

Agapiou, A; Clausen, L E; Flanagan, R; Norman, G and Notman, D (1998) The role of logistics in the materials flow control process. Construction Management and Economics, 16(2), pp. 131-137. ISSN 01446193

Agarwal, S; Kant, R and Shankar, R (2022) Humanitarian supply chain management: Modeling the pre and post-disaster relief operations. International Journal of Disaster Resilience in the Built Environment, 13(4), pp. 421-439. ISSN 1759-5916

Agbaxode, P D K; Saghatforoush, E and Dlamini, S (2020) Integrated project delivery (IPD): Projecting a common good to key participants and the project. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Agbo, E A; Izam, Y D and Ayegba, C (2022) Quantifying the impact of work environment factors on the variability of labour productivity in wall plastering. Journal of Construction in Developing Countries, 27(2), pp. 109-125. ISSN 1823-6499

Agbola, S B (1983) The housebuilding industry in Osogbo, Nigeria: A study in the transformation of the industry in the process of development. PhD thesis, University of Pennsylvania, USA.

Agbulos, A; Mohamed, Y; Al-Hussein, M; Abourizk, S and Roesch, J (2006) Application of lean concepts and simulation analysis to improve efficiency of drainage operations maintenance crews. Journal of Construction Engineering and Management, 132(3), pp. 291-299. ISSN 0733-9364

Agdas, D and Ellis, R D (2010) The potential of xml technology as an answer to the data interchange problems of the construction industry. Construction Management and Economics, 28(7), pp. 737-746. ISSN 1466433X

Agha, R H M (2016) The role of intelligent systems in traditional courtyard houses in Baghdad, Iraq. PhD thesis, University of Newcastle upon Tyne, UK.

Agha, R H M and Hussein, A N (2024) Adaptation re-use of traditional cafés in Erbil, Iraq. International Journal of Building Pathology and Adaptation, 42(1), pp. 153-174. ISSN 23984708

Agha, R H M and Kamara, J M (2017) Adaptations in traditional courtyard houses in Baghdad, Iraq. International Journal of Building Pathology and Adaptation, 35(4), pp. 348-363.

Aghajamali, K; Metvaei, S; Suliman, A; Lei, Z and Chen, Q (2025) Development of a prefabricated construction productivity estimation model through BIM and data augmentation processes. Construction Management and Economics, 43(5), pp. 340-359. ISSN 0144-6193

Aghajamali, K; Nekouvaght Tak, A; Taghaddos, H; Mousaei, A; Behzadipour, S and Hermann, U (2023) Planning of mobile crane walking operations in congested industrial construction sites. Journal of Construction Engineering and Management, 149(7): 04023047, ISSN 0733-9364

Aghimien, D O; Aigbavboa, C; Edwards, D J; Mahamadu, A M; Olomolaiye, P; Nash, H and Onyia, M (2022) A fuzzy synthetic evaluation of the challenges of smart city development in developing countries. Smart and Sustainable Built Environment, 11(3), pp. 405-421. ISSN 2046-6099

Agnoletto, S (2013) Building an economic ethic niche: Italian immigrants in the Toronto construction industry (1950s-1970s): a case study. PhD thesis, Kingston University, UK.

Aguocha, T (2023) Best practices for cost monitoring and control in construction projects: An exploratory case study. DBA thesis, National University, USA.

Agustí-Juan, I (2018) Sustainability assessment and development of guidelines for digital fabrication in construction. DSc thesis, ETH Zürich, Switzerland.

Agyefi-Mensah, S; Kpamma, Z E and Hagan, D E (2020) Residential adaptations as users' tacit means of communicating spatial needs in housing design: A case study. Journal of Engineering, Design and Technology, 18(6), pp. 1593-1613. ISSN 1726-0531

Agyekum, K; Kukah, A S and Amudjie, J (2022) The impact of COVID-19 on the construction industry in Ghana: The case of some selected firms. Journal of Engineering, Design and Technology, 20(1), pp. 222-244. ISSN 1726-0531

Agyekum-Mensah, G (2013) The development of an innovative sustainable total planning and control system for construction projects. PhD thesis, Nottingham Trent University, UK.

Agyekum-Mensah, G (2019) The degree of accuracy and factors that influence the uncertainty of SME cost estimates. International Journal of Construction Management, 19(5), pp. 413-426. ISSN 1562-3599

Agyem-Bediako, S F (2007) Management commitment to safety among multinational construction companies in developing countries: A case of Ghana. DSc thesis, University of Massachusetts Lowell, USA.

Ahankoob, A.; Abbasnejad, B.; Nazareth, I.; Macasaet, P. and Wong, P. S. (2026) Optimising virtual site assessment process for mounted PV array design: An immersive BIM-based approach for existing buildings. Smart and Sustainable Built Environment, pp. 1-26. ISSN 2046-6099

Ahankoob, A.; Calixto, V.; Abbasnejad, B. and Wong, P. S. P. (2026) A generative BIM approach for DfMA integration into building facade design. International Journal of Construction Management, 26(9), pp. 1858-1878. ISSN 1562-3599

Ahiaga-Dagbui, D D and Smith, S D (2014) Exploring escalation of commitment in construction project management: Case study of the scottish parliament project. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Ahiakwo, O A (2015) Improving construction processes in Nigeria using the Last Planner® System. PhD thesis, University of Wolverhampton, UK.

Ahlstrand, R (2022) Structures of subcontracting: Work organisation, control, and labour in the Swedish building sector. PhD thesis, Lund University, Sweden.

Ahmad, A G and Rahman, H F A (2010) Treatment of salt attack and rising damp in heritage buildings in Penang, Malaysia. Journal of Construction in Developing Countries, 15(1), pp. 93-113. ISSN 1823-6499

Ahmad, A G B (1994) Conservation of British colonial buildings built between 1800 and 1930 in Malaysia. PhD thesis, University of Sheffield, UK.

Ahmad, H; An, M and Gaterell, M (2008) Km model to embed knowledge management activities into work activities in construction organisations. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Ahmad, H S; An, M and Gaterell, M (2007) Development of km model to simplify knowledge management implementation in construction projects. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Ahmad, H S M (2011) Development of knowledge management model for knowledge management implementation and application in construction projects. PhD thesis, University of Birmingham, UK.

Ahmad, Hesham Saleh Mahmoud (2011) Development of km model for knowledge management implementation and application in construction projects. PhD thesis, University of Birmingham, UK.

Ahmad, S; Soetanto, R and Goodier, C (2019) Lean approach in precast concrete component production. Built Environment Project and Asset Management, 9(3), pp. 457-470. ISSN 2044-124X

Ahmad, S B S; Mazhar, M U; Bruland, A; Andersen, B S; Langlo, J A and Torp, O (2020) Labour productivity statistics: A reality check for the Norwegian construction industry. International Journal of Construction Management, 20(1), pp. 39-52. ISSN 1562-3599

Ahmad, T; Aibinu, A A and Stephan, A (2017) Green building projects: Process innovation leading to project innovation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Ahmad, T; Thaheem, M J and Anwar, A (2016) Developing a green-building design approach by selective use of systems and techniques. Architectural Engineering and Design Management, 12(1), pp. 29-50. ISSN 1745-2007

Ahmadian, F F A; Akbarnezhad, A; Rashidi, T H and Waller, S T (2016) Accounting for transport times in planning off-site shipment of construction materials. Journal of Construction Engineering and Management, 142(1): 04015050, ISSN 0733-9364

Ahmed, A; Mohammed, H A; Gambatese, J and Hurwitz, D (2021) Effects of flashing blue lights mounted on paving equipment on vehicle speed behavior in work zones. Journal of Construction Engineering and Management, 147(9): 04021101, ISSN 0733-9364

Ahmed, I (2016) Housing and resilience: Case studies from the Cook Islands. International Journal of Disaster Resilience in the Built Environment, 7(5), pp. 489-500. ISSN 1759-5916

Ahmed, I and Charlesworth, E R (2015) An evaluation framework for assessing resilience of post-disaster housing. International Journal of Disaster Resilience in the Built Environment, 6(3), pp. 300-312. ISSN 1759-5916

Ahmed, I and Kabir, M H (2021) Building codes and regulations for disaster resilience in Bangladesh: The case of Dhaka. International Journal of Disaster Resilience in the Built Environment, 12(5), pp. 540-554. ISSN 1759-5916

Ahmed, I and McEvoy, D (2014) Post-tsunami resettlement in Sri Lanka and India: Site planning, infrastructure and services. International Journal of Disaster Resilience in the Built Environment, 5(1), pp. 53-65. ISSN 1759-5916

Ahmed, M E K and Girgs, I R N (2023) A comparative study on achieving universally designed schools. Two case studies at aswan city, Egypt. International Journal of Construction Management, 23(12), pp. 2102-2115. ISSN 1562-3599

Ahmed, M O; Abdul Nabi, M; El-Adaway, I H; Caranci, D; Eberle, J; Hawkins, Z and Sparrow, R (2021) Contractual guidelines for promoting integrated project delivery. Journal of Construction Engineering and Management, 147(11): 05021008, ISSN 0733-9364

Ahmed, M U (2000) ‘Champions of collaboration’ in collaborative technological innovation. PhD thesis, Simon Fraser University, Canada.

Ahmed, S; Haq, I and Anam, S M A (2024) Impacts of COVID-19 on the construction sector in the least developed countries. International Journal of Building Pathology and Adaptation, 42(6), pp. 1085-1105. ISSN 2398-4708

Ahmed, S; Mahmud, A; Akoh, S and Tariq, U (2024) Exploring IPD as an antidote to fragmentation within the UK construction sector. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Ahmed, S N; Pasquire, C and Manu, E (2022) Key factors affecting commercial actors in collaborative working within the UK construction industry. Journal of Financial Management of Property and Construction, 27(3), pp. 323-347. ISSN 1366-4387

Ahmed, S S (2018) Innovation of building processes in Syria by using BIM. PhD thesis, Czech Technical University, Czech Republic.

Ahmed, V; Saboor, S; Almarzooqi, F A; Alshamsi, H A; Alketbi, M A and Al Marei, F A (2021) A comparative study of energy performance in educational buildings in the UAE. Construction Economics and Building, 21(3), pp. 33-57. ISSN 2204-9029

Ahmed Memon, Z; Zaimi, M A M and Mustaffar, M (2007) A systematic procedure for developing the 3D model to evaluate the construction project progress. Construction Innovation, 7(2), pp. 187-199. ISSN 1471-4175

Ahmed Namadi, S i (2019) A framework for collaborative costing in the UK construction industry. PhD thesis, Nottingham Trent University, UK.

Ahn, C R and Lee, S (2013) Importance of operational efficiency to achieve energy efficiency and exhaust emission reduction of construction operations. Journal of Construction Engineering and Management, 139(4), pp. 404-413. ISSN 0733-9364

Ahn, Y H; Pearce, A R and Holley, P W (2009) Project delivery system for foreign manufacturers in the United States. International Journal of Construction Education and Research, 5(3), pp. 149-166. ISSN 1557-8771

Ahsan, S; El-Hamalawi, A; Bouchlaghem, D and Ahmad, S (2007) Mobile technologies for improved collaboration on construction sites. Architectural Engineering and Design Management, 3(4), pp. 257-272. ISSN 1745-2007

Ahuja, V; Yang, J; Skitmore, M and Shankar, R (2010) An empirical test of causal relationships of factors affecting ICT adoption for building project management: An Indian SME case study. Construction Innovation, 10(2), pp. 164-180. ISSN 1471-4175

Ahuja, Vanita (2007) It enhanced communication protocols for building project management by small and medium enterprises in the Indian construction industry. PhD thesis, Queensland University of Technology, Australia.

Aibinu, A and Papadonikolaki, E (2016) BIM implementation and project coordination in design-build procurement. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Aibinu, A A; Carter, S; Francis, V and Vaz-Serra, P (2020) Request for information frequency and their turnaround time in construction projects: A data-analytic study. Built Environment Project and Asset Management, 10(1), pp. 1-15. ISSN 2044-124X

Aibinu, A A and Papadonikolaki, E (2020) Conceptualizing and operationalizing team task interdependences: BIM implementation assessment using effort distribution analytics. Construction Management and Economics, 38(5), pp. 420-446. ISSN 01446193

Aidane, A (2021) Applying an equity lens to project stakeholder engagement: How organizations are embedding equitable stakeholder engagement in their project management processes. PhD thesis, Canterbury Christ Church University, UK.

Aihie, V U; Oyetunji, A K; Omotayo, T and Ekundayo, D (2025) Does the analytical hierarchy process help appraisers make better decisions? A quasi-experimental approach for property investment comparables. International Journal of Building Pathology and Adaptation, 43(1), pp. 117-133. ISSN 2398-4708

Aitken, A and Paton, R A (2016) The 'transaction X-ray': Understanding construction Procurement. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(3), pp. 115-123. ISSN 17514304

Aiyin, J and Yimin, Z (2010) A multi-stage approach to time-cost trade-off analysis using mathematical programming. International Journal of Construction Management, 10(3), pp. 13-27. ISSN 1562-3599

Ajayi, S; Saad, A; Oyegoke, A and Alaka, H (2024) Enhancing productivity and sustainability through BIM-based plugins: A case study of AutoBIM carbon diagnostics system. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Aka, A; Isah, A D; Salisu, O I and Bello, A O (2025) Students’ perception of strategies for effective lean knowledge in future Nigerian construction industry. Construction Innovation, 25(4), pp. 1171-1187. ISSN 1471-4175

Akadiri, O P (2011) Development of a multi-criteria approach for the selection of sustainable materials for building projects. PhD thesis, University of Wolverhampton, UK.

Akanmu, A; Olayiwola, J and Olatunji, O A (2020) Musculoskeletal disorders within the carpentry trade: Analysis of timber flooring subtasks. Engineering, Construction and Architectural Management, 27(9), pp. 2577-2590. ISSN 0969-9988

Akbar, M R (2012) Evaluating sustainability in high-rise developments. PhD thesis, Ulster University, UK.

Akbari, S; Pour Rahimian, F; Sheikhkhoshkar, M; Banihashemi, S and Khanzadi, M (2020) Dynamic sustainable success prediction model for infrastructure projects: a rough set based fuzzy inference system. Construction Innovation, 20(4), pp. 545-567. ISSN 1471-4175

Akbil, E and Butterworth, C (2025) Urban rooms and the expanded ecology of urban living labs. Buildings & Cities, 6(1), pp. 544-560. ISSN 2632-6655

Akbiyikli, R and Eaton, D (2006) Operation and maintenance (O&M) management in PFI road projects in the UK. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Akcamete, A (2011) A formal approach for managing facility change information and capturing change history as part of building information models (BIMs). PhD thesis, Carnegie Mellon University, USA.

Akdede, N.; Ay, B. Ö and Dino, İ G. (2026) Rethinking the second life of post-disaster and post-conflict temporary housing. Buildings & Cities, 7(1), pp. 488-503. ISSN 2632-6655

Akeila, M; Preece, C and Kuok, K K K (2021) Evaluating the environmental performance of 3D printed shelters in Jordan. Journal of Construction in Developing Countries, 26(2), pp. 117-134. ISSN 1823-6499

Akinci, B; Kiziltas, S; Ergen, E; Karaesmen, I Z and Keceli, F (2006) Modeling and analyzing the impact of technology on data capture and transfer processes at construction sites: A case study. Journal of Construction Engineering and Management, 132(11), pp. 1148-1157. ISSN 0733-9364

Akinradewo, O; Aigbavboa, C; Aghimien, D; Oke, A and Ogunbayo, B (2023) Modular method of construction in developing countries: The underlying challenges. International Journal of Construction Management, 23(8), pp. 1344-1354. ISSN 1562-3599

Akinsola, A O (1997) An intelligent model of variations' contingency on constructions projects. PhD thesis, University of Wolverhampton, UK.

Akintoye, A; Beck, M; Hardcastle, C; Chinyio, E A and Asenova, D (2001) Risk identification practices under PFI environment. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Akintoye, A; Hardcastle, C; Beck, M; Chinyio, E and Asenova, D (2003) Achieving best value in private finance initiative project procurement. Construction Management and Economics, 21(5), pp. 461-470. ISSN 01446193

Akoh, S R (2018) Risk management framework for highway construction projects in Nigeria. PhD thesis, Heriot-Watt University, UK.

Aksenova, G (2020) The dark side of ecosystem orchestration: an empirical investigation of building information management in the digital built environment sector. PhD thesis, University of Liverpool, UK.

Akter, J; Datta, S D; Islam, M; Tayeh, B A; Sraboni, S A and Das, N (2025) Assessment and analysis of the effects of implementing building information modelling as a lean management tool in construction management. International Journal of Building Pathology and Adaptation, 43(4), pp. 877-894. ISSN 2398-4708

Akuhe, G; Tutesigensi, A and Kayondo, M (2023) Consequences of poor management of acculturation on large infrastructure projects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Al Ahbabi, M S (2014) Process protocol for the implementation of integrated project delivery in the UAE: A client perspective. PhD thesis, University of Salford, UK.

Al Ahbabi, M S M (2014) Process protocol for the implementation of integrated project delivery in the UAE: a client perspective. PhD thesis, University of Salford, UK.

Al Asali, M W (2020) Craft-inclusive construction: design strategies for thin-tile vaulting. PhD thesis, University of Cambridge, UK.

Al Dairi, J S S (2017) The design and development of a knowledge-based lean six sigma maintenance system for sustainable buildings. PhD thesis, University of Bradford, UK.

Al Ghazal, H (2018) Post occupancy evaluation involving end users in Saudi Arabian office buildings through the use of a shortened quality function deployment method. PhD thesis, University of Manchester, UK.

Al Hashmi, E (2016) Fire engineering in sustainable buildings: an evaluation for the application of performance-based design in Abu Dhabi. PhD thesis, University of Central Lancashire, UK.

Al Hawsah, M O (2020) The impact of project sponsors' decisions on the success of projects: An action research study. PhD thesis, University of Liverpool, UK.

Al Niyadi, R (2024) Public relations mediation in citizen engagement for Oman’s nation-building: The case of Oman vision 2040. PhD thesis, Lancaster University, UK.

Al Qasimi, S K H (2019) The impact of implementing heritage elements in contemporary buildings in the United Arab Emirates. PhD thesis, University of Wolverhampton, UK.

Al Saudi, I S A (2011) The impediments to the adoption of the design and build project procurement strategy in the Saudi construction industry. PhD thesis, Heriot-Watt University, UK.

Al Shalabi, F A (2016) BIM framework for energy and maintenance performance assessment for facility management. PhD thesis, Iowa State University, USA.

Al Subaih, A (2016) A framework for implementation of IPD principles in oil & gas projects. PhD thesis, University of Salford, UK.

Al Surf, Mohammed Saied (2014) Challenges facing the application of sustainability to housing in Saudi Arabia. PhD thesis, Queensland University of Technology, Australia.

Al Yami, H M A (2017) Decision making analysis for an integrated risk management framework of maritime container port infrastructure and transportation systems. PhD thesis, Liverpool John Moores University, UK.

Al Zarooni, S; Abdou, A and Lewis, J (2011) Improving the client briefing for UAE public healthcare projects: Space programming guidelines. Architectural Engineering and Design Management, 7(4), pp. 251-265. ISSN 1745-2007

Al-Adwani, M (2021) Development of a BIM and lean construction process protocol for the construction industry in Kuwait: From a client perspective. PhD thesis, University of Salford, UK.

Al-Adwani, M M H M A (2021) Development of a BIM and LEAN construction process protocol for the construction industry in Kuwait, from a client perspective. PhD thesis, University of Salford, UK.

Al-Ajam, M (2008) Integrating collaborative extranets with project integrated databases to improve the construction tender stage. PhD thesis, University of Salford, UK.

Al-Amin, Md (2023) Pavement maintenance and rehabilitation programming and budget allocation from strategic perspectives: Multiobjective optimization models. PhD thesis, University of Texas at Austin, USA.

Al-Ashaikh, M H (1996) Project management in the public sector of Saudi Arabia, problems and solutions. PhD thesis, University of Liverpool, UK.

Al-Atawi, S (2005) An ICT framework to improve the tendering process in the governmental construction sector in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.

Al-Aubaidy, N A (2015) Factors affecting underreporting of construction safety incidents on capital projects. PhD thesis, University of Texas at Austin, USA.

Al-Azemi, K (2012) Risk management for build, operate and transfer projects within Kuwait. PhD thesis, Loughborough University, UK.

Al-Balushi, R A; Kaka, A and Fortune, C (2004) Project management processes and the achievement of organizational strategies: The case of telecomm. Operator. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Al-Barghouthi, M T (2010) Capturing tacit knowledge in the construction industry in Saudi Arabia. DM thesis, University of Phoenix, USA.

Al-Bataineh, M; Abourizk, S and Parkis, H (2013) Using simulation to plan tunnel construction. Journal of Construction Engineering and Management, 139(5), pp. 564-571. ISSN 0733-9364

Al-Bayati, A J (2019) Satisfying the need for diversity training for Hispanic construction workers and their supervisors at US construction workplaces: A case study. Journal of Construction Engineering and Management, 145(6): 05019007, ISSN 0733-9364

Al-Bazi, A and Dawood, N (2018) Simulation-based optimisation using simulated annealing for crew allocation in the precast industry. Architectural Engineering and Design Management, 14(1-2), pp. 109-126. ISSN 1745-2007

Al-Dahash, H F K; Mohammed, R K; Al-Rubaye, M and Hardman, M (2024) Comprehensive evaluation of the foreign direct investment (fdi) opportunities in Iraq: The karbala cement manufacturing company as a case study. International Journal of Construction Management, 24(6), pp. 573-585. ISSN 1562-3599

Al-Gahtani, K; Alsugair, A; Alsanabani, N; Alabduljabbar, A and Almutairi, B (2024) Forecasting delay-time model for Saudi construction projects using DEMATEL–sd technique. International Journal of Construction Management, 24(11), pp. 1225-1239. ISSN 1562-3599

Al-Ghassani, A M (2003) Improving the structural design process: a knowledge management approach. PhD thesis, Loughborough University, UK.

Al-Ghzawi, M and El-Rayes, K (2023) Optimizing the planning of airport airside expansion projects to minimize air traffic disruptions and construction cost. Journal of Construction Engineering and Management, 149(4): 04023013, ISSN 0733-9364

Al-Hafith, O; Bk, S and de Wilde, P (2023) Assessing annual thermal comfort extent in central courtyards: Baghdad as a case study. Smart and Sustainable Built Environment, 12(3), pp. 660-681. ISSN 2046-6099

Al-Hajri, S N (2017) Public values and project management practices & processes in the public sector in the case of the State of Qatar. PhD thesis, Bangor University, UK.

Al-Hasan, M A A (2007) A parametric model for the estimation of construction project labour productivity. PhD thesis, Liverpool John Moores University, UK.

Al-Hinai, A (2024) A hermeneutical approach to social value: A case study of national infrastructure planning in Oman. PhD thesis, University of Manchester, UK.

Al-Hussein, M; Kumar, J; Sharma, V and Mah, D (2006) A knowledge-based automated development permit approval process in the housing industry. Engineering, Construction and Architectural Management, 13(3), pp. 290-306. ISSN 0969-9988

Al-Jallal, A A (1991) Technology adoption and innovation patterns in construction industry in Saudi Arabia: An exploratory study. PhD thesis, University of Texas at Austin, USA.

Al-Keim, A (2017) Strategies to reduce cost overruns and schedule delays in construction projects. PhD thesis, Walden University, USA.

Al-Khiami, M. I. and Lindhard, Sø M. (2026) On-site evaluation of back-support exoskeleton effectiveness in construction: A multiple case study of physical performance, ergonomic comfort, and user acceptance among masonry workers. Journal of Construction Engineering and Management, 152(10): 04026167, ISSN 0733-9364

Al-Kofahi, Z G; Mahdavian, A and Oloufa, A (2022) System dynamics modeling approach to quantify change orders impact on labor productivity 1: Principles and model development comparative study. International Journal of Construction Management, 22(7), pp. 1355-1366. ISSN 1562-3599

Al-Meshekeh, H S and Langford, D A (1999) Conflict management and construction project effectiveness: a review of the literature and development of a theoretical framework. Journal of Construction Procurement, 5(1), pp. 58-75. ISSN 1358-9180

Al-Mhdawi, M K S (2022) Risk management of construction projects under extreme conditions: a case study of Iraq. PhD thesis, University of Southampton, UK.

Al-Mohammad, M S; Haron, A T; Aloko, M N and Rahman, R A (2023) Factors affecting BIM implementation in post-conflict low-income economies: The case of Afghanistan. Journal of Engineering, Design and Technology, 21(1), pp. 299-318. ISSN 1726-0531

Al-Muqdadi, F (2020) Assessing the potentials of heritage building information modelling (HBIM) in damaged heritage reconstruction. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Al-Musallam, A A (2002) A web-based approach for coordinating architectural drawings with other construction documents. PhD thesis, Illinois Institute of Technology, USA.

Al-Musleh, A M (2011) Development of a framework for total quality management principles in the construction companies with special reference to the construction companies in the state of Qatar. PhD thesis, Queen Mary University of London, UK.

Al-Obaidi, T S A (2018) A transformational organisational framework for improving Iraqi quasi-governmental construction companies' performance. PhD thesis, University of Salford, UK.

Al-Otaibi, S (2010) A framework for improving the performance of standard design models in the Saudi Ministry of Interior projects. PhD thesis, Loughborough University, UK.

Al-Rasheed, K A (1997) Construction schedule logic development: The impact of visualization. PhD thesis, University of Colorado at Boulder, USA.

Al-Refaie, A; Alashwal, A; Abdul-Samad, Z; Salleh, H and Elshafie, A (2023) Evaluation of weather-productivity models of construction labour for tropics. Built Environment Project and Asset Management, 13(2), pp. 238-252. ISSN 2044-124X

Al-Rqaibat, Sana'A Mohammad (2019) A framework for the implementation of digital technologies in the concept stage of the architectural design process. PhD thesis, Virginia Tech, USA.

Al-Saeed, Y; Edwards, D J and Scaysbrook, S (2020) Automating construction manufacturing procedures using BIM digital objects (BDOs): Case study of knowledge transfer partnership project in UK. Construction Innovation, 20(3), pp. 345-377. ISSN 1471-4175

Al-Saeed, Y; Parn, E; Edwards, D J and Scaysbrook, S (2019) A conceptual framework for utilising BIM digital objects (BDO) in manufacturing design and production: A case study. Journal of Engineering, Design and Technology, 17(5), pp. 960-984. ISSN 1726-0531

Al-Saggaf, A; Hegazy, T; Nasir, H and Taha, M (2022) Computerized DSS for evaluating design performance of residential buildings using additive weighting approach. Architectural Engineering and Design Management, 18(5), pp. 631-651. ISSN 1745-2007

Al-Sakkaf, A; Bagchi, A; Zayed, T and Mahmoud, S (2023) Sustainability assessment model for heritage buildings. Smart and Sustainable Built Environment, 12(1), pp. 105-127. ISSN 2046-6099

Al-Saleh, F S (1980) A case study and evaluation of a technological delivery system: Construction management in Saudi Arabia. PhD thesis, University of Washington, USA.

Al-Saqer, K M (2001) An investigation into the development processes and project management practices of government construction projects in Saudi Arabia. PhD thesis, University of Birmingham, UK.

Al-Shammery, H A-H (2017) Improving the school building delivery process in post conflict Iraq. PhD thesis, University of Salford, UK.

Al-Sinan, M A (2004) TQM and the construction industry: Saudi Arabia: a case study. PhD thesis, City, University of London, UK.

Al-Smadi, H; Al-Sakkaf, A; Zayed, T and Nasiri, F (2023) An integrated space-based building maintenance management model using multi-objective optimization. Smart and Sustainable Built Environment, 12(2), pp. 277-297. ISSN 2046-6099

Al-Sudairi, A A (2000) Evaluation of construction processes: Traditional practices versus lean principles. PhD thesis, University of Colorado at Boulder, USA.

Al-Tabtabai, H (2002) Construction procurement strategy selection using analytical hierarchy process. Journal of Construction Procurement, 8(2), pp. 117-132. ISSN 1358-9180

Al-Tameemi, K S and Samir, H H (2022) The impact of investment projects on the traditional architectural identity of basra city. International Journal of Building Pathology and Adaptation, 40(4), pp. 661-669. ISSN 23984708

Al-Wareh, M (1979) Investigation of the design procedures for buildings of quality in modern architecture, with notes on the relevant contemporary situation in Syria. PhD thesis, University of Sheffield, UK.

Al-Wazeer, A A-R (2007) Risk-based bridge maintenance strategies. PhD thesis, University of Maryland, College Park, USA.

Al-Werikat, G K E (2017) The impact of supply chain management on construction projects performance in Jordan. PhD thesis, Coventry University, UK.

Al-Yami, A and Sanni-Anibire, M O (2021) BIM in the Saudi Arabian construction industry: State of the art, benefit and barriers. International Journal of Building Pathology and Adaptation, 39(1), pp. 33-47. ISSN 23984708

Al-Yami, A M H (2008) An integrated approach to value management and sustainable construction during strategic briefing in Saudi construction projects. PhD thesis, Loughborough University, UK.

Al-Zarrad, M A (2018) Multi-criteria decision-making model to improve linear repetitive projects time-cost trade-off in uncertain environment. PhD thesis, University of Alabama, USA.

Al-Zubi, M (2011) The impact of organizational culture on knowledge sharing in the construction sector in Jordan. PhD thesis, University of Salford, UK.

AlHamouri, K; Caldas, C H; Hwang, B G; Krishnankutty, P and de Oliveira, D P (2021) Utilization of workface planning for the execution of maintenance activities, shutdowns and turnarounds in petrochemical facilities: A case study. International Journal of Construction Management, 21(11), pp. 1115-1129. ISSN 1562-3599

AlKheder, S; Al Otaibi, H; Al Baghli, Z; Al Ajmi, S and Alkhedher, M (2025) Analytic hierarchy process (AHP) assessment of Kuwait mega construction projects' complexity. Engineering, Construction and Architectural Management, 32(3), pp. 1903-1946. ISSN 0969-9988

Alac, R; Hammad, A W A; Hadigheh, A and Opdyke, A (2025) A multi-criteria approach to egress location selection in buildings: Integrating economic, technical and social factors. Engineering, Construction and Architectural Management, 32(12), pp. 8304-8325. ISSN 0969-9988

Aladağ, H and Işık, Z (2019) Design and construction risks in BOT type mega transportation projects. Engineering, Construction and Architectural Management, 26(10), pp. 2223-2242. ISSN 0969-9988

Alade, K and Windapo, A O (2021) Developing effective 4IR leadership framework for construction organisations. Engineering, Construction and Architectural Management, 28(5), pp. 1377-1396. ISSN 0969-9988

Alade, W A (2020) Environmental and socio-economic impacts of Ojodu-Berger Road upgrade, Lagos, Nigeria. Journal of Construction Business and Management, 4(1), pp. 24-33. ISSN 2521-0165

Alaka, H; Oyedele, L; Toriola-Coker, O; Owolabi, H; Akinade, O; Bilal, M and Ajayi, S (2015) Methodological approach of construction businesses failure prediction studies: A review. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Alam, M (2009) Investigating the effectiveness of continuing professional development in project management. PhD thesis, University of Manchester, UK.

Alam, M K and Hasan, M D R (2010) Protection works against wave attacks in the haor areas of Bangladesh: Analysis of sustainability. Journal of Construction in Developing Countries, 15(2), pp. 69-85. ISSN 1823-6499

Alameri, H (2018) A resource-based perspective of project success in public sector projects in Abu Dhabi. PhD thesis, Bournemouth University, UK.

Alanjari, P; Razavialavi, S and AbouRizk, S (2015) Hybrid genetic algorithm-simulation optimization method for proactively planning layout of material yard laydown. Journal of Construction Engineering and Management, 141(10): 06015001, ISSN 0733-9364

Alankarage, S; Chileshe, N; Samaraweera, A; Rameezdeen, R and Edwards, D J (2023) Guidelines for using a case study approach in construction culture research: Application to BIM-enabled organizations. Journal of Construction Engineering and Management, 149(9): 05023009, ISSN 0733-9364

Alankarage, S; Chileshe, N; Samaraweera, A; Rameezdeen, R and Edwards, D J (2023) Organisational BIM maturity models and their applications: A systematic literature review. Architectural Engineering and Design Management, 19(6), pp. 567-585. ISSN 1745-2007

Alao, O O; Jagboro, G O and Opawole, A (2018) Cost and time implications of abandoned project resuscitation: A case study of educational institutional buildings in Nigeria. Journal of Financial Management of Property and Construction, 23(2), pp. 185-201. ISSN 1366-4387

Alarcón, L F; Ashley, D B; De Hanily, A S; Molenaar, K R and Ungo, R (2011) Risk planning and management for the Panama Canal expansion program. Journal of Construction Engineering and Management, 137(10), pp. 762-771. ISSN 0733-9364

Alarcón, L F; Rodríguez, A and Mourgues, C (2012) Impact of machine-failure costs on equipment replacement policies: Tunneling company case study. Journal of Construction Engineering and Management, 138(6), pp. 767-774. ISSN 0733-9364

Alarcón-Ramirez, D; Oliveros-Romero, J and Mahn, D (2026) Performance comparison of public–private partnerships and traditionally procured hospitals. Construction Management and Economics, 44(2), pp. 79-97. ISSN 0144-6193

Alasad, R (2015) Dynamic modelling of demand risk in PPP infrastructure projects: the case of toll roads. PhD thesis, Heriot-Watt University, UK.

Alatalo, E; Laine, M and Kyrönviita, M (2025) Increasing civic resilience in urban living labs: City authorities' roles. Buildings & Cities, 6(1), pp. 917-933. ISSN 2632-6655

Alazzaz, F and Whyte, A (2015) Linking employee empowerment with productivity in off-site construction. Engineering, Construction and Architectural Management, 22(1), pp. 21-37. ISSN 0969-9988

Albano, L D (1992) An axiomatic approach to performance-based design. PhD thesis, Massachusetts Institute of Technology, USA.

Albar, A M (2022) The design and development of an intelligent adaptive extrusion system for additive manufacturing robotics in construction using advanced cementitious materials. PhD thesis, Brunel University, UK.

Albassami, A A (2014) A framework for international commercialization of innovative products in residential construction: A case of structural insulated panels (SIPs) in the United States and Saudi Arabia. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Albert, I (2020) A lean production approach to materials management in the Nigerian construction industry. PhD thesis, Nelson Mandela University, South Africa.

Albogamy, A and Dawood, N (2015) Development of a client-based risk management methodology for the early design stage of construction processes: Applied to the KSA. Engineering, Construction and Architectural Management, 22(5), pp. 493-515. ISSN 0969-9988

Albuquerque, F and Bersanetti, F (2024) Servitization and construction industry: Ideas and insights from the commercial building sector. International Journal of Construction Management, 24(2), pp. 109-123. ISSN 1562-3599

Alderman, N and Ivory, C (2010) Service-led projects: Understanding the meta-project context. Construction Management and Economics, 28(11), pp. 1131-1143. ISSN 1466433X

Alenazi, E O N (2018) Using BIM for delay management in public sector construction projects in KSA. PhD thesis, Loughborough University, UK.

Alencastro, J; Fuertes, A and de Wilde, P (2016) Improving the quality management systems for energy-efficient social housing projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Alencastro, J; Fuertes, A and de Wilde, P (2020) Quality management in UK social housing projects: Addressing thermal performance. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Alfadhli, A (2013) Does the alternative dispute resolution have a role to play in the construction industry in the State of Kuwait?: look into the most appropriate methodology that may be taken in Kuwait in comparison with what are available in the English legal system. PhD thesis, University of Southampton, UK.

Alfandi, G R (2015) Investigating risk management capability of construction firms in the Gulf Cooperation Council (GCC) countries. PhD thesis, Brunel University, UK.

Alfar, E (2016) GIS-based pavement maintenance management model for local roads in the UK. PhD thesis, University of Salford, UK.

Alfieri, E; Seghezzi, E; Sauchelli, M; Di Giuda, G M and Masera, G (2020) A BIM-based approach for DfMA in building construction: Framework and first results on an Italian case study. Architectural Engineering and Design Management, 16(4), pp. 247-269. ISSN 1745-2007

Algithami, S M (2017) The use of a system dynamics approach for modelling maturity of total quality management in Saudi construction firms. PhD thesis, University of Reading, UK.

Alhabashi, M H (1991) Material management in the United States construction industry. DSc thesis, George Washington University, USA.

Alhaddad, H. and Galal Ahmed, K. (2026) Informal household-practiced urban agriculture as a contributor to sustainability and resilience: The case of emirati neighbourhoods. Smart and Sustainable Built Environment, 15(3), pp. 1085-1114. ISSN 2046-6099

Alharbi, F (2020) Critical delay factors in housing construction projects in Saudi Arabia: Assessment and solutions. PhD thesis, Nottingham Trent University, UK.

Alharbi, S (2020) The influence of human resources management on job embeddedness and voluntary turnover intention: a case study of the constructions industry in Saudi Arabia. PhD thesis, University of Plymouth, UK.

Alharmoodi, S (2017) The effect of stakeholder integration on open innovation in construction projects. PhD thesis, British University in Dubai, UAE.

Alhawamdeh, M (2020) An interpretivist approach for the development of a behavioural framework to support the adoption of waste minimisation behaviour of contractors: the case study of Jordan. PhD thesis, University of Salford, UK.

Alhumaidi, H M (2015) Construction contractors ranking method using multiple decision-makers and multiattribute fuzzy weighted average. Journal of Construction Engineering and Management, 141(4): 04014092, ISSN 0733-9364

Alhusban, A A and Almshaqbeh, S N (2024) Delivering an inclusive built environment for physically disabled people in public universities (Jordan as a case study). Journal of Engineering, Design and Technology, 22(6), pp. 1980-1998. ISSN 1726-0531

Ali, A (2018) Development of a framework for sustainable construction waste management: a case study of three major Libyan cities. PhD thesis, University of Wolverhampton, UK.

Ali, A H; Kineber, A F; Elyamany, A; Hussein Ibrahim, A and Daoud, A O (2025) Exploring stationary and major modular construction challenges in developing countries: A case study of Egypt. Journal of Engineering, Design and Technology, 23(2), pp. 569-598. ISSN 1726-0531

Ali, A K (2019) A case study in developing an interdisciplinary learning experiment between architecture, building construction, and construction engineering and management education. Engineering, Construction and Architectural Management, 26(9), pp. 2040-2059. ISSN 0969-9988

Ali, Atif (2010) Investigating project management practices in public sector organisations of a less developed country. PhD thesis, RMIT University, Australia.

Ali, F; Chowdary, B V and Gonzales, L (2013) An integrated design approach for rapid product development: A case study through application of reverse engineering, re-engineering and fast prototyping tools. Journal of Engineering, Design and Technology, 11(2), pp. 178-189. ISSN 1726-0531

Ali, I; Peng, C; Ullah, H; Deng, J; Bibi, A and Mahar, W A (2025) Multi-objective optimization of insulation materials for building energy and comfort improvements in hot and arid regions. Building Research & Information, 53(6), pp. 797-816. ISSN 0961-3218

Ali, N (2018) A framework for designing energy efficient dwellings satisfying socio-cultural needs in hot climates. PhD thesis, De Montfort University, UK.

Ali, R A; Mannakkara, S and Wilkinson, S (2020) Factors affecting successful transition between post-disaster recovery phases: A case study of 2010 floods in Sindh, Pakistan. International Journal of Disaster Resilience in the Built Environment, 11(5), pp. 597-614. ISSN 1759-5916

Ali Amjad, A (2003) A causal path model to measure the effects of professional training upon time overruns in Saudi construction industry. PhD thesis, Heriot-Watt University, UK.

Aliero, B A (1994) Utilisation of environmental impact assessment technique in the assessment of impact of human interference on natural ecology of estuaries: a case study of Mersey Estuary. PhD thesis, University of Salford, UK.

Alikhani, H; Le, C; Jeong, H D and Damnjanovic, I (2023) Sequential machine learning for activity sequence prediction from daily work report data. Journal of Construction Engineering and Management, 149(9): 04023082, ISSN 0733-9364

Alinaitwe, H; Apolot, R and Tindiwensi, D (2013) Investigation into the causes of delays and cost overruns in Uganda's public sector construction projects. Journal of Construction in Developing Countries, 18(2), pp. 33-47. ISSN 1823-6499

Aljammaz, K M A (2006) An approach for the assessment of sustainability of construction materials. PhD thesis, University of Newcastle upon Tyne, UK.

Aljohani, A (2019) Cost overrun causality model in Saudi Arabian public sector construction projects. PhD thesis, Robert Gordon University, UK.

Alkaabi, J A (1994) Improved materials management using automatic identification techniques. PhD thesis, Loughborough University, UK.

Alkass, S and Harris, F (1991) Development of an integrated system for planning earthwork operations in road construction. Construction Management and Economics, 9(3), pp. 263-289. ISSN 01446193

Alkass, S; Tribaldos, E; Mazerolle, M and Harris, F (1995) Computer aided construction delay analysis and claims preparation. Construction Management and Economics, 13(4), pp. 335-352. ISSN 01446193

Alkatheeri, A (2018) An investigative study on the relationship between organizational factors and knowledge management effectiveness in UAE public organizations: the case study of Abu Dhabi. PhD thesis, University of Wolverhampton, UK.

Alkhaldi, M (2019) Impact of human errors on accidents in the oil and gas industry in Bahrain. PhD thesis, University of Salford, UK.

Alkilani, S Z; Jupp, J and Sawhney, A (2013) Issues of construction health and safety in developing countries: A case of Jordan. Construction Economics and Building, 13(3), pp. 141-156. ISSN 2204-9029

Alkoud, A (2023) Investigating the impact of tall building ordinances (TBOs) on the evolution of ultra-tall buildings typology: Case studies in Chicago and Dubai. PhD thesis, Illinois Institute of Technology, USA.

Allam, A; Elbeltagi, E; Abouelsaad, M N and E. El Madawy, M (2026) Integrated BIM-GA approach for slab formwork design optimization. Construction Innovation, 26(2), pp. 631-651. ISSN 1471-4175

Allan, P and Bryant, M (2014) The attributes of resilience: A tool in the evaluation and design of earthquake-prone cities. International Journal of Disaster Resilience in the Built Environment, 5(2), pp. 109-129. ISSN 1759-5916

Allan, S; Jones, K and Walker, S (2006) Retrofitting e-learning to an existing distance learning course: A case study. Architectural Engineering and Design Management, 2(1-2), pp. 137-147. ISSN 1745-2007

Alleem, R (2012) A usability based model for suggestion system evaluation of infrastructure organisations in the UAE. PhD thesis, University of Salford, UK.

Alleman, D and Lee, E B (2020) Mitigating the legal challenges of imposing disincentives on nonperforming transportation projects. Engineering, Construction and Architectural Management, 27(10), pp. 2859-2891. ISSN 0969-9988

Allen, C and Smallwood, J (2008) Improving construction planning through 4D planning. Journal of Engineering, Design and Technology, 6(1), pp. 7-20. ISSN 1726-0531

Allport, R J (2008) Improving decision-making for major urban rail projects. PhD thesis, Imperial College London, UK.

Allport, R J (2011) Improving decision-making for major urban rail projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(2), pp. 61-70. ISSN 17514312

Almadhoob, Huda Mohamed Ali Hasan Husain (2020) Self-organising networks in complex infrastructure projects: the case of London Bank Station Capacity Upgrade Project. PhD thesis, University College London, UK.

Almahmoud, Essam (2014) Social sustainability health check: A model for evaluating and optimising social value creation in construction projects. PhD thesis, University of Melbourne, Australia.

Almalki, M (2024) Accelerated wastewater pipeline construction. PhD thesis, Syracuse University, USA.

Almarri, K (2021) Comparative analysis of the value for money factors of PPPs between the UAE and the UK. International Journal of Construction Management, 21(4), pp. 416-426. ISSN 1562-3599

Almasabha, G; Shehadeh, A; Alshboul, O and Al Hattamleh, O (2024) Structural performance of buried reinforced concrete pipelines under deep embankment soil. Construction Innovation, 24(5), pp. 1280-1296. ISSN 1471-4175

Almashaqbeh, M and El-Rayes, K (2022) Minimizing transportation cost of prefabricated modules in modular construction projects. Engineering, Construction and Architectural Management, 29(10), pp. 3847-3867. ISSN 0969-9988

Almatared, M M S (2024) An integrated digital twin framework and evacuation simulation system for enhanced safety in smart buildings. PhD thesis, Western Michigan University, USA.

Almeida, L; Tam, V W Y; Le, K N and She, Y (2020) Effects of occupant behaviour on energy performance in buildings: A green and non-green building comparison. Engineering, Construction and Architectural Management, 27(8), pp. 1939-1962. ISSN 0969-9988

Almohssen, Abdulaziz (2018) A new methodology for tracking the performance of subcontractors in the construction industry. PhD thesis, University of New South Wales, Australia.

Almutairi, S (2017) Assessment and develop the Saudi's contractors classification system. PhD thesis, Arizona State University, USA.

Alnaggar, Ahmed Mohamed Mohamed Moustafa (2022) Digital transformation in asset management organisations: towards a data driven approach for life cycle asset management. PhD thesis, University College London, UK.

Alnaser, A A (2018) The implication of BIM use on communication channels in design processes for Saudi architectural engineering firms. PhD thesis, University of Reading, UK.

Alnasseri, N (2015) Managing and controlling airport construction projects: a strategic management framework for operators. PhD thesis, Northumbria University, UK.

Alnasseri N, O A S G (2013) Organizational culture, leadership style and effectiveness: A case study of middle eastern construction clients. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Alnoaimi, Ali D (2021) Development of sustainability assessment framework for sewerage infrastructure projects in the Kingdom of Bahrain. PhD thesis, Griffith University, Australia.

Alnuaimi, A S; Taha, R A; Al Mohsin, M and Al-Harthi, A S (2010) Causes, effects, benefits, and remedies of change orders on public construction projects in Oman. Journal of Construction Engineering and Management, 136(5), pp. 615-622. ISSN 0733-9364

Along, N Z B; Ahmed, I and MacKee, J (2024) Flood knowledge management by multiple stakeholders: An example from Malaysia. International Journal of Disaster Resilience in the Built Environment, 15(1), pp. 141-157. ISSN 1759-5916

Alotaibi, M; El-Rayes, K and Altuwaim, A (2021) Optimizing the renovation scheduling of leased residential buildings to minimize total project cost. Journal of Construction Engineering and Management, 147(7): 2063, ISSN 0733-9364

Alothaimeen, I (2018) Multi-objective optimization for LEED: New construction using genetic algorithms. PhD thesis, Illinois Institute of Technology, USA.

Alothman, A and Vilventhan, A (2025) Development of building information model-enabled facility management for metro rail stations. Journal of Construction Engineering and Management, 151(3): 05024018, ISSN 0733-9364

Alqahtani, A and Whyte, A (2013) Artificial neural networks incorporating cost significant items towards enhancing estimation for (life-cycle) costing of construction projects. Construction Economics and Building, 13(3), pp. 51-64. ISSN 2204-9029

Alqahtani, F K; Alkhaldi, M; Alsaqer, T; Abotaleb, I S; Mohamed, A G and Dirar, S (2022) A comparative assessment of advanced construction systems incorporating green concrete. Journal of Construction Engineering and Management, 148(9): 04022083, ISSN 0733-9364

Alqarni, K H (2018) A case study of information technology acceptance in the Saudi Arabian architecture, engineering and construction industry. PhD thesis, University of Reading, UK.

Alqarni, M (2017) Developing a framework to improve the implementation of geospatial technology in the planning and delivery of infrastructure for residential areas in Saudi Arabia: a case study of Riyadh city. PhD thesis, Northumbria University, UK.

Alqershy, M T and Kishore, R (2023) Construction claims prediction using ann models: A case study of the Indian construction industry. International Journal of Construction Management, 23(6), pp. 1097-1108. ISSN 1562-3599

Alqubaisi, S (2019) Developing a framework to assess the portfolio governance, risk and compliance of Abu Dhabi Government entities in the UAE. PhD thesis, Aston University, UK.

Alrashed, F A (2015) Design and application of zero-energy homes in Saudi Arabia. PhD thesis, Glasgow Caledonian University, UK.

Alrashidi, M (2021) Multiple perspective of public-private partnership project success: the case of Kuwaiti public housing initiative. PhD thesis, University of Salford, UK.

Alsabban, A (2019) A study on analysing mega-project failures in Saudi Arabia by using agency theory. PhD thesis, University of Birmingham, UK.

Alsahli, A (2011) A framework for successful implementation of IT for the construction organizations in Saudi Arabia. PhD thesis, University of Salford, UK.

Alsahly, F F M (2016) Improving the management of change requests in construction of large building projects in Saudi Arabia. PhD thesis, University of Hull, UK.

Alsamarraie, M M; Yousif, O S and Ghazali, F E M (2025) Procurement integrity: Best practices for PPP projects in Iraq and Malaysia. Construction Economics and Building, 25(3-4), pp. 289-310. ISSN 2204-9029

Alsehaimi, A O; Fazenda, P T and Koskela, L (2014) Improving construction management practice with the last planner system: A case study. Engineering, Construction and Architectural Management, 21(1), pp. 51-64. ISSN 0969-9988

Alsemari, M A A A and Ramegowda, M (2025) BIM-based approach to manage basra oil company projects. Smart and Sustainable Built Environment, 14(6), pp. 1824-1845. ISSN 2046-6099

Alshamsi, O S (2019) Multiple criteria decision making for supplier selection and cross-cultural considerations: Case study of the United Kingdom / United Arab Emirates construction industry. PhD thesis, University of Exeter, UK.

Alsharif, M A (2017) Improving sustainability on university campuses in Saudi Arabia: An assessment of organisational and decision-related opportunities and barriers. PhD thesis, University of Reading, UK.

Alsharqawi, M; Abu Dabous, S; Zayed, T and Hamdan, S (2021) Budget optimization of concrete bridge decks under performance-based contract settings. Journal of Construction Engineering and Management, 147(6): 04021040, ISSN 0733-9364

Alshboul, O.; Al-Shboul, K.; Shehadeh, A. and Tatari, O. (2026) Advancing equipment management for construction: Introducing a new model for cost, time and quality optimization. Construction Innovation, 26(4), pp. 1191-1217. ISSN 1471-4175

Alshboul, O. and Shehadeh, A. (2026) Enhancing infrastructure project outcomes through optimized contractual structures and long-term warranties. Engineering, Construction and Architectural Management, 33(3), pp. 2220-2242. ISSN 0969-9988

Alshboul, O (2019) Multi-objective optimization for heavy earthmoving construction equipment management based on time, cost, and pollutant emissions. PhD thesis, University of Central Florida, USA.

Alsheikh-Salem, Y M-B (2022) The development of a sustainability risk assessment model for construction projects: A case study on the Jordanian construction industry. PhD thesis, University of Salford, UK.

Alshorafa, R and Ergen, E (2021) Determining the level of development for BIM implementation in large-scale projects: A multi-case study. Engineering, Construction and Architectural Management, 28(1), pp. 397-423. ISSN 0969-9988

Alsofyani, S (2021) An analysis of how culture influences the arbitration process used to resolve disputes on construction projects in Saudi Arabia. PhD thesis, University of Plymouth, UK.

Alsyouf, L; Al Harbat, R; Ma'bdeh, S N and Mushtaha, E S N (2026) Economic feasibility of low-impact retrofit strategies for enhancing energy efficiency in residential townhouses: A case study of sharjah. Construction Economics and Building, 26(1), ISSN 2204-9029

Altaf, A (2022) Integrating safety, security and human factors engineering in rail infrastructure design and evaluation. PhD thesis, Bournemouth University, UK.

Alvanchi, A; Bajalan, Z and Iravani, P (2021) Emission assessment of alternative dam structure types, a novel approach to consider in new dam projects. Construction Innovation, 21(2), pp. 203-217. ISSN 1471-4175

Alvand, A; Mirhosseini, S M; Ehsanifar, M; Zeighami, E and Mohammadi, A (2023) Identification and assessment of risk in construction projects using the integrated FMEA-swara-waspas model under fuzzy environment: A case study of a construction project in Iran. International Journal of Construction Management, 23(3), pp. 392-404. ISSN 1562-3599

Alves, J. L.; Almeida Filho, A. T. D.; Bradaschia, F. and Palha, R. P. (2026) Solarisbim.AI: Smart sustainable building planning with BIM-based solar-production estimation using machine-learning radiation forecasts. Journal of Construction Engineering and Management, 152(6): 04026076, ISSN 0733-9364

Alves, T d C L (2005) Buffering practices in HVAC ductwork supply chains. PhD thesis, University of California, Berkeley, USA.

Alves Tenório de Morais, G and Casado Lordsleem Júnior, A (2019) Building maintenance management activities in a public institution. Engineering, Construction and Architectural Management, 26(1), pp. 85-103. ISSN 0969-9988

Alwan, Z; Greenwood, D and Gledson, B (2015) Rapid LEED evaluation performed with BIM-based sustainability analysis on a virtual construction project. Construction Innovation, 15(2), pp. 134-150. ISSN 1471-4175

Alzahrani, A (2017) The social value of urban design in mixed use developments in London. PhD thesis, University of Nottingham, UK.

Alzahrani, H; Arif, M; Kaushik, A; Goulding, J and Heesom, D (2021) Artificial neural network analysis of teachers' performance against thermal comfort. International Journal of Building Pathology and Adaptation, 39(1), pp. 20-32. ISSN 23984708

Alzahrani, H; Arif, M; Kaushik, A K; Rana, M Q and Aburas, H M (2023) Evaluating the effects of indoor air quality on teacher performance using artificial neural network. Journal of Engineering, Design and Technology, 21(2), pp. 604-618. ISSN 1726-0531

Alzanati, A (2021) Complex building construction projects: reducing rework through facilitation of craftspeople's motivation in United Arab Emirates. PhD thesis, Bournemouth University, UK.

Alzara, M (2016) Measuring the construction performance in Saudi Arabia and proposing new procurement model based on BV PIPS (a university case study). PhD thesis, Arizona State University, USA.

Alzeraa, A (2018) Impact of project communications effectiveness on construction disputes. PhD thesis, Wayne State University, USA.

Alzohbi, M G M (2015) A framework for evaluating material management performance in Jordanian concrete building projects. PhD thesis, Sheffield Hallam University, UK.

Alzoubi, Y; Locatelli, G and Tristano, S (2024) The ugly side of construction: Modern slavery in the 2022 fifa world cup program. Construction Management and Economics, 42(5), pp. 412-430. ISSN 01446193

Amadi, A I (2026) Construction economics at early stage: Order of cost estimating, life cycle costing and development appraisal of a proposed office complex. International Journal of Building Pathology and Adaptation, 44(1), pp. 70-90. ISSN 2398-4708

Amadi, A (2023) Integration in a mixed-method case study of construction phenomena: From data to theory. Engineering, Construction and Architectural Management, 30(1), pp. 210-237. ISSN 0969-9988

Amadi, A I (2016) Explaining cost overruns in highway projects: a geo-spatial regression modelling and cognitive mapping of latent pathogens and contextual drivers. PhD thesis, University of Salford, UK.

Amadi, A I and Higham, A (2018) The trickle-down effect of psycho-social constructs and knowledge deficiencies as organizational barriers to cost performance on highway projects. Journal of Financial Management of Property and Construction, 23(1), pp. 57-72. ISSN 1366-4387

Amadi, C; Carrillo, P and Tuuli, M (2018) Stakeholder management in PPP projects: External stakeholders' perspective. Built Environment Project and Asset Management, 8(4), pp. 403-414. ISSN 2044-124X

Amadi, C; Carrillo, P and Tuuli, M (2020) PPP projects: Improvements in stakeholder management. Engineering, Construction and Architectural Management, 27(2), pp. 544-560. ISSN 0969-9988

Amakali, Tangi Rebekka (2017) Inclusive design policy implementation: an organizational knowledge creation perspective. PhD thesis, University of Reading, UK.

Amankona, D (2021) Socio-ecological impacts and adaptations arising from Chinese-led infrastructure developments in Africa: A case study of the BUI hydropower dam in Ghana. PhD thesis, Open University, UK.

Amarah, Burhan (2016) Development of a triple bottom line stakeholder satisfaction model. PhD thesis, Bond University, Australia.

Amaratunga, D and Senaratne, S (2009) Principles of integrating research into teaching in higher education: Built environment perspective. International Journal of Construction Education and Research, 5(3), pp. 220-232. ISSN 1557-8771

Amaratunga, R D G (2001) Theory building in facilities management performance measurement: Application of some core performance measurement and management principles. PhD thesis, University of Salford, UK.

Ameen, J R M; Neale, R H and Abrahamson, M (2003) An application of regression analysis to quantify a claim for increased costs. Construction Management and Economics, 21(2), pp. 159-165. ISSN 01446193

Ameh, H and Lamond, J (2025) Public preference of flood-resilient housing technologies in Nigeria: A case study of Kogi State. International Journal of Disaster Resilience in the Built Environment, 16(1), pp. 87-103. ISSN 1759-5908

Amida, A; Chang, I and Yearwood, D (2020) Designing a practical lab-based assessment: a case study. Journal of Engineering, Design and Technology, 18(3), pp. 567-581. ISSN 1726-0531

Amini, S; Rezvani, A; Tabassi, M and Malek Sadati, S S (2023) Causes of cost overruns in building construction projects in Asian countries; Iran as a case study. Engineering, Construction and Architectural Management, 30(7), pp. 2739-2766. ISSN 0969-9988

Amini Khafri, Amin (2018) A framework for forecasting project estimate at completion using historical and current performance data. PhD thesis, University of Alberta, Canada.

Aminuddin, F A B (2019) The compatibility of dispute resolution mechanisms with national culture in the construction industry: a case study of the Malaysian statutory adjudication regime. PhD thesis, University of Salford, UK.

Amiri, O; Rahimi, M; Ayazi, A and Khazaeni, G (2024) Multi-criteria decision-making model for EPC contractor prequalification: A hybrid approach. International Journal of Building Pathology and Adaptation, 42(3), pp. 369-385. ISSN 23984708

Amiri Ara, R; Paardenkooper, K and van Duin, R (2022) A new blockchain system design to improve the supply chain of engineering, procurement and construction (EPC) companies: a case study in the oil and gas sector. Journal of Engineering, Design and Technology, 20(4), pp. 887-913. ISSN 1726-0531

Ammar, M. A. and Alattyih, W. (2026) Lingo optimization modelling of construction scheduling. International Journal of Construction Management, 26(9), pp. 1746-1760. ISSN 1562-3599

Ammar, M A (2022) Optimization of line of balance scheduling considering work interruption. International Journal of Construction Management, 22(2), pp. 305-316. ISSN 1562-3599

Ammar, T; Abdel-Monem, M and El-Dash, K (2025) Regression-based model predicting cost contingencies for road network projects. International Journal of Construction Management, 25(11), pp. 1273-1287. ISSN 1562-3599

Amoah, C; Kajimo-Shakantu, K and Van Shalkwyk, T (2022) The level of participation of the end-users in the construction of the rdp houses: The case study of manguang municipality. International Journal of Construction Management, 22(5), pp. 949-960. ISSN 1562-3599

Amoah, C and Pretorius, L (2020) Evaluation of the impact of risk management on project performance in small construction firms in South Africa: The case study of construction systems. Journal of Engineering, Design and Technology, 18(3), pp. 611-634. ISSN 1726-0531

Amoo, O; Lukman, Y and Musa, N (2022) Dispute resolution methods adopted by contractors during COVID-19 in eastern cape South Africa: A case study. Journal of Construction Business and Management, 5(2), pp. 54-67. ISSN 2521-0165

Amorocho, J A P and Hartmann, T (2020) Decision-making process to select energy-efficient renovation alternatives for residential buildings: Two case studies. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Amponsah, C T (2010) Public-private partnerships: Critical success factors for procurements of capital projects. PhD thesis, Capella University, USA.

Amsalu Workineh, N; Tarko Kassa, E and Dagnaw Bogale, D (2025) Factors affecting residential land market value: a case study of Injibara Town, Ethiopia. International Journal of Construction Management, 25(2), pp. 215-223. ISSN 1562-3599

Amunzu, I C (2020) A qualitative case study of construction managers’ understanding of lean thinking. PhD thesis, Grand Canyon University, USA.

An, J; Luo, Q; Wang, Z; Pan, S; Qin, H and Yan, D (2026) An integrated resilience-based failure risk assessment method of highway tunnel operation and maintenance systems for fire accidents. Journal of Construction Engineering and Management, 152(4): 04026013, ISSN 0733-9364

An, J; Wang, Z; Pan, S; Qin, H; Luo, Q and Yan, D (2024) An integrated resilience and assessment methodology framework for addressing uncertainty in highway operation and maintenance systems. Journal of Construction Engineering and Management, 150(12): 04024174, ISSN 0733-9364

An, T and Watanabe, T (2011) Towards the sustainable improvement in construction labour's employment in China: Cultivating subcontractor's role. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

An, X; Li, H; Zuo, J; Ojuri, O; Wang, Z and Ding, J (2018) Identification and prevention of unbalanced bids using the unascertained model. Journal of Construction Engineering and Management, 144(11): 05018013, ISSN 0733-9364

An, X; Zheng, F; Wang, Z; Li, Z; Jiao, Y and An, H (2025) Dynamic risk assessment approach for deep foundation pit construction based on the integration of multisource data using D-S evidence theory. Journal of Construction Engineering and Management, 151(10): 04025155, ISSN 0733-9364

Anagnostou, E (2005) Investigation of risk management and uncertainty in Athens 2004 Olympic games: The Equestrian Centre case study. PhD thesis, University College London, UK.

Anagnostou, G (2008) Quality in the apartment building industry a case study in Greece. PhD thesis, University College London, UK.

Anamege, T E (2019) Capital financing strategies of small-scale contractors in Nigeria. PhD thesis, Walden University, USA.

Anastasopoulos, P (2009) Infrastructure asset management: A case study on pavement rehabilitation. PhD thesis, Purdue University, USA.

Ancell, D J (2007) Performance-based contracting in construction: innovation for the brave? PhD thesis, University of Reading, UK.

Andersen, M T and Findsen, A L (2019) Exploring the benefits of structured information with the use of virtual design and construction principles in a BIM life-cycle approach. Architectural Engineering and Design Management, 15(2), pp. 83-100. ISSN 1745-2007

Anderson, S; Shane, J S and Schexnayder, C (2011) Strategies for planned project acceleration. Journal of Construction Engineering and Management, 137(5), pp. 372-381. ISSN 0733-9364

Anderson, S D; Patil, S S; Gibson Jr, G E and Sullivan, G R (2004) Owner-contractor work structures: Process approach. Journal of Construction Engineering and Management, 130(5), pp. 680-690. ISSN 0733-9364

Andersson, R. and Eidenskog, M. (2023) Beyond barriers–exploring resistance towards BIM through a knowledge infrastructure framework. Construction Management and Economics, 41(11-12), pp. 926-941. ISSN 0144-6193

Andersson, R and Buser, M (2020) On the road to nowhere? The challenges of aligning construction and demolition waste practices with circular economy. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Andersson, R and Eidenskog, M (2023) Beyond barriers: Exploring resistance towards BIM through a knowledge infrastructure framework. Construction Management and Economics, 41(11-12), pp. 926-941. ISSN 01446193

Andrade, J B (2017) Early stage design methodology to ensure life cycle sustainability of residential buildings. PhD thesis, Universidade do Minho, Portugal.

Andrawus, J; Watson, J and Kishk, M (2007) Maintenance optimisation of wind turbines: Lessons for the built environment. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Andreu, I C and Oreszczyn, T (2004) Architects need environmental feedback. Building Research & Information, 32(4), pp. 313-328. ISSN 0961-3218

Ankomah, E N; Ayarkwa, J and Agyekum, K (2020) Status of lean construction implementation among small and medium building contractors (SMBCs) in Ghana. Journal of Engineering, Design and Technology, 18(6), pp. 1691-1709. ISSN 1726-0531

Annamalai, T R and Hari, S (2016) Innovative financial intermediation and long term capital pools for infrastructure: A case study of infrastructure debt funds. Journal of Financial Management of Property and Construction, 21(3), pp. 231-252. ISSN 1366-4387

Annemans, M and Heylighen, A (2021) Productive interactions to exchange knowledge in healthcare building design. Building Research & Information, 49(3), pp. 281-293. ISSN 0961-3218

Ansari, R (2019) Dynamic simulation model for project change-management policies: Engineering project case. Journal of Construction Engineering and Management, 145(7): 05019008, ISSN 0733-9364

Ansari, S (2020) Investigating the energy performance of a multiuse venue building. EngD thesis, University of Reading, UK.

Ansell, M (2009) A study of a collaborative framework arrangement for highways renewals schemes. EngD thesis, Loughborough University, UK.

Ansell, M; Evans, R; Holmes, M; Price, A and Pasquire, C (2009) An application of the construction management framework in highways major maintenance. Engineering, Construction and Architectural Management, 16(2), pp. 162-174. ISSN 0969-9988

Ansell, M; Holmes, M; Evans, R; Pasquire, C and Price, A (2009) Delivering best value in highways major maintenance schemes: Case study. Journal of Construction Engineering and Management, 135(4), pp. 235-245. ISSN 0733-9364

Anspach, J A; Sharma, V and Madathil, K C (2024) Hospital design planning: unscheduled trauma ER visits impacting inpatient space allocation. Building Research & Information, 52(7), pp. 836-850. ISSN 0961-3218

Antillon, E I (2016) An exploration of the influence of public-private-partnerships on the life cycle design decision-making process of highway projects. PhD thesis, University of Colorado at Boulder, USA.

Antillon, E I; Molenaar, K R and Javernick-Will, A (2017) Evaluating the effect of contract timing on lifecycle-design innovation in public-private partnerships: Comparative case study of highway projects. Journal of Construction Engineering and Management, 143(4): 05016023, ISSN 0733-9364

Antoniadis, D (2009) Managing complexity in project teams. PhD thesis, Loughborough University, UK.

Anumba, C E H; Dainty, A; Ison, S and Sergeant, A (2006) Understanding structural and cultural impediments to ICT system integration: A GIS-based case study. Engineering, Construction and Architectural Management, 13(6), pp. 616-633. ISSN 0969-9988

Anumba, C J; Issa, R R A; Pan, J and Mutis, I (2008) Ontology-based information and knowledge management in construction. Construction Innovation, 8(3), pp. 218-239. ISSN 1471-4175

Anuradha, I G N; Perera, B A K S and Ekanayake, B J (2022) Significance of whole life embodied energy and embodied carbon of wall materials compared to their initial/maintenance costs. International Journal of Construction Management, 22(6), pp. 1090-1103. ISSN 1562-3599

Anvuur, A M and Kumaraswamy, M K (2010) Promises, pitfalls and shortfalls of the guaranteed maximum price approach: A comparative case study. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Aouad, G F; Ford, S R; Kirkham, J A; Child, T; Cooper, G S; Brandon, P S; Brown, F E; Oxman, R E and Young, B (1994) Knowledge elicitation using protocol analysis in a workshop environment. Construction Management and Economics, 12(3), pp. 271-278. ISSN 01446193

Aouad, G F; Kirkham, J A; Cooper, G S; Ford, S; Sarshar, M; Brandon, P S; Brown, F E; Oxman, R E and Young, B (1993) Information modelling in the construction industry: The information engineering approach. Construction Management and Economics, 11(5), pp. 384-397. ISSN 01446193

Aouad, G F; Ozorhon, B and Abbott, C (2010) Facilitating innovation in construction: Directions and implications for research and policy. Construction Innovation, 10(4), pp. 374-394. ISSN 1471-4175

Apostu, A and Drăghici, M (2026) A public theatre as a living lab to create resilience. Buildings & Cities, 7(1), pp. 232-253. ISSN 2632-6655

Appell, H (2020) Workers of Europe unite!? Explaining the form of European labor organization: The construction industry. PhD thesis, Freie Universitaet Berlin, Germany.

Aquere, A L; Dinis-Carvalho, J and Lima, R M (2013) Project cell: Cellular organization of the building design process. Journal of Construction Engineering and Management, 139(5), pp. 538-546. ISSN 0733-9364

Arabi, S; Eshtehardian, E and Shafiei, I (2022) Using Bayesian networks for selecting risk-response strategies in construction projects. Journal of Construction Engineering and Management, 148(8): 04022067, ISSN 0733-9364

Arafa, E A B (2015) The impact of knowledge management on project success. PhD thesis, University of Portsmouth, UK.

Arai, K and Morimoto, E (2023) Case study in shikoku: Changes in the bidding behaviour of businesses. International Journal of Construction Management, 23(2), pp. 225-233. ISSN 1562-3599

Arain, F M (2009) Leveraging on information technology to teach construction law to built environment students: A knowledge-based system approach. Journal of Construction in Developing Countries, 14(2), pp. 77-102. ISSN 1823-6499

Arana, M M and Wittek, R P M (2016) Community resilience: Sustained cooperation and space usage in collective housing. Building Research & Information, 44(7), pp. 764-774. ISSN 0961-3218

Aranda-Mena, G (2003) Mapping workers' cognitive structures of construction site hazards. PhD thesis, University of Reading, UK.

Arar, A J; Poirier, E and Staub-French, S (2025) A research and development framework for integrated project delivery. Construction Management and Economics, 43(2), pp. 85-112. ISSN 0144-6193

Araujo, Alexandre Jose Vianna Barbosa de (2015) Sustainability in the construction industry from the perspective of leadership. PhD thesis, Universidade Federal Fluminense, Brazil.

Araujo, L G; Piña, A B S; Aidar, L A G; Coelho, G O and Carvalho, M T M (2019) Recommendations and guidelines for implementing PPP projects: Case of the electricity sector in Brazil. Built Environment Project and Asset Management, 9(2), pp. 262-276. ISSN 2044-124X

Araujo, Luís Otávio Cocito de (2005) Method to propose directions improving labor productivity in the steel reinforcement activities. PhD thesis, Universidade de São Paulo, Brazil.

Arayici, Y (2004) Requirements engineering in innovative systems developments for the construction industry. PhD thesis, University of Salford, UK.

Arayici, Y and Aouad, G (2004) Industry driven innovative systems development for the construction industry: The DIVERCITY project. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Arayici, Y and Aouad, G (2005) Computer integrated construction: An approach to requirements engineering. Engineering, Construction and Architectural Management, 12(2), pp. 194-215. ISSN 0969-9988

Arayici, Y; Aouad, G and Ahmed, V (2005) Requirements engineering for innovative integrated ICT systems for the construction industry. Construction Innovation, 5(3), pp. 179-200. ISSN 1471-4175

Arayici, Y; Tokdemir, O B and Kassem, M (2023) A quantitative, evidence-based analysis of correlations between lean construction and building information modelling. Smart and Sustainable Built Environment, 12(5), pp. 975-1001. ISSN 2046-6099

Arbulu, R J; Tommelein, I D; Walsh, K D and Hershauer, J C (2003) Value stream analysis of a re-engineered construction supply chain. Building Research & Information, 31(2), pp. 161-171. ISSN 0961-3218

Arico, Manuela (2025) Application of scan-to-BIM approaches to HBIM digitisations in architectural heritage environment for documentation, management and conservation purposes. PhD thesis, Università degli Studi di Palermo, Italy.

Arif, M and Egbu, C (2010) Making a case for offsite construction in China. Engineering, Construction and Architectural Management, 17(6), pp. 536-548. ISSN 0969-9988

Arif, M; Egbu, C; Alom, O and Khalfan, M M A (2009) Measuring knowledge retention: A case study of a construction consultancy in the UAE. Engineering, Construction and Architectural Management, 16(1), pp. 92-108. ISSN 0969-9988

Arif, M; Egbu, C and Toma, T (2010) Knowledge retention in construction in the UAE. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Arif, M; Khalfan, M; Barnard, J H and Heller, N A (2012) Assessing knowledge retention in construction organisations: Cases from the UAE. Construction Economics and Building, 12(2), pp. 55-71. ISSN 2204-9029

Aritua, B; Bower, D and Turner, M (2008) Managing the delivery of iconic football stadiums in England. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(2), pp. 55-60. ISSN 17514312

Aritua, B; Male, S and Bower, D (2009) Defining the intelligent public sector construction client. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(2), pp. 75-82. ISSN 17514312

Aritua, B; Male, S; Bower, D and Madter, N (2011) Competencies for the intelligent public sector construction client. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(4), pp. 193-201. ISSN 17514304

Arja, M; Sauce, G and Souyri, B (2009) External uncertainty factors and LCC: A case study. Building Research & Information, 37(3), pp. 325-334. ISSN 0961-3218

Arjun, R A S and Vinodh, S (2016) A case study on application of oreste for agile concept selection. Journal of Engineering, Design and Technology, 14(4), pp. 781-801.

Arowoiya, V.; Oke, A.; Chan, M. and Adelusi, A. (2026) Benefits of adopting digital twin technology (dtt) in the Nigerian construction industry. International Journal of Construction Management, 26(7), pp. 1134-1148. ISSN 1562-3599

Arroteia, Aline Valverde (2022) Critical success factors of BIM in the design and construction interface. PhD thesis, Universidade de São Paulo, Brazil.

Arrotéia, Aline Valverde (2022) Critical success factors for BIM in the design and construction interface. PhD thesis, Universidade de São Paulo, Brazil.

Arroyo, P (2014) Exploring decision-making methods for sustainable design in commercial buildings. PhD thesis, University of California, Berkeley, USA.

Arroyo, P; Tommelein, I D and Ballard, G (2016) Selecting globally sustainable materials: A case study using choosing by advantages. Journal of Construction Engineering and Management, 142(2): 05015015, ISSN 0733-9364

Arslan, M A O; Thiruchelvam, S and Hayder, G (2024) Measuring the availability of the requirements of the quality management system (ISO 9001:2015) clause leadership, performance, and planning: A case study. International Journal of Construction Management, 24(8), pp. 867-874. ISSN 1562-3599

Artis, D A Z (2015) Women as leaders in construction in a Northwestern US city: A multiple-case study of the effectiveness of motivation practices and success strategies. PhD thesis, Capella University, USA.

Arumsari, P and Rarasati, A D (2017) Maintenance strategy for public-rented residential building: A case study in Jakarta, Indonesia. Built Environment Project and Asset Management, 7(1), pp. 99-110. ISSN 2044-124X

Asad, S; Fuller, P; Pan, W and Dainty, A R J (2005) Learning to innovate in construction: A case study. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Asadabadi, M R (2024) Project investment decisions: Comparison of nonmonetary benefits. Journal of Construction Engineering and Management, 150(8): 05024008, ISSN 0733-9364

Asadi, S; Sharghi, A; Mottaki, Z and Salehsedghpour, B (2023) Investigating the role of risk perception in place-based responses: Case studies of the 2003 bam and 2017 ezgeleh-sarpol zahab earthquakes. International Journal of Disaster Resilience in the Built Environment, 14(3), pp. 349-365. ISSN 1759-5916

Ascione, F; Bellia, L; Mazzei, P and Minichiello, F (2010) Solar gain and building envelope: The surface factor. Building Research & Information, 38(2), pp. 187-205. ISSN 0961-3218

Ashcroft, D; Egbelakin, T; Jing, J and Rasheed, E O (2019) Cost comparison of seismic damage resisting systems for modules in multi-storey buildings. Journal of Engineering, Design and Technology, 17(2), pp. 330-346. ISSN 1726-0531

Ashton, P (2003) A system designed to improve site investigation procedures and for the reduction of risk associated with uncertain site conditions. PhD thesis, University of Brighton, UK.

Ashton, P and Gidado, K (2001) Risk associated with inadequate site investigation procedures under design and build procurement systems. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Ashton, P and Gidado, K (2002) The identification of uncertainty and risk associated with inadequate site investigation procedures relative to project complexity. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Ashton, P and Gidado, K (2003) The development of a project and site investigation risk evaluation model. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Ashton, P and Gidado, K (2004) The practical application of a site investigation risk evaluation system. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Asiedu, E M and Mkansi, M (2023) Critical factors contributing to budget overruns in Ghana's telecommunication industry construction projects. Journal of Construction in Developing Countries, 28(2), pp. 265-293. ISSN 1823-6499

Asif, M; Hassanain, M A; Nahiduzzaman, K M and Sawalha, H (2019) Techno-economic assessment of application of solar PV in building sector: A case study from Saudi Arabia. Smart and Sustainable Built Environment, 8(1), pp. 34-52. ISSN 2046-6099

Aslam, A; Rana, I A and Bhatti, S S (2022) Local climate zones and its potential for building urban resilience: A case study of lahore, Pakistan. International Journal of Disaster Resilience in the Built Environment, 13(2), pp. 248-265. ISSN 1759-5916

Aslan, Zaki M (2008) The design of protective structures for the conservation and presentation of archaeological sites. PhD thesis, University College London, UK.

Aslani, F; Amini Hosseini, K and Fallahi, A (2020) A framework for earthquake resilience at neighborhood level. International Journal of Disaster Resilience in the Built Environment, 11(4), pp. 557-575. ISSN 1759-5916

Asmone, A S (2020) Development of a bayesian based design-for-maintinability decision support framework. PhD thesis, National University of Singapore, Singapore.

Assaad, R; El-Adaway, I H; Hastak, M and Needy, K L (2020) Commercial and legal considerations of offsite construction projects and their hybrid transactions. Journal of Construction Engineering and Management, 146(12): 05020019, ISSN 0733-9364

Assaf, G and Assaad, R H (2024) A data-driven decision-support tool for selecting the optimal project delivery method for bundled projects: Integrating machine learning and expert domain knowledge. Journal of Construction Engineering and Management, 150(12): 04024181, ISSN 0733-9364

Assaf, S (1987) Feasibility assessment of large-scale housing development in Saudi Arabia: A case study. Construction Management and Economics, 5(2), pp. 157-168. ISSN 01446193

Ataei, S and Jafari, A (2026) Comparative environmental impact assessment of 3D concrete printing and precast techniques in bridge construction: A case study analysis. Journal of Construction Engineering and Management, 152(1): 05025018, ISSN 0733-9364

Ataman, C and Dino, İ G (2022) Performative design processes in architectural practices in Turkey: Architects' perception. Architectural Engineering and Design Management, 18(5), pp. 690-704. ISSN 1745-2007

Atanasov, V; Greenwood, D and Robson, S (2020) The management of disputes as an element of construction transaction costs: An empirical study. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Atanasov, V; Greenwood, D; Thurairajah, N and Hatcher, C (2021) Forensic delay analysis: An investigation of the reasons for disagreements in time-related disputes. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Atapattu, C N; Domingo, N and Sutrisna, M (2024) A conceptual cost estimation model for the pre-design stage of road projects using multiple regression analysis. Journal of Financial Management of Property and Construction, 29(3), pp. 388-404. ISSN 1366-4387

Atasoy, G; Ertaymaz, U; Dikmen, I and Talat Birgonul, M (2022) Empowering risk communication: Use of visualizations to describe project risks. Journal of Construction Engineering and Management, 148(5): 04022015, ISSN 0733-9364

Atef Elhamy Kamel, M (2013) Encouraging walkability in GCC cities: Smart urban solutions. Smart and Sustainable Built Environment, 2(3), pp. 288-310. ISSN 2046-6099

Athamlebbe, R.; Rahman, R. A.; Haron, A. T. and Papadonikolaki, E. (2026) Evaluating competency development strategies to enhance digital leadership in the construction industry: The case of entry-level professionals. Journal of Construction Engineering and Management, 152(9): 04026140, ISSN 0733-9364

Athanasopoulou, E (2008) Delays in construction projects using traditional contract forms: Causes and effects. PhD thesis, University College London, UK.

Athapaththu, K I and Karunasena, G (2018) Framework for sustainable construction practices in Sri Lanka. Built Environment Project and Asset Management, 8(1), pp. 51-63. ISSN 2044-124X

Atiq Ur Rehman, M; Chaabane, A and Khan, S A (2026) A novel decision support system for integrating supply chain and project management decisions to optimize multiple project performance: A case study in building renovation. International Journal of Construction Management, 26(1), pp. 29-53. ISSN 1562-3599

Atkins, R and Emmanuel, R (2014) Could refurbishment of "traditional" buildings reducecarbon emissions? Built Environment Project and Asset Management, 4(3), pp. 221-237. ISSN 2044-124X

Atkinson, B (2000) Inca: A retrospective performance tool for project management. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Atkinson, E; Spillane, J; Bradley, J and Brooks, T (2022) Challenges in the adoption of mobile information communication technology (m-ICT) in the construction phase of infrastructure projects in the UK. International Journal of Building Pathology and Adaptation, 40(3), pp. 327-344. ISSN 23984708

Atmo, G and Duffield, C (2014) Improving investment sustainability for PPP power projects in emerging economies: Value for money framework. Built Environment Project and Asset Management, 4(4), pp. 335-351. ISSN 2044-124X

Atout, M M M (2008) Causes of delays in construction projects & how the project manager can act to avoid delays. PhD thesis, University of South Wales, UK.

Attalla, M M A M (2000) Reconstruction of operating facilities: A model for project management. PhD thesis, University of Waterloo, Canada.

Attallah, S O (2014) A life cycle analysis approach for the enhancement of sustainability decision-making in the construction industry using agent-based modeling. PhD thesis, Purdue University, USA.

Attar, A; Boudjakdji, M A; Bhuiyan, N; Grine, K; Kenai, S and Aoubed, A (2009) Integrating numerical tools in underground construction process. Engineering, Construction and Architectural Management, 16(4), pp. 376-391. ISSN 0969-9988

Atuahene, B T; Kanjanabootra, S and Gajendra, T (2020) Benefits of big data application experienced in the construction industry: A case of an Australian construction company. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Atuahene, B T; Kanjanabootra, S and Gajendran, T (2022) Preliminary benefits of big data in the construction industry: a case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(2), pp. 67-77. ISSN 17514304

Atukpa, D J (2021) Managerial support strategies to minimize job insecurity among Nigerian private firms. PhD thesis, Walden University, USA.

Auchterlounie, A C (2004) A new quality theory for UK private housebuilding based on definable quality principles, impression management and the control of cognitive dissonance. PhD thesis, Heriot-Watt University, UK.

Austrin, T B (1978) Industrial relations in the construction industry: Some sociological considerations on wage contracts and trade unionism (1919-1973). PhD thesis, University of Bristol, UK.

Avetisyan, H G (2013) Sustainable infrastructure modeling and policy analyses: Construction, energy and transportation industries. PhD thesis, University of Maryland, College Park, USA.

Avetisyan, H G; Miller-Hooks, E and Melanta, S (2012) Decision models to support greenhouse gas emissions reduction from transportation construction projects. Journal of Construction Engineering and Management, 138(5), pp. 631-641. ISSN 0733-9364

Avrithi, K. (2026) Resilience of infrastructure for midsized cities against flooding: A case study. International Journal of Disaster Resilience in the Built Environment, pp. 1-16. ISSN 1759-5908

Awakul, P and Ogunlana, S O (2002) The effect of attitudinal differences on interface conflicts in large scale construction projects: A case study. Construction Management and Economics, 20(4), pp. 365-377. ISSN 01446193

Awale, R and Rowlinson, S (2015) An exploratory study of a CSV concept for achieving firm competitiveness in Hong Kong construction firms. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Awale, Raman (2016) An exploratory study of a 'creating shared value' (CSV) concept for achieving firm competitiveness in Hong Kong construction firms. PhD thesis, University of Hong Kong, Hong Kong.

Awe, O O; Atofarati, E O; Adeyinka, M O; Musa, A P and Onasanya, E O (2024) Assessing the factors affecting building construction collapse casualty using machine learning techniques: A case of Lagos, Nigeria. International Journal of Construction Management, 24(3), pp. 261-269. ISSN 1562-3599

Awodele, I A; Mewomo, M C and Eze, E C (2023) Inhibitors to the adoption of building information modelling in modular construction: A case study of the Nigerian construction industry. Journal of Construction in Developing Countries, 28(2), pp. 19-36. ISSN 1823-6499

Awolusi, I G and Marks, E D (2017) Safety activity analysis framework to evaluate safety performance in construction. Journal of Construction Engineering and Management, 143(3): 05016022, ISSN 0733-9364

Awuah, E (2020) A conceptual risk management framework for public private partnership in developing countries: A Ghanaian and South African perspective. PhD thesis, University of South Africa, South Africa.

Awuzie, B; McDermott, P and Farag, F (2018) Achieving social value through construction frameworks: the effect of client attributes. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(1), pp. 25-31. ISSN 17514304

Awuzie, B O (2014) A viable infrastructure delivery systems model for achieving socio-economic benefits in the Nigerian oil and gas industry. PhD thesis, University of Salford, UK.

Awuzie, B O and McDermott, P (2016) The role of contracting strategies in social value implementation. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(3), pp. 106-114. ISSN 17514304

Axon, S and Morrissey, J (2020) Just energy transitions? Social inequities, vulnerabilities and unintended consequences. Buildings & Cities, 1(1), pp. 393-411. ISSN 2632-6655

Ayadi, A; Nasraoui, H; Driss, Z; Bouabidi, A and Abid, M S (2018) Unsteady state of a solar chimney power plant accoupled with a turbine: Case study. Journal of Engineering, Design and Technology, 16(2), pp. 244-255. ISSN 1726-0531

Ayala Collazo, I C (2023) An analysis of governing factors affecting diversity in local government capital improvement program implementation. DPA thesis, University of Baltimore, USA.

Ayda Montaser, K and Heidari, S (2021) Optimizing window size by integrating energy and lighting analyses considering occupants' visual satisfaction. Built Environment Project and Asset Management, 11(4), pp. 673-686. ISSN 2044-124X

Aye, L; Bamford, N; Charters, B and Robinson, J (1999) Environmentally sustainable development: A life cycle costing approach for a commercial office building in Melbourne, Australia. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Aye, L; Bamford, N; Charters, B and Robinson, J (2000) Environmentally sustainable development: A life-cycle costing approach for a commercial office building in Melbourne, Australia. Construction Management and Economics, 18(8), pp. 927-934. ISSN 01446193

Ayinla, K; Cheung, F and Skitmore, M (2022) Process waste analysis for offsite production methods for house construction: A case study of factory wall panel production. Journal of Construction Engineering and Management, 148(1): 05021011, ISSN 0733-9364

Ayinla, K; Cheung, F and Towe, B (2025) Time-driven activity-based costing (TDABC) model for performance optimization of offsite manufacturing methods housebuilding. Construction Management and Economics, 43(8), pp. 637-656. ISSN 0144-6193

Ayman Anwar, R (2022) Enhancing the integration of sustainability assessment within dynamic BIM enabled design projects. PhD thesis, Northumbria University, UK.

Ayodele, T T (2022) Cost-effective retrofit packages for low-middle income residential buildings in Nigeria. PhD thesis, De Montfort University, UK.

Azadeh, A; Kalantari, M; Ahmadi, G and Eslami, H (2019) A flexible genetic algorithm-fuzzy regression approach for forecasting: The case of bitumen consumption. Construction Innovation, 19(1), pp. 71-88. ISSN 1471-4175

Azambuja, M M; Ponticelli, S and O'Brien, W J (2014) Strategic procurement practices for the industrial supply chain. Journal of Construction Engineering and Management, 140(7): 06014005, ISSN 0733-9364

Azhar, N (2014) Integrated construction project delivery system in the U.S. Public sector: An information modeling framework. PhD thesis, Florida International University, USA.

Azhar, S; Ahmad, I and Sein, M K (2010) Action research as a proactive research method for construction engineering and management. Journal of Construction Engineering and Management, 136(1), pp. 87-98. ISSN 0733-9364

Azhar, S and Brown, J (2009) Bim for sustainability analyses. International Journal of Construction Education and Research, 5(4), pp. 276-292. ISSN 1557-8771

Azhar, S and Choudhry, R M (2016) Capacity building in construction health and safety research, education, and practice in Pakistan. Built Environment Project and Asset Management, 6(1), pp. 92-105. ISSN 2044-124X

Azhar, S; Khalfan, M and Maqsood, T (2012) Building information modeling (BIM): Now and beyond. Construction Economics and Building, 12(4), pp. 15-28. ISSN 2204-9029

Aziz, Z; Alzaabi, E and Syazli Fathi, M (2023) Prioritisation of resilience criteria and performance indicators for road emergencies crisis response: An analytic hierarchy process (AHP) approach. Journal of Financial Management of Property and Construction, 28(2), pp. 178-205. ISSN 1366-4387

Azizibabani, M (2026) Investigating the interactions of the components affecting the social performance of open spaces in affordable housing projects. International Journal of Construction Management, 26(5), pp. 735-750. ISSN 1562-3599

Azman, M A; Chuweni, N N; Halil, F M; Ku Mohammad Asyraf Ku, A; Lee, B L; Farah Nazira, J and Skitmore, M (2024) The impact of the change in institutional regulation on construction productivity: Firm-level evidence in a developing economy. Construction Management and Economics, 42(3), pp. 199-214. ISSN 01446193

Azzouz, A (2018) Current perspectives and future directions of BIM assessment methods. PhD thesis, University of Bath, UK.

Azzouz, A and Papadonikolaki, E (2020) Boundary-spanning for managing digital innovation in the AEC sector. Architectural Engineering and Design Management, 16(5), pp. 356-373. ISSN 1745-2007

Babahaji Meibodi, A (2015) On-site concrete waste minimisation in Iran. PhD thesis, Kingston University, UK.

Babar, S; Thaheem, M J and Ayub, B (2017) Estimated cost at completion: Integrating risk into earned value management. Journal of Construction Engineering and Management, 143(3): 04016104, ISSN 0733-9364

Babatunde, S (2015) Developing public private partnership strategy for infrastructure delivery in Nigeria. PhD thesis, Northumbria University, UK.

Babatunde, S O and Perera, S (2017) Cross-sectional comparison of public-private partnerships in transport infrastructure development in Nigeria. Engineering, Construction and Architectural Management, 24(6), pp. 875-900. ISSN 0969-9988

Babatunde, S O; Perera, S and Zhou, L (2016) Methodology for developing capability maturity levels for PPP stakeholder organisations using critical success factors. Construction Innovation, 16(1), pp. 81-110. ISSN 1471-4175

Babazadeh, N; Teizer, J; Bargstädt, H J and Melzner, J (2025) Predictive simulation of construction site noise emissions from heavy equipment. Smart and Sustainable Built Environment, 14(3), pp. 715-739. ISSN 2046-6099

Baborska-Narożny, M and Stevenson, F (2019) Service controls interfaces in housing: Usability and engagement tool development. Building Research & Information, 47(3), pp. 290-304. ISSN 0961-3218

Baborska-Narożny, M; Stevenson, F and Grudzińska, M (2017) Overheating in retrofitted flats: Occupant practices, learning and interventions. Building Research & Information, 45(1-2), pp. 40-59. ISSN 0961-3218

Back, W E; Grau, D and Mejia-Aguilar, G (2013) Effectiveness evaluation of contract incentives on project performance. International Journal of Construction Education and Research, 9(4), pp. 288-306. ISSN 1557-8771

Badalpur, M and Nurbakhsh, E (2021) An application of waspas method in risk qualitative analysis: A case study of a road construction project in Iran. International Journal of Construction Management, 21(9), pp. 910-918. ISSN 1562-3599

Badasyan, N (2018) Project feasibility analysis economic model for private investments in the renewable energy sector. Built Environment Project and Asset Management, 8(2), pp. 215-230. ISSN 2044-124X

Badawy, M; El-Sheikh, R and Hamdy, K (2025) Sensitivity analysis of key factors influencing concession period estimation in PPP wastewater treatment projects: A system dynamics approach. Construction Economics and Building, 25(3-4), pp. 65-89. ISSN 2204-9029

Badenfelt, U (2007) Trust and control in the early phases of target cost contracts. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Badenfelt, U (2008) The selection of sharing ratios in target cost contracts. Engineering, Construction and Architectural Management, 15(1), pp. 54-65. ISSN 0969-9988

Badenfelt, U (2010) I trust you, I trust you not: A longitudinal study of control mechanisms in incentive contracts. Construction Management and Economics, 28(3), pp. 301-310. ISSN 1466433X

Badi, S (2017) Public sustainable-energy requirements and innovation in UK PFI school projects. Construction Management and Economics, 35(4), pp. 218-238. ISSN 01446193

Badi, Sulafa M (2012) Sustainable energy innovation (SEI) within private finance initiative (PFI) projects. PhD thesis, University College London, UK.

Bae, Y J (2016) Integrated design tool of building system optimization for building life cycle cost. PhD thesis, Purdue University, USA.

Baggett, B L (1988) Analysis of the role of financial engineering in the marketing of major international construction projects. DBA thesis, George Washington University, USA.

Bagheri-Zadeh, S H; Kim, H; Hounsell, S; Wood, C R; Soleymani, H and King, M (2007) Field study of concrete maturity methodology in cold weather. Journal of Construction Engineering and Management, 133(11), pp. 827-835. ISSN 0733-9364

Baharfar, Y; Mohammadyan, M; Moattar, F; Nassiri, P and Behzadi, M H (2022) Indoor pm2.5 concentrations of pre-schools; determining the effective factors and model for prediction. Smart and Sustainable Built Environment, 11(4), pp. 1042-1059. ISSN 2046-6099

Baharuddin, H E A; Ibrahim, C K I C; Costello, S B and Wilkinson, S (2017) Managing stakeholders through alliances: A case study of a megaproject in New Zealand. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(4), pp. 151-160. ISSN 17514304

Bahrami, S (2021) Product information quality: A sustainability challenge in design and construction. PhD thesis, Lund University, Sweden.

Bahrami, S and Zeinali, D (2023) The sustainability challenge of product information quality in the design and construction of facades: Lessons from the grenfell tower fire. Smart and Sustainable Built Environment, 12(3), pp. 488-506. ISSN 2046-6099

Bai, S; Li, M; Song, L and Kong, R (2021) Developing a common library of prefabricated structure components through graphic media mapping to improve design efficiency. Journal of Construction Engineering and Management, 147(1): 1954, ISSN 0733-9364

Bai, Y; Burkett, W R and Nash, P T (2006) Lessons learned from an emergency bridge replacement project. Journal of Construction Engineering and Management, 132(4), pp. 338-344. ISSN 0733-9364

Bai, Y; Kim, S H and Burkett, W R (2007) Enhancing the capability of rapid bridge replacement after extreme events. Engineering, Construction and Architectural Management, 14(4), pp. 375-386. ISSN 0969-9988

Baiden, B K (2006) Framework for the integration of the project delivery team. PhD thesis, Loughborough University, UK.

Baienat, S. and Iordanova, I. (2026) Quantifying building adaptability and circular performance through BIM: The adaptation intensity index (AII), circular adaptability performance (CAP), and digital adaptability passport (DAP). Smart and Sustainable Built Environment, pp. 1-22. ISSN 2046-6099

Baik, A H (2017) Heritage Building Information Modelling (HBIM) as a model of UNESCO's World Heritage Nomination File. PhD thesis, University College London, UK.

Bailey, Brian T (2025) Understanding workplace stigma and coping strategies among those living with chronic migraine in the construction industry. PhD thesis, Liberty University, USA.

Bailey, D (2016) A performance evaluation of mainstream timber framed and traditional masonry housing in the UK. PhD thesis, University of Nottingham, UK.

Bailey, K A (1995) The metamorphosis of Battersea, 1800-1914: a building history. PhD thesis, Open University, UK.

Bajracharya, A (2009) Implementation of innovation on construction projects: A behavioral perspective. PhD thesis, National University of Singapore, Singapore.

Bakatjan, S; Arikan, M and Tiong, R L K (2003) Optimal capital structure model for BOT power projects in Turkey. Journal of Construction Engineering and Management, 129(1), pp. 89-97. ISSN 0733-9364

Baker, D and Nateque Mahmood, M (2012) Developing tools to support complex infrastructure decision-making. Smart and Sustainable Built Environment, 1(1), pp. 59-72. ISSN 2046-6099

Baker, H; Moncaster, A; Wilkinson, S and Remøy, H (2023) Demolition or retention of buildings: Drivers at the masterplan scale. Buildings & Cities, 4(1), pp. 488-506. ISSN 2632-6655

Baker, L M (1984) A labor market model to manage costs risk in construction project management. PhD thesis, Colorado School of Mines, USA.

Baker, M J (1991) The development of vocational education and training in the British construction industry, 1970-1990. PhD thesis, University of Hull, UK.

Baker, Scott William (1997) Risk management in major projects. PhD thesis, University of Edinburgh, UK.

Bakht, A B (2018) Engineering leadership competencies for entry-level civil engineers: A multiple case study. PhD thesis, Walden University, USA.

Bakis, N (2009) Product data sharing in architecture, engineering and construction: Assessment of middleware support and business benefits. PhD thesis, University of Salford, UK.

Bakogiannis, A (2005) Managing stakeholders: A case study in Athens, Greece. PhD thesis, University College London, UK.

Bakti, E S; Majid, M Z B A; Zin, R M and Trigunarsyah, B (2011) Constructability improvement in seawater intake structure. Engineering, Construction and Architectural Management, 18(6), pp. 595-608. ISSN 0969-9988

Balali, A; Moehler, R C and Valipour, A (2022) Ranking cost overrun factors in the mega hospital construction projects using Delphi-swara method: An Iranian case study. International Journal of Construction Management, 22(13), pp. 2577-2585. ISSN 1562-3599

Balali, V; Zalavadia, A and Heydarian, A (2020) Real-time interaction and cost estimating within immersive virtual environments. Journal of Construction Engineering and Management, 146(2): 04019098, ISSN 0733-9364

Balasubramani, M; Mahalingam, A and Scott, W R (2020) Imitation and adaptation: Lessons from a case study of a metro rail project in India. Construction Management and Economics, 38(4), pp. 364-382. ISSN 01446193

Baldursdottir, N and Ottosson, E (2012) Managing change through participation: Developing shared construction guidelines in 26 public organisations. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Baldwin, A; Li, H; Huang, T; Kong, C W; Guo, H L; Chan, N and Wong, J (2009) Supporting pre-tender construction planning with virtual prototyping. Engineering, Construction and Architectural Management, 16(2), pp. 150-161. ISSN 0969-9988

Ball, M and Chambers, M (2009) An incentivisation scheme for a major transportation infrastructure project in the UK. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Ball Jr., L F (2011) Assessment of the green building education needs of North Carolina real estate appraisers. PhD thesis, Prescott College, USA.

Ballard, G (2002) Managing work flow on design projects: A case study. Engineering, Construction and Architectural Management, 9(3), pp. 284-291. ISSN 0969-9988

Ballard, H G (2000) The last planner system of production control. PhD thesis, University of Birmingham, UK.

Ballesteros-Pérez, P (2017) M-PERT: Manual project-duration estimation technique for teaching scheduling basics. Journal of Construction Engineering and Management, 143(9): 04017063, ISSN 0733-9364

Ballesteros-Pérez, P; Phua, F T T and Mora-Melià, D (2019) Human resource allocation to multiple projects based on members' expertise, group heterogeneity, and social cohesion. Journal of Construction Engineering and Management, 145(2): 04018134, ISSN 0733-9364

Ballesteros-Pérez, P; Smith, S T; Lloyd-Papworth, J G and Cooke, P (2018) Incorporating the effect of weather in construction scheduling and management with sine wave curves: Application in the United Kingdom. Construction Management and Economics, 36(12), pp. 666-682. ISSN 01446193

Ballesteros-Pérez, P; del Campo-Hitschfeld, M L; González-Naranjo, M A and González-Cruz, M C (2015) Climate and construction delays: Case study in Chile. Engineering, Construction and Architectural Management, 22(6), pp. 596-621. ISSN 0969-9988

Baloi, D (2003) Sustainable construction: Challenges and opportunities. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Bambrah, G K (1989) A systematic approach to appraisal/evaluation of civil engineering projects, with special emphasis on technology. PhD thesis, Loughborough University, UK.

Bamisile, A (1991) A communication system approach to the management of quality in construction. PhD thesis, Open University, UK.

Banawi, A and Bilec, M M (2014) A framework to improve construction processes: Integrating lean, green and six sigma. International Journal of Construction Management, 14(1), pp. 45-55. ISSN 1562-3599

Banawi, A A (2013) Improving construction processes by integrating lean, green, and six-sigma. PhD thesis, University of Pittsburgh, USA.

Bandara, C; Dissanayake, D M P P; Karunasena, G and Madhusanka, N (2018) Mitigation of challenges in sustaining green certification in the Sri Lankan hotel sector. Built Environment Project and Asset Management, 8(5), pp. 515-527. ISSN 2044-124X

Baniassadi, F; Alvanchi, A and Mostafavi, A (2018) A simulation-based framework for concurrent safety and productivity improvement in construction projects. Engineering, Construction and Architectural Management, 25(11), pp. 1501-1515. ISSN 0969-9988

Banks, C; Kotecha, R; Curtis, J; Dee, C; Pitt, N and Papworth, R (2018) Enhancing high-rise residential construction through design for manufacture and assembly: A UK case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(4), pp. 164-174. ISSN 17514304

Banks, E R (2021) Women in construction: Exploring gender-diverse recruitment for engaging a full workforce. PhD thesis, Northcentral University, USA.

Banks, M S (2012) Understanding information technology enabled social action networks: Construction, sustainability and user participation. PhD thesis, University of Memphis, USA.

Banks-Hunt, Joan Maria (2021) Exploring design thinking for instructional practice. PhD thesis, Virginia Tech, USA.

Bansal, V K (2020) Use of GIS to consider spatial aspects in construction planning process. International Journal of Construction Management, 20(3), pp. 207-222. ISSN 1562-3599

Banteli, A; Stevenson, V and Patel, H (2020) Embodied energy considerations in a BIM-enabled building design process: An ethnographic case study. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Banwo, O (2016) The development of a procurement decision support system to enhance construction claims management practice. PhD thesis, Coventry University, UK.

Bao, F; Chen, C; Chan, A P C; Martek, I and Shrestha, A (2019) Dynamic framework transfer model for public-private partnerships: Lessons from a China water sector case study. Engineering, Construction and Architectural Management, 26(7), pp. 1218-1239. ISSN 0969-9988

Bao, Z; Laovisutthichai, V; Tan, T; Wang, Q and Lu, W (2022) Design for manufacture and assembly (dfma) enablers for offsite interior design and construction. Building Research & Information, 50(3), pp. 325-338. ISSN 0961-3218

Barai, N and Faruk, M (2025) Analyzing physical environment of child friendly spaces in emergencies: In the context of rohingya crisis at cox's bazar, Bangladesh. International Journal of Disaster Resilience in the Built Environment, 16(2), pp. 224-241. ISSN 1759-5908

Barakat, T A H (2009) A hybrid model of communication and information management in mega construction projects in Dubai using a new critical success factor approach. PhD thesis, Loughborough University, UK.

Barati, M K and Bankaru-Swamy, S (2026) A living lab approach to co-designing climate adaptation strategies. Buildings & Cities, 7(1), pp. 39-57. ISSN 2632-6655

Barbosa, Elisabeti de Fátima Teixeira (2024) Influence of user's behavior on thermoenergetic performance in higher education buildings. PhD thesis, Universidade Estadual de Campinas, Brazil.

Barbosa, J A; Araújo, C; Mateus, R and Bragança, L (2016) Smart interior design of buildings and its relationship to land use. Architectural Engineering and Design Management, 12(2), pp. 97-106. ISSN 1745-2007

Barbosa, P S F and Pimentel, P R (2001) A linear programming model for cash flow management in the Brazilian construction industry. Construction Management and Economics, 19(5), pp. 469-479. ISSN 01446193

Barbosa Resende, C (2021) Post-construction evaluation for work zones and construction engineers' training. PhD thesis, Iowa State University, USA.

Barker, R (2006) Waste assessment and application of improvement techniques in UK private housebuilding supply chains. PhD thesis, Cardiff University, UK.

Barlow, C (2012) The Code for Sustainable Homes: what are the innovation implications for the social housing development sector? PhD thesis, University of Salford, UK.

Barlow, J; Childerhouse, P; Gann, D; Hong-Minh, S; Naim, M and Ozaki, R (2003) Choice and delivery in housebuilding: Lessons from Japan for UK housebuilders. Building Research & Information, 31(2), pp. 134-145. ISSN 0961-3218

Barnes, C J (1999) A methodology for the concurrent design of products and their assembly sequence. PhD thesis, Cranfield University, UK.

Barontini, A (2021) Bio-inspired algorithms for structural health monitoring of civil engineering systems. PhD thesis, Universidade do Minho, Portugal.

Barr, D W J (2004) The department of trade and industry key performance indicators: A critical appraisal. PhD thesis, University of Southampton, UK.

Barraket, J and Loosemore, M (2018) Co-creating social value through cross-sector collaboration between social enterprises and the construction industry. Construction Management and Economics, 36(7), pp. 394-408. ISSN 01446193

Barrett, P and Barrett, L (2006) The 4Cs model of exemplary construction projects. Engineering, Construction and Architectural Management, 13(2), pp. 201-215. ISSN 0969-9988

Barrett, P and Sutrisna, M (2009) Methodological strategies to gain insights into informality and emergence in construction project case studies. Construction Management and Economics, 27(10), pp. 935-948. ISSN 1466433X

Barrie, H; McDougall, K; Miller, K and Faulkner, D (2023) The social value of public spaces in mixed-use high-rise buildings. Buildings & Cities, 4(1), pp. 669-689. ISSN 2632-6655

Barry, W; Leite, F and O'Brien, W J (2015) Late deliverable risk catalog: Evaluating the impacts and risks of late deliverables to construction sites. Journal of Construction Engineering and Management, 141(4): 04014087, ISSN 0733-9364

Barsoumian, T (2023) Survive and thrive: An exploration of methods implemented by small businesses in the construction industry to sustain their business beyond 5 years. EdD thesis, Pepperdine University, USA.

Barthel, P-A (2016) Morocco in the era of eco-urbanism: Building a critical and operational research on an emerging practice in Africa. Smart and Sustainable Built Environment, 5(3), pp. 272-288. ISSN 2046-6099

Bartlett, E and Howard, N (2000) Informing the decision makers on the cost and value of green building. Building Research & Information, 28(5-6), pp. 315-324. ISSN 0961-3218

Bartlett, H V (2006) Understanding the implementation of sustainability principles in UK educational building projects. PhD thesis, University of Cambridge, UK.

Bascoul, A M (2017) Managing project structural complexity by integrating facility management in planning, designing, and execution of high-end facility upgrades. PhD thesis, University of California, Berkeley, USA.

Basheer, M; Elnour, Z; Siddig, K and Grethe, H (2025) Economic impacts of large dams on downstream brickmaking in developing countries. Construction Management and Economics, 43(3), pp. 213-225. ISSN 0144-6193

Bassioni, H A (2004) A framework for measuring business performance in construction contracting organisations. PhD thesis, Loughborough University, UK.

Bassioni, H A; Price, A D F and Hassan, T M (2005) Building a conceptual framework for measuring business performance in construction: An empirical evaluation. Construction Management and Economics, 23(5), pp. 495-507. ISSN 01446193

Bastien, A N (2002) Successful organisational and human practices in the UK construction industry: proposing the CONSTRUCT framework of good practice. PhD thesis, University of Warwick, UK.

Batarseh, Shadi (2024) Digital twin for digital asset management: Asset information model characteristics and digital capabilities for smart functions, sydney metro case study. PhD thesis, University of New South Wales, Australia.

Bataw, A (2016) On the integration of building information modelling in undergraduate civil engineering programmes in the United Kingdom. PhD thesis, University of Manchester, UK.

Bates, William (1999) A strategy for the development of a knowledge based system for predicting out-turn costs of heavy engineering works within a multi-national cost consultancy. PhD thesis, Teesside University, UK.

Battikha, M G (2008) Reasoning mechanism for construction nonconformance root-cause analysis. Journal of Construction Engineering and Management, 134(4), pp. 280-288. ISSN 0733-9364

Bau, Z (2022) Developing circularity of construction waste in emerging economies: an environmental Kuznets curve approach. PhD thesis, University of Hong Kong, Hong Kong.

Bauer, E and Menches, C L (2011) Why we need renaissance engineers: Golden Gate bridge seismic retrofit Phase II case study. Journal of Construction Engineering and Management, 137(10), pp. 901-905. ISSN 0733-9364

Baumann, L (2013) The impact of national culture on project management in the Middle East. PhD thesis, Loughborough University, UK.

Baumgärtner, C E (2000) Collaboration between engineering consultants and their clients: characteristics of success. PhD thesis, University of Cambridge, UK.

Bavafa, M (2015) Enhancing information quality through building information modelling implementation within UK structural engineering organisations. PhD thesis, University of Salford, UK.

Baweshkha, Monair Ali (2021) Integrating project management office and organisational change management processes for better implementation and adoption of e-health strategy in Saudi Arabia. PhD thesis, RMIT University, Australia.

Baxendale, A T (1992) Construction management information systems for production control. PhD thesis, Bristol Polytechnic, UK.

Baxendale, T (1984) Construction resource models by Monte Carlo simulation. Construction Management and Economics, 2(3), pp. 201-217. ISSN 01446193

Bayandor, S; Kalatehjari, R; Akherati, R and Kasebzadeh, J (2025) Causes, effects and solutions of delay and cost overruns in Iranian deep excavation projects. Built Environment Project and Asset Management, 15(2), pp. 309-336. ISSN 2044-124X

Bayar, M S (2019) BIM-enabled recommendations for digital handover process in the highways sector. PhD thesis, University of Salford, UK.

Bayat, F.; Noorzai, E. and Golabchi, M. (2019) Identifying the most important public–private partnership risks in afghanistan's infrastructure projects. Journal of Financial Management of Property and Construction, 24(3), pp. 309-337. ISSN 1366-4387

Bayat, F; Noorzai, E and Golabchi, M (2019) Identifying the most important public-private partnership risks in Afghanistan's infrastructure projects. Journal of Financial Management of Property and Construction, 24(3), pp. 309-337. ISSN 1366-4387

Bayat, M; Khanzadi, M; Nasirzadeh, F and Chavoshian, A (2020) Financial conflict resolution model in BOT contracts using bargaining game theory. Construction Innovation, 20(1), pp. 18-42. ISSN 1471-4175

Bayhan, H G (2025) Transaction costs in construction project team communications: Language model and network science applications. PhD thesis, Michigan State University, USA.

Bayrak, T (2008) Semi automatic construction progress measurement using a combination of CAD modelling, photogrammetry and construction knowledge. PhD thesis, Heriot-Watt University, UK.

Bayraktar, M E; Arif, F; Ponder, D; Prozzi, J and Mahmoud, N V (2016) Opportunities for value extraction projects in highway rights-of-way and development of feasibility assessment tool. Journal of Construction Engineering and Management, 142(8): 4016023, ISSN 0733-9364

Bayraktar, M E and Hastak, M (2009) Bayesian belief network model for decision making in highway maintenance: Case studies. Journal of Construction Engineering and Management, 135(12), pp. 1357-1369. ISSN 0733-9364

Bayram, S and Al-Jibouri, S (2016) Efficacy of estimation methods in forecasting building projects' costs. Journal of Construction Engineering and Management, 142(11): 05016012, ISSN 0733-9364

Bayram, S and Al-Jibouri, S (2018) Cost forecasting using RCF: A case study for planning public building projects costs in Turkey. International Journal of Construction Management, 18(5), pp. 405-417. ISSN 1562-3599

Beadle, K (2008) Analysis of the design process for low-energy housing. PhD thesis, De Montfort University, UK.

Beadle, K; Gibb, A; Austin, S; Fuster, A and Madden, P (2008) Adaptable futures: Sustainable aspects of adaptable buildings. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Beatham, S (2003) Development of an integrated business improvement system for construction. EngD thesis, Loughborough University, UK.

Becerik, B (2006) Implementation and value of online collaboration and project management systems in design and construction. DDes thesis, Harvard University, USA.

Becker, T C (2012) Improving the predictability of construction project outcomes through project level indirect construction cost practices. PhD thesis, North Carolina State University, USA.

Beemsterboer, S and Koch, C (2017) A human touch: Examining the roles of middle managers for innovation in contractors. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Beg, M A (1999) An economic based decision support system for project level pavement type selection. PhD thesis, University of Texas at Austin, USA.

Behar, C B (2016) A socio-technical perspective of ventilation practices in UK social housing with whole house ventilation systems: design, everyday life and change. PhD thesis, University College London, UK.

Behnisch, M and Ultsch, A (2009) Urban data-mining: Spatiotemporal exploration of multidimensional data. Building Research & Information, 37(5-6), pp. 520-532. ISSN 0961-3218

Beitelmal, J A (1999) Development of appropriate technology road condition monitoring system: Case study of the city of Benghazi in Libya. PhD thesis, University of Newcastle upon Tyne, UK.

Bekdik, B; Pörzgen, J; Bull, S S and Thuesen, C (2018) Modularising design processes of façades in Denmark: Re-exploring the use of design structure matrix. Architectural Engineering and Design Management, 14(1-2), pp. 95-108. ISSN 1745-2007

Belayutham, S; Che Ibrahim, C K I; Zulkifli, A R and Ibrahim, N (2019) A dual-functional social innovation process model for low-cost houses through university-enabled initiative. Construction Innovation, 19(2), pp. 126-148. ISSN 1471-4175

Belfield, A (2025) Co-learning in living labs: Nurturing civic agency and resilience. Buildings & Cities, 6(1), pp. 969-985. ISSN 2632-6655

Bell, T (2018) A detailed investigation into the engineering properties and challenges affecting the potential introduction of a UK grown dowel-laminated timber floor panel into the domestic construction market. PhD thesis, University of Strathclyde, UK.

Bellamy, L (2019) Optimisation tools to assist efficient and sustainable tall building design. PhD thesis, Imperial College London, UK.

Belpoliti, V; Said, Z; Hachicha, A A and Altan, H (2024) Simulated and monitored electrical energy balance in a solar house in Dubai, UAE. Architectural Engineering and Design Management, 20(5), pp. 1100-1117. ISSN 1745-2007

Beltrão, L M P and Carvalho, M T M (2019) Prioritizing construction risks using fuzzy AHP in Brazilian public enterprises. Journal of Construction Engineering and Management, 145(2): 05018018, ISSN 0733-9364

Ben Mahmoud, B; Lehoux, N; Blanchet, P and Jobidon, G (2026) Towards a resilient project delivery system selection: Evaluating the impact of external environment criteria for public infrastructure in quebec. Construction Management and Economics, 44(3), pp. 159-182. ISSN 0144-6193

Bender, W J (2000) A risk-based cost control methodology for constructing complex structures with the mobile offshore base as a case study. PhD thesis, University of Maryland, College Park, USA.

Bendi, D (2017) Developing an offsite readiness framework for Indian construction organisations. PhD thesis, University of Salford, UK.

Bendi, D; Rana, M Q; Arif, M; Lamb, S M; Sawhney, A and Kaushik, A K (2022) Assessing off-site readiness in construction organisations: Cases from India. Construction Innovation, 22(2), pp. 320-341. ISSN 1471-4175

Bengtsson, S H and Rosander, L (2018) Public clients' possibilities to initiate sustainable change: Exploring two Swedish clients' procurement strategies. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Benhaim, M (1997) Interfirm relationships within the construction industry: Towards the emergence of networks? A comparative study between France and the UK. PhD thesis, Brunel University, UK.

Benhaim, M and Birchall, D W (1998) Interfirm relationships within the construction industry: A comparative study between France and the UK. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Benn, M and Stoy, C (2024) Challenges impairing the data quality of information deliverables in BIM during the planning phase of office buildings in Germany. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Benne, B C (2005) Managing AEC project organizations at the edge of chaos: An analysis of AEC projects' adaptive capacity from a living systems perspective. PhD thesis, University of California, Berkeley, USA.

Bennett, L and Gibbeson, C (2010) Perceptions of occupiers' liability risk by estate managers: A case study of memorial safety in English cemeteries. International Journal of Law in the Built Environment, 2(1), pp. 76-93. ISSN 1756-1450

Bennett, W G and Karunarathna, H (2020) Coastal flood alleviation through management interventions under changing climate conditions. International Journal of Disaster Resilience in the Built Environment, 11(2), pp. 187-203. ISSN 1759-5916

Bensalah, M; Elouadi, A and Mharzi, H (2019) Overview: The opportunity of BIM in railway. Smart and Sustainable Built Environment, 8(2), pp. 103-116. ISSN 2046-6099

Bentil, K K (1990) A model approach for predicting commercial construction site accidents. PhD thesis, University of Florida, USA.

Berawi, M A; Kim, A A; Naomi, F; Basten, V; Miraj, P; Medal, L A and Sari, M (2023) Designing a smart integrated workspace to improve building energy efficiency: An Indonesian case study. International Journal of Construction Management, 23(3), pp. 410-422. ISSN 1562-3599

Berente, N; Baxter, R and Lyytinen, K (2010) Dynamics of inter-organizational knowledge creation and information technology use across object worlds: The case of an innovative construction project. Construction Management and Economics, 28(6), pp. 569-588. ISSN 1466433X

Berg, J B; Thuesen, C and Jensen, P A (2023) Procurement innovation as a vehicle for sustainable change: a case study of the Danish model of strategic partnerships. Construction Innovation, 23(3), pp. 665-682. ISSN 1471-4175

Berg, S; Legnerot, C; Lindstrom, A; Nilsson, M; Bosch, P and Gluch, P (2012) Knowledge transfer within and across organizational boundaries: A case study in the construction industry. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Berry, M J (2000) An investigation into the incidence effect and management of conflict arising out of the construction process: A case study based approach. PhD thesis, University of Wales, UK.

Besklubova, S; Kravchenko, E; Kasprzhitskii, A; Lazorenko, G and Zhong, R Y (2026) Establishing a market for carbon-neutral technology in concrete waste recycling by sequestering flue co 2: An evolutionary game theory-based case study in Hong Kong. Journal of Construction Engineering and Management, 152(4): 04026017, ISSN 0733-9364

Bettemir, O H (2025) Analysis of existing resource distribution metrics and suggestion of new metrics. Journal of Construction Engineering and Management, 151(2): 04024195, ISSN 0733-9364

Bettemir, Ö H and Birgonul, M T (2025) Solution of discrete time–cost trade-off problem with adaptive search domain. Engineering, Construction and Architectural Management, 32(2), pp. 1032-1052. ISSN 0969-9988

Beurskens, Pieter Robert (2021) The development of an evaluation method to support circular building design. PhD thesis, University of Twente, Netherlands.

Bevan, W (2016) An investigation of the required skills for the delivery of low and zero carbon buildings within a region. PhD thesis, University of Reading, UK.

Bevan, W; Lu, S L and Sexton, M (2020) Skills required to deliver energy efficient school retrofit buildings. Engineering, Construction and Architectural Management, 27(10), pp. 3051-3073. ISSN 0969-9988

Bevan, W J (2020) How to improve the student feedback process: A case study within the built environment. International Journal of Construction Education and Research, 16(2), pp. 117-131. ISSN 1557-8771

Bevan W, L S (2013) Green marketing in housing: Reality or rhetoric? In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Bewry, S and Kenley, R (1998) Development of service delivery through asset management. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Bhardwaj, S.; Francis, A. and Soman, R. P. (2026) Scenario-based energy and environmental assessment for climate-responsive and low-carbon building design. Smart and Sustainable Built Environment, pp. 1-22. ISSN 2046-6099

Bhargava, A (2009) A probabilistic evaluation of highway project costs. PhD thesis, Purdue University, USA.

Bhattacharya, S (2011) Enablers of growth for construction companies in India: a strategic approach. PhD thesis, Indian Institute of Technology Delhi, India.

Bhattacharya-Mis, N; Lamond, J; Montz, B; Kreibich, H; Wilkinson, S; Chan, F and Proverbs, D (2018) Flood risk to commercial property: Training and education needs of built environment professionals. International Journal of Disaster Resilience in the Built Environment, 9(4-5), pp. 385-401. ISSN 1759-5916

Bhawani, S (2021) A function-based lean construction methods ontology supporting the lean implementation planning process developed for construction projects. PhD thesis, Pennsylvania State University, USA.

Bhih, M and Hegazy, T (2021) Enhanced but-for method to apportion net delays and accelerations. Journal of Construction Engineering and Management, 147(7): 06021003, ISSN 0733-9364

Bhih, M and Hegazy, T (2023) Multiple-window modified but-for analysis of project delays and accelerations. International Journal of Construction Management, 23(4), pp. 686-696. ISSN 1562-3599

Bhurisith, I and Touran, A (2002) Case study of obsolescence and equipment productivity. Journal of Construction Engineering and Management, 128(4), pp. 357-361. ISSN 0733-9364

Bhutto, K H (2004) The application of integrated management systems by contracting organisations. PhD thesis, Sheffield Hallam University, UK.

Bhutto, Khalid Hussain (2004) The application of integrated management systems (IMS) by contracting organisations. PhD thesis, Sheffield Hallam University, UK.

Bi, L; Ren, B; Zhong, D and Hu, L (2015) Real-time construction schedule analysis of long-distance diversion tunnels based on lithological predictions using a markov process. Journal of Construction Engineering and Management, 141(2): 04014076, ISSN 0733-9364

Bibby, L; Austin, S and Bouchlaghem, D (2006) The impact of a design management training initiative on project performance. Engineering, Construction and Architectural Management, 13(1), pp. 7-26. ISSN 0969-9988

Bichard, E (2009) The application of sustainable behaviour change strategies in three built environment companies. Journal of Engineering, Design and Technology, 7(1), pp. 7-20. ISSN 1726-0531

Bilbo, D; Bigelow, B; Escamilla, E and Lockwood, C (2015) Comparison of construction manager at risk and integrated project delivery performance on healthcare projects: A comparative case study. International Journal of Construction Education and Research, 11(1), pp. 40-53. ISSN 1557-8771

Bildsten, L (2016) Purchasing in construction companies. PhD thesis, Lund University, Sweden.

Bilec, M M (2007) A hybrid life cycle assessment model for construction processes. PhD thesis, University of Pittsburgh, USA.

Bilec, Melissa M (2007) A hybrid life cycle assessment model for construction processess. PhD thesis, University of Pittsburgh, USA.

Bilgates, P and Raviteja, Y (2025) A holistic design approach for sustainable building environment: A case study of an educational building. International Journal of Construction Management, 25(16), pp. 1982-1997. ISSN 1562-3599

Biltonen, E F (2001) Cost-benefit analysis of a flood protection project incorporating poverty alleviation concerns: Case study Vietnam. PhD thesis, Colorado State University, USA.

Bingol, B N; Arditi, D and Polat, G (2024) A performance-based subcontractor selection model. Journal of Construction Engineering and Management, 150(8): 04024079, ISSN 0733-9364

Bingol, B N; Arditi, D and Polat, G (2025) Subcontractor selection for a construction project: Optimal plan. Journal of Construction Engineering and Management, 151(12): 04025205, ISSN 0733-9364

Binions, O (2019) A study of corruption using the Institutional Analysis and Development framework with an application to the bidding phase of infrastructure procurement. PhD thesis, University College London, UK.

Biotto, C (2019) Integration of overlapped design and construction stages through location-based planning tools. PhD thesis, University of Huddersfield, UK.

Birchall, S J (2011) An appraisal of the performance of a 'green' office building. PhD thesis, University of Leeds, UK.

Birgonul, Z (2021) A receptive-responsive tool for customizing occupant's thermal comfort and maximizing energy efficiency by blending BIM data with real-time information. Smart and Sustainable Built Environment, 10(3), pp. 504-535. ISSN 2046-6099

Birnie, J and Yates, A (1991) Cost prediction using decision/risk analysis methodologies. Construction Management and Economics, 9(2), pp. 171-186. ISSN 01446193

Bishop, J; Bouchlaghem, D; Glass, J and Matsumoto, I (2008) Identifying and implementing management best practice for communities of practice. Architectural Engineering and Design Management, 4(3-4), pp. 160-175. ISSN 1745-2007

Bittner, R B and Schmitt, R L (2011) Construction engineering process and knowledge requirements for fostering creative design solutions on infrastructure projects. Journal of Construction Engineering and Management, 137(10): 0000303, ISSN 0733-9364

Björnfot, A and Jongeling, R (2007) Application of line-of-balance and 4D CAD for lean planning. Construction Innovation, 7(2), pp. 200-211. ISSN 1471-4175

Blackwood, D J (1998) Rationalisation of design cost estimation in the construction industry. PhD thesis, Abertay University, UK.

Blackwood, D J; Sarkar, S and Price, A D F (1997) A research methodology for modelling construction design service costs. Journal of Construction Procurement, 3(3), pp. 47-67. ISSN 1358-9180

Blampied, N B (2018) Parametric functions for conceptual and feasibility estimating in public highway project portfolios. PhD thesis, University of California, Berkeley, USA.

Blay, K B (2017) Resilience in projects: definition, dimensions, antecedents and consequences. PhD thesis, Loughborough University, UK.

Blindheim, J; Elverum, C W; Welo, T and Steinert, M (2020) Concept evaluation in new product development: A set-based method utilizing rapid prototyping and physical modelling. Journal of Engineering, Design and Technology, 18(5), pp. 1139-1151. ISSN 1726-0531

Blismas, N; Pasquire, C and Gibb, A (2006) Benefit evaluation for off-site production in construction. Construction Management and Economics, 24(2), pp. 121-130. ISSN 01446193

Blismas, N; Sher, W; Thorpe, A and Baldwin, A (2004) A typology for clients' multi-project environments. Construction Management and Economics, 22(4), pp. 357-371. ISSN 01446193

Blismas, N and Wakefield, R (2009) Drivers, constraints and the future of offsite manufacture in Australia. Construction Innovation, 9(1), pp. 72-83. ISSN 1471-4175

Blismas, N G; Sher, W and Thorpe, A (1999) The nature and characteristics of multi-site construction projects and programmes. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Blismas, N G; Sher, W D; Thorpe, A and Baldwin, A N (2004) Factors influencing project delivery within construction clients' multi-project environments. Engineering, Construction and Architectural Management, 11(2), pp. 113-125. ISSN 0969-9988

Boadu, Elijah Frimpong (2022) A framework for promoting health and safety through procurement in the construction industry in developing countries: A case of Ghana. PhD thesis, University of New South Wales, Australia.

Boateng, P (2014) A dynamic systems approach to risk assessment in megaprojects. PhD thesis, Heriot-Watt University, UK.

Boateng, P; Omotayo, T; Osunsanmi, T and Ekundayo, D (2025) Socio-ecological risks management dynamic simulation in megaproject development of the edinburgh tram network. International Journal of Building Pathology and Adaptation, 43(1), pp. 75-92. ISSN 2398-4708

Boba, R and Santos, L R (2007) Single-family home construction site theft: A crime prevention case study. International Journal of Construction Education and Research, 3(3), pp. 217-236. ISSN 1557-8771

Boeing Singh, L and Kalidindi, S N (2009) Criteria influencing debt financing of Indian PPP road projects: A case study. Journal of Financial Management of Property and Construction, 14(1), pp. 34-60. ISSN 1366-4387

Boerkoel, S; Gledson, B; Littlemore, M and Ponton, H (2022) Challenges of organisational learning in a Netherlands project-based organisation. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Bogus, S M; Molenaar, K R and Diekmann, J E (2006) Strategies for overlapping dependent design activities. Construction Management and Economics, 24(8), pp. 829-837. ISSN 1466433X

Boje, C P (2018) Knowledge representation, storage and retrieval for BIM supported building evacuation design. PhD thesis, Cardiff University, UK.

Bonev, M; Wörösch, M and Hvam, L (2015) Utilizing platforms in industrialized construction: A case study of a precast manufacturer. Construction Innovation, 15(1), pp. 84-106. ISSN 1471-4175

Bonham, M B (2013) Leading by example: New professionalism and the government client. Building Research & Information, 41(1), pp. 77-94. ISSN 0961-3218

Bonnar, I D (2007) Not as cool as fighter pilots: an exploration of identity and learning for full-time quantity surveying students. EdD thesis, University of Stirling, UK.

Bonuke, D O (2021) Strategies to improve survival rate among small businesses in the construction industry. PhD thesis, Walden University, USA.

Booker, J D; Lock, R; Williamson, S and Freire, G J (2016) Effective practices for the concept design of electromechanical systems. Journal of Engineering, Design and Technology, 14(3), pp. 489-506.

Boothman, J C; Higham, A and Horsfall, B (2012) Attaining zero defects within building schools for the future: A realistic target or a sisyphean task? In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Boothman C, H A (2013) Attaining zero defects within the UK's building schools for the future programme: Stakeholders' perceptions. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Bordass, B and Leaman, A (2005) Making feedback and post-occupancy evaluation routine 3: Case studies of the use of techniques in the feedback portfolio. Building Research & Information, 33(4), pp. 361-375. ISSN 0961-3218

Borg, J (2020) Work readiness of project management graduates in construction: a multi-method multi-vocal qualitative study. PhD thesis, RMIT University, Australia.

Borg, M (2001) Environmental assessment of materials, components and buildings: Building-specific considerations, open-loop recycling, variations in assessment results and the usage phase of buildings. PhD thesis, Kungliga Tekniska Hogskolan, Sweden.

Borges, D B; Soares, C A P; Najjar, M; Costa, B B F D; Tam, V W Y and Haddad, A N (2025) Project success and critical success factors of construction projects from the perspective of a multicultural team: A case study in Guyana. International Journal of Construction Management, 25(10), pp. 1115-1129. ISSN 1562-3599

Borges, Maria Luiza Abath Escorel (2025) Decision-making optimization method for construction site layout planning based on slp and BIM. PhD thesis, Universidade Estadual de Campinas, Brazil.

Borges, W F and Mário, P D C (2017) Five project-duration control methods in time units: Case study of a linearly distributed planned value. Journal of Construction Engineering and Management, 143(6): 05017002, ISSN 0733-9364

Borja, Luis Claudio Alves (2019) Development of a quantitative method for predicting environmental aspects generated by construction sites. PhD thesis, Universidade Federal da Bahia, Brazil.

Borthwick, F (2002) The impact of the European Construction Products Directive on UK construction product manufacturers. PhD thesis, De Montfort University, UK.

Bosch-Rekveldt, M G C (2011) Managing project complexity: A study into adapting early project phases to improve project performance in large engineering projects. PhD thesis, Delft University of Technology, Netherlands.

Bosch-Sijtsema, P and Gluch, P (2021) Challenging construction project management institutions: The role and agency of BIM actors. International Journal of Construction Management, 21(11), pp. 1077-1087. ISSN 1562-3599

Boser, R A and El-Gafy, M (2011) Accelerating waste minimization in residential construction: A source separation case study. International Journal of Construction Education and Research, 7(1), pp. 58-70. ISSN 1557-8771

Bossink, B A G (2004) Effectiveness of innovation leadership styles: A manager's influence on ecological innovation in construction projects. Construction Innovation, 4(4), pp. 211-228. ISSN 1471-4175

Botha, P S; van der Walt, J D; Scheepbouwer, E and Barutha, P J (2024) A tool for reporting the optimal timing of preconstruction services in New Zealand. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 240-252. ISSN 17514304

Botti, A (2020) The development of an early stage design tool to assess the risk of overheating for UK residential buildings. PhD thesis, University of Surrey, UK.

Bougrain, F (2012) Energy performance and public private partnership. Built Environment Project and Asset Management, 2(1), pp. 41-55. ISSN 2044-124X

Boukamp, F (2006) Modeling of and reasoning about construction specifications to support automated defect detection. PhD thesis, Carnegie Mellon University, USA.

Bourdakis, V (1994) Performance appraisal of sportshall and swimming pool buildings in Greece. PhD thesis, University of Bath, UK.

Bourdeau, L (1999) Sustainable development and the future of construction: A comparison of visions from various countries. Building Research & Information, 27(6), pp. 354-366. ISSN 0961-3218

Bourgeois, I.; Ferreira, V. and Rodrigues, H. (2026) From monitoring to forecasting: Predictive modelling of thermal-induced displacements in heritage masonry: The batalha monastery case study. International Journal of Building Pathology and Adaptation, 44(9), pp. 16-34. ISSN 2398-4708

Bourgeois, I.; Ferreira, V. and Rodrigues, H. (2026) From monitoring to forecasting: Predictive modelling of thermal-induced displacements in heritage masonry: The Batalha Monastery case study. International Journal of Building Pathology and Adaptation, 44(9), pp. 16-34. ISSN 2398-4708

Bourikas, L; Costanza, E; Gauthier, S; James, P A B; Kittley-Davies, J; Ornaghi, C; Rogers, A; Saadatian, E and Huang, Y (2018) Camera-based window-opening estimation in a naturally ventilated office. Building Research & Information, 46(2), pp. 148-16. ISSN 0961-3218

Boutfskis, V and Fellows, R F (1997) Appraising the performance of long span sportshalls and swimming pools in Greece. Journal of Financial Management of Property and Construction, 2(2), pp. 39-58. ISSN 1366-4387

Bowden, S L (2005) Application of mobile IT in construction. EngD thesis, Loughborough University, UK.

Bowen, P A (1993) A communication-based approach to price modelling and price forecasting in the design phase of the traditional building procurement process in South Africa. Unpublished PhD thesis, University of Port Elizabeth, South Africa.

Bowles, G; Dagpunar, J S and Gow, H (1997) Financial management of planned maintenance for housing associations. Construction Management and Economics, 15(4), pp. 315-326. ISSN 01446193

Boyd, D and Bentley, D (2012) A critique of conceptions of design and management in construction projects. Construction Management and Economics, 30(6), pp. 441-454. ISSN 1466433X

Boyd, D and Gichuhi, F (2003) Studying site meetings in projects. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Boyd, P and Schweber, L (2012) Variations in the mainstreaming of sustainability: A case study approach. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Boyer, E J (2012) Building capacity for cross-sector collaboration: How transportation agencies develop skills and systems to manage public-private partnerships. PhD thesis, George Washington University, USA.

Boyes, G (2021) Towards BIM/GIS interoperability: a theoretical framework and practical generation of spaces to support infrastructure Asset Management. PhD thesis, University College London, UK.

Boyle, L and Michell, K (2020) Key ingredients for a collaborative urban regeneration strategy in the global South. Construction Economics and Building, 20(2), pp. 150-164. ISSN 2204-9029

Boyle F, T C (2013) Housing an ageing population: Implications for managing the social housing stock. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Božiček, D; Almezeraani, Y and Košir, M (2024) Making sense of LCA results when evaluating multiple building designs: Comparison of interpretation concepts. Building Research & Information, 52(1-2), pp. 129-147. ISSN 0961-3218

Brach, A M (1991) Contextual knowledge and the diffusion of technology in construction. PhD thesis, Massachusetts Institute of Technology, USA.

Bradley, R A; Gohnert, M and Bulovic, I (2018) Construction considerations for low-cost earth brick shells. Journal of Construction in Developing Countries, 23(1), pp. 43-60. ISSN 1823-6499

Brady, D A (2014) Using visual management to improve transparency in planning and control in construction. PhD thesis, University of Salford, UK.

Brady, L (2019) An investigation into the management of energy performance for building services systems: design to operation. PhD thesis, Liverpool John Moores University, UK.

Brambilla, A; Candido, C; Sangiorgio, M F; Gocer, O and Gocer, K (2021) Can commercial buildings cope with Australian bushfires? An IAQ analysis. Buildings & Cities, 2(1), pp. 583-598. ISSN 2632-6655

Branch, H K (2018) Strategies construction project managers use to create environmental sustainability in construction projects. PhD thesis, Walden University, USA.

Brandon, P (2012) Sustainable development: Ignorance is fatal: what don't we know? Smart and Sustainable Built Environment, 1(1), pp. 14-28. ISSN 2046-6099

Braz, João Carlos Rocha (2014) Technical and economic evaluation of structural systems to eight floors residential buildings. PhD thesis, Universidade Estadual de Campinas, Brazil.

Brchner, J and Olofsson, T (2012) Construction productivity measures for innovation projects. Journal of Construction Engineering and Management, 138(5), pp. 670-677. ISSN 0733-9364

Brege, S; Stehn, L and Nord, T (2014) Business models in industrialized building of multi-storey houses. Construction Management and Economics, 32(1-2), pp. 208-226. ISSN 01446193

Bresnen, M (2010) Keeping it real? Constituting partnering through boundary objects. Construction Management and Economics, 28(6), pp. 615-628. ISSN 1466433X

Bresnen, M; Edelman, L; Newell, S; Scarbrough, H and Swan, J (2005) Exploring social capital in the construction firm. Building Research & Information, 33(3), pp. 235-244. ISSN 0961-3218

Bresnen, M; Goussevskaia, A and Swan, J (2005) Implementing change in construction project organizations: Exploring the interplay between structure and agency. Building Research & Information, 33(6), pp. 547-560. ISSN 0961-3218

Bresnen, M and Marshall, N (1998) Partnering strategies and organizational cultures in the construction industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Bresnen, M and Marshall, N (2000) Learning to co-operate and co-operating to learn: Capturing knowledge of partnering in construction. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Bresnen, M and Marshall, N (2000) Building partnerships: Case studies of client-contractor collaboration in the UK construction industry. Construction Management and Economics, 18(7), pp. 819-832. ISSN 01446193

Bresnen, M and Marshall, N (2000) Motivation, commitment and the use of incentives in partnerships and alliances. Construction Management and Economics, 18(5), pp. 587-598. ISSN 01446193

Bresnen, M J (1986) A study of forms of project organisation and matrix management: case studies from the construction industry. PhD thesis, University of Nottingham, UK.

Bresnen, M J (1991) Construction contracting in theory and practice: A case study. Construction Management and Economics, 9(3), pp. 247-262. ISSN 01446193

Brett-Jones, A T (1983) Barchester low rise: A case study of a management contract for remedial work to a large housing scheme. Construction Management and Economics, 1(2), pp. 91-117. ISSN 01446193

Brewer, G and Gajendran, T (2012) Attitudes, behaviours and the transmission of cultural traits: Impacts on ICT/BIM use in a project team. Construction Innovation, 12(2), pp. 198-215. ISSN 1471-4175

Brewer, G; Gajendran, T; Jefferies, M; McGeorge, D; Rowlinson, S and Dainty, A (2013) Value through innovation in long-term service delivery: Facility management in an Australian PPP. Built Environment Project and Asset Management, 3(1), pp. 74-88. ISSN 2044-124X

Brewer, G; Gajendran, T and Runeson, G (2013) ICT & innovation: A case of integration in a regional construction firm. Construction Economics and Building, 13(3), pp. 24-36. ISSN 2204-9029

Brewster, D (2023) Strategies for reducing employee turnover in the construction industry. DBA thesis, Walden University, USA.

Bridgeman, J and Loosemore, M (2024) Evaluating social procurement: A theoretically informed and methodologically robust social return on investment (sroi) analysis of a construction training initiative developed to reduce the risk of youth homelessness in Wales. Construction Management and Economics, 42(5), pp. 387-411. ISSN 01446193

Briscoe, G H; Dainty, A R J; Millett, S J and Neale, R H (2004) Client-led strategies for construction supply chain improvement. Construction Management and Economics, 22(2), pp. 193-201. ISSN 01446193

Brncich, A; Shane, J S; Strong, K C and Passe, U (2011) Using integrated student teams to advance education in sustainable design and construction. International Journal of Construction Education and Research, 7(1), pp. 22-40. ISSN 1557-8771

Brockmann, C; Brezinski, H and Erbe, A (2016) Innovation in construction megaprojects. Journal of Construction Engineering and Management, 142(11): 04016059, ISSN 0733-9364

Broer, S (2012) Solutions to climate change in UK housing developments: a lifestyle approach. EngD thesis, University College London, UK.

Brooks, T (2020) Implementation and effectiveness of the ISO 9001 quality management system in the construction sector in the UK and Ireland. PhD thesis, Queen's University Belfast, UK.

Brooks, T; Gunning, J G; Spillane, J P and Cole, J (2021) Regulatory decoupling and the effectiveness of the ISO 9001 quality management system in the construction sector in the UK–a case study analysis. Construction Management and Economics, 39(12), pp. 988-1005. ISSN 01446193

Brooks, T and Spillane, J (2017) Lies, damned lies and quality management systems: A pilot case study. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Brown, C; Milke, M and Seville, E (2010) Waste management as a "lifeline"? A New Zealand case study analysis. International Journal of Disaster Resilience in the Built Environment, 1(2), pp. 192-206. ISSN 1759-5916

Brown, J D (2012) Corporate responsibility in the UK construction industry: a study of activities and reporting. PhD thesis, University of Nottingham, UK.

Brown, K (2023) The role of governance in the building of arenas for popular music in France and England, 1980-2019. PhD thesis, Leeds Beckett University, UK.

Brown, L A and Cresciani, M (2017) Adaptable design in olympic construction. International Journal of Building Pathology and Adaptation, 35(4), pp. 397-416.

Bruen, J; Spillane, J P and Brooks, T (2020) Post-disaster affordable and sustainable house design and delivery: An international non-governmental organisation (INGO) perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Bruen, J; Spillane, J P and Brooks, T (2021) Community orientated post-disaster sustainable housing recovery, rebuilding and community renewal: Sri Lanka case study. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Brumme, J (2013) The role of organisational behaviour in establishing a corporate academy in the construction industry. PhD thesis, University of Pretoria, South Africa.

Brunet, M; Motamedi, A; Guénette, L M and Forgues, D (2019) Analysis of BIM use for asset management in three public organizations in Québec, Canada. Built Environment Project and Asset Management, 9(1), pp. 153-167. ISSN 2044-124X

Bråthen, K and Moum, A (2016) Bridging the gap: Bringing BIM to construction workers. Engineering, Construction and Architectural Management, 23(6), pp. 751-764. ISSN 0969-9988

Bröchner, J and Silfwerbrand, J (2019) Performance of performance specifications in design-build highway projects. Construction Economics and Building, 19(2), pp. 111-125. ISSN 2204-9029

Bu, Z; Liu, J and Lu, Z (2025) Research on dynamic profit distribution mechanism and options in PPP project value creation. Journal of Construction Engineering and Management, 151(12): 04025190, ISSN 0733-9364

Bubshait, A A and Tahir, B M (1996) Planning and scheduling concrete repair work: a case study. Building Research & Information, 24(6), pp. 363-368. ISSN 0961-3218

Buckman, A H (2016) An exploration of the applications of increased information availability in smart buildings. PhD thesis, University of Sheffield, UK.

Budawara, N (2009) Key performance indicators to measure design performance in construction. PhD thesis, Concordia University, Canada.

Budde, B (2013) Challenges of coordination between climate and technology policies: A case study of strategies in Denmark and the UK. Construction Innovation, 13(1), pp. 98-116. ISSN 1471-4175

Buhamdan, S; Alwisy, A; Bouferguene, A and Al-Hussein, M (2019) Novel approach to overcoming discontinuity in knowledge: Application in value-adding frameworks in construction industry. Journal of Construction Engineering and Management, 145(8): 04019045, ISSN 0733-9364

Buhamdan, S; Duncheva, T and Alwisy, A (2021) Developing a BIM and simulation-based hazard assessment and visualization framework for CLT construction design. Journal of Construction Engineering and Management, 147(3): 04021003, ISSN 0733-9364

Buijs, A and Silvester, S (1996) Demonstration projects and sustainable housing. Building Research & Information, 24(4), pp. 195-202. ISSN 0961-3218

Buli, L G (2017) Strategies for improving labor productivity in construction companies. PhD thesis, Walden University, USA.

Bunemer, Ricardo (2020) Construction 4.0 proposal for digital technological innovations for the civil construction sector: Case study of a smart house. PhD thesis, Universidade Estadual de Campinas, Brazil.

Burballa Noria, A (2018) The governance of megaproject developments: lessons from the comparison of two contested infrastructure projects. PhD thesis, Ulster University, UK.

Burdge, J A (2023) Building a New University: a study of the buildings and related interiors at the University of St Andrews, c.1890-1914. PhD thesis, University of St Andrews, UK.

Burfoot, M; GhaffarianHoseini, A; Ghaffarianhoseini, A and Naismith, N (2024) Passive variable acoustic technology for classroom reverberation time: A case study. Smart and Sustainable Built Environment, 13(6), pp. 1450-1472. ISSN 2046-6099

Burford, N K and Smith, F W (1999) Developing a new military shelter system: A case study in innovation. Building Research & Information, 27(1), pp. 35-55. ISSN 0961-3218

Burgoon, J M (2020) Exploring the equity climate of construction education in the land grant system: A mixed methods study. PhD thesis, Colorado State University, USA.

Burgoon, J M; Roebuck, A and Elliott, J W (2024) Evidence of opportunity gaps in construction education: A longitudinal analysis of student success. International Journal of Construction Education and Research, 20(1), pp. 83-97. ISSN 15578771

Burke, R (2014) Risk management in Republic of Ireland PPP toll roads. PhD thesis, Queen's University Belfast, UK.

Burke, R D (2018) Early design decisions in building materials for higher performing buildings. PhD thesis, Arizona State University, USA.

Burley, J and Pan, W (2010) Adoption of air source heat pumps for low carbon homes. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Burman, E (2016) Assessing the operational performance of educational buildings against design expectations: a case study approach. PhD thesis, University College London, UK.

Burnside-Lawry, J and Carvalho, L (2016) A stakeholder approach to building community resilience: Awareness to implementation. International Journal of Disaster Resilience in the Built Environment, 7(1), pp. 4-25. ISSN 1759-5916

Burtonshaw-Gunn, S A (2001) Strategic supply chain management: Critical success factors for partnering relationships within the UK construction industry. PhD thesis, Manchester Metropolitan University, UK.

Buser, M; Bosch, P and Koch, C (2016) Engineering companies strategizing globalisation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Buser, M and Bosch-Sijtsema, P (2018) Attributing value to waste: The difficult road to efficient waste management for renovation projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Buser, M and Carlsson, V (2015) Renewing renovation: Looking at renovation of owners occupied houses with socio-materiality lenses. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Buser, M and Carlsson, V (2017) What you see is not what you get: Single-family house renovation and energy retrofit seen through the lens of sociomateriality. Construction Management and Economics, 35(5), pp. 276-287. ISSN 01446193

Buser, M; Gottlieb, S C; de Gier, A and Andersson, R (2021) From concept to practice: Implementation of circular building as a process of translation. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Butcher, D C A (2011) Learning organization principles and processes: UK construction organization experiences. PhD thesis, University of South Wales, UK.

Butchers, A M (2004) Learning off the job: engineers and professional education. PhD thesis, University of Sheffield, UK.

Butt, A A (2014) Life cycle assessment of asphalt roads: Decision support at the project level. PhD thesis, KTH Royal Institute of Technology, Sweden.

Buxton, A (2010) A future in the past: Unlocking a career in Britain's built heritage. PhD thesis, Sheffield Hallam University, UK.

Buyukyoran, F and Yaman, H (2024) Construction sector dynamics in Turkey: Economic advancements and vulnerabilities. Journal of Construction in Developing Countries, 29(1), pp. 267-291. ISSN 1823-6499

Buzzelli, M D (2001) The Canadian urban housebuilding industry: Firm size structure and production methods in Ontario, 1945–2000. PhD thesis, McMaster University, Canada.

Bygballe, L E; Endresen, M and Fålun, S (2018) The role of formal and informal mechanisms in implementing lean principles in construction projects. Engineering, Construction and Architectural Management, 25(10), pp. 1322-1338. ISSN 0969-9988

Bygballe, L E and Jahre, M (2009) Balancing value creating logics in construction. Construction Management and Economics, 27(7), pp. 695-704. ISSN 1466433X

Bypaneni, S P K (2017) A Bayesian network-based decision framework for selecting project delivery methods in highway construction. PhD thesis, University of Kansas, USA.

Böhme, T; Escribano, A; Heffernan, E E and Beazley, S (2018) Causes and mitigation for declining productivity in the Australian mid-rise residential construction sector. Built Environment Project and Asset Management, 8(3), pp. 253-266. ISSN 2044-124X

Cabral, I F (2015) A systematic methodology to analyse the performance and design configurations of business interoperability in cooperative industrial networks. PhD thesis, Universidade NOVA de Lisboa, Portugal.

Cadman, D M (2009) Developing sustainability in the design and construction process. PhD thesis, Lancaster University, UK.

Cai, K Q (2007) Business process model for process improvement: an investigation of the tendering process in aconstruction company. PhD thesis, University of Hong Kong, Hong Kong.

Cai, Q; Hu, Q and Ma, G (2021) Improved hybrid reasoning approach to safety risk perception under uncertainty for mountain tunnel construction. Journal of Construction Engineering and Management, 147(9): 04021105, ISSN 0733-9364

Caixeta, M C B F and Fabricio, M M (2013) A conceptual model for the design process of interventions in healthcare buildings: A method to improve design. Architectural Engineering and Design Management, 9(2), pp. 95-109. ISSN 1745-2007

Calcerano, F; Thravalou, S; Martinelli, L; Alexandrou, K; Artopoulos, G and Gigliarelli, E (2024) Energy and environmental improvement of built heritage: HBIM simulation-based approach applied to nine mediterranean case-studies. Building Research & Information, 52(1-2), pp. 225-247. ISSN 0961-3218

Caldas, C and Gupta, A (2017) Critical factors impacting the performance of mega-projects. Engineering, Construction and Architectural Management, 24(6), pp. 920-934. ISSN 0969-9988

Callcott, A E (1985) Microcomputers for civil engineering consultancy in developing countries. PhD thesis, Aston University, UK.

Calvert, J; Price, V; Winch, C; Clarke, L; Sahin-Dikmen, M; Bilodeau, P L and Dionne, E (2026) Climate literacy and labour agency in vocational education and training. Buildings & Cities, 7(1), pp. 378-395. ISSN 2632-6655

Cameron, I (1999) A goal setting approach to the practice of safety management in the construction industry: Three case studies. PhD thesis, University of Manchester, UK.

Cameron, I and Duff, R (2007) Use of performance measurement and goal setting to improve construction managers' focus on health and safety. Construction Management and Economics, 25(8), pp. 869-881. ISSN 1466433X

Campbell, J M and Smith, S D (2006) CBR research using the 'think', 'plan', 'do' classification method. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Campbell, J M and Smith, S D (2006) Improving industrial value and longevity of safety management research. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Campbell, J M and Smith, S D (2007) Knowledge transfer of safety critical information by the internet. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Candel, M; Gustavsson, T K and Eriksson, P E (2019) Beyond national building regulations: Exploring public-private negotiations over sustainability requirements. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Candel, M; Karrbom Gustavsson, T and Eriksson, P E (2021) Front-end value co-creation in housing development projects. Construction Management and Economics, 39(3), pp. 245-260. ISSN 01446193

Candido, C; Thomas, L; Haddad, S; Zhang, F; Mackey, M and Ye, W (2019) Designing activity-based workspaces: Satisfaction, productivity and physical activity. Building Research & Information, 47(3), pp. 275-289. ISSN 0961-3218

Cao, Q; Zou, X and Zhang, L (2025) A flexible scheduling framework for repetitive construction projects based on constraint programming. Journal of Construction Engineering and Management, 151(7): 04025073, ISSN 0733-9364

Cao, Y and Yang, A (2025) Spatial syntax analysis on the renewal of the external space of mining heritage buildings: A case study of Zollverein Coal Mine Industrial Complex. Architectural Engineering and Design Management, 21(1), pp. 136-153. ISSN 1745-2007

Capitanio, M (2018) More green space in Japanese shopping streets: Assessing the manifold potential of green roofs in Shimokitazawa, Tokyo. Smart and Sustainable Built Environment, 7(2), pp. 212-222. ISSN 2046-6099

Caprario, Rick (2025) Interpersonal communication, relationships, and collaboration among construction specialty contractor project management professionals: A single case study. EdD thesis, Baylor University, USA.

Carbonari, G (2018) Sustainable facilities management with the support of building information modelling. PhD thesis, University of Greenwich, UK.

Cardellicchio, L (2020) Self-cleaning and colour-preserving efficiency of photocatalytic concrete: Case study of the jubilee church in rome. Building Research & Information, 48(2), pp. 160-179. ISSN 0961-3218

Cardellicchio, L (2021) Building defects in new iconic structures: The technical challenge and the economic impact of restoring the Jubilee Church in Rome. Architectural Engineering and Design Management, 17(1-2), pp. 146-166. ISSN 1745-2007

Cardoso, A F S P and Torkkeli, M (2014) Innovation in footwear companies: does it pay off? Journal of Engineering, Design and Technology, 12(1), pp. 128-154. ISSN 1726-0531

Cargnelutti, Dejan (2025) 4IR technologies within germany’s construction sector to meet fire protection standards and international climate objectives: A multiple-case study. PhD thesis, European Institute of Management, Malta.

Carmichael, D G and Balatbat, M C A (2008) The influence of extra projects on overall investment feasibility. Journal of Financial Management of Property and Construction, 13(3), pp. 161-175. ISSN 1366-4387

Carmichael, D G and Mustaffa, N K (2018) Emissions and production penalties/bonuses associated with non-standard earthmoving loading policies. Construction Innovation, 18(2), pp. 227-245. ISSN 1471-4175

Carmody, S; Spillane, J P and Clarke, N (2022) Barriers to the implementation of modular construction in Ireland: A case study from an Irish small and medium-sized enterprise perspective. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Carollo, Federica Carla (2023) Circularity in the construction and demolition waste management chain. PhD thesis, Politecnico di Milano, Italy.

Carrasco, S; Ochiai, C and Okazaki, K (2017) Residential satisfaction and housing modifications: A study in disaster-induced resettlement sites in Cagayan de Oro, Philippines. International Journal of Disaster Resilience in the Built Environment, 8(2), pp. 175-189. ISSN 1759-5916

Carrick, D (2022) How factors of collaboration affect delivery of construction projects with a high degree of reliance on building services: an action research and cross-case study analysis of Edinburgh primary schools. DProf thesis, University of Salford, UK.

Carrillo, P (1996) Technology transfer on joint venture projects in developing countries. Construction Management and Economics, 14(1), pp. 45-54. ISSN 01446193

Carrillo, P (2004) Managing knowledge: Lessons from the oil and gas sector. Construction Management and Economics, 22(6), pp. 631-642. ISSN 01446193

Carrillo, P (2005) Lessons learned practices in the engineering, procurement and construction sector. Engineering, Construction and Architectural Management, 12(3), pp. 236-250. ISSN 0969-9988

Carrillo, P M (1998) Mergers and acquisitions: The impact on information systems and information technology. Engineering, Construction and Architectural Management, 5(3), pp. 276-284. ISSN 0969-9988

Carrillo, P M (1998) Acquisition or divestment: UK contractors changing business portfolio. Journal of Financial Management of Property and Construction, 3(3), pp. 49-70. ISSN 1366-4387

Carrillo, P M (2001) Mergers and acquisitions in the construction industry: an exploratory study. PhD thesis, Loughborough University, UK.

Carrillo, P M; Robinson, H S; Anumba, C J and Bouchlaghem, N M (2006) A knowledge transfer framework: The PFI context. Construction Management and Economics, 24(10), pp. 1045-1056. ISSN 1466433X

Carrillo, S K C A P (2010) Findings from preliminary case studies on knowledge flow in aerospace and construction supply chains. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Carrière, S; Weigend Rodríguez, R; Pey, P; Pomponi, F and Ramakrishna, S (2020) Circular cities: The case of Singapore. Built Environment Project and Asset Management, 10(4), pp. 491-507. ISSN 2044-124X

Carroll, Steven Paige (2005) Risk-based approach to on-site wastewater treatment system siting design and management. PhD thesis, Queensland University of Technology, Australia.

Carter, D J (2008) Tubular guidance systems for daylight: UK case studies. Building Research & Information, 36(5), pp. 520-535. ISSN 0961-3218

Cass, D and Mukherjee, A (2011) Calculation of greenhouse gas emissions for highway construction operations by using a hybrid life-cycle assessment approach: Case study for pavement operations. Journal of Construction Engineering and Management, 137(11), pp. 1015-1025. ISSN 0733-9364

Cass, N (2018) Energy-related standards and UK speculative office development. Building Research & Information, 46(6), pp. 615-635. ISSN 0961-3218

Cassandro, J; Mirarchi, C and Pavan, A (2025) A comprehensive literature review of 5D building information modelling using latent dirichlet allocation analysis. Construction Innovation, 25(7), pp. 331-357. ISSN 1471-4175

Cassar, R and Martin, H (2016) How to choose a project manager under uncertainty. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Castelblanco, G and Guevara, J (2024) Stakeholder dynamics: Rethinking roles and responsibilities in user-pay transport PPP projects. Journal of Construction Engineering and Management, 150(8): 05024009, ISSN 0733-9364

Castelblanco, G; Guevara, J and De Marco, A (2024) Crisis management in public–private partnerships: Lessons from the global crises in the xxi century. Built Environment Project and Asset Management, 14(1), pp. 56-73. ISSN 2044-124X

Castelblanco, G; Narbaev, T; Osei-Kyei, R; Serikbay, D; Mukashev, Y and Guevara, J (2025) Pandemic risks in PPPs: comparative analysis within developing countries. International Journal of Construction Management, 25(4), pp. 456-468. ISSN 1562-3599

Castillo, G; Alarcón, L F and González, V A (2015) Implementing lean production in copper mining development projects: Case study. Journal of Construction Engineering and Management, 141(1): 05014013, ISSN 0733-9364

Castle, C M (1999) Construction project networks: A study of internet-based interorganizational information systems in the building industry. DDes thesis, Harvard University, USA.

Catrillo, C (2025) Investigation of sprinkler requirements in one-or-two-family newly constructed homes. DPA thesis, Walden University, USA.

Cavan, G and Kingston, R (2012) Development of a climate change risk and vulnerability assessment tool for urban areas. International Journal of Disaster Resilience in the Built Environment, 3(3), pp. 253-269. ISSN 1759-5916

Cavill, C A (2014) Fitness for purpose evaluation of stables in current use in the UK. PhD thesis, University of Salford, UK.

Celentano, G (2021) The regenerative development potential of the construction sector in the informal city: The cases of Bangkok, Nairobi and Cape Town. DSc thesis, ETH Zürich, Switzerland.

Celik, T (1989) Improving concrete quality by using an expert system. PhD thesis, Loughborough University, UK.

Celik, T (2014) Developing a building construction associated social cost estimation system for Turkish construction industry. PhD thesis, University of Salford, UK.

Celis-D'Amico, F; Echeverria-Valiente, E; Garcia-Alvarado, R; Escorcia-Oyola, O and da Casa-Martín, F (2025) CASA+: Highly energy-efficient housing system for the central-south of Chile. Construction Innovation, 25(2), pp. 306-327. ISSN 1471-4175

Cemesova, A (2013) Enhancing BIM-based data transfer to support the design of low energy buildings. PhD thesis, Cardiff University, UK.

Cennamo, C and Fiore, M D (2013) Best practice of structural retrofit: The SS. Rosario Church in Gesualdo, Italy. International Journal of Disaster Resilience in the Built Environment, 4(2), pp. 215-235. ISSN 1759-5916

Ceran, N (2002) Private participation in infrastructure: A risk analysis of long-term contracts in power sector. PhD thesis, George Mason University, USA.

Cerimagic, Sabina (2012) Cross cultural characteristics and training of Australian project managers and working in the United Arab Emirates. PhD thesis, Bond University, Australia.

Cerrahoğlu, M and Maden, F (2024) Design of transformable transitional shelter for post disaster relief. International Journal of Disaster Resilience in the Built Environment, 15(2), pp. 227-243. ISSN 1759-5916

Cevallos, O A; Jaramillo, D; Ávila, C and Aldaz, X (2017) Production and quality levels of construction materials in Andean regions: A case study of Chimborazo, Ecuador. Journal of Construction in Developing Countries, 22(1), pp. 115-136. ISSN 1823-6499

Cha, H S; Kim, K H and Kim, C K (2012) Case study on selective demolition method for refurbishing deteriorated residential apartments. Journal of Construction Engineering and Management, 138(2), pp. 294-303. ISSN 0733-9364

Chagadama, J (2022) Small construction business owners’ strategies to reduce voluntary employee turnover. PhD thesis, Walden University, USA.

Chahrour, R; Hafeez, M A; Ahmad, A M; Sulieman, H I; Dawood, H; Rodriguez-Trejo, S; Kassem, M; Naji, K K and Dawood, N (2021) Cost-benefit analysis of BIM-enabled design clash detection and resolution. Construction Management and Economics, 39(1), pp. 55-72. ISSN 01446193

Chakhrit, A and Chennoufi, M (2023) Failure mode, effects and criticality analysis improvement by using new criticality assessment and prioritization based approach. Journal of Engineering, Design and Technology, 21(5), pp. 1545-1567. ISSN 1726-0531

Champion, R (2005) Acceleration in construction and engineering contracts. PhD thesis, University of London, UK.

Chan, A P C; Chan, M W; Oppong, G D; Adabre, M A; Darko, A and Liu, W (2025) Developing a project surveillance system to monitor and control building projects: The case of Hong Kong. International Journal of Construction Management, 25(16), pp. 1952-1967. ISSN 1562-3599

Chan, A P C (1995) Towards an expert system on project procurement. Journal of Construction Procurement, 1(2), pp. 111-123. ISSN 1358-9180

Chan, A P C; Wong, F K W; Chan, D W M; Yam, M C H; Kwok, A W K; Lam, E W M and Cheung, E (2008) Work at height fatalities in the repair, maintenance, alteration, and addition works. Journal of Construction Engineering and Management, 134(7), pp. 527-535. ISSN 0733-9364

Chan, D W M (1998) Modelling construction durations for public housing projects. PhD thesis, University of Hong Kong, Hong Kong.

Chan, D W M and Kumaraswamy, M M (1995) A study of the factors affecting construction durations in Hong Kong. Construction Management and Economics, 13(4), pp. 319-333. ISSN 01446193

Chan, D W M; Lam, P T I; Chan, A P C and Wong, J M W (2011) Guaranteed maximum price (GMP) contracts in practice: A case study of a private office development project in Hong Kong. Engineering, Construction and Architectural Management, 18(2), pp. 188-205. ISSN 0969-9988

Chan, E H W and Chan, A T S (1999) Imposing ISO 9000 quality assurance system on statutory agents in Hong Kong. Journal of Construction Engineering and Management, 125(4), pp. 285-291. ISSN 0733-9364

Chan, E H W; Suen, H C H and Chan, S L (2005) An integrated project extranet design prototype: E-AEC for architects, engineers and contractors in Hong Kong and Mainland China. Journal of Construction Research, 6(2), pp. 253-271. ISSN 1609-9451

Chan, J K W; Tam, C M and Cheung, R (2005) Monitoring financial health of contractors at the aftermath of the Asian economic turmoil: A case study in Hong Kong. Construction Management and Economics, 23(5), pp. 451-458. ISSN 01446193

Chan, K C G (2012) The use of virtual reality for visualizing construction safety management process. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chan, K H (2012) Critical factors in minimizing lighting energy. Architectural Engineering and Design Management, 8(1), pp. 21-29. ISSN 1745-2007

Chan, K Y (2012) Optimizing construction planning and scheduling by virtual prototyping enabled resource analysis. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chan, M-W (1997) The relationship between project funding and construction systems. PhD thesis, University of Hong Kong, Hong Kong.

Chan, P and Kaka, A (2004) Construction productivity measurement: A comparison of two case studies. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Chan, P W and Cooper, R (2005) Passion for learning: Consider the project mission. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Chan, P W and Moehler, R (2007) Developing a 'road-map' to facilitate employers' role in engaging with the skills development agenda. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Chan, T K (2011) Comparison of precast construction costs: Case studies in Australia and Malaysia. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Chan, W T; Chua, D K H and Kannan, G (1996) Construction resource scheduling with genetic algorithms. Journal of Construction Engineering and Management, 122(2), pp. 125-132. ISSN 0733-9364

Chand, A (2015) A socio-ecological resilience perspective to enhance hospital service delivery resilience to extreme weather events. PhD thesis, University of New South Wales, Australia.

Chand, A M and Loosemore, M (2016) Hospital learning from extreme weather events: Using causal loop diagrams. Building Research & Information, 44(8), pp. 875-888. ISSN 0961-3218

Chandra, Shailja (2006) Investigating green building assessment tools: a risk-analysis based approach. PhD thesis, University of New South Wales, Australia.

Chandra, V and Loosemore, M (2008) Cultural learning during briefing: A facilities management perspective. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Chandra, V and Loosemore, M (2010) Mapping stakeholders' cultural learning in the hospital briefing process. Construction Management and Economics, 28(7), pp. 761-769. ISSN 1466433X

Chandra, V and Loosemore, M (2011) Communicating about organizational culture in the briefing process: Case study of a hospital project. Construction Management and Economics, 29(3), pp. 223-231. ISSN 1466433X

Chandra, V and Loosemore, M (2011) Sowing the seeds of misunderstanding in the briefing process: A case study of a new hospital project. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Chandra, Venny (2007) An investigation of cultural learning during the hospital process from a facilities management perspective. PhD thesis, University of New South Wales, Australia.

Chandrasekara, C M K N K; Weerasinghe, K D N; Pathirana, S and Piyadasa, R U K (2018) Stresses over surface water sources in a human dominated environment: A case study in Hamilton canal, Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 9(2), pp. 184-197. ISSN 1759-5916

Chang, A S and Tien, C C (2006) Quantifying uncertainty and equivocality in engineering projects. Construction Management and Economics, 24(2), pp. 171-184. ISSN 01446193

Chang, C H; Lin, Y C and Tserng, H P (2008) Distilling and managing engineers' experience in construction projects using a pattern approach. Construction Management and Economics, 26(3), pp. 209-223. ISSN 1466433X

Chang, J; Jaskula, K; Papadonikolaki, E; Rovas, D and Parlikad, A K (2024) Can blockchain prevent the deterioration of building handover information quality for higher education institutions? Built Environment Project and Asset Management, 14(4), pp. 509-528. ISSN 2044-124X

Chang, Ruidong (2017) Towards sustainability in the Chinese construction industry: A transition approach. PhD thesis, University of Adelaide, Australia.

Chang, V; Xu, Y K; Zhang, J and Xu, Q (2021) Research on intelligent manufacturing development approach for China's local valve industry. Smart and Sustainable Built Environment, 10(2), pp. 293-321. ISSN 2046-6099

Chang, Y; Wilkinson, S; Potangaroa, R and Seville, E (2011) Identifying factors affecting resource availability for post-disaster reconstruction: A case study in China. Construction Management and Economics, 29(1), pp. 37-48. ISSN 1466433X

Chang, Y; Wilkinson, S; Potangaroa, R and Seville, E (2012) Managing resources in disaster recovery projects. Engineering, Construction and Architectural Management, 19(5), pp. 557-580. ISSN 0969-9988

Chang, Y P (2020) Construction worker safety and accident prevention in Taiwan. PhD thesis, University of Bristol, UK.

Chang Albitres, C M (2007) Development of a multi-objective strategic management approach to improve decisions for pavement management practices in local agencies. PhD thesis, Texas A&M University, USA.

Chao, L-C (1994) An adaptive approach to evaluation of implementation prospects of new construction technologies. PhD thesis, Purdue University, USA.

Chao-Amonphat, S; Nitivattananon, V and Srinonil, S (2024) Adaptation measures on hydrological risks and climate change impacts in urbanized sub-region, Thailand: A case study in Lower Chao Phraya River basin. International Journal of Disaster Resilience in the Built Environment, 15(1), pp. 59-79. ISSN 1759-5916

Chapman, C (2023) Green and grey drainage infrastructure: costs and benefits of reducing surface water flood risk. PhD thesis, University of Oxford, UK.

Chapman, R J (1998) An investigation of the risk of changes to key project personnel during the design stage. PhD thesis, University of Reading, UK.

Charkhakan, M H and Heravi, G (2018) Risk manageability assessment to improve risk response plan: Case study of construction projects in Iran. Journal of Construction Engineering and Management, 144(11): 05018012, ISSN 0733-9364

Charles, S H; Chang-Richards, A and Yiu, T W (2023) Providing a framework for post-disaster resilience factors in buildings and infrastructure from end-users' perspectives: Case study in caribbean island states. International Journal of Disaster Resilience in the Built Environment, 14(3), pp. 366-386. ISSN 1759-5916

Charlesworth, E and Fien, J (2014) Breaching the urban contract: Lessons from post disaster reconstruction from research on five divided cities. International Journal of Disaster Resilience in the Built Environment, 5(2), pp. 194-201. ISSN 1759-5916

Charlson, J (2021) Emerging trends in construction law at the confluence of academia and industry. PhD thesis, University of Wolverhampton, UK.

Charlson, J and Oduoza, C (2014) Legal risk identification for SMEs in the construction industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Charlson J, C E (2013) A case study of joint procurement and provision of legal services to a group of a universities in the midlands. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Charlton, J; Kelly, K; Greenwood, D and Moreton, L (2021) The complexities of managing historic buildings with BIM. Engineering, Construction and Architectural Management, 28(2), pp. 570-583. ISSN 0969-9988

Charoenngam, C and Sriprasert, E (2001) Assessment of cost control systems: A case study of Thai construction organizations. Engineering, Construction and Architectural Management, 8(5-6), pp. 368-380. ISSN 0969-9988

Charoenphol, D (2017) Using robust statistical methodology to evaluate the performance of project delivery systems: A case study of horizontal construction. PhD thesis, George Washington University, USA.

Charpia, J (2018) Employee turnover intentions in the construction industry: A quantitative correlational study. PhD thesis, Northcentral University, USA.

Chatterjee, S (2010) Development of an analytic basis for performing all-hazards risk management. PhD thesis, Vanderbilt University, USA.

Chau, A D; Hoang, H T and Nguyen, L D (2025) Web-based decision support system for automated pavement design and life-cycle cost analysis. Journal of Construction Engineering and Management, 151(8): 05025004, ISSN 0733-9364

Chauhan, Krishna (2024) Prefabrication in construction: A systemic approach to impact and implementation. DScTech thesis, Aalto University, Finland.

Chauhan, S S (1999) Dam safety risk assessment modeling with uncertainty analysis. PhD thesis, Utah State University, USA.

Che Ibrahim, C K I; Belayutham, S; Mohammad, M Z and Ismail, S (2022) Development of a conceptual designer's knowledge, skills, and experience index for prevention through design practice in construction. Journal of Construction Engineering and Management, 148(2): 04021199, ISSN 0733-9364

Cheah, C; Kang, J and Chew, D (2007) Strategic analysis of large local construction firms in China. Construction Management and Economics, 25(1), pp. 25-38. ISSN 1466433X

Cheah, C Y J and Liu, J (2005) Real option evaluation of complex infrastructure projects: The case of dabhol power. Journal of Financial Management of Property and Construction, 10(1), pp. 55-68. ISSN 1366-4387

Cheah, C Y J and Liu, J (2006) Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation. Construction Management and Economics, 24(5), pp. 545-554. ISSN 1466433X

Chegu Badrinath, A and Hsieh, S H (2019) Empirical approach to identify operational critical success factors for BIM projects. Journal of Construction Engineering and Management, 145(3): 04018140, ISSN 0733-9364

Chelson, D E (2010) The effects of building information modeling on construction site productivity. PhD thesis, University of Maryland, College Park, USA.

Chen, B (2018) Contribution of process-technology fit to IT business value: the case of BIM in the construction industry. PhD thesis, University of Hong Kong, Hong Kong.

Chen, C (2005) Entry strategies for international construction markets. PhD thesis, Pennsylvania State University, USA.

Chen, C (2007) Soft computing-based life-cycle cost analysis tools for transportation infrastructure management. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Chen, C (2019) Heterogeneous integration of BIM with low-cost indoor mobile laser scanning method for building fabric maintenance in China. PhD thesis, University of Nottingham, UK.

Chen, C and Messner, J (2011) Characterizing entry modes for international construction markets: Paving the way to a selection model. Engineering, Construction and Architectural Management, 18(6), pp. 547-567. ISSN 0969-9988

Chen, C and Messner, J I (2005) An investigation of Chinese BOT projects in water supply: A comparative perspective. Construction Management and Economics, 23(9), pp. 913-925. ISSN 01446193

Chen, C; Tang, L; Hancock, C M and Zhang, P (2019) Development of low-cost mobile laser scanning for 3D construction indoor mapping by using inertial measurement unit, ultra-wide band and 2D laser scanner. Engineering, Construction and Architectural Management, 26(7), pp. 1367-1386. ISSN 0969-9988

Chen, G (2023) Enhance collaboration reliability at task level for construction projects using blockchain technology. PhD thesis, North Carolina State University, USA.

Chen, H; Jin, Z; Su, Q and Yue, G (2021) The roles of captains in megaproject innovation ecosystems: The case of the Hong Kong‐zhuhai‐macau bridge. Engineering, Construction and Architectural Management, 28(3), pp. 662-680. ISSN 0969-9988

Chen, J H; Su, M C and Huang, D Y (2010) Application of a SOM-based optimization algorithm in minimizing construction time for secant pile wall. Journal of Construction Engineering and Management, 136(11), pp. 1189-1195. ISSN 0733-9364

Chen, K (2015) A strategic decision making framework for organisational BIM implementation. PhD thesis, Cardiff University, UK.

Chen, K (2018) The quest for the holy grail : bridging BIM and building for information management in construction. PhD thesis, University of Hong Kong, Hong Kong.

Chen, K and Lu, W (2019) Bridging BIM and building (BBB) for information management in construction: The underlying mechanism and implementation. Engineering, Construction and Architectural Management, 26(7), pp. 1518-1532. ISSN 0969-9988

Chen, K W; Teitelbaum, E; Meggers, F; Pantelic, J and Rysanek, A (2021) Exploring membrane-assisted radiant cooling for designing comfortable naturally ventilated spaces in the tropics. Building Research & Information, 49(5), pp. 483-495. ISSN 0961-3218

Chen, L and Whyte, J (2022) Understanding design change propagation in complex engineering systems using a digital twin and design structure matrix. Engineering, Construction and Architectural Management, 29(8), pp. 2950-2975. ISSN 0969-9988

Chen, L; Yuan, B and Wang, X (2024) Simulation analysis of the constraints on the green retrofit of existing buildings and strategies for its promotion: a hybrid method based on ISM and SD. Building Research & Information, 52(5), pp. 515-532. ISSN 0961-3218

Chen, P; Qiang, M and Wang, J N (2009) Project management in the Chinese construction industry: Six-case study. Journal of Construction Engineering and Management, 135(10), pp. 1016-1026. ISSN 0733-9364

Chen, Q; Christy, A; Owens, M; Bortz, D; Greene, W and King, B (2012) Two-plus-two construction management programs and articulation agreements. International Journal of Construction Education and Research, 8(1), pp. 4-25. ISSN 1557-8771

Chen, Q and Jin, R (2012) Safety4site commitment to enhance jobsite safety management and performance. Journal of Construction Engineering and Management, 138(4), pp. 509-519. ISSN 0733-9364

Chen, S; Tian, Y; Jin, L and Xiang, L (2021) Estimating the frequency of exposure to uncertain hazards: Impact of wind conditions on concrete dam construction. Journal of Construction Engineering and Management, 147(2): 04020167, ISSN 0733-9364

Chen, W (2019) Integration of building information modeling and internet of things for facility maintenance management. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Chen, Wenxin (2022) Establishing balance in project governance: Exploring yin-yang and mindfulness. PhD thesis, University of New South Wales, Australia.

Chen, X (2019) Developing a third party investment partnership framework to encourage low carbon building projects in China. PhD thesis, Northumbria University, UK.

Chen, X (2019) Big data in construction project management: prospects and challenges. PhD thesis, University of Hong Kong, Hong Kong.

Chen, X; Chang-Richards, A Y; Ling, F Y Y; Yiu, T W; Pelosi, A and Yang, N (2025) Digital technology-enabled AEC project management: practical use cases, deployment patterns and emerging trends. Engineering, Construction and Architectural Management, 32(6), pp. 4125-4154. ISSN 0969-9988

Chen, Xilin (2025) Sustainability of underground infrastructure: Digitalisation-based embodied carbon assessment and design optimisation. PhD thesis, Monash University, Australia.

Chen, Y (2008) Using mobile computing for construction site information management. PhD thesis, University of Newcastle upon Tyne, UK.

Chen, Y; Fang, Q and Lan, Y (2025) Development of a modular assembling, suspended, and sliding scaffold. Journal of Construction Engineering and Management, 151(9): 04025131, ISSN 0733-9364

Chen, Y; Zhuang, T and Liu, G (2023) A hybrid approach to supporting physical-change-based renewal projects selection decisions in high-density city: A case study of Chongqing. Engineering, Construction and Architectural Management, 30(7), pp. 2879-2903. ISSN 0969-9988

Chen, Y J (2012) Strategic implications of e-business in the construction industry. PhD thesis, Loughborough University, UK.

Chen, Yu (2024) Improving information requirements management in complex rail transport projects. PhD thesis, University of Technology Sydney, Australia.

Chen, Z; Abdullah, A B; Anumba, C J and Li, H (2014) Anp experiment for demolition plan evaluation. Journal of Construction Engineering and Management, 140(2): 06013005, ISSN 0733-9364

Chen, Z; Boateng, P and Ogunlana, S O (2019) A dynamic system approach to risk analysis for megaproject delivery. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(6), pp. 232-252. ISSN 17514304

Chen, Z; Li, H; Ross, A; Khalfan, M M A and Kong, S C W (2008) Knowledge-driven ANP approach to vendors evaluation for sustainable construction. Journal of Construction Engineering and Management, 134(12), pp. 928-941. ISSN 0733-9364

Chen, Z; li, H; Kong, S C W and xu, Q (2005) A knowledge-driven management approach to environmental-conscious construction. Construction Innovation, 5(1), pp. 27-39. ISSN 1471-4175

Chen, Zhanliang (2024) Narrative carpentry: A study on conservation organisations for traditional Chinese timber structures. DDes thesis, Harvard University, USA.

Chenchu, M. K.; Ruikar, K. and Jha, K. N. (2026) A network-based framework for enhancing data integration and usage in highway infrastructure decision-making. Construction Innovation, 26(6), pp. 1911-1934. ISSN 1471-4175

Cheng, M. Y. and Vu, Q. T. (2026) Bidirectional revolving gate Fourier transform: A newly spectrum deep machine learning for enhancing construction worker safety classification. Engineering, Construction and Architectural Management, pp. 1-28. ISSN 0969-9988

Cheng, M. Y. and Vu, Q. T. (2026) Bidirectional revolving gate Fourier transform: A newly spectrum deep machine learning for enhancing construction worker safety classification. Engineering, Construction and Architectural Management, pp. 1-28. ISSN 0969-9988

Cheng, M Y; Vu, Q T and Aldo, A (2026) Automated BIM parametric design for optimal external wall tile planning. International Journal of Construction Management, 26(1), pp. 131-151. ISSN 1562-3599

Cheng, Y H and Hong, W T (2025) An analytical research tool for monitoring stakeholder conflicts in public-private partnership project delivery. Construction Management and Economics, 43(12), pp. 1060-1079. ISSN 0144-6193

Cheng, J; Proverbs, D G and Oduoza, C F (2006) The satisfaction levels of UK construction clients based on the performance of consultants: Results of a case study. Engineering, Construction and Architectural Management, 13(6), pp. 567-583. ISSN 0969-9988

Cheng, L Y; Wen, D C and Jiang, H C (2014) The performance excellence model in construction enterprises: An application study with modelling and analysis. Construction Management and Economics, 32(11), pp. 1078-1092. ISSN 01446193

Cheraghi, E; Zohrehvandi, S; Vanhoucke, M and Mohamadpour Tosarkani, B (2023) A multiproject scheduling and resource management model in projects construction. Engineering, Construction and Architectural Management, 30(4), pp. 1578-1600. ISSN 0969-9988

Cherkos, F D and Jha, K N (2021) Drivers of road sector public-private partnership adoption in new and inexperienced markets. Journal of Construction Engineering and Management, 147(3): 04020186, ISSN 0733-9364

Chester, M and Hendrickson, C (2005) Cost impacts, scheduling impacts, and the claims process during construction. Journal of Construction Engineering and Management, 131(1), pp. 102-107. ISSN 0733-9364

Chesworth, B (2015) Is the concept of zero harm an achievable goal? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Chesworth, B; London, K and Gajendran, T (2011) Understanding lean implementation: Perspectives and approaches of an American construction organisation. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Cheung, C; Muchoki, L; Jin, R; Adamu, Z; Chi, N W and Lin, J C (2023) A systematic review of digitalisation adoptions in construction safety education and training. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Cheung, C K (2005) CH2 energy harvesting systems: Economic use and efficiency. Construction Economics and Building, 5(2), pp. 20-31. ISSN 2204-9029

Cheung, F K T; Kurul, E and Oti, A H (2016) A case study of hybrid strategies to create value for a contracting business in the education sector in England and Wales. Construction Management and Economics, 34(4-5), pp. 335-352. ISSN 01446193

Cheung, S O and Suen, H C H (2002) A multi-attribute utility model for dispute resolution strategy selection. Construction Management and Economics, 20(7), pp. 557-568. ISSN 01446193

Cheung, Yan Ki Fiona (2011) Relationship management as a strategy for supply chain engagement in the civil engineering construction industry. PhD thesis, Queensland University of Technology, Australia.

Chew, D A S and Liu, G (2004) Creating and sustaining international competitiveness of Chinese construction firms. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Chew, M Y L (2021) Façade inspection for falling objects from tall buildings in Singapore. International Journal of Building Pathology and Adaptation, 41(6), pp. 162-183. ISSN 23984708

Chew, M Y L; Conejos, S and Azril, F H B (2019) Design for maintainability of high-rise vertical green facades. Building Research & Information, 47(4), pp. 453-467. ISSN 0961-3218

Chew, M Y L; Conejos, S and Law, J S L (2017) Green maintainability design criteria for nanostructured titanium dioxide (TiO2) façade coatings. International Journal of Building Pathology and Adaptation, 35(2), pp. 139-158.

Chi, C S F and Javernick-Will, A N (2011) Institutional effects on project arrangement: High-speed rail projects in China and Taiwan. Construction Management and Economics, 29(6), pp. 595-611. ISSN 1466433X

Chi, C S-F (2010) How host country and transnational institutions interact on international infrastructure projects in less developed countries: Case studies of high-speed rail projects in China and Taiwan. PhD thesis, Stanford University, USA.

Chi, J D (2022) Cross-industry adoption and sustainability practices in facility management. PhD thesis, University of Maryland, USA.

Chi Man Hui, E; Omar, I and Ismail, M (2009) Kotaka's model in land acquisition for infrastructure provision in Malaysia. Journal of Financial Management of Property and Construction, 14(3), pp. 194-207. ISSN 1366-4387

Chiang, Y H; Li, V J; Zhou, L; Wong, F and Lam, P (2016) Evaluating sustainable building-maintenance projects: Balancing economic, social, and environmental impacts in the case of Hong Kong. Journal of Construction Engineering and Management, 142(2): 06015003, ISSN 0733-9364

Chiang, Y H; Zhou, L; Li, J; Lam, P T I and Wong, K W (2014) Achieving sustainable building maintenance through optimizing life-cycle carbon, cost, and labor: Case in Hong Kong. Journal of Construction Engineering and Management, 140(3): 5014001, ISSN 0733-9364

Chiara, N (2006) Real option methods for improving economic risk management in infrastructure project finance. PhD thesis, Columbia University, USA.

Chiara, N and Garvin, M (2008) Variance models for project financial risk analysis with applications to greenfield BOT highway projects. Construction Management and Economics, 26(9), pp. 925-939. ISSN 1466433X

Chiba, Y; Prabhakar, S V R K; Islam, M A and Akber, M A (2018) Priority practices for addressing non-economic loss and damages caused by cyclones in Bangladesh: Case study of Koyra. International Journal of Disaster Resilience in the Built Environment, 9(4-5), pp. 333-347. ISSN 1759-5916

Chigara, B (2018) Integrating sustainability principles in construction health and safety management practices in Zimbabwe. PhD thesis, Nelson Mandela University, South Africa.

Chih, Y-Y (2010) A decision-support framework for choosing a project delivery system in a multi-project environment. PhD thesis, University of California, Berkeley, USA.

Chih, Ying-Yi (2010) A decision-support framework for choosing a project delivery system (PDS) in a multi-project environment. PhD thesis, University of California, USA.

Chileshe, N (2004) The application of TQM within small and medium sized construction related organisations. PhD thesis, Sheffield Hallam University, UK.

Chin, S (1997) An integrated life-cycle information framework for construction project management. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Chitengi, H S (2015) Deriving lessons for urban planning and housing delivery from the resilience of informal housing systems in Zambia. PhD thesis, University of Dundee, UK.

Chmielewski, H T (2023) Overcoming modeling barriers in long-term interdependent infrastructure systems planning. PhD thesis, North Carolina State University, USA.

Cho, J G (2008) Open source project managment: From the integrated control perspective. PhD thesis, Claremont Graduate University, USA.

Cho, K and Hastak, M (2013) Time and cost-optimized decision support model for fast-track projects. Journal of Construction Engineering and Management, 139(1), pp. 90-101. ISSN 0733-9364

Cho, S K (2011) The relation between lean construction and performance in the Korean construction industry. PhD thesis, University of California, Berkeley, USA.

Cho, Y J (2003) A layered architecture supporting the collaborative design of virtual environments for science inquiry. PhD thesis, University of Illinois at Chicago, USA.

Choi, H H; Cho, H N and Seo, J W (2004) Risk assessment methodology for underground construction projects. Journal of Construction Engineering and Management, 130(2), pp. 258-272. ISSN 0733-9364

Choi, J O; Shrestha, B K; Kwak, Y H and Shane, J (2022) Exploring the benefits and trade-offs of design standardization in capital projects. Engineering, Construction and Architectural Management, 29(3), pp. 1169-1193. ISSN 0969-9988

Choi, Y S; Lim, I; Kim, T; Cho, H and Kang, K I (2016) Case study of the core structure succeeding method for tall building construction. Journal of Construction Engineering and Management, 142(12): 05016017, ISSN 0733-9364

Chong, D; Wang, Y; Zhao, K; Wang, D and Oeser, M (2018) Asphalt fume exposures by pavement construction workers: Current status and project cases. Journal of Construction Engineering and Management, 144(4): 05018002, ISSN 0733-9364

Chong, H Y and Cheng, M (2023) Smart contract implementation in building information modeling-enabled projects: Approach to contract administration. Journal of Construction Engineering and Management, 149(5): 05023004, ISSN 0733-9364

Chong, H-Y and Oon, C K (2016) A practical approach in clarifying legal drafting: Delphi and case study in Malaysia. Engineering, Construction and Architectural Management, 23(5), pp. 610-621. ISSN 0969-9988

Choudhry, R M; Aslam, M A and Arain, F M (2014) Cost and schedule risk analysis of bridge construction in Pakistan: Establishing risk guidelines. Journal of Construction Engineering and Management, 140(7): 04014020, ISSN 0733-9364

Chow, V; Loosemore, M and McDonnell, G (2012) Modelling the impact of extreme weather events on hospital facilities management using a system dynamics approach. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Chowdary, B V and Jaglal, D (2023) 3D CAD model reconstruction and fast prototyping of rotational parts: A reverse engineering approach. Journal of Engineering, Design and Technology, 21(5), pp. 1520-1544. ISSN 1726-0531

Chowdhooree, I; Aziz, T; Rashid, M J and Hossain, M (2024) Climate change adaptation through nature-based solution: Examining the case of Thakurani Khal of Mongla Port Municipality, Bagerhat Bangladesh. International Journal of Disaster Resilience in the Built Environment, 15(3), pp. 474-493. ISSN 1759-5916

Chowdhooree, I and Islam, I (2018) Factors and actors for enhancing community flood resilience: An experience from a river-side settlement in Bangladesh. International Journal of Disaster Resilience in the Built Environment, 9(2), pp. 153-169. ISSN 1759-5916

Choy, N Y C (2016) The construction of urban design values in volume housing production. PhD thesis, King's College London, UK.

Christen, M W (2018) The consideration of energy efficiency in the strategic planning of refurbishment in building portfolios. DSc thesis, ETH Zürich, Switzerland.

Christensen, A N (2019) Identifying private construction project owner inefficiencies that affect project goals. PhD thesis, Iowa State University, USA.

Christian, J (2002) An overview of systems utilizing information and communication technologies: Five research case studies. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Christini, G; Fetsko, M and Hendrickson, C (2004) Environmental management systems and ISO 14001 certification for construction firms. Journal of Construction Engineering and Management, 130(3), pp. 330-336. ISSN 0733-9364

Christodoulou, S (2010) Bid mark-up selection using artificial neural networks and an entropy metric. Engineering, Construction and Architectural Management, 17(4), pp. 424-439. ISSN 0969-9988

Christodoulou, S E; Ellinas, G and Michaelidou-Kamenou, A (2010) Minimum moment method for resource leveling using entropy maximization. Journal of Construction Engineering and Management, 136(5), pp. 518-527. ISSN 0733-9364

Christodoulou, S E; Ellinas, G N and Aslani, P (2009) Disorder considerations in resource-constrained scheduling. Construction Management and Economics, 27(3), pp. 229-240. ISSN 1466433X

Chua, D K H and Godinot, M (2006) Use of a WBS matrix to improve interface management in projects. Journal of Construction Engineering and Management, 132(1), pp. 67-79. ISSN 0733-9364

Chua, D K H and Goh, Y M (2004) Incident causation model for improving feedback of safety knowledge. Journal of Construction Engineering and Management, 130(4), pp. 542-551. ISSN 0733-9364

Chua, D K H; Tyagi, A; Ling, S and Bok, S H (2003) Process-parameter-interface model for design management. Journal of Construction Engineering and Management, 129(6), pp. 653-663. ISSN 0733-9364

Chua, D K H and Yeoh, K W (2011) PDM++: Planning framework from a construction requirements perspective. Journal of Construction Engineering and Management, 137(4), pp. 266-274. ISSN 0733-9364

Chua, D K H; Yeoh, K W and Song, Y (2010) Quantification of spatial temporal congestion in four-dimensional computer-aided design. Journal of Construction Engineering and Management, 136(6), pp. 641-649. ISSN 0733-9364

Chun, C K; Li, H and Skitmore, M (2012) The use of virtual prototyping for hazard identification in the early design stage. Construction Innovation, 12(1), pp. 29-42. ISSN 1471-4175

Chunduri, S (2014) Development of planning and design phases of an integrative building lifecycle process model for advanced energy retrofit projects. PhD thesis, Pennsylvania State University, USA.

Chung, J H (2015) Optimizing financial structure of transportation public-private partnership infrastructure projects based on traffic revenue risks: Case study of US DBFOM project. PhD thesis, University of Florida, USA.

Chung, J K H; Shen, G Q P; Leung, B Y P; Hao, J J L; Hills, M J; Fox, P W and Zou, P X W (2005) Using e-learning to deliver construction technology for undergraduate students. A case study in Hong Kong. Architectural Engineering and Design Management, 1(4), pp. 295-308. ISSN 1745-2007

Chung, T H; Mohamed, Y and Abourizk, S (2006) Bayesian updating application into simulation in the North Edmonton sanitary trunk tunnel project. Journal of Construction Engineering and Management, 132(8), pp. 882-894. ISSN 0733-9364

Cicmil, S and Marshall, D (2005) Insights into collaboration at the project level: Complexity, social interaction and procurement mechanisms. Building Research & Information, 33(6), pp. 523-535. ISSN 0961-3218

Cirilovic, J; Vajdic, N; Mladenovic, G and Queiroz, C (2014) Developing cost estimation models for road rehabilitation and reconstruction: Case study of projects in Europe and Central Asia. Journal of Construction Engineering and Management, 140(3): 4013065, ISSN 0733-9364

Cirrincione, Laura (2021) Simulation and experimental methods for improving energy efficiency, environmental performance and resilience of single and clustered groups of buildings. PhD thesis, Università degli Studi di Palermo, Italy.

Clark, P I (2011) CDM regulations: safety targeted assessment through gateway evaluation (stage) approach. PhD thesis, University of the West of England, Bristol, UK.

Clarke, K (2021) A critical analysis of the gap between collaborative risk management policies and practice in construction projects in the Scottish Highlands. DProf thesis, University of Salford, UK.

Clarke, N; Bradley, J G and Spillane, J P (2020) Mental health and well-being in micro-enterprises in the construction industry: An Irish perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Clarkson, Luke (2021) Comprehensive monitoring strategy for tailings dams. PhD thesis, University of Queensland, Australia.

Clevenger, C M (2010) Design guidance: Assessing process challenge, strategy, and exploration. PhD thesis, Stanford University, USA.

Clevenger, C M and Ozbek, M E (2013) Teaching sustainability through service-learning in construction education. International Journal of Construction Education and Research, 9(1), pp. 3-18. ISSN 1557-8771

Clevenger, C M; Ozbek, M E; Fanning, B and Vonfeldt, S (2015) Case study of work-based learning involving BIM for infrastructure in support of graduate construction research. International Journal of Construction Education and Research, 11(3), pp. 163-178. ISSN 1557-8771

Clifford-Lindkvist, C and Elmualim, A (2008) The socio-technical shaping of innovation in facilities management. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Coates, S P (2013) BIM implementation strategy framework for small architectural practices. PhD thesis, University of Salford, UK.

Cochran, K M (2006) Construction and demolition debris recycling: Methods, markets, and policy. PhD thesis, University of Florida, USA.

Coelho Maran, A C (2010) Multicriteria decision support system to delineate water resources planning and management regions. PhD thesis, Colorado State University, USA.

Cole, L J R (1991) Construction scheduling: Principles, practices, and six case studies. Journal of Construction Engineering and Management, 117(4), pp. 579-588. ISSN 0733-9364

Cole, R J and Larsson, N K (1999) GBC '98 and GBTool: Background. Building Research & Information, 27(4-5), pp. 221-229. ISSN 0961-3218

Cole, R J and Mitchell, L (1999) Customizing and using GBTool: Two case-study projects. Building Research & Information, 27(4-5), pp. 257-275. ISSN 0961-3218

Coleman, E; Nooni, I K; Fianko, S K; Dadzie, L; Neequaye, E N; Owusu-Agyemang, J and Ansa-Asare, E O (2020) Assessing contract management as a strategic tool for achieving quality of work in Ghanaian construction industry: A case study of FPMU and MMDAS. Journal of Financial Management of Property and Construction, 25(1), pp. 41-60. ISSN 1366-4387

Coleman, M J; Irvine, K N; Lemon, M and Shao, L (2013) Promoting behaviour change through personalized energy feedback in offices. Building Research & Information, 41(6), pp. 637-651. ISSN 0961-3218

Coleman, N (2019) Project critical success factors: A study of linear transportation projects. PhD thesis, Northcentral University, USA.

Colin, J and Vanhoucke, M (2016) Empirical perspective on activity durations for project-management simulation studies. Journal of Construction Engineering and Management, 142(1): 04015047, ISSN 0733-9364

Collins, H J (2007) Identity and interpretation of the built environment: a case study of interpretation of symbolic artefacts in the organisational built environment and it's effect on the identity forming process. PhD thesis, University of Strathclyde, UK.

Collins, W; Salman, A; Olbina, S and Mosier, R (2024) Scientometric, thematic, and methodological analysis of IJCER construction education focused publications: 2004–2023. International Journal of Construction Education and Research, 20(4), pp. 383-404. ISSN 1557-8771

Comassetto Hamerski, D; Saurin, T A; Formoso, C T and Isatto, E L (2024) The Last Planner system as an emergent production planning and control method: The role of multiple representations. Journal of Construction Engineering and Management, 150(11): 04024155, ISSN 0733-9364

Comerford, P.; Kinnane, O.; O'Hegarty, R. and Crowe, P. (2026) Embodied carbon impacts of residential development siteworks: New assessment framework. Buildings & Cities, 7(1), pp. 467-487. ISSN 2632-6655

Comiskey, D; McKane, M; Jaffrey, A; Wilson, P and Mordue, S (2017) An analysis of data sharing platforms in multidisciplinary education. Architectural Engineering and Design Management, 13(4), pp. 244-261. ISSN 1745-2007

Condon, E J (2006) The project game: Strategic estimating on major projects. PhD thesis, University of Calgary, Canada.

Conejos, S; Chew, M Y L; Tay, K; Tay, S and Safiena, S (2023) Green maintainability assessment of building-integrated photovoltaic (BIPV) applications: Lessons learnt. International Journal of Building Pathology and Adaptation, 41(2), pp. 320-346. ISSN 23984708

Conejos, S; Langston, C; Chan, E H W and Chew, M Y L (2016) Governance of heritage buildings: Australian regulatory barriers to adaptive reuse. Building Research & Information, 44(5-6), pp. 507-519. ISSN 0961-3218

Connelly, J (2001) Developing guidelines for adopting an environmental orientation for construction and related organisations within the supply chain in the construction industry. PhD thesis, Heriot-Watt University, UK.

Conroy, G (1997) CONSERV: A methodology for the management of capital projects and concurrent engineering design using knowledge based technology. PhD thesis, Cranfield University, UK.

Constantinou, C (2023) Assessment of the civil engineering graduate training scheme as part of the professional certification process in Cyprus. PhD thesis, Saint Louis University, USA.

Cook, E L (1997) Integration of total quality management with a project management approach for capital projects. PhD thesis, Texas A&M University, USA.

Cook, M and Pasquire, C (2001) The relationship between the management of design projects and improved performance in the building services sector of the construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Cooke, R S (2006) The use of alternative energy technologies in buildings: the influence of engineering consultants. EngD thesis, Brunel University, UK.

Cooke-Davies, T J (2000) Towards improved project management practice: uncovering the evidence for effective practices through empirical research. PhD thesis, Leeds Beckett University, UK.

Coolican, Alice Maeve (1989) A history of industrial relations in the Sydney building trades, 1870-1914. PhD thesis, University of New South Wales, Australia.

Cooper, J (2015) Sustainable building maintenance within social housing. PhD thesis, University of Greenwich, UK.

Cooper, J; Lee, A and Jones, K (2020) Sustainable built asset management performance indicators and attributes: A UK social housing case study example. International Journal of Building Pathology and Adaptation, 38(3), pp. 508-522. ISSN 23984708

Cooper, L P (2008) How project teams conceive of and manage pre-quantitative risk. PhD thesis, University of Southern California, USA.

Corley, J; Rowe, A; Tranfield, D; Smart, P; Levene, R; Rogerson, J and Deasley, P (2001) Customer-centred construction: Bringing a service approach through cultural change and team-working. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Corona Suarez, G A (2007) Simulation-aided framework for assessing the effect of project quality management on construction performance. PhD thesis, University of Alberta, Canada.

Correa, J. G. A.; Alves, J. L.; Homrich, A. S. and Carvalho, M. M. d (2026) Evolving skillsets of architecture, engineering and construction sector: Unveiling the interplay between project management, BIM, strategic and operational skills. Engineering, Construction and Architectural Management, 33(3), pp. 2422-2447. ISSN 0969-9988

Correia, Marcia Castilho (2019) Assessment of the quality of architectural projects for public health research laboratories: Sustainability and biosafety. PhD thesis, Universidade Federal do Rio de Janeiro, Brazil.

Corry, S J (2002) A collective profile: Meaning in the built environment among designers, managers and users with a mobility disability. PhD thesis, Washington State University, USA.

Costa, D B and Formoso, C T (2004) A set of evaluation criteria for performance measurement systems in the construction industry. Journal of Financial Management of Property and Construction, 9(2), pp. 91-102. ISSN 1366-4387

Costa, S; Sameiro Carvalho, M; Pimentel, C and Duarte, C (2025) Conceptualizing the phenomenon of construction industrialization: linking theory and practice through a cross-sector case study. International Journal of Construction Management, 25(8), pp. 923-931. ISSN 1562-3599

Costantino, N and Pellegrino, R (2015) Public-private partnership implementation: Cross-case analysis. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(4), pp. 164-176. ISSN 17514304

Cotton, A P; Sohail, M and Scott, R E (2005) Towards improved labour standards for construction of minor works in low income countries. Engineering, Construction and Architectural Management, 12(6), pp. 617-632. ISSN 0969-9988

Counter, B J (2013) Development of innovative approaches for life extension of railway track systems. PhD thesis, University of South Wales, UK.

Cox, David George (2002) Construction professionals and management in English local government: A triangulated investigation. PhD thesis, Durham University, UK.

Cox, I D; Morris, J P; Rogerson, J H and Jared, G E (1999) A quantitative study of post contract award design changes in construction. Construction Management and Economics, 17(4), pp. 427-439. ISSN 01446193

Cox, R F (1994) Case studies of employee participation programs in construction and their effects on absenteeism. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Craft, William James (2022) A decision-making framework for regenerative precinct development. PhD thesis, University of New South Wales, Australia.

Craighill, A L (2002) Lifecycle assessment and evaluation of construction and demolition waste management. PhD thesis, University of East Anglia, UK.

Crawford, L; Langston, C and Bajracharya, B (2012) Building capability for disaster resilience. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Crawford, L; Langston, C and Bajracharya, B (2013) Participatory project management for improved disaster resilience. International Journal of Disaster Resilience in the Built Environment, 4(3), pp. 317-333. ISSN 1759-5916

Creagh, R; McGann, S; Jancey, J; Blackford, K; Tye, M; Tindall, R and Sal Moslehian, A (2025) Workplace circulation design and movement: a case study of three Australian campus buildings. Architectural Engineering and Design Management, 21(4), pp. 665-680. ISSN 1745-2007

Crespo Vallejo, L G (2018) Project manager strategies to improve the delivery of construction projects. PhD thesis, Walden University, USA.

Crippa, J; Boeing, L C; Caparelli, A P A; da Costa, M R M M; Scheer, S; Araujo, A M F and Bem, D (2018) A BIM–LCA integration technique to embodied carbon estimation applied on wall systems in Brazil. Built Environment Project and Asset Management, 8(5), pp. 491-503. ISSN 2044-124X

Cripps, A (2004) Cardboard as a construction material: A case study. Building Research & Information, 32(3), pp. 207-219. ISSN 0961-3218

Croffi, J; Kroll, D; Soebarto, V; Barrie, H and McDougall, K (2023) Wellbeing fostered by design: A framework for evaluating indoor environment performance. Buildings & Cities, 4(1), pp. 507-523. ISSN 2632-6655

Crompton, L (2016) A standardised incorporated partnering model for the UK construction industry. PhD thesis, University of Central Lancashire, UK.

Croope, S V (2010) Managing critical civil infrastructure systems: Improving resilience to disasters. PhD thesis, University of Delaware, USA.

Cross, J (2016) A framework for the delivery of built environment student satisfaction in England. PhD thesis, University of Salford, UK.

Crowe, P and Fortune, C J (2012) A preliminary method of classifying collaborative contractual behaviour in higher education construction projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Cruz, C O; Marques, R C and Pereira, I (2015) Alternative contractual arrangements for urban light rail systems: Lessons from two case studies. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Cruz, N F D and Marques, R C (2012) Delivering local infrastructure through PPPs: Evidence from the school sector. Journal of Construction Engineering and Management, 138(12), pp. 1433-1443. ISSN 0733-9364

Cruz-Roveda, S (2022) A qualitative open-ended interview study using a comparative multiple case study approach of bus rapid transit (BRT) construction projects within the United States. DPA thesis, California Baptist University, USA.

Cuellar Franca, R M (2013) Sustainability assessment framework for the residential construction sector in the UK. PhD thesis, University of Manchester, UK.

Cui, Q (2005) A dynamic model for profitability analysis of construction firms: Towards complexity, learning, and uncertainty. PhD thesis, Purdue University, USA.

Cummings, A J G (1980) The York Buildings Company: A case study in eighteenth century corporation mismanagement. PhD thesis, University of Strathclyde, UK.

Cunha, L R M; Bastos, C D; Meijon, M N H and Araújo, D F (2016) Gamification technique for supporting transparency on construction sites: A case study. Engineering, Construction and Architectural Management, 23(6), pp. 801-822. ISSN 0969-9988

Cunningham Emord, P (2009) Building evaluation capacity with appreciative inquiry: An exploratory case study. PhD thesis, University of New Mexico, USA.

Curran, M; Spillane, J and Clarke-Hagan, D (2018) External stakeholders in urban construction development projects: Who are they and how are they engaged? In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Curran, M and Spillane, J P (2020) External stakeholder management and engagement on urban construction projects in Ireland. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(2), pp. 59-68. ISSN 17514304

Curran, M; Spillane, J P and Clarke-Hagan, D (2019) The considerate constructors scheme: Improving the image of construction, but how considerate are they to contractors? In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Curvelo Magdaniel, F T J (2016) Technology campuses and cities: A study on the relation between innovation and the built environment at the urban area level. PhD thesis, Delft University of Technology, Netherlands.

Cutrim, Sérgio Sampaio (2017) Port planning and governance in Brazil. PhD thesis, Universidade de São Paulo, Brazil.

Czelusniak-Serviss, C J (2023) Construction industry: Profitable corporate sustainability strategies and processes achieve competitive advantage. DBA thesis, Walden University, USA.

Dabirian, S; Ahmadi, M and Abbaspour, S (2023) Analyzing the impact of financial policies on construction projects performance using system dynamics. Engineering, Construction and Architectural Management, 30(3), pp. 1201-1221. ISSN 0969-9988

Dabirian, S; Moussazadeh, M; Khanzadi, M and Abbaspour, S (2023) Predicting the effects of congestion on labour productivity in construction projects using agent-based modelling. International Journal of Construction Management, 23(4), pp. 606-618. ISSN 1562-3599

Dabous, S A and Alkass, S (2010) A multi-attribute ranking method for bridge management. Engineering, Construction and Architectural Management, 17(3), pp. 282-291. ISSN 0969-9988

Dadashi Haji, M and Behnam, B (2025) An automated BIM and system dynamics tool for assessing safety leading indicators in construction projects. International Journal of Building Pathology and Adaptation, 43(3), pp. 414-439. ISSN 2398-4708

Dadashnejad, A A and Valmohammadi, C (2018) Investigating the effect of value stream mapping on operational losses: A case study. Journal of Engineering, Design and Technology, 16(3), pp. 478-500. ISSN 1726-0531

Dadzie, J; Runeson, G and Ding, G (2020) Assessing determinants of sustainable upgrade of existing buildings: The case of sustainable technologies for energy efficiency. Journal of Engineering, Design and Technology, 18(1), pp. 270-292. ISSN 1726-0531

Dadzie, John (2018) A model for predicting the energy performance of existing buildings upgraded with sustainable technologies. PhD thesis, University of Technology Sydney, Australia.

Daget, Y T and Zhang, H (2020) Decision-making model for the evaluation of industrialized housing systems in Ethiopia. Engineering, Construction and Architectural Management, 27(1), pp. 296-320. ISSN 0969-9988

Dainty, A R J; Bryman, A; Price, A D F; Greasley, K; Soetanto, R and King, N (2005) Project affinity: The role of emotional attachment in construction projects. Construction Management and Economics, 23(3), pp. 241-244. ISSN 01446193

Dair, C M (2000) An evaluation of the UK regulatory system for the redevelopment of contaminated land. PhD thesis, University of Sussex, UK.

Dakas, A I I (2014) Management of project stakeholders: facilitating project success in public sector projects in Nigeria. PhD thesis, University of Leeds, UK.

Dale, J M and Dulaimi, M F (2016) Cultural competence: A success factor in NGO projects? Built Environment Project and Asset Management, 6(2), pp. 232-246. ISSN 2044-124X

Dalla Valle, Anna (2019) Environment-driven change management in AEC firms: Life cycle perspective in practice. PhD thesis, Politecnico di Milano, Italy.

Dallasega, P; Schulze, F and Revolti, A (2023) Augmented reality to overcome visual management implementation barriers in construction: A mep case study. Construction Management and Economics, 41(3), pp. 232-255. ISSN 01446193

Dalton, M (2008) A risk breakdown structure for public sector construction projects. PhD thesis, University of Manchester, UK.

Damnjanovic, I (2006) A risk-based approach to modeling life-cycle costs associated with warranty specifications for transportation infrastructure. PhD thesis, University of Texas at Austin, USA.

Damoah, I S (2015) An investigation into the causes and effects of project failure in government projects in developing countries: Ghana as a case study. PhD thesis, Liverpool John Moores University, UK.

Damodaran, L and Shelbourn, M (2006) Collaborative working: the elusive vision. Architectural Engineering and Design Management, 2(4), pp. 227-243. ISSN 1745-2007

Dams, B; Maskell, D; Shea, A; Allen, S; Cascione, V and Walker, P (2023) Upscaling bio-based construction: Challenges and opportunities. Building Research & Information, 51(7), pp. 764-782. ISSN 0961-3218

Dandan, T H; Sweis, G; Sukkari, L S and Sweis, R J (2020) Factors affecting the accuracy of cost estimate during various design stages. Journal of Engineering, Design and Technology, 18(4), pp. 787-819. ISSN 1726-0531

Danel, T; Lafhaj, Z; Puppala, A; BuHamdan, S; Lienard, S and Richard, P (2024) Identifying tower crane activities with data: The case of the concrete pouring. Engineering, Construction and Architectural Management, 31(2), pp. 939-956. ISSN 0969-9988

Dang, C N; Wipulanusat, W; Nuaklong, P and Witchayangkoon, B (2025) Assessing green innovation practices in construction firms: A developing-country perspective. Engineering, Construction and Architectural Management, 32(5), pp. 3104-3131. ISSN 0969-9988

Dang-Trinh, N; Duc-Thang, P; Nguyen-Ngoc Cuong, T and Duc-Hoc, T (2023) Machine learning models for estimating preliminary factory construction cost: Case study in southern Vietnam. International Journal of Construction Management, 23(16), pp. 2879-2887. ISSN 1562-3599

Dangana, S (2015) A decision support framework for selecting innovative sustainable technologies for delivering low carbon retail buildings. PhD thesis, University of Plymouth, UK.

Dangana, Z; Pan, W and Goodhew, S (2012) Delivering sustainable buildings in retail construction. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Dangerfield, B; Green, S and Austin, S (2010) Understanding construction competitiveness: The contribution of system dynamics. Construction Innovation, 10(4), pp. 408-420. ISSN 1471-4175

Dania, A A (2017) Sustainable construction at the firm level: case studies from Nigeria. PhD thesis, University of Reading, UK.

Dania, A A; Larsen, G D and Ewart, I J (2014) Sustainable construction: Exploring the capabilities of Nigerian construction firms. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Daniel, E I (2017) Exploratory study into the use of Last Planner® System and collaborative planning for construction process improvement. PhD thesis, Nottingham Trent University, UK.

Dansoh, A; Frimpong, S; Ampratwum, G; Dennis Oppong, G and Osei-Kyei, R (2020) Exploring the role of traditional authorities in managing the public as stakeholders on PPP projects: A case study. International Journal of Construction Management, 20(6), pp. 628-641. ISSN 1562-3599

Dao, M A (2008) Determinants of firm compliance with environmental laws : A case study of Vietnam. PhD thesis, National University of Singapore, Singapore.

Daoud, A O; KhairEldin, M; Ibrahim, A H and Toma, H M (2026) Adaptive neuro-fuzzy inference system for Egyptian residential construction waste prediction. International Journal of Construction Management, 26(6), pp. 1059-1077. ISSN 1562-3599

Daoud, A O; Othman, A A E; Ebohon, O J and Bayyati, A (2022) Overcoming the limitations of the green pyramid rating system in the Egyptian construction industry: A critical analysis. Architectural Engineering and Design Management, 18(2), pp. 114-127. ISSN 1745-2007

Daoud, R M (2000) An evaluation of the role of the Palestine economic council for development and reconstruction (PECDAR) in palestine's infrastructure development since the 1993 Oslo accords. PhD thesis, Walden University, USA.

DarConte, F X (2017) Best value alignment process for public works construction in New York state. PhD thesis, Polytechnic Institute of New York University, USA.

Dara, S (2025) A study on implementing QFD (quality function deployment) in the construction of a commercial business center. Construction Innovation, 25(2), pp. 419-441. ISSN 1471-4175

Darwai, V R; Mandavgane, S A and Lohia, P (2022) Systems based approach to a small scale dairy farm (goshala): A case study. Built Environment Project and Asset Management, 12(3), pp. 503-518. ISSN 2044-124X

Darwish, M; Elsayed, A Y and Nassar, K (2018) Design and constructability of a novel funicular arched steel truss falsework. Journal of Construction Engineering and Management, 144(3): 04018002, ISSN 0733-9364

Das, D. K. and Emuze, F. (2021) Design delays in building projects in india: Effects and remedies. Construction Economics and Building, 21(1), pp. 22-44. ISSN 2204-9029

Das, D K (2024) Conceptualising environmental justice in the construction of road transport infrastructure in the global South: An Indian context. International Journal of Construction Management, 24(4), pp. 400-410. ISSN 1562-3599

Dasandara, M; Ernst, R; Kulatunga, U and Rathnasiri, P (2022) Investigation of issues in structural flood management measures in Sri Lanka. Journal of Construction in Developing Countries, 27(1), pp. 65-78. ISSN 1823-6499

Datta, A; Ninan, J and Sankaran, S (2020) 4D visualization to bridge the knowing-doing gap in megaprojects: An Australian case study. Construction Economics and Building, 20(4), pp. 25-41. ISSN 2204-9029

Dave, B (2017) Business process management: A construction case study. Construction Innovation, 17(1), pp. 50-67. ISSN 1471-4175

Dave, Malay (2019) High performance prefab housing: towards an evaluation framework for design, sustainability and affordability. PhD thesis, University of New South Wales, Australia.

Davey, C L; Powell, J A; Powell, J E and Cooper, I (2002) Action learning in a medium-sized construction company. Building Research & Information, 30(1), pp. 5-15. ISSN 0961-3218

Davidson, R (2021) Innovation within private finance initiative projects: the influence of governance throughout the first stage of post-contract implementation. PhD thesis, University of Brighton, UK.

Davies, P J; Emmitt, S and Firth, S K (2013) On-site energy management challenges and opportunities: A contractor's perspective. Building Research & Information, 41(4), pp. 450-468. ISSN 0961-3218

Davies, P J; Emmitt, S and Firth, S K (2014) Challenges for capturing and assessing initial embodied energy: A contractor's perspective. Construction Management and Economics, 32(3), pp. 290-308. ISSN 01446193

Davies, R (2013) Healthcare built environment impacts, construction projects and organisational change. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Davies, R and Harty, C F (2012) Control, surveillance and the 'dark side' of BIM. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Davis, P R (2004) Relationship marketing techniques in construction projects: A case study approach. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Davis, W J (1997) An evaluation of life cycle factors for urban arterial roadways. PhD thesis, Georgia Institute of Technology, USA.

Dawood, I (2010) Decision support system (DSS) model to facilitate strategic planning of the housing industry in the developing world. PhD thesis, University of Salford, UK.

Dawood, N (1998) Estimating project and activity duration: A risk management approach using network analysis. Construction Management and Economics, 16(1), pp. 41-48. ISSN 01446193

Dawood, N and Sikka, S (2009) Development of 4D based performance indicators in construction industry. Engineering, Construction and Architectural Management, 16(5), pp. 438-458. ISSN 0969-9988

Dawood, N N (1995) An integrated knowledge-based/simulation approach to production planning: An application to the pre-cast industry. Construction Management and Economics, 13(1), pp. 53-64. ISSN 01446193

Dawood, N N; Hobbs, B and Fanning, A (1999) Standardization of brickwork construction: Process identification. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Dawood, N N; Yasuhara, T; Usuda, Y; Matsuda, C and Sawada, A (2001) Analysis of cost escalation and risk assessment of infrastructure projects: An application in Japanese civil engineering projects. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Day, A (1996) The maquette, the model and the computer: Organizational futures for design and construction. Engineering, Construction and Architectural Management, 3(1-2), pp. 15-28. ISSN 0969-9988

Day, K and Martel, A (2021) Designing for neurodiversity: Reimagining the home for a COVID normal life. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

De Athayde Prata, B; Pitombeira-Neto, A R and De Moraes Sales, C J (2015) An integer linear programming model for the multiperiod production planning of precast concrete beams. Journal of Construction Engineering and Management, 141(10): 04015029, ISSN 0733-9364

De Azevedo, R C; De Oliveira Lacerda, R T; Ensslin, L; Jungles, A E and Ensslin, S R (2013) Performance measurement to aid decision making in the budgeting process for apartment-building construction: Case study using MCDA-c. Journal of Construction Engineering and Management, 139(2), pp. 225-235. ISSN 0733-9364

De Blois, M; Herazo-Cueto, B; Latunova, I and Lizarralde, G (2011) Relationships between construction clients and participants of the building industry: Structures and mechanisms of coordination and communication. Architectural Engineering and Design Management, 7(1), pp. 3-22. ISSN 1745-2007

De Cicco, S (2004) Design and development of an information management system for highway construction specifications. PhD thesis, University of Wisconsin - Madison, USA.

De Haan, J; Voordijk, H and Joosten, G J (2002) Market strategies and core capabilities in the building industry. Construction Management and Economics, 20(2), pp. 109-118. ISSN 01446193

De Jorge Moreno, J; De Jorge Huertas, V and Rojas Carrasco, O (2016) Assessment of the efficiency of the Spanish construction industry using parametric methods: Case study. Journal of Construction Engineering and Management, 142(9): 05016008, ISSN 0733-9364

De La Garza, J M and Mitropoulos, P (1991) Technology-transfer (t2) model for expert systems. Journal of Construction Engineering and Management, 117(4), pp. 736-755. ISSN 0733-9364

De Lapp, J A; Ford, D N; Bryant, J A and Horlen, J (2004) Impacts of CAD on design realization. Engineering, Construction and Architectural Management, 11(4), pp. 284-291. ISSN 0969-9988

De Marco, A; Briccarello, D and Rafele, C (2009) Cost and schedule monitoring of industrial building projects: Case study. Journal of Construction Engineering and Management, 135(9), pp. 853-862. ISSN 0733-9364

De Ridder, H A J (1994) Design and construct of complex civil engineering systems: A new approach to organization and contracts. PhD thesis, Delft University of Technology, Netherlands.

De Silva, G D R; Perera, B A K S and Rodrigo, M N N (2019) Adaptive reuse of buildings: The case of Sri Lanka. Journal of Financial Management of Property and Construction, 24(1), pp. 79-96. ISSN 1366-4387

De Souza, D V S (2015) A conceptual framework and best practices for designing and improving construction supply chains. PhD thesis, University of Salford, UK.

De Waegemaeker, J; Kerselaers, E; Van Acker, M and Rogge, E (2017) Design workshops in the age of climate change: Analysis of a design workshop on drought in Flanders. Smart and Sustainable Built Environment, 6(1), pp. 48-63. ISSN 2046-6099

De Wilde, P; Augenbroe, G and Van Der Voorden, M (2002) Managing the selection of energy saving features in building design. Engineering, Construction and Architectural Management, 9(3), pp. 192-208. ISSN 0969-9988

DeJesus, I (2024) Strategies for implementing organizational change in the construction industry. DBA thesis, Walden University, USA.

Deakin, M (1997) The development of computer-based information systems for local authority property management 2: The application. Journal of Financial Management of Property and Construction, 2(2), pp. 59-84. ISSN 1366-4387

Debrah, C and Owusu-Manu, D G (2022) An apposite framework for green cities development in developing countries: The case of Ghana. Construction Innovation, 22(4), pp. 789-808. ISSN 1471-4175

Deilmann, C; Effenberger, K H and Banse, J (2009) Housing stock shrinkage: Vacancy and demolition trends in Germany. Building Research & Information, 37(5-6), pp. 660-668. ISSN 0961-3218

Dejahang, F (2004) Determinants of productivity on construction sites. PhD thesis, London South Bank University, UK.

Del Ceno, J S (2012) Selective licensing and resident satisfaction in social housing: A UK case study. International Journal of Law in the Built Environment, 4(2), pp. 126-139. ISSN 1756-1450

Delgado, J M D; Oyedele, L; Bilal, M; Ajayi, A; Akanbi, L and Akinade, O (2020) Big data analytics system for costing power transmission projects. Journal of Construction Engineering and Management, 146(1): 05019017, ISSN 0733-9364

Delgado-Hernandez, D J; Bampton, K E and Aspinwall, E (2007) Quality function deployment in construction. Construction Management and Economics, 25(6), pp. 597-609. ISSN 1466433X

Delgado-Hernandez, D J; Cruz-Cruz, C C and Vences-García, P Y (2017) Improvement management tools in the construction industry: Case study of Mexico. Journal of Construction Engineering and Management, 143(4): 05016024, ISSN 0733-9364

Delgado-Hernández, D J and Palacios-Navarro, U J (2024) A Bayesian network for selecting improvement management tools to increase customer satisfaction in the construction industry: Case study of Mexico. Engineering, Construction and Architectural Management, 31(7), pp. 2900-2915. ISSN 0969-9988

Delmon, J J (2008) Increasing the efficiency of risk allocation in project financed infrastructure transactions by reducing the impact of risk noise. PhD thesis, King's College London, UK.

Deloly, C; Gall, A R; Moore, G; Bretelle, L; Milner, J; Mohajeri, N; Osrin, D; Salvia, G; Symonds, P; Tsoulou, I; Zimmermann, N; Wilkinson, P and Davies, M (2021) Relationship-building around a policy decision-support tool for urban health. Buildings & Cities, 2(1), pp. 717-733. ISSN 2632-6655

Demetracopoulou, Vassiliki A (2023) Risk and innovation in project delivery method selection for complex highway projects. PhD thesis, University of Texas at Austin, USA.

Demian, P and Walters, D (2014) The advantages of information management through building information modelling. Construction Management and Economics, 32(12), pp. 1153-1165. ISSN 01446193

Demirel, H C (2022) Dealing with uncertainty in infrastructure public-private partnership projects. PhD thesis, Delft University of Technology, Netherlands.

Demirel, H C; Leendertse, W and Hertogh, M (2015) Pre-contract assumptions in practice: A qualitative study on the flexibility to changes in dbfm contracts: Blankenburgverbinding project case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Demirel, H Ç; Leendertse, W; Volker, L and Hertogh, M (2017) Flexibility in PPP contracts: Dealing with potential change in the pre-contract phase of a construction project. Construction Management and Economics, 35(4), pp. 196-206. ISSN 0144-6193

Demirel, H Ç; Volker, L; Leendertse, W and Hertogh, M (2019) Dealing with contract variations in PPPs: Social mechanisms and contract management in infrastructure projects. Journal of Construction Engineering and Management, 145(11): 04019073, ISSN 0733-9364

Demirkesen, S. (2025) Exploring the causes of sunk cost fallacy in the construction industry: Case of mega projects. Engineering, Construction and Architectural Management, 33(5), pp. 3761-3776. ISSN 0969-9988

Deng, F (2015) Performance measurement system: attributes, effects and context in UK construction firms. PhD thesis, University College London, UK.

Deng, Y (2015) Mapping of BIM and GIS for interoperable geospatial data management and analysis for the built environment. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Deng, Y; Gan, V J L; Das, M; Cheng, J C P and Anumba, C (2019) Integrating 4D BIM and GIS for construction supply chain management. Journal of Construction Engineering and Management, 145(4): 04019016, ISSN 0733-9364

Deng, Y and Poon, S W (2011) Mega-challenges for mega-event flagships. Architectural Engineering and Design Management, 7(1), pp. 23-37. ISSN 1745-2007

Deng, Y and Poon, S W (2013) Meeting sustainability challenges of mega-event flagships. Engineering, Construction and Architectural Management, 20(1), pp. 46-62. ISSN 0969-9988

Deng, Y and Poon, S W (2014) Mega-event flagships in transformation: Learning from Expo 2010 Shanghai China. Journal of Engineering, Design and Technology, 12(4), pp. 440-460.

Deng, Y and Poon, S W (2014) Positioning mega-event flagships: from performing arts center of Expo 2010 to Mercedes-Benz Arena. Architectural Engineering and Design Management, 10(3-4), pp. 233-250. ISSN 1745-2007

Denny, J (2025) Organizing change: A single case study exploring the perceptions of self-determination in high school employees during a building renovation. EdD thesis, Baylor University, USA.

Denowitz, R M (1982) Industries and environments: A comparative study of housebuilding in two suburban areas. PhD thesis, University of Chicago, USA.

Densley Tingley, D (2013) Design for deconstruction: an appraisal. PhD thesis, University of Sheffield, UK.

Derek, T and Clements-Croome, J (1996) Future horizons in building environmental engineering: A comprehensive and thought provoking presentation of how technology has been viewed at various stages of civilization with particular reference to environmental systems, both active and passive. A number of case studies are included. Building Research & Information, 24(2), pp. 86-96. ISSN 0961-3218

Derradji, R and Hamzi, R (2020) Multi-criterion analysis based on integrated process-risk optimization. Journal of Engineering, Design and Technology, 18(5), pp. 1015-1035. ISSN 1726-0531

Deshpande, A S (2009) Best practices for the management of design in fast track industrial projects. PhD thesis, University of Cincinnati, USA.

Dev, P (2025) Agency and vulnerability of women in disaster: Exploring role of women in disaster risk reduction in dnd project area. International Journal of Disaster Resilience in the Built Environment, 16(3), pp. 402-416. ISSN 1759-5908

Devapriya, K A K and Khu, F L (2004) Bond financing in private infrastructure projects in developing countries. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Devkar, G; Palliyaguru, R and Oyegoke, A S (2020) The effects of institutional frameworks on implementation of PPP projects: A comparative perspective in Australia and India. International Journal of Construction Management, 20(6), pp. 720-736. ISSN 1562-3599

Devkar, G A and Kalidindi, S N (2013) External agencies for supplementing competencies in Indian urban PPP projects. Built Environment Project and Asset Management, 3(1), pp. 58-73. ISSN 2044-124X

Devkar, G A and Kalidindi, S N (2013) Modeling and assessment of competencies in urban local bodies for implementing PPP projects. Built Environment Project and Asset Management, 3(1), pp. 42-57. ISSN 2044-124X

Dewagoda, K G; Perera, B and Senaratne, S (2021) A "knowledge value chain" framework for contractor organisations to maximise chances of winning tenders. Built Environment Project and Asset Management, 11(4), pp. 577-593. ISSN 2044-124X

Dewundara Maha Galappaththi Arachchige, N M S (2021) Innovation in construction project-based firms through the lens of exploratory and exploitative learning : effects of social capital and collaborative environment. PhD thesis, University of Hong Kong, Hong Kong.

Dhakal, S; Mrawira, D and Rankin, J (2009) Effect of specifications type on the quality of paving contracts in New Brunswick. Journal of Construction Engineering and Management, 135(9), pp. 801-811. ISSN 0733-9364

Dharmadasa, K; Kulatunga, U and Eranga, I (2025) Significance of critical infrastructure development in post-disaster resettlement in Sri Lanka. International Journal of Construction Management, 25(3), pp. 312-321. ISSN 1562-3599

Di Ruocco, G; Melella, R and Marino, V (2022) An integrated assessment method for the sustainability of the opaque building envelope in residential buildings with Italian gbc-home certification. Architectural Engineering and Design Management, 18(4), pp. 545-570. ISSN 1745-2007

Diab, A A (2009) Risk management of building services modularisation: Knowledge management perspective. PhD thesis, University of Manchester, UK.

Dickinson, H and Swaffield, L (2004) Implementing a segregation-based waste management system on site: Does it reduce site waste disposal costs? Journal of Financial Management of Property and Construction, 9(2), pp. 75-90. ISSN 1366-4387

Diehlmann, F; Hiemsch, P S; Wiens, M; Lüttenberg, M and Schultmann, F (2022) Including decision-makers preferences in the cost-deprivation trade-off during disaster interventions. Journal of Engineering, Design and Technology, 20(2), pp. 543-565. ISSN 1726-0531

Dikmen, I; Birgonul, M T and Arikan, A E (2006) Application of an integrated risk management system (IRMS) to an international construction project. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Dimitrov, D S (2024) The new work of building operations in the digital age: The impact of IoT and digital twins on facility management and operational practices. PhD thesis, University of Washington, USA.

Ding, G and Forsythe, P (2016) A comparative study of floor construction on sloping sites: An analysis of cumulative energy demand and greenhouse gas emissions. Construction Economics and Building, 16(1), pp. 33-49. ISSN 2204-9029

Ding, G K C (2005) Developing a multicriteria approach for the measurement of sustainable performance. Building Research & Information, 33(1), pp. 3-16. ISSN 0961-3218

Ding, Q (2018) Using social media to evaluate public acceptance of infrastructure projects. PhD thesis, University of Maryland, College Park, USA.

Ding, Z and ng, F (2010) Knowledge sharing in architectural design institutes: A multiple-case study. Construction Innovation, 10(3), pp. 267-285. ISSN 1471-4175

Dinh, T H; Dinh, T H and Götze, U (2024) Roadworks design: Study on selection of construction materials in the preliminary design phase based on economic performance. International Journal of Construction Management, 24(5), pp. 503-511. ISSN 1562-3599

Dion, H; Evans, M and Farrell, P (2023) Hospitals management transformative initiatives; towards energy efficiency and environmental sustainability in healthcare facilities. Journal of Engineering, Design and Technology, 21(2), pp. 552-584. ISSN 1726-0531

Disney, O; Roupé, M and Johansson, M (2023) Driving circularity with total BIM: An integrated approach to data-driven design. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Disney, O; Roupé, M; Johansson, M and Domenico Leto, A (2024) Embracing BIM in its totality: A total BIM case study. Smart and Sustainable Built Environment, 13(3), pp. 512-531. ISSN 2046-6099

Dissanayake, N; Xia, B; Skitmore, M; Trigunarsyah, B and Menadue, V (2026) Developing a generic fuzzy multi-attribute analysis model for EPC contractor selection. Built Environment Project and Asset Management, 16(1), pp. 1-19. ISSN 2044-124X

Dizdaroglu, D; Yigitcanlar, T and Dawes, L (2012) A micro-level indexing model for assessing urban ecosystem sustainability. Smart and Sustainable Built Environment, 1(3), pp. 291-315. ISSN 2046-6099

Djebbar, K E B and Mokhtari, A (2025) Evaluation of the level of awareness of the inhabitants on the importance of the energy retrofitting of buildings: Case study of Tlemcen (Algeria). International Journal of Building Pathology and Adaptation, 43(2), pp. 209-256. ISSN 2398-4708

Djebbar, K E B; Salem, S and Mokhtari, A (2020) Assessment of energy performance using bottom-up method: Exemplified by multi-storey buildings in Tlemcen (Algeria). International Journal of Building Pathology and Adaptation, 38(1), pp. 192-216. ISSN 23984708

Do, S T; Nguyen, V T and Banlasan, D (2024) Social media sensing framework for urban infrastructure management: A Philippine case study. Construction Innovation, 24(4), pp. 1117-1136. ISSN 1471-4175

Doczy, R (2018) Risk-benefit analysis and optimization of LEED-certified school buildings design and construction: Statisitical and machine learning approaches. PhD thesis, Florida State University, USA.

Dodd, J and Langford, D A (1990) Construction management on one large project in London: A case study. Construction Management and Economics, 8(4), pp. 385-398. ISSN 01446193

Dodd, J R (2021) Maximizing benchmarking initiatives in the built environment for sustained continuous improvement. PhD thesis, University of North Carolina at Charlotte, USA.

Doe, Robert (2017) Integration of computational design tools in the design and production of prefabricated homes. PhD thesis, University of Sydney, Australia.

Doherty, M M (2022) Exploring the expansion of planners' engagement capabilities via accessing the data from a building information model for public consultation. PhD thesis, Northumbria University, UK.

Dojutrek, M S; Labi, S and Dietz, J E (2016) A multi-criteria methodology for measuring the resilience of transportation assets. International Journal of Disaster Resilience in the Built Environment, 7(3), pp. 290-301. ISSN 1759-5916

Dolidze, G and Spillane, J P (2020) Smart city approach to educational campuses: Case study at University of Limerick, Ireland. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(3), pp. 95-103. ISSN 17514304

Dolla, T; Devkar, G and Boeing, L (2021) Procurement governance and information asymmetry in waste management of India. Built Environment Project and Asset Management, 11(1), pp. 38-51. ISSN 2044-124X

Dolla, T and Laishram, B S (2018) Procurement of low carbon municipal solid waste infrastructure in India through public-private partnerships. Built Environment Project and Asset Management, 8(5), pp. 449-460. ISSN 2044-124X

Doloi, H (2018) Community-centric model for evaluating social value in projects. Journal of Construction Engineering and Management, 144(5): 04018019, ISSN 0733-9364

Dominguez, D (2008) Handling future uncertainty: Strategic planning for the infrastructure sector. DSc thesis, ETH Zürich, Switzerland.

Donato, V (2017) Towards design process validation integrating graph theory into BIM. Architectural Engineering and Design Management, 13(1), pp. 22-38. ISSN 1745-2007

Donn, M (2025) Simulation and the building performance gap. Buildings & Cities, 6(1), pp. 713-728. ISSN 2632-6655

Donyavi, S and Flanagan, R (2009) The impact of effective material management on construction site performance for small and medium sized construction enterprises. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Donyavi, S and Flanagan, R (2011) Tracking and positioning technology and its applications for supply chain materials for small and medium enterprises (SMEs) on construction sites. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Dorignon, L; Oswald, D; Kempton, L; Boehme, T; Iyer-Raniga, U; Moore, T and Dalton, T (2024) Investigating residential building materials in a circular economy: An Australian perspective. Journal of Construction Engineering and Management, 150(9): 04024115, ISSN 0733-9364

Dormohamadi, M; Tahbaz, M and Velashjerdi Farahani, A (2025) Performance evaluation of a single-side windcatcher in the transitional seasons (case study: Khousf Town, Southern Khorasan Province, Iran). International Journal of Building Pathology and Adaptation, 43(3), pp. 338-368. ISSN 2398-4708

Dorrah, D H (2024) Development of integrated decision support framework for payment management and negotiation in construction projects. PhD thesis, University of Toronto, Canada.

Dorée, A G and Holmen, E (2004) Achieving the unlikely: Innovating in the loosely coupled construction system. Construction Management and Economics, 22(8), pp. 827-838. ISSN 01446193

Dos Santos, A; da Rocha, C G and Lepre, P (2010) Barriers and opportunities in developing 'do-it-yourself' products for low-income housing. Journal of Construction in Developing Countries, 15(1), pp. 29-43. ISSN 1823-6499

Dosumu, B A (2022) Development of a construction project risk management framework: A case study of major Nigerian cities. PhD thesis, University of Manchester, UK.

Dosumu, O S (2018) Perceived effects of prevalent errors in contract documents on construction projects. Construction Economics and Building, 18(1), pp. 1-26. ISSN 2204-9029

Dou, Y; Sun, X; Ji, A; Wang, Y and Xue, X (2023) Development strategy for prefabricated construction projects: A tripartite evolutionary game based on prospect theory. Engineering, Construction and Architectural Management, 30(1), pp. 105-124. ISSN 0969-9988

Doukakis, J P (2024) A case study of a mechanics of solids course in civil engineering education. PhD thesis, Rutgers The State University of New Jersey, USA.

Doukari, O; Kassem, M; Scoditti, E; Aguejdad, R and Greenwood, D (2024) A BIM based tool for evaluating building renovation strategies: The case of three demonstration sites in different European countries. Construction Innovation, 24(1), pp. 365-383. ISSN 1471-4175

Doulabi, S H H; Seifi, A and Shariat, S Y (2011) Efficient hybrid genetic algorithm for resource leveling via activity splitting. Journal of Construction Engineering and Management, 137(2), pp. 137-146. ISSN 0733-9364

Dow, I; Ross, A D and Sertyesilisik, B (2009) An investigation on the cost implications of methodology of subcontract work pricing. Journal of Financial Management of Property and Construction, 14(2), pp. 98-125. ISSN 1366-4387

Dow, I; Ross, A D and Sertyesilisik, B (2009) An investigation on the cost implications of methodology of subcontract work pricing. Journal of Financial Management of Property and Construction, 14(2), pp. 98-125. ISSN 1366-4387

Downey, M (2012) Lowering CO2 emissions in the new build social housing sector: A Spanish case study. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Downey, M (2014) Selection and adoption of low and zero carbon technologies in social housing: a socio-technical network approach. PhD thesis, University of Reading, UK.

Dowsett, R. M. and Harty, C. F. (2019) Assessing the implementation of BIM–an information systems approach. Construction Management and Economics, 37(10), pp. 551-566. ISSN 0144-6193

Dowsett, R (2016) Assessing the success of BIM implementation. DEng thesis, University of Reading, UK.

Dowsett, R and Harty, C (2016) Making the link between bim's benefits and implementation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Dowsett, R M and Harty, C F (2019) Assessing the implementation of BIM: an information systems approach. Construction Management and Economics, 37(10), pp. 551-566. ISSN 01446193

Du, H; Han, Q and De Vries, B (2025) The effects of social influence on low-cost and high-cost household energy-efficient product adoption: A case study in wuhan. Smart and Sustainable Built Environment, 14(6), pp. 1908-1926. ISSN 2046-6099

Du, H; Han, Q; Sun, J and Wang, C C (2023) Adoptions of prefabrication in residential sector in China: Agent-based policy option exploration. Engineering, Construction and Architectural Management, 30(4), pp. 1697-1725. ISSN 0969-9988

Du, J (2012) Investigation of interpersonal cooperation in construction project teams: An agent-based modeling approach. PhD thesis, Michigan State University, USA.

Du, J; El-Gafy, M and Zhao, D (2016) Optimization of change order management process with object-oriented discrete event simulation: Case study. Journal of Construction Engineering and Management, 142(4): 05015018, ISSN 0733-9364

Du, J; Kim, B C and Zhao, D (2016) Cost performance as a stochastic process: EAC projection by Markov chain simulation. Journal of Construction Engineering and Management, 142(6): 04016009, ISSN 0733-9364

DuBois, P J (1996) An efficient method to accurately predict general condition costs in the building construction industry. PhD thesis, Colorado School of Mines, USA.

Duarte, Carolina Mendonça de Moraes (2022) Innovation management in construction and development companies. PhD thesis, Universidade Estadual de Campinas, Brazil.

Dubey, K K (2001) A framework for analysing quality in the US homebuilding industry. PhD thesis, Swansea University, UK.

Dubler, C R (2011) Evaluating waste associated with building information exchange using lean theory. PhD thesis, Pennsylvania State University, USA.

Duffield, C (1998) Commercial viability of privately financed heating systems in Europe: A case study. Engineering, Construction and Architectural Management, 5(1), pp. 3-8. ISSN 0969-9988

Duffield, Colin F (2001) An evaluation framework for privately funded infrastructure projects in Australia. PhD thesis, University of Melbourne, Australia.

Duffy, K; Graham, B and Thomas, K (2007) Assessing the potential for construction collaboration technologies (cct) in small to medium enterprises in the Irish construction industry. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Dulaimi, M and Hartmann, A (2006) The role of organizational culture in motivating innovative behaviour in construction firms. Construction Innovation, 6(3), pp. 159-172. ISSN 1471-4175

Dulaimi, M; Khalfan, M M A and McDermott, P (2006) Innovating for supply chain integration within construction. Construction Innovation, 6(3), pp. 143-157. ISSN 1471-4175

Dulaimi, M F (2007) Case studies on knowledge sharing across cultural boundaries. Engineering, Construction and Architectural Management, 14(6), pp. 550-567. ISSN 0969-9988

Dulaimi, M F; Alhashemi, M; Ling, F Y Y and Kumaraswamy, M (2010) The execution of public-private partnership projects in the UAE. Construction Management and Economics, 28(4), pp. 393-402. ISSN 1466433X

Duman, S (2003) Policy impact analysis of privatizing public services: The case of wastewater treatment in Indianapolis. PhD thesis, University of Pittsburgh, USA.

Dunne, K O (2006) Effective leadership in the multi-faceted client organisation: A case study on the Olympic client coalition. PhD thesis, University College London, UK.

Dunston, P S; Gambatese, J A and McManus, J F (2005) Assessing state transportation agency constructability implementation. Journal of Construction Engineering and Management, 131(5), pp. 569-578. ISSN 0733-9364

Duodo, B (2017) Intellectual capital and innovation in construction firms: the role of learning capability. PhD thesis, University of Hong Kong, Hong Kong.

Durnall, T (2010) Attitudes to externalization and reform in local authority projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Duvel, C S (1999) Establishing rule-based models to implement workflow within construction organizations. PhD thesis, University of Florida, USA.

Duyne Barenstein, J E (2015) Continuity and change in housing and settlement patterns in post-earthquake Gujarat, India. International Journal of Disaster Resilience in the Built Environment, 6(2), pp. 140-155. ISSN 1759-5916

Dyas, V (2008) Constituents of performance: investigating relational contracting in a construction industry setting to establish a framework for drivers of performance. PhD thesis, Kingston University, UK.

Díaz-Jimenez, D; Ruiz, J L; González-Lama, J and Verdejo-Espinosa, Á (2025) Assessing the sustainable alignment of a sensor-based connected health system with SDGs: An evaluation model and case study. Smart and Sustainable Built Environment, 14(7), pp. 2235-2259. ISSN 2046-6099

Eaton, D (2000) A phenomenologically based contingent anatomy of competitive advantage within the construction industry. PhD thesis, University of Salford, UK.

Ebbert, T (2010) Re-face: Refurbishment strategies for the technical improvement of office façades. PhD thesis, Delft University of Technology, Netherlands.

Ebekozien, A; Aigbavboa, C; Samsurijan, M S; Radin Firdaus, R B; Ayo-Odifiri, S O and Amadi, G C (2024) Disasters recovery and rehabilitation in informal settlements: The role of fourth industrial revolution technologies. International Journal of Construction Management, 24(11), pp. 1155-1165. ISSN 1562-3599

Ebekozien, A; Aigbavboa, C; Samsurijan, M S and Thwala, W D (2025) Developing a framework for mitigating pilfering: a case study of selected Nigeria's construction sites via soft system methodology. International Journal of Construction Management, 25(6), pp. 672-681. ISSN 1562-3599

Ebekozien, A; Aigbavboa, C O; Aliu, J and Thwala, W D (2024) Generic skills of future built environment practitioners in South Africa: Unexplored mechanism via students' perception. Journal of Engineering, Design and Technology, 22(2), pp. 561-577. ISSN 1726-0531

Ebekozien, A; Aigbavboa, C O; Samsurijan, M S; Muhammad, A K and Akinradewo, O (2024) Developing a framework for housing financing: A case study of nigeria's sustainable low-cost housing via soft system methodology. Engineering, Construction and Architectural Management, 32(13), pp. 27-48. ISSN 0969-9988

Ebekozien, A; Samsurijan, M S; Aigbavboa, C and Awo-Osagie, A I (2024) Developing a framework for building maintenance: A case study of Malaysia's low-cost housing via soft system methodology. International Journal of Building Pathology and Adaptation, 42(5), pp. 1041-1057. ISSN 2398-4708

Eberhardt, L C M; Birgisdóttir, H and Birkved, M (2019) Life cycle assessment of a Danish office building designed for disassembly. Building Research & Information, 47(6), pp. 666-680. ISSN 0961-3218

Eccles, T and Pointing, J (2013) Smart regulation, shifting architectures and changes in governance. International Journal of Law in the Built Environment, 5(1), pp. 71-88. ISSN 17561469

Echeverria-Valiente, E; Garcia-Alvarado, R; Celis-D’Amico, F and Saelzer-Fuica, G (2019) Integrated design experiences for energy-efficient housing in Chile. Construction Innovation, 19(2), pp. 236-255. ISSN 1471-4175

Edirisinghe, R and Lingard, H (2016) Exploring the potential for the use of video to communicate safety information to construction workers: Case studies of organizational use. Construction Management and Economics, 34(6), pp. 366-376. ISSN 0144-6193

Edirisinghe, R; Lingard, H and Broadhurst, D (2015) Exploring the potential for using video to communicate safety information to construction workers: Case studies of organisational use. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Edirisinghe, R; Stranieri, A and Blismas, N (2016) Information visualisation for the wicked problem of safe construction design. Architectural Engineering and Design Management, 12(4), pp. 296-310. ISSN 1745-2007

Edirisinghe, V R D (2023) Framework for improved alternatives dispute resolution practice in the Sri Lankan constructions industry. PhD thesis, Liverpool John Moores University, UK.

Edkins, Andrew J D (1998) Managing the design process in construction: a cognitive approach. PhD thesis, University College London, UK.

Edouard, M B; Camille, J; Vincent, B and Améziane, A (2025) Design for mixed model final assembly line (dfmmfal): A new tool for assembly interface identification based on assembly process planning. Journal of Engineering, Design and Technology, 23(1), pp. 143-160. ISSN 1726-0531

Edum-Fotwe, F T (1995) A framework for improving the strategic management of construction contractors. PhD thesis, Loughborough University, UK.

Edwards, D; Parn, E A; Sing, M C P and Thwala, W D (2019) Risk of excavators overturning: Determining horizontal centrifugal force when slewing freely suspended loads. Engineering, Construction and Architectural Management, 26(3), pp. 479-498. ISSN 0969-9988

Edwards, D J and Holt, G D (2008) Health and safety issues relating to construction excavators and their attachments. Engineering, Construction and Architectural Management, 15(4), pp. 321-335. ISSN 0969-9988

Edwards, D J and Holt, G D (2008) Protecting capital investment in plant and equipment: Case study observations of post-theft recovery. Journal of Financial Management of Property and Construction, 13(2), pp. 96-110. ISSN 1366-4387

Edwards, D J and Holt, G D (2010) The case for "3D triangulation" when applied to construction management research. Construction Innovation, 10(1), pp. 25-41. ISSN 1471-4175

Edwards, D J and Holt, G D (2014) Antecedents of health and safety issues relating to plant trailer wheels. Journal of Construction Engineering and Management, 140(7): 04014027, ISSN 0733-9364

Edwards, D J; Martek, I; Ejohwomu, O; Aigbavboa, C and Hosseini, M R (2021) Hand-arm vibration management: An operational health and safety strategy framework. International Journal of Building Pathology and Adaptation, 39(5), pp. 811-830. ISSN 23984708

Edwards, P J and Bowen, P A (1998) Risk and risk management in construction: towards more appropriate research techniques. Journal of Construction Procurement, 4(2), pp. 103-115. ISSN 1358-9180

Efebeli, T V (2021) Strategies for reducing project cost overruns in the oil and gas construction industry. PhD thesis, Walden University, USA.

Egan, T P (1993) Home restoration cooperative: A case study of a small construction craft skill worker participative cooperative. PhD thesis, University of Kentucky, USA.

Egbelakin, T; Wilkinson, S; Potangaroa, R and Ingham, J (2011) Enhancing seismic risk mitigation decisions: A motivational approach. Construction Management and Economics, 29(10), pp. 1003-1016. ISSN 01446193

Egbelakin, T K and Wilkinson, S (2010) Sociological and behavioural impediments to earthquake hazard mitigation. International Journal of Disaster Resilience in the Built Environment, 1(3), pp. 310-321. ISSN 1759-5916

Egbelakin, T K; Wilkinson, S; Potangaroa, R and Ingham, J (2011) Challenges to successful seismic retrofit implementation: A socio-behavioural perspective. Building Research & Information, 39(3), pp. 286-300. ISSN 0961-3218

Egbele-Okoro, K U (2020) Examining health and safety through the Lean thinking lens: the case of the Nigerian construction industry. PhD thesis, University of Huddersfield, UK.

Egbu, C O (1999) Mechanisms for exploiting construction innovations to gain competitive advantage. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Egbu, C O; Gaskell, C and Howes, J (2001) The role of organizational culture and motivation in the effective utilization of information technology for teamworking in construction. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Egbu, C O; Henry, J; Kaye, G R; Quintas, P; Schumacher, T R and Young, B A (1998) Managing organizational innovations in construction. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Egbu, C O; Young, B A and Torrance, V B (1998) Planning and control processes and techniques for refurbishment management. Construction Management and Economics, 16(3), pp. 315-325. ISSN 01446193

Egger, C S (2015) Sewer rehabilitation planning under uncertainty. PhD thesis, ETH Zürich, Switzerland.

Ehsani Far, H; Nayyeri Fallah, S and Khalili, A (2024) Relationship between physical environment and neuropsychological perception in children with asperger's disorder. International Journal of Building Pathology and Adaptation, 42(6), pp. 1282-1303. ISSN 2398-4708

Ehsanifar, M and Hemesy, M (2021) A new hybrid multi-criteria decision-making model to prioritize risks in the construction process under fuzzy environment (case study: The Valiasr Street Underpass Project). International Journal of Construction Management, 21(5), pp. 508-523. ISSN 1562-3599

Ehwi, R J; Oti-Sarpong, K; Shojaei, R and Burgess, G (2022) Offsite manufacturing research: A systematic review of methodologies used. Construction Management and Economics, 40(1), pp. 1-24. ISSN 01446193

Eid, M E M (2004) Rethinking relationships in the construction industry: integrating sustainable development into project management processes. PhD thesis, University of Edinburgh, UK.

Eid, M S; Elbeltagi, E E and El-Adaway, I H (2021) Simultaneous multi-criteria optimization for scheduling linear infrastructure projects. International Journal of Construction Management, 21(1), pp. 41-55. ISSN 1562-3599

Eikelenboom, M; van Uden, M; Coenen, T B J and Vosman, L (2025) Strategic programmes for circular construction: Lessons from three public clients. Construction Management and Economics, 43(11), pp. 901-921. ISSN 0144-6193

Eilers, H I (2015) Impact of sustainable business practices on strategic performance for commercial building contractors. PhD thesis, University of Kansas, USA.

Eiris, R; Jain, E; Gheisari, M and Wehle, A (2021) Online hazard recognition training: Comparative case study of static images, cinemagraphs, and videos. Journal of Construction Engineering and Management, 147(8): 04021082, ISSN 0733-9364

Ekanayake, B J; Ysandanayake, Y and Ramachandra, T (2018) Application of value management to refurbishment projects: A Sri Lankan case study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Ekanayake, E M A C; Shen, G Q P; Kumaraswamy, M M; Owusu, E K and Saka, A B (2021) Modeling supply chain resilience in industrialized construction: A Hong Kong case. Journal of Construction Engineering and Management, 147(11): 05021009, ISSN 0733-9364

Ekanayake, L L (2006) Interface conflicts and regulatory decision making process on power projects in Sri Lanka. PhD thesis, National University of Singapore, Singapore.

Ekeskär, A; Havenvid, M I and Gustavsson, T K (2019) Horizontal inter-organizational collaboration: The case of third-party logistics. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Ekeskär, A; Havenvid, M I; Karrbom Gustavsson, T and Eriksson, P E (2022) Construction logistics in a multi-project context: Coopetition among main contractors and the role of third-party logistics providers. Construction Management and Economics, 40(1), pp. 25-40. ISSN 01446193

Ekeskär, A and Rudberg, M (2016) Third-party logistics in construction: The case of a large hospital project. Construction Management and Economics, 34(3), pp. 174-191. ISSN 01446193

Eksteen, B and Bate, G (2002) The effects of construction on the environment: A case study. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Ekström, M A and Björnsson, H C (2005) Valuing flexibility in architecture, engineering, and construction information technology investments. Journal of Construction Engineering and Management, 131(4), pp. 431-438. ISSN 0733-9364

Ekundayo, D; Babatunde, S O; Ekundayo, A; Perera, S and Udeaja, C (2019) Life cycle carbon emissions and comparative evaluation of selected open source UK embodied carbon counting tools. Construction Economics and Building, 19(2), pp. 220-242. ISSN 2204-9029

El Asmar, M; Hanna, A S and Chang, C K (2009) Monte Carlo simulation approach to support alliance team selection. Journal of Construction Engineering and Management, 135(10), pp. 1087-1095. ISSN 0733-9364

El Ghazali, Y (2013) Implications of RFID in a supply chain: Process, knowledge management and performance. PhD thesis, Ecole Polytechnique, Montreal, Canada.

El Meouche, R; Abunemeh, M; Hijaze, I; Mebarki, A and Shahrour, I (2018) Developing optimal paths for evacuating risky construction sites. Journal of Construction Engineering and Management, 144(2): 04017099, ISSN 0733-9364

El Samaty, H S (2025) Readiness of urban design projects for integration with big data. Case study: Humanizing neighborhoods initiative–KSA. Smart and Sustainable Built Environment, 14(4), pp. 943-959. ISSN 2046-6099

El Samaty, H S (2025) Readiness of urban design projects for integration with big data. Case study: Humanizing neighborhoods initiative—KSA. Smart and Sustainable Built Environment, 14(4), pp. 943-959. ISSN 2046-6099

El Sawalhi, N I and Yazgi, A N (2021) House of quality: A method to identify landscape design requirements. Construction Innovation, 21(3), pp. 441-455. ISSN 1471-4175

El Sawalhi, N I H (2007) Developing a model for construction contractors pre-qualification in the Gaza Strip and West Bank. PhD thesis, University of Salford, UK.

El Sayed, A Y; Darwish, M and Nassar, K (2021) Design and constructability of novel extendable arched steel truss falsework. Journal of Construction Engineering and Management, 147(3): 04020187, ISSN 0733-9364

El Tayeh, A (2008) Social web-based systems for supporting geographically dispersed project teams in the architecture-engineering-construction industry. PhD thesis, University of Manchester, UK.

El Wazan, J P and Edirisinghe, R (2024) Measuring agricultural loss and the impact of differing dwelling types: a case study in Melbourne. Smart and Sustainable Built Environment, 13(5), pp. 1155-1176. ISSN 2046-6099

El-Diraby, T A and Gill, S M (2006) A taxonomy for construction terms in privatized-infrastructure finance: Supporting semantic exchange of project risk information. Construction Management and Economics, 24(3), pp. 271-285. ISSN 01446193

El-Gafy, M; Abdelhamid, T and Abdelrazig, Y (2010) Environmental impact analysis using hybrid decision support framework: A transportation project case study. International Journal of Construction Education and Research, 6(3), pp. 219-237. ISSN 1557-8771

El-Hasia, A M (2005) The effects of state's construction procurement policy implementation on the outcome of local construction projects: the Libyan case. PhD thesis, University of Salford, UK.

El-Kholy, A M (2022) A new technique for subcontractor selection by adopting choosing by advantages. International Journal of Construction Management, 22(7), pp. 1171-1193. ISSN 1562-3599

El-Rasas, T and Marzouk, M (2020) Fuzzy model for assessing delays in Egyptian residential projects. Journal of Financial Management of Property and Construction, 25(2), pp. 225-246. ISSN 1366-4387

El-Razek, M E A; Bassioni, H and El-Salam, W A (2007) Investigation into the causes of claims in Egyptian building construction. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

El-Sabek, L M (2017) Framework for managing integration challenges of production planning and control in international construction mega-projects. PhD thesis, University of Toronto, Canada.

El-Saboni, M A (2011) Interaction between electronic communication and perceived success in UAE construction projects. PhD thesis, University of Salford, UK.

El-Sawalhi, N; Eaton, D and Rustom, R (2008) Forecasting contractor performance using a neural network and genetic algorithm in a pre-qualification model. Construction Innovation, 8(4), pp. 280-298. ISSN 1471-4175

El-Sayegh, S M (2009) Multi-criteria decision support model for selecting the appropriate construction management at risk firm. Construction Management and Economics, 27(4), pp. 385-398. ISSN 1466433X

El-Sheikh, A and Pryke, S D (2010) Network gaps and project success. Construction Management and Economics, 28(12), pp. 1205-1217. ISSN 1466433X

El-Tayeh, A and Gil, N (2007) Using digital socialization to support geographically dispersed AEC project teams. Journal of Construction Engineering and Management, 133(6), pp. 462-473. ISSN 0733-9364

ElAlem, M A; Mahdi, I M; Mohamadien, H A and Hosny, S (2025) Forecasting scope creep in Egyptian construction projects: An evaluation using artificial neural network (ANN) and random forest models. International Journal of Construction Management, 25(16), pp. 2082-2101. ISSN 1562-3599

ElMenshawy, M and Marzouk, M (2021) Automated BIM schedule generation approach for solving time–cost trade-off problems. Engineering, Construction and Architectural Management, 28(10), pp. 3346-3367. ISSN 0969-9988

ElZomor, M A (2017) Development of the project definition rating index (PDRI) for small infrastructure projects. PhD thesis, Arizona State University, USA.

Elbarkouky, M M G (2010) A fuzzy consensus building framework for early alignment of construction project teams on the extent of their roles and responsibilities. PhD thesis, University of Alberta, Canada.

Elbehairy, H (2007) Bridge management system with integrated life cycle cost optimization. PhD thesis, University of Waterloo, Canada.

Elbeltagi, E; Ammar, M; Sanad, H and Kassab, M (2016) Overall multiobjective optimization of construction projects scheduling using particle swarm. Engineering, Construction and Architectural Management, 23(3), pp. 265-282. ISSN 0969-9988

Elbeltagi, E; Hegazy, T and Eldosouky, A (2004) Dynamic layout of construction temporary facilities considering safety. Journal of Construction Engineering and Management, 130(4), pp. 534-541. ISSN 0733-9364

Elbeltagi, E; Hegazy, T; Hosny, A H and Eldosouky, A (2001) Schedule-dependent evolution of site layout planning. Construction Management and Economics, 19(7), pp. 689-697. ISSN 01446193

Eldin, N N (1988) Constructability improvement of project designs. Journal of Construction Engineering and Management, 114(4), pp. 631-640. ISSN 0733-9364

Eldin, N N (1991) Management of engineering/design phase. Journal of Construction Engineering and Management, 117(1), pp. 163-175. ISSN 0733-9364

Eldin, N N (1999) Impact of employee, management, and process issues on constructability implementation. Construction Management and Economics, 17(6), pp. 711-720. ISSN 01446193

Eldin, N N and Egger, S (1990) Productivity improvement tool: Camcorders. Journal of Construction Engineering and Management, 116(1), pp. 100-111. ISSN 0733-9364

Elf, M L (2007) Modelling of care processes: The use of simulation models for the design of health care environments. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Elgendi, E M O (2016) An automated dynamic site layout planning system: a case study of Egypt. PhD thesis, University of Salford, UK.

Elghaish, F and Abrishami, S (2020) Developing a framework to revolutionise the 4D BIM process: IPD-based solution. Construction Innovation, 20(3), pp. 401-420. ISSN 1471-4175

Elghaish, F and Abrishami, S (2021) A centralised cost management system: Exploiting EVM and abc within IPD. Engineering, Construction and Architectural Management, 28(2), pp. 549-569. ISSN 0969-9988

Elghaish, F; Abrishami, S; Abu Samra, S; Gaterell, M; Hosseini, M R and Wise, R (2021) Cash flow system development framework within integrated project delivery (IPD) using BIM tools. International Journal of Construction Management, 21(6), pp. 555-570. ISSN 1562-3599

Elghaish, F A K (2020) An automated IPD cost management system: BIM and blockchain based solution. PhD thesis, University of Portsmouth, UK.

Elgrari, O (2011) The role of technology transfer in improving manpower capability in private house building companies in Libya. PhD thesis, University of Salford, UK.

Elgrari, O and Ingirige, B (2011) Privatisation and manpower capability development: Cases from the Libyan house building sector. Engineering, Construction and Architectural Management, 18(5), pp. 497-515. ISSN 0969-9988

Eliufoo, H K (2005) Knowledge creation and transfer in construction organisations in Tanzania. PhD thesis, KTH Royal Institute of Technology, Sweden.

Elkadi, Karim (2024) BIM-enabled facility management framework and simulation. PhD thesis, George Mason University, USA.

Elkahlout, G; Milton, S and Hawa, R (2025) Mud brick houses as a suitable alternative to emergency shelters for internally displaced persons (idps): Evidence from Northern Syria. International Journal of Disaster Resilience in the Built Environment, 16(2), pp. 289-305. ISSN 1759-5908

Elkhayat, Y.; Moran, P.; Barrett, S.; Barry, P. and Goggins, J. (2026) Developing a methodology with a tool for calculating and reducing the upfront carbon emissions of buildings: Ireland as a case study. Architectural Engineering and Design Management, 22(1), pp. 168-187. ISSN 1745-2007

Elkhidir, E; Mannakkara, S and Wilkinson, S (2020) Criteria for selecting partner cities in a national-level resilience network. International Journal of Disaster Resilience in the Built Environment, 12(4), pp. 443-454. ISSN 1759-5916

Elkholosy, H; Ead, R; Hammad, A and AbouRizk, S (2024) Data mining for forecasting labor resource requirements: A case study of project management staffing requirements. International Journal of Construction Management, 24(5), pp. 561-572. ISSN 1562-3599

Elliott, M E and Heymsfield, E (2003) Inspection of luling bridge cable stays: Case study. Journal of Construction Engineering and Management, 129(2), pp. 226-230. ISSN 0733-9364

Ellis, R A (1980) An analysis of the impact of public participation activities in water and transportation projects. PhD thesis, Ohio State University, USA.

Ellis, R C T (2001) Lessons in project management. PhD thesis, Loughborough University, UK.

Ellis Jr, R D and Lee, S H (2006) Measuring project level productivity on transportation projects. Journal of Construction Engineering and Management, 132(3), pp. 314-320. ISSN 0733-9364

Elmahroug, M H M (2018) Facilitating effective external stakeholder involvement in the pre-design phase of civil engineering infrastructure projects. PhD thesis, University of Leeds, UK.

Elmasoudi, I; Ibrahim, M G; Tokimatsu, K and Elbeltagi, E (2022) Environmental impact assessment model for buildings' construction activities. International Journal of Construction Management, 22(5), pp. 849-860. ISSN 1562-3599

Elmasry, M; Zayed, T and Hawari, A (2019) Multi-objective optimization model for inspection scheduling of sewer pipelines. Journal of Construction Engineering and Management, 145(2): 04018129, ISSN 0733-9364

Elmousalami, H H (2020) Artificial intelligence and parametric construction cost estimate modeling: State-of-the-art review. Journal of Construction Engineering and Management, 146(1): 03119008, ISSN 0733-9364

Elmualim, A A and Govender, K (2008) Communities of practice in UK large contracting firms: Contrasting application and non-utilized merits. Architectural Engineering and Design Management, 4(3-4), pp. 149-159. ISSN 1745-2007

Elnaas H, A P G K (2013) A decision evaluation model to choose between manufacturing off-site or on-site methods for construction of house building projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Elsayah, O S (2016) A framework for improvement of contractor selection procedures on major construction project in Libya. PhD thesis, Edinburgh Napier University, UK.

Elsayed, M; Romagnoni, P; Pelsmakers, S; Castaño-Rosa, R and Klammsteiner, U (2023) The actual performance of retrofitted residential apartments: Post-occupancy evaluation study in Italy. Building Research & Information, 51(4), pp. 411-429. ISSN 0961-3218

Elsayed, M A A; Lastovets, N; Pistore, L and Pelsmakers, S (2024) Summer-time performance of Finnish housing: Poe of five apartments. International Journal of Building Pathology and Adaptation, 43(8), pp. 1-25. ISSN 2398-4708

Elshaboury, N; Attia, T and Marzouk, M (2020) Application of evolutionary optimization algorithms for rehabilitation of water distribution networks. Journal of Construction Engineering and Management, 146(7): 04020069, ISSN 0733-9364

Elshaboury, N and Marzouk, M (2021) Optimizing construction and demolition waste transportation for sustainable construction projects. Engineering, Construction and Architectural Management, 28(9), pp. 2411-2425. ISSN 0969-9988

Elsherbiny, A (2021) Prediction of design error rework cost in EPC industrial projects. DEng thesis, George Washington University, USA.

Elvin, G A (1998) A process model for integrated design and construction. PhD thesis, University of California, Berkeley, USA.

Elyamany, A; Basha, I and Zayed, T (2007) Performance evaluating model for construction companies: Egyptian case study. Journal of Construction Engineering and Management, 133(8), pp. 574-581. ISSN 0733-9364

Embi, M R (1997) An intelligent assistant for designing to fire regulations in Malaysia. PhD thesis, University of Sheffield, UK.

Emetere, M E (2019) A modified approach to estimating thermodynamic impact on buildings: A case study of poor urban setting in Lagos state. Journal of Engineering, Design and Technology, 17(1), pp. 115-135. ISSN 1726-0531

Emhemed, A E (2005) Comprehensive approach to housing legislation: with reference to housing in Libya. PhD thesis, Heriot-Watt University, UK.

Emmitt, S (1997) The diffusion of innovations in the building industry. PhD thesis, University of Manchester, UK.

Emmitt, S (2006) Investigating the synergy between teaching and research in a teaching-led university: The case of an architectural technology undergraduate programme. Architectural Engineering and Design Management, 2(1-2), pp. 61-72. ISSN 1745-2007

Emmitt, S; Christoffersen, A K and Sander, D (2004) Design management: A value based approach. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Emsley, M (2005) A benefits analysis of partnering: A case study of a community primary school. Journal of Financial Management of Property and Construction, 10(1), pp. 69-79. ISSN 1366-4387

Emuze, F (2020) Factors causing fatigue and safety-related errors on construction sites in bloemfontein. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Emuze, F (2023) An illustrative case study of workaround and its effects on construction site safety in South Africa. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Emuze, F; Linake, M and Seboka, L (2016) Construction work and the housekeeping challenge in Lesotho. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Emuze, F and Mollo, L (2019) Disrespecting people with working conditions in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(3), pp. 112-117. ISSN 17514304

Emuze, F and Ravu, P (2014) Optimism bias, pathogens and cost overrun: The case of an RTS project in South Africa. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Emuze F, S J (2013) How can supply chain management proliferate in South African construction? In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Enache-Pommer, E (2010) A synergistic approach to green building delivery, lean principles and building information modeling in the design of healthcare facilities. PhD thesis, Pennsylvania State University, USA.

Ene, G U (2017) A learning 'learning' model for optimised construction workforce development. PhD thesis, University of Central Lancashire, UK.

English, J and Hay, P (2015) Black South African women in construction: Cues for success. Journal of Engineering, Design and Technology, 13(1), pp. 144-164.

Enshassi, A; Al-Swaity, E; Abdul Aziz, A R and Choudhry, R (2018) Coping behaviors to deal with stress and stressor consequences among construction professionals: A case study at the Gaza Strip, Palestine. Journal of Financial Management of Property and Construction, 23(1), pp. 40-56. ISSN 1366-4387

Enshassi, M S A; Walbridge, S; West, J S and Haas, C T (2020) Dynamic and proactive risk-based methodology for managing excessive geometric variability issues in modular construction projects using Bayesian theory. Journal of Construction Engineering and Management, 146(2): 04019096, ISSN 0733-9364

Entner, D; Prante, T; Vosgien, T; Zăvoianu, A C; Saminger-Platz, S; Schwarz, M and Fink, K (2019) Potential identification and industrial evaluation of an integrated design automation workflow. Journal of Engineering, Design and Technology, 17(6), pp. 1085-1109. ISSN 1726-0531

Eom, C S J and Paek, J H (2009) Risk index model for minimizing environmental disputes in construction. Journal of Construction Engineering and Management, 135(1), pp. 34-41. ISSN 0733-9364

Eom, C S J; Yun, S H and Paek, J H (2008) Subcontractor evaluation and management framework for strategic partnering. Journal of Construction Engineering and Management, 134(11), pp. 842-851. ISSN 0733-9364

Erbatur, O C (2012) A methodology for estimating construction unit bid prices. DEng thesis, Texas A&M University, USA.

Erdogan, B (2008) Organisational change management for the implementation of collaboration environments. PhD thesis, Loughborough University, UK.

Ereiba, Y H; Glass, J and Thorpe, T (2004) Tby using focus groups in construction management research. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Ergen, E (2005) Formalization of life-cycle data management of engineered-to-order components using advanced tracking technologies. PhD thesis, Carnegie Mellon University, USA.

Ergen, E and Akinci, B (2008) Formalization of the flow of component-related information in precast concrete supply chains. Journal of Construction Engineering and Management, 134(2), pp. 112-121. ISSN 0733-9364

Eriksson, P; Milić, V and Brostrom, T (2020) Balancing preservation and energy efficiency in building stocks. International Journal of Building Pathology and Adaptation, 38(2), pp. 356-373. ISSN 23984708

Eriksson, P E (2010) Partnering: What is it, when should it be used, and how should it be implemented? Construction Management and Economics, 28(9), pp. 905-917. ISSN 1466433X

Eriksson, P E; Atkin, B and Nilsson, T (2009) Overcoming barriers to partnering through cooperative procurement procedures. Engineering, Construction and Architectural Management, 16(6), pp. 598-611. ISSN 0969-9988

Eriksson, P E; Olander, S; Szentes, H and Widén, K (2014) Managing short-term efficiency and long-term development through industrialized construction. Construction Management and Economics, 32(1-2), pp. 97-108. ISSN 01446193

Eriksson, P E; Volker, L; Kadefors, A; Lingegård, S; Larsson, J and Rosander, L (2019) Collaborative procurement strategies for infrastructure projects: A multiple-case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(5), pp. 197-205. ISSN 17514304

Eriksson, T (2015) Developing routines in large inter-organisational projects: A case study of an infrastructure megaproject. Construction Economics and Building, 15(3), pp. 4-18. ISSN 2204-9029

Eriksson, T and Kadefors, A (2012) Trust, control and knowledge integration in a rock tunnel project. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Ernest, K; Theophilus, A K; Amoah, P and Emmanuel, B B (2019) Identifying key economic indicators influencing tender price index prediction in the building industry: A case study of Ghana. International Journal of Construction Management, 19(2), pp. 106-112. ISSN 1562-3599

Ernzen, J J and Schexnayder, C (2000) One company's experience with design/build: Labor cost risk and profit potential. Journal of Construction Engineering and Management, 126(1), pp. 10-14. ISSN 0733-9364

Erol, H H (2020) Incorporating complexity into risk management:An integrated risk assessment process for mega construction projects. PhD thesis, Middle East Technical University, Turkey.

Ershadi, M; Davis, P and Newaz, M T (2021) Important academic interventions for promoting resilience: The perception of construction management undergraduates. Construction Management and Economics, 39(4), pp. 340-355. ISSN 01446193

Erten, S (2008) Spatial analysis of mega-event hosting: Olympic host and Olympic bid cities. PhD thesis, Middle East Technical University, Turkey.

Esezobor, E L (2016) Sustainability and construction: a study of the transition to sustainable construction practices in Nigeria. PhD thesis, Birmingham City University, UK.

Esguicero, Fabio Jose (2020) Framework applied to process modeling in municipal management of construction waste. PhD thesis, Universidade Estadual Paulista Júlio de Mesquita Filho, Brazil.

Esmaeeli, A N and Heravi, G (2019) Real options approach versus conventional approaches to valuing highway projects under uncertainty. Journal of Construction Engineering and Management, 145(11): 04019068, ISSN 0733-9364

Esmaeili, I; Poças Martins, J and Castro, J M (2026) Computer vision-based CAD to BIM design change management: Case of building's lightings. International Journal of Construction Management, 26(2), pp. 234-255. ISSN 1562-3599

Esmaeili, B and Hallowell, M (2013) Integration of safety risk data with highway construction schedules. Construction Management and Economics, 31(6), pp. 528-541. ISSN 1466433X

Espinoza, D; Rojo, J; Cifuentes, A and Morris, J (2020) DNPV: A valuation methodology for infrastructure and capital investments consistent with prospect theory. Construction Management and Economics, 38(3), pp. 259-274. ISSN 01446193

Eufrasio Espinosa, R M (2015) A visio-spatial life cycle energy model of building materials within a bioregional context: Mapping the embodied energy of fired clay bricks in Cuitzeo, Mexico. PhD thesis, University of Sheffield, UK.

Evans, M (2013) An investigation into occupants' satisfaction in UK sustainable social housing. PhD thesis, University of the West of England, Bristol, UK.

Evans, R C and Kaka, A P (1998) Analysis of the accuracy of standard/average value curves using food retail building projects as case studies. Engineering, Construction and Architectural Management, 5(1), pp. 58-67. ISSN 0969-9988

Evdorides, H and Shoji, M (2013) Public-private partnerships for road infrastructure services in Zambia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(6), pp. 277-286. ISSN 17514312

Evia, C (2011) Localizing and designing computer-based safety training solutions for Hispanic construction workers. Journal of Construction Engineering and Management, 137(6), pp. 452-459. ISSN 0733-9364

Eweda, A; Al-Sakkaf, A; Zayed, T and Alkass, S (2023) Condition assessment model of building indoor environment: A case study on educational buildings. International Journal of Building Pathology and Adaptation, 41(4), pp. 767-788. ISSN 23984708

Eyiah, A K and Cook, P (2003) Financing small and medium-scale contractors in developing countries: A Ghana case study. Construction Management and Economics, 21(4), pp. 357-367. ISSN 01446193

Ezcan, V; Goulding, J S and Arif, M (2020) Redefining ICT embeddedness in the construction industry: Maximizing technology diffusion capabilities to support agility. Building Research & Information, 48(8), pp. 922-944. ISSN 0961-3218

Ezeldin, A S and Soliman, A (2009) Hybrid time-cost optimization of nonserial repetitive construction projects. Journal of Construction Engineering and Management, 135(1), pp. 42-55. ISSN 0733-9364

Ezzeddine, A; Shehab, L; Srour, I; Power, W; Zankoul, E and Freiha, E (2023) Ccc_implementing the construction control room on a fast-paced project: The case study of the beirut port explosion. International Journal of Construction Management, 23(5), pp. 745-755. ISSN 1562-3599

Fadiya, O; Georgakis, P; Chinyio, E and Nwagboso, C (2010) Development of an ICT-based logistics framework for the construction industry. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Fadoul, A (2020) A BIM-based model for constructability assessment of buildings design. PhD thesis, University of Nottingham, UK.

Fageha, Mohammed Kamal (2014) Managing stakeholders' participation to improve project scope definition completeness and enhance project outcome. PhD thesis, University of Melbourne, Australia.

Faheem Haider, M.; Aslam, M.; Khan, R. W. A. and Malik, M. S. A. (2026) Exploring the factors to improve complaint management system in building management through a case study. International Journal of Construction Management, 26(9), pp. 1777-1798. ISSN 1562-3599

Fahid, S (2007) An investigation of the effectiveness of total quality management in the UK construction industry: An empirical study. PhD thesis, Heriot-Watt University, UK.

Fahkhri, H (2015) Public Participation in NHS Construction Projects. Unpublished PhD thesis, University of Reading, UK.

Fahmy, A (2014) A dynamic scheduling model for construction enterprises. PhD thesis, Loughborough University, UK.

Fahmy, A; Hassan, T; Bassioni, H and McCaffer, R (2020) Dynamic scheduling model for the construction industry. Built Environment Project and Asset Management, 10(3), pp. 313-330. ISSN 2044-124X

Fahmy, T (2015) Sustainability assessment of a municipal utility complex: A system of systems approach. PhD thesis, University of Central Florida, USA.

Faisol, N (2010) An investigation of relational contracting norms in construction projects in Malaysia. PhD thesis, Loughborough University, UK.

Faisol, N; Dainty, A R J and Price, A D F (2006) Perceptions of construction organisations on developing successful inter-organisational relationships. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Faith-Ell, C (2005) The application of environmental requirements in procurement of road maintenance in Sweden. PhD thesis, KTH Royal Institute of Technology, Sweden.

Fakilede, J (2020) Strategies utility business organizations use to deliver construction projects on-budget and on-schedule. PhD thesis, Walden University, USA.

Fang, C Y (2015) Mapping innovation in the construction sector: A study of national firms in Malaysia. PhD thesis, University of Malaya, Malaysia.

Fang, D; Chen, Y and Wong, L (2006) Safety climate in construction industry: A case study in Hong Kong. Journal of Construction Engineering and Management, 132(6), pp. 573-584. ISSN 0733-9364

Fang, D; Li, M; Fong, P S W and Shen, L (2004) Risks in Chinese construction market: contractors' perspective. Journal of Construction Engineering and Management, 130(6), pp. 853-861. ISSN 0733-9364

Fang, Y; Cho, Y K; Zhang, S and Perez, E (2016) Case study of BIM and cloud-enabled real-time RFID indoor localization for construction management applications. Journal of Construction Engineering and Management, 142(7): 5016003, ISSN 0733-9364

Fang, Z (2022) Machine learning integrated portfolio-based strategic building asset management. PhD thesis, University College London, UK.

Faqih, F; Zayed, T and Alfalah, G (2022) Technology-based multi-tiered building diagnosis framework. International Journal of Building Pathology and Adaptation, 40(1), pp. 101-133. ISSN 23984708

Farag, F (2018) Understanding social value creation in public construction projects using systems thinking. PhD thesis, University of Salford, UK.

Farajmandi, M; Ali, M; Hermann, R and AbouRizk, S (2020) A decision support tool for planning module installation in industrial construction. Engineering, Construction and Architectural Management, 27(9), pp. 2615-2641. ISSN 0969-9988

Fardhosseini, M S (2021) A quantitative analysis of the impact of integrating digital technology for formwork fabrication on human factors perspectives. PhD thesis, University of Washington, USA.

Fares, A; Elazouni, A and Al-Alawi, M (2025) Using game theory to negotiate win-win payment terms between contractors and subcontractors. Journal of Construction Engineering and Management, 151(5): 04025023, ISSN 0733-9364

Farghaly, K (2020) Building information modelling and asset management: Semantic and syntactic interoperability. PhD thesis, Oxford Brookes University, UK.

Faris, H M A (2020) Improving project collaboration to minimise the energy performance gap in residential construction: case study of Kurdistan. PhD thesis, University of Portsmouth, UK.

Farnsworth, C B; South, A J; Barrett-Rodriguez, T J; Wells, M B; Smith, J P and Bingham, E D (2025) Assessing the effects of hurricanes irma and maria on the commercial and civil construction industry in Puerto Rico. International Journal of Construction Education and Research, 21(4), pp. 461-481. ISSN 1557-8771

Farran, M and Zayed, T (2012) New life-cycle costing approach for infrastructure rehabilitation. Engineering, Construction and Architectural Management, 19(1), pp. 40-60. ISSN 0969-9988

Farrell, L M (2001) Financial agency issues in mortgage underwriting and real estate valuation. Journal of Financial Management of Property and Construction, 6(2), pp. 119-137. ISSN 1366-4387

Farrokhshad, M (2021) How practitioners make sense of risk and uncertainty: A Goffmanian study of two case studies of construction companies in the United Kingdom. PhD thesis, University of Manchester, UK.

Faruqi, S and Smith, N J (1997) Karachi light rail transit: A private finance proposal. Engineering, Construction and Architectural Management, 4(3), pp. 233-246. ISSN 0969-9988

Farzaneh, A (2019) Development of BIM-BEM framework to support the design process. DEng thesis, Ecole de Technologie Superieure, Canada.

Farzin, A; Ghazi, M; Sotoodeh, A F and Nikian, M (2021) Economic optimization of heat exchanger networks based on geometric parameters using hybrid genetic-particle swarm algorithm technique. Journal of Engineering, Design and Technology, 19(4), pp. 989-1015. ISSN 1726-0531

Fasna, M F F and Gunatilake, S (2020) Roles and functions of stakeholders in implementing energy retrofits in the hotel sector. International Journal of Building Pathology and Adaptation, 38(5), pp. 737-751. ISSN 23984708

Fasna, M F F and Gunatilake, S (2020) Overcoming barriers for building energy efficiency retrofits: Insights from hotel retrofits in Sri Lanka. Built Environment Project and Asset Management, 10(2), pp. 277-295. ISSN 2044-124X

Fath-Kolmes, E. M. and Long, T. B. (2026) Dynamic capabilities for sustainability and performance maturity levels: Evidence from the construction industry. Construction Management and Economics, 44(6), pp. 430-452. ISSN 0144-6193

Fatima, Zahra (2024) Pakistan's international investment policy: Towards a new generation of fair and equitable treatment provisions. PhD thesis, Canterbury Christ Church University, UK.

Fattahi Tabasi, S; Rafizadeh, H R; Andaji Garmaroudi, A and Banihashemi, S (2024) Optimizing urban layouts through computational generative design: density distribution and shape optimization. Architectural Engineering and Design Management, 20(5), pp. 1164-1184. ISSN 1745-2007

Fauth, J; Pasetti Monizza, G and Malacarne, G (2023) Understanding processes on digital building permits–a case study in South tyrol. Building Research & Information, 51(5), pp. 518-532. ISSN 0961-3218

Fauzi, F Z and Kusumasari, B (2020) Public-private partnership in Western and non-Western countries: A search for relevance. Journal of Financial Management of Property and Construction, 26(1), pp. 87-102. ISSN 1366-4387

Faw, Robert (2025) Adapting leadership styles in changing environments. PhD thesis, Liberty University, USA.

Fawcett, W; Hughes, M; Krieg, H; Albrecht, S and Vennström, A (2012) Flexible strategies for long-term sustainability under uncertainty. Building Research & Information, 40(5), pp. 545-557. ISSN 0961-3218

Fay, R; Treloar, G and Iyer-Raniga, U (2000) Life-cycle energy analysis of buildings: A case study. Building Research & Information, 28(1), pp. 31-41. ISSN 0961-3218

Fay-Spina, D (2017) Exploring business planning strategies of women-owned small businesses in the construction trades. PhD thesis, Walden University, USA.

Fayazi, M (2011) Reconstruction projects by using core housing method in Iran: Case study: Gilan province experience. International Journal of Disaster Resilience in the Built Environment, 2(1), pp. 74-85. ISSN 1759-5916

Fazio, P; Théberge, P; revay, S and Moselhi, O (1988) Design impact of construction fast-track. Construction Management and Economics, 6(3), pp. 195-208. ISSN 01446193

Feige, A; Wallbaum, H and Krank, S (2011) Harnessing stakeholdermotivation: Towards a Swiss sustainable building sector. Building Research & Information, 39(5), pp. 504-517. ISSN 0961-3218

Fellows, R; Liu, A and Storey, C (2009) Values, power and performance on construction projects: A preliminary investigation. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Fenech, N (2006) Managing risks within international hotel construction projects. PhD thesis, University College London, UK.

Feng, H; Kassem, M; Greenwood, D and Doukari, O (2023) Whole building life cycle assessment at the design stage: A bim-based framework using environmental product declaration. International Journal of Building Pathology and Adaptation, 41(1), pp. 109-142. ISSN 23984708

Feng, P P-Y (2009) Causes and effects of rework on the delivery of healthcare facilities in California. PhD thesis, University of California, Berkeley, USA.

Fergusson, H and Langford, D A (2006) Strategies for managing environmental issues in construction organizations. Engineering, Construction and Architectural Management, 13(2), pp. 171-185. ISSN 0969-9988

Fernandes, A G G (2014) Improving and embedding project management practice in organisations. PhD thesis, University of Southampton, UK.

Fernandes, D A; Costa, A A and Lahdenperä, P (2018) Key features of a project alliance and their impact on the success of an apartment renovation: A case study. International Journal of Construction Management, 18(6), pp. 482-496. ISSN 1562-3599

Fernandez-Solis, J L (2013) Building construction: A deterministic non-periodic flow-a case study of chaos theories in tracking production flow. Architectural Engineering and Design Management, 9(1), pp. 21-48. ISSN 1745-2007

Fernandez-Solis, J L; Porwal, V; Lavy, S; Shafaat, A; Rybkowski, Z K; Son, K and Lagoo, N (2013) Survey of motivations, benefits, and implementation challenges of last planner system users. Journal of Construction Engineering and Management, 139(4), pp. 354-360. ISSN 0733-9364

Fernando, L. S.; Kulatunga, U.; Ranadewa, T. and Keraminiyage, K. P. (2026) Accelerating disaster recovery: An agile approach to enhancing community disaster resilience. International Journal of Disaster Resilience in the Built Environment, 17(2), pp. 181-202. ISSN 1759-5908

Fernando, N G (2011) The impact of training and development towards women's career advancement in the UK construction industry. PhD thesis, University of Salford, UK.

Fernando, N G; Amaratunga, D and Haigh, R (2014) The career advancement of the professional women in the UK construction industry: The career success factors. Journal of Engineering, Design and Technology, 12(1), pp. 53-70. ISSN 1726-0531

Fernando, S; Panuwatwanich, K and Thorpe, D (2021) Introducing an innovation promotion model for construction projects. Engineering, Construction and Architectural Management, 28(3), pp. 728-746. ISSN 0969-9988

Fernie, S (2005) Making sense of supply chain management in UK construction organisations: theory versus practice. PhD thesis, Loughborough University, UK.

Fernie, S and Thorpe, A (2007) Exploring change in construction: Supply chain management. Engineering, Construction and Architectural Management, 14(4), pp. 319-333. ISSN 0969-9988

Fernández-Pacheco Sáez, J L; Rasskin-Gutman, I; Martín-Bermúdez, N and Pérez-del-Campo, A (2026) Living knowledge labs: Creating community and inclusive nature-based solutions. Buildings & Cities, 7(1), pp. 58-74. ISSN 2632-6655

Fernández-Solís, J L; Lü, X and Ryoo, B Y (2013) Corrigendum to building construction: A deterministic non-periodic flow: a case study of chaos theories in tracking production flow (architectural engineering and design management, (2013), 9, 1 (21-48)). Architectural Engineering and Design Management, 9(2), ISSN 1745-2007

Fernández-Solís, J L; Rybkowski, Z K; Xiao, C; Lü, X and Chae, L S (2015) General contractor's project of projects: a meta-project: Understanding the new paradigm and its implications through the lens of entropy. Architectural Engineering and Design Management, 11(3), pp. 213-242. ISSN 1745-2007

Ferreira, A C F; Carmo, C S T; Cruz, A S and Faisca, R G (2025) A case study to explore the synergy between HBIM and BEM for maintenance of historical buildings. International Journal of Building Pathology and Adaptation, 43(3), pp. 302-320. ISSN 2398-4708

Few, J; Shipworth, M and Elwell, C (2024) Ventilation regulations and occupant practices: Undetectable pollution and invisible extraction. Buildings & Cities, 5(1), pp. 16-34. ISSN 2632-6655

Fialho, Beatriz Campos (2021) Design for smart maintenance enabled by BIM and IoT. PhD thesis, Universidade de São Paulo, Brazil.

Fields, S (2022) Strategies for competitive advantage in small construction businesses. PhD thesis, Walden University, USA.

Fifield, L-J (2017) Monitoring UK hospital building type performance. PhD thesis, Loughborough University, UK.

Figliola, A (2023) Digital workflow for climate resilient building façade generation. Building Research & Information, 51(3), pp. 257-278. ISSN 0961-3218

Figliola, A; Canducci, A; Calcagni, L and Battisti, A (2024) Passive strategies for climate change mitigation in architectural heritage: the case study of Santa Maria in Trastevere Basilica, Rome. Building Research & Information, 52(7), pp. 725-747. ISSN 0961-3218

Fikri Mohamed, S and Anumba, C J (2006) Potential for improving site management practices through knowledge management. Construction Innovation, 6(4), pp. 232-249. ISSN 1471-4175

Filho, A N d M; Filho, F M M; Miranda, A N d and Miranda, M I A d (2005) Improving the root pile execution process through setup time reduction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Fini, A A F; Akbarnezhad, A; Rashidi, T H and Waller, S T (2018) Dynamic programming approach toward optimization of workforce planning decisions. Journal of Construction Engineering and Management, 144(2): 04017113, ISSN 0733-9364

Finnie, D; Ali, N A and Park, K (2018) Enhancing off-site manufacturing through early contractor involvement (ECI) in New Zealand. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(4), pp. 176-185. ISSN 17514304

Fireman, M C T; Saurin, T A; Formoso, C T; Koskela, L and Tommelein, I D (2023) Slack in production planning and control: A study in the construction industry. Construction Management and Economics, 41(3), pp. 256-276. ISSN 01446193

Fischer, M A and Adams, H (2011) Engineering-based decisions in construction. Journal of Construction Engineering and Management, 137(10), pp. 751-754. ISSN 0733-9364

Fitch, G J; Odeh, I and William Ibbs, C (2015) Economic sustainability of dbo water based on wastewater projects in the U.S.: Three case studies. Journal of Construction Engineering and Management, 141(5): 05015001, ISSN 0733-9364

Fitzpatrick, T and Molloy, J (2014) The role of NGOs in building sustainable community resilience. International Journal of Disaster Resilience in the Built Environment, 5(3), pp. 292-304. ISSN 1759-5916

Fitzpatrick-Ramirez, Cameron (2014) Strategies and contradictions: Knowledge workers and the built environment. PhD thesis, University of New South Wales, Australia.

Fjeldstad, O H; Ali, M and Katera, L (2019) Policy implementation under stress: Central-local government relations in property tax administration in Tanzania. Journal of Financial Management of Property and Construction, 24(2), pp. 129-147. ISSN 1366-4387

Flanagan, R (1980) Tender price and time prediction for construction work. PhD thesis, Aston University, UK.

Flanagan, R; Kendell, A; Norman, G and Robinson, G D (1987) Life cycle costing and risk management. Construction Management and Economics, 5(4), ISSN 01446193

Fletcher, S L (2001) Developing disassembly strategies for buildings to reduce the lifetime environmental impacts by applying a systems approach. PhD thesis, University of Sheffield, UK.

Flett, P (2001) The role of quality in the management of projects. PhD thesis, University of Stirling, UK.

Flint, M M (2014) A modular framework for performance-based durability engineering. PhD thesis, Stanford University, USA.

Flood, C and Scott, L (2020) Thermal analysis and post construction verification. International Journal of Building Pathology and Adaptation, 38(1), pp. 51-67. ISSN 23984708

Florez, L; Irizarry, J; Castro-Lacouture, D; Abdollahipour, S and Jeong, H (2012) Feasibility of implementing a computer-assisted pavement rehabilitation decision support system. International Journal of Construction Education and Research, 8(4), pp. 281-300. ISSN 1557-8771

Fobiri, Godfred (2024) A framework to apply reality capture technology for interim payment valuation of construction projects. PhD thesis, University of Johannesburg, South Africa.

Foliente, G and Seo, S (2012) Modelling building stock energy use and carbon emission scenarios. Smart and Sustainable Built Environment, 1(2), pp. 118-138. ISSN 2046-6099

Fong, Patrick Sik-wah (2001) Understanding knowledge creation: A study of the processes, interrelationships and contributory factors within multidisciplinary project teams. PhD thesis, University of Warwick, UK.

Fontana, C.; Tomassoni, V.; Giuffrè, M. and Moscatelli, M. (2026) Why should we bother about urban risk reduction? ERS instrument and a methodology to assess its impact on urban functionality. International Journal of Disaster Resilience in the Built Environment, 17(2), pp. 203-220. ISSN 1759-5908

Fore, S and Mbohwa, C (2015) Greening manufacturing practices in a continuous process industry: Case study of a cement manufacturing company. Journal of Engineering, Design and Technology, 13(1), pp. 94-122.

Fore, S and Mbohwa, C T (2010) Cleaner production for environmental conscious manufacturing in the foundry industry. Journal of Engineering, Design and Technology, 8(3), pp. 314-333. ISSN 1726-0531

Forino, G; von Meding, J K and Brewer, G J (2018) Challenges and opportunities for Australian local governments in governing climate change adaptation and disaster risk reduction integration. International Journal of Disaster Resilience in the Built Environment, 9(3), pp. 258-272. ISSN 1759-5916

Forman, M (2013) Inertia and change: Lean construction and health and safety work on construction sites. Construction Management and Economics, 31(6), pp. 647-660. ISSN 1466433X

Formoso, C; Leite, F and Miron, L (2011) Client requirements management in social housing: A case study on the residential leasing program in Brazil. Journal of Construction in Developing Countries, 16(2), pp. 47-67. ISSN 1823-6499

Formoso, C T and Isatto, E L (2011) Three theoretical perspectives for understanding inter-firm coordination of construction project supply chains. Construction Economics and Building, 11(3), pp. 1-17. ISSN 2204-9029

Formoso, C T and Jobim, M S S (2006) Challenges in improving customer focus in small-sized house-building companies in Brazil. Journal of Construction in Developing Countries, 11(2), pp. 77-101. ISSN 1823-6499

Formoso, C T; Santos, A D and Powell, J A (2002) An exploratory study on the applicability of process transparency in construction sites. Journal of Construction Research, 3(1), pp. 35-54. ISSN 1609-9451

Formoso, C T; Tzortzopoulos, P and Liedtke, R (2002) A model for managing the product development process in house building. Engineering, Construction and Architectural Management, 9(5-6), pp. 419-432. ISSN 0969-9988

Forooraghi, M; Cobaleda-Cordero, A and Babapour Chafi, M (2022) A healthy office and healthy employees: A longitudinal case study with a salutogenic perspective in the context of the physical office environment. Building Research & Information, 50(1-2), pp. 134-151. ISSN 0961-3218

Forooraghi, M; Miedema, E; Ryd, N; Wallbaum, H and Babapour Chafi, M (2023) Relationship between the design characteristics of activity-based flexible offices and users' perceptions of privacy and social interactions. Building Research & Information, 51(5), pp. 588-604. ISSN 0961-3218

Foroughi Sabzevar, M; Gheisari, M and Lo, L J (2021) Improving access to design information of paper-based floor plans using augmented reality. International Journal of Construction Education and Research, 17(2), pp. 178-198. ISSN 1557-8771

Forsman, S; Björngrim, N; Bystedt, A; Laitila, L; Bomark, P and Öhman, M (2012) Need for innovation in supplying engineer-to-order joinery products to construction: A case study in Sweden. Construction Innovation, 12(4), pp. 464-491. ISSN 1471-4175

Forsythe, P (2011) Drivers of housing demolition decision making and the impact on timber waste management. Construction Economics and Building, 11(1), pp. 1-14. ISSN 2204-9029

Forsythe, P (2015) Monitoring customer perceived service quality and satisfaction during the construction process. Construction Economics and Building, 15(1), pp. 19-42. ISSN 2204-9029

Forsythe, P (2018) Extending and operationalizing construction productivity measurement on building projects. Construction Management and Economics, 36(12), pp. 683-699. ISSN 01446193

Forsythe, P J (2016) Construction service quality and satisfaction for a targeted housing customer. Engineering, Construction and Architectural Management, 23(3), pp. 323-348. ISSN 0969-9988

Forsythe, P J and Sepasgozar, S M E (2019) Measuring installation productivity in prefabricated timber construction. Engineering, Construction and Architectural Management, 26(4), pp. 578-598. ISSN 0969-9988

Forsythe, Perry (2003) The role of service quality as a determinant of customer satisfaction in residential construction. PhD thesis, University of New South Wales, Australia.

Fortea, S M E (1989) An investigation of appropriateness relative to indigenous and modern housing in Libya. PhD thesis, Heriot-Watt University, UK.

Fortunato Iii, B R; Hallowell, M R; Behm, M and Dewlaney, K (2012) Identification of safety risks for high-performance sustainable construction projects. Journal of Construction Engineering and Management, 138(4), pp. 499-508. ISSN 0733-9364

Foster, S R (2020) Management strategies for improving construction industry ethics. PhD thesis, Walden University, USA.

Foulds, C (2013) Practices and technological change: the unintended consequences of low energy dwelling design. PhD thesis, University of East Anglia, UK.

Fox, S (2009) Applying critical realism to information and communication technologies: A case study. Construction Management and Economics, 27(5), pp. 465-472. ISSN 1466433X

Fox, S J (2001) Application of design for manufacture principles to building design and construction. PhD thesis, Sheffield Hallam University, UK.

France-Mensah, J (2019) Integrated planning and budget allocation for highway maintenance, rehabilitation, and capital construction projects. PhD thesis, University of Texas at Austin, USA.

Frances, Z and Stevenson, F (2018) Domestic photovoltaic systems: The governance of occupant use. Building Research & Information, 46(1), pp. 23-41. ISSN 0961-3218

Francis, A; Padmanabhan, V and Thomas, A (2025) A life cycle assessment-based case study analysis of the sustainability of "vernacular" versus contemporary construction techniques. Engineering, Construction and Architectural Management, 32(9), pp. 6187-6212. ISSN 0969-9988

Francis, A (2016) A chronographic protocol for modelling construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(4), pp. 168-177. ISSN 17514304

Francis, A; Bibai, J and Miresco, E (2013) Simulation of scheduling logic using dynamic functions. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(3), pp. 145-158. ISSN 17514312

Francis, A and Thomas, A (2023) System dynamics modelling coupled with multi-criteria decision-making (MCDM) for sustainability-related policy analysis and decision-making in the built environment. Smart and Sustainable Built Environment, 12(3), pp. 534-564. ISSN 2046-6099

Francis, Matthew Charles (2020) Assessing impact of the built environment on academic research productivity. PhD thesis, RMIT University, Australia.

Francis, T R; Wilkinson, S; Mannakkara, S and Chang-Richards, A (2018) Post-disaster reconstruction in Christchurch: A "build back better" perspective. International Journal of Disaster Resilience in the Built Environment, 9(3), pp. 239-248. ISSN 1759-5916

Franco, L A (2005) Problem structuring methods for collaboration: A conceptual development, with an application to a construction partnership in the UK. PhD thesis, London School of Economics and Political Science, UK.

Franco, M and Rodrigues, M (2022) Indicators to measure the performance of sustainable urban entrepreneurship: An empirical case study applied to Portuguese cities and towns. Smart and Sustainable Built Environment, 11(1), pp. 19-38. ISSN 2046-6099

Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.

Franks, M S (2024) Managing complexity and uncertainty in megaprojects: A case study of Fort Friendly’s transformational megaprogram. DBA thesis, National University, USA.

Franz, B and Roberts, B A M (2022) Thematic analysis of successful and unsuccessful project delivery teams in the building construction industry. Journal of Construction Engineering and Management, 148(3): 05022001, ISSN 0733-9364

Franz, B W; Leicht, R M and Riley, D R (2013) Project impacts of specialty mechanical contractor design involvement in the health care industry: Comparative case study. Journal of Construction Engineering and Management, 139(9), pp. 1091-1097. ISSN 0733-9364

França, A J G L and Ornstein, S W (2022) The role of the built environment in updating design requirements in the post-pandemic scenario: A case study of selected diagnostic facilities in Brazil. Architectural Engineering and Design Management, 18(5), pp. 671-689. ISSN 1745-2007

Fredriksson, A; Janné, M and Peltokorpi, A (2024) Making logistics a central core in complex construction projects: a power-dependency analysis. Construction Management and Economics, 42(11-12), pp. 963-976. ISSN 01446193

Fredriksson, A; Sezer, A A and Sundquist, V (2024) Construction logistics status and actors’ opinions: An industry wide survey in Sweden. Construction Innovation, 24(7), pp. 319-340. ISSN 1471-4175

Fredslund, L M and Gottlieb, S C (2018) Engaging the construction supply chain: A pluralistic perspective. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Frei, M (2021) Data-driven building retrofit using a wireless sensor network. DSc thesis, ETH Zürich, Switzerland.

Frey, Shane (2024) Department of defense project management team leaders: Team dynamics and teamwork strategies during complex construction projects. EdD thesis, University of Massachusetts Global, USA.

Frimpong, E and Twumasi, E (2022) Prediction of unregulated energy usage in office buildings. International Journal of Building Pathology and Adaptation, 40(2), pp. 269-282. ISSN 23984708

Frödell, M (2011) Criteria for achieving efficient contractor-supplier relations. Engineering, Construction and Architectural Management, 18(4), pp. 381-393. ISSN 0969-9988

Frödell, M (2014) Organisation of purchasing and buyer-supplier relationships in large construction companies. PhD thesis, Chalmers University of Technology, Sweden.

Fu, X (2010) Refinancing and restructuring projects utilising project finance in developing countries. PhD thesis, University of Manchester, UK.

Fu, Y (2021) Institutional complexity and organizational responses: a case study of Chinese construction firms. PhD thesis, University of Hong Kong, Hong Kong.

Fullen, M D (2009) The development, diffusion and evaluation of a fall hazard safety training program for residential construction workers utilizing instructor led and new media delivery. EdD thesis, West Virginia University, USA.

Fuller, J; Brown, C J and Crowley, R (2018) Performance-based maintenance contracting in Florida: Evaluation by surveys, statistics, and content analysis. Journal of Construction Engineering and Management, 144(2): 05017021, ISSN 0733-9364

Fuller, P A (2011) Improving lessons learnt outcomes in multi-phase project environments. PhD thesis, Loughborough University, UK.

Fuller, P A; Dainty, A R J; Thorpe, T and MacDonald, R (2009) Event-based measurement of learning in projects: A methodology. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Fung, C K A (1996) Development of a TQM model for improving business performance based on surveys conducted in Hong Kong, Japan and the UK. PhD thesis, De Montfort University, UK.

Furber, A; Duncan, S; Smith, S D and Crapper, M (2012) The health and safety implications of socio-cultural context for community construction projects in developing countries. Construction Management and Economics, 30(10), pp. 857-867. ISSN 1466433X

Furber, A; Smith, S D and Crapper, M (2012) A case study of the impact of cultural differences during a construction project in Ghana. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Furber, A M (2013) Social and cultural context of rural water and sanitation projects: Case studies from Ghana. PhD thesis, University of Edinburgh, UK.

Futcher, K (2001) Managing portfolios of projects. PhD thesis, Loughborough University, UK.

Gabai, D S; Haronian, E; Sacks, R; Kennard, N S; Wong, N; Miera, M K and Cloyd, T D (2026) Doubling throughput and halving project durations: Lessons from intel's ocf strategy for project portfolio management. Journal of Construction Engineering and Management, 152(2): 04025256, ISSN 0733-9364

Gaber, B; Zhan, C; Han, X; Omar, M and Li, G (2024) Employing ANN for daylight and energy prediction of hot climate office buildings: A case study of new cairo, Egypt. Architectural Engineering and Design Management, 20(6), pp. 1752-1776. ISSN 1745-2007

Gaisie, Eric (2021) Social capital and disaster resilience: A case of flooding in informal settlements in Accra, Ghana. PhD thesis, University of Melbourne, Australia.

Gajendran, T and Brewer, G (2012) Cultural consciousness and the effective implementation of information and communication technology. Construction Innovation, 12(2), pp. 179-197. ISSN 1471-4175

Gajendran, T; Brewer, G; Gudergan, S and Sankaran, S (2014) Deconstructing dynamic capabilities: The role of cognitive and organizational routines in the innovation process. Construction Management and Economics, 32(3), pp. 246-261. ISSN 01446193

Galal Ahmed, K; Hamza, N; Kordi, A O and M. Shareef, O S (2025) Retrofit with residents: Proposed locally responsive participatory method for technical thermal retrofitting of public housing in the United Arab Emirates. Smart and Sustainable Built Environment, 14(4), pp. 1038-1072. ISSN 2046-6099

Gale, K (2013) An evaluation of performance improvement within public sector construction framework agreements. PhD thesis, Anglia Ruskin University, UK.

Galea, N; Loosemore, M; Powell, A and Chappell, L (2014) Gender equity in construction professions: A new institutionalist perspective. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Galha, H M (1998) Quality in building design: A case study. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Galiano-Garrigós, A; García-Figueroa, A; Rizo-Maestre, C and González-Avilés, Á (2019) Evaluation of BIM energy performance and CO2 emissions assessment tools: A case study in warm weather. Building Research & Information, 47(7), pp. 787-812. ISSN 0961-3218

Galiano-Garrigós, A; Marcos, C L; Kouider, T and Juan Gutiérrez, P J (2022) Reassessing thermal comfort in modern architecture: E.1027 as a case study. Building Research & Information, 50(1-2), pp. 230-254. ISSN 0961-3218

Gallardo, Amarilis Lucia Casteli Figueiredo (2004) Evaluation of the environmental management practices in the construction of the descending roadway of imigrantes highway. PhD thesis, Universidade de São Paulo, Brazil.

Galvin, R (2015) Integrating the rebound effect: Accurate predictors for upgrading domestic heating. Building Research & Information, 43(6), pp. 710-722. ISSN 0961-3218

Gambatese, J A and Hallowell, M (2011) Enabling and measuring innovation in the construction industry. Construction Management and Economics, 29(6), pp. 553-567. ISSN 1466433X

Gambatese, J A; Michael Toole, T and Abowitz, D A (2017) Owner perceptions of barriers to prevention through design diffusion. Journal of Construction Engineering and Management, 143(7): 04017016, ISSN 0733-9364

Gan, C E (1998) Organizational interactions in the management of development projects. PhD thesis, National University of Singapore, Singapore.

Gan, V J L (2022) BIM-based building geometric modeling and automatic generative design for sustainable offsite construction. Journal of Construction Engineering and Management, 148(10): 04022111, ISSN 0733-9364

Gana, V F G (2018) Soft Landings based Design Management as a tool to enhance Sustainability: a case study of non-residential buildings in the UK. PhD thesis, University of Kent, UK.

Ganah, A A M (2003) Computer visualisation support for buildability. PhD thesis, Loughborough University, UK.

Ganesan, S (1994) Employment maximization in construction in developing countries. Construction Management and Economics, 12(4), pp. 323-335. ISSN 01446193

Gangatheepan, S (2023) Workplace-based learning: a study in BIM-enabled construction projects. PhD thesis, Birmingham City University, UK.

Gangatheepan, S; Thurairajah, N and Lees, L (2018) From information transmission to engagement in practice: A study on BIM enabled construction projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Gangolells, M; Casals, M; Forcada, N; Fuertes, A and Roca, X (2013) Model for enhancing integrated identification, assessment, and operational control of on-site environmental impacts and health and safety risks in construction firms. Journal of Construction Engineering and Management, 139(2), pp. 138-147. ISSN 0733-9364

Ganguly, K K; Padhy, R K and Rai, S S (2017) Managing the humanitarian supply chain: A fuzzy logic approach. International Journal of Disaster Resilience in the Built Environment, 8(5), pp. 521-536. ISSN 1759-5916

Gann, D M and Barlow, J (1996) Flexibility in building use: The technical feasibility of converting redundant offices into flats. Construction Management and Economics, 14(1), pp. 55-66. ISSN 01446193

Gannon, M J and Smith, N J (2011) An effective outline business case to facilitate successful decision-making. Construction Management and Economics, 29(2), pp. 185-197. ISSN 1466433X

Gansmo, H J (2012) Municipal planning of a sustainable neighbourhood: Action research and stakeholder dialogue. Building Research & Information, 40(4), pp. 493-503. ISSN 0961-3218

Gao, C. M.; Wong, K. Y. and Mohd Maulana, M. I. I. (2026) Remanufacturing in the construction industry: Key factors, job competencies, and implementation framework. International Journal of Building Pathology and Adaptation, 44(5), pp. 1329-1360. ISSN 2398-4708

Gao, H; Zhong, B; Luo, H and Chen, W (2022) Computational geometric approach for BIM semantic enrichment to support automated underground garage compliance checking. Journal of Construction Engineering and Management, 148(1): 05021013, ISSN 0733-9364

Gao, J (2011) A characterization framework to document and compare BIM implementations on construction projects. PhD thesis, Stanford University, USA.

Gao, S (2013) The toyota way model: An implementation framework for large Chinese construction firms. PhD thesis, National University of Singapore, Singapore.

Gao, S; Chan, T K and Hendy, P (2025) Adoption of the digitalised last planner system in infrastructure projects: An Australian case study. Construction Innovation, 25(3), pp. 994-1013. ISSN 1471-4175

Gao, S and Low, S P (2015) Implementing Toyota way principles for construction projects in China: A case study. International Journal of Construction Management, 15(3), pp. 179-195. ISSN 1562-3599

Gao, S; Song, X and Ding, R (2020) Promoting information transfer in collaborative projects through network structure adjustment. Journal of Construction Engineering and Management, 146(2): 04019108, ISSN 0733-9364

Gao, T (2014) Dynamic approach to stakeholder theory for temporary organizations. PhD thesis, Stevens Institute of Technology, USA.

Gao, T; Ergan, S; Akinci, B and Garrett, J H (2014) Proactive productivity management at job sites: Understanding characteristics of assumptions made for construction processes during planning based on case studies and interviews. Journal of Construction Engineering and Management, 140(3): 4013054, ISSN 0733-9364

Gao, X and Pishdad-Bozorgi, P (2020) A framework of developing machine learning models for facility life-cycle cost analysis. Building Research & Information, 48(5), pp. 501-525. ISSN 0961-3218

Gao, X; Pishdad-Bozorgi, P; Shelden, D R and Tang, S (2021) Internet of things enabled data acquisition framework for smart building applications. Journal of Construction Engineering and Management, 147(2): 04020169, ISSN 0733-9364

Garg, Arun (2022) Quantifying resilient safety culture using complex network theory. PhD thesis, Griffith University, Australia.

Garip, S B; Güzelci, O Z; Garip, E and Kocabay, S (2024) A genetic algorithm-based design model to provide reduced risk areas for housing interiors. Construction Innovation, 24(1), pp. 49-66. ISSN 1471-4175

Garmston, H M (2017) Decision-making in the selection of retrofit facades for non-domestic buildings. PhD thesis, University of Plymouth, UK.

Garmston H, F M and Pan W, d W P (2013) Multi-storey building retrofit with a focus on the façade selection process: A UK commercial office case study. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Garnett, J (2002) Work based learning partnerships and structural capital: The case of Middlesex University. DProf thesis, Middlesex University, UK.

Garnett, N and Pickrell, S (2000) Benchmarking for construction: Theory and practice. Construction Management and Economics, 18(1), pp. 55-63. ISSN 01446193

Garrido Martins, C (2019) Assessment of project risks in fast-track construction projects. PhD thesis, University of New Mexico, USA.

Garvin, M J and Cheah, C Y J (2004) Valuation techniques for infrastructive investment decisions. Construction Management and Economics, 22(4), pp. 373-383. ISSN 01446193

Gaspari, J; Fabbri, K and Marchi, L (2025) Investigating the influence of perforated façade skins on indoor illuminance level: A case study. Architectural Engineering and Design Management, 21(2), pp. 211-230. ISSN 1745-2007

Gasparro, K E (2019) Crowdfunding our cities: Three perspectives on stakeholder dynamics during innovative infrastructure delivery. PhD thesis, Stanford University, USA.

Gbadegesin, A O; Sun, Y and Nwulu, N I (2021) Stacked value streams of hybrid energy storage systems in prosumer microgrids. Journal of Engineering, Design and Technology, 19(5), pp. 1063-1079. ISSN 1726-0531

Ge, Y; Cui, C; Zhang, C; Ke, Y and Liu, Y (2021) Testing a social-psychological model of public acceptance towards highway infrastructure projects: A case study from China. Engineering, Construction and Architectural Management, 28(9), pp. 2772-2787. ISSN 0969-9988

Gebken, Richard John (2006) Quantification of transactional dispute resolution costs for the U.S. Construction industry. PhD thesis, University of Texas at Austin, USA.

Gebken II, R J (2006) Quantification of transactional dispute resolution costs for the United States construction industry. PhD thesis, University of Texas at Austin, USA.

Gebremeskel, M N; Kim, S Y; Thuc, L D and Nguyen, M V (2021) Forming a driving index for implementing public-private partnership projects in emerging economy: Ethiopian perception. Engineering, Construction and Architectural Management, 28(10), pp. 2925-2947. ISSN 0969-9988

Gebretekle, Y T and Fayek, A R (2023) Fuzzy agent-based modeling of competency and performance measures in construction. Journal of Construction Engineering and Management, 149(12): 04023133, ISSN 0733-9364

Gehrig, G B (2002) A decision support system framework to improve design-construction integration and project performance on public sector underground utility projects. PhD thesis, Colorado State University, USA.

Gelisen, G (2010) Automated productivity based schedule animation (APBSA). PhD thesis, Polytechnic Institute of New York University, USA.

Gelisen, G and Griffis, F H (2014) Automated productivity-based schedule animation: Simulation-based approach to time-cost trade-off analysis. Journal of Construction Engineering and Management, 140(4): B4013007, ISSN 0733-9364

Genc, O (2021) Symbioconstruction: A bibliography-driven dynamic construction industry symbiosis database. Journal of Construction Engineering and Management, 147(8): 04021077, ISSN 0733-9364

Geng, S.; Chau, H. W.; Jamei, E. and Vrcelj, Z. (2026) Enablers and challenges of smart heritage implementation: The case of chinatown Melbourne. Smart and Sustainable Built Environment, 15(5), pp. 1695-1721. ISSN 2046-6099

Geng, L; Herath, N; Hui, F K P; Liu, X; Duffield, C and Zhang, L (2023) Evaluating uncertainties to deliver enhanced service performance in education PPPs: A hierarchical reliability framework. Engineering, Construction and Architectural Management, 30(9), pp. 4464-4485. ISSN 0969-9988

Geng, S; Chau, H W; Yan, S; Zhang, W and Zhang, C (2020) Comparative analysis of hospital environments in Australia and China using the space syntax approach. International Journal of Building Pathology and Adaptation, 39(3), pp. 525-546. ISSN 23984708

Georg, S and Tryggestad, K (2009) On the emergence of roles in construction: The qualculative role of project management. Construction Management and Economics, 27(10), pp. 969-981. ISSN 1466433X

George, K M (2019) Key performance indicators' effects on public sector infrastructure project efficiency in Grenada. DPA thesis, Walden University, USA.

George, M and Sekpe, V (2010) Inspection of insulated concrete form walls using ground penetrating radar. International Journal of Construction Education and Research, 6(4), pp. 303-317. ISSN 1557-8771

George, M G (2003) The implementation of project management in the building construction field in the United Arab Emirates. PhD thesis, University of South Wales, UK.

Georgekutty, C K (2014) Optimization of construction cost in construction materials. Unpublished PhD thesis, Cochin University of Science and Technology, India.

Georgiou, A; Haritos, G; Fowler, M and Imani, Y (2016) Advanced phase powertrain design attribute and technology value mapping. Journal of Engineering, Design and Technology, 14(1), pp. 115-133.

Georgy, M and Basily, S Y (2008) Using genetic algorithms in optimizing construction material delivery schedules. Construction Innovation, 8(1), pp. 23-45. ISSN 1471-4175

Gerbov, A; Singh, V and Herva, M (2018) Challenges in applying design research studies to assess benefits of BIM in infrastructure projects: Reflections from Finnish case studies. Engineering, Construction and Architectural Management, 25(1), pp. 2-20. ISSN 0969-9988

Gerding, D; Wamelink, H and Leclercq, E (2020) Implementation of circularity in the building process: A case study research into organizing the actor network and decision-making process. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Gerding, D P; Wamelink, H and Leclercq, E M (2021) Implementing circularity in the construction process: A case study examining the reorganization of multi-actor environment and the decision-making process. Construction Management and Economics, 39(7), pp. 617-635. ISSN 01446193

Gerrish, T (2017) Exploring the effectiveness of BIM for energy performance management of non-domestic buildings. EngD thesis, Loughborough University, UK.

Gerth, R; Boqvist, A; Bjelkemyr, M and Lindberg, B (2013) Design for construction: Utilizing production experiences in development. Construction Management and Economics, 31(2), pp. 135-150. ISSN 1466433X

Getuli, V; Capone, P and Bruttini, A (2021) Planning, management and administration of hs contents with BIM and VR in construction: An implementation protocol. Engineering, Construction and Architectural Management, 28(2), pp. 603-623. ISSN 0969-9988

Getuli, V; Capone, P; Bruttini, A and Sorbi, T (2022) A smart objects library for BIM-based construction site and emergency management to support mobile VR safety training experiences. Construction Innovation, 22(3), pp. 504-530. ISSN 1471-4175

Ghafoori, M and Abdallah, M (2022) Simulation-based optimization model to minimize equivalent annual cost of existing buildings. Journal of Construction Engineering and Management, 148(2): 04021202, ISSN 0733-9364

Ghahramanzadeh, M (2013) Managing risk of construction projects: a case study of Iran. PhD thesis, University of East London, UK.

Ghale, Tashi Tsering (2025) Brahminical infrastructures: States, roads, and lands in dolpo, Nepal. PhD thesis, Washington University in St. Louis, USA.

Ghalenoei, N; Babaeian Jelodar, M; Paes, D; Sutrisna, M and Rahmani, D (2025) Offsite construction and BIM integration framework across project life cycle. Journal of Construction Engineering and Management, 151(7): 05025002, ISSN 0733-9364

Ghanbari, M; Olaikhan, A A J and Skitmore, M (2025) Enhancing project portfolio selection for construction holding firms: A multi-objective optimization framework with risk analysis. Engineering, Construction and Architectural Management, 32(8), pp. 5534-5557. ISSN 0969-9988

Ghanbari, M; Rusch, R and Skitmore, M (2024) BIM-based environmental assessment of residential renovation projects during the operational phase. Architectural Engineering and Design Management, 20(3), pp. 624-635. ISSN 1745-2007

Ghanbari Parsa, A R (1989) The interaction of planning policies and construction technologies in Iran with reference to China & Japan. PhD thesis, University of Newcastle upon Tyne, UK.

Ghanbaripour, A N; Langston, C; Tumpa, R J and Skulmoski, G (2024) Validating and testing a project delivery success model in construction: A mixed-method approach in Australia. Smart and Sustainable Built Environment, 13(3), pp. 532-559. ISSN 2046-6099

Ghanbaripour, A N; Langston, C and Yousefi, A (2017) Implementation of 3D integration model for project delivery success: Case study. Journal of Construction Engineering and Management, 143(8): 05017012, ISSN 0733-9364

Ghanbaripour, Amir (2020) Improving the project delivery success of Australian construction project management practice. PhD thesis, Bond University, Australia.

Gharaie, E; Wakefield, R and Blismas, N (2010) Explaining the increase in the Australian average house completion time: Activity-based versus workflow-based approach. Construction Economics and Building, 10(4), pp. 34-49. ISSN 2204-9029

Gharaie, Ehsan (2011) House completion time in Australia: Workflow planning approach. PhD thesis, RMIT University, Australia.

Gharehbaghi, K; Georgy, M; Robson, K M; Wilkinson, S and Farnes, K (2022) Versatility in sustainable building design (sbd) practices: An empirical study. International Journal of Building Pathology and Adaptation, 40(5), pp. 728-752. ISSN 23984708

Gharehbaghi, K; McManus, K; Georgy, M; Farnes, K; Pagliara, F and Myers, M (2024) Verifying the sustainability factors of mega transportation infrastructure: Sydney metro's commissioning through the "significance matrix" methodology. Journal of Engineering, Design and Technology, 22(1), pp. 22-41. ISSN 1726-0531

Gharehbaghi, K; McManus, K; Hurst, N; Robson, K and Myers, M (2020) Complexities in mega rail transportation projects: “Sydney metro” and “Melbourne metro rail” insight. Journal of Engineering, Design and Technology, 18(5), pp. 973-990. ISSN 1726-0531

Gharehbaghi, K; McManus, K and Myers, M (2022) Utilization of adaptive methodology to underpin rail transportation systems: Sydney metro's methodical formulation. Journal of Engineering, Design and Technology, 20(5), pp. 1132-1153. ISSN 1726-0531

Gharehbaghi, K; McManus, K and Robson, K (2019) Minimizing the environmental impacts of mega infrastructure projects: Australian public transport perspective. Journal of Engineering, Design and Technology, 17(4), pp. 736-746. ISSN 1726-0531

Ghattas, R T (2018) Stakeholder perceptions of how to diminish cost overruns in large, United States government-financed construction projects under earned value management: A multiple case study. DBA thesis, Northcentral University, USA.

Ghazal, M M and Hammad, A (2022) Application of knowledge discovery in database (KDD) techniques in cost overrun of construction projects. International Journal of Construction Management, 22(9), pp. 1632-1646. ISSN 1562-3599

Ghazali, F E M (2007) A reenginered model for effective risk management in pre-contractual procurement process for NHS PFI hospitals. PhD thesis, University of Leeds, UK.

Gheisari, M; Foroughi Sabzevar, M; Chen, P and Irizzary, J (2016) Integrating BIM and panorama to create a semi-augmented-reality experience of a construction site. International Journal of Construction Education and Research, 12(4), pp. 303-316. ISSN 1557-8771

Ghiasi, V; Ghiasi, S and Prasad, A (2012) Evaluation of tunnels under squeezing rock condition. Journal of Engineering, Design and Technology, 10(2), pp. 168-179. ISSN 1726-0531

Ghoddousi, P; Nasirzadeh, F and Hashemi, H (2018) Evaluating highway construction projects' sustainability using a multicriteria group decision-making model based on bootstrap simulation. Journal of Construction Engineering and Management, 144(9): 04018092, ISSN 0733-9364

Ghoddousi, P and Zamani, A (2025) The effect of emotional intelligence, motivation and job burnout on safety behaviors of construction workers: A case study. Engineering, Construction and Architectural Management, 32(2), pp. 1211-1228. ISSN 0969-9988

Ghodoosi, F; Abu-Samra, S; Zeynalian, M and Zayed, T (2018) Maintenance cost optimization for bridge structures using system reliability analysis and genetic algorithms. Journal of Construction Engineering and Management, 144(2): 04017116, ISSN 0733-9364

Gholami, E (2017) Exploiting BIM in energy efficient domestic retrofit: evaluation of benefits and barriers. PhD thesis, University of Liverpool, UK.

Gholizadeh, P and Esmaeili, B (2020) Cost of occupational incidents for electrical contractors: Comparison using robust-factorial analysis of variance. Journal of Construction Engineering and Management, 146(7): 0001861, ISSN 0733-9364

Ghorai, S (2017) Accelerated construction of roadways: Life cycle assessment and environmental impacts. PhD thesis, Syracuse University, USA.

Ghosh, B. and Karmakar, S. (2026) Development and application of a digitalized document management system to update highway operation and management systems using building information modeling. Journal of Construction Engineering and Management, 152(7): 04026090, ISSN 0733-9364

Ghosh, B. and Karmakar, S. (2026) Development and application of a digitalised construction safety document management system for advanced constructions using building information modeling. International Journal of Construction Management, 26(8), pp. 1490-1507. ISSN 1562-3599

Ghosh, A (2015) Analyzing the impact of building information modeling (BIM) on labor productivity in retrofit construction: Case study at a semiconductor manufacturing facility. PhD thesis, Arizona State University, USA.

Ghosh, S (2014) Does formal daily huddle meetings improve safety awareness? International Journal of Construction Education and Research, 10(4), pp. 285-299. ISSN 1557-8771

Ghosh, S; Dickerson, D E and Mills, T (2019) Effect of the Last Planner system® on social interactions among project participants. International Journal of Construction Education and Research, 15(2), pp. 100-117. ISSN 1557-8771

Ghosh, S and Lee, S K (2023) Using social network analysis to explore communication among members of an integrated project delivery team. International Journal of Construction Education and Research, 19(2), pp. 132-149. ISSN 1557-8771

Ghosh, S and Robson, K F (2015) Analyzing the empire state building project from the perspective of lean delivery system: A descriptive case study. International Journal of Construction Education and Research, 11(4), pp. 257-267. ISSN 1557-8771

Giahchy, S; Hosseini, S A; Akhbari, M; Safa, E and Akbarpour, A (2023) A novel mathematical multi-criteria decision-making model for optimizing life cycle energy and cost in construction projects planning. Architectural Engineering and Design Management, 19(2), pp. 200-213. ISSN 1745-2007

Gibbons, T (2013) Management agreements in multi-unit housing developments: Existing models and the New Zealand unit titles acts. International Journal of Law in the Built Environment, 5(1), pp. 40-52. ISSN 17561469

Gibbons, T N (2013) Management agreements in multi-unit housing developments: A case study in regulation and remedies. International Journal of Law in the Built Environment, 5(3), pp. 207-221. ISSN 17561469

Gibbs, D-J (2017) Development of building information models (BIM) to support innovative time management and delay analysis. EngD thesis, Loughborough University, UK.

Gibson, G E (1990) Data integration and transfer methodologies in industrial construction. PhD thesis, Auburn University, USA.

Gibson, G E and Bell, L C (1990) Electronic data interchange in construction. Journal of Construction Engineering and Management, 116(4), pp. 727-737. ISSN 0733-9364

Gibson, G E and Bell, L C (1992) Integrated data-base systems. Journal of Construction Engineering and Management, 118(1), pp. 50-59. ISSN 0733-9364

Gibson Jr, G E; McGinnis, C I; Flanigan, W S and Wood, J E (1996) Constructability in public sector. Journal of Construction Engineering and Management, 122(3), pp. 274-280. ISSN 0733-9364

Gichunge, H K; Masu, S M and K'Akumu, O A (2010) Factor cost indices practices in the building industry for Nairobi, Kenya. Journal of Financial Management of Property and Construction, 15(1), pp. 61-70. ISSN 1366-4387

Gidado, K (1993) Numerical index of complexity in building construction with particular consideration to its effect on production time. PhD thesis, University of Brighton, UK.

Gidado, K (2004) Enhancing the prime contractor's pre-construction planning. Journal of Construction Research, 5(1), pp. 87-106. ISSN 1609-9451

Giddings, B and Rogerson, R (2021) Compacting the city centre: Densification in two newcastles. Buildings & Cities, 2(1), pp. 185-202. ISSN 2632-6655

Giel, B K (2013) Framework for evaluating the BIM competencies of building owners. PhD thesis, University of Florida, USA.

Gijsbers, R and Lichtenberg, J (2014) Demand driven selection of adaptable building technologies for flexibility-in-use. Smart and Sustainable Built Environment, 3(3), pp. 237-260. ISSN 2046-6099

Gil, N; Beckman, S and Tommelein, I (2008) Problem-solving base building under uncertainty and ambiguity: Multiple-case study on an airport expansion program. Journal of Construction Engineering and Management, 134(12), pp. 991-1001. ISSN 0733-9364

Gilbert, A (2015) Sustainable development and greenspace in housebuilding: rules, roles and responsibilities. PhD thesis, University of Manchester, UK.

Gilbert, Daryl (2024) Effective project management strategies for identifying and addressing projects' complexities and improving projects' success rates. DBA thesis, Walden University, USA.

Gilham, A (2010) A governance framework for sustainable development in the built environment. PhD thesis, De Montfort University, UK.

Gill, G N (2014) Environmental protection and developmental interests: A case study of the River Yamuna and the Commonwealth Games, Delhi, 2010. International Journal of Law in the Built Environment, 6(1-2), pp. 69-90. ISSN 1756-1450

Gillette, J R (1986) The law and economics of the feasibility criterion as used in section 6(b)(5) of the occupational safety and health act and in the occupational noise standard (OSHA, occupational standards). PhD thesis, Texas A&M University, USA.

Gillott, M; Holland, R; Riffat, S and Fitchett, J A (2006) Post-occupancy evaluation of space use in a dwelling using RFID tracking. Architectural Engineering and Design Management, 2(4), pp. 273-288. ISSN 1745-2007

Gilmour, Tony (2009) Network power: An international study of strengthening housing association capacity. PhD thesis, University of Sydney, Australia.

Ginigaddara, B; Perera, S; Feng, Y and Rahnamayiezekavat, P (2022) Offsite construction skills evolution: An Australian case study. Construction Innovation, 22(1), pp. 41-56. ISSN 1471-4175

Ginigaddara, B; Perera, S; Feng, Y; Rahnamayiezekavat, P and Kagioglou, M (2024) Industry 4.0 driven emerging skills of offsite construction: A multi-case study-based analysis. Construction Innovation, 24(3), pp. 747-769. ISSN 1471-4175

Ginigaddara, B; Perera, S; Feng, Y; Rahnamayiezekavat, P and Thomson, R (2023) Development of offsite construction skill profile prediction models using mixed-effect regression analysis. Construction Management and Economics, 41(10), pp. 820-839. ISSN 01446193

Ginigaddara, Buddhini (2022) Developing a skill profile prediction model for typologies of offsite construction. PhD thesis, Western Sydney University, Australia.

Ginige, K N (2014) Mainstreaming women in disaster risk reduction in the built environment. PhD thesis, University of Salford, UK.

Giri, O P; Sainju, P R and Htet, A (2025) Evaluating occupational health and safety practices in an airport construction project in Nepal. Built Environment Project and Asset Management, 15(1), pp. 149-164. ISSN 2044-124X

Gkountis, I and Zayed, T (2015) Subway infrastructure condition assessment. Journal of Construction Engineering and Management, 141(12): 04015042, ISSN 0733-9364

Glass, J and Simmonds, M (2007) "Considerate construction": Case studies of current practice. Engineering, Construction and Architectural Management, 14(2), pp. 131-149. ISSN 0969-9988

Glaumann, M; Malm, T and Larsson, J (1999) Evaluation of green buildings in Sweden. Building Research & Information, 27(4-5), pp. 276-285. ISSN 0961-3218

Glavan, J R and Tucker, R L (1991) Forecasting design-related problems-case study. Journal of Construction Engineering and Management, 117(1), pp. 47-65. ISSN 0733-9364

Gledson, B; Rogage, K; Luk, M; Tallet, E; Thompson, A; Landy, M and Wigget, D (2022) Addressing design management challenges through the development of a web-based platform. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Gledson, B J (2016) Hybrid project delivery processes observed in constructor BIM innovation adoption. Construction Innovation, 16(2), pp. 229-246. ISSN 1471-4175

Gledson, B J (2017) Innovation diffusion within the UK construction sector: a study of the adoption of 4D BIM. PhD thesis, Northumbria University, UK.

Gledson, B J and Greenwood, D (2017) The adoption of 4D BIM in the UK construction industry: An innovation diffusion approach. Engineering, Construction and Architectural Management, 24(6), pp. 950-967. ISSN 0969-9988

Glick, S; Leed, A P; Guggemos, A A and Price, J (2011) Increasing resource efficiency through residential greywater use. International Journal of Construction Education and Research, 7(1), pp. 41-57. ISSN 1557-8771

Glick, S; Shuler, S and Guggemos, A A (2013) Life cycle analysis for sustainable development: A case study of parking lot pavements. International Journal of Construction Education and Research, 9(3), pp. 226-236. ISSN 1557-8771

Gluch, P (2009) Unfolding roles and identities of professionals in construction projects: Exploring the informality of practices. Construction Management and Economics, 27(10), pp. 959-968. ISSN 1466433X

Gluch, P and Räisänen, C (2012) What tensions obstruct an alignment between project and environmental management practices? Engineering, Construction and Architectural Management, 19(2), pp. 127-140. ISSN 0969-9988

Gluch, P and Svensson, I (2018) On the nexus of changing public facilities management practices: Purposive and co-creative actions across multiple levels. Construction Management and Economics, 36(5), pp. 259-275. ISSN 01446193

Gochoco, J J (1968) The capital structure and financing of the construction industry. PhD thesis, University of Manchester, UK.

Gocmen, F C (2014) Infrastructure scaling and pricing. PhD thesis, Columbia University, USA.

Godawatte, G A G R (2021) Understanding the cost overrun causation in construction megaprojects: a grounded systems thinking approach. PhD thesis, Heriot-Watt University, UK.

Godbolt, Å L; Flyen, C; Hauge, Å L; Flyen, A C and Moen, L L (2018) Future resilience of cultural heritage buildings: how do residents make sense of public authorities' sustainability measures? International Journal of Disaster Resilience in the Built Environment, 9(1), pp. 18-30. ISSN 1759-5916

Goh, C S (2014) Development of a capability maturity model for sustainable construction. PhD thesis, University of Hong Kong, Hong Kong.

Goh, C S; Abdul-Rahman, H and Abdul Samad, Z (2013) Applying risk management workshop for a public construction project: Case study. Journal of Construction Engineering and Management, 139(5), pp. 572-580. ISSN 0733-9364

Goh, Y M (2005) A case-based reasoning approach to construction safety risk assessment. PhD thesis, National University of Singapore, Singapore.

Goh, Y M and Chua, D (2013) Neural network analysis of construction safety management systems: A case study in Singapore. Construction Management and Economics, 31(5), pp. 460-470. ISSN 1466433X

Goh, Y M and Chua, D K H (2009) Case-based reasoning for construction hazard identification: Case representation and retrieval. Journal of Construction Engineering and Management, 135(11), pp. 1181-1189. ISSN 0733-9364

Goh, Y M and Chua, D K H (2010) Case-based reasoning approach to construction safety hazard identification: Adaptation and utilization. Journal of Construction Engineering and Management, 136(2), pp. 170-178. ISSN 0733-9364

Goh, Y M and Goh, W M (2015) Evaluating the effectiveness of fall prevention plan: Do we need another safety document? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Goh, Y M and Wang, Q (2015) Investigating the adequacy of horizontal lifeline system design through case studies from Singapore. Journal of Construction Engineering and Management, 141(7): 4015017, ISSN 0733-9364

Gohardani, N (2014) An approach towards sustainable building. PhD thesis, KTH Royal Institute of Technology, Sweden.

Gohil, U; Carrillo, P; Ruikar, K and Anumba, C (2011) Value-enhanced collaborative working: Case study of a small management advisory firm. Construction Innovation, 11(1), pp. 43-60. ISSN 1471-4175

Goins, J and Moezzi, M (2013) Linking occupant complaints to building performance. Building Research & Information, 41(3), pp. 361-372. ISSN 0961-3218

Golabchi, A; Han, S; Seo, J; Han, S; Lee, S and Al-Hussein, M (2015) An automated biomechanical simulation approach to ergonomic job analysis for workplace design. Journal of Construction Engineering and Management, 141(8): 04015020, ISSN 0733-9364

Goldenberg, M and Shapira, A (2007) Systematic evaluation of construction equipment alternatives: Case study. Journal of Construction Engineering and Management, 133(1), pp. 72-85. ISSN 0733-9364

Goldsmith, W and Flanagan, T (2017) Value methodology: case studies within climate resilience and sustainability policy application. Architectural Engineering and Design Management, 13(1), pp. 3-21. ISSN 1745-2007

Goldstein, G (2021) An examination of cultural diversity discrimination claims in Texas construction companies: A case study. PhD thesis, Purdue University, USA.

Golizadeh, Hamed (2019) Adoption of building information modelling innovations to reduce occupational fatalities in the Australian construction industry. PhD thesis, Queensland University of Technology, Australia.

Golparvar-Fard, M; Peña-Mora, F and Savarese, S (2011) Integrated sequential as-built and as-planned representation with D 4AR tools in support of decision-making tasks in the AEC/FM industry. Journal of Construction Engineering and Management, 137(12), pp. 1099-1116. ISSN 0733-9364

Gomes Araújo, L and Lucko, G (2022) Best practices for case studies in construction engineering and management research. Journal of Construction Engineering and Management, 148(8): 04022062, ISSN 0733-9364

Gomez Villanueva, Sulyn Cossett (2023) Behavior-based quality system (bbqs). PhD thesis, University of California, USA.

Gonzalez-Ruiz, J D; Arboleda, A; Botero, S and Rojo, J (2019) Investment valuation model for sustainable infrastructure systems: Mezzanine debt for water projects. Engineering, Construction and Architectural Management, 26(5), pp. 850-884. ISSN 0969-9988

Gonzlez, V; Alarcn, L F; Maturana, S and Bustamante, J A (2011) Site management of work-in-process buffers to enhance project performance using the reliable commitment model: Case study. Journal of Construction Engineering and Management, 137(9), pp. 707-715. ISSN 0733-9364

González, J; Figueiredo, K; Hammad, A W A; Tam, V W Y; Haddad, A N and Illankoon, C (2025) Heritage BIM (HBIM) applied in emergency scenarios: A case study of the National Museum in Brazil. International Journal of Construction Management, 25(11), pp. 1239-1253. ISSN 1562-3599

González, P; González, V; Molenaar, K and Orozco, F (2014) Analysis of causes of delay and time performance in construction projects. Journal of Construction Engineering and Management, 140(1): 04013027, ISSN 0733-9364

González, V; Alarcón, L F; Maturana, S; Mundaca, F and Bustamante, J (2010) Improving planning reliability and project performance using the reliable commitment model. Journal of Construction Engineering and Management, 136(10), pp. 1129-1139. ISSN 0733-9364

Goodchild, B and Beatty, C (2000) Assessing the procurement practices of housing associations: A case study of new build in Scotland. Journal of Construction Procurement, 6(1), pp. 20-32. ISSN 1358-9180

Goodrum, P M; Wan, Y and Fenouil, P C (2009) A decision-making system for accelerating roadway construction. Engineering, Construction and Architectural Management, 16(2), pp. 116-135. ISSN 0969-9988

Goonetillake, J F (2019) A framework for the integration of information requirements within infrastructure digital construction. PhD thesis, Cardiff University, UK.

Gordo-Gregorio, P; Alavi, H; Edwards, D J; Forcada, N and Guéna, F (2026) An occupant-centric approach on digital twins for building management. Building Research & Information, 54(1), pp. 59-78. ISSN 0961-3218

Gordon, C (2006) A formalism and a framework for planning of sensor-based construction inspections. PhD thesis, Carnegie Mellon University, USA.

Gorgolewski, M (2008) Designing with reused building components: Some challenges. Building Research & Information, 36(2), pp. 175-188. ISSN 0961-3218

Gorman, S (2014) Peering into the culture of a civil engineering discipline and finding the white rabbit. EdD thesis, Northern Arizona University, USA.

Gorod, A; Hallo, L; Statsenko, L; Nguyen, T and Chileshe, N (2021) Integrating hierarchical and network centric management approaches in construction megaprojects using a holonic methodology. Engineering, Construction and Architectural Management, 28(3), pp. 627-661. ISSN 0969-9988

Gorse, C A; Bates, M and Hudson-Tyreman, A (2006) Practicalities of delay analysis: Retrospective analysis. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Gorse, C A; Emmitt, S and Lowis, M (1999) Problem solving and appropriate communication medium. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Gorse, C A; Emmitt, S; Lowis, M and Howarth, A (2000) Interaction analysis during management and design team meetings. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Gosling, J (2011) Flexibility strategies for engineer-to-order construction supply chains. PhD thesis, Cardiff University, UK.

Gosling, J and Naim, M M (2009) Coping with project uncertainty in construction supply chains. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Gosling, J; Towill, D and Naim, M (2012) Learning how to eat an elephant: Implementing supply chain management principles. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Goswami, M; Singh, J and Kumar, V (2016) An enterprise based decision support system for engineering aggregate selection: A case study. Journal of Engineering, Design and Technology, 14(4), pp. 851-873.

Gottlieb, S C; Frederiksen, N; Koch, C and Thuesen, C (2018) Institutional logics and hybrid organizing in public-private partnerships. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Gottlieb, S C and Haugbølle, K (2013) Contradictions and collaboration: Partnering in-between systems of production, values and interests. Construction Management and Economics, 31(2), pp. 119-134. ISSN 1466433X

Gottlieb, S C and Storgaard, K (2006) Flexible strategic partnerships in Danish construction. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Gottsche, J; Kelly, M and Taggart, M (2016) Assessing the impact of energy management initiatives on the energy usage during the construction phase of an educational building project in Ireland. Construction Management and Economics, 34(1), pp. 46-60. ISSN 01446193

Gouett, M C; Haas, C T; Goodrum, P M and Caldas, C H (2011) Activity analysis for direct-work rate improvement in construction. Journal of Construction Engineering and Management, 137(12), pp. 1117-1124. ISSN 0733-9364

Goulden, S; Erell, E; Garb, Y and Pearlmutter, D (2017) Green building standards as socio-technical actors in municipal environmental policy. Building Research & Information, 45(4), pp. 414-425. ISSN 0961-3218

Goulding, J S; Ezcan, V and Sutrisna, M (2018) Securing the embeddedness of psychosocial diffusion indicators into the Turkish construction industry: Silence is no longer golden. Journal of Financial Management of Property and Construction, 23(1), pp. 90-111. ISSN 1366-4387

Goulias, D (1992) Quality assurance and specifications. PhD thesis, University of Texas at Austin, USA.

Govender, N.; Laryea, S. and Watermeyer, R. (2026) Through the client's lens: Factors impacting project document quality in the South African construction industry. Engineering, Construction and Architectural Management, 33(15), pp. 345-361. ISSN 0969-9988

Govender, R; Saba, G; Ham, N; Hou, L; Moon, S and Kim, J J (2022) Appraisal of building information modeling (BIM) curriculum for early-career construction-industry professionals: Case study at c educational institute in Korea. International Journal of Construction Management, 22(5), pp. 891-899. ISSN 1562-3599

Govertsen, K and Kane, M (2024) Measuring health inequities due to housing characteristics. Buildings & Cities, 5(1), pp. 451-469. ISSN 2632-6655

Gowri, K and Depanni, S (1998) The health and safety expert system (HASES): An expert system framework for building inspections. Engineering, Construction and Architectural Management, 5(1), pp. 92-101. ISSN 0969-9988

Graebert, R F (2015) The implementation of building energy management in commercial real estate and impacts on building energy performance. PhD thesis, Stanford University, USA.

Graham, B and Thomas, K (2005) An investigation into the development of knowledge management systems within the leading Irish construction companies. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Graham, B and Thomas, K (2008) Learning from experience: Aligning continuing professional development with knowledge management. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Graham, S (2005) Sustainable building design: A systematic approach. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Graham, T E (2002) Infrastructure engineering evaluation and assessment using geographic information system and the analytic hierarchy process: A cross-discipline approach. DEng thesis, Morgan State University, USA.

Granheimer, K; Eriksson, P E and Hedgren, E (2025) Innovation outcomes and processes in the planning and design phase of a public infrastructure project. Construction Innovation, 25(7), pp. 1-22. ISSN 1471-4175

Gransberg, D D (2004) Life cycle evaluation criteria for design-build highway pavement projects. PhD thesis, University of Colorado at Boulder, USA.

Gransberg, Nils (2021) A critical analysis of construction manager-at-risk project delivery in public university capital projects. PhD thesis, University of Oklahoma, USA.

Graser, K; Kahlert, A and Hall, D M (2021) Dfab house: Implications of a building-scale demonstrator for adoption of digital fabrication in AEC. Construction Management and Economics, 39(10), pp. 853-873. ISSN 01446193

Gray, C and Flanagan, R (1984) US productivity and fast tracking starts on the drawing board. Construction Management and Economics, 2(2), pp. 133-144. ISSN 01446193

Green, E; Lannon, S; Patterson, J; Variale, F and Iorwerth, H (2020) Decarbonising the welsh housing stock: From practice to policy. Buildings & Cities, 1(1), pp. 277-292. ISSN 2632-6655

Green, S D (1989) Tendering: Optimization and rationality. Construction Management and Economics, 7(1), pp. 53-63. ISSN 01446193

Green, S D (1996) SMART value management: a group decision support methodology for building design. PhD thesis, University of Reading, UK.

Green, S D (1999) A participative research strategy for propagating soft methodologies in value management practice. Construction Management and Economics, 17(3), pp. 329-340. ISSN 01446193

Green, S D; Larsen, G D and Kao, C C (2008) Competitive strategy revisited: Contested concepts and dynamic capabilities. Construction Management and Economics, 26(1), pp. 63-78. ISSN 1466433X

Green, S D and Simister, S J (1999) Modelling client business processes as an aid to strategic briefing. Construction Management and Economics, 17(1), pp. 63-76. ISSN 01446193

Greene, A (2002) Group and individual decision-making in project risk management. PhD thesis, Loughborough University, UK.

Greene, A; Thorpe, A and Austin, S A (2002) As likely as not it could happen: Linguistic interpretations of risk. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Greenwood, D and Gledson, B J (2012) The efficient scheduling of resources in engineering construction projects: Reflections on a case study from Iran. Construction Management and Economics, 30(8), pp. 687-695. ISSN 1466433X

Greenwood, D J; Osborne, A N and Aggiag, M A (2001) A comparative analysis of administrative delays in hospital buildings. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Greenwood, D J and Yates, D J (2006) The determinants of successful partnering: A transaction cost perspective. Journal of Construction Procurement, 12(1),

Greenwood, J P (2007) An examination of the performance based building code on the design of a commercial building. Construction Economics and Building, 7(1), pp. 37-44. ISSN 2204-9029

Greer, Fiona Muriel (2021) Life-cycle environmental and economic management of airport infrastructure and operations. PhD thesis, University of California, USA.

Gregory, R A (1992) Development of a knowledge-based system approach for decision-making in construction projects. PhD thesis, University of Florida, USA.

Gregory-Stevens, J; Frame, I and Henjewele, C (2016) Mediation in construction disputes in England. International Journal of Law in the Built Environment, 8(2), pp. 123-136. ISSN 1756-1450

Grenzfurtner, W and Gronalt, M (2021) Continuous improvement of the industrialised housebuilding order fulfilment process. Construction Innovation, 21(1), pp. 22-39. ISSN 1471-4175

Grenzfurtner, W; Rudberg, M; Mayrhofer, R; Loike, K and Gronalt, M (2022) Performance measurement and management practices of on-site activities in industrialized housebuilding. Construction Management and Economics, 40(4), pp. 239-253. ISSN 01446193

Grey Rodriguez, F C (2019) Space-mate: A framework to harmonize occupant well-being and building sustainability. PhD thesis, Stanford University, USA.

Griffis, F H and Christodoulou, S (2000) Construction risk analysis tool for determining liquidated damages insurance premiums: Case study. Journal of Construction Engineering and Management, 126(6), pp. 407-413. ISSN 0733-9364

Griffith, A (1984) A critical investigation of factors influencing buildability and productivity. PhD thesis, Heriot-Watt University, UK.

Griffith, A (2011) Delivering best value in the small works portfolio of public sector organizations when using preferred contractors. Construction Management and Economics, 29(9), pp. 891-900. ISSN 1466433X

Griffith, A and Bhutto, K (2008) Contractors' experiences of integrated management systems. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(3), pp. 93-98. ISSN 17514312

Grilo, A C B (1998) The development of electronic trading between construction firms. PhD thesis, University of Salford, UK.

Grilo, L; Melhado, S; Silva, S A R; Edwards, P and Hardcastle, C (2007) International building design management and project performance: Case study in São Paulo, Brazil. Architectural Engineering and Design Management, 3(1), pp. 5-16. ISSN 1745-2007

Grimes, H J (2012) Integrating human rights into water governance. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(3), pp. 141-157. ISSN 17514312

Griner Jr., C H (2019) Small construction business owners' strategies for employee retention. DBA thesis, Walden University, USA.

Grinnell, R C (2017) Recipes for low carbon, adaptable design. PhD thesis, Loughborough University, UK.

Grinnell R, A S D A R J (2013) Design strategies for a future climate: A qualitative comparative analysis. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Grist, E (2014) The implementation of innovative and sustainable construction materials. EngD thesis, University of Bath, UK.

Grosskopf, K R (2004) Teaching methods improvement using industry focus groups: A case study in construction financing. International Journal of Construction Education and Research, 1(1), pp. 13-25. ISSN 1557-8771

Grosskopf, K R and Kibert, C J (2006) Economic incentive framework for sustainable energy use in us residential construction. Construction Management and Economics, 24(8), pp. 839-846. ISSN 1466433X

Grove, E (2019) Becoming collaborative: enhancing the understanding of intra-organisational relational dynamics. EngD thesis, Loughborough University, UK.

Grover, R; Walacik, M; Buzu, O; Gunes, T; Raskovic, M and Yildiz, U (2019) Barriers to the use of property taxation in municipal finance. Journal of Financial Management of Property and Construction, 24(2), pp. 166-183. ISSN 1366-4387

Gu, T; Hao, E and Zhang, L (2025) Exploring determinants of residents' participation intention towards smart community construction by extending the TPB: A case study of Shenzhen city. Engineering, Construction and Architectural Management, 32(8), pp. 5228-5252. ISSN 0969-9988

Gu, T.; Hu, J.; Song, X.; Yan, H. and Chen, Z. (2026) How to enhance the urban community resilience from the perspective of social networks? A case study of xuzhou, China. Engineering, Construction and Architectural Management, 33(7), pp. 5340-5363. ISSN 0969-9988

Guadalupe, H (2020) Safety design management processes to mitigate design errors. PhD thesis, Walden University, USA.

Guan, L (2023) An extended TOE model for digital procurement adoption of Chinese construction industry: A case study of H group. PhD thesis, ISCTE - Instituto Universitario de Lisboa, Portugal.

Guan, Li (2022) An integrated decision support system for project risk assessment and treatment decision making considering risk interdependencies. PhD thesis, University of New South Wales, Australia.

Gudem, M; Steinert, M; Welo, T and Leifer, L (2013) Redefining customer value in lean product development design projects. Journal of Engineering, Design and Technology, 11(1), pp. 71-89. ISSN 1726-0531

Guenther, P (2020) A case study of perceptions of asset tracking and inventory management technology in a small construction company. PhD thesis, Wilmington University (Delaware), USA.

Guerra, M. A.; Carvalho, M. S.; Pimentel, C.; Duarte, C. and Costa, S. (2026) Determining different levels of modularization on a construction project through a product architecture modularity decomposition approach: A case study. Journal of Engineering, Design and Technology, 24(3), pp. 713-733. ISSN 1726-0531

Guevara, M; Guevara, J; Vargas, H and Ozuna, A (2011) Promoting good design management practices in colombian construction projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Gujar, S and Deshmukh, A (2023) Methodology for visual comfort analysis in intermediate open spaces of residential areas, case study: Nagpur, India. Architectural Engineering and Design Management, 19(6), pp. 602-619. ISSN 1745-2007

Gul, S (2012) The role of conflict & negotiation in the complexity of projects. PhD thesis, University of Southampton, UK.

Gultekin, P (2015) An integrated process model and decision support system for energy efficient retrofits. PhD thesis, Pennsylvania State University, USA.

Gultekin-Bicer, P; Anumba, C J and Leicht, R M (2018) Advanced energy retrofit projects: Cross-case analysis of integrated system design. International Journal of Construction Management, 18(6), pp. 453-466. ISSN 1562-3599

Gumusburun Ayalp, G and Çivici, T (2023) Factors affecting the performance of construction industry during the COVID-19 pandemic: A case study in Turkey. Engineering, Construction and Architectural Management, 30(8), pp. 3160-3202. ISSN 0969-9988

Gunarathna, C; Yang, R J; Jayasuriya, S; Yi, X; Arashpour, M; Ning, X and Heng, X (2026) Design and development of blockchain-enabled information management system for building integrated photovoltaic projects. Engineering, Construction and Architectural Management, 33(15), pp. 72-114. ISSN 0969-9988

Gunarathna, C; Yang, R J and Fernando, N (2018) Conflicts and management styles in the Sri Lankan commercial building sector. Engineering, Construction and Architectural Management, 25(2), pp. 178-201. ISSN 0969-9988

Gunasagaran, S; Mari, T; Mohamed, R; Ng, V and Srirangam, S (2024) Students’ perception of virtual reality applications to analyse daylighting and spatial functions in architecture and environment. Journal of Construction in Developing Countries, 29(2), pp. 147-165. ISSN 1823-6499

Gunasekara, D M H; Indikatiya, I H P R; Perera, B A K S and Senaratne, S (2023) Managing intragroup conflicts within project design teams during pre-contract stage that effect the project deliverables in Sri Lanka. Construction Innovation, 23(2), pp. 406-424. ISSN 1471-4175

Gunatilake, S (2013) The uptake and implementation of sustainable construction: transforming policy into practice. PhD thesis, University of Central Lancashire, UK.

Guo, B H W; Gonzalez, V A; Puolitaival, T; Enegbuma, W and Zou, Y (2023) Bridging the gap between building information modelling education and practice: A competency-based education perspective. International Journal of Construction Management, 23(15), pp. 2558-2569. ISSN 1562-3599

Guo, F; Jahren, C T and Turkan, Y (2021) Electronic document management systems for the transportation construction industry. International Journal of Construction Education and Research, 17(1), pp. 52-67. ISSN 1557-8771

Guo, H and Lu, W (2023) Measuring competitiveness with data-driven principal component analysis: A case study of chinese international construction companies. Engineering, Construction and Architectural Management, 30(4), pp. 1558-1577. ISSN 0969-9988

Guo, H B (2022) From corporate social responsibility to creating shared value: Competitive strategies for Chinese international construction companies on the "one belt one road". PhD thesis, University of Hong Kong, Hong Kong.

Guo, K (2006) Risk of pavement warranties to contractors. PhD thesis, University of Florida, USA.

Guo, Q; Amin, S; Wang, H and Yan, H (2024) Coupling simulation of human-environmental safety risk factors in metro construction: A case study of Rongjiazhai Station at xi’an Metro Line 5 in China. International Journal of Construction Education and Research, 20(1), pp. 26-42. ISSN 15578771

Guo, S (2012) Pedagogical design in built environment distance education: A critical appraisal of students' learning strategies at postgraduate level. PhD thesis, Northumbria University, UK.

Guo, S; Zhao, Y; Luoren, Y; Liang, K and Tang, B (2022) Knowledge discovery of correlations between unsafe behaviors within construction accidents. Engineering, Construction and Architectural Management, 29(4), pp. 1797-1816. ISSN 0969-9988

Guo, S J (2002) Identification and resolution of work space conflicts in building construction. Journal of Construction Engineering and Management, 128(4), pp. 287-295. ISSN 0733-9364

Guo, Y; Liu, J; Chen, C; Luo, X and Martek, I (2024) PPP project price mode typologies: A China-based comparative case study. Engineering, Construction and Architectural Management, 31(5), pp. 2034-2052. ISSN 0969-9988

Guo, Z; Xu, X; Gao, X; Xu, Y; Liu, J; Zhang, M and Li, F (2025) Enhanced risk-based quality control for hydraulic engineering construction projects considering the risk-influencing mechanism. Journal of Construction Engineering and Management, 151(2): 04024204, ISSN 0733-9364

Gupta, Naresh (2024) Impact of COVID-19 pandemic on the sustained development of infrastructure projects: Putting economies on the brink. PhD thesis, University of Adelaide, Australia.

Gupta, R; Barnfield, L and Gregg, M (2017) Overheating in care settings: Magnitude, causes, preparedness and remedies. Building Research & Information, 45(1-2), pp. 83-101. ISSN 0961-3218

Gupta, R and Gregg, M (2013) Preventing the overheating of English suburban homes in a warming climate. Building Research & Information, 41(3), pp. 281-300. ISSN 0961-3218

Gupta, R; Gregg, M; Manu, S; Vaidya, P and Dixit, M (2019) Customized performance evaluation approach for Indian green buildings. Building Research & Information, 47(1), pp. 56-74. ISSN 0961-3218

Gupta, T; Kothari, C and Misra, S (2025) Integrating 'difficulty in management' as a decision-making criterion in the risk assessment of PPP infrastructure projects. Construction Management and Economics, 43(7), pp. 502-517. ISSN 0144-6193

Gurevich, U; Sacks, R and Shrestha, P (2017) BIM adoption by public facility agencies: Impacts on occupant value. Building Research & Information, 45(6), pp. 610-630. ISSN 0961-3218

Gurjao, S (2010) Inclusivity: understanding the careers of women in the construction industry. PhD thesis, University of Reading, UK.

Guven, H and Tanik, A (2020) Water-energy nexus: Sustainable water management and energy recovery from wastewater in eco-cities. Smart and Sustainable Built Environment, 9(1), pp. 54-70. ISSN 2046-6099

Gyampoh-Vidogah, R; Moreton, R and Proverbs, D (2003) Implementing information management in construction: Establishing problems, concepts and practice. Construction Innovation, 3(3), pp. 157-173. ISSN 1471-4175

Gómez-Chaparro, M; García-Sanz-Calcedo, J and Aunión-Villa, J (2020) Maintenance in hospitals with less than 200 beds: Efficiency indicators. Building Research & Information, 48(5), pp. 526-537. ISSN 0961-3218

Günhan, S and Arditi, D (2007) Budgeting owner's construction contingency. Journal of Construction Engineering and Management, 133(7), pp. 492-497. ISSN 0733-9364

Habets, T; Voordijk, H and Sijde, P V D (2011) The adoption of innovative asphalt equipment in road construction. Construction Innovation, 11(2), pp. 229-245. ISSN 1471-4175

Habisreutinger, P and Gunderson, D E (2006) Real estate reuse opportunities within the regenesis project area: A case study. International Journal of Construction Education and Research, 2(1), pp. 53-63. ISSN 1557-8771

Haddadin, K H (2003) Cultural and institutional barriers to the take-up of construction management in Jordan. PhD thesis, University of Westminster, UK.

Hadidi, L A (2016) Using quality function deployment to conduct assessment for engineering designs' contractors. Architectural Engineering and Design Management, 12(3), pp. 205-230. ISSN 1745-2007

Hadikusumo, B H W and Tobgay, S (2015) Construction claim types and causes for a large-scale hydropower project in Bhutan. Journal of Construction in Developing Countries, 20(1), pp. 49-63. ISSN 1823-6499

Hadizade, S. (2026) Components of children's hospital architecture from the perspective of staff: A mixed-method case study from Iran. Architectural Engineering and Design Management, 22(2), pp. 295-307. ISSN 1745-2007

Hadjistephanou, P (2007) The Olympic Games: a demonstration of the positive and negative side of project management. PhD thesis, Keele University, UK.

Hagan, G; Bower, D A and Smith, N (2012) Delivery of complex construction multi-projects in contractor-led procurement. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Haglund, P; Rudberg, M and Sezer, A A (2022) Organizing logistics to achieve strategic fit in building contractors: A configurations approach. Construction Management and Economics, 40(9), pp. 711-726. ISSN 01446193

Haidar, A (2011) Analysis and optimization of megaproject performance. PhD thesis, University of Florida, USA.

Haidar, A; Naoum, S; Howes, R and Tah, J (1999) Genetic algorithms application and testing for equipment selection. Journal of Construction Engineering and Management, 125(1), pp. 32-38. ISSN 0733-9364

Haidar, A; Underwood, J and Coates, P (2019) Smart processes for smart buildings: 'Sustainable processes', 'recyclable processes' and 'building seeds' in parametric design. Architectural Engineering and Design Management, 15(5), pp. 402-429. ISSN 1745-2007

Haigh, R (2004) Continuous process improvement and learning on construction projects: The role of process capability assessments. PhD thesis, University of Salford, UK.

Hairstans, R and Smith, R E (2018) Offsite hub (Scotland): Establishing a collaborative regional framework for knowledge exchange in the UK. Architectural Engineering and Design Management, 14(1-2), pp. 60-77. ISSN 1745-2007

Haizelden, J; Marasini, R and Daniel, E (2019) An analysis of diversity management in the construction industry: A case study of a main contractor. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Haj Seiyed Taghia, S A; Darvishvand, H R and Ebrahimi, M (2020) Economic analyses for low-strength concrete wrapped with CFRP to improve the mechanical properties and seismic parameters. Journal of Construction Engineering and Management, 146(3): 04019117, ISSN 0733-9364

Hajibabai, L (2014) Scheduling and routing of service trucks and planning of resource replenishment locations for winter roadway maintenance. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hajikazemi, S; Aaltonen, K; Ahola, T; Aarseth, W and Andersen, B (2020) Normalising deviance in construction project organizations: A case study on the collapse of Carillion. Construction Management and Economics, 38(12), pp. 1122-1138. ISSN 01446193

Hajirasouli, A; Banihashemi, S; Sanders, P and Rahimian, F (2024) BIM-enabled virtual reality (VR)-based pedagogical framework in architectural design studios. Smart and Sustainable Built Environment, 13(6), pp. 1490-1510. ISSN 2046-6099

Hajizadeh, S. and Seyis, S. (2026) Multi-climate zone approach to sustainable retrofitting for optimizing energy efficiency and CO2 reduction in Australian detached houses. International Journal of Building Pathology and Adaptation, 44(4), pp. 885-909. ISSN 2398-4708

Hajjar, D (1999) A unified modeling methodology for simulation-based planning of construction projects. PhD thesis, University of Alberta, Canada.

Hajjar, D and AbouRizk, S M (2002) Unified modeling methodology for construction simulation. Journal of Construction Engineering and Management, 128(2), pp. 174-185. ISSN 0733-9364

Hajji, A M and Lewis, P (2013) Development of productivity-based estimating tool for energy and air emissions from earthwork construction activities. Smart and Sustainable Built Environment, 2(1), pp. 84-100. ISSN 2046-6099

Hakim, H (2011) Effective contract structures and value for money in PFI social housing projects. PhD thesis, University of Leeds, UK.

Halabya, A and El-Rayes, K (2020) Optimizing the planning of pedestrian facilities upgrade projects to maximize accessibility for people with disabilities. Journal of Construction Engineering and Management, 146(1): 04019088, ISSN 0733-9364

Halder, A. (2026) Modeling critical driving factors of stakeholder integration and their influences on construction megaproject performance: A regression-based analysis. Journal of Engineering, Design and Technology, 24(1), pp. 213-241. ISSN 1726-0531

Halim, M S A; Jaafar, M; Osman, O and Shariff Haniff, M (2012) Financial ratio analysis: An assessment of Malaysian contracting firms. Journal of Construction in Developing Countries, 17(S1), pp. 71-78. ISSN 1823-6499

Hall, D M; Whyte, J K and Lessing, J (2020) Mirror-breaking strategies to enable digital manufacturing in Silicon Valley construction firms: A comparative case study. Construction Management and Economics, 38(4), pp. 322-339. ISSN 01446193

Hall, M A (2001) 'Root' cause analysis: A tool for closer supply chain integration in construction. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Hallal, I and Sahnoune, T (2023) Urban mix in housing neighbourhoods: Challenges, evaluation method and diagnosis of ayouf in jijel, Algeria. International Journal of Disaster Resilience in the Built Environment, 14(2), pp. 229-248. ISSN 1759-5916

Halligan, D W; Demsetz, L A; Brown, J D and Pace, C B (1994) Action-response model and loss of productivity in construction. Journal of Construction Engineering and Management, 120(1), pp. 47-64. ISSN 0733-9364

Hallowell, M R (2011) Risk-based framework for safety investment in construction organizations. Journal of Construction Engineering and Management, 137(8), pp. 592-599. ISSN 0733-9364

Hallowell, M R; Hinze, J W; Baud, K C and Wehle, A (2013) Proactive construction safety control: Measuring, monitoring, and responding to safety leading indicators. Journal of Construction Engineering and Management, 139(10): 04013010, ISSN 0733-9364

Ham, N; Moon, S; Kim, J H and Kim, J J (2018) Economic analysis of design errors in BIM-based high-rise construction projects: Case study of Haeundae L project. Journal of Construction Engineering and Management, 144(6): 05018006, ISSN 0733-9364

Ham, Y (2015) Vision-based building energy diagnostics and retrofit analysis using 3D thermography and building information modeling. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hamed, O (2022) Developing a BIM-based tool to automate green buildings assessment: the case of Jordan Green Building Guide. PhD thesis, University of Sheffield, UK.

Hamerski, D C; Tarcisio Abreu, S; Carlos Torres, F and Isatto, E L (2024) The contributions of the last planner system to resilient performance in construction projects. Construction Management and Economics, 42(4), pp. 328-345. ISSN 01446193

Hamid, M Y (2009) The feasibility of a process protocol for facilities management: An exploratory investigation in a higher education institution in the United Kingdom. PhD thesis, University of Salford, UK.

Hamida, M. B.; Remøy, H.; Gruis, V. and van Laar, B. (2026) Towards promoting circular building adaptability in adaptive reuse projects: A co-developed framework. Smart and Sustainable Built Environment, 15(3), pp. 1313-1340. ISSN 2046-6099

Hamida, M B (2025) Circular and adaptable building transformation: Reconceptualization, practice exploration, framework co‑development and implementation. PhD thesis, Delft University of Technology, Netherlands.

Hamida, M B; Remøy, H; Gruis, V and Jylhä, T (2025) Circular building adaptability in adaptive reuse: Multiple case studies in the Netherlands. Journal of Engineering, Design and Technology, 23(1), pp. 161-183. ISSN 1726-0531

Hamidavi, T (2020) Automatic integrated structural design and optimisation in BIM. PhD thesis, University of Portsmouth, UK.

Hamilton-MacLaren, F (2013) Alternative, more sustainable, wall construction techniques than brick and block, for new housing in England and Wales. PhD thesis, Loughborough University, UK.

Hamma-Adama, M (2020) Framework for macro building information modelling (BIM) adoption in Nigeria. PhD thesis, Robert Gordon University, UK.

Hammad, A W; Grzybowska, H; Sutrisna, M; Akbarnezhad, A and Haddad, A (2020) A novel mathematical optimisation model for the scheduling of activities in modular construction factories. Construction Management and Economics, 38(6), pp. 534-551. ISSN 01446193

Hammad, A W A; Akbarnezhad, A; Rey, D and Waller, S T (2016) A computational method for estimating travel frequencies in site layout planning. Journal of Construction Engineering and Management, 142(5): 04015102, ISSN 0733-9364

Hammond, D; Dempsey, J J; Szigeti, F and Davis, G (2005) Integrating a performance-based approach into practice: A case study. Building Research & Information, 33(2), pp. 128-141. ISSN 0961-3218

Hammuda, I M and Dulaimi, M F (1997) The effects of the situational variables on the leadership styles in construction projects. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Hampson, K; Peters, R; Walker, D and Tucker, S (2000) Project alliancing and information technology in building construction: The national museum of Australia. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Hamstead, Z; Coseo, P; Alkhaled, S; Boamah, E F; Hondula, D M; Middel, A and Rajkovich, N (2020) Thermally resilient communities: Creating a socio-technical collaborative response to extreme temperatures. Buildings & Cities, 1(1), pp. 218-232. ISSN 2632-6655

Hamta, N; Ehsanifar, M and Sarikhani, J (2021) Presenting a goal programming model in the time-cost-quality trade-off. International Journal of Construction Management, 21(1), pp. 1-11. ISSN 1562-3599

Hamza, A (2002) Partnering in the construction industry: an empirical investigation into the critical success factors. PhD thesis, Nottingham Trent University, UK.

Hamzeh, F; Abdul, G O; Saleh, B M B and Abbas, Y (2017) Modular concrete construction: The differing perspectives of designers, manufacturers, and contractors in Lebanon. Engineering, Construction and Architectural Management, 24(6), pp. 935-949. ISSN 0969-9988

Hamzeh, F R (2009) Improving construction workflow: The role of production planning and control. PhD thesis, University of California, Berkeley, USA.

Han, Bing (2022) Implementing virtual reality-based design review in the construction industry. PhD thesis, University of Texas at Austin, USA.

Han, K; Degol, J and Golparvar-Fard, M (2018) Geometry- and appearance-based reasoning of construction progress monitoring. Journal of Construction Engineering and Management, 144(2): 04017110, ISSN 0733-9364

Han, Q and Keeffe, G (2020) Stepping stones: Assessing the permeability of urban greenspaces to climate-driven migration of trees. Smart and Sustainable Built Environment, 9(3), pp. 246-257. ISSN 2046-6099

Han, R; Li, X; Shen, Z and Jia, D (2024) A framework of robust project portfolio selection problem under strategic objectives considering the risk propagation. Engineering, Construction and Architectural Management, 31(12), pp. 4872-4896. ISSN 0969-9988

Han, S (2005) Application modeling of the conventional and the GPS-based earthmoving systems. PhD thesis, Purdue University, USA.

Han, S (2013) Automated monitoring and systemic analysis of workers' safety behavior in construction operations. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Han, S (2024) Understanding of AI-aided reality capture data for the development of BIM modeling for building façade inspections. PhD thesis, Marquette University, USA.

Han, S; Bouferguene, A; Al-Hussein, M and Hermann, U R (2017) 3D-based crane evaluation system for mobile crane operation selection on modular-based heavy construction sites. Journal of Construction Engineering and Management, 143(9): 04017060, ISSN 0733-9364

Han, S H (1999) Risk-based go/no-go decision making model for international construction projects: The cross-impact analysis approach. PhD thesis, University of Colorado at Boulder, USA.

Han, S H and Diekmann, J (2004) Judgment-based cross-impact method for predicting cost variance for highly uncertain projects. Journal of Construction Research, 5(2), pp. 171-192. ISSN 1609-9451

Han, S H and Diekmann, J E (2001) Making a risk-based bid decision for overseas construction projects. Construction Management and Economics, 19(8), pp. 765-776. ISSN 01446193

Han, S H; Diekmann, J E; Lee, Y and Ock, J H (2004) Multicriteria financial portfolio risk management for international projects. Journal of Construction Engineering and Management, 130(3), pp. 346-356. ISSN 0733-9364

Han, S H; Kim, D Y and Kim, H (2007) Predicting profit performance for selecting candidate international construction projects. Journal of Construction Engineering and Management, 133(6), pp. 425-436. ISSN 0733-9364

Han, S H; Park, S H; Kim, D Y; Kim, H and Kang, Y W (2007) Causes of bad profit in overseas construction projects. Journal of Construction Engineering and Management, 133(12), pp. 932-943. ISSN 0733-9364

Han, Sang Hyeok (2014) BIM-based motion planning of mobile crane operation in modular-based heavy construction sites. PhD thesis, University of Alberta, Canada.

Han, Y; Du, H and Zhao, C (2025) Development of a digital transformation maturity model for the construction industry. Engineering, Construction and Architectural Management, 32(7), pp. 4384-4412. ISSN 0969-9988

Hanif, H; Khurshid, M B; Lindhard, S M and Aslam, Z (2016) Impact of variation orders on time and cost in mega hydropower projects of Pakistan. Journal of Construction in Developing Countries, 21(2), pp. 37-53. ISSN 1823-6499

Haniff, A and Ogunlana, S O (2015) Strategic alignment within a TMO: Perceptions of project success. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Haniff, A P and Kaka, A P (2001) A framework for development of a knowledge database for use within the construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Hanna, A S (2012) Using the earned value management system to improve electrical project control. Journal of Construction Engineering and Management, 138(3), pp. 449-457. ISSN 0733-9364

Hanna, A S; Chang, C K; Lackney, J A and Sullivan, K T (2007) Impact of overmanning on mechanical and sheet metal labor productivity. Journal of Construction Engineering and Management, 133(1), pp. 22-28. ISSN 0733-9364

Hansen, D E (2021) Including commissioning during design phase benefits new construction: A qualitative case study. PhD thesis, Northcentral University, USA.

Hansen, G K and Olsson, N O E (2011) Layered project-layered process: Lean thinking and flexible solutions. Architectural Engineering and Design Management, 7(2), pp. 70-84. ISSN 1745-2007

Hansen, K L (1993) How strategies happen: An investigation of the decision to upgrade CAD/CIE in architectural, engineering, and construction firms. PhD thesis, Stanford University, USA.

Harani, A. R. and Riskiyanto, R. (2026) Local approaches to interpreting disaster: Exploring the spatial practice of communities in coastal settlement. International Journal of Disaster Resilience in the Built Environment, 17(3), pp. 375-388. ISSN 1759-5908

Hardie, M (2016) Vectors of technical innovation delivery by small and medium Australian construction firms. Construction Economics and Building, 16(3), pp. 59-70. ISSN 2204-9029

Hardie, Mary (2011) Technical innovation delivery in small and medium construction enterprises. PhD thesis, University of Western Sydney, Australia.

Harding, A M (1999) A global approach to project optimisation. PhD thesis, University of Edinburgh, UK.

Hare, B; Cameron, I; Real, K J and Maloney, W F (2013) Exploratory case study of pictorial aids for communicating health and safety for migrant construction workers. Journal of Construction Engineering and Management, 139(7), pp. 818-825. ISSN 0733-9364

Harinarain, N and Haupt, T C (2016) Mission: Studio based learning in construction. The University of KwaZulu-Natal case study. Journal of Engineering, Design and Technology, 14(1), pp. 160-181.

Harisuthan, S; Hasalanka, H; Kularatne, D and Siriwardana, C (2020) Applicability of the PTVA-4 model to evaluate the structural vulnerability of hospitals in Sri Lanka against tsunami. International Journal of Disaster Resilience in the Built Environment, 11(5), pp. 581-596. ISSN 1759-5916

Harmansah, O (2005) Spatial narratives, commemorative practices and the building project: New urban foundations in upper syro-mesopotamia during the early iron age. PhD thesis, University of Pennsylvania, USA.

Haroglu, H (2010) Investigating the structural frame decision making process. EngD thesis, Loughborough University, UK.

Haron, A T (2013) Organisational readiness to implement building information modelling: a framework for design consultants in Malysia. PhD thesis, University of Salford, UK.

Harper, R S and Koehn, E (1998) Managing industrial construction safety in southeast Texas. Journal of Construction Engineering and Management, 124(6), pp. 452-457. ISSN 0733-9364

Harris, Michael Samuel (2019) Competitive precinct projects: An evaluation of competitively positioned mixed-use megaprojects. PhD thesis, University of Sydney, Australia.

Harris, R; Romer, J; Kelly, O and Johnson, S (2003) Design and construction of the downland gridshell. Building Research & Information, 31(6), pp. 427-454. ISSN 0961-3218

Hartmann, A. and van den Berg, M. (2026) Circularity on demand and at the side: Working rule patterns in construction design practices. Construction Management and Economics, 44(8), pp. 639-652. ISSN 0144-6193

Hartmann, A; Davies, A and Frederiksen, L (2010) Learning to deliver service-enhanced public infrastructure: Balancing contractual and relational capabilities. Construction Management and Economics, 28(11), pp. 1165-1175. ISSN 1466433X

Hartmann, T (2008) A grassroots model of decision support system implementations by construction project teams. PhD thesis, Stanford University, USA.

Hartmann, T (2011) Goal and process alignment during the implementation of decision support systems by project teams. Journal of Construction Engineering and Management, 137(12), pp. 1134-1141. ISSN 0733-9364

Hartmann, T; Gao, J and Fischer, M (2008) Areas of application for 3D and 4D models on construction projects. Journal of Construction Engineering and Management, 134(10), pp. 776-785. ISSN 0733-9364

Hartmann, T and Levitt, R E (2010) Understanding and managing three-dimensional/four-dimensional model implementations at the project team level. Journal of Construction Engineering and Management, 136(7), pp. 757-767. ISSN 0733-9364

Hartmann A, D e A (2013) Messages in bottles: The fallacy of transferring knowledge between construction projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Harun, A N (2015) The application of mobile web and devices for environmental surveillance on construction sites in Malaysia. PhD thesis, University of Salford, UK.

Harvey, E (2019) Rethinking construction safety. PhD thesis, Loughborough University, UK.

Hasan, A and Jha, K N (2016) Acceptance of the incentive/disincentive contracting strategy in developing construction markets: Empirical study from India. Journal of Construction Engineering and Management, 142(2): 04015064, ISSN 0733-9364

Hasan, M and Lu, M (2021) Error propagation model for analyzing project labor cost budget risks in industrial construction. Journal of Construction Engineering and Management, 147(4): 2010, ISSN 0733-9364

Hasan, M and Lu, M (2024) Mitigating project schedule risks by identifying subcritical paths and variance-critical activities. Journal of Construction Engineering and Management, 150(8): 04024096, ISSN 0733-9364

Hasan, M S (2013) Decision support system for crane selection and location optimization on construction sites. PhD thesis, University of Alberta, Canada.

Hasan, N (2006) Developing a balanced scorecard model for evaluation of project management and performance. PhD thesis, University of Birmingham, UK.

Hasanain, F A (2022) A BIM-Mostadam plug-in design and evaluation model. PhD thesis, University of Florida, USA.

Hasannejad, A; Sardrud, J M and Shirzadi Javid, A A (2023) BIM-based clash detection improvement automatically. International Journal of Construction Management, 23(14), pp. 2431-2437. ISSN 1562-3599

Hassan, A; El-Rayes, K and Attalla, M (2023) Stochastic scheduling optimization of repetitive construction projects to minimize project duration and cost. International Journal of Construction Management, 23(9), pp. 1447-1456. ISSN 1562-3599

Hassan, A A A (2019) Risk management of repetitive construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hassan, N M; Al Maazmi, T; Al Hadhrami, A and Al Hosani, M (2016) Discrete event simulation: A vital tool for a concurrent life cycle design. Construction Innovation, 16(1), pp. 67-80. ISSN 1471-4175

Hassanain, M A; Sanni-Anibire, M O and Mahmoud, A S (2024) An assessment of users' satisfaction with a smart building on university campus through post-occupancy evaluation. Journal of Engineering, Design and Technology, 22(4), pp. 1119-1135. ISSN 1726-0531

Hassanain, M A; Sanni-Anibire, M O; Mahmoud, A S and Ahmed, W (2020) Post-occupancy evaluation of research and academic laboratory facilities. International Journal of Building Pathology and Adaptation, 38(5), pp. 797-810. ISSN 23984708

Hassanain, M A; Sanni-Anibire, M O; Mahmoud, A S and Hamida, M B (2020) Design guidelines for the functional efficiency of laboratory facilities. Architectural Engineering and Design Management, 16(2), pp. 115-130. ISSN 1745-2007

Hassandokht Mashhadi, A; Handy, R; Farhadmanesh, M; Rashidi, A; Honda, T; Sleeth, D K and Henry, T (2022) Feasibility study of using nebulizer-retrofitted uavs at construction projects: The case study of residential jobsites in Utah. Journal of Construction Engineering and Management, 148(10): 05022009, ISSN 0733-9364

Hassanein, A A G and Afify, H M F (2006) Contractors' risk identification behaviour: A case study. Journal of Construction Procurement, 12(1),

Hassanein, A A G and Afify, H M F (2007) Risk management practices of contractors: A case study of power station projects in Egypt. Journal of Financial Management of Property and Construction, 12(3), pp. 164-179. ISSN 1366-4387

Hassanien, A (2003) Analysing hotel repositioning through property renovation in the hospitality industry. PhD thesis, University of Strathclyde, UK.

Hastheetham, A and Hadikusumo, B H W (2011) Theoretical framework of strategic behaviors in Thai contractors: An empirical case study. Engineering, Construction and Architectural Management, 18(2), pp. 206-225. ISSN 0969-9988

Hastie, J; Sutrisna, M and Egbu, C (2017) Modelling knowledge integration process in early contractor involvement procurement at tender stage: A Western Australian case study. Construction Innovation, 17(4), pp. 429-456. ISSN 1471-4175

Hatcher, C (2015) Illegal geographies of the state: The legalisation of a "squatter" settlement in Bishkek, Kyrgyzstan. International Journal of Law in the Built Environment, 7(1), pp. 39-54. ISSN 1756-1450

Hatush, Z A (1996) Contractor selection using the multiattribute utility theory. PhD thesis, University of Salford, UK.

Hauck, A J; Walker, D H T; Hampson, K D and Peters, R J (2004) Project alliancing at national museum of Australia: collaborative process. Journal of Construction Engineering and Management, 130(1), pp. 143-152. ISSN 0733-9364

Haugbølle, K; Larsen, J N and Nielsen, J (2019) Construction productivity revisited: Towards measuring performance of construction output. Engineering, Construction and Architectural Management, 26(5), pp. 794-813. ISSN 0969-9988

Haupt, T C and Pillay, K (2016) Investigating the true costs of construction accidents. Journal of Engineering, Design and Technology, 14(2), pp. 373-419.

Havenvid, M I; Hulthén, K; Linné, Å and Sundquist, V (2016) Renewal in construction projects: Tracing effects of client requirements. Construction Management and Economics, 34(11), pp. 790-807. ISSN 01446193

Hawkins-Saleemi, Lisa (2023) Achieving organizational sustainability through gender-diverse strategies for builder leaders' succession planning. DBA thesis, Walden University, USA.

Hayat, E; Haigh, R and Amaratunga, D (2019) A framework for reconstruction of road infrastructure after a disaster. International Journal of Disaster Resilience in the Built Environment, 10(2-3), pp. 151-166. ISSN 1759-5916

Hayes, J; McDermott, V and Lingard, H (2015) What is risk? Construction activity near hazardous infrastructure. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Hayles, C S (2010) An examination of decision making in post disaster housing reconstruction. International Journal of Disaster Resilience in the Built Environment, 1(1), pp. 103-122. ISSN 1759-5916

He, J.; Chen, H.; Yang, H.; Li, P. and Zheng, Z. (2026) Text2Onto-Agent: An llm agent-based end-to-end automated ontology construction method anda case study of green building domain modeling. Journal of Construction Engineering and Management, 152(9): 04026153, ISSN 0733-9364

He, C (2022) Integrate human and engineering aspects to facilitate construction scheduling under uncertainty. PhD thesis, North Carolina State University, USA.

He, Hailong (2017) Exploring the combined impact of project portfolio construction and steering on project portfolio performance. PhD thesis, University of Gloucestershire, UK.

He, N (2016) Conceptual cost modeling of innovative industrial estates using sysml and case-based reasoning. PhD thesis, National University of Singapore, Singapore.

He, P; Qin, L; Yuan, Y and Yuan, J (2025) Action reliability assessment framework for automated construction labor measurements: Case study on plastering operations. Journal of Construction Engineering and Management, 151(8): 05025006, ISSN 0733-9364

He, S (2018) A project-level infrastructure management framework for sustainable roadways. PhD thesis, Syracuse University, USA.

He, W (1997) Pavement project optimization and analysis. PhD thesis, Arizona State University, USA.

He, Y; Bai, W; Ye, Y; Guo, W; Wang, X and Zou, X (2025) A lean approach to enhance the visual experience during wayfinding in the emergency department spaces: a case study of a large-scale general hospital in China. Architectural Engineering and Design Management, 21(4), pp. 642-664. ISSN 1745-2007

Heaton, J (2020) Development of asset information requirements to support asset management. PhD thesis, University of Cambridge, UK.

Hebiba, A M; Bouferguene, A; Moon, S and Han, S (2022) Wind-wise automated stability analysis for selection of tower crane and location. Journal of Construction Engineering and Management, 148(11): 04022127, ISSN 0733-9364

Hedborg Bengtsson, S; Karrbom Gustavsson, T and Eriksson, P E (2018) Users’ influence on inter-organizational innovation: mapping the receptive context. Construction Innovation, 18(4), pp. 488-504. ISSN 1471-4175

Heesom, D (2004) An analytical system for space planning on construction sites. PhD thesis, University of Wolverhampton, UK.

Hefer, A L R (2019) Optimising construction project role-player performance. PhD thesis, Nelson Mandela University, South Africa.

Hefferan, Michael (2006) An examination of the interface between commercial property assets and contemporary knowledge-intensive firms: Demands, responses and priorities. PhD thesis, Queensland University of Technology, Australia.

Hegazy, T (1999) Optimization of resource allocation and leveling using genetic algorithms. Journal of Construction Engineering and Management, 125(3), pp. 167-175. ISSN 0733-9364

Hegazy, T; Abdel-Monem, M and Saad, D A (2014) Framework for enhanced progress tracking and control of linear projects. Engineering, Construction and Architectural Management, 21(1), pp. 94-110. ISSN 0969-9988

Hegazy, T and Ersahin, T (2001) Simplified spreadsheet solutions. II: Overall schedule optimization. Journal of Construction Engineering and Management, 127(6), pp. 469-475. ISSN 0733-9364

Hegazy, T and Kamarah, E (2008) Efficient repetitive scheduling for high-rise construction. Journal of Construction Engineering and Management, 134(4), pp. 253-264. ISSN 0733-9364

Hegazy, T and Kassab, M (2003) Resource optimization using combined simulation and genetic algorithms. Journal of Construction Engineering and Management, 129(6), pp. 698-705. ISSN 0733-9364

Hegazy, T and Menesi, W (2008) Delay analysis under multiple baseline updates. Journal of Construction Engineering and Management, 134(8), pp. 575-582. ISSN 0733-9364

Hegazy, T and Menesi, W (2012) Heuristic method for satisfying both deadlines and resource constraints. Journal of Construction Engineering and Management, 138(6), pp. 688-696. ISSN 0733-9364

Hegazy, T and Saad, D A (2014) A microeconomic perspective on infrastructure rehabilitation. Construction Management and Economics, 32(5), pp. 433-445. ISSN 01446193

Hegazy, T and Zhang, K (2005) Daily windows delay analysis. Journal of Construction Engineering and Management, 131(5), pp. 505-512. ISSN 0733-9364

Heidemann, A and Gehbauer, F (2011) The way towards cooperative project delivery. Journal of Financial Management of Property and Construction, 16(1), pp. 19-30. ISSN 1366-4387

Helaly, H.; El-Rayes, K. and Ignacio, E. J. (2026) Multiobjective optimization for the planning of prefabricated bridge construction projects. Journal of Construction Engineering and Management, 152(8): 04026103, ISSN 0733-9364

Heljedal M, P F (2013) Sustainable intermodal transportation of prefabricated construction materials. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Hellsvik, Stina (2025) Sustainability roles in the making: Exploring the work and agency of sustainability professionals in the Swedish construction industry. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Hemalattha, S and Vidjeapriya, R (2021) Developing an integrated framework for optimization of spatial requirements of construction equipment. Built Environment Project and Asset Management, 11(5), pp. 903-917. ISSN 2044-124X

Henao, Y; Grubert, E; Korey, M; Bank, L C and Gentry, R (2024) Life cycle assessment and life cycle cost analysis of repurposing decommissioned wind turbine blades as high-voltage transmission poles. Journal of Construction Engineering and Management, 150(5): 05024004, ISSN 0733-9364

Henderson, Z; Morgan, B and Watson, J (2019) Implementing the circular economy in buildings: Processes of sensemaking in design and delivery. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Hendrickson, Thomas Peter (2013) Carbon and water resource management for water distribution systems. PhD thesis, University of California, USA.

Hendy, A O A (2007) An approach to sustainable construction in post-disaster contexts: with specific reference to the Marmara region of Turkey. PhD thesis, Coventry University, UK.

Heng, H K S and Loosemore, M (2011) Structural holes in hospital organisations: Exploring the brokerage potential of facilities managers from a social network perspective. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Heng, H K S and Loosemore, M (2013) Structural holes in hospital organisations: Facilities managers as intrapreneurial brokers in the tertiary health sector. Engineering, Construction and Architectural Management, 20(5), pp. 474-487. ISSN 0969-9988

Heng, H K S; Loosemore, M and McGeorge, W D (2004) Exploring the brokerage potential of facilities manager in hospitals. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Heng, Hock Kang Sherman (2010) Information brokerage in hospital facilities management: A social network perspective. PhD thesis, University of New South Wales, Australia.

Henjewele, C (2010) Modelling client's value for money uncertainties in PFI projects. PhD thesis, University of the West of England, Bristol, UK.

Henjewele, C; Fewings, P and Pantaleo, D R (2013) De-marginalising the public in PPP projects through multi-stakeholders management. Journal of Financial Management of Property and Construction, 18(3), pp. 210-231. ISSN 1366-4387

Henjewele, C; Sun, M and Fewings, P (2008) Uncertainties and the challenge of long-term value for money in the delivery of PFI projects. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Henrich, G (2010) Development of a tool for diagnosing production management efficiency on construction sites. PhD thesis, University of Salford, UK.

Henriques, D F; Clara, M P and Flores-Colen, I (2023) Inspection and structural assessment of traditional timber floors: A practical systematization. International Journal of Building Pathology and Adaptation, 41(3), pp. 675-691. ISSN 23984708

Henry Duncan John, M; Amoah, C and Ayesu-Koranteng, E (2022) Causes of road projects' delays: A case of blantyre, Malawi. Built Environment Project and Asset Management, 12(2), pp. 293-308. ISSN 2044-124X

Heravi, G and Ilbeigi, M (2012) Development of a comprehensive model for construction project success evaluation by contractors. Engineering, Construction and Architectural Management, 19(5), pp. 526-542. ISSN 0969-9988

Heravi Torbati, Amir Hossein (2014) Improving construction management: An investigation into the influences of effective stakeholder involvement on project quality outcomes. PhD thesis, Queensland University of Technology, Australia.

Herazo, Benjamin (2017) The influence of sustainability in project management practices in the building sector. PhD thesis, Université de Montréal, Canada.

Herbsman, Z (1983) Long-range forecasting highway construction costs. Journal of Construction Engineering and Management, 109(4), pp. 423-434. ISSN 0733-9364

Herbsman, Z (1986) SERC: A model for estimating construction inputs. Journal of Construction Engineering and Management, 112(3), pp. 425-439. ISSN 0733-9364

Herbsman, Z J (1995) A+B bidding method: hidden success story for highway construction. Journal of Construction Engineering and Management, 121(4), pp. 430-437. ISSN 0733-9364

Herbsman, Z J; Chen, W T and Epstein, W C (1995) Time is money: Innovative contracting methods in highway construction. Journal of Construction Engineering and Management, 121(3), pp. 273-281. ISSN 0733-9364

Herbsman, Z J and Glagola, C R (1998) Lane rental: innovative way to reduce road construction time. Journal of Construction Engineering and Management, 124(5), pp. 411-417. ISSN 0733-9364

Hermawan, F (2015) A strategic approach to enhancing sustainable practices in public building projects: a case study of Indonesian local authorities. PhD thesis, Coventry University, UK.

Hernandez, P and Kenny, P (2010) Integrating occupant preference and life cycle energy evaluation: A simplified method. Building Research & Information, 38(6), pp. 625-637. ISSN 0961-3218

Herrera-Avellanosa, D; Haas, F; Leijonhufvud, G; Brostrom, T; Buda, A; Pracchi, V; Webb, A L; Hüttler, W and Troi, A (2020) Deep renovation of historic buildings: The iea-shc task 59 path towards the lowest possible energy demand and CO2 emissions. International Journal of Building Pathology and Adaptation, 38(4), pp. 539-553. ISSN 23984708

Herrero, J J (2003) Columbus: a solution using metadata for integrating document management, project hosting and document control in the construction industry. PhD thesis, University of Greenwich, UK.

Herzog, Florian (2005) Strategic portfolio management for long-term investments: An optimal control approach. PhD thesis, ETH Zürich, Switzerland.

Hes, D; Morrison, A W and Bates, M (2005) Assessment and selection of materials for Melbourne city Council House 2. Construction Economics and Building, 5(2), pp. 8-19. ISSN 2204-9029

Hessami, A R; Faghihi, V; Kim, A and Ford, D N (2020) Evaluating planning strategies for prioritizing projects in sustainability improvement programs. Construction Management and Economics, 38(8), pp. 726-738. ISSN 01446193

Hesselink, L; Vahdatikhaki, F; Harmsen, Y and Voordijk, H (2024) Usability analysis of virtual-reality-enabled digital twin for the inspection of sewage pumping stations. International Journal of Construction Management, 24(13), pp. 1419-1430. ISSN 1562-3599

Heurkens, E W T M (2012) Private sector-led urban development projects: Management, partnerships and effects in the Netherlands and the UK. PhD thesis, Delft University of Technology, Netherlands.

Heywood, C; Missingham, G and Kenley, R (2002) Strategic issues for facility provision: A re-examination of the nimby phenomenon. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Hezel, Claudia Regina (2014) Impact assessment of the requirements of the contractor in integrated management systems for industrial assembly companies in the oil industry. PhD thesis, Universidade Estadual de Campinas, Brazil.

Hietajärvi, A-M and Aaltonen, K (2018) The formation of a collaborative project identity in an infrastructure alliance project. Construction Management and Economics, 36(1), pp. 1-21. ISSN 0144-6193

Hietajärvi, A-M; Aaltonen, K and Haapasalo, H (2017) Opportunity management in large projects: A case study of an infrastructure alliance project. Construction Innovation, 17(3), pp. 340-362. ISSN 1471-4175

Hiete, M; Stengel, J; Ludwig, J and Schultmann, F (2011) Matching construction and demolition waste supply to recycling demand: A regional management chain model. Building Research & Information, 39(4), pp. 333-351. ISSN 0961-3218

Higham, A P (2014) Conceptual framework for the sustainable benefit evaluation of UK social housing projects. PhD thesis, Sheffield Hallam University, UK.

Hijazi, A A; Das, P; Li, Y; Moehler, R C and Maxwell, D W (2026) A contingency approach to platform implementation: Platform types, attributes, and value chain integration. Building Research & Information, 54(1), pp. 4-23. ISSN 0961-3218

Hijazi, A A; Perera, S; Calheiros, R N and Alashwal, A (2023) A data model for integrating BIM and blockchain to enable a single source of truth for the construction supply chain data delivery. Engineering, Construction and Architectural Management, 30(10), pp. 4645-4664. ISSN 0969-9988

Hijazi, A M (1989) Simulation analysis of linear construction processes. PhD thesis, Purdue University, USA.

Hijazi, S A (2016) Developing a framework to enhance building handover practices in public sector construction projects in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.

Hildreth, J; Vorster, M and Martinez, J (2005) Reduction of short-interval GPS data for construction operations analysis. Journal of Construction Engineering and Management, 131(8), pp. 920-927. ISSN 0733-9364

Hill, C and Ainsworth, A (2001) Health and safety: Academic research and practical application. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Hill, C and Rodgers, J (2000) Project partnering arrangement for delivery of a tight scheduled project. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Hindmarch, H (2012) Design change management: Developing a software application to support the evaluation of construction design changes. DEng thesis, University of Manchester, UK.

Hindmarch, H; Gale, A W and Harrison, R E (2010) A proposed construction design change management tool to aid in making informed design decisions. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Hirano, S; Kayumba, E; Grafweg, A and Kelman, I (2011) Developing Rwanda's schools infrastructure standards and guidelines. International Journal of Disaster Resilience in the Built Environment, 2(1), pp. 30-46. ISSN 1759-5916

Hirbod, S (2018) The application of EnerPHit standard to residential tower blocks in the UK. PhD thesis, University of Kent, UK.

Hitt, S J; Hairstans, R; Oloke, D; Bertasso, S; Tamagnone, G and Shirley, B (2024) Developing modern construction professionals with a focus on timber – a UK case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(1), pp. 32-40. ISSN 17514304

Hiyassat, M A; Hiyari, M A and Sweis, G J (2016) Factors affecting construction labour productivity: A case study of Jordan. International Journal of Construction Management, 16(2), pp. 138-149. ISSN 1562-3599

Ho, M F; Drew, D; McGeorge, D and Loosemore, M (2004) Implementing corporate ethics management and its comparison with the safety management system: A case study in Hong Kong. Construction Management and Economics, 22(6), pp. 595-606. ISSN 01446193

Ho, M F C and Ng, C W V (2003) Quantity surveyors' background and training, and their ethical concepts, conceptions and interests considerations. Construction Management and Economics, 21(1), pp. 43-67. ISSN 01446193

Ho, S P; Lin, Y H; Chu, W and Wu, H L (2009) Model for organizational governance structure choices in construction joint ventures. Journal of Construction Engineering and Management, 135(6), pp. 518-530. ISSN 0733-9364

Hochscheid, E; Falardeau, M; Lapalme, J; Boton, C and Rivest, L (2023) Practitioners' concerns about their liability toward BIM collaborative digital mockups: Case study in civil engineering. Journal of Construction Engineering and Management, 149(9): 05023010, ISSN 0733-9364

Hochstatter, Kirk (2025) Collaborative project delivery governance and shared leadership in AEC building virtual teams. PhD thesis, University of Washington, USA.

Hodkinson, S and Essen, C (2015) Grounding accumulation by dispossession in everyday life: The unjust geographies of urban regeneration under the private finance initiative. International Journal of Law in the Built Environment, 7(1), pp. 72-91. ISSN 1756-1450

Hoeber, H and Alsem, D (2016) Life-cycle information management using open-standard BIM. Engineering, Construction and Architectural Management, 23(6), pp. 696-708. ISSN 0969-9988

Hoekstra, T J (2021) Stakeholders’ perceptions of inefficiencies in commercial construction and development projects in the midwestern United States. PhD thesis, Concordia University Chicago, USA.

Hoezen, M; Voordijk, H and Dewulf, G (2012) Contracting dynamics in the competitive dialogue procedure. Built Environment Project and Asset Management, 2(1), pp. 6-24. ISSN 2044-124X

Hoezen, M; van Rutten, J; Voordijk, H and Dewulf, G (2010) Towards better customized service-led contracts through the competitive dialogue procedure. Construction Management and Economics, 28(11), pp. 1177-1186. ISSN 1466433X

Hoezen, Mieke (2012) The competitive dialogue procedure: Negotiations and commitment in inter-organisational construction projects. PhD thesis, University of Twente, Netherlands.

Hoffman, S J (1993) Behind the facade: The constraining influence of race, class and power on elites in the city-building process, Richmond, Virginia, 1870-1920. PhD thesis, Carnegie Mellon University, USA.

Hofman, E; Voordijk, H and Halman, J (2009) Matching supply networks to a modular product architecture in the house-building industry. Building Research & Information, 37(1), pp. 31-42. ISSN 0961-3218

Hogarth, T and Gambin, L (2014) Employer investment in apprenticeships in England: An exploration of the sensitivity of employers in the construction sector to the net costs of training. Construction Management and Economics, 32(9), pp. 845-856. ISSN 01446193

Holley, P W (2006) Effectiveness of it-based course material: A case study in publishing and using a digital textbook for construction surveying. International Journal of Construction Education and Research, 2(1), pp. 29-41. ISSN 1557-8771

Holmes, Matthew Ian (2013) The application of structural contingency theory to supply chain management: Developing a strategic model for prefabricated timber systems. PhD thesis, University of Technology Sydney, Australia.

Holt, G D (1997) Classifying construction contractors: A case study using cluster analysis. Building Research & Information, 25(6), pp. 374-382. ISSN 0961-3218

Holt, G D (2014) Industrial innovation: Case study of the Claerwen Dam. Built Environment Project and Asset Management, 4(2), pp. 146-165. ISSN 2044-124X

Holt, G D (2016) Historical British antecedents of innovative construction project organisation and social structures. Construction Innovation, 16(1), pp. 46-66. ISSN 1471-4175

Holt, G D; Akintoye, A and Davis, P T (2015) Editorial: Analysis of papers published in the journal of financial management of property and construction 2010-2015. Journal of Financial Management of Property and Construction, 20(2), pp. 106-115. ISSN 1366-4387

Holt, G D and Edwards, D J (2012) Innovation or business survival? A preliminary, qualitative study of UK construction plant supply chains. Construction Innovation, 12(1), pp. 99-122. ISSN 1471-4175

Holt, G D and Edwards, D J (2014) Machinery transportation management: Case study of "plant-trailer" H&S incidents. Built Environment Project and Asset Management, 4(3), pp. 264-280. ISSN 2044-124X

Holt, L (1983) A case study of the construction of a terephthalic acid plant for Imperial Chemicals Limited at the Davies Works, Wilton, Cleveland, UK. Construction Management and Economics, 1(1), pp. 57-74. ISSN 01446193

Holton, I R (2009) Developing a sector sustainability strategy for the UK precast concrete industry. EngD thesis, Loughborough University, UK.

Holtzhower, D L (2015) Decision model to optimize wastewater treatment in the built environment. PhD thesis, University of Florida, USA.

Hon, C K H; Sun, C; Xia, B; Jimmieson, N L; Way, K A and Wu, P P Y (2022) Applications of Bayesian approaches in construction management research: A systematic review. Engineering, Construction and Architectural Management, 29(5), pp. 2153-2182. ISSN 0969-9988

Hong, J (2006) A study on analytic approaches to intelligent buildings assessment. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Hong, T (2005) Life-cycle cost assessment model of composite materials in construction. PhD thesis, Purdue University, USA.

Hong, T; Cho, K; Hyun, C and Han, S (2011) Simulation-based schedule estimation model for ACS-based core wall construction of high-rise building. Journal of Construction Engineering and Management, 137(6), pp. 393-402. ISSN 0733-9364

Hong, W T; Whyte, J and Xue, J (2025) A natural language processing-driven framework for policymaking in infrastructure development. Journal of Construction Engineering and Management, 151(5): 04025025, ISSN 0733-9364

Hong, Y; Xie, H; Agapaki, E and Brilakis, I (2023) Graph-based automated construction scheduling without the use of BIM. Journal of Construction Engineering and Management, 149(2): 05022020, ISSN 0733-9364

Hong, Z; Hong, Y; Cai, H; Abraham, D M; Zhang, J and Dunston, P S (2025) BIM-based framework for in-plant quality control of precast concrete manufacturing. Journal of Construction Engineering and Management, 151(12): 05025017, ISSN 0733-9364

Hong-minh, S M T (2002) Re-engineering the UK private house building supply chain. PhD thesis, University of Wales College of Cardiff, UK.

Honsa, J; Versele, A; van de Kerckhove, T and Piccardo, C (2025) Circularity at the neighbourhood scale: Co-creative living lab lessons. Buildings & Cities, 6(1), pp. 800-818. ISSN 2632-6655

Hooko, D K (1999) The private urban residential development process in Tamale, Ghana: an application of structure and agency institutionalism. PhD thesis, University of Aberdeen, UK.

Hooper, M (2015) BIM anatomy II: Standardisation needs & support systems. PhD thesis, Lund University, Sweden.

Hopkin, T; Lu, S L; Sexton, M and Rogers, P (2019) Learning from defects in the UK housing sector using action research: A case study of a housing association. Engineering, Construction and Architectural Management, 26(8), pp. 1608-1624. ISSN 0969-9988

Hopkin, T; Lu, S-L; Rogers, P and Sexton, M (2016) Detecting defects in the UK new-build housing sector: A learning perspective. Construction Management and Economics, 34(1), pp. 35-45. ISSN 0144-6193

Horgan, I (2014) The influence of an online collaboration tool on relationships in inter-organisational networks. PhD thesis, Victoria University, Australia.

Horii, T (2005) Impact of multiple normative systems on the organizational performance of international joint ventures. PhD thesis, Stanford University, USA.

Horney, J; Simon, M C; Ricchetti-Masterson, K and Berke, P (2016) Resident perception of disaster recovery planning priorities. International Journal of Disaster Resilience in the Built Environment, 7(4), pp. 330-343. ISSN 1759-5916

Horvath, A (1997) Estimation of environmental implications of construction materials and designs using life cycle assessment techniques. PhD thesis, Carnegie Mellon University, USA.

Hosein, R and Lewis, T M (2005) Quantifying the relationship between aggregate GDP and construction value added in a small petroleum rich economy: a case study of Trinidad and Tobago. Construction Management and Economics, 23(2), pp. 185-197. ISSN 01446193

Hoseini, E; Bosch-Rekveldt, M and Hertogh, M (2020) Cost contingency and cost evolvement of construction projects in the preconstruction phase. Journal of Construction Engineering and Management, 146(6): 05020006, ISSN 0733-9364

Hosny, F.; El-Damaty, M.; Mantha, B. R. K. and Abu Dabous, S. (2026) Analysis and modeling of delays during construction handover stage for building projects: A case study of United Arab Emirates. International Journal of Building Pathology and Adaptation, 44(3), pp. 658-684. ISSN 2398-4708

Hosny, O; Nassar, K and Esmail, Y (2013) Prequalification of Egyptian construction contractors using fuzzy-AHP models. Engineering, Construction and Architectural Management, 20(4), pp. 381-405. ISSN 0969-9988

Hossain, M M and Ahmed, S (2022) Developing an automated safety checking system using BIM: A case study in the Bangladeshi construction industry. International Journal of Construction Management, 22(7), pp. 1206-1224. ISSN 1562-3599

Hossain, M M; Ahmed, S; Anam, S M A; Baxramovna, I A; Meem, T I; Sobuz, M H R and Haq, I (2025) BIM-based smart safety monitoring system using a mobile app: A case study in an ongoing construction site. Construction Innovation, 25(2), pp. 552-576. ISSN 1471-4175

Hossain, Y (2017) Energy-efficient homes in Alaska: Historical and contemporary perspectives on adaptation and innovation. PhD thesis, University of Alaska Fairbanks, USA.

Hosseini, S. M.; Heidari, S.; Attia, S.; Wang, J. and Triantafyllidis, G. (2026) Biomimetic kinetic façade as a real-time daylight control: Complex form versus simple form with proper kinetic behavior. Smart and Sustainable Built Environment, 15(2), pp. 472-507. ISSN 2046-6099

Hosseinian, A H and Baradaran, V (2023) A two-phase approach for solving the multi-skill resource-constrained multi-project scheduling problem: A case study in construction industry. Engineering, Construction and Architectural Management, 30(1), pp. 321-363. ISSN 0969-9988

Hosseinian, S M; Younesi, S; Razini, S and Carmichael, D G (2022) Intelligent stochastic agent-based model for predicting truck production in construction sites by considering learning effect. Journal of Construction Engineering and Management, 148(5): 04022018, ISSN 0733-9364

Hou, Shan (2014) An investigation into the development of low/zero carbon design training programmes for the purpose of disseminating the knowledge and skills of low/zero carbon design to architects in practice in England and Wales. PhD thesis, Cardiff University, UK.

Hou, W and Wang, L (2022) Research on the refinancing capital structure of highway PPP projects based on dynamic capital demand. Engineering, Construction and Architectural Management, 29(5), pp. 2047-2072. ISSN 0969-9988

Hove, G (2015) Perceptions of small business executives on determinants of performance in the construction industry in Gauteng, South Africa. DBL thesis, University of South Africa, South Africa.

Howard, M A (2022) Integration strategies for mergers and acquisitions in the United Kingdom housing sector. DBA thesis, Walden University, USA.

Howard, Robert W (2021) Of incentive, bias, and behaviour: an empirical economic investigation into project delivery constructs influencing the adoption of building information modelling. PhD thesis, University College London, UK.

Howard, W E (1996) Innovative strategies for compensation of engineering and construction contractors. PhD thesis, Clemson University, USA.

Howarth, T; Stoneman, G and Hill, C (2000) A review of the construction (design and management) regulations. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Howe, A S (1998) A new paradigm for life-cycle management of kit-of-parts building systems. PhD thesis, University of Michigan, USA.

Howsawi, Eskander Mohammed Adam (2014) Effective strategies for successful engineering project delivery during national crises. PhD thesis, University of Technology Sydney, Australia.

Hoxha, E; Passer, A; Saade, M R M; Trigaux, D; Shuttleworth, A; Pittau, F; Allacker, K and Habert, G (2020) Biogenic carbon in buildings: A critical overview of LCA methods. Buildings & Cities, 1(1), pp. 504-524. ISSN 2632-6655

Hoxie, C; Berkebile, R and Todd, J A (2012) Stimulating regenerative development through community dialogue. Building Research & Information, 40(1), pp. 65-80. ISSN 0961-3218

Hsiao, C-C (2000) Constructing a sustainable impact assessment methodology: an evaluation of Taiwanese EIA of high-rise building. PhD thesis, University of Edinburgh, UK.

Hsu, C L; Wang, J T and Huang, Y H (2023) A functional element-naming approach for BIM elements in building envelope systems. Journal of Construction Engineering and Management, 149(6): 04023035, ISSN 0733-9364

Hsu, D (2014) Improving energy benchmarking with self-reported data. Building Research & Information, 42(5), pp. 641-656. ISSN 0961-3218

Hsu, P Y; Aurisicchio, M; Angeloudis, P and Whyte, J (2020) Understanding and visualizing schedule deviations in construction projects using fault tree analysis. Engineering, Construction and Architectural Management, 27(9), pp. 2501-2522. ISSN 0969-9988

Hsu, P-Y (2019) Optimal logistics for modular construction. PhD thesis, Imperial College London, UK.

Hu, D; Mohamed, Y; Taghaddos, H and Hermann, U (2018) A simulation-based method for effective workface planning of industrial construction projects. Construction Management and Economics, 36(6), pp. 328-347. ISSN 01446193

Hu, H and Zhu, Y (2015) Social welfare-based concession model for build/operate/transfer contracts. Journal of Construction Engineering and Management, 141(1): 04014064, ISSN 0733-9364

Hu, J; Ren, Z and Shen, L Y (2008) Impacts of overseas management structures on project buyout management: Case studies of Chinese international contractors. Journal of Construction Engineering and Management, 134(11), pp. 864-875. ISSN 0733-9364

Hu, M (2020) Life-cycle environmental assessment of energy-retrofit strategies on a campus scale. Building Research & Information, 48(6), pp. 659-680. ISSN 0961-3218

Hu, M (2022) Influence of project design team characteristics on construction cost of sustainable buildings. PhD thesis, University of Maryland, College Park, USA.

Hu, M (2023) An evaluation of the retrofit net zero building performances: Life cycle energy, emissions and cost. Building Research & Information, 51(2), pp. 179-191. ISSN 0961-3218

Hu, Q; Bai, Y; He, L; Cai, Q; Tang, S; Ma, G; Tan, J and Liang, B (2020) Intelligent framework for worker-machine safety assessment. Journal of Construction Engineering and Management, 146(5): 04020045, ISSN 0733-9364

Hu, W and Panthi, K (2020) Project status reporting system (PSRS) for pipeline relocation programs. Built Environment Project and Asset Management, 10(5), pp. 693-708. ISSN 2044-124X

Hu, X; Xia, B; Buys, L; Skitmore, M; Kennedy, R and Drogemuller, R (2015) Stakeholder analysis of a retirement village development in Australia: Insights from an interdisciplinary workshop. International Journal of Construction Management, 15(4), pp. 299-309. ISSN 1562-3599

Hu, Y and Dossick, C S (2024) Decoding the dynamics of BIM use practice in construction projects. Construction Management and Economics, 42(5), pp. 451-475. ISSN 01446193

Hua, G B and Pin, T H O (2000) Forecasting construction industry demand, price and productivity in Singapore: The Box-Jenkins approach. Construction Management and Economics, 18(5), pp. 607-618. ISSN 01446193

Hua, Y; He, J; Gong, J and Zhao, J (2020) Hazardous area risk-based evacuation simulation and analysis of building construction sites. Journal of Construction Engineering and Management, 146(5): 04020047, ISSN 0733-9364

Huang, C (2005) The development of an integrated paradigm and a decision support framework for IT innovation adoption. Unpublished PhD thesis, University of Reading, UK.

Huang, C; Wang, Z K; Li, B; Wang, C; Xu, L S; Jiang, K; Liu, M; Guo, C X; Zhao, X F and Yang, H (2023) Discretized cell modeling for optimal layout of multiple tower cranes. Journal of Construction Engineering and Management, 149(8): 04023068, ISSN 0733-9364

Huang, C-N (2003) Time study on two-echelon supply chain for steel framing construction: Field investigation and networking model simulation. PhD thesis, University of Wisconsin - Madison, USA.

Huang, H; Zhang, C and Hammad, A (2021) Effective scanning range estimation for using tls in construction projects. Journal of Construction Engineering and Management, 147(9): 04021106, ISSN 0733-9364

Huang, J; Han, D; Zhang, H and Cui, W (2024) Framework and case study for the assembly accuracy prediction of prefabricated buildings using BIM and tls. Architectural Engineering and Design Management, 20(6), pp. 1427-1453. ISSN 1745-2007

Huang, K-S (2003) Development-related BOT: A lesson of under-utilized and over-utilized development synergy in Taiwan. DDes thesis, Harvard University, USA.

Huang, R Y (2006) A performance-based bridge LCCA model using visual inspection inventory data. Construction Management and Economics, 24(10), pp. 1069-1081. ISSN 1466433X

Huang, R Y and Halpin, D W (1995) Graphical-based method for transient evaluation of construction operations. Journal of Construction Engineering and Management, 121(2), pp. 222-229. ISSN 0733-9364

Huang, R Y and Sun, K S (2006) Non-unit-based planning and scheduling of repetitive construction projects. Journal of Construction Engineering and Management, 132(6), pp. 585-597. ISSN 0733-9364

Huang, R-Y (1994) A graphical-based method for transient evaluation of construction operations. PhD thesis, Purdue University, USA.

Huang, S (2016) Model based technologies for enhancing building operation. PhD thesis, University of Miami, USA.

Huang, Y (2010) Sustainable infrastructure system modeling under uncertainties and dynamics. PhD thesis, University of California, Davis, USA.

Huang, Y L and Pi, C C (2014) Real-option valuation of build-operate-transfer infrastructure projects under performance bonding. Journal of Construction Engineering and Management, 140(5): 04013068, ISSN 0733-9364

Hubbard, P (2015) Law, sex and the city: Regulating sexual entertainment venues in England and Wales. International Journal of Law in the Built Environment, 7(1), pp. 5-20. ISSN 1756-1450

Huber, A; Heinrichs, H and Jaeger-Erben, M (2024) Promoting neighbourhood sharing: Infrastructures of convenience and community. Buildings & Cities, 5(1), pp. 349-367. ISSN 2632-6655

Hudak, D and Maxwell, M (2007) A macro approach to estimating correlated random variables in engineering production projects. Construction Management and Economics, 25(8), pp. 883-892. ISSN 1466433X

Hudson, R (2010) Strategies for parametric design in architecture: an application of practice-led research. PhD thesis, University of Bath, UK.

Hughes, B; Edwards, D J; Martek, I; Chileshe, N and Thwala, W D (2022) Assessing the "clerk of works" role in delivering quality affordable housing: A UK case study. Smart and Sustainable Built Environment, 11(4), pp. 996-1016. ISSN 2046-6099

Hughes, J O; Pallin, S; Aldykiewicz, A J and Clark, C J (2021) Installation quality framework: Investment return approach for energy savings on building product installation. Journal of Construction Engineering and Management, 147(11): 04021158, ISSN 0733-9364

Hughes, M L (2020) Evaluating the impact of knowledge transfer on project delays for construction project delivery: A qualitative case study. PhD thesis, Northcentral University, USA.

Hughes, W P (1989) Organizational analysis of building projects. PhD thesis, Liverpool Polytechnic, UK.

Hugo, J and Farhadian, M (2026) Living labs and building testing labs: Enabling climate change adaptation. Buildings & Cities, 7(1), pp. 126-142. ISSN 2632-6655

Huijbregts, H J J (2002) Information and communications technology for real estate investment management. DDes thesis, Harvard University, USA.

Hulathdoowage, N D; Karunasena, G; Udawatta, N and Liu, C (2024) Essential parameters in stepwise retrofitting for long-term emission reduction in residential buildings. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Humphrey, S D (2005) Construction procurement and profit: an analysis of the relationship from a contractor's perspective. PhD thesis, Loughborough University, UK.

Hunter, K and Kelly, J (2003) An investigation of commonality of issues at different project stages using a three-stage project model. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Hunter, K and Kelly, J (2004) The case for value management in the UK public service sector. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Hunter, K and Kelly, J (2004) Value management workshops and partnering conundrums. Journal of Construction Procurement, 10(1),

Huo, T; Ren, H; Cai, W; Shen, G Q; Liu, B; Zhu, M and Wu, H (2018) Measurement and dependence analysis of cost overruns in megatransport infrastructure projects: Case study in Hong Kong. Journal of Construction Engineering and Management, 144(3): 05018001, ISSN 0733-9364

Huo, X; Yu, A T W; Zezhou, W and Jayantha, W M (2020) Site planning and design of green residential building projects: Case studies in China. Engineering, Construction and Architectural Management, 27(2), pp. 525-543. ISSN 0969-9988

Hussain, R S (2017) Investigating the business process implications of managing road works and street works. PhD thesis, Loughborough University, UK.

Hussain, R S; Ruikar, K; Enoch, M P; Brien, N and Gartside, D (2017) Process mapping for road works planning and coordination. Built Environment Project and Asset Management, 7(2), pp. 157-172. ISSN 2044-124X

Hussein, M; Darko, A; Eltoukhy, A E E and Zayed, T (2022) Sustainable logistics planning in modular integrated construction using multimethod simulation and taguchi approach. Journal of Construction Engineering and Management, 148(6): 04022022, ISSN 0733-9364

Hussein, M K; Yusof, M J M and Jaafar, N S (2020) An observational study on forest landscape conservation in Malaysia via the establishment of forestry educational centres. Journal of Construction in Developing Countries, 25(2), pp. 153-173. ISSN 1823-6499

Hussey, H J (2023) Establishing criteria for descriptions of building work which include practicality and intricacy. PhD thesis, University of Northumbria at Newcastle, UK.

Hutcheson, John M (1979) Administration of building contracts with particular reference to the builder's financial control. PhD thesis, University of New South Wales, Australia.

Huuhka, S (2023) Understanding demolition. Buildings & Cities, 4(1), pp. 927-937. ISSN 2632-6655

Huuhka, S; Moisio, M and Arnould, M (2024) Evaluating past and future building operational emissions: Improved method. Buildings & Cities, 5(1), pp. 150-161. ISSN 2632-6655

Huuhka, S; Moisio, M; Salmio, E; Köliö, A and Lahdensivu, J (2023) Renovate or replace? Consequential replacement LCA framework for buildings. Buildings & Cities, 4(1), pp. 212-228. ISSN 2632-6655

Hvid Horup, L; Ohms, P K; Hauschild, M; Gummidi, S R B; Secher, A Q; Thuesen, C and Ryberg, M (2024) Evaluating mitigation strategies for building stocks against absolute climate targets. Buildings & Cities, 5(1), pp. 117-132. ISSN 2632-6655

Hwang, B G and Lim, E S J (2013) Critical success factors for key project players and objectives: Case study of Singapore. Journal of Construction Engineering and Management, 139(2), pp. 204-215. ISSN 0733-9364

Hwang, S; Park, M; Lee, H S; Lee, S and Kim, H (2015) Postdisaster interdependent built environment recovery efforts and the effects of governmental plans: Case analysis using system dynamics. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Hyatt, B A (2023) Construction data leaders’ descriptions of their organization’s analytics maturity. DBA thesis, Grand Canyon University, USA.

Hyde, R (1995) Buildability as a design concept for architects: A case study of laboratory buildings. Engineering, Construction and Architectural Management, 2(1), pp. 45-56. ISSN 0969-9988

Hyde, R A (1999) Educating engineers for environmentally sensitive practice. PhD thesis, University of Toronto, Canada.

Hyun, C; Cho, K; Koo, K; Hong, T and Moon, H (2008) Effect of delivery methods on design performance in multifamily housing projects. Journal of Construction Engineering and Management, 134(7), pp. 468-482. ISSN 0733-9364

Hyung, W G; Kim, S and Jo, J K (2020) Improved similarity measure in case-based reasoning: A case study of construction cost estimation. Engineering, Construction and Architectural Management, 27(2), pp. 561-578. ISSN 0969-9988

Häkkinen, T and Belloni, K (2011) Barriers and drivers for sustainable building. Building Research & Information, 39(3), pp. 239-255. ISSN 0961-3218

Hällström, A A F (2023) Collaborative project delivery models in infrastructure construction. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Höök, M; Stehn, L and Brege, S (2015) The development of a portfolio of business models: A longitudinal case study of a building material company. Construction Management and Economics, 33(5-6), pp. 334-348. ISSN 01446193

Ibbotson, K (2020) Prioritising carbon reduction in UK public sector flood and coastal risk management. PhD thesis, University of Bolton, UK.

Ibbs, W and Liu, M (2005) Improved measured mile analysis technique. Journal of Construction Engineering and Management, 131(12), pp. 1249-1256. ISSN 0733-9364

Ibbs, W and Nguyen, L D (2007) Alternative for quantifying field-overhead damages. Journal of Construction Engineering and Management, 133(10), pp. 736-742. ISSN 0733-9364

Ibbs, W and Nguyen, L D (2007) Schedule analysis under the effect of resource allocation. Journal of Construction Engineering and Management, 133(2), pp. 131-138. ISSN 0733-9364

Ibbs, W; Nguyen, L D and Simonian, L (2011) Concurrent delays and apportionment of damages. Journal of Construction Engineering and Management, 137(2), pp. 119-126. ISSN 0733-9364

Ibe, C. N. (2026) Optimising sustainable deconstruction strategies for concrete structures: A multi-criteria decision-making framework approach. International Journal of Building Pathology and Adaptation, 44(3), pp. 773-788. ISSN 2398-4708

Ibrahim, A D; Price, A D F and Dainty, A R J (2008) Is the local improvement finance trust (LIFT) procurement initiative delivering the expected economies of scale? Results from three case studies. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Ibrahim, A D; Price, A D F and Dainty, A R J (2009) Evaluation of key practices under the local improvement finance trust (lift) initiative for UK healthcare facilities. Engineering, Construction and Architectural Management, 16(5), pp. 504-518. ISSN 0969-9988

Ibrahim, F S; Esa, M and Kamal, E M (2022) Strategies to minimise the impact of COVID-19 on the construction industry: A case study of construction site clusters in Malaysia. Construction Economics and Building, 22(3), pp. 21-42. ISSN 2204-9029

Ibrahim, K I; Costello, S B; Wilkinson, S and Walker, D (2016) Project alliancing: The case of road infrastructure projects in New Zealand. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Idrissi Gartoumi, K; Aboussaleh, M and Zaki, S (2024) Implementing lean construction to improve quality and megaproject construction: A case study. Journal of Financial Management of Property and Construction, 29(1), pp. 1-22. ISSN 1366-4387

Iftikhar, Rehab (2017) Crisis management in project based organizations and mega projects: An integrated approach. PhD thesis, Luiss Guido Carli, Italy.

Ihsanallah, K O (1987) The management of superprojects. PhD thesis, University of Manchester Institute of Science and Technology, UK.

Ihuah, P W (2015) Conceptual framework for the sustainable management of social (public) housing estates in the Niger Delta region of Nigeria. PhD thesis, University of Salford, UK.

Ikediashi, D I and Ogunlana, S O (2015) Significant risk factors associated with facilities management outsourcing: A study on Nigeria's public hospitals. Engineering, Construction and Architectural Management, 22(6), pp. 771-796. ISSN 0969-9988

Ikerd II, W F (2021) Level of acceptance (LOA) for scan-to-BIM creation. PhD thesis, University of Denver, USA.

Ikudayisi, A E and Adegun, O B (2025) Pathways for green building acceleration in fast-growing countries: A case study on Nigeria. Built Environment Project and Asset Management, 15(3), pp. 450-466. ISSN 2044-124X

Ikuma, L H; Nahmens, I and James, J (2011) Use of safety and lean integrated kaizen to improve performance in modular homebuilding. Journal of Construction Engineering and Management, 137(7), pp. 551-560. ISSN 0733-9364

Ilgın, H E (2022) A study on interrelations of structural systems and main planning considerations in contemporary supertall buildings. International Journal of Building Pathology and Adaptation, 41(6), pp. 1-25. ISSN 23984708

Ilgın, H E (2022) Interrelations of slenderness ratio and main design criteria in supertall buildings. International Journal of Building Pathology and Adaptation, 41(6), pp. 139-161. ISSN 23984708

Ilgın, H E (2023) An analysis of space efficiency in asian supertall towers. International Journal of Building Pathology and Adaptation, 41(6), pp. 237-253. ISSN 23984708

Ilgın, H E; Karjalainen, M and Pelsmakers, S (2022) Contemporary tall residential timber buildings: What are the main architectural and structural design considerations? International Journal of Building Pathology and Adaptation, 41(6), pp. 26-46. ISSN 23984708

Illankoon, Illankoon Mudiyanselage Chethana Sanathani (2018) A life-cycle cost model for green commercial office buildings with optimal green star credits. PhD thesis, Western Sydney University, Australia.

Ilozor, B D (2009) Differential management of waste by construction sectors: A case study in Michigan, USA. Construction Management and Economics, 27(8), pp. 763-770. ISSN 1466433X

Ilter, A T (2011) Evaluation of contracting firms' innovation approaches. PhD thesis, Istanbul Technical University, Turkey.

Ilter, D; Cakmak, P I; Ustuner, Y A and Tas, E (2016) Toward a research roadmap for construction mediation. International Journal of Law in the Built Environment, 8(2), pp. 176-190. ISSN 1756-1450

Ilyas, M; Shaojun, C; Li, Y; Ahmad, S and Hamza, A (2024) Cause analysis of delay in development induced displacement and resettlement (didr) project. A case study of diamer basha dam project in Pakistan. International Journal of Construction Management, 24(5), pp. 551-560. ISSN 1562-3599

Imam, R and Ayadi, O (2022) Powering electric tower cranes by solar energy for sustainable construction. International Journal of Construction Management, 22(13), pp. 2614-2624. ISSN 1562-3599

Imanghaliyeva, A (2021) Managing sociotechnical risks in infrastructure projects: Sociotechnical Systems (STS) perspectives on systems. PhD thesis, Heriot-Watt University, UK.

Imu, N J; Ezeamama, A and Matemilola, S (2022) Assessment of energy and emissions saving impact of solar PV modules: A case study of Bangladesh. International Journal of Building Pathology and Adaptation, 40(4), pp. 608-621. ISSN 23984708

Inançoğlu, S and Uzunoglu, S S (2022) Transformation of social housing kitchens over time: Nicosia göçmenköy social houses as a case study. International Journal of Building Pathology and Adaptation, 40(1), pp. 40-59. ISSN 23984708

Indikatiya, I H P R; Liyanage, M L D C J and Jayawardene, S M (2025) Managing intragroup conflicts between direct stakeholder's teams during construction stage: Case studies in Sri Lanka. Journal of Financial Management of Property and Construction, 30(3), pp. 500-517. ISSN 1366-4387

Ingirige, B and Sexton, M (2006) Alliances in construction: Investigating initiatives and barriers for long-term collaboration. Engineering, Construction and Architectural Management, 13(5), pp. 521-535. ISSN 0969-9988

Ingirige, M J B (2004) A study of knowledge sharing in multinational construction alliances. PhD thesis, University of Salford, UK.

Ingraham, A T (2001) Bidder-auctioneer cheating in sealed-bid auctions. PhD thesis, University of Maryland, College Park, USA.

Innella, F; Arashpour, M and Bai, Y (2019) Lean methodologies and techniques for modular construction: Chronological and critical review. Journal of Construction Engineering and Management, 145(12): 04019076, ISSN 0733-9364

Inti, S (2016) A decision making approach for selection of sustainable pavements in Texas by integrating life cycle cost analysis (LCCA), life cycle assessment (LCA) of environmental and social impacts. PhD thesis, University of Texas at El Paso, USA.

Inyang, N I (2013) A framework for ergonomic assessment of residential construction tasks. PhD thesis, University of Alberta, Canada.

Inzulza Contardo, J; Boano, C and Wirsching, C (2018) Gentrification in (re)construction: Talca's neighbourhoods post 2010 earthquake. International Journal of Disaster Resilience in the Built Environment, 9(2), pp. 170-183. ISSN 1759-5916

Inácio, M F M (1999) The building deconstruction process and the debris trail: towards a dynamic model. PhD thesis, University of Salford, UK.

Ioannidou, D (2016) On sustainability aspects through the prism of stone as a material for construction. DSc thesis, ETH Zürich, Switzerland.

Ioannidou, D; Zerbi, S; García de Soto, B and Habert, G (2018) Where does the money go? Economic flow analysis of construction projects. Building Research & Information, 46(4), pp. 348-366. ISSN 0961-3218

Irajifar, L; Sipe, N and Alizadeh, T (2016) The impact of urban form on disaster resiliency: A case study of Brisbane and Ipswich, Australia. International Journal of Disaster Resilience in the Built Environment, 7(3), pp. 259-275. ISSN 1759-5916

Irving, P A (2016) Explicating excessive financial resource allocation by building control in achieving regulatory conformity in domestic extensions. PhD thesis, University of Salford, UK.

Isa, M F M (2013) Quality modeling and improvement of university facilities services using six-sigma: A case study on wayne state university FPM services. PhD thesis, Wayne State University, USA.

Isa, R; Emuze, F; Das, D and Awuzie, B O (2018) Modeling a transformational route to infrastructure sustainability in South Africa. Built Environment Project and Asset Management, 8(2), pp. 147-159. ISSN 2044-124X

Isaksson, T (2002) Model for estimation of time and cost based on risk evaluation applied on tunnel projects. PhD thesis, Kungliga Tekniska Hogskolan, Sweden.

Isaton, Camila (2023) A collaborative risk identification model with cost risk simulation: A case study of a port logistics storage yard. PhD thesis, Universidade Federal de Santa Catarina, Brazil.

Ishtiaque, T A and Klakegg, O J (2025) Effects of early contractor involvement in small construction projects: Lessons from Norway. Built Environment Project and Asset Management, 15(4), pp. 879-893. ISSN 2044-124X

Isiadianso, C (2007) Integrating deconstruction into the project delivery process. PhD thesis, Loughborough University, UK.

Isied, M M (2023) Critical assessment of asphalt mixture design procedures and asphalt mixture classification systems. PhD thesis, North Carolina State University, USA.

Islam, M A; Shetu, M M and Hakim, S S (2022) Possibilities of a gender-responsive infrastructure for livelihood-vulnerable women's resilience in rural-coastal Bangladesh. Built Environment Project and Asset Management, 12(3), pp. 447-466. ISSN 2044-124X

Islam, M S; Nepal, M and Skitmore, M (2025) Structuring risks for a comprehensive understanding of cost overruns in power plant projects. Construction Innovation, 25(3), pp. 1014-1032. ISSN 1471-4175

Ismaeel, W S E (2022) Sustainable site selection using system dynamics; case study LEED-certified project. Architectural Engineering and Design Management, 18(4), pp. 368-386. ISSN 1745-2007

Ismaeel, W S E; Alamoudy, F O and Sameh, R (2023) How renovation activities may jeopardise indoor air quality: Accounting for short and long-term symptoms of sick building syndrome in educational buildings. Architectural Engineering and Design Management, 19(4), pp. 360-377. ISSN 1745-2007

Ismail, F Z; Halog, A and Smith, C (2017) How sustainable is disaster resilience? An overview of sustainable construction approach in post-disaster housing reconstruction. International Journal of Disaster Resilience in the Built Environment, 8(5), pp. 555-572. ISSN 1759-5916

Ismail, S (2013) Analyzing coordination function within a governance structure: Evidence from case studies of selected housing projects in Malaysia. PhD thesis, University of Malaya, Malaysia.

Ismail, Z A (2019) An integrated computerised maintenance management system (I-CMMS) for IBS building maintenance. International Journal of Building Pathology and Adaptation, 37(3), pp. 326-343. ISSN 23984708

Ismail, Z A (2021) Implementation of BIM technology for knowledge transfer in IBS building maintenance projects. International Journal of Building Pathology and Adaptation, 39(1), pp. 115-134. ISSN 23984708

Ismail, Z A (2023) Improving failure risk by better planning and safety for precast beam-to-column connection elements using physical internet-enabled building information modeling technology: A Malaysian case study. International Journal of Building Pathology and Adaptation, 41(3), pp. 517-532. ISSN 23984708

Ismail, Z A B (2021) Towards a BIM-based approach for improving maintenance performance in IBS building projects. Engineering, Construction and Architectural Management, 28(5), pp. 1468-1490. ISSN 0969-9988

Ison, S; Dainty, A and Wall, S (2004) The construction sector, congestion charging and exemptions. Engineering, Construction and Architectural Management, 11(6), pp. 386-394. ISSN 0969-9988

Issa, R R A; Olbina, S and Zuppa, D (2018) Model for developing trust on US construction projects. Built Environment Project and Asset Management, 8(1), pp. 5-23. ISSN 2044-124X

Issariyanukula, A (2011) A probabilistic methodology for estimating transportation project costs using Bayesian models. PhD thesis, Purdue University, USA.

Ivory, C (2005) The cult of customer responsiveness: Is design innovation the price of a client-focused construction industry? Construction Management and Economics, 23(8), pp. 861-870. ISSN 01446193

Iyer, K C; Kumar, R and Singh, S P (2020) Understanding the role of contractor capability in risk management: A comparative case study of two similar projects. Construction Management and Economics, 38(3), pp. 223-238. ISSN 01446193

Iyer, K C and Sagheer, M (2011) A real options based traffic risk mitigation model for build-operate-transfer highway projects in India. Construction Management and Economics, 29(8), pp. 771-779. ISSN 1466433X

Iyer-Raniga, Usha (1997) Participative techniques for urban environmental improvement. PhD thesis, University of Melbourne, Australia.

Jaafari, A L I and Manivong, K (1999) The need for life-cycle integration of project processes. Engineering, Construction and Architectural Management, 6(3), pp. 235-255. ISSN 0969-9988

Jabang, S-W (2017) An investigation into the use of public procurement and commissioning to deliver community (societal) value. PhD thesis, University of Birmingham, UK.

Jabbari, A (2020) Project planning algorithms: Lowering cost and improving delivery time in capital projects. PhD thesis, University of California, Berkeley, USA.

Jackson, G (2003) Contingency for cost control in project management: A case study. Construction Economics and Building, 3(1), pp. 1-12. ISSN 2204-9029

Jackson, J I (2009) Collaboration in planning sustainable developments. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(2), pp. 69-74. ISSN 17514312

Jacobsson, M and Linderoth, H C J (2010) The influence of contextual elements, actors' frames of reference, and technology on the adoption and use of ICT in construction projects: A Swedish case study. Construction Management and Economics, 28(1), pp. 13-23. ISSN 1466433X

Jacobsson, M; Linderoth, H C J and Rowlinson, S (2017) The role of industry: An analytical framework to understand ICT transformation within the AEC industry. Construction Management and Economics, 35(10), pp. 611-626. ISSN 01446193

Jacobsson, M and Roth, P (2014) Towards a shift in mindset: Partnering projects as engagement platforms. Construction Management and Economics, 32(5), pp. 419-432. ISSN 01446193

Jacomit, A M and Granja, A D (2011) An investigation into the adoption of target costing on Brazilian public social housing projects. Architectural Engineering and Design Management, 7(2), pp. 113-127. ISSN 1745-2007

Jacques de Sousa, L; Poças Martins, J and Sanhudo, L (2024) Predicting construction project compliance with machine learning model: case study using Portuguese procurement data. Engineering, Construction and Architectural Management, 31(13), pp. 285-302. ISSN 0969-9988

Jadidoleslami, S; Saghatforoush, E; Heravi, A and Preece, C (2022) A practical framework to facilitate constructability implementation using the integrated project delivery approach: A case study. International Journal of Construction Management, 22(7), pp. 1225-1239. ISSN 1562-3599

Jafari, A (2018) A decision-making framework for the selection of sustainable alternatives for energy-retrofits. PhD thesis, University of New Mexico, USA.

Jafari, Parinaz (2021) A framework for enhancing contract-related documentation in construction. PhD thesis, University of Alberta, Canada.

Jahan, Israt (2024) Life-cycle sustainability analysis of construction and demolition wood waste to achieve circular economy. PhD thesis, RMIT University, Australia.

Jaillon, L and Poon, C S (2008) Sustainable construction aspects of using prefabrication in dense urban environment: A Hong Kong case study. Construction Management and Economics, 26(9), pp. 953-966. ISSN 1466433X

Jaillon, L and Poon, C S (2010) Design issues of using prefabrication in Hong Kong building construction. Construction Management and Economics, 28(10), pp. 1025-1042. ISSN 1466433X

Jaillon, L C (2009) The evolution of the use of prefabrication techniques in Hong Kong construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Jain, M and Rawal, R (2022) Emissions from a net-zero building in India: Life cycle assessment. Buildings & Cities, 3(1), pp. 398-416. ISSN 2632-6655

Jain, Nishesh (2021) Reducing the performance gap using calibrated simulation models. PhD thesis, University College London, UK.

Jaiswal, A; Kumar, A; Pal, I; Raisinghani, B and Bhoraniya, T H (2022) Sustainable management of coastal critical infrastructure: Case study of multi-purpose cyclone shelters in South Asia. International Journal of Disaster Resilience in the Built Environment, 13(3), pp. 304-326. ISSN 1759-5916

Jalaei, F; Zhang, J; McNeil- Ayuk, N and McLeod, C (2025) Environmental life cycle assessment (LCA) for design of climate-resilient bridges-a comprehensive review and a case study. International Journal of Construction Management, 25(1), pp. 99-114. ISSN 1562-3599

Jalaei, F; Zhang, J; McNeil- Ayuk, N and McLeod, C (2025) Environmental life cycle assessment (LCA) for design of climate-resilient bridges: A comprehensive review and a case study. International Journal of Construction Management, 25(1), pp. 99-114. ISSN 1562-3599

Jalali Sohi, A (2018) Flexibility in project management: Towards improving project performance. PhD thesis, Delft University of Technology, Netherlands.

Jalloul, Hiba (2024) Leveraging emergence for enhanced planning and decision-making in the built environment: Applications in resilience and sustainability planning. PhD thesis, Florida State University, USA.

Jallow, A K (2011) Integrated lifecycle requirements information management in construction. PhD thesis, Loughborough University, UK.

Jamshed, A; Rana, I A; McMillan, J M and Birkmann, J (2019) Building community resilience in post-disaster resettlement in Pakistan. International Journal of Disaster Resilience in the Built Environment, 10(4), pp. 301-315. ISSN 1759-5916

Janda, K B; Bright, S; Patrick, J; Wilkinson, S and Dixon, T J (2016) The evolution of green leases: Towards inter-organizational environmental governance. Building Research & Information, 44(5-6), pp. 660-674. ISSN 0961-3218

Janda, K B and Parag, Y (2013) A middle-out approach for improving energy performance in buildings. Building Research & Information, 41(1), pp. 39-50. ISSN 0961-3218

Jang, J (2008) Improving the make-ready process and forecasting project performance using performance of the make-ready process. PhD thesis, State University of New York College of Environmental Science and Forestry, USA.

Janné, M (2020) Construction logistics in a city development setting. PhD thesis, Linköping University, Sweden.

Jansson, G; Johnsson, H and Engström, D (2014) Platform use in systems building. Construction Management and Economics, 32(1-2), pp. 70-82. ISSN 01446193

Jansson, G; Söderholm, E and Johnsson, H (2008) Design process organisation at industrial house builders: A case study of two timber housing companies in Sweden. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Jaradat, S and Beunders, N (2023) Participatory design in refugee camps: Ethnographic case studies from Greece. Engineering, Construction and Architectural Management, 30(3), pp. 1080-1097. ISSN 0969-9988

Jaradat, S and Sexton, M (2016) BIM articulation in different-sized architectural firms. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Jaraskumjonkul, T (2020) A digital prototype for collaborative conceptual design in the Thai AEC sector. PhD thesis, University of Salford, UK.

Jarder, S L N; Garciano, L E O and Maruyama, O (2021) Probable maximum loss of a pipe network due to earthquakes: A case study in iloilo city, Philippines. International Journal of Disaster Resilience in the Built Environment, 12(2), pp. 223-237. ISSN 1759-5916

Jaselskis, E J; Gao, Z and Walters, R C (2005) Improving transportation projects using laser scanning. Journal of Construction Engineering and Management, 131(3), pp. 377-384. ISSN 0733-9364

Jasiński, A (2021) Impact of BIM implementation on architectural practice. Architectural Engineering and Design Management, 17(5-6), pp. 447-457. ISSN 1745-2007

Jassim, H S H (2019) Assessing energy use and carbon emissions to support planning of environmentally sustainable earthmoving operations. PhD thesis, Luleå University of Technology, Sweden.

Javanmardi, A; Abbasian-Hosseini, S A; Liu, M and Hsiang, S M (2020) Improving effectiveness of constraints removal in construction planning meetings: Information-theoretic approach. Journal of Construction Engineering and Management, 146(4): 04020015, ISSN 0733-9364

Javed, A (2024) Optimizing infrastructure resilience through utility maturity. PhD thesis, University of Florida, USA.

Javed, N; Thaheem, M J; Bakhtawar, B; Nasir, A R; Khan, K I A and Gabriel, H F (2020) Managing risk in green building projects: Toward a dedicated framework. Smart and Sustainable Built Environment, 9(2), pp. 156-173. ISSN 2046-6099

Javed, S; Ørnes, I R; Myrup, M and Dokka, T H (2019) Design optimization of the borehole system for a plus-energy kindergarten in Oslo, Norway. Architectural Engineering and Design Management, 15(3), pp. 181-195. ISSN 1745-2007

Javernick-Will, A N and Scott, W R (2010) Who needs to know what? Institutional knowledge and global projects. Journal of Construction Engineering and Management, 136(5), pp. 546-557. ISSN 0733-9364

Jawad, S and Ledwith, A (2022) A measurement model of project control systems success for engineering and construction projects case study: Contractor companies in saudi's petroleum and chemical industry. Engineering, Construction and Architectural Management, 29(3), pp. 1218-1240. ISSN 0969-9988

Jawad, S; Ledwith, A and Khan, R (2022) Project control system (PCS) implementation in engineering and construction projects: An empirical study in Saudi's petroleum and chemical industry. Engineering, Construction and Architectural Management, 31(13), pp. 181-207. ISSN 0969-9988

Jay, C I and Bowen, P A (2015) Value management and innovation: A historical perspective and review of the evidence. Journal of Engineering, Design and Technology, 13(1), pp. 123-143.

Jaya, N M (2014) An activity-based cost controlling model for improving the management of construction project overheads. PhD thesis, University of Salford, UK.

Jayakrishna, K; Girubha, R J and Vinodh, S (2016) Comparison of sustainability characteristics of conventional and CNC turning processes: A case study. Journal of Engineering, Design and Technology, 14(3), pp. 422-445.

Jayarathne, T D; De Silva, N and Samarakoon, W K U R M K P K (2024) Adopting smart retrofits: A decision-making model and benchmarking criteria. Built Environment Project and Asset Management, 14(3), pp. 366-383. ISSN 2044-124X

Jayasinghe, H M; Sandanayake, Y G and Jayasinghe, R (2026) Managing conflicts in joint venture contracts in infrastructure construction projects in Sri Lanka. Built Environment Project and Asset Management, 16(2), pp. 415-436. ISSN 2044-124X

Jayasinghe, R S; Rameezdeen, R and Chileshe, N (2023) Modelling the cause and effect relationship risks in reverse logistics supply chains for demolition waste. Engineering, Construction and Architectural Management, 30(9), pp. 4018-4044. ISSN 0969-9988

Jayawardana, J; Sandanayake, M; Jayasinghe, J A S C; Kulatunga, A K and Zhang, G K (2025) Life cycle economic and social sustainability aspects of prefabricated construction: A systematic review towards the holistic sustainability. Construction Innovation, 25(7), pp. 98-138. ISSN 1471-4175

Jayawardana, Jayawardanage Janappriya (2024) Investigating the sustainability of modern construction practices focusing on prefabricated construction. PhD thesis, RMIT University, Australia.

Jayawardane, A K W and Gunawardena, N B (1998) Construction workers in developing countries: A case study of Sri Lanka. Construction Management and Economics, 16(5), pp. 521-530. ISSN 01446193

Jefferies, M (2006) Critical success factors of public private sector partnerships: A case study of the sydney superdome. Engineering, Construction and Architectural Management, 13(5), pp. 451-462. ISSN 0969-9988

Jefferies, M; Brewer, G J and Gajendran, T (2014) Using a case study approach to identify critical success factors for alliance contracting. Engineering, Construction and Architectural Management, 21(5), pp. 465-480. ISSN 0969-9988

Jefferies, M and Chen, S E (2004) Identifying risk factors of boot procurement: A case study of stadium Australia. Construction Economics and Building, 4(1), pp. 11-20. ISSN 2204-9029

Jefferies, M; Chen, S E and Conway, J (2002) Assessment of professional competence in a construction management problem-based learning setting. Construction Economics and Building, 2(1), pp. 47-56. ISSN 2204-9029

Jefferies, M; Gameson, R O D and Rowlinson, S (2002) Critical success factors of the BOOT procurement system: Reflections from the stadium Australia case study. Engineering, Construction and Architectural Management, 9(4), pp. 352-361. ISSN 0969-9988

Jefferies M, G T B G (2013) Public private partnerships: The provision of healthcare infrastructure in Australia. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Jeffrey, J H (2010) Recurrent problems in the construction process: an action research study of the design and construction quality of hospital en-suites. PhD thesis, University of Salford, UK.

Jeffries, M; Gameson, R; Chen, S E and Elliott, T (2001) The justification and implementation of project alliances: Reflections from the Wandoo B development. Journal of Construction Procurement, 7(2), pp. 31-41. ISSN 1358-9180

Jegard, L.; Castaño-Rosa, R. and Pelsmakers, S. (2026) Impact of glazed balcony design on daylight in Finnish apartments. Buildings & Cities, 7(1), pp. 576-596. ISSN 2632-6655

Jegede, O E and Taki, A (2022) Optimization of building envelopes using indigenous materials to achieve thermal comfort and affordable housing in Abuja, Nigeria. International Journal of Building Pathology and Adaptation, 40(2), pp. 219-247. ISSN 23984708

Jelodar, M B; Wilkinson, S; Kalatehjari, R and Zou, Y (2022) Designing for construction procurement: An integrated decision support system for building information modelling. Built Environment Project and Asset Management, 12(1), pp. 111-127. ISSN 2044-124X

Jelodar, M B; Yiu, T W and Wilkinson, S (2015) Systematic representation of relationship quality in conflict and dispute: For construction projects. Construction Economics and Building, 15(1), pp. 89-103. ISSN 2204-9029

Jensen, Christopher Antony (2019) Staged competition as a driver of construction innovation. PhD thesis, University of Melbourne, Australia.

Jensen, J S; Gottlieb, S C and Thuesen, C L (2011) Construction sector development: Frames and governance responses. Building Research & Information, 39(6), pp. 665-677. ISSN 0961-3218

Jensen, P A (2009) Design integration of facilities management: A challenge of knowledge transfer. Architectural Engineering and Design Management, 5(3), pp. 124-135. ISSN 1745-2007

Jensen, P A (2011) Inclusive briefing and user involvement: Case study of a media centre in Denmark. Architectural Engineering and Design Management, 7(1), pp. 38-49. ISSN 1745-2007

Jeon, J; Lee, J and Ham, Y (2019) Quantifying the impact of building envelope condition on energy use. Building Research & Information, 47(4), pp. 404-420. ISSN 0961-3218

Jeong, K S; Kagioglou, M; Haigh, R; Amaratunga, D and Siriwardena, M L (2006) Embedding good practice sharing within process improvement. Engineering, Construction and Architectural Management, 13(1), pp. 62-81. ISSN 0969-9988

Jeong, K S; Lu, S L and Sexton, M G (2010) Good practice transfer within small construction specialist trade contractors. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Jeong, W S (2014) Integrating building information modeling with object-oriented physical modeling for building thermal simulation. PhD thesis, Texas A&M University, USA.

Jergeas, G F and Revay, S O (1993) Quantifying construction claims using the differential cost method. Construction Management and Economics, 11(2), pp. 163-166. ISSN 01446193

Jeyakumar, R (2013) The implementation and effectiveness of value engineering in the United Arab Emirates. PhD thesis, University of Glamorgan, UK.

Jha, K N (2004) Factors for the success of a construction project: empirical study. PhD thesis, Indian Institute of Technology Delhi, India.

Ji, S H; Park, M and Lee, H S (2010) Data preprocessing-based parametric cost model for building projects: Case studies of Korean construction projects. Journal of Construction Engineering and Management, 136(8), pp. 844-853. ISSN 0733-9364

Ji, W and Abourizk, S M (2018) Data-driven simulation model for quality-induced rework cost estimation and control using absorbing Markov chains. Journal of Construction Engineering and Management, 144(8): 04018078, ISSN 0733-9364

Ji, W; Abourizk, S M; Zaïane, O R and Li, Y (2018) Complexity analysis approach for prefabricated construction products using uncertain data clustering. Journal of Construction Engineering and Management, 144(8): 04018063, ISSN 0733-9364

Ji, Wenying (2018) Simulation-based analytics for fabrication quality-associated decision support. PhD thesis, University of Alberta, Canada.

Ji, Y; Lee, A and Swan, W (2019) Retrofit modelling of existing dwellings in the UK: The Salford energy house case study. International Journal of Building Pathology and Adaptation, 37(3), pp. 344-360. ISSN 23984708

Ji, Y and Leite, F (2020) Optimized planning approach for multiple tower cranes and material supply points using mixed-integer programming. Journal of Construction Engineering and Management, 146(3): 04020007, ISSN 0733-9364

Ji, Y; Qi, K; Qi, Y; Li, Y; Li, H X; Lei, Z and Liu, Y (2020) BIM-based life-cycle environmental assessment of prefabricated buildings. Engineering, Construction and Architectural Management, 27(8), pp. 1703-1725. ISSN 0969-9988

Jia, A Y; Gao, S S and Kvan, T (2017) Markets, professions and firms of the construction industry: The changing roles of architects in response to vertical integration. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Jia, A Y; Loosemore, M; Gilbert, D and Rowlinson, S (2016) Shielding workers from heat stress: Reconciling the paradoxes of protection and production logics. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Jiang, J (2026) Reconstruction in post-war Rome: Transnational flows and national identity. Buildings & Cities, 7(1), pp. 215-231. ISSN 2632-6655

Jiang, A (2005) A decision support model for cost and activity-based performance measurement in steel construction. PhD thesis, University of Florida, USA.

Jiang, B; Nordin, J and Mohd Salleh, M N (2025) Design preferences for learning spaces among rural primary school students in China: A case study. Building Research & Information, 53(4), pp. 458-478. ISSN 0961-3218

Jiang, H; Lin, P and Qiang, M (2016) Public-opinion sentiment analysis for large hydro projects. Journal of Construction Engineering and Management, 142(2): 05015013, ISSN 0733-9364

Jiang, L (2016) A constructability review ontology to support automated rule checking leveraging building information models. PhD thesis, Pennsylvania State University, USA.

Jiang, L; Zhao, T; Feng, C and Zhang, W (2023) Improvement of random forest by multiple imputation applied to tower crane accident prediction with missing data. Engineering, Construction and Architectural Management, 30(3), pp. 1222-1242. ISSN 0969-9988

Jiang, L; Zhong, H; Chen, J; Cheng, J; Chen, S; Gong, Z; Lun, Z; Zhang, J and Su, Z (2023) Study on the construction workforce management based on lean construction in the context of COVID-19. Engineering, Construction and Architectural Management, 30(8), pp. 3310-3329. ISSN 0969-9988

Jiang, W; Ding, L and Zhou, C (2021) Cyber physical system for safety management in smart construction site. Engineering, Construction and Architectural Management, 28(3), pp. 788-808. ISSN 0969-9988

Jiang, Y; Yang, G; Li, H; Zhang, T and Khudhair, A (2024) Physics-informed knowledge-driven decision-making framework for holistic bridge maintenance. Journal of Construction Engineering and Management, 150(9): 04024105, ISSN 0733-9364

Jimenez-Roa, Lisandro Arturo (2020) Data-driven damage detection for bridges through vibration structural health monitoring. EngD thesis, University of Twente, Netherlands.

Jimoh, I (2021) What explains the efficiency of major public project delivery in Nigeria? PhD thesis, University of Cambridge, UK.

Jimoh, R and van Wyk, J (2013) Ideological leaning and praxis of housing co-operatives in South Africa: Matters arising. Construction Economics and Building, 13(2), pp. 54-66. ISSN 2204-9029

Jin, S. (2026) Dynamics and influences analysis of public concerns in mega construction projects: An integrated topic and sentiment modeling approach. Journal of Construction Engineering and Management, 152(8): 04026104, ISSN 0733-9364

Jin, R; Yang, T; Piroozfar, P; Kang, B G; Wanatowski, D; Hancock, C M and Tang, L (2018) Project-based pedagogy in interdisciplinary building design adopting BIM. Engineering, Construction and Architectural Management, 25(10), pp. 1376-1397. ISSN 0969-9988

Jin, R; Zou, P X; Li, B; Piroozfar, P and Painting, N (2019) Comparisons of students' perceptions on BIM practice among Australia, China and UK. Engineering, Construction and Architectural Management, 26(9), pp. 1899-1923. ISSN 0969-9988

Jin, X H and Ling, F Y Y (2005) Constructing a framework for building relationships and trust in project organizations: Two case studies of building projects in China. Construction Management and Economics, 23(7), pp. 685-696. ISSN 01446193

Jin, X-H (2009) Allocating risks in public-private partnerships using a transaction cost economic approach: A case study. Construction Economics and Building, 9(1), pp. 19-26. ISSN 2204-9029

Jin, Z; Deng, F; Li, H and Skitmore, M (2013) Practical framework for measuring performance of international construction firms. Journal of Construction Engineering and Management, 139(9), pp. 1154-1167. ISSN 0733-9364

Jin, Z; Gambatese, J; Liu, D and Dharmapalan, V (2019) Using 4D BIM to assess construction risks during the design phase. Engineering, Construction and Architectural Management, 26(11), pp. 2637-2654. ISSN 0969-9988

Jirandeh, R R; Ghazi, M; Sotoodeh, A F and Nikian, M (2021) Plate-fin heat exchanger network modeling, design and optimization: a novel and comprehensive algorithm. Journal of Engineering, Design and Technology, 19(5), pp. 1017-1043. ISSN 1726-0531

Jnior, A C L and Melhado, S B (2011) Design for producing vertical non-loadbearing masonry: Scope analysis. Architectural Engineering and Design Management, 7(4), pp. 275-284. ISSN 1745-2007

Jobe, K (2017) A flexible housing approach for self-help housing in Botswana. PhD thesis, University of Bath, UK.

Johannes, K; Theodorus Voordijk, J; Marias Adriaanse, A and Aranda-Mena, G (2021) Identifying maturity dimensions for smart maintenance management of constructed assets: A multiple case study. Journal of Construction Engineering and Management, 147(9): 05021007, ISSN 0733-9364

Johannes, K; Voordijk, H and Aranda-Mena, G (2023) The role of purchasing in raising the maturity of smart maintenance management. Built Environment Project and Asset Management, 13(2), pp. 324-340. ISSN 2044-124X

Johannes, Koos (2023) Crafting intrapreneurial stewardship: An institutional perspective on client-led innovation in smart building maintenance. PhD thesis, University of Twente, Netherlands.

Johansen, A; Collins, D; Temeljotov-Salaj, A and Hagehaugen, G (2022) By the fjord: Successful public and private collaboration in a neighbourhood redevelopment project in Norway. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(4), pp. 156-165. ISSN 17514304

Johansen, J B; Jensen, P A and Thuesen, C (2017) Maturity model for strategic collaboration in sustainable building renovation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Johansen, K W; Hong, K; Schultz, C and Teizer, J (2024) Automated quantification of construction workers’ exposure to falling object hazards. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 207-222. ISSN 17514304

Johansson, P; Linderoth, H C J and Granth, K (2014) The role of BIM in preventing design errors. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

John, G A; Clements-Croome, D J; Fairey, V and Loy, H M (2005) Contextual prerequisites for the application of ILS principles to the building services industry. Engineering, Construction and Architectural Management, 12(4), pp. 307-328. ISSN 0969-9988

Johnson, B T (2007) Exploring the use of virtual construction to capture knowledge and reduce waste for residential projects. PhD thesis, Colorado State University, USA.

Johnson, C; Lizarralde, G and Davidson, C H (2006) A systems view of temporary housing projects in post-disaster reconstruction. Construction Management and Economics, 24(4), pp. 367-378. ISSN 01446193

Johnson, R; Clayton, M; Xia, G E; Woo, J H and Song, Y (2002) The strategic implications of e-commerce for the design and construction industry. Engineering, Construction and Architectural Management, 9(3), pp. 241-248. ISSN 0969-9988

Johnsson, H (2013) Production strategies for pre-engineering in house-building: Exploring product development platforms. Construction Management and Economics, 31(9), pp. 941-958. ISSN 1466433X

Johnsson, H and Meiling, J H (2009) Defects in offsite construction: Timber module prefabrication. Construction Management and Economics, 27(7), pp. 667-681. ISSN 1466433X

Johnsson H, J G J P (2013) Modularization in a housing platform for mass customization. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Johnston, D; Farmer, D; Brooke-Peat, M and Miles-Shenton, D (2016) Bridging the domestic building fabric performance gap. Building Research & Information, 44(2), pp. 147-159. ISSN 0961-3218

Johnston, M; Guaralda, M and Sawang, S (2014) Sustainable innovation for Queensland's housing design: A case study. Construction Economics and Building, 14(4), pp. 11-31. ISSN 2204-9029

Jones, I and Graham, M (2009) The integration of sprinkler systems into school fire safety packages within South and West Wales. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Jones, K and Kaluarachchi, Y (2007) Operational factors affecting strategic partnering in UK social housing. Engineering, Construction and Architectural Management, 14(4), pp. 334-345. ISSN 0969-9988

Jones, K; Mosca, L; Whyte, J; Davies, A and Glass, J (2022) Addressing specialization and fragmentation: Product platform development in construction consultancy firms. Construction Management and Economics, 40(11-12), pp. 918-933. ISSN 01446193

Jones, M M (2024) Exploring accessibility, usability, and relevance: A case study of Wyoming's construction workforce training program. PhD thesis, University of Wyoming, USA.

Jones, S H and Armanios, D E (2020) Methodological framework and feasibility study to assess social equity impacts of the built environment. Journal of Construction Engineering and Management, 146(11): 05020016, ISSN 0733-9364

Jones-Crabtree, A J (2001) Decision-making variances: Creating deferred maintenance solutions using the paradigm of sustainable design. PhD thesis, Georgia Institute of Technology, USA.

Jonker-Hoffrén, P (2023) Policy tensions in demolition: Dutch social housing and circularity. Buildings & Cities, 4(1), pp. 405-421. ISSN 2632-6655

Jonsson, H (2018) Production strategy in project based production within a house-building context. PhD thesis, Linköping University, Sweden.

Jonsson, H and Rudberg, M (2015) Production system classification matrix: Matching product standardization and production-system design. Journal of Construction Engineering and Management, 141(6): 05015004, ISSN 0733-9364

Jonsson, J (1996) Construction site productivity measurements selection, application and evaluation of methods and measures. PhD thesis, Luleå University of Technology, Sweden.

Jordan, E (2012) Pathways to community recovery: A qualitative comparative analysis of post-disaster outcomes. PhD thesis, University of Colorado at Boulder, USA.

Jordan, E; Javernick-Will, A and Amadei, B (2014) A qualitative comparative analysis of neighborhood recovery following Hurricane Katrina. International Journal of Disaster Resilience in the Built Environment, 5(4), pp. 391-412. ISSN 1759-5916

Jordan Srour, F; Kiomjian, D and Srour, I M (2018) Automating the use of learning curve models in construction task duration estimates. Journal of Construction Engineering and Management, 144(7): 04018055, ISSN 0733-9364

Jorge, J (1990) Model of uniform cost policies and procedures for the establishment of construction equipment rates. PhD thesis, University of Florida, USA.

Joseph, A and Hamilton, D K (2008) The Pebble Projects: Coordinated evidence-based case studies. Building Research & Information, 36(2), pp. 129-145. ISSN 0961-3218

Josephson, P E and Bjorkman, L (2013) Why do work sampling studies in construction? The case of plumbing work in Scandinavia. Engineering, Construction and Architectural Management, 20(6), pp. 589-603. ISSN 0969-9988

Joubert, F; Steyn, E and Pretorius, L (2021) Using the HAZOP method to conduct a risk assessment on the dismantling of large industrial machines and associated structures: Case study. Journal of Construction Engineering and Management, 147(1): 05020021, ISSN 0733-9364

Joubert, G D and Raji, A K (2025) Development and validation of a real-time testbed for renewable energy integration studies: South African grid code case study. Journal of Engineering, Design and Technology, 23(1), pp. 1-20. ISSN 1726-0531

Joutsiniemi, A; Vaattovaara, M and Airaksinen, J (2021) Empowered by planning law: Unintended outcomes in the Helsinki region. Buildings & Cities, 2(1), pp. 837-855. ISSN 2632-6655

Jowett, B; Edwards, D J and Kassem, M (2024) Field BIM and mobile BIM technologies: A requirements taxonomy and its interactions with construction management functions. Construction Innovation, 24(1), pp. 134-163. ISSN 1471-4175

Jowett, B R (2023) A framework for the implementation of mobile BIM technology at project and organisational level supporting lean construction approaches. PhD thesis, University of Northumbria at Newcastle, UK.

Ju, C (2015) A study of institutional complexity and contractors' safety management strategies. PhD thesis, University of Hong Kong, Hong Kong.

Ju, C and Rowlinson, S (2014) Institutional determinants of construction safety management strategies of contractors in Hong Kong. Construction Management and Economics, 32(7-8), pp. 725-736. ISSN 01446193

Ju, Q; Wang, Y; Liu, H; Du, X and Li, Y (2025) A framework for assessing stakeholder interface health in complex capital projects. Engineering, Construction and Architectural Management, 32(7), pp. 4746-4770. ISSN 0969-9988

Ju C, R S (2013) Institutional determinants of construction safety management strategies of contractors in Hong Kong. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Juan, C and Olmos, F (2019) Public-private equity joint ventures and risk transfers in motorways of the sea. Built Environment Project and Asset Management, 9(5), pp. 669-682. ISSN 2044-124X

Juan, Y K; Chi, H Y and Chen, H H (2021) Virtual reality-based decision support model for interior design and decoration of an office building. Engineering, Construction and Architectural Management, 28(1), pp. 229-245. ISSN 0969-9988

Juan, Y K; Lin, I C and Tsai, J X (2019) A hybrid approach to optimize initial design strategies for pre-sale housing projects. Engineering, Construction and Architectural Management, 26(3), pp. 515-534. ISSN 0969-9988

Judson, E P and Maller, C (2014) Housing renovations and energy efficiency: Insights from homeowners practices. Building Research & Information, 42(4), pp. 501-511. ISSN 0961-3218

Jun, J B (2008) Valuation of governmental guarantee in BOT project finance with real option analysis. PhD thesis, Texas A&M University, USA.

Jung, M; Park, M; Lee, H S and Kim, H (2016) Weather-delay simulation model based on vertical weather profile for high-rise building construction. Journal of Construction Engineering and Management, 142(6): 04016007, ISSN 0733-9364

Jung, Y (1997) Information systems planning methodology for the construction industry. PhD thesis, University of Texas at Austin, USA.

Jung, Y and Woo, S (2004) Flexible work breakdown structure for integrated cost and schedule control. Journal of Construction Engineering and Management, 130(5), pp. 616-625. ISSN 0733-9364

Junnila, S (2004) The environmental impact of an office building throughout its life cycle. PhD thesis, Helsinki University of Technology, Finland.

Järvelä, H; Lehto, A; Pirilä, T and Kuittinen, M (2025) Metrics for building component disassembly potential: A practical framework. Buildings & Cities, 6(1), pp. 634-653. ISSN 2632-6655

Järvenpää, A T; Eriksson, P E and Larsson, J (2022) Exploring a public client's control systems in infrastructure projects from a relationship history perspective. Construction Management and Economics, 40(1), pp. 56-71. ISSN 01446193

Järvenpää, A-T (2022) How to promote innovation from an organizational control perspective a case study of a public infrastructure client. PhD thesis, Luleå University of Technology, Sweden.

J⊘rgensen, B and Emmitt, S (2009) Investigating the integration of design and construction from a "lean" perspective. Construction Innovation, 9(2), pp. 225-240. ISSN 1471-4175

Kabo, F W (2006) Low-cost housing design and provision: A case study of Kenya. PhD thesis, University of Michigan, USA.

Kaboli, A S and Carmichael, D G (2014) Truck dispatching and minimum emissions earthmoving. Smart and Sustainable Built Environment, 3(2), pp. 170-186. ISSN 2046-6099

Kaboli, A S and Carmichael, D G (2014) Optimum scraper load time and fleet size for minimum emissions. International Journal of Construction Management, 14(4), pp. 209-226. ISSN 1562-3599

Kadefors, A (1997) Beställar-entreprenörrelationer i byggandet: Samarbete, konflikt och social påverkan (Client-contractor relationships in building projects: Co-operation, conflict and social influence). PhD thesis, Chalmers University of Technology, Sweden.

Kadefors, A (2005) Fairness in interorganizational project relations: Norms and strategies. Construction Management and Economics, 23(8), pp. 871-878. ISSN 01446193

Kadir, M R b A (1996) Conceptual phase best practices. PhD thesis, Loughborough University, UK.

Kagioglou, M (1999) Adapting manufacturing project processes into construction: a methodology. PhD thesis, University of Salford, UK.

Kaka, A P (1996) Decision support system for plant-hirers' financial strategies. Journal of Financial Management of Property and Construction, 1(1), pp. 21-36. ISSN 1366-4387

Kaka, A P; Lewis, J and Petros, H (2003) The effects of the variability of project planning on cost commitment curves: A case study. Engineering, Construction and Architectural Management, 10(1), pp. 15-26. ISSN 0969-9988

Kakitahi, J M (2014) Causality, magnitude and impact mitigation of rework in Uganda. PhD thesis, Lund University, Sweden.

Kakitahi, J M; Alinaitwe, H M; Landin, A and Mone, S J (2016) Impact of construction-related rework on selected Ugandan public projects. Journal of Engineering, Design and Technology, 14(2), pp. 238-251.

Kakitahi, J M; Landin, A and Alinaitwe, H M (2013) An exploratory study of rework causality in Uganda. Construction Innovation, 13(3), pp. 266-280. ISSN 1471-4175

Kalamaras, G S (1996) A case method approach for interactive risk analysis of tunnel "design-for-constructability" concept. PhD thesis, Pennsylvania State University, USA.

Kale, S (2009) Fuzzy intellectual capital index for construction firms. Journal of Construction Engineering and Management, 135(6), pp. 508-517. ISSN 0733-9364

Kale, S and Karaman, E A (2011) Evaluating the knowledge management practices of construction firms by using importance-comparative performance analysis maps. Journal of Construction Engineering and Management, 137(12), pp. 1142-1152. ISSN 0733-9364

Kaluarachchi, Y and Jones, K (2004) Improving the delivery of social housing in UK- using the Amphion initiative as a case study. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Kalutara, P; Zhang, G; Setunge, S and Wakefield, R (2023) Decision-making model for sustainable management of Australian community buildings: Combined approach using analytical hierarchy process and neuro-fuzzy system. International Journal of Construction Management, 23(8), pp. 1299-1310. ISSN 1562-3599

Kam, C K H (2005) Dynamic decision breakdown structure: Ontology, methodology, and framework for information management in support of decision-enabling tasks in the building industry. PhD thesis, Stanford University, USA.

Kam, C W (2000) Quality assurance of construction works in Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Kamal, E M (2011) Absorptive capacity and implementation of new technology in Malaysian small and medium sized construction companies. PhD thesis, University of Reading, UK.

Kamal, E M and Flanagan, R (2012) Understanding absorptive capacity in Malaysian small and medium sized (SME) construction companies. Journal of Engineering, Design and Technology, 10(2), pp. 180-198. ISSN 1726-0531

Kamal, E M and Flanagan, R (2014) Key characteristics of rural construction SMEs. Journal of Construction in Developing Countries, 19(2), pp. 1-13. ISSN 1823-6499

Kamal Mohammad Attia, M (2013) LEED as a tool for enhancing affordable housing sustainability in Saudi Arabia:The case of Al-Ghala project. Smart and Sustainable Built Environment, 2(3), pp. 224-250. ISSN 2046-6099

Kamar, K A M (2011) Critical success factors to industrialised building system (IBS) contractor. PhD thesis, University of Salford, UK.

Kamara, J M (2012) Integration in the project development process of a private finance initiative (PFI) project. Architectural Engineering and Design Management, 8(4), pp. 228-245. ISSN 1745-2007

Kamardeen, I (2009) Strategic safety management information system for building projects in Singapore. Engineering, Construction and Architectural Management, 16(1), pp. 8-25. ISSN 0969-9988

Kamardeen, I (2014) Stimulating learning with integrated assessments in construction education. Construction Economics and Building, 14(3), pp. 86-98. ISSN 2204-9029

Kamardeen, I (2015) Critically reflective pedagogical model: A pragmatic blueprint for enhancing learning and teaching in construction disciplines. Construction Economics and Building, 15(4), pp. 63-75. ISSN 2204-9029

Kamardeen, I and Samaratunga, M (2020) Digiexplanation driven assignments for personalising learning in construction education. Construction Economics and Building, 20(3), pp. 103-123. ISSN 2204-9029

Kamari, A; Kotula, B M and Schultz, C P L (2022) A BIM-based LCA tool for sustainable building design during the early design stage. Smart and Sustainable Built Environment, 11(2), pp. 217-244. ISSN 2046-6099

Kaming, P F; Olomolaiye, P O; Holt, G D; Kometa, S T and Harris, F C (1996) Project managers' perception of production problems: an Indonesian case study. Building Research & Information, 24(5), pp. 302-310. ISSN 0961-3218

Kaminsky, J (2021) Who are we talking to? Situating construction engineering and management knowledge. Journal of Construction Engineering and Management, 147(2): 06020003, ISSN 0733-9364

Kandil, A; El-Rayes, K and El-Anwar, O (2010) Optimization research: Enhancing the robustness of large-scale multiobjective optimization in construction. Journal of Construction Engineering and Management, 136(1), pp. 17-25. ISSN 0733-9364

Kang, J; Cheah, C Y J and Chew, D A S (2005) Strategic analysis of large chinese construction enterprises. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Kang, K (2018) Enhancing critical capacity of infrastructure supply chain to improve resilience of associated communities and infrastructure to disaster. PhD thesis, Purdue University, USA.

Kang, L S; Park, I C and Lee, B H (2001) Optimal schedule planning for multiple, repetitive construction process. Journal of Construction Engineering and Management, 127(5), pp. 382-390. ISSN 0733-9364

Kang, S and Seo, J (2013) GIS method for haul road layout planning in large earthmoving projects: Framework and analysis. Journal of Construction Engineering and Management, 139(2), pp. 236-246. ISSN 0733-9364

Kannimuthu, M; Raphael, B; Ekambaram, P and Kuppuswamy, A (2020) Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem. Engineering, Construction and Architectural Management, 27(4), pp. 893-916. ISSN 0969-9988

Kannimuthu, M; Raphael, B; Palaneeswaran, E and Kuppuswamy, A (2019) Optimizing time, cost and quality in multi-mode resource-constrained project scheduling. Built Environment Project and Asset Management, 9(1), pp. 44-63. ISSN 2044-124X

Kant Jain, K and Bhattacharjee, B (2012) Application of fuzzy concepts to the visual assessment of deteriorating reinforced concrete structures. Journal of Construction Engineering and Management, 138(3), pp. 399-408. ISSN 0733-9364

Kao, C C; Green, S D and Larsen, G D (2009) Emergent discourses of construction competitiveness: Localized learning and embeddedness. Construction Management and Economics, 27(10), pp. 1005-1017. ISSN 1466433X

Kao, C-C (2004) The briefing process: an organizational knowledge-creation perspective. PhD thesis, University of Reading, UK.

Kapelko, M and Abbott, M (2017) Productivity growth and business cycles: Case study of the Spanish construction industry. Journal of Construction Engineering and Management, 143(5): 05016026, ISSN 0733-9364

Karakhan, A A; Rajendran, S; Gambatese, J and Nnaji, C (2018) Measuring and evaluating safety maturity of construction contractors: Multicriteria decision-making approach. Journal of Construction Engineering and Management, 144(7): 04018054, ISSN 0733-9364

Karam, K S; Karam, J S and Einstein, H H (2007) Decision analysis applied to tunnel exploration planning. I: Principles and case study. Journal of Construction Engineering and Management, 133(5), pp. 344-353. ISSN 0733-9364

Karamitsos, I (2020) Examination of the relationship between organisational and facility management strategy and value added. PhD thesis, University of Salford, UK.

Karamoozian, M. and Zhang, H. (2026) Pushing the boundaries of prefabricated shell building design with building information modeling (BIM) and ultra-high performance concrete (uhpc). Engineering, Construction and Architectural Management, 33(3), pp. 2564-2585. ISSN 0969-9988

Karamoozian, A and Wu, D (2020) A hybrid risk prioritization approach in construction projects using failure mode and effective analysis. Engineering, Construction and Architectural Management, 27(9), pp. 2661-2686. ISSN 0969-9988

Karatas, A; Stoiko, A and Menassa, C C (2016) Framework for selecting occupancy-focused energy interventions in buildings. Building Research & Information, 44(5-6), pp. 535-551. ISSN 0961-3218

Karaz, Mahmoud Abdel Fattah Abdel Athim (2024) Construction waste management model for contractors using lean and BIM tools. PhD thesis, Universidade do Minho, Portugal.

Karim, J A; Demian, P; Baldwin, A and Anumba, C (2014) An empirical study of the complexity of requirements management in construction projects. Engineering, Construction and Architectural Management, 21(5), pp. 505-531. ISSN 0969-9988

Karki, T K (2019) What did the 2015 earthquake tell us about what the state of earthquake resilience in Kathmandu metropolitan city was? International Journal of Disaster Resilience in the Built Environment, 10(2-3), pp. 188-202. ISSN 1759-5916

Karki, T K (2020) Flood resilience in Malaysian cities: A case study of two towns in Johor state. International Journal of Disaster Resilience in the Built Environment, 11(3), pp. 329-342. ISSN 1759-5916

Karlsson, M; Lakka, A; Sulankivi, K; Hanna, A S and Thompson, B P (2008) Best practices for integrating the concurrent engineering environment into multipartner project management. Journal of Construction Engineering and Management, 134(4), pp. 289-299. ISSN 0733-9364

Karmakar, S (2025) Third-party quality control concept, methodology, and implementation in the building and housing construction industry in India. International Journal of Construction Management, 25(9), pp. 1021-1031. ISSN 1562-3599

Karrbom Gustavsson, T (2016) Liminality roles in construction project practice: Opportunities and challenges. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Kartman, S A (1995) Reengineering construction planning systems. PhD thesis, University of California, Berkeley, USA.

Karunaratne, T L W and De Silva, N (2019) Demand-side energy retrofit potential in existing office buildings. Built Environment Project and Asset Management, 9(3), pp. 426-439. ISSN 2044-124X

Karunasena, G and Amaratunga, D (2015) Capacity gaps in post disaster construction and demolition waste management. Engineering, Construction and Architectural Management, 22(4), pp. 446-466. ISSN 0969-9988

Karunasena, G I (2012) Capacity building for post disaster waste management: Construction and demolition waste. PhD thesis, University of Salford, UK.

Karvekar, S P (2008) Private sector participation in roads development: Planning and management issues. PhD thesis, Maharaja Sayajirao University of Baroda, India.

Kasai, S; Li, N and Fang, D (2015) A system-of-systems approach to understanding urbanization: state of the art and prospect. Smart and Sustainable Built Environment, 4(2), pp. 154-171. ISSN 2046-6099

Kasbar, M; Staub-French, S; Pilon, A; Poirier, E; Teshnizi, Z and Froese, T (2021) Construction productivity assessment on brock commons tallwood house. Construction Innovation, 21(4), pp. 951-968. ISSN 1471-4175

Kashem, S B (2019) Housing practices and livelihood challenges in the hazard-prone contested spaces of rural Bangladesh. International Journal of Disaster Resilience in the Built Environment, 10(5), pp. 420-434. ISSN 1759-5916

Kashiwagi, D; Parmar, D and Savicky, J (2003) Case study of the impact of specifications, construction management and inspection on construction performance. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Kashiwagi, D and Savicky, J (2003) A case study of the transaction cost and value of the delivering of construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Kashiwagi, D T and Byfield, R (2002) Minimizing political influence in performance contracting case studies. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Kashiwagi, D T and Byfield, R (2002) Project MA Case study of potential impact of subjective decision making on construction performance. Journal of Construction Procurement, 8(2), pp. 101-116. ISSN 1358-9180

Kashiwagi, D T and Mayo, R E (2001) Best value procurement in construction using artificial intelligence. Journal of Construction Procurement, 7(2), pp. 42-59. ISSN 1358-9180

Kashiwagi, J S (2013) Factors of success in performance information procurement system and performance information risk management system. PhD thesis, Delft University of Technology, Netherlands.

Kashkool, A M H and Al Ali, S S (2021) Maintenance management of heritage buildings in Iraq. Engineering, Construction and Architectural Management, 28(9), pp. 2448-2465. ISSN 0969-9988

Kasim, N B (2008) Improving materials management on construction projects. PhD thesis, Loughborough University, UK.

Kassab, M; Hegazy, T and Hipel, K (2010) Computerized DSS for construction conflict resolution under uncertainty. Journal of Construction Engineering and Management, 136(12), pp. 1249-1257. ISSN 0733-9364

Kassab, M; Hipel, K and Hegazy, T (2006) Conflict resolution in construction disputes using the graph model. Journal of Construction Engineering and Management, 132(10), pp. 1043-1052. ISSN 0733-9364

Kassem, M; Dawood, N and Mitchell, D (2012) A decision support system for the selection of curtain wall systems at the design development stage. Construction Management and Economics, 30(12), pp. 1039-1053. ISSN 1466433X

Kassem, M; Kelly, G; Dawood, N; Serginson, M and Lockley, S (2015) BIM in facilities management applications: A case study of a large university complex. Built Environment Project and Asset Management, 5(3), pp. 261-277. ISSN 2044-124X

Kassim, S M (2006) Sustainability of private sector in solid waste collection: a case of Dar es Salaam Tanzania. PhD thesis, Loughborough University, UK.

Katavic, I (2014) Corporate social responsibility and sustainable competitive advantage: A case study of the cement industry. PhD thesis, Northcentral University, USA.

Kathri, A K D (2003) A study of project finance in Asia with emphasis on private infrastructure project finance. PhD thesis, University of Hong Kong, Hong Kong.

Katsanis, C J (1998) An empirical examination of the relationships between strategy, structure and performance in building industry organizations. PhD thesis, Universite de Montreal, Canada.

Kaunda, R T (2020) Project Delivery Methods impact on efficient delivery of road construction projects in Malawi. PhD thesis, University of Bolton, UK.

Kaushik, A (2019) Gating and syntactical analysis of spatial configuration of sectors of Gurgaon (Gurugram), India. Journal of Construction in Developing Countries, 23(2), pp. 87-106. ISSN 1823-6499

Kavaarpuo, Godwin (2022) Transaction costs and entrepreneurial discovery in house building innovations: A study of developers' behaviour in Ghana. PhD thesis, University of Melbourne, Australia.

Kavishe, N; Jefferson, I and Chileshe, N (2018) An analysis of the delivery challenges influencing public-private partnership in housing projects: The case of Tanzania. Engineering, Construction and Architectural Management, 25(2), pp. 202-240. ISSN 0969-9988

Kavvouras, G (2010) A holistic systemic model for decision support in sustainable construction. PhD thesis, University of Nottingham, UK.

Kaya, H D and Dikmen, I (2024) Using system dynamics to support strategic digitalization decisions. Journal of Construction Engineering and Management, 150(4): 04024009, ISSN 0733-9364

Kayaga, S (2008) Public-private delivery of urban water services in Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 147-155. ISSN 17514312

Ke, Y (2020) Impact of trust on the performance of construction enterprises: analysis of the cooperative process mechanism in the context of Chaoshan culture. DProf thesis, Fordham University, USA.

Ke, Y; Hao, W; Ding, H and Wang, Y (2017) Factors influencing the private involvement in urban rail public-private partnership projects in China. Construction Economics and Building, 17(1), pp. 90-106. ISSN 2204-9029

Keast, R and Hampson, K (2007) Building constructive innovation networks: Role of relationship management. Journal of Construction Engineering and Management, 133(5), pp. 364-373. ISSN 0733-9364

Keats, R J (2014) An exploration of how professional associations advance innovation and promote innovation pedagogy. PhD thesis, Nottingham Trent University, UK.

Kedarisetty, S (2025) Pavement management systems in local governments. PhD thesis, University of California, Davis, USA.

Kedir, F; Hall, D M; Brantvall, S; Lessing, J; Hollberg, A and Soman, R K (2024) Circular information flows in industrialized housing construction: The case of a multi-family housing product platform in Sweden. Construction Innovation, 24(5), pp. 1354-1379. ISSN 1471-4175

Keenan, J M (2016) From sustainability to adaptation: Goldman Sachs' corporate real estate strategy. Building Research & Information, 44(4), pp. 407-422. ISSN 0961-3218

Kelly, G (2015) Understanding how improved feedback to architects can support the design of more adaptable buildings. PhD thesis, Loughborough University, UK.

Kempton, J (2007) Mixed versus mono tenure estates: Is there a difference in asset management needs? In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Kenley, R (1998) The role of meta-analysis in construction management research. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Kennedy, R and Sidwell, A C (2001) Re-engineering the construction delivery process: The museum of tropical Queensland, townsville: a case study. Construction Innovation, 1(2), pp. 77-89. ISSN 1471-4175

Kenny, J; Curran, M; Spillane, J P and Brooks, T (2021) Do you want some sauce on that? Factors influencing dietary habits among the Irish construction workforce: A case study review. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Keraminiyage, K and Piyatadsananon, P (2013) Achieving success in post-disaster resettlement programmes through better coordination between spatial and socio-economic/cultural factors. International Journal of Disaster Resilience in the Built Environment, 4(3), pp. 352-372. ISSN 1759-5916

Keraminiyage, K P (2009) Achieving high process capability maturity in construction organisations. PhD thesis, University of Salford, UK.

Kern, A P and Formoso, C T (2006) A model for integrating cost management and production planning and control in construction. Journal of Financial Management of Property and Construction, 11(2), pp. 75-90. ISSN 1366-4387

Kern, A P; Postay, R; Schneck, E R; Mancio, M; González, M A S and Guerra, G (2021) Cost and environmental impacts reduction through building compactness. Engineering, Construction and Architectural Management, 28(4), pp. 1176-1195. ISSN 0969-9988

Kern, A P and Zuliani da Silva, L G (2025) System of rehabilitation assessment and cost comparative (SARC): Case study in abandoned buildings rehabilitation in Brazil. Architectural Engineering and Design Management, 21(1), pp. 78-97. ISSN 1745-2007

Keskin, B (2021) A building information modeling (BIM)-centric digital ecosystem for smart airport life cycle management. PhD thesis, Syracuse University, USA.

Keskin, B; Salman, B and Ozorhon, B (2021) Airport project delivery within BIM-centric construction technology ecosystems. Engineering, Construction and Architectural Management, 28(2), pp. 530-548. ISSN 0969-9988

Keskin, F S (2021) Integration of lifecycle assessment into structural intervention scenarios for assessing environmental impacts of vulnerable buildings. PhD thesis, University of Birmingham, UK.

Kestle, L; London, K; Bodger, P and Storey, B (2002) The development of a typology for remote construction projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Kestle, L; Potangaroa, R and Storey, B (2011) Integration of lean design and design management and its influence on the development of a multidisciplinary design management model for remote site projects. Architectural Engineering and Design Management, 7(2), pp. 139-153. ISSN 1745-2007

Kestle, L; Storey, B and Potangaroa, R (2008) Towards the validation of a conceptual design management model for remote site projects. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Keung, C C W; Yiu, T W and Feng, Z (2023) Building information modeling education for quantity surveyors in Hong Kong: Current states, education gaps, and challenges. International Journal of Construction Education and Research, 19(3), pp. 259-275. ISSN 1557-8771

Keusters, G; Bakker, H and Houwing, E J (2024) Improving the performance of civil engineering projects through the integrated design process. Journal of Engineering, Design and Technology, 22(2), pp. 344-364. ISSN 1726-0531

Khadour, L (2010) Total quality environmental management framework towards sustainability (UK novated D&B principal contractors). PhD thesis, Nottingham Trent University, UK.

Khadour, L; Ramsay-Dawber, P and Morledge, R (2009) Case studies on the implementation of TQEM in the UK building contractors. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Khadour, Lina (2010) Total quality environmental management (tqem) framework towards sustainability (UK novated D&B principal contractors). PhD thesis, Nottingham Trent University, UK.

Khalfan, M M A (2001) Benchmarking and readiness assessment for concurrent engineering in construction (BEACON). PhD thesis, Loughborough University, UK.

Khalfan, M M A and McDermott, P (2006) Once unthought, now the best practice within the construction sector. Journal of Construction Procurement, 12(1),

Khalid, M A; Hassan, M U; Ullah, F and Ahmed, K (2025) Integrated building information modeling and blockchain system for decentralized progress payments in construction projects. Journal of Engineering, Design and Technology, 23(5), pp. 1770-1796. ISSN 1726-0531

Khalifa, M; Farrell, P and Emam, H (2015) The concept of partnering in public–private partnership projects in the United Arab Emirates. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 277-284. ISSN 17514304

Khalil, Khalili (1994) An evaluation of managerial knowledge and skills of technical professionals in the construction industry in Malaysia. PhD thesis, University of New South Wales, Australia.

Khalilzadeh, M; Balafshan, R and Hafezalkotob, A (2020) Multi-objective mathematical model based on fuzzy hybrid multi-criteria decision-making and FMEA approach for the risks of oil and gas projects. Journal of Engineering, Design and Technology, 18(6), pp. 1997-2016. ISSN 1726-0531

Khalilzadeh, M; Kebriyaii, O and Rezaei, R (2023) Identification and selection of stakeholder engagement strategies: Case study of an Iranian oil and gas construction project. International Journal of Construction Management, 23(3), pp. 484-494. ISSN 1562-3599

Khallaf, R (2016) Interactional risks associated with parties to a PPP project. PhD thesis, Purdue University, USA.

Khallaf, Z; Alshibani, A; Alsawafy, O; Mohammed, A and Bubshait, A (2024) Dynamic fleet configuration model for optimizing earthmoving operations using mixed integer linear programming. Journal of Construction Engineering and Management, 150(11): 04024152, ISSN 0733-9364

Khamaksorn, A (2019) Knowledge transfer processes in international construction joint venture projects in Thailand. PhD thesis, Oxford Brookes University, UK.

Khamaksorn, A; Nimmolrat, A; Mahat, N and Thinnukool, O (2023) An IDEF0 functional planning model for the development of an asset management framework: A case study of chiang mai university. Journal of Construction in Developing Countries, 28(1), pp. 133-150. ISSN 1823-6499

Khamaksorn, A; Tah, J H M and Kurul, E (2022) Social networks and knowledge transfer in international construction joint venture projects: A case study in Thailand. Journal of Construction in Developing Countries, 27(1), pp. 111-137. ISSN 1823-6499

Khan, A H; Herman, S S and Jaafar, M F Z (2021) The influence of wind effects on architectural buildings heights in Iraqi residential buildings based on computational fluid dynamics simulations. Journal of Construction in Developing Countries, 26(1), pp. 63-87. ISSN 1823-6499

Khan, Mona (2025) System of systems framework for structured risk analysis in complex engineering projects involving alliance. PhD thesis, RMIT University, Australia.

Khanh, H. D.; Tiep, N. V. and Nguyen, K. V. (2026) EFA models for evaluating stakeholder perceptions of falls-from-height risks in building projects: A case study from Vietnam. Journal of Engineering, Design and Technology, 24(6), pp. 1483-1509. ISSN 1726-0531

Khanh, H D; Kim, S Y; Khoa, N V and Tu, N T (2023) The relationship between workers' experience and productivity: A case study of brick masonry construction. International Journal of Construction Management, 23(4), pp. 596-605. ISSN 1562-3599

Khanh, H D; Kim, S Y and Linh, L Q (2023) Construction productivity prediction through Bayesian networks for building projects: Case from Vietnam. Engineering, Construction and Architectural Management, 30(5), pp. 2075-2100. ISSN 0969-9988

Khanyile, N S M; Musonda, I and Agumba, J N (2019) Evaluating the relationship between communication management practices and project outcomes: A case study of Eswatini (Swaziland) construction industry. Construction Economics and Building, 19(2), pp. 197-219. ISSN 2204-9029

Khanzode, A R (2011) An integrated virtual design and construction and lean (IVL) method for coordination of mechanical, electrical and plumbing (MEP) systems. PhD thesis, Stanford University, USA.

Khatib, J M; Chileshe, N and Sloan, S (2007) Antecedents and benefits of 3D and 4D modelling for construction planners. Journal of Engineering, Design and Technology, 5(2), pp. 159-172. ISSN 1726-0531

Khatibi, A.; Sedigh Rezvani, M.; Alavi, P. and Rahmati, S. (2026) A holistic fire risk-to-resilience framework for the historic bazaars (case study: The Zanjan bazaar, Iran). International Journal of Disaster Resilience in the Built Environment, 17(4), pp. 505-526. ISSN 1759-5908

Khatleli, N (2015) The impact of nativist exclusion on the migrant labourers in the South African construction industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Khazaeni, G and Khazaeni, A (2026) Multi-objective optimal allocation of construction project risks, ant colony optimization algorithm. International Journal of Building Pathology and Adaptation, 44(1), pp. 208-222. ISSN 2398-4708

Kheel, M (2024) The impact of risk and uncertainty on healthcare project delivery and its effect on intra-group conflict in the context of Saudi Arabia. PhD thesis, University of Manchester, UK.

Kheni, N A (2008) Impact of health and safety management on safety performance of small and medium-sized construction businesses in Ghana. PhD thesis, Loughborough University, UK.

Kheni, N A; Dainty, A R J and Gibb, A G F (2007) Influence of political and socio-cultural environments on health and safety management within SMEs: A Ghana case study. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Kheni, N A; Gibb, A G F and Dainty, A R J (2006) The management of construction site health and safety by small and medium-sized construction businesses in developing countries: A Ghana case study. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Khodabakhshian, Ania (2023) Machine learning for risk management in construction projects. PhD thesis, Politecnico di Milano, Italy.

Khoshbakht Iradmoosa, Maryam (2019) Building performance studies for higher education campus buildings: Energy use, occupant satisfaction and thermal comfort. PhD thesis, Griffith University, Australia.

Khosrowshahi, F (2015) Enhanced project brief: Structured approach to client-designer interface. Engineering, Construction and Architectural Management, 22(5), pp. 474-492. ISSN 0969-9988

Kian Manesh Rad, E (2016) Development of a project complexity assessment method for energy megaprojects. PhD thesis, Heriot-Watt University, UK.

Kiani Mavi, N; Brown, K; Fulford, R and Goh, M (2024) Forecasting project success in the construction industry using adaptive neuro-fuzzy inference system. International Journal of Construction Management, 24(14), pp. 1550-1568. ISSN 1562-3599

Kiatake, M and Petreche, J R D (2012) A case study on the application of the theory of inventive problem solving in architecture. Architectural Engineering and Design Management, 8(2), pp. 90-102. ISSN 1745-2007

Kifokeris, D; Tjell, J; Viklund-Tallgren, M; Farah, L N and Roupé, M (2020) Challenges in the digital transformation of lean design methods: A case study. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Kikwasi, G and Mbuya, E (2019) Vulnerability analysis of building structures to floods: The case of flooding informal settlements in Dar es Salaam, Tanzania. International Journal of Building Pathology and Adaptation, 37(5), pp. 629-656. ISSN 23984708

Killingsworth, J; Mehany, M H and Ladhari, H (2021) General contractors’ experience using off-site structural framing systems. Construction Innovation, 21(1), pp. 40-63. ISSN 1471-4175

Kim, D.; Yang, J.; Lee, D.; Lee, D.; Rahimian, F. and Park, C. (2026) Blockchain-enhanced computer vision approach for remote safety inspection in construction. Engineering, Construction and Architectural Management, 33(3), pp. 1907-1931. ISSN 0969-9988

Kim, Y W and Rhee, B D (2026) An incentive scheme in GMP contracts using a game theory approach. Journal of Construction Engineering and Management, 152(4): 04026016, ISSN 0733-9364

Kim, B; Lim, H; Kim, H and Hong, T (2012) Determining the value of governmental subsidies for the installation of clean energy systems using real options. Journal of Construction Engineering and Management, 138(3), pp. 422-430. ISSN 0733-9364

Kim, B S and Hong, T (2012) Revised case-based reasoning model development based on multiple regression analysis for railroad bridge construction. Journal of Construction Engineering and Management, 138(1), pp. 154-162. ISSN 0733-9364

Kim, C (2004) Spatial information acquisition and its use for infrastructure operation and maintenance. PhD thesis, University of Texas at Austin, USA.

Kim, D (2002) Exploratory study of lean construction: Assessment of lean implementation. PhD thesis, University of Texas at Austin, USA.

Kim, E (2000) A study on the effective implementation of earned value management methodology. DSc thesis, George Washington University, USA.

Kim, J; Ham, Y; Chung, Y and Chi, S (2019) Systematic camera placement framework for operation-level visual monitoring on construction jobsites. Journal of Construction Engineering and Management, 145(4): 04019019, ISSN 0733-9364

Kim, J; Hyun, J-Y; Chong, W K and Ariaratnam, S (2017) Understanding the effects of environmental factors on building energy efficiency designs and credits: Case studies using data mining and real-time data. Journal of Engineering, Design and Technology, 15(3), pp. 270-285.

Kim, J; Kamari, M; Lee, S and Ham, Y (2021) Large-scale visual data-driven probabilistic risk assessment of utility poles regarding the vulnerability of power distribution infrastructure systems. Journal of Construction Engineering and Management, 147(10): 04021121, ISSN 0733-9364

Kim, J and Philips, P (2012) Determinants of quits and dismissals on a long-lasting unionized industrial construction project. Journal of Construction Engineering and Management, 138(5), pp. 661-669. ISSN 0733-9364

Kim, J and Philips, P (2014) Remuneration and absenteeism on a large construction site. Construction Management and Economics, 32(10), pp. 983-999. ISSN 01446193

Kim, J-L (2006) A multiheuristic approach to resource constrained project scheduling: An adaptive hybrid genetic algorithm. PhD thesis, University of Florida, USA.

Kim, K; Cho, Y and Kim, K (2018) BIM-driven automated decision support system for safety planning of temporary structures. Journal of Construction Engineering and Management, 144(8): 04018072, ISSN 0733-9364

Kim, K and Cho, Y K (2021) Automatic recognition of workers' motions in highway construction by using motion sensors and long short-term memory networks. Journal of Construction Engineering and Management, 147(3): 04020184, ISSN 0733-9364

Kim, K P and Park, K S (2016) Primary BIM dataset for refurbishing flood risk vulnerable housing in the UK. Built Environment Project and Asset Management, 6(4), pp. 365-378. ISSN 2044-124X

Kim, M (2017) Noncontact quality assessment of precast concrete elements using 3D laser scanning and building information modeling. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Kim, S Y; Nguyen, M V and Dao, T T N (2021) Prioritizing complexity using fuzzy DANP: Case study of international development projects. Engineering, Construction and Architectural Management, 28(4), pp. 1114-1133. ISSN 0969-9988

Kim, Suryeon (2024) Strategic approaches for accelerating effective sharing and dissemination of construction management knowledge and methods. PhD thesis, Texas A&M University, USA.

Kim, T; Lim, H; Cho, H and Kang, K I (2014) Automated lifting system integrated with construction hoists for table formwork in tall buildings. Journal of Construction Engineering and Management, 140(10): 04014049, ISSN 0733-9364

Kim, T H; Lee, H W and Hong, S W (2016) Value engineering for roadway expansion project over deep thick soft soils. Journal of Construction Engineering and Management, 142(2): 05015014, ISSN 0733-9364

Kim, Y W; Han, S; Shin, S and Choi, K (2011) A case study of activity-based costing in allocating rebar fabrication costs to projects. Construction Management and Economics, 29(5), pp. 449-461. ISSN 1466433X

Kim, Y-W (2002) The implications of a new production paradigm for project cost control. PhD thesis, University of California, Berkeley, USA.

King, A P (2008) Enhancing the effectiveness of design and build tendering. PhD thesis, Sheffield Hallam University, UK.

King, D; Gurtner, Y; Firdaus, A; Harwood, S and Cottrell, A (2016) Land use planning for disaster risk reduction and climate change adaptation: Operationalizing policy and legislation at local levels. International Journal of Disaster Resilience in the Built Environment, 7(2), pp. 158-172. ISSN 1759-5916

Kio, P N and Anumba, C (2024) Circularity: a workflow for reusing waste wind turbine blades. Built Environment Project and Asset Management, 14(5), pp. 751-764. ISSN 2044-124X

Kipling, J; Newton, R and Ormerod, M (2011) Accessing emergency rest centres in the UK: Lessons learnt. International Journal of Disaster Resilience in the Built Environment, 2(1), pp. 47-58. ISSN 1759-5916

Kirkham, R J; Boussabaine, A H and Awwad, B H (2002) Probability distributions of facilities management costs for whole life cycle costing in acute care nhs hospital buildings. Construction Management and Economics, 20(3), pp. 251-261. ISSN 01446193

Kirkham, R J; Halim Boussabaine, A and Kirkham, M P (2002) Stochastic time series forecasting of electricity costs in an nhs acute care hospital building, for use in whole life cycle costing. Engineering, Construction and Architectural Management, 9(1), pp. 38-52. ISSN 0969-9988

Kishk, M; Pollock, R and Okhuahesogie, E (2004) Sensitivity of simulated whole-life costs to input probability distributions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Kishk, M a U C (2008) The impact of effective risk management on project success. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Kisi, K P; Mani, N; Rojas, E M and Foster, E T (2018) Estimation of optimal productivity in labor-intensive construction operations: Advanced study. Journal of Construction Engineering and Management, 144(10): 04018097, ISSN 0733-9364

Kismet, B and Colakoglu, M B (2026) Developing a building-scale circularity indicator through fuzzy analytical hierarchy process and gini index-based circularity calculation methods. International Journal of Construction Management, 26(6), pp. 994-1016. ISSN 1562-3599

Kissi, J (2012) Improving innovation and project performance in construction professional services firms: the leadership role of middle managers. PhD thesis, Loughborough University, UK.

Kissi, J; Dainty, A and Liu, A (2012) Examining middle managers' influence on innovation in construction professional services firms: A tale of three innovations. Construction Innovation, 12(1), pp. 11-28. ISSN 1471-4175

Kiu, M S; Chia, F C and Wong, P F (2022) Exploring the potentials of blockchain application in construction industry: A systematic review. International Journal of Construction Management, 22(15), pp. 2931-2940. ISSN 1562-3599

Kiziltas, S (2008) An automated approach for developing integrated model-based construction project histories to support estimation of activity production rates. PhD thesis, Carnegie Mellon University, USA.

Kleemann, F; Lederer, J; Aschenbrenner, P; Rechberger, H and Fellner, J (2016) A method for determining buildings' material composition prior to demolition. Building Research & Information, 44(1), pp. 51-62. ISSN 0961-3218

Klitgaard, A; Beck, F; Buhl, H; Jeppesen, R D and Nissen, S B (2016) Expansive learning in construction projects: A contradiction in terms? In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Klocko, Barbara A (2009) Superintendents as sensemakers in the design of sustainable schools. PhD thesis, Oakland University, USA.

Klopper, C H (1986) An investigation into and evaluation of the cost reimbursable basis for building contracts. DSc thesis, University of Pretoria, South Africa.

Kloukinas, D (2015) Neolithic building technology and the social context of construction practices: The case of Northern Greece. PhD thesis, Cardiff University, UK.

Klous, Jason D (2026) Investigating the role of the language action perspective in improving communication and collaboration in lean construction teams. PhD thesis, Nottingham Trent University, UK.

Knebel, V (2006) Preserve and rebuild: the built environment, status transformations and identity construction in eastern Germany after reunification. PhD thesis, University of Edinburgh, UK.

Knotten, V; Lædre, O and Hansen, G K (2017) Building design management: key success factors. Architectural Engineering and Design Management, 13(6), pp. 479-493. ISSN 1745-2007

Ko, T; Lee, J and David Jeong, H (2024) Project requirements prioritization through NLP-driven classification and adjusted work items analysis. Journal of Construction Engineering and Management, 150(3): 04023171, ISSN 0733-9364

Kobeyev, S; Tokbolat, S; Nazipov, F and Satyanaga, A (2023) Design and modeling of an on-site greywater treatment system for a hotel building. International Journal of Building Pathology and Adaptation, 41(1), pp. 201-224. ISSN 23984708

Koc, K; Durdyev, S; Tleuken, A; Ekmekcioglu, O; Mbachu, J and Karaca, F (2024) Critical success factors for construction industry transition to circular economy: Developing countries' perspectives. Engineering, Construction and Architectural Management, 31(12), pp. 4955-4974. ISSN 0969-9988

Koch, C and Buser, M (2003) Innovating mature public private partnerships: Danish municipalities and construction firms in networked public services. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Koch, C and Buser, M (2015) Sitting between two chairs: Introducing social sustainability in three large Swedish contractor companies. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Koch, C and Haubjerg, E (2011) Performing the transition: Integrated design processes in climate change mitigation. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Koch, C and Larsen, C S (2006) Quality in construction: A supply chain perspective. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Koch, C H G H J K (2018) Information standards: A hinder or an enabler for innovation? In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Kodikara, G W (1990) Data flow in building contractor organisations. PhD thesis, Loughborough University, UK.

Kodikara, G W and McCaffer, R (1993) Flow of estimating data in Sri Lankan building contractor organizations. Construction Management and Economics, 11(5), pp. 341-346. ISSN 01446193

Kodikara, G W; Thorpe, A and McCaffer, R (1993) The use of bills of quantities in building contractor organizations. Construction Management and Economics, 11(4), pp. 261-269. ISSN 01446193

Koh, T Y (2010) The effects of social capital on construction project success: exploring the mediating role of projectlearning. PhD thesis, University of Hong Kong, Hong Kong.

Koirala, M P; Thapa, N; Giri, O P and Sha, R K (2025) Evaluation of variation orders on road construction projects in rural Nepal. Construction Economics and Building, 25(3-4), pp. 311-338. ISSN 2204-9029

Kokkarinen, N; Shaw, A; Cullen, J; Pedrola, M O; Mason, A and Al-Shamma’a, A (2014) Investigation of audible carbon monoxide alarm ownership : Case study. Smart and Sustainable Built Environment, 3(1), pp. 72-86. ISSN 2046-6099

Kokkonen, A (2017) Integrated project emerging within the daily project life through active participation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Kokkonen, A and Alin, P (2016) Practitioners deconstructing and reconstructing practices when responding to the implementation of BIM. Construction Management and Economics, 34(7-8), pp. 578-591. ISSN 01446193

Kokkonen, A and Vaagaasar, A L (2018) Managing collaborative space in multi-partner projects. Construction Management and Economics, 36(2), pp. 83-95. ISSN 01446193

Kolar, Duro (2017) Improving the link between project management and strategy to optimise project success. PhD thesis, RMIT University, Australia.

Komendantova, N; Scolobig, A; Garcia-Aristizabal, A; Monfort, D and Fleming, K (2016) Multi-risk approach and urban resilience. International Journal of Disaster Resilience in the Built Environment, 7(2), pp. 114-132. ISSN 1759-5916

Kong, D; Tiong, R L K; Cheah, C Y J; Permana, A and Ehrlich, M (2008) Assessment of credit risk in project finance. Journal of Construction Engineering and Management, 134(11), pp. 876-884. ISSN 0733-9364

Kongchasing, N and Sua-iam, G (2022) The main issue working with migrant construction labor: A case study in Thailand. Engineering, Construction and Architectural Management, 29(4), pp. 1715-1730. ISSN 0969-9988

Konukcu, S (2011) A knowledge chain framework for construction supply chains. PhD thesis, Loughborough University, UK.

Koo, B and Fischer, M (2000) Feasibility study of 4D CAD in commercial construction. Journal of Construction Engineering and Management, 126(4), pp. 251-260. ISSN 0733-9364

Koo, D H (2007) Development of sustainability assessment model for underground infrastructure. PhD thesis, Arizona State University, USA.

Koo, D H and Ariaratnam, S T (2008) Application of a sustainability model for assessing water main replacement options. Journal of Construction Engineering and Management, 134(8), pp. 563-574. ISSN 0733-9364

Koo, K J and Park, S C (2012) GA-based fuel-efficient transfer path selection model for delivering construction materials. Journal of Construction Engineering and Management, 138(6), pp. 725-732. ISSN 0733-9364

Koo, T K and Tiong, R (1993) An expert system for assessing the performance of RC beams and slabs. Construction Management and Economics, 11(5), pp. 347-357. ISSN 01446193

Koolwijk, J S J (2022) Rules, power and trust: Interplay between inter-organizational structures and interpersonal relationships in project-based organizations in the construction industry. PhD thesis, Delft University of Technology, Netherlands.

Korczynski, M (1993) Capital, labour and economic performance in the engineering construction industry: 1960-1990. PhD thesis, University of Warwick, UK.

Kordestani Ghalenoeei, N; Saghatforoush, E; Athari Nikooravan, H and Preece, C (2021) Evaluating solutions to facilitate the presence of operation and maintenance contractors in the pre-occupancy phases: A case study of road infrastructure projects. International Journal of Construction Management, 21(2), pp. 140-152. ISSN 1562-3599

Kordi, N E; Belayutham, S and Che Ibrahim, C K I (2025) Development and demonstration of a social sustainability assessment tool for the construction project life cycle. Construction Innovation, 25(1), pp. 161-186. ISSN 1471-4175

Kori, S i (2017) BIM business value creation for SME architectural firms in Nigeria using intellectual capital development. PhD thesis, University of Liverpool, UK.

Korkmaz, S (2007) Piloting evaluation metrics for high performance green building project delivery. PhD thesis, Pennsylvania State University, USA.

Korkmaz, S; Riley, D and Horman, M (2011) Assessing project delivery for sustainable, high-performance buildings through mixed methods. Architectural Engineering and Design Management, 7(4), pp. 266-274. ISSN 1745-2007

Kornakova, M and March, A (2017) The role of citizens in DRR planning exercises: When to inform or consult. International Journal of Disaster Resilience in the Built Environment, 8(2), pp. 209-222. ISSN 1759-5916

Koseoglu, O and Nurtan-Gunes, E T (2018) Mobile BIM implementation and lean interaction on construction site: A case study of a complex airport project. Engineering, Construction and Architectural Management, 25(10), pp. 1298-1321. ISSN 0969-9988

Koseoglu, O; Sakin, M and Arayici, Y (2018) Exploring the BIM and lean synergies in the Istanbul Grand Airport construction project. Engineering, Construction and Architectural Management, 25(10), pp. 1339-1354. ISSN 0969-9988

Koskela, L; Huovila, P and Leinonene, J (2002) Design management in building construction: From theory to practice. Journal of Construction Research, 3(1), pp. 1-16. ISSN 1609-9451

Koskela, L J (2000) An exploration towards a production theory and its application to construction. DSc(Tech) thesis, Teknillinen Korkeakoulu (Helsinki), Finland.

Kpamma, Z E; Adjei-Kumi, T; Ayarkwa, J and Adinyira, E (2018) Choosing by advantages incorporated framework for a user-involved design process. Architectural Engineering and Design Management, 14(3), pp. 194-217. ISSN 1745-2007

Kremers, J; Rietjens, B; Voordijk, H and de Boer, S J (2010) Construction contracting and civil-military interaction. Construction Management and Economics, 28(8), pp. 871-883. ISSN 1466433X

Krone, S J (1991) Decreasing the impact of changes. DSc thesis, George Washington University, USA.

Krystallis, I (2016) A study of the concept of future-proofing in healthcare building asset management and the role of BIM in its delivery. PhD thesis, Loughborough University, UK.

Krzywoszynska, A; Buckley, A; Birch, H; Watson, M; Chiles, P; Mawyin, J; Holmes, H and Gregson, N (2016) Co-producing energy futures: Impacts of participatory modelling. Building Research & Information, 44(7), pp. 804-815. ISSN 0961-3218

Ku, S; Jo, H; Sim, J and Moon, W S (2024) Competitive performance of public–private partnerships: unsolicited proposal projects and tendering rules in South Korea. Construction Management and Economics, 42(8), pp. 714-740. ISSN 01446193

Kua, H W (2006) The design of effective policies for the promotion of sustainable construction materials. PhD thesis, Massachusetts Institute of Technology, USA.

Kuitert, L; Volker, L and Hermans, M H (2020) The public construction client of the future: Network-based collaborator in a traditional public administrative system. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Kuitert, L; Willems, J and Leentje, V (2024) Value integration in multi-functional urban projects: A value driven perspective on sustainability transitions. Construction Management and Economics, 42(2), pp. 182-198. ISSN 01446193

Kuitert, L; Willems, J J and Volker, L (2021) Value integration through social innovation in blue-green infrastructure projects. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Kuittinen, M (2016) Does the use of recycled concrete lower the carbon footprint in humanitarian construction? International Journal of Disaster Resilience in the Built Environment, 7(5), pp. 472-488. ISSN 1759-5916

Kuittinen, M and Takano, A (2017) The energy efficiency and carbon footprint of temporary homes: A case study from Japan. International Journal of Disaster Resilience in the Built Environment, 8(4), pp. 326-343. ISSN 1759-5916

Kula, B and Ergen, E (2021) Implementation of a BIM-FM platform at an international airport project: Case study. Journal of Construction Engineering and Management, 147(4): 05021002, ISSN 0733-9364

Kulatunga, K J (2008) Construction client and innovation: effect of client characteristics. PhD thesis, University of Salford, UK.

Kulatunga, U (2008) Influence of performance measurement towards construction research and development. PhD thesis, University of Salford, UK.

Kulchartchai, O and Hadikusumo, B H (2010) Exploratory study of obstacles in safety culture development in the construction industry: A grounded theory approach. Journal of Construction in Developing Countries, 15(1), pp. 45-66. ISSN 1823-6499

Kulevich, A E (2025) Effective strategies for mitigating bidding corruption for U.S. Infrastructure contracts. DBA thesis, Walden University, USA.

Kulkarni, S; Edwards, D J; Parn, E A; Chapman, C; Aigbavboa, C O and Cornish, R (2018) Evaluation of vehicle lightweighting to reduce greenhouse gas emissions with focus on magnesium substitution. Journal of Engineering, Design and Technology, 16(6), pp. 869-888. ISSN 1726-0531

Kulshrestha, M (1997) Total Value Control in Construction through Multiple Criteria Decision Making (MCDM). PhD thesis, Indian Institute of Technology Delhi, India.

Kumar, N.; Modi, S. and Kumar, P. (2026) The Kedarnath tragedy of 2013: Intersections of natural fury and human negligence in the Himalayan region. International Journal of Disaster Resilience in the Built Environment, pp. 1-13. ISSN 1759-5908

Kumar, A (1994) Development of a model for determining workzone illumination requirements during nighttime highway construction. PhD thesis, University of Florida, USA.

Kumar, R (2020) Risk management framework for construction projects aligned to actualities. PhD thesis, Indian Institute of Technology Delhi, India.

Kumar, S and Bansal, V K (2021) GIS-based locational evaluation of infrastructure facilities in hilly regions: A case study of an institute campus. International Journal of Construction Management, 21(11), pp. 1165-1184. ISSN 1562-3599

Kumar, S; Dhingra, A and Singh, B (2018) Lean-kaizen implementation: A roadmap for identifying continuous improvement opportunities in Indian small and medium sized enterprise. Journal of Engineering, Design and Technology, 16(1), pp. 143-160.

Kumar, V S S; Hanna, A S and Adams, T (2000) Assessment of working capital requirements by fuzzy set theory. Engineering, Construction and Architectural Management, 7(1), pp. 93-103. ISSN 0969-9988

Kumarasiri, B and Dissanayake, P (2021) Barriers to implementing waste-to-energy projects in Sri Lanka: A pestel analysis. Built Environment Project and Asset Management, 11(4), pp. 544-558. ISSN 2044-124X

Kumaraswamy, M M; Chan, D W M; Dissanayaka, S M and Yogeswaran, K (1997) Mapping methodologies and mixing methods in construction management research. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Kumari, T; Kulathunga, U; Hewavitharana, T and Madusanka, N (2022) Embodied carbon reduction strategies for high-rise buildings in Sri Lanka. International Journal of Construction Management, 22(13), pp. 2605-2613. ISSN 1562-3599

Kunieda, Y; Codinhoto, R and Emmitt, S (2019) Increasing the efficiency and efficacy of demolition through computerised 4D simulation. Engineering, Construction and Architectural Management, 26(10), pp. 2186-2205. ISSN 0969-9988

Kurkela, M; Maksimainen, M; Julin, A; Virtanen, J P; Männistö, I; Vaaja, M T and Hyyppä, H (2022) Applying photogrammetry to reconstruct 3D luminance point clouds of indoor environments. Architectural Engineering and Design Management, 18(1), pp. 56-72. ISSN 1745-2007

Kurniawan, F; Ogunlana, S and Motawa, I (2010) An integrated project evaluation tool for PFI seaport projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Kurul, E (2003) Re-using listed buildings through conversion: A process mapping approach. PhD thesis, University College London, UK.

Kusuma, I C (2016) The evolution of culture-climate interplay in temporary multi-organisations: the case of construction alliancing projects. PhD thesis, University College London, UK.

Kwafo, D G (2021) Strategies for improving performance of project managers in Ghana to reduce delays. PhD thesis, Walden University, USA.

Kwawu, W and Hughes, W P (2005) The impact of relational contracting on the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Kwawu, W and Laryea, S (2014) Governance structures in collaborative working practices. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Kwawu, W E K and Hughes, W P (2007) Are relational and formal contracts implemented as substitutes in the UK construction industry? In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Kwawu, W E K and Hughes, W P (2008) Strategies for aligning organizational incentive systems through contracts. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Kwon, N; Song, K; Lee, H S; Kim, J and Park, M (2018) Construction noise risk assessment model focusing on construction equipment. Journal of Construction Engineering and Management, 144(6): 04018034, ISSN 0733-9364

Kyalisiima, C; Tutesigensi, A and Kayondo, M (2022) Is the competence of internal stakeholders in construction projects an antidote to construction contract disputes? In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Kyaw Oo D’Amore, G and Mauro, F (2023) Numerical study on modelling perforated elements using porous baffle interface and porous region. Journal of Engineering, Design and Technology, 21(6), pp. 1827-1840. ISSN 1726-0531

Köseoğlu Balta, G Ç (2019) A Bayesian belief, network-based, delay risk assessment tool for tunnel projects: BBN tunnel. PhD thesis, Middle East Technical University, Turkey.

Kübelböck, G (2013) Constructing a conceptual framework for market intelligence in the European plant building industry. PhD thesis, University of Gloucestershire, UK.

La Fleur, L (2019) Energy renovation of multi-family buildings in Sweden an evaluation of life cycle costs, indoor environment and primary energy use, and a comparison with constructing a new building. PhD thesis, Linköping University, Sweden.

Laan, A; Voordijk, H and Kolkman, S (2003) Measuring the added value of it in construction firms. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Labaka, L; Hernantes, J and Sarriegi, J M (2015) A framework to improve the resilience of critical infrastructures. International Journal of Disaster Resilience in the Built Environment, 6(4), pp. 409-423. ISSN 1759-5916

Labib, Y A M (2017) Lean framework for assessing construction logistics in Jordan. PhD thesis, University of Salford, UK.

Laborde, M and Sanvido, V (1994) Introducing new process technologies into construction companies. Journal of Construction Engineering and Management, 120(3), pp. 488-508. ISSN 0733-9364

Lai, H Y; Abdul-Aziz, A R and Chan, T K (2014) Effect of the global financial crisis on the financial performance of public listed construction companies in Malaysia. Journal of Financial Management of Property and Construction, 19(3), pp. 246-263. ISSN 1366-4387

Lai, H Y and Chiang, W H (2024) Generative design of terraced concert hall: A case study of Taipei music and library centre. Building Research & Information, 52(1-2), pp. 49-67. ISSN 0961-3218

Laloui, H; Abdul Majid, N H and Sanusi, A N Z (2022) The impacts of introducing voids combinations on indoor ventilation performance in high-rise residential buildings. Engineering, Construction and Architectural Management, 29(7), pp. 2736-2759. ISSN 0969-9988

Lam, T Y M and Gale, K S (2026) Construction framework process: A qualitative investigation of behaviour change drivers and project outcomes. Construction Innovation, 26(1), pp. 83-96. ISSN 1471-4175

Lam, H-C R (2003) An investigation into the implementation of safety management systems by Hong Kong construction contractors. PhD thesis, University of Hong Kong, Hong Kong.

Lam, K A and Runeson, G (1999) Modelling financial decisions in construction firms. Construction Management and Economics, 17(5), pp. 589-602. ISSN 01446193

Lam, K C; Gibb, A G F and Sher, W D (1997) An analysis of building procurement factors affecting coordination of building services. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Lam, K C; Hu, T; Cheung, S O; Yuen, R K K and Deng, Z M (2001) Multi-project cash flow optimization: Non-inferior solution through neuro-multiobjective algorithm. Engineering, Construction and Architectural Management, 8(2), pp. 130-144. ISSN 0969-9988

Lam, K C; Runeson, G; Tam, C M and Lo, S M (1998) Modelling loan acquisition decisions. Engineering, Construction and Architectural Management, 5(4), pp. 359-375. ISSN 0969-9988

Lam, K C; So, A T P; Hu, T; Ng, T; Yuen, R K K; Lo, S M; Cheung, S O and Yang, H (2001) An integration of the fuzzy reasoning technique and the fuzzy optimization method in construction project management decision-making. Construction Management and Economics, 19(1), pp. 63-76. ISSN 01446193

Lam, K C; Song Hu, T I E; Ng, T; Yuen, R K K; Lo, S M and Wong, C T C (2001) Using an adaptive genetic algorithm to improve construction finance decisions. Engineering, Construction and Architectural Management, 8(1), pp. 31-45. ISSN 0969-9988

Lam, K C; Thomas Ng, S; Hu, T; Skitmore, M and Cheung, S O (2000) Decision support system for contractor pre-qualification: Artificial neural network model. Engineering, Construction and Architectural Management, 7(3), pp. 251-266. ISSN 0969-9988

Lam, K-C (2003) Co-ordination of building services and procurement methods for highly serviced buildings. PhD thesis, Loughborough University, UK.

Lam, T and Gale, K (2014) Highway maintenance: Impact of framework agreements upon project financial performance. Construction Management and Economics, 32(5), pp. 460-472. ISSN 01446193

Lam, T Y M and Gale, K S (2023) A performance-driving model for public-sector construction framework procurement in England. Built Environment Project and Asset Management, 13(6), pp. 781-798. ISSN 2044-124X

Lam, T Y M; Brock, T and Gale, K S (2025) Is "design and build" suitable for social housing projects in the UK housing crisis? Built Environment Project and Asset Management, 15(4), pp. 863-878. ISSN 2044-124X

Lambert, E L (2015) Complex factors related to capital construction project success: A case study. PhD thesis, Capella University, USA.

Lan, R; Adenuga, O and Awolusi, I (2026) Professionals' perspectives on the factors causing construction project failures in developing countries: A case study of Lagos metropolis. International Journal of Construction Management, 26(3), pp. 511-535. ISSN 1562-3599

Landes, Drew (2024) Trade, global value chains and power the role of oligopsony, 1995-2020. PhD thesis, The New School, USA.

Landgren, M and Jensen, L B (2018) How does sustainability certification affect the design process? Mapping final design projects at an architectural office. Architectural Engineering and Design Management, 14(4), pp. 292-305. ISSN 1745-2007

Landy, M F B (2022) Integrating quality and innovation in services in dynamic and turbulent environments. PhD thesis, Universidade do Minho, Portugal.

Lang, R; Goodier, C and Glass, J (2016) Are housebuilders' production strategies a barrier to offsite construction uptake in the UK? In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Langdon, M (2021) Towards a shift of values in rail infrastructure project evaluation. PhD thesis, University of Nottingham, UK.

Langston, C (2013) The role of coordinate-based decision-making in the evaluation of sustainable built environments. Construction Management and Economics, 31(1), pp. 62-77. ISSN 1466433X

Langston, C (2023) The empirical relationship between contractor success and project innovation. Engineering, Construction and Architectural Management, 30(6), pp. 2231-2254. ISSN 0969-9988

Langston, C and Crowley, C (2021) Evaluation of transportation infrastructure: A case study of Gold Coast Light Rail stage 1&2. Construction Economics and Building, 21(4), pp. 1-20. ISSN 2204-9029

Langston, Y L and Langston, C (2007) Building energy and cost performance: An analysis of thirty Melbourne case studies. Construction Economics and Building, 7(1), pp. 1-18. ISSN 2204-9029

Langston, Y L and Langston, C (2009) The inherent building energy-cost relationship: An analysis of thirty Melbourne case studies. Construction Economics and Building, 9(1), pp. 9-18. ISSN 2204-9029

Langston, Y L and Langston, C A (2008) Reliability of building embodied energy modelling: An analysis of 30 Melbourne case studies. Construction Management and Economics, 26(2), pp. 147-160. ISSN 1466433X

Lansley, P (1985) Putting organizational research into practice. Construction Management and Economics, 3(1), pp. 1-14. ISSN 01446193

Lansley, P; McCreadie, C; Tinker, A; Flanagan, S and Goodacre, K (2004) Adapting the homes of older people: A case study of costs and savings. Building Research & Information, 32(6), pp. 468-483. ISSN 0961-3218

Laovisutthichai, V. and Lu, W. (2026) Design for excellence (dfx) in architecture, engineering, and construction: Definition, necessity, and knowledge management-based framework. Architectural Engineering and Design Management, 22(1), pp. 188-205. ISSN 1745-2007

Laovisutthichai, V and Lu, W (2023) Design for manufacture and assembly (dfma) in architectural design meetings: From a case study to knowledge-to-action framework. Smart and Sustainable Built Environment, 12(5), pp. 1117-1134. ISSN 2046-6099

Laovisutthichai, V; Lu, W and Bao, Z (2022) Design for construction waste minimization: Guidelines and practice. Architectural Engineering and Design Management, 18(3), pp. 279-298. ISSN 1745-2007

Laovisutthichai, V; Lu, W and Low, S P (2025) Design for excellence (DfX) for high-rise modular buildings: from DfX considerations to module design guidelines using the case of Hong Kong. Architectural Engineering and Design Management, 21(3), pp. 430-449. ISSN 1745-2007

Larsen, G D (2011) Understanding the early stages of the innovation diffusion process: Awareness, influence and communication networks. Construction Management and Economics, 29(10), pp. 987-1002. ISSN 01446193

Larsen, G D and Whyte, J (2013) Safe construction through design: Perspectives from the site team. Construction Management and Economics, 31(6), pp. 675-690. ISSN 1466433X

Larsen, J K; Lindhard, S M; Brunoe, T D and Jensen, K N (2018) The relation between pre-planning, commissioning and enhanced project performance. Construction Economics and Building, 18(2), pp. 1-14. ISSN 2204-9029

Larsson, J; Eriksson, P E; Lingegård, S and Järvenpää, A T (2022) Innovation outcomes and processes in infrastructure projects–a co mparative study of design-build and design-build-maintenance contracts. Construction Management and Economics, 40(2), pp. 142-156. ISSN 01446193

Larsson, J; Lu, W; Krantz, J and Olofsson, T (2016) Discrete event simulation analysis of product and process platforms: A bridge construction case study. Journal of Construction Engineering and Management, 142(4): 04015097, ISSN 0733-9364

Larsson, N K and Cole, R J (2001) Green building challenge: The development of an idea. Building Research & Information, 29(5), pp. 336-345. ISSN 0961-3218

Laryea, S (2009) Subcontract and supply enquiries in the tender process of contractors. Construction Management and Economics, 27(12), pp. 1219-1230. ISSN 1466433X

Laryea, S (2011) Quality of tender documents: Case studies from the UK. Construction Management and Economics, 29(3), pp. 275-286. ISSN 1466433X

Laryea, S (2016) Compensation events in NEC3 contracts: Case studies from South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(2), pp. 49-64. ISSN 17514304

Laryea, S (2019) Procurement strategy and outcomes of a new universities project in South Africa. Engineering, Construction and Architectural Management, 26(9), pp. 2060-2083. ISSN 0969-9988

Laryea, S and Watermeyer, R (2020) Managing uncertainty in fast-track construction projects: Case study from South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(2), pp. 49-63. ISSN 17514304

Laryea, S and Watermeyer, R (2021) Structuring architectural competitions as a competitive procurement process. Engineering, Construction and Architectural Management, 28(4), pp. 886-907. ISSN 0969-9988

Laryea, S A (2008) How contractors take account of risk in the tender process: Theory and practice. PhD thesis, University of Reading, UK.

Laryea, S A and Hughes, W P (2009) Commercial reviews in the tender process of contractors. Engineering, Construction and Architectural Management, 16(6), pp. 558-572. ISSN 0969-9988

Lassandro, P and Cosola, T (2018) Climate change mitigation: Resilience indicators for roof solutions. International Journal of Disaster Resilience in the Built Environment, 9(1), pp. 4-17. ISSN 1759-5916

Lateef, O A; Khamidi, M F and Idrus, A (2010) Building maintenance management in a Malaysian university campus: A case study. Construction Economics and Building, 10(1-2), pp. 76-89. ISSN 2204-9029

Latif, H M (2014) Case studies of Malaysian contractors' bidding process: ethical principles and practices. PhD thesis, University of Reading, UK.

Latiff, A M A; Jaapar, A and Isa, C M M (2020) Project governance practices in urban public housing projects: A case study of public housing in Malaysia. Construction Economics and Building, 20(4), pp. 120-136. ISSN 2204-9029

Latiff, A M A; Jaapar, A and Isa, C M M (2022) Factors influencing governance practices in rural development projects: A case study of rural road projects in Malaysia. Journal of Construction in Developing Countries, 27(2), pp. 1-16. ISSN 1823-6499

Lau, E and Rowlinson, S (2009) Interpersonal trust and inter-firm trust in construction projects. Construction Management and Economics, 27(6), pp. 539-554. ISSN 1466433X

Lau, H-l (2005) Trust relations in the construction industry. PhD thesis, University of Hong Kong, Hong Kong.

Laufer, A (1985) On site performance improvement programs. Journal of Construction Engineering and Management, 111(1), pp. 82-97. ISSN 0733-9364

Laureij, L V (2013) Supply chain contracting as disagreement management: Institutionalizing procurement practice through communication design. PhD thesis, Rutgers The State University of New Jersey, USA.

Laurell-Stenlund, K (2010) Value creation in development and construction of public buildings: The case of houses of culture. PhD thesis, Luleå University of Technology, Sweden.

Laurell-Stenlund, K and Eriksson, P E (2010) Design factors' influence on value creation when building houses of culture. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Laurent, J and Leicht, R M (2019) Practices for designing cross-functional teams for integrated project delivery. Journal of Construction Engineering and Management, 145(3): 05019001, ISSN 0733-9364

Lavikka, R H; Kyrö, R; Peltokorpi, A and Särkilahti, A (2019) Revealing change dynamics in hospital construction projects. Engineering, Construction and Architectural Management, 26(9), pp. 1946-1961. ISSN 0969-9988

Lavy, S and Nixon, J L (2017) Applications, enrolment, attendance, and student performance in rebuilt school facilities: A case study. International Journal of Construction Education and Research, 13(2), pp. 125-41. ISSN 1557-8771

Lavy, S and Shohet, I M (2004) Integrated maintenance management of hospital buildings: A case study. Construction Management and Economics, 22(1), pp. 25-34. ISSN 01446193

Lawani, K; Sadeghineko, F; Tong, M and Bayraktar, M (2025) Methodology for retrospectively developing a BIM model from point cloud scans using ongoing building project as case study. Journal of Engineering, Design and Technology, 23(4), pp. 1243-1261. ISSN 1726-0531

Lawrence, R; Elsayed, M and Keime, C (2019) Evaluation of environmental design strategies for university buildings. Building Research & Information, 47(8), pp. 883-900. ISSN 0961-3218

Lawson, B; Statsenko, L and Shokri-Ghasabeh, M (2022) Value co-creation in asset integrity and improvement portfolio: Evidence from the Australian mining industry. Journal of Engineering, Design and Technology, 20(2), pp. 516-542. ISSN 1726-0531

Lazaro, S. A. M.; Li, X. and Baba, V. F. (2026) Evaluating expanded polystyrene insulation for enhancing energy efficiency in residential buildings: A scalable model from Mozambique. Journal of Engineering, Design and Technology, 24(4), pp. 992-1011. ISSN 1726-0531

Le, D. T.; Nguyen, M. V.; Tran, V. T.; Le-Hoai, L. and Nguyen Pham, N. D. (2026) Applying Maslow's hierarchy of needs in assessing mental ill-health risk factors of construction employees: A case study in Vietnam. Journal of Engineering, Design and Technology, 24(6), pp. 1435-1459. ISSN 1726-0531

Le, C; Jeong, H D and Damnjanovic, I (2021) Network theory-driven construction logic knowledge network: Process modeling and application in highway projects. Journal of Construction Engineering and Management, 147(10): 04021261, ISSN 0733-9364

Le, C; Jeong, H D; Damnjanovic, I and Bukkapatnam, S (2022) Pareto principle in scoping-phase cost estimating: A multiobjective optimization approach for selecting and applying optimal major work items. Journal of Construction Engineering and Management, 148(8): 04022076, ISSN 0733-9364

Le, Ngoc Quyet (2021) Building information modelling (BIM) adoption and implementation: Interaction between BIM specialists and non-BIM specialists in Vietnam. PhD thesis, University of Technology Sydney, Australia.

Le Gallais, Tricia Anne (2006) Building identities in FE: A case study of construction lecturers. PhD thesis, Birmingham City University, UK.

Le Gia, T T; Dang, H A; Dinh, V B; Tong, M Q; Nguyen, T K; Nguyen, H H and Nguyen, D Q (2022) A simulation-based multi-objective genetic optimization framework for efficient building design in early stages: Application for Vietnam's hot and humid climates. International Journal of Building Pathology and Adaptation, 40(3), pp. 305-326. ISSN 23984708

Le Masurier, J W (2001) Developing the observational method as a systematic approach to uncertainty management. PhD thesis, University of Bristol, UK.

Le-Hoai, L; Dang, C N; Lee, S B and Lee, Y D (2019) Benchmarking claim causes against contractors in emerging markets: Empirical case study. International Journal of Construction Management, 19(4), pp. 307-316. ISSN 1562-3599

Leathem, T M (2020) Development and evaluation of a model for clarifying acce student learning outcomes. International Journal of Construction Education and Research, 16(1), pp. 43-60. ISSN 1557-8771

Leblanc, H (2012) Knowledge mapping and process modelling to develop a sustainability-related knowledge management strategy for Scottish housing association planned works. PhD thesis, Glasgow Caledonian University, UK.

Leblanc, H; Thomson, C and Cameron, I (2015) Developing a sustainability KM strategy for HA planned works. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(2), pp. 49-65. ISSN 17514304

Leblanc, H; Thomson, C; Cameron, I and Nitithamyong, P (2013) Developing a planned work process model for housing associations. Engineering, Construction and Architectural Management, 20(3), pp. 232-249. ISSN 0969-9988

Leblanc, H; Thomson, C and Nitithamyong, P (2011) Mapping sustainability related knowledge of construction planned works: A social housing case study. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Lee, J; Jang, K; Sparkling, A E and Kang, K (2026) Large language model-based construction site management for severe weather preparedness. Journal of Construction Engineering and Management, 152(1): 04025220, ISSN 0733-9364

Lee, A (2002) The development of a project process evaluation (PPE) framework that aims to measure the effectiveness of implementing a new design and construction project process. PhD thesis, University of Salford, UK.

Lee, C (2023) Evaluating construction delays using productivity-based resource reallocation for economic feasibility. Engineering, Construction and Architectural Management, 30(4), pp. 1679-1696. ISSN 0969-9988

Lee, C and Park, K K H (2022) Forecasting trading volume in local housing markets through a time-series model and a deep learning algorithm. Engineering, Construction and Architectural Management, 29(1), pp. 165-178. ISSN 0969-9988

Lee, D (2023) Development of a real-time automated mobile robotic welding system in construction. PhD thesis, North Carolina State University, USA.

Lee, E B; Lee, H and Harvey, J T (2006) Fast-track urban freeway rehabilitation with 55-h weekend closures: I-710 long beach case study. Journal of Construction Engineering and Management, 132(5), pp. 465-472. ISSN 0733-9364

Lee, E B; Roesler, J; Harvey, J T and Ibbs, C W (2002) Case study of urban concrete pavement reconstruction on Interstate 10. Journal of Construction Engineering and Management, 128(1), pp. 49-56. ISSN 0733-9364

Lee, E B and Thomas, D K (2007) State-of-practice technologies on accelerated urban highway rehabilitation: I-15 California experience. Journal of Construction Engineering and Management, 133(2), pp. 105-113. ISSN 0733-9364

Lee, G and Kim, S (2012) Case study of mass customization of double-curved metal façade panels using a new hybrid sheet metal processing technique. Journal of Construction Engineering and Management, 138(11), pp. 1322-1330. ISSN 0733-9364

Lee, H S; Lee, J Y and Lee, J S (1999) Nonshored formwork system for top-down construction. Journal of Construction Engineering and Management, 125(6), pp. 392-399. ISSN 0733-9364

Lee, H S; Shin, J W; Park, M and Ryu, H G (2009) Probabilistic duration estimation model for high-rise structural work. Journal of Construction Engineering and Management, 135(12), pp. 1289-1298. ISSN 0733-9364

Lee, H S and Yi, K J (1999) Application of mathematical matrix to integrate project schedule and cost. Journal of Construction Engineering and Management, 125(5), pp. 339-346. ISSN 0733-9364

Lee, H S; Yu, J H and Kim, S K (2004) Impact of labor factors on workflow. Journal of Construction Engineering and Management, 130(6), pp. 918-923. ISSN 0733-9364

Lee, H W (2012) Application of target value design to energy efficiency investments. PhD thesis, University of California, Berkeley, USA.

Lee, J S (2018) Value engineering for defect prevention on building façade. Journal of Construction Engineering and Management, 144(8): 04018069, ISSN 0733-9364

Lee, J S (2021) Life cycle costing for exterior materials on building façade. Journal of Construction Engineering and Management, 147(7): 2068, ISSN 0733-9364

Lee, Jaeho (2007) A methodology for developing bridge condition rating models based on limited inspection records. PhD thesis, Griffith University, Australia.

Lee, K J (2013) A formal and ontological approach to embed commissioning test protocol into building information model. PhD thesis, Carnegie Mellon University, USA.

Lee, M; Jeong, J and Lee, J (2025) Development of a quantitative assessment method for occupational accident risk of construction workers using resource and cost information in the preconstruction stage. Journal of Construction Engineering and Management, 151(12): 04025208, ISSN 0733-9364

Lee, S (2007) Entry decision for unsolicited build-operate-transfer (BOT) highway projects: Real options approach. PhD thesis, University of Colorado at Boulder, USA.

Lee, S (2015) Determination of priority weights under multiattribute decision-making situations: AHP versus fuzzy AHP. Journal of Construction Engineering and Management, 141(2): 05014015, ISSN 0733-9364

Lee, S; Peña-Mora, F and Park, M (2005) Quality and change management model for large scale concurrent design and construction projects. Journal of Construction Engineering and Management, 131(8), pp. 890-902. ISSN 0733-9364

Lee, S H (2010) Optimal highway investment decision-making under risk and uncertainty. PhD thesis, Illinois Institute of Technology, USA.

Lee, S-H (2003) A process model for controlling project productivity of highway construction operations. PhD thesis, University of Florida, USA.

Lee, W V and Steemers, K (2017) Exposure duration in overheating assessments: A retrofit modelling study. Building Research & Information, 45(1-2), pp. 60-82. ISSN 0961-3218

Lee, Y (2020) A methodology to align the logistical requirements of prefabricated wall panels. PhD thesis, Stanford University, USA.

Lees, M A (2009) Measuring the value of engagement between higher education and industry and practice in the built environment. PhD thesis, University of Salford, UK.

Lees, T and Sexton, M (2012) The domestication and use of low and zero carbon technologies in new homes. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Lefebvre, G (2009) The influence of the psychological characteristics of the team members on construction project performance. PhD thesis, University of Salford, UK.

Leghissa, G; Sage, D and Dainty, A (2016) Collaboration between housebuilding firms and suppliers for the implementation of innovation strategies: A strategy-as-practice approach. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Lehtinen, J and Aaltonen, K (2024) Community stakeholders' online engagement in infrastructure projects: a theory-testing single-case study. Construction Management and Economics, 42(8), pp. 758-786. ISSN 01446193

Lehtiranta, L and Junnonen, J M (2014) Stretching risk management standards: Multi-organizational perspectives. Built Environment Project and Asset Management, 4(2), pp. 128-145. ISSN 2044-124X

Lehtovaara, J; Seppänen, O and Peltokorpi, A (2022) Improving construction management with decentralised production planning and control: Exploring the production crew and manager perspectives through a multi-method approach. Construction Management and Economics, 40(4), pp. 254-277. ISSN 01446193

Lehtovaara, J; Seppänen, O; Peltokorpi, A; Kujansuu, P and Grönvall, M (2021) How Takt production contributes to construction production flow: A theoretical model. Construction Management and Economics, 39(1), pp. 73-95. ISSN 01446193

Lehtovaara, Joonas (2023) Takt production and decentralized decision-making: Improving construction production flow with novel planning & control approaches. DScTech thesis, Aalto University, Finland.

Lei, Haoran (2024) Life cycle assessment in circular economy for built environment. PhD thesis, RMIT University, Australia.

Lei, Z; Chen, Q; Altaf, M S and Cao, K (2024) Defining information requirements for off-site construction management: An industry case study from Canada. Journal of Construction Engineering and Management, 150(12): 05024014, ISSN 0733-9364

Lei, Z; Han, S; Bouferguène, A; Taghaddos, H; Hermann, U and Al-Hussein, M (2015) Algorithm for mobile crane walking path planning in congested industrial plants. Journal of Construction Engineering and Management, 141(2): 05014016, ISSN 0733-9364

Lei, Z; Sadiq Altaf, M; Cheng, Z; Liu, H and Tang, S (2023) Measurement of information loss and transfer impacts of technology systems in offsite construction processes. Journal of Construction Engineering and Management, 149(9): 05023011, ISSN 0733-9364

Leicht, R and Harty, C (2017) Influence of multiparty IPD contracts on construction innovation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Leicht, R M; Hunter, S T; Saluja, C and Messner, J I (2010) Implementing observational research methods to study team performance in construction management. Journal of Construction Engineering and Management, 136(1), pp. 76-86. ISSN 0733-9364

Leiringer, R (2003) Technological innovations in the context of public-private partnership projects. PhD thesis, KTH Royal Institute of Technology, Sweden.

Leiringer, R; Green, S D and Raja, J Z (2009) Living up to the value agenda: The empirical realities of through-life value creation in construction. Construction Management and Economics, 27(3), pp. 271-285. ISSN 1466433X

Lerche, J; Neve, H H; Ballard, G; Teizer, J; Wandahl, S and Gross, A (2020) Application of last planner system to modular offshore wind construction. Journal of Construction Engineering and Management, 146(11): 05020015, ISSN 0733-9364

Leshinsky, R (2012) Use of planning agreements to support sustainability and environmental preservation: A case study from Victoria, Australia. International Journal of Law in the Built Environment, 4(2), pp. 157-172. ISSN 1756-1450

Leslie-Carter, R; Zou, P X W and Tan, E X (2009) Managing international projects: A case study of the water cube aquatic centre for Beijing 2008 olympic games. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Lessing, J and Brege, S (2015) Business models for product-oriented house-building companies: Experience from two Swedish case studies. Construction Innovation, 15(4), pp. 449-472. ISSN 1471-4175

Lessing, J and Brege, S (2018) Industrialized building companies' business models: Multiple case study of Swedish and North American companies. Journal of Construction Engineering and Management, 144(2): 05017019, ISSN 0733-9364

Lessing, J; Stehn, L and Ekholm, A (2015) Industrialised house-building: Development and conceptual orientation of the field. Construction Innovation, 15(3), pp. 378-399. ISSN 1471-4175

Lester, E (2021) COVID-19 crisis management left tacit knowledge behind. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Leung, M-Y (2000) Value Management in construction projects. Unpublished PhD thesis, City University of Hong Kong, Hong Kong.

Leuven, A v and Voordijk, H (2001) Enterprise resource planning in construction: An evaluation of recent implementations. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Levis, James William (2013) A mathematical programming life-cycle assessment model for solid waste management decision making. PhD thesis, North Carolina State University, USA.

Lewis, A (2013) A framework for improving building operations decisions for energy efficiency. PhD thesis, University of Reading, UK.

Lewis, A and Elmualim, A (2011) Development of a decision support system for proactive energy and maintenance management decisions. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Lewis, P; Karimi, B; Shan, Y and Rasdorf, W (2019) Comparing the economic, energy, and environmental impacts of biodiesel versus petroleum diesel fuel use in construction equipment. International Journal of Construction Education and Research, 15(4), pp. 276-290. ISSN 1557-8771

Li, F.; Chi, H. L.; Li, R.; Zou, Z. and Wang, R. D. (2026) Two-stage optimization design framework for tower crane layout planning in modular integrated construction considering transportation efficiency, operator visibility, and lifting safety. Journal of Construction Engineering and Management, 152(6): 04026080, ISSN 0733-9364

Li, H X; Nair, S; Li, Y; Yahaya, A; Timms, W and Owolabi, A B (2026) Evaluating energy performance of educational buildings: A case study in Australia. Engineering, Construction and Architectural Management, 33(15), pp. 137-158. ISSN 0969-9988

Li, J. and Li, Y. (2026) A mini review of greenhouse gas emissions and mitigation strategies in the building sector. International Journal of Building Pathology and Adaptation, 44(5), pp. 1302-1328. ISSN 2398-4708

Li, M N; Wang, X; Cheng, R X and Chen, Y (2025) Aided design decision-making framework for engineering projects considering cost and social benefits. Engineering, Construction and Architectural Management, 32(8), pp. 5040-5065. ISSN 0969-9988

Li, X; Chen, R; Chen, W and Jim, C Y (2025) Safety-risk assessment system for prefabricated building construction in China. Engineering, Construction and Architectural Management, 32(12), pp. 8073-8096. ISSN 0969-9988

Li, X.; Lin, M.; Chen, J. and Jim, C. Y. (2026) A lifecycle-based risk assessment framework for prefabricated building supply chains using G1-entropy weight and cloud matter-element models. Engineering, Construction and Architectural Management, 33(7), pp. 5645-5674. ISSN 0969-9988

Li, Y; Gao, R; Wu, H; Wen, J; Li, T and Dong, X (2026) Multiobjective construction schedule optimization with labor resource allocation: Coupling parameter-adaptive genetic algorithm and network flow. Journal of Construction Engineering and Management, 152(5): 04026053, ISSN 0733-9364

Li, Z and Mok Paik, S (2025) Resource cost optimization strategies in off-site manufacturing for modern construction methods: A lean theory perspective case study in Ireland. International Journal of Construction Management, 25(16), pp. 1892-1900. ISSN 1562-3599

Li, B (2008) Managing a collaborative preconstruction planning process. PhD thesis, Loughborough University, UK.

Li, Chenyang (2022) A model for developing retrofitting strategies for office buildings. PhD thesis, University of Technology Sydney, Australia.

Li, F; Phoon, K K; Du, X and Zhang, M (2013) Improved AHP method and its application in risk identification. Journal of Construction Engineering and Management, 139(3), pp. 312-320. ISSN 0733-9364

Li, G; Chen, C; Martek, I; Ao, Y and Dai, J (2021) Bid or no-bid decision model for international construction projects: Evidential reasoning approach. Journal of Construction Engineering and Management, 147(2): 1984, ISSN 0733-9364

Li, G; Zhang, G; Chen, C and Martek, I (2020) Empirical bid or no bid decision process in international construction projects: Structural equation modeling framework. Journal of Construction Engineering and Management, 146(6): 04020050, ISSN 0733-9364

Li, Guokai (2024) A research on construction and demolition waste management. PhD thesis, Università degli Studi di Padova, Italy.

Li, H; Chan, G; Skitmore, M and Huang, T (2015) A 4D automatic simulation tool for construction resource planning: A case study. Engineering, Construction and Architectural Management, 22(5), pp. 536-550. ISSN 0969-9988

Li, H; Guo, H; Skibniewski, M J and Skitmore, M (2008) Using the IKEA model and virtual prototyping technology to improve construction process management. Construction Management and Economics, 26(9), pp. 991-1000. ISSN 1466433X

Li, H; Guo, H L; Kong, S C W and Chen, Z (2012) Optimization of curved roof surface design using GA. Journal of Engineering, Design and Technology, 10(3), pp. 345-359. ISSN 1726-0531

Li, H; Guo, H L; Skitmore, M; Huang, T; Chan, K Y N and Chan, G (2011) Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong. Construction Management and Economics, 29(3), pp. 233-245. ISSN 01446193

Li, H; Li, W; Wang, L and Lv, L (2021) Public satisfaction evaluation of urban water environment treatment public-private partnership project: A case study from China. International Journal of Building Pathology and Adaptation, 39(2), pp. 407-432. ISSN 23984708

Li, H; Lu, W and Huang, T (2009) Rethinking project management and exploring virtual design and construction as a potential solution. Construction Management and Economics, 27(4), pp. 363-371. ISSN 1466433X

Li, H; Su, L; L.V, L and Xia, Q (2021) Detecting unbalanced bidding to achieve economic sustainability using fuzzy logic approach. Construction Innovation, 21(2), pp. 164-181. ISSN 1471-4175

Li, H; Xia, Q; Wang, L and Ma, Y (2020) Sustainability assessment of urban water environment treatment public-private partnership projects using fuzzy logic. Journal of Engineering, Design and Technology, 18(5), pp. 1251-1267. ISSN 1726-0531

Li, H T (2013) Modeling and evaluating multi-stakeholder multi-objective decisions during public participation in major infrastructure and constructionprojects. PhD thesis, University of Hong Kong, Hong Kong.

Li, H X; Ma, Z; Liu, H; Wang, J; Al-Hussein, M and Mills, A (2020) Exploring and verifying BIM-based energy simulation for building operations. Engineering, Construction and Architectural Management, 27(8), pp. 1679-1702. ISSN 0969-9988

Li, J; Chen, Y and Wang, H (2025) Human-machine system modeling and safety risk assessment in construction operations incorporating workers' performance variability. Journal of Construction Engineering and Management, 151(3): 04024209, ISSN 0733-9364

Li, J; Huang, W; Song, D; Zhou, L and Yang, B (2025) A constrained planning method: Considering storage space limitations and soft logic for cruise cabin assembly scheduling. Journal of Construction Engineering and Management, 151(8): 04025102, ISSN 0733-9364

Li, J; Jiang, W and Zuo, J (2020) The effects of trust network among project participants on project performance based on SNA approach: A case study in China. International Journal of Construction Management, 20(8), pp. 837-847. ISSN 1562-3599

Li, J; Zuo, J; Jiang, W; Zhong, X; Li, J and Pan, Y (2020) Policy instrument choice for construction and demolition waste management: The case study of Shenzhen, China. Engineering, Construction and Architectural Management, 27(6), pp. 1283-1297. ISSN 0969-9988

Li, Liancheng (2025) Towards sustainable recovery of waste plastics with the Australian construction industry: Transition scenarios and environmental impact evaluation. PhD thesis, University of Adelaide, Australia.

Li, M G; Chen, J J; Xu, A J; Xia, X H and Wang, J H (2014) Case study of innovative top-down construction method with channel-type excavation. Journal of Construction Engineering and Management, 140(5): 05014003, ISSN 0733-9364

Li, Mei (2012) A waste management system for small and medium enterprises engaged in office building retrofit projects. PhD thesis, Queensland University of Technology, Australia.

Li, N; Du, J; González, V A and Chen, J (2022) Methodology for extended reality-enabled experimental research in construction engineering and management. Journal of Construction Engineering and Management, 148(10): 04022106, ISSN 0733-9364

Li, P (2017) The international competitiveness of Chinese construction firms. PhD thesis, Coventry University, UK.

Li, Q (2009) Energy efficiency design of residential buildings in North China cities. PhD thesis, Cardiff University, UK.

Li, Q (2012) Inter-organizational relationships in the programme management lifecycle. PhD thesis, University of Leeds, UK.

Li, R and Roberti, R (2017) Optimal scheduling of railway track possessions in large-scale projects with multiple construction works. Journal of Construction Engineering and Management, 143(6): 04017007, ISSN 0733-9364

Li, S (2017) Modeling, optimizing, and impact analysis of incentive and regulation mechanisms in infrastructure privatization. PhD thesis, Purdue University, USA.

Li, S (2018) Knowledge domains and skills that facilitate knowledge sharing in project management: a case study in the Chinese construction industry. PhD thesis, University of Sheffield, UK.

Li, S; Wang, J and Xu, Z (2025) Automated compliance checking for BIM models based on Chinese-NLP and knowledge graph: An integrative conceptual framework. Engineering, Construction and Architectural Management, 32(6), pp. 3832-3856. ISSN 0969-9988

Li, Shuyang (2020) Proactive design approaches for energy-efficient buildings. PhD thesis, University of California, USA.

Li, W X (2015) A performance management methodology for collaborative design and construction project teams. PhD thesis, Stanford University, USA.

Li, X and Chen, X (2012) Using grouting of shield tunneling to reduce settlements of overlying tunnels: Case study in Shenzhen metro construction. Journal of Construction Engineering and Management, 138(4), pp. 574-584. ISSN 0733-9364

Li, X; Li, H; Skitmore, M and Wang, F (2022) Understanding the influence of safety climate and productivity pressure on non-helmet use behavior at construction sites: A case study. Engineering, Construction and Architectural Management, 29(1), pp. 72-90. ISSN 0969-9988

Li, X; Liu, Y; Wilkinson, S and Liu, T (2019) Driving forces influencing the uptake of sustainable housing in New Zealand. Engineering, Construction and Architectural Management, 26(1), pp. 46-65. ISSN 0969-9988

Li, X; Lu, W; Xue, F; Wu, L; Zhao, R; Lou, J and Xu, J (2022) Blockchain-enabled IoT-BIM platform for supply chain management in modular construction. Journal of Construction Engineering and Management, 148(2): 0002229, ISSN 0733-9364

Li, X; Zhang, Z; Jim, C Y; Lai, J and Chen, X (2023) Owner-based benefit evaluation of bim applications in China's engineering projects. Engineering, Construction and Architectural Management, 30(9), pp. 4387-4414. ISSN 0969-9988

Li, Y (2007) Integrated dynamic perspective on firm competencies and organizationalperformance: a study of China's largeconstruction SOEs. PhD thesis, University of Hong Kong, Hong Kong.

Li, Y (2013) Developing a sustainable construction waste estimation and management system. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Li, Y; Cao, L; Han, Y and Wei, J (2020) Development of a conceptual benchmarking framework for healthcare facilities management: Case study of Shanghai municipal hospitals. Journal of Construction Engineering and Management, 146(1): 05019016, ISSN 0733-9364

Li, Y; Li, G; Wang, T; Zhu, Y and Li, X (2019) Semicustomized design framework of container accommodation for migrant construction workers. Journal of Construction Engineering and Management, 145(4): 04019014, ISSN 0733-9364

Li, Y; Liu, J; Du, X and Zhong, R Y (2025) Creating value from data resources: Research on a service ecosystem symbiosis model of digital transportation infrastructure. Journal of Construction Engineering and Management, 151(9): 05025009, ISSN 0733-9364

Li, Y; Nie, X and Chen, S (2007) Fuzzy approach to prequalifying construction contractors. Journal of Construction Engineering and Management, 133(1), pp. 40-49. ISSN 0733-9364

Li, Y; Wang, J; Cao, L; Wei, D and Wang, Y (2022) Three-step mathematical model for optimizing rebar cutting-stock with practical application. Journal of Construction Engineering and Management, 148(7): 04022043, ISSN 0733-9364

Li, Y; Wang, X and Wang, Y (2017) Using bargaining game theory for risk allocation of public-private partnership projects: Insights from different alternating offer sequences of participants. Journal of Construction Engineering and Management, 143(3): 04016102, ISSN 0733-9364

Li, Y; Yao, Z; Wu, J; Zeng, S and Wu, G (2024) Toward ecological environmental risk for spoil ground group management in mega projects. Engineering, Construction and Architectural Management, 31(9), pp. 3706-3726. ISSN 0969-9988

Li, Y I H; Fellows, R F and Liu, A M M (2008) Directional interaction of organizational culture and structure through information processing theory. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Li, Y; Maxwell, D W and Moehler, R (2025) Facilitating platform-based business model innovation in construction start-ups: A dynamic capability perspective. Construction Management and Economics, 43(10), pp. 864-881. ISSN 0144-6193

Li, Yingying (2015) Sense of home in post-disaster reconstruction: A study of resident experiences of living in rebuilt houses after the wenchuan earthquake in China. PhD thesis, University of New South Wales, Australia.

Liang, R and Chong, H Y (2019) A hybrid group decision model for green supplier selection: A case study of megaprojects. Engineering, Construction and Architectural Management, 26(8), pp. 1712-1734. ISSN 0969-9988

Liang, R; Li, R; Yan, X; Xue, Z and Wei, X (2023) Evaluating and selecting the supplier in prefabricated megaprojects using extended fuzzy TOPSIS under hesitant environment: A case study from China. Engineering, Construction and Architectural Management, 30(5), pp. 1902-1931. ISSN 0969-9988

Liang, R; Xue, Z and Chong, H Y (2023) Risk evaluation of logistics park projects' lifecycle during the COVID-19 pandemic: Failure mode and effects analysis. Journal of Construction Engineering and Management, 149(1): 04022153, ISSN 0733-9364

Liang, R; Zhang, J; Wu, C; Sheng, Z and Wang, X (2019) Joint-venture contractor selection using competitive and collaborative criteria with uncertainty. Journal of Construction Engineering and Management, 145(2): 04018123, ISSN 0733-9364

Liang, X; Rasheed, U; Cai, J; Wibranek, B and Awolusi, I (2024) Impacts of collaborative robots on construction work performance and worker perception: Experimental analysis of human-robot collaborative wood assembly. Journal of Construction Engineering and Management, 150(8): 04024087, ISSN 0733-9364

Liang, Y (2012) A study of public private partnership project success factors and risk management integration in mainland China. PhD thesis, University of Hong Kong, Hong Kong.

Liang, Y and Ashuri, B (2022) Challenges and enabling features of small and medium infrastructure public-private partnerships (p3s): A case study of the US P3 infrastructure market. Engineering, Construction and Architectural Management, 29(1), pp. 49-71. ISSN 0969-9988

Liao, L (2018) Building information modeling-based process transformation to improve productivity in the Singapore construction industry. PhD thesis, National University of Singapore, Singapore.

Liao, L; Teo, E A L and Low, S P (2017) A project management framework for enhanced productivity performance using building information modelling. Construction Economics and Building, 17(3), pp. 1-26. ISSN 2204-9029

Liao, M C; Hsieh, T Y and Wang, W H (2024) Management of gross negligence manslaughter liability construction for professionals and lessons learned. Engineering, Construction and Architectural Management, 31(12), pp. 4942-4954. ISSN 0969-9988

Liao, X; Lee, C Y and Chong, H Y (2020) Contractual practices between the consultant and employer in Chinese BIM-enabled construction projects. Engineering, Construction and Architectural Management, 27(1), pp. 227-244. ISSN 0969-9988

Licher, Monica Katherine (2016) Estimating post-construction costs of a changing urban stormwater program. PhD thesis, Virginia Tech, USA.

Lihakanga, R (2022) Generic wireless sensor network for dynamic monitoring of a new generation of building material. PhD thesis, Heriot-Watt University, UK.

Lihua, R and Greenwood, D (2000) Technology transfer in international joint venture projects in China. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Likita, A J; Jelodar, M B; Vishnupriya, V and Rotimi, J O B (2024) Lean and BIM integration benefits construction management practices in New Zealand. Construction Innovation, 24(1), pp. 106-133. ISSN 1471-4175

Lim, B; Nepal, M P; Skitmore, M and Xiong, B (2016) Drivers of the accuracy of developers' early stage cost estimates in residential construction. Journal of Financial Management of Property and Construction, 21(1), pp. 4-20. ISSN 1366-4387

Lim, K H (2006) Causal model for management of subcontractors in waste minimization. PhD thesis, National University of Singapore, Singapore.

Lim, Soon Kam (2009) Framework and processes for enhancing sustainability deliverables in Australian road infrastructure projects. PhD thesis, Queensland University of Technology, Australia.

Lim, T; Porras-Alvarado, J D and Zhang, Z (2019) Pricing of highway infrastructure for transportation asset management. Built Environment Project and Asset Management, 9(1), pp. 64-79. ISSN 2044-124X

Lim, Y S; Xia, B; Skitmore, M; Gray, J and Bridge, A (2015) Education for sustainability in construction management curricula. International Journal of Construction Management, 15(4), pp. 321-331. ISSN 1562-3599

Lin, G (2009) Measuring the performance of value management studies in construction. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Lin, K L and Haas, C T (1996) Multiple heavy lifts optimization. Journal of Construction Engineering and Management, 122(4), pp. 354-362. ISSN 0733-9364

Lin, Q; Zhang, C; Cai, H; Li, X and Xiao, H (2024) Urban night lighting evaluation system and case study: Blending popular contemporary elements, cultural traditions and advanced lighting technologies. Engineering, Construction and Architectural Management, 31(7), pp. 2916-2931. ISSN 0969-9988

Lin, S S and Zheng, X J (2025) A decision support approach for safety risk analysis and management in large-scale shield cutter head hoisting operations. Journal of Construction Engineering and Management, 151(11): 04025169, ISSN 0733-9364

Linares-Garcia, D A and Roofigari-Esfahan, N (2024) Practical deployment of BIM-interoperable voice-based intelligent virtual agent support construction worker productivity. Journal of Construction Engineering and Management, 150(11): 04024153, ISSN 0733-9364

Lindblad, H (2019) Black boxing BIM: The public client's strategy in BIM implementation. Construction Management and Economics, 37(1), pp. 1-12. ISSN 01446193

Lindblad, H and Guerrero, J R (2020) Client's role in promoting BIM implementation and innovation in construction. Construction Management and Economics, 38(5), pp. 468-482. ISSN 01446193

Lindblad, H and Karrbom Gustavsson, T (2017) Receptiveness for change: The case of a public client. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Lindblad, H and Karrbom Gustavsson, T (2021) Public clients ability to drive industry change: The case of implementing BIM. Construction Management and Economics, 39(1), pp. 21-35. ISSN 01446193

Linderoth, H C J (2015) When big visions meet the pragmatic practice: Follow the institutional logic or personal benefits? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Linderoth, H C J (2017) From visions to practice: The role of sensemaking, institutional logic and pragmatic practice. Construction Management and Economics, 35(6), pp. 324-337. ISSN 0144-6193

Lindgren, J and Emmitt, S (2017) Diffusion of a systemic innovation: A longitudinal case study of a Swedish multi-storey timber housebuilding system. Construction Innovation, 17(1), pp. 25-44. ISSN 1471-4175

Lindgren, J; Emmitt, S and Widén, K (2018) Construction projects as mechanisms for knowledge integration: Mechanisms and effects when diffusing a systemic innovation. Engineering, Construction and Architectural Management, 25(11), pp. 1516-1533. ISSN 0969-9988

Lindhard, S M; Neve, H; Terje Kalsaas, B; Møller, D E and Wandahl, S (2022) Ranking and comparing key factors causing time-overruns in on-site construction. International Journal of Construction Management, 22(14), pp. 2724-2730. ISSN 1562-3599

Lindholm, J; Johansson, P and Yitmen, I (2025) Toward a BIM information delivery framework based on common data environment. Construction Innovation, 25(7), pp. 139-157. ISSN 1471-4175

Lindkvist, C (2015) Contextualizing learning approaches which shape BIM for maintenance. Built Environment Project and Asset Management, 5(3), pp. 318-330. ISSN 2044-124X

Lindkvist, C and Elmualim, A (2009) Developing new technology in facilities management through knowledge roles. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Lindkvist, C and Elmualim, A (2010) An examination of actors that impact technology introduction to FM. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Ling, F Y Y and Gui, Y (2009) Strengths, weaknesses, opportunities, and threats: Case study of consulting firms in Shenzhen, China. Journal of Construction Engineering and Management, 135(7), pp. 628-636. ISSN 0733-9364

Ling, F Y Y and Hien, M B T (2014) Boosting project outcomes through goal alignment: A case study of Vietnam. Construction Economics and Building, 14(2), pp. 73-86. ISSN 2204-9029

Ling, F Y Y and Ng, W T (2011) Boosting performance of road infrastructure: A case study based on motorist satisfaction in Singapore. Built Environment Project and Asset Management, 1(2), pp. 211-225. ISSN 2044-124X

Ling, F Y Y; Pham, V M C and Hoang, T P (2009) Strengths, weaknesses, opportunities, and threats for architectural, engineering, and construction firms: Case study of Vietnam. Journal of Construction Engineering and Management, 135(10), pp. 1105-1113. ISSN 0733-9364

Lingard, H.; Cooke, T. and Gharaie, E. (2013) A case study analysis of fatal incidents involving excavators in the Australian construction industry. Engineering, Construction and Architectural Management, 20(5), pp. 488-504. ISSN 0969-9988

Lingard, H; Blismas, N; Harley, J; Stranieri, A; Zhang, R P and Pirzadeh, P (2018) Making the invisible visible: Stimulating work health and safety-relevant thinking through the use of infographics in construction design. Engineering, Construction and Architectural Management, 25(1), pp. 39-61. ISSN 0969-9988

Lingard, H; Brown, K; Bradley, L; Bailey, C and Townsend, K (2007) Improving employees' work-life balance in the construction industry: Project alliance case study. Journal of Construction Engineering and Management, 133(10), pp. 807-815. ISSN 0733-9364

Lingard, H; Cooke, T and Blismas, N (2011) Who is 'the designer' in construction occupational health and safety? In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Lingard, H; Pink, S; Harley, J and Edirisinghe, R (2015) Looking and learning: Using participatory video to improve health and safety in the construction industry. Construction Management and Economics, 33(9), pp. 740-751. ISSN 01446193

Lingard, H and Wakefield, R (2013) A voluntary approach to designing for safer construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(5), pp. 249-259. ISSN 17514312

Lingard, H; Wakefield, R and Cashin, P (2011) The development and testing of a hierarchical measure of project OHS performance. Engineering, Construction and Architectural Management, 18(1), pp. 30-49. ISSN 0969-9988

Lingard, H; Wakefield, R and Walker, D (2020) The client's role in promoting work health and safety in construction projects: Balancing contracts and relationships to effect change. Construction Management and Economics, 38(11), pp. 993-1008. ISSN 01446193

Lingard, H C; Cooke, T and Blismas, N (2012) Designing for construction workers' occupational health and safety: A case study of socio-material complexity. Construction Management and Economics, 30(5), pp. 367-382. ISSN 1466433X

Lingard, H C; Townsend, K; Bradley, L and Brown, K (2008) Alternative work schedule interventions in the Australian construction industry: A comparative case study analysis. Construction Management and Economics, 26(10), pp. 1101-1112. ISSN 1466433X

Lippard, C D (2006) Building inequality: A case study of white, black, and latino contractors in the Atlanta construction industry. PhD thesis, Georgia State University, USA.

Liston, K M (2009) A mediated interaction approach to study the role of media use in team interaction. PhD thesis, Stanford University, USA.

Littke, H (2016) Becoming biophilic: Challenges and opportunities for biophilic urbanism in urban planning policy. Smart and Sustainable Built Environment, 5(1), pp. 15-24. ISSN 2046-6099

Liu, W.; Feng, Z.; Hu, Y. and Luo, X. (2026) Study on the measurement of the level of construction occupational health and safety management in prefabricated building: A case study of a practical training building. Engineering, Construction and Architectural Management, 33(4), pp. 3352-3374. ISSN 0969-9988

Liu, W; Feng, Z and Luo, X (2026) Study of a risk-sharing mechanism in a prefabricated building project supply chain. Journal of Construction Engineering and Management, 152(6): 04026063, ISSN 0733-9364

Liu, Y.; Schmidt, S.; Li, H. and Cao, Y. (2026) A study on the moisture risk assessment path for exterior wall of existing residential building in Shanghai based on hygrothermal simulation analysis. Architectural Engineering and Design Management, 22(2), pp. 340-364. ISSN 1745-2007

Liu, A M M; Lau, W S W and Fellows, R (2012) The contributions of environmental management systems towards project outcome: Case studies in Hong Kong. Architectural Engineering and Design Management, 8(3), pp. 160-169. ISSN 1745-2007

Liu, A M M; Shuibo, Z and Meiyung, L (2006) A framework for assessing organisational culture of Chinese construction enterprises. Engineering, Construction and Architectural Management, 13(4), pp. 327-342. ISSN 0969-9988

Liu, C; González, V A; Lee, G; Cabrera-Guerrero, G; Zou, Y and Davies, R (2024) Integrating the last planner system and immersive virtual reality: Exploring the social mechanisms produced by using LPS in projects. Journal of Construction Engineering and Management, 150(7): 04024070, ISSN 0733-9364

Liu, C and Lu, M (2015) Optimizing earthmoving job planning based on evaluation of temporary haul road networks design for mass earthworks projects. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Liu, Chang (2020) Data-driven strategies to improve the construction equipment management. PhD thesis, University of Alberta, Canada.

Liu, D; Lu, W and Niu, Y (2023) Isomorphic pressures to catalyze innovation diffusion in construction project-based organizations: Identification of source factors. Journal of Construction Engineering and Management, 149(2): 4022170, ISSN 0733-9364

Liu, D; Sun, J; Zhong, D and Song, L (2012) Compaction quality control of earth-rock dam construction using real-time field operation data. Journal of Construction Engineering and Management, 138(9), pp. 1085-1094. ISSN 0733-9364

Liu, F (2015) Integrated change and knowledge management for energy efficient retrofit projects. PhD thesis, Pennsylvania State University, USA.

Liu, F; Wang, Y; Li, H and Zhou, X (2021) Influence of cooperative period of municipal PPPs on transaction cost: a case study. Engineering, Construction and Architectural Management, 28(4), pp. 1261-1277. ISSN 0969-9988

Liu, G W (2003) A framework for implementing value management in China's construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Liu, H; Song, J and Wang, G (2020) Development of a tool for measuring building information modeling (BIM) user satisfaction: method selection, scale development and case study. Engineering, Construction and Architectural Management, 27(9), pp. 2409-2427. ISSN 0969-9988

Liu, J (2024) Value co-creation for public–private partnership (PPP) projects in China: A holistic framework from antecedents to outcomes of interaction. PhD thesis, University of Technology Sydney, Australia.

Liu, J; Li, Y; Li, Y; Zibo, C; Lian, X and Zhang, Y (2023) Location optimization of emergency medical facilities for public health emergencies in megacities based on genetic algorithm. Engineering, Construction and Architectural Management, 30(8), pp. 3330-3356. ISSN 0969-9988

Liu, J; Liu, G; Wang, N; Pan, M and Jiang, Y (2025) Predicting structural deterioration of large-scale building clusters using snapshot data: An integrated Markov-LSTM model. Building Research & Information, 53(6), pp. 700-716. ISSN 0961-3218

Liu, J and Lu, M (2018) Constraint programming approach to optimizing project schedules under material logistics and crew availability constraints. Journal of Construction Engineering and Management, 144(7): 04018049, ISSN 0733-9364

Liu, J and Lu, M (2020) Synchronized optimization of various management-function schedules in a multiproject environment: Case study of planning steel girder fabrication projects in bridge construction. Journal of Construction Engineering and Management, 146(5): 05020002, ISSN 0733-9364

Liu, J; Zhao, X and Yan, P (2016) Risk paths in international construction projects: Case study from Chinese contractors. Journal of Construction Engineering and Management, 142(6): 05016002, ISSN 0733-9364

Liu, J Y; Zou, P X W and Gong, W (2013) Managing project risk at the enterprise level: Exploratory case studies in China. Journal of Construction Engineering and Management, 139(9), pp. 1268-1274. ISSN 0733-9364

Liu, Jiani (2014) Developing a life cycle assessment model for measuring sustainable performance of buildings in China. PhD thesis, University of Technology Sydney, Australia.

Liu, Jing (2018) Dual-level resource-constrained multi-project scheduling framework for prefabrication in construction. PhD thesis, University of Alberta, Canada.

Liu, K; Hwang, B G; Jia, J; Man, Q and Zhang, S (2025) Shaping online and offline informal learning networks in off-site construction projects: A proximity perspective. Engineering, Construction and Architectural Management, 32(2), pp. 939-966. ISSN 0969-9988

Liu, L (2009) Risk management during technology transfer: A case study of sanitation project in Shangdong Province, China. PhD thesis, University College London, UK.

Liu, L; Wang, X and Sheng, Z (2012) Achieving ambidexterity in large, complex engineering projects: A case study of the sutong bridge project. Construction Management and Economics, 30(5), pp. 399-409. ISSN 1466433X

Liu, Li (2003) Models of enterprise-level project performance: Comparative studies of organizational form, control mode and feedback mechanisms in the construction and it services industries. PhD thesis, University of New South Wales, Australia.

Liu, M (2007) Work flow variability and labor productivity loss for construction projects. PhD thesis, University of California, Berkeley, USA.

Liu, M (2013) The application of BIM and IPD in public design and construction. PhD thesis, Polytechnic Institute of New York University, USA.

Liu, Margaret Ze-Yu (2016) Energy efficiency retrofits of tertiary education buildings: An investigation of case studies in New South Wales. PhD thesis, University of Sydney, Australia.

Liu, N (2010) Analysing functionalities of project extranets in construction: a provision and requirement approach. PhD thesis, University of Salford, UK.

Liu, N; Ruan, L; Jin, R; Chen, Y; Deng, X and Yang, T (2019) Investigation of individual perceptions towards BIM implementation-a Chongqing case study. Engineering, Construction and Architectural Management, 26(7), pp. 1455-1475. ISSN 0969-9988

Liu, Q; Ye, G; Feng, Y; Wang, C and Peng, Y (2020) Case-based insights into rework costs of residential building projects in China. International Journal of Construction Management, 20(4), pp. 347-355. ISSN 1562-3599

Liu, R (2021) Impact of enhanced context-awareness for construction field crews on task cycle time. PhD thesis, Stanford University, USA.

Liu, S; Jin, H; Liu, C; Xie, B and Mills, A (2020) Government compensation and costs of non-competition guarantee for PPP rental retirement villages. Engineering, Construction and Architectural Management, 27(1), pp. 128-149. ISSN 0969-9988

Liu, T; Bennon, M; Garvin, M J and Wang, S (2017) Sharing the big risk: Assessment framework for revenue risk sharing mechanisms in transportation public-private partnerships. Journal of Construction Engineering and Management, 143(12): 04017086, ISSN 0733-9364

Liu, T and Wilkinson, S (2013) Can the pilot public-private partnerships project be applied in future urban rail development? A case study of Beijing Metro Line 4 project. Built Environment Project and Asset Management, 3(2), pp. 250-263. ISSN 2044-124X

Liu, T and Wilkinson, S (2014) Using public-private partnerships for the building and management of school assets and services. Engineering, Construction and Architectural Management, 21(2), pp. 206-223. ISSN 0969-9988

Liu, W; Zhang, J and Liu, W (2021) Heuristic methods for finance-based and resource-constrained project scheduling problem. Journal of Construction Engineering and Management, 147(11): 04021141, ISSN 0733-9364

Liu, Y (2021) From best practices to next practices: project-based learning in the development of large infrastructure. PhD thesis, Delft University of Technology, Netherlands.

Liu, Y; Wang, X; Zhang, J and Guo, S (2025) How risk factors lead to the early termination of public–private partnership projects in China: A multi-case study based on social network analysis and interpretive-structure modeling. Engineering, Construction and Architectural Management, 32(2), pp. 824-846. ISSN 0969-9988

Liu, Z (2012) Know-how signalling and transfer systems to support integrated supply chains. PhD thesis, University of Manchester, UK.

Liu, Z; Lu, Y; Nath, T; Wang, Q; Tiong, R L K and Peh, L L C (2022) Critical success factors for BIM adoption during construction phase: A Singapore case study. Engineering, Construction and Architectural Management, 29(9), pp. 3267-3287. ISSN 0969-9988

Livesey, P V and Runeson, G (2018) Autoethnography and theory testing. Construction Economics and Building, 18(3), pp. 40-54. ISSN 2204-9029

Livingstone, N; Fiorentino, S and Short, M (2021) Planning for residential 'value'? London's densification policies and impacts. Buildings & Cities, 2(1), pp. 203-219. ISSN 2632-6655

Liyanage, C; Egbu, C and Tookey, J (2005) Investigating the current state of infection control practices in domestics services in the national health service in Scotland: A case study approach. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Lizarralde, G and Root, D (2008) The informal construction sector and the inefficiency of low cost housing markets. Construction Management and Economics, 26(2), pp. 103-113. ISSN 1466433X

Lizarralde, G; Tomiyoshi, S; Bourgault, M; Malo, J and Cardosi, G (2013) Understanding differences in construction project governance between developed and developing countries. Construction Management and Economics, 31(7), pp. 711-730. ISSN 1466433X

Lo, Y; Zhang, C; Ye, Z and Cui, C (2023) Monitoring road base course construction progress by photogrammetry-based 3D reconstruction. International Journal of Construction Management, 23(12), pp. 2087-2101. ISSN 1562-3599

Lo Prete, Matteo (2013) Synergies between management and valorization of cultural heritage through models based on BIM technologies. PhD thesis, Politecnico di Milano, Italy.

Lockley, E E (1998) Forensic engineering investigation into construction failures and their documentation. PhD thesis, Polytechnic University, USA.

Loforte Ribeiro, F (2009) Enhancing knowledge management in construction firms. Construction Innovation, 9(3), pp. 268-284. ISSN 1471-4175

Loforte Robeiro, F and Love, P E D (2003) Value creation through an e-business strategy: Implication for SMEs in construction. Construction Innovation, 3(1), pp. 3-14. ISSN 1471-4175

Loganathan, S; Forsythe, P and Kalidindi, S N (2018) Work practices of onsite construction crews and their influence on productivity. Construction Economics and Building, 18(3), pp. 18-39. ISSN 2204-9029

Loganathan, Santhosh (2023) A framework for analysing the influence of teamwork processes of onsite construction trade crews on productivity. PhD thesis, University of Technology Sydney, Australia.

Logsdon, Louise (2019) Housing quality: Supporting instruments to social housing design. PhD thesis, Universidade de São Paulo, Brazil.

Lohne, J; Klakegg, O J and Lædre, O (2023) Understanding the potential for criminal activity in the Norwegian AEC industry: A building process perspective. Journal of Construction Engineering and Management, 149(1): 05022015, ISSN 0733-9364

Lokuge, W; Gamage, N and Setunge, S (2016) Fault tree analysis method for deterioration of timber bridges using an Australian case study. Built Environment Project and Asset Management, 6(3), pp. 332-344. ISSN 2044-124X

Lomas, K J; Cook, M J and Short, C A (2009) Commissioning hybrid advanced naturally ventilated buildings: A US case study. Building Research & Information, 37(4), pp. 397-412. ISSN 0961-3218

Lombardi, P and Ferretti, V (2015) New spatial decision support systems for sustainable urban and regional development. Smart and Sustainable Built Environment, 4(1), pp. 45-66. ISSN 2046-6099

London, K (2010) Multi-market industrial organizational economic models for the internationalization process by small and medium enterprise construction design service firms. Architectural Engineering and Design Management, 6(2), pp. 132-152. ISSN 1745-2007

London, K and Pablo, Z (2017) An actor-network theory approach to developing an expanded conceptualization of collaboration in industrialized building housing construction. Construction Management and Economics, 35(8-9), pp. 553-577. ISSN 0144-6193

London, K; Singh, V; Taylor, C; Gu, N and Brankovic, L (2008) Building information modelling project decision support framework. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Longhurst, Peta (2011) The foundations of madness: The role of the built environment in the mental institutions of New South Wales. PhD thesis, University of Sydney, Australia.

Loosemore, M (1995) Reactive management: Communication and behavioural issues in dealing with the occurrence of client risks. Construction Management and Economics, 13(1), pp. 65-80. ISSN 01446193

Loosemore, M (1996) Crisis management in building projects: a longitudinal investigation of communication and behaviour patterns within a grounded theory framework. PhD thesis, University of Reading, UK.

Loosemore, M (1998) The influence of communication structure upon crisis management efficiency. Construction Management and Economics, 16(6), pp. 661-671. ISSN 01446193

Loosemore, M (2009) Managing public perceptions of risk on construction and engineering projects: How to involve stakeholders in business decisions. International Journal of Construction Management, 9(2), pp. 65-74. ISSN 1562-3599

Loosemore, M and Bridgeman, J (2017) Corporate volunteering in the construction industry: Motivations, costs and benefits. Construction Management and Economics, 35(10), pp. 641-653. ISSN 01446193

Loosemore, M; Bridgeman, J and Keast, R (2020) Reintegrating ex-offenders into work through construction: A case study of cross-sector collaboration in social procurement. Building Research & Information, 48(7), pp. 731-746. ISSN 0961-3218

Loosemore, M; Carthey, J; Chandra, V and Chand, A M (2010) Risk management of extreme weather events: A case study of Coffs Harbour Base Hospital, Australia. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Loosemore, M; Carthey, J; Chandra, V and Chand, A M (2011) Climate change risks and opportunities in hospital adaptation. International Journal of Disaster Resilience in the Built Environment, 2(3), pp. 210-221. ISSN 1759-5916

Loosemore, M and Chand, A (2016) Barriers to building resilience to extreme weather events in Australian hospitals. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Loosemore, M and Chandra, V (2012) Learning through briefing: For strategic facilities management in the health sector. Built Environment Project and Asset Management, 2(1), pp. 103-117. ISSN 2044-124X

Loosemore, M; Chow, V and Harvison, T (2013) Inter-agency governance risk in managing hospital responses to extreme weather events in New South Wales, Australia: A facilities management perspective of shared situational awareness. Construction Management and Economics, 31(10), pp. 1072-1082. ISSN 1466433X

Loosemore, M; Chow, V and McGeorge, D (2014) Managing the health risks of extreme weather events by managing hospital infrastructure. Engineering, Construction and Architectural Management, 21(1), pp. 4-32. ISSN 0969-9988

Loosemore, M; Denny-Smith, G; Barraket, J; Keast, R; Chamberlain, D; Muir, K; Powell, A; Higgon, D and Osborne, J (2021) Optimising social procurement policy outcomes through cross-sector collaboration in the Australian construction industry. Engineering, Construction and Architectural Management, 28(7), pp. 1908-1928. ISSN 0969-9988

Loosemore, M; Higgon, D and Osborne, J (2020) Managing new social procurement imperatives in the Australian construction industry. Engineering, Construction and Architectural Management, 27(10), pp. 3075-3093. ISSN 0969-9988

Loosemore, M; Osborne, J and Higgon, D (2021) Affective, cognitive, behavioural and situational outcomes of social procurement: A case study of social value creation in a major facilities management firm. Construction Management and Economics, 39(3), pp. 227-244. ISSN 01446193

Loosemore, M and Phua, F (2010) Untangling rhetoric and reality in the CSR debate: The role of corporate social responsibility in effective business strategy. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Lopane, F D (2022) Spatial optimisation for resilient infrastructure services. PhD thesis, University of Newcastle upon Tyne, UK.

Lopez, R and Amara, A (2018) Comparison of dispute boards and statutory adjudication in construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(2), pp. 70-78. ISSN 17514304

Lopez, R; Mascione, D and Liu, H J (2017) Management of issues in the delivery of airport infrastructure within Western Australia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(5), pp. 207-217. ISSN 17514304

Lopez Del Puerto, C and Shane, J S (2014) Keys to success in megaproject management in Mexico and the United States: Case study. Journal of Construction Engineering and Management, 140(4): B5013001, ISSN 0733-9364

Lord, S-F; Noye, S; Ure, J; Tennant, M G and Fisk, D J (2016) Comparative review of building commissioning regulation: A quality perspective. Building Research & Information, 44(5-6), pp. 630-643. ISSN 0961-3218

Lordsleem Jr, A C and Melhado, S B (2014) Scope of design for production of wall partitions. Journal of Engineering, Design and Technology, 12(2), pp. 263-279. ISSN 1726-0531

Lordsleem Junior, Alberto Casado (2002) Methodology for subcontractor companies management capacitation. PhD thesis, Universidade de São Paulo, Brazil.

Loria Arcila, J H (2002) Major issues impacting affordable housing developments in Mexico. PhD thesis, Georgia Institute of Technology, USA.

Lotfabadi, P and Iranmanesh, A (2024) Evaluation of learning methods in architecture design studio via analytic hierarchy process: A case study. Architectural Engineering and Design Management, 20(1), pp. 47-64. ISSN 1745-2007

Lou, E C W (2012) E-readiness in construction: readiness of UK construction organisations. PhD thesis, University of Salford, UK.

Lou, J; Lu, W; Xu, J; Li, X and Wang, J (2022) Nomenclature for offsite construction. Building Research & Information, 50(8), pp. 894-908. ISSN 0961-3218

Louis, J (2016) Simulation analysis, monitoring, and control of operations. PhD thesis, Purdue University, USA.

Louw, M P (2016) The adaptive reuse of industrial structures: Revisiting the Thesen Islands power station project in South Africa. Journal of Engineering, Design and Technology, 14(4), pp. 920-940.

Love, P E D (2001) Determinants of rework in Australian construction projects. PhD thesis, Monash University, Australia.

Love, P E D; Ackermann, F; Teo, P and Morrison, J (2015) From individual to collective learning: A conceptual learning framework for enacting rework prevention. Journal of Construction Engineering and Management, 141(11): 05015009, ISSN 0733-9364

Love, P E D; Edwards, D J and Sohal, A (2004) Total quality management in Australian contracting organisations: Pre-conditions for successful implementation. Engineering, Construction and Architectural Management, 11(3), pp. 189-198. ISSN 0969-9988

Love, P E D; Irani, Z; Cheng, E and Li, H (2002) A model for supporting inter-organizational relations in the supply chain. Engineering, Construction and Architectural Management, 9(1), pp. 2-15. ISSN 0969-9988

Love, P E D and Li, H (2000) Overcoming the problems associated with quality certification. Construction Management and Economics, 18(2), pp. 139-149. ISSN 01446193

Love, P E D; Manual, P and Li, H (1999) Determining the causal structure of rework influences in construction. Construction Management and Economics, 17(4), pp. 505-517. ISSN 01446193

Love, P E D; Niedzweicki, M; Bullen, P A and Edwards, D J (2012) Achieving the green building council of Australia's world leadership rating in an office building in perth. Journal of Construction Engineering and Management, 138(5), pp. 652-660. ISSN 0733-9364

Love, P E D; Smith, J; Treloar, G J and Li, H (2000) Some empirical observations of service quality in construction. Engineering, Construction and Architectural Management, 7(2), pp. 191-201. ISSN 0969-9988

Love, P E D; Tse, R Y C; Holt, G D and Proverbs, D G (2002) Transaction costs, learning, and alliances. Journal of Construction Research, 3(2), pp. 193-207. ISSN 1609-9451

Love, P E D; Veli, S; Davis, P; Teo, P and Morrison, J (2017) See the difference in a precast facility: Changing mindsets with an experiential safety program. Journal of Construction Engineering and Management, 143(2): 05016021, ISSN 0733-9364

Love, P E D; Zhou, J; Matthews, J; Sing, C-P and Carey, B (2015) A systems information model for managing electrical, control, and instrumentation assets. Built Environment Project and Asset Management, 5(3), pp. 278-289. ISSN 2044-124X

Low, S P and Tan, W (1996) Public policies for managing construction quality: The grand strategy of Singapore. Construction Management and Economics, 14(4), pp. 295-309. ISSN 01446193

Lowe, B D; Albers, J; Hayden, M; Lampl, M; Naber, S and Wurzelbacher, S (2020) Review of construction employer case studies of safety and health equipment interventions. Journal of Construction Engineering and Management, 146(4): 04020012, ISSN 0733-9364

Lowe, J (1993) Construction productivity: an input-output approach. PhD thesis, Glasgow Caledonian University, UK.

Lowe, J (1997) Labour productivity trends for the UK construction sector. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Lowe, J G (1996) Technological change and construction. Journal of Financial Management of Property and Construction, 1(2), pp. 65-94. ISSN 1366-4387

Lowe, J G (2010) Edinburgh trams: A case study of a complex project. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Lowe, R; Chiu, L F and Oreszczyn, T (2018) Socio-technical case study method in building performance evaluation. Building Research & Information, 46(5), pp. 469-484. ISSN 0961-3218

Lowry, M B (2008) An online analytic-deliberative approach to public participation for transportation investment decisions. PhD thesis, University of Washington, USA.

Lu, K.; Deng, X. and Zhai, X. (2026) Openbim-based simulation of building operational carbon under different information availability. Smart and Sustainable Built Environment, 15(5), pp. 1751-1780. ISSN 2046-6099

Lu, W; Du, L; Tam, V W Y; Feng, Q and Huo, L (2026) Sharing indexes and heterogeneity update of green building rating systems: Evidence of holistic comparative analysis. International Journal of Construction Management, 26(1), pp. 76-98. ISSN 1562-3599

Lu, W.; Wu, L.; Yang, Z.; Peng, Z. and Chu, L. (2025) A deployable agile blockchain as a service (abaas) framework for construction projects. Engineering, Construction and Architectural Management, 33(5), pp. 3919-3956. ISSN 0969-9988

Lu, H (2002) Extended production integration for construction (epic): An integration system for building construction. PhD thesis, University of Florida, USA.

Lu, H; Wang, H; Yu, D and Ye, J (2023) Sharp schedule compression in urgent emergency construction projects via activity crashing, substitution and overlapping: A case study of huoshengshan and leishenshan hospital projects in wuhan. Engineering, Construction and Architectural Management, 30(8), pp. 3696-3712. ISSN 0969-9988

Lu, M (2000) Productivity studies using advanced ANN models. PhD thesis, University of Alberta, Canada.

Lu, M (2003) Simplified discrete-event simulation approach for construction simulation. Journal of Construction Engineering and Management, 129(5), pp. 537-546. ISSN 0733-9364

Lu, M and AbouRizk, S M (2000) Simplified CPM/PERT simulation model. Journal of Construction Engineering and Management, 126(3), pp. 219-226. ISSN 0733-9364

Lu, M; Poon, C S and Wong, L C (2006) Application framework for mapping and simulation of waste handling processes in construction. Journal of Construction Engineering and Management, 132(11), pp. 1212-1221. ISSN 0733-9364

Lu, S and Sexton, M G (2004) Appropriate research design for investigating innovation in small knowledge-intensive professional service firms. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Lu, S and Sexton, M G (2009) The establishment and growth of a high technology firm: Interim results from an exploratory longitudinal case study. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Lu, S L (2005) A theory of innovation in small knowledge-intensive professional service firms. PhD thesis, University of Salford, UK.

Lu, S L and Sexton, M (2006) Innovation in small construction knowledge-intensive professional service firms: A case study of an architectural practice. Construction Management and Economics, 24(12), pp. 1269-1282. ISSN 1466433X

Lu, S L and Sexton, M G (2011) New governance approaches to environmental regulation: An example of the code for sustainable homes (chs). In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Lu, W (2010) Improved SWOT approach for conducting strategic planning in the construction industry. Journal of Construction Engineering and Management, 136(12), pp. 1317-1328. ISSN 0733-9364

Lu, W; Chen, K; Zetkulic, A and Liang, C (2021) Measuring building information modeling maturity: A Hong Kong case study. International Journal of Construction Management, 21(3), pp. 299-311. ISSN 1562-3599

Lu, W; Hua, Y and Zhang, S (2017) Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects. Engineering, Construction and Architectural Management, 24(1), pp. 118-132. ISSN 0969-9988

Lu, W and Wang, H (2014) Organizational responses to institutional pressures in international infrastructure projects: A transnational pipeline project case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Lu, W; Wu, L and Zhao, R (2023) Rebuilding trust in the construction industry: A blockchain-based deployment framework. International Journal of Construction Management, 23(8), pp. 1405-1416. ISSN 1562-3599

Lu, Y; Li, Y; Pang, D and Zhang, Y (2015) Organizational network evolution and governance strategies in megaprojects. Construction Economics and Building, 15(3), pp. 19-33. ISSN 2204-9029

Lu, Y; Pang, D and Li, Y (2016) Evolutionary collaboration network and organizational competitiveness in megaprojects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Lu, Y; Scott, A; Kim, J; Curi, C B; McCarty, J; Pardy, A; Rysanek, A; Girling, C and Kellett, R (2021) Integration of an energy-economy model with an urban energy model. Buildings & Cities, 2(1), pp. 114-133. ISSN 2632-6655

Lu, Y; Sood, T; Chang, R and Liao, L (2022) Factors impacting integrated design process of net zero energy buildings: An integrated framework. International Journal of Construction Management, 22(9), pp. 1700-1712. ISSN 1562-3599

Lu, Y and Zhu, Y (2021) Integrating hoisting efficiency into construction site layout plan model for prefabricated construction. Journal of Construction Engineering and Management, 147(10): 04021130, ISSN 0733-9364

Lu, Z (2018) Feasibility assessment framework for financing public-private partnership infrastructure projects through asset-backed security. PhD thesis, Columbia University, USA.

Luambano, C; Kavishe, N; Zulu, S and Chileshe, N (2023) Drivers and challenges of vertical integration in the Tanzanian construction industry. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Luane Assunção Paiva, M; Clara Beatriz Ferreira de, O and Reymard Savio Sampaio de, M (2022) Allocating scarce financial resources effectively through function analysis in social housing projects. Built Environment Project and Asset Management, 12(1), pp. 96-110. ISSN 2044-124X

Luck, R (1998) Studying the effect of systematization on design activity. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Lucko, G; Helinski, P O and Ballesteros-Pérez, P (2026) Universal model for performance and delay tracking of linear construction schedules. Journal of Construction Engineering and Management, 152(5): 04026035, ISSN 0733-9364

Lucko, G; Alves, T D C L and Angelim, V L (2014) Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling. Construction Management and Economics, 32(6), pp. 575-594. ISSN 01446193

Lucko, G and Rojas, E M (2010) Research validation: Challenges and opportunities in the construction domain. Journal of Construction Engineering and Management, 136(1), pp. 127-135. ISSN 0733-9364

Ludvig, K; Stenberg, A C and Gluch, P (2013) The value of communicative skills for developing an energy strategy. Building Research & Information, 41(6), pp. 611-621. ISSN 0961-3218

Ludwig, M (2011) Learning in the construction industry an analysis based on the activity theory. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Luise Valencia Gluyas, J (2004) Public-private participation in water infrastructure in Mexico. PhD thesis, University of Leeds, UK.

Luiten, G T (1994) Computer-aided design for construction in the building industry. Dr thesis, Delft University of Technology, Netherlands.

Lukhele, T; Botha, B and Mbanga, S (2021) Exploring project complexity relations to scope changes in construction projects: A case study of NEC projects in South Africa. Construction Economics and Building, 21(2), pp. 18-33. ISSN 2204-9029

Lukhele, T M (2023) A systematic risk management model for construction project management: a case study of the new infrastructure project in the University of Mpumalanga. PhD thesis, Nelson Mandela University, South Africa.

Lukhele, T M; Botha, B and Mbanga, S (2023) Exploring the nexus between professional ethics and occupational health and safety in construction projects: A case study approach. International Journal of Construction Management, 23(12), pp. 2048-2057. ISSN 1562-3599

Lumley, R (1978) A study of industrial relations on a large industrial construction site. PhD thesis, Sheffield City Polytechnic, UK.

Lundberg, M; Engström, S and Lidelöw, H (2019) Diffusion of innovation in a contractor company: The impact of the social system structure on the implementation process. Construction Innovation, 19(4), pp. 629-652. ISSN 1471-4175

Lundberg, O; Nylén, D and Sandberg, J (2022) Unpacking construction site digitalization: The role of incongruence and inconsistency in technological frames. Construction Management and Economics, 40(11-12), pp. 987-1002. ISSN 01446193

Lundeen, K M (2019) Autonomous scene understanding, motion planning, and task execution for geometrically adaptive robotized construction work. PhD thesis, University of Michigan, USA.

Lundgren, R (2023) Social life cycle assessment of adaptive reuse. Buildings & Cities, 4(1), pp. 334-351. ISSN 2632-6655

Lundgren, R; Kyrö, R and Olander, S (2024) The lifecycle impact and value capture of circular business models in the built environment. Construction Management and Economics, 42(6), pp. 527-544. ISSN 01446193

Lundkvist, R (2015) Experience feedback in industrialised house-building: The impact of production strategies. PhD thesis, Luleå University of Technology, Sweden.

Lundkvist, R; Meiling, J H and Sandberg, M (2014) A proactive plan-do-check-act approach to defect management based on a Swedish construction project. Construction Management and Economics, 32(11), pp. 1051-1065. ISSN 01446193

Lundman, P (2011) Cost management for underground infrastructure projects a case study on cost increase and its causes. PhD thesis, Luleå University of Technology, Sweden.

Lundström, A; Savolainen, J and Kostiainen, E (2016) Case study: Developing campus spaces through co-creation. Architectural Engineering and Design Management, 12(6), pp. 409-426. ISSN 1745-2007

Luo, J; Zadeh, P and Staub-French, S (2024) Ontology-based design features for representing constructability in architectural design: Toward BIM in off-site construction. Journal of Construction Engineering and Management, 150(10): 05024010, ISSN 0733-9364

Luo, J; Zhang, H and Sher, W (2021) A mixed method for measuring incompatibilities between manufacturing approaches and off-site construction. Engineering, Construction and Architectural Management, 28(9), pp. 2516-2548. ISSN 0969-9988

Luo, L Z; Mao, C; Shen, L Y and Li, Z D (2015) Risk factors affecting practitioners' attitudes toward the implementation of an industrialized building system a case study from China. Engineering, Construction and Architectural Management, 22(6), pp. 622-643. ISSN 0969-9988

Luo, Y (2008) Decision support for prefabrication strategy selection on building systems. PhD thesis, Pennsylvania State University, USA.

Luo, Y (2008) Radical architecture, collective mindfulness, and information technology: A dialectical analysis of risk control in complex socio-technical systems. PhD thesis, Case Western Reserve University, USA.

Luo, Z; Guo, J; Han, J and Wang, Y (2024) Research on the construction safety risk assessment of prefabricated subway stations in China. Engineering, Construction and Architectural Management, 31(4), pp. 1751-1787. ISSN 0969-9988

Luong, D L; Tran, D H and Nguyen, P T (2021) Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution. International Journal of Construction Management, 21(3), pp. 271-283. ISSN 1562-3599

Luth, G P (2011) VDC and the engineering continuum. Journal of Construction Engineering and Management, 137, pp. 906-915. ISSN 0733-9364

Lynch, H (2014) Passivhaus in the UK: the challenges of an emerging market: a case study of innovation using mixed methods research. PhD thesis, University College London, UK.

Lynch, S and Proverbs, D G (2020) How adaption of historic listed buildings affords access. International Journal of Building Pathology and Adaptation, 38(4), pp. 589-605. ISSN 23984708

Lynch, T D (1996) A transaction cost framework for evaluating construction project organizations. PhD thesis, Pennsylvania State University, USA.

Lyu, H M; Sun, W J; Shen, S L and Zhou, A N (2020) Risk assessment using a new consulting process in fuzzy AHP. Journal of Construction Engineering and Management, 146(3): 04019112, ISSN 0733-9364

Lyu, S; Hon, C K H; Chan, A P C; Javed, A A; Zhang, R P and Wong, F K W (2020) An exploratory study of safety communication networks of ethnic minority crews in the Hong Kong construction industry. Engineering, Construction and Architectural Management, 28(4), pp. 1156-1175. ISSN 0969-9988

Löfgren, A (2008) Making mobile meaning: Expectations and experiences of mobile computing usefulness in construction site management practice. PhD thesis, KTH Royal Institute of Technology, Sweden.

Löfgren, P and Eriksson, P E (2009) Effects of collaboration in projects on construction project performance. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Löwstedt, M (2015) Strategizing in construction: Exploring practices and paradoxes. PhD thesis, Chalmers University of Technology, Sweden.

Löwstedt, M and Räisänen, C (2012) 'Playing back-spin balls': Narrating organizational change in construction. Construction Management and Economics, 30(9), pp. 795-806. ISSN 1466433X

Löwstedt, M and Räisänen, C (2014) Social identity in construction: Enactments and outcomes. Construction Management and Economics, 32(11), pp. 1093-1105. ISSN 01446193

Löwstedt, M and Räisänen, C (2018) Ceos narrating leadership: Constant gardeners, team players, actionable pragmatists and business directors. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Löwstedt, M; Räisänen, C and Stenberg, A C (2011) How does change happen in a large construction company: Comparing objectified and lived versions of change. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Löwstedt, M and Sandberg, R (2020) Standardizing the free and independent professional: The case of construction site managers in Sweden. Engineering, Construction and Architectural Management, 27(6), pp. 1337-1355. ISSN 0969-9988

Lühr, G J; Bosch-Rekveldt, M and Radujković, M (2023) The last-planner-system's impact on project culture. Journal of Engineering, Design and Technology, 21(5), pp. 1303-1322. ISSN 1726-0531

Lützkendorf, T; Foliente, G; Balouktsi, M and Wiberg, A H (2015) Net-zero buildings: Incorporating embodied impacts. Building Research & Information, 43(1), pp. 62-81. ISSN 0961-3218

Ma, R; Mao, C; Yuan, J; Jiang, C and Lou, P (2025) Evaluation for digital transformation capability of construction enterprises: A case study in China. Engineering, Construction and Architectural Management, 32(12), pp. 8239-8272. ISSN 0969-9988

Ma, S; Li, Z and Zhang, J (2025) A multi-attribute group decision-making framework for site selection of waste-to-energy project considering public participation. Engineering, Construction and Architectural Management, 32(12), pp. 8326-8359. ISSN 0969-9988

Ma, C (2015) Stakeholder risk attitudes in safety risk management : exploring the relationship between risk attitude and safety risk management performance. PhD thesis, University of Hong Kong, Hong Kong.

Ma, G; Gu, L and Li, N (2015) Scenario-based proactive robust optimization for critical-chain project scheduling. Journal of Construction Engineering and Management, 141(10): 04015030, ISSN 0733-9364

Ma, G; Wang, A; Li, N; Gu, L and Ai, Q (2014) Improved critical chain project management framework for scheduling construction projects. Journal of Construction Engineering and Management, 140(12): 04014055, ISSN 0733-9364

Ma, J (2016) A data driven study on LEED credits and green building related implications in city planning. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Ma, L (2022) A BIM-based life cycle assessment tool of embodied energy and environmental impacts of reinforced concrete tall buildings. PhD thesis, Illinois Institute of Technology, USA.

Ma, P (2023) A sociomateriality view of boundary spanning in BIM-enabled early facilities management involvement. PhD thesis, University of Hong Kong, Hong Kong.

Ma, S; Li, Z; Li, L; Zhang, S and Zheng, R (2024) Deciphering the key characteristics of on-site industrialized construction: Inspiration from China. Journal of Construction Engineering and Management, 150(4): 05024003, ISSN 0733-9364

Ma, S; Li, Z and Shen, Y (2025) Decision-making framework for selecting sustainable prefabricated residential building technology schemes under minimum assembly rate constraints. Journal of Construction Engineering and Management, 151(8): 04025100, ISSN 0733-9364

Ma, T; Wang, Z; Skibniewski, M J; Ding, J; Wang, G and He, Q (2021) Investigating stewardship behavior in megaprojects: An exploratory analysis. Engineering, Construction and Architectural Management, 28(9), pp. 2570-2591. ISSN 0969-9988

Ma, X; Chan, A P C; Wu, H; Xiong, F and Dong, N (2018) Achieving leanness with BIM-based integrated data management in a built environment project. Construction Innovation, 18(4), pp. 469-487. ISSN 1471-4175

Ma, Z; Chong, H Y and Liao, P C (2021) Development of a time-variant causal model of human error in construction with dynamic Bayesian network. Engineering, Construction and Architectural Management, 28(1), pp. 291-307. ISSN 0969-9988

Maal, M and Wilson-North, M (2019) Social media in crisis communication: the "do's" and "don'ts". International Journal of Disaster Resilience in the Built Environment, 10(5), pp. 379-391. ISSN 1759-5916

Maali, M; Orhan, S N; Sagiroglu, M and Cirpici, B K (2023) Analyzing of bolted joints for connecting rectangular hollow sections in reticulated shells. Architectural Engineering and Design Management, 19(5), pp. 550-566. ISSN 1745-2007

MacArulla, M; Forcada, N; Casals, M; Gangolells, M; Fuertes, A and Roca, X (2013) Standardizing housing defects: Classification, validation, and benefits. Journal of Construction Engineering and Management, 139(8), pp. 968-976. ISSN 0733-9364

MacAskill, K and Guthrie, P (2014) Application of sustainability principles in post-disaster reconstruction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

MacAskill, K and Guthrie, P (2016) Disaster risk reduction and empowering local government: a case comparison between Sri Lanka and New Zealand. International Journal of Disaster Resilience in the Built Environment, 7(4), pp. 318-329. ISSN 1759-5916

MacLaren, A J W; Wilson, M; Simmonds, R; Hamilton-Pryde, A; McCarthy, J and Milligan, A (2017) Educating students for the collaborative workplace: Facilitating interdisciplinary learning in construction courses. International Journal of Construction Education and Research, 13(3), pp. 180-202. ISSN 1557-8771

Macdonald, S and Arato Goncalves, A P (2020) Concrete conservation: Outstanding challenges and potential ways forward. International Journal of Building Pathology and Adaptation, 38(4), pp. 607-618. ISSN 23984708

Mace, B K (2001) A production control model for commercial construction. PhD thesis, Pennsylvania State University, USA.

Machline, E; Pearlmutter, D; Cohen, C and Schwartz, M (2023) COVID-19: A catalyst for revitalizing mixed-use urban centers? The case of Paris. Building Research & Information, 51(1), pp. 39-55. ISSN 0961-3218

Macieira, M; Mendonça, P; Miranda Guedes, J and Tereso, A (2022) Evaluating the efficiency of membrane's refurbishment solutions to perform vertical extensions in old buildings using a multicriteria decision-support model. Architectural Engineering and Design Management, 18(1), pp. 1-25. ISSN 1745-2007

Macintosh, A and Steemers, K (2005) Ventilation strategies for urban housing: Lessons from a PoE case study. Building Research & Information, 33(1), pp. 17-31. ISSN 0961-3218

Macit, S (2014) Computer representation of building codes for automated compliance checking. PhD thesis, Izmir Institute of Technology, Turkey.

Macmillan, S; Steele, J; Kirby, P; Spence, R and Austin, S (2002) Mapping the design process during the conceptual phase of building projects. Engineering, Construction and Architectural Management, 9(3), pp. 174-180. ISSN 0969-9988

Macpherson, S J; Kelly, J R and Webb, R S (1993) How designs develop: Insights from case studies in building engineering services. Construction Management and Economics, 11(6), pp. 475-485. ISSN 01446193

Madaha, R M (2012) Disparate coping strategies for gendered effects of drought: A call for re-examination of gender roles and harmful traditions in central Tanzania. International Journal of Disaster Resilience in the Built Environment, 3(3), pp. 283-302. ISSN 1759-5916

Madhubhashana, H S A; Perera, B A K S and Perera, C S R (2019) Post-tensioned concreting: its suitability for and acceptability in Sri Lanka. Journal of Engineering, Design and Technology, 17(4), pp. 719-735. ISSN 1726-0531

Madihi, M H; Shirzadi Javid, A A and Nasirzadeh, F (2025) Enhancing risk assessment: An improved Bayesian network approach for analyzing interactions among risks. Engineering, Construction and Architectural Management, 32(3), pp. 2022-2043. ISSN 0969-9988

Madson, K M; Franz, B; Molenaar, K R and Okudan Kremer, G (2020) Strategic development of flexible manufacturing facilities. Engineering, Construction and Architectural Management, 27(6), pp. 1299-1314. ISSN 0969-9988

Maduka, N S (2017) The role of knowledge management in assisting key stakeholders in making informed decisions in delivering sustainable retrofitted building projects. PhD thesis, Northumbria University, UK.

Madushika, U G D and Ramachandra, T (2024) A comparative assessment of indirect green façade and conventional walls: perspective of life cycle cost. Built Environment Project and Asset Management, 14(5), pp. 697-712. ISSN 2044-124X

Maemura, Y; Kim, E and Ozawa, K (2018) Root causes of recurring contractual conflicts in international construction projects: Five case studies from Vietnam. Journal of Construction Engineering and Management, 144(8): 05018008, ISSN 0733-9364

Maftei, L and Harty, C (2014) Designers' perspectives on the use of immersive virtual reality technology in practice. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Maftei L, H C (2013) Accounting for users: Design team work in immersive virtual reality environments. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Magdy, M; Abdel-Monem, M and El Dash, K (2022) Float loss impact on project cost. International Journal of Construction Management, 22(9), pp. 1647-1656. ISSN 1562-3599

Magent, C S (2005) A process and competency-based approach to high performance building design. PhD thesis, Pennsylvania State University, USA.

Magent, C S; Korkmaz, S; Klotz, L E and Riley, D R (2009) A design process evaluation method for sustainable buildings. Architectural Engineering and Design Management, 5(1-2), pp. 62-74. ISSN 1745-2007

Maghiar, M (2011) Crew coordination modeling in wood-framing construction. PhD thesis, Arizona State University, USA.

Maghsoudi, Soroush (2017) Evaluation of innovation in building, construction, and infrastructure projects. PhD thesis, University of Melbourne, Australia.

Magill, L J; Jafarifar, N; Watson, A and Omotayo, T (2022) 4D BIM integrated construction supply chain logistics to optimise on-site production. International Journal of Construction Management, 22(12), pp. 2325-2334. ISSN 1562-3599

Magub, A T (2006) Experiences of the phenomenon of internet use for information sharing on construction projects and skills set identification for effective project participation. PhD thesis, Queensland University of Technology, Australia.

Magxaka, M; Gajjar, D and Lucas, J (2023) Project close-out process for HVAC mechanical contractors: Current practices. Journal of Construction Engineering and Management, 149(1): 05022016, ISSN 0733-9364

Mah, D E (2011) Framework for rating the sustainability of the residential construction practice. PhD thesis, University of Alberta, Canada.

Mahagedara, U I K (2021) Implementation of sustainable supply chain management in UK SMEs in construction industry. PhD thesis, University of the West of Scotland, UK.

Mahalingam, A (2006) Understanding and mitigating institutional costs on global projects. PhD thesis, Stanford University, USA.

Mahalingam, A (2010) PPP experiences in Indian cities: Barriers, enablers, and the way forward. Journal of Construction Engineering and Management, 136(4), pp. 419-429. ISSN 0733-9364

Mahalingam, A and Levitt, R E (2007) Institutional theory as a framework for analyzing conflicts on global projects. Journal of Construction Engineering and Management, 133(7), pp. 517-528. ISSN 0733-9364

Mahalingam, A and Levitt, R E (2007) Safety issues on global projects. Journal of Construction Engineering and Management, 133(7), pp. 506-516. ISSN 0733-9364

Mahamadu, A M; Manu, P; Mahdjoubi, L; Booth, C; Aigbavboa, C and Abanda, F H (2020) The importance of BIM capability assessment: An evaluation of post-selection performance of organisations on construction projects. Engineering, Construction and Architectural Management, 27(1), pp. 24-48. ISSN 0969-9988

Mahamedi, E; Wonders, M; Gerami Seresht, N; Woo, W L and Kassem, M (2024) A reinforcing transfer learning approach to predict buildings energy performance. Construction Innovation, 24(1), pp. 242-255. ISSN 1471-4175

Mahammedi, C.; Mahdjoubi, L.; Booth, C.; Butt, T. E. and Al-mhdawi, M. K. S. (2026) The design and validation of a decision support system (DSS) for the preliminary risk assessment of brownfield sites (prabs). Smart and Sustainable Built Environment, 15(3), pp. 1255-1276. ISSN 2046-6099

Mahato, B K and Ogunlana, S O (2011) Conflict dynamics in a dam construction project: A case study. Built Environment Project and Asset Management, 1(2), pp. 176-194. ISSN 2044-124X

Mahdavi, A; Naderpajouh, N; Choi, J; Ketabi, A B; Hastak, M and Cui, Q (2021) Dynamics of project selection and growth in project-based organizations. International Journal of Construction Management, 21(12), pp. 1200-1217. ISSN 1562-3599

Mahdavian, A and Shojaei, A (2020) Hybrid genetic algorithm and constraint-based simulation framework for building construction project planning and control. Journal of Construction Engineering and Management, 146(12): 04020140, ISSN 0733-9364

Mahdi, I M; Arafat, H; Ebid, A M and El-Kadi, A F (2023) Decision model to identify the optimum retaining wall type for restricted highway projects sites. International Journal of Construction Management, 23(8), pp. 1387-1394. ISSN 1562-3599

Mahdi, I M; Khalil, A H; Mahdi, H A and Mansour, D M M (2022) Decision support system for optimal bridge' maintenance. International Journal of Construction Management, 22(3), pp. 342-356. ISSN 1562-3599

Maheswari, J U; Mujumdar, P; Padala, S P S and Gwaskoti, A (2022) BDM–MDM integrated solution concept for scheduling information-driven projects. Engineering, Construction and Architectural Management, 29(2), pp. 1016-1037. ISSN 0969-9988

Mahjoubpour, B; Nasirzadeh, F; Mohammad Hosein Zadeh Golabchi, M; Ramezani Khajehghiasi, M and Mir, M (2018) Modeling of workers' learning behavior in construction projects using agent-based approach: The case study of a steel structure project. Engineering, Construction and Architectural Management, 25(4), pp. 559-573. ISSN 0969-9988

Mahmood, S; Ahmed, S M; Panthi, K and Kureshi, N I (2014) Determining the cost of poor quality and its impact on productivity and profitability. Built Environment Project and Asset Management, 4(3), pp. 296-311. ISSN 2044-124X

Mahmoud, S; Hussein, M; Zayed, T and Fahmy, M (2022) Multiobjective optimization model for the life cycle cost-sustainability trade-off problem of building upgrading using a generic sustainability assessment tool. Journal of Construction Engineering and Management, 148(7): 04022050, ISSN 0733-9364

Mahmud, A; Ogunlana, S O; Hong, W T; Yahaya, I W and Akoh, S R (2023) Adopting qualitative data in conceptual system dynamic modelling. Construction Economics and Building, 23(3-4), pp. 71-86. ISSN 2204-9029

Mahmud, A T (2021) Enhancing the understanding of cost overrun drivers in highway projects in Nigeria through system dynamics modelling. PhD thesis, Heriot-Watt University, UK.

Mahmud, A T; Ogunlana, S O and Hong, W T (2021) Key driving factors of cost overrun in highway infrastructure projects in Nigeria: A context-based perspective. Journal of Engineering, Design and Technology, 19(6), pp. 1530-1555. ISSN 1726-0531

Maina, W and van Graan, A (2017) Identifying path-breaking transitions for kenya's marginalised communities in water and sanitation provision. Journal of Engineering, Design and Technology, 15(5), pp. 689-699.

Maiti, S and Choi, J H (2021) An evidence-based approach to health and safety management in megaprojects. International Journal of Construction Management, 21(10), pp. 997-1010. ISSN 1562-3599

Maiwada, Y B (2003) Private financing of infrastructure projects in Sub-Sahara Africa: a case study of Nigerian water infrastructure project. PhD thesis, University of Manchester, UK.

Maiwada, Yusuf Bashir (2003) Private financing of infrastructure projects in sub Sahara Africa: A case study of Nigerian water infrastructure project. PhD thesis, University of Manchester, UK.

Majava, J; Haapasalo, H and Aaltonen, K (2019) Elaborating factors affecting visual control in a big room. Construction Innovation, 19(1), pp. 34-47. ISSN 1471-4175

Majdalani, Z; Ajam, M and Mezher, T (2006) Sustainability in the construction industry: A Lebanese case study. Construction Innovation, 6(1), pp. 33-46. ISSN 1471-4175

Mak, S; Wong, J and Picken, D (1998) The effect on contingency allowances of using risk analysis in capital cost estimating: A Hong Kong case study. Construction Management and Economics, 16(6), pp. 615-619. ISSN 01446193

Mak, Wae Hoa Jonathan (2019) The design of resilient engineering infrastructure systems. PhD thesis, University of Cambridge, UK.

Makahaube, J S (2020) Performance measure methodology of project management practices in local government agencies. PhD thesis, University of Texas at El Paso, USA.

Malabi Eberhardt, L C; Kuittinen, M; Häkkinen, T; Moinel, C; Nibel, S and Birgisdottir, H (2024) Carbon handprint: A review of potential climate benefits of buildings. Building Research & Information, 52(6), pp. 708-723. ISSN 0961-3218

Malalgoda, C and Amaratunga, D (2015) A disaster resilient built environment in urban cities: The need to empower local governments. International Journal of Disaster Resilience in the Built Environment, 6(1), pp. 102-116. ISSN 1759-5916

Malalgoda, C; Amaratunga, D and Haigh, R (2013) Creating a disaster resilient built environment in urban cities: The role of local governments in Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 4(1), pp. 72-94. ISSN 1759-5916

Maldonado-Fortunet, F (2002) Sustainable development criteria for the evaluation of highway projects. PhD thesis, Georgia Institute of Technology, USA.

Male, S and Kelly, J (1989) Organizational responses of public sector clients in Canada to the implementation of value management: Lessons for the UK construction industry. Construction Management and Economics, 7(3), pp. 203-216. ISSN 01446193

Malik, N; Ahmad, R; Chen, Y; Altaf, M S and Al-Hussein, M (2021) Minimizing joist cutting waste through dynamic waste allocation in panelized floor manufacturing. International Journal of Construction Management, 21(10), pp. 1011-1023. ISSN 1562-3599

Malmberg, F (2007) Introduction of a new form of quote evaluation: A case study in southern Sweden. Construction Management and Economics, 25(6), pp. 661-669. ISSN 1466433X

Malmqvist, T and Brismark, J (2023) Embodied carbon savings of co-living and implications for metrics. Buildings & Cities, 4(1), pp. 386-404. ISSN 2632-6655

Mandujano Rodríguez, M G (2016) A method to identify virtual design and construction implementation strategies from a lean construction perspective. DEng thesis, Pontificia Universidad Catolica de Chile, Chile.

Manewa, A; Siriwardena, M; Ross, A and Madanayake, U (2016) Adaptable buildings for sustainable built environment. Built Environment Project and Asset Management, 6(2), pp. 139-158. ISSN 2044-124X

Manewa, R M A S (2012) Economic considerations for adaptability in buildings. PhD thesis, Loughborough University, UK.

Mango, T (2014) The impact of real estate construction and holding companies: A case study of Beirut's Solidere and Amman's Abdali. PhD thesis, University of Exeter, UK.

Mangu, S; Thillai Rajan, A and Deep, A (2021) Comparison of toll and annuity PPPs: A case study of highway projects in India. Built Environment Project and Asset Management, 11(1), pp. 103-120. ISSN 2044-124X

Mani, S.; Karunasena, G.; Hosseini, M. R. and Hasan, A. (2026) Building circularity performance model: A weighted multi-level assessment framework aligned with ISO standards. Smart and Sustainable Built Environment, ISSN 2046-6099

Mani, S; Ahmadi Eftekhari, N; Hosseini, M R and Bakhshi, J (2024) Sociotechnical dimensions of BIM-induced changes in stakeholder management of public and private building projects. Construction Innovation, 24(2), pp. 425-445. ISSN 1471-4175

Manjia, M; Pettang, C and Abanda, F H (2011) Urban self-building labour cost modelling in Cameroon. Journal of Construction in Developing Countries, 16(2), pp. 69-90. ISSN 1823-6499

Mannakkara, S and Wilkinson, S (2015) Supporting post-disaster social recovery to build back better. International Journal of Disaster Resilience in the Built Environment, 6(2), pp. 126-139. ISSN 1759-5916

Manocha, N (2018) Infrastructure investments under deep uncertainty. PhD thesis, National University of Singapore, Singapore.

Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2024) A systematic evaluation on the competencies of construction supervisors in productivity and performance improvement practices: Sri Lankan perspective. Smart and Sustainable Built Environment, 13(4), pp. 960-988. ISSN 2046-6099

Manowong, E and Ogunlana, S O (2006) Public hearings in Thailand's infrastructure projects: Effective participations? Engineering, Construction and Architectural Management, 13(4), pp. 343-363. ISSN 0969-9988

Manrique, J D; Al-Hussein, M; Telyas, A and Funston, G (2007) Case study-based challenges of quality concrete finishing for architecturally complex structures. Journal of Construction Engineering and Management, 133(3), pp. 208-216. ISSN 0733-9364

Mansell, P R (2021) Measuring infrastructure projects sustainable development goals impact (MISI). PhD thesis, London South Bank University, UK.

Mansoori, S; Harkonen, J and Haapasalo, H (2023) Productization and product structure enabling BIM implementation in construction. Engineering, Construction and Architectural Management, 30(5), pp. 2155-2184. ISSN 0969-9988

Mansour, H; Aminudin, E and Mansour, T (2023) Implementing industry 4.0 in the construction industry- strategic readiness perspective. International Journal of Construction Management, 23(9), pp. 1457-1470. ISSN 1562-3599

Mante, J (2014) Resolution of construction disputes arising from major infrastructure projects in developing countries: case study of Ghana. PhD thesis, University of Wolverhampton, UK.

Mante, J (2015) Resolving infrastructure-related construction disputes in developing countries: The Ghana experience. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Manu, E (2014) Supply chain management practices in construction and inter-organisational trust dynamics. PhD thesis, University of Wolverhampton, UK.

Manu, E; Ankrah, N; Chinyio, E A and Proverbs, D (2016) Functional consequences of trust in the construction supply chain: A multi-dimensional view. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Manzoni, B; Morris, P and Smyth, H (2010) Managing architectural competitions: Empirical evidence from practices in the UK and Italy. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Mao, W; Ran, K; Wang, T K; Yu, A; Lv, H and Chen, J H (2025) An optimization model for just-in-time (JIT) delivery of precast components considering 3D loading constraints, real-time road conditions and assembly time. Engineering, Construction and Architectural Management, 32(5), pp. 3259-3284. ISSN 0969-9988

Mao, X; Zhang, X and Abourizk, S M (2009) Enhancing value engineering process by incorporating inventive problem-solving techniques. Journal of Construction Engineering and Management, 135(5), pp. 416-424. ISSN 0733-9364

Maqsood, T; Walker, D H T and Finegan, A D (2005) The role of knowledge management in enhancing knowledge pull in the construction organisation to deliver innovation: A case study. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Maqsood, T; Walker, D H T and Finegan, A D (2007) Facilitating knowledge pull to deliver innovation through knowledge management: A case study. Engineering, Construction and Architectural Management, 14(1), pp. 94-109. ISSN 0969-9988

Maqsood, Tayyab (2006) Role of knowledge management in supporting innovation and learning in construction. PhD thesis, RMIT University, Australia.

Maqsoom, A and Charoenngam, C (2014) Determinants of successful international expansion of construction contracting firms: A case study of Pakistani firms. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Maradza, E; Whyte, J and Larsen, G D (2014) Interactive learning in UK construction practice: Examining the role of BIM process standards. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Maradza, E N (2015) Adaptation of industry BIM process standards in a large construction firm. PhD thesis, University of Reading, UK.

Maraqa, M J; Sacks, R and Spatari, S (2021) Quantitative assessment of the impacts of BIM and lean on process and operations flow in construction projects. Engineering, Construction and Architectural Management, 28(8), pp. 2176-2198. ISSN 0969-9988

Marasini, R and Dawood, N (2000) A simulation model to manage and optimise stockyard layout: A case study in precast concrete products industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Marasini, R and Dawood, N (2002) Integration of genetic algorithms and simulation for stockyard layout planning. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Marasini, R and Dawood, N (2006) Innovative managerial control system (IMCS): An application in precast concrete building products industry. Construction Innovation, 6(2), pp. 97-120. ISSN 1471-4175

Marasini, R; Dawood, N S and Hobbs, B (2001) Stockyard layout planning in precast concrete products industry: A case study and proposed framework. Construction Management and Economics, 19(4), pp. 365-377. ISSN 01446193

Marcos, Micheline Helen Cot (2015) Method of obtaining environmental impact data, during the design development process through use of BIM tool. PhD thesis, Universidade de São Paulo, Brazil.

Marey Madi, H A (2024) Sustainability assessment of using green concrete materials for residential buildings in Egypt. PhD thesis, Debreceni Egyetem, Hungary.

Mariz, Renato Nunes (2024) Method for applying the work design in construction based on lean thinking. PhD thesis, Universidade Estadual de Campinas, Brazil.

Markkanen, P and Herneoja, A (2024) Constructing a theory-informed workplace design framework: co-design case study for knowledge work environment satisfaction improvement. Building Research & Information, 52(8), pp. 870-886. ISSN 0961-3218

Markos, P A and Dentsoras, A J (2013) A heuristic approach for the positioning of elevator hoistways based on the utilization intensity index. Architectural Engineering and Design Management, 9(4), pp. 209-228. ISSN 1745-2007

Marlow, E C; Chmutina, K and Dainty, A (2023) Interpreting sustainability and resilience in the built environment. International Journal of Disaster Resilience in the Built Environment, 14(3), pp. 332-348. ISSN 1759-5916

Marmanillo, O Z (2021) Study of lean and complex adaptive mechanism to regulate the function of production planning and control in construction projects. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.

Marsh, L (1998) Portable datafiles in the construction supply chain. PhD thesis, University of Reading, UK.

Marsh, L E and Finch, E F (1999) Using portable datafiles in the construction supply chain. Building Research & Information, 27(3), pp. 127-139. ISSN 0961-3218

Martabid, J E and Mourgues, C (2015) Criteria used for selecting envelope wall systems in Chilean residential projects. Journal of Construction Engineering and Management, 141(12): 05015011, ISSN 0733-9364

Martin, H; James, J and Chadee, A (2025) Exploring large language model AI tools in construction project risk assessment: ChatGPT limitations in risk identification, mitigation strategies, and user experience. Journal of Construction Engineering and Management, 151(9): 04025119, ISSN 0733-9364

Martin, H; Koylass, J and Welch, F (2018) An exploration of the consistency limits of the analytical hierarchy process and its impact on contractor selection. International Journal of Construction Management, 18(1), pp. 14-25. ISSN 1562-3599

Martin, H; Lewis, T; Peters, E and Petersen, A (2017) Construction project delivery cloud decisionsupport model. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(1), pp. 6-26. ISSN 17514304

Martin, H and Ramjarrie, K (2021) Cloud contractor selection model for design-build open tender. Journal of Construction Engineering and Management, 147(4): 04021020, ISSN 0733-9364

Martinez, E; Reid, C K and Tommelein, I D (2019) Lean construction for affordable housing: a case study in Latin America. Construction Innovation, 19(4), pp. 570-593. ISSN 1471-4175

Martinez-Soto, A and Jentsch, M F (2020) A transferable energy model for determining the future energy demand and its uncertainty in a country's residential sector. Building Research & Information, 48(6), pp. 587-612. ISSN 0961-3218

Martins, S S; Evangelista, A C J; Hammad, A W A; Tam, V W Y and Haddad, A (2022) Evaluation of 4D BIM tools applicability in construction planning efficiency. International Journal of Construction Management, 22(15), pp. 2987-3000. ISSN 1562-3599

Martínez Alonso, Wilfrido (2024) An NLP approach to understand construction long text. PhD thesis, Stanford University, USA.

Martínez Avíla, C (2018) Stakeholder participation in property development. PhD thesis, Lund University, Sweden.

Martínez-Carricondo, P; Carvajal-Ramírez, F; Yero-Paneque, L and Agüera-Vega, F (2020) Combination of nadiral and oblique UAV photogrammetry and HBIM for the virtual reconstruction of cultural heritage. Case study of Cortijo del Fraile in Níjar, Almería (Spain). Building Research & Information, 48(2), pp. 140-159. ISSN 0961-3218

Martínez-Rocamora, A; García-Alvarado, R; Casanova-Medina, E; González-Böhme, L F and Auat-Cheein, F (2020) Parametric programming of 3D printed curved walls for cost-efficient building design. Journal of Construction Engineering and Management, 146(5): 04020039, ISSN 0733-9364

Marzouk, M (2002) Optimizing earthmoving operations using computer simulation. PhD thesis, Concordia University, Canada.

Marzouk, M and Ashmawy, M M (2021) Assessment of highways concrete and asphalt pavements using superiority inferiority ranking technique. Construction Innovation, 21(2), pp. 259-278. ISSN 1471-4175

Marzouk, M and Enaba, M (2019) Analyzing project data in BIM with descriptive analytics to improve project performance. Built Environment Project and Asset Management, 9(4), pp. 476-488. ISSN 2044-124X

Marzouk, M and Hamdala, D (2025) Phasing real estate projects considering profitability and customer satisfaction. Engineering, Construction and Architectural Management, 32(5), pp. 2942-2970. ISSN 0969-9988

Marzouk, M and Moamen, M (2009) A framework for estimating negotiation amounts in construction projects. Construction Innovation, 9(2), pp. 133-148. ISSN 1471-4175

Marzouk, M and Mohamed, E (2018) Modeling bid/no bid decisions using fuzzy fault tree. Construction Innovation, 18(1), pp. 90-108. ISSN 1471-4175

Marzouk, M and Zaher, M (2020) Artificial intelligence exploitation in facility management using deep learning. Construction Innovation, 20(4), pp. 609-624. ISSN 1471-4175

Marzouk, M and Zaher, M (2025) Integrated approach for facility management of existing buildings using point cloud segmentation. International Journal of Building Pathology and Adaptation, 43(6), pp. 1439-1465. ISSN 2398-4708

Maseko, L and Root, D (2021) Collaborative risk management within the design phase of green buildings. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Mashhadi, A H; Azad, A R G and Tavakolan, M (2023) Life cycle cost comparison of strengthening a steel bridge using post-installed shear connectors with bridge reconstruction. International Journal of Construction Management, 23(8), pp. 1311-1322. ISSN 1562-3599

Mashi, I H (2023) Emotional intelligence among Nigerian construction project leaders during periods of uncertainty. PhD thesis, Walden University, USA.

Mason, B (2023) Advancing autonomous green stormwater infrastructure. PhD thesis, University of Michigan, USA.

Masrom, M A N; Chan, M; Ohueri, C C; Mohd Ramlee, N H and Omar, R (2025) Construction safety improvement framework for mass rapid transit projects. Construction Innovation, 25(7), pp. 189-212. ISSN 1471-4175

Mastrolembo Ventura, Silvia (2019) The role of virtual reality in digitally-enabled design review: Procedural guidelines for the effective implementation of immersive virtual environments for usability-focused analysis. PhD thesis, Politecnico di Milano, Italy.

Masu, S; Gichunge, H and K'Akumu, O A (2012) Component ratios of new building costs in Nairobi: A contractors' perspective. Journal of Financial Management of Property and Construction, 17(3), pp. 222-234. ISSN 1366-4387

Masurier, J L; Rotimi, J O B and Wilkinson, S (2006) A comparison between routine construction and post-disaster reconstruction with case studies from New Zealand. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Mat Zin, R (2006) A case study of management control. A construction project: Issues of transaction costs and trust. PhD thesis, University of Manchester, UK.

Matar, M; Osman, H; Georgy, M; Abou-Zeid, A and Elsaid, M (2020) Evaluating the environmental performance of pipeline construction using systems modelling. Construction Management and Economics, 38(8), pp. 689-714. ISSN 01446193

Matarneh, S (2024) Construction disputes causes and resolution methods: A case study from a developing country. Journal of Construction in Developing Countries, 29(1), pp. 139-161. ISSN 1823-6499

Matarneh, S T (2019) BIM-based information exchange framework to support facilities management systems. PhD thesis, University of Portsmouth, UK.

Mathews, J D (2000) Optimisation and decision support during the conceptual stage of building design: New techniques based on the genetic algorithm. PhD thesis, University of Plymouth, UK.

Mathews, M (2013) BIM collaboration in student architectural technologist learning. Journal of Engineering, Design and Technology, 11(2), pp. 190-206. ISSN 1726-0531

Mathur, Sandeep (2024) Managing data science initiatives as exploratory projects : A new approach to program management. PhD thesis, University of Technology Sydney, Australia.

Matipa, W M; Kelliher, D and Keane, M (2008) How a quantity surveyor can ease cost management at the design stage using a building product model. Construction Innovation, 8(3), pp. 164-181. ISSN 1471-4175

Matoseiro Dinis, F; Rodrigues, R and Pedro da Silva Poças Martins, J (2024) Development and validation of natural user interfaces for semantic enrichment of BIM models using open formats. Construction Innovation, 24(1), pp. 196-220. ISSN 1471-4175

Matsumoto, I T; Thorpe, A; Baldwin, A and McWilliams, R (2002) Linking process mapping and technology: A case study of teamwork 2001. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Matsuoka, Y; Takeuchi, Y and Shaw, R (2013) Implementation of Hyogo framework for action in Makati City, Philippines. International Journal of Disaster Resilience in the Built Environment, 4(1), pp. 23-42. ISSN 1759-5916

Maund, K; Gajendran, T and Brewer, G (2014) Examining the barriers to successful onsite construction environmental management operations. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Mavrogianni, A; Davies, M; Chalabi, Z; Wilkinson, P; Kolokotroni, M and Milner, J (2009) Space heating demand and heatwave vulnerability: London domestic stock. Building Research & Information, 37(5-6), pp. 583-597. ISSN 0961-3218

Mavrogianni, A; Taylor, J; Davies, M; Thoua, C and Kolm-Murray, J (2015) Urban social housing resilience to excess summer heat. Building Research & Information, 43(3), pp. 316-333. ISSN 0961-3218

Mavroudhis, V G (2017) Understanding one institutions' process in preparing civil engineering students to be globally competent. EdD thesis, Northeastern University, USA.

Maxwell, D and Couper, R (2023) Construction tracking: Implications of logistics data. Construction Innovation, 23(2), pp. 322-339. ISSN 1471-4175

Maxwell, Duncan William (2018) The case for design-value in industrialised house building platforms: Product to ecosystem. PhD thesis, University of Sydney, Australia.

Mayer, Z and Kazakidis, V (2007) Decision making in flexible mine production system design using real options. Journal of Construction Engineering and Management, 133(2), pp. 169-180. ISSN 0733-9364

Mayorga Amaya, C F (2020) Moving forecasting error: A risk-based cost forecasting approach. PhD thesis, Auburn University, USA.

Mazher, K M; Chan, A P C; Zahoor, H; Khan, M I and Ameyaw, E E (2018) Fuzzy integral-based risk-assessment approach for public-private partnership infrastructure projects. Journal of Construction Engineering and Management, 144(12): 04018111, ISSN 0733-9364

Mbabu, Alex (2025) Digital twins in lean strategic facility management in the UK healthcare sector: A proposed framework to enabling lean strategic facility management in healthcare operations in the UK. PhD thesis, University of Salford, UK.

Mbachu, A and Frei, M (2011) Diagnosing the strategic health of an organization from SWOT analysis results: Case study of the Australasian cost management profession. Construction Management and Economics, 29(3), pp. 287-303. ISSN 1466433X

Mbachu, J (2008) Conceptual framework for the assessment of subcontractors' eligibility and performance in the construction industry. Construction Management and Economics, 26(5), pp. 471-484. ISSN 1466433X

McAndrew, S T (2009) Collaborative technologies for mobile workers and virtual project teams. EngD thesis, Loughborough University, UK.

McBride, M L (2003) Bunkhouses, black flies, and seasonal unemployment: The industrial construction industry in Newfoundland, 1960s–1990s. PhD thesis, Memorial University of Newfoundland, Canada.

McCabe, A; Parker, R and Brown, K (2011) Social outcomes in the construction industry: The case of the Western Australian 'percent for art' policy. Construction Management and Economics, 29(9), pp. 929-941. ISSN 1466433X

McCabe, S and Robertson, H (2000) Striving to be the best: A case study of construction benchmarking world class organizations. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

McCann, A B (2017) The relevance of project management best practice and its application in the UK construction industry. DProf thesis, University of Salford, UK.

McCarney, M; Goodier, C I and Gibb, A (2023) Interface management of offsite bathroom construction: A conceptual model. Construction Innovation, 23(3), pp. 587-605. ISSN 1471-4175

McCarney, M P (2017) Interface management of offsite bathroom construction: process- and people-factors. PhD thesis, Loughborough University, UK.

McCarthy, C (2021) Towards behavioural equality: the impact of employee perception of justice on employee attitudes towards company equality approaches in large UK main contractor companies. PhD thesis, Loughborough University, UK.

McCormack, M; Treloar, G J; Palmowski, L and Crawford, R (2007) Modelling direct and indirect water requirements of construction. Building Research & Information, 35(2), pp. 156-162. ISSN 0961-3218

McCowan, A K and Mohamed, S (2007) Decision support system to evaluate and compare concession options. Journal of Construction Engineering and Management, 133(2), pp. 114-123. ISSN 0733-9364

McCoy, A; Thabet, W and Badinelli, R (2011) Defining a commercialisation model for residential construction innovation: Industry case studies. Construction Innovation, 11(1), pp. 114-132. ISSN 1471-4175

McCoy, A P (2008) Commercialization for innovative products in the residential construction industry. PhD thesis, Virginia Polytechnic Institute and State University, USA.

McCoy, A P; Thabet, W and Badinelli, R (2008) Towards establishing a domain specific commercialization model for innovation in residential construction. Construction Innovation, 8(2), pp. 137-155. ISSN 1471-4175

McDavid, H A (1996) Construction and economic development: A stimulus or constraint in developing countries. DSc thesis, George Washington University, USA.

McDermot, E; Agdas, D; Rodríguez Díaz, C R; Rose, T and Forcael, E (2022) Improving performance of infrastructure projects in developing countries: An ecuadorian case study. International Journal of Construction Management, 22(13), pp. 2469-2483. ISSN 1562-3599

McDermott, P; Khalfan, M and Swan, W (2005) Trust in construction projects. Journal of Financial Management of Property and Construction, 10(1), pp. 19-32. ISSN 1366-4387

McDonald, B and Smithers, M (1998) Implementing a waste management plan during the construction phase of a project: A case study. Construction Management and Economics, 16(1), pp. 71-78. ISSN 01446193

McGeorge, D; Chow, V W; Carthey, J and Loosemore, M (2011) Modelling the impact of extreme weather events on healthcare infrastructure using rich picture diagrams. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

McGill, G; Oyedele, L O and McAllister, K (2015) An investigation of indoor air quality, thermal comfort and sick building syndrome symptoms in UK energy efficient homes. Smart and Sustainable Built Environment, 4(3), pp. 329-348. ISSN 2046-6099

McGinty, L N (2020) Business model innovation for green urban infrastructure. PhD thesis, University of Newcastle upon Tyne, UK.

McGuffin, A A and Obonyo, E (2010) Enhancing performance: A case study of the effects of employee coaching in construction practice. Construction Management and Economics, 28(2), pp. 141-149. ISSN 1466433X

McIntyre, C (1996) A decision support system for the residential land development site selection process. PhD thesis, Pennsylvania State University, USA.

McKay, L J (2010) The effect of offsite construction on occupational health and safety. PhD thesis, Loughborough University, UK.

McKnight, P (2018) Strategies small construction business managers use to reduce safety incidents in their organization. DBA thesis, Walden University, USA.

McLaren, Matthew (2018) An investigation of swift trust formation in disaster management teams. PhD thesis, University of New South Wales, Australia.

McLarnon, C; Spillane, J P; Bradley, J; McCartan, N and Nelson, M (2020) Open innovation within loughview timber: How knowledge transfer is opening doors to new markets. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

McLean, M (2014) A longitudinal analysis of a partial mediation model of employee engagement in a knowledge-intensive firm. PhD thesis, Nottingham Trent University, UK.

McMichael, P S; Iglesias, M C; Johnston, J; Holley, P and Peresin, M S (2025) Case study of bio-based coagulation and flocculation systems to treat contaminants in concrete washout water. International Journal of Construction Education and Research, 21(3), pp. 371-381. ISSN 1557-8771

McWilliam, Sarah (2022) Global value chain governance dynamics: A co-evolutionary perspective on the transition from relational to modular governance in construction. PhD thesis, University of Sydney, Australia.

Md Ali, Z; Zawawi, R; Myeda, N E and Mohamad, N (2019) Adaptive reuse of historical buildings: Service quality measurement of Kuala Lumpur museums. International Journal of Building Pathology and Adaptation, 37(1), pp. 54-68. ISSN 23984708

Mead, S P (1999) Communication effectiveness in intranet based construction projects. PhD thesis, Loughborough University, UK.

Meem, T I; Hossain, M M and Akter, J (2025) BIM-based analysis of construction safety tracking using behavior-based safety in Bangladeshi construction industry. International Journal of Building Pathology and Adaptation, 43(3), pp. 369-390. ISSN 2398-4708

Mehany, M S H M (2014) Delay-caused claims in infrastructure projects under design-bid-build delivery systems. PhD thesis, Colorado State University, USA.

Mehmood, U.; Ujang, U. and Azri, S. (2026) Spatiotemporal 3D GIS-integrated rule-based scheduling for high-rise maintenance optimisation: A Malaysian case study. Built Environment Project and Asset Management, 16(2), pp. 321-337. ISSN 2044-124X

Mei, X; Zhou, X; Xu, F and Zhang, Z (2023) Human intrusion detection in static hazardous areas at construction sites: Deep learning-based method. Journal of Construction Engineering and Management, 149(1): 04022142, ISSN 0733-9364

Meier, J R and Russell, J S (2000) Model process for implementing maintainability. Journal of Construction Engineering and Management, 126(6), pp. 440-450. ISSN 0733-9364

Meijon Morêda Neto, H; Bastos Costa, D and Coelho Ravazzano, T (2019) Recommendations for target value design implementation for real estate development in Brazil. Architectural Engineering and Design Management, 15(1), pp. 48-65. ISSN 1745-2007

Meiling, J (2010) Continuous improvement and experience feedback in off-site construction timber-framed module prefabrication. PhD thesis, Luleå University of Technology, Sweden.

Meiling, J; Backlund, F and Johnsson, H (2012) Managing for continuous improvement in off-site construction: Evaluation of lean management principles. Engineering, Construction and Architectural Management, 19(2), pp. 141-158. ISSN 0969-9988

Meir, I A; Schwartz, M; Davara, Y and Garb, Y (2019) A window of one's own: A public office post-occupancy evaluation. Building Research & Information, 47(4), pp. 437-452. ISSN 0961-3218

Meistad, T (2014) How energy efficient office buildings challenge and contribute to usability. Smart and Sustainable Built Environment, 3(2), pp. 110-131. ISSN 2046-6099

Meistad, Torill Randi (2015) Sustainable building: From role model projects to industrial transformation. PhD thesis, Norges Teknisk-Naturvitenskapelige Universitet, Norway.

Mejlænder-Larsen, Ø (2017) Using a change control system and building information modelling to manage change in design. Architectural Engineering and Design Management, 13(1), pp. 39-51. ISSN 1745-2007

Mejlænder-Larsen, Ø (2019) A three-step process for reporting progress in detail engineering using BIM, based on experiences from oil and gas projects. Engineering, Construction and Architectural Management, 26(4), pp. 648-667. ISSN 0969-9988

Mejía, G and Franco-Duran, D M (2017) Evidence-based improvement policies in public management: A case study of public projects in Barrancabermeja City, Colombia. Journal of Construction in Developing Countries, 22(2), pp. 55-66. ISSN 1823-6499

Melanta, S; Miller-Hooks, E and Avetisyan, H G (2013) Carbon footprint estimation tool for transportation construction projects. Journal of Construction Engineering and Management, 139(5), pp. 547-555. ISSN 0733-9364

Meldrum, A (2009) Measuring worker engagement as an aspect of health and safety performance in the construction industry: towards a best practice tool. PhD thesis, Glasgow Caledonian University, UK.

Melhem, N N; Maher, R A and Sundermeier, M (2021) Waste-based management of steel reinforcement cutting in construction projects. Journal of Construction Engineering and Management, 147(7): 04021056, ISSN 0733-9364

Melia, K (2005) Exploring and modelling the process of change management in construction organisations. PhD thesis, University of Dundee, UK.

Mellado, F (2022) Organisational readiness for BIM, lean and sustainability adoption: a conceptual self-assessment framework for construction SMEs in Chile. PhD thesis, University of Manchester, UK.

Melzner, J; Zhang, S; Teizer, J and Bargstädt, H J (2013) A case study on automated safety compliance checking to assist fall protection design and planning in building information models. Construction Management and Economics, 31(6), pp. 661-674. ISSN 1466433X

Meléndez, W; Saavedra, R; Garcés, G and Herrera, R (2026) Comparative analysis of quantity take-off in reinforcing steel bars in apartment buildings based on CAD and BIM method: A case study. International Journal of Construction Management, 26(5), pp. 751-771. ISSN 1562-3599

Memarian, B (2012) Development of high reliability construction work systems: Lessons from production practices of high performance work crews. PhD thesis, Arizona State University, USA.

Memarian, B; Brooks, S B and Le, J C (2023) Obstacles and solutions to implementing job hazard analysis in construction: A case study. International Journal of Construction Education and Research, 19(2), pp. 187-198. ISSN 1557-8771

Memarian, B and Mitropoulos, P (2014) Production system design for speed and reliability: A case study in concrete construction. International Journal of Construction Education and Research, 10(3), pp. 181-200. ISSN 1557-8771

Memarzia, K (1995) Productivity and the Iranian building industry: a case study of component manufacture. PhD thesis, University of York, UK.

Membah, J F J (2016) Parametric cost estimating and risk analysis of transportation tunneling projects. PhD thesis, North Dakota State University, USA.

Memecan, S (1983) A theoretical framework for technology of building. PhD thesis, University of Pennsylvania, USA.

Menassa, C; Pea Mora, F and Pearson, N (2010) Study of real options with exogenous competitive entry to analyze dispute resolution ladder investments in architecture, engineering, and construction projects. Journal of Construction Engineering and Management, 136(3), pp. 377-390. ISSN 0733-9364

Menassa, C C; Mora, F P and Pearson, N (2009) Option pricing model to analyze cost-benefit trade-offs of adr investments in AEC projects. Journal of Construction Engineering and Management, 135(3), pp. 156-168. ISSN 0733-9364

Menconi, M; Painting, N and Piroozfar, P (2024) An energy performance baseline scenario for 19thc listed dwellings in the UK. International Journal of Building Pathology and Adaptation, 42(1), pp. 133-152. ISSN 23984708

Menesi, W; Golzarpoor, B and Hegazy, T (2013) Fast and near-optimum schedule optimization for large-scale projects. Journal of Construction Engineering and Management, 139(9), pp. 1117-1124. ISSN 0733-9364

Meng, F and Cao, X (2025) An intelligent framework for rework risk identification in prefabricated construction processes based on compliance checking. Engineering, Construction and Architectural Management, 32(8), pp. 5066-5098. ISSN 0969-9988

Meng, X (2008) Development of assessment framework for construction supply chain relationships. PhD thesis, University of the West of England, Bristol, UK.

Meng X, H F (2013) The application of whole life costing in PFI/PPP projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Menzies, B; Emmanuel, R; Thomson, C and Walton, J (2010) Creating the conditions that facilitate the development of equitable, low carbon communities in Scotland. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Mer'Eb, M M (2008) GREENOMETER-7: A tool to assess the sustainability of a building's life cycle at the conceptual design phase. DEng thesis, Cleveland State University, USA.

Meriläinen, S and Tervo, A (2025) The changing typology of urban apartment buildings in Aurinkolahti. Buildings & Cities, 6(1), pp. 50-69. ISSN 2632-6655

Merna, A and Smith, N J (1994) Concession contracts for power generation. Engineering, Construction and Architectural Management, 1(1), pp. 17-27. ISSN 0969-9988

Mesquita, Maria Julia de Moraes (2007) Subsidy for quality plans of buildings in the hospitality sector. PhD thesis, Universidade de São Paulo, Brazil.

Messner, J I (1994) An information framework for evaluating international construction projects. PhD thesis, Pennsylvania State University, USA.

Messner, J I and Sanvido, V E (2001) An information model for project evaluation. Engineering, Construction and Architectural Management, 8(5-6), pp. 393-402. ISSN 0969-9988

Metawa, K O (1987) The transfer of construction management technology to developing countries - Libya as a case study. PhD thesis, University of Manchester, UK.

Metham, M and Benjaoran, V (2015) The assessment of greenhouse gas emissions for evaluating actual road construction operations. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Mezher, T; Abdul-Malak, M A; Arnaout, S and Bassil, Z (2004) Public project programming system (3PS): A decision support system for public sector investment. Construction Innovation, 4(2), pp. 99-111. ISSN 1471-4175

Miao, K; Lou, W; Schonfeld, P and Xiao, Z (2024) Optimal earthmoving-equipment combination considering carbon emissions with an indicator-based multiobjective optimizer. Journal of Construction Engineering and Management, 150(1): 04023152, ISSN 0733-9364

Micelli, E (2000) Mobilizing the skills of specialist firms to reduce costs and enhance performance in the European construction industry: Two case studies. Construction Management and Economics, 18(6), pp. 651-656. ISSN 01446193

Mickovski S B, B J D S M J (2013) Innovative use of ECC (NEC) for procurement and management of infrastructure projects with limited funding: Bervie Braes case study. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Migliaccio, G C (2007) Planning for strategic change in the project delivery strategy. PhD thesis, University of Texas at Austin, USA.

Migliaccio, G C; Bogus, S M and Cordova-Alvidrez, A A (2014) Continuous quality improvement techniques for data collection in asset management systems. Journal of Construction Engineering and Management, 140(4): B4013008, ISSN 0733-9364

Mignone, G; Hosseini, M R; Chileshe, N and Arashpour, M (2016) Enhancing collaboration in BIM-based construction networks through organisational discontinuity theory: A case study of the New Royal Adelaide Hospital. Architectural Engineering and Design Management, 12(5), pp. 333-352. ISSN 1745-2007

Mihocic, E; Gharehbaghi, K; Hilletofth, P; Tee, K F and Myers, M (2025) Augmenting the cities' and metropolitan regional demands for mega rail infrastructure: The application of SWOT and factor analysis. Smart and Sustainable Built Environment, 14(2), pp. 377-406. ISSN 2046-6099

Mikhailova, A (2017) Spatial evolution of a museum building: a case of the State Historical Museum in Moscow. PhD thesis, University of Leicester, UK.

Milberg, C T (2006) Application of tolerance management to civil systems. PhD thesis, University of California, Berkeley, USA.

Miles, D W J (1997) The development of intermediate construction enterprises. PhD thesis, Loughborough University, UK.

Miles-Shenton, D; Parker, J; Glew, D and Thomas, F (2025) Quantifying inter-dwelling air exchanges during fan pressurisation tests. Buildings & Cities, 6(1), pp. 239-254. ISSN 2632-6655

Milián Bernal, D; Pelsmakers, S; Nisonen, E and Vanhatalo, J (2026) Working at home: Tactics to reappropriate the home. Buildings & Cities, 7(1), pp. 143-160. ISSN 2632-6655

Miller, C J M; Packham, G A and Thomas, B C (2002) Harmonization between main contractors and subcontractors: a prerequisite for lean construction? Journal of Construction Research, 3(01), 67–82. Journal of Construction Research, ISSN 1609-9451

Miller, J P (2020) Post-disaster recovery through the evolution of the Lakou, a traditional settlement pattern. International Journal of Disaster Resilience in the Built Environment, 11(1), pp. 3-14. ISSN 1759-5916

Millett, S J; Dainty, A R J and Briscoe, G H (2001) Client procurement strategies: A cross-sectoral analysis. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Mills, Anthony John (2002) Client and contractor attitudes to prequalification and selection processes for construction work. PhD thesis, University of Melbourne, Australia.

Mills, G; Austin, S and Price, A (2008) Values driven policy in designing environments for children and young people’s education, health and wellbeing. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Mills, G R (2013) Values and value in design. PhD thesis, Loughborough University, UK.

Mills, G R W and Razmdoost, K (2016) Managing value co-creation/destruction: A longitudinal education capital programme/project case study. Construction Management and Economics, 34(4-5), pp. 286-301. ISSN 01446193

Min, W and Pheng, L S (2005) Economic order quantity (EOQ) versus just-in-time (JIT) purchasing: An alternative analysis in the ready-mixed concrete industry. Construction Management and Economics, 23(4), pp. 409-422. ISSN 01446193

Min, W and Pheng, L S (2005) EOQ with a price discount versus JIT purchasing: an alternative analysis in the ready-mixed concrete industry. Journal of Construction Research, 6(1), pp. 47-69. ISSN 1609-9451

Minato, T (2003) Representing causal mechanism of defective designs: A system approach considering human errors. Construction Management and Economics, 21(3), pp. 297-305. ISSN 01446193

Minato, T (2004) Representing causal mechanism of defective designs: Exploration through case studies. Construction Management and Economics, 22(2), pp. 183-192. ISSN 01446193

Minchin Jr, R E; Lewis, D W and McLeod, L (2011) Improving productivity on a troubled bridge project. Journal of Construction Engineering and Management, 137(5), pp. 364-371. ISSN 0733-9364

Mincks, W R (2016) Career success for construction project managers: A qualitative study of construction project managers coping with stress to complete successful projects. PhD thesis, University of Idaho, USA.

Minelli, P (2020) Improved methods for managing megaprojects. PhD thesis, Massachusetts Institute of Technology, USA.

Mintah, K; Higgins, D and Callanan, J (2018) A real option approach for the valuation of switching output flexibility in residential property investment. Journal of Financial Management of Property and Construction, 23(2), pp. 133-151. ISSN 1366-4387

Mintah, Kwabena (2019) Is there value in waiting? An empirical study of real options application to Australian property developments. PhD thesis, RMIT University, Australia.

Mirmoghtadaee, M; Abdi, M H and Eslamlou, M S (2025) Managing uncertainties in fault avoidance zone of urban areas: A case study of karaj, Iran. International Journal of Disaster Resilience in the Built Environment, 16(2), pp. 275-288. ISSN 1759-5908

Mirzaee, A M and Martek, I (2025) Improving project management "closeout" phase outcomes: Evidence from a large general contractor in Iran using "x-inefficiency theory". Engineering, Construction and Architectural Management, 32(8), pp. 5253-5271. ISSN 0969-9988

Mirzaee, A M and Martek, I (2026) Utilizing multiple intelligences as a means to improving claim performance outcomes in project-based organizations. Engineering, Construction and Architectural Management, 33(1), pp. 532-551. ISSN 0969-9988

Mirzaee, A M; Hosseini, M R; Martek, I; Rahnamayiezekavat, P and Arashpour, M (2023) Mitigation of contractual breaches in international construction joint ventures under conditions of absent legal recourse: Case studies from Iran. Engineering, Construction and Architectural Management, 30(4), pp. 1481-1495. ISSN 0969-9988

Mirzaee, A M; Pourrostam, T; Majrouhi Sardroud, J; Hosseini, M R; Rahnamayiezekavat, P and Edwards, D (2024) Dispute root causes and prevention in Iranian public-private partnership projects: A causal-predictive model. Engineering, Construction and Architectural Management, 31(1), pp. 405-431. ISSN 0969-9988

Mitchell Finnigan, S J (2020) Human-centred smart buildings: Reframing smartness through the lens of human-building interaction. PhD thesis, University of Newcastle upon Tyne, UK.

Mitropoulos, P (1996) Technology adoption decisions in construction organizations. PhD thesis, Stanford University, USA.

Mitropoulos, P; Cupido, G and Namboodiri, M (2009) Cognitive approach to construction safety: Task demand-capability model. Journal of Construction Engineering and Management, 135(9), pp. 881-889. ISSN 0733-9364

Mitropoulos, P and Guillama, V (2010) Analysis of residential framing accidents, activities, and task demands. Journal of Construction Engineering and Management, 136(2), pp. 260-269. ISSN 0733-9364

Mitropoulos, P and Namboodiri, M (2011) The task demands assessment methodology. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(1), pp. 9-17. ISSN 17514312

Mitropoulos, P and Tajima, V (2022) Constructability opportunities in the engineering design of marine pier structures: A case study. International Journal of Construction Management, 22(3), pp. 366-378. ISSN 1562-3599

Miura, K (2017) International joint ventures in the US military construction programs in Japan: An exploratory case study investigation. PhD thesis, Northcentral University, USA.

Mkandawire, K; Kabiri, S and Connaughton, J (2023) Knowledge transaction between offsite and onsite interfaces. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Mlitwa, N B W and Birch, D (2011) The role of intrusion detection systems in electronic information security: From the activity theory perspective. Journal of Engineering, Design and Technology, 9(3), pp. 296-312. ISSN 1726-0531

Moccio, F A (1992) Contradicting male power and privilege: Class, race and gender relations in the building trades. PhD thesis, New School for Social Research, USA.

Modin, J (1995) KBS-class: A neural network tool for automatic content recognition of building texts. Construction Management and Economics, 13(5), pp. 411-416. ISSN 01446193

Moe, T L (2012) Aiming for resilience and adaptation in managing environment: An emerging environmental and emergency leadership in the twenty-first century. International Journal of Disaster Resilience in the Built Environment, 3(1), pp. 42-51. ISSN 1759-5916

Moghadam, M (2014) Lean-mod: An approach to modular construction manufacturing production efficiency improvement. PhD thesis, University of Alberta, Canada.

Moghaddam, S.; Dashti, M. S.; Alvanchi, A. and Khanzadi, M. (2026) An integrated BIM-based augmented reality framework for improving facility maintenance management. Engineering, Construction and Architectural Management, 33(3), pp. 2007-2047. ISSN 0969-9988

Moghaddaszadeh Kermani, M (2016) Criticality-based strategic decision-making model for maintenance and asset management. PhD thesis, University of Manchester, UK.

Moghani, E (2013) A simulation-based framework for as-built documentation of construction process and product information. PhD thesis, University of Alberta, Canada.

Mohajeri, M; Ardeshir, A and Malekitabar, H (2023) Diagnostic intervention program based on construction workers' internal factors for persistent reduction of unsafe behavior. Engineering, Construction and Architectural Management, 30(2), pp. 478-495. ISSN 0969-9988

Mohamad, M and Tran, D Q (2021) Risk-based prioritization approach to construction inspections for transportation projects. Journal of Construction Engineering and Management, 147(1): 04020150, ISSN 0733-9364

Mohamad, M I (1999) The application of concurrent engineering philosophy to the construction industry. PhD thesis, Loughborough University, UK.

Mohamad, Saifulnizam Suhaimi (2014) Value management in design planning: A systems-based framework for multi-disciplinary team involvement. PhD thesis, Queensland University of Technology, Australia.

Mohamad Kamar, K A (2011) Critical success factors to industrialised building system contractor. PhD thesis, University of Salford, UK.

Mohamed, M and Tran, D Q (2021) Risk-based inspection model for hot mix asphalt pavement construction projects. Journal of Construction Engineering and Management, 147(6): 78622053, ISSN 0733-9364

Mohamed, S F (2006) Improving construction site management practices through knowledge management. PhD thesis, Loughborough University, UK.

Mohamed, T and Karima, A (2018) Architectural quality through the integration of users' viewpoints in architectural design: Case study Pouillon's Diar es Saada. Journal of Construction in Developing Countries, 23(1), pp. 149-175. ISSN 1823-6499

Mohamed, Y (2002) A framework for systematic improvement of construction systems. PhD thesis, University of Alberta, Canada.

Mohamed, Y; Borrego, D; Francisco, L; Al-Hussein, M; Abourizk, S and Hermann, U (2007) Simulation-based scheduling of module assembly yards: Case study. Engineering, Construction and Architectural Management, 14(3), pp. 293-311. ISSN 0969-9988

Mohamed Safith, A W and De Silva, L (2022) The techniques and challenges of GPS surveying for vertical alignments in high-rise buildings. International Journal of Building Pathology and Adaptation, 40(4), pp. 587-607. ISSN 23984708

Mohammad Shamsudin, N A (2021) Perceptions of critical success factors in the management of dilapidated schools' reconstruction projects using Industrialised Building System method in rural areas in Sarawak. PhD thesis, University of Nottingham, UK.

Mohammadi, A; Amador-Jimenez, L and Nasiri, F (2020) Reliable, effective, and sustainable urban railways: A model for optimal planning and asset management. Journal of Construction Engineering and Management, 146(6): 04020057, ISSN 0733-9364

Mohammadi, A; Igwe, C; Amador-Jimenez, L and Nasiri, F (2020) Applying lean construction principles in road maintenance planning and scheduling. International Journal of Construction Management, 22(12), pp. 2364-2374. ISSN 1562-3599

Mohammadi, Masoud (2023) Development of bridge information model (brim) for digital twinning and management using tls technology. PhD thesis, Western Sydney University, Australia.

Mohammadi, N; Heidary Dahooie, J and Khajevand, M (2023) A hybrid approach for identifying and prioritizing critical success factors in technology transfer projects (case study: Diesel locomotive manufacturing). Journal of Engineering, Design and Technology, 21(5), pp. 1389-1413. ISSN 1726-0531

Mohammadi, P; Asgari, S; Rashidi, A and Alder, R (2025) Culvert inspection framework using hybrid xgboost and risk-based prioritization: Utah case study. Journal of Construction Engineering and Management, 151(6): 04025052, ISSN 0733-9364

Mohammadi, S; Tavakolan, M and Zahraie, B (2022) An intelligent simulation-based framework for automated planning of concrete construction works. Engineering, Construction and Architectural Management, 29(2), pp. 916-939. ISSN 0969-9988

Mohammadpour, A (2014) Retrofitting healthcare facilities to enhance patient safety and energy efficiency. PhD thesis, Pennsylvania State University, USA.

Mohammed, R E (2007) An exploratory system dynamics model to investigate the relationships between errors that occur in construction documents in Saudi Arabia and their possible causes. PhD thesis, Heriot-Watt University, UK.

Mohandes, S R (2020) Towards improvements to the occupational health and safety in construction industry. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Mohandes, S R; Durdyev, S; Sadeghi, H; Mahdiyar, A; Hosseini, M R; Banihashemi, S and Martek, I (2023) Towards enhancement in reliability and safety of construction projects: Developing a hybrid multi-dimensional fuzzy-based approach. Engineering, Construction and Architectural Management, 30(6), pp. 2255-2279. ISSN 0969-9988

Mohanty, P; Pal, I and Roy, J (2025) Improving community resilience through distributed solar energy as critical infrastructure: A case study of South Asia. International Journal of Disaster Resilience in the Built Environment, 16(3), pp. 309-327. ISSN 1759-5908

Moharrami, S; Taghaddos, M; RazaviAlavi, S R and AbouRizk, S (2021) A hybrid simulation approach for microtunneling construction planning. Construction Innovation, 21(3), pp. 363-378. ISSN 1471-4175

Mohd Zaini, F; Kwong, Q J and Jack, L B (2021) Water efficiency in Malaysian commercial buildings: A green initiative and cost–benefit approach. International Journal of Building Pathology and Adaptation, 39(5), pp. 702-719. ISSN 23984708

Mohlasedi, K M and Nkado, R N (1997) The role of stakeholders in the delivery of affordable housing schemes in South Africa. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Mohsen, Osama (2021) A machine learning approach to predict production time in industrialized building construction. PhD thesis, University of Alberta, Canada.

Mohyin, N (2011) Managing commitment in small construction professional services firms. PhD thesis, Loughborough University, UK.

Moir, S (2004) Worker participation in OHS change in the construction workplace. ScD thesis, University of Massachusetts Lowell, USA.

Moisio, M; Salmio, E; Kaasalainen, T; Huuhka, S; Räsänen, A; Lahdensivu, J; Leppänen, M and Kuula, P (2024) Towards urban LCA: examining densification alternatives for a residential neighbourhood. Buildings & Cities, 5(1), pp. 581-600. ISSN 2632-6655

Mojahed, S (2005) A project improvement system for effective management of construction projects. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Mok, K Y; Shen, G Q and Yang, R (2018) Stakeholder complexity in large scale green building projects: A holistic analysis towards a better understanding. Engineering, Construction and Architectural Management, 25(11), pp. 1454-1474. ISSN 0969-9988

Mok, K Y; Shen, G Q and Yang, R J (2017) A network theory-based analysis of stakeholder issues and their interrelationships in large construction projects: A case study. International Journal of Construction Management, 17(3), pp. 210-227. ISSN 1562-3599

Mokhtar Azizi, N S; Wilkinson, S and Fassman, E (2014) Management practice to achieve energy-efficient performance of green buildings in New Zealand. Architectural Engineering and Design Management, 10(1-2), pp. 25-39. ISSN 1745-2007

Mokhtar Azizi, Z; Cochrane, J; Thurairajah, N and Mokhtar Azizi, N S (2023) Remote working in construction: Assessing the affordance of digitisation. Built Environment Project and Asset Management, 13(1), pp. 5-19. ISSN 2044-124X

Molaei, P; Hashempour, P and Tang, L M (2022) Semi-open spaces of apartments considering COVID-19 pandemic: General expectations of balcony design in the post-pandemic world. Architectural Engineering and Design Management, 18(5), pp. 705-722. ISSN 1745-2007

Molenaar, K R (1997) Public sector design-build: A model for project selection. PhD thesis, University of Colorado at Boulder, USA.

Molenaar, K R (2005) Programmatic cost risk analysis for highway megaprojects. Journal of Construction Engineering and Management, 131(3), pp. 343-353. ISSN 0733-9364

Molenaar, K R and Songer, A D (1998) Model for public sector design-build project selection. Journal of Construction Engineering and Management, 124(6), pp. 467-479. ISSN 0733-9364

Mollasalehi, S (2022) The benefits of BIM use to improve information flow: making the design process more leaner. PhD thesis, University of Salford, UK.

Moloney, J; Globa, A; Wang, R; Khoo, C K and Tokede, O (2019) Hybrid environmental-media facades: Rationale and feasibility. Architectural Engineering and Design Management, 15(5), pp. 313-333. ISSN 1745-2007

Momennia Rankohi, S (2022) Investigating the concept of integration in construction projects: Cases of integrated project delivery and design for manufacturing and assembly. PhD thesis, Ecole Polytechnique, Montreal, Canada.

Momoh, J; Ige, O; Ogbenjuwa, L; Udeaja, C; Alonge, O D and Okoror, G (2025) The impact of work experience on lecturer's subject knowledge and professional development. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(3), pp. 170-179. ISSN 17514304

Momoh, J; Medjdoub, B; Ebohon, O J; Ige, O; Young, B E and Ruoyu, J (2024) The implications of adopting sustainable urbanism in developing resilient places in Abuja, Nigeria. International Journal of Building Pathology and Adaptation, 42(5), pp. 914-931. ISSN 2398-4708

Monahan, J (2013) Housing and carbon reduction: can mainstream 'eco-housing' deliver on its low carbon promises? PhD thesis, University of East Anglia, UK.

Moncaster, A (2012) Constructing sustainability: connecting the social and the technical in a case study of school building projects. PhD thesis, University of East Anglia, UK.

Moncaster, A; Malmqvist, T; Forman, T; Pomponi, F and Anderson, J (2022) Embodied carbon of concrete in buildings, Part 2: Are the messages accurate? Buildings & Cities, 3(1), pp. 334-355. ISSN 2632-6655

Mondorf, P E; Kuprenas, J A and Kordahi, E N (1997) Segmental cantilever bridge construction case study. Journal of Construction Engineering and Management, 123(1), pp. 79-84. ISSN 0733-9364

Monib, R (2020) Decision support for modularisation: engineering construction case studies. PhD thesis, Loughborough University, UK.

Montague, A M (2017) Investigating women entrepreneurs in construction and their sense of belonging in a male dominated industry: A multiple-case study. DBA thesis, Northcentral University, USA.

Montali, J (2019) Digitised engineering knowledge for prefabricated fac?ades. PhD thesis, University of Cambridge, UK.

Monticelli, C and Zanelli, A (2021) Material saving and building component efficiency as main eco-design principles for membrane architecture: Case: studies of etfe enclosures. Architectural Engineering and Design Management, 17(3-4), pp. 264-280. ISSN 1745-2007

Moon, H J and Augenbroe, G (2008) Empowerment of decision-makers in mould remediation. Building Research & Information, 36(5), pp. 486-498. ISSN 0961-3218

Moon, S; Choi, E and Hong, S (2016) Creation of robust design alternatives for temporary construction in value engineering. Journal of Construction Engineering and Management, 142(3): 04015086, ISSN 0733-9364

Moon, S; Ha, C and Yang, J (2012) Structured idea creation for improving the value of construction design. Journal of Construction Engineering and Management, 138(7), pp. 841-853. ISSN 0733-9364

Moon, S; Ham, N; Kim, S; Hou, L; Kim, J H and Kim, J J (2020) Fourth industrialization-oriented offsite construction: Case study of an application to an irregular commercial building. Engineering, Construction and Architectural Management, 27(9), pp. 2271-2286. ISSN 0969-9988

Moore, T; Ahiaga-Dagbui, D; Shrestha, A and Debnath, A (2022) Risk allocation on transport megaprojects: A case for an institutional theory lens. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Mootanah, D P (1999) A holistic approach to the management of risk and value in project management. PhD thesis, Anglia Polytechnic University, UK.

Morbitzer, C A (2003) Towards the integration of simulation into the building design process. PhD thesis, University of Strathclyde, UK.

Moreno, M; Ortiz, R and Ortiz, P (2024) Remote sensing to assess the risk for cultural heritage: Forecasting potential collapses due to rainfall in historic fortifications. International Journal of Building Pathology and Adaptation, 42(1), pp. 92-113. ISSN 23984708

Moret, Y and Einstein, H H (2012) Modeling correlations in rail line construction. Journal of Construction Engineering and Management, 138(9), pp. 1075-1084. ISSN 0733-9364

Morgado, J and Neves, J (2014) Work zone planning in pavement rehabilitation: Integrating cost, duration, and user effects. Journal of Construction Engineering and Management, 140(11): 4014050, ISSN 0733-9364

Morgan, B (2017) Organizing for technology in practice: implementing Building Information Modeling in a design firm. PhD thesis, University College London, UK.

Morkos, R (2014) Operational efficiency frontier: Visualizing, manipulating, and navigating the construction scheduling state space with precedence, discrete, and disjunctive constraints. PhD thesis, Stanford University, USA.

Morland, K V (2020) Multi-level learning of a quality management routine: a UK housebuilder case study. PhD thesis, University of Sheffield, UK.

Morland, K V and Breslin, D (2024) Resolving learning paradoxes within a UK new-build housebuilder. Construction Management and Economics, 42(4), pp. 307-327. ISSN 01446193

Morledge, R (2011) Colleges as agents for construction innovation. Construction Innovation, 11(4), pp. 441-451. ISSN 1471-4175

Morris, J; Rogerson, J and Jared, G (1998) A tool for modelling the briefing and design decision making processes in construction. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Morton, C N (1979) Collective bargaining in building and civil engineering: a case study of three major re-development protects in the City of London. PhD thesis, London School of Economics and Political Science, UK.

Morton, P; Goodwin, A; Kellond, A; Close, K and Collins, J (2011) Investing in the future construction workforce: CSR and work experience placements. International Journal of Construction Management, 11(2), pp. 49-58. ISSN 1562-3599

Morton, R R (1982) The speculative housebuilding industry in the nineteen seventies. PhD thesis, University of Liverpool, UK.

Moskowitz, J M and McCranie, J B (2026) Investigating the impact of army safety and occupational health management system implementation on safety performance indices: Case study of a U.S. Army corps of engineers district. International Journal of Construction Management, 26(5), pp. 840-856. ISSN 1562-3599

Moss, Q Z (2012) Performance measurement in facilities management-the case of outsourced service contracts. PhD thesis, University of Salford, UK.

Mostafa, M A and El-Gohary, N M (2014) Stakeholder-sensitive social welfare-oriented benefit analysis for sustainable infrastructure project development. Journal of Construction Engineering and Management, 140(9): 04014038, ISSN 0733-9364

Mostafa, M A and El-Gohary, N M (2015) Semantic system for stakeholder-conscious infrastructure project planning and design. Journal of Construction Engineering and Management, 141(2): 04014075, ISSN 0733-9364

Mostafa, S and Chileshe, N (2015) Discrete-event simulation model for offsite manufacturing in Australia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Mostafaeipour, A; Qolipour, M; Rezaei, M; Jahangiri, M; Goli, A and Sedaghat, A (2021) A novel integrated approach for ranking solar energy location planning: A case study. Journal of Engineering, Design and Technology, 19(3), pp. 698-720. ISSN 1726-0531

Mostafaeipour, A; Sadeghi, S; Jahangiri, M; Nematollahi, O and Rezaeian Sabbagh, A (2020) Investigation of accurate location planning for wind farm establishment: A case study. Journal of Engineering, Design and Technology, 18(4), pp. 821-845. ISSN 1726-0531

Mostafavi, A (2013) Ex-ante assessment of financial innovation policies in infrastructure system-of-systems. PhD thesis, Purdue University, USA.

Mostafavi, A and Karamouz, M (2010) Selecting appropriate project delivery system: Fuzzy approach with risk analysis. Journal of Construction Engineering and Management, 136(8), pp. 923-930. ISSN 0733-9364

Mostafavi, A; Valentin, V; Abraham, D M and Louis, J (2012) Assessment of the productivity of nighttime asphalt paving operations. Journal of Construction Engineering and Management, 138(12), pp. 1421-1432. ISSN 0733-9364

Mostavi, E (2018) Development of multiple criteria decision making instrument in designing of high performance commercial buildings. PhD thesis, Pennsylvania State University, USA.

Motaleb, O H (2014) Development of a risk response model to handle delays of construction projects in the United Arab Emirates. PhD thesis, Robert Gordon University, UK.

Motawa, I and Almarshad, A (2015) Case-based reasoning and BIM systems for asset management. Built Environment Project and Asset Management, 5(3), pp. 233-247. ISSN 2044-124X

Motawa, I A (2001) Simulating the implementation of technological innovations in construction. PhD thesis, Loughborough University, UK.

Motawa, I A; Khosrowshahi, F and Kaka, A P (2005) Development and evaluation of a company-level budgeting technique incorporating future construction contracts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Mottaki, Z; Hosseini Sabzevari, S A and Aslani, F (2024) Designing post-earthquake temporary shelter in hot and arid climate (case study: Isfahan city, Iran). Architectural Engineering and Design Management, 20(6), pp. 1777-1794. ISSN 1745-2007

Mourgues, C (2009) Method to produce field instructions from product and process models. PhD thesis, Stanford University, USA.

Mousavi, Milad (2025) Evolving and proactive risk modelling in underground working environments. PhD thesis, University of New South Wales, Australia.

Moussa, M (2022) Truck tolling for bridges in USA: A new approach for determining a fair toll policy. PhD thesis, New York University Tandon School of Engineering, USA.

Moussavi, S (2023) Integration of environmental sustainability and decision making: Case studies of civil infrastructure. PhD thesis, University of Nebraska - Lincoln, USA.

Moussavi Nadoushani, Z S; Akbarnezhad, A and Rey, D (2018) Optimization of concrete placing operation based on competing carbon footprint, cost and production rate objectives. Engineering, Construction and Architectural Management, 25(7), pp. 938-957. ISSN 0969-9988

Moussavi Nadoushani, Z S; Hammad, A W A and Akbarnezhad, A (2017) Location optimization of tower crane and allocation of material supply points in a construction site considering operating and rental costs. Journal of Construction Engineering and Management, 143(1): 04016089, ISSN 0733-9364

Moustafa, I M M (2001) A decision support system for the selection of the optimum contractor. PhD thesis, University of Southampton, UK.

Moynihan, G; Zhou, H and Cui, Q (2009) Stochastic modeling for pavement warranty cost estimation. Journal of Construction Engineering and Management, 135(5), pp. 352-359. ISSN 0733-9364

Muaz, Fagiar (2019) Forensic schedule information modeling for analysis of time claims in construction projects. PhD thesis, University of Alberta, Canada.

Mugabi, J and Marin, P (2008) PPP in urban water: Lessons from Yerevan, Armenia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 171-178. ISSN 17514312

Mughrabi, A O (2019) Change management capability maturity model for contractors in the Kuwaiti construction industry. PhD thesis, Heriot-Watt University, UK.

Muhammad, Z and Johar, F (2019) Critical success factors of public-private partnership projects: A comparative analysis of the housing sector between Malaysia and Nigeria. International Journal of Construction Management, 19(3), pp. 257-269. ISSN 1562-3599

Muhammed-Yakubu, N (2023) A BIM-based information management schema for construction activities data-flow across the project life cycle. PhD thesis, University of the West of England, Bristol, UK.

Mukhopadhyay, S; Halligan, J and Hastak, M (2016) Assessment of major causes: Nuclear power plant disasters since 1950. International Journal of Disaster Resilience in the Built Environment, 7(5), pp. 521-543. ISSN 1759-5916

Mukopfa, C (2021) Strategies to sustain small construction businesses beyond the first 5 years of operation. DBA thesis, Walden University, USA.

Mukwanason, D E; Tutesigensi, A; Kayondo, M and Mutikanga, H E (2023) Impact of project quality culture on defects in infrastructure projects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Mulenga, C Z (2020) Construction project performance in Zambia: A case study of public high schools. PhD thesis, University of Bolton, UK.

Mulholland, C (2020) Social value management in megaprojects: A study of UK nuclear decommissioning and remediation. PhD thesis, University of Manchester, UK.

Mulholland, C; Chan, P W; Canning, K and Ejohwomu, O A (2020) Social value for whom, by whom and when? Managing stakeholder dynamics in a UK megaproject. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(2), pp. 75-86. ISSN 17514304

Mullens, M A and Arif, M (2006) Structural insulated panels: Impact on the residential construction process. Journal of Construction Engineering and Management, 132(7), pp. 786-794. ISSN 0733-9364

Muller, M (2018) Lessons from transforming a South African special-purpose vehicle into a project implementation agency. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(5), pp. 189-196. ISSN 17514304

Mulliner, E K (2012) A model for the complex assessment of sustainable housing affordability. PhD thesis, Liverpool John Moores University, UK.

Mund, A T (2002) An evaluation framework for exterior envelope wall systems for the homebuilding industry. PhD thesis, Arizona State University, USA.

Muniandy, Meenachi (2016) Assessing the economic impact of public investment in Malaysia: A case study on myrapid transit project using a dynamic computable general equilibrium model. PhD thesis, Monash University, Australia.

Munir, M (2020) Development of a building information modelling asset value realisation model. PhD thesis, University of Liverpool, UK.

Munir, M; Kiviniemi, A; Jones, S and Finnegan, S (2020) BIM-based operational information requirements for asset owners. Architectural Engineering and Design Management, 16(2), pp. 100-114. ISSN 1745-2007

Munir, M; Kiviniemi, A and Jones, S W (2019) Business value of integrated BIM-based asset management. Engineering, Construction and Architectural Management, 26(6), pp. 1171-1191. ISSN 0969-9988

Munir, Mustapha (2020) Development of a building information modelling asset (bimasset) value realisation model. PhD thesis, University of Liverpool, UK.

Munthali, N C (2022) Project management strategies for success: The case of Zambia. DBA thesis, Walden University, USA.

Murillo, Fernando (2024) A case study on university architecture professors' experiences teaching building information modeling technology. EdD thesis, Concordia University Irvine, USA.

Murnane, R; Simpson, A and Jongman, B (2016) Understanding risk: What makes a risk assessment successful? International Journal of Disaster Resilience in the Built Environment, 7(2), pp. 186-200. ISSN 1759-5916

Murphy, M; Heaney, G and Perera, S (2011) A methodology for evaluating construction innovation constraints through project stakeholder competencies and FMEA. Construction Innovation, 11(4), pp. 416-440. ISSN 1471-4175

Murphy, M E; Perera, R S and Heaney, S G (2008) Building design innovation: Expansion of classification linkages through case study analysis. Journal of Engineering, Design and Technology, 6(2), pp. 99-111. ISSN 1726-0531

Murray, M. (2024) Civil engineering employers' engagement in work-integrated learning. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(1), pp. 58-70. ISSN 1751-4304

Murray, M D; Tookey, J E; Langford, D A and Hardcastle, C (2000) Project communication variables: A comparative study of us and UK construction industry perceptions. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Musa, M M (2019) A framework for implementing target value delivery to enhance value creation in the construction industry. PhD thesis, Nottingham Trent University, UK.

Musa, S (2019) A framework of intra-organisational knowledge sharing practices in implementing BIM within the Malaysian construction industry. PhD thesis, University of Salford, UK.

Musabayana, J (2012) Small enterprise growth: The critical role of the owner-manager a case study of the construction sector in Gauteng, South Africa. DBL thesis, University of South Africa, South Africa.

Mushtaha, E; Alsyouf, I; Hamad, R; Elmualim, A; Maksoud, A and Yahia, M W (2022) Developing design guidelines for university campus in hot climate using quality function deployment (QFD): The case of the University of sharjah, UAE. Architectural Engineering and Design Management, 18(5), pp. 593-613. ISSN 1745-2007

Musil, T A (2011) Evaluating development and community benefits of shopping malls: A case study using input/output analysis. Journal of Financial Management of Property and Construction, 16(2), pp. 111-125. ISSN 1366-4387

Mustapa, M (2013) Facilities management knowledge in private finance initiative (PFI) healthcare projects. PhD thesis, Loughborough University, UK.

Mutti, C d N (2005) The drivers of Brazilian contractors' competitiveness in the international market. PhD thesis, University of Reading, UK.

Muya, M; Price, A D F and Edum-Fotwe, F T (2006) Overview of funding for construction craft skills training in Sub-Saharan Africa: A case study of Zambia. Construction Management and Economics, 24(2), pp. 197-208. ISSN 01446193

Muzorewa, Maxwell (2024) Project management strategies used in hospitality construction projects to improve performance. DBA thesis, Walden University, USA.

Mwanaki Alinaitwe, H (2008) Improvement of labour performance and productivity in Uganda's building industry. PhD thesis, Lund University, Sweden.

Myers, H; Wade, F and Webb, J (2019) Mapping emerging subcontracting networks for the energy efficiency retrofit of hard-to-treat buildings. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Myint, K. Z. and Hadikusumo, B. H. W. (2026) Key factors influencing governance in transport infrastructure public-private partnership projects in Myanmar: Case study approach. International Journal of Construction Management, 26(10), pp. 2258-2278. ISSN 1562-3599

Møller, J L; Kines, P; Dyreborg, J; Andersen, L L and Ajslev, J Z N (2021) The competences of successful safety and health coordinators in construction projects. Construction Management and Economics, 39(3), pp. 199-211. ISSN 01446193

Naanaa, H.; Bril El Haouzi, H.; Derigent, W. and Lezoche, M. (2026) A semantic search system for efficient information retrieval in the construction domain. Smart and Sustainable Built Environment, 15(5), pp. 1781-1807. ISSN 2046-6099

Naar, L; Nikolova, N and Forsythe, P (2016) Innovative construction and the role of boundary objects: A Gehry case study. Construction Management and Economics, 34(10), pp. 688-699. ISSN 01446193

Naderi, M; Nazari, A; Shafaat, A and Abrishami, S (2025) Enhancing accuracy in construction overhead cost estimation: A novel integration of activity-based costing and building information modelling. Smart and Sustainable Built Environment, 14(3), pp. 758-775. ISSN 2046-6099

Nadim, W (2016) Live-work and adaptable housing in Egypt: A zero commuting concept, lessons learnt from informal developments. Smart and Sustainable Built Environment, 5(3), pp. 289-302. ISSN 2046-6099

Nagar, S (2015) Internationalisation of New Zealand civil construction firms: opportunities and challenges in Asia. PhD thesis, Auckland University of Technology, New Zealand.

Nahmens, I and Mullens, M (2009) The impact of product choice on lean homebuilding. Construction Innovation, 9(1), pp. 84-100. ISSN 1471-4175

Nahmens, I and Reichel, C (2013) Adoption of high performance building systems in hot-humid climates: lessons learned. Construction Innovation, 13(2), pp. 186-201. ISSN 1471-4175

Naimi, M (2013) Contract and claim prevention in major projects: a study on petrochemical projects in Iran. PhD thesis, University of Manchester, UK.

Naismith, N (2007) An emprical evaluation of strategic human resource management within construction sites. PhD thesis, Loughborough University, UK.

Naismith, N; Price, A D F; Dainty, A R J; Bryman, A; Greasley, K and Soetanto, R (2005) Engendering trust in the construction supply chain. Journal of Construction Procurement, 11(2),

Naji, K K (1997) The development of a virtual environment for simulating equipment-based construction operations in real-time object-oriented systems. PhD thesis, University of Florida, USA.

Naji, K K (2005) Virtual environments for improving construction site safety. Architectural Engineering and Design Management, 1(2), pp. 93-102. ISSN 1745-2007

Naji Almassi, A (2011) Credit value adjusted real options based valuation of multiple-exercise government guarantees for infrastructure projects. PhD thesis, University of Toronto, Canada.

Najjar, M K; Figueiredo, K; Evangelista, A C J; Hammad, A W A; Tam, V W Y and Haddad, A (2022) Life cycle assessment methodology integrated with BIM as a decision-making tool at early-stages of building design. International Journal of Construction Management, 22(4), pp. 541-555. ISSN 1562-3599

Nakanishi, H; Black, J and Matsuo, K (2014) Disaster resilience in transportation: Japan earthquake and tsunami 2011. International Journal of Disaster Resilience in the Built Environment, 5(4), pp. 341-361. ISSN 1759-5916

Nakano, V M (2008) A design assessment system to protect buildings from internal chemical and biological threats. PhD thesis, Purdue University, USA.

Nam, C H (1990) The process of product innovation in the building and heavy sectors of the U.S. construction industry. PhD thesis, Stanford University, USA.

Nam, T-J (2001) Investigations of collaborative design environments: a framework for real-time collaborative 3D CAD. PhD thesis, Brunel University, UK.

Namini, Seyed Saeed Banihashemi (2017) Active BIM with artifical intelligence for energy optimisation in buildings. PhD thesis, University of Technology Sydney, Australia.

Naoum, S and Haidar, A L I (2000) A hybrid knowledge base system and genetic algorithms for equipment selection. Engineering, Construction and Architectural Management, 7(1), pp. 3-14. ISSN 0969-9988

Naoum, S G (1989) An investigation into the performance of management contracts and the traditional methods of building procurement. PhD thesis, Brunel University, UK.

Naoum, S G (1994) Critical analysis of time and cost of management and traditional contracts. Journal of Construction Engineering and Management, 120(4), pp. 687-705. ISSN 0733-9364

Naoum, S G and Mustapha, F H (1995) Relationship between the building team, procurement methods and project performance. Journal of Construction Procurement, 1(1), pp. 50-63. ISSN 1358-9180

Narain, V (2021) Building the resilience of periurban communities to the impacts of climate change and urbanization. International Journal of Disaster Resilience in the Built Environment, 12(1), pp. 115-125. ISSN 1759-5916

Nasir, D; McCabe, B and Hartono, L (2003) Evaluating risk in construction-schedule model (ERIC-S): Construction schedule risk model. Journal of Construction Engineering and Management, 129(5), pp. 518-527. ISSN 0733-9364

Nasirzadeh, F; Carmichael, D G; Jarban, M J and Rostamnezhad, M (2019) Hybrid fuzzy-system dynamics approach for quantification of the impacts of construction claims. Engineering, Construction and Architectural Management, 26(7), pp. 1261-1276. ISSN 0969-9988

Nasirzadeh, F; Kabir, H M D; Akbari, M; Khosravi, A; Nahavandi, S and Carmichael, D G (2020) ANN-based prediction intervals to forecast labour productivity. Engineering, Construction and Architectural Management, 27(9), pp. 2335-2351. ISSN 0969-9988

Nasr, E B (2005) An integrated project planning and control system approach for measuring project performance. PhD thesis, University of Colorado at Boulder, USA.

Nasri, E; Pegels, G; Mostofinejad, D and Chini, A (2010) International transfer of CAD/CAM construction technologies: Case study of a German-Iranian partnership. International Journal of Construction Management, 10(2), pp. 71-92. ISSN 1562-3599

Nassar, N and AbouRizk, S (2016) Introduction to techniques for resolving project performance contradictions. Journal of Construction Engineering and Management, 142(8): 4016027, ISSN 0733-9364

Nassri, S; Talebi, S; Elghaish, F; Koohestani, K; McIlwaine, S; Hosseini, M R; Poshdar, M and Kagioglou, M (2023) Labor waste in housing construction projects: An empirical study. Smart and Sustainable Built Environment, 12(2), pp. 325-340. ISSN 2046-6099

Nauman, R A (1999) The United States air force academy: A case study of rhetoric and reality in the making of modernism. PhD thesis, University of New Mexico, USA.

Naumets, S; Lu, M and Ali, M (2022) Project schedule development under environment-induced time-window constraints: Case of constructing river-crossing bridge in remote Northern region. Journal of Construction Engineering and Management, 148(12): 04022129, ISSN 0733-9364

Navon, R and Haskaya, I (2006) Is detailed progress monitoring possible without designated manual data collection? Construction Management and Economics, 24(12), pp. 1225-1229. ISSN 1466433X

Nawarathna, A.; Alwan, Z.; Gledson, B. and Fernando, N. G. (2026) An early-stage embodied carbon assessment method for the Global South: Sri Lankan case study. Built Environment Project and Asset Management, pp. 1-16. ISSN 2044-124X

Nayyer, M I and Annamalai, T R (2024) Procuring authorities and project performance: A case study of PPP highway projects in India. Built Environment Project and Asset Management, 14(1), pp. 38-55. ISSN 2044-124X

Ndekugri, I; Silverio, A K and Mason, J (2024) Enforcing payment obligations under construction contracts by insolvency proceedings. Journal of Financial Management of Property and Construction, 29(3), pp. 372-387. ISSN 1366-4387

Ndekugri, I E (1986) Construction contract information management: an integrated systems approach. PhD thesis, Loughborough University, UK.

Ndoni, D and Elhag, T M S (2012) Improving project performance of PPP/PFI project-based organisations. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Ndulue, J C A (1985) Urban black adaptation and successful entrepreneurship in chicago: An extended case study of a black-owned and operated construction industry. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Nedaei, A; Seyednaghavi, M; Firouzfar, M and Zamani, N (2022) A comparative study of urban resilience in coping with the crisis in the metropolises of Tehran and Mashhad. International Journal of Disaster Resilience in the Built Environment, 13(1), pp. 51-71. ISSN 1759-5916

Neeraj, S; Mannakkara, S and Wilkinson, S (2020) Build back better concepts for resilient recovery: A case study of India's 2018 flood recovery. International Journal of Disaster Resilience in the Built Environment, 12(3), pp. 280-294. ISSN 1759-5916

Negahban, S (2008) Utilization of enterprise resource planning tools by small to medium size construction organizations: A decision-making model. PhD thesis, University of Maryland, College Park, USA.

Negreiros, Iara (2018) Urban retrofitting an approach to support decision-making. PhD thesis, Universidade de São Paulo, Brazil.

Nelson, T N T; Poleacovschi, C; Appelgate, M; Drake, R; Swalwell, K; Jackson, C; Svec, J and Cetin, K (2024) Making social justice central to construction engineering: Testing interventions for educating reflexive engineers. Journal of Construction Engineering and Management, 150(10): 04024122, ISSN 0733-9364

Nemati, M A and Rastaghi, Z (2024) Quality assessment of on-campus student housing facilities through a holistic post-occupancy evaluation (A case study of Iran). Architectural Engineering and Design Management, 20(4), pp. 719-740. ISSN 1745-2007

Nepal, M P (2011) Automated extraction and querying of construction-specific design features from a building information model. PhD thesis, University of British Columbia, Canada.

Nesan, L J (1997) A generic model for effective implementation of empowerment in construction contractor organisations. PhD thesis, University of Wolverhampton, UK.

Nesan Lenin, J (2011) Integrated e-bidding framework for construction. International Journal of Construction Education and Research, 7(4), pp. 243-258. ISSN 1557-8771

Neshat, N; Hadian, H and Rahimi Alangi, S (2020) Technological learning modelling towards sustainable energy planning. Journal of Engineering, Design and Technology, 18(1), pp. 84-101. ISSN 1726-0531

Ness, K (2013) Constructing craft identities: discourses of skill and identity in the building trades. PhD thesis, University of Reading, UK.

Neves, J C and Bugalho, A (2008) Coordination and control in emerging international construction firms. Construction Management and Economics, 26(1), pp. 3-13. ISSN 1466433X

Neya, I; Yamegueu, D; Messan, A; Coulibaly, Y; Ouedraogo, A L S N and Ayite, Y M X D (2025) Effect of cement and geopolymer stabilization on the thermal comfort: Case study of an earthen building in Burkina Faso. International Journal of Building Pathology and Adaptation, 43(3), pp. 283-301. ISSN 2398-4708

Ng, Y. Y.; Ma, Q. and Yam, M. C. H. (2026) Optimizing subcontractor selection: A dual-model AHP framework for aligning client and contractor priorities in construction. Journal of Engineering, Design and Technology, 24(4), pp. 869-893. ISSN 1726-0531

Ng, A and Loosemore, M (2006) Risk allocation in public private partnership (PPP) projects: The new southern railway project. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Ng, C-W V (2007) Managing power, conflict and change: an analytical model for construction contract procurement. PhD thesis, University of Hong Kong, Hong Kong.

Ng, M F; Tummala, V M R and Yam, R C M (2003) A risk-based maintenance management model for toll road/tunnel operations. Construction Management and Economics, 21(5), pp. 495-510. ISSN 01446193

Ng, M S; Graser, K and Hall, D M (2023) Digital fabrication, BIM and early contractor involvement in design in construction projects: A comparative case study. Architectural Engineering and Design Management, 19(1), pp. 39-55. ISSN 1745-2007

Ng, Ming Shan (2022) Design for digital fabrication (dfdfab): Management for sustainable adoption of emerging technologies and innovations. PhD thesis, ETH Zürich, Switzerland.

Ng, S T and Wong, Y M W (2006) Adopting non-privately funded public-private partnerships in maintenance projects: A case study in Hong Kong. Engineering, Construction and Architectural Management, 13(2), pp. 186-200. ISSN 0969-9988

Ng, S T and Wong, Y M W (2007) Payment and audit mechanisms for non private-funded PPP-based infrastructure maintenance projects. Construction Management and Economics, 25(9), pp. 915-923. ISSN 1466433X

Ng, S T; Xie, J and Kumaraswamy, M M (2010) Simulating the effect of risks on equity return for concession-based public-private partnership projects. Engineering, Construction and Architectural Management, 17(4), pp. 352-368. ISSN 0969-9988

Ng, S T; Zheng, D X M and Xie, J Z (2013) Allocation of construction resources through a pull-driven approach. Construction Innovation, 13(1), pp. 77-97. ISSN 1471-4175

Ngowi, A B (1997) A hybrid approach to house construction: a case study in Botswana. Building Research & Information, 25(3), pp. 142-147. ISSN 0961-3218

Ngowi, A B; Iwisi, D S and Mushi, R J (2002) Competitive strategy in a context of low financial resources. Building Research & Information, 30(3), pp. 205-211. ISSN 0961-3218

Ngowi, A B and Pienaar, E (2005) Trust factor in construction alliances. Building Research & Information, 33(3), pp. 267-278. ISSN 0961-3218

Ngowtanasuwan, G and Hadikusumo, B H W (2017) System dynamics modelling for BIM adoption in Thai architectural and engineering design industry. Construction Innovation, 17(4), pp. 457-474. ISSN 1471-4175

Nguyen, T. T.; Do, S. T. and Nguyen, V. T. (2025) Investigating cause-effect relationships among barriers to circular economy adoption in construction: A case study in Vietnam. Construction Innovation, 26(5), pp. 1556-1581. ISSN 1471-4175

Nguyen, V N; Peansupap, V and Tongthong, T (2025) Complexity measurement framework for change orders in construction projects: Case study of Vietnam. Journal of Engineering, Design and Technology, 23(6), pp. 2082-2104. ISSN 1726-0531

Nguyen, A; Mollik, A and Chih, Y Y (2018) Managing critical risks affecting the financial viability of public-private partnership projects: Case study of toll road projects in Vietnam. Journal of Construction Engineering and Management, 144(12): 05018014, ISSN 0733-9364

Nguyen, D C; Nguyen, T Q; Jin, R; Jeon, C H and Shim, C S (2022) BIM-based mixed-reality application for bridge inspection and maintenance. Construction Innovation, 22(3), pp. 487-503. ISSN 1471-4175

Nguyen, D M; Ding, G and Runeson, G (2020) Energy and economic analysis of environmental upgrading of existing office buildings. Construction Economics and Building, 20(4), pp. 82-102. ISSN 2204-9029

Nguyen, D T; Doan, D T V; Tran, N N C and Tran, D H (2023) A novel multiple objective whale optimization for time-cost-quality tradeoff in non-unit repetitive projects. International Journal of Construction Management, 23(5), pp. 843-854. ISSN 1562-3599

Nguyen, Dinh Manh (2017) Maintenance practices: Improving sustainability performance of existing office buildings: An Australian case study. PhD thesis, University of Technology Sydney, Australia.

Nguyen, H D; Nguyen, L D; Chih, Y Y and Le-Hoai, L (2017) Influence of participants' characteristics on sustainable building practices in emerging economies: Empirical case study. Journal of Construction Engineering and Management, 143(8): 05017014, ISSN 0733-9364

Nguyen, H V (2010) Process-based cost modeling to support target value design. PhD thesis, University of California, Berkeley, USA.

Nguyen, Hong Trang (2018) Formulating supportive instruments for green building development in Vietnam. PhD thesis, Queensland University of Technology, Australia.

Nguyen, L D and Ibbs, W (2008) Flora: New forensic schedule analysis technique. Journal of Construction Engineering and Management, 134(7), pp. 483-491. ISSN 0733-9364

Nguyen, L D and Ibbs, W (2010) Case law and variations in cumulative impact productivity claims. Journal of Construction Engineering and Management, 136(8), pp. 826-833. ISSN 0733-9364

Nguyen, L D and Nguyen, H T (2013) Relationship between building floor and construction labor productivity a case of structural work. Engineering, Construction and Architectural Management, 20(6), pp. 563-575. ISSN 0969-9988

Nguyen, L D and Tran, D Q (2021) Measurement of fuzzy membership functions in construction risk assessment. Journal of Construction Engineering and Management, 147(4): 04021005, ISSN 0733-9364

Nguyen, L d (2007) The dynamics of float, logic, resource allocation, and delay timing in forensic schedule analysis and construction delay claims. PhD thesis, University of California, Berkeley, USA.

Nguyen, Loi (2018) Management innovation: Case study of balanced scorecard implementation in Vietnam. PhD thesis, University of Minnesota, USA.

Nguyen, M V (2024) Barriers to innovation in construction organizations of different sizes: A case study in Vietnam. Engineering, Construction and Architectural Management, 31(11), pp. 4209-4235. ISSN 0969-9988

Nguyen, N T H and Dang, H T (2020) Adaptation of "participatory method" in design "for/with/by" the poor community in Tam Thanh, Quang Nam, Vietnam. Smart and Sustainable Built Environment, 9(3), pp. 272-282. ISSN 2046-6099

Nguyen, P H D and Tran, D (2024) Exploring the use of quality control plans for alternative contracting methods in highway projects. Journal of Construction Engineering and Management, 150(5): 04024030, ISSN 0733-9364

Nguyen, T; Chileshe, N; Ho, D T; Nguyen, V T and Tran, Q P (2024) Significant risks that trigger cost overruns and delays in urban rail projects: A typical case study of Vietnam. Built Environment Project and Asset Management, 14(2), pp. 278-295. ISSN 2044-124X

Nguyen, T; Gosine, R and Warrian, P (2022) A review of the role of digitalization in health risk management in extractive industries: a study motivated by COVID-19. Journal of Engineering, Design and Technology, 20(2), pp. 475-496. ISSN 1726-0531

Nguyen, T; Tran, Q P; Chileshe, N; Thao Huynh, T Y and Hallo, L (2024) Risk prioritization using analytic process network for metro rail implementation projects in developing countries: A typical case study of Vietnam. International Journal of Construction Management, 24(10), pp. 1077-1089. ISSN 1562-3599

Nguyen, T A; Do, S T; Le-Hoai, L; Nguyen, V T and Pham, T A (2023) Practical workflow for cultural heritage digitalization and management: A case study in Vietnam. International Journal of Construction Management, 23(13), pp. 2305-2319. ISSN 1562-3599

Nguyen, T A; Do, S T; Nguyen, V T; Khuc, T Q and Quach, Q T (2024) Essential strategies for embracing building information modeling (BIM) in public investment projects: A case study in Vietnam. International Journal of Construction Management, 24(15), pp. 1708-1718. ISSN 1562-3599

Nguyen, T A; Le, N M U; Nguyen, S H and Ngo, N V (2024) Determining the Frequency of Component with Building Information Modelling-Level of Development in Facility Management: A Case Study in Vietnam. Journal of Construction in Developing Countries, 29(2), pp. 157-180. ISSN 1823-6499

Nguyen, T H D; Chileshe, N and Rameezdeen, R (2018) External stakeholder strategic actions in construction projects: A Vietnamese study. Construction Management and Economics, 36(8), pp. 443-458. ISSN 01446193

Nguyen, T H D; Chileshe, N; Rameezdeen, R and Wood, A (2019) Stakeholder influence pathways in construction projects: Multicase study. Journal of Construction Engineering and Management, 145(9): 05019011, ISSN 0733-9364

Nguyen, V T; Do, S T; Tran, C N N and Aung, Z M (2025) Developing a Bayesian belief network model for quantifying and predicting claim causes-related schedule delays. International Journal of Construction Management, 25(1), pp. 32-45. ISSN 1562-3599

Nguyen, V T; Do, S T; Tran, C N N and Vo, M D (2024) Assessing the impact of the traits of payment delay causes on subcontractor's business performance in construction projects: A case study in Vietnam. International Journal of Construction Management, 24(11), pp. 1259-1269. ISSN 1562-3599

Nguyen Ngoc, H; Mohammed Abdelkader, E; Al-Sakkaf, A; Alfalah, G and Zayed, T (2024) A hybrid AHP-MAUT model for assessing competitiveness of construction companies: A case study of construction companies in Vietnam and Canada. Construction Innovation, 24(5), pp. 1320-1353. ISSN 1471-4175

Nguyen Van, D; Le Dinh, T and Tran, H-B (2022) Assessing stakeholder satisfaction in PPP transport projects in developing countries: Evidence from Vietnam. Built Environment Project and Asset Management, 12(2), pp. 309-324. ISSN 2044-124X

Nibbelink, J-G; Sutrisna, M and Zaman, A U (2017) Unlocking the potential of early contractor involvement in reducing design risks in commercial building refurbishment projects: a Western Australian perspective. Architectural Engineering and Design Management, 13(6), pp. 439-456. ISSN 1745-2007

Nicol, L A (2011) The role of institutional regimes in motivating change for sustainable housing. Building Research & Information, 39(5), pp. 459-472. ISSN 0961-3218

Nie, P; Dahanayake, K C and Sumanarathna, N (2024) Exploring uae's transition towards circular economy through construction and demolition waste management in the pre-construction stage–a case study approach. Smart and Sustainable Built Environment, 13(2), pp. 246-266. ISSN 2046-6099

Nielsen, Y; Bouchlaghem, D; Koseoglu, O O; Erdogan, B and Anumba, C J (2006) Integration of visualisation & mobile technologies in construction. Journal of Construction Research, 7(1), pp. 227-246. ISSN 1609-9451

Nielsen, Y and Sayar, T (2001) Web-based information flow modelling in construction. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Nik Bakht, M (2015) Analyzing social network discussions of infrastructure projects: towards a bottom-up decision making environment. PhD thesis, University of Toronto, Canada.

Nikellis, A (2019) Risk-informed decision making for civil infrastructure subjected to single and multiple hazards. PhD thesis, State University of New York at Buffalo, USA.

Nikolic, D; Castronovo, F and Leicht, R (2021) Teaching BIM as a collaborative information management process through a continuous improvement assessment lens: A case study. Engineering, Construction and Architectural Management, 28(8), pp. 2248-2269. ISSN 0969-9988

Nikou, T and Klotz, L (2014) Application of multi-attribute utility theory for sustainable energy decisions in commercial buildings: A case study. Smart and Sustainable Built Environment, 3(3), pp. 207-222. ISSN 2046-6099

Nilsson Vestola, E and Eriksson, P E (2023) Engineered and emerged collaboration: Vicious and virtuous cycles. Construction Management and Economics, 41(1), pp. 79-96. ISSN 01446193

Nilsson Vestola, E; Larsson, J and Hedgren, E (2025) Public clients pursue innovation, but what's going on at the project level? A case study of infrastructure operation and maintenance. Construction Management and Economics, 43(1), pp. 26-39. ISSN 0144-6193

Nima, M A; Abdul-Kadir, M R; Jaafar, M S and Alghulami, R G (2002) Constructability concepts in west port highway in Malaysia. Journal of Construction Engineering and Management, 128(4), pp. 348-356. ISSN 0733-9364

Nima, M A; Abdul-Kadir, M R; Jaafar, M S and Alghulami, R G (2004) Constructability concepts in Kuala Selangor cable-stayed bridge in Malaysia. Journal of Construction Engineering and Management, 130(3), pp. 315-321. ISSN 0733-9364

Ninan, J; Mantha, B R K and Kesavan, B (2025) Human-centred cybersecurity for critical infrastructure: The case of the Florida water plant hack. Engineering, Construction and Architectural Management, 32(13), pp. 547-569. ISSN 0969-9988

Ninan, J; Zaharia, A and Bosch-Rekveldt, M (2026) How digital platforms enable sustainability transitions in the built environment. Construction Management and Economics, 44(4), pp. 300-317. ISSN 0144-6193

Ninan, Johan (2019) External stakeholder management strategies in infrastructure megaprojects: An organizational power perspective. PhD thesis, University of Technology Sydney, Australia.

Nipun, M W H; Ashik-Ur-Rahman, M; Rikta, S Y; Parven, A and Pal, I (2024) Rooftop rainwater harvesting for sustainable water usage in residential buildings for climate resilient city building: Case study of Rajshahi, Bangladesh. International Journal of Disaster Resilience in the Built Environment, 15(1), pp. 80-100. ISSN 1759-5916

Nitithamyong, P (2003) Analysis of success and failure factors in application of web-based project management systems in construction. PhD thesis, Purdue University, USA.

Nitithamyong, P and Skibniewski, M J (2011) Success factors for the implementation of web-based construction project management systems: A cross-case analysis. Construction Innovation, 11(1), pp. 14-42. ISSN 1471-4175

Niu, J (2014) Ontology-based semantic interpretation framework for legal analysis of construction claims. PhD thesis, University of Florida, USA.

Niu, M (2017) Developing a process to measure safety climate under the aconstruction working environment. PhD thesis, Pennsylvania State University, USA.

Niu, Y; Anumba, C and Lu, W (2019) Taxonomy and deployment framework for emerging pervasive technologies in construction projects. Journal of Construction Engineering and Management, 145(5): 04019028, ISSN 0733-9364

Nkado, R N and Mbachu, J I (2001) Modelling client needs and satisfaction in the built environment. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Nkeleme, E I; Mbamali, I and Shakantu, W (2022) A measure of combustion-generated pollutants in university laboratories and their effects on the indoor air quality. Journal of Construction Business and Management, 5(2), pp. 44-53. ISSN 2521-0165

Nnaji, C; Gambatese, J; Karakhan, A and Osei-Kyei, R (2020) Development and application of safety technology adoption decision-making tool. Journal of Construction Engineering and Management, 146(4): 04020028, ISSN 0733-9364

Nnaji, C; Lee, H W; Karakhan, A and Gambatese, J (2018) Developing a decision-making framework to select safety technologies for highway construction. Journal of Construction Engineering and Management, 144(4): 04018016, ISSN 0733-9364

Noakes, J D (2005) Under the radar: Defence Construction (1951) Limited and military infrastructure in Canada, 1950–1965. PhD thesis, Carleton University, Canada.

Nobe, M C and Greenwell, C (2016) Moving operations and maintenance practices of existing buildings beyond sustainability: A case study of the lenses framework during post occupancy. International Journal of Construction Education and Research, 12(2), pp. 122-141. ISSN 1557-8771

Noganta, A (2019) Key challenges faced by main contractors in coordinating the works of their subcontractors: A case study of kusile power station project. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Noia, Paula Regina da Cruz (2017) Participation and quality of the environment built in housing: Process and product in the program minha casa minha vida: Entities. PhD thesis, Universidade de São Paulo, Brazil.

Noktehdan, M; Shahbazpour, M; Zare, M R and Wilkinson, S (2019) Innovation management and construction phases in infrastructure projects. Journal of Construction Engineering and Management, 145(2): 04018135, ISSN 0733-9364

Nolla, Ieda Maria (2023) HBIM in the management of cultural assets. PhD thesis, Universidade de São Paulo, Brazil.

Noller, Hanna and Tarik, Ayat (2025) The importance of multi-roles and code-switching in living labs. Buildings & Cities, 6(1), pp. 952-968. ISSN 2632-6655

Noopur (2025) Identifying the stressors hindering performance in the Indian construction industry: An empirical investigation. Engineering, Construction and Architectural Management, 32(2), pp. 1053-1073. ISSN 0969-9988

Noor, Muhammad Ali (2012) Investigating the role of procurement practices in effective implementation of infrastructure projects in a developing country: A case of Pakistan. PhD thesis, RMIT University, Australia.

Noorizadeh, A; Rashidi, K and Peltokorpi, A (2018) Categorizing suppliers for development investments in construction: Application of DEA and rfm concept. Construction Management and Economics, 36(9), pp. 487-506. ISSN 01446193

Nordin, F; Christina, O; Kollberg, B and Nord, T (2010) Building a new supply chain position: An exploratory study of companies in the timber housing industry. Construction Management and Economics, 28(10), pp. 1071-1083. ISSN 1466433X

Noshadravan, A; Miller, T R and Gregory, J G (2017) A lifecycle cost analysis of residential buildings including natural hazard risk. Journal of Construction Engineering and Management, 143(7): 04017017, ISSN 0733-9364

Nosheen, A (2022) Development of an effective claim management framework for the UK construction industry. PhD thesis, Coventry University, UK.

Nouri, H; Safehian, M and Mir Mohammad Hosseini, S M (2023) Life cycle assessment of earthen materials for low-cost housing a comparison between rammed earth and fired clay bricks. International Journal of Building Pathology and Adaptation, 41(2), pp. 364-377. ISSN 23984708

Novak, V M (2012) Managing sustainability value in design: A systems approach. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Novak, V M (2014) Design management of sustainability values: A learning organization perspective. Architectural Engineering and Design Management, 10(3-4), pp. 218-232. ISSN 1745-2007

Novak, V M; Fernandez-Anez, N and Shiraishi, K (2017) Rethinking resilience planning: From problems to potential. International Journal of Disaster Resilience in the Built Environment, 8(4), pp. 412-424. ISSN 1759-5916

Nowbati, B (2011) Visual information and knowledge representation in organisations. EngD thesis, Loughborough University, UK.

Ntiyakunze, S K (2011) Conflicts in building projets in Tanzania: Analysis of causes and management approaches. PhD thesis, KTH Royal Institute of Technology, Sweden.

Ntshwene, K (2019) The transition to sustainable construction in Botswana: a multi-level perspective. PhD thesis, University of Reading, UK.

Nwadigo, O (2019) Real-time and dynamic planning and scheduling under disruption using multi-hybrid simulation and optimisation. PhD thesis, Auckland University of Technology, New Zealand.

Nwadigo, O; Naismith, N N; Ghaffarianhoseini, A; Ghaffarian Hoseini, A and Tookey, J (2021) Dynamic Bayesian network modelling for predicting adaptability of time performance during time influencing factors disruptions in construction enterprise. Engineering, Construction and Architectural Management, 28(10), pp. 2994-3013. ISSN 0969-9988

Nwankwo, D C (2023) Improving approaches to material inventory management in construction industry in the UK. DBA thesis, University of Wales Trinity Saint David, UK.

Nwaogu, J M and Chan, A P C (2021) Evaluation of multi-level intervention strategies for a psychologically healthy construction workplace in Nigeria. Journal of Engineering, Design and Technology, 19(2), pp. 509-536. ISSN 1726-0531

Nwazota, A (2023) Special purpose vehicle for infrastructure project financing through public private partnerships: the answer to infrastructure problems in developing countries? PhD thesis, University of Manchester, UK.

Nwodo, M N (2020) Investigation of exergy-based life cycle assessment of buildings. PhD thesis, University of Florida, USA.

Nyakaana Blair, A M A (1999) Risk analysis of cost and schedule of complex engineering systems. PhD thesis, University of Maryland, College Park, USA.

Nyalungu, Jey; Mbona, Sizwe; Ogunsola, Sijuwade and Sibuyi, Venus (2026) The effectiveness of supply chain management in enhancing project management outcomes. Journal of Construction Business and Management, 8(2), pp. 54-64. ISSN 2521-0165

Nyqvist, R; Peltokorpi, A; Lavikka, R and Ainamo, A (2025) Artificial intelligence driven platforms in the construction industry: Implications for companies' business models. Construction Innovation, 25(7), pp. 409-443. ISSN 1471-4175

Nyqvist, R; Peltokorpi, A; Lavikka, R and Ainamo, A (2025) Building the digital age: Management of digital transformation in the construction industry. Construction Management and Economics, 43(4), pp. 262-283. ISSN 0144-6193

Nystrom, J (2006) The naivety of partnering assessments. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Nørkjaer Gade, P; Nørkjaer Gade, A; Otrel-Cass, K and Svidt, K (2019) A holistic analysis of a BIM-mediated building design process using activity theory. Construction Management and Economics, 37(6), pp. 336-350. ISSN 01446193

O'Brien, S (2022) Critical infrastructure organisation management: an analysis of the transition to the Industry 4.0 era. PhD thesis, University of Cambridge, UK.

O'Connor, J T and Mock, B (2020) Responsibilities and accountabilities for industrial facility commissioning and startup activities. Construction Innovation, 20(4), pp. 625-645. ISSN 1471-4175

O'Connor, J T; O'Brien, W J and Choi, J O (2015) Standardization strategy for modular industrial plants. Journal of Construction Engineering and Management, 141(9): 4015026, ISSN 0733-9364

O'Connor, L A (2003) A socio-technical analysis of the standards based apprenticeship in Ireland: a case study of the construction industry. EdD thesis, University of Leicester, UK.

O'Connor, M G (2016) Labour market institutions in the Brazilian variety of capitalism since 2003: Evidence from the construction industry. PhD thesis, University of York, UK.

O'Hegarty, R; McCarthy, A; O'hagan, J; Thanapornpakornsin, T; Raffoul, S and Kinnane, O (2025) Understanding the embodied carbon credentials of modern methods of construction. Buildings & Cities, 6(1), pp. 70-89. ISSN 2632-6655

O'Neill, T; Spillane, J P and Carmody, S (2022) The composition and classification of interpersonal conflict in Irish construction small and medium-sized enterprises: A case study. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Obi, L I (2017) Development of a system model for cost management in low-cost housing projects in Nigeria. PhD thesis, University of Salford, UK.

Obi, L I; Omotayo, T; Ekundayo, D and Oyetunji, A K (2024) Enhancing BIM competencies of built environment undergraduates students using a problem-based learning and network analysis approach. Smart and Sustainable Built Environment, 13(1), pp. 217-238. ISSN 2046-6099

Obieje, I D (2019) Improving the achievement of value for money in construction procurement under the Nigerian Public Procurement Act (2007). PhD thesis, University of Salford, UK.

Obiozo, R N (2018) The role of psychosocial recuperative therapy in enhancing construction performance on projects. PhD thesis, Nelson Mandela University, South Africa.

Obiozo, R N and Smallwood, J J (2015) Biophilic construction site model: Enhancing the motivational and humanistic value of the green construction site. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Obiri, K A; Bjeirmi, B; Moore, D and Boateng, P (2020) Infrastructure development in the West African extractive industry: A system thinking approach. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Obonyo, E (2012) Developing enhanced, lignocellulosic fibre reinforcement for low-cost, cementitious, construction materials. Architectural Engineering and Design Management, 8(1), pp. 30-41. ISSN 1745-2007

Ochiai, C (2022) Windbreak stonewalls in a mountainous village of Japan: A case study of tsuchigoya in hongu-cho, tanabe city. International Journal of Disaster Resilience in the Built Environment, 13(2), pp. 197-210. ISSN 1759-5916

Ochoa Franco, L A (2004) Life cycle assessment of residential buildings. PhD thesis, Carnegie Mellon University, USA.

Ock, J-H (1998) Integrated decision process model (idepm) for the development of the build-operate-transfer (bot) highway project proposals. PhD thesis, University of Colorado at Boulder, USA.

Odebode, O M (2004) Consideration of investment risk in build operate transfer infrastructure projects in Africa: Lenders' perspective. PhD thesis, University of Reading, UK.

Odewole, A O (2020) Development of a collaborative innovation management framework to assist in the utilisation of agricultural waste as building materials in Nigeria. PhD thesis, University of Salford, UK.

Odeyinka, H; Lowe, J and Kaka, A (2012) Regression modelling of risk impacts on construction cost flow forecast. Journal of Financial Management of Property and Construction, 17(3), pp. 203-221. ISSN 1366-4387

Odeyinka, H A; Lowe, J and Kaka, A P (2013) Artificial neural network cost flow risk assessment model. Construction Management and Economics, 31(5), pp. 423-439. ISSN 01446193

Odimabo, O (2016) Risk management system to guide building construction projects in developing countries: a case study of Nigeria. PhD thesis, University of Wolverhampton, UK.

Ofosu, K (2010) An integrated approach to transportation infrastructure management. PhD thesis, Florida State University, USA.

Ogbeifun, E; Mbohwa, C and Pretorius, J H C (2018) Developing an effective renovation plan: The influence of data collection tools. International Journal of Building Pathology and Adaptation, 36(1), pp. 63-76. ISSN 23984708

Ogunbayo, B F; Ohis Aigbavboa, C; Thwala, W D and Akinradewo, O I (2022) Assessing maintenance budget elements for building maintenance management in Nigerian built environment: A Delphi study. Built Environment Project and Asset Management, 12(4), pp. 649-666. ISSN 2044-124X

Ogunbiyi, O E (2014) Implementation of the lean approach in sustainable construction: a conceptual framework. PhD thesis, University of Central Lancashire, UK.

Ogunkah, I (2015) Rethinking low-cost green building material selection process in the design of low-impact green housing developments. PhD thesis, University of Westminster, UK.

Ogunlana, S O; Li, H and Sukhera, F A (2003) System dynamics approach to exploring performance enhancement in a construction organization. Journal of Construction Engineering and Management, 129(5), pp. 528-536. ISSN 0733-9364

Ogunnusi, M; Salman, H and Laing, R (2023) TOPSIS analysis for sustainable redevelopment potential of abandoned infrastructure in Nigeria. Built Environment Project and Asset Management, 13(1), pp. 73-88. ISSN 2044-124X

Ogwang, A (2016) Threshold-based resurfacing policies in pavement management to minimize costs and greenhouse gas emissions. PhD thesis, UniversityofCalifornia, Berkeley, USA.

Ogwueleka, A C (2015) Evaluation of incentive mechanisms on performance-based contracting systems in South Africa and Nigeria. PhD thesis, University of Pretoria, South Africa.

Oh, E H; Deshmukh, A and Hastak, M (2010) Disaster impact analysis based on inter-relationship of critical infrastructure and associated industries: A winter flood disaster event. International Journal of Disaster Resilience in the Built Environment, 1(1), pp. 25-49. ISSN 1759-5916

Oh, E H; Naderpajouh, N; Hastak, M and Gokhale, S (2016) Integration of the construction knowledge and expertise in front-end planning. Journal of Construction Engineering and Management, 142(2): 04015067, ISSN 0733-9364

Ohtsu, N; Hokugo, A; Cruz, A M; Sato, Y; Araki, Y and Park, H (2023) Evacuation of vulnerable people during a Natech: A case study of a flood and factory explosion in Japan. International Journal of Disaster Resilience in the Built Environment, 14(1), pp. 53-67. ISSN 1759-5916

Ojghaz, A S and Heravi, G (2026) An integrated BIM-GIS framework for building quality assessment based on price estimation: Evaluating design and location factors. Journal of Construction Engineering and Management, 152(4): 04026020, ISSN 0733-9364

Ojiako, U; Maseko, L; Root, D; Venkatachalam, S; Marshall, A; AlRaeesi, E and Chipulu, M (2025) Design phase collaborative risk management factors: A case study of a green rating system in South Africa. Engineering, Construction and Architectural Management, 32(9), pp. 6268-6301. ISSN 0969-9988

Ojo, E O (2019) Project managers’ capacity-planning practices for infrastructure projects in qatar. PhD thesis, Walden University, USA.

Okafor, C C; Aigbavboa, C and Thwala, W D (2023) A Delphi approach to evaluating the success factors for the application of smart mobility systems in smart cities: A construction industry perspective. International Journal of Construction Management, 23(8), pp. 1289-1298. ISSN 1562-3599

Okakpu, A; Ghaffarianhoseini, A; Tookey, J; Haar, J; Ghaffarianhoseini, A and Rehman, A U (2022) Risk factors that influence adoption of building information modelling (BIM) for refurbishment of complex building projects: Stakeholders perceptions. International Journal of Construction Management, 22(13), pp. 2446-2458. ISSN 1562-3599

Okakpu, A I (2019) Investigating the effectiveness of adopting building information modelling for refurbishment of complex buildings: Case study of auckland. PhD thesis, Auckland University of Technology, New Zealand.

Oke, A E and Ogunsemi, D R (2016) Structural equation modelling of construction bond administration. Journal of Financial Management of Property and Construction, 21(3), pp. 192-211. ISSN 1366-4387

Okehielem, N (2011) A benchmark for impact assessment of affordable housing. PhD thesis, University of Wolverhampton, UK.

Okonkwo, P N and Wium, J (2020) Health and safety management systems within construction contractor organizations: Case study of South Africa. Journal of Construction Engineering and Management, 146(5): 05020003, ISSN 0733-9364

Okonta, U; Hosseinian-Far, A and Sarwar, D (2025) A systemic approach to sustainable railway infrastructure planning: The case study of milton keynes. Smart and Sustainable Built Environment, 14(2), pp. 407-428. ISSN 2046-6099

Okorafor, C; Emuze, F; Das, D; Awuzie, B O and Haupt, T (2020) An artefact for improving the delivery of building energy retrofit project in South Africa. Built Environment Project and Asset Management, 10(4), pp. 619-635. ISSN 2044-124X

Okoroh, M I; Goulding, J S and Walker, S (2006) Outsourcing local authorities housing stocks. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Okudan, O; Demirdöğen, G and Işık, Z (2025) A decision-support framework for suspension of public infrastructure projects: A combined use of neutrosophic AHP and TOPSIS. Engineering, Construction and Architectural Management, 32(5), pp. 3187-3216. ISSN 0969-9988

Okuwoga, A A (1994) Construction cost escalation and resource planning in Nigeria: A case study of public sector housing projects 1975-90. PhD thesis, University College London, UK.

Okwilagwe, O (2017) Collaboration processes in partnership working: local regeneration in Nigeria. PhD thesis, Bournemouth University, UK.

Olagunju, O A (2014) The development of a framework for sustainable housing delivery in Lagos, Nigeria. PhD thesis, University of Wolverhampton, UK.

Olaniyan, R (2019) Barriers to technology adoption among construction project managers in Nigeria. PhD thesis, Walden University, USA.

Olanrewaju, A A and Anavhe, P J (2014) Perceived claim sources in the Nigerian construction industry. Built Environment Project and Asset Management, 4(3), pp. 281-295. ISSN 2044-124X

Olatunji, A; Adama, U; Adoga, A; Ojetunde, I; Adewale, S and Nwuba, C C (2020) Valuing an underperforming agricultural entity in Minna, Nigeria as a specialised property. African Journal of Built Environment Research, 4(1), pp. 97-115. ISSN 2414-0236

Olawumi, T O and Chan, D W M (2021) Green-building information modelling (green-BIM) assessment framework for evaluating sustainability performance of building projects: A case of Nigeria. Architectural Engineering and Design Management, 17(5-6), pp. 458-477. ISSN 1745-2007

Olawumi, T O and Chan, D W M (2022) Developing project evaluation models for smart sustainable practices implementation in construction projects: A comparative study between Nigeria and Hong Kong. Engineering, Construction and Architectural Management, 29(3), pp. 1522-1552. ISSN 0969-9988

Olbina, S and Beliveau, Y (2009) Developing a transparent shading device as a daylighting system. Building Research & Information, 37(2), pp. 148-163. ISSN 0961-3218

Olearczyk, J (2010) Crane lifting operation planning and lifted object spatial trajectory analysis. PhD thesis, University of Alberta, Canada.

Oliomogbe, G O (2017) The investigation of the generation of intangible benefits through project management. PhD thesis, University of Leeds, UK.

Oliva, Carolina Asensio (2019) Target value design in the real estate market with units for sale: Model and guidelines for implementation. PhD thesis, Universidade Estadual de Campinas, Brazil.

Oliveira, L A and Melhado, S B (2011) Conceptual model for the integrated design of building façades. Architectural Engineering and Design Management, 7(3), pp. 190-204. ISSN 1745-2007

Oliveira, Nylvandir Liberato Fernandes de (2018) Risk analysis in civil construction projects in Brazil: A measurement method. PhD thesis, Universidade Federal Fluminense, Brazil.

Oliveira, Otávio José de (2005) Management model for small building design firms. PhD thesis, Universidade de São Paulo, Brazil.

Oliver, A and Pearl, D S (2018) Rethinking sustainability frameworks in neighbourhood projects: A process-based approach. Building Research & Information, 46(5), pp. 513-527. ISSN 0961-3218

Oliveros-Romero, J and Paton-Cole, V P (2023) Infrastructure development: Reflections on Sierra Leone infrastructure scheme and the lungi bridge project. Journal of Financial Management of Property and Construction, 28(1), pp. 127-144. ISSN 1366-4387

Olivieri, H; Seppänen, O and Denis Granja, A (2018) Improving workflow and resource usage in construction schedules through location-based management system (LBMS). Construction Management and Economics, 36(2), pp. 109-124. ISSN 01446193

Olivieri, Hylton (2016) Integrating production planning and controlling systems for construction projects. PhD thesis, Universidade Estadual de Campinas, Brazil.

Oloo, J O and Omondi, P (2017) Strengthening local institutions as avenues for climate change resilience. International Journal of Disaster Resilience in the Built Environment, 8(5), pp. 573-588. ISSN 1759-5916

Olopade, J O (2020) Qualitative comparative analysis of causal pathways to successful construction cross-functional teams. PhD thesis, University of Florida, USA.

Olugboyega, O; Oseghale, G E and Aigbavboa, C (2023) Multiple holistic case study of project-level building information modelling (BIM) adoption in Nigeria. Construction Innovation, 23(3), pp. 567-586. ISSN 1471-4175

Oluikpe, P (2007) Knowledge management in development projects. PhD thesis, Loughborough University, UK.

Olukayode, Olukemi Temitope (2020) Sustainable construction compliance: Recommending a transformational leader for sustainability policies supervision in the United States construction industry. DBA thesis, Northcentral University, USA.

Oluwayemi, O (2021) Retrofitting Sustainable Drainage Systems (SUDS) in public buildings in the UK: a cost benefit analysis model. PhD thesis, Birmingham City University, UK.

Omar, B (2012) Context-aware services delivery in the construction supply chain. PhD thesis, University of Reading, UK.

Omar, H (2020) Towards an automated photogrammetry-based approach for monitoring and controlling construction site activities. PhD thesis, University of the West of England, Bristol, UK.

Omar, H and Dulaimi, M (2023) Solutions for effective diffusion of BIM for BIM late adopters: Case study of UAE AEC industry. International Journal of Construction Management, 23(9), pp. 1484-1493. ISSN 1562-3599

Omar, I and Makhlomo, S (2003) Energy alternatives for water pumping in rural areas: Using a case study approach. Journal of Engineering, Design and Technology, 1(1), pp. 1-14. ISSN 1726-0531

Omar, I and Mncwango, S (2005) Sanitary landfill energy harnessing and applications. Journal of Engineering, Design and Technology, 3(2), pp. 127-139. ISSN 1726-0531

Omar, M R; Ayob, A; Zakaria, M H; Rahim, N S A; Mokhtar, H; Rani, H A and Rahman, F A (2023) Perspective of construction building professionals on low-carbon materials in Malaysia. Journal of Construction in Developing Countries, 28(2), pp. 139-162. ISSN 1823-6499

Omar, N (2022) Enhancing agile application in construction projects using BIM. PhD thesis, Heriot-Watt University, UK.

Omar Attallah, S; Senouci, A; Kandil, A and al-Derham, H (2013) Utilization of life-cycle analysis to evaluate sustainability rating systems for construction projects with a case study on qatar sustainability assessment system (qsas). Smart and Sustainable Built Environment, 2(3), pp. 272-287. ISSN 2046-6099

Omaran, S M (2021) Improving leadership and decision-making skills of construction project managers through the development and use of simulation model and framework. PhD thesis, Western Michigan University, USA.

Omollo, W O (2019) Barriers to the effective regulation of the building construction industry: An empirical analysis. Journal of Construction Business and Management, 3(2), pp. 49-58. ISSN 2521-0165

Omoregie, A (2006) Blueprints for infrastructure and service delivery in Sub-Saharan Africa. PhD thesis, De Montfort University, UK.

Onalaja, A A (2023) Improving costing in infrastructure projects to accommodate uncertainties. PhD thesis, Northumbria University, UK.

Ong, A T (1994) Strategic development of firms in the dynamic business environment: a case on the construction industry in Singapore. Unpublished PhD thesis, Curtin University of Technology, Australia.

Ong, H Y; Wang, C and Zainon, N (2018) Developing a quality-embedded EVM tool to facilitate the iron triangle in architectural, construction, and engineering practices. Journal of Construction Engineering and Management, 144(9): 04018079, ISSN 0733-9364

Ong, J (2019) Enabling lean through using shared mental models for precast construction in Singapore. PhD thesis, National University of Singapore, Singapore.

Ongkowijoyo, C and Doloi, H (2017) Determining critical infrastructure risks using social network analysis. International Journal of Disaster Resilience in the Built Environment, 8(1), pp. 5-26. ISSN 1759-5916

Ono, Eikichi (2025) Occupant-centric design for functional and thermal zoning at activity-based workspaces. PhD thesis, National University of Singapore, Singapore.

Onukwugha, V C (1991) Optimising the constructional and technological aspects of management for mass housing schemes in Nigeria. PhD thesis, University of Lagos, Nigeria.

Onyido, T B C; Boyd, D and Thurairajah, N (2016) Developing SMEs as environmental businesses. Construction Innovation, 16(1), pp. 30-45. ISSN 1471-4175

Oo, B L; Nguyen, A T; Ahn, Y and Lim, B T H (2025) Predicting the number of bidders in construction competitive bidding using explainable machine learning models. Construction Innovation, 25(7), pp. 158-188. ISSN 1471-4175

Opdyke, A (2017) Resilient and sustainable infrastructure systems: A comparative analysis of post-disaster shelter coordination, stakeholder participation, and training. PhD thesis, University of Colorado at Boulder, USA.

Ophiyandri, T (2013) Project risk management for community-based post-disaster housing reconstruction. PhD thesis, University of Salford, UK.

Ophiyandri, T; Amaratunga, D and Keraminiyage, K (2016) Advantages and limitations of community-based post-disaster housing reconstruction projects. International Journal of Disaster Resilience in the Built Environment, 7(4), pp. 420-431. ISSN 1759-5916

Opiyo, Neema George (2022) Analysis of user (dis)engagement in the provision of affordable housing: Cases in the UK housing sector. PhD thesis, University of Manchester, UK.

Opoku, A; Cruickshank, H; Guthrie, P and Georgiadou, M C (2014) Stakeholder engagement in research: The case of retrofit 2050 research project. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Opoku, A and Tallon, A (2019) The role of project sponsors in defining and realising project benefits. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Opoku, A; Tallon, A; Lok, K L; Chen, C X L and Umar, T (2020) Realising project benefits in the public sector: Project sponsor's perspective. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(1), pp. 7-13. ISSN 17514304

Opoku, D G J; Agyekum, K and Ayarkwa, J (2022) Drivers of environmental sustainability of construction projects: A thematic analysis of verbatim comments from built environment consultants. International Journal of Construction Management, 22(6), pp. 1033-1041. ISSN 1562-3599

Oputa, N B (2017) Project managers' strategies for megaproject success. PhD thesis, Walden University, USA.

Orero, E (2019) Exploring options in infrastructure financing in Africa: steering of public private partnerships (PPPs) in Kenya. PhD thesis, Royal Holloway, University of London, UK.

Organ, S (2020) The opportunities and challenges of improving the condition and sustainability of a historic building at an international tourist attraction in the UK. International Journal of Building Pathology and Adaptation, 38(2), pp. 329-355. ISSN 23984708

Orgut, R E (2017) Metrics that matter: Improving project controls and analytics in construction industry. PhD thesis, North Carolina State University, USA.

Ormeño Zender, Y and García de Soto, B (2021) Use of scrum in the rehabilitation of a commercial building in Peru. Construction Innovation, 21(2), pp. 145-163. ISSN 1471-4175

Ornstein, S W and Ono, R (2010) Post-occupancy evaluation and design quality in Brazil: Concepts, approaches and an example of application. Architectural Engineering and Design Management, 6(1), pp. 48-67. ISSN 1745-2007

Orstavik, F (2014) Innovation as re-institutionalization: A case study of technological change in housebuilding in Norway. Construction Management and Economics, 32(9), pp. 857-873. ISSN 01446193

Osama, M; Sherif, A and Badawy, M (2023) Risk analysis of construction of administration projects using Bayesian networks. Journal of Engineering, Design and Technology, 21(1), pp. 281-298. ISSN 1726-0531

Osborne, A N (2005) Social conflict in construction-related inter-organizational collectives: A comparative analysis and structural equation model. PhD thesis, Northumbria University, UK.

Osei-Kyei, R. and Chan, A. P. C. (2017) Implementing public–private partnership (PPP) policy for public construction projects in Ghana: Critical success factors and policy implications. International Journal of Construction Management, 17(2), pp. 113-123. ISSN 1562-3599

Osei-Kyei, R and Chan, A P C (2017) Implementing public-private partnership (PPP) policy for public construction projects in Ghana: Critical success factors and policy implications. International Journal of Construction Management, 17(2), pp. 113-123. ISSN 1562-3599

Osei-Kyei, R and Chan, A P C (2018) Evaluating the project success index of public-private partnership projects in Hong Kong: The case of the Cross Harbour Tunnel. Construction Innovation, 18(3), pp. 371-391. ISSN 1471-4175

Osei-Kyei, R; Chan, A P C; Yao, Y and Mazher, K M (2019) Conflict prevention measures for public-private partnerships in developing countries. Journal of Financial Management of Property and Construction, 24(1), pp. 39-57. ISSN 1366-4387

Osipova, E (2013) On enhancing joint risk management throughout a project's lifecycle: Empirical studies of Swedish construction projects. PhD thesis, Luleå University of Technology, Sweden.

Osorio-Sandoval, C A (2021) BIM-based construction simulation modelling. PhD thesis, University of Nottingham, UK.

Ostovar, M (2023) Environmental and social life cycle assessment (LCA) in transport infrastructure. PhD thesis, University of California, Davis, USA.

Osuizugbo, I. C.; Awuzie, B. O. and Olorunlogbon, O. O. (2026) Assessing the proficiency and application of artificial intelligence skills among construction professionals in a developing country: Evidence from Nigeria. Journal of Engineering, Design and Technology, ISSN 1726-0531

Osuizugbo, I C (2021) The need for and benefits of buildability analysis: Nigeria as a case study. Journal of Engineering, Design and Technology, 19(5), pp. 1207-1230. ISSN 1726-0531

Osuizugbo, I C; Oshodi, O S; Kukoyi, P O; Lawani, A O and Onokwai, A O (2025) Barriers to adoption of work–life balance practices amongst construction companies in Lagos, Nigeria: An exploratory factor analysis. Engineering, Construction and Architectural Management, 32(3), pp. 1643-1669. ISSN 0969-9988

Oswald, D; Sherratt, F and Smith, S (2019) Managing production pressures through dangerous informality: A case study. Engineering, Construction and Architectural Management, 26(11), pp. 2581-2596. ISSN 0969-9988

Oswald, D; Sherratt, F and Smith, S D (2017) An investigation into a health & safety rewards system on a large construction project. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Oswald, D; Sherratt, F; Smith, S D and Hallowell, M R (2018) Exploring safety management challenges for multi-national construction workforces: A UK case study. Construction Management and Economics, 36(5), pp. 291-301. ISSN 01446193

Otchere-Darko, E; Atuah, L; Opoku, R and Koranteng, C (2025) Redefining green roof systems with climbers: Simulation of a conceptual model for thermal-radiative performance and plant vitality. International Journal of Building Pathology and Adaptation, 43(3), pp. 528-547. ISSN 2398-4708

Otegbulu, A C and N.Onukwube, H (2007) Enhancing real estate investment through tero- value technology. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Othman, A A E and Saad, A S M (2026) A strategy for reducing construction waste generated during the design process in architectural design firms in Egypt. Construction Innovation, 26(2), pp. 395-420. ISSN 1471-4175

Othman, A A E (2004) Value and risk management for dynamic brief development in construction. PhD thesis, Loughborough University, UK.

Othman, A A E and Abdelrahim, S M (2020) Achieving sustainability through reducing construction waste during the design process: A value management perspective. Journal of Engineering, Design and Technology, 18(2), pp. 362-377. ISSN 1726-0531

Othman, A A E and Alamoudy, F O (2021) Optimising building performance through integrating risk management and building information modelling during the design process. Journal of Engineering, Design and Technology, 19(6), pp. 1233-1267. ISSN 1726-0531

Othman, A A E and El-Saeidy, Y A (2024) Early supplier involvement framework for reducing construction waste during the design process. Journal of Engineering, Design and Technology, 22(2), pp. 578-597. ISSN 1726-0531

Othman, A A E and ElKady, M M (2023) A knowledge management based framework for enhancing the learning culture in architectural design firms in developing countries. Journal of Engineering, Design and Technology, 21(1), pp. 23-57. ISSN 1726-0531

Othman, A A E and Hussein, R M (2024) Innovation management framework for achieving sustainability through managing risks of innovative solutions during the design process. Journal of Engineering, Design and Technology, 22(6), pp. 1870-1893. ISSN 1726-0531

Othman, A A E and Kamal, A R (2024) A framework for enhancing building maintainability through facilitating early suppliers' involvement in the design process. Journal of Engineering, Design and Technology, 22(4), pp. 1231-1256. ISSN 1726-0531

Othman, A A E and Khalil, M H (2020) Divergent heritage sustainability: A threefold approach through lean talent management. Journal of Engineering, Design and Technology, 18(1), pp. 150-171. ISSN 1726-0531

Othman, A A E and Khalil, M H M (2018) Lean talent management: A novel approach for increasing creativity in architectural design firms. Engineering, Construction and Architectural Management, 25(10), pp. 1355-1375. ISSN 0969-9988

Othman, A A E and Youssef, L Y W (2021) A framework for implementing integrated project delivery in architecture design firms in Egypt. Journal of Engineering, Design and Technology, 19(3), pp. 721-757. ISSN 1726-0531

Oti-Sarpong, K (2019) Examining international technology transfer on construction projects in developing countries through a social construction of technology lens. PhD thesis, University of Hong Kong, Hong Kong.

Oti-Sarpong, K and Leiringer, R (2016) The role of learning in construction technology transfer: A 'SCOT' perspective. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Otim, M A; Kyalisiima, C; Tutesigensi, A; Mutikanga, H E and Kayondo, M (2023) Avoiding disputes through effective procurement in large construction projects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Otim, M A; Tutesigensi, A and Mutikanga, H E (2022) Can professionalism make contract disputes in infrastructure projects disappear? In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Ottou, J A; Baiden, B K; Nani, G and Martin Morgan, T (2021) Benefits of implementing six sigma in competitive tendering process. Built Environment Project and Asset Management, 11(2), pp. 214-230. ISSN 2044-124X

Ou, C-S (2007) Sustainable infrastructure materials: A life cycle assessment approach. PhD thesis, University of Colorado at Boulder, USA.

Oussadou, A (1988) Residential satisfaction in the new urban housing projects in Algeria: a case study of Ain-Allah, Algiers. PhD thesis, University of Nottingham, UK.

Outcault, S; Alston-Stepnitz, E; Sanguinetti, A; DePew, A N and Magaña, C (2022) Building lower-carbon affordable housing: Case studies from California. Building Research & Information, 50(6), pp. 646-661. ISSN 0961-3218

Owolabi, H (2018) Public accountability: The case of government guarantee scheme in PFI/PPP projects. PhD thesis, University of the West of England, Bristol, UK.

Owolabi, H; Oyedele, L; Alaka, H; Ajayi, S; Bilal, M and Akinade, O (2020) Risk mitigation in PFI/PPP project finance: A framework model for financiers' bankability criteria. Built Environment Project and Asset Management, 10(1), pp. 28-49. ISSN 2044-124X

Owoyemi, J A (2018) Performance evaluation of higway transportation design-build project delivery: A case study. PhD thesis, University of Maryland, College Park, USA.

Owusu-Manu, D; Quaigrain, R and Edwards, D J (2015) Barriers constraining management innovation (mi) adoption in the Ghanaian construction consulting sector: A case study. Journal of Engineering, Design and Technology, 13(4), pp. 612-631.

Owusu-Manu, D G; Edwards, D J; Kukah, A S; Parn, E A; El-Gohary, H and Hosseini, M R (2018) An empirical examination of moral hazards and adverse selection on PPP projects: A case study of Ghana. Journal of Engineering, Design and Technology, 16(6), pp. 910-924. ISSN 1726-0531

Owusu-Manu, D G; Ghansah, F A; Darko, A; Asiedu, R O and Edwards, D J (2020) Insurable and non-insurable risks in complex project deals: Case of the Ghanaian construction industry. Journal of Engineering, Design and Technology, 18(6), pp. 1971-1995. ISSN 1726-0531

Owusu-Manu, D-G; John, E D; Adesi, M; Badu, E and Love, P E D (2016) Attaining fairness in construction cost consultancy pricing services: A case study in Ghana. Journal of Engineering, Design and Technology, 14(4), pp. 699-712.

Oxman, R (1995) Data, knowledge and experience in multiuser information systems. Construction Management and Economics, 13(5), pp. 401-409. ISSN 01446193

Oyediran, H (2025) Robot-integrated 4D building information modeling (4D BIM): Framework for planning safe autonomous construction operations in dynamic environments. PhD thesis, University of Nebraska - Lincoln, USA.

Oyegoke, A S (2007) Specialist task organisations procurement approach for re-engineering construction project processes. DSc thesis, Teknillinen Korkeakoulu (Helsinki), Finland.

Oyekunle Oyewobi, L; Olukemi Windapo, A and Cattell, K S (2013) Impact of business diversification on South African construction companies' corporate performance. Journal of Financial Management of Property and Construction, 18(2), pp. 110-127. ISSN 1366-4387

Oyenuga, A (2016) Economic and environmental impact assessment of construction and demolition waste recycling and reuse using LCA and MCDA management tools. PhD thesis, London South Bank University, UK.

Ozdemir, B and Kumral, M (2017) Stochastic assessment of the material haulage efficiency in the earthmoving industry. Journal of Construction Engineering and Management, 143(8): 05017013, ISSN 0733-9364

Ozener, O O (2009) Studio education for integrated practice using building information modeling. PhD thesis, Texas A&M University, USA.

Ozols, R S (2015) A strategic framework to aid the success of small and micro sized UK construction contractors. DProf thesis, University of Salford, UK.

Ozturk, A (2010) Management of trans-boundary mega-projects in the post-cold war Eurasia: The case studies of GAP water and Baku-Ceyhan pipeline projects. PhD thesis, Keele University, UK.

Ozumba, A O; Ojiako, U; Shakantu, W; Marshall, A and Chipulu, M (2019) Process need areas and technology adoption in construction site management. Journal of Construction in Developing Countries, 24(2), pp. 123-155. ISSN 1823-6499

O’Brien, J J; Kreitzberg, F C and Mikes, W F (1985) Network scheduling variations for repetitive work. Journal of Construction Engineering and Management, 111(2), pp. 105-116. ISSN 0733-9364

O’Connell, S; Reynders, G; Seri, F; Sterling, R and Keane, M M (2020) A standardised flexibility assessment methodology for demand response. International Journal of Building Pathology and Adaptation, 38(1), pp. 20-37. ISSN 23984708

Pablo, Z; London, K; Wong, P S P and Khalfan, M (2021) Actor-network theory and the evolution of complex adaptive supply networks. Construction Innovation, 21(4), pp. 668-684. ISSN 1471-4175

Pablo, Z and London, K A (2020) Stable relationality and dynamic innovation: Two models of collaboration in SME-driven offsite manufacturing supply chains in housing construction. Engineering, Construction and Architectural Management, 27(7), pp. 1553-1577. ISSN 0969-9988

Pacheco-Torres, R; Etxebarria-Berrizbeitia, S and Gago, E J (2024) Influence of urban density on energy retrofit of building stock: Case study of Spain. Architectural Engineering and Design Management, 20(6), pp. 1832-1855. ISSN 1745-2007

Pachnou, D (2003) The effectiveness of bidder remedies for enforcing the EC public procurement rules: a case study of the public works sector in the United Kingdom and Greece. PhD thesis, University of Nottingham, UK.

Padala, S P S (2025) A BIM-integrated multi objective optimization model for sustainable building construction management. Construction Innovation, 25(6), pp. 1727-1751. ISSN 1471-4175

Padala, S P S and M Skanda, P (2025) BIM-based multi-objective optimization framework for volumetric analysis of building projects. Journal of Engineering, Design and Technology, 23(5), pp. 1326-1347. ISSN 1726-0531

Padala, S P S (2020) Matrix-based framework for modeling changes across multiple entity types in construction projects. PhD thesis, Indian Institute of Technology Delhi, India.

Padala, S P S; Maheswari, J U and Hirani, H (2022) Identification and classification of change causes and effects in construction projects. International Journal of Construction Management, 22(14), pp. 2788-2807. ISSN 1562-3599

Pagliara, F; El-Ansari, W and Henke, I (2025) A methodology to estimate the benefits and costs of stakeholder engagement in a transport decision-making process. Smart and Sustainable Built Environment, 14(2), pp. 326-341. ISSN 2046-6099

Paidakaki, A. (2026) Creating resilient cities: Advocacy and planning for equity-based recovery. Buildings & Cities, 7(1), pp. 597-613. ISSN 2632-6655

Pakgohar, A (2014) Hierarchical multi-project planning and supply chain management: an integrated framework. PhD thesis, University of Exeter, UK.

Pal, A.; Lin, J. J.; Amer, F.; Hsieh, S. H. and Golparvar Fard, M. (2026) Automatic mapping of schedule activities and reality models for tracking construction progress. Engineering, Construction and Architectural Management, 33(3), pp. 1932-1958. ISSN 0969-9988

Pala, M (2018) Implementing inter-organisational information systems for the integration of construction supply chains. PhD thesis, Loughborough University, UK.

Pala, M; Edum-Fotwe, F; Ruikar, K; Peters, C and Doughty, N (2016) Implementing commercial information exchange: A construction supply chain case study. Construction Management and Economics, 34(12), pp. 898-918. ISSN 01446193

Palacio Tomayo, D C (2000) Place-networks: A social-environmental approach for the conservation of protected areas: The case studies of monte tezio, Italy, and utria, Colombia. PhD thesis, Swansea University, UK.

Palaneeswaran, E and Kumaraswamy, M M (2003) Knowledge mining of information sources for research in construction management. Journal of Construction Engineering and Management, 129(2), pp. 182-191. ISSN 0733-9364

Pali, P (2020) Potential for climate change mitigation through low carbon investment in Indian roads and railways: an assessment of obstacles and opportunities for the Asian Development Bank. PhD thesis, University of Manchester, UK.

Palliyaguru, R; Amaratunga, D and Haigh, R (2010) Integration of "disaster risk reduction" into infrastructure reconstruction sector: Policy vs practise gaps. International Journal of Disaster Resilience in the Built Environment, 1(3), pp. 277-296. ISSN 1759-5916

Pallyyaguru, Roshani Sandika (2010) Influence of integrating disaster risk reduction within post-disaster infrastructure reconstruction on socio-economic development. PhD thesis, University of Salford, UK.

Palojärvi, L (2009) Managing risks in the international growth business of Finnish construction contractors and building product suppliers. PhD thesis, Helsinki University of Technology, Finland.

Pan, N-F S (2001) Fuzzy reasoning expert scheduling system (FRESS) for highway construction subject to rain impact: A case study in Taiwan. PhD thesis, Ohio State University, USA.

Pan, W (2006) A decision support tool for optimising the use of offsite technologies in housebuilding. PhD thesis, Loughborough University, UK.

Pan, W (2010) Strategies for managing innovation in UK housebuilding. Engineering, Construction and Architectural Management, 17(1), pp. 78-88. ISSN 0969-9988

Pan, W; Chen, L and Zhan, W (2021) Positioning construction workers' vocational training of guangdong in the global political-economic spectrum of skill formation. Engineering, Construction and Architectural Management, 28(9), pp. 2489-2515. ISSN 0969-9988

Pan, W; Dainty, A R J and Gibb, A G F (2004) Managing innovation: A focus on off-site production (OSP) in the UK housebuilding industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Pan, W; Gibb, A G F and Dainty, A R J (2012) Strategies for integrating the use of off-site production technologies in house building. Journal of Construction Engineering and Management, 138(11), pp. 1331-1340. ISSN 0733-9364

Pan, W; Sidwell, R and Soetanto, R (2009) A longitudinal investigation into utilising crosswall construction for multi-storey residential buildings. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Pan, Y H (2007) Application of industrialized housing system in major cities in China: A case study of Chongqing. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Panagiotakopoulos, P D and Jowitt, P W (2004) Representing and assessing sustainability in construction. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Pandey, P (2019) Lean scheduling in construction projects: realistic milestone planning. PhD thesis, Indian Institute of Technology Delhi, India.

Paneru, S; Suh, S; Seo, W and Rausch, C (2024) Evaluating the decarbonization potential of industrialized construction: A review of the current state, opportunities, and challenges. Journal of Construction Engineering and Management, 150(9): 03124005, ISSN 0733-9364

Panopoulos, G D (2003) Economic aspects of safety in the Greek construction industry. PhD thesis, Aston University, UK.

Panta, M (2018) Approaches to the resilience and the potential for adaptation through community-driven construction projects in the global South. PhD thesis, University of Brighton, UK.

Panthi, K (2009) A methodological framework for modeling pavement maintenance costs for projects with performance-based contracts. PhD thesis, Florida International University, USA.

Pantouvakis, J P and Manoliadis, O G (2008) A compromise programming model for site selection of borrow pits. Construction Management and Economics, 26(5), pp. 433-446. ISSN 1466433X

Pantzartzis, E; Deka, L; Price, A D F; Tann, C; Mills, G R W and Rich-Mahadkar, S (2016) Sustainable management of NHS assets backlog maintenance. Built Environment Project and Asset Management, 6(5), pp. 535-552. ISSN 2044-124X

Panuwatwanich, K; Stewart, R A and Mohamed, S (2009) Validation of an empirical model for innovation diffusion in Australian design firms. Construction Innovation, 9(4), pp. 449-467. ISSN 1471-4175

Panuwatwanich, Kriengsak (2008) Modelling the innovation diffusion process in Australian architectural and engineering design organisations. PhD thesis, Griffith University, Australia.

Panwar, A (2019) Development of a many-objective model based on NSGA-III for construction projects. PhD thesis, Indian Institute of Technology Delhi, India.

Panwar, A and Jha, K N (2017) Trade-off between life cycle cost and greenhouse gas emission in construction projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Panwar, A and Jha, K N (2019) A many-objective optimization model for construction scheduling. Construction Management and Economics, 37(12), pp. 727-739. ISSN 01446193

Papadonikolaki, E (2016) Alignment of partnering with construction it: Exploration and synthesis of network strategies to integrate BIM-enabled supply chains. PhD thesis, Delft University of Technology, Netherlands.

Papadonikolaki, E; Verbraeck, A and Wamelink, H (2017) Formal and informal relations within BIM-enabled supply chain partnerships. Construction Management and Economics, 35(8-9), pp. 531-552. ISSN 01446193

Papadonikolaki, E; Vrijhoef, R and Wamelink, H (2015) BIM adoption in integrated supply chains: A multiple case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Papadonikolaki, E; Vrijhoef, R and Wamelink, H (2016) The interdependences of BIM and supply chain partnering: Empirical explorations. Architectural Engineering and Design Management, 12(6), pp. 476-494. ISSN 1745-2007

Papadonikolaki, E and van Oel, C (2016) The actors' perceptions and expectations of their roles in BIM-based collaboration. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Papageorgiou, G and Demetriou, G (2020) Investigating learning and diffusion strategies for sustainable mobility. Smart and Sustainable Built Environment, 9(1), pp. 1-16. ISSN 2046-6099

Papajohn, D (2019) Contract administration functions and tools for design-build and construction manager/general contractor project delivery in U.S. Highway construction. PhD thesis, Arizona State University, USA.

Parchami Jalal, M and Shoar, S (2019) A hybrid framework to model factors affecting construction labour productivity: Case study of Iran. Journal of Financial Management of Property and Construction, 24(3), pp. 630-654. ISSN 1366-4387

Parchami Jalal, M; Yavari Roushan, T; Noorzai, E and Alizadeh, M (2020) A BIM-based construction claim management model for early identification and visualization of claims. Smart and Sustainable Built Environment, 10(2), pp. 227-257. ISSN 2046-6099

Parchamijalal, M; Moradi, S and Zabihi Shirazi, M (2023) Claim management office maturity model (cmomm) in project-oriented organizations in the construction industry. Engineering, Construction and Architectural Management, 30(1), pp. 74-104. ISSN 0969-9988

Pareek, P; Han, S and Misra, S (2016) Application of Bayesian updating for real-time schedule estimation in a concreting operation. International Journal of Construction Management, 16(1), pp. 54-66. ISSN 1562-3599

Parisi, L. and Donyavi, S. (2026) Advancing materials procurement processes in construction: A framework for optimising technology integration in SMEs' construction supply chains. International Journal of Construction Management, 26(7), pp. 1365-1389. ISSN 1562-3599

Parizeau, K and Lepawsky, J (2015) Legal orderings of waste in built spaces. International Journal of Law in the Built Environment, 7(1), pp. 21-38. ISSN 1756-1450

Park, J; Brown, J; Al-Hasani, L E; Gentry, T R; Kurtis, K E and Cho, Y K (2024) Cost-effective thermal control planning for mass concrete construction using nomograms. Journal of Construction Engineering and Management, 150(10): 06024001, ISSN 0733-9364

Park, J; Kim, K and Cho, Y K (2017) Framework of automated construction-safety monitoring using cloud-enabled BIM and BLE mobile tracking sensors. Journal of Construction Engineering and Management, 143(2): 05016019, ISSN 0733-9364

Park, M and Peña-Mora, F (2004) Reliability buffering for construction projects. Journal of Construction Engineering and Management, 130(5), pp. 626-637. ISSN 0733-9364

Park, T; Kim, M K; Kim, C and Kim, H (2009) Interactive 3D CAD for effective derrick crane operation in a cable-stayed bridge construction. Journal of Construction Engineering and Management, 135(11), pp. 1261-1270. ISSN 0733-9364

Parmar, D; Kashiwagi, D and Savicky, J (2003) Case study of the dallas independent school district’s construction value. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Parrish, K D (2009) Applying a set-based design approach to reinforcing steel design. PhD thesis, University of California, Berkeley, USA.

Parry, A (2015) The improvement of delay analysis in the UK construction industry. PhD thesis, Northumbria University, UK.

Parsanezhad, P (2019) Towards a BIM-enabled facility management: Promises, obstacles and requirements. PhD thesis, KTH Royal Institute of Technology, Sweden.

Parsi, M; Baradaran, V and Hosseinian, A H (2025) Integrating the stochastic multiproject scheduling and material ordering problems for offshore projects: Multiagent optimization methodology. Engineering, Construction and Architectural Management, 32(4), pp. 2614-2645. ISSN 0969-9988

Pasquire, C; Ballard, G; Bildsten, L; Björnfot, A and Sandberg, E (2011) Value-driven purchasing of kitchen cabinets in industrialised housing. Journal of Financial Management of Property and Construction, 16(1), pp. 73-83. ISSN 1366-4387

Pasquire, C; Ballard, G; Zimina, D and Pasquire, C L (2011) Applying lean thinking in commercial management. Journal of Financial Management of Property and Construction, 16(1), pp. 64-72. ISSN 1366-4387

Pasquire, C; Pennanen, A; Ballard, G and Haahtela, Y (2011) Target costing and designing to targets in construction. Journal of Financial Management of Property and Construction, 16(1), pp. 52-63. ISSN 1366-4387

Pasquire, C L (1991) Builders quantities for contractors' management. PhD thesis, Loughborough University, UK.

Pasquire, C L and Gibb, A G F (2002) Considerations for assessing the benefits of standardisation and pre-assembly in construction. Journal of Financial Management of Property and Construction, 7(3), pp. 151-162. ISSN 1366-4387

Pasquire, C L and King, J H J (2000) Project team performance within the Scottish water market based private finance initiative. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Patcharachavalit, N; Limsawasd, C and Athigakunagorn, N (2023) Multiobjective optimization for improving sustainable equipment options in road construction projects. Journal of Construction Engineering and Management, 149(1): 04022160, ISSN 0733-9364

Patching, A; Skitmore, M; Rusch, R and Lester, D (2024) Case study of the collaborative design of an integrated BIM, IPD and lean university education program. International Journal of Construction Management, 24(7), pp. 799-808. ISSN 1562-3599

Patel, T.; Guo, B. H. W.; van der Walt, J. D. and Bapat, H. (2026) Vision-based automated road construction progress monitoring: Improved u-net segmentation approach. International Journal of Construction Management, 26(10), pp. 2154-2175. ISSN 1562-3599

Patel, T; Guo, B H W; van der Walt, J D and Zou, Y (2025) Unmanned ground vehicle (ugv) based automated construction progress measurement of road using LSTM. Engineering, Construction and Architectural Management, 32(9), pp. 5764-5791. ISSN 0969-9988

Patel, M and Robinson, H (2010) Impact of governance on project delivery of complex NHS PFI/PPP schemes. Journal of Financial Management of Property and Construction, 15(3), pp. 216-234. ISSN 1366-4387

Patel, T D; Haupt, T C and Bhatt, T (2020) Fuzzy probabilistic approach for risk assessment of BOT toll roads in Indian context. Journal of Engineering, Design and Technology, 18(1), pp. 251-269. ISSN 1726-0531

Pathirage, C and Al-Khaili, K (2016) Disaster vulnerability of emirati energy sector and barriers to enhance resilience. Built Environment Project and Asset Management, 6(4), pp. 403-414. ISSN 2044-124X

Pathirage, C P (2007) A structured approach to manage the tacit knowledge of construction employees. PhD thesis, University of Salford, UK.

Patil, M. P.; Salama, A. M.; Arnfield, J. and Alvanides, S. (2026) Youwalk-youreclaim: A co-assessment approach for active university campus environments. Smart and Sustainable Built Environment, 15(5), pp. 1663-1694. ISSN 2046-6099

Patil, S K (2016) Determining influencing factors and predicting dispute outcome of variation claims in Indian construction contracts/ by Smita Krishnarao Patil. PhD thesis, Indian Institute of Technology Delhi, India.

Patsiadas, P (2006) Public private partnership in motorway service areas: Decision making, investment analysis and best practice tools. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Patterson, M R (2017) Skin fit and retrofit: Challenging the sustainability of curtainwall practice in tall buildings. PhD thesis, University of Southern California, USA.

Paula, Nathalia de (2016) The management of design firms and the environmental sustainability of buildings. PhD thesis, Universidade de São Paulo, Brazil.

Paula, Nathália de (2016) Design firms management and environmental sustainability of buildings. PhD thesis, Universidade de São Paulo, Brazil.

Paullin, R J (1977) Construction management: Implications for intermediate school district boards of education and administrators in Michigan. PhD thesis, Michigan State University, USA.

Paunikar, A (1983) Performance constraints of housing prefabricators in India: 3 case studies. ArchD thesis, University of Michigan, USA.

Peace, S L (1999) Partnering in the UK building industry. PhD thesis, University of Reading, UK.

Peacock, W S (1990) Site investigation procedures and risk analysis. PhD thesis, University of Manchester, UK.

Peansupap, V and Walker, D (2005) Exploratory factors influencing information and communication technology diffusion and adoption within Australian construction organizations: A micro analysis. Construction Innovation, 5(3), pp. 135-157. ISSN 1471-4175

Peansupap, V and Walker, D H T (2004) Strategic adoption of information and communication technology (ICT): Case studies of construction contractors. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Peansupap, V and Walker, D H T (2006) Innovation diffusion at the implementation stage of a construction project: A case study of information communication technology. Construction Management and Economics, 24(3), pp. 321-332. ISSN 01446193

Pearce, A R (1999) Sustainability and the built environment: A metric and process for prioritizing improvement opportunities. PhD thesis, Georgia Institute of Technology, USA.

Pearson, A D (2014) An investigation of climatically responsive ultra-low energy housing in rural Scotland: a case study. PhD thesis, University of Dundee, UK.

Pearson, R L (2024) A sociotechnical systems approach to water infrastructure decision making. PhD thesis, University of Washington, USA.

Peiris, S and De Silva, N (2022) Re-engineered factory acceptance testing under the new normal. Built Environment Project and Asset Management, 12(5), pp. 754-774. ISSN 2044-124X

Pekuri, A (2015) The role of business models in construction business management. PhD thesis, University of Oulu, Finland.

Pekuri, A; Pekuri, L and Haapasalo, H (2015) Business models and project selection in construction companies. Construction Innovation, 15(2), pp. 180-197. ISSN 1471-4175

Pellegrino, R (2021) Effects of public supports for mitigating revenue risk in public-private partnership projects: Model to choose among support alternatives. Journal of Construction Engineering and Management, 147(12), ISSN 0733-9364

Pellicer, E; Yepes, V; Correa, C L and Alarcón, L F (2014) Model for systematic innovation in construction companies. Journal of Construction Engineering and Management, 140(4): B4014001, ISSN 0733-9364

Peltokorpi, A; Olivieri, H; Granja, A D and Seppänen, O (2018) Categorizing modularization strategies to achieve various objectives of building investments. Construction Management and Economics, 36(1), pp. 32-48. ISSN 01446193

Pemsel, S (2012) Knowledge processes and capabilities in project-based organizations. PhD thesis, Lund University, Sweden.

Pemsel, S and Widén, K (2011) Bridging boundaries between organizations in construction. Construction Management and Economics, 29(5), pp. 495-506. ISSN 1466433X

Pena Mora, F A (1994) Design rationale for computer supported conflict mitigation during the design-construction process of large-scale civil engineering systems. PhD thesis, Massachusetts Institute of Technology, USA.

Pendlebury, M C (2000) Techniques and strategies to improve conceptual and schematic design. PhD thesis, Loughborough University, UK.

Peng, J and Liu, X J (2024) Labor resource allocation under extremely short construction period based on the inverse optimization method. Engineering, Construction and Architectural Management, 31(3), pp. 1254-1271. ISSN 0969-9988

Peng, Z; Deng, W and Hong, Y (2019) Materials consumption, indoor thermal comfort and associated energy flows of urban residential buildings: Case studies from the cold climate zone of China. International Journal of Building Pathology and Adaptation, 37(5), pp. 579-596. ISSN 23984708

Penland, J L (2002) Implementation of web-based team collaboration tools in the architectural, engineering and construction industry. PhD thesis, University of Kansas, USA.

Pepper, C (2005) A critical evaluation of diversity and equality in the UK construction sector. PhD thesis, Loughborough University, UK.

Pereira, Ana Paula Carvalho (2017) Building information modeling in the project phase: A proposal for a BIM execution plan for SUMAI / UFBA. PhD thesis, Universidade Federal da Bahia, Brazil.

Pereira, E; Han, S; Abourizk, S and Hermann, U (2017) Empirical testing for use of safety related measures at the organizational level to assess and control the on-site risk level. Journal of Construction Engineering and Management, 143(6): 05017004, ISSN 0733-9364

Pereira, E; Hermann, U; Han, S and Abourizk, S (2018) Case-based reasoning approach for assessing safety performance using safety-related measures. Journal of Construction Engineering and Management, 144(9): 04018088, ISSN 0733-9364

Perera, B A K S and Dewagoda, K G (2020) Streamlining the management of payment delays: The case of Sri Lankan government building construction projects. Journal of Financial Management of Property and Construction, 26(2), pp. 236-256. ISSN 1366-4387

Perera, B A K S; Ekanayake, B J; Jayalath, C and Jayathilaka, G R H (2021) A study on variation-specific disputes that arise in road projects in Sri Lanka: A qualitative approach. International Journal of Construction Management, 21(6), pp. 571-581. ISSN 1562-3599

Perera, B A K S; Wijewickrama, M K C S; Ranaweera, W R S C and Gamage, I S W (2021) Significant factors influencing the bid mark-up decision of infrastructure projects in Sri Lanka. International Journal of Construction Management, 21(8), pp. 769-783. ISSN 1562-3599

Perera, S; Hayles, C S and Kerlin, S (2011) An analysis of value management in practice: The case of Northern Ireland's construction industry. Journal of Financial Management of Property and Construction, 16(2), pp. 94-110. ISSN 1366-4387

Perera, S; Senaratne, S; Rodrigo, M N N and Brady, L (2021) Analysis of embodied carbon and cost profiles of school buildings in Australia. Built Environment Project and Asset Management, 11(4), pp. 660-672. ISSN 2044-124X

Perera, T G U P (2019) Achieving sustainable housing affordability through an institutionalist approach to communicative planning: a case study of a new settlements and sustainable urban extensions in England. PhD thesis, University of Birmingham, UK.

Perera, U S; Siriwardana, C and Pitigala Liyana Arachchi, I S (2024) Development of critical infrastructure resilience index for cities in Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 15(2), pp. 193-211. ISSN 1759-5916

Perera, U T G; Haigh, R and Amaratunga, D (2025) Integration of public health into road projects in Sri Lanka: Identifying barriers and enablers. Built Environment Project and Asset Management, 15(3), pp. 647-662. ISSN 2044-124X

Perez, A M and Ghosh, S (2018) Barriers faced by new-adopter of last planner system®: A case study. Engineering, Construction and Architectural Management, 25(9), pp. 1110-1126. ISSN 0969-9988

Perez-Bella, J M; Dominguez-Hernandez, J; Cano-Suñen, E; Del Coz-Diaz, J J and Alvarez Rabanal, F P (2015) Improvement alternatives for determining the watertightness performance of building facades. Building Research & Information, 43(6), pp. 723-736. ISSN 0961-3218

Perkins, J A (1992) Institutionalizing transportation infrastructure investments and economic development: The role of state departments of transportation in multi-state economic development activities. PhD thesis, Georgia Institute of Technology, USA.

Perrucci, D V (2021) Methods for scenario modeling of post-disaster temporary housing. PhD thesis, Vanderbilt University, USA.

Perry, J G (1985) The development of contract strategies for construction projects. PhD thesis, University of Manchester, UK.

Perry, M J (1997) Distributed cognition and computer supported collaborative design: The organisation of work in construction engineering. PhD thesis, Brunel University, UK.

Persad, A (2020) Strategies to retain skilled assistant project managers in construction industries. DBA thesis, Walden University, USA.

Persson, M (2010) Impact assessment and project appraisal in cases of coastal erosion. International Journal of Disaster Resilience in the Built Environment, 1(3), pp. 297-309. ISSN 1759-5916

Persson, M H (2006) Lessons learned in knowledge management: The case of construction. PhD thesis, Lund University, Sweden.

Pesterfield, C (2022) Reconceptualising responses to the UK's 2015 Modern Slavery Act: a construction industry case study. PhD thesis, University of Bristol, UK.

Peter, E; Love, D and Heng, L I (2000) Quantifying the causes and costs of rework in construction. Construction Management and Economics, 18(4), pp. 479-490. ISSN 01446193

Peters, R; Whitman, P and Hampson, K (2001) Skill development for innovative procurement environments in construction. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Petrescu, D; Petcou, C and Baibarac, C (2016) Co-producing commons-based resilience: Lessons from R-Urban. Building Research & Information, 44(7), pp. 717-736. ISSN 0961-3218

Petroutsatou, K (2022) A proposal of project management practices in public institutions through a comparative analyses of critical path method and critical chain. International Journal of Construction Management, 22(2), pp. 242-251. ISSN 1562-3599

Pettit, J H (2000) Clients: their role in the procurement of infrastructure projects. PhD thesis, Loughborough University, UK.

Peveler, E (2018) The supply of building materials to construction projects in Roman Oxfordshire: Logistics, economics, and social significance. PhD thesis, University of Oxford, UK.

Pham, V H S and Pham, D H (2025) A cutting-edge approach to prefabricated construction site layouts using multi-objective artificial hummingbird algorithm solution. International Journal of Construction Management, 25(16), pp. 2063-2081. ISSN 1562-3599

Pham, V. H. S. and Pham, D. H. (2026) Advanced construction site layout planning for prefabricated projects: An application of the new algorithm. Engineering, Construction and Architectural Management, 33(3), pp. 2471-2511. ISSN 0969-9988

Pham, V H S; Nguyen Dang, N T and Nam, N V (2025) Optimizing time and cost in construction projects with a hybridized multi-verse optimizer and opposition-based learning. Engineering, Construction and Architectural Management, 32(7), pp. 4852-4886. ISSN 0969-9988

Phelps, A F and Horman, M J (2010) Ethnographic theory-building research in construction. Journal of Construction Engineering and Management, 136(1), pp. 58-65. ISSN 0733-9364

Pheng, L S and Hui, M S (1999) The application of JIT philosophy to construction: A case study in site layout. Construction Management and Economics, 17(5), pp. 657-668. ISSN 01446193

Pheng, L S and Hui, M S (2004) Implementing and applying six sigma in construction. Journal of Construction Engineering and Management, 130(4), pp. 482-489. ISSN 0733-9364

Pheng, L S and Omar, H F (1997) Integration, segmentalism and the maintenance of quality management systems in the construction industry. Building Research & Information, 25(1), pp. 36-49. ISSN 0961-3218

Pheng, L S and Tan, S K L (1997) The measurement of just in time wastage for a public housing project in Singapore. Building Research & Information, 25(2), pp. 67-81. ISSN 0961-3218

Pheng, L S and Tan, S K L (1998) How 'just-in-time' wastages can be quantified: Case study of a private condominium project. Construction Management and Economics, 16(6), pp. 621-635. ISSN 01446193

Phillips, R E (2020) Occupant centric dynamic modeling of sustainability analyses in buildings. PhD thesis, Northeastern University, USA.

Phillips, S (2007) OVID-BV: optimising value in decision making for best value in the UK social housing sector. EngD thesis, Loughborough University, UK.

Phillips, S; Price, A and Dainty, A (2004) Achieving best value in social housing procurement. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Phrommarat, B and Arromdee, P (2022) A life cycle assessment study of pre-stressed concrete poles in Thailand. International Journal of Construction Management, 22(6), pp. 1053-1064. ISSN 1562-3599

Phythian, G J (1991) Applications of knowledge-based expert systems in recurrent competitive bidding. PhD thesis, Loughborough University, UK.

Piao, Y (2020) Case studies to determine the effect of applying blockchain technology and building information modeling on the workflow of water infrastructure projects. PhD thesis, Stanford University, USA.

Piao, Y; Xu, W; Wang, T K and Chen, J H (2021) Dynamic fall risk assessment framework for construction workers based on dynamic Bayesian network and computer vision. Journal of Construction Engineering and Management, 147(12): 04021171, ISSN 0733-9364

Picchi, P; Verzandvoort, S; Geneletti, D; Hendriks, K and Stremke, S (2022) Deploying ecosystem services to develop sustainable energy landscapes: A case study from the Netherlands. Smart and Sustainable Built Environment, 11(3), pp. 422-437. ISSN 2046-6099

Pickett, S T A; Grove, J M; Boone, C G and Buckley, G L (2023) Resilience of racialized segregation is an ecological factor: Baltimore case study. Buildings & Cities, 4(1), pp. 783-800. ISSN 2632-6655

Pidgeon, A and Dawood, N (2023) Verification and validation of a framework for collaborative BIM implementation, measurement and management (cimm). Smart and Sustainable Built Environment, 12(4), pp. 847-871. ISSN 2046-6099

Pidomson, G B (2016) Unexpected events in Nigerian construction projects: A case of four construction companies. PhD thesis, Walden University, USA.

Pierce Meyer, Kathryn Alisa (2018) Documenting architectural practice. PhD thesis, University of Texas at Austin, USA.

Pietroforte, R (1992) Communication and information in the building delivery process. PhD thesis, Massachusetts Institute of Technology, USA.

Pikas, E; Sacks, R and Hazzan, O (2013) Building information modeling education for construction engineering and management II: Procedures and implementation case study. Journal of Construction Engineering and Management, 139(11): 5013002, ISSN 0733-9364

Ping, T; Pan, W and Zhang, Z (2025) Developing a systematic performance measurement framework for benchmarking steel modular building construction. Engineering, Construction and Architectural Management, 32(3), pp. 1837-1856. ISSN 0969-9988

Pinheiro Santos Fernandes, P G; Elias Arantes, A and Ferreira Nobre Júnior, E (2024) Optimization model for earthwork allocations considering the construction of multiple haul roads: GIS-based integrated approach. Journal of Construction Engineering and Management, 150(4): 05024001, ISSN 0733-9364

Pinky Devi, L and Palaniappan, S (2019) Life cycle energy analysis of a low-cost house in India. International Journal of Construction Education and Research, 15(4), pp. 256-275. ISSN 1557-8771

Pinti, Lidia (2019) BIM-based facility management: Embedded information management for maintenance: Building information modelling and database integration for the Italian public administration. PhD thesis, Politecnico di Milano, Italy.

Pipattanapiwong, J and Watanabe, T (2000) Multi-party risk management process (MRMP) for a construction project financed by an international lender. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Piroozfar, P; Pomponi, F and Farr, E R P (2016) Life cycle assessment of domestic hot water systems: A comparative analysis. International Journal of Construction Management, 16(2), pp. 109-125. ISSN 1562-3599

Pirzadeh, P; Lingard, H and Blismas, N (2020) A multilevel socio-technical perspective on work health and safety related design decision making. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Pirzadeh, P; Lingard, H and Blismas, N (2021) Design decisions and interactions: A sociotechnical network perspective. Journal of Construction Engineering and Management, 147(10): 04021110, ISSN 0733-9364

Pirzadeh, Payam (2018) A social network perspective on design for construction safety. PhD thesis, RMIT University, Australia.

Pishdad-Bozorgi, P (2012) Case-based study and analysis of integrated project delivery (IPD) approach and trust-building attributes. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Pishdad-Bozorgi, P (2017) Case studies on the role of integrated project delivery approach on the establishment and promotion of trust. International Journal of Construction Education and Research, 13(2), pp. 102-23. ISSN 1557-8771

Plantinga, H; Voordijk, H and Doree, A (2019) The reasoning behind infrastructure manager's choice of procurement instruments. Engineering, Construction and Architectural Management, 26(2), pp. 303-320. ISSN 0969-9988

Plantinga, H; Voordijk, H and Dorée, A (2020) Creating strategic alignment during the development of procurement instruments. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(1), pp. 14-22. ISSN 17514304

Plantinga, H E C; Voordijk, J T and Dorée, A G (2014) Assessing qualification systems: The relevance of explicating implicit reasoning. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Platten, A and Gorse, C (2010) Supply chain development for major public sector projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Plumblee II, J M (2013) Incorporating natural hazard resistance into the life cycle assessment framework. PhD thesis, Clemson University, USA.

Pocobelli, D P (2021) Heritage building information model (BIM) for scientific data. PhD thesis, University College London, UK.

Poirier, E; Staub-French, S and Forgues, D (2015) Embedded contexts of innovation: BIM adoption and implementation for a specialty contracting SME. Construction Innovation, 15(1), pp. 42-65. ISSN 1471-4175

Poirier, E; Staub-French, S; Pilon, A; Fallahi, A; Teshnizi, Z; Tannert, T and Froese, T (2022) Design process innovation on brock commons tallwood house. Construction Innovation, 22(1), pp. 23-40. ISSN 1471-4175

Poirier, E A; Forgues, D and Staub-French, S (2017) Understanding the impact of BIM on collaboration: A Canadian case study. Building Research & Information, 45(6), pp. 681-695. ISSN 0961-3218

Polat, G (2010) Using ANP priorities with goal programming in optimally allocating marketing resources. Construction Innovation, 10(3), pp. 346-365. ISSN 1471-4175

Polat, G; Arditi, D and Mungen, U (2007) Simulation-based decision support system for economical supply chain management of rebar. Journal of Construction Engineering and Management, 133(1), pp. 29-39. ISSN 0733-9364

Polat, G and Bayhan, H G (2022) Selection of HVAC-ahu system supplier with environmental considerations using fuzzy edas method. International Journal of Construction Management, 22(10), pp. 1863-1871. ISSN 1562-3599

Polat, G and Donmez, U (2010) ANP-based marketing activity selection model for construction companies. Construction Innovation, 10(1), pp. 89-111. ISSN 1471-4175

Polson, D R (2020) Assessment of applications of optimisation to building design and energy modelling. PhD thesis, University of London, University College London, UK.

Ponce de Leon, I. and Gotangco Gonzales, C. K. (2026) The disconnect between plans and practice: Insights from case studies in risk communication for extreme rainfall and flooding events. International Journal of Disaster Resilience in the Built Environment, pp. 1-11. ISSN 1759-5908

Pongpeng, J (2002) Multicriteria and multidecision-makers in tender evaluation. PhD thesis, Queensland University of Technology, Australia.

Pons, O; Casanovas-Rubio, M M; Armengou, J and De La Fuente, A (2021) Sustainability-driven decision-making model: Case study of fiber-reinforced concrete foundation piles. Journal of Construction Engineering and Management, 147(10): 04021116, ISSN 0733-9364

Ponton, H (2021) Social interactions in construction design team meetings. PhD thesis, Northumbria University, UK.

Ponton, H; Osborne, A; Thompson, N and Greenwood, D (2020) The power of humour to unite and divide: A case study of design coordination meetings in construction. Construction Management and Economics, 38(1), pp. 32-54. ISSN 01446193

Poon, C S; Yu, A T W; See, S C and Cheung, E (2004) Minimizing demolition wastes in Hong Kong public housing projects. Construction Management and Economics, 22(8), pp. 799-805. ISSN 01446193

Poon, J and Hoxley, M (2010) Use of moral theory to analyse the ethical codes of built environment professional organisations: A case study of the Royal Institution of Chartered Surveyors. International Journal of Law in the Built Environment, 2(3), pp. 260-275. ISSN 1756-1450

Porkar, M J; Khakzand, M and Mardanlou, N (2025) Achievement to adaptive reuse strategies of industrial heritage: Learning from Iranian cases. International Journal of Building Pathology and Adaptation, 43(3), pp. 463-481. ISSN 2398-4708

Portas, J and AbouRizk, S (1997) Neural network model for estimating construction productivity. Journal of Construction Engineering and Management, 123(4), pp. 399-410. ISSN 0733-9364

Porteous, C D A; Sharpe, T R; Menon, R A; Shearer, D; Musa, H; Baker, P H; Sanders, C H; Strachan, P A; Kelly, N J and Markopoulos, A (2012) Energy and environmental appraisal of domestic laundering appliances. Building Research & Information, 40(6), pp. 679-699. ISSN 0961-3218

Porwal, A; Parsamehr, M; Szostopal, D; Ruparathna, R and Hewage, K (2023) The integration of building information modeling (BIM) and system dynamic modeling to minimize construction waste generation from change orders. International Journal of Construction Management, 23(1), pp. 156-166. ISSN 1562-3599

Poshdar, M; González, V A; Raftery, G M and Orozco, F (2014) Characterization of process variability in construction. Journal of Construction Engineering and Management, 140(11): 5014009, ISSN 0733-9364

Potemans, A; Volker, L and Hermans, M (2018) From agents to stewards? Experiences from a Dutch infrastructure case study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Potseluyko Amobi, L (2021) Improving business and technical operations within timber frame self-build housing sector by applying integrated VR/AR and BIM technologies. PhD thesis, Teesside University, UK.

Potts, K (2009) Construction during World War II: Management and financial administration. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Pour Aghajan, Marjan (2025) Supporting early decision-making between precast and in-situ concrete in construction industry. PhD thesis, Queensland University of Technology, Australia.

Pourafshar, O; Barmayehvar, B; Esmaeilabadi, R and Asnaashari, E (2025) An integrated FAHP-SD model to assess and allocate of critical risks for public-private partnership transportation projects. International Journal of Construction Management, 25(6), pp. 605-623. ISSN 1562-3599

Pouraghajan, M; Omrani, S and Drogemuller, R (2025) Enhancing decision-making in Australian concrete construction: A decision support model using an entropy-TOPSIS approach. Engineering, Construction and Architectural Management, 32(9), pp. 5913-5942. ISSN 0969-9988

Pouryarmohammadi, M; Ahmadi, H and Salaripour, A (2022) Developing physical resilience strategies in passive defense according to identification of endangered areas of urban environments (case study: Ahvaz city). International Journal of Disaster Resilience in the Built Environment, 13(1), pp. 14-30. ISSN 1759-5916

Pourzolfaghar, Z (2011) Improving knowledge capture during conceptual design phase of building projects. PhD thesis, Universiti Putra Malaysia, Malaysia.

Power, W; Sinnott, D and Lynch, P (2021) Evaluating the efficacy of a dedicated last planner® system facilitator to enhance construction productivity. Construction Economics and Building, 21(3), pp. 142-158. ISSN 2204-9029

Power, W; Sinnott, D and Lynch, P (2024) Takt complementing Last Planner® system on residential construction projects. Construction Economics and Building, 24(4-5), pp. 58-80. ISSN 2204-9029

Pozzer, A E; Rausch, C and Leite, F (2025) Methodology for evaluating the uncertainty of embodied carbon assessments in construction projects across project phases. Journal of Construction Engineering and Management, 151(10): 04025158, ISSN 0733-9364

Prakash, A (2019) Smart cities mission in India: Some definitions and considerations. Smart and Sustainable Built Environment, 8(4), pp. 322-337. ISSN 2046-6099

Prakash, A and Phadtare, M (2019) Exploration of logic in project marketing using interpretive structural modeling. Journal of Construction Engineering and Management, 145(11): 04019066, ISSN 0733-9364

Prasanna, M and Vinodh, S (2013) Lean six sigma in SMEs: An exploration through literature review. Journal of Engineering, Design and Technology, 11(3), pp. 224-250. ISSN 1726-0531

Praticò, F G (2013) New road surfaces: Logical bases for simple quality-related pay adjustments. Journal of Construction Engineering and Management, 139(11): 4013020, ISSN 0733-9364

Praticò, F G; Antonio, C and Domenico, T (2012) Influence of dispersion and location on pay adjustment in construction engineering. Journal of Construction Engineering and Management, 138(10), pp. 1125-1130. ISSN 0733-9364

Praticò, F G and Giunta, M (2018) Proposal of a key performance indicator for railway track based on LCC and rams analyses. Journal of Construction Engineering and Management, 144(2): 04017104, ISSN 0733-9364

Prayogo, A; Teophilea, H S; Nugraha, P; Sunindijo, R Y; Maharani, C F and Yang, K (2025) Noise disturbance increases negative emotions and unsafe behaviour among construction workers. International Journal of Construction Management, 25(8), pp. 932-939. ISSN 1562-3599

Preece, C; Moodley, K and Hyde, J (2000) Knowledge management strategies to improve construction business development processes: A preliminary case study. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Pregenzer, L J; Seppanen, P J; Kunz, J C and Paulson, B C (1999) Value-added assessment of construction plans. Journal of Construction Engineering and Management, 125(4), pp. 242-248. ISSN 0733-9364

Premier, A; GhaffarianHoseini, A and GhaffarianHoseini, A (2022) Solar-powered smart urban furniture: Preliminary investigation on limits and potentials of current designs. Smart and Sustainable Built Environment, 11(2), pp. 334-345. ISSN 2046-6099

Pretorius, F I H and Taylor, R G (1986) Conflict and individual coping behaviour in informal matrix organizations within the construction industry. Construction Management and Economics, 4(2), pp. 87-104. ISSN 01446193

Price, A D F (2003) The strategy process within large construction orgnisations. Engineering, Construction and Architectural Management, 10(4), pp. 283-296. ISSN 0969-9988

Price, A D F and Chahal, K (2006) A strategic framework for change management. Construction Management and Economics, 24(3), pp. 237-251. ISSN 01446193

Price, A D F and Shawa, H H (1997) Risk and risk management in project related finance. Journal of Construction Procurement, 3(3), pp. 27-46. ISSN 1358-9180

Price, D A (2003) Community involvement in the design of social housing. PhD thesis, University of Sheffield, UK.

Price, S J (2012) To deliver a sustainable built estate: The management and operationalisation of sustainable facilities management. PhD thesis, University of London, University College London, UK.

Pries, F and Dorée, A (2005) A century of innovation in the Dutch construction industry. Construction Management and Economics, 23(6), pp. 561-564. ISSN 01446193

Primdahl, M B; Forman, M; Frandsen, A F; Pihl, D and Nielsen, A K B (2022) Does the enactment of information and communications technology agreements in a digital construction organisation impact the mental work environment? In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Priyadarshani, K; Karunasena, G and Jayasuriya, S (2013) Construction safety assessment framework for developing countries: A case study of Sri Lanka. Journal of Construction in Developing Countries, 18(1), pp. 33-51. ISSN 1823-6499

Prochorskaite, A (2016) An investigation of the 'soft' features of sustainable and healthy housing design: exploring stakeholder preferences and their provision in new housing developments. PhD thesis, Liverpool John Moores University, UK.

Pryce, M (2006) An exploration of the benefits, drivers and barriers that affect the adoption of green roofs in urban Britain. PhD thesis, University of Salford, UK.

Pryke, S and Pearson, S (2006) Project governance: Case studies on financial incentives. Building Research & Information, 34(6), pp. 534-545. ISSN 0961-3218

Pryke, S D; Zagkli, G and Kougia, I (2011) Resource provision ego-networks in small Greek construction firms. Building Research & Information, 39(6), pp. 616-636. ISSN 0961-3218

Pryke, Stephen David (2002) UK construction in transition: developing a social network approach to the evaluation of new procurement and management strategies. PhD thesis, University College London, UK.

Psilander, K (2012) Managing production costs of small and large developers in Sweden: A case study on multi-family construction. International Journal of Construction Education and Research, 8(1), pp. 47-62. ISSN 1557-8771

Pulaski, M H (2005) The alignment of sustainability and constructability: A continuous value enhancement process. PhD thesis, Pennsylvania State University, USA.

Pulaski, M H and Horman, M J (2005) Organizing constructability knowledge for design. Journal of Construction Engineering and Management, 131(8), pp. 911-919. ISSN 0733-9364

Pulkka, L and Junnila, S (2015) Gravitational slingshot analogy of discontinuous sustainability innovation in the construction industry. Construction Innovation, 15(4), pp. 409-427. ISSN 1471-4175

Pulkka, L; Ristimäki, M; Rajakallio, K and Junnila, S (2016) Applicability and benefits of the ecosystem concept in the construction industry. Construction Management and Economics, 34(2), pp. 129-144. ISSN 01446193

Pun, S K; Liu, C and Langston, C (2006) Case study of demolition costs of residential buildings. Construction Management and Economics, 24(9), pp. 967-976. ISSN 1466433X

Puri, V and Martinez, J C (2013) Modeling of simultaneously continuous and stochastic construction activities for simulation. Journal of Construction Engineering and Management, 139(8), pp. 1037-1045. ISSN 0733-9364

Purnomo, M R A; Anugerah, A R; Aulia, S F and Azzam, A (2021) A novel optimisation model in the collaborative supply chain with production time capacity consideration. Journal of Engineering, Design and Technology, 19(3), pp. 647-658. ISSN 1726-0531

Pusceddu, C; Blumberg, G; Salvalai, G and Imperadori, M (2017) The use of building technology to support disaster resilience: The case study of air shelter house. International Journal of Disaster Resilience in the Built Environment, 8(2), pp. 139-157. ISSN 1759-5916

Pyles, E J (2022) Impact of psychological safety on organizational safety climate and safety culture in the heavy industrial construction industry: An embedded case study. DELead thesis, University of Charleston - Beckley, USA.

Pérez, C T and Bastos Costa, D (2021) Increasing production efficiency through the reduction of transportation activities and time using 4D BIM simulations. Engineering, Construction and Architectural Management, 28(8), pp. 2222-2247. ISSN 0969-9988

Pérez, C T and Costa, D (2018) Developing a taxonomy of transportation waste in construction production processes. Built Environment Project and Asset Management, 8(5), pp. 434-448. ISSN 2044-124X

Pérez, D; Lagos, C and Fernando Alarcón, L (2022) Key last planner system metrics to assess project performance in high-rise building and industrial construction projects. Journal of Construction Engineering and Management, 148(1): 04021179, ISSN 0733-9364

Pérez, Z G (2005) Appropriate designs and appropriating irrigation systems : Irrigation infrastructure development and users' management capability in Bolivia. PhD thesis, Wageningen University and Research, Netherlands.

Pérez-Bou, S; Kishnani, N and Dutta, A (2024) Human factors for a successful integrated design process in zero energy buildings: Leadership, trust, and goal orientation: A case study in Singapore. Architectural Engineering and Design Management, 20(4), pp. 928-945. ISSN 1745-2007

Qasim, M (2018) Improving highways construction processes using computer-based simulation techniques. PhD thesis, University of Salford, UK.

Qi, B (2021) BIM and ontological-based framework for design, manufacturing, and assembling requirements checking of prefabricated component. PhD thesis, University of Florida, USA.

Qian, Q K; Fan, K and Chan, E H W (2016) Regulatory incentives for green buildings: Gross floor area concessions. Building Research & Information, 44(5-6), pp. 675-693. ISSN 0961-3218

Qin, B (2019) Change and continuity: making sense of marketization in the Chinese construction sector. PhD thesis, University of Reading, UK.

Qu, Yingying (2017) An investigation of opportunistic behaviour in public-private partnerships. PhD thesis, University of New South Wales, Australia.

Quadri, H A (2019) Value engineering decisioneering: A risk management tool in the project management office- case study of electricity distribution companies in Nigeria. PhD thesis, University of Maryland, College Park, USA.

Quanjel, E M C J (2013) Collaborative design support: workshops to stimulate interaction and knowledge exchange between practitioners. PhD thesis, Eindhoven University of Technology, Netherlands.

Radtke, M W and Russell, J S (1993) Project-level model process for implementing constructability. Journal of Construction Engineering and Management, 119(4), pp. 813-831. ISSN 0733-9364

Radzi, A R; K.S, A; Alias, A R; Algahtany, M and Rahman, R A (2025) Modeling the factors affecting workplace well-being at construction sites: a cross-regional multigroup analysis. Journal of Engineering, Design and Technology, 23(4), pp. 1087-1110. ISSN 1726-0531

Rafferty, M and Toner, P (2019) Thinking like capital markets: Financialisation of the Australian construction industry. Construction Management and Economics, 37(3), pp. 156-168. ISSN 01446193

Rafiei, M H and Adeli, H (2016) A novel machine learning model for estimation of sale prices of real estate units. Journal of Construction Engineering and Management, 142(2): 04015066, ISSN 0733-9364

Rahayu, H P; Haigh, R; Amaratunga, D; Kombaitan, B; Khoirunnisa, D and Pradana, V (2020) A micro scale study of climate change adaptation and disaster risk reduction in coastal urban strategic planning for the Jakarta. International Journal of Disaster Resilience in the Built Environment, 11(1), pp. 119-133. ISSN 1759-5916

Rahim, A A and Samad, N A A (2010) Accessible built environment for the elderly and disabled in Malaysia: Hotels as case studies. Journal of Construction in Developing Countries, 15(2), pp. 1-21. ISSN 1823-6499

Rahimi, Y; Tavakkoli-Moghaddam, R; Iranmanesh, S H and Vaez-Alaei, M (2018) Hybrid approach to construction project risk management with simultaneous FMEA/ISO 31000/evolutionary algorithms: Empirical optimization study. Journal of Construction Engineering and Management, 144(6): 04018043, ISSN 0733-9364

Rahman, A (2014) The determinants of multinational contractors' willingness to bid for Australian public sector major infrastructure projects: deploying the eclectic paradigm of internationalisation. PhD thesis, Queensland University of Technology, Australia.

Rahman, A; Bridge, A J; Rowlinson, S and Kwowk, T (2012) Multinational contracting into Australia: Developing dunning’s theory and case study design. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Rahman, F; Rowlands, I and Weber, O (2017) Do green buildings capture higher market valuations and lower vacancy rates? A Canadian case study of LEED and BOMA-BEST properties. Smart and Sustainable Built Environment, 6(4), pp. 102-115. ISSN 2046-6099

Rahman, H A (1993) The management and cost of quality for civil engineering projects. PhD thesis, University of Manchester, UK.

Rahman, M M (2002) Joint risk management through transactionally efficient relational contracting. Construction Management and Economics, 20(1), pp. 45-54. ISSN 01446193

Rahman, M M (2003) Revitalising construction project procurement through joint risk management. PhD thesis, University of Hong Kong, Hong Kong.

Rahmani, F and Leifels, K (2018) Abductive grounded theory: A worked example of a study in construction management. Construction Management and Economics, 36(10), pp. 565-583. ISSN 01446193

Rahmani Asl, M (2015) A building information model (BIM) based framework for performance optimization. PhD thesis, Texas A&M University, USA.

Rahmayati, Y (2016) Reframing "building back better" for post-disaster housing design: A community perspective. International Journal of Disaster Resilience in the Built Environment, 7(4), pp. 344-360. ISSN 1759-5916

Rahouti, A; Datoussaïd, S and Descamps, T (2018) Safety assessment of a high-rise dormitory in case of fire. International Journal of Disaster Resilience in the Built Environment, 9(1), pp. 84-95. ISSN 1759-5916

Raidén, A B (2004) The development of a strategic employee resourcing framework (SERF) for construction organisations. PhD thesis, Loughborough University, UK.

Raidén, A B; Dainty, A R J and Neale, R H (2006) Balancing employee needs, project requirements and organisational priorities in team deployment. Construction Management and Economics, 24(8), pp. 883-895. ISSN 1466433X

Raidén, A B; Dainty, A R J and Neale, R H (2008) Understanding employee resourcing in construction organizations. Construction Management and Economics, 26(11), pp. 1133-1143. ISSN 1466433X

Raisbeck, P (2010) Investigating design as research: Understanding R&D activities in Australian architectural practices. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Raisbeck, P (2013) Time keeps on slippin', slippin', slippin' into the future: BIM, imaging and time on construction sights. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Raisbeck, P and Tang, L C M (2009) Humanistic and scientific knowledge management: A comparison of design practice between architects and engineers. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Raj, S; Hillig, J B and Hughes, W P (2009) Responsiveness to change by standard-form contract drafters in the construction industry: A case study of the FIDIC white book. International Journal of Law in the Built Environment, 1(3), pp. 205-220. ISSN 1756-1450

Raja, J (2016) Reducing the environmental impact of construction through use of geosynthetics. EngD thesis, Loughborough University, UK.

Raja, P (2025) A building centric urban digital twin for resiliency planning. PhD thesis, Rutgers The State University of New Jersey, USA.

Rajadurai, R and Vilventhan, A (2022) Integrating road information modeling (rim) and geographic information system (GIS) for effective utility relocations in infrastructure projects. Engineering, Construction and Architectural Management, 29(9), pp. 3647-3663. ISSN 0969-9988

Rajagopalan, N (2011) Residential life cycle assessment modeling for green buildings and building products. PhD thesis, University of Pittsburgh, USA.

Rajak, S. and Vimal, K. E. K. (2026) Blockchain-based time impact analysis method for sustainable delay management in EPC projects. Journal of Construction Engineering and Management, 152(6): 04026074, ISSN 0733-9364

Rajala, P; Ylä-Kujala, A; Sinkkonen, T and Kärri, T (2025) Operational effectiveness in building renovation business: Best practices for profitable execution. Construction Economics and Building, 25(1), pp. 97-121. ISSN 2204-9029

Rajan, T; Siddharth, R and Mukund, S P (2010) PPPs in road renovation and maintenance: A case study of the East Coast Road project. Journal of Financial Management of Property and Construction, 15(1), pp. 21-40. ISSN 1366-4387

Rajiv, P; Logesh, R; Vinodh, S and Rajanayagam, D (2014) Financial feasibility and value engineering principles integrated quality function deployment for a manufacturing organization: A case study. Journal of Engineering, Design and Technology, 12(1), pp. 71-88. ISSN 1726-0531

Ram, S-A (2024) Understanding sustainability education within undergraduate engineering at the university of Toronto. PhD thesis, University of Toronto, Canada.

Ramage, K L (2018) Scope management strategies for engineering leaders to improve project success rates. PhD thesis, Walden University, USA.

Ramaji, I J and Memari, A M (2018) Extending the current model view definition standards to support multi-storey modular building projects. Architectural Engineering and Design Management, 14(1-2), pp. 158-176. ISSN 1745-2007

Raman, S (1996) Construction exports from semi-industrialized countries: The case of India. PhD thesis, University of Connecticut, USA.

Ramani, P V and Ksd, L K L (2021) Application of lean in construction using value stream mapping. Engineering, Construction and Architectural Management, 28(1), pp. 216-228. ISSN 0969-9988

Ramani, P V and Lingan, L K (2022) Developing a lean model to reduce the design process cost of gas insulated switchgear foundation using value stream mapping–a case study. International Journal of Construction Management, 22(4), pp. 669-677. ISSN 1562-3599

Ramani, P V; Selvaraj, P; T., S and Gupta, A (2022) Application of linear scheduling in water canal construction with a comparison of critical path method. Journal of Construction in Developing Countries, 27(1), pp. 189-212. ISSN 1823-6499

Rambaruth, A; Adam, J K and Krishna, S B N (2022) Contributing elements and issues to strategic management in the construction industry among small and medium enterprises: A case study in South africa's ethekwini region. Journal of Construction Business and Management, 5(2), pp. 20-28. ISSN 2521-0165

Rameezdeen, R; Gunarathna, N and Assistant, R (2003) Organisational culture in construction: An employee perspective. Construction Economics and Building, 3(1), pp. 19-30. ISSN 2204-9029

Ramezanpour Jirandeh, R; Ghazi, M; Sotoodeh, A F and Nikian, M (2021) Plate-fin heat exchanger network modeling, design and optimization: A novel and comprehensive algorithm. Journal of Engineering, Design and Technology, 19(5), pp. 1017-1043. ISSN 1726-0531

Rampini, L and Re Cecconi, F (2024) Synthetic images generation for semantic understanding in facility management. Construction Innovation, 24(1), pp. 33-48. ISSN 1471-4175

Rampini, Luca (2023) Artificial intelligence enhances digital asset management. PhD thesis, Politecnico di Milano, Italy.

Ranasinghe, M (1999) Private sector participation in infrastructure projects: A methodology to analyse viability of BOT. Construction Management and Economics, 17(5), pp. 613-623. ISSN 01446193

Randeree, K and Ahmed, N (2019) The social imperative in sustainable urban development: The case of Masdar City in the United Arab Emirates. Smart and Sustainable Built Environment, 8(2), pp. 138-149. ISSN 2046-6099

Rankohi, S; Bourgault, M and Iordanova, I (2023) The new-normal challenges and IPD solutions: A Canadian case study. Built Environment Project and Asset Management, 13(1), pp. 20-35. ISSN 2044-124X

Ransolin, N; Saurin, T A; Clay-Williams, R; Formoso, C T; Rapport, F and Cartmill, J (2025) Beyond the operating room: Built environment design knowledge supportive of resilient surgical services. Engineering, Construction and Architectural Management, 32(6), pp. 3804-3831. ISSN 0969-9988

Raoufi, M and Fayek, A R (2018) Framework for identification of factors affecting construction crew motivation and performance. Journal of Construction Engineering and Management, 144(9): 04018080, ISSN 0733-9364

Rasdorf, W; Lewis, P; Arocho, I and Hummer, J (2015) Characterizing air pollutant emissions for highway construction projects. Smart and Sustainable Built Environment, 4(3), pp. 315-328. ISSN 2046-6099

Rashid, M J; Chowdhooree, I; Aziz, T and Hossain, M (2024) Determining the climate adaptive capacity of urban actors: A case study of Mongla port-town in Bangladesh. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 617-635. ISSN 1759-5916

Rashidian, Sara (2024) An integrated building information modelling, integrated project delivery and lean construction maturity model. PhD thesis, Queensland University of Technology, Australia.

Rasmussen C K S, T C L (2013) Organizing construction practices in different cultural contexts. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Rasmy, M O; Abu Atta, T A L and Mohamed Ibrahim, A A (2022) Sustainable strategy to create multisector or unisector smart economic hubs. Smart and Sustainable Built Environment, 11(3), pp. 692-716. ISSN 2046-6099

Rastegar, H; Arbab Shirani, B; Mirmohammadi, S H and Akhondi Bajegani, E (2021) Stochastic programming model for bidding price decision in construction projects. Journal of Construction Engineering and Management, 147(4): 02008, ISSN 0733-9364

Ratcliffe, J. W.; Alnaqshabandy, H.; Fox, M. and Goodhew, S. (2026) Optimising thermal performance in historic solid wall buildings: The role of orientation, natural insulation and building simulation. International Journal of Building Pathology and Adaptation, pp. 1-18. ISSN 2398-4708

Ratcliffe, J. W.; Alnaqshabandy, H.; Fox, M. and Goodhew, S. (2026) Optimising thermal performance in historic solid wall buildings: The role of orientation, natural insulation and building simulation. International Journal of Building Pathology and Adaptation, pp. 1-18. ISSN 2398-4708

Rathnayake, A P (2021) A framework to enhance the adoption of building information modelling amongst Sri Lankan quantity surveying organisations to increase the accuracy of pre-tender cost estimates. PhD thesis, University of Salford, UK.

Rathnayake, B; Gunathilake, L; Edirisinghe, R and Perera, S (2025) Ecoconstruct: A blockchain-based system for carbon trading in construction projects. Construction Innovation, 25(7), pp. 213-234. ISSN 1471-4175

Rathnayake, D K; Kularatne, D; Abeysinghe, S; Shehara, I; Fonseka, T; Edirisinghe Mudiyanselage, S D J; Kamalrathne, W G C T; Siriwardana, C; Alagiyawanna Mohotti Appuhamilage, C S B and Dissanayake, R (2020) Barriers and enablers of coastal disaster resilience: lessons learned from tsunami in Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 11(2), pp. 275-288. ISSN 1759-5916

Ratnasabapathy, S; Alashwal, A and Perera, S (2021) Investigation of waste diversion rates in the construction and demolition sector in Australia. Built Environment Project and Asset Management, 11(3), pp. 427-439. ISSN 2044-124X

Rauf, A; Shafiq, M T; Khalfan, M M A and Ulhaq, I (2024) Sustainable water management in construction: Life-cycle embodied water assessment of residential buildings. Built Environment Project and Asset Management, 14(5), pp. 682-696. ISSN 2044-124X

Rausch, C; Sanchez, B and Haas, C (2021) Topology optimization of architectural panels to minimize waste during fabrication: Algorithms for panel unfolding and nesting. Journal of Construction Engineering and Management, 147(7): 2089, ISSN 0733-9364

Ravirala, V (1995) Multi-criteria optimization methodologies for highway program development. PhD thesis, Rensselaer Polytechnic Institute, USA.

Raviv, G; Shapira, A and Sacks, R (2022) Empirical investigation of the applicability of constructability methods to prevent design errors. Built Environment Project and Asset Management, 12(1), pp. 53-69. ISSN 2044-124X

Rayburn, L M (1989) Productivity database and job cost control using microcomputers. Journal of Construction Engineering and Management, 115(4), pp. 585-601. ISSN 0733-9364

Razavialavi, S and Abourizk, S (2017) Genetic algorithm-simulation framework for decision making in construction site layout planning. Journal of Construction Engineering and Management, 143(1): 04016084, ISSN 0733-9364

Reddrick, L A (2023) Leadership strategies for modeling ethical behavior in the real estate industry. DBA thesis, Walden University, USA.

Reeves, K (2003) The evolution of the Japanese construction business system and its major players. PhD thesis, University of London, University College London, UK.

Reger, Darren Peter (2015) Economically and environmentally informed policies for road resurfacing: Tradeoffs between costs and greenhouse gas emissions. PhD thesis, University of California, USA.

Reilly, R (2022) Development of a management framework to improve the building services engineering design process: a case study of engineering management in an Irish consultancy practice. DProf thesis, University of Salford, UK.

Reiman, A; Pedersen, L M; Väyrynen, S; Sormunen, E; Airaksinen, O; Haapasalo, H and Räsänen, T (2019) Safety training parks–cooperative contribution to safety and health trainings. International Journal of Construction Education and Research, 15(1), pp. 19-41. ISSN 1557-8771

Reja, V. K.; Yin, M.; Davletshina, D.; Wei, R.; Fauth, J.; Perrotta, F. and Brilakis, I. (2026) Establishing and fulfilling information requirements for computer vision-enabled digital twin-based control of roadside vegetation. Journal of Construction Engineering and Management, 152(9): 04026147, ISSN 0733-9364

Rekapalli, P V and Martinez, J C (2011) Discrete-event simulation-based virtual reality environments for construction operations: Technology introduction. Journal of Construction Engineering and Management, 137(3), pp. 214-224. ISSN 0733-9364

Rekola, M; Kojima, J and Mäkeläinen, T (2010) Towards integrated design and delivery solutions: Pinpointed challenges of process change. Architectural Engineering and Design Management, 6(4), pp. 264-278. ISSN 1745-2007

Rempelos, G (2023) A whole life carbon model for railway track system interventions. PhD thesis, University of Southampton, UK.

Ren, Z; Chrysostomou, V and Price, T (2012) The measurement of carbon performance of construction activities: A case study of a hotel construction project in South Wales. Smart and Sustainable Built Environment, 1(2), pp. 153-171. ISSN 2046-6099

Render, N; Greenwood, D and Edge, J (2005) The other g.M.P: Good manufacturing practice and its importance in the validation of constructed pharmaceutical facilities. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Rener, A T (2022) Innovative methodologies to enhance productivity, supply chain, and sustainability in industrialized construction. PhD thesis, Lawrence Technological University, USA.

Renev, Ivan (2019) Automation of the conceptual design process in construction industry using ideas generation techniques. PhD thesis, Lappeenranta-Lahti University of Technology, Finland.

Resalati, S; Kendrick, C C and Hill, C (2020) Embodied energy data implications for optimal specification of building envelopes. Building Research & Information, 48(4), pp. 429-445. ISSN 0961-3218

Reszka, M and Edwards, P J (1997) Joint ventures: A construction project case study. Journal of Financial Management of Property and Construction, 2(2), pp. 5-20. ISSN 1366-4387

Rezaee Arjroody, A; Hosseini, S A; Akhbari, M; Safa, E and Asadpour, J (2024) Accurate estimation of cost and time utilizing risk analysis and simulation (case study: Road construction projects in Iran). International Journal of Construction Management, 24(1), pp. 19-30. ISSN 1562-3599

Rezakhani, P (2022) Hybrid fuzzy-Bayesian decision support tool for dynamic project scheduling and control under uncertainty. International Journal of Construction Management, 22(15), pp. 2864-2876. ISSN 1562-3599

Rezgui, Y and Miles, J (2010) Exploring the potential of SME alliances in the construction sector. Journal of Construction Engineering and Management, 136(5), pp. 558-567. ISSN 0733-9364

Riaz, Z (2008) Improving construction plant safety using advanced ICT. PhD thesis, Loughborough University, UK.

Riaz, Z; Edwards, D J; Holt, G D and Thorpe, T (2011) Data flow analysis of plant and equipment health and safety management. Journal of Engineering, Design and Technology, 9(2), pp. 178-203. ISSN 1726-0531

Ribeiro, F L (1998) Project delivery methods for large scale building projects: A case study. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Ribeiro, F L (1998) Delivering large scale building projects: a case study. Journal of Construction Procurement, 4(2), pp. 77-88. ISSN 1358-9180

Ribeiro, F L (1999) Appraisal of value engineering in design in Portugal. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Ribeiro, F L (2001) BOT model: The Portuguese case. Journal of Construction Procurement, 7(2), pp. 72-86. ISSN 1358-9180

Ribón, J G T M (2020) Advanced monitoring of construction safety using UAS and positioning technologies. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.

Rich, K (2011) Design and construction process of two LEED certified university buildings: A collective case study. PhD thesis, University of Missouri - Columbia, USA.

Richardson, S (2017) Embodied carbon assessment and decision making under uncertainty: case studies of UK supermarket construction. EngD thesis, University of Reading, UK.

Rickaby, M (2020) Defining the relationship between personal values and sustainability performance in a TMO setting. EngD thesis, Loughborough University, UK.

Rickaby, M; Glass, J; Mills, G and McCarthy, S (2017) Exploring alignment of personal values in a complex, multi-organisation construction project environment. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Rigby, E T; McCoy, A P and Garvin, M J (2012) Toward aligning academic and industry understanding of innovation in the construction industry. International Journal of Construction Education and Research, 8(4), pp. 243-259. ISSN 1557-8771

Riley, D R (1994) Modeling the space behavior of construction activities. PhD thesis, Pennsylvania State University, USA.

Riley, D R and Sanvido, V E (1997) Space planning method for multistory building construction. Journal of Construction Engineering and Management, 123(2), pp. 171-180. ISSN 0733-9364

Riley, D R; Varadan, P; James, J S and Thomas, H R (2005) Benefit-cost metrics for design coordination of mechanical, electrical, and plumbing systems in multistory buildings. Journal of Construction Engineering and Management, 131(8), pp. 877-889. ISSN 0733-9364

Riley, F G (2018) Information behaviour in construction project management teams: contradictions, motivations and influencing factors. PhD thesis, University of Leeds, UK.

Riley, M J (2001) Re-engineering the construction procurement process. PhD thesis, University of Southampton, UK.

Riley, S (2022) Assessing barriers to green infrastructure for flood mitigation. PhD thesis, University of Hawai'i at Manoa, USA.

Rintala, Kai M (2004) The economic efficiency of accommodation service PFI projects. PhD thesis, University College London, UK.

Ritson, N H; Wilson, M M J and Cohen, D A (2017) Managing engineering contractors in the UK petrochemicals industry. Engineering, Construction and Architectural Management, 24(6), pp. 1067-1080. ISSN 0969-9988

Ritter, V (2012) Optimizing the combination of active and passive building components in refurbishment projects to allow for net-zero emission architecture. DSc thesis, ETH Zürich, Switzerland.

Rivas, R A; Borcherding, J D; Gonzlez, V and Alarcn, L F (2011) Analysis of factors influencing productivity using craftsmen questionnaires: Case study in a Chilean construction company. Journal of Construction Engineering and Management, 137(4), pp. 312-320. ISSN 0733-9364

Rivera, A O (2017) Shifting from management to leadership: A procurement model adaptation to project management. PhD thesis, Arizona State University, USA.

Riza, R (2014) Integration of wind catchers in modern residential buildings in the uae as a means of providing thermal comfort. PhD thesis, British University in Dubai, UAE.

Rizaee, S and Lei, Z (2024) Duration estimation of a heavy industrial scaffolding project: A case study. Journal of Construction Engineering and Management, 150(4): 05024002, ISSN 0733-9364

Rizzi, Dario (2025) Tools for sustainable design strategies: Optimization of integrated BIM-blockchain technologies and protocols for the application of minimum environmental criteria. PhD thesis, Università degli Studi di Ferrara, Italy.

Roachanakanan, K (2005) A case study of cost overruns in a Thai condominium project. PhD thesis, Texas A&M University, USA.

Roberts, C; Bobrova, Y and Marjanovic-Halburd, L (2019) Impacts of energy legislation on organizational motivation: A case study. Building Research & Information, 47(2), pp. 234-244. ISSN 0961-3218

Roberts, C; Edwards, D J; Sing, M C P and Aigbavboa, C (2023) Post-occupancy evaluation: Process delineation and implementation trends in the UK higher education sector. Architectural Engineering and Design Management, 19(2), pp. 125-147. ISSN 1745-2007

Robertson, B (2020) On-site installation flexibility for disruption management in modular off-site construction systems. PhD thesis, University of Cambridge, UK.

Robinson, A; Gibb, A G and Austin, S A (2012) Standardisation of specification driven buildings with serial and repeat order designs. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Robinson, A C (2017) ISBU modular construction and building design prototypes. EngD thesis, Loughborough University, UK.

Robinson, H S (2000) A critical systems approach to infrastructure investment and resource management in developing countries. PhD thesis, London South Bank University, UK.

Robinson, H S; Carrillo, P M; Anumba, C J and A-Ghassani, A M (2005) Review and implementation of performance management models in construction engineering organizations. Construction Innovation, 5(4), pp. 203-217. ISSN 1471-4175

Robinson, H S; Carrillo, P M; Anumba, C J and Al-Ghassani, A M (2004) Developing a business case for knowledge management: The IMPaKT approach. Construction Management and Economics, 22(7), pp. 733-743. ISSN 01446193

Robinson, H S; Carrillo, P M; Anumba, C J and Al-Ghassani, A M (2005) Knowledge management practices in large construction organisations. Engineering, Construction and Architectural Management, 12(5), pp. 431-445. ISSN 0969-9988

Robinson, H S and Scott, J (2009) Service delivery and performance monitoring in PFI/PPP projects. Construction Management and Economics, 27(2), pp. 181-197. ISSN 1466433X

Robinson, W G (2019) Servitization as an ongoing process of changing: the case of ConstructCo. PhD thesis, University of Manchester, UK.

Robinson, W G; Chan, P W and Lau, T (2016) Sensors and sensibility: Examining the role of technological features in servitizing construction towards greater sustainability. Construction Management and Economics, 34(1), pp. 4-20. ISSN 01446193

Robinson A, A S G A (2013) Reinventing the wheel? Case study of research into linear/non-linear and framing processes. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Robson, A; Boyd, D and Thurairajah, N (2015) Are contractors' cost accounting practices up to the job of establishing improvement in site operations? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Robson, A; Boyd, D and Thurairajah, N (2016) Studying 'cost as information' to account for construction improvements. Construction Management and Economics, 34(6), pp. 418-431. ISSN 01446193

Rochat, Matthew James (2025) Chinese economic engagement in Africa and West African maritime ports. PhD thesis, University of California, Santa Barbara, USA.

Rockow, Z R (2020) Qualitative & quantitative analyses of existing buildings’ adaptability. PhD thesis, Clemson University, USA.

Rockow, Z R and Ross, B E (2020) An areal openness model (AOM) for quantifying the "openness" of floor plans. International Journal of Building Pathology and Adaptation, 39(3), pp. 470-489. ISSN 23984708

Rodger, D; Callaghan, N and Thomson, C (2019) The integration of retrofit practice within social housing. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Rodger, D; Callaghan, N and Thomson, C (2020) Exploring collaboration within social housing retrofit practice for an ageing population: A single case study in the West of Scotland. Journal of Financial Management of Property and Construction, 26(1), pp. 126-140. ISSN 1366-4387

Rodrigo, G A; Perera, B A K S and Ekanayake, B J (2022) Occupant perceptions on the thermal comfort guidelines in air-conditioned offices in Colombo, Sri Lanka. International Journal of Construction Management, 22(4), pp. 579-587. ISSN 1562-3599

Rodrigo, M N N; Perera, S; Senaratne, S and Jin, X (2022) Systematic development of a data model for the blockchain-based embodied carbon (bec) estimator for construction. Engineering, Construction and Architectural Management, 29(9), pp. 3311-3330. ISSN 0969-9988

Rodrigo, N; Perera, S; Senaratne, S and Jin, X (2024) Development of a blockchain-based embodied carbon estimator. Built Environment Project and Asset Management, 14(6), pp. 914-936. ISSN 2044-124X

Rodrigo, V (2016) Development of an e-business capability maturity model for construction organisations. PhD thesis, Northumbria University, UK.

Rodrigues, M R and Lindhard, S M (2023) Benefits and challenges to applying IPD: Experiences from a Norwegian mega-project. Construction Innovation, 23(2), pp. 287-305. ISSN 1471-4175

Rodrigues Aragao, R (2018) Using network theory to manage knowledge from unstructured data in construction projects: Application to a collaborative analysis of the energy consumption in the construction of oil and gas facilities. PhD thesis, University of Toronto, Canada.

Rodrigues Santos de Melo, R and Bastos Costa, D (2019) Integrating resilience engineering and uas technology into construction safety planning and control. Engineering, Construction and Architectural Management, 26(11), pp. 2705-2722. ISSN 0969-9988

Rodriguez, C M; Medina, J M and Pinzón, A (2019) Thermal comfort and satisfaction in the context of social housing: Case study in Bogotá, Colombia. Journal of Construction in Developing Countries, 24(1), pp. 101-124. ISSN 1823-6499

Rodriguez Diaz, C R (2012) Development of a framework and a rating system tool, for sustainable infrastructure certification in developing countries, case study for Ecuador. PhD thesis, University of Florida, USA.

Rodriguez-Ramos, W E (1982) Quantitative techniques for construction site layout planning. PhD thesis, University of Florida, USA.

Rodríguez-Labajos, L; Thomson, C S and O’Brien, G (2021) Applying constructivist grounded theory in co-production research: A case study exploring its potential and lessons for construction management research. Construction Management and Economics, 39(5), pp. 369-382. ISSN 01446193

Rogan, A (1999) Inter-organisational relationships in the construction process. PhD thesis, University of the West of England, Bristol, UK.

Rogers, B W (2010) "It's not just about the buildings, it's about the people": Architecture practice, and preservation in post-Katrina New Orleans. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Rogers, M (1998) Systematic decision-making in the environmental assessment of civil engineering projects. PhD thesis, University College Dublin, Ireland.

Rogers, M (2000) Using ELECTRE to aid the choice of housing construction process within structural engineering. Construction Management and Economics, 18(3), pp. 333-342. ISSN 01446193

Rogers, T R (1996) A conceptual communication-system model applied to construction. PhD thesis, University of Maryland, College Park, USA.

Rojas Molina, E M (1997) Developing a web-centric process to support inspection. PhD thesis, University of Colorado at Boulder, USA.

Rollo, Michael John (2020) Managing mega infrastructure projects: Linking theory with practice. PhD thesis, University of Sydney, Australia.

Romanello, G (2018) Stability analysis of mobile cranes and determination of outriggers loading. Journal of Engineering, Design and Technology, 16(6), pp. 938-958. ISSN 1726-0531

Romeiras de Lemos, M T (2002) Sustainable competitive advantage in PFI: A systematic and holistic approach to identify the csfs in risk management in PFI, taking into account the whole life cycle. PhD thesis, University of Salford, UK.

Rooke, J and Clark, L (2005) Learning, knowledge and authority on site: A case study of safety practice. Building Research & Information, 33(6), pp. 561-570. ISSN 0961-3218

Rooke, J A and Kagioglou, M (2007) Criteria for evaluating research: The unique adequacy requirement of methods. Construction Management and Economics, 25(9), pp. 979-987. ISSN 1466433X

Rooney P, A R (2013) A case study of changing procurement practices on delivery of highways projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Root, D S (2001) The influence of professional and occupational cultures on project relationships mediated through standard forms and conditions of contract. PhD thesis, University of Bath, UK.

Rosa, Fabiana Pires (2021) Proposal for a management model for the building maintenance phase, using the BIM concept, focusing on preventive maintenance. PhD thesis, Universidade do Vale do Rio dos Sinos, Brazil.

Rose, Colin (2019) Systems for reuse, repurposing and upcycling of existing building components. PhD thesis, University College London, UK.

Rose, J and Jayawickrama, J (2016) Capacity building of institutions for disaster risk reduction: Learning from communities as first responders. Built Environment Project and Asset Management, 6(4), pp. 391-402. ISSN 2044-124X

Rose, T and Manley, K (2010) Motivational misalignment on an iconic infrastructure project. Building Research & Information, 38(2), pp. 144-156. ISSN 0961-3218

Rose, T M and Manley, K (2014) Revisiting the adoption of innovative products on Australian road infrastructure projects. Construction Management and Economics, 32(9), pp. 904-917. ISSN 01446193

Rosenbaum, S; Toledo, M and González, V (2014) Improving environmental and production performance in construction projects using value-stream mapping: Case study. Journal of Construction Engineering and Management, 140(2): 04013045, ISSN 0733-9364

Rosenfeld, Y; Warszawski, A and Laufer, A (1992) Using quality circles to raise productivity and quality of work life. Journal of Construction Engineering and Management, 118(1), pp. 17-33. ISSN 0733-9364

Ross, A D (2005) A model of contingency factors affecting contractors' economic organisation of projects. PhD thesis, University of Salford, UK.

Ross, N; Bowen, P A and Lincoln, D (2010) Sustainable housing for low-income communities: Lessons for South Africa in local and other developing world cases. Construction Management and Economics, 28(5), pp. 433-449. ISSN 1466433X

Rossenbach, T D (2018) The development of a management accounting system for decentralised construction companies. PhD thesis, University of Gloucestershire, UK.

Rosso, S (2007) Environmental life-cycle of domestic kitchen refurbishment. PhD thesis, University of Brighton, UK.

Rostamnezhad, M; Nasirzadeh, F; Khanzadi, M; Jarban, M J and Ghayoumian, M (2020) Modeling social sustainability in construction projects by integrating system dynamics and fuzzy‐DEMATEL method: A case study of highway project. Engineering, Construction and Architectural Management, 27(7), pp. 1595-1618. ISSN 0969-9988

Rouhana, F and Jawad, D (2020) Transportation network resilience against failures: GIS-based assessment of network topology role. International Journal of Disaster Resilience in the Built Environment, 12(4), pp. 357-370. ISSN 1759-5916

Rouhi, S (2011) Framework for owner's project requirements for total structural systems (OPRTSS). PhD thesis, Georgia Institute of Technology, USA.

Rouhparvar, M; Babaei, F and Navidi, H (2025) Cooperative game theory approach towards capital equipment procurement in construction projects: a concrete batch plant case study. International Journal of Construction Management, 25(8), pp. 899-910. ISSN 1562-3599

Rounds, J L and Warning, G (1987) Impact of computerizing midsized construction companies. Journal of Construction Engineering and Management, 113(2), pp. 183-190. ISSN 0733-9364

Roussac, A C and Bright, S (2012) Improving environmental performance through innovative commercial leasing: An Australian case study. International Journal of Law in the Built Environment, 4(1), pp. 6-22. ISSN 1756-1450

Rowbotham, A (2018) Designing for fluid transitions to sustainable infrastructure: the case of the Bedford & Milton Keynes Waterway. PhD thesis, Open University, UK.

Rowlands, A S (2016) Effective collaboration in construction: the importance of managing power. PhD thesis, University of Birmingham, UK.

Rowlinson, S (2001) Matrix organizational structure, culture and commitment: A Hong Kong public sector case study of change. Construction Management and Economics, 19(7), pp. 669-673. ISSN 01446193

Rowlinson, S (2007) The temporal nature of forces acting on innovative IT in major construction projects. Construction Management and Economics, 25(3), pp. 227-238. ISSN 1466433X

Rowlinson, S; Mohamed, S and Lam, S W (2003) Hong Kong construction foremen's safety responsibilities: A case study of management oversight. Engineering, Construction and Architectural Management, 10(1), pp. 27-35. ISSN 0969-9988

Rowlinson, S M (1988) An analysis of factors affecting project performance in industrial buildings with particular reference to design build contracts. PhD thesis, Brunel University, UK.

Royal, S; Lehoux, N and Blanchet, P (2022) New home warranty schemes: Developing a theoretical comparative framework using qualitative content analysis. International Journal of Building Pathology and Adaptation, 40(4), pp. 499-522. ISSN 23984708

Royal, S; Lehoux, N and Blanchet, P (2023) Comparative case study research: An international analysis of nine home warranty schemes. International Journal of Building Pathology and Adaptation, 41(4), pp. 789-824. ISSN 23984708

Ruan, X; Ochieng, E G; Price, A D F and Egbu, C O (2012) Knowledge integration process in construction projects: A social network analysis approach to compare competitive and collaborative working. Construction Management and Economics, 30(1), pp. 5-19. ISSN 1466433X

Ruane, K (2020) Management strategies used by construction managers to reduce employee absenteeism. PhD thesis, Walden University, USA.

Rubio, F J (2018) Maintaining and widening the M25 motorway, UK: A private finance case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(5), pp. 197-206. ISSN 17514304

Ruddock, L and Wharton, A (2001) Analysing the construction sector: Progress towards a new framework. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Ruddock, S (2009) Assessment of the built environment for healthcare: A case study in the development of an evaluation framework. PhD thesis, University of Salford, UK.

Rudeli, N; Santilli, A; Puente, I and Viles, E (2017) Statistical model for schedule prediction: Validation in a housing-cooperative construction database. Journal of Construction Engineering and Management, 143(11): 04017083, ISSN 0733-9364

Rueda-Benavides, J; Khalafalla, M; Miller, M and Gransberg, D (2023) Cross-asset prioritization model for transportation projects using multi-attribute utility theory: A case study. International Journal of Construction Management, 23(16), pp. 2746-2755. ISSN 1562-3599

Ruhl, V R (1997) Computer-aided design and manufacturing of complex-shaped concrete formwork. DDes thesis, Harvard University, USA.

Ruikar, K (2006) Business process implications of e-commerce in construction organisations. EngD thesis, Loughborough University, UK.

Ruikar, K; Anumba, C J and Carrillo, P M (2005) End-user perspectives on use of project extranets in construction organisations. Engineering, Construction and Architectural Management, 12(3), pp. 222-235. ISSN 0969-9988

Ruikar, K; Koskela, L and Sexton, M (2009) Communities of practice in construction case study organisations: Questions and insights. Construction Innovation, 9(4), pp. 434-448. ISSN 1471-4175

Ruiz, A; Vinke-de Kruijf, J; Santos, J; Volker, L and Dorée, A (2023) Sustainable innovation processes in the asphalt paving sector: A system innovation approach. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Ruiz, A; Vinke-De Kruijf, J; Santos, J; Volker, L and Dorée, A (2025) Sustainability transitions in infrastructure: Understanding causal dynamics in the Dutch asphalt paving sector. Construction Management and Economics, 43(10), pp. 794-822. ISSN 0144-6193

Ruiz, J A; Granja, A D and Kowaltowski, D C C K (2014) Cost reallocation in social housing projects considering the desired values of end-users. Built Environment Project and Asset Management, 4(4), pp. 352-367. ISSN 2044-124X

Ruiz, R D B; Lordsleem Jr, A C; Rocha, J H A and Irizarry, J (2022) Unmanned aerial vehicles (uav) as a tool for visual inspection of building facades in AEC+FM industry. Construction Innovation, 22(4), pp. 1155-1170. ISSN 1471-4175

Rungjang, K (2013) Public investment for developing port facilities within competitive market. PhD thesis, University of Wisconsin - Madison, USA.

Ruokolainen, A and Plat, H T (1998) A system for allocating of private home owners' annual budget to housing. Journal of Financial Management of Property and Construction, 3(3), pp. 37-48. ISSN 1366-4387

Rupp, S H and Plagmann, M (2019) Characterisation of air permeability of common ceiling linings and penetrations. International Journal of Building Pathology and Adaptation, 37(4), pp. 448-460. ISSN 23984708

Russell, E F (2020) Leading role or bit player? Main contractors, supply chain and sustainable construction. PhD thesis, University of Surrey, UK.

Russell, J S; Gugel, J G and Radtke, M W (1994) Comparative analysis of three constructability approaches. Journal of Construction Engineering and Management, 120(1), pp. 180-195. ISSN 0733-9364

Russell, M M (2013) Allocation of time buffer to construction project task durations. PhD thesis, North Carolina State University, USA.

Russell, M M; Liu, M; Howell, G and Hsiang, S M (2015) Case studies of the allocation and reduction of time buffer through use of the last planner system. Journal of Construction Engineering and Management, 141(2): 04014068, ISSN 0733-9364

Russell, R C (2016) The development of a design and construction process protocol to support occupational therapists in delivering effective home modifications. PhD thesis, University of Salford, UK.

Rustom, R N and Yahia, A (2007) Estimating productivity using simulation: A case study of Gaza beach embankment protection project. Construction Innovation, 7(2), pp. 167-186. ISSN 1471-4175

Rwamamara, R and Simonsson, P (2009) Health and safety in concrete casting processes. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Rwamamara, R A (2007) Planning the healthy construction workplace through risk assessment and design methods. PhD thesis, Luleå University of Technology, Sweden.

Rwelamila, P D and Asalan, R (2010) Understanding of project management good practices by construction project managers: The case of ABCD. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Rwelamila, P D and Phungula, M G (2009) Managing the complexity of public private partnerships initiatives: How mature are South African public institutions? In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Rwelamila, P D; Talukhaba, A A and Ngowi, A B (1999) Tracing the African project failure syndrome: The significance of 'ubuntu'. Engineering, Construction and Architectural Management, 6(4), pp. 335-346. ISSN 0969-9988

Rwelamila P D, H C M S (2013) Capacity building in emerging economies through international construction ventures: Case study of the nmpp project. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Ryd, N V (2003) Exploring construction briefing: From document to process. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Saad, N M (2016) The influence of safety culture on safety performance in Saudi Arabian construction industry. PhD thesis, University of Salford, UK.

Saade, M R M; da Silva, M G; Gomes, V; Franco, H G; Schwamback, D and Lavor, B (2014) Material eco-efficiency indicators for Brazilian buildings. Smart and Sustainable Built Environment, 3(1), pp. 54-71. ISSN 2046-6099

Sabharwal, A; Syal, M and Hastak, M (2009) Impact of manufactured housing component assembly redesign on facility layout and production process. Construction Innovation, 9(1), pp. 58-71. ISSN 1471-4175

Sachchithananthan, M and Thayaparan, M (2025) A framework to select suitable sustainable materials for high-rise buildings in Sri Lanka. International Journal of Construction Management, 25(9), pp. 1072-1086. ISSN 1562-3599

Sackey, E (2014) A Sociotechnical Systems Analysis of Building Information Modelling (STSaBIM) Implementation in Construction Organisations. PhD thesis, Loughborough University, UK.

Sackey, E; Tuuli, M and Dainty, A (2019) Expansive learning in contemporary construction organisations: An exemplar in BIM-mediated projects. Built Environment Project and Asset Management, 9(3), pp. 383-398. ISSN 2044-124X

Sacks, A; Nisbet, A; Ross, J and Harinarain, N (2012) Life cycle cost analysis: A case study of Lincoln on the Lake. Journal of Engineering, Design and Technology, 10(2), pp. 228-254. ISSN 1726-0531

Sadat, H and Thomas, N (2025) An integrated approach to investigate the causes of time delays and cost overruns in Afghanistan construction projects. International Journal of Construction Management, 25(6), pp. 624-634. ISSN 1562-3599

Sadeghi, J; Oghabi, M; Sarvari, H; Sabeti, M S; Kashefi, H; Chan, D W M and Lotfata, A (2023) A hybrid risk assessment approach for assessing the earthquake risks in worn-out urban fabrics: A case study in Iran. International Journal of Disaster Resilience in the Built Environment, 14(2), pp. 193-211. ISSN 1759-5916

Sadeghi, M; Mahmoudi, A and Deng, X (2023) Blockchain technology in construction organizations: Risk assessment using trapezoidal fuzzy ordinal priority approach. Engineering, Construction and Architectural Management, 30(7), pp. 2767-2793. ISSN 0969-9988

Sadeghi, Naimeh (2015) A hybrid fuzzy discrete event simulation framework for analysis of stochastic and subjective uncertainties in construction projects. PhD thesis, University of Alberta, Canada.

Sadek, S M A (2016) Managing standard construction contractual forms modifications in the Middle East: overview and recommendations. PhD thesis, University of Salford, UK.

Saeb, A; Mohd Danuri, M S B; Zakaria, N B and Mohamed, O B (2020) A case study of dispute resolution methods pertaining to the construction standard form in Iran. International Journal of Construction Education and Research, 16(3), pp. 211-230. ISSN 1557-8771

Saeed, A M; Duffield, C and Hui, F K P (2018) An enhanced framework for assessing the operational performance of public-private partnership school projects. Built Environment Project and Asset Management, 8(2), pp. 194-214. ISSN 2044-124X

Saeed, F; Mostafa, K; Rauch, C and Hegazy, T (2023) Environmental impact and cost assessment for reusing waste during end-of-life activities on building projects. Journal of Construction Engineering and Management, 149(10): 04023099, ISSN 0733-9364

Saeed, S A A (2009) Delay to projects: Cause, effect and measures to reduce/eliminate delay by mitigation/acceleration. PhD thesis, British University in Dubai, UAE.

Saez Ujaque, D; Fuertes Perez, P; Garcia Almirall, M P and de Balanzó Joue, R (2022) Embedded resilience in the built stock. Lessons from socio-spatial interpretation. The case of canfugarolas (mataro-barcelona). Building Research & Information, 50(3), pp. 351-368. ISSN 0961-3218

Safapour, E; Kermanshachi, S and Kamalirad, S (2021) Analysis of effective project-based communication components within primary stakeholders in construction industry. Built Environment Project and Asset Management, 11(2), pp. 157-173. ISSN 2044-124X

Safapour, E; Kermanshachi, S and Rouhanizadeh, B (2022) Key components of successful post–hurricane reconstruction of transportation infrastructures. Built Environment Project and Asset Management, 12(5), pp. 775-791. ISSN 2044-124X

Safari, K and Ghandehariun, S (2026) An integrative BIM-based life cycle assessment framework to address uncertainties: A mixed-methods study under real construction project context. International Journal of Construction Management, 26(1), pp. 54-75. ISSN 1562-3599

Safari, M (2019) A regenerative approach to development and construction of building energy retrofit projects. PhD thesis, Pennsylvania State University, USA.

Safizadeh, M (2024) Simulation of the circulation complexity in student residence buildings using space syntax analyses (Case studies: Highland hall, Rita Atkinson, Rutgers University and Tooker Residences, USA). Architectural Engineering and Design Management, 20(4), pp. 741-760. ISSN 1745-2007

Sage, D; Dainty, A and Brookes, N (2012) A strategy-as-practice exploration of lean construction strategizing. Building Research & Information, 40(2), pp. 221-230. ISSN 0961-3218

Sage, D; Dainty, A; Tryggestad, K; Justesen, L and Mouritsen, J (2014) Building with wildlife: Project geographies and cosmopolitics in infrastructure construction. Construction Management and Economics, 32(7-8), pp. 773-786. ISSN 01446193

Sagoo, A S (2014) A decision support system for evaluating local authority housing maintenance strategies in the United Kingdom. PhD thesis, University of Derby, UK.

Saha, S; Hazra, S and Ghosh, T (2022) How embankment influences coastal livelihood in the context of climate adaptation: a case study of Indian sundarban delta. International Journal of Disaster Resilience in the Built Environment, 13(3), pp. 327-350. ISSN 1759-5916

Saha, Swapan Kumar (2002) Predicting realistic performance rate and optimum inspection rate in construction. PhD thesis, University of Western Sydney, Australia.

Sahebzamani, E and Forcada, N (2026) Enhancing sustainable construction decisions: Integrating BIM and VR for circular economy assessment. Building Research & Information, 54(1), pp. 79-99. ISSN 0961-3218

Said, H (2015) Prefabrication best practices and improvement opportunities for electrical construction. Journal of Construction Engineering and Management, 141(12): 04015045, ISSN 0733-9364

Saidi, K (2002) Possible applications of handheld computers to quantity surveying. PhD thesis, University of Texas at Austin, USA.

Sajid, Z W; Khan, S A; Hussain, F; Ullah, F; Khushnood, R A and Soliman, N (2026) Assessing economic and environmental performance of infill materials through BIM: A life cycle approach. Smart and Sustainable Built Environment, 15(1), pp. 9-39. ISSN 2046-6099

Sajjad, S and Dar, K H (2025) Economic infrastructure and its impact on economic growth: A case study of 7 sister states. Journal of Financial Management of Property and Construction, 30(3), pp. 357-376. ISSN 1366-4387

Sajjadian, S M (2016) Dynamic modelling of solar storage system: A case study of leisure centre. Smart and Sustainable Built Environment, 5(2), pp. 165-175. ISSN 2046-6099

Saka, A B and Chan, D W M (2020) Profound barriers to building information modelling (BIM) adoption in construction small and medium-sized enterprises (SMEs): An interpretive structural modelling approach. Construction Innovation, 20(2), pp. 261-284. ISSN 1471-4175

Saka, N and Olanipekun, A O (2021) Impact of the banking sector reform in the construction sector. Journal of Financial Management of Property and Construction, 26(3), pp. 387-407. ISSN 1366-4387

Saka, N; Saka, A B; Akinradewo, O and Aigbavboa, C O (2024) Impact assessment of political administrations on the performance of the construction sector: A time series analysis. Journal of Engineering, Design and Technology, 22(1), pp. 1-21. ISSN 1726-0531

Salah, M; Elbeltagi, E and Elsheikh, A (2024) Optimization of construction site layout using BIM generative design. International Journal of Construction Management, 24(3), pp. 314-322. ISSN 1562-3599

Salah Eldeen Ismaeel Elsayed Ahmed, Walaa (2014) Developing a systemic framework for applying LEED system: Managing energy and materials credits. PhD thesis, Politecnico di Milano, Italy.

Salam, M; Wilkinson, S and Wu, S (2025) Retrofitting for bushfire resilience: A scalable approach to addressing housing vulnerability among ageing populations in Australia. International Journal of Building Pathology and Adaptation, 43(8), pp. 75-88. ISSN 2398-4708

Salam, M; Killen, C and Forsythe, P (2025) Assessing interdisciplinary collaboration in the detailed design phase of construction projects: applying practice-based inter-organisational theories. International Journal of Construction Management, 25(2), pp. 238-247. ISSN 1562-3599

Salama, M A (2011) The relationship between the performance of the economy and the costing of building projects: a case study of school buildings in Egypt. PhD thesis, Heriot-Watt University, UK.

Salat, S (2009) Energy loads, CO2 emissions and building stocks: Morphologies, typologies, energy systems and behaviour. Building Research & Information, 37(5-6), pp. 598-609. ISSN 0961-3218

Salazar-Kish, J M (2001) Modeling concurrency tradeoffs and their effects on project duration and rework. PhD thesis, Stanford University, USA.

Saleh, Nour M M (2025) Post-disaster management in housing reconstruction. DEng thesis, Technische Universitaet Berlin, Germany.

Salehudin, Muhamad Syafiq Bin (2012) Developing sustainable resorts in developing countries: A proposed new generation rating framework for Malaysia. PhD thesis, University of New South Wales, Australia.

Saleki, S and Bahramani, S K (2019) Designing a low-carbon building via lcb method 3.0, case study: An educational building in Tehran. Journal of Construction in Developing Countries, 23(2), pp. 129-150. ISSN 1823-6499

Salem, O; Shahin, A and Khalifa, Y (2007) Minimizing cutting wastes of reinforcement steel bars using genetic algorithms and integer programming models. Journal of Construction Engineering and Management, 133(12), pp. 982-992. ISSN 0733-9364

Salih, A (2020) Project management information system introduction: Challenges and remedies in a construction context. PhD thesis, University of Liverpool, UK.

Salman, A; Moselhi, O and Zayed, T (2013) Scheduling model for rehabilitation of distribution networks using MINLP. Journal of Construction Engineering and Management, 139(5), pp. 498-509. ISSN 0733-9364

Salman, A F M; Skibniewski, M J and Basha, I (2007) BOT viability model for large-scale infrastructure projects. Journal of Construction Engineering and Management, 133(1), pp. 50-63. ISSN 0733-9364

Salman, S H (1991) Planning and control in the small business: Case studies from construction industry. PhD thesis, Swansea University, UK.

Salmaninezhad, M and Jazayeri Moghaddas, S M (2023) A multi-attribute approach to select the best method for repairing river bridge columns. Engineering, Construction and Architectural Management, 30(1), pp. 1-18. ISSN 0969-9988

Salmio, E and Huuhka, S (2026) Environmental impacts of reclaimed bricks: Comparing different deconstruction methods. Buildings & Cities, 7(1), pp. 323-340. ISSN 2632-6655

Salonen, A (2006) Relational risk and relationship management in facilities management partnerships. PhD thesis, Helsinki University of Technology, Finland.

Salvado, F; Almeida, N and Vale e Azevedo, A (2020) Aligning financial and functional equivalent depreciations rates of building assets. Engineering, Construction and Architectural Management, 27(2), pp. 441-457. ISSN 0969-9988

Salvatierra-Garrido, J (2012) Conceptualising value for construction: experience from social housing projects in Chile. PhD thesis, Loughborough University, UK.

Salvatierra-Garrido, J; Pasquire, C and Thorpe, T (2008) Social housing in Chile: Opportunities to apply value concept in early stage of projects. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Sam, M; Franz, B W and Alwisy, A (2026) Comparing vulnerability to adverse events in construction processes performed by human-robot collaboration and traditional crews: A case study in drywall finishing. Journal of Construction Engineering and Management, 152(6): 05026005, ISSN 0733-9364

Samarakkody, A L; Perera, B A K S and Palliyaguru, R (2022) Appropriateness of soft landings concept for avoiding malpractices in Sri Lankan building projects. International Journal of Construction Management, 22(14), pp. 2817-2829. ISSN 1562-3599

Samaraweera, A; Senaratne, S and Sandanayake, Y G (2018) Methodology to extract underlying basic assumptions of a public sector construction project culture: An exploratory case study. International Journal of Construction Management, 18(6), pp. 467-481. ISSN 1562-3599

Samaraweera, A; Senaratne, S and Sandanayake, Y G (2018) Nature of construction project cultures in the public sector: Case studies in Sri Lanka. Built Environment Project and Asset Management, 8(5), pp. 557-568. ISSN 2044-124X

Sami Kashkooli, A M (2013) A critical building lifecycle assessment framework for building designers and decision makers. PhD thesis, University of Sheffield, UK.

Sami Ur Rehman, M; Thaheem, M J; Nasir, A R and Khan, K I A (2022) Project schedule risk management through building information modelling. International Journal of Construction Management, 22(8), pp. 1489-1499. ISSN 1562-3599

Samman, R A and Graham, I (2007) The six sigma project management strategy. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Samonte, P and Djalante, R (2024) Postdisaster relocation and its impacts on family dynamics: a case study of Typhoon Ketsana relocation in the Philippines. International Journal of Disaster Resilience in the Built Environment, 15(1), pp. 158-173. ISSN 1759-5916

Samsurijan, M S; Radin Firdaus, R B; Rohayati, M I; Ebekozien, A and Aigbavboa, C (2025) Moderating effect of government policy on the relationship between low-cost housing demand-supply gap and COVID-19 impact. Smart and Sustainable Built Environment, 14(1), pp. 72-92. ISSN 2046-6099

Samuelsson, P (2006) Integrated measurement and assessment of performance in large organizations: The case of a Swedish construction company. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Sanchez X, A; Lehtiranta, L; Hampson, K D and Kenley, R (2014) Evaluation framework for green procurement in road construction. Smart and Sustainable Built Environment, 3(2), pp. 153-169. ISSN 2046-6099

Sandberg, E and Bildsten, L (2011) Coordination and waste in industrialised housing. Construction Innovation, 11(1), pp. 77-91. ISSN 1471-4175

Sandberg, R (2021) Illusions of freedom: Practice and contradictions in the work of construction site managers. PhD thesis, Chalmers University of Technology, Sweden.

Sanei, H (2016) Discipline breakdown structure: Bridging project management and systems engineering to form an integrated management system in multidisciplinary rail projects. PhD thesis, University College London, UK.

Sang, L; Yu, M; Lin, H; Zhang, Z and Jin, R (2021) Big data, technology capability and construction project quality: A cross-level investigation. Engineering, Construction and Architectural Management, 28(3), pp. 706-727. ISSN 0969-9988

Sanhudo, L; Poças Martins, J; Ramos, N M M; Almeida, R M S F; Rocha, A; Pinto, D; Barreira, E and Simões, M L (2021) BIM framework for the specification of information requirements in energy-related projects. Engineering, Construction and Architectural Management, 28(10), pp. 3123-3143. ISSN 0969-9988

Sankaran, B and O'Brien, W J (2018) Impact of CIM technologies and agency policies on performance for highway infrastructure projects. Journal of Construction Engineering and Management, 144(7): 04018052, ISSN 0733-9364

Sankaran, Bharathwaj (2017) Civil integrated management for highway infrastructure projects: Analyses of trends, specifications, impact, and maturity. PhD thesis, University of Texas at Austin, USA.

Sansakorn, P (2018) Development of a risk assessment methodology and safety management model for the building construction industry: case studies from Thailand. PhD thesis, University of Birmingham, UK.

Sanseverino, Anna (2023) Application of BIM methodology for structural inspection and maintenance eco-systems: Semi-automated monitoring procedures to implement different kinds of data into enriched cooperative systems. PhD thesis, Università degli Studi di Salerno, Italy.

Santos, P A S; Cortez, B and Carvalho, M T M (2025) Integrating GIS and BIM with MCDM for infrastructure planning: A comprehensive framework. Engineering, Construction and Architectural Management, 32(6), pp. 4197-4226. ISSN 0969-9988

Santoso, D S and Gallage, P G M P (2020) Critical factors affecting the performance of large construction projects in developing countries: A case study of Sri Lanka. Journal of Engineering, Design and Technology, 18(3), pp. 531-556. ISSN 1726-0531

Santoso, J and Loosemore, M (2013) Expatriate management in Australian multinational enterprises. Construction Management and Economics, 31(11), pp. 1098-1109. ISSN 1466433X

Sanvido, V E (1984) Designing productivity management and control systems for construction projects. PhD thesis, Stanford University, USA.

Sanvido, V E and Paulson, B C (1992) Site-level construction information system. Journal of Construction Engineering and Management, 118(4), pp. 701-715. ISSN 0733-9364

Sapountzis, S (2013) An investigation into the development of an effective benefits realisation process for healthcare infrastructure projects. PhD thesis, University of Salford, UK.

Sapri, M (2008) Using the repertory grid technique for the appraisal of facilities performance within higher education institutions: Library case study. PhD thesis, Heriot-Watt University, UK.

Saputro, K A (2016) Information volunteers' strategies in crisis communication: The case of Mt. Merapi eruption in Indonesia 2010. International Journal of Disaster Resilience in the Built Environment, 7(1), pp. 63-72. ISSN 1759-5916

Saraei, M H; Sharifi, A and Adeli, M (2023) Optimization of spatial distribution of hospitals for better earthquake recovery using GIS and imperialist competition algorithm (case study: Gorgan, Iran). International Journal of Disaster Resilience in the Built Environment, 14(3), pp. 285-300. ISSN 1759-5916

Saratsis, E; Dogan, T and Reinhart, C F (2017) Simulation-based daylighting analysis procedure for developing urban zoning rules. Building Research & Information, 45(5), pp. 478-491. ISSN 0961-3218

Sarden, Y and Stehn, L (2006) Industrialisation as a tool for reducing uncertainty in construction. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Sareen, S; Smith, A; Gantioler, S; Balest, J; Brisbois, M C; Tomasi, S; Sovacool, B; Contreras, G A T; Dellavalle, N and Haarstad, H (2023) Social implications of energy infrastructure digitalisation and decarbonisation. Buildings & Cities, 4(1), pp. 612-628. ISSN 2632-6655

Sargent, K; Hyland, P and Sawang, S (2012) Factors influencing the adoption of information technology in a construction business. Construction Economics and Building, 12(2), pp. 72-86. ISSN 2204-9029

Sarhan, S; Pretlove, S; Elghaish, F; Matarneh, S and Mossman, A (2025) Sources of occupational stress in UK construction projects: An empirical investigation and agenda for future research. Smart and Sustainable Built Environment, 14(6), pp. 1701-1728. ISSN 2046-6099

Sarhan, M (2008) Risk-based approach in highway geometric design. PhD thesis, Carleton University, Canada.

Sari, L H; Kayan, B A and Zahriah, Z (2024) An assessment of indoor environmental quality in COVID-19 affected houses: A case study in Banda Aceh, Indonesia. International Journal of Building Pathology and Adaptation, 42(5), pp. 932-956. ISSN 2398-4708

Saridaki, M and Haugbølle, K (2020) Informing early stage design through LCC data. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Sarisley, E F (1990) Construction methods and costs of stress-laminated timber bridges. Journal of Construction Engineering and Management, 116(3), pp. 432-447. ISSN 0733-9364

Sarkar, D; Jha, K N and Patel, S (2021) Critical chain project management for a highway construction project with a focus on theory of constraints. International Journal of Construction Management, 21(2), pp. 194-207. ISSN 1562-3599

Sarker, R I; Mailer, M and Sikder, S K (2020) Walking to a public transport station: Empirical evidence on willingness and acceptance in Munich, Germany. Smart and Sustainable Built Environment, 9(1), pp. 38-53. ISSN 2046-6099

Saroglou, T; Itzhak-Ben-Shalom, H and Meir, I A (2022) Pedestrian thermal perception: Studies around two high-rise buildings in the mediterranean climate. Building Research & Information, 50(1-2), pp. 171-191. ISSN 0961-3218

Sarshar, M; Haigh, R and Amaratunga, D (2004) Improving project processes: Best practice case study. Construction Innovation, 4(2), pp. 69-82. ISSN 1471-4175

Sarshar, M; Haigh, R; Finnemore, M; Aouad, G; Barrett, P; Baldry, D and Sexton, M (2000) Spice: A business process diagnostics tool for construction projects. Engineering, Construction and Architectural Management, 7(3), pp. 241-250. ISSN 0969-9988

Sarshar, M; Murat Tanyer, A; Aouad, G and Underwood, J (2002) A vision for construction IT 2005 2010: Two case studies. Engineering, Construction and Architectural Management, 9(2), pp. 152-160. ISSN 0969-9988

Saseendran, A (2021) Community engagement and outreach in the construction industry. PhD thesis, Texas A&M University, USA.

Sasidharan, M P (2020) A risk-informed approach to setting economically-justifiable maintenance strategies for railway tracks. PhD thesis, University of Birmingham, UK.

Sathvik, S; Krishnaraj, L and Awuzie, B O (2023) An assessment of prevalence of poor sleep quality among construction workers in southern India. Built Environment Project and Asset Management, 13(2), pp. 290-305. ISSN 2044-124X

Satterfield, J H (2020) Strategies for improving the performance of multigenerational cohorts in the construction industry. PhD thesis, Walden University, USA.

Saurin, T A; Formoso, C T; Reck, R; Beck Da Silva Etges, B M and Ribeiro, J L D (2015) Findings from the analysis of incident-reporting systems of construction companies. Journal of Construction Engineering and Management, 141(9): 501500, ISSN 0733-9364

Savage, D (2010) Business networks and conflict management. PhD thesis, Queen's University Belfast, UK.

Savaşkan, M O and Özener, O Ö (2023) H-BIM applications for vernacular architecture: A historic rural house case study in bursa, Turkey. Engineering, Construction and Architectural Management, 30(9), pp. 3997-4017. ISSN 0969-9988

Savikko, H; Hokkanen, J; Metsäranta, H; Honkatukia, J; Haapanen, M; Tohmo, T and Pongrácz, E (2025) A methodological framework to assess the employment impacts of transport infrastructure construction. Construction Economics and Building, 25(2), pp. 143-167. ISSN 2204-9029

Savoie, É; Sapinski, J P and Laroche, A M (2025) Key factors for revitalising heritage buildings through adaptive reuse. Buildings & Cities, 6(1), pp. 103-120. ISSN 2632-6655

Savolainen, J M; Saari, A; Männistö, A and Kähkonen, K (2018) Indicators of collaborative design management in construction projects. Journal of Engineering, Design and Technology, 16(4), pp. 674-691. ISSN 1726-0531

Sawan, R; Low, J F and Schiffauerova, A (2018) Quality cost of material procurement in construction projects. Engineering, Construction and Architectural Management, 25(8), pp. 974-988. ISSN 0969-9988

Sayed, E (2022) Biomimetic intelligence for systemic innovation in the built environment. PhD thesis, University of Northumbria at Newcastle, UK.

Sayed, M; Abdel-Hamid, M and El-Dash, K (2023) Improving cost estimation in construction projects. International Journal of Construction Management, 23(1), pp. 135-143. ISSN 1562-3599

Sayed, N; Badawy, A; Attia, T and Ahmed, A (2025) Cost-benefit analysis of recycled materials in road asphalt layer: A case study in Egypt. Built Environment Project and Asset Management, 15(4), pp. 791-807. ISSN 2044-124X

Sayed, T A E (1995) A highway safety expert system: A new approach to safety programs. PhD thesis, University of British Columbia, Canada.

Sayed Zayed, N.; Badawy Abu-Sena, A. B.; Attia, T. M. and Ahmed, A. (2026) Integrating recycled materials in road construction: A cost-effective and sustainable approach. International Journal of Construction Management, 26(7), pp. 1222-1238. ISSN 1562-3599

Scanlon, Jane (2011) Sustainability governance in the delivery phase of infrastructure: Two case studies from the urban rail sector. PhD thesis, Western Sydney University, Australia.

Schaefer, K K (2024) Community insurance as a flood management element in California. PhD thesis, University of California, Davis, USA.

Schexnayder, C; Alarcón, L F; Antillo, E D; Morales, B C and Lopez, M (2014) Observations on bridge performance during the Chilean earthquake of 2010. Journal of Construction Engineering and Management, 140(4): B4013001, ISSN 0733-9364

Schexnayder, C and Ohrn, L G (1997) Highway specifications: quality versus pay. Journal of Construction Engineering and Management, 123(4), pp. 437-443. ISSN 0733-9364

Schied Jr., E P (2012) Geometric information scheduling to identify and resolve spatial conflicts and increase efficiency of space use on construction projects. PhD thesis, Catholic University of America, USA.

Schiller, G; Gruhler, K and Xie, X (2020) Assessing the efficiency of indoor and outdoor access-related infrastructure. Buildings & Cities, 1(1), pp. 56-69. ISSN 2632-6655

Schlick, H (1983) Temporary heating in construction contracts. Journal of Construction Engineering and Management, 109(4), pp. 447-459. ISSN 0733-9364

Schlueter, A (2010) Model-based, performance-oriented building design employing distributed service systems. DSc thesis, ETH Zürich, Switzerland.

Schmidt, M; Crawford, R H and Warren-Myers, G (2020) Integrating life-cycle GHG emissions into a building's economic evaluation. Buildings & Cities, 1(1), pp. 361-378. ISSN 2632-6655

Schmidt Iii, R; Vibaek, K S and Austin, S (2014) Evaluating the adaptability of an industrialized building using dependency structure matrices. Construction Management and Economics, 32(1-2), pp. 160-182. ISSN 01446193

Schmieg, P A (1990) The politics of school board-community interaction: A case study of a high school construction project. EdD thesis, Temple University, USA.

Schnell, P (2022) Examination of the communication strategy based on company straplines: A case study of German construction companies. Construction Economics and Building, 22(4), pp. 81-97. ISSN 2204-9029

Schoenefeldt, H (2019) The House of Commons: A precedent for post-occupancy evaluation. Building Research & Information, 47(6), pp. 635-665. ISSN 0961-3218

Schoenwitz, M (2014) Aligning product and processes to customer needs in prefabricated house building. PhD thesis, Cardiff University, UK.

Schoenwitz, M; Naim, M and Potter, A (2012) The nature of choice in mass customized house building. Construction Management and Economics, 30(3), pp. 203-219. ISSN 1466433X

Schofield, L N (2011) The role of stakeholders in building self-sustaining capacity in housing development projects in marginalised communities: case of Odi and Kaduna South communities in Nigeria. PhD thesis, University of Salford, UK.

Schraven, D; Hartmann, A and Dewulf, G (2011) Effectiveness of infrastructure asset management: Challenges for public agencies. Built Environment Project and Asset Management, 1(1), pp. 61-74. ISSN 2044-124X

Schropfer, T (2004) Relational geographies of building practice: An analytic framework. DDes thesis, Harvard University, USA.

Schröpfer, V (2013) Social network analysis of knowledge transfer in sustainable office building projects in the UK and Germany. PhD thesis, Oxford Brookes University, UK.

Schweber, L and Haroglu, H (2014) Comparing the fit between BREEAM assessment and design processes. Building Research & Information, 42(3), pp. 300-317. ISSN 0961-3218

Schweber, L and Harty, C (2010) Actors and objects: A socio-technical networks approach to technology uptake in the construction sector. Construction Management and Economics, 28(6), pp. 657-674. ISSN 1466433X

Schönbeck, P (2022) Data based configuration decisions in hospital construction projects. PhD thesis, KTH Royal Institute of Technology, Sweden.

Schönbeck, P; Löfsjögård, M and Ansell, A (2022) Framework for change control in healthcare construction projects compared to current practice. International Journal of Construction Management, 22(12), pp. 2405-2412. ISSN 1562-3599

Scott, D (1984) Economic evaluation of minor roading projects. Construction Management and Economics, 2(1), pp. 77-90. ISSN 01446193

Scott, J N (2002) Facilitating the application of information technology in a UK piling contractor. PhD thesis, Lancaster University, UK.

Seaden, G and Manseau, A (2001) Public policy and construction innovation. Building Research & Information, 29(3), pp. 182-196. ISSN 0961-3218

Sebastian, R (2006) Evaluating a proposed approach for managing collaborative design in the conceptual design phase. Architectural Engineering and Design Management, 2(3), pp. 216-224. ISSN 1745-2007

Sebastian, R (2007) Managing collaborative design. Dr thesis, Delft University of Technology, Netherlands.

Sebastian, R (2011) Changing roles of the clients, architects and contractors through BIM. Engineering, Construction and Architectural Management, 18(2), pp. 176-187. ISSN 0969-9988

Sebastian, R; Claeson-Jonsson, C and Di Giulio, R (2013) Performance-based procurement for low-disturbance bridge construction projects. Construction Innovation, 13(4), pp. 394-409. ISSN 1471-4175

Seboni, L and Tutesigensi, A (2014) Allocating project managers to projects in a multi-project environment. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Seboni, L and Tutesigensi, A (2015) Project manager-to-project allocations in practice: An empirical study of the decision-making practices of a multi-project based organization. Construction Management and Economics, 33(5-6), pp. 428-443. ISSN 01446193

Sehic, A (2014) Decision support tool for interface management. PhD thesis, Polytechnic Institute of New York University, USA.

Seki, Y; Sutrisna, M and Olanipekun, A O (2021) Integrating a rich picture diagram and causal loop diagram to model stakeholder engagement in building refurbishment projects. Engineering, Construction and Architectural Management, 28(7), pp. 1929-1951. ISSN 0969-9988

Selih, J (2006) Selection of refurbishment actions for residential buildings by multi criteria decision method. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Selvam, G.; Kamalanandhini, M.; Velpandian, M.; Hariharan, R.; Mohanakrishna, S. and Thirumurugan, V. (2026) Integrated statutory waste management framework for the sustainable built environment. Engineering, Construction and Architectural Management, 33(5), pp. 4078-4097. ISSN 0969-9988

Semaan, N and Salem, M (2017) A deterministic contractor selection decision-support system for competitive bidding. Engineering, Construction and Architectural Management, 24(1), pp. 61-77. ISSN 0969-9988

Senaratne, S (2005) A knowledge-based approach to managing project change in the construction phase within collaborative team settings. PhD thesis, University of Salford, UK.

Senaratne, S and Gunawardane, S (2015) Application of team role theory to construction design teams. Architectural Engineering and Design Management, 11(1), pp. 1-20. ISSN 1745-2007

Senaratne, S and Hapuarachchi, A (2009) Construction project teams and their development: Case studies in Sri Lanka. Architectural Engineering and Design Management, 5(4), pp. 215-224. ISSN 1745-2007

Senaratne, S and Hewamanage, P R (2015) The role of team leadership in achieving LEED certification in a green building project. Built Environment Project and Asset Management, 5(2), pp. 170-183. ISSN 2044-124X

Senaratne, S and Jayarathna, T (2012) Quality planning process of construction contractors: Case studies in Sri Lanka. Journal of Construction in Developing Countries, 17(1), pp. 103-115. ISSN 1823-6499

Senaratne, S; Jin, X and Denham, K (2023) Knowledge sharing through social networks within construction organisations: Case studies in Australia. International Journal of Construction Management, 23(7), pp. 1223-1232. ISSN 1562-3599

Senaratne, S; Jin, X-H and Balasuriya, K (2017) Exploring the role of networks in disseminating construction project knowledge through case studies. Engineering, Construction and Architectural Management, 24(6), pp. 1281-1293. ISSN 0969-9988

Senaratne, S; Kagioglou, M; Amaratunga, D; Baldry, D; Aouad, G and Bowden, A (2005) Research knowledge transfer into teaching in the built environment. Engineering, Construction and Architectural Management, 12(6), pp. 587-600. ISSN 0969-9988

Senaratne, S; Kc, A and Rai, S (2024) Stakeholder management challenges and strategies for sustainability issues in megaprojects: Case studies from Australia. Built Environment Project and Asset Management, 14(3), pp. 414-431. ISSN 2044-124X

Senaratne, S and Kuruwita, S (2010) Resistance to organisational change: A case study in Sri Lankan construction organisation. International Journal of Construction Management, 10(1), pp. 61-73. ISSN 1562-3599

Senaratne, S and Malewana, C (2011) Linking individual, team and organizational learning in construction project team settings. Architectural Engineering and Design Management, 7(1), pp. 50-63. ISSN 1745-2007

Senaratne, S and Pasqual, Y S (2011) Learning, teaching and research for construction undergraduate programmes: An exploratory case study in Sri Lanka. International Journal of Construction Management, 11(3), pp. 35-48. ISSN 1562-3599

Senaratne, S and Ruwanpura, M (2016) Communication in construction: A management perspective through case studies in Sri Lanka. Architectural Engineering and Design Management, 12(1), pp. 3-18. ISSN 1745-2007

Senaratne, S and Samaraweera, A (2015) Construction project leadership across the team development process. Built Environment Project and Asset Management, 5(1), pp. 69-88. ISSN 2044-124X

Senaratne, S and Sexton, M (2008) Managing construction project change: A knowledge management perspective. Construction Management and Economics, 26(12), pp. 1303-1311. ISSN 1466433X

Senaratne, S and Sexton, M G (2004) Managing construction project change in the knowledge age: A case study. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Senaratne, S and Sexton, M G (2009) Role of knowledge in managing construction project change. Engineering, Construction and Architectural Management, 16(2), pp. 186-200. ISSN 0969-9988

Senaratne, S and Udawatta, N (2013) Managing intragroup conflicts in construction project teams: Case studies in Sri Lanka. Architectural Engineering and Design Management, 9(3), pp. 158-175. ISSN 1745-2007

Seneviratne, K; Perera, S; Ginigaddara, B; Jin, X; Tang, L and Osei Kyei, R (2024) Good practices in COVID-19 risk reduction adopted by Australian construction enterprises. Built Environment Project and Asset Management, 14(3), pp. 449-469. ISSN 2044-124X

Seng, Hansen (2020) A front end planning decision-making framework for infrastructure project selection and prioritisation in Indonesia. PhD thesis, RMIT University, Australia.

Senghore, O; Hastak, M; Abdelhamid, T S; AbuHammad, A and Syal, M G (2004) Production process for manufactured housing. Journal of Construction Engineering and Management, 130(5), pp. 708-718. ISSN 0733-9364

Sengonzi, R (2011) A framework for achieving whole life value of healthcare facilities through briefing and optioneering. PhD thesis, Loughborough University, UK.

Senouci, A B and Adeli, H (2001) Resource scheduling using neural dynamics model of adeli and park. Journal of Construction Engineering and Management, 127(1), pp. 28-34. ISSN 0733-9364

Seo, J (1998) Graphical interface design for equipment control in unstructured environments. PhD thesis, University of Texas at Austin, USA.

Seo, J; Lee, S and Seo, J (2016) Simulation-based assessment of workers' muscle fatigue and its impact on construction operations. Journal of Construction Engineering and Management, 142(11): 04016063, ISSN 0733-9364

Seo, J W and Choi, H H (2008) Risk-based safety impact assessment methodology for underground construction projects in Korea. Journal of Construction Engineering and Management, 134(1), pp. 72-81. ISSN 0733-9364

Sepp nen, O (2009) Empirical research on the success of production control in building construction projects. PhD thesis, Helsinki University of Technology, Finland.

Seraphim, D l (2006) Implementing TQM principles in a construction company in the UAE. PhD thesis, University of South Wales, UK.

Serhiiuk, I and Kalakoski, I (2023) Demolition or adaptation? Post-industrial buildings in Ukraine. Buildings & Cities, 4(1), pp. 352-368. ISSN 2632-6655

Serne, J N (2024) Attributing cause for occupational accidents in construction: A descriptive single case study. PhD thesis, Grand Canyon University, USA.

Serraino, P (2024) Teamwork and collaboration: Case studies in architectural practice. PhD thesis, University of California, Berkeley, USA.

Serugga, J (2020) A decision support system for benefits realisation in front end design of construction projects in dynamic contexts. PhD thesis, University of Huddersfield, UK.

Serugga, J; Kagioglou, M and Tzortzopoulos, P (2021) Benefits realization: Novel conceptual model for front end-design decision-making using dempster-shafer theory and quality function deployment. Journal of Construction Engineering and Management, 147(7): 04021062, ISSN 0733-9364

Sesoko, M P (2000) Gender and development in the construction industry in South Africa: A study of partnerships as alternative solution for women. PhD thesis, Brandeis University, Heller School for Social Policy and Management, USA.

Setiawan, H (2015) Corporate entrepreneurship capability model for contractors. PhD thesis, Heriot-Watt University, UK.

Seward, D W (2002) Automating the construction workplace: Positioning and navigational factors. Construction Innovation, 2(3), pp. 167-189. ISSN 1471-4175

Sexton, M and Barrett, P (2004) The role of technology transfer in innovation within small construction firms. Engineering, Construction and Architectural Management, 11(5), pp. 342-348. ISSN 0969-9988

Sexton, M; Barrett, P S; Miozzo, M; Wharton, A and Leho, E (2001) Innovation in small construction firms: Is it just a frame of mind? In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Sexton, M; Goulding, J; Zhang, X; Kagioglou, M; Aouad, G; Cooper, R and Barrett, P (2005) The role of the hycon design-support tool in elevating hybrid concrete as a design option for structural frames. Engineering, Construction and Architectural Management, 12(6), pp. 568-586. ISSN 0969-9988

Seydel, A; Wilson, O D and Skitmore, R M (2002) Financial evaluation of waste management methods: a case study. Journal of Construction Research, 3(1), pp. 167-179. ISSN 1609-9451

Seyis, S; Ergen, E and Pizzi, E (2016) Identification of waste types and their root causes in green-building project delivery process. Journal of Construction Engineering and Management, 142(2): 04015059, ISSN 0733-9364

Seymour-Jones, Trevor (2017) An assessment of international leading practice in the integrated management of public sector property assets, and its application to the Australian public sector. PhD thesis, University of Sydney, Australia.

Sezegen, A and Edis, E (2020) Product innovation types: A discussion considering building facade products. Engineering, Construction and Architectural Management, 27(9), pp. 2379-2408. ISSN 0969-9988

Sezer, A A; Thunberg, M and Wernicke, B (2021) Digitalization index: Developing a model for assessing the degree of digitalization of construction projects. Journal of Construction Engineering and Management, 147(10): 04021119, ISSN 0733-9364

Shafabakhsh, G A; Kashi, E and Akbari, A (2016) A comparison effect of aircraft main gear configuration on runway damages by led and fe method. Journal of Engineering, Design and Technology, 14(2), pp. 362-372.

Shafei, H; Rahman, R A and Lee, Y S (2025) Evaluating Construction 4.0 technologies in enhancing safety and health: case study of a national strategic plan. Journal of Engineering, Design and Technology, 23(4), pp. 1211-1242. ISSN 1726-0531

Shafei, H; Rahman, R A; Lee, Y S and Che Ibrahim, C K I (2025) Implications of construction 4.0 technologies to enhancing well-being: A fuzzy TOPSIS evaluation. Construction Innovation, 25(1), pp. 131-165. ISSN 1471-4175

Shafiee, S; Piroozfar, P; Forberg, L F; Hansen, H N and Farr, E (2025) Enhancing efficiency and sustainability in construction: a product configurator for customizable off-site building solutions. Architectural Engineering and Design Management, 21(3), pp. 450-466. ISSN 1745-2007

Shafique, F (2020) Transformational leadership for sustainability in architecture engineering and construction project teams. PhD thesis, Michigan State University, USA.

Shah, Mohammad Aminur Rahman A R (2017) Decision support framework for sustainability assessment of flood mitigation projects. PhD thesis, Griffith University, Australia.

Shah, R K (2011) Innovative methodology for location-based scheduling and visualisation of earthworks in road construction projects. PhD thesis, Teesside University, UK.

Shah, R K and Dawood, N (2011) An innovative approach for generation of a time location plan in road construction projects. Construction Management and Economics, 29(5), pp. 435-448. ISSN 1466433X

Shah, R K; Dawood, N; Dean, J and Castro, S (2009) A virtual construction model of 4d planning in road project. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Shahata, K and Zayed, T (2016) Integrated risk-assessment framework for municipal infrastructure. Journal of Construction Engineering and Management, 142(1): 04015052, ISSN 0733-9364

Shahbazi, B; Akbarnezhad, A; Rey, D; Ahmadian Fard Fini, A and Loosemore, M (2019) Optimization of job allocation in construction organizations to maximize workers' career development opportunities. Journal of Construction Engineering and Management, 145(6): 04019036, ISSN 0733-9364

Shaheen, A A-H I (2005) A framework for integrating fuzzy set theory and discrete event simulation in construction engineering. PhD thesis, University of Alberta, Canada.

Shahhosseini, V; Afshar, M R and Amiri, O (2018) Value engineering practices in infrastructure projects: A case study of Ilam gas refinery's water transmission system at Reno Mountain, Iran. International Journal of Construction Management, 18(5), pp. 351-363. ISSN 1562-3599

Shahin, A; Fahimian, M; Mahboubi Niazmandi, M; Soltaninejad, M and Wood, L C (2026) The green building policy puzzle: A stakeholder-informed multistage fuzzy framework for incentive evaluation. Journal of Construction Engineering and Management, 152(2): 04025246, ISSN 0733-9364

Shahin, Y; Eid, M S; Ahmed, H and Elhakeem, A (2025) Towards a more stable Construction Joint Venture agreement: individual rationality vs. fairness. International Journal of Construction Management, 25(2), pp. 161-170. ISSN 1562-3599

Shahtaheri, M; Haas, C T and Salimi, T (2017) A multi-dimensional joint confidence limit approach to mixed mode planning for round-the-clock projects. Engineering, Construction and Architectural Management, 24(1), pp. 40-60. ISSN 0969-9988

Shaikh, S; Brown, A and Enegbuma, W I (2023) The role of disaster knowledge management in improving housing reconstruction outcomes: With particular reference to postearthquake reconstruction in Pakistan. International Journal of Disaster Resilience in the Built Environment, 14(3), pp. 314-331. ISSN 1759-5916

Shakantu, W; Muya, M; Tookey, J and Bowen, P (2008) Flow modelling of construction site materials and waste logistics: A case study from Cape Town, South Africa. Engineering, Construction and Architectural Management, 15(5), pp. 423-439. ISSN 0969-9988

Shakantu, W; Muya, M; Tookey, J and Bown, P (2008) Evaluating truck empty running in construction: A case study from Cape Town, South Africa. Construction Economics and Building, 8(2), pp. 41-49. ISSN 2204-9029

Shakeri, E (2002) An investigation of privately promoted infrastructure (ppi) strategy in developing countries: Public-private partnership (ppp) approach. PhD thesis, University of Manchester, UK.

Shalaby, A and Ezeldin, A S (2022) A model for work packages optimization in results-based-finance projects. Engineering, Construction and Architectural Management, 29(7), pp. 2810-2835. ISSN 0969-9988

Shalaby, A and Hassanein, A (2019) A decision support system (DSS) for facilitating the scenario selection process of the renegotiation of PPP contracts. Engineering, Construction and Architectural Management, 26(6), pp. 1004-1023. ISSN 0969-9988

Shalaby, A M H (2021) Model for the automated generation of optimized work packages in results-based-finance mega sanitation projects. PhD thesis, The American University in Cairo, Egypt.

Shamp, P (2017) Scheduling strategies for construction project managers toward on time delivery. PhD thesis, Walden University, USA.

Shams, A. and Marzouk, M. (2026) Integrated time-cost-safety trade-off analysis and visual safety heat maps for enhanced construction performance. Journal of Construction Engineering and Management, 152(8): 04026114, ISSN 0733-9364

Shams, A. and Marzouk, M. (2026) Leveraging BIM and time-cost-safety trade-off analysis for optimized decisions in construction projects. Engineering, Construction and Architectural Management, 33(7), pp. 5180-5209. ISSN 0969-9988

Shamsai, M; Whitlatch, E and Sezen, H (2007) Economic evaluation of reinforced concrete structures with columns reinforced with prefabricated cage system. Journal of Construction Engineering and Management, 133(11), pp. 864-870. ISSN 0733-9364

Shandraseharan, A and Kulatunga, U (2023) Social media for disaster management: The Sri Lankan context. International Journal of Construction Management, 23(4), pp. 648-655. ISSN 1562-3599

Shang, L (2019) Achieving public agency goals in public-private partnerships using innovative payment mechanisms. PhD thesis, University of Washington, USA.

Shang, L and Abdel Aziz, A M (2020) Stackelberg game theory-based optimization model for design of payment mechanism in performance-based PPPs. Journal of Construction Engineering and Management, 146(4): 04020029, ISSN 0733-9364

Shankar, R and Tan, W (2024) Bid variability in public-private partnerships: Lessons from asset monetization through the toll-operate-transfer model in India. Journal of Construction Engineering and Management, 150(12): 05024015, ISSN 0733-9364

Shao, Y; Yang, Y; Ng, S T; Xing, J and Kwok, C Y (2025) Revelation and enhancement for pedestrian evacuation at metro station: Metamodeling-based simulation optimization approach. Journal of Construction Engineering and Management, 151(2): 04024198, ISSN 0733-9364

Shapira, A (1999) Contemporary trends in formwork standards: a case study. Journal of Construction Engineering and Management, 125(2), pp. 69-75. ISSN 0733-9364

Shapira, A (2004) Work inputs and related economic aspects of multitier shoring towers. Journal of Construction Engineering and Management, 130(1), pp. 134-142. ISSN 0733-9364

Shapira, A and Elbaz, A (2014) Tower crane cycle times: Case study of remote-control versus cab-control operation. Journal of Construction Engineering and Management, 140(12): 05014010, ISSN 0733-9364

Shapira, A; Shahar, Y and Raz, Y (2001) Design and construction of high multitier shoring towers: Case study. Journal of Construction Engineering and Management, 127(2), pp. 108-115. ISSN 0733-9364

Shareef, S; Mushtaha, E S; Abu Dabous, S and Alsyouf, I (2024) Holistic analysis for the efficiency of the thermal mass performance of precast concrete panels in hot climate zones. Engineering, Construction and Architectural Management, 31(10), pp. 4184-4206. ISSN 0969-9988

Shari, Zalina (2011) Development of a sustainability assessment framework for Malaysian office buildings using a mixed-methods approach. PhD thesis, University of Adelaide, Australia.

Sharif, M M; Chuo, S and Haas, C T (2022) Rapid 3D quality control in prefabrication using a 3D digital-templates framework. Journal of Construction Engineering and Management, 148(11): 04022117, ISSN 0733-9364

Sharifi, A A and Farahinia, A H (2020) Evaluation of the future adaptive reuse of mashrooteh house using the adaptSTAR model. International Journal of Building Pathology and Adaptation, 38(5), pp. 771-784. ISSN 23984708

Sharma, D K (2012) Design of availabilty payment mechanism for public private partnerships. PhD thesis, University of Maryland, College Park, USA.

Sharma, K and Trivedi, M K (2022) Latin hypercube sampling-based nsga-iii optimization model for multimode resource constrained time–cost–quality–safety trade-off in construction projects. International Journal of Construction Management, 22(16), pp. 3158-3168. ISSN 1562-3599

Sharma, V; Al-Hussein, M and Abourizk, S M (2006) Residential construction lot grading approval process optimization: Case study of city of Edmonton. Journal of Construction Engineering and Management, 132(12), pp. 1225-1233. ISSN 0733-9364

Sharp, M and Jones, K (2012) Perceived inefficiency in social housing maintenance. Construction Innovation, 12(4), pp. 414-428. ISSN 1471-4175

Sharrard, A L (2007) Greening construction processes using an input-output-based hybrid life cycle assessment method. PhD thesis, Carnegie Mellon University, USA.

Shaw, C; de Andrade Pereira, F; Farghaly, K; Hoare, C; Hartmann, T and O'Donnell, J (2024) Life cycle cost analysis at scale: a reference architecture-based approach. Built Environment Project and Asset Management, 14(5), pp. 713-733. ISSN 2044-124X

Shawa, H H (1995) Project related finance for construction contractors operating in the United Arab Emirates. PhD thesis, Loughborough University, UK.

Sheamar, S; Wedawatta, G; Tennakoon, M; Palliyaguru, R and Antwi-Afari, M F (2024) The potential of new models of construction procurement to counter cost overruns in construction projects: An exploratory study from a contractors' perspective. Journal of Financial Management of Property and Construction, 29(2), pp. 211-228. ISSN 1366-4387

Shearman, J; Hughes, W P; Gilchrist, R and Elwazani, S (2005) Strategies for reducing construction problems on archaeological sites. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Shebob, A (2012) Development of a methodology for analysing and quantifying delay factors affecting construction projects in Libya. PhD thesis, Teesside University, UK.

Shebob, A; Dawood, N; Shah, R K and Xu, Q (2012) Comparative study of delay factors in Libyan and the UK construction industry. Engineering, Construction and Architectural Management, 19(6), pp. 688-712. ISSN 0969-9988

Shebob, A; Dawood, N and Xu, Q (2011) Analysing construction delay factors: A case study of building construction project in Libya. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Shehadeh, Ali (2019) Multi-objective optimization for construction equipment fleet selection and management in highway construction projects based on time, cost, and quality objectives. PhD thesis, University of Central Florida, USA.

Shehata, A O; Megahed, N A; Hassan, A M and Shahda, M M (2024) Holistic SWOT based matrix of BIM adoption in heritage green retrofitting processes. Architectural Engineering and Design Management, 20(3), pp. 694-718. ISSN 1745-2007

Shelake, A G and Gogate, N G (2026) An integrated risk prioritization and determination of activity-wise delay (irpad) framework for enhancing schedule management in tunnel projects. Engineering, Construction and Architectural Management, 33(1), pp. 763-784. ISSN 0969-9988

Shelton, J; Martek, I and Chen, C (2016) Implementation of innovative technologies in small-scale construction firms: Five Australian case studies. Engineering, Construction and Architectural Management, 23(2), pp. 177-191. ISSN 0969-9988

Shen, Z; Wang, G; Ali, A; Wei, X; Zang, X and Ye, Y (2025) Study on the cooperation model of infrastructure projects in the third-party market of the belt and road. International Journal of Construction Management, 25(13), pp. 1609-1625. ISSN 1562-3599

Shen, K; Li, X; Cao, X and Zhang, Z (2022) Prefabricated construction process optimization based on rework risk. Journal of Construction Engineering and Management, 148(6): 04022031, ISSN 0733-9364

Shen, L; Wu, Y and Zhang, X (2011) Key assessment indicators for the sustainability of infrastructure projects. Journal of Construction Engineering and Management, 137(6), pp. 441-451. ISSN 0733-9364

Shen, L Y; Li, Q M; Drew, D and Shen, Q P (2004) Awarding construction contracts on multicriteria basis in China. Journal of Construction Engineering and Management, 130(3), pp. 385-393. ISSN 0733-9364

Shen, Q; Wang, H and Tang, B S (2014) A decision-making framework for sustainable land use in Hong Kong's urban renewal projects. Smart and Sustainable Built Environment, 3(1), pp. 35-53. ISSN 2046-6099

Shen, W; Xue, J; Xiong, J; Zhai, X; Lee, S and Lu, J (2025) A social network-based approach for analyzing interproject risks in large-scale programs. Journal of Construction Engineering and Management, 151(9): 04025124, ISSN 0733-9364

Shen, Xiaohan (2025) Vision-based information management using digital construction knowledge graphs to integrate data in digital twins for prefabricated construction. PhD thesis, University of New South Wales, Australia.

Shen, Y (2013) An investigation of safety climate on Hong Kong construction sites. PhD thesis, University of Hong Kong, Hong Kong.

Shepherd, S (2006) Evaluation of an engineering intervention to prevent silica exposures in construction. ScD thesis, University of Massachusetts Lowell, USA.

Shepherd, S and Woskie, S R (2010) Case study to identify barriers and incentives to implementing an engineering control for concrete grinding dust. Journal of Construction Engineering and Management, 136(11), pp. 1238-1248. ISSN 0733-9364

Sherafat, Behnam (2022) Acoustical modeling of construction jobsites with multiple operational machines for activity recognition and productivity analysis. PhD thesis, University of Utah, USA.

Sherif, A H (1988) The choice of construction technology in developing countries: A socially conscious economic assessment approach. DArch thesis, University of Michigan, USA.

Sherif, K F (2010) Total quality management and construction project management in Libya. PhD thesis, University of Plymouth, UK.

Sheriff, A (2011) Improvements in the effectiveness of information management in construction organisations. EngD thesis, Loughborough University, UK.

Sheriff, A M; Bouchlaghem, D; El-Hamalawi, A and Yeomans, S (2011) Developing a metadata standard for multimedia content management: A case study. Architectural Engineering and Design Management, 7(3), pp. 157-176. ISSN 1745-2007

Sherratt, F and Sherratt, S (2018) PPP problems: Challenging academic compliance with economic opportunism and exploitation. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Sherry, C (2009) The New South Wales strata and community titles acts: A case study of legislatively created high rise and master planned communities. International Journal of Law in the Built Environment, 1(2), pp. 130-142. ISSN 1756-1450

Sheth, A Z (2011) A refurbishment framework with an emphasis on energy consumption of existing healthcare facilities. EngD thesis, Loughborough University, UK.

Shi, X.; Gong, X.; Ke, Y. and Wu, X. (2026) Bundling strategies for routine expressway maintenance projects with similarity thresholds. Journal of Construction Engineering and Management, 152(8): 04026125, ISSN 0733-9364

Shi, J (2017) A quantitative method for assessing home envelope's energy performance using measured data. International Journal of Construction Management, 17(2), pp. 89-99. ISSN 1562-3599

Shi, J; Hu, J; Ma, M and Wang, H (2021) An environmental impact analysis method of machine-tool cutting units based on LCA. Journal of Engineering, Design and Technology, 19(5), pp. 1192-1206. ISSN 1726-0531

Shi, Q; Yu, J; Zhang, L; Su, Y; Wang, J and Kong, Q (2025) An optimization model for the duration of workshop production processes for precast concrete components for highway projects. International Journal of Construction Management, 25(7), pp. 813-825. ISSN 1562-3599

Shi, Q; Zuo, J and Zillante, G (2012) Exploring the management of sustainable construction at the programme level: A Chinese case study. Construction Management and Economics, 30(6), pp. 425-440. ISSN 1466433X

Shi, Y and Collinge, W (2023) Measuring social value in rail infrastructure projects: A system dynamic approach. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Shibeika, A (2014) Diffusion of digital innovation in a project-based firm: Case study of a UK engineering firm. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Shibeika, A and Harty, C (2015) Diffusion of digital innovation in construction: A case study of a UK engineering firm. Construction Management and Economics, 33(5-6), pp. 453-466. ISSN 01446193

Shided Keniwe, M S; Ali, A H; Abdelaal, M A; Yassin, A M; Kineber, A F; Nosier, I A R; El Monayeri, O D and Elsayad, M A (2025) Introducing a novel decision support system to enhance performance in infrastructure sanitation projects within the construction industry. Engineering, Construction and Architectural Management, 32(7), pp. 4581-4610. ISSN 0969-9988

Shields, R and West, K (2003) Innovation in clean-room construction: A case study of co-operation between firms. Construction Management and Economics, 21(4), pp. 337-344. ISSN 01446193

Shin, Y J; Farrokh, E; Jung, J and Kang, H (2025) Optimizing tunnel boring machine operations in real time within defined constraints. Journal of Construction Engineering and Management, 151(6): 04025042, ISSN 0733-9364

Shirani, F; O’sullivan, K; Henwood, K; Hale, R and Pidgeon, N (2022) Living in an active home: Household dynamics and unintended consequences. Buildings & Cities, 3(1), pp. 589-604. ISSN 2632-6655

Shiratuddin, M F (2009) Framework for context-aware information processing for design review in a virtual environment. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Shirazi, B; Langford, D A and Rowlinson, S M (1996) Organizational structures in the construction industry. Construction Management and Economics, 14(3), pp. 199-212. ISSN 01446193

Shiue, I (2016) Future urban design strategies for health and wellbeing: Proposal of DIDID action plan and design mapping. Journal of Engineering, Design and Technology, 14(1), pp. 104-114.

Shoesmith, D R (1996) A study of the management and procurement of building services work. Construction Management and Economics, 14(2), pp. 93-101. ISSN 01446193

Shohet, I M (2006) Key performance indicators for strategic healthcare facilities maintenance. Journal of Construction Engineering and Management, 132(4), pp. 345-352. ISSN 0733-9364

Shojaei, R S; Oti-Sarpong, K and Burgess, G (2023) Leading UK construction companies’ strategies to tackle BIM training and skills challenges. International Journal of Construction Education and Research, 19(4), pp. 383-404. ISSN 1557-8771

Shojaei, R S; Oti-Sarpong, K and Burgess, G (2023) Enablers for the adoption and use of BIM in main contractor companies in the UK. Engineering, Construction and Architectural Management, 30(4), pp. 1726-1745. ISSN 0969-9988

Shojaei Kol Kachi, A (2017) Extending the portfolio and strategic planning horizon by the stochastic forecasting of unknown future projects: A FDOT case study. PhD thesis, University of Florida, USA.

Shooshtarian, S; Maqsood, T; Wong, P S P; Caldera, S; Ryley, T; Zaman, A and Cáceres Ruiz, A M (2024) Circular economy in action: The application of products with recycled content in construction projects: a multiple case study approach. Smart and Sustainable Built Environment, 13(2), pp. 370-394. ISSN 2046-6099

Shooshtarian, S and Ridley, I (2016) Determination of acceptable thermal range in outdoor built environments by various methods. Smart and Sustainable Built Environment, 5(4), pp. 352-371. ISSN 2046-6099

Short, C A; Barrett, P; Dye, A and Sutrisna, M (2007) Impacts of value engineering on five capital arts projects. Building Research & Information, 35(3), pp. 287-315. ISSN 0961-3218

Short, C A; Whittle, G E and Owarish, M (2006) Fire and smoke control in naturally ventilated buildings. Building Research & Information, 34(1), pp. 23-54. ISSN 0961-3218

Shouman, B; Othman, A A E and Marzouk, M (2022) Enhancing users involvement in architectural design using mobile augmented reality. Engineering, Construction and Architectural Management, 29(6), pp. 2514-2534. ISSN 0969-9988

Shourkabi, A (2016) A study of designer time utilisation in Iranian construction consultancies. PhD thesis, Loughborough University, UK.

Shrahily, R; Medjdoub, B; Klalib, H; Chalal, M and Alwetaishi, M (2022) Managing construction site communication using the responsibility assignment matrix (RAM) system. International Journal of Construction Management, 22(15), pp. 2966-2986. ISSN 1562-3599

Shrestha, Asheem (2015) Risk allocation in public private partnerships: A principal agent approach. PhD thesis, University of Melbourne, Australia.

Shrestha, H D; Yatabe, R; Bhandary, N P and Subedi, J (2012) Vulnerability assessment and retrofitting of existing school buildings: A case study of Aceh. International Journal of Disaster Resilience in the Built Environment, 3(1), pp. 52-65. ISSN 1759-5916

Shrestha, R; Ko, T and Lee, J (2025) Quantifying project uncertainties: Leveraging historical bid and change order data for automated detection of cost and schedule impacts in new projects. Journal of Construction Engineering and Management, 151(4): 04025017, ISSN 0733-9364

Shrivastava, S (2012) Development of an energy information system for the construction phase of buildings: A contractor’s perspective. PhD thesis, University of Florida, USA.

Shugart, C T (1998) Regulation-by-contract and municipal services: The problem of contractual incompleteness. PhD thesis, Harvard University, USA.

Shuster, W D; Burkman, C E; Grosshans, J; Dadio, S and Losco, R (2015) Green residential demolitions: Case study of vacant land reuse in storm water management in cleveland. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Siddiqui, A A (2019) An investigation into data sharing between building information modelling and fire safety engineering, with potential applications to smart buildings. PhD thesis, University of Greenwich, UK.

Sidney, E E (2019) Evaluating the adoption of project management tools and techniques in private construction companies in Nigeria. PhD thesis, University of Bedfordshire, UK.

Sidwell, A C (1983) An evaluation of management contracting. Construction Management and Economics, 1(1), pp. 47-55. ISSN 01446193

Sidwell, A C (1990) Project management: Dynamics and performance. Construction Management and Economics, 8(2), pp. 159-178. ISSN 01446193

Sidwell, T and Kennedy, R (2004) Re-valuing construction through project delivery. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Siebelink, Sander (2021) Maturities in building information modelling: A multi-level perspective. PhD thesis, University of Twente, Netherlands.

Siebert, M (2019) Concrete and the barriers to innovation in UK housebuilding. PhD thesis, University of Nottingham, UK.

Siehler, B A (1999) European construction companies as global players towards the new millennium. PhD thesis, University of South Wales, UK.

Siemons, J C M M (1992) Occupational safety and health policy implementation: A comparison between Japan and the Netherlands. PhD thesis, University of Twente, Netherlands.

Sierra, L A; Pellicer, E and Yepes, V (2016) Social sustainability in the lifecycle of Chilean public infrastructure. Journal of Construction Engineering and Management, 142(5): 05015020, ISSN 0733-9364

Siew, Karyne Cheng (2018) Multi-stakeholder perspectives of value in project portfolios. PhD thesis, University of Technology Sydney, Australia.

Siew, R Y J (2015) Health and safety communication strategy in a Malaysian construction company: A case study. International Journal of Construction Management, 15(4), pp. 310-320. ISSN 1562-3599

Silva, E N; Brasil de Brito Mello, L C and Pinto, G O (2023) Challenges for lean construction adoption in the Brazilian industry: A study in construction companies, universities and class organizations. Construction Innovation, 23(5), pp. 1130-1150. ISSN 1471-4175

Silva, Vanessa Gomes da (2003) Sustainability assessment of office buildings in Brazil: Guidelines and methodological basis. PhD thesis, Universidade de São Paulo, Brazil.

Silveira da Costa, V and da Silva Torres, A (2023) Diagnosis of degradation state of the historic building facade through qualitative and quantitative indicators: Case study of the former school of agronomy eliseu maciel. International Journal of Building Pathology and Adaptation, 41(4), pp. 734-766. ISSN 23984708

Silverio-Fernandez, M A; Renukappa, S and Suresh, S (2019) Evaluating critical success factors for implementing smart devices in the construction industry: An empirical study in the Dominican Republic. Engineering, Construction and Architectural Management, 26(8), pp. 1625-1640. ISSN 0969-9988

Silwal, A.; Rouhanizadeh, B.; Safapour, E. and Ricks, M. (2026) Sustainable transportation infrastructure: Comparative analysis and a comprehensive decision-support tool. Built Environment Project and Asset Management, 16(3), pp. 616-636. ISSN 2044-124X

Simister, S J (1994) An investigation into the influences on construction professionals' working practices. PhD thesis, University of Reading, UK.

Simister, S J and Green, S D (1997) Recurring themes in value management practice. Engineering, Construction and Architectural Management, 4(2), pp. 113-125. ISSN 0969-9988

Simkoko, E E (1989) Analysis of factors impacting technology transfer in construction projects: Case studies from developing countries. TaknDr thesis, Kungliga Tekniska Hogskolan, Sweden.

Simmons, D R; Polmear, M; Bae, H and McCall, C (2022) Applying a new lens: Using photo elicitation in construction engineering management research. Journal of Construction Engineering and Management, 148(8): 04022074, ISSN 0733-9364

Simon, M (2010) The commitment to corporate social responsibility of construction companies in the United Kingdom and Germany. PhD thesis, University of Dundee, UK.

Simpeh, E and Smallwood, J (2018) Field diagnosis of challenges and facilitators to the adoption of green building principles in multi-purpose office facilities. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Simpeh, E K (2018) The adoption of green building in South Africa. PhD thesis, Nelson Mandela University, South Africa.

Simpeh, F and Adisa, S (2022) On-campus student accommodation safety measures: Provision versus risk analysis. International Journal of Building Pathology and Adaptation, 40(1), pp. 60-75. ISSN 23984708

Simpson, E; Bradley, D and O’Keeffe, J (2018) Failure is an option: An innovative engineering curriculum. International Journal of Building Pathology and Adaptation, 36(3), pp. 268-282. ISSN 23984708

Simpson, E; Gilmour, D; Blackwood, D; Falconer, R and Isaacs, J (2015) Major project team learning: Examining building information modelling. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Simpson, K; Janda, K B and Owen, A (2020) Preparing 'middle actors' to deliver zero-carbon building transitions. Buildings & Cities, 1(1), pp. 610-624. ISSN 2632-6655

Simushi, S and Wium, J (2020) Time and cost overruns on large projects: Understanding the root cause. Journal of Construction in Developing Countries, 25(1), pp. 129-146. ISSN 1823-6499

Sinesilassie, E G (2017) Determinants of success of public construction projects in Ethiopia. PhD thesis, Indian Institute of Technology Delhi, India.

Sing, M C P; Fung, I W H; Edwards, D J and Liu, H (2022) Dynamic construction site layout planning: An application of branch and bond algorithm. International Journal of Building Pathology and Adaptation, 40(4), pp. 523-538. ISSN 23984708

Sing, M C P; Luk, S Y Y; Chan, K H C; Liu, H J and Humphrey, R (2024) Scan-to-BIM technique in building maintenance projects: Practicing quantity take-off. International Journal of Building Pathology and Adaptation, 42(6), pp. 1250-1262. ISSN 2398-4708

Sing, M C P; Cao, N; Liu, H J and Choy, Y N (2025) Digitalization in Hong Kong building surveying: Advancements in building plan scrutiny process. Built Environment Project and Asset Management, 15(4), pp. 827-843. ISSN 2044-124X

Sing, T F (2002) Time to build options in construction processes. Construction Management and Economics, 20(2), pp. 119-130. ISSN 01446193

Singh, A (2017) Corporate social responsibility in construction firms operating in the UK. PhD thesis, University of Reading, UK.

Singh, H; Elghaish, F and Brooks, T (2023) Automated workflows for design coordination: Supporting MEP systems. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Singh, M M; Sawhney, A and Borrmann, A (2019) Integrating rules of modular coordination to improve model authoring in BIM. International Journal of Construction Management, 19(1), pp. 15-31. ISSN 1562-3599

Singh, R (2018) Defining models for project management processes. PhD thesis, King's College London, UK.

Singh, S and Ramiya, A M (2025) Assessing avalanche susceptibility using the analytic hierarchical process and multi-criteria weighted overlay: A case study of the leh-parthapur road axis. International Journal of Disaster Resilience in the Built Environment, 16(3), pp. 437-455. ISSN 1759-5908

Singh, V V (2024) Data-driven production planning and control using work density for on-site building construction. PhD thesis, University of California, Berkeley, USA.

Singh Rajput, T and Thomas, A (2023) Optimizing passive design strategies for energy efficient buildings using hybrid artificial neural network (ann) and multi-objective evolutionary algorithm through a case study approach. International Journal of Construction Management, 23(13), pp. 2320-2332. ISSN 1562-3599

Singhaputtangkul, N (2017) A decision support tool to mitigate decision-making problems faced by a building design team. Smart and Sustainable Built Environment, 6(1), pp. 2-18. ISSN 2046-6099

Singhaputtangkul, N and Zhao, X (2016) Applying a fuzzy consensus scheme to enhance the group decision making of a building envelope design team. Journal of Construction Engineering and Management, 142(8): 4016025, ISSN 0733-9364

Sinha, A K and Jha, K N (2021) Financing constraints of public-private partnership projects in India. Engineering, Construction and Architectural Management, 28(1), pp. 246-269. ISSN 0969-9988

Sinha, S (2006) Skill based framework for measuring complexity of construction projects. PhD thesis, University of Strathclyde, UK.

Sinha, S; Kumar, B and Thomson, A (2006) Measuring project complexity: A project manager's tool. Architectural Engineering and Design Management, 2(3), pp. 187-202. ISSN 1745-2007

Sinoh, S S; Othman, F and Ibrahim, Z (2020) Critical success factors for BIM implementation: A Malaysian case study. Engineering, Construction and Architectural Management, 27(9), pp. 2737-2765. ISSN 0969-9988

Siriwardena, M L (2015) Organisational learning in construction: a framework from the process improvement perspective. PhD thesis, University of Salford, UK.

Siriwardena, N (2012) Managing stakeholder needs and expectations in a post-disaster housing reconstruction scenario. PhD thesis, University of Salford, UK.

Sistos-Sescosse, G; Atuahene, B T; Ajulo, O and Adams, I (2025) Examining the decision criteria for BIM–LCA: A case study. Construction Economics and Building, 25(1), pp. 203-220. ISSN 2204-9029

Siu, M F (2016) Development of quantitative methods for project scheduling and workface planning under time-dependent resource constraints. PhD thesis, University of Alberta, Canada.

Siva, J and London, K (2012) Client learning for successful architect-client relationships. Engineering, Construction and Architectural Management, 19(3), pp. 253-268. ISSN 0969-9988

Siva, J P S and London, K (2011) Investigating the role of client learning for successful architect-client relationships on private single dwelling projects. Architectural Engineering and Design Management, 7(3), pp. 177-189. ISSN 1745-2007

Siva Rama Krishna, U and Naga Satish Kumar, C (2022) A case study on maintenance of bituminous concrete pavement considering life cycle cost analysis and carbon footprint estimation. International Journal of Construction Management, 22(9), pp. 1756-1764. ISSN 1562-3599

Sjökvist, S; Francart, N; Balouktsi, M and Birgisdottir, H (2025) Embodied climate impacts in urban development: a neighbourhood case study. Buildings & Cities, 6(1), pp. 25-49. ISSN 2632-6655

Skaik, S and Oweineh, H (2014) Assessing the practice of project-based jv between local and international contractors in the UAE. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Skea, J (2012) Research and evidence needs for decarbonisation in the built environment: A UK case study. Building Research & Information, 40(4), pp. 432-445. ISSN 0961-3218

Skibniewski, M J (1986) Engineering and economic analysis of robotics application potential in selected construction operations. PhD thesis, Carnegie Mellon University, USA.

Skibniewski, M J and Ghosh, S (2009) Determination of key performance indicators with enterprise resource planning systems in engineering construction firms. Journal of Construction Engineering and Management, 135(10), pp. 965-978. ISSN 0733-9364

Skinner, D W H (1974) An investigation of the contractor's use of bills of quantities. PhD thesis, Aston University, UK.

Skitmore, M and Drew, D (2003) The analysis of pre-tender building price forecasting performance: A case study. Engineering, Construction and Architectural Management, 10(1), pp. 36-42. ISSN 0969-9988

Skitmore, M and Ng, S T (2002) Analytical and approximate variance of total project cost. Journal of Construction Engineering and Management, 128(5), pp. 456-460. ISSN 0733-9364

Skoura, A and Madden, A (2023) Assessing the social values of historic shopping arcades: Building biographies. Buildings & Cities, 4(1), pp. 690-707. ISSN 2632-6655

Slaughter, E S (2000) Implementation of construction innovations. Building Research & Information, 28(1), pp. 2-17. ISSN 0961-3218

Slay, Peter Gordon Ronald (2019) Development of an ontology for project management success criteria and associated technical and personal competencies in an Australian engineering context. PhD thesis, University of New South Wales, Australia.

Smailes, R L (2000) Building chan chan: The application of construction project management to the analysis of ancient architecture. PhD thesis, University of Florida, USA.

Small-Warner, K (2022) Adopting sustainable business models in small island developing states (SIDS): buildings and construction sector. PhD thesis, De Montfort University, UK.

Smallwood, J J (2003) The image of contractors: A South African case study. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Smallwood, J J; Allen, C J and Deacon, C H (2020) The role of industry 4.0 in construction occupational health (OH). In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Smallwood, J J and Emuze, F (2016) Factors that promote zero fatalities, injuries, and disease in construction. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Smith, D (2020) Rank and file union organising and employers' counter-mobilisation: The role of activists in the mobilisation of 'self-employed' construction workers. PhD thesis, University of the West of England, Bristol, UK.

Smith, D R (2020) Adaptive leadership strategies and project success of construction project managers in Jamaica. PhD thesis, Walden University, USA.

Smith, J; Edwards, D J; Martek, I; Chileshe, N; Hayhow, S and Roberts, C J (2023) The antecedents of construction project change: An analysis of design and build procurement application. Journal of Engineering, Design and Technology, 21(3), pp. 655-689. ISSN 1726-0531

Smith, J; Georgiou, J; O’Keeffe, N and Love, P (2003) Design management in a design-construct organization. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Smith, J and Wyatt, R (1999) Strategic needs analysis: Preliminary results. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Smith, J P (2013) Trust-building in the construction project delivery process: A relational lookahead tool for managing trust. PhD thesis, Texas A&M University, USA.

Smith, Jim (2002) Strategic client briefing: A model for building project inception. PhD thesis, University of Melbourne, Australia.

Smith, R E; Griffin, G; Rice, T and Hagehofer-Daniell, B (2018) Mass timber: Evaluating construction performance. Architectural Engineering and Design Management, 14(1-2), pp. 127-138. ISSN 1745-2007

Smith, S D; Wood, G S and Gould, M (2000) A new earthworks estimating methodology. Construction Management and Economics, 18(2), pp. 219-228. ISSN 01446193

Smyth, H (2010) Construction industry performance improvement programmes: The UK case of demonstration projects in the 'continuous improvement' programme. Construction Management and Economics, 28(3), pp. 255-270. ISSN 1466433X

Smyth, H and Fitch, T (2009) Application of relationship marketing and management: A large contractor case study. Construction Management and Economics, 27(4), pp. 399-410. ISSN 1466433X

Snippert, T; Witteveen, W; Boes, H and Voordijk, H (2015) Barriers to realizing a stewardship relation between client and vendor: The best value approach. Construction Management and Economics, 33(7), pp. 569-586. ISSN 01446193

Sodagar, B; Rai, D; Jones, B; Wihan, J and Fieldson, R (2011) The carbon-reduction potential of straw-bale housing. Building Research & Information, 39(1), pp. 51-65. ISSN 0961-3218

Soe, Y (2017) Construction supply chain risk management framework for construction projects: case studies in Myanmar. PhD thesis, University of Birmingham, UK.

Soetanto, R; Glass, J; Dainty, A R J and Price, A D F (2007) Structural frame selection: Case studies of hybrid concrete frames. Building Research & Information, 35(2), pp. 206-219. ISSN 0961-3218

Soetanto, R and Pan, W (2009) Strategic planning of UK housebuilders: Case study of a major property developer. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Sohail, M (1997) An investigation into the procurement of urban infrastructure in developing countries. PhD thesis, Loughborough University, UK.

Sohrabizadeh, S; Jahangiri, K; Shafiei Moghaddam, P; Safarpour, H and Eskandari, Z (2019) Earthquake preparedness in higher education structures: A case study of an academic institute in Tehran, Iran. International Journal of Disaster Resilience in the Built Environment, 10(2-3), pp. 175-187. ISSN 1759-5916

Solanki, A; Sarkar, D and Kapdi, P (2024) Evaluation of key performance indicators of internet of things and cloud computing for infrastructure projects in Gujarat, India through consistent fuzzy preference relations approach. International Journal of Construction Management, 24(7), pp. 707-721. ISSN 1562-3599

Solheim-Kile, E and Wald, A (2019) Extending the transactional view on public-private partnership projects: Role of relational and motivational aspects in goal alignment. Journal of Construction Engineering and Management, 145(5): 04019030, ISSN 0733-9364

Solis, F; Sinfield, J V and Abraham, D M (2013) Hybrid approach to the study of inter-organization high performance teams. Journal of Construction Engineering and Management, 139(4), pp. 379-392. ISSN 0733-9364

Solnosky, R L (2013) Integrated structural process model: An inclusive non-material specific approach to determining the required tasks and information exchanges for structural building information modeling. PhD thesis, Pennsylvania State University, USA.

Solovyova, I (2008) The role of the autobiographical experiences with emotional significance of an architect in design conjecturing. PhD thesis, Texas A&M University, USA.

Soltani, M; Aouag, H and Mouss, M D (2020) An integrated framework using VSM, AHP and TOPSIS for simplifying the sustainability improvement process in a complex manufacturing process. Journal of Engineering, Design and Technology, 18(1), pp. 211-229. ISSN 1726-0531

Somasundaram, T and Davies, B J (2014) Collaboration to improve evacuation centre operations in Queensland. International Journal of Disaster Resilience in the Built Environment, 5(3), pp. 305-317. ISSN 1759-5916

Somboonpisan, J and Limsawasd, C (2021) Environmental weight for bid evaluation to promote sustainability in highway construction projects. Journal of Construction Engineering and Management, 147(4): 04021013, ISSN 0733-9364

Somiah, M K; Aigbavboa, C and Thwala, W D (2021) Rethinking the attributes for competitive advantage of indigenous construction firms in developing countries: A Ghana study. International Journal of Construction Education and Research, 17(3), pp. 242-257. ISSN 1557-8771

Sommerville, J (2011) Ethical views of micro-enterprises delivering project and asset management services in West-Central Scotland. Built Environment Project and Asset Management, 1(1), pp. 91-103. ISSN 2044-124X

Sommerville, J; Craig, N and Charles, A (2011) No-fines homes: The make or break question? In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Sompolgrunk, A; Banihashemi, S and Mohandes, S R (2023) Building information modelling (BIM) and the return on investment: A systematic analysis. Construction Innovation, 23(1), pp. 129-154. ISSN 1471-4175

Son, J; O'Brien, W J and Thomas, S R (2022) Recommended practices for effective management of academia-industry collaborative research teams in construction management. Journal of Construction Engineering and Management, 148(8): 04022075, ISSN 0733-9364

Son, Junghye (2013) Key process attributes and success factors for collaborative academia-industry research in construction industry project management. PhD thesis, University of Texas at Austin, USA.

Song, S H; Choi, J O and Cho, H (2024) Transportation-induced impact on a prefinished volumetric modular house using trailer bogie: Case study. Journal of Construction Engineering and Management, 150(7): 05024007, ISSN 0733-9364

Song, Y (2022) Resilience bonds and the financing of resilient infrastructure. PhD thesis, University College London, UK.

Song, Y and Chua, D K H (2006) Modeling of functional construction requirements for constructability analysis. Journal of Construction Engineering and Management, 132(12), pp. 1314-1326. ISSN 0733-9364

Song, Y and Chua, D K H (2007) Temporal logic representation schema for intermediate function. Journal of Construction Engineering and Management, 133(4), pp. 277-286. ISSN 0733-9364

Sonkor, Muammer Semih (2026) A cybersecurity decision-support framework for technology integration in the built environment. PhD thesis, New York University Tandon School of Engineering, USA.

Sonson, S J (2018) Performance measurement and management within construction firms in Saint Lucia. PhD thesis, University of Salford, UK.

Sooksil, N and Benjaoran, V (2014) Validation of construction safety equilibrium model on high-rise building construction project in Thailand. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Soomro, M A (2013) Failure mechanisms in transportation public private partnerships. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Sospeter, N G and Awuzie, B O (2024) Capital budgeting implementation by public sector construction firms in tanzania's housebuilding industry: An exploratory study. Journal of Construction in Developing Countries, 29(1), pp. 87-109. ISSN 1823-6499

Soto, C; Thomson, C S and Uti Nchor, J (2024) Realizing the potential for circularity in Glasgow through the socio-spatial dimension of urban systems. Building Research & Information, 52(8), pp. 957-983. ISSN 0961-3218

Souchoroukov, P (2004) Improvement of cost estimating internal practice. PhD thesis, Cranfield University, UK.

Soudbaksh, K; Etminan, M; Hakimazari, M and Salavatian, S (2022) Impacts of window factors and building orientation on energy consumption in residential buildings of humid temperate climatic zone in Iran. Journal of Construction in Developing Countries, 27(2), pp. 235-262. ISSN 1823-6499

Sourani, A (2008) Realising sustainable construction through procurement stratergies. PhD thesis, Loughborough University, UK.

Sourani, A and Sohail, M (2015) The Delphi method: Review and use in construction management research. International Journal of Construction Education and Research, 11(1), pp. 54-76. ISSN 1557-8771

South, A J (2019) Stakeholder network dynamics and the governance of public-private partnerships. PhD thesis, Stanford University, USA.

Souza, Flávia Rodrigues de (2015) The design management process into real estate developers companies. PhD thesis, Universidade de São Paulo, Brazil.

Souza, M P D and Fabricio, M M (2024) BIM and virtual reality for pre-design evaluation of building performance. Architectural Engineering and Design Management, 20(5), pp. 1260-1279. ISSN 1745-2007

Sparkling, A E (2018) Collaborative project delivery practices, goal alignment, and performance in architecture, engineering, and construction project teams. PhD thesis, Michigan State University, USA.

Sparkling, A E and Dogra, P (2021) Supervisors' reliance on tacit knowledge and barriers to knowledge sharing in the electrical contracting industry. Journal of Construction Engineering and Management, 147(5): 2042, ISSN 0733-9364

Spearing, L A; Bakchan, A; Hamlet, L C; Stephens, K K; Kaminsky, J A and Faust, K M (2022) Comparing qualitative analysis techniques for construction engineering and management research: The case of arctic water infrastructure. Journal of Construction Engineering and Management, 148(7): 04022058, ISSN 0733-9364

Spearman, P (2015) Using sustainable development as a competitive strategy. DBA thesis, Walden University, USA.

Speiser, K and Teizer, J (2024) Automatic creation of personalised virtual construction safety training in digital twins. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 173-183. ISSN 17514304

Spellacy, J; Edwards, D J; Roberts, C J; Hayhow, S and Shelbourn, M (2021) An investigation into the role of the quantity surveyor in the value management workshop process. Journal of Engineering, Design and Technology, 19(2), pp. 423-445. ISSN 1726-0531

Spigliantini, G; Fabi, V; Schweiker, M and Corgnati, S (2019) Historical buildings' energy conservation potentialities: A methodology focused on building operation. International Journal of Building Pathology and Adaptation, 37(3), pp. 306-325. ISSN 23984708

Spillane, J and Oyedele, L (2013) Strategies for effective management of health and safety in confined site construction. Construction Economics and Building, 13(4), pp. 50-64. ISSN 2204-9029

Spillane, J P (2013) Challenges and strategies for confined site construction: The case of personnel, plant and material management (PPMM). PhD thesis, Queen's University Belfast, UK.

Spillane, J P; Flood, M; Lukumon, O O; von Meding, J K and Konanahalli, A (2013) Urban high-density construction sites and their surrounding community: Issues encountered and strategies adopted by contractors. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Spillane, J P; Oyedele, L O and von Meding, J K (2012) Confined site construction: An empirical analysis of factors impacting health and safety management. Journal of Engineering, Design and Technology, 10(3), pp. 397-420. ISSN 1726-0531

Spillane, J P; Oyedele, L O; von Meding, J K and Konanahalli, A (2011) Confined site construction: A qualitative review of issues regarding health and safety on-site. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Sporrong, J (2014) Selecting architectural and engineering consultants: Municipal practices in Sweden. PhD thesis, Chalmers University of Technology, Sweden.

Sporrong, J and Kadefors, A (2014) Municipal consultancy procurement: New roles and practices. Building Research & Information, 42(5), pp. 616-628. ISSN 0961-3218

Sprau Coulter, T L (2014) Improving energy audit process and report outcomes through planning initiatives. PhD thesis, Pennsylvania State University, USA.

Squires, G; Hutchison, N; Adair, A; Berry, J; McGreal, S and Organ, S (2016) Innovative real estate development finance: evidence from Europe. Journal of Financial Management of Property and Construction, 21(1), pp. 54-72. ISSN 1366-4387

Sreram, P K and Thomas, A (2026) A discrete event simulation-based value stream map implementation scheme for small and medium enterprises (SMEs). International Journal of Construction Management, 26(3), pp. 428-444. ISSN 1562-3599

Sridarran, P and Fernando, N G (2016) Change management framework to enable sustainable outsourcing of facilities management services. Built Environment Project and Asset Management, 6(3), pp. 317-331. ISSN 2044-124X

Srithongrung, A (2006) The impact of state capital budget and management programs on state capital budget decisions and economic performance. DPA thesis, University of Illinois at Springfield, USA.

Sruthilaya, D; Vilventhan, A and Gopal, P R C (2024) Analysis of project complexity factors and their interdependencies in metro rail projects. Built Environment Project and Asset Management, 14(2), pp. 260-277. ISSN 2044-124X

Sruthilaya, D; Vilventhan, A and Gopal, P R C (2025) Development of a project complexity measurement model for metro rail projects. Engineering, Construction and Architectural Management, 32(4), pp. 2728-2744. ISSN 0969-9988

Ssengooba, F P (2010) Performance-based contracting: a case study of non-profit hospitals in Uganda. PhD thesis, University of London, UK.

Standing, N A (1999) Value engineering and the contractor. PhD thesis, University of Leeds, UK.

Stankos, M A (2020) The nature of evidence utilized in healthcare architectural design decisions at five Midwestern critical access hospitals. PhD thesis, University of Missouri - Columbia, USA.

Stanley, Hannah J (2017) Airport planning and stakeholder engagement: An international comparison. PhD thesis, Queensland University of Technology, Australia.

Staples, Warren (2010) Public value in public sector infrastructure procurement. PhD thesis, RMIT University, Australia.

Staub-French, S; Pilon, A; Poirier, E; Fallahi, A; Kasbar, M; Calderon, F; Teshnizi, Z and Froese, T (2022) Construction process innovation on brock commons tallwood house. Construction Innovation, 22(1), pp. 1-22. ISSN 1471-4175

Staykova, G and Underwood, J (2017) Assessing collaborative performance on construction projects through knowledge exchange: A UK rail strategic alliance case study. Engineering, Construction and Architectural Management, 24(6), pp. 968-987. ISSN 0969-9988

Steel, A C (1985) The diffusion of working time innovations in manufacturing and construction industry. PhD thesis, Brunel University, UK.

Steenhausen, P D (2003) Negotiating among mediators: Multiparty mediation in international politics. PhD thesis, University of Southern California, USA.

Stefańska, A; Cygan, M; Batte, K and Pietrzak, J (2021) Application of timber and wood-based materials in architectural design using multi-objective optimisation tools. Construction Economics and Building, 21(3), pp. 105-121. ISSN 2204-9029

Stehn, L. and Erikshammar, J. (2026) Configuring innovation ecosystem capabilities for scaling digital innovation in construction. International Journal of Construction Management, 26(9), pp. 1944-1959. ISSN 1562-3599

Stehn, L (2002) Environmental labelling of timber-framed dwellings and their building components. Building Research & Information, 30(4), pp. 248-254. ISSN 0961-3218

Stehn, L; Engström, S; Uusitalo, P and Lavikka, R (2021) Understanding industrialised house building as a company’s dynamic capabilities. Construction Innovation, 21(1), pp. 5-21. ISSN 1471-4175

Steinhardt, D; Manley, K; Bildsten, L and Widen, K (2020) The structure of emergent prefabricated housing industries: A comparative case study of Australia and Sweden. Construction Management and Economics, 38(6), pp. 483-501. ISSN 01446193

Stellacci, S; Domingos, L and Resende, R (2024) Integrated computational approaches for energy retrofit of historical buildings in extreme climate environments. International Journal of Building Pathology and Adaptation, 42(1), pp. 114-132. ISSN 23984708

Stenbeck, T (2007) Promoting innovation in transportation infrastructure maintenance: Incentives contracting and performance based specifications. PhD thesis, KTH Royal Institute of Technology, Sweden.

Stenberg, A C (2007) Green ideas travelling across organizational boundaries. Building Research & Information, 35(5), pp. 501-513. ISSN 0961-3218

Stender, M and Walter, A (2019) The role of social sustainability in building assessment. Building Research & Information, 47(5), pp. 598-610. ISSN 0961-3218

Stenis, J (2005) Industrial management models with emphasis on construction waste. PhD thesis, Lund University, Sweden.

Stenlund, K L; Ryd, N and Vennström, A (2009) Client's decisions in strategic briefs and their impact on user values. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Stephan, A and Crawford, R H (2014) A comprehensive life cycle water analysis framework for residential buildings. Building Research & Information, 42(6), pp. 685-695. ISSN 0961-3218

Stephens, P (1974) Builders' and plumbers' merchanting: an attribute study of organization, functions and performance. PhD thesis, University of Manchester, UK.

Sterner, E (2002) Green procurement of buildings: Estimation of environmental impact and life-cycle cost. PhD thesis, Luleå University of Technology, Sweden.

Stevens, J D and Murray, A L (1994) Modified roof erection system. Journal of Construction Engineering and Management, 120(4), pp. 828-837. ISSN 0733-9364

Stevenson, F and Baborska-Narozny, M (2018) Housing performance evaluation: Challenges for international knowledge exchange. Building Research & Information, 46(5), pp. 501-512. ISSN 0961-3218

Stevenson, F; Baborska-Narozny, M and Chatterton, P (2016) Resilience, redundancy and low-carbon living: Co-producing individual and community learning. Building Research & Information, 44(7), pp. 789-803. ISSN 0961-3218

Stewardson, A; Edwards, D J; Asamoah, E; Aigbavboa, C O; Lai, J H K and El-Gohary, H (2023) The late payment epidemic in UK construction. Journal of Financial Management of Property and Construction, 28(3), pp. 374-397. ISSN 1366-4387

Stewart, L (2022) Business strategies for reducing professional labor shortages within the u.S. Construction industry. DBA thesis, Walden University, USA.

Stewart, P J (2000) Strategic IT maturity of construction companies. PhD thesis, Royal Melbourne Institute of Technology, Australia.

Stewart, R A (2003) Lifecycle management of information technology (IT) projects in construction. PhD thesis, Griffith University, Australia.

Stewart, R A and Spencer, C A (2006) Six-sigma as a strategy for process improvement on construction projects: A case study. Construction Management and Economics, 24(4), pp. 339-348. ISSN 01446193

Stiles, S (2019) Investigation of safety leadership within infrastructure engineering construction projects. PhD thesis, University of Nottingham, UK.

Stjern, M (1998) Uncertainty in construction contracting: A new approach for contractors. DrIng thesis, Norges Teknisk-Naturvitenskapelige Universitet, Norway.

Stojanovic, V; Falconer, R; Isaacs, J; Gilmour, D and Blackwood, D (2013) Interactive visualisation to support sustainability assessment in land use scenario planning. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Stollberg, D (1998) An appraisal of system built housing in a comparative perspective. PhD thesis, Southampton Solent University, UK.

Storvang, P and Clarke, A H (2014) How to create a space for stakeholders' involvement in construction. Construction Management and Economics, 32(12), pp. 1166-1182. ISSN 01446193

Stoy, C; Pollalis, S and Schalcher, H R (2008) Drivers for cost estimating in early design: Case study of residential construction. Journal of Construction Engineering and Management, 134(1), pp. 32-39. ISSN 0733-9364

Straub, M (2014) A new framework for designing and developing cost-effective logistic chains for long items. PhD thesis, University of Gloucestershire, UK.

Stremke, S and Schöbel, S (2019) Research through design for energy transition: Two case studies in Germany and the Netherlands. Smart and Sustainable Built Environment, 8(1), pp. 16-33. ISSN 2046-6099

Stuban, S M F (2011) Employing risk management to control military construction costs. PhD thesis, George Washington University, USA.

Stundon, D; Spillane, J; Lim, J P B; Tansey, P and Tracey, M (2015) Building information modelling energy performance assessment on domestic dwellings: A comparative study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Sturts Dossick, C and Schunk, T K (2007) Subcontractor schedule control method. Journal of Construction Engineering and Management, 133(3), pp. 262-265. ISSN 0733-9364

Styhre, A; Josephson, P E and Knauseder, I (2004) Learning capabilities in organizational networks: Case studies of six construction projects. Construction Management and Economics, 22(9), pp. 957-966. ISSN 01446193

Styhre, A; Wikmalm, L; Ollila, S and Roth, J (2012) Sociomaterial practices in engineering work: The backtalk of materials and the tinkering of resources. Journal of Engineering, Design and Technology, 10(2), pp. 151-167. ISSN 1726-0531

Su, P; Lu, W; Chen, J and Hong, S (2024) Floor plan graph learning for generative design of residential buildings: A discrete denoising diffusion model. Building Research & Information, 52(6), pp. 627-653. ISSN 0961-3218

Su, X (2013) A spatial temporal information model for construction planning. PhD thesis, Purdue University, USA.

Su, X and Cai, H (2014) Life cycle approach to construction workspace modeling and planning. Journal of Construction Engineering and Management, 140(7): 04014019, ISSN 0733-9364

Su, Y; Isaac, S and Lucko, G (2018) Integrated temporal-spatial model for construction plans with boolean logic operators. Journal of Construction Engineering and Management, 144(4): 04018009, ISSN 0733-9364

Su, Y S (2017) Rebuild, retreat or resilience: Urban flood vulnerability analysis and simulation in Taipei. International Journal of Disaster Resilience in the Built Environment, 8(2), pp. 110-122. ISSN 1759-5916

Subprasom, K (2004) Multi-party and multi-objective network design analysis for the build-operate-transfer scheme. PhD thesis, Utah State University, USA.

Subprasom, K and Chen, A (2007) Effects of regulation on highway pricing and capacity choice of a build-operate-transfer scheme. Journal of Construction Engineering and Management, 133(1), pp. 64-71. ISSN 0733-9364

Subsomboon, K (2004) A procurement and material management (PMM) system based on the fully integrated and automated project process (FIAPP). PhD thesis, Columbia University, USA.

Suchowerska, R; Loosemore, M and Barraket, J (2024) How employment-focused social procurement tackles health inequities: An investigation of Australia’s construction industry using determinants of health theory. Construction Management and Economics, 42(11-12), pp. 977-991. ISSN 01446193

Suermann, P C (2009) Evaluating the impact of building information modeling (BIM) on construction. PhD thesis, University of Florida, USA.

Sugar, K; Mose, T M; Nolden, C; Davis, M; Eyre, N; Sanchez-Graells, A and van der Horst, D (2022) Local decarbonisation opportunities and barriers: UK public procurement legislation. Buildings & Cities, 3(1), pp. 895-911. ISSN 2632-6655

Sugiyama, G T; Rodrigues, M F and Rodrigues, H (2025) Environmental impacts and BIM: A Portuguese heritage case study. International Journal of Building Pathology and Adaptation, 43(7), pp. 1863-1877. ISSN 2398-4708

Suhail, S A (1995) CPM/LOB: new methodology to integrate CPM and line of balance. PhD thesis, Loughborough University, UK.

Suhomlinova, O O (1996) Organizational transformation in the post-Soviet economy: The case of the Russian construction industry, 1985-1993. PhD thesis, Duke University, USA.

Sukmara, R B; Ariyaningsih, A and Bachtiar, R (2024) Understanding the stakeholders' interests and role toward climate change adaptation (case study of Indonesia). International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 571-590. ISSN 1759-5916

Sulaiman, K (2008) A study of building procurement process as a potential tool to enhance safety practice in the construction industry. PhD thesis, University of Salford, UK.

Sullivan, J J (2016) Developing a decision-making framework for market entry in the sheet metal construction industry. PhD thesis, Arizona State University, USA.

Sultan, B and Alaghbari, W (2023) Construction industry sustainable development indicator for low-income developing countries: Yemen as a case study. International Journal of Construction Management, 23(6), pp. 1053-1060. ISSN 1562-3599

Sumanarathna, N; Duodu, B; Memon, S A and Rowlinson, S (2025) Exploring innovation deployment of construction contracting firms through the lens of exploratory–exploitative learning: A Hong Kong case study. Construction Innovation, 25(2), pp. 641-664. ISSN 1471-4175

Sun, A C S; Zou, P X W; Long, B and Marix-Evans, P (2010) Case studies of return on investment in contruction safety management. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Sun, C; Wang, M; Man, Q and Wan, D (2023) Research on the BIM application mechanism of engineering-procurement-construction projects based on a tripartite evolutionary game. Journal of Construction Engineering and Management, 149(3): 04022182, ISSN 0733-9364

Sun, J; Balakrishnan, S and Zhang, Z (2021) A resource allocation framework for predisaster resilience management of interdependent infrastructure networks. Built Environment Project and Asset Management, 11(2), pp. 284-303. ISSN 2044-124X

Sun, J; Murphy, M R; Hazlett, D G; Shuai, C and Gao, L (2025) Simulation-based framework for predicting construction workforce demand: A comparative analysis with multivariate LSTM-based seq2seq model. Journal of Construction Engineering and Management, 151(6): 04025049, ISSN 0733-9364

Sun, Jing (2020) Green infrastructure design and evaluation model for resilient sponge city program transitional construction. PhD thesis, University of Nottingham, UK.

Sun, M; Vidalakis, C and Oza, T (2009) A change management maturity model for construction projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Sun, R; Yan, Q; Zhang, C; Qiao, M and Ren, J (2025) Comprehensive evaluation of grouting effectiveness combining qualitative on-site tests and improved fuzzy integration with entropy weight method: Case study of a mountain tunnel. Journal of Construction Engineering and Management, 151(4): 04025020, ISSN 0733-9364

Sun, X (2016) Energy-efficient retrofits for existing buildings: a multi-dimensional, comparative study of buildings in Hong Kong, Shanghai and Singapore, with focus on operation and maintenance. PhD thesis, University of Hong Kong, Hong Kong.

Sun, Y and Goh, B H (2015) Contribution index based on green building certification systems. Construction Economics and Building, 15(2), pp. 31-48. ISSN 2204-9029

Sun, Z (2020) Predictive control of interpersonal communication processes in civil infrastructure systems operations. PhD thesis, Arizona State University, USA.

Sundaraj, G (2012) The significance and co-dependency of 'robustness' in PFI projects: A granting authority perspective. PhD thesis, University of Salford, UK.

Sundling, R (2019) Factors influencing the outcome of renovation projects. PhD thesis, Lund University, Sweden.

Sundling, R (2019) A development process for extending buildings vertically – based on a case study of four extended buildings. Construction Innovation, 19(3), pp. 367-385. ISSN 1471-4175

Sundquist, V (2014) The role of intermediation in business networks. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Sundquist, V; Gadde, L-E and Hulthén, K (2018) Reorganizing construction logistics for improved performance. Construction Management and Economics, 36(1), pp. 49-65. ISSN 0144-6193

Sundquist, V; Hulthén, K and Gadde, L E (2018) From project partnering towards strategic supplier partnering. Engineering, Construction and Architectural Management, 25(3), pp. 358-373. ISSN 0969-9988

Sunikka, M (2006) Energy efficiency and low-carbon technologies in urban renewal. Building Research & Information, 34(6), pp. 521-533. ISSN 0961-3218

Sunikka-Blank, M; Purohit, R and Samuel, F (2025) Co-curation as civic practice in community engagement. Buildings & Cities, 6(1), pp. 899-916. ISSN 2632-6655

Suo, W.; Li, J.; Zhang, J. and Wang, L. (2026) A feature-driven risk allocation modeling methodology for transport infrastructure public-private partnership projects. Journal of Construction Engineering and Management, 152(10): 04026174, ISSN 0733-9364

Surahyo, M and El-Diraby, T E (2009) Schema for interoperable representation of environmental and social costs in highway construction. Journal of Construction Engineering and Management, 135(4), pp. 254-266. ISSN 0733-9364

Suriyanon, N; Sutheerawatthana, P; Kaewmoracharoen, M and Klansai, V (2023) The utility and value of contract terms: A case study on interior contractors. Construction Economics and Building, 23(1-2), pp. 77-94. ISSN 2204-9029

Suriyanon, N; Sutheerawatthana, P; Rinchumphu, D and Suksawat, R (2025) Carbon footprint assessment of a precast concrete yard: A case study from Thailand. Construction Economics and Building, 25(2), pp. 43-68. ISSN 2204-9029

Susanti, B; Kadarsa, E; Foralisa, M and Juliantina, I (2023) Non-toll revenue potential to increase funding sources for toll road maintenance. Construction Economics and Building, 23(3-4), pp. 170-185. ISSN 2204-9029

Sutrisna, M and Barrett, P (2007) Applying rich picture diagrams to model case studies of construction projects. Engineering, Construction and Architectural Management, 14(2), pp. 164-179. ISSN 0969-9988

Sutrisna, M and Goulding, J (2019) Managing information flow and design processes to reduce design risks in offsite construction projects. Engineering, Construction and Architectural Management, 26(2), pp. 267-284. ISSN 0969-9988

Sutterby, P; Wang, X; Li, H X and Ji, Y (2023) The impact of COVID-19 on construction supply chain management: An Australian case study. Engineering, Construction and Architectural Management, 30(8), pp. 3098-3122. ISSN 0969-9988

Sutton, R M (2019) The development of a sustainable construction design process. PhD thesis, University of Liverpool, UK.

Suzuki, K (2017) The impact of national culture on communication management - japanese contractors in singapore construction industry. PhD thesis, National University of Singapore, Singapore.

Suzuki, K (2018) The impact of national culture on communication management: Japanese contractors in Singapore construction industry. PhD thesis, National University of Singapore, Singapore.

Suárez, J L; Gosselin, L and Lehoux, N (2023) Optimizing modularity of prefabricated residential plumbing systems for construction in remote communities. Journal of Construction Engineering and Management, 149(1): 05022017, ISSN 0733-9364

Svensson, I (2022) Exploring the connection between emotions, artefacts and institutional work: The case of institutional change for public facilities management. Construction Management and Economics, 40(5), pp. 343-358. ISSN 01446193

Svensson, I and Gluch, P (2017) The role of objects for institutional work in energy efficient renovation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Svensson, I and Loöwstedt, M (2019) Navigating the logics of changing public facilities management. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Swaffield, L M and Johnson, G A (2005) The financial benefits of implementing ISO 14001 within construction contracting organizations. Architectural Engineering and Design Management, 1(3), pp. 197-210. ISSN 1745-2007

Swaffield, L M and McDonald, A M (2008) The contractor's use of life cycle costing on PFI projects. Engineering, Construction and Architectural Management, 15(2), pp. 132-148. ISSN 0969-9988

Swai, L L P and Arewa, A O (2018) Potentiality of emerging technologies to minimise late-payments quandary in construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Swan, W; Cooper, R; McDermott, P and Wood, G (2001) A review of social network analysis for the IMI Trust in Construction Project. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Swan, W; McDermott, P; Khalfan, M M A; Cooper, R; Rees, C and Wood, G (2005) The Development of Trust Inventory. Journal of Construction Procurement, 11(1),

Swan, W C (2002) Construct IT: An exploratory case study of a knowledge network supported by an intermediary. PhD thesis, University of Salford, UK.

Swarup, L; Korkmaz, S and Riley, D (2011) Project delivery metrics for sustainable, high-performance buildings. Journal of Construction Engineering and Management, 137(12), pp. 1043-1051. ISSN 0733-9364

Swei, O (2020) Forecasting infidelity: Why current methods for predicting costs miss the mark. Journal of Construction Engineering and Management, 146(2): 04019100, ISSN 0733-9364

Swei, O; Gregory, J and Kirchain, R (2017) Probabilistic approach for long-run price projections: Case study of concrete and asphalt. Journal of Construction Engineering and Management, 143(1): 05016018, ISSN 0733-9364

Sweis, R J (1999) A model to assess alternative policies to promote the construction industry in developing countries. PhD thesis, Northwestern University, USA.

Swiggum, K E; Anderson, S D and Russell, J S (1994) Case study of burlington cable-stayed bridge. Journal of Construction Engineering and Management, 120(3), pp. 649-666. ISSN 0733-9364

Symons, Anne Wood (2021) Integrated design, design management and the delivery of major hospitals. PhD thesis, University College London, UK.

Szamocki, N; Kim, M K; Ahn, C R and Brilakis, I (2019) Reducing greenhouse gas emission of construction equipment at construction sites: Field study approach. Journal of Construction Engineering and Management, 145(9): 05019012, ISSN 0733-9364

Sze, E; Kumaraswamy, M; Fung, A; Palaneeswaran, E and Wong, S (2004) Partnering with the tenants- Hong Kong experience. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Szentes, H (2018) Reinforcing cycles involving inter- and intraorganizational paradoxical tensions when managing large construction projects. Construction Management and Economics, 36(3), pp. 125-140. ISSN 01446193

Tabatabaei Sameni, S (2019) Overheating investigation in UK social housing flats built to the Passivhaus standard. PhD thesis, Coventry University, UK.

Taghaddos, H; Abourizk, S; Mohamed, Y and Hermann, U (2012) Simulation-based auction protocol for resource scheduling problems. Journal of Construction Engineering and Management, 138(1), pp. 31-42. ISSN 0733-9364

Taghaddos, M; Pereira, E; Osorio-Sandoval, C; Hermann, U and Abourizk, S (2023) A data-driven approach for deploying safety policies for schedule planning in industrial construction projects: A case study. Journal of Construction Engineering and Management, 149(12): 05023013, ISSN 0733-9364

Taghizadeh, K; Alizadeh, M and Yavari Roushan, T (2021) Cooperative game theory solution to design liability assignment issues in BIM projects. Journal of Construction Engineering and Management, 147(9): 04021103, ISSN 0733-9364

Tah, J H M (1989) Integrated microcomputer applications in formwork design. PhD thesis, Loughborough University, UK.

Taheri Tafti, M and Tomlinson, R (2016) Long-term socio-spatial transformation of earthquake-affected neighbourhoods in Bhuj: Who stayed, who left and who moved in? International Journal of Disaster Resilience in the Built Environment, 7(3), pp. 230-258. ISSN 1759-5916

Taimu, M (2020) A contractor-driven stakeholder relationship management framework for botswana's construction industry. DBL thesis, University of South Africa, South Africa.

Tainter, J A and Taylor, T G (2014) Complexity, problem-solving, sustainability and resilience. Building Research & Information, 42(2), pp. 168-181. ISSN 0961-3218

Tait, P D and Swaffield, L M (2003) Construction site waste: The real cost and benefits available from waste reduction. Journal of Financial Management of Property and Construction, 8(1), pp. 3-16. ISSN 1366-4387

Taiwo, D O (2022) Incremental development of a legal framework for arbitration in emerging markets: A case study of construction arbitration in Nigeria. PhD thesis, University of Essex, UK.

Tajani, F; Sica, F; De Paola, P and Morano, P (2025) A networking-economic model to enhance the cultural value in small towns. Smart and Sustainable Built Environment, 14(6), pp. 1752-1779. ISSN 2046-6099

Takabatake, T; Hasegawa, N and Nishigaki, S (2024) Relative importance of safety against natural disasters for residential selection: A case study at Osaka Prefecture, Japan. International Journal of Disaster Resilience in the Built Environment, 15(2), pp. 303-319. ISSN 1759-5916

Takim, R (2005) A framework for successful construction project performance. PhD thesis, Glasgow Caledonian University, UK.

Taleb, H; Elsebaei, M and El-Attar, M (2019) Enhancing the sustainability of shipping container homes in a hot arid region: A case study of Aswan in Egypt. Architectural Engineering and Design Management, 15(6), pp. 459-474. ISSN 1745-2007

Taleb, H M and Abumoeilak, L (2021) An assessment of different courtyard configurations in urban communities in the United Arab Emirates. Smart and Sustainable Built Environment, 10(1), pp. 67-89. ISSN 2046-6099

Talebi, S; Wu, S; Al-Adhami, M; Shelbourn, M and Serugga, J (2022) The development of a digitally enhanced visual inspection framework for masonry bridges in the UK. Construction Innovation, 22(3), pp. 624-646. ISSN 1471-4175

Talley, K G and Torres, A S (2018) Measuring the impact of using daily objectives to provide rapid feedback in construction courses. International Journal of Construction Education and Research, 14(2), pp. 95-117. ISSN 1557-8771

Talton, V (2023) Examining the relationship between culture and the construction labor shortage: An explanatory case study. DBA thesis, Northcentral University, USA.

Tam, V W Y; Fung, I W H; Jorge Evangelista, A C J and Wong, S W L (2025) Assistant robotic machine for Hong Kong construction industry. International Journal of Construction Management, 25(14), pp. 1749-1754. ISSN 1562-3599

Tam, C M; Tong, T K L and Lau, C T (2003) ELECTRE III in evaluating performance of construction plants: Case study on concrete vibrators. Construction Innovation, 3(1), pp. 45-61. ISSN 1471-4175

Tam, C M; Tong, T K L; Lau, T C T and Chan, K K (2005) Selection of vertical formwork system by probabilistic neural networks models. Construction Management and Economics, 23(3), pp. 245-254. ISSN 01446193

Tam, C M; Tong, T K L and Wong, Y W (2004) Selection of concrete pump using the superiority and inferiority ranking method. Journal of Construction Engineering and Management, 130(6), pp. 827-834. ISSN 0733-9364

Tam, V W Y and Hao, J J L (2014) Prefabrication as a mean of minimizing construction waste on site. International Journal of Construction Management, 14(2), pp. 113-121. ISSN 1562-3599

Tam, V W Y and Le, K N (2008) On using the Gaussian and hyperbolic distributions to improve quality in construction. Journal of Engineering, Design and Technology, 6(2), pp. 112-123. ISSN 1726-0531

Tam, V W Y; Le, K N and Le, H N (2008) Using Gaussian and hyperbolic distributions for quality improvement in construction: Case study approach. Journal of Construction Engineering and Management, 134(7), pp. 555-561. ISSN 0733-9364

Tam, V W Y and Shen, L Y (2010) On applications of an optimal price-time bidding model in Hong Kong foundation projects. Construction Innovation, 10(1), pp. 14-24. ISSN 1471-4175

Tam, V W Y; Shen, L Y; Fung, I W H and Wang, J Y (2007) Controlling construction waste by implementing governmental ordinances in Hong Kong. Construction Innovation, 7(2), pp. 149-166. ISSN 1471-4175

Tam, V W Y and Tam, C M (2008) Waste reduction through incentives: A case study. Building Research & Information, 36(1), pp. 37-43. ISSN 0961-3218

Tam, V W Y; Tam, C M; Yiu, K T W and Cheung, S O (2006) Critical factors for environmental performance assessment (EPA) in the Hong Kong construction industry. Construction Management and Economics, 24(11), pp. 1113-1123. ISSN 1466433X

Tambo, T (2010) Smooth operator: Mobile information technology for improved flow at the construction site. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Tamburro, N and Wood, P (2014) Alliancing in Australia: Competing for thought leadership. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(2), pp. 75-82. ISSN 17514304

Tan, H C (2006) A methodology for the 'live' capture and reuse of project knowledge in construction. PhD thesis, Loughborough University, UK.

Tan, T; Lu, W; Tan, G; Xue, F; Chen, K; Xu, J; Wang, J and Gao, S (2020) Construction-oriented design for manufacture and assembly guidelines. Journal of Construction Engineering and Management, 146(8): 04020085, ISSN 0733-9364

Tan, T; Mills, G; Papadonikolaki, E; Li, B and Huang, J (2023) Digital-enabled design for manufacture and assembly (dfma) in offsite construction: A modularity perspective for the product and process integration. Architectural Engineering and Design Management, 19(3), pp. 267-282. ISSN 1745-2007

Tan, T; Graser, K; Walzer, A N; Ng, M S and Hall, D (2025) Exploring the implementation of digital fabrication in construction: Combining system approaches and a revelatory case study from Switzerland. Journal of Construction Engineering and Management, 151(12): 05025016, ISSN 0733-9364

Tan, W (2011) Managing lean projects: Understanding the structures of lean production. International Journal of Construction Management, 11(3), pp. 67-78. ISSN 1562-3599

Tan, W and Dong, X (2010) Institutional innovation and financing infrastructure in Xi'an. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(4), pp. 143-149. ISSN 17514312

Tan, Y; Shen, L Y and Langston, C (2011) A fuzzy approach for assessing contractors' competitiveness. Engineering, Construction and Architectural Management, 18(3), pp. 234-247. ISSN 0969-9988

Taneja, P (2013) The flexible port. PhD thesis, Delft University of Technology, Netherlands.

Tang, C M; Leung, A Y T and Lam, K C (2006) Entropy application to improve construction finance decisions. Journal of Construction Engineering and Management, 132(10), pp. 1099-1113. ISSN 0733-9364

Tang, C M; Wong, C W Y; Leung, A Y T and Lam, K C (2005) A GA-based borrowing strategy for construction smes in Hong Kong. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Tang, C M; Wong, C W Y; Leung, A Y T and Lam, K C (2006) Selection of funding schemes by a borrowing decision model: A Hong Kong case study. Construction Management and Economics, 24(4), pp. 349-365. ISSN 01446193

Tang, L; Chen, C; Li, H and Mak, D Y Y (2022) Developing a BIM GIS-integrated method for urban underground piping management in China: A case study. Journal of Construction Engineering and Management, 148(9): 05022004, ISSN 0733-9364

Tang, L C M; Atkinson, B and Zou, R R (2012) An entropy-based SWOT evaluation process of critical success factors for international market entry: A case study of a medium-sized consulting company. Construction Management and Economics, 30(10), pp. 821-834. ISSN 1466433X

Tang, S L; Aoieong, R T and Ahmed, S M (2004) The use of process cost model (PCM) for measuring quality costs of construction projects: Model testing. Construction Management and Economics, 22(3), pp. 263-275. ISSN 01446193

Tang, W; Cui, Q; Zhang, F and Chen, Y (2019) Urban rail-transit project investment benefits based on compound real options and trapezoid fuzzy numbers. Journal of Construction Engineering and Management, 145(1): 05018016, ISSN 0733-9364

Tang, Y; Liu, C; Feng, K; Yang, X; Li, X and Leng, X (2025) Identifying struck-by hazards in unknown lifting loads: A hybrid computer vision approach. Journal of Construction Engineering and Management, 151(10): 04025146, ISSN 0733-9364

Tangrungruengyoo, K (2018) The impact of environmental impact assessment on new housing development: a case study of Bangkok, Thailand. PhD thesis, King's College London, UK.

Tangtinthai, N (2016) Extraction, use and disposal of construction materials in Great Britain and Thailand. PhD thesis, University of Newcastle upon Tyne, UK.

Tanguy, A; Breton, C; Blanchet, P and Amor, B (2020) Characterising the development trends driving sustainable neighborhoods. Buildings & Cities, 1(1), pp. 164-181. ISSN 2632-6655

Tanikawa, H and Hashimoto, S (2009) Urban stock over time: Spatial material stock analysis using 4d-GIS. Building Research & Information, 37(5-6), pp. 483-502. ISSN 0961-3218

Tanko, B. L.; Oakley, J. T.; Jagun, Z. and Madanayake, U. (2026) Comparing 5D BIM costs: Stilt housing against conventional housing for flood management. Journal of Engineering, Design and Technology, 24(2), pp. 361-383. ISSN 1726-0531

Tanko, B L; Zakka, W P and Heng, W N (2024) BIM in the Malaysian construction industry: A scientometric review and case study. Engineering, Construction and Architectural Management, 31(3), pp. 1165-1186. ISSN 0969-9988

Tansey, P and Spillane, J (2016) From crisis to opportunity: Turnaround strategies of large Irish construction contractors during the period 2007-2015. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Tansey, P and Spillane, J (2018) Vistas of strategy-making within Northern Ireland construction firms: How sme's differ from large firms. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Tansey, P; Spillane, J P and Brooks, T (2018) Creating opportunities in the face of an environmental jolt: Exploring turnaround strategizing practices within large Irish construction contractors. Construction Management and Economics, 36(4), pp. 217-241. ISSN 01446193

Tansey, P; Spillane, J P and Meng, X (2014) Linking response strategies adopted by construction firms during the 2007 economic recession to Porter's generic strategies. Construction Management and Economics, 32(7-8), pp. 705-724. ISSN 01446193

Tansey P, M X C D (2013) A critical review of response strategies adopted by construction companies during an economic recession. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Tanyer, A M (2004) Implementation barriers of computer integrated construction: A usability perspective. PhD thesis, University of Salford, UK.

Tao, L and Kumaraswamy, M (2012) Unveiling relationships between contractor inputs and performance outputs. Construction Innovation, 12(1), pp. 86-98. ISSN 1471-4175

Tao, Y; Hu, H; Xu, F and Zhang, Z (2023) Ergonomic risk assessment of construction workers and projects based on fuzzy Bayesian network and D-S evidence theory. Journal of Construction Engineering and Management, 149(6): 04023034, ISSN 0733-9364

Tao, Y; Hu, H; Xu, F and Zhang, Z (2024) Work-rest schedule optimization of precast production considering workers' overexertion. Journal of Construction Engineering and Management, 150(5): 04024033, ISSN 0733-9364

Taofeeq, D M; Adeleke, A Q and Ajibike, W A (2020) Human factors influencing contractors' risk attitudes: A case study of the Malaysian construction industry. Construction Economics and Building, 20(1), pp. 96-116. ISSN 2204-9029

Tariq, M (2012) Green supply chain assessment model for construction projects in the UAE. PhD thesis, University of Salford, UK.

Tariq, S and Zhang, X (2021) Critical analysis of the private sector roles in water PPP failures. Journal of Construction Engineering and Management, 147(4): 04021015, ISSN 0733-9364

Tariq, S and Zhang, X (2022) A critical analysis of water PPP failures in Sub-Saharan Africa. Engineering, Construction and Architectural Management, 29(8), pp. 3157-3180. ISSN 0969-9988

Taroun, A (2012) Decision support system (DSS) for construction project risk analysis and evaluation via evidential reasoning (ER). PhD thesis, University of Manchester, UK.

Tarr, K R (2024) Incorporating sustainability in infrastructure design: A case study of phoenix, Arizona. PhD thesis, Arizona State University, USA.

Taslimi, M S; Azimi, A and Nazari, M (2021) Resilience to economic sanctions; case study: Hospital equipment cluster of Tehran (hect). International Journal of Disaster Resilience in the Built Environment, 12(1), pp. 13-28. ISSN 1759-5916

Tasselli, Nicola (2023) BIM digital integration for existing buildings: Processes and tools to foster technological innovation of added-value building systems applied to the 20th century built asset in emilia-romagna. PhD thesis, Università degli Studi di Ferrara, Italy.

Tatum, C B (2018) Construction engineering research: Integration and innovation. Journal of Construction Engineering and Management, 144(3): 04018005, ISSN 0733-9364

Tauber, G (2015) Architects and rural post-disaster housing: Lessons from south India. International Journal of Disaster Resilience in the Built Environment, 6(2), pp. 206-224. ISSN 1759-5916

Tavafzadeh Haghi, N; Ahmadian Nezhad Monfared, M; Hashemian, L and Bayat, A (2019) Capital cost comparison of pavements comprised of insulation layers: Case study in Edmonton, Canada. Journal of Construction Engineering and Management, 145(7): 04019038, ISSN 0733-9364

Tavakolan, M and Mohammadi, A (2018) Risk management workshop application: A case study of Ahwaz Urban Railway project. International Journal of Construction Management, 18(3), pp. 260-274. ISSN 1562-3599

Tavakolan, M and Nikoukar, S (2022) Developing an optimization financing cost-scheduling trade-off model in construction project. International Journal of Construction Management, 22(2), pp. 262-277. ISSN 1562-3599

Tavakoli, P; Yitmen, I; Sadri, H and Taheri, A (2024) Blockchain-based digital twin data provenance for predictive asset management in building facilities. Smart and Sustainable Built Environment, 13(1), pp. 4-21. ISSN 2046-6099

Tawalare, A and Laishram, B (2020) Factors hindering effective partnering in Indian public sector construction organizations. Journal of Financial Management of Property and Construction, 25(1), pp. 83-105. ISSN 1366-4387

Taylor, J E; Dossick, C S and Garvin, M (2011) Meeting the burden of proof with case-study research. Journal of Construction Engineering and Management, 137(4), pp. 303-311. ISSN 0733-9364

Taylor, M D; Fisher, A and Wamuziri, S C (2009) A comparison of modern methods of bathroom construction: A project case study. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Taylor, S (2015) Sourcing of public sector building surveying and engineering professional services : A framework for progression. PhD thesis, University of Salford, UK.

Taylor, T (2014) Assessing the thermal performance of buildings at the construction stage using thermography: development and evaluation of a testing approach in the context of new housing in Wales. PhD thesis, Cardiff Metropolitan University, UK.

Taylor-Lewis, D (2012) Entrepreneurial support for black (afro-caribbean) and Asian construction businesses: Can it enhance their growth? PhD thesis, Oxford Brookes University, UK.

Tazilan, A (2012) Identifying microarchitecture for sustainable design in Malaysia. Smart and Sustainable Built Environment, 1(2), pp. 172-185. ISSN 2046-6099

Teale, Allan F (2022) The relationship between transparency, public private partnerships and delivery outcomes in major transport infrastructure. PhD thesis, University of Technology Sydney, Australia.

Teall, O (2014) Building information modelling in the highways sector: Major projects of the future. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(3), pp. 127-133. ISSN 17514304

Teixeira, J M (1993) Contractors management functions: an integrated approach for planning, estimating and control. PhD thesis, Loughborough University, UK.

Tejero-González, A; DeFreitas-Barros-Galvão, V M; Zarzuelo-Sánchez, A M and SanJosé-Alonso, J F (2021) Energy use optimization in ventilation of operating rooms during inactivity periods. Building Research & Information, 49(3), pp. 308-324. ISSN 0961-3218

Telem, D; Shapira, A; Goren, Y D and Schexnayder, C J (2006) Moving a reinforced-concrete building: Case study. Journal of Construction Engineering and Management, 132(2), pp. 115-124. ISSN 0733-9364

Tembo, M; Kahanji, C and Mwanaumo, E M (2024) Cultivating procurement strategies to manage the tender price level for public infrastructure: : A case study of IRCP (World Bank) projects in Zambia. Journal of Construction Business and Management, 7(1), pp. 16-33. ISSN 2521-0165

Tender, M; Couto, J P; Fuller, P; Demian, P; Chow, V; Vaughan, A; Silva, F and Santos, R (2024) Using virtual reality for occupational safety and health in a UK tunnelling megaproject. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 232-239. ISSN 17514304

Tene Nengou, C B (2019) Framework for the effective implementation of building regulations and policies: The case of Sub-Sahara African countries. PhD thesis, University of Nottingham, UK.

Tengberg, C S (2022) A design-build contractor risk assessment framework for new technical solutions in the construction industry. PhD thesis, Chalmers University of Technology, Sweden.

Tennakoon, T M M P; Chileshe, N; Rameezdeen, R; Ochoa Paniagua, J; Samaraweera, A and Statsenko, L (2025) Uncertainties affecting the offsite construction supply chain resilience: A systematic literature review. Construction Innovation, 25(3), pp. 912-930. ISSN 1471-4175

Tennakoon, T M M P; Ranasinghe, U; Samaraweera, A; Rameezdeen, R; Gallage, S; Newman, W R; White, B J and Lim, D N T W (2025) Work-related factors affecting mental well-being of young construction workers in South Australia. Built Environment Project and Asset Management, 15(3), pp. 682-698. ISSN 2044-124X

Tennant, S (2007) Site management teams and project performance in the UK construction industry. PhD thesis, University of Strathclyde, UK.

Tente, P; Misheng'u Mwanaumo, E and Didibhukut Thwala, W (2023) Sources and control measures of crystalline silica dust in a road and building project in Zambia. Journal of Construction Business and Management, 6(1), pp. 43-52. ISSN 2521-0165

Teo, M and Loosemore, M (2006) Community protest groups' perceptions of environmental risks using social contagion theory. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Teo, M M and Loosemore, M (2011) Community-based protest against construction projects: A case study of movement continuity. Construction Management and Economics, 29(2), pp. 131-144. ISSN 1466433X

Teo, More Mei Melissa (2009) An investigation of community-based protest movement continuity against construction projects. PhD thesis, University of New South Wales, Australia.

Teo, P (2014) The effect of procurement on competition and flexibility : determining the suitability of public-private partnerships in major infrastructure projects. PhD thesis, Queensland University of Technology, Australia.

Teo, P L; Bridge, A J; Gray, J and Jefferies, M C (2011) Developing a research method to test a new first-order decision making model for the procurement of public sector major infrastructure. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Teräväinen, V J and Junnonen, J M (2019) The promoters and the barriers for organizational culture change in a Finnish construction company. Construction Innovation, 19(4), pp. 672-688. ISSN 1471-4175

Tetik, M; Peltokorpi, A; Seppänen, O; Leväniemi, M and Holmström, J (2021) Kitting logistics solution for improving on-site work performance in construction projects. Journal of Construction Engineering and Management, 147(1): 05020020, ISSN 0733-9364

Tews, T; Skulmoski, G; Langston, C and Patching, A (2020) Innovation in project management education: Let's get serious! Construction Economics and Building, 20(3), pp. 124-141. ISSN 2204-9029

Tews, T; Skulmoski, G; Langston, C and Patching, A (2020) Innovation in project management education: let's get serious! Construction Economics and Building, 20(3), pp. 124-141. ISSN 2204-9029

Tezel, B A (2011) Visual management: an exploration of the concept and its implementation in construction. PhD thesis, University of Salford, UK.

Thabet, W and Lucas, J (2017) Asset data handover for a large educational institution: Case-study approach. Journal of Construction Engineering and Management, 143(11): 05017017, ISSN 0733-9364

Thadicaran, A B G (1997) Implementation strategies for water resources projects under uncertainties of completion time. PhD thesis, Colorado State University, USA.

Thajudeen, S; Elgh, F and Lennartsson, M (2022) A framework supporting mixed production strategies in platform development: A case study in post and beam building system. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Thajudeen, S; Lennartsson, M and Elgh, F (2019) Challenges and critical success factors for the design phase in Swedish industrialised house building. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Thajudeen, S; Lennartsson, M and Elgh, F (2020) Identification of challenges and success factors in industrialised house building design. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(1), pp. 27-37. ISSN 17514304

Thakhtravachi, M (2017) Tacit knowledge integration within the traditional construction procurement system. PhD thesis, University of Salford, UK.

Thannon, A Y (1989) The appraisal and management of multistorey dwelling blocks using large concrete panel systems. PhD thesis, Aston University, UK.

Thanu H P; Rajasekaran C and Deepak M D (2023) Assessing the life cycle performance of green building projects: A building performance score (BPS) model approach. Architectural Engineering and Design Management, 19(4), pp. 378-393. ISSN 1745-2007

Thawanapong, C and Tachakitkachorn, T (2026) The sequence of activities for digital twin implementation for building operations by industrial practitioners: A multiple case study analysis in Thailand. International Journal of Construction Management, 26(5), pp. 825-839. ISSN 1562-3599

Thayaparan, M (2012) Contributions of women managers to the UK construction industry. PhD thesis, University of Salford, UK.

Theaker, I G and Cole, R J (2001) The role of local governments in fostering 'green' buildings: A case study. Building Research & Information, 29(5), pp. 394-408. ISSN 0961-3218

Thekinen, J D; Pandey, N; Mollaoglu, S; Duva, M; Frank, K and Zhao, D (2023) Detecting information bottlenecks in architecture engineering construction projects for integrative project management. Journal of Construction Engineering and Management, 149(12): 04023135, ISSN 0733-9364

Theodorakopoulos, T F (2017) Integrated cost management system for delivering construction projects. PhD thesis, Loughborough University, UK.

Thiel, D J (2005) Builders: the social organisation of a construction site. PhD thesis, London School of Economics and Political Science, UK.

Thomas, A (2017) Modeling occupant behavior, systems life cycle performance, and energy consumption nexus in buildings using multi-method distributed simulation. PhD thesis, University of Michigan, USA.

Thomas, A; Davis, B; Dadi, G B and Goodrum, P M (2013) Case study on the effect of 690 mpa (100 ksi) steel reinforcement on concrete productivity in buildings. Journal of Construction Engineering and Management, 139(11): 4013025, ISSN 0733-9364

Thomas, A V and Sudhakumar, J (2014) Modelling masonry labour productivity using multiple regression. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Thomas, Douglas N (2015) The increase of timber use in residential construction in Australia: Towards a sustainable residential development model. PhD thesis, University of Technology Sydney, Australia.

Thomas, H R (2000) Schedule acceleration, work flow, and labor productivity. Journal of Construction Engineering and Management, 126(4), pp. 261-267. ISSN 0733-9364

Thomas, H R and Bluedorn, A C (1986) Case study of organizational changes. Journal of Construction Engineering and Management, 112(3), pp. 358-369. ISSN 0733-9364

Thomas, H R and Ellis, R D (2007) Contractor prebid planning principles. Journal of Construction Engineering and Management, 133(8), pp. 542-552. ISSN 0733-9364

Thomas, H R; Horman, M J and De Souza, U E L (2004) Symbiotic crew relationships and labor flow. Journal of Construction Engineering and Management, 130(6), pp. 908-917. ISSN 0733-9364

Thomas, H R; Riley, D R and Messner, J I (2005) Fundamental principles of site material management. Journal of Construction Engineering and Management, 131(7), pp. 808-815. ISSN 0733-9364

Thomas, H R and Sanvido, V E (2000) Role of the fabricator in labor productivity. Journal of Construction Engineering and Management, 126(5), pp. 358-365. ISSN 0733-9364

Thomas, H R; Sanvido, V E and Sanders, S R (1989) Impact of material management on productivity: a case study. Journal of Construction Engineering and Management, 115(3), pp. 370-384. ISSN 0733-9364

Thomas, T (1998) Domestic water supply using rainwater harvesting. Building Research & Information, 26(2), pp. 94-101. ISSN 0961-3218

Thompson, D E (2014) A study of building information modeling usage through the perceived utilization of facilities management training, building information modeling technical specifications, and a quality building information model for facilities management at higher educational institutions in Texas. PhD thesis, Texas A&M University, USA.

Thompson, E T (1997) A rational approach to computer integration in construction. PhD thesis, London South Bank University, UK.

Thompson, M J (2023) Environmental sustainability of small wastewater treatment systems and pathways for improvement. PhD thesis, University of Nebraska - Lincoln, USA.

Thompson, N E (2005) Business excellence: lessons for the construction industry. PhD thesis, Loughborough University, UK.

Thompson, P and Surgeoner, D (2014) Bridging the gap: University to professional qualifications. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(4), pp. 189-200. ISSN 17514304

Thompson, R F (2002) Management of architects within architectural businesses. PhD thesis, University of Salford, UK.

Thompson, R F and McDermott, P (2001) The management of architects within architectural businesses: A case study. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Thomson, C and El-Haram, M (2014) Potential and implications of sustainability action plans: Lessons from the Greater Middlehaven Regeneration Project. Built Environment Project and Asset Management, 4(1), pp. 108-122. ISSN 2044-124X

Thomson, C; Mickovski, S and Orr, C (2014) Promoting double loop learning in flood risk management in the Scottish context. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Thomson, C S (2006) A study of the innovation process within the construction project environment. PhD thesis, University of Dundee, UK.

Thomson, C S and El-Haram, M (2011) Exploring the potential of sustainability action plans within construction projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Thomson, C S and El-Haram, M A (2019) Is the evolution of building sustainability assessment methods promoting the desired sharing of knowledge amongst project stakeholders? Construction Management and Economics, 37(8), pp. 433-460. ISSN 01446193

Thomson, C S; El-Haram, M A and Emmanuel, R (2009) Mapping knowledge during sustainability assessment within a PPP school project. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Thomson, C S and Munns, A K (2004) Successfully implementing system innovations within the construction project environment. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Thomson, C S and Munns, A K (2010) Managing the implementation of component innovation within construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Thomson, D (2011) A pilot study of client complexity, emergent requirements and stakeholder perceptions of project success. Construction Management and Economics, 29(1), pp. 69-82. ISSN 1466433X

Thomson, D S; Austin, S A; Root, D S; Thorpe, A and Hammond, J W (2006) A problem-solving approach to value-adding decision making in construction design. Engineering, Construction and Architectural Management, 13(1), pp. 43-61. ISSN 0969-9988

Thomson, Esmeralda (2017) Adoptive governance in distributed agile development projects. PhD thesis, University of New South Wales, Australia.

Thorpe, T and Mead, S (2001) Project-specific web sites: Friend or foe? Journal of Construction Engineering and Management, 127(5), pp. 406-413. ISSN 0733-9364

Thuc, T; Thanh Thuy, T and Huong, H T L (2023) Multi-hazard risk assessment of typhoon, typhoon-rainfall and post-typhoon-rainfall in the Mid-Central coastal region of Vietnam. International Journal of Disaster Resilience in the Built Environment, 14(3), pp. 402-419. ISSN 1759-5916

Thuesen, C (2013) Pride and prejudice: Identity and collaboration in construction. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Thuesen, C and Hvam, L (2011) Efficient on-site construction: Learning points from a German platform for housing. Construction Innovation, 11(3), pp. 338-355. ISSN 1471-4175

Thuesen, C and Koch, C (2003) Coordinating knowledge in building design. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Thuesen, C; Koch-Ørvad, N and Maslesa, E (2016) Organising sustainable transition: Understanding the product, project and service domain of the built environment. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Thunberg, M (2016) Developing a framework for supply chain planning in construction. PhD thesis, Linköping University, Sweden.

Thunberg, M; Fredriksson, A; Danielsson, J; Hyll, H; Sandberg, E and Westin, A (2017) Planning in construction: How are the different planning processes linked? In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Thunberg M, P F (2013) A logistics framework for improving construction supply chain performance. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Thurairajah, N (2013) Leadership practices to address cultural and behavioural challenges in construction partnering projects. PhD thesis, University of Salford, UK.

Thuvander, L (2002) Towards environmental informatics for building stocks. A conceptual model for an environmental building stock information system for sustainable development – EBSIS. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Thuvander, L (2003) Towards environmental informatics for building stocks: A conceptual model for an environmental building stock information system for sustainable development - EBSIS(SD). PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Thörnqvist, C and Woolfson, C (2012) When tender turns tough: Posted workers and the tendering regime in the Swedish construction industry. Construction Management and Economics, 30(7), pp. 525-533. ISSN 1466433X

Tian, L; Stuart, G and Ozawa-Meida, L (2026) Smart faces: Using communication strategies to optimize technical information flow in middle-out facilities management. Building Research & Information, 54(1), pp. 44-58. ISSN 0961-3218

Tian, L; Wright, A; Painter, B and Pazhoohesh, M (2023) Factors influencing BIM use in green building construction project management in the UK and China. Building Research & Information, 51(7), pp. 853-870. ISSN 0961-3218

Tian, Y (2022) Financing infrastructure through blockchain tokenization. PhD thesis, University of Florida, USA.

Tierney, G and Tennant, S (2016) Post occupancy evaluation (POE): A BREEAM excellent case study. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Tiew, S Y (2025) Improving professional development through building contract administration (bca) framework of housing projects for graduate architects. Engineering, Construction and Architectural Management, 32(8), pp. 5272-5290. ISSN 0969-9988

Tiew, S Y (2025) A construction contract administration (cca) framework for graduate architects' professional development. Engineering, Construction and Architectural Management, 32(12), pp. 8056-8072. ISSN 0969-9988

Tiew, S Y (2024) Factors affecting performance of graduate architects in contract implementation management: A case study on housing projects in Malaysia. Engineering, Construction and Architectural Management, 31(5), pp. 1789-1806. ISSN 0969-9988

Tighnavard Balasbaneh, A and Ramadan, B S (2026) Integrating three pillars of sustainability for evaluating the modular construction building. Construction Innovation, 26(2), pp. 328-352. ISSN 1471-4175

Tilde, A (2023) An investigation of energy saving behaviour for residential buildings in Nigeria. PhD thesis, University of Salford, UK.

Tilford, K R; Jaselskis, E J and Smith, G R (2000) Impact of environmental contamination on construction projects. Journal of Construction Engineering and Management, 126(1), pp. 45-51. ISSN 0733-9364

Tingey, M; Webb, J and Van Der Horst, D (2021) Housing retrofit: Six typeof local authority energy service models. Buildings & Cities, 2(1), pp. 518-532. ISSN 2632-6655

Tirado Fabian, D R (2022) Contribution to the development of a model for the analysis of stocks and flows of waste materials from buildings at a territorial scale. DSc thesis, ETH Zürich, Switzerland.

Tiruneh, G G and Fayek, A R (2022) Hybrid GA-manfis model for organizational competencies and performance in construction. Journal of Construction Engineering and Management, 148(4): 04022002, ISSN 0733-9364

Tiwari, R (2015) A decision-support framework for design of non-residential net-zero energy buildings. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Tjell, J and Bosch-Sijtsema, P (2015) Client’s presence during design: A study on roles, practice and visual management. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Tobi, S U M and Amaratunga, D (2010) Social enterprise applications in an urban facilities management setting. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Toews, C D (1981) The regional economic and labor market impact of large-scale, rural, public works construction: A case study of the McClellan-Kerr Arkansas River Navigation System. PhD thesis, University of Texas at Austin, USA.

Tokdemir, O B; Erol, H and Dikmen, I (2019) Delay risk assessment of repetitive construction projects using line-of-balance scheduling and Monte Carlo simulation. Journal of Construction Engineering and Management, 145(2): 04018132, ISSN 0733-9364

Tokede, O and Ahiaga-Dagbui, D (2016) Evaluating the whole-life cost implication of revocability and disruption in office retrofit building projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Tokede, O; Boggavarapu, M K and Wamuziri, S (2023) Assessment of building retrofit scenarios using embodied energy and life cycle impact assessment. Built Environment Project and Asset Management, 13(5), pp. 666-681. ISSN 2044-124X

Tokede, O; Udawatta, N and Luther, M (2018) Retrofitting heritage office buildings in the UK: A case study. Built Environment Project and Asset Management, 8(1), pp. 39-50. ISSN 2044-124X

Tokede, O O (2016) Developing whole-life cost models for retrofit options in office buildings. PhD thesis, Edinburgh Napier University, UK.

Toledo, L; Wright, A and Cropper, P (2025) Case study investigation of overheating in low-energy homes: Insights from a post-occupancy evaluation in England. Building Research & Information, 53(1-2), pp. 139-164. ISSN 0961-3218

Tomar, A and Bansal, V K (2022) Generation, visualization, and evaluation schedule of repetitive construction projects using GIS. International Journal of Construction Management, 22(6), pp. 1104-1119. ISSN 1562-3599

Tomašević, V (2004) Developing productive relationships in the construction industry. PhD thesis, University of Cambridge, UK.

Tombesi, P (1997) Travels from flatland: The Walt Disney concert hall and the specialization of design knowledge in the building sector. PhD thesis, University of California, Los Angeles, USA.

Tomlinson, J (1998) A premises occupancy cost forecasting model. PhD thesis, University of Liverpool, UK.

Tommelein, I D (1989) SightPlan: an expert system that models and augments human decision making for designing construction site layouts. PhD thesis, Stanford University, USA.

Tomrukcu, G; Kizildag, H; Avgan, G; Dal, O; Ganic Saglam, N; Ozdemir, E and Ashrafian, T (2026) A systematic approach to manual calibration and validation of building energy simulation. Smart and Sustainable Built Environment, 15(1), pp. 203-230. ISSN 2046-6099

Tomrukçu, G and Ashrafian, T (2024) Energy-efficient building design under climate change adaptation process: A case study of a single-family house. International Journal of Building Pathology and Adaptation, 42(4), pp. 553-575. ISSN 23984708

Tong, M K L (2011) The management of inter-organisational relationships and project based learning. PhD thesis, Glasgow Caledonian University, UK.

Tong, P and Wilhelm, H C (2022) A strategy for integrating hillside dwelling design and automated construction techniques. Smart and Sustainable Built Environment, 11(2), pp. 387-403. ISSN 2046-6099

Tonna, Ren P (2021) How stakeholders experience and value the sustainable design elements of a residential high-rise building. PhD thesis, Griffith University, Australia.

Too, E G (2012) A capability model to improve infrastructure asset performance. Journal of Construction Engineering and Management, 138(7), ISSN 0733-9364

Too, Eric Gun Sim (2009) Capabilities for strategic infrastructure asset management. PhD thesis, Queensland University of Technology, Australia.

Tookey, J E; Kulatunga, K; Kulatunga, U; Amaratunga, D and Haigh, R (2011) Client's championing characteristics that promote construction innovation. Construction Innovation, 11(4), pp. 380-398. ISSN 1471-4175

Tookey, J E; Murray, M; Hardcastle, C and Langford, D (2001) Construction procurement routes: Re-defining the contours of construction procurement. Engineering, Construction and Architectural Management, 8(1), pp. 20-30. ISSN 0969-9988

Torcellini, P; Pless, S and Leach, M (2014) A pathway for net-zero energy buildings: Creating a case for zero cost increase. Building Research & Information, 43(1), pp. 25-33. ISSN 0961-3218

Torfi, F and Rashidi, A (2011) Selection of project managers in construction firms using analytic hierarchy process and fuzzy TOPSIS: A case study. Journal of Construction in Developing Countries, 16(1), pp. 69-89. ISSN 1823-6499

Toriola-Coker, L; Owolabi, H; Alaka, H; Bello, W A and Pathirage, C (2023) Critical success factors (CSFs) for motivating end-user stakeholder's support for ensuring sustainability of PPP projects in Nigerian host communities. Journal of Engineering, Design and Technology, 21(3), pp. 902-926. ISSN 1726-0531

Townsend, K; Lingard, H; Bradley, L and Brown, K (2012) Complicated working time arrangements: Construction industry case study. Journal of Construction Engineering and Management, 138(3), pp. 443-448. ISSN 0733-9364

Toyin, J O and Mewomo, M C (2022) Building information modelling core competencies expected of construction management graduates: A Nigerian construction industry case study. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Tramontini, L M (2024) Towards the integration of additive manufacturing for freeform steel and glass façade construction. PhD thesis, Delft University of Technology, Netherlands.

Tran, D H (2020) Optimizing time-cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods. Engineering, Construction and Architectural Management, 27(9), pp. 2287-2313. ISSN 0969-9988

Tran, D H and Long, L D (2018) Project scheduling with time, cost and risk trade-off using adaptive multiple objective differential evolution. Engineering, Construction and Architectural Management, 25(5), pp. 623-638. ISSN 0969-9988

Tran, D H; Tran, K N and Nguyen, N H (2025) A novel hybrid multiple objective optical microscope algorithm for fuzzy time, cost, and quality tradeoff in project management. International Journal of Construction Management, 25(10), pp. 1141-1153. ISSN 1562-3599

Tran, D Q; Diraviam, G and Minchin, R E (2018) Performance of highway design-bid-build and design-build projects by work types. Journal of Construction Engineering and Management, 144(2): 04017112, ISSN 0733-9364

Tran, D Q; Harper, C M; Smadi, A M and Mohamed, M (2020) Staffing needs and utilization for alternative contracting methods in highway design and construction. Engineering, Construction and Architectural Management, 27(9), pp. 2163-2178. ISSN 0969-9988

Tran, H; Robert, D; Gunarathna, P and Setunge, S (2023) Stochastic prediction of road network degradation based on field monitoring data. Journal of Construction Engineering and Management, 149(10): 04023096, ISSN 0733-9364

Tran, H; Robert, D; Gunarathna, P and Setunge, S (2024) Estimating cost of bridge closure for bridge network rehabilitation priorities. Journal of Construction Engineering and Management, 150(7): 04024071, ISSN 0733-9364

Tran, V D (2017) Evaluating the economics of construction and demolition waste minimisation and zero waste in the New Zealand construction industry. PhD thesis, Auckland University of Technology, New Zealand.

Traska, G (2007) Designing renovation: The building as planning material. Building Research & Information, 35(1), pp. 54-69. ISSN 0961-3218

Treacy, D; Spillane, J P and Tansey, P (2016) Construction disputes in small to medium enterprise's in Ireland during recession: Identification of critical factors. International Journal of Law in the Built Environment, 8(1), pp. 21-41. ISSN 1756-1450

Trethanya, S and Perera, R (2009) Environmental assessment for small- and medium-scale road projects implemented in local authority areas: A case study from Thailand. Journal of Construction in Developing Countries, 14(2), pp. 55-76. ISSN 1823-6499

Triana-Granados, K V; Bernard, I R; Merlin, A; Lucko, G and Ballesteros-Pérez, P (2024) Graphical delay tracking for linear and repetitive schedules. Journal of Construction Engineering and Management, 150(8): 04024090, ISSN 0733-9364

Trigunarsyah, B (2004) A review of current practice in constructability improvement: Case studies on construction projects in Indonesia. Construction Management and Economics, 22(6), pp. 567-580. ISSN 01446193

Trigunarsyah, Bambang (2001) Implementing constructability improvement into the Indonesian construction industry. PhD thesis, University of Melbourne, Australia.

Trill, J E (2003) The application of occupational performance standards in the construction industry: 'Factors influencing their use'. PhD thesis, University of Sussex, UK.

Trinh, T T P and Sharif, N (1996) Assessing construction technology by integrating constructed product and construction process complexities: A case study of embankment dams in Thailand. Construction Management and Economics, 14(6), pp. 467-484. ISSN 01446193

Truong-Hong, L; Lindenbergh, R and Nguyen, T A (2022) Structural assessment using terrestrial laser scanning point clouds. International Journal of Building Pathology and Adaptation, 40(3), pp. 345-379. ISSN 23984708

Tryggestad, K; Georg, S and Hernes, T (2010) Constructing buildings and design ambitions. Construction Management and Economics, 28(6), pp. 695-705. ISSN 1466433X

Tryggestad, K; Hugosson, M and Søberg, P (2018) Managing risk and uncertainty in sustainable construction innovation: The role of the partnering contract. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Tsai, S L; Ochiai, C; Deng, C Z and Tseng, M H (2022) A sustainable post-disaster housing development framework for an indigenous hao-cha community in Taiwan: Considering culture and livelihood in housing extensions. International Journal of Disaster Resilience in the Built Environment, 13(5), pp. 583-600. ISSN 1759-5916

Tsai, S L; Ochiai, C; Tseng, M H and Deng, C Z (2022) Suggestions for large-scale, postdisaster reconstruction involving indigenous populations: A participatory approach to recovery after Typhoon Morakot. International Journal of Disaster Resilience in the Built Environment, 13(2), pp. 180-196. ISSN 1759-5916

Tsao, C C Y (2005) Use of work structuring to increase performance of project-based production systems. PhD thesis, University of California, Berkeley, USA.

Tsao, C C Y; Tommelein, I D; Swanlund, E S and Howell, G A (2004) Work structuring to achieve integrated product-process design. Journal of Construction Engineering and Management, 130(6), pp. 780-789. ISSN 0733-9364

Tsemo, V (2015) An investigation of CSR as a source of corporate political power. PhD thesis, University of Wolverhampton, UK.

Tsenkova, S (1998) Private housebuilding and housing markets in transitional economies: The case of Bulgaria. PhD thesis, University of Toronto, Canada.

Tserng, H P; Russell, J S; Hsu, C W and Lin, C (2012) Analyzing the role of national PPP units in promoting PPPs: Using new institutional economics and a case study. Journal of Construction Engineering and Management, 138(2), pp. 242-249. ISSN 0733-9364

Tserng, H P; Yin, S Y L; Skibniewski, M J and Lee, M H (2010) Developing an Aris-house-based method from existing information systems to project-based enterprise resource planning for general contractor. Journal of Construction Engineering and Management, 136(2), pp. 199-209. ISSN 0733-9364

Tshatshu, Q.; Ndandani, Z. and Gwabavu, M. (2026) The effect of leadership styles on the professional development of project managers in South Africa. International Journal of Construction Management, 26(7), pp. 1264-1283. ISSN 1562-3599

Tsz Wai, C; Wai Yi, P; Ibrahim Olanrewaju, O; Abdelmageed, S; Hussein, M; Tariq, S and Zayed, T (2023) A critical analysis of benefits and challenges of implementing modular integrated construction. International Journal of Construction Management, 23(4), pp. 656-668. ISSN 1562-3599

Tu, B; Zuo, J; Chang, R D; Webber, R J; Xiong, F and Dong, N (2023) A system dynamic model for assessing the level of BIM implementation in construction phase: A China case study. Engineering, Construction and Architectural Management, 30(4), pp. 1321-1343. ISSN 0969-9988

Tucker, M; Mulliner, E and Wilson, H (2017) Research preparedness in the undergraduate property and construction curriculum: The student experience. International Journal of Construction Education and Research, 13(3), pp. 203-24. ISSN 1557-8771

Tucker, R R (2014) Influence of individual perceptions on engineering team performance within design-build infrastructure projects. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Tucker, S; Gamage, A and Wijeyesekera, C (2014) Some design aspects of sustainable post-disaster housing. International Journal of Disaster Resilience in the Built Environment, 5(2), pp. 163-181. ISSN 1759-5916

Tugrul Okbaz, F (2025) Evaluation of space efficiency criteria in high-rise buildings based on functions: A case study of türkiye. Architectural Engineering and Design Management, 21(1), pp. 60-77. ISSN 1745-2007

Tuholski, S J (2008) Transformation, flow, and value constellations in AEC projects. PhD thesis, University of California, Berkeley, USA.

Tunji-Olayeni, P F; Kajimo–Shakantu, K; Ayodele, T O and Philips, B I (2023) Students' perception of sustainable construction: Accelerating progress towards construction education for sustainable development. International Journal of Construction Management, 23(2), pp. 276-285. ISSN 1562-3599

Tuomela, A (2005) Network service organisation: interaction in workplace networks. PhD thesis, Helsinki University of Technology, Finland.

Tupe, S N (2009) Issues in financing of power projects during the period of economic reforms in India. PhD thesis, Indian Institute of Technology, Bombay, India.

Turner, Aidan (2022) Detecting the early essence of 'modern' project management: An historic case study approach (hms barham, 1912-1915). PhD thesis, University of the West of England, Bristol, UK.

Turner, P L (2017) A realist exploration of small firm tendering for public sector contracts: a micro-foundational study of capability. PhD thesis, Manchester Metropolitan University, UK.

Tutesigensi, A and Oak, D P (2007) Feasibility of collaborative working at the second tier subcontractor level in a prime contract. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Tutesigensi, A and Parcell, K (2007) Benefits of mobile telephones for construction contractors in the United Kingdom. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Tuuli, M M (2009) Empowerment and control dynamics in project teams: a multilevel examination of the antecedents and jobperformance consequences. PhD thesis, University of Hong Kong, Hong Kong.

Tuuli, M M and Koh, S R T Y (2009) Portfolio of control modes in project teams: A Hong Kong case study. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Tuuli, M M; Rowlinson, S and Koh, T Y (2010) Dynamics of control in construction project teams. Construction Management and Economics, 28(2), pp. 189-202. ISSN 1466433X

Tuuli, M M; Rowlinson, S and Koh, Y T (2010) Control modes and mechanisms in construction project teams: Drivers and consequences. Construction Management and Economics, 28(5), pp. 451-465. ISSN 1466433X

Twum, B A; Kabiri, S and Tutt, D (2023) Managing onsite production pressure and its impact on safety performance in construction: An activity theory analysis. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Tzortzopoulos, P (2004) The design and implementation of product development process models in construction companies. PhD thesis, University of Salford, UK.

Tzortzopoulos, P and Cooper, R (2007) Design management from a contractor's perspective: The need for clarity. Architectural Engineering and Design Management, 3(1), pp. 17-28. ISSN 1745-2007

Tzortzopoulos, P and Sexton, M (2007) An investigation on the implementation of product development process models in construction companies. Construction Management and Economics, 25(11), pp. 1153-1164. ISSN 01446193

Tzoumis, K A (1992) The role of public involvement in managing political conflict: A comparative case study of public involvement activities in siting low-level radioactive waste disposal facilities. PhD thesis, Texas A&M University, USA.

Ubesingha, Buddhinie (2025) Professionalism and ethics in post-disaster reconstruction projects. PhD thesis, London South Bank University, UK.

Udawatta, N; Zuo, J; Chiveralls, K and Zillante, G (2021) From green buildings to living buildings? Rating schemes and waste management practices in Australian educational buildings. Engineering, Construction and Architectural Management, 28(4), pp. 1278-1294. ISSN 0969-9988

Udeaja, C and Aziz, Z (2015) A case study of fostering multidisciplinary in built environment using BIM. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Ugwuoke, A A (2018) Innovation persistence during economic crisis by Nigeria's construction contracting firms: an investigation of the critical success factors. PhD thesis, University of Salford, UK.

Ulhaq, Irfan (2022) Investigation of knowledge management process within the Vietnamese construction industry. PhD thesis, RMIT University, Australia.

Ullah, F; Sepasgozar, S; Tahmasebinia, F; Sepasgozar, S M E and Davis, S (2020) Examining the impact of students' attendance, sketching, visualization, and tutors experience on students' performance: A case of building structures course in construction management. Construction Economics and Building, 20(3), pp. 78-102. ISSN 2204-9029

Ullal, A and Tombesi, P (2021) Dimensions and correlates of development in construction. Journal of Construction in Developing Countries, 26(2), pp. 37-64. ISSN 1823-6499

Ullal, André (2018) Clear, Hold and Build: Conditions and practices characterising construction in conflict and post-conflict settings. PhD thesis, University of Melbourne, Australia.

Ulrich de Alencastro, J P (2019) The impact of quality management on the thermal performance of social housing in the United Kingdom. PhD thesis, University of Plymouth, UK.

Ulutaş, D D; Giritli, H and McDermott, P (2016) Corporate social responsibility in construction industry: A comparative study between UK and Turkey. Built Environment Project and Asset Management, 6(2), pp. 218-231. ISSN 2044-124X

Umar, T and Egbu, C (2018) Perceptions on safety climate: A case study in the Omani construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(6), pp. 251-263. ISSN 17514304

Umar, T; Umeokafor, N; Zia, A; Egbu, C; Ahmed, S and Saidani, M (2025) How engineering and technology sectors are derailed by legislations: a case study of Pakistan. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(2), pp. 112-123. ISSN 17514304

Umeokafor, N; Evangelinos, K and Windapo, A (2022) Strategies for improving complex construction health and safety regulatory environments. International Journal of Construction Management, 22(7), pp. 1333-1344. ISSN 1562-3599

Umeokafor, N and Windapo, A (2019) The influence of religious consciousness on construction health and safety practices and performance. Journal of Construction in Developing Countries, 24(1), pp. 23-47. ISSN 1823-6499

Umeokafor, N; Windapo, A O; Manu, P; Diugwu, I and Haroglu, H (2023) Critical barriers to prevention through design in construction in developing countries: A qualitative inquiry. Engineering, Construction and Architectural Management, 30(7), pp. 3014-3042. ISSN 0969-9988

Umer, Muhammad (2025) Spotting inventory: Autonomous item localization on active construction sites using a boston dynamics spot® with Bayesian filtering and object detection. PhD thesis, Auburn University, USA.

Underwood, J (1995) Integrating design and construction to improve constructability through an effective usage of IT. PhD thesis, University of Salford, UK.

Ungureanu, L C; Hartmann, T and Serbanoiu, I (2019) Quantitative lean assessment of line of balance schedules' quality. Engineering, Construction and Architectural Management, 26(2), pp. 224-244. ISSN 0969-9988

Unterhitzenberger, C (2017) Organizational justice and its impact on project performance: an explanatory framework in the context of the construction industry. PhD thesis, Liverpool John Moores University, UK.

Upstill-Goddard, J; Glass, J; Dainty, A and Nicholson, I (2016) Implementing sustainability in small and medium-sized construction firms: The role of absorptive capacity. Engineering, Construction and Architectural Management, 23(4), pp. 407-427. ISSN 0969-9988

Upstill-Goddard, J D (2016) Towards a framework to enable construction small and medium-sized enterprises (SMEs) to manage sustainability. EngD thesis, Loughborough University, UK.

Ur Rehman, H S; Raza, M A; Masood, R; Khan, M A; Alamgir, S; Javed, M A; Roy, K and Lim, J B P (2023) A multi-facet BIM based approach for green building design of new multi-family residential building using LEED system. International Journal of Construction Management, 23(12), pp. 2024-2038. ISSN 1562-3599

Urup, L (2016) Integrated design-build management: studying institutional processes to understand project coordination & performance. PhD thesis, Chalmers University of Technology, Sweden.

Usman, W. I.; Mazher, K. M.; Umer, W.; Wuni, I. Y.; Alshibani, A.; Ghaithan, A.; Nasir, A. R. and Mohammed, A. (2026) BIM-based construction accidents knowledge database management system: Centralized accessible information repository for enhanced learning from the past. Journal of Construction Engineering and Management, 152(9): 04026149, ISSN 0733-9364

Usmani, A R A; Elshafey, A; Gheisari, M; Chai, C; Aminudin, E B and Tan, C S (2020) A scan to as-built building information modeling workflow: A case study in Malaysia. Journal of Engineering, Design and Technology, 18(4), pp. 923-940. ISSN 1726-0531

Utkucu, D and Sözer, H (2025) Modeling a mixed-mode cooling system with correlation to operable building facade openings: Mathematical logic integration of computational fluid dynamics and energy models. Journal of Construction Engineering and Management, 151(6): 04025054, ISSN 0733-9364

Uusitalo, P; Lappalainen, E; Seppänen, O; Pikas, E; Peltokorpi, A; Menzhinskii, N and Piitulainen, M (2021) To trust or not to trust: Is trust a prerequisite for solving design quality problems? Construction Management and Economics, 39(4), pp. 279-297. ISSN 01446193

Uusitalo, P; Peltokorpi, A; Seppänen, O and Alhava, O (2024) Towards systemic transformation in the construction industry: A complex adaptive systems perspective. Construction Innovation, 24(7), pp. 341-368. ISSN 1471-4175

Uusitalo, P; Seppänen, O; Peltokorpi, A and Olivieri, H (2019) Solving design management problems using lean design management: The role of trust. Engineering, Construction and Architectural Management, 26(7), pp. 1387-1405. ISSN 0969-9988

Vafaie, F; Remøy, H and Gruis, V (2025) From theory to practice: Evaluating success factors of adaptive reuse through a case study. Built Environment Project and Asset Management, 15(3), pp. 432-449. ISSN 2044-124X

Vahanvati, M and Rafliana, I (2019) Reliability of build back better at enhancing resilience of communities. International Journal of Disaster Resilience in the Built Environment, 10(4), pp. 208-221. ISSN 1759-5916

Vahdatmanesh, M and Firouzi, A (2020) Construction material supply risk management using Asian option contracts: The case of a pipeline project. Engineering, Construction and Architectural Management, 27(10), pp. 3395-3414. ISSN 0969-9988

Vakola, M (1999) Business process re-engineering and organisational change: Evaluation of implementation strategies. PhD thesis, University of Salford, UK.

Valinejadshoubi, M; Sacks, R; Valdivieso, F; Corneau-Gauvin, C and Kaptué, A (2025) Digital twin construction in practice: A case study of closed-loop production control integrating BIM, GIS, and IoT sensors. Journal of Construction Engineering and Management, 151(11): 05025014, ISSN 0733-9364

Valkonen, T; Lindberg, A; Alhava, O; Talebi, S; Koskela, L and Seppänen, O (2026) Tolerance management in prefabrication of mechanical, electrical, and plumbing installations. Construction Management and Economics, 44(4), pp. 279-299. ISSN 0144-6193

Valks, B; Arkesteijn, M H; Koutamanis, A and den Heijer, A C (2021) Towards a smart campus: Supporting campus decisions with internet of things applications. Building Research & Information, 49(1), pp. 1-20. ISSN 0961-3218

Valluru, Charan T (2022) The subcontractor safety problem: Hidden, variable, and outsider work. PhD thesis, Griffith University, Australia.

Van Amstel, F M C; Zerjav, V; Hartmann, T; Van Der Voort, M C and Dewulf, G P M R (2015) Expanding the representation of user activities. Building Research & Information, 43(2), pp. 144-159. ISSN 0961-3218

Van Arsdale, C (2021) Analytical assessment of project complexity: A guide to managing projects through reduction of complexity. PhD thesis, Michigan Technological University, USA.

Van Dam, S S; Bakker, C A and Van Hal, J D M (2010) Home energy monitors: Impact over the medium-term. Building Research & Information, 38(5), pp. 458-469. ISSN 0961-3218

Van Der Heijden, J (2010) Privatisation of building code enforcement: A comparative study of regimes in Australia and Canada. International Journal of Law in the Built Environment, 2(1), pp. 60-75. ISSN 1756-1450

Van Reedt Dortland, M; Voordijk, H and Dewulf, G (2013) Real options in project coalitions in Dutch health care: Two case studies of construction projects. Construction Management and Economics, 31(3), pp. 266-286. ISSN 1466433X

Van Timmeren, A and Sidler, D (2007) The sustainable implant: Decentralised sanitation and energy reuse (Desaer) in the built environment. Construction Innovation, 7(1), pp. 22-37. ISSN 1471-4175

Van der Heijden, J J (2009) Building regulatory enforcement regimes: Comparative analysis of private sector involvement in the enforcement of public building regulations. PhD thesis, Delft University of Technology, Netherlands.

Vaughan, J L; Leming, M L; Liu, M and Jaselskis, E (2013) Cost-benefit analysis of construction information management system implementation: Case study. Journal of Construction Engineering and Management, 139(4), pp. 445-455. ISSN 0733-9364

Vaziri, K (2006) Program planning under uncertainty. PhD thesis, Cornell University, USA.

Vazquez, F and Allen, S (2004) Private sector participation in the delivery of highway infrastructure in central America and Mexico. Construction Management and Economics, 22(7), pp. 745-754. ISSN 01446193

Vecino, G A (2016) The feasibility of using web-based technology for the management of dredging projects. PhD thesis, University of Maryland, College Park, USA.

Vegad, K; Madurwar, M and Ralegaonkar, R (2014) Application of AV-ERP system for on-site project monitoring. Construction Innovation, 14(4), pp. 518-531. ISSN 1471-4175

Velasco, E and Segovia, E (2024) Effectiveness of equipping bus stop shelters with cooling and filtering systems in a city with tropical climate. Smart and Sustainable Built Environment, 13(5), pp. 1330-1345. ISSN 2046-6099

Venkataraman, V and Cheng, J C P (2014) Social network analysis on the inter-organizational interactions in green building projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Venselaar, M and Gruis, V (2016) Studying intra-organizational dynamics in implementing supply chain partnering: A case study about work floor experiences in a Dutch housing association. Construction Management and Economics, 34(2), pp. 98-109. ISSN 01446193

Ventovuori, T (2007) Elements of sourcing strategy in facilites management services : decision categories and choices. PhD thesis, Helsinki University of Technology, Finland.

Ventura, M; S. Dias, I; Flores-Colen, I and Silva, A (2023) Pathology and proactive maintenance of floor finishes. International Journal of Building Pathology and Adaptation, 41(3), pp. 588-605. ISSN 23984708

Verma, S; Mandal, S N; Robinson, S; Bajaj, D and Saxena, A (2021) Investment appraisal and financial benefits of corporate green buildings: A developing economy case study. Built Environment Project and Asset Management, 11(2), pp. 392-408. ISSN 2044-124X

Vernali, R J (1992) The case of the California contractors state license board: A palette of conflict resolution strategies for the 1990s. DPA thesis, Golden Gate University, USA.

Vernikos, V K (2016) Realising offsite construction in the civil engineering and infrastructure sector. PhD thesis, Loughborough University, UK.

Vernikos, V K; Goodier, C I; Gibb, A G F; Robery, P C and Broyd, T W (2011) Offsite innovation in UK infrastructure: The role of the approvals process in box jacking projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Vernikos V K, N R and Goodier Ci, R P C (2013) Implementing an offsite construction strategy: A UK contracting organisation case study. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Verzobio, A (2020) Supporting rational decision-making in civil engineering. PhD thesis, University of Strathclyde, UK.

Vesali Mahmoud, N (2016) A comprehensive decision support framework in the front-end phase of major transportation projects. PhD thesis, Florida International University, USA.

Veselka, J (2023) BIM data structure in the building optimization: Methodology for model development. PhD thesis, Czech Technical University, Czech Republic.

Veshosky, D A (1992) An investigation of factors that influence decisions by engineering firms concerning adoption of CAD/CAE systems. PhD thesis, Lehigh University, USA.

Vestin, A (2020) Smart manufacturing for the wooden single-family house industry. PhD thesis, Jönköping University, Sweden.

Vestin, A; Säfsten, K and Löfving, M (2021) Smart factories for single-family wooden houses – a practitioner’s perspective. Construction Innovation, 21(1), pp. 64-84. ISSN 1471-4175

Victoria, M; Perera, S and Davies, A (2015) Developing an early design stage embodied carbon prediction model: A case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Victoria, M F; Perera, S; Davies, A and Fernando, N (2017) Carbon and cost critical elements: A comparative analysis of two office buildings. Built Environment Project and Asset Management, 7(5), pp. 460-470. ISSN 2044-124X

Vidogah, W (1997) Claims on construction contracts: a new management framework. PhD thesis, University of Wolverhampton, UK.

Vidyadhar, R; Sudeep, K R; Vinodh, S and Antony, J (2016) Application of fuzzy logic for leanness assessment in SMEs: A case study. Journal of Engineering, Design and Technology, 14(1), pp. 78-103.

Vieira, P M d S (2007) Environmental assessment of office buildings. PhD thesis, University of California, Berkeley, USA.

Vijay, V; Chandra, R and Subbarao, P M V (2022) Biomass as a means of achieving rural energy self-sufficiency: A concept. Built Environment Project and Asset Management, 12(3), pp. 382-400. ISSN 2044-124X

Viklund Tallgren, M; Roupe, M and Johansson, M (2015) An empowered collaborative planning method in a Swedish construction company: A case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Vilasini, N (2014) Generating value in alliance contracts through the lean concept. PhD thesis, Auckland University of Technology, New Zealand.

Vilasini, N and Neitzert, T (2012) Improving project performance through worker participation in alliance projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Vilasini, N; Neitzert, T and Rotimi, J (2014) Developing and evaluating a framework for process improvement in an alliance project: A New Zealand case study. Construction Management and Economics, 32(6), pp. 625-640. ISSN 01446193

Villa, S B; Vasconcellos, P B; De Bortoli, K C R and De Araujo, L B (2022) Lack of adaptability in Brazilian social housing: Impacts on residents. Buildings & Cities, 3(1), pp. 376-397. ISSN 2632-6655

Vilventhan, A and Kalidindi, S N (2016) Interrelationships of factors causing delays in the relocation of utilities: A cognitive mapping approach. Engineering, Construction and Architectural Management, 23(3), pp. 349-368. ISSN 0969-9988

Vilventhan, A and Kalidindi, S N (2018) Utility relocation management in highway projects. Built Environment Project and Asset Management, 8(2), pp. 171-182. ISSN 2044-124X

Vilventhan, A and Rajadurai, R (2020) 4D bridge information modelling for management of bridge projects: A case study from India. Built Environment Project and Asset Management, 10(3), pp. 423-435. ISSN 2044-124X

Vinci, F (2022) Project-based networks in the delivery of infrastructure projects and programmes. PhD thesis, University College London, UK.

Vinodh, S and Arun, M (2010) Application of creative design concept to braking system synchronization in two wheeler bikes. Journal of Engineering, Design and Technology, 8(3), pp. 354-368. ISSN 1726-0531

Vinodh, S and Jayakrishna, K (2014) Development of integrated ecqfd, LCA and sustainable analysis model: A case study in an automotive component manufacturing organization. Journal of Engineering, Design and Technology, 12(1), pp. 102-127. ISSN 1726-0531

Vinodh, S and Rathod, G (2014) Application of life cycle assessment and Monte Carlo simulation for enabling sustainable product design. Journal of Engineering, Design and Technology, 12(3), pp. 307-315.

Vinodh, S and Ravikumar, R (2012) Application of probabilistic finite element analysis for crane hook design. Journal of Engineering, Design and Technology, 10(2), pp. 255-275. ISSN 1726-0531

Vinodh, S and Sharath, K T (2016) A case study on applying creative design concepts to brake rotor design. Journal of Engineering, Design and Technology, 14(1), pp. 2-16.

Visscher, H; Suddle, S and Meijer, F (2008) Quantitative risk analysis as a supporting tool for safety protocols at multi-functional urban locations. Construction Innovation, 8(4), pp. 269-279. ISSN 1471-4175

Vitorio Junior, P C and Kripka, M (2021) Fair wage potential as a tool for social assessment in building projects. Engineering, Construction and Architectural Management, 28(4), pp. 1295-1318. ISSN 0969-9988

Vlasova, L and Gram-Hanssen, K (2014) Incorporating inhabitants everyday practices into domestic retrofits. Building Research & Information, 42(4), pp. 512-524. ISSN 0961-3218

Vogelius, P; Forman, M; Haugbølle, K and Storgaard, K (2009) Innovation in the kitchen line of business: Users, configuration and context. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Vohmann, B (2019) Authentic assessment to enhance undergraduates' learning and development as effective practitioners in built environment disciplines. EngD thesis, Anglia Ruskin University, UK.

Volker, L (2010) Dutch architectural design tenders explained from a sensemaking perspective. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Volker, L; Eriksson, P E; Kadefors, A and Larsson, J (2018) A case-based comparison of the efficiency and innovation potential of integrative and collaborative procurement strategies. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Volker, L and Lauche, K (2008) Decision making during a tendering procedure: Case studies of restricted European tenders in architecture. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Von Meding, J K (2013) NGO competency-based framework for the delivery of post-disaster reconstruction projects. PhD thesis, Queen's University Belfast, UK.

Voordijk, H; Vahdatikhaki, F and Hesselink, L (2025) Digital twin–based asset inspection and user–technology interactions. Journal of Engineering, Design and Technology, 23(2), pp. 406-422. ISSN 1726-0531

Voordijk, H; Van Leuven, A and Laan, A (2003) Enterprise resource planning in a large construction firm: Implementation analysis. Construction Management and Economics, 21(5), pp. 511-521. ISSN 01446193

Voordijk, J T (2019) Technological mediation in construction: Postphenomenological inquiry into digital technologies. Journal of Construction Engineering and Management, 145(12): 04019084, ISSN 0733-9364

Vorasubin, P and Chareonngam, C (2007) Strategic assets driving financial capability of Thai construction firms. Journal of Financial Management of Property and Construction, 12(2), pp. 87-94. ISSN 1366-4387

Vosman, L; Coenen, T B J; Volker, L and Visscher, K (2021) Exploring the innovation ecosystem concept for a construction industry in transition. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Voyatzaki, M G (1996) An insight into the design process of unconventional structures. PhD thesis, University of Bath, UK.

Vrijhoef, R (2019) Studying time presence on site as an indicator of productive time use by construction workers. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Vu, Thu Hang (2017) Equity issues in land acquisition: A source of delays in large construction projects in Vietnam. PhD thesis, Queensland University of Technology, Australia.

Wade, F and Han, Y (2024) Mapping supply chains for energy retrofit. Buildings & Cities, 5(1), pp. 388-399. ISSN 2632-6655

Wadu Mesthrige, J and Kwong, H Y (2018) Criteria and barriers for the application of green building features in Hong Kong. Smart and Sustainable Built Environment, 7(3-4), pp. 251-276. ISSN 2046-6099

Wafaei Baneh, K; Wafaei Baneh, B; Osman, A; Mostafapour, O and Bradosty, Z R (2023) Regeneration and documentation of historic geometric islamic patterns via HBIM: A case study of Choli minaret, Kurdistan region. International Journal of Building Pathology and Adaptation, 41(2), pp. 347-363. ISSN 23984708

Wafai, M H and Aouad, G (2023) Innovation transfer in construction: Re-interpreting factor-based research from the perspective of the social construction of technology (scot). Construction Innovation, 23(5), pp. 1323-1344. ISSN 1471-4175

Wafai, M H M H (2005) Developing a methodology for technology transfer of advanced IT solutions in the construction sector. PhD thesis, University of Salford, UK.

Wagner, H E (2015) Hiring goals: Are they assisting more women to enter and remain in the building trades? PhD thesis, University of Minnesota, USA.

Wagner, H E and Kulwiec, A (2022) Expanding pre-apprenticeship training programs as a model to improve recruitment and retention of building construction tradeswomen. International Journal of Construction Education and Research, 18(1), pp. 3-16. ISSN 1557-8771

Wah, L W (2015) Impact of organisational culture on Malaysian international contractors’ bidding decisions. PhD thesis, University of Malaya, Malaysia.

Wahab, A (2024) Integrating building information modeling (BIM) and blockchain technology in the pre-construction planning processes. PhD thesis, Mississippi State University, USA.

Wahab, A and Wang, J (2022) Factors-driven comparison between BIM-based and traditional 2D quantity takeoff in construction cost estimation. Engineering, Construction and Architectural Management, 29(2), pp. 702-715. ISSN 0969-9988

Wahab, A; Wang, J; Shojaei, A and Ma, J (2023) A model-based smart contracts system via blockchain technology to reduce delays and conflicts in construction management processes. Engineering, Construction and Architectural Management, 30(10), pp. 5052-5072. ISSN 0969-9988

Wahalathantri, B; Lokuge, W; Karunasena, W and Setunge, S (2018) Quantitative assessment of flood discharges and floodway failures through cross-cultivation of advancement in knowledge and traditional practices. International Journal of Disaster Resilience in the Built Environment, 9(4-5), pp. 435-456. ISSN 1759-5916

Waibel, C (2018) Simulation-based optimization of buildings and multi-energy systems. DSc thesis, ETH Zürich, Switzerland.

Walker, A and Hughes, W P (1984) Private industrial project management: A systems-based case study. Construction Management and Economics, 2(2), pp. 93-110. ISSN 01446193

Walker, A and Hughes, W P (1986) A conventionally-managed project: A systems- based case study. Construction Management and Economics, 4(1), pp. 57-74. ISSN 01446193

Walker, A and Hughes, W P (1987) A project managed by a multi-disciplinary practice: A systems-based case study. Construction Management and Economics, 5(2), pp. 123-140. ISSN 01446193

Walker, A and Newcombe, R (2000) The positive use of power on a major construction project. Construction Management and Economics, 18(1), pp. 37-44. ISSN 01446193

Walker, D and Jacobsson, M (2014) A rationale for alliancing within a public-private partnership. Engineering, Construction and Architectural Management, 21(6), pp. 648-673. ISSN 0969-9988

Walker, D H T (1994) An investigation into factors that determine building construction time performance. PhD thesis, Royal Melbourne Institute of Technology, Australia.

Walker, D H T (1997) Choosing an appropriate research methodology. Construction Management and Economics, 15(2), pp. 149-159. ISSN 01446193

Walker, D H T (1997) Construction time performance and traditional versus non-traditional procurement methods. Journal of Construction Procurement, 3(1), pp. 42-55. ISSN 1358-9180

Walker, D H T; Peters, R J; Hampson, K D and Thompson, M J (2001) Achieving a responsive industrial relations environment for construction industry workers: A project alliancing case study. Construction Innovation, 1(4), pp. 211-225. ISSN 1471-4175

Walker, D H T and Rahmani, F (2016) Delivering a water treatment plant project using a collaborative project procurement approach. Construction Innovation, 16(2), pp. 158-184. ISSN 1471-4175

Walker, G (1999) A critical analysis into the factors that determine project management success: The case in railway engineering projects. PhD thesis, London South Bank University, UK.

Walker, G; Brown, S and Neven, L (2016) Thermal comfort in care homes: Vulnerability, responsibility and 'thermal care'. Building Research & Information, 44(2), pp. 135-146. ISSN 0961-3218

Walker, G; Naoum, S and Howes, R (1997) Determinants of project management success. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Walker, L (2022) Scenario-based robustness assessment for low-emission building retrofit. DSc thesis, ETH Zürich, Switzerland.

Walker D.H.T, S Y J (2002) Project understanding, planning, flexibility of management action and construction time performance: Two Australian case studies. Construction Management and Economics, 20(1), pp. 31-44. ISSN 01446193

Wall, C M (2004) New ways of building: Architects, operatives and industrialised production in britain 1940-70. PhD thesis, University of Cambridge, UK.

Wall, J and Ahmed, V (2008) Lessons learned from a case study in deploying blended learning continuing professional development. Engineering, Construction and Architectural Management, 15(2), pp. 185-202. ISSN 0969-9988

Wallace, D and Wallace, R (2011) Consequences of massive housing destruction: The New York city fire epidemic. Building Research & Information, 39(4), pp. 395-411. ISSN 0961-3218

Wallhagen, M and Glaumann, M (2011) Design consequences of differences in building assessment tools: A case study. Building Research & Information, 39(1), pp. 16-33. ISSN 0961-3218

Walsh, A J (2021) Cultural dissonance as a risk factor in the construction of megaprojects: The experience of western consultants working in the gulf cooperation council. DProf thesis, University of Salford, UK.

Walsh, K D; Hershauer, J C; Tommelein, I D and Walsh, T A (2004) Strategic positioning of inventory to match demand in a capital projects supply chain. Journal of Construction Engineering and Management, 130(6), pp. 818-826. ISSN 0733-9364

Walsh, K D; Sawhney, A and Brown Iv, A (2005) International comparison of cost for the construction sector: Purchasing power parity. Journal of Construction Engineering and Management, 131(2), pp. 160-167. ISSN 0733-9364

Wambeke, B W; Liu, M and Hsiang, S M (2012) Using last planner and a risk assessment matrix to reduce variation in mechanical related construction tasks. Journal of Construction Engineering and Management, 138(4), pp. 491-498. ISSN 0733-9364

Wambeke, B W; Liu, M and Hsiang, S M (2012) Using Pajek and centrality analysis to identify a social network of construction trades. Journal of Construction Engineering and Management, 138(10), pp. 1192-1201. ISSN 0733-9364

Wamsler, C and Brink, E (2015) The role of individual adaptive practices for sustainable adaptation. International Journal of Disaster Resilience in the Built Environment, 6(1), pp. 6-29. ISSN 1759-5916

Wandahl, S; Pérez, C T; Salling, S; Neve, H H; Lerche, J and Petersen, S (2021) The impact of construction labour productivity on the renovation wave. Construction Economics and Building, 21(3), pp. 11-32. ISSN 2204-9029

Wandahl, S and Skovbogaard, J (2017) Towards improving productivity on refurbishment projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Wang, L; Zhang, M and Liu, J (2025) Analysis of the influencing factors of the cost of village prefabricated housing in rural revitalization: A southern shaanxi case study. Engineering, Construction and Architectural Management, 32(10), pp. 6353-6372. ISSN 0969-9988

Wang, M; Shaari, N; Abidin, S Z and He, Y (2025) Service design in the context of sustainable production and consumption: A case study of elderly fall-protection clothing. Journal of Engineering, Design and Technology, 23(6), pp. 1919-1939. ISSN 1726-0531

Wang, Y; Xiao, B; Mueller, S T and Yi, W (2026) Task–taxon–task framework for modeling and predicting the cognitive impact of collaborative robots on worker performance in modular construction. Journal of Construction Engineering and Management, 152(4): 04026033, ISSN 0733-9364

Wang, Z.; Hu, X.; Wei, A.; Yang, W. and Dong, Z. (2026) A blockchain-based system for just-in-time in construction supply chains. Built Environment Project and Asset Management, 16(2), pp. 377-395. ISSN 2044-124X

Wang, C; Li, B; Li, B and Baldwin, A (2017) Case study of "project controlling" on a large HOPSCA project in China. Engineering, Construction and Architectural Management, 24(6), pp. 862-874. ISSN 0969-9988

Wang, C; Liu, M; Hsiang, S M and Leming, M L (2012) Causes and penalties of variation: Case study of a precast concrete slab production facility. Journal of Construction Engineering and Management, 138(6), pp. 775-785. ISSN 0733-9364

Wang, H (2015) The interplay of formal and informal institutions for procurement innovation: a social network approach. PhD thesis, University of Hong Kong, Hong Kong.

Wang, H (2021) BIM-based knowledge management for the use of construction and facilities management knowledge in construction projects. PhD thesis, Queen's University Belfast, UK.

Wang, H; Yi, W; Zhen, L; Song, Y and Wu, P (2025) Designing optimal government-contractor subsidy policy for promoting modular construction: Bilevel stochastic program. Journal of Construction Engineering and Management, 151(10): 04025136, ISSN 0733-9364

Wang, J (2020) Building information modeling (BIM) localization: tackling the "last mile" problem in BIM adoption. PhD thesis, University of Hong Kong, Hong Kong.

Wang, J (2023) Direct policy search for adaptive management of flood risk. PhD thesis, Purdue University, USA.

Wang, J; Chen, J J and Isaac, D (1996) Financing real estate in China: The development of a real estate investment bond market in Tianjin. Journal of Financial Management of Property and Construction, 1(3), pp. 5-22. ISSN 1366-4387

Wang, J; Han, J; Chen, J; Ding, G; Feng, G; Liu, T and Guo, B (2022) Experimental and numerical study on the dynamic response of a superthick backfill subgrade under high-speed railway loading: A case study of qianjiang-zhangjiajie-changde railway. Journal of Construction Engineering and Management, 148(12): 05022014, ISSN 0733-9364

Wang, J; Li, X; Memari, A; Skitmore, M; Zhong, Y; Ashuri, B; Chen, J and Cao, J (2025) Assessing the implementation and effectiveness of China's social credit system of the construction industry: a case study of Nanjing. International Journal of Construction Management, 25(7), pp. 850-859. ISSN 1562-3599

Wang, J and Lu, W (2022) A deployment framework for BIM localization. Engineering, Construction and Architectural Management, 29(1), pp. 407-430. ISSN 0969-9988

Wang, J; Luo, H; Pena-Mora, F; Zhou, W and Fang, W (2024) An integrated BIM-IoT framework for real-time quality monitoring in construction site. Journal of Construction Engineering and Management, 150(11): 05024013, ISSN 0733-9364

Wang, J; Wang, X; Shou, W and Xu, B (2014) Integrating BIM and augmented reality for interactive architectural visualisation. Construction Innovation, 14(4), pp. 453-476. ISSN 1471-4175

Wang, K; Guo, F; Zhou, R and Qian, L (2024) Implementation of augmented reality in BIM-enabled construction projects: A bibliometric literature review and a case study from China. Construction Innovation, 24(4), pp. 1085-1116. ISSN 1471-4175

Wang, K; Ke, Y; Liu, T and Sankaran, S (2022) Social sustainability in public-private partnership projects: Case study of the Northern beaches hospital in sydney. Engineering, Construction and Architectural Management, 29(6), pp. 2437-2460. ISSN 0969-9988

Wang, L; Lee, J; Nimawat, J; Han, K and Gupta, A (2024) Integrated 4D design change management model for construction projects. Journal of Construction Engineering and Management, 150(5): 04024023, ISSN 0733-9364

Wang, L; Zhang, P; Zhang, P; Li, R; Zhang, Y and Wu, Y (2018) A systematic approach for public-private partnership projects CSFs evaluation. Engineering, Construction and Architectural Management, 25(9), pp. 1127-1145. ISSN 0969-9988

Wang, M (2014) Sensitivity analysis and evolutionary optimization for building design. PhD thesis, Loughborough University, UK.

Wang, M; Altaf, M S; Al-Hussein, M and Ma, Y (2020) Framework for an IoT-based shop floor material management system for panelized homebuilding. International Journal of Construction Management, 20(2), pp. 130-145. ISSN 1562-3599

Wang, M; Yao, G; Yang, Y; Li, R and Deng, R (2025) A decision support tool for dust prevention and control in construction. Journal of Construction Engineering and Management, 151(5): 04025037, ISSN 0733-9364

Wang, N (2022) Spoken dialogue system for information extraction from building information models using artificial intelligence. PhD thesis, University of Florida, USA.

Wang, N and Horner, R M W (2007) Fuzzy rule based system approach to assess cleaning costs of carpet flooring. Journal of Financial Management of Property and Construction, 12(1), pp. 25-36. ISSN 1366-4387

Wang, N; Wang, H and Zhang, K (2022) The dynamics of changes in PPP projects: A meta-case analysis approach. Construction Management and Economics, 40(9), pp. 727-742. ISSN 01446193

Wang, P; Mohamed, Y; Abourizk, S M and Rawa, A R T (2009) Flow production of pipe spool fabrication: Simulation to support implementation of lean technique. Journal of Construction Engineering and Management, 135(10), pp. 1027-1038. ISSN 0733-9364

Wang, P; Wu, P; Wang, X; Chen, X and Zhou, T (2020) Developing optimal scaffolding erection through the integration of lean and work posture analysis. Engineering, Construction and Architectural Management, 27(9), pp. 2109-2133. ISSN 0969-9988

Wang, Q; Appolloni, A and Liu, J (2024) Does "low-carbon pilot policy" affect the carbon intensity of construction industry? Exploring the implementation mechanism and effectiveness in China. Engineering, Construction and Architectural Management, 31(8), pp. 3222-3248. ISSN 0969-9988

Wang, Q; Guo, Z; Mei, T; Li, Q and Li, P (2018) Labor crew workspace analysis for prefabricated assemblies' installation: A 4D-BIM-based approach. Engineering, Construction and Architectural Management, 25(3), pp. 374-411. ISSN 0969-9988

Wang, S (2019) An exact architectural practice: Strategies for post-digital architectural design in China’s construction context. PhD thesis, The Chinese University of Hong Kong, Hong Kong.

Wang, S; Hasan, M and Lu, M (2024) Global sensitivity analysis methodology for construction simulation models: Multiple linear regressions versus multilayer perceptions. Journal of Construction Engineering and Management, 150(5): 04024035, ISSN 0733-9364

Wang, S; Tang, J; Zou, Y and Zhou, Q (2020) Research on production process optimization of precast concrete component factory based on value stream mapping. Engineering, Construction and Architectural Management, 27(4), pp. 850-871. ISSN 0969-9988

Wang, T; Abdallah, M; Clevenger, C and Monghasemi, S (2021) Time–cost–quality trade-off analysis for planning construction projects. Engineering, Construction and Architectural Management, 28(1), pp. 82-100. ISSN 0969-9988

Wang, W; Hao, S; Zhong, H and Sun, Z (2024) Toward sustainable construction: Optimizing carbon emission reduction in the building supply chain through game-theoretic strategies, government subsidies, and cost-sharing contract. Journal of Construction Engineering and Management, 150(6): 04024042, ISSN 0733-9364

Wang, X (2022) Enabling human-robot partnerships in digitally-driven construction work through integration of building information models, interactive virtual reality, and process-level digital twins. PhD thesis, University of Michigan, USA.

Wang, X; Chen, Y; Liu, B; Shen, Y and Sun, H (2013) A total factor productivity measure for the construction industry and analysis of its spatial difference: A case study in China. Construction Management and Economics, 31(10), pp. 1059-1071. ISSN 1466433X

Wang, X; Du, M; Li, H X; Hasan, A and Ahmadian Fard Fini, A (2025) Gender inequality and challenges of women in the construction industry: An evidenced-based analysis from China. Engineering, Construction and Architectural Management, 32(13), pp. 213-233. ISSN 0969-9988

Wang, X; He, N and Li, X (2023) Social network analysis of the construction community in the anti-epidemic emergency project: A case study of wuhan huoshenshan hospital, China. Engineering, Construction and Architectural Management, 30(8), pp. 3539-3561. ISSN 0969-9988

Wang, X; Huang, X; Luo, Y; Pei, J and Xu, M (2018) Improving workplace hazard identification performance using data mining. Journal of Construction Engineering and Management, 144(8): 04018068, ISSN 0733-9364

Wang, Xi (2018) Assessing the application of the unmanned aerial systems (uas) in earthwork volume measurement. PhD thesis, University of Kentucky, USA.

Wang, Y (2009) Measuring competitiveness of chinese professional design firms. PhD thesis, University of Reading, UK.

Wang, Y; Deng, X and Mao, H (2023) The optimization of personnel localization management on international construction projects: Cases study from China enterprises. Engineering, Construction and Architectural Management, 30(8), pp. 3259-3291. ISSN 0969-9988

Wang, Y; Gong, E; Zhang, Y; Yao, Y and Zhou, X (2024) Risk assessment of infrastructure reits projects based on cloud model: A case study of China. Engineering, Construction and Architectural Management, 31(11), pp. 4330-4352. ISSN 0969-9988

Wang, Y; Shi, G and Zhang, Y (2025) How did polycentric spatial structure affect carbon emissions of the construction industry? A case study of 10 Chinese urban clusters. Engineering, Construction and Architectural Management, 32(2), pp. 1186-1210. ISSN 0969-9988

Wang, Y; Thangasamy, V K; Tiong, R L K and Zhang, L (2022) Improved workflow for precast element design based on BIM and lean construction. Journal of Construction Engineering and Management, 148(8): 04022065, ISSN 0733-9364

Wang, Y-P (2021) How level of detail of activity duration data influences look-ahead schedule performance in prefabricated construction. PhD thesis, Stanford University, USA.

Wang, Z; Hu, H and Gong, J (2018) Modeling worker competence to advance precast production scheduling optimization. Journal of Construction Engineering and Management, 144(11): 04018098, ISSN 0733-9364

Wang, Z; Liu, Y; Hu, H and Dai, L (2021) Hybrid rescheduling optimization model under disruptions in precast production considering real-world environment. Journal of Construction Engineering and Management, 147(4): 04021012, ISSN 0733-9364

Wang, Z; Shen, Y and Li, K (2025) Resilience strengthening paths for precast production management in prefabricated construction. Journal of Construction Engineering and Management, 151(8): 04025095, ISSN 0733-9364

Wang, Z; Zhou, Y; Jin, X; Zhao, N and Sun, J (2023) Risk allocation and benefit distribution of PPP projects for construction waste recycling: A case study of China. Engineering, Construction and Architectural Management, 30(9), pp. 3927-3956. ISSN 0969-9988

Wang, Zhichen (2025) Framework for automated change propagation from building information models to building energy models. PhD thesis, Carnegie Mellon University, USA.

Wanigarathna, N (2014) Evidence-based design for healthcare buildings in England and wales. PhD thesis, Loughborough University, UK.

Wanigarathna, N; Jones, K; Pascale, F; Morga, M and Meslem, A (2023) Cost–benefit analysis to appraise technical mitigation options for earthquake-induced liquefaction disaster events. Journal of Financial Management of Property and Construction, 28(2), pp. 220-241. ISSN 1366-4387

Wanigarathna, N; Sherratt, F; Price, A and Austin, S (2016) Healthcare designers' use of prescriptive and performance-based approaches. Architectural Engineering and Design Management, 12(6), pp. 427-441. ISSN 1745-2007

Wanigarathna, N; Sherratt, F; Price, A and Austin, S (2019) Design re-use: Critical application of healthcare building design evidence. Engineering, Construction and Architectural Management, 26(3), pp. 350-366. ISSN 0969-9988

Wanigarathna, N; Sherratt, F; Price, A D F and Austin, S (2021) Sources and flow of healthcare built environment design evidence. Built Environment Project and Asset Management, 11(5), pp. 851-869. ISSN 2044-124X

Wao, J O (2014) Value engineering methodology to improve building sustainability outcomes. PhD thesis, University of Florida, USA.

Warcup, R (2015) Successful paths to becoming a lean organization in the construction industry. PhD thesis, Utah State University, USA.

Ward, B (2015) Integrated asset management systems for water infrastructure. EngD thesis, University of Exeter, UK.

Waroonkun, T and Stewart, R A (2008) Pathways to enhanced value creation from the international technology transfer process in Thai construction projects. Construction Innovation, 8(4), pp. 299-317. ISSN 1471-4175

Waroonkun, Tanut (2007) Modelling international technology transfer in Thai construction projects. PhD thesis, Griffith University, Thailand.

Warren-Myers, G; Judge, M and Paladino, A (2018) Sustainability ratings in residential development: A worthwhile endeavour? International Journal of Building Pathology and Adaptation, 36(4), pp. 353-372. ISSN 23984708

Warrner, J (2018) Transitioning from college to career: Skills needed for success for construction professionals. EdD thesis, Ball State University, USA.

Wasiluk, K L (2012) Sustainable wealth creation in practice: a framework to manage firm's intangibles. PhD thesis, University of Leeds, UK.

Waskett, P R (1999) Management of the building design process with the analytical design planning technique. PhD thesis, Loughborough University, UK.

Watchman, M; Demers, C M H and Potvin, A (2022) Biophilia in school buildings: Towards a simplified assessment method based on spatial geometry. Architectural Engineering and Design Management, 18(4), pp. 434-452. ISSN 1745-2007

Waters, J; Neale, R; Hutson, S and Mears, K (2005) A perceptual assessment of personal safety in relation to university campus facilities. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Watson, L T (2007) Leadership traits in large-volume residential construction. PhD thesis, Capella University, USA.

Watson, P and Davis, R (2002) The application of the European foundation for quality management excellence model. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Watson, S (2004) Improving the implementation of environmental strategies in the design of buildings: Towards a life-cycle based, front loaded, framework for building environmental assessment during design. PhD thesis, University of Queensland, Australia.

Watts, N; Watson, P A and Griffith, A (2000) The role of project managers in partnering arrangements. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Wearne, S H (1969) Organization of large engineering design departments. PhD thesis, University of Manchester, UK.

Webb, E (2014) Management of multi-cultural teams on international joint venture megaprojects in Asia. PhD thesis, Loughborough University, UK.

Webb, N (2012) Digital re-analysis of lost or unbuilt architecture. PhD thesis, University of Liverpool, UK.

Weber, I and Isatto, E L (2025) Performance metrics for the corrective building maintenance of hospital facilities. Building Research & Information, 53(5), pp. 582-599. ISSN 0961-3218

Weber, J R (2023) Commercial construction ethical decision making: Authentic case studies. PhD thesis, Colorado State University, USA.

Wedawatta, G and Ingirige, B (2016) A conceptual framework for understanding resilience of construction SMEs to extreme weather events. Built Environment Project and Asset Management, 6(4), pp. 428-443. ISSN 2044-124X

Wedawatta, H G (2013) Resilience of construction SMEs to extreme weather events. PhD thesis, University of Salford, UK.

Weddikkara, C and Devapriya, K (2001) Demand and supply trends and construction industry development: A case study in the Sri Lankan construction industry. Construction Economics and Building, 1(1), pp. 91-105. ISSN 2204-9029

Weerasekara, G K T; Shandraseharan, A; Perera, B A K S and Disaratna, V (2023) The impact of building morphology factors on the cost and aesthetical appearance of urban detached residential buildings in Sri Lanka. Journal of Engineering, Design and Technology, 21(1), pp. 58-74. ISSN 1726-0531

Weerasinghe, A; Ramachandra, T and Rotimi, J O B (2016) A simplified model for predicting running cost of office buildings in Sri Lanka. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Weerasinghe, A S and Ramachandra, T (2018) Economic sustainability of green buildings: A comparative analysis of green vs non-green. Built Environment Project and Asset Management, 8(5), pp. 528-543. ISSN 2044-124X

Wefki, H; Salah, M; Elbeltagi, E; Elsheikh, A and Khallaf, R (2025) A generative design-based optimization model for multi-objective construction site layout planning. Engineering, Construction and Architectural Management, 32(8), pp. 5429-5455. ISSN 0969-9988

Wei, B (2021) Value creation, value sensing, value delivery, and value capturing mechanism of green building: A value network. PhD thesis, Temple University, USA.

Wei, C-L (2025) Data-centric AI solutions for built environment applications. PhD thesis, Arizona State University, USA.

Wei, Y (2019) Data-driven approaches for analysis of building energy consumption and indoor occupancy behavior. PhD thesis, University of Nottingham, UK.

Weippert, A; Kajewski, S L and Tilley, P A (2002) Internet-based information and communication systems on remote construction projects: A case study analysis. Construction Innovation, 2(2), pp. 103-116. ISSN 1471-4175

Weitkamp, T K B (2024) Uncharted territory: Mapping diverse and dispersed smallholder irrigation in Sub-Saharan Africa through remote sensing. PhD thesis, Wageningen University and Research, Netherlands.

Wells, J (1993) Appropriate building technologies: An appraisal based on case studies of building projects in Senegal and Kenya. Construction Management and Economics, 11(3), pp. 203-216. ISSN 01446193

Wen, Q (2021) Strategic international human resource management in MNEs from an emerging market: case evidence from a Chinese multinational construction enterprise. PhD thesis, University of Manchester, UK.

Wenchi, S; Wang, J; Wang, X and Chong, H Y (2015) An application of value stream mapping for turnaround maintenance in oil and gas industry: Case study and lessions learned. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Wenzelberger, J P (1987) The economic analysis of tall buildings (Milwaukee, Wisconsin; Boston, Massachusetts; Kansas City, Missouri). DSc thesis, George Washington University, USA.

Wernsman, M G (2008) The process of designing and constructing an accessible residence hall for people with disabilities on a public university campus. PhD thesis, Colorado State University, USA.

Westgate, S E (1986) An information system for estimating, targetting and planning in small building firms. PhD thesis, Sheffield Hallam University, UK.

Westling, H (1991) Technology procurement for innovation in Swedish construction. TaknDr thesis, Kungliga Tekniska Hogskolan, Sweden.

Weththasinghe, K K and Wong, P S P (2023) Towards developing partnership models for leveraging design for manufacture and assembly for school buildings. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(2), pp. 75-90. ISSN 17514304

Wetzel, E M (2016) The use of a BIM-based framework to support safe facility management processes. PhD thesis, Virginia Tech, USA.

Whelton, M G (2004) The development of purpose in the project definition phase of construction projects: Implications for project management. PhD thesis, University of California, Berkeley, USA.

Whelton, M G and Keane, M M (1998) The systematic development of a software environment for building appraisal in the building renovation industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

White, A (2020) Operational performance and delivery structure of hospital facilities: empirical relationship analyses in Ontario, Canada. DBA thesis, University of Manchester, UK.

White, D and Fortune, J (2012) Using systems thinking to evaluate a major project: The case of the Gateshead Millennium Bridge. Engineering, Construction and Architectural Management, 19(2), pp. 205-228. ISSN 0969-9988

White, J A (1964) Determination of income and financial reporting for long-term construction-type contracts. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

White, W M (2001) Using a soft systems approach to inspire change in an organization. EdD thesis, Fielding Graduate Institute, USA.

Whitla, P; Walters, P and Davies, H (2006) The use of global strategies by British construction firms. Construction Management and Economics, 24(9), pp. 945-954. ISSN 1466433X

Whitman, C J; Prizeman, O; Walker, P and Gwilliam, J A (2020) Heritage retrofit and cultural empathy; a discussion of challenges regarding the energy performance of historic UK timber-framed dwellings. International Journal of Building Pathology and Adaptation, 38(2), pp. 386-404. ISSN 23984708

Whittaker, S and Jespersen, K (2022) Stretching or conforming? Financing urban climate change adaptation in Copenhagen. Buildings & Cities, 3(1), pp. 974-999. ISSN 2632-6655

Whyte, J (2000) Virtual reality applications in the house-building industry. PhD thesis, Loughborough University, UK.

Whyte, J (2003) Innovation and users: Virtual reality in the construction sector. Construction Management and Economics, 21(6), pp. 565-572. ISSN 01446193

Whyte, J and Bouchlaghem, D (2002) Implementation of VR systems: A comparison between the early adoption of CAD and current uptake of VR. Construction Innovation, 2(1), pp. 3-13. ISSN 1471-4175

Whyte, J; Bouchlaghem, D and Thorpe, T (2002) IT implementation in the construction organization. Engineering, Construction and Architectural Management, 9(5-6), p. 371. ISSN 0969-9988

Wibowo, A and Alfen, H W (2013) Fine-tuning the value and cost of capital of risky PPP infrastructure projects. Engineering, Construction and Architectural Management, 20(4), pp. 406-419. ISSN 0969-9988

Wibowo, A and Kochendörfer, B (2005) Financial risk analysis of project finance in Indonesian toll roads. Journal of Construction Engineering and Management, 131(9), pp. 963-972. ISSN 0733-9364

Wibowo, A; Permana, A; Kochendörfer, B; Kiong, R T L; Jacob, D and Neunzehn, D (2012) Modeling contingent liabilities arising from government guarantees in Indonesian BOT/PPP toll roads. Journal of Construction Engineering and Management, 138(12), pp. 1403-1410. ISSN 0733-9364

Wickramaratne, S; Wirasinghe, S C and Ruwanpura, J (2020) An update of proposed Sri Lanka warning system for East and West Coast tsunamis. International Journal of Disaster Resilience in the Built Environment, 11(2), pp. 169-186. ISSN 1759-5916

Wiewiora, Anna (2011) The role of organisational culture, trust and mechanisms in inter-project knowledge sharing. PhD thesis, Queensland University of Technology, Australia.

Wiik, M K (2025) Developing whole-life carbon benchmark values for Norwegian buildings. Building Research & Information, 53(3), pp. 345-358. ISSN 0961-3218

Wijewickrama, M. K. C. S.; Chileshe, N.; Rameezdeen, R. and Ochoa, J. J. (2026) Application of a Bayesian belief network-based information processing model for quality assurance in demolition waste reverse logistics: Insights from two case studies. Engineering, Construction and Architectural Management, 33(15), ISSN 0969-9988

Wiliem, Leonard (2008) Incorporating interdependence in risk likelihood analysis to enhance diagnostics in condition monitoring. PhD thesis, Queensland University of Technology, Australia.

Wilkinson, R; Sherratt, F and Farrell, P (2015) Knowledge management on site: A case study project. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(2), pp. 99-109. ISSN 17514304

Wilkinson, S; Piri, I S and Chang-Rihcards, Y (2017) Developing resilience in subcontracting organisations during disaster recovery. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Wilkinson, S; Potangaroa, R; Cameron, R and Mitansha, M (2024) Improving disaster response: Combining organisational and individual resilience for improved outcomes. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Wilkinson, S J and Reed, R (2011) Examining and quantifying the drivers behind alterations and extensions to commercial buildings in a central business district. Construction Management and Economics, 29(7), pp. 725-735. ISSN 1466433X

Willan, C M (2019) Life in the gap: how does a construction company respond to the challenge of targets for energy and carbon in-use? PhD thesis, University College London, UK.

Willan, Catherine M (2019) Life in the gap: How does a construction company respond to the challenge of targets for energy and carbon in-use? PhD thesis, University College London, UK.

Willcock, J and Evans, S (2003) Co-development: A case study linking work from the automotive sector with the construction industry. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Willems, S; Saelens, D and Heylighen, A (2022) Patient well-being, adaptation of and to indoor conditions, and hospital room design: Two mixed methods case studies. Building Research & Information, 50(1-2), pp. 105-133. ISSN 0961-3218

Willems, S; Saelens, D and Heylighen, A (2024) How to investigate differences in indoor environmental comfort and adaptation? Mixed methods research with patients. Building Research & Information, 52(8), pp. 851-869. ISSN 0961-3218

Willenbrock, J H; Thomas, H R and Francis, P J (1987) Factors affecting outage construction efficiency. Journal of Construction Engineering and Management, 113(1), pp. 99-116. ISSN 0733-9364

Willetts, R (2013) Investigating the multiple influences affecting sustainability in a multidisciplinary engineering consultancy. PhD thesis, Loughborough University, UK.

Williams, A (2004) Industry engagement in uk built environment higher education courses. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Williams, D (2019) Preventing harness-induced pathology in U.S. construction companies: A qualitative multiple case study. PhD thesis, University of Phoenix, USA.

Williams, J; Fugar, F; Adinyira, E and Danso, H (2024) A framework towards health and safety knowledge transfer from the construction industry to the community in developing countries: A case study of Ghana. International Journal of Construction Management, 24(7), pp. 771-783. ISSN 1562-3599

Williams, J M (1991) Interfaces: Integrating product design and process engineering in manufacturing and construction. PhD thesis, Stanford University, USA.

Williams, P (1999) The successful management of air conditioned environments for the construction industry. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Williams, P (2014) Growing houses and trees: Integrating biodiversity conservation and urbanisation: An Australian case study. International Journal of Law in the Built Environment, 6(1-2), pp. 152-173. ISSN 1756-1450

Williams, P and Williams, A (2014) Planning law reform and fast-tracking development in Australia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Williams, P J and Williams, A M (2016) Sustainability and planning law in Australia: Achievements and challenges. International Journal of Law in the Built Environment, 8(3), pp. 226-242. ISSN 1756-1450

Williams, T (2013) The management of renewable energy technologies implementations within a contracting organisation's processes. EngD thesis, Loughborough University, UK.

Williamson, M; Wilson, O; Skitmore, R M and Runeson, G (2004) Client abuses of the competitive tendering system: some general principles and a case study. Journal of Construction Research, 5(1), pp. 61-73. ISSN 1609-9451

Williamson, T; Soebarto, V and Radford, A (2010) Comfort and energy use in five Australian award-winning houses: Regulated, measured and perceived. Building Research & Information, 38(5), pp. 509-529. ISSN 0961-3218

Wilson, H K and Cotgrave, A J (2020) Learning space design: The presentation of a framework for the built environment discipline. International Journal of Construction Education and Research, 16(2), pp. 132-148. ISSN 1557-8771

Wilson, I E (2003) Digitally enabling the construction virtual enterprise. PhD thesis, University of Salford, UK.

Wilson, M T (2020) Assessing voluntary resilience standards and impacts of flood risk information. Building Research & Information, 48(1), pp. 84-100. ISSN 0961-3218

Winarno, S; Griffith, A and Stephenson, P (2010) Reducing earthquake risk to non-engineered buildings in Indonesia. Construction Innovation, 10(4), pp. 421-434. ISSN 1471-4175

Winch, G (1998) Zephyrs of creative destruction: Understanding the management of innovation in construction. Building Research & Information, 26(5), pp. 268-279. ISSN 0961-3218

Windapo, A; Moghayedi, A; Oliphant, D and Adediran, A (2018) Exploring the components of cost on construction projects. Journal of Construction Business and Management, 2(2), pp. 42-50. ISSN 2521-0165

Windapo, A O and Goulding, J (2013) Value-based perspectives of stakeholders' building requirements in low cost and government subsidised housing projects in South Africa. Construction Innovation, 13(4), pp. 424-444. ISSN 1471-4175

Windapo, A O and Moghayedi, A (2020) Adoption of smart technologies and circular economy performance of buildings. Built Environment Project and Asset Management, 10(4), pp. 585-601. ISSN 2044-124X

Wingrove, K; Heffernan, E and Daly, D (2024) Increased home energy use: unintended outcomes of energy efficiency focused policy. Building Research & Information, 52(5), pp. 577-595. ISSN 0961-3218

Winn, K R (2014) Inter-scalar multivariable decision making framework for the architectural envelope. PhD thesis, Rensselaer Polytechnic Institute, USA.

Wirba, E N (1996) An object-oriented knowledge-based systems approach to construction project control. PhD thesis, London South Bank University, UK.

Wirba, E N; Tah, J H M and Howes, R (1996) Risk interdependencies and natural language computations. Engineering, Construction and Architectural Management, 3(4), pp. 251-269. ISSN 0969-9988

Wise, F; Moncaster, A and Jones, D (2021) Rethinking retrofit of residential heritage buildings. Buildings & Cities, 2(1), pp. 495-517. ISSN 2632-6655

Woksepp, S (2007) Virtual reality in construction tools, methods and processes. PhD thesis, Luleå University of Technology, Sweden.

Woldesenbet, A K (2014) Highway infrastructure data and information integration & assessment framework: A data-driven decision-making approach. PhD thesis, Iowa State University, USA.

Wolfenden, Alison K (2004) Decision support system for the evaluation and comparison of concession project investments. PhD thesis, Griffith University, Australia.

Wong, A K D and Zhang, R (2013) Implementation of web-based construction project management system in China projects by Hong Kong developers. Construction Innovation, 13(1), pp. 26-49. ISSN 1471-4175

Wong, C H (2001) A discriminant model for classifying contractor performance on public works projects. PhD thesis, University of Wolverhampton, UK.

Wong, C H (2001) Investigation of contractor selection criteria and development of contractor classification model: a UK case. PhD thesis, University of Wolverhampton, UK.

Wong, C H (2007) ICT implementation and evolution: Case studies of intranets and extranets in UK construction enterprises. Construction Innovation, 7(3), pp. 254-273. ISSN 1471-4175

Wong, C H; Nicholas, J and Holt, G D (2003) Using multivariate techniques for developing contractor classification models. Engineering, Construction and Architectural Management, 10(2), pp. 99-116. ISSN 0969-9988

Wong, Florence (2025) Mass engineered timber construction in Southeast Asia: An analysis of obstacles, drivers and opportunities in hot and humid cities. PhD thesis, University of New South Wales, Australia.

Wong, J M W; Chan, A P C and Chiang, Y H (2005) Time series forecasts of the construction labour market in Hong Kong: The Box-Jenkins approach. Construction Management and Economics, 23(9), pp. 979-991. ISSN 01446193

Wong, K-w K (2014) Integrative approach to addressing societal needs in infrastructure development projects. PhD thesis, University of Hong Kong, Hong Kong.

Wong, Y L P (2007) Facility management benchmarking: Measuring performances using multi-attribute decision tools. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Wongbumru, T and Dewancker, B (2016) Post-occupancy evaluation of user satisfaction: A case study of "old" and "new" public housing schemes in Bangkok. Architectural Engineering and Design Management, 12(2), pp. 107-124. ISSN 1745-2007

Woo, J (2021) A new blockchain framework for existing building energy performance measurement, reporting, and verification (MRV): A pathway for the building sector to participate in the carbon credit market. PhD thesis, University of Florida, USA.

Wood, H L and Ashton, P (2010) Modelling project complexity. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Wood, H L; Piroozfar, P A E and Farr, E R P (2014) Moving beyond project complexity: Exploring empirical dimensions of complexity in the construction industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Woodhead, R M (1999) The influence of paradigms and perspectives on the decision to build undertaken by large experienced clients of the UK construction industry. PhD thesis, University of Leeds, UK.

Woodson, T; Coulibaly, Y and Traoré, E S (2012) Earth-air heat exchangers for passive air conditioning: Case study Burkina Faso. Journal of Construction in Developing Countries, 17(1), pp. 21-33. ISSN 1823-6499

Woodward, A and Heesom, D (2021) Implementing HBIM on conservation heritage projects: Lessons from renovation case studies. International Journal of Building Pathology and Adaptation, 39(1), pp. 96-114. ISSN 23984708

Woolcott, G; Loosemore, M; Keast, R and Chamberlain, D (2023) Addressing youth un/underemployment through construction social procurement: An ecological systems theory perspective. Construction Management and Economics, 41(11-12), pp. 942-960. ISSN 01446193

Woolcott, G; Loosemore, M; Keast, R; Meltzer, A and Alkilani, S (2025) Transitioning young people into employment in the Australian construction industry: The trust-building role of project-based intermediaries. Engineering, Construction and Architectural Management, 32(4), pp. 2571-2589. ISSN 0969-9988

Workineh, N; Terefe, B and Nigussie, W (2025) Nonconformity in social service space use: A case study of injibara town's plan implementation. International Journal of Construction Management, 25(14), pp. 1755-1768. ISSN 1562-3599

Worsham, J R (2012) Business effects of Arizona immigration laws on the construction industry in Pima County, Arizona. PhD thesis, University of Phoenix, USA.

Worsham, J R (2014) Business effects of Arizona immigration laws on the construction industry in pima county, Arizona. PhD thesis, University of Phoenix, USA.

Wu, D.; Wang, T.; Chan, P. and Gruis, V. (2026) Integration of circular economy principles into Dutch social housing procurement: Technological, organizational and environmental practices, challenges and development potentials. Smart and Sustainable Built Environment, pp. 1-21. ISSN 2046-6099

Wu, X; Li, X; Chen, J; Gao, J and Luo, X (2026) Driving mechanism of attentional bias toward safety of construction workers: Case study in China. Engineering, Construction and Architectural Management, 33(1), pp. 125-143. ISSN 0969-9988

Wu, C; Chen, C; Jiang, R; Wu, P; Xu, B and Wang, J (2019) Understanding laborers' behavioral diversities in multinational construction projects using integrated simulation approach. Engineering, Construction and Architectural Management, 26(9), pp. 2120-2146. ISSN 0969-9988

Wu, Chee Shien Jeremy (2008) A comparative study of three international construction firms: Knowledge management infrastructures for optimising organisations' learning. PhD thesis, University of Sydney, Australia.

Wu, J; Liu, H J; Sing, M C P; Humphrey, R and Zhao, J (2020) Public-private partnerships: Implications from policy changes for practice in managing risks. Engineering, Construction and Architectural Management, 27(9), pp. 2253-2269. ISSN 0969-9988

Wu, J; Yan, B; Sun, G; Liu, M; Li, Y and Zhou, C (2025) Research on the construction-forming model of a single-layer orthogonal saddle-shaped cable net with an opening. Journal of Construction Engineering and Management, 151(9): 05025008, ISSN 0733-9364

Wu, K-C (2012) A multi-functional collaborative design environment. PhD thesis, University of Salford, UK.

Wu, Kai (2012) The dynamics of enterprise resource planning implementation in a complex organizational and environmental context. PhD thesis, University of New South Wales, Australia.

Wu, L; Jia, G and Mackhaphonh, N (2019) Case study on improving the effectiveness of public participation in public infrastructure megaprojects. Journal of Construction Engineering and Management, 145(4): 1623, ISSN 0733-9364

Wu, L; Mohamed, E; Jafari, P and Abourizk, S (2023) Machine learning-based Bayesian framework for interval estimate of unsafe-event prediction in construction. Journal of Construction Engineering and Management, 149(11): 04023118, ISSN 0733-9364

Wu, M (2005) Modelling just-in-time purchasing in the ready mixed concrete industry. PhD thesis, National University of Singapore, Singapore.

Wu, M; Wang, L; Li, M and Long, H (2015) Alleviating feature fatigue in product development based on the bass model. Journal of Engineering, Design and Technology, 13(3), pp. 350-368.

Wu, P (2011) Application of the lean philosophy to reduce carbon emissions in the precast concrete industry of Singapore. PhD thesis, National University of Singapore, Singapore.

Wu, R (2002) Computer -aided dimensional control in building construction. PhD thesis, Eindhoven University of Technology, Netherlands.

Wu, R W K and Hadipriono, F C (1994) Fuzzy modus ponens deduction technique for construction scheduling. Journal of Construction Engineering and Management, 120(1), pp. 162-179. ISSN 0733-9364

Wu, Su Kon (2021) Innovation management planning: Design of a maintenance concept innovation management system. EngD thesis, University of Twente, Netherlands.

Wu, X and Xu, F (2021) Detection model for unbalanced bidding in railway construction projects: Considering the risk of quantity variation. Journal of Construction Engineering and Management, 147(7): 04021055, ISSN 0733-9364

Wuni, I Y; Shen, G Q and Darko, A (2022) Best practices for implementing industrialized construction projects: Lessons from nine case studies. Construction Innovation, 22(4), pp. 915-938. ISSN 1471-4175

Xi, J (2013) Evaluating the functional performance of small-scale public demountable buildings. PhD thesis, University of Liverpool, UK.

Xia, B; Rosly, N; Wu, P; Bridge, A and Pienaar, J (2016) Improving sustainability literacy of future quantity surveyors. Smart and Sustainable Built Environment, 5(4), pp. 325-339. ISSN 2046-6099

Xia, B; Wu, T; Skitmore, M; Chen, Q; Li, M and Zuo, J (2016) Delivering sustainable communities: A case study in China. Built Environment Project and Asset Management, 6(3), pp. 253-267. ISSN 2044-124X

Xia, N; Zhong, R; Wu, C; Wang, X and Wang, S (2017) Assessment of stakeholder-related risks in construction projects: Integrated analyses of risk attributes and stakeholder influences. Journal of Construction Engineering and Management, 143(8): 04017030, ISSN 0733-9364

Xiahou, X; Yuan, J; Xie, H; Skibniewski, M J and Li, Q (2022) Exploring driving factors of smart city development under the physical-human society-cyber (p-h-c) space model. International Journal of Construction Management, 22(14), pp. 2753-2763. ISSN 1562-3599

Xiang, L; Tan, Y; Jin, X and Shen, G (2021) Understanding stakeholders' concerns of age-friendly communities at the briefing stage: A preliminary study in urban China. Engineering, Construction and Architectural Management, 28(1), pp. 31-54. ISSN 0969-9988

Xiang, P; Xia, X and Pang, X (2024) An integrated risk assessment method for cross-regional mega construction projects. Engineering, Construction and Architectural Management, 31(6), pp. 2369-2391. ISSN 0969-9988

Xiao, H.; Proverbs, D. G.; Joseph, R. and Adedeji, T. (2026) Property flood resilience (PFR): Exploring the experiences of commercial property owners. International Journal of Building Pathology and Adaptation, 44(4), pp. 935-949. ISSN 2398-4708

Xiao, L; Mokhtar, N A and Sulaiman, M K A M (2025) Enhancing profitability and cost efficiency in China's construction industry. Construction Economics and Building, 25(3-4), pp. 1-21. ISSN 2204-9029

Xiao, H and Proverbs, D (2001) A comparison of contractor performance in Japan, the UK and the USA: Some preliminary findings from a new approach. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Xiao, H; Proverbs, D G; Shaw, T and Holt, G D (2000) A new approach to comparing the performance of contractors internationally. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Xiao, Y; Liu, J and Pang, Y (2019) Development of a competency model for real-estate project managers: Case study of China. International Journal of Construction Management, 19(4), pp. 317-328. ISSN 1562-3599

Xie, L.; Yu, Z. and Zhao, X. (2025) Assessing construction safety risks in large urban complex projects: An interval ordinal priority approach. Engineering, Construction and Architectural Management, 33(5), pp. 3996-4018. ISSN 0969-9988

Xie, H (2005) User model-driven architecture for information retrieval in construction project management. PhD thesis, University of Florida, USA.

Xie, H; Hong, Y; Xin, M; Brilakis, I and Shi, O (2025) Identification and analysis of communication barriers for construction projects with time uncertainties. Engineering, Construction and Architectural Management, 32(1), pp. 305-331. ISSN 0969-9988

Xie, L; Ju, T; Han, T and Hou, L (2023) A meta-network-based management framework for megaproject social responsibility behaviour in China. Engineering, Construction and Architectural Management, 30(9), pp. 4415-4434. ISSN 0969-9988

Xie, X (2002) Communications in construction design. PhD thesis, Loughborough University, UK.

Xie, X; Lu, Q; Rodenas-Herraiz, D; Parlikad, A K and Schooling, J M (2020) Visualised inspection system for monitoring environmental anomalies during daily operation and maintenance. Engineering, Construction and Architectural Management, 27(8), pp. 1835-1852. ISSN 0969-9988

Xiong, B; Newton, S; Li, V; Skitmore, M and Xia, B (2019) Hybrid approach to reducing estimating overfitting and collinearity. Engineering, Construction and Architectural Management, 26(10), pp. 2170-2185. ISSN 0969-9988

Xiong, B; Skitmore, M; Xia, P; Ballesteros-Pérez, P; Ye, K and Zhang, X (2019) Impact of corporate credit scoring on construction contractors in China. Journal of Construction Engineering and Management, 145(4): 05019002, ISSN 0733-9364

Xiong, W (2015) A study of renegotiation and early termination in public private partnerships projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Xiong, W and Zhang, X (2016) The real option value of renegotiation in public-private partnerships. Journal of Construction Engineering and Management, 142(8): 4016021, ISSN 0733-9364

Xiong, Yunjie (2020) A BIM-based interoperability platform in support of building operation and energy management. PhD thesis, Virginia Tech, USA.

Xu, F; Nguyen, T and Du, J (2024) Augmented reality for maintenance tasks with chatgpt for automated text-to-action. Journal of Construction Engineering and Management, 150(4): 04024015, ISSN 0733-9364

Xu, J (2019) In the shadow of a negative past: Repairing and developing trust in construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(1), pp. 5-13. ISSN 17514304

Xu, J (2021) A human-organization-technology fit model to harness the power of building information modeling in construction project organizations. PhD thesis, University of Hong Kong, Hong Kong.

Xu, J; Jin, R; Piroozfar, P; Wang, Y; Kang, B G; Ma, L; Wanatowski, D and Yang, T (2018) Constructing a BIM climate-based framework: Regional case study in China. Journal of Construction Engineering and Management, 144(11): 04018105, ISSN 0733-9364

Xu, J; Shi, Y and Zhao, S (2019) Reverse logistics network-based multiperiod optimization for construction and demolition waste disposal. Journal of Construction Engineering and Management, 145(2): 04018124, ISSN 0733-9364

Xu, J; Teng, Y and Pan, W (2021) A BIM-LCA integrated method for enhancing efficiency of embodied carbon estimation of prefabricated high-rise buildings. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Xu, J and Zeng, Z (2011) Applying optimal control model to dynamic equipment allocation problem: Case study of concrete-faced rockfill dam construction project. Journal of Construction Engineering and Management, 137(7), pp. 536-550. ISSN 0733-9364

Xu, J and Zhao, S (2017) Noncooperative game-based equilibrium strategy to address the conflict between a construction company and selected suppliers. Journal of Construction Engineering and Management, 143(8): 04017051, ISSN 0733-9364

Xu, S; Wang, J; Wang, X; Shou, W and Ngo, T (2025) Defect modelling and correlation mapping for bridge inspection. Engineering, Construction and Architectural Management, 32(6), pp. 4174-4196. ISSN 0969-9988

Xu, S; Zhou, L and Zou, P X W (2024) What influences stakeholders' decision in adopting blockchain-based quality tracking systems in prefabricated construction. Engineering, Construction and Architectural Management, 31(6), pp. 2224-2247. ISSN 0969-9988

Xu, W and Wang, T K (2020) Dynamic safety prewarning mechanism of human-machine-environment using computer vision. Engineering, Construction and Architectural Management, 27(8), pp. 1813-1833. ISSN 0969-9988

Xu, W and Wang, T K (2023) Construction worker safety prediction and active warning based on computer vision and the gray absolute decision analysis method. Journal of Construction Engineering and Management, 149(4): 04023014, ISSN 0733-9364

Xu, X (2024) A multi-agent reinforcement learning task allocation framework for navigation sequences of construction robots. PhD thesis, New York University Tandon School of Engineering, USA.

Xu, Y and Turkan, Y (2020) BrIM and UAS for bridge inspections and management. Engineering, Construction and Architectural Management, 27(3), pp. 785-807. ISSN 0969-9988

Xu, Z; Wang, X; Xiao, Y and Yuan, J (2020) Modeling and performance evaluation of PPP projects utilizing IFC extension and enhanced matter-element method. Engineering, Construction and Architectural Management, 27(8), pp. 1763-1794. ISSN 0969-9988

Xue, H; Sun, T; Ling, F Y Y and Wang, L (2023) Redesigning the virtual organisational structure for the management of prefabricated buildings. International Journal of Construction Management, 23(6), pp. 1069-1085. ISSN 1562-3599

Xue, J; Shen, G Q; Yang, R J; Zafar, I and Ekanayake, E M A C (2020) Dynamic network analysis of stakeholder conflicts in megaprojects: Sixteen-year case of Hong Kong-Zhuhai-Macao Bridge. Journal of Construction Engineering and Management, 146(9): 04020103, ISSN 0733-9364

Yadav, S and Ray, G S (2015) Supply chain management in flyover projects in India. Journal of Construction in Developing Countries, 20(1), pp. 25-47. ISSN 1823-6499

Yaghi, M A F (1980) Organizational decision making in a public organization: A case study of the new york state facilities design and construction group. DPA thesis, State University of New York at Albany, USA.

Yakub, H (1992) Buildings at risk registers: Their influence in reducing risk of dilapidation. PhD thesis, Oxford Brookes University, UK.

Yakın, Ö and Güncü, A. (2026) Post-disaster housing recovery models in Turkey: A case study of the 2020 İzmir seferihisar earthquake. International Journal of Disaster Resilience in the Built Environment, 17(2), pp. 239-257. ISSN 1759-5908

Yalciner, S (2018) Sustainable architecture and the influence of global assessment tools. PhD thesis, University of Manchester, UK.

Yaman Galantini, Z D and Tezer, A (2018) Resilient urban planning process in question: Istanbul case. International Journal of Disaster Resilience in the Built Environment, 9(1), pp. 48-57. ISSN 1759-5916

Yamaura, J T (2018) The value of cloud computing technology in public transportation construction. PhD thesis, University of Washington, USA.

Yan, C (2006) Risk management strategy of construction projects in China. PhD thesis, University of Bedfordshire, UK.

Yan, S (1992) Intermodal pricing and operations using network flow techniques. PhD thesis, Massachusetts Institute of Technology, USA.

Yan, X and Li, T (2023) Construction and application of urban digital infrastructure: practice of "urban brain" in facing COVID-19 in hangzhou, China. Engineering, Construction and Architectural Management, 30(8), pp. 3123-3141. ISSN 0969-9988

Yang, S.; Xiang, P.; Wang, Y.; Zhang, X. and Qian, Y. (2026) Emphasizing cross-regional matters: Interpreting the critical risks of cross-regional mega infrastructure projects from an interactional perspective. Engineering, Construction and Architectural Management, 33(7), pp. 5540-5564. ISSN 0969-9988

Yang, Y.; Luo, H. and Adibhesami, M. A. (2026) Climate and performance-driven architectural floorplan optimization using deep graph networks. Engineering, Construction and Architectural Management, 33(3), pp. 2400-2421. ISSN 0969-9988

Yang, C Y; Xu, M X and Chen, W F (2007) Reliability analysis of shotcrete lining during tunnel construction. Journal of Construction Engineering and Management, 133(12), pp. 975-981. ISSN 0733-9364

Yang, J (2022) Integrated decision support system for the selection and implementation of delay analysis in construction projects. PhD thesis, Illinois Institute of Technology, USA.

Yang, J B and Lai, T H (2024) Selecting EVM, esm and EDM(t) for managing construction project schedule. Engineering, Construction and Architectural Management, 31(12), pp. 4988-5006. ISSN 0969-9988

Yang, J B and Tsai, M K (2011) Computerizing ICBF method for schedule delay analysis. Journal of Construction Engineering and Management, 137(8), pp. 583-591. ISSN 0733-9364

Yang, L; Lv, X and Zhao, X (2024) Coping with abnormal organizational behaviors in complex project based on network attack theory. Engineering, Construction and Architectural Management, 31(9), pp. 3773-3800. ISSN 0969-9988

Yang, M L; Chen, S J and Chen, S T (2006) Innovative central opening strut system for foundation excavation. Journal of Construction Engineering and Management, 132(1), pp. 58-66. ISSN 0733-9364

Yang, N (2010) Optimization of highway work zone decisions considering short-term and long-term impacts. PhD thesis, University of Maryland, College Park, USA.

Yang, R J; Jayasuriya, S; Gunarathna, C; Arashpour, M; Xue, X and Zhang, G (2018) The evolution of stakeholder management practices in Australian mega construction projects. Engineering, Construction and Architectural Management, 25(6), pp. 690-706. ISSN 0969-9988

Yang, R J; Zou, P X W and Wang, J (2014) Stakeholder-associated risk networks in green buildings: China versus Australia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Yang, S; Guan, T; Wang, J; Wang, X and Ren, B (2025) Label scarcity- and class imbalance-aware current-based pipeline for concrete vibration activity recognition. Journal of Construction Engineering and Management, 151(10): 04025135, ISSN 0733-9364

Yang, S; Zhang, J; Xu, S; Deng, T; He, Q and Wang, P (2025) Work section planning for accompanying construction of extra-long tunnel and ballastless track of mountainous high-speed railways. Journal of Construction Engineering and Management, 151(9): 04025126, ISSN 0733-9364

Yang, X; Jefferson, W and Bulbul, T (2025) Evaluation of construction worker perceptions of wearable proximity sensors during the COVID-19 pandemic. Journal of Construction Engineering and Management, 151(3): 04024217, ISSN 0733-9364

Yang, X L (2010) Research on general contracter and subcontractor cooperative management in construction. PhD thesis, Harbin Institute of Technology, China.

Yang, Y; Pan, M and Pan, W (2022) Integrated offsite logistics scheduling approach for high-rise modular building projects. Journal of Construction Engineering and Management, 148(6): 04022032, ISSN 0733-9364

Yang, Y C; Park, C J; Kim, J H and Kim, J J (2007) Management of daily progress in a construction project of multiple apartment buildings. Journal of Construction Engineering and Management, 133(3), pp. 242-253. ISSN 0733-9364

Yang, Z and Lu, W (2024) Lean modular integrated construction production phase planning under uncertainties: A big data-driven optimization approach. Journal of Construction Engineering and Management, 150(6): 04024048, ISSN 0733-9364

Yang, Z R (1997) UK construction company failure prediction: Robust heteroscedastic parzen window classifier. PhD thesis, University of Portsmouth, UK.

Yao, H and Hao, J L (2014) Simulation model for identifying effective policy in mitigating noise emissions from highway projects. International Journal of Construction Management, 14(2), pp. 67-77. ISSN 1562-3599

Yao, Y (2024) The role of digital environments in facilitating engineering knowledge management. PhD thesis, University of Manchester, UK.

Yao, Y P; Ruan, Y Z; Chen, J; Geng, Y; Zhang, X; Liu, B Y; Zong, X P and Yu, G Z (2018) Research on a real-time monitoring platform for compaction of high embankment in airport engineering. Journal of Construction Engineering and Management, 144(1): 04017096, ISSN 0733-9364

Yapage, N and Liyanapathirana, S (2018) Behaviour of geosynthetic reinforced column supported embankments. Journal of Engineering, Design and Technology, 16(1), pp. 44-62.

Yashiro, T (2014) Conceptual framework of the evolution and transformation of the idea of the industrialization of building in Japan. Construction Management and Economics, 32(1-2), pp. 16-39. ISSN 01446193

Yates, D J and Hardcastle, C (2002) The causes of conflict and disputes in construction: A transaction cost economics perspective. Journal of Financial Management of Property and Construction, 7(2), pp. 115-126. ISSN 1366-4387

Yates, J K (1993) Construction decision support system for delay analysis. Journal of Construction Engineering and Management, 119(2), pp. 226-244. ISSN 0733-9364

Yates, J K and Lockley, E E (2002) Documenting and analyzing construction failures. Journal of Construction Engineering and Management, 128(1), pp. 8-17. ISSN 0733-9364

Yaworsky, R A (1994) Risk planning for large and BOT projects: A holistic framework. PhD thesis, University of British Columbia, Canada.

Yazdani, M; Abdi, M R; Kumar, N; Keshavarz-Ghorabaee, M and Chan, F T S (2019) Improved decision model for evaluating risks in construction projects. Journal of Construction Engineering and Management, 145(5): 04019024, ISSN 0733-9364

Yazdani Mehr, S and Wilkinson, S (2018) Technical issues and energy efficient adaptive reuse of heritage listed city halls in Queensland Australia. International Journal of Building Pathology and Adaptation, 36(5), pp. 529-542. ISSN 23984708

Yazdi, Alireza Jalali (2022) Developing an integrated design support framework to enable mass-customisation in multi-storey timber building projects. PhD thesis, University of Technology Sydney, Australia.

Ye, K; Jiang, W and Shen, L (2008) Project competition intensity (PCI) in the construction market: A case study in China. Construction Management and Economics, 26(5), pp. 463-470. ISSN 01446193

Ye, K M (2013) A conceptual model to improve building commissioning in construction projects: Case studies of a public institution of higher learning in Malaysia. PhD thesis, University of Malaya, Malaysia.

Ye, S and Liu, Y (2008) Study on development patterns of infrastructure projects. Journal of Construction Engineering and Management, 134(2), pp. 94-102. ISSN 0733-9364

Ye, S and Tiong, R K L (2000) Government support and risk-return trade-off in China's BOT power projects. Engineering, Construction and Architectural Management, 7(4), pp. 412-422. ISSN 0969-9988

Ye, S and Tiong, R L K (2004) Public-private partnership for power projects: A case study of Hub power project. Journal of Financial Management of Property and Construction, 9(3), pp. 129-140. ISSN 1366-4387

Yee, Tiew Si (2024) Developing a building contract administration framework for graduate architects managing housing projects. PhD thesis, University of Malaya, Malaysia.

Yeganeh, A A; Azizi, M and Falsafi, R (2019) Root causes of design-construction interface problems in Iranian design-build projects. Journal of Construction Engineering and Management, 145(12): 05019014, ISSN 0733-9364

Yeoh, J K W and Chua, D K H (2017) Optimizing crane selection and location for multistage construction using a four-dimensional set cover approach. Journal of Construction Engineering and Management, 143(8): 04017029, ISSN 0733-9364

Yeoh, K-W (2012) Construction requirements driven planning and scheduling. PhD thesis, National University of Singapore, Singapore.

Yeomans, S G (2005) ICT-enabled collaborative working methodologies in construction. EngD thesis, Loughborough University, UK.

Yfanti, S (2015) An investigation of critical success factors for the creation of clusters within micro companies working in the construction sector. PhD thesis, Glasgow Caledonian University, UK.

Yimprayoon, C (2012) Energy efficiency design strategies for buildings with grid-connected photovoltaic systems. PhD thesis, University of Michigan, USA.

Yin, J; Li, J; Yang, A and Cai, S (2024) Optimization of service scheduling problem for overlapping tower cranes with cooperative coevolutionary genetic algorithm. Engineering, Construction and Architectural Management, 31(3), pp. 1348-1369. ISSN 0969-9988

Ying, F; Tookey, J and Roberti, J (2014) Addressing effective construction logistics through the lens of vehicle movements. Engineering, Construction and Architectural Management, 21(3), pp. 261-275. ISSN 0969-9988

Ying, F J; O'Sullivan, M and Adan, I (2021) Simulation of vehicle movements for planning construction logistics centres. Construction Innovation, 21(4), pp. 608-624. ISSN 1471-4175

Ying, J F; Tookey, J and Roberti, J (2015) SCM competencies in construction: Issues and challenges in New Zealand. Journal of Engineering, Design and Technology, 13(4), pp. 522-538.

Ying, W; Dai, X and Shen, W (2025) Rapid project delivery through bricolage and planning: A case study of the huoshenshan hospital project. Journal of Construction Engineering and Management, 151(8): 05025003, ISSN 0733-9364

Yip, R C P (2009) The cultural shift of the construction industry of Hong Kong under the influence of sustainable development. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yisa, S B (1995) A methodology for evaluating the marketing function in the UK construction industry. PhD thesis, University of Wolverhampton, UK.

Yllmaz, M and Dede, T (2025) Optimizing multiobjective time-cost-quality problems in construction projects: Efficacy of strength Pareto-based rao algorithms. Journal of Construction Engineering and Management, 151(5): 04025036, ISSN 0733-9364

Yogeswaran, K (1998) Sources, causes and minimisation of contractual claims in civil engineering projects in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.

Yoo, W; Ozer, H and Ham, Y (2019) System-level approach for identifying main uncertainty sources in pavement construction life-cycle assessment for quantifying environmental impacts. Journal of Construction Engineering and Management, 145(2): 04018137, ISSN 0733-9364

Yoon, S; Kang, K; Yoon, Y; Hastak, M and Ji, R (2018) Systematic decision-making process for composite pavement maintenance. Journal of Construction Engineering and Management, 144(6): 04018044, ISSN 0733-9364

Yoon, S; Weidner, T and Hastak, M (2021) Total-package-prioritization mitigation strategy for deferred maintenance of a campus-sized institution. Journal of Construction Engineering and Management, 147(3): 04020185, ISSN 0733-9364

Yoon, Y and Gangarao, H (2021) Prioritization framework for rockfall countermeasures for rock-cut slopes for rural roads. Journal of Construction Engineering and Management, 147(10), ISSN 0733-9364

Yoon, Y J (2012) Planning of optimal rehabilitation strategies for infrastructure using time float and multiyear prioritization approach. PhD thesis, Purdue University, USA.

Young, B; Harty, C; Lu, S L and Davies, R (2015) Developing temporary manufacturing facilities for residential building: A case of the modern flying factory. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Younis, G E (2010) Minimizing construction disputes. PhD thesis, University of Salford, UK.

Yousef, R A (2015) Toward effective construction safety: Application of morphological analysis to the Arabian Gulf region. PhD thesis, University of Texas at Dallas, USA.

Yousefi, S (2009) Attitude-based strategic and tactical negotiations for conflict resolution in construction. PhD thesis, University of Waterloo, USA.

Yousefzadeh, S; Spillane, J P; Lamont, L; McFadden, J and Lim, J P B (2015) Building information modelling (BIM) software interoperability: A review of the construction sector. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Yu, H.; Peng, Z. and Wu, Z. (2026) Coupled analysis and simulation of safety risks in deep foundation pit construction for subway stations based on the N-K model and system dynamics. Journal of Construction Engineering and Management, 152(7): 04026088, ISSN 0733-9364

Yu, A; Shen, Q P; Kelly, J and Hunter, K (2004) Development of a value management framework for the formation of project briefs. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Yu, B (2013) Environmental implications of pavements: A life cycle view. PhD thesis, University of South Florida, USA.

Yu, H (2009) A knowledge based system for construction health and safety competence assessment. PhD thesis, University of Wolverhampton, UK.

Yu, H (2010) An integrated approach toward lean for production homebuilders. PhD thesis, University of Alberta, Canada.

Yu, J; Leung, M Y and Jiang, X (2020) Impact of critical factors within decision making process of public engagement and public consultation for construction projects: Case studies. International Journal of Construction Management, 22(12), pp. 2290-2299. ISSN 1562-3599

Yu, J H; Lee, H S and Kim, W (2006) Evaluation model for information systems benefits in construction management processes. Journal of Construction Engineering and Management, 132(10), pp. 1114-1121. ISSN 0733-9364

Yu, M; Ruan, W; Zhou, Y and Zhao, Y (2025) Flow shop scheduling for prefabricated components production considering parallel machines and buffer constraints. Journal of Construction Engineering and Management, 151(4): 04025010, ISSN 0733-9364

Yu, T; Shen, G Q and Shi, Q (2017) Comparing the performance quality of design-bid-build and design-build delivery methods. Journal of Construction Engineering and Management, 143(4): 04016111, ISSN 0733-9364

Yu, T W (2007) A value management framework for systematic identification and precise representation of client requirements in the briefing process. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yu, W D (2006) PIREM: A new model for conceptual cost estimation. Construction Management and Economics, 24(3), pp. 259-270. ISSN 01446193

Yu, W D; Chang, P L; Yao, S H and Liu, S J (2009) KVAM: Model for measuring knowledge management performance of engineering community of practice. Construction Management and Economics, 27(8), pp. 733-747. ISSN 1466433X

Yu, W D; Lin, T C; Liu, S J and Chang, P L (2013) Is the knowledge management system truly cost effective? Case study of km-enabled engineering problem solving. Journal of Construction Engineering and Management, 139(2), pp. 216-224. ISSN 0733-9364

Yu, Y (2021) Road network maintenance and repair considering day-to-day traffic dynamics and transient congestion. PhD thesis, Imperial College London, UK.

Yu, Y (2022) Use inspired research in using virtual reality for safe operation of exemplar critical infrastructure systems. PhD thesis, Rutgers The State University of New Jersey, School of Graduate Studies, USA.

Yuan, J; Li, X; Ke, Y; Xu, W; Xu, Z and Skibniewski, M (2020) Developing a building information modeling-based performance management system for public-private partnerships. Engineering, Construction and Architectural Management, 27(8), pp. 1727-1762. ISSN 0969-9988

Yuan, Mei (2011) An integrated knowledge management framework for managing sustainability knowledge in the Australian infrastructure sector. PhD thesis, Queensland University of Technology, Australia.

Yuan, X; Pan, H and Fu, B (2023) Models and analysis of stadium and commercial space integration: A case study from China. Building Research & Information, 51(8), pp. 915-936. ISSN 0961-3218

Yuan, X X (2011) A correlated bidding model for markup size decisions. Construction Management and Economics, 29(11), pp. 1101-1119. ISSN 1466433X

Yuan, X X (2012) Bayesian method for the correlated competitive bidding model. Construction Management and Economics, 30(6), pp. 477-491. ISSN 1466433X

Yue, H; Ye, G; Cao, H; Liu, Q; Xiang, Q and Luo, Y (2024) Exploring the internal influence mechanism of group safety behavior of construction workers: Qualitative method approach. Journal of Construction Engineering and Management, 150(11): 04024163, ISSN 0733-9364

Yue, J; Li, W; Cheng, J; Xiong, H; Xue, Y; Deng, X and Zheng, T (2023) A dynamic calculation model of the carbon footprint in the life cycle of hospital building: A case study in China. Engineering, Construction and Architectural Management, 30(10), pp. 4735-4761. ISSN 0969-9988

Yumarni, T and Amaratunga, D (2018) Gender mainstreaming as a strategy to achieve sustainable post-disaster reconstruction. Built Environment Project and Asset Management, 8(5), pp. 544-556. ISSN 2044-124X

Yun, G C (2008) The utility of knowledge mapping as an approach to improving corporate and project performance: a case study of a large South Korean consulting firm. PhD thesis, University of Salford, UK.

Yung, P and Agyekum-Mensah, G (2012) Productivity losses in smoking breaks on construction sites: A case study. Engineering, Construction and Architectural Management, 19(6), pp. 636-646. ISSN 0969-9988

Yunus, Riduan (2012) Decision making guidelines for sustainable construction of industrialised building systems. PhD thesis, Queensland University of Technology, Australia.

Yılmaz, M and Dede, T (2026) Multi-objective time-cost-safety risk trade-off optimization for the construction scheduling problem. Engineering, Construction and Architectural Management, 33(1), pp. 380-412. ISSN 0969-9988

Zaalouk, A and Han, S (2021) Parameterized design optimization framework for worker-friendly workplaces in modular construction. Journal of Construction Engineering and Management, 147(5): 04021030, ISSN 0733-9364

Zabihi Kolaei, A; Khanzadi, M and Ghodrati Amiri, G (2026) Integration of augmented reality and blockchain technologies for visualizing and documenting change orders in a building project: Case study. Journal of Construction Engineering and Management, 152(2): 04025251, ISSN 0733-9364

Zachariah, J-A L (2003) Towards sustainable homes through optimization: An approach to balancing life cycle environmental impacts and life cycle costs in residential buildings. PhD thesis, University of Toronto, Canada.

Zaeri, F; Rotimi, J O B; Hosseini, M R and Cox, J (2017) Implementation of the LPS using an excel spreadsheet: A case study from the New Zealand construction industry. Construction Innovation, 17(3), pp. 324-339. ISSN 1471-4175

Zaghloul, R S (2005) Risk allocation in contracts: How to improve the process. PhD thesis, University of Calgary, Canada.

Zahari, N F; Che-Ani, A I; Abdul Rashid, R B; Mohd Tahir, M A and Amat, S (2020) Factors contribute in development of the assessment framework for wheelchair accessibility in national heritage buildings in Malaysia. International Journal of Building Pathology and Adaptation, 38(2), pp. 311-328. ISSN 23984708

Zahoor, H; Khan, R M; Nawaz, A; Ayaz, M and Maqsoom, A (2022) Project control and forecast assessment of building projects in Pakistan using earned value management. Engineering, Construction and Architectural Management, 29(2), pp. 842-869. ISSN 0969-9988

Zahraie, B and Tavakolan, M (2009) Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets. Journal of Construction Engineering and Management, 135(11), pp. 1162-1171. ISSN 0733-9364

Zaina, S M; Fadli, F and Hosseini, S M (2022) Evaluation of smart irrigation systems in hot-arid climates for green roofs and walls: Case of doha, qatar. Smart and Sustainable Built Environment, 11(2), pp. 346-367. ISSN 2046-6099

Zainab S, P W and Goodhew S, F A (2013) Stakeholders perspective on sustainable technology selection to achieve zero carbon retail buildings. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Zairi, A (2013) An empirical study of quality culture in the construction industry: a Gulf Cooperation Council context. PhD thesis, University of Salford, UK.

Zairi, A (2013) An empirical study of quality culture in the construction industry: A GCC context. PhD thesis, University of Salford, UK.

Zaky, N; Ahmed, M Z; Alarjani, A and Attia, E A (2025) Lean manufacturing implementation in iron and steel industries: Effect of wastes management on the production costs. Journal of Engineering, Design and Technology, 23(2), pp. 525-545. ISSN 1726-0531

Zamalik, M N and Nawi, M N M (2024) Managing soil and geotechnical aspects in housing developments: Analysis of case studies. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Zamani, S H; Rahman, R A; Yusof, L M and Naganathan, H (2025) Well building for developing countries: Critical design criteria for residential buildings in Malaysia. Journal of Engineering, Design and Technology, 23(5), pp. 1519-1540. ISSN 1726-0531

Zamenian, H; Choi, J; Sadeghi, S A and Naderpajouh, N (2017) Systematic approach for asset management of urban water pipeline infrastructure systems. Built Environment Project and Asset Management, 7(5), pp. 506-517. ISSN 2044-124X

Zandee, D; Zutshi, A; Creed, A and Nijhof, A (2024) Aiming for bullseye: A novel gameplan for circular economy in the construction industry. Engineering, Construction and Architectural Management, 31(2), pp. 593-617. ISSN 0969-9988

Zani, C M; Brandalise, F M P; Pedó, B; Formoso, C T; Tommelein, I D; Ortiz-Marcos, I; Viana, D D; Bataglin, F S and Koskela, L (2025) Devising a taxonomy for visual management requirements by considering different purposes and contexts. Construction Management and Economics, 43(7), pp. 518-536. ISSN 0144-6193

Zanni, M; Ruikar, K and Soetanto, R (2020) Systematising multidisciplinary sustainable building design processes utilising BIM. Built Environment Project and Asset Management, 10(5), pp. 637-655. ISSN 2044-124X

Zanni, M A (2017) Communication of sustainability information and assessment within BIM-enabled collaborative environment. PhD thesis, Loughborough University, UK.

Zanni, M A; Soetanto, R and Ruikar, K (2017) Towards a BIM-enabled sustainable building design process: Roles, responsibilities, and requirements. Architectural Engineering and Design Management, 13(2), pp. 101-129. ISSN 1745-2007

Zarei, F; Arashpour, M; Mirnezami, S A; Shahabi-Shahamiri, R and Ghasemi, M (2024) Multi-skill resource-constrained project scheduling problem considering overlapping: Fuzzy multi-objective programming approach to a case study. International Journal of Construction Management, 24(8), pp. 820-833. ISSN 1562-3599

Zatta, E and Condotta, M (2023) Assessing the sustainability of architectural reclamation processes: An evaluation procedure for the early design phase. Building Research & Information, 51(1), pp. 21-38. ISSN 0961-3218

Zawawi, M I b Z (2017) Improving competition within public private partnership (PPP) procurement process for infrastructure delivery in Malaysia. PhD thesis, University of Salford, UK.

Zayed, T and Liu, Y (2014) Cash flow modeling for construction projects. Engineering, Construction and Architectural Management, 21(2), pp. 170-189. ISSN 0969-9988

Zayed, T and Mohamed, E (2014) A case productivity model for automatic climbing system. Engineering, Construction and Architectural Management, 21(1), pp. 33-50. ISSN 0969-9988

Zayed, T; Sharifi, M R; Baciu, S and Amer, M (2008) Slip-form application to concrete structures. Journal of Construction Engineering and Management, 134(3), pp. 157-168. ISSN 0733-9364

Zayed, T M and Minkarah, I (2004) Resource allocation for concrete batch plant operation: Case study. Journal of Construction Engineering and Management, 130(4), pp. 560-569. ISSN 0733-9364

Zea Escamilla, E (2015) Development of simplified life cycle assessment methodology for construction materials and buildings outside of the European context through the use of geographic information systems. DSc thesis, ETH Zürich, Switzerland.

Zedan, S and Miller, W (2018) Quantifying stakeholders' influence on energy efficiency of housing: Development and application of a four-step methodology. Construction Management and Economics, 36(7), pp. 375-393. ISSN 01446193

Zekri, A.; Tarkashvand, A. and Ekhlassi, A. (2026) An integrated rational-intuitive knowledge-based decision-making model for facade aesthetics using smart method. Architectural Engineering and Design Management, 22(1), pp. 39-66. ISSN 1745-2007

Zeng, N; Liu, Y and König, M (2023) 4D BIM-enabled look-ahead scheduling for early warning of off-site supply chain disruptions. Journal of Construction Engineering and Management, 149(1): 04022154, ISSN 0733-9364

Zeng, R; Chini, A and Ries, R (2021) Innovative design for sustainability: Integrating embodied impacts and costs during the early design phase. Engineering, Construction and Architectural Management, 28(3), pp. 747-764. ISSN 0969-9988

Zeng, R; Chini, A; Srinivasan, R S and Jiang, P (2017) Energy efficiency of smart windows made of photonic crystal. International Journal of Construction Management, 17(2), pp. 100-112. ISSN 1562-3599

Zeng, R; Shi, J J S; Wang, C and Lu, T (2024) Integrating as-built BIM model from point cloud data in construction projects. Engineering, Construction and Architectural Management, 31(9), pp. 3557-3574. ISSN 0969-9988

Zeni, K S and Kikwasi, G J (2023) Factors affecting maintenance cost of public buildings: Case study of Tanzania buildings agency and national housing corporation. International Journal of Building Pathology and Adaptation, 41(5), pp. 926-941. ISSN 23984708

Zerjav, V; Hartmann, T and Achammer, C (2013) Managing the process of interdisciplinary design: Identifying, enforcing, and anticipating decision-making frames. Architectural Engineering and Design Management, 9(2), pp. 121-133. ISSN 1745-2007

Zhai, Y (2022) Evaluation for optimisation: Design for assembly in panel construction. PhD thesis, The Chinese University of Hong Kong, Hong Kong.

Zhairy, A. E.; Daoud, A. O. and Mohamed, A. G. (2026) Transforming facility management with BIM, IoT, and digital twin: A data-driven approach to air quality monitoring. Architectural Engineering and Design Management, 22(2), pp. 426-445. ISSN 1745-2007

Zhan, H; Hwang, B G and Jabbar, S B B A (2025) An integrated approach to assessing digitalization of integrated digital delivery projects. Journal of Construction Engineering and Management, 151(6): 04025044, ISSN 0733-9364

Zhan, H; Hwang, B G and Jabbar, S B B A (2025) Erratum for: An integrated approach to assessing digitalization of integrated digital delivery projects (journal of construction engineering and management DOI: 10.1061/jcemd4.Coeng-16149). Journal of Construction Engineering and Management, 151(10): 08225001, ISSN 0733-9364

Zhan, W; Pan, W and Chen, L (2021) Construction project productivity evaluation framework with expanded system boundaries. Engineering, Construction and Architectural Management, 28(4), pp. 863-885. ISSN 0969-9988

Zhang, M. and Liu, L. (2026) Incorporating safety signs in risk evaluation for tourist-construction interactions in a scenic area renovation project. Engineering, Construction and Architectural Management, 33(4), pp. 2968-2994. ISSN 0969-9988

Zhang, C; Zayed, T and Hammad, A (2008) Resource management of bridge deck rehabilitation: Jacques cartier bridge case study. Journal of Construction Engineering and Management, 134(5), pp. 311-319. ISSN 0733-9364

Zhang, D (2015) An analysis of building information modelling (BIM) implementation from a planned behavior perspective. PhD thesis, University of Hong Kong, Hong Kong.

Zhang, G and Zou, P X W (2007) Fuzzy analytical hierarchy process risk assessment approach for joint venture construction projects in China. Journal of Construction Engineering and Management, 133(10), pp. 771-779. ISSN 0733-9364

Zhang, Guomin (2005) Factors influencing the implementation of raised floor system for the fitout of office buildings in the Australian context. PhD thesis, Queensland University of Technology, Australia.

Zhang, J (2018) Building a sustainability assessment model for highway infrastructure projects in Yunnan, China. PhD thesis, University of Greenwich, UK.

Zhang, J and El-Diraby, T E (2006) Constructability analysis of the bridge superstructure rotation construction method in China. Journal of Construction Engineering and Management, 132(4), pp. 353-362. ISSN 0733-9364

Zhang, J and Jiang, S (2025) Construction safety decision-making system based on improved integration of case-based reasoning and rule-based reasoning. Journal of Construction Engineering and Management, 151(9): 04025130, ISSN 0733-9364

Zhang, J; Li, H; Xia, B; Skitmore, M; Pu, S; Deng, Q and Jin, W (2021) Development of a market-oriented efqm excellence model for analyzing the implementation of quality management in developing countries. International Journal of Construction Management, 21(9), pp. 884-909. ISSN 1562-3599

Zhang, J; Liu, C; Luther, M; Chil, B; Zhao, J and Liu, C (2025) Students' sound environment perceptions in informal learning spaces: A case study on a university campus in Australia. Engineering, Construction and Architectural Management, 32(1), pp. 109-130. ISSN 0969-9988

Zhang, J; Ouyang, Y; Li, H; Ballesteros-Pérez, P and Skitmore, M (2020) Simulation analysis of incentives on employees' acceptance of foreign joint venture management practices: A case study. Engineering, Construction and Architectural Management, 27(8), pp. 2047-2078. ISSN 0969-9988

Zhang, J; Xie, H and Li, H (2019) Improvement of students problem-solving skills through project execution planning in civil engineering and construction management education. Engineering, Construction and Architectural Management, 26(7), pp. 1437-1454. ISSN 0969-9988

Zhang, J and Yuan, X X (2021) Stochastic modelling of maintenance flexibility in value for money assessment of PPP road projects. Construction Management and Economics, 39(2), pp. 173-191. ISSN 01446193

Zhang, J; Zhou, Q and Zhang, S (2022) Case study of field application of prefabricated anchoring frame beam structure in slope supporting projects. Journal of Construction Engineering and Management, 148(9): 05022008, ISSN 0733-9364

Zhang, J; Zou, W and Kumaraswamy, M (2015) Developing public private people partnership (4P) for post disaster infrastructure procurement. International Journal of Disaster Resilience in the Built Environment, 6(4), pp. 468-484. ISSN 1759-5916

Zhang, L (2022) Risk management framework to guide off-site manufacturing process: a Chinese perspective. PhD thesis, University of Strathclyde, UK.

Zhang, L; He, J and Zhou, S (2013) Sharing tacit knowledge for integrated project team flexibility: Case study of integrated project delivery. Journal of Construction Engineering and Management, 139(7), pp. 795-804. ISSN 0733-9364

Zhang, L; Wu, X and Liu, H (2016) Strategies to reduce ground settlement from shallow tunnel excavation: A case study in China. Journal of Construction Engineering and Management, 142(5): 04016001, ISSN 0733-9364

Zhang, M; Xue, X; Luo, T; Li, M and Tang, X (2024) The supportability evaluation of cross-regional major infrastructure projects based on the combination weighting of the game theory-cloud model. Engineering, Construction and Architectural Management, 31(9), pp. 3679-3705. ISSN 0969-9988

Zhang, N; Wang, J; Al-Hussein, M and Yin, X (2023) BIM-based automated design of drainage systems for panelized residential buildings. International Journal of Construction Management, 23(15), pp. 2683-2698. ISSN 1562-3599

Zhang, P; Li, N; Fang, D and Wu, H (2017) Supervisor-focused behavior-based safety method for the construction industry: Case study in Hong Kong. Journal of Construction Engineering and Management, 143(7): 05017009, ISSN 0733-9364

Zhang, Peng (2015) Comparative research between the Chinese and the Australian construction industries based on productivity and industrial competitiveness. PhD thesis, RMIT University, Australia.

Zhang, Q; Oo, B L and Lim, B T H (2022) Corporate social responsibility practices by leading construction firms in China: A case study. International Journal of Construction Management, 22(8), pp. 1420-1431. ISSN 1562-3599

Zhang, Qian (2021) Key influencing factors of corporate social responsibility implementation in the Chinese construction industry. PhD thesis, University of New South Wales, Australia.

Zhang, S (2019) Developing commercial capabilities for infrastructure delivery: A dynamic capabilities view. PhD thesis, University of Hong Kong, Hong Kong.

Zhang, S; Du, C; Sa, W; Wang, C and Wang, G (2014) Bayesian-based hybrid simulation approach to project completion forecasting for underground construction. Journal of Construction Engineering and Management, 140(1): 04013031, ISSN 0733-9364

Zhang, S; Duan, H; Wei, T and Shane, G (2020) A review of university-enterprise-cooperation research in China: A quantitative perspective. Construction Economics and Building, 20(3), pp. 62-77. ISSN 2204-9029

Zhang, S; Duan, H; Zhao, X; Xia, B; Feng, Y and Galvin, S (2021) Learning on rework management of construction projects: A case study. International Journal of Construction Management, 21(3), pp. 246-260. ISSN 1562-3599

Zhang, S and Leiringer, R (2016) Owner project capabilities in infrastructure projects: Unpacking commercial capabilities. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Zhang, S; Leiringer, R and Winch, G (2024) Procuring infrastructure public-private partnerships: Capability development and learning from an owner perspective. Construction Management and Economics, 42(1), pp. 35-53. ISSN 01446193

Zhang, S; Pan, F; Wang, C; Sun, Y and Wang, H (2017) BIM-based collaboration platform for the management of EPC projects in hydropower engineering. Journal of Construction Engineering and Management, 143(12): 04017087, ISSN 0733-9364

Zhang, S; Shang, C; Wang, C; Song, R and Wang, X (2019) Real-time safety risk identification model during metro construction adjacent to buildings. Journal of Construction Engineering and Management, 145(6): 04019034, ISSN 0733-9364

Zhang, W (2021) Construction productivity improvement through industrialized construction methods. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Zhang, W; Xue, N; Zhang, J and Zhang, X (2021) Identification of critical causal factors and paths of tower-crane accidents in China through system thinking and complex networks. Journal of Construction Engineering and Management, 147(12): 04021174, ISSN 0733-9364

Zhang, W; Zhang, H and Yu, L (2023) Collaborative planning for stacking and installation of prefabricated building components regarding crane-collision avoidance. Journal of Construction Engineering and Management, 149(6): 04023029, ISSN 0733-9364

Zhang, X (2004) Concessionaire selection: Methods and criteria. Journal of Construction Engineering and Management, 130(2), pp. 235-244. ISSN 0733-9364

Zhang, X (2005) Critical success factors for public-private partnerships in infrastructure development. Journal of Construction Engineering and Management, 131(1), pp. 3-14. ISSN 0733-9364

Zhang, X (2005) Paving the way for public-private partnerships in infrastructure development. Journal of Construction Engineering and Management, 131(1), pp. 71-80. ISSN 0733-9364

Zhang, X (2006) Public clients' best value perspectives of public private partnerships in infrastructure development. Journal of Construction Engineering and Management, 132(2), pp. 107-114. ISSN 0733-9364

Zhang, X (2009) Win-win concession period determination methodology. Journal of Construction Engineering and Management, 135(6), pp. 550-558. ISSN 0733-9364

Zhang, X (2010) Competitiveness for real estate developers: a China study. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Zhang, X (2018) Sustainable retrofitting of existing residential buildings at community scale in China. PhD thesis, Cardiff University, UK.

Zhang, X (2019) Integrating lean construction, BIM and quality: a new paradigm for the improvement of Chinese construction quality. PhD thesis, University of Bath, UK.

Zhang, X; Austin, S; Glass, J and Mills, G (2008) Toward collective organizational values: A case study in UK construction. Construction Management and Economics, 26(10), pp. 1009-1028. ISSN 1466433X

Zhang, X; Austin, S A and Glass, J (2006) Linking individual and organisational values: A case study in UK construction. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Zhang, X; Azhar, S; Nadeem, A and Khalfan, M (2018) Using building information modelling to achieve lean principles by improving efficiency of work teams. International Journal of Construction Management, 18(4), pp. 293-300. ISSN 1562-3599

Zhang, X and Tariq, S (2020) Failure mechanisms in international water PPP projects: A public sector perspective. Journal of Construction Engineering and Management, 146(6): 04020055, ISSN 0733-9364

Zhang, X; Yu, Y; He, W and Chen, Y (2021) Bidding decision-support model for construction projects based on projection pursuit learning method. Journal of Construction Engineering and Management, 147(7): 04021054, ISSN 0733-9364

Zhang, X; Zhang, W; Jiang, L and Zhao, T (2020) Identification of critical causes of tower-crane accidents through system thinking and case analysis. Journal of Construction Engineering and Management, 146(7): 04020071, ISSN 0733-9364

Zhang, Y; Luo, H; Skitmore, M; Li, Q and Zhong, B (2018) Optimal camera placement for monitoring safety in metro station construction work. Journal of Construction Engineering and Management, 145(1): 04018118, ISSN 0733-9364

Zhang, Y and Tan, W (2019) The leading small group: An institutional innovation for PPP projects in China. Built Environment Project and Asset Management, 9(2), pp. 291-301. ISSN 2044-124X

Zhang, Y; Wang, J; Ahmad, R and Li, X (2022) Integrating lean production strategies, virtual reality technique and building information modeling method for mass customization in cabinet manufacturing. Engineering, Construction and Architectural Management, 29(10), pp. 3970-3996. ISSN 0969-9988

Zhang, Y; Wang, Z; Lin, W; Minchin, R E and Xue, X (2022) Understanding the slow diffusion of alternative delivery systems using interpretive structural modelling. Construction Management and Economics, 40(6), pp. 459-476. ISSN 01446193

Zhang, Y; Yuan, J; Zhao, J; Cheng, L and Li, Q (2022) Hybrid dynamic pricing model for transport PPP projects during the residual concession period. Journal of Construction Engineering and Management, 148(2): 04021200, ISSN 0733-9364

Zhang, Yanjing (2019) Transdisciplinary practice in the contemporary architectural profession. PhD thesis, University of Sydney, Australia.

Zhang, Yibo (2017) A tool to evaluate sustainability of pavement maintenance projects. PhD thesis, University of Louisville, USA.

Zhang, Z (2021) Participatory ergonomics in construction: Enabling practice-to-research-to-practice via the 2safemodel. PhD thesis, University of Washington, USA.

Zhang, Z; Koh, Z Y and Ling, F (2020) Benchmarking contractors' financial performance: Case study of Singapore. Journal of Financial Management of Property and Construction, 25(2), pp. 183-199. ISSN 1366-4387

Zhao, J. and Xu, Z. (2026) A generalizable deep reinforcement learning-based algorithm for priority rule scheduling in stochastic resource-constrained project scheduling. Journal of Construction Engineering and Management, 152(9): 04026156, ISSN 0733-9364

Zhao, B; Yu, Y; Xu, Y and Guo, H (2024) Bamboo as a sustainable construction material for residential buildings in the cold and severe cold regions of China. Architectural Engineering and Design Management, 20(6), pp. 1511-1528. ISSN 1745-2007

Zhao, C E (2007) Financial risk management of PPP projects in the UK and China: A comparative study. PhD thesis, University of London, University College London, UK.

Zhao, D; McCoy, A P; Bulbul, T; Fiori, C and Nikkhoo, P (2015) Building collaborative construction skills through BIM-integrated learning environment. International Journal of Construction Education and Research, 11(2), pp. 97-120. ISSN 1557-8771

Zhao, H (2017) Distributed building information modeling in multidisciplinary collaboration. DSc thesis, ETH Zürich, Switzerland.

Zhao, J; Lam, K P; Biswas, T and Wang, H (2015) An online platform to automate LEED energy performance evaluation and submission process. Construction Innovation, 15(3), pp. 313-332. ISSN 1471-4175

Zhao, L; Wang, Q; Hwang, B G and Chang-Richards, A Y (2024) Analysis of critical factors influencing sustainable infrastructure vulnerabilities using an ISM-MICMAC approach. Engineering, Construction and Architectural Management, 31(9), pp. 3622-3652. ISSN 0969-9988

Zhao, N (2021) Developing a framework for roading infrastructure projects procurement system selection. PhD thesis, Auckland University of Technology, New Zealand.

Zhao, S and De Angelis, E (2020) Reducing mould risk during the building design stage: Case studies in South-East China. Journal of Construction in Developing Countries, 25(1), pp. 1-20. ISSN 1823-6499

Zhao, X; Hwang, B G and Low, S P (2014) Investigating enterprise risk management maturity in construction firms. Journal of Construction Engineering and Management, 140(8): 05014006, ISSN 0733-9364

Zhao, Y (2016) Green supply chain management drivers/pressures, practices and performance in Chinese construction industry. PhD thesis, Anglia Ruskin University, UK.

Zhao, Y (2022) An ontology-based semantic building post-occupancy evaluation framework and its application. PhD thesis, Brunel University, UK.

Zhao, Y; Hao, S; Chen, Z; Zhou, X; Zhang, L and Guo, Z (2025) Critical factors influencing the internet of things technology adoption behavior of construction companies: Evidence from China. Engineering, Construction and Architectural Management, 32(2), pp. 760-784. ISSN 0969-9988

Zhao, Z Y; Shen, L Y and Zuo, J (2009) Performance and strategy of Chinese contractors in the international market. Journal of Construction Engineering and Management, 135(2), pp. 108-118. ISSN 0733-9364

Zheng, D X M and Ng, S T (2005) Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front. Journal of Construction Engineering and Management, 131(2), pp. 176-186. ISSN 0733-9364

Zheng, R; Li, Z; Li, L; Dou, Y; Yuan, M and Yin, X (2024) Proposing a lean-optimized scheduling model of mixed-flow prefabricated component production in off-site construction. Journal of Construction Engineering and Management, 150(8): 04024088, ISSN 0733-9364

Zheng, S and Tiong, R L K (2010) First public-private-partnership application in taiwan's wastewater treatment sector: Case study of the nanzih BOT wastewater treatment project. Journal of Construction Engineering and Management, 136(8), pp. 913-922. ISSN 0733-9364

Zhong, B; Tian, J; Pan, X and Shen, L (2024) An online housing reputation assessment framework based on text mining and visualization technologies. Journal of Construction Engineering and Management, 150(8): 04024076, ISSN 0733-9364

Zhong, D; Li, J; Zhu, H and Song, L (2004) Geographic information system-based visual simulation methodology and its application in concrete dam construction processes. Journal of Construction Engineering and Management, 130(5), pp. 742-750. ISSN 0733-9364

Zhong, S and Elzarka, H (2022) A hybrid grey system theory-based subcontractor selection model for high-stakes construction projects. Journal of Construction Engineering and Management, 148(6): 04022037, ISSN 0733-9364

Zhou, H.; Xu, M. and Yang, Q. (2026) Quantitative safety risk coupling assessment method based on complex network theory: A case study in super-high-rise building construction. Journal of Construction Engineering and Management, 152(7): 04026095, ISSN 0733-9364

Zhou, C; Li, R; Xiong, X; Li, J and Gao, Y (2023) Optimization of triage time and sample delivery path in health infrastructure to combat COVID-19. Engineering, Construction and Architectural Management, 30(8), pp. 3620-3644. ISSN 0969-9988

Zhou, H B and Zhang, H (2011) Risk assessment methodology for a deep foundation pit construction project in Shanghai, China. Journal of Construction Engineering and Management, 137(12), pp. 1185-1194. ISSN 0733-9364

Zhou, H W; Zhou, Y H and Zhao, C J (2016) Fault-response mechanism of production system in concrete-dam-construction simulation. Journal of Construction Engineering and Management, 142(11): 04016065, ISSN 0733-9364

Zhou, L (2009) Achieving sustainable development through the private finance initiative procurement process. PhD thesis, Oxford Brookes University, UK.

Zhou, N; Chang-Richards, A; Wang, K I K and Dirks, K N (2022) Prototyping an IoT-based system for monitoring building indoor environment. Journal of Engineering, Design and Technology, 20(4), pp. 965-992. ISSN 1726-0531

Zhou, Q; Fang, D and Mohamed, S (2011) Safety climate improvement: Case study in a Chinese construction company. Journal of Construction Engineering and Management, 137(1), pp. 86-95. ISSN 0733-9364

Zhou, S (2024) Platforming for industrialized building: a comparative case study of digitally-enabled product platforms. Building Research & Information, 52(1-2), pp. 4-18. ISSN 0961-3218

Zhou, S; Mosca, L and Whyte, J (2023) How the reliability of external competences shapes the modularization strategies of industrialized construction firms. Construction Management and Economics, 41(7), pp. 608-619. ISSN 01446193

Zhou, Yifan (2010) Asset life prediction and maintenance decision-making using a non-linear non-Gaussian state space model. PhD thesis, Queensland University of Technology, Australia.

Zhu, X.; Ma, J.; Chen, W. and Tan, Y. (2026) Llm-querybc: An llm-based regulation query system for textual and tabular information in building codes. Journal of Construction Engineering and Management, 152(6): 04026075, ISSN 0733-9364

Zhu, F; Hu, H; Xu, F and Tang, N (2021) Predicting the impact of country-related risks on cost overrun for overseas infrastructure projects. Journal of Construction Engineering and Management, 147(2): 0012933, ISSN 0733-9364

Zhu, F; Sun, M; Wang, L; Sun, X and Yu, M (2019) Value conflicts between local government and private sector in stock public-private partnership projects: A case of China. Engineering, Construction and Architectural Management, 26(6), pp. 907-926. ISSN 0969-9988

Zhu, H; Hwang, B G; Tan, Y Z and Wei, F (2024) Building on digital twin: Overcoming barriers and unlocking success in the construction industry. Journal of Construction Engineering and Management, 150(10): 04024141, ISSN 0733-9364

Zhu, J; Zhang, C; Yuan, J; Pan, W; Xue, J and Lou, F (2025) An improved model for precast component transportation scheduling under dynamic traffic and weather conditions. Journal of Construction Engineering and Management, 151(11): 04025181, ISSN 0733-9364

Zhu, K; Xiang, Y; Bu, J and Zhang, H (2021) The design and construction of public service building in developing rural regions during the post COVID-19 period: Cased on a Chinese village centre. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Zhu, L (2015) Design of a bankable and resilient financial arrangement for PPP projects using game theory with multi-agent simulation. PhD thesis, National University of Singapore, Singapore.

Zhu, L; Cheung, S O; Gao, X; Li, Q and Liu, G (2020) Success DNA of a record-breaking megaproject. Journal of Construction Engineering and Management, 146(8): 05020009, ISSN 0733-9364

Zhu, X (2023) Machine learning supported multiple criteria decision making for project delivery system selection. PhD thesis, Queen's University Belfast, UK.

Zhu, Y (1999) Web-based construction document processing through a "malleable frame". PhD thesis, University of Florida, USA.

Zhu, Y; Ahmad, I and Wang, L (2009) Estimating work zone road user cost for alternative contracting methods in highway construction projects. Journal of Construction Engineering and Management, 135(7), pp. 601-608. ISSN 0733-9364

Zhu, Y; Brigham, J C and Fascetti, A (2025) Lidar-rgb data fusion for four-dimensional uav-based monitoring of reinforced concrete bridge construction: Case study of the fern hollow bridge reconstruction. Journal of Construction Engineering and Management, 151(1): 05024016, ISSN 0733-9364

Zhu, Y and Ibrahim, M (2017) Application of structure–behavior–function (SBF) theory to construction education. International Journal of Construction Management, 17(4), pp. 264-279. ISSN 1562-3599

Zhu, Zicheng (2025) Enhancing building information modelling in existing complex built environment through advanced reality capture and point cloud processing techniques. PhD thesis, Bond University, Australia.

Zhuravchak, R; Nord, N and Brattebø, H (2022) The effect of building attributes on the energy performance at a scale: An inferential analysis. Building Research & Information, 50(6), pp. 662-680. ISSN 0961-3218

Zighan, S (2016) Servitization strategies in real estate development: Evidence from Jordan. PhD thesis, University of Huddersfield, UK.

Zin, Z M I; Kulatunga, U and Thayaparan, M (2016) Malaysian experience with public-private partnership: Managing unsolicited proposal. Built Environment Project and Asset Management, 6(5), pp. 508-520. ISSN 2044-124X

Zin Zawawi, M I (2017) Improving competition within public private partnership procurement process for infrastructure delivery in Malaysia. PhD thesis, University of Salford, UK.

Zohrehvandi, S and Khalilzadeh, M (2019) APRT-FMEA buffer sizing method in scheduling of a wind farm construction project. Engineering, Construction and Architectural Management, 26(6), pp. 1129-1150. ISSN 0969-9988

Zohrehvandi, S; Vanhoucke, M; Khalilzadeh, M; Amiri, M and Shadrokh, S (2023) A fuzzy project buffer management algorithm: A case study in the construction of a renewable project. International Journal of Construction Management, 23(12), pp. 2134-2143. ISSN 1562-3599

Zoiopoulos, I I (2011) Exploring the relationship between the configurations of international construction majors and the effectiveness with which they develop their core competencies. PhD thesis, University College London, UK.

Zolfagharian, S; Irizarry, J; Ressang, A; Nourbakhsh, M and Gheisari, M (2014) Automated safety planning approach for residential construction sites in Malaysia. International Journal of Construction Management, 14(3), pp. 134-147. ISSN 1562-3599

Zomer, T (2021) Institutional pressures and decoupling in projects: the case of BIM Level 2 and coercive isomorphism in the UK's construction sector. PhD thesis, University of Cambridge, UK.

Zomer, T; Neely, A; Sacks, R and Parlikad, A (2020) Exploring the influence of socio-historical constructs on BIM implementation: An activity theory perspective. Construction Management and Economics, 39(1), pp. 1-20. ISSN 01446193

Zou, J and Zillante, G (2006) Relationship contracting: The South Australian experience: a case study. Construction Economics and Building, 6(2), pp. 20-31. ISSN 2204-9029

Zou, P X W (2004) Knowledge management practice in two Australian architecture-engineering-construction (AEC) companies. Construction Economics and Building, 4(2), pp. 19-32. ISSN 2204-9029

Zou, P X W and Li, J (2010) Risk identification and assessment in subway projects: Case study of Nanjing Subway Line 2. Construction Management and Economics, 28(12), pp. 1219-1238. ISSN 1466433X

Zou, P X W; Redman, S and Windon, S (2008) Case studies on risk and opportunity at design stage of building projects in australia: Focus on safety. Architectural Engineering and Design Management, 4(3-4), pp. 221-238. ISSN 1745-2007

Zou, P X W; Wang, S and Fang, D (2008) A life-cycle risk management framework for PPP infrastructure projects. Journal of Financial Management of Property and Construction, 13(2), pp. 123-142. ISSN 1366-4387

Zou, W (2012) Relationship management in public private partnership infrastructure projects. PhD thesis, University of Hong Kong, Hong Kong.

Zou, X; Wu, G and Zhang, Q (2021) Work continuity constraints in repetitive project scheduling considering soft logic. Engineering, Construction and Architectural Management, 28(6), pp. 1713-1738. ISSN 0969-9988

Zou, X; Zhang, L and Zhang, Q (2022) Time-cost optimization in repetitive project scheduling with limited resources. Engineering, Construction and Architectural Management, 29(2), pp. 669-701. ISSN 0969-9988

Zou R R, F R and Jewell C, T L C M (2013) An exploratory study of information maturity in construction and developing a decision-making model. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Zu, F. and Zhang, X. (2026) Streamline the information phase of the value engineering workshop through a web-based platform integrating BIM and GIS. Engineering, Construction and Architectural Management, 33(5), pp. 4149-4180. ISSN 0969-9988

Zu, L and Liao, W (2025) Reinforcement learning-based multiobjective and multiconstraint production scheduling for precast concrete. Journal of Construction Engineering and Management, 151(8): 04025089, ISSN 0733-9364

Zulkeflee, A A; Faisol, N; Ismail, F and Ismail, N A A (2022) Safety compliances enhancement: Foreign labours behaviour in the Malaysian construction site. Journal of Construction in Developing Countries, 27(1), pp. 153-171. ISSN 1823-6499

Zulu, E; Zulu, S L; Chabala, M; Kavishe, N; Chifunda, C and Musonda, I (2024) Infrastructure design stage considerations for environmental sustainability in Zambia. Journal of Engineering, Design and Technology, 22(3), pp. 836-853. ISSN 1726-0531

Zuluaga Santa, C M (2018) Protecting bridge maintenance workers: Evaluating fall protection supplementary devices using virtual prototyping and wearable technology. PhD thesis, North Carolina State University, USA.

Zuppa, D (2009) Model for developing trust in construction management. PhD thesis, University of Florida, USA.

af Hällström, A and Bosch-Sijtsema, P (2021) The dark side of collaboration: The risks of strong ties in collaborative project networks. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

af Hällström, A; Bosch-Sijtsema, P; Poblete, L; Rempling, R and Karlsson, M (2021) The role of social ties in collaborative project networks: A tale of two construction cases. Construction Management and Economics, 39(9), pp. 723-738. ISSN 01446193

al Abo Omar, E and Mangin, J (2002) A new cost control model and indicators to measure productivity on building sites. Construction Innovation, 2(2), pp. 83-101. ISSN 1471-4175

de Casas Castro Marins, K R (2014) A method for energy efficiency assessment during urban energy planning. Smart and Sustainable Built Environment, 3(2), pp. 132-152. ISSN 2046-6099

de Castro e Silva Neto, D (2019) Contributions to the governance and renegotiation processes of public-private partnerships in Brazil. PhD thesis, Universidade de Aveiro, Portugal.

de Kock, P M and Carta, S (2020) Trojans of ambiguity vs resilient regeneration: Visual meaning in cities. Construction Economics and Building, 20(2), pp. 6-24. ISSN 2204-9029

de Melo, R S S; Do, D; Tillmann, P; Ballard, G and Granja, A D (2016) Target value design in the public sector: Evidence from a hospital project in San Francisco, CA. Architectural Engineering and Design Management, 12(2), pp. 125-137. ISSN 1745-2007

de Paula, A L; Marchezini, V and Mendes, T S G (2025) Participatory analysis of disaster risk creation in Brazilian coastal cities: Bridging remote sensing and citizen generated data. International Journal of Disaster Resilience in the Built Environment, 16(3), pp. 378-401. ISSN 1759-5908

de Silva, N; Ranasinghe, M and de Silva, C R (2012) Risk factors affecting building maintenance under tropical conditions. Journal of Financial Management of Property and Construction, 17(3), pp. 235-252. ISSN 1366-4387

den Heijer, F (2025) Comprehensive risk-perspective for flood defence system management. PhD thesis, Delft University of Technology, Netherlands.

den Otter, A and Emmitt, S (2008) Design team communication and design task complexity: The preference for dialogues. Architectural Engineering and Design Management, 4(2), pp. 121-129. ISSN 1745-2007

dos Santos, A (1999) Application of flow principles in the production management of construction sites. PhD thesis, University of Salford, UK.

ng, S T; Fang, Y and Skitmore, R M (2008) Negotiation of on-site buffer stocks: A fuzzy non-structural fuzzy decision support system approach. Construction Innovation, 8(3), pp. 202-217. ISSN 1471-4175

van Egmond-deWilde de Ligny, E and Erkelens, P (2008) Construction technology diffusion in developing countries: Limitations of prevailing innovation systems. Journal of Construction in Developing Countries, 13(2), pp. 43-63. ISSN 1823-6499

van Gelder, P H A J M (2000) Statistical methods for the risk -based design of civil structures. PhD thesis, Delft University of Technology, Netherlands.

van Hoof, J; Rutten, P G S; Struck, C; Huisman, E R C M and Kort, H S M (2015) The integrated and evidence-based design of healthcare environments. Architectural Engineering and Design Management, 11(4), pp. 243-263. ISSN 1745-2007

van Manen, M; olde Scholtenhuis, L and Voordijk, H (2022) Empirically validating five propositions regarding 3D visualizations for subsurface utility projects. Engineering, Construction and Architectural Management, 29(6), pp. 2535-2553. ISSN 0969-9988

van Rij, E and Altes, W K K (2014) Integrated air quality and land use planning in The Netherlands. International Journal of Law in the Built Environment, 6(1-2), pp. 194-210. ISSN 1756-1450

van den Berg, M; Voordijk, H and Adriaanse, A (2020) Information processing for end-of-life coordination: a multiple-case study. Construction Innovation, 20(4), pp. 647-671. ISSN 1471-4175

van den Boomen, M; Spaan, M T J; Schoenmaker, R and Wolfert, A R M (2019) Untangling decision tree and real options analyses: A public infrastructure case study dealing with political decisions, structural integrity and price uncertainty. Construction Management and Economics, 37(1), pp. 24-43. ISSN 01446193

van den Boomen, M; Spaan, M T J; Shang, Y and Wolfert, A R M (2020) Infrastructure maintenance and replacement optimization under multiple uncertainties and managerial flexibility. Construction Management and Economics, 38(1), pp. 91-107. ISSN 01446193

van den Bosch, C C K (2016) Tree agency and urban forest governance. Smart and Sustainable Built Environment, 5(2), pp. 176-188. ISSN 2046-6099

van der Ham, M and Opdenakker, R (2023) Overcoming process-related barriers in modular high-rise building projects. International Journal of Construction Management, 23(10), pp. 1779-1789. ISSN 1562-3599

van der Kuyp, D J (2018) Strategies construction managerial leaders use to counteract material cost overruns. PhD thesis, Walden University, USA.

van der Meer, J; Hartmann, A; van der Horst, A and Dewulf, G (2020) Multi-criteria decision analysis and quality of design decisions in infrastructure tenders: A contractor's perspective. Construction Management and Economics, 38(2), pp. 172-188. ISSN 01446193

zu Ermgassen, S O S E (2022) Hard questions, concrete solutions: Mitigating the ecological impacts of the global infrastructure boom. PhD thesis, University of Kent, UK.

Álvares, J S; Costa, D B and Melo, R R S (2018) Exploratory study of using unmanned aerial system imagery for construction site 3D mapping. Construction Innovation, 18(3), pp. 301-320. ISSN 1471-4175

Çankaya Topak, S (2024) Conforming to future changes in buildings: A component-oriented detailing strategy. PhD thesis, Middle East Technical University, Turkey.

Çağlayan, N and Satoglu, S I (2022) Simulation analysis of critical factors of casualty transportation for disaster response: A case study of Istanbul earthquake. International Journal of Disaster Resilience in the Built Environment, 13(5), pp. 632-647. ISSN 1759-5916

Çepni, M. S.; Kutluca, A. K.; Salihoğlu, T.; Atmaca, A. and Mintemur, S. (2026) Changing land-use metrics in mass housing: Türkiye case study. Buildings & Cities, 7(1), pp. 541-558. ISSN 2632-6655

Çetin, Sultan (2023) Towards a circular building industry through digitalisation: Exploring how digital technologies can help narrow, slow, close, and regenerate the loops in social housing practice. PhD thesis, Delft University of Technology, Netherlands.

Çevikbaş, M; Okudan, O and Işlk, Z (2022) New delay-analysis method using modified schedule and modified updated schedule for construction projects. Journal of Construction Engineering and Management, 148(11): 04022119, ISSN 0733-9364

Ó Riain, M (2016) The nZEB retrofit of regional technical college buildings. PhD thesis, University College Cork, Ireland.

Özdemir, M (2015) A fuzzy structural equation model to analyze relationships between determinants of safety performance in construction sites: Development of a safety performance index assessment tool. PhD thesis, Middle East Technical University, Turkey.

Özener, O Ö (2024) Context-based learning for BIM: Simulative role-playing games for strategic business implementations. Smart and Sustainable Built Environment, 13(4), pp. 908-933. ISSN 2046-6099

Şentürk, H A; Yazici, G and Kaplanoǧlu, S B (2004) Case study: Izmit domestic and industrial water supply build-operate- transfer project. Journal of Construction Engineering and Management, 130(3), pp. 449-454. ISSN 0733-9364

Šelih, J (2005) Improvement of construction and demolition (C&D) waste management on construction sites. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Špačková, O (2012) Risk management of tunnel construction projects. PhD thesis, Czech Technical University, Czech Republic.

Štaube, T; Leemeijer, B; Geipele, S; Kauškale, L; Geipele, I and Jansen, J (2016) Economic and financial rationale for age-friendly housing. Journal of Financial Management of Property and Construction, 21(2), pp. 99-121. ISSN 1366-4387

This list was generated on Sat Aug 22 02:22:31 2026 UTC.