Items with Index Term: building contract
Alshawi, M A and Hope, A E (1989) Expert systems and contractual disputes: Extension of time under JCT 80. Construction Management and Economics, 7(1), pp. 65-74. ISSN 01446193
Au, Chung Yu Maria (2013) An optimal contract strategy in managing extension of time provisions in building contracts. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Ayus, A M B N (1992) Building contract claims: a comparative study (Scotland, England and Malaysia). PhD thesis, University of Aberdeen, UK.
Betts, M P (1987) Coordinated information retrieval for building contractors' tendering. PhD thesis, Polytechnic of the South Bank, UK.
Boudjabeur, S (1997) Design and build defined. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Chadee, A A; Martin, H; Chadee, X T; Bahadoorsingh, S and Olutoge, F (2023) Root cause of cost overrun risks in public sector social housing programs in sids: Fuzzy synthetic evaluation. Journal of Construction Engineering and Management, 149(11): 04023106, ISSN 0733-9364
Chan, A P C and Yeong, C M (1995) A comparison of strategies for reducing variations. Construction Management and Economics, 13(6), pp. 467-473. ISSN 01446193
Chan, C F P (2001) The development of construction law in singapore. PhD thesis, University of London, UK.
Chan, E H W and Au, M C Y (2008) Relationship between organizational sizes and contractors' risk pricing behaviors for weather risk under different project values and durations. Journal of Construction Engineering and Management, 134(9), pp. 673-680. ISSN 0733-9364
Cockerill, J E (1993) The construction industry in belfast 1800-1914. PhD thesis, Queen's University Belfast, UK.
Cooke, John Richard (1973) Methods of documentation and administration of building contracts. PhD thesis, University of New South Wales, Australia.
Coombe-Davies, M (1985) The laws on contract liability as they specifically relate to architectural practice. PhD thesis, University College Cardiff, UK.
Day, K D (1989) The administration of the 'botched' FIDIC contract: the problems arising out of the administration of a wrongly 'slanted' contract for turnkey projects. PhD thesis, University of Southampton, UK.
Deacon, H A and Kajimo-Shakantu, K (2024) The prevalence of claims under the JBCC principal building agreement in South Africa. International Journal of Construction Management, 24(3), pp. 331-338. ISSN 1562-3599
Eilers, H I (2015) Impact of sustainable business practices on strategic performance for commercial building contractors. PhD thesis, University of Kansas, USA.
Enshassi, A; Mohamed, S and Madi, I (2005) Factors affecting accuracy of cost estimation of building contracts in the Gaza Strip. Journal of Financial Management of Property and Construction, 10(2), pp. 115-125. ISSN 1366-4387
Ernest, K; Theophilus, A K; Amoah, P and Emmanuel, B B (2019) Identifying key economic indicators influencing tender price index prediction in the building industry: A case study of Ghana. International Journal of Construction Management, 19(2), pp. 106-112. ISSN 1562-3599
Felllows, R F (1988) Escalation management. PhD thesis, University of Reading, UK.
Flanagan, R and Norman, G (1985) Sealed bid auctions: An application to the building industry. Construction Management and Economics, 3(2), pp. 145-161. ISSN 01446193
Frame, S M (1969) A descriptive study of the relationship of an economic index and school construction bid economy in fourteen Southern California counties. EdD thesis, New Mexico State University, USA.
Fu, W K (2004) The effect of experience in construction contract bidding. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Fu, W K; Drew, D S and Lo, H P (2003) Competitiveness of inexperienced and experienced contractors in bidding. Journal of Construction Engineering and Management, 129(4), pp. 388-395. ISSN 0733-9364
Gatley, D (2004) A critical examination of building contracts in New Zealand: an investigation into the types of building contracts employed ; their formation and administration ; and into the incidence, nature and resolution of disputes resulting from their usage ; in the commercial and residential sectors of the construction industry in New Zealand. PhD thesis, RMIT University, Australia.
Glendinning, M (1991) 'Give the people homes!': Britain's multi-storey housing drive. PhD thesis, University of Edinburgh, UK.
Greenwood, D J and Shaglouf, A A (1997) Comparison between planned and actual durations in medium sized building projects. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Gunner, J and Skitmore, M (1999) Comparative analysis of pre-bid forecasting of building prices based on Singapore data. Construction Management and Economics, 17(5), pp. 635-646. ISSN 01446193
Gunner, J C (1997) A model of building price forecasting accuracy. PhD thesis, University of Salford, UK.
Hassanien, A (2003) Analysing hotel repositioning through property renovation in the hospitality industry. PhD thesis, University of Strathclyde, UK.
Hauptfleisch, A C (1989) The development of building process relationships with special reference to South Africa. PhD thesis, University of Pretoria, South Africa.
Hui, K J (2008) Court decisions on building contract disputes: a Coasian empirical analysis. PhD thesis, University of Hong Kong, Hong Kong.
Hulett, D A (2001) The disintegration and reintegration of building contractors' management systems. PhD thesis, University of Salford, UK.
Hutcheson, John M (1979) Administration of building contracts with particular reference to the builder's financial control. PhD thesis, University of New South Wales, Australia.
Kaka, A and Price, A D F (1991) Relationship between value and duration of construction projects. Construction Management and Economics, 9(4), pp. 383-400. ISSN 01446193
Kehinde, J O and Aiyetan, O A (2002) A study of the nature of contractual claims in building contracts in Nigeria. Journal of Financial Management of Property and Construction, 7(3), pp. 197-202. ISSN 1366-4387
Klopper, C H (1986) An investigation into and evaluation of the cost reimbursable basis for building contracts. DSc thesis, University of Pretoria, South Africa.
Kodikara, G W (1990) Data flow in building contractor organisations. PhD thesis, Loughborough University, UK.
Lim, E C (1996) The analysis of productivity in building construction. PhD thesis, Loughborough University, UK.
Loosemore, M (1994) Dealing with unexpected problems-do contracts help? A comparison of the NEC and JCT 80 forms. Engineering, Construction and Architectural Management, 1(2), pp. 115-137. ISSN 0969-9988
Lundkvist, R (2015) Experience feedback in industrialised house-building: The impact of production strategies. PhD thesis, LuleƄ University of Technology, Sweden.
Maritz, M J and Putlitz, U (2014) Standard form construction contracts; why the need for regular changes? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Martin, S D (1981) Building contracts in classical Roman law. PhD thesis, University of Michigan, USA.
McLernon, T (2014) A study of the management of time by comparing and evaluating the provisions for the management of time in the JCT standard building contract (JCT sbc), the new engineering and construction contract (nec3) and the new complex projects contract 2013 (cpc20. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Neale, R H and Light, L F (1982) A comparison of the reimbursement provided by the Series 1 and Series 2 NEDO formulae for thirteen building projects. Construction Papers, 1(3), pp. 21-25. ISSN 0144-8587
Ntiyakunze, S K (2011) Conflicts in building projets in Tanzania: Analysis of causes and management approaches. PhD thesis, KTH Royal Institute of Technology, Sweden.
Oduro Asamoah, R; Offei-Nyako, K and Twumasi-Ampofo, K (2023) Relative importance of triggers influencing cost contingency determination for building contracts: the perspective of quantity surveyors. International Journal of Construction Management, 23(5), pp. 790-798. ISSN 1562-3599
Oladimeji, O and Haddad, A N (2025) Corruption and factors influencing the viability of micro, small and medium scale construction firms (msmcfs). Journal of Financial Management of Property and Construction, 30(3), pp. 477-499. ISSN 1366-4387
Pain, J and Bennett, J (1988) JCT with contractor's design form of contract: A study in use. Construction Management and Economics, 6(4), pp. 307-337. ISSN 01446193
Persson, U (2009) Management of sustainability in construction works. PhD thesis, Lund University, Sweden.
Pryke, S and Pearson, S (2006) Project governance: Case studies on financial incentives. Building Research & Information, 34(6), pp. 534-545. ISSN 0961-3218
Rahman, A and Sainati, T (2021) Adapting standard forms of contract to facilitate building information modelling. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(3), pp. 110-118. ISSN 17514304
Raj, S; Hillig, J B and Hughes, W P (2009) Responsiveness to change by standard-form contract drafters in the construction industry: A case study of the FIDIC white book. International Journal of Law in the Built Environment, 1(3), pp. 205-220. ISSN 1756-1450
Rich, D (2014) On-site application of self-compacting concrete. EngD thesis, Loughborough University, UK.
Saari, A and Aalto, L (2006) Indoor environment quality contracts in building projects. Building Research & Information, 34(1), pp. 66-74. ISSN 0961-3218
Skinner, D W H (1979) An analysis of the utility of bills of quantities in the process of building contracting. PhD thesis, Aston University, UK.
Smith, D (2020) Rank and file union organising and employers' counter-mobilisation: The role of activists in the mobilisation of 'self-employed' construction workers. PhD thesis, University of the West of England, Bristol, UK.
Spencer, C A (2024) The contract, the contractor, and the capitalization of American building. PhD thesis, Massachusetts Institute of Technology, USA.
Tang, S L; Lee, H K and Wong, K (1997) Safety cost optimization of building projects in Hong Kong. Construction Management and Economics, 15(2), pp. 177-186. ISSN 01446193
Tennant, S and Fernie, S (2010) A contemporary examination of framework agreements. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Thiel, D J (2005) Builders: the social organisation of a construction site. PhD thesis, London School of Economics and Political Science, UK.
Thomas, C S (1994) Aspects of building contracts: A comparative view of english and french law in the light of potential harmonisation. PhD thesis, King's College London, UK.
Tiew, S Y (2025) Improving professional development through building contract administration (bca) framework of housing projects for graduate architects. Engineering, Construction and Architectural Management, 32(8), pp. 5272-5290. ISSN 0969-9988
Tiew, S Y (2025) Performance barriers and competence development of graduate architects in construction contract administration (cca): The mediating role of cca skills. Engineering, Construction and Architectural Management, 32(8), pp. 5609-5637. ISSN 0969-9988
Tiew, S Y; Hashim, H A and Zolkafli, U K B (2022) Performance barriers in relation with professional development of graduate architects in construction industry: A systematic literature review. Journal of Construction Business and Management, 5(2), pp. 29-43. ISSN 2521-0165
Wiguna, I P A (2005) The influence of risk on project performance in Indonesian building contracts. PhD thesis, University of Newcastle upon Tyne, UK.
Wiguna, I P A and Scott, S (2005) Nature of the critical risk factors affecting project performance in Indonesian building contracts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Wiguna, I P A and Scott, S (2006) Relating risk to project performance in Indonesian building contracts. Construction Management and Economics, 24(11), pp. 1125-1135. ISSN 1466433X
Williams, G A (1992) Contract as organisation: an economic analysis of the Joint Contracts Tribunal's Standard Form of Building contract 1980. PhD thesis, University of Newcastle upon Tyne, UK.
Wilson, N C (1978) Responsibility for building construction (with particular reference to a standard form of building contract as published for the Joint Contracts Tribunal). PhD thesis, University of Leeds, UK.
Yee, Tiew Si (2024) Developing a building contract administration framework for graduate architects managing housing projects. PhD thesis, University of Malaya, Malaysia.
de Leeuw, C P (1988) The pre-estimation of compensation payable in accordance with the contract price adjustment provisions of the building industry advisory council. DSc thesis, University of Pretoria, South Africa.