Items with Index Term: building process

Number of items: 203.

Abdalla-Salem, S B (2009) Computer-aided planning and building process. PhD thesis, Technische Universitaet Berlin, Germany.

Abdel Meguid, T A (1998) Managed claims procurement strategy (MCPS): A comparative study of the performance of alternate building procurement strategies. PhD thesis, Universite de Montreal, Canada.

Abeydeera, W P P (2003) The role of social capital in collaborative governmental and non-governmental programmes on poverty reduction in Sri Lanka. PhD thesis, University of Guelph, Canada.

AbulHassan, H S (2001) A framework for applying concurrent engineering principles to the construction industry. PhD thesis, Pennsylvania State University, USA.

Agapiou, A; Clausen, L E; Flanagan, R; Norman, G and Notman, D (1998) The role of logistics in the materials flow control process. Construction Management and Economics, 16(2), pp. 131-137. ISSN 01446193

Ahmed, S S (2018) Innovation of building processes in Syria by using BIM. PhD thesis, Czech Technical University, Czech Republic.

Al-Derham, H R (1999) The establishment of performance criteria for the evaluation of procurement of senior staff and private housing projects in the State of Qatar. PhD thesis, University of Glamorgan, UK.

Ali, A H; Elyamany, A; Ibrahim, A H; Kineber, A F and Daoud, A O (2024) Modelling the relationship between modular construction adoption and critical success factors for residential projects in developing countries. International Journal of Construction Management, 24(12), pp. 1314-1325. ISSN 1562-3599

Aljohani, A (2019) Cost overrun causality model in Saudi Arabian public sector construction projects. PhD thesis, Robert Gordon University, UK.

Andreu, I C and Oreszczyn, T (2004) Architects need environmental feedback. Building Research & Information, 32(4), pp. 313-328. ISSN 0961-3218

Arditi, D and Gunaydin, H M (1998) Factors that affect process quality in the life cycle of building projects. Journal of Construction Engineering and Management, 124(3), pp. 194-203. ISSN 0733-9364

Astrand, R N (2003) Selection model to choose innovative building systems for progressive housing with special reference to metro Manila, Philippines. PhD thesis, McGill University, Canada.

Atkinson, B (2000) Inca: A retrospective performance tool for project management. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Auchterlounie, T (2006) An example of partnering between a North American speculative housebuilder and their subcontractors. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Bahadur, A V (2014) Policy climates and climate policies: analysing the politics of building resilience to climate change. PhD thesis, University of Sussex, UK.

Bakens, W; Foliente, G and Jasuja, M (2005) Engaging stakeholders in performance-based building: Lessons from the performance-based building (PeBBu) network. Building Research & Information, 33(2), pp. 149-158. ISSN 0961-3218

Banteli, A; Stevenson, V and Patel, H (2020) Embodied energy considerations in a BIM-enabled building design process: An ethnographic case study. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Bao, Z; Laovisutthichai, V; Tan, T; Wang, Q and Lu, W (2022) Design for manufacture and assembly (dfma) enablers for offsite interior design and construction. Building Research & Information, 50(3), pp. 325-338. ISSN 0961-3218

Basri, H (1994) An expert system for preliminary landfill design in developing countries. PhD thesis, University of Leeds, UK.

Bernold, L E and Treseler, J F (1991) Vendor analysis for best buy in construction. Journal of Construction Engineering and Management, 117(4), pp. 645-658. ISSN 0733-9364

Bersson, T F (2012) A framework for application of system engineering process models to sustainable design of high performance buildings. PhD thesis, George Washington University, USA.

Blomenkamp, M (2011) A program evaluation of the building construction of Bellevue Elementary School for the Bellevue Public Schools. EdD thesis, University of Nebraska at Omaha, USA.

Bologna, R and Del Nord, R (2000) Effects of the law reforming public works contracts on the Italian building process. Building Research & Information, 28(2), pp. 109-118. ISSN 0961-3218

Bouchlaghem, K A D and Pasquire, C (2009) An information-led process framework for hybrid projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Brege, S; Stehn, L and Nord, T (2014) Business models in industrialized building of multi-storey houses. Construction Management and Economics, 32(1-2), pp. 208-226. ISSN 01446193

Bridgewater, C (1992) A new approach to the design of buildings for automated construction. PhD thesis, University of Reading, UK.

Campbell, A J (2012) The politics of canal construction: the Ashby Canal, 1781-1804. PhD thesis, University of Leicester, UK.

Cardellicchio, L (2021) Building defects in new iconic structures: The technical challenge and the economic impact of restoring the Jubilee Church in Rome. Architectural Engineering and Design Management, 17(1-2), pp. 146-166. ISSN 1745-2007

Catrillo, C (2025) Investigation of sprinkler requirements in one-or-two-family newly constructed homes. DPA thesis, Walden University, USA.

Chan, D W M (1998) Modelling construction durations for public housing projects. PhD thesis, University of Hong Kong, Hong Kong.

Chan, D W M and Kumaraswamy, M M (1999) Modelling and predicting construction durations in Hong Kong public housing. Construction Management and Economics, 17(3), pp. 351-362. ISSN 01446193

Cherneff, J M (1990) Knowledge-based interpretation of architectural drawings. PhD thesis, Massachusetts Institute of Technology, USA.

Chiang, Y H; Tang, B S and Wong, F (2008) Volume building as competitive strategy. Construction Management and Economics, 26(2), pp. 161-176. ISSN 1466433X

Chmielewski, H T (2023) Overcoming modeling barriers in long-term interdependent infrastructure systems planning. PhD thesis, North Carolina State University, USA.

Chouhan, S; Narang, A and Mukherjee, M (2024) Multihazard risk assessment of educational institutes of dehradun, uttarakhand. International Journal of Disaster Resilience in the Built Environment, 15(1), pp. 45-58. ISSN 1759-5916

Cirelli Jr., L R (2017) Impact of design fees and duration of design process on construction quality: Implications for quality management. PhD thesis, Baker College (Michigan), USA.

Clegg, D R (1999) A construction-specific simulation-based framework for earthworks. PhD thesis, Sheffield Hallam University, UK.

Codarin, Sara (2020) Innovative construction systems within building processes: An approach to large-scale robotic additive layer manufacturing for the conservation of cultural heritage. PhD thesis, University of Ferrara, Italy.

Coulter III, C (1968) A systems analysis of the corps of engineers approach to design and construction. PhD thesis, Texas A&M University, USA.

De Haan, J; Voordijk, H and Joosten, G J (2002) Market strategies and core capabilities in the building industry. Construction Management and Economics, 20(2), pp. 109-118. ISSN 01446193

Deng, Zhong Ming (1995) Extended state space modelling and influence diagrams for construction processes and aids. PhD thesis, University of New South Wales, Australia.

Di Ruocco, G; Melella, R and Marino, V (2022) An integrated assessment method for the sustainability of the opaque building envelope in residential buildings with Italian gbc-home certification. Architectural Engineering and Design Management, 18(4), pp. 545-570. ISSN 1745-2007

Dreicer, G K (1993) The long span. Intercultural exchange in building technology: Development and industrialization of the framed beam in Western Europe and the United States, 1820-1870. PhD thesis, Cornell University, USA.

Duman, S (2003) Policy impact analysis of privatizing public services: The case of wastewater treatment in Indianapolis. PhD thesis, University of Pittsburgh, USA.

Duyne Barenstein, J E (2015) Continuity and change in housing and settlement patterns in post-earthquake Gujarat, India. International Journal of Disaster Resilience in the Built Environment, 6(2), pp. 140-155. ISSN 1759-5916

Edwards, E H (1999) The architect in the building process, pragmatic reflection, concrete experience. DrTechn thesis, Kungliga Tekniska Hogskolan, Sweden.

El-Shahhat, A M (1993) Safety of concrete high-rise buildings during construction. PhD thesis, Purdue University, USA.

Emmitt, S (1999) Architectural management: An evolving field. Engineering, Construction and Architectural Management, 6(2), pp. 188-196. ISSN 0969-9988

Erten, S (2008) Spatial analysis of mega-event hosting: Olympic host and Olympic bid cities. PhD thesis, Middle East Technical University, Turkey.

Etzion, Y (1980) A theoretical basis for a model of the selection, design and integration of sub-systems in the building process to minimize cost. PhD thesis, Texas A&M University, USA.

Feldmann, F G (2022) Novel perspectives on sustainable value creation: Challenging the status quo by implementing advanced technologies into supply chain processes. PhD thesis, Friedrich-Alexander-Universitaet Erlangen-Nuernberg, Germany.

Felix, R (1988) The use of domestic building products by the owner-builder. PhD thesis, University of Leeds, UK.

Filho, A J (1995) Technological change and informal housebuilding in Brazil. PhD thesis, University College London, UK.

Fleming, E; Callaghan, N and Craig, N (2019) Robotics and automation as a solution to bridging the UK housing gap. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Flyen, C; Hauge, Å L; Almås, A J and Godbolt, Å L (2018) Municipal collaborative planning boosting climate resilience in the built environment. International Journal of Disaster Resilience in the Built Environment, 9(1), pp. 58-69. ISSN 1759-5916

Forman, M and Haugbølle, K (2009) Arbitration and expert appraisals of defects in construction: What do companies learn? In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Freitas, Márcia Regina de (2008) Computacional tool for support planning and elaboration of construction site layout. PhD thesis, Universidade de São Paulo, Brazil.

Galvin, P and Tywoniak, S (2019) How organizational boundary choices impact capability development. Construction Management and Economics, 37(12), pp. 712-726. ISSN 01446193

Georgiou, J (2013) Workmanship and defects in housing in the state of Victoria, Australia. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Gerding, D; Wamelink, H and Leclercq, E (2020) Implementation of circularity in the building process: A case study research into organizing the actor network and decision-making process. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Ghansah, F A and Lu, W (2024) Major opportunities of digital twins for smart buildings: A scientometric and content analysis. Smart and Sustainable Built Environment, 13(1), pp. 63-84. ISSN 2046-6099

Gharaie, Ehsan (2011) House completion time in Australia: Workflow planning approach. PhD thesis, RMIT University, Australia.

Gibney, A (1998) Studies in eighteenth-century building history. PhD thesis, Trinity College Dublin, Ireland.

Gidado, K (1993) Numerical index of complexity in building construction with particular consideration to its effect on production time. PhD thesis, University of Brighton, UK.

Giorgi, Serena (2020) Circular economy and regeneration of building stock: Policy improvements, strategic partnerships and life cycle decision-making tools. PhD thesis, Politecnico di Milano, Italy.

Gottlieb, S C and Haugbølle, K (2013) Contradictions and collaboration: Partnering in-between systems of production, values and interests. Construction Management and Economics, 31(2), pp. 119-134. ISSN 1466433X

Griffith, A (1984) A critical investigation of factors influencing buildability and productivity. PhD thesis, Heriot-Watt University, UK.

Griffith, A (2006) Expanding knowledge and practice of construction management systems and procedures. DSc thesis, Sheffield Hallam University, UK.

Griffith, A and Sidwell, A C (1997) Development of constructability concepts, principles and practices. Engineering, Construction and Architectural Management, 4(4), pp. 295-310. ISSN 0969-9988

Gruneberg, S and Hughes, W P (2004) Construction consortia: Do they serve any real purpose? In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Gunaydin, H M (1999) Impact of information technologies on project management functions. PhD thesis, Illinois Institute of Technology, USA.

Hadipriono, F C (1982) Institutional and procedural methods for preventing failures of long span structures. DEngr thesis, University of California, Berkeley, USA.

Hadipriono, F C and Wang, H K (1986) Analysis of causes of falsework failures in concrete structures. Journal of Construction Engineering and Management, 112(1), pp. 112-121. ISSN 0733-9364

Haller, M; Lu, W; Stehn, L and Jansson, G (2015) An indicator for superfluous iteration in offsite building design processes. Architectural Engineering and Design Management, 11(5), pp. 360-375. ISSN 1745-2007

Hampson, K; Peters, R; Walker, D and Tucker, S (2000) Project alliancing and information technology in building construction: The national museum of Australia. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Harrison, B W (1982) Socially responsive professional behavior of architectural firms: A social psychological perspective. PhD thesis, University of Michigan, USA.

Hauptfleisch, A C (1989) The development of building process relationships with special reference to South Africa. PhD thesis, University of Pretoria, South Africa.

Herazo, B and Lizarralde, G (2015) The influence of green building certifications in collaboration and innovation processes. Construction Management and Economics, 33(4), pp. 279-298. ISSN 01446193

Hoffman, S J (1993) Behind the facade: The constraining influence of race, class and power on elites in the city-building process, Richmond, Virginia, 1870-1920. PhD thesis, Carnegie Mellon University, USA.

Ireland, V (1985) The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects. Construction Management and Economics, 3(1), pp. 59-87. ISSN 01446193

Isiadianso, C (2007) Integrating deconstruction into the project delivery process. PhD thesis, Loughborough University, UK.

Ismaeel, W S E (2020) An integrated model for energy-efficient building opening design. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Jaskot, P B (1993) The architectural policy of the SS, 1936-1945. PhD thesis, Northwestern University, USA.

Johnsson, H and Meiling, J H (2009) Defects in offsite construction: Timber module prefabrication. Construction Management and Economics, 27(7), pp. 667-681. ISSN 1466433X

Jones, A M (1990) Design and construction for traditional house building. PhD thesis, Aston University, UK.

Jørgensen, K and Rasmussen, G M G (2009) Critical events in construction process. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Kaatz, E; Root, D and Bowen, P (2005) Broadening project participation through a modified building sustainability assessment. Building Research & Information, 33(5), pp. 441-454. ISSN 0961-3218

Kaatz, E; Root, D S; Bowen, P A and Hill, R C (2006) Advancing key outcomes of sustainability building assessment. Building Research & Information, 34(4), pp. 308-320. ISSN 0961-3218

Kaatz, E; Root, D S; Hilland, R C and Bowen, P A (2006) Fostering sustainability and enhancing quality in construction with building sustainability assessment. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

KaplińSki, O and Meszek, W (1992) Catastrophic and strategic aspects of building processes balancing. Construction Management and Economics, 10(1), pp. 81-88. ISSN 01446193

Karakhan, A A and Gambatese, J A (2017) Integrating worker health and safety into sustainable design and construction: Designer and constructor perspectives. Journal of Construction Engineering and Management, 143(9): 04017069, ISSN 0733-9364

Karlsson, M; Lakka, A; Sulankivi, K; Hanna, A S and Thompson, B P (2008) Best practices for integrating the concurrent engineering environment into multipartner project management. Journal of Construction Engineering and Management, 134(4), pp. 289-299. ISSN 0733-9364

Kim, K J (1997) Simplified discrete event simulation for heavy construction operations. PhD thesis, University of Texas at Austin, USA.

Kiviniemi, A (2005) Requirements management interface to building product models. PhD thesis, Stanford University, USA.

Klopper, C H (1986) An investigation into and evaluation of the cost reimbursable basis for building contracts. DSc thesis, University of Pretoria, South Africa.

Kloukinas, D (2015) Neolithic building technology and the social context of construction practices: The case of Northern Greece. PhD thesis, Cardiff University, UK.

Knebel, V (2006) Preserve and rebuild: the built environment, status transformations and identity construction in eastern Germany after reunification. PhD thesis, University of Edinburgh, UK.

Ko, W H (2021) View and environmental quality in buildings. PhD thesis, University of California, Berkeley, USA.

Koch, C (2004) Operations management on the construction site: Developing a human resource and knowledge oriented alternative to lean construction. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Koch, C H G H J K (2018) Information standards: A hinder or an enabler for innovation? In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Korpela, J and Kerosuo, H (2014) Working together in a knot: The simultaneity and pulsation of collaboration in an early phase of building design. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Koskisto, O (1997) Reliability-based optimization of plant precast concrete building systems. PhD thesis, Johns Hopkins University, USA.

Kristensen, E K (2011) Systemic barriers to a future transformation of the building industry from a buyer controlled to a seller driven industry: an analysis of key systemic variables in the building industry, such as 'procurement model', 'buyer perception', 'production mode' and 'leadership and management', principally in a Danish development context and seen from the perspective of the architect. PhD thesis, Robert Gordon University, UK.

Lahdenperä, P (1999) Restructuring the building industry for improved performance. Journal of Construction Procurement, 5(2), pp. 118-128. ISSN 1358-9180

Laitinen, J (1998) Model based construction process management. PhD thesis, KTH Royal Institute of Technology, Sweden.

Lam, K-C (2003) Co-ordination of building services and procurement methods for highly serviced buildings. PhD thesis, Loughborough University, UK.

Laptali, E (1996) Application of optimisation techniques to planning and estimating decisions in the building process. PhD thesis, University of Glamorgan, UK.

Laurell-Stenlund, K (2010) Value creation in development and construction of public buildings: The case of houses of culture. PhD thesis, Luleå University of Technology, Sweden.

Leiringer, R; Gottlieb, S C; Fang, Y and Mo, X (2022) In search of sustainable construction: The role of building environmental assessment methods as policies enforcing green building. Construction Management and Economics, 40(2), pp. 104-122. ISSN 01446193

Leopold, E and Bishop, D (1983) Design philosophy and practice in speculative housebuilding: Part 1. Construction Management and Economics, 1(2), pp. 119-144. ISSN 01446193

Leyland, M R (2016) Patronage and the architectural profession: the country house in nineteenth-century Northamptonshire. PhD thesis, University of Leicester, UK.

Lichtenberg, J (2005) Slimbouwen®: A strategy for innovation. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Likita, A J; Jelodar, M B; Vishnupriya, V and Rotimi, J O B (2024) Lean and BIM integration benefits construction management practices in New Zealand. Construction Innovation, 24(1), pp. 106-133. ISSN 1471-4175

Lisco, M and Aulin, R (2024) Taxonomy supporting design strategies for reuse of building parts in timber-based construction. Construction Innovation, 24(1), pp. 221-241. ISSN 1471-4175

Liu, Jiani (2014) Developing a life cycle assessment model for measuring sustainable performance of buildings in China. PhD thesis, University of Technology Sydney, Australia.

Lizarralde, G (2004) Organisational system and performance of post-disaster reconstruction projects. PhD thesis, Universite de Montreal, Canada.

Lofqvist, P (1994) Knowledge-based systems for preliminary design of structures. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Lohne, J; Klakegg, O J and Lædre, O (2023) Understanding the potential for criminal activity in the Norwegian AEC industry: A building process perspective. Journal of Construction Engineering and Management, 149(1): 05022015, ISSN 0733-9364

Lounsbury, C R (1983) From craft to industry: The building process in North Carolina in the nineteenth century. PhD thesis, George Washington University, USA.

Love, P E D; Skitmore, M and Earl, G (1998) Selecting a suitable procurement method for a building project. Construction Management and Economics, 16(2), pp. 221-233. ISSN 01446193

Lowe, J (1993) Construction productivity: an input-output approach. PhD thesis, Glasgow Caledonian University, UK.

Luiten, G T (1994) Computer-aided design for construction in the building industry. Dr thesis, Delft University of Technology, Netherlands.

Ma, Y (2011) A semiotic framework for buildings performance assessment. PhD thesis, University of Reading, UK.

Mace, B K (2001) A production control model for commercial construction. PhD thesis, Pennsylvania State University, USA.

Maduka, N S (2017) The role of knowledge management in assisting key stakeholders in making informed decisions in delivering sustainable retrofitted building projects. PhD thesis, Northumbria University, UK.

Male, S and Kelly, J (1989) Organizational responses of public sector clients in Canada to the implementation of value management: Lessons for the UK construction industry. Construction Management and Economics, 7(3), pp. 203-216. ISSN 01446193

Manavazhi, M R (1998) A configuration-based modeling methodology for the automated generation of simulation models in construction. PhD thesis, University of Alberta, Canada.

Matthews, J D (1996) A project partnering approach to the main contractor - sub contractor relationship. PhD thesis, Loughborough University, UK.

McCain, M L (1986) Skill and deskilling in the English building trades in the nineteenth-century. PhD thesis, Georgetown University, USA.

McLoud, M (1988) Craftsmen and entrepreneurs: Builders in late nineteenth-century Washington, D.C. PhD thesis, George Washington University, USA.

Memarzia, K (1995) Productivity and the Iranian building industry: a case study of component manufacture. PhD thesis, University of York, UK.

Mmereki, D and Brouwer, D (2022) Application of innovative materials and methods in green buildings and associated occupational exposure and health of construction workers: A systematic literature review. Journal of Construction Engineering and Management, 148(8): 04022068, ISSN 0733-9364

Mohsini, R A and Davidson, C H (1992) Determinants of performance in the traditional building process. Construction Management and Economics, 10(4), pp. 343-359. ISSN 01446193

Moore, D (1996) The renaissance: The beginning of the end for implicit buildability. Building Research & Information, 24(5), pp. 259-269. ISSN 0961-3218

Morland, K V (2020) Multi-level learning of a quality management routine: a UK housebuilder case study. PhD thesis, University of Sheffield, UK.

Mwanaki Alinaitwe, H (2008) Improvement of labour performance and productivity in Uganda's building industry. PhD thesis, Lund University, Sweden.

Nakajima, T (1972) Modeling and optimization of the building process for systems building. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Namkung, T T (2020) Diffusion of renewable energy technology (RET) the effects of absorptive capacity (ACAP) in construction. PhD thesis, Temple University, USA.

Naoum, S G and Mustapha, F H (1995) Relationship between the building team, procurement methods and project performance. Journal of Construction Procurement, 1(1), pp. 50-63. ISSN 1358-9180

Niu, Y; Nwagboso, C; Proverbs, D and Olomolaiye, P (2004) Developing supply chain integration in building technologies cluster. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Ojo, A; Ogunsina, O and Ogunsemi, D R (2022) Assessment of cost management practices of civil engineering (project procurement) organisations in ondo state, Nigeria. Journal of Financial Management of Property and Construction, 27(1), pp. 57-75. ISSN 1366-4387

Pain, J (1988) Design-build and the traditional approach: A comparative study with particular reference to the JCT 'with contractor's design' 1981 form of contract. PhD thesis, University of Reading, UK.

Pan, W; Gibb, A G F and Dainty, A R J (2012) Strategies for integrating the use of off-site production technologies in house building. Journal of Construction Engineering and Management, 138(11), pp. 1331-1340. ISSN 0733-9364

Park, A (2022) Essays on the theory of bargaining and economics of matching platforms. PhD thesis, University of California, Los Angeles, USA.

Pennington, D E (1977) A cost analysis of the construction management method of school facility construction. EdD thesis, Indiana University, USA.

Pietroforte, R (1992) Communication and information in the building delivery process. PhD thesis, Massachusetts Institute of Technology, USA.

Pietroforte, R (1997) Communication and governance in the building process. Construction Management and Economics, 15(1), pp. 71-82. ISSN 01446193

Pontikis, K L (1998) Apartment building process: The design and construction of the korinthos apartment building in Cyprus. PhD thesis, University of California, Berkeley, USA.

Poon, J L K (2001) Development of a process model for the design stage of building projects. PhD thesis, University of Wolverhampton, UK.

Pourghazian, H (2008) Industrial construction methods for cost-effective and sustainable multi-storey buildings. PhD thesis, KTH Royal Institute of Technology, Sweden.

Praharaj, S and Han, H (2019) Building a typology of the 100 smart cities in India. Smart and Sustainable Built Environment, 8(5), pp. 400-414. ISSN 2046-6099

Prayoonhong, C (1995) An integrated information model for the building process. DArch thesis, University of Michigan, USA.

Rekola, M; Kojima, J and Mäkeläinen, T (2010) Towards integrated design and delivery solutions: Pinpointed challenges of process change. Architectural Engineering and Design Management, 6(4), pp. 264-278. ISSN 1745-2007

Renier, B and Volker, L (2008) The architect as a system integrator? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Roberts, W E (1985) An analysis of conflict arising between architects and school personnel when planning, designing, and constructing school facilities. EdD thesis, Northern Arizona University, USA.

Rohlman, R E (1978) Construction management: A comparison of management services, time, cost and supervision performance factors on public school projects in Michigan. PhD thesis, University of Michigan, USA.

Rosenfeld, Y; Warszawski, A and Laufer, A (1992) Using quality circles to raise productivity and quality of work life. Journal of Construction Engineering and Management, 118(1), pp. 17-33. ISSN 0733-9364

Roy, R; Low, M and Waller, J (2005) Documentation, standardization and improvement of the construction process in house building. Construction Management and Economics, 23(1), pp. 57-67. ISSN 01446193

Roy, R; Waller, J and Low, M (2002) Development of a process documentation system for the house-building industry. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Saari, A and Aalto, L (2006) Indoor environment quality contracts in building projects. Building Research & Information, 34(1), pp. 66-74. ISSN 0961-3218

Salah Eldeen Ismaeel Elsayed Ahmed, Walaa (2014) Developing a systemic framework for applying LEED system: Managing energy and materials credits. PhD thesis, Politecnico di Milano, Italy.

Samasoni, J and Rotimi, J O B (2016) Perceptions of regulatory building inspectors and designers on the proposed risk-based inspection regime in New Zealand. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Sandweiss, E T (1991) Construction and community in South St. Louis, 1850-1910. PhD thesis, University of California, Berkeley, USA.

Sandy, G C (1981) An evaluative comparison of the satisfaction with the utility of new buildings versus library additions and addition/renovations. PhD thesis, Florida State University, USA.

Sandy, T (2018) High-accuracy mobile manipulation for on-site robotic building construction. DSc thesis, ETH Zürich, Switzerland.

Sanvido, V; Grobler, F; Parfitt, K; Guvenis, M and Coyle, M (1992) Critical success factors for construction projects. Journal of Construction Engineering and Management, 118(1), pp. 94-111. ISSN 0733-9364

Sebastian, R (2010) Integrated design and engineering using building information modelling: A pilot project of small-scale housing development in the Netherlands. Architectural Engineering and Design Management, 6(2), pp. 103-110. ISSN 1745-2007

Sexton, J C (1999) Craftsmen, clients, and buildings: The domestic architecture of Guilford, Connecticut, 1689-1789. PhD thesis, Yale University, USA.

Shayboun, M; Kifokeris, D and Koch, C (2019) Construction planning with machine learning. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Sidwell, A C (1982) A critical study of project team organisational forms within the building process. PhD thesis, Aston University, UK.

Sidwell, A C (1983) An evaluation of management contracting. Construction Management and Economics, 1(1), pp. 47-55. ISSN 01446193

Siebken Schultz, C (2012) Construction production failure in a structural perspective: A study of reactive and proactive problem-solving practices. PhD thesis, Chalmers University of Technology, Sweden.

Smith, J; Georgiou, J; O’Keeffe, N and Love, P (2003) Design management in a design-construct organization. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Smith, Jim (2002) Strategic client briefing: A model for building project inception. PhD thesis, University of Melbourne, Australia.

Speer, S T (2023) Understanding the significance of building a school in Belize through action research. PhD thesis, University of Incarnate Word, USA.

Srinivasan, R S (2011) Re(de)fining net zero energy: Maximizing renewable resource use through emergy analysis of environmental building design. PhD thesis, University of Pennsylvania, USA.

Stankos, M A (2020) The nature of evidence utilized in healthcare architectural design decisions at five Midwestern critical access hospitals. PhD thesis, University of Missouri - Columbia, USA.

Steenhausen, P D (2003) Negotiating among mediators: Multiparty mediation in international politics. PhD thesis, University of Southern California, USA.

Stouffs, R (2001) Visualizing information structures and its impact on project teams: An information architecture for the virtual AEC company. Building Research & Information, 29(3), pp. 218-232. ISSN 0961-3218

Strand, S M (2003) The mase decision support system: Development of an integrated information system for the selection of environmentally preferable materials and products in the building process. DrIng thesis, Norges Teknisk-Naturvitenskapelige Universitet, Norway.

Sung, W-K (2017) Factors motivating construction safety knowledge sharing in online social media. PhD thesis, University of Hong Kong, Hong Kong.

Tasselli, Nicola (2023) BIM digital integration for existing buildings: Processes and tools to foster technological innovation of added-value building systems applied to the 20th century built asset in emilia-romagna. PhD thesis, Università degli Studi di Ferrara, Italy.

Tauber, G (2015) Architects and rural post-disaster housing: Lessons from south India. International Journal of Disaster Resilience in the Built Environment, 6(2), pp. 206-224. ISSN 1759-5916

Thuesen, C (2013) Pride and prejudice: Identity and collaboration in construction. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Tijhuis, W (1996) Contractors at work or into conflict? Lessons from international collaboration: Dutch experiences into German construction industry. PhD thesis, Eindhoven University of Technology, Netherlands.

Tombesi, P (1997) Travels from flatland: The Walt Disney concert hall and the specialization of design knowledge in the building sector. PhD thesis, University of California, Los Angeles, USA.

Tucker, S N and Ambrose, M D (1998) Innovation and evaluation in process improvement. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Tzoumis, K A (1992) The role of public involvement in managing political conflict: A comparative case study of public involvement activities in siting low-level radioactive waste disposal facilities. PhD thesis, Texas A&M University, USA.

Urup, L and Koch, C (2014) Recasting coordination: A theoretical review in the context of design-build project organisations. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Vakili-Ardebili, A and Boussabaine, A H (2007) Creating value through sustainable building design. Architectural Engineering and Design Management, 3(2), pp. 83-92. ISSN 1745-2007

Villacis Jr., J E (1999) The component architecture toolkit. PhD thesis, Indiana University, USA.

Wall, C M (2004) New ways of building: Architects, operatives and industrialised production in britain 1940-70. PhD thesis, University of Cambridge, UK.

Wang, J; Wang, X; Shou, W and Xu, B (2014) Integrating BIM and augmented reality for interactive architectural visualisation. Construction Innovation, 14(4), pp. 453-476. ISSN 1471-4175

Ward, B (2015) Integrated asset management systems for water infrastructure. EngD thesis, University of Exeter, UK.

Welch, J A (2024) Ancient Maya labor relations: Constructing a palace at Ucanha, Yucatán, Mexico. PhD thesis, Yale University, USA.

Wilkinson, S; Potangaroa, R; Cameron, R and Mitansha, M (2024) Improving disaster response: Combining organisational and individual resilience for improved outcomes. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Wood H L, P P F E R P (2013) Understanding complexity in the AEC industry. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Wright, C E (1980) The energy requirements of residential developments. PhD thesis, University of Surrey, UK.

Yang, F (2022) Ascending the pagoda: A ground-up exploration of the ancient construction methods of dayanta using virtual reality. PhD thesis, Ohio State University, USA.

Yu, H (2010) An integrated approach toward lean for production homebuilders. PhD thesis, University of Alberta, Canada.

Zhong, Q (1998) Building process modelling using product modelling methodology and its application to scheduling. PhD thesis, National University of Singapore, Singapore.

de Valence, Gerard and Runeson, Goran (2015) Graham Ive and the methodology of construction economics. Construction Management and Economics, 33(2), pp. 126-133. ISSN 01446193

Çhoker, G B (1985) Information system for building products. Journal of Construction Engineering and Management, 111(4), pp. 411-425. ISSN 0733-9364

This list was generated on Sat Aug 22 02:05:16 2026 UTC.