Items with Index Term: bridge design

Number of items: 16.

Aktas, E (2001) Structural design code calibration using reliability-based cost optimization. PhD thesis, University of Pittsburgh, USA.

Amponsah, I (2008) Emerging civil infrastructure and environmental sustainability: Life-cycle assessment and multiobjective optimization. PhD thesis, University of South Carolina, USA.

Bai, Y and Burkett, W R (2006) Rapid bridge replacement: Processes, techniques, and needs for improvements. Journal of Construction Engineering and Management, 132(11), pp. 1139-1147. ISSN 0733-9364

Balogun, T B (2018) Integrating bridge maintenance life cycle assessments into bridge design for improved sustainable decision making. PhD thesis, University of the West of England, Bristol, UK.

Ekström, D (2019) Integrated structural and construction engineering: a study of project team performance in Swedish bridge design. PhD thesis, Chalmers University of Technology, Sweden.

Ekström, D; Rempling, R and Plos, M (2019) Integrated project team performance in early design stages: performance indicators influencing effectiveness in bridge design. Architectural Engineering and Design Management, 15(4), pp. 249-266. ISSN 1745-2007

El-Diraby, T E-S (1997) System for evaluating bridge construction plans. PhD thesis, University of Texas at Austin, USA.

Ghodoosi, F; Abu-Samra, S; Zeynalian, M and Zayed, T (2018) Maintenance cost optimization for bridge structures using system reliability analysis and genetic algorithms. Journal of Construction Engineering and Management, 144(2): 04017116, ISSN 0733-9364

Halfawy, M M R (1998) A multi-agent collaborative framework for concurrent design of constructed facilities. PhD thesis, Ohio State University, USA.

Jonnalagadda, S (2016) Artificial neural networks, non linear auto regression networks (NARX) and causal loop diagram approaches for modelling bridge infrastructure conditions. PhD thesis, Clemson University, USA.

Li, M; Zheng, Q and Ashuri, B (2024) Application of artificial intelligence in design automation: A two-stage framework for structure configuration and design. Journal of Construction Engineering and Management, 150(8): 04024083, ISSN 0733-9364

Loper, J H; Marquis, E L and Rhomberg, E J (1988) Precast prestressed long-span bridges. Journal of Construction Engineering and Management, 114(1), pp. 95-103. ISSN 0733-9364

Markiz, N and Jrade, A (2022) Integrating an expert system with brims, cost estimation, and linear scheduling at conceptual design stage of bridge projects. International Journal of Construction Management, 22(5), pp. 913-928. ISSN 1562-3599

Sarah Slaughter, E and Shimizu, H (2000) 'Clusters' of innovations in recent long span and multi-segmental bridges. Construction Management and Economics, 18(3), pp. 269-280. ISSN 01446193

Schexnayder, C; Alarcón, L F; Antillo, E D; Morales, B C and Lopez, M (2014) Observations on bridge performance during the Chilean earthquake of 2010. Journal of Construction Engineering and Management, 140(4): B4013001, ISSN 0733-9364

Yang, C (2023) Reliability-based methodology for design and evaluation of concrete bridge decks. PhD thesis, Rutgers The State University of New Jersey, School of Graduate Studies, USA.

This list was generated on Sat Aug 22 02:10:26 2026 UTC.