Items with Index Term: buildability

Number of items: 95.

Akintoye, A (2000) Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18(1), pp. 77-89. ISSN 01446193

Ballal, T M A (1999) The use of artificial neural networks for modelling buildability in preliminary structural design. PhD thesis, Loughborough University, UK.

Ballal, T M A and Sher, W D (2003) Artificial neural network for the selection of buildable structural systems. Engineering, Construction and Architectural Management, 10(4), pp. 263-271. ISSN 0969-9988

Bansal, V K and Pal, M (2011) Construction projects scheduling using GIS tools. International Journal of Construction Management, 11(1), pp. 1-18. ISSN 1562-3599

Brett-Jones, A T (1983) Barchester low rise: A case study of a management contract for remedial work to a large housing scheme. Construction Management and Economics, 1(2), pp. 91-117. ISSN 01446193

Buertey, J T; Dadadzogbor, E and Atsrim, F (2021) Procurement path influencing factors in Ghana: Managing the challenge of cultural shift. International Journal of Construction Management, 21(1), pp. 78-92. ISSN 1562-3599

Cheetham, D W and Lewis, J (2001) Productivity, buildability and constructability: Is work study the missing link? In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Chritamara, S; Ogunlana, S O and Luong Bach, N (2001) Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling. Engineering, Construction and Architectural Management, 8(5-6), pp. 381-392. ISSN 0969-9988

Durdyev, S and Mbachu, J (2011) On-site labour productivity of New Zealand construction industry: Key constraints and improvement measures. Construction Economics and Building, 11(3), pp. 18-33. ISSN 2204-9029

Finnie, D (2013) Comparison of time adjustment clauses between DZ3910, AS4000 and STCC. Construction Economics and Building, 13(1), pp. 66-84. ISSN 2204-9029

Finnie, D; Ali, N A and Park, K (2018) Enhancing off-site manufacturing through early contractor involvement (ECI) in New Zealand. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(4), pp. 176-185. ISSN 17514304

Finnie, D; Ali, N A and Park, K (2019) Design development post contract signing in New Zealand: Client's or contractor's cost? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(4), pp. 146-156. ISSN 17514304

Ganah, A A M (2003) Computer visualisation support for buildability. PhD thesis, Loughborough University, UK.

Ganah, A A M; Anumba, C J and Bouchlaghem, N M (2000) The use of visualization to communicate design information to construction sites. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Glass, J and Pepper, C (2005) Perceptions of precast concrete cladding in the UK market. Architectural Engineering and Design Management, 1(4), pp. 233-246. ISSN 1745-2007

Gray, C (1986) Intelligent' construction time and cost analysis. Construction Management and Economics, 4(2), pp. 135-150. ISSN 01446193

Griffith, A (1984) A critical investigation of factors influencing buildability and productivity. PhD thesis, Heriot-Watt University, UK.

Griffith, A and Sidwell, A C (1997) Development of constructability concepts, principles and practices. Engineering, Construction and Architectural Management, 4(4), pp. 295-310. ISSN 0969-9988

Gurmu, Argaw (2017) An investigation into construction management practices influencing labour productivity in multi-storey building projects. PhD thesis, University of Melbourne, Australia.

Hassan, Z (1997) CONPLAN: Construction planning and buildability evaluation in an integrated and intelligent construction environment. PhD thesis, University of Salford, UK.

Henderson, J R (2013) Enhancing buildability through improving design-construction feedback loops within complex projects. PhD thesis, Loughborough University, UK.

Henderson, J R; Ruikar, K and Dainty, A R J (2010) The need for embedding 'learning' in healthcare projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Henderson, J R; Ruikar, K D and Dainty, A R J (2013) The need to improve double-loop learning and design-construction feedback loops: A survey of industry practice. Engineering, Construction and Architectural Management, 20(3), pp. 290-306. ISSN 0969-9988

Hooper, A and Nicol, C (2000) Design practice and volume production in speculative housebuilding. Construction Management and Economics, 18(3), pp. 295-310. ISSN 01446193

Hyde, R (1995) Buildability as a design concept for architects: A case study of laboratory buildings. Engineering, Construction and Architectural Management, 2(1), pp. 45-56. ISSN 0969-9988

Ireland, V (1985) The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects. Construction Management and Economics, 3(1), pp. 59-87. ISSN 01446193

Jarkas, A M (2005) An investigation into the influence of buildability factors on productivity of in situ reinforced concrete construction. PhD thesis, University of Dundee, UK.

Jarkas, A M (2010) The influence of buildability factors on rebar fixing labour productivity of beams. Construction Management and Economics, 28(5), pp. 527-543. ISSN 1466433X

Jarkas, A M (2010) Buildability factors influencing formwork labour productivity of isolated foundations. Journal of Engineering, Design and Technology, 8(3), pp. 274-295. ISSN 1726-0531

Jarkas, A M (2010) The effects of buildability factors on rebar fixing labour productivity of isolated foundations. International Journal of Construction Management, 10(2), pp. 33-51. ISSN 1562-3599

Jarkas, A M (2010) Buildability factors influencing micro-level formwork labour productivity of slab panels in building floors. Architectural Engineering and Design Management, 6(3), pp. 161-174. ISSN 1745-2007

Jarkas, A M (2010) Buildability factors influencing formwork labour productivity of walls. International Journal of Construction Management, 10(4), pp. 101-117. ISSN 1562-3599

Jarkas, A M (2011) Buildability factors that influence micro-level formwork labour productivity of beams in building floors. Journal of Construction in Developing Countries, 16(1), pp. 1-18. ISSN 1823-6499

Jarkas, A M (2012) Influence of buildability factors on rebar installation labor productivity of columns. Journal of Construction Engineering and Management, 138(2), pp. 258-267. ISSN 0733-9364

Jarkas, A M (2012) Buildability factors influencing concreting labor productivity. Journal of Construction Engineering and Management, 138(1), pp. 89-97. ISSN 0733-9364

Jarkas, A M (2016) Effect of buildability on labor productivity: A practical quantification approach. Journal of Construction Engineering and Management, 142(2): 06015002, ISSN 0733-9364

Jarkas, A M (2017) Beamless or beam-supported building floors: Is buildability knowledge the missing link to improving productivity? Engineering, Construction and Architectural Management, 24(3), pp. 537-552. ISSN 0969-9988

Jergeas, G F (1989) Detailed design and constructability. PhD thesis, Loughborough University, UK.

Kifokeris, D and Xenidis, Y (2017) Constructability: Outline of past, present, and future research. Journal of Construction Engineering and Management, 143(8): 04017035, ISSN 0733-9364

Kong, A T and Gray, J (2006) Traditional procurement is too slow. Construction Economics and Building, 6(1), pp. 51-62. ISSN 2204-9029

Lam, G T W; Cheung, S O and Ng, S T (1999) The effectiveness of design and build conditions of contract. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Lam, P T I; Wong, F K W and Wong, F W H (2007) Building features and site-specific factors affecting buildability in Hong Kong. Journal of Engineering, Design and Technology, 5(2), pp. 129-147. ISSN 1726-0531

Lam, P T I and Wong, F W H (2009) Improving building project performance: How buildability benchmarking can help. Construction Management and Economics, 27(1), pp. 41-52. ISSN 1466433X

Lam, P T I and Wong, F W H (2011) A comparative study of buildability perspectives between clients, consultants and contractors. Construction Innovation, 11(3), pp. 305-320. ISSN 1471-4175

Lam, P T I; Wong, F W H; Chan, A P C; Shea, W C Y and Lau, J W S (2012) A scheme design buildability assessment model for building projects. Construction Innovation, 12(2), pp. 216-238. ISSN 1471-4175

Laovisutthichai, V; Lu, W and Low, S P (2025) Design for excellence (DfX) for high-rise modular buildings: from DfX considerations to module design guidelines using the case of Hong Kong. Architectural Engineering and Design Management, 21(3), pp. 430-449. ISSN 1745-2007

Leopold, E and Bishop, D (1983) Design philosophy and practice in speculative housebuilding: Part 1. Construction Management and Economics, 1(2), pp. 119-144. ISSN 01446193

Li, M (2024) Dfma-oriented rebar design optimization for reinforced concrete structures using graph neural network. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Lu, W; Tan, T; Xu, J; Wang, J; Chen, K; Gao, S and Xue, F (2021) Design for manufacture and assembly (DfMA) in construction: The old and the new. Architectural Engineering and Design Management, 17(1-2), pp. 77-91. ISSN 1745-2007

Luiten, G T and Fischer, M A (1998) Opportunities for computer-aided design for construction. Engineering, Construction and Architectural Management, 5(2), pp. 127-136. ISSN 0969-9988

Maneschi, K and Melhado, S (2010) Scope of design for production of partition walls and facade coverings. Architectural Engineering and Design Management, 6(1), pp. 3-17. ISSN 1745-2007

Marinelli, M (2022) A dfx-based approach for incorporating sustainability in infrastructure project planning. Built Environment Project and Asset Management, 12(1), pp. 20-37. ISSN 2044-124X

Masera, M (1999) An innovative planning technique in quality management. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Mishra, S K; Upadhyay, B and Das, B B (2026) Exploring the role of metakaolin in binary and ternary blended 3D printable mortars: Deep insights into printability. International Journal of Construction Management, 26(2), pp. 185-203. ISSN 1562-3599

Mkandawire, K; Kabiri, S and Connaughton, J (2023) Knowledge transaction between offsite and onsite interfaces. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Mkandawire, K; Kabiri, S; Mbugua, L and Connaughton, J (2022) Managing interfaces between offsite and onsite construction. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Moore, D (1996) Buildability assessment and the development of an automated design aid for managing the transfer of construction process knowledge. Engineering, Construction and Architectural Management, 3(1-2), pp. 29-46. ISSN 0969-9988

Moore, D (1996) The renaissance: The beginning of the end for implicit buildability. Building Research & Information, 24(5), pp. 259-269. ISSN 0961-3218

Moore, D R (1996) Task difficulty assessment: a contribution towards improved buildability through simplification. PhD thesis, De Montfort University, UK.

Moore, D R (1997) An examination of the experimental design process with regard to tolerance requirement general theory. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Morris, J (1999) Improving construction design: the lean thinking paradigm. PhD thesis, Cranfield University, UK.

Ndoni, D and Elhag, T M S (2012) Improving project performance of PPP/PFI project-based organisations. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Nima, M A; Abdul-Kadir, M R; Jaafar, M S and Alghulami, R G (2001) Constructability implementation: A survey in the Malaysian construction industry. Construction Management and Economics, 19(8), pp. 819-829. ISSN 01446193

Noruwa, B I (2020) Application and effects of emerging technologies on variation minimisation in the UK construction projects. PhD thesis, Coventry University, UK.

Osuizugbo, I C (2021) The need for and benefits of buildability analysis: Nigeria as a case study. Journal of Engineering, Design and Technology, 19(5), pp. 1207-1230. ISSN 1726-0531

Osuizugbo, I C (2024) Factors impeding the implementation of buildability assessment in building construction industry. Journal of Engineering, Design and Technology, 22(6), pp. 1825-1846. ISSN 1726-0531

Osuizugbo, I C (2025) Measures for improving the buildability of building designs in construction industry. Construction Innovation, 25(2), pp. 490-509. ISSN 1471-4175

Osuizugbo, I C; Aina, O O and Onokwai, A O (2023) Roles of clients in buildability improvement in Nigeria: An exploratory factor analysis. Built Environment Project and Asset Management, 13(6), pp. 862-879. ISSN 2044-124X

Osuizugbo, I C; Okolie, K C and Oshodi, O S (2024) Factors supporting the implementation of buildability assessment as a tool for buildability improvement. Journal of Engineering, Design and Technology, 22(3), pp. 879-900. ISSN 1726-0531

Osuizugbo, I C; Okolie, K C; Oshodi, O S and Oyeyipo, O O (2023) Buildability in the construction industry: A systematic review. Construction Innovation, 23(5), pp. 1300-1322. ISSN 1471-4175

Osuizugbo, I C; Okolie, K C and Oyeyipo, O O (2023) Factors influencing buildability assessment implementation in the Nigerian construction industry. Construction Innovation, 23(5), pp. 917-938. ISSN 1471-4175

Osuizugbo, I C; Omer, M M; Rahman, R A and Oshodi, O S (2024) A systematic search and review of early contractor involvement in construction project development. Built Environment Project and Asset Management, 14(6), pp. 835-857. ISSN 2044-124X

Osuizugbo, I C; Onokwai, A O and Faleti, O O (2025) Principal factor analysis of project designers' roles in improving construction projects buildability in Nigeria. Journal of Engineering, Design and Technology, 23(1), pp. 88-107. ISSN 1726-0531

Osuizugbo, I C and Oshodi, O S (2023) Buildability attributes for improving the practice of construction management in Nigeria. Built Environment Project and Asset Management, 13(2), pp. 270-289. ISSN 2044-124X

Pavitt, T C (2002) Managing construction interfaces within the building facade. PhD thesis, Loughborough University, UK.

Pham, L T; Nguyen, T; Trinh, T; Nguyen, A; Do, Q; Bui, B and Xiao, J (2023) Development of 3D printers for concrete structures: Mix proportion design approach and laboratory testing. Smart and Sustainable Built Environment, 12(5), pp. 1056-1073. ISSN 2046-6099

Poh, P S H and Chen, J (1998) The Singapore buildable design appraisal system: A preliminary review of the relationship between buildability, site productivity and cost. Construction Management and Economics, 16(6), pp. 681-692. ISSN 01446193

Reaney, M; Griffith, A; Watson, P A and Ellis, C (2001) Construction cost control implications for the planning application process. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Ren, Z; Kwaw, P and Yang, F (2012) Ghana's public procurement reform and the continuous use of the traditional procurement system: The way forward. Built Environment Project and Asset Management, 2(1), pp. 56-69. ISSN 2044-124X

Rodrigues, M R and Lindhard, S M (2023) Benefits and challenges to applying IPD: Experiences from a Norwegian mega-project. Construction Innovation, 23(2), pp. 287-305. ISSN 1471-4175

Rogan, A (1999) Inter-organisational relationships in the construction process. PhD thesis, University of the West of England, Bristol, UK.

Root, D; Fernie, S and Baldwin, A N (1999) The languages of product and service: Barriers to the integration of construction and design. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Saghatforoush, Ehsan (2014) Extension of constructability to include operation and maintenance for infrastructure projects. PhD thesis, Queensland University of Technology, Australia.

Salter, A and Torbett, R (2003) Innovation and performance in engineering design. Construction Management and Economics, 21(6), pp. 573-580. ISSN 01446193

Samarasinghe, D A S and Piri, I S (2022) Assessing design buildability through virtual reality from the perspective of construction students. Built Environment Project and Asset Management, 12(5), pp. 823-836. ISSN 2044-124X

Tarekegn Gurmu, A (2023) Preconstruction phase management practices enhancing labor productivity in multistory building projects. Journal of Construction Engineering and Management, 149(6): 04023032, ISSN 0733-9364

Taylor, M D; Fisher, A and Wamuziri, S C (2009) A comparison of modern methods of bathroom construction: A project case study. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Towner, M and Baccarini, D (2008) Risk pricing in construction tenders: how, who, what. Construction Economics and Building, 8(1), pp. 49-60. ISSN 2204-9029

Trigunarsyah, B (2004) Constructability practices among construction contractors in Indonesia. Journal of Construction Engineering and Management, 130(5), pp. 656-669. ISSN 0733-9364

Whitehead, R C (1995) Factors influencing labour productivity on construction sites. PhD thesis, University of Dundee, UK.

Wong, F W H; Lam, P T I and Shen, L Y (2004) A dynamic design management system for improving buildability of construction. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Wong, W H (2007) Developing and implementing an empirical system for scoring buildability of designs in the Hong Kong construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yang, Y (2004) Modeling a decision support system for buildable designs. PhD thesis, National University of Singapore, Singapore.

Yoon, J; Yu, I and Jung, D (2018) Factors needed for the development of a constructability assessment model for building renovation and extension in Korea. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Zou, P X W; Redman, S and Windon, S (2008) Case studies on risk and opportunity at design stage of building projects in australia: Focus on safety. Architectural Engineering and Design Management, 4(3-4), pp. 221-238. ISSN 1745-2007

This list was generated on Sat Aug 22 02:12:20 2026 UTC.