Items with Index Term: building refurbishment

Number of items: 24.

Ali, A S; Azmi, N F and Baaki, T K (2018) Cost performance of building refurbishment works: The case of Malaysia. International Journal of Building Pathology and Adaptation, 36(1), pp. 41-62. ISSN 23984708

Babangida, I (2014) Hierarchical structuring and evaluation of risks, uncertainties and technical challenges faced by building refurbishment contractors. PhD thesis, University of Bolton, UK.

Babangida, I; Olubodun, F and Kangwa, J (2012) Building refurbishment: Holistic evaluation of barriers and opportunities. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Bruno, Silvana (2019) The implementation of automatic diagnostics and monitoring towards diagnosis-aided historic building information modelling and management. PhD thesis, Politecnico di Bari, Italy.

Bryde, D J and Schulmeister, R (2012) Applying lean principles to a building refurbishment project: Experiences of key stakeholders. Construction Management and Economics, 30(9), pp. 777-794. ISSN 1466433X

Bui, T T P; Wilkinson, S; Domingo, N and MacGregor, C (2021) Towards zero carbon building refurbishment: A new conceptual framework for decision support tools. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Carlos, J S (2017) The impact of refurbished windows on Portuguese old school buildings. Architectural Engineering and Design Management, 13(3), pp. 185-201. ISSN 1745-2007

Couto, A and Couto, J (2007) Why deconstruction is not adequately considered in Portuguese building refurbishment. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Dulung, A Z A (2007) Computer aided decision support system for the selection of subcontractors in building refurbishment works. PhD thesis, National University of Singapore, Singapore.

Fernando, M H V; Costa, D D; Malsha Nadeetharu, B K and Kulatunga, U (2024) Application of lean principles for building refurbishment projects in Sri Lanka. Built Environment Project and Asset Management, 14(2), pp. 244-259. ISSN 2044-124X

Keane, P J (1994) A computer-aided systematic approach to time delay analysis for extension of time claims on construction projects. PhD thesis, Loughborough University, UK.

Macieira, M; Mendonça, P; Miranda Guedes, J and Tereso, A (2022) Evaluating the efficiency of membrane's refurbishment solutions to perform vertical extensions in old buildings using a multicriteria decision-support model. Architectural Engineering and Design Management, 18(1), pp. 1-25. ISSN 1745-2007

Okakpu, A; Ghaffarianhoseini, A; Tookey, J; Haar, J; Ghaffarianhoseini, A and Rehman, A U (2022) Risk factors that influence adoption of building information modelling (BIM) for refurbishment of complex building projects: Stakeholders perceptions. International Journal of Construction Management, 22(13), pp. 2446-2458. ISSN 1562-3599

Okoroh, M I (1992) Knowledge based decision support system for the selection and appointment of sub-contractors for building refurbishment contracts. PhD thesis, Loughborough University, UK.

Priyan, P.; Le, A.; Domingo, N. and To, T. H. Q. (2026) Zero-carbon refurbishment: Current practices and attitudes from a New Zealand interview study. International Journal of Building Pathology and Adaptation, 44(3), pp. 583-598. ISSN 2398-4708

Ranasinghe, U; Jefferies, M; Davis, P and Pillay, M (2023) Enabling a resilient work environment: An analysis of causal relationships between resilience engineering factors in construction refurbishment projects. Journal of Construction Engineering and Management, 149(9): 04023078, ISSN 0733-9364

Rathnayake, I; Sridarran, P; Abeynayake, M and Jayakodi, S (2023) Enhancing building performance of post-fire refurbished apparel manufacturing buildings in sri lanka. Built Environment Project and Asset Management, 13(3), pp. 375-393. ISSN 2044-124X

Seki, Y; Sutrisna, M and Olanipekun, A O (2021) Integrating a rich picture diagram and causal loop diagram to model stakeholder engagement in building refurbishment projects. Engineering, Construction and Architectural Management, 28(7), pp. 1929-1951. ISSN 0969-9988

Sezer, A A (2013) Indicators of environmental and productivity performance for building refurbishment projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Sezer, A A (2015) Contractor use of productivity and sustainability indicators for building refurbishment. Built Environment Project and Asset Management, 5(2), pp. 141-153. ISSN 2044-124X

Sezer, A A and Bosch-Sijtsema, P (2022) Actor-to-actor tensions influencing waste management in building refurbishment projects: A service ecosystem perspective. International Journal of Construction Management, 22(9), pp. 1690-1699. ISSN 1562-3599

Shafie, K (1995) Building refurbishment contracts bid decision knowledge and its applicationan a knowledge based decision support system (ADJUBID). PhD thesis, University of London, University College London, UK.

Taylor, M D; Fisher, A and Wamuziri, S C (2009) A comparison of modern methods of bathroom construction: A project case study. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Vahabi, A; Nasirzadeh, F and Mills, A (2023) Assessing the impact of project brief clarity using project definition rating index tool and system dynamic. Engineering, Construction and Architectural Management, 30(2), pp. 697-713. ISSN 0969-9988

This list was generated on Sat Aug 22 02:10:35 2026 UTC.