Items with Index Term: bridge construction
Abd El-Razek, M E and Basha, I M (2001) Constructability improvement of bridges using stepping formwork. Journal of Construction Engineering and Management, 127(3), pp. 206-213. ISSN 0733-9364
Anglade, Y J (1998) Development of methodology for highway agencies to follow in establishing optimum acceptance plans for pavements. PhD thesis, University of Florida, USA.
Ataei, S and Jafari, A (2026) Comparative environmental impact assessment of 3D concrete printing and precast techniques in bridge construction: A case study analysis. Journal of Construction Engineering and Management, 152(1): 05025018, ISSN 0733-9364
Attara, M G (2015) Predicting cost overrun of railroad bridge construction. PhD thesis, Rutgers The State University of New Jersey - New Brunswick, USA.
Aviram Traubita, A (2009) Structural response and cost characterization of bridge construction using seismic performance enhancement strategies. PhD thesis, University of California, Berkeley, USA.
Bai, Y and Burkett, W R (2006) Rapid bridge replacement: Processes, techniques, and needs for improvements. Journal of Construction Engineering and Management, 132(11), pp. 1139-1147. ISSN 0733-9364
Bai, Y; Burkett, W R and Nash, P T (2006) Lessons learned from an emergency bridge replacement project. Journal of Construction Engineering and Management, 132(4), pp. 338-344. ISSN 0733-9364
Basha, I M and Gab-Allah, A A (1991) Value engineering in Egyptian bridge construction. Journal of Construction Engineering and Management, 117(3), pp. 393-401. ISSN 0733-9364
Besklubova, S; Skibniewski, M J and Zhang, X (2021) Factors affecting 3D printing technology adaptation in construction. Journal of Construction Engineering and Management, 147(5): 2034, ISSN 0733-9364
Chan, W H and Lu, M (2008) Materials handling system simulation in precast viaduct construction: Modeling, analysis, and implementation. Journal of Construction Engineering and Management, 134(4), pp. 300-310. ISSN 0733-9364
Choudhry, R M; Aslam, M A and Arain, F M (2014) Cost and schedule risk analysis of bridge construction in Pakistan: Establishing risk guidelines. Journal of Construction Engineering and Management, 140(7): 04014020, ISSN 0733-9364
Dang, C N; Le-Hoai, L; Kim, S-Y; Nguyen, C V; Lee, Y-D and Lee, S-H (2017) Identification of risk patterns in Vietnamese road and bridge construction: Contractor's perspective. Built Environment Project and Asset Management, 7(1), pp. 59-72. ISSN 2044-124X
Ekanayake, E M A C; Xue, J; Shen, G Q and Kumaraswamy, M M (2021) Dynamic supply chain vulnerability analysis of Hong Kong-Zhuhai-Macao Bridge construction: A topic modelling approach. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Ekström, D (2019) Integrated structural and construction engineering: a study of project team performance in Swedish bridge design. PhD thesis, Chalmers University of Technology, Sweden.
Ekström, D; Rempling, R and Plos, M (2019) Integrated project team performance in early design stages: performance indicators influencing effectiveness in bridge design. Architectural Engineering and Design Management, 15(4), pp. 249-266. ISSN 1745-2007
El-Diraby, T E and O'Connor, J T (2001) Model for evaluating bridge construction plans. Journal of Construction Engineering and Management, 127(5), pp. 399-405. ISSN 0733-9364
El-Diraby, T E-S (1997) System for evaluating bridge construction plans. PhD thesis, University of Texas at Austin, USA.
Fash, M F (2024) Development of a femalized kinesthetic learning model to increase architecture, engineering, and construction (AEC) career interests in African American middle school girls. PhD thesis, North Carolina Agricultural and Technical State University, USA.
Fernando, N; T.A, K D and Zhang, H (2024) An artificial neural network (ann) approach for early cost estimation of concrete bridge systems in developing countries: The case of Sri Lanka. Journal of Financial Management of Property and Construction, 29(1), pp. 23-51. ISSN 1366-4387
Ghaeli, M R (1998) Pavement and bridge cost allocation analysis of the Intario intercity highway network. PhD thesis, University of Waterloo, USA.
Guo, K; Minchin, E and Ferragut, T (2005) The shift to warranties and performance specifications: What of method specifications? Construction Management and Economics, 23(9), pp. 953-963. ISSN 01446193
Hampson, K and Fischer, M (1997) Structural designs and construction technologies for California highway bridges. Journal of Construction Engineering and Management, 123(3), pp. 269-275. ISSN 0733-9364
Hampson, K and Tatum, C B (1997) Technology strategy and competitive performance in bridge construction. Journal of Construction Engineering and Management, 123(2), pp. 153-161. ISSN 0733-9364
Hampson, K D (1994) Technology strategy and competitive performance: A study of bridge construction. PhD thesis, Stanford University, USA.
Harryson, P (2008) Industrial bridge engineering: structural developments for more efficient bridge construction. PhD thesis, Chalmers University of Technology, Sweden.
Hashemi, H; Mousavi, S M and Mojtahedi, S M H (2011) Bootstrap technique for risk analysis with interval numbers in bridge construction projects. Journal of Construction Engineering and Management, 137(8), pp. 600-608. ISSN 0733-9364
Helaly, H.; El-Rayes, K. and Ignacio, E. J. (2026) Multiobjective optimization for the planning of prefabricated bridge construction projects. Journal of Construction Engineering and Management, 152(8): 04026103, ISSN 0733-9364
Helaly, H; El-Rayes, K; Ignacio, E J and Joan, H J (2025) Comparison of machine-learning algorithms for estimating cost of conventional and accelerated bridge construction methods during early design phase. Journal of Construction Engineering and Management, 151(3): 04025004, ISSN 0733-9364
Hu, F; Liao, R and Chen, J (2023) Calculation methods to optimize the number of pedestals and evaluate production plans for precast yards fabricating prestressed bridge beams and precast segments for poststressed segmental erection. Journal of Construction Engineering and Management, 149(1): 04022146, ISSN 0733-9364
Huh, Y (2004) Highway bridge construction production rates for time estimation. PhD thesis, University of Texas at Austin, USA.
Jaselskis, E J; Gao, Z and Walters, R C (2005) Improving transportation projects using laser scanning. Journal of Construction Engineering and Management, 131(3), pp. 377-384. ISSN 0733-9364
Javanmardi, A; Abbasian-Hosseini, S A; Liu, M and Hsiang, S M (2020) Improving effectiveness of constraints removal in construction planning meetings: Information-theoretic approach. Journal of Construction Engineering and Management, 146(4): 04020015, ISSN 0733-9364
Jen, H (2005) Web-based construction process simulation framework. PhD thesis, Purdue University, USA.
Jia, B; Yang, Y; Xie, B and Yu, X (2021) Novel geometric control technology for precast segmental bridges. Journal of Construction Engineering and Management, 147(4): 04021006, ISSN 0733-9364
Jones, S H and Armanios, D E (2020) Methodological framework and feasibility study to assess social equity impacts of the built environment. Journal of Construction Engineering and Management, 146(11): 05020016, ISSN 0733-9364
Kim, B S and Hong, T (2012) Revised case-based reasoning model development based on multiple regression analysis for railroad bridge construction. Journal of Construction Engineering and Management, 138(1), pp. 154-162. ISSN 0733-9364
Kim, K and Cho, Y K (2021) Automatic recognition of workers' motions in highway construction by using motion sensors and long short-term memory networks. Journal of Construction Engineering and Management, 147(3): 04020184, ISSN 0733-9364
Kim, S (2008) Development of a wireless real-time productivity measurement system for rapid construction operations. PhD thesis, University of Kansas, USA.
Larsson, J; Lu, W; Krantz, J and Olofsson, T (2016) Discrete event simulation analysis of product and process platforms: A bridge construction case study. Journal of Construction Engineering and Management, 142(4): 04015097, ISSN 0733-9364
Larsson, J and Simonsson, P (2012) Barriers and drivers for increased use of off-site bridge construction in Sweden. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Le, N. D.; Tran, D. and Williams, N. J. (2026) Exploring competencies for bridge construction inspectors. Journal of Construction Engineering and Management, 152(9): 04026137, ISSN 0733-9364
Lenderink, B; Halman, J I M; Boes, H and Voordijk, H (2020) A method to encourage and assess innovations in public tenders for infrastructure and construction projects. Construction Innovation, 20(2), pp. 171-189. ISSN 1471-4175
Liu, J and Lu, M (2020) Synchronized optimization of various management-function schedules in a multiproject environment: Case study of planning steel girder fabrication projects in bridge construction. Journal of Construction Engineering and Management, 146(5): 05020002, ISSN 0733-9364
Liu, K and El-Gohary, N (2022) Bridge deterioration knowledge ontology for supporting bridge document analytics. Journal of Construction Engineering and Management, 148(6): 04022030, ISSN 0733-9364
Ma, L; Guo, H and Fang, Y (2021) Analysis of construction workers' safety behavior based on Myers-Briggs type indicator personality test in a bridge construction project. Journal of Construction Engineering and Management, 147(1): 04020149, ISSN 0733-9364
Mariaca Clavel, Israel Simon (2025) Dynamic construction scheduling: Utilizing AI data automation in a BIM-integrated serious game framework. PhD thesis, University College London, UK.
Marinelli, M D L F N L S (2015) Non-parametric bill-of-quantities estimation of concrete road bridge superstructure: An artificial neural networks approach. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Markiz, N and Jrade, A (2022) Integrating an expert system with brims, cost estimation, and linear scheduling at conceptual design stage of bridge projects. International Journal of Construction Management, 22(5), pp. 913-928. ISSN 1562-3599
Micelli, E (2000) Mobilizing the skills of specialist firms to reduce costs and enhance performance in the European construction industry: Two case studies. Construction Management and Economics, 18(6), pp. 651-656. ISSN 01446193
Minchin, R E; Li, X; Issa, R R and Vargas, G G (2013) Comparison of cost and time performance of design-build and design-bid-build delivery systems in Florida. Journal of Construction Engineering and Management, 139(10): 04013007, ISSN 0733-9364
Minchin Jr, R E; Lewis, D W and McLeod, L (2011) Improving productivity on a troubled bridge project. Journal of Construction Engineering and Management, 137(5), pp. 364-371. ISSN 0733-9364
Mohammed, A W (2016) Agent-based modeling of abc methods for decisionmaking in highway bridge projects including uncertainty and several stakeholders. PhD thesis, Western Michigan University, USA.
Mondorf, P E; Kuprenas, J A and Kordahi, E N (1997) Segmental cantilever bridge construction case study. Journal of Construction Engineering and Management, 123(1), pp. 79-84. ISSN 0733-9364
Nani, G; Mensah, I and Adjei-Kumi, T (2017) Duration estimation model for bridge construction projects in Ghana. Journal of Engineering, Design and Technology, 15(6), pp. 754-777.
Nibbelink, J-G; Sutrisna, M and Zaman, A U (2017) Unlocking the potential of early contractor involvement in reducing design risks in commercial building refurbishment projects: a Western Australian perspective. Architectural Engineering and Design Management, 13(6), pp. 439-456. ISSN 1745-2007
O'Connor, J T and Huh, Y (2005) Crew production rates for contract time estimation: Bent footing, column, and cap of highway bridges. Journal of Construction Engineering and Management, 131(9), pp. 1013-1020. ISSN 0733-9364
O'Connor, J T and Huh, Y (2006) Crew production rates for contract time estimation: Beam erection, deck, and rail of highway bridges. Journal of Construction Engineering and Management, 132(4), pp. 408-415. ISSN 0733-9364
Ongkowijoyo, C S; Gurmu, A and Andi, A (2021) Investigating risk of bridge construction project: Exploring suramadu strait-crossing cable-stayed bridge in Indonesia. International Journal of Disaster Resilience in the Built Environment, 12(1), pp. 127-142. ISSN 1759-5916
Park, M and Peña-Mora, F (2004) Reliability buffering for construction projects. Journal of Construction Engineering and Management, 130(5), pp. 626-637. ISSN 0733-9364
Park, T; Kim, M K; Kim, C and Kim, H (2009) Interactive 3D CAD for effective derrick crane operation in a cable-stayed bridge construction. Journal of Construction Engineering and Management, 135(11), pp. 1261-1270. ISSN 0733-9364
Poh, Y P (2005) Knowledge-based integrated project duration-cost risk simulation model. PhD thesis, London South Bank University, UK.
Rho, J-J (1994) A systems engineering model for implementing automation technology into a construction process. PhD thesis, University of Houston, USA.
Rowings, J E and Kaspar, S L (1991) Constructability of cable-stayed bridges. Journal of Construction Engineering and Management, 117(2), pp. 259-278. ISSN 0733-9364
Russell, A D and Caselton, W F (1988) Extensions to linear scheduling optimization. Journal of Construction Engineering and Management, 114(1), pp. 36-52. ISSN 0733-9364
Rwamamara, R A (2007) Planning the healthy construction workplace through risk assessment and design methods. PhD thesis, Luleå University of Technology, Sweden.
Sarisley, E F (1990) Construction methods and costs of stress-laminated timber bridges. Journal of Construction Engineering and Management, 116(3), pp. 432-447. ISSN 0733-9364
Sarkar, D (2018) Hybrid approach for resource optimization and management of bridge projects using bootstrap technique and genetic algorithm. International Journal of Construction Management, 18(3), pp. 207-220. ISSN 1562-3599
Sebastian, R; Claeson-Jonsson, C and Di Giulio, R (2013) Performance-based procurement for low-disturbance bridge construction projects. Construction Innovation, 13(4), pp. 394-409. ISSN 1471-4175
Shrestha, K J; Jeong, H D and Gransberg, D D (2017) Multidimensional highway construction cost indexes using dynamic item basket. Journal of Construction Engineering and Management, 143(8): 04017036, ISSN 0733-9364
Shrestha, S; Shan, Y and Goodrum, P M (2024) Identification of best practices in project bundling for state dots using semistructured interviews. Journal of Construction Engineering and Management, 150(7): 04024056, ISSN 0733-9364
Stewart, P J (2000) Strategic IT maturity of construction companies. PhD thesis, Royal Melbourne Institute of Technology, Australia.
Swiggum, K E; Anderson, S D and Russell, J S (1994) Case study of burlington cable-stayed bridge. Journal of Construction Engineering and Management, 120(3), pp. 649-666. ISSN 0733-9364
Tah, J H M; Carr, V and Howes, R (1998) An application of case-based reasoning to the planning of highway bridge construction. Engineering, Construction and Architectural Management, 5(4), pp. 327-338. ISSN 0969-9988
Thomas, H R; Horman, M J; Minchin Jr, R E and Chen, D (2003) Improving labor flow reliability for better productivity as lean construction principle. Journal of Construction Engineering and Management, 129(3), pp. 251-261. ISSN 0733-9364
Vasserman, S (2019) Essays on industrial organization. PhD thesis, Harvard University, USA.
Vilventhan, A and Kalidindi, S N (2016) Interrelationships of factors causing delays in the relocation of utilities: A cognitive mapping approach. Engineering, Construction and Architectural Management, 23(3), pp. 349-368. ISSN 0969-9988
Vilventhan, A and Rajadurai, R (2020) 4D bridge information modelling for management of bridge projects: A case study from India. Built Environment Project and Asset Management, 10(3), pp. 423-435. ISSN 2044-124X
Walter, L and Styhre, A (2013) The role of organizational objects in construction projects: The case of the collapse and restoration of the Tjörn Bridge. Construction Management and Economics, 31(12), pp. 1172-1185. ISSN 1466433X
Willar, D; Estrellita Varina Yanti, W; Daisy Debora Grace, P and Rudolf Estephanus Golioth, M (2021) Sustainable construction practices in the execution of infrastructure projects: The extent of implementation. Smart and Sustainable Built Environment, 10(1), pp. 106-124. ISSN 2046-6099
Yuan, W; Yang, R; Yu, J; Zeng, Q and Yao, Z (2023) Control method of spray curing system for cement concrete members based on the adaboost.M1 algorithm. Construction Innovation, 23(1), pp. 178-192. ISSN 1471-4175
Zaeri, F (2017) Exploring the potential for the application of simulation methods in construction project delivery in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.
Zhang, J and El-Diraby, T E (2006) Constructability analysis of the bridge superstructure rotation construction method in China. Journal of Construction Engineering and Management, 132(4), pp. 353-362. ISSN 0733-9364
Zhu, L; Cheung, S O; Gao, X; Li, Q and Liu, G (2020) Success DNA of a record-breaking megaproject. Journal of Construction Engineering and Management, 146(8): 05020009, ISSN 0733-9364
Zhu, Y; Brigham, J C and Fascetti, A (2025) Lidar-rgb data fusion for four-dimensional uav-based monitoring of reinforced concrete bridge construction: Case study of the fern hollow bridge reconstruction. Journal of Construction Engineering and Management, 151(1): 05024016, ISSN 0733-9364
Up a level