Items with Index Term: bidding

Number of items: 547.

Ab Rani, N I; Ismail, S; Mohamed, Z; Hussain, A H and Ghafourian, K (2018) Local contractors' awareness on competitiveness towards liberalisation and globalisation in the Malaysian construction industry. Journal of Construction in Developing Countries, 23(1), pp. 21-42. ISSN 1823-6499

Abdel-Galil, E; Ibrahim, A H and Alborkan, A (2022) Assessment of transaction costs for construction projects. International Journal of Construction Management, 22(9), pp. 1618-1631. ISSN 1562-3599

Abdelghafar, A (2024) Identifying challenges, best practices, and potential solutions to NYCSCA project delays. DBA thesis, Touro University Worldwide, USA.

Abdollahipour, S (2013) Multi-parameter bidding in highway construction and rehabilitation projects. PhD thesis, Oklahoma State University, USA.

Aboneh, A and Mahesh, G (2025) Understanding the key factors of operating environment for small and medium contractors in the developing economies: The case of Ethiopia. Journal of Engineering, Design and Technology, 23(1), pp. 69-87. ISSN 1726-0531

Aboseif, E and Hanna, A S (2024) Benchmarking of construction projects performance for comparative assessment and performance improvement: A statistical quantitative approach. Engineering, Construction and Architectural Management, 31(7), pp. 2829-2851. ISSN 0969-9988

Abotaleb, I S (2018) Construction dispute mitigation: quantitative and qualitative analytic approach with a focus on bidding, out-of-sequence work, and contract analysis. PhD thesis, University of Tennessee, USA.

Abotaleb, I S and El-Adaway, I H (2017) Construction bidding markup estimation using a multistage decision theory approach. Journal of Construction Engineering and Management, 143(1): 04016079, ISSN 0733-9364

Abourizk, S M and Dozzi, S P (1993) Application of computer simulation in resolving construction disputes. Journal of Construction Engineering and Management, 119(2), pp. 355-373. ISSN 0733-9364

Abu-Shabeen, N N (2008) Development of multi-criteria decision analysis models for bidding and contractor selection. PhD thesis, Edinburgh Napier University, UK.

Adio, Obafemi Adekunle (2022) An automated knowledge-based decision support system for managing non-conformances on australia's large infrastructure projects. PhD thesis, University of Melbourne, Australia.

Aduwo, E B; Ibem, E O; Afolabi, A O; Oluwnmi, A O; Tunji-Olayeni, P F; Ayo-Vaughan, E A; Uwakonye, U O and Oni, A A (2020) Exploring anti-corruption capabilities of e-procurement in construction project delivery in Nigeria. Construction Economics and Building, 20(1), pp. 56-76. ISSN 2204-9029

Ahadzi, M and Bowles, G (2004) Public-private partnerships and contract negotiations: An empirical study. Construction Management and Economics, 22(9), pp. 967-978. ISSN 01446193

Ahadzi, M K (2004) Public private partnerships in infrastructure procurement: A generic multi-attribute hierarchical model for minimising pre-contract time and cost overruns (GMAHM). PhD thesis, Heriot-Watt University, UK.

Ahmad, I U (1988) Bidding strategy: Multicriteria decision-making approach. PhD thesis, University of Cincinnati, USA.

Ahmed, M O; El-Adaway, I H and Caldwell, A (2024) Comprehensive understanding of factors impacting competitive construction bidding. Journal of Construction Engineering and Management, 150(4): 04024017, ISSN 0733-9364

Ahmed, M O; El-Adaway, I H; Coatney, K T and Eid, M S (2016) Construction bidding and the winner's curse: Game theory approach. Journal of Construction Engineering and Management, 142(2): 04015076, ISSN 0733-9364

Ahmed, M O and El-adaway, I H (2023) An integrated game-theoretic and reinforcement learning modeling for multi-stage construction and infrastructure bidding. Construction Management and Economics, 41(3), pp. 183-207. ISSN 01446193

Ahn, C (2012) An integrated framework for sustainable construction processes: Understanding and managing the environmental performance of construction operations. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Aje, I O; Oladinrin, T O and Nwaole, A N C (2016) Factors influencing success rate of contractors in competitive bidding for construction works in South-East, Nigeria. Journal of Construction in Developing Countries, 21(1), pp. 19-34. ISSN 1823-6499

Akanmu, A A (2012) Towards cyber-physical systems integration in construction. PhD thesis, Pennsylvania State University, USA.

Al-Kaisy, A and Nassar, K (2005) Nighttime construction issues revisited. Journal of Construction Research, 6(1), pp. 139-156. ISSN 1609-9451

Al-Sharif, F F A (2007) Financial model for private finance initiative projects applied to school buildings. PhD thesis, Heriot-Watt University, UK.

AlKheder, S; Al Otaibi, H; Al Baghli, Z; Al Ajmi, S and Alkhedher, M (2025) Analytic hierarchy process (AHP) assessment of Kuwait mega construction projects' complexity. Engineering, Construction and Architectural Management, 32(3), pp. 1903-1946. ISSN 0969-9988

Alahmadi, N H (2018) Nudging contracting firms rivals within municipal road projects in Saudi Arabia to bid competitively. PhD thesis, University of Strathclyde, UK.

Alhabashi, M H (1991) Material management in the United States construction industry. DSc thesis, George Washington University, USA.

Ali, A H; Kineber, A F; Elyamany, A; Hussein Ibrahim, A and Daoud, A O (2025) Exploring stationary and major modular construction challenges in developing countries: A case study of Egypt. Journal of Engineering, Design and Technology, 23(2), pp. 569-598. ISSN 1726-0531

Alkhateeb, A M; Hyari, K H and Hiyassat, M A (2021) Analyzing bidding competitiveness and success rate of contractors competing for public construction projects. Construction Innovation, 21(4), pp. 576-591. ISSN 1471-4175

Allouche, E N; Ariaratnam, S T and Lueke, J S (2000) Horizontal directional drilling: Profile of an emerging industry. Journal of Construction Engineering and Management, 126(1), pp. 68-76. ISSN 0733-9364

Almazroa, D A (2003) Project delivery system decision framework using the weighting factors and analytic hierarchy process methods. PhD thesis, University of Pittsburgh, USA.

Alotaibi, S S (2016) The international contractor's decision to invest: a strategic risk management decision model for public private partnership projects in Saudi Arabia. PhD thesis, Heriot-Watt University, UK.

Alpert, I (1973) Competitive bidding on publicly-advertised construction projects. PhD thesis, New York University, Graduate School of Business Administration, USA.

Ammar, T; Abdel-Monem, M and El-Dash, K (2025) Regression-based model predicting cost contingencies for road network projects. International Journal of Construction Management, 25(11), pp. 1273-1287. ISSN 1562-3599

Anastasopoulos, P C; Labi, S; Bhargava, A; Bordat, C and Mannering, F L (2010) Frequency of change orders in highway construction using alternate count-data modeling methods. Journal of Construction Engineering and Management, 136(8), pp. 886-893. ISSN 0733-9364

Andalib, R; Hoseini, A and Gatmiri, B (2018) A stochastic model of cash flow forecasting considering delays in owners' payments. Construction Management and Economics, 36(10), pp. 545-564. ISSN 01446193

Apollo, M and Burkacki, D (2024) Key success factors for small design offices in the bidding process. Architectural Engineering and Design Management, 20(1), pp. 32-46. ISSN 1745-2007

Arai, K and Morimoto, E (2014) A comparative analysis of the desired and actual bidding behaviour of construction companies. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Arai, K and Morimoto, E (2023) Case study in shikoku: Changes in the bidding behaviour of businesses. International Journal of Construction Management, 23(2), pp. 225-233. ISSN 1562-3599

Arantes, A and Ferreira, L M D F (2020) Underlying causes and mitigation measures of delays in construction projects: An empirical study. Journal of Financial Management of Property and Construction, 25(2), pp. 165-181. ISSN 1366-4387

Arditi, D and Lee, D E (2003) Assessing the corporate service quality performance of design-build contractors using quality function deployment. Construction Management and Economics, 21(2), pp. 175-185. ISSN 01446193

Arditi, D and Ongkasuwan, D (2009) Duties and responsibilities of construction managers: Perceptions of parties involved in construction. Journal of Construction Engineering and Management, 135(12), pp. 1370-1374. ISSN 0733-9364

Art Chaovalitwongse, W; Wang, W; Williams, T P and Chaovalitwongse, P (2012) Data mining framework to optimize the bid selection policy for competitively bid highway construction projects. Journal of Construction Engineering and Management, 138(2), pp. 277-286. ISSN 0733-9364

Asgari, S (2016) Modeling construction competitive bidding: An agent-based approach. PhD thesis, Columbia University, USA.

Attwell, D N (1989) Bayesian models for sequential bidding and related theoretical topics. PhD thesis, University of Warwick, UK.

Awwad, R E (2010) Neutral and risk-sensitive models for competitive bidding methods based on average and order statistics. PhD thesis, University of Michigan, USA.

Azman, M. A.; Chuweni, N. N.; Muhamad Halil, F.; Ku Azir, K. M. A.; Juhari, F. N.; Lee, B. L. and Skitmore, M. (2026) Market competition and construction firm productivity: The role of market regulation in a developing economy. Engineering, Construction and Architectural Management, 33(7), pp. 5760-5782. ISSN 0969-9988

Azman, M A (2016) Bidding competitiveness: A comparative analysis of different bid auctions in Malaysia. Journal of Engineering, Design and Technology, 14(4), pp. 678-698.

Babatunde, S O; Ekundayo, D; Udeaja, C and Abubakar, U O (2022) An investigation into the sustainability practices in PPP infrastructure projects: A case of Nigeria. Smart and Sustainable Built Environment, 11(1), pp. 110-125. ISSN 2046-6099

Bageis, A S and Fortune, C (2009) Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors. Construction Management and Economics, 27(1), pp. 53-71. ISSN 1466433X

Bageis, A S O (2008) Contractors' decision to bid: development of a bid/no bid strategic decision model. PhD thesis, Heriot-Watt University, UK.

Baghdadi, A M A (2017) The allocation of risks in the Saudi Arabian domestic and regional aviation construction projects. PhD thesis, Robert Gordon University, UK.

Bagies, A and Fortune, C (2006) Bid/no-bid decision modelling for construction projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Ballesteros-Pérez, P; González-Cruz, M C; Fuentes-Bargues, J L and Skitmore, M (2015) Analysis of the distribution of the number of bidders in construction contract auctions. Construction Management and Economics, 33(9), pp. 752-770. ISSN 01446193

Ballesteros-Pérez, P and Skitmore, M (2016) Estimating the number of new and repeated bidders in construction auctions. Construction Management and Economics, 34(12), pp. 919-934. ISSN 01446193

Ballesteros-Pérez, P and Skitmore, M (2017) On the distribution of bids for construction contract auctions. Construction Management and Economics, 35(3), pp. 106-121. ISSN 01446193

Ballesteros-Pérez, P; Skitmore, M; Cerezo-Narváez, A; González-Cruz, M C; Pastor-Fernández, A and Otero-Mateo, M (2021) Standard deviation of bids for construction contract auctions. Journal of Construction Engineering and Management, 147(8): 04021096, ISSN 0733-9364

Ballesteros-Pérez, P; Skitmore, M; Cerezo-Narváez, A; Otero-Mateo, M and Pastor-Fernández, A (2023) Gates' bidding model (revisited). Construction Management and Economics, 41(7), pp. 576-586. ISSN 01446193

Ballesteros-Pérez, P; Skitmore, M; Das, R and Del Campo-Hitschfeld, M L (2015) Quick abnormal-bid-detection method for construction contract auctions. Journal of Construction Engineering and Management, 141(7): 4015010, ISSN 0733-9364

Ballesteros-Pérez, P; Skitmore, M; Pellicer, E and González-Cruz, M C (2015) Scoring rules and abnormally low bids criteria in construction tenders: A taxonomic review. Construction Management and Economics, 33(4), pp. 259-278. ISSN 01446193

Ballesteros-Pérez, P; Skitmore, M; Pellicer, E and Zhang, X (2016) Scoring rules and competitive behavior in best-value construction auctions. Journal of Construction Engineering and Management, 142(9): 04016035, ISSN 0733-9364

Barkokebas, B; Khalife, S; Al-Hussein, M and Hamzeh, F (2021) A BIM-lean framework for digitalisation of premanufacturing phases in offsite construction. Engineering, Construction and Architectural Management, 28(8), pp. 2155-2175. ISSN 0969-9988

Basaran, Y.; Aladag, H. and Isik, Z. (2026) Machine learning-based dynamic model for on-site subcontractor performance management. Engineering, Construction and Architectural Management, 33(7), pp. 5592-5624. ISSN 0969-9988

Bavafa, M (2015) Enhancing information quality through building information modelling implementation within UK structural engineering organisations. PhD thesis, University of Salford, UK.

Benjamin, Neal B H (1969) Competitive bidding for building construction contracts. PhD thesis, Stanford University, USA.

Berends, T C (2007) Contracting economics of large engineering and construction projects. PhD thesis, Delft University of Technology, Netherlands.

Bhargava, A; Anastasopoulos, P C; Labi, S; Sinha, K C and Mannering, F L (2010) Three-stage least-squares analysis of time and cost overruns in construction contracts. Journal of Construction Engineering and Management, 136(11), pp. 1207-1218. ISSN 0733-9364

Binions, O (2019) A study of corruption using the Institutional Analysis and Development framework with an application to the bidding phase of infrastructure procurement. PhD thesis, University College London, UK.

Birrell, G S (1985) General contractors' management: How subs evaluate it. Journal of Construction Engineering and Management, 111(3), pp. 244-259. ISSN 0733-9364

Boice, J R (1970) A history and evaluation of the school construction systems development project, 1961-1967. EdD thesis, Stanford University, USA.

Broemser, G M (1968) Competitive bidding in the construction industry. PhD thesis, Stanford University, USA.

Bu-Qammaz, A S A S (2015) Risk management model for international public construction joint venture projects in Kuwait. PhD thesis, Ohio State University, USA.

Buhamizo, I; Muhwezi, L and Sengonzi, R (2023) A regression model to enhance the profitability of local construction contractors in Uganda. Journal of Construction in Developing Countries, 28(1), pp. 221-241. ISSN 1823-6499

Cacciatori, E (2003) Total recall? Organisational memory and innovation in project-based firms. PhD thesis, University of Sussex, UK.

Calahorra Jiménez, M I (2020) Advancing knowledge of design-build and best-value in highway projects. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.

Campo, S (2002) Asymmetry and risk aversion in first -price sealed bid auctions: Identification, estimation, and applications. PhD thesis, University of Southern California, USA.

Carr, R I (1983) Impact of number of bidders on competition. Journal of Construction Engineering and Management, 109(1), pp. 61-73. ISSN 0733-9364

Castro-Lacouture, D (2003) B2b e-work intranet solution design for rebar supply interactions. PhD thesis, Purdue University, USA.

Cattell, D W (2012) An overview of component unit pricing theory. Construction Management and Economics, 30(1), pp. 81-92. ISSN 1466433X

Cattell, D W; Bowen, P A and Kaka, A P (2010) The risks of unbalanced bidding. Construction Management and Economics, 28(4), pp. 333-344. ISSN 1466433X

Cattell, D W; Bowen, P A and Kaka, A P (2011) Proposed framework for applying cumulative prospect theory to an unbalanced bidding model. Journal of Construction Engineering and Management, 137(12), pp. 1052-1059. ISSN 0733-9364

Cattell, D W; Bowen, P A and Kaka, A R (2008) A simplified unbalanced bidding model. Construction Management and Economics, 26(12), pp. 1283-1290. ISSN 1466433X

Chan, C T W and Pasquire, C (2002) Estimation of project overheads: A contractor’s perspective. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Chao, L C (2010) Estimating project overheads rate in bidding: DSS approach using neural networks. Construction Management and Economics, 28(3), pp. 287-299. ISSN 1466433X

Chao, L C and Kuo, C P (2018) Neural-network-centered approach to determining lower limit of combined rate of overheads and markup. Journal of Construction Engineering and Management, 144(2): 04017117, ISSN 0733-9364

Chao, L C and Liaw, S J (2019) Fuzzy logic model for determining minimum overheads-cum-markup rate. Journal of Construction Engineering and Management, 145(4): 04019008, ISSN 0733-9364

Chao, L C and Liou, C N (2007) Risk-minimizing approach to bid-cutting limit determination. Construction Management and Economics, 25(8), pp. 835-843. ISSN 1466433X

Charbel, G; Assaad, R H; Qiao, Y and Labi, S (2025) Predicting the level of competition and determining optimal bidding strategies for bundled projects: Integrating machine-learning algorithms and probabilistic modeling. Journal of Construction Engineering and Management, 151(11): 04025178, ISSN 0733-9364

Charlson J, C E (2013) A case study of joint procurement and provision of legal services to a group of a universities in the midlands. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Chen, J H; Yang, L R; Chen, W H and Chang, C K (2008) Case-based allocation of onsite supervisory manpower for construction projects. Construction Management and Economics, 26(8), pp. 805-814. ISSN 01446193

Chen, S (2013) Improving value for money in public-private partnership infrastructure projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Chen, Y; Chen, S; Hu, C; Jin, L and Zheng, X (2020) Novel probabilistic cost estimation model integrating risk allocation and claim in hydropower project. Journal of Construction Engineering and Management, 146(8): 04020092, ISSN 0733-9364

Chen, Y Q; Zhang, S J; Liu, L S and Hu, J (2015) Risk perception and propensity in bid/no-bid decision-making of construction projects. Engineering, Construction and Architectural Management, 22(1), pp. 2-20. ISSN 0969-9988

Chen, Y-K (1991) An analysis of decision strategy as applied to construction portfolios. PhD thesis, Stevens Institute of Technology, USA.

Cheng, T-m (1996) Impact of front-end loading on construction project cash-flows: A mathematical approach for determination of unit prices in bidding. PhD thesis, Purdue University, USA.

Chigara, B. and Smallwood, J. (2026) The impact of procurement on construction health and safety (H&S) in Zimbabwe. Journal of Engineering, Design and Technology, 24(4), pp. 943-962. ISSN 1726-0531

Chileshe, N; Edwards, D J; Kavishe, N and Haupt, T C (2020) Perception on challenges impacting bid decision of indigenous building contractors in Dar es Salaam, Tanzania. Journal of Engineering, Design and Technology, 18(6), pp. 1641-1662. ISSN 1726-0531

Chileshe, N; Kavishe, N and Edwards, D J (2021) Critical factors influencing the bid or no-bid decision of the indigenous small building contractors in Tanzania. Construction Innovation, 21(2), pp. 182-202. ISSN 1471-4175

Chinyio, E A; Olomolaiye, P O; Kometa, S T and Harris, F C (1998) A needs-based methodology for classifying construction clients and selecting contractors. Construction Management and Economics, 16(1), pp. 91-98. ISSN 01446193

Chisala, M L (2017) Quantitative bid or no-bid decision-support model for contractors. Journal of Construction Engineering and Management, 143(12): 04017088, ISSN 0733-9364

Choi, C Y; Ryu, K R and Shahandashti, M (2021) Predicting city-level construction cost index using linear forecasting models. Journal of Construction Engineering and Management, 147(2): 0001973, ISSN 0733-9364

Chotibhongs, R (2011) Managing the bidding process for the construction owner-detection and prevention of unbalanced bids and collusive bids. PhD thesis, Illinois Institute of Technology, USA.

Chotibhongs, R and Arditi, D (2012) Detection of collusive behavior. Journal of Construction Engineering and Management, 138(11), pp. 1251-1258. ISSN 0733-9364

Chotibhongs, R and Arditi, D (2012) Analysis of collusive bidding behaviour. Construction Management and Economics, 30(3), pp. 221-231. ISSN 1466433X

Christodoulou, S (2010) Bid mark-up selection using artificial neural networks and an entropy metric. Engineering, Construction and Architectural Management, 17(4), pp. 424-439. ISSN 0969-9988

Christodoulou, S E (1998) Optimum bid markup calculation in competitive bidding environments using fuzzy artificial neural networks. PhD thesis, Columbia University, USA.

Christodoulou, S E (2008) A bid-unbalancing method for lowering a contractor's financial risk. Construction Management and Economics, 26(12), pp. 1291-1302. ISSN 1466433X

Chua, D K H and Li, D (2000) Key factors in bid reasoning model. Journal of Construction Engineering and Management, 126(5), pp. 349-357. ISSN 0733-9364

Chua, D K H; Li, D Z and Chan, W T (2001) Case-based reasoning approach in bid decision making. Journal of Construction Engineering and Management, 127(1), pp. 35-45. ISSN 0733-9364

Craig, R W (2000) Controversial aspects of Commonwealth Construction and Engineering Procurement Law. PhD thesis, Loughborough University, UK.

Crowley, L G and Hancher, D E (1995) Risk assessment of competitive procurement. Journal of Construction Engineering and Management, 121(2), pp. 230-237. ISSN 0733-9364

Cui, Q (2005) A dynamic model for profitability analysis of construction firms: Towards complexity, learning, and uncertainty. PhD thesis, Purdue University, USA.

Dai, H; Cao, G and Su, H (2006) Management and construction of the three gorges project. Journal of Construction Engineering and Management, 132(6), pp. 615-619. ISSN 0733-9364

Dawood, N N (1995) An integrated bidding management expert system for the make-to-order precast industry. Construction Management and Economics, 13(2), pp. 115-125. ISSN 01446193

De Silva, D G (2002) Asymmetries in procurement auctions. PhD thesis, University of Oklahoma, USA.

Debela, G Y (2022) Critical success factors (CSFs) of public-private partnership (PPP) road projects in Ethiopia. International Journal of Construction Management, 22(3), pp. 489-500. ISSN 1562-3599

Delaney, F T (2003) Effectiveness of mergers and acquisitions and corporate financial performance in construction. PhD thesis, Edinburgh Napier University, UK.

Delaney, J W (2018) The effect of competition on bid quality and final results on state dot projects. PhD thesis, State University of New York at Buffalo, USA.

Deltas, G M (1996) Essays in auctions and procurement: An analysis of bidding rings, left bids, stochastic properties of winning bids, and two step structural estimators of bidding for contracts. PhD thesis, Yale University, USA.

Deng, Zhong Ming (1995) Extended state space modelling and influence diagrams for construction processes and aids. PhD thesis, University of New South Wales, Australia.

Dikmen, I and Birgonul, M T (2004) Neural network model to support international market entry decisions. Journal of Construction Engineering and Management, 130(1), pp. 59-66. ISSN 0733-9364

Dikmen, I; Birgonul, M T and Arikan, A E (2004) A critical review of risk management support tools. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Do, S T; Nguyen, V T; Tran, C N N and Aung, Z M (2023) Identifying and evaluating the key claim causes leading to construction delays. International Journal of Construction Management, 23(12), pp. 1999-2011. ISSN 1562-3599

Dodanwala, T C and Santoso, D S (2025) Critical factors influencing the bid/no-bid decisions of small and medium-sized contractors in Sri Lanka. International Journal of Construction Education and Research, 21(1), pp. 24-49. ISSN 1557-8771

Dolla, T and Laishram, B (2019) Prequalification in municipal solid waste management public-private partnerships of India. Construction Economics and Building, 19(1), pp. 40-56. ISSN 2204-9029

Dosumu, O (2018) Assessment of the likelihood of risk occurrence on tendering and procurement of construction projects. Journal of Construction Business and Management, 2(1), pp. 20-32. ISSN 2521-0165

Dozzi, S P; Abourizk, S M and Schroeder, S L (1996) Utility-theory model for bid markup decisions. Journal of Construction Engineering and Management, 122(2), pp. 119-124. ISSN 0733-9364

Dreschler, M (2009) Fair competition: How to apply the 'economically most advantageous tender' award mechanism in the Dutch construction industry. PhD thesis, Delft University of Technology, Netherlands.

Drew, D; Kwong, C; Zou, P and Shen, L Y (2002) Determining the optimal fee-technical proposal combination in two envelope fee bidding. Construction Economics and Building, 2(2), pp. 1-9. ISSN 2204-9029

Drew, D; Li, H and Shen, L Y (2000) Feedback in competitive fee tendering. Journal of Construction Procurement, 6(2), ISSN 1358-9180

Drew, D and Skitmore, M (1997) The effect of contract type and size on competitiveness in bidding. Construction Management and Economics, 15(5), pp. 469-489. ISSN 01446193

Drew, D S (1994) The effect of contract type and size on competitiveness in construction contract bidding. PhD thesis, University of Salford, UK.

Drew, D S; Ho, L C Y and Skitmore, M (2001) Analysing a consultant's competitiveness in two-envelope fee tendering. Construction Management and Economics, 19(5), pp. 503-510. ISSN 01446193

Drew, D S; Lai, P Y; Li, H and Lo, H P (2002) Correcting the fee-technical score variability imbalance in two-envelope fee tendering. Construction Management and Economics, 20(2), pp. 157-166. ISSN 01446193

Drew, D S; Shen, L Y and Zou, P X W (2002) Developing an optimal bidding strategy in two-envelope fee bidding. Construction Management and Economics, 20(7), pp. 611-620. ISSN 01446193

Drew, D S and Skitmore, M (2006) Testing Vickery's revenue equivalence theory in construction auctions. Journal of Construction Engineering and Management, 132(4), pp. 425-428. ISSN 0733-9364

Drew, D S and Skitmore, R M (1992) Competitiveness in bidding: A consultant's perspective. Construction Management and Economics, 10(3), pp. 227-247. ISSN 01446193

Drew D.S, T S L Y (2002) Developing a tendering strategy in two-envelope fee tendering based on technical score-fee variability. Construction Management and Economics, 20(1), pp. 67-81. ISSN 01446193

Du, J and El-Gafy, M (2011) Feasibility analytical mapping (FAM) for the bidding decision: A graphic bidding decision making model based on multidimensional scaling and discriminant analysis. International Journal of Construction Education and Research, 7(3), pp. 198-209. ISSN 1557-8771

Duncan, K; Case, A and Manzo IV, F (2024) Prevailing wages, school construction costs, and bids by out-of-state contractors: evidence from the Minneapolis–Saint Paul metropolitan area. Construction Management and Economics, 42(8), pp. 695-713. ISSN 01446193

Dutra, Clezio Thadeu de Souza (2016) Sustainable public bidding for engineering works and services. PhD thesis, Universidade Federal Fluminense, Brazil.

Duzkale, A K and Lucko, G (2016) Exposing uncertainty in bid preparation of steel construction cost estimating: II. Comparative analysis and quantitative C-I-V-I-L classification. Journal of Construction Engineering and Management, 142(10): 04016050, ISSN 0733-9364

Edirisinghe, V R D (2023) Framework for improved alternatives dispute resolution practice in the Sri Lankan constructions industry. PhD thesis, Liverpool John Moores University, UK.

Edouni, A R (2004) Competitive bidding, contractor pre-qualifying, and their impact on public works construction contracting: An analysis of municipal public works construction contracting in California. DPA thesis, University of La Verne, USA.

Ehoff Jr., C E (1992) Removed from scheduled maintenance: An inquiry into the problems threatening the survival of United States elevator manufacturers. PhD thesis, Golden Gate University, USA.

Eissa, R; Eid, M S and Elbeltagi, E (2021) Current applications of game theory in construction engineering and management research: A social network analysis approach. Journal of Construction Engineering and Management, 147(7): 0002085, ISSN 0733-9364

Eken, G (2022) Using natural language processing for automated construction contract review during risk assessment at the bidding stage. PhD thesis, Middle East Technical University, Turkey.

Eksteen, B and Rosenberg, D (2002) The management of overhead costs in construction companies. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Ekstrom, M A (2002) Accounting for rater credibility when evaluating construction industry service providers. PhD thesis, Stanford University, USA.

Ekström, M A and Bjornsson, H C (2002) Trust building tools supporting electronic bidding in construction. Journal of Construction Procurement, 8(2), pp. 133-147. ISSN 1358-9180

Ekström, M A; Björnsson, H C and Nass, C I (2003) Accounting for rater credibility when evaluating AEC subcontractors. Construction Management and Economics, 21(2), pp. 197-208. ISSN 01446193

El-Rayes, K (2001) Optimum planning of highway construction under A+B bidding method. Journal of Construction Engineering and Management, 127(4), pp. 261-269. ISSN 0733-9364

El-Samadony, A A E-Y (1986) Development of an improved construction bidding model incorporating multiple objective functions. PhD thesis, University of Leeds, UK.

El-Sayegh, S M (2009) Multi-criteria decision support model for selecting the appropriate construction management at risk firm. Construction Management and Economics, 27(4), pp. 385-398. ISSN 1466433X

El-Sayegh, S M; AbdRaboh, T; Elian, D; ElJarad, N and Ahmad, Y (2022) Developing a bi-parameter bidding model integrating price and sustainable construction practices. International Journal of Construction Management, 22(11), pp. 2191-2198. ISSN 1562-3599

El-Sayegh, S M and Rabie, M M (2016) Modified price plus time bi-parameter bidding model incorporating float loss impact. International Journal of Construction Management, 16(4), pp. 267-280. ISSN 1562-3599

Elfving, J A (2003) Exploration of opportunities to reduce lead times for engineered-to-order products. PhD thesis, University of California, Berkeley, USA.

Enshassi, A; Mohamed, S and El Karriri, A (2010) Factors affecting the bid/no bid decision in the Palestinian construction industry. Journal of Financial Management of Property and Construction, 15(2), pp. 118-142. ISSN 1366-4387

Enshassi, A; Mohamed, S and Madi, I (2005) Factors affecting accuracy of cost estimation of building contracts in the Gaza Strip. Journal of Financial Management of Property and Construction, 10(2), pp. 115-125. ISSN 1366-4387

Enshassi, A; Mohamed, S and Modough, Z (2013) Contractors' selection criteria: Opinions of Palestinian construction professionals. International Journal of Construction Management, 13(1), pp. 19-37. ISSN 1562-3599

Erbas, I (2013) Construction management project delivery system as a form of project implementation in Turkish public procurement. PhD thesis, Istanbul Technical University, Turkey.

Farid, F (1990) Pricing construction contracts under Tax Reform Act of 1986. Journal of Construction Engineering and Management, 116(2), pp. 300-315. ISSN 0733-9364

Farid, F and Boyer, L T (1985) Fair and reasonable markup (FARM) pricing model. Journal of Construction Engineering and Management, 111(4), pp. 374-390. ISSN 0733-9364

Fayek, A (1998) Competitive bidding strategy model and software system for bid preparation. Journal of Construction Engineering and Management, 124(1), pp. 1-10. ISSN 0733-9364

Field, C and Davenport, D (1999) PFI policy since 1996 and the implications for small and medium sized enterprises in the UK construction industry. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Firat Dogu, A; Damci, A; Arditi, D and Demirkesen, S (2024) An advanced decision-support system for ranking unbalanced bids. Construction Management and Economics, 42(7), pp. 610-623. ISSN 01446193

Foster, W R (2007) The impact of a bidder workshop on self-efficacy. EdD thesis, University of Cincinnati, USA.

Fu, W K (2004) The effect of experience in construction contract bidding. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Fu, W K; Drew, D S and Lo, H P (2003) Competitiveness of inexperienced and experienced contractors in bidding. Journal of Construction Engineering and Management, 129(4), pp. 388-395. ISSN 0733-9364

Fu, W K; Drew, D S and Lo, H P (2004) Start-up and steady-state learning in recurrent bidding. Building Research & Information, 32(6), pp. 484-496. ISSN 0961-3218

Gaikwad, S V; Calahorra-Jimenez, M; Molenaar, K R and Torres-Machi, C (2021) Challenges in engineering estimates for best value design-build highway projects. Journal of Construction Engineering and Management, 147(7): 04021065, ISSN 0733-9364

Gajpal, Y; Islam, M A and Elazouni, A (2026) Towards competitive contractors' bids: Optimizing selections of subcontractors and payment lags using branch and bound algorithm. Construction Management and Economics, 44(4), pp. 260-278. ISSN 0144-6193

Gannon M, M S A J (2013) Tied supply chains in construction projects: Lessons from London underground's public-private-partnership. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Ghulman, B A (2000) Predicting construction cost growth in ODOT's paving projects using information available at the bidding time. PhD thesis, Oklahoma State University, USA.

Gil, N; Tommelein, I D and Ballard, G (2004) Theoretical comparison of alternative delivery systems for projects in unpredictable environments. Construction Management and Economics, 22(5), pp. 495-508. ISSN 01446193

Gkritza, K and Labi, S (2008) Estimating cost discrepancies in highway contracts: Multistep econometric approach. Journal of Construction Engineering and Management, 134(12), pp. 953-962. ISSN 0733-9364

Gohardani, N (2014) An approach towards sustainable building. PhD thesis, KTH Royal Institute of Technology, Sweden.

Gordon, J E (1977) An analysis of the bidding process of design/build/bidding in new school construction. EdD thesis, Indiana University, USA.

Griffis, F H (1992) Bidding strategy: Winning overkey competitors. Journal of Construction Engineering and Management, 118(1), pp. 151-165. ISSN 0733-9364

Grimsey, D and Graham, R (1997) PFI in the NHS (Private finance initiative in the UK national health service). Engineering, Construction and Architectural Management, 4(3), pp. 215-231. ISSN 0969-9988

Gunduz, M (2002) Change orders impact assessment for labor intensive construction. PhD thesis, University of Wisconsin - Madison, USA.

Gunduz, M and Al-Ajji, I (2022) Employment of CHAID and crt decision tree algorithms to develop bid/no-bid decision-making models for contractors. Engineering, Construction and Architectural Management, 29(9), pp. 3712-3736. ISSN 0969-9988

Guo, Y; Su, Y; Chen, C and Martek, I (2024) Inclusion of "managing flexibility" valuations in the pricing of PPP projects: A multi-objective decision-making method. Engineering, Construction and Architectural Management, 31(11), pp. 4562-4584. ISSN 0969-9988

Haar, B W (1983) Collusion in the highway construction industry: Economic evidence as an investigative tool. PhD thesis, University of Nebraska - Lincoln, USA.

Hailu, H and Tshehla, M (2025) A conceptual framework for enhancing subcontracting performance in the construction industry of developing countries. Journal of Construction Business and Management, 7(2), pp. 1-15.

Hamza, N and Greenwood, D (2007) The impact of procurement methods on delivering environmentally sensitive buildings. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Han, S H and Diekmann, J (2004) Judgment-based cross-impact method for predicting cost variance for highly uncertain projects. Journal of Construction Research, 5(2), pp. 171-192. ISSN 1609-9451

Harada, S (2015) Bidding for private finance initiative projects: An analysis. Journal of Financial Management of Property and Construction, 20(2), pp. 188-202. ISSN 1366-4387

Hartono, B and Yap, C M (2011) Understanding risky bidding: A prospect-contingent perspective. Construction Management and Economics, 29(6), pp. 579-593. ISSN 1466433X

Harvey, J (1979) Competitive bidding on Canadian public construction contracts: Stochastic analysis for optimization. PhD thesis, University of Western Ontario, Canada.

Hasantha, M L; Waidyasekara, A S and Victar, H C (2025) Evaluation of time allocated for bid preparation in national competitive bidding in the Sri Lankan construction industry. Engineering, Construction and Architectural Management, 32(7), pp. 4310-4337. ISSN 0969-9988

Hassanein, A A G (1996) Factors affecting the bidding behaviour of contractors in Egypt. Building Research & Information, 24(4), pp. 228-236. ISSN 0961-3218

Hassanein, A A G and Hakam, Z H R (1996) A bidding decision index for construction contractors. Building Research & Information, 24(4), pp. 237-244. ISSN 0961-3218

Hatush, Z A (1996) Contractor selection using the multiattribute utility theory. PhD thesis, University of Salford, UK.

Hauck, A J (1990) Development and evaluation of computerized construction estimating, pricing, and bidding programs using integrated applications software. PhD thesis, University of Maryland, College Park, USA.

Hegab, M; Smith, G R and Salem, O M (2006) Soil penetration modeling in microtunneling projects. Journal of Construction Engineering and Management, 132(6), pp. 598-605. ISSN 0733-9364

Hegazy, T and Moselhi, O (1994) Estimator: A prototype of an integrated bid preparation system. Engineering, Construction and Architectural Management, 1(1), pp. 51-67. ISSN 0969-9988

Hegazy, T M (1994) Integrated bid preparation with emphases on risk assessment using neural networks. PhD thesis, Concordia University, Canada.

Herbsman, Z and Ellis, R (1992) Multiparameter bidding system: innovation in contract administration. Journal of Construction Engineering and Management, 118(1), pp. 142-150. ISSN 0733-9364

Herbsman, Z J (1995) A+B bidding method: hidden success story for highway construction. Journal of Construction Engineering and Management, 121(4), pp. 430-437. ISSN 0733-9364

Herbsman, Z J and Glagola, C R (1998) Lane rental: innovative way to reduce road construction time. Journal of Construction Engineering and Management, 124(5), pp. 411-417. ISSN 0733-9364

Hinze, J and Tracey, A (1994) The contractor-subcontractor relationship: The subcontractor's view. Journal of Construction Engineering and Management, 120(2), pp. 274-287. ISSN 0733-9364

Hlaing, N N; Singh, D; Tiong, R L K and Ehrlich, M (2008) Perceptions of Singapore construction contractors on construction risk identification. Journal of Financial Management of Property and Construction, 13(2), pp. 85-95. ISSN 1366-4387

Ho, S P and Liu, L Y (2004) Analytical model for analyzing construction claims and opportunistic bidding. Journal of Construction Engineering and Management, 130(1), pp. 94-104. ISSN 0733-9364

Ho, S-P (2001) Real options and game theoretic valuation, financing and tendering for investments on build-operate-transfer projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hofsteede, Iraina (2019) The influence of leadership competencies on the outcome of tendering projects. PhD thesis, RMIT University, Australia.

Hollister, K C (1992) An extended structured query language incorporating object data types for the construction industry. PhD thesis, University of Florida, USA.

Horta, I M; Camanho, A S and Lima, A F (2013) Design of performance assessment system for selection of contractors in construction industry e-marketplaces. Journal of Construction Engineering and Management, 139(8), pp. 910-917. ISSN 0733-9364

Hyari, K H (2016) Handling unbalanced bidding in construction projects: Prevention rather than detection. Journal of Construction Engineering and Management, 142(2): 04015060, ISSN 0733-9364

Hyari, K H and Alamayreh, T (2023) Unbalanced bidding in construction projects: A contractors' perspective. International Journal of Construction Management, 23(12), pp. 2058-2066. ISSN 1562-3599

Hyari, K H; Tarawneh, Z S and Katkhuda, H N (2016) Detection model for unbalanced pricing in construction projects: A risk-based approach. Journal of Construction Engineering and Management, 142(12): 04016078, ISSN 0733-9364

Ibbs, C W (1986) Brand name or equalproduct specifications. Journal of Construction Engineering and Management, 112(1), pp. 1-13. ISSN 0733-9364

Ibbs, C W J (1980) Risk, complex decision-making and the application of multiattribute utility analysis in the construction industry. PhD thesis, University of California, Berkeley, USA.

Ioannou, P G (1988) Bidding models: symmetry and state of information. Journal of Construction Engineering and Management, 114(2), pp. 214-232. ISSN 0733-9364

Ioannou, P G (1988) Geologic exploration and risk reduction in underground construction. Journal of Construction Engineering and Management, 114(4), pp. 532-547. ISSN 0733-9364

Ioannou, P G (2019) Friedman's bidding model: Errors and corrections. Journal of Construction Engineering and Management, 145(10): 04019058, ISSN 0733-9364

Ioannou, P G (2022) Risk-sensitive competitive bidding model and impact of risk aversion and cost uncertainty on optimum bid. Journal of Construction Engineering and Management, 148(3): 04021205, ISSN 0733-9364

Ioannou, P G and Awwad, R E (2010) Below-average bidding method. Journal of Construction Engineering and Management, 136(9), pp. 936-946. ISSN 0733-9364

Ioannou, P G and Leu, S S (1993) Average-bid method: competitive bidding strategy. Journal of Construction Engineering and Management, 119(1), pp. 131-147. ISSN 0733-9364

Izzat, R M (1977) A computerised approach to bidding strategy in civil engineering. PhD thesis, Aston University, UK.

Jackson, B (2005) The perceptions of experienced construction practitioners regarding ethical transgressions in the construction industry. International Journal of Construction Education and Research, 1(2), pp. 112-128. ISSN 1557-8771

Jackson, B J (2000) The perceptions of experienced construction practitioners regarding ethical transgressions in the construction industry. PhD thesis, Colorado State University, USA.

Jacques de Sousa, L; Poças Martins, J and Sanhudo, L (2024) Predicting construction project compliance with machine learning model: case study using Portuguese procurement data. Engineering, Construction and Architectural Management, 31(13), pp. 285-302. ISSN 0969-9988

Jang, S G (2011) A concessionaire selection decision model: development and application for the PPP project procurement. PhD thesis, University of Southampton, UK.

Jarkas, A M (2013) Primary factors influencing bid mark-up size decisions of general contractors in Kuwait. Journal of Financial Management of Property and Construction, 18(1), pp. 53-75. ISSN 1366-4387

Jaselskis, E J and Talukhaba, A (1998) Bidding considerations in developing countries. Journal of Construction Engineering and Management, 124(3), pp. 185-193. ISSN 0733-9364

Jefferies, M and Chen, S E (2004) Identifying risk factors of boot procurement: A case study of stadium Australia. Construction Economics and Building, 4(1), pp. 11-20. ISSN 2204-9029

Jensen, D A (2010) A longitudinal study of a Type I differing conditions claim: Investigating the contractor's failure to meet the reasonable prudent standard. Construction Management and Economics, 28(1), pp. 63-74. ISSN 1466433X

Jin, R; Han, S; Hyun, C and Cha, Y (2016) Application of case-based reasoning for estimating preliminary duration of building projects. Journal of Construction Engineering and Management, 142(2): 04015082, ISSN 0733-9364

Johnson, K D and Tatum, C B (1993) Technology in marine construction firms. Journal of Construction Engineering and Management, 119(1), pp. 148-162. ISSN 0733-9364

Johnson, L R (1969) A competitive strategy model for highway construction proposals. PhD thesis, Oklahoma State University, USA.

Jones, B K (1998) A model for collaborative engineering the construction industry. PhD thesis, University of Southampton, UK.

Jones, Barry Kenneth (1998) A model for collaborative engineering in the construction industry. PhD thesis, University of Southampton, UK.

Jones III, R C (1991) An economic analysis of national society of professional engineers versus United States. PhD thesis, University of California, Los Angeles, USA.

Jun, J B (2008) Valuation of governmental guarantee in BOT project finance with real option analysis. PhD thesis, Texas A&M University, USA.

Kalamaras, G S (1996) A case method approach for interactive risk analysis of tunnel "design-for-constructability" concept. PhD thesis, Pennsylvania State University, USA.

Kashiwagi, D and Byfield, R (2002) State of Utah performance information procurement system tests. Journal of Construction Engineering and Management, 128(4), pp. 338-347. ISSN 0733-9364

Kashiwagi, D T (1991) Development of a performance based design/procurement system for nonstructural facility systems. PhD thesis, Arizona State University, USA.

Kavishe, N and Chileshe, N (2020) Factors influencing bid/no bid decision of foreign contractors in Tanzania. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Kawal, D E (1970) A systems model of a construction firm. PhD thesis, Iowa State University, USA.

Kelley, M N (1991) Ft. Drum estimating and bidding from contractor's point of view. Journal of Construction Engineering and Management, 117(3), pp. 565-571. ISSN 0733-9364

Keung, C and Shen, L (2017) Network strategy for contractors' business competitiveness. Construction Management and Economics, 35(8-9), pp. 482-497. ISSN 01446193

Kim, D Y; Han, S H and Kim, H (2008) Discriminant analysis for predicting ranges of cost variance in international construction projects. Journal of Construction Engineering and Management, 134(6), pp. 398-410. ISSN 0733-9364

Kim, H J (2009) The effects of risk attitude on competitive success in the construction industry. PhD thesis, Texas A&M University, USA.

Kim, H J and Reinschmidt, K F (2006) A dynamic competition model for construction contractors. Construction Management and Economics, 24(9), pp. 955-965. ISSN 1466433X

Kim, H J and Reinschmidt, K F (2011) Effects of contractors' risk attitude on competition in construction. Journal of Construction Engineering and Management, 137(4), pp. 275-283. ISSN 0733-9364

Kim, S-K (2001) Toward a framework for an intelligent earthwork system (ies). PhD thesis, University of Wisconsin - Madison, USA.

Kjerulf, L and Haugbølle, K (2021) Circular prequalification and bidding practices at contractor firms. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Ko, T; Lee, J and David Jeong, H (2024) Project requirements prioritization through NLP-driven classification and adjusted work items analysis. Journal of Construction Engineering and Management, 150(3): 04023171, ISSN 0733-9364

Koch, C and Haubjerg, E (2011) Performing the transition: Integrated design processes in climate change mitigation. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Kong, C W; li, H and Love, P E D (2001) An e-commerce system for construction material procurement. Construction Innovation, 1(1), pp. 43-54. ISSN 1471-4175

Konno, Y (2014) Default or exit? Empirical study on SMEs in the Japanese construction industry. Construction Management and Economics, 32(10), pp. 1017-1029. ISSN 01446193

Korb, S and Sacks, R (2021) Agent-based simulation of general contractor-subcontractor interactions in a multiproject environment. Journal of Construction Engineering and Management, 147(1): 1944, ISSN 0733-9364

Kostuk, K J (2003) Quantifying the uncertainty associated with long-term maintenance contracts. PhD thesis, University of Saskatchewan, Canada.

Krasnokutskaya, E (2003) Identification and estimation in highway procurement auctions under unobserved heterogeneity. PhD thesis, Yale University, USA.

Kulevich, A E (2025) Effective strategies for mitigating bidding corruption for U.S. Infrastructure contracts. DBA thesis, Walden University, USA.

Kurniawan, F (2013) An integrated project evaluation tool for public-private partnership projects. PhD thesis, Heriot-Watt University, UK.

Kurniawan, F; Ogunlana, S and Motawa, I (2010) An integrated project evaluation tool for PFI seaport projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Labib, Y N; Lotfallah, W B; Hanna, A S and Boulos, N W (2021) Development and application of performance index for comparative assessment of public capital projects. Journal of Construction Engineering and Management, 147(2): 04020175, ISSN 0733-9364

Lan, O B; Ling, F Y Y and Soo, A (2014) Information feedback and bidders' competitiveness in construction bidding. Engineering, Construction and Architectural Management, 21(5), pp. 571-585. ISSN 0969-9988

Larew, R E (1976) A quantitative approach to estimating and pricing in a construction company. PhD thesis, University of Iowa, USA.

Laryea, S (2009) Subcontract and supply enquiries in the tender process of contractors. Construction Management and Economics, 27(12), pp. 1219-1230. ISSN 1466433X

Laryea, S and Hughes, W (2008) How contractors price risk in bids: Theory and practice. Construction Management and Economics, 26(9), pp. 911-924. ISSN 1466433X

Laryea, S and Hughes, W (2009) How contractors in Ghana include risk in their bid prices. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Laryea, S and Lubbock, A (2014) Tender pricing environment of subcontractors in the United Kingdom. Journal of Construction Engineering and Management, 140(1): 04013029, ISSN 0733-9364

Laryea, S A (2008) How contractors take account of risk in the tender process: Theory and practice. PhD thesis, University of Reading, UK.

Laryea, S A and Hughes, W P (2006) The price of risk in construction projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Laryea, S A and Hughes, W P (2011) Risk and price in the bidding process of contractors. Journal of Construction Engineering and Management, 137(4), pp. 248-258. ISSN 0733-9364

Latif, H M (2014) Case studies of Malaysian contractors' bidding process: ethical principles and practices. PhD thesis, University of Reading, UK.

Lee, D E (2005) Probability of project completion using stochastic project scheduling simulation. Journal of Construction Engineering and Management, 131(3), pp. 310-318. ISSN 0733-9364

Lee, G; Moon, S and Chi, S (2023) Reference section identification of construction specifications by a deep structured semantic model. Engineering, Construction and Architectural Management, 30(9), pp. 4358-4386. ISSN 0969-9988

Lee, J I; Lee, H S and Park, M (2018) Contractor liquidity evaluation model for successful public housing projects. Journal of Construction Engineering and Management, 144(12): 04018109, ISSN 0733-9364

Lee, T S (1990) Detection of collusion in highway construction contract bidding. PhD thesis, University of Wisconsin - Madison, USA.

Li, G; Chen, C; Zhang, G and Martek, I (2020) Bid/no-bid decision factors for Chinese international contractors in international construction projects. Engineering, Construction and Architectural Management, 27(7), pp. 1619-1643. ISSN 0969-9988

Li, G; Zhang, G; Chen, C and Martek, I (2020) Empirical bid or no bid decision process in international construction projects: Structural equation modeling framework. Journal of Construction Engineering and Management, 146(6): 04020050, ISSN 0733-9364

Li, H; Arditi, D and Wang, Z (2012) Transaction-related issues and construction project performance. Construction Management and Economics, 30(2), pp. 151-164. ISSN 1466433X

Li, H; Arditi, D and Wang, Z (2013) Factors that affect transaction costs in construction projects. Journal of Construction Engineering and Management, 139(1), pp. 60-68. ISSN 0733-9364

Li, H; Arditi, D and Wang, Z (2014) Transaction costs incurred by construction owners. Engineering, Construction and Architectural Management, 21(4), pp. 444-458. ISSN 0969-9988

Li, H; Shen, L Y and Love, P E D (1999) Ann-based mark-up estimation system with self-explanatory capacities. Journal of Construction Engineering and Management, 125(3), pp. 185-189. ISSN 0733-9364

Li, H; Su, L; Zuo, J; An, X; Dong, G; Wang, L and Zhang, C (2023) The framework of data-driven and multi-criteria decision-making for detecting unbalanced bidding. Engineering, Construction and Architectural Management, 30(2), pp. 598-622. ISSN 0969-9988

Li, M and Ashuri, B (2021) Proportional cox hazards model to quantify the likelihood of underestimation in transportation projects. Journal of Construction Engineering and Management, 147(10): 04021134, ISSN 0733-9364

Li, M; Baek, M and Ashuri, B (2021) Forecasting ratio of low bid to owner's estimate for highway construction. Journal of Construction Engineering and Management, 147(1): 04020157, ISSN 0733-9364

Li, S (2006) Three essays on bidding in the construction industry. PhD thesis, University of Utah, USA.

Li, W (2008) An agent-based negotiation model for the sourcing of construction suppliers. PhD thesis, University of Hong Kong, Hong Kong.

Liang, R; Li, R and Chong, H Y (2023) Sustainable supplier selection for prefabricated megaprojects during COVID-19: A novel large group decision-making model. Building Research & Information, 51(5), pp. 533-554. ISSN 0961-3218

Lima, Luanda Regina Reis (2022) A systematic approach for developing sustainability guidelines for stakeholders in public project management. PhD thesis, Universidade Federal de Pernambuco, Brazil.

Liu, Chang (2020) Data-driven strategies to improve the construction equipment management. PhD thesis, University of Alberta, Canada.

Liu, J and Cheah, C Y J (2009) Real option application in PPP/PFI project negotiation. Construction Management and Economics, 27(4), pp. 331-342. ISSN 1466433X

Liu, J and Lu, M (2020) Synchronized optimization of various management-function schedules in a multiproject environment: Case study of planning steel girder fabrication projects in bridge construction. Journal of Construction Engineering and Management, 146(5): 05020002, ISSN 0733-9364

Liu, M and Luo, M (2025) Cost estimation model of prefabricated construction for general contractors based on system dynamics. Engineering, Construction and Architectural Management, 32(1), pp. 621-638. ISSN 0969-9988

Liu, Q (2025) The impact of funnel sales management on sales performance in engineering construction companies: An empirical study based on CE company data. DBA thesis, Arizona State University, USA.

Liu, S L; Wang, S Y and Lai, K K (2005) A general multivariate analysis approach for determining bid mark-up strategy. Construction Management and Economics, 23(4), pp. 347-353. ISSN 01446193

Lo, H P and Lam, M-L (2001) A bidding strategy using multivariate distribution. Journal of Financial Management of Property and Construction, 6(3), pp. 155-165. ISSN 1366-4387

Lo, W; Lin, C L and Yan, M R (2007) Contractor's opportunistic bidding behavior and equilibrium price level in the construction market. Journal of Construction Engineering and Management, 133(6), pp. 409-416. ISSN 0733-9364

Lo, W and Yan, M R (2009) Evaluating qualification-based selection system: A simulation approach. Journal of Construction Engineering and Management, 135(6), pp. 458-465. ISSN 0733-9364

Long, W; Wang, X; Liang, Y and Ye, K (2023) Characteristics of collusive practices in bidding: Mixed methods study in China. Journal of Construction Engineering and Management, 149(6): 04023030, ISSN 0733-9364

Loosemore, M and Richard, J (2015) Valuing innovation in construction and infrastructure: Getting clients past a lowest price mentality. Engineering, Construction and Architectural Management, 22(1), pp. 38-53. ISSN 0969-9988

Lowe, D J and Parvar, J (2004) A logistic regression approach to modelling the contractor's decision to bid. Construction Management and Economics, 22(6), pp. 643-653. ISSN 01446193

Lowe, D J; Parvar, J and Emsley, M W (2004) Development of a decision support system (DSS) for the contractor's decision to bid: Regression analysis and neural networks solutions. Journal of Financial Management of Property and Construction, 9(1), pp. 27-42. ISSN 1366-4387

Lu, M (2000) Productivity studies using advanced ANN models. PhD thesis, University of Alberta, Canada.

Lu, W (2006) A system for assessing and communicating contractors' competitiveness. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Lu, W; Shen, L and Yam, M C H (2008) Critical success factors for competitiveness of contractors: China study. Journal of Construction Engineering and Management, 134(12), pp. 972-982. ISSN 0733-9364

Lu, Y; Pang, D and Li, Y (2016) Evolutionary collaboration network and organizational competitiveness in megaprojects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Lulyalya, L P; Kikwasi, G J and Sospeter, N G (2026) Adequacy of contractor's financial capability weighing criteria in Tanzania construction projects: A quadratic and gap analysis. Journal of Engineering, Design and Technology, 24(1), pp. 24-44. ISSN 1726-0531

Luo, J (1998) The transitional construction industry and sino-foreign construction joint ventures in the P.R. Of China. PhD thesis, University of Manchester, UK.

Maci, M (2010) Bid rigging in the EU public procurement markets. PhD thesis, Queen Mary University of London, UK.

Madenli, O; Atasoy, G and Dikmen, I (2026) Identification and categorization of defects in construction specifications utilizing natural language processing. Journal of Construction Engineering and Management, 152(5): 04026044, ISSN 0733-9364

Mahfouz, T; Davlyatov, S and Kandil, A (2016) Analysis of differing site condition litigation reasoning through statistical modeling. International Journal of Construction Education and Research, 12(4), pp. 285-302. ISSN 1557-8771

Mak, S W K (1992) Risk management in construction: A study of subjective judgments. PhD thesis, London, External, UK.

Malekaee Ashtiyani, F; Karimi Gavareshki, M H and Gheidar-Kheljani, J (2026) AI-based multi-layer framework for monitoring productivity and coordinating subcontractors in construction projects. International Journal of Construction Management, 26(5), pp. 905-924. ISSN 1562-3599

Mallisetti, V; Dolla, T and Laishram, B (2022) Unpacking the framework of unsolicited proposal for public private partnership projects: the Indian case. Journal of Financial Management of Property and Construction, 27(2), pp. 179-198. ISSN 1366-4387

Maradza, E N (2015) Adaptation of industry BIM process standards in a large construction firm. PhD thesis, University of Reading, UK.

Marzouk, M and Mohamed, E (2018) Modeling bid/no bid decisions using fuzzy fault tree. Construction Innovation, 18(1), pp. 90-108. ISSN 1471-4175

Marzouk, M and Moselhi, O (2003) A decision support tool for construction bidding. Construction Innovation, 3(2), pp. 111-124. ISSN 1471-4175

Masu, S; Gichunge, H and K'Akumu, O A (2012) Component ratios of new building costs in Nairobi: A contractors' perspective. Journal of Financial Management of Property and Construction, 17(3), pp. 222-234. ISSN 1366-4387

Matthewson, C (1992) The relationship between tactical management and contract procurement in the North American competitive lump sum bidding process. PhD thesis, Heriot-Watt University, UK.

May, D; Wilson, O and Skitmore, M (2001) Bid cutting: An empirical study of practice in South-East Queensland. Engineering, Construction and Architectural Management, 8(4), pp. 250-256. ISSN 0969-9988

Mayo, R E (1992) Improved optimum bid markup estimation through work load related bid distribution functions. PhD thesis, Stevens Institute of Technology, USA.

McCaffer, R (1976) Contractors' bidding behaviour and tender price prediction. PhD thesis, Loughborough University, UK.

McCaffer, R (2000) The management process within contractors' companies. DSc thesis, University of Strathclyde, UK.

McFarland, A E (2010) An end user approach to teaching specifications. International Journal of Construction Education and Research, 6(2), pp. 83-103. ISSN 1557-8771

McLellan, R (1994) The use of project management procedures by construction contractors. PhD thesis, University of Strathclyde, UK.

McShane Lodwick, Leslie Erin (2024) Architectures of schooling: School construction systems development, 1961-1969. PhD thesis, University of California, USA.

Mehany, M S H M (2014) Delay-caused claims in infrastructure projects under design-bid-build delivery systems. PhD thesis, Colorado State University, USA.

Meléndez, W; Saavedra, R; Garcés, G and Herrera, R (2026) Comparative analysis of quantity take-off in reinforcing steel bars in apartment buildings based on CAD and BIM method: A case study. International Journal of Construction Management, 26(5), pp. 751-771. ISSN 1562-3599

Metham, M; Benjaoran, V and Sedthamanop, A (2022) An evaluation of green road incentive procurement in road construction projects by using the AHP. International Journal of Construction Management, 22(3), pp. 501-513. ISSN 1562-3599

Micelli, E (2000) Mobilizing the skills of specialist firms to reduce costs and enhance performance in the European construction industry: Two case studies. Construction Management and Economics, 18(6), pp. 651-656. ISSN 01446193

Miller, D P (2009) Essays on subcontracting, competitive bidding, and dynamic housing demand. PhD thesis, University of Minnesota, USA.

Mishmish, M and El-Sayegh, S M (2018) Causes of claims in road construction projects in the UAE. International Journal of Construction Management, 18(1), pp. 26-33. ISSN 1562-3599

Mochtar, K (2000) Market-based pricing in construction. PhD thesis, Illinois Institute of Technology, USA.

Mochtar, K and Arditi, D (2001) Pricing strategy in the US construction industry. Construction Management and Economics, 19(4), pp. 405-415. ISSN 01446193

Mohamed, E; Jafari, P and Hammad, A (2022) Mixed qualitative–quantitative approach for bidding decisions in construction. Engineering, Construction and Architectural Management, 29(6), pp. 2328-2357. ISSN 0969-9988

Mohammadi, A; Igwe, C; Amador-Jimenez, L and Nasiri, F (2020) Applying lean construction principles in road maintenance planning and scheduling. International Journal of Construction Management, 22(12), pp. 2364-2374. ISSN 1562-3599

Moon, H; Kim, K; Lee, H S; Park, M; Williams, T P; Son, B and Chun, J Y (2020) Cost performance comparison of design-build and design-bid-build for building and civil projects using mediation analysis. Journal of Construction Engineering and Management, 146(9): 04020113, ISSN 0733-9364

Moon, S; Lee, G; Chi, S and Oh, H (2021) Automated construction specification review with named entity recognition using natural language processing. Journal of Construction Engineering and Management, 147(1): 04020147, ISSN 0733-9364

Morimoto, E and Arai, K (2024) Public procurement and business performance in COVID-19 situation: Decline in firms' entry. International Journal of Construction Management, 24(14), pp. 1589-1598. ISSN 1562-3599

Moriyani, M A; Le, C; Le, T and Pirim, H (2026) Beyond one-size-fits-all: A novel data-driven framework for quantifying bidding competition intensity in highway design-bid-build contracts. Journal of Construction Engineering and Management, 152(3): 04026006, ISSN 0733-9364

Moselhi, O and Hassanein, A (2003) Optimized scheduling of linear projects. Journal of Construction Engineering and Management, 129(6), pp. 664-673. ISSN 0733-9364

Moselhi, O; Hegazy, T and Fazio, P (1993) DBID: Analogy-based dss for bidding in construction. Journal of Construction Engineering and Management, 119(3), pp. 466-479. ISSN 0733-9364

Moynihan, G; Zhou, H and Cui, Q (2009) Stochastic modeling for pavement warranty cost estimation. Journal of Construction Engineering and Management, 135(5), pp. 352-359. ISSN 0733-9364

Munaif, M A (1995) Multiple criteria decision-making in contractor selection and evaluation of construction bids in Saudi Arabia. PhD thesis, University of Missouri - Rolla, USA.

Nam, C H (1990) The process of product innovation in the building and heavy sectors of the U.S. construction industry. PhD thesis, Stanford University, USA.

Nassar, K (2003) Construction contracts in a competitive market: C3M, a simulation game. Engineering, Construction and Architectural Management, 10(3), pp. 172-178. ISSN 0969-9988

Nathan, K V S K (1994) Submission to ICSID in breach of the convention: disputes in international civil engineering contracts. PhD thesis, Queen Mary University of London, UK.

Nesan Lenin, J (2011) Integrated e-bidding framework for construction. International Journal of Construction Education and Research, 7(4), pp. 243-258. ISSN 1557-8771

Neufville, R D and Smith, J T (1994) Improving contractors' bids using preference reversal phenomenon. Journal of Construction Engineering and Management, 120(4), pp. 706-719. ISSN 0733-9364

Ng, S T and Li, W (2004) A multiagent system for negotiating construction bidding decisions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Ngai, S C; Drew, D S; Lo, H P and Skitmore, M (2002) A theoretical framework for determining the minimum number of bidders in construction bidding competitions. Construction Management and Economics, 20(6), pp. 473-482. ISSN 01446193

Nguyen, P H D; Lines, B C and Tran, D Q (2018) Best-value procurement in design-bid-build construction projects: Empirical analysis of selection outcomes. Journal of Construction Engineering and Management, 144(10): 04018093, ISSN 0733-9364

Nichols, J (2018) Reverse auction bidding: Studying player behavior. Journal of Construction Engineering and Management, 144(1): 04017095, ISSN 0733-9364

Nifa, F A A and Ahmed, V (2010) The role of organizational culture in construction partnering to produce innovation. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Niss, J F (1965) Custom production, theory and practice: With special emphasis on the goals and pricing procedures of the contract construction industry. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Nourah, B T K (2013) Development of strategic mark up decision by contractors in Saudi Arabia. PhD thesis, University of Manchester, UK.

Nwadigo, O (2019) Real-time and dynamic planning and scheduling under disruption using multi-hybrid simulation and optimisation. PhD thesis, Auckland University of Technology, New Zealand.

Ogbu, C P and Adindu, C C (2020) Direct risk factors and cost performance of road projects in developing countries: Contractors’ perspective. Journal of Engineering, Design and Technology, 18(2), pp. 326-342. ISSN 1726-0531

Ojelabi, R A; Oyeyipo, O O; Afolabi, A O and Omuh, I O (2022) Evaluating barriers inhibiting investors participation in public-private partnership project bidding process using structural equation model. International Journal of Construction Management, 22(16), pp. 3055-3064. ISSN 1562-3599

Oke, A; Omoraka, A and Olatunbode, A (2020) Appraisal of factors affecting bidding decisions in Nigeria. International Journal of Construction Management, 20(2), pp. 169-175. ISSN 1562-3599

Olatunji, O A; Aje, O I and Makanjuola, S (2017) Bid or no-bid decision factors of indigenous contractors in Nigeria. Engineering, Construction and Architectural Management, 24(3), pp. 378-392. ISSN 0969-9988

Olawumi, T O and Chan, D W M (2021) Green-building information modelling (green-BIM) assessment framework for evaluating sustainability performance of building projects: A case of Nigeria. Architectural Engineering and Design Management, 17(5-6), pp. 458-477. ISSN 1745-2007

Onsarigo, L; Duncan, K and Atalah, A (2020) The effect of prevailing wages on building costs, bid competition, and bidder behaviour: Evidence from Ohio school construction. Construction Management and Economics, 38(10), pp. 917-933. ISSN 01446193

Oo, B L (2007) Modelling individual contractors' bidding decisions in different competitive environments. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Oo, B L (2016) On the external validity of construction bidding experiment. Construction Economics and Building, 16(1), pp. 64-75. ISSN 2204-9029

Oo, B L (2017) Release of construction clients' pre-tender cost estimates: An experimental study. Construction Economics and Building, 17(4), pp. 37-47. ISSN 2204-9029

Oo, B L; Abdul-Aziz, A R and Lim, Y M (2011) Information feedback and learning in construction bidding. Construction Economics and Building, 11(3), pp. 33-44. ISSN 2204-9029

Oo, B L; Drew, D and Lo, H (2007) Modelling contractors' mark-up behaviour in different construction markets. Engineering, Construction and Architectural Management, 14(5), pp. 447-462. ISSN 0969-9988

Oo, B L; Drew, D S and Lo, H P (2007) Applying a random coefficients logistic model to contractors' decision to bid. Construction Management and Economics, 25(4), pp. 387-398. ISSN 1466433X

Oo, B L; Drew, D S and Lo, H P (2008) Heterogeneous approach to modeling contractors' decision-to-bid strategies. Journal of Construction Engineering and Management, 134(10), pp. 766-775. ISSN 0733-9364

Oo, B L; Drew, D S and Lo, H P (2010) Modeling the heterogeneity in contractors' mark-up behavior. Journal of Construction Engineering and Management, 136(7), pp. 720-729. ISSN 0733-9364

Oo, B L; Drew, D S and Runeson, G (2010) Competitor analysis in construction bidding. Construction Management and Economics, 28(12), pp. 1321-1329. ISSN 1466433X

Oo, B L; Lim, B T H and Runeson, G (2023) Mark-up on construction projects: what have we learnt in the last 20 years? Engineering, Construction and Architectural Management, 30(9), pp. 4319-4338. ISSN 0969-9988

Oo, B L and Lim, B T-H (2016) Game-based learning in construction management courses: A case of bidding game. Engineering, Construction and Architectural Management, 23(1), pp. 4-19. ISSN 0969-9988

Oo, B L; Ling, F Y Y and Soo, A (2015) Construction procurement: Modelling bidders' learning in recurrent bidding. Construction Economics and Building, 15(4), pp. 16-29. ISSN 2204-9029

Oo, B L; Lo, H P and Lim, B T H (2012) The effect of bidding success in construction bidding. Engineering, Construction and Architectural Management, 19(1), pp. 25-39. ISSN 0969-9988

Oo, B L and Tang, O S (2023) Information feedback in construction contract bidding: Perceptions of Hong Kong contractors. International Journal of Construction Management, 23(6), pp. 1044-1052. ISSN 1562-3599

Oo, B-L; Drew, D and Lo, H-P (2008) Comparing contractors' decision to bid in different market environments. Construction Economics and Building, 8(1), pp. 1-10. ISSN 2204-9029

Oo, B L; Nguyen, A T; Ahn, Y and Lim, B T H (2025) Predicting the number of bidders in construction competitive bidding using explainable machine learning models. Construction Innovation, 25(7), pp. 158-188. ISSN 1471-4175

Orsaah, S (1984) Perception and management of risk in the construction industry. PhD thesis, University of Strathclyde, UK.

Owen, G and Merna, A (1997) The private finance initiative. Engineering, Construction and Architectural Management, 4(3), pp. 163-177. ISSN 0969-9988

Oyeyipo, O O; Odusami, K T; Ojelabi, R A and Afolabi, A O (2016) Factors affecting contractors' bidding decisions for construction projects in Nigeria. Journal of Construction in Developing Countries, 21(2), pp. 21-35. ISSN 1823-6499

Paek, J H; Lee, Y W and Ock, J H (1993) Pricing construction risk: Fuzzy set application. Journal of Construction Engineering and Management, 119(4), pp. 743-756. ISSN 0733-9364

Pan, L-J (1996) A study of risk management in dealing with contracts in the construction industry. PhD thesis, University of Glasgow, UK.

Parker, P E (1992) Efficiency and the response to reform in Chinese urban construction enterprises: A production theory approach. PhD thesis, University of Washington, USA.

Parvar, J; Lowe, D; Emsley, M and Duff, A R (2000) Neural networks as a decision support system for the decision to bid process. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Pasquire, C L and King, J H J (2000) Project team performance within the Scottish water market based private finance initiative. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Patil, N A and Laishram, B S (2016) Sustainability of Indian PPP procurement process: Development of strategies for enhancement. Built Environment Project and Asset Management, 6(5), pp. 491-507. ISSN 2044-124X

Pearl, R G; Bowen, P A and Hall, K A (1998) The compilation of a tender submission: The role of method statements and construction planning charts. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Pearl, R G; Bowen, P A and Nkado, R N (1997) A communication-based examination of construction planning and tendering. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Pekuri, A; Pekuri, L and Haapasalo, H (2015) Business models and project selection in construction companies. Construction Innovation, 15(2), pp. 180-197. ISSN 1471-4175

Pennington, D E (1977) A cost analysis of the construction management method of school facility construction. EdD thesis, Indiana University, USA.

Perera, B A K S; Ekanayake, B J; Jayalath, C and Jayathilaka, G R H (2021) A study on variation-specific disputes that arise in road projects in Sri Lanka: A qualitative approach. International Journal of Construction Management, 21(6), pp. 571-581. ISSN 1562-3599

Perng, Y H and Chang, C L (2004) How does government procurement law affect bidding price competition in Taiwan? Building Research & Information, 32(6), pp. 497-509. ISSN 0961-3218

Perng, Y H; Juan, Y K and Chien, S F (2006) Exploring the bidding situation for economically most advantageous tender projects using a bidding game. Journal of Construction Engineering and Management, 132(10), pp. 1037-1042. ISSN 0733-9364

Pesek, A E (2017) Impact of construction document deficiencies on heavy/civil low-bid infrastructure projects and the introduction of a contractor document review assessment. PhD thesis, Arizona State University, USA.

Pham, V H S and Phan, K A (2023) Elaboration of willingness to pay and compensation demanded for costly bid preparation. International Journal of Construction Management, 23(7), pp. 1131-1137. ISSN 1562-3599

Phythian, G J (1991) Applications of knowledge-based expert systems in recurrent competitive bidding. PhD thesis, Loughborough University, UK.

Pin, T H and Scott, W F (1994) Bidding model for refurbishment work. Journal of Construction Engineering and Management, 120(2), pp. 257-273. ISSN 0733-9364

Polat, G and Donmez, U (2010) ANP-based marketing activity selection model for construction companies. Construction Innovation, 10(1), pp. 89-111. ISSN 1471-4175

Portugal, M. A. and Scur, G. (2026) Sustainability in stalled public works: A framework for measuring economic, social and environmental impacts. Construction Management and Economics, 44(7), pp. 481-498. ISSN 0144-6193

Qin, B and Green, S (2019) Change and continuity in the Chinese construction sector: Practitioner responses to bidding and tendering. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Qin, B and Green, S D (2022) The micro-practices of project organizing in the Chinese construction sector: A sensemaking perspective. Construction Management and Economics, 40(9), pp. 655-675. ISSN 01446193

Quah, L K (1988) An evaluation of the risks in estimating and tendering for refurbishment work. PhD thesis, Heriot-Watt University, UK.

Rabie, M and El-Sayegh, S (2017) Modelling of tri-parameter bidding integrating cost, time and risk: A stochastic approach. Journal of Financial Management of Property and Construction, 22(2), pp. 117-134. ISSN 1366-4387

Rahman, A (2014) The determinants of multinational contractors' willingness to bid for Australian public sector major infrastructure projects: deploying the eclectic paradigm of internationalisation. PhD thesis, Queensland University of Technology, Australia.

Raisbeck, P and Aibinu, A A (2010) Early stage cost estimation and the relationship of architects to quantity surveyors. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Rajput, B; Kore, S and Agarwal, A (2024) Competencies of civil engineering graduates: Indian construction professionals' perspective. International Journal of Construction Management, 24(11), pp. 1240-1248. ISSN 1562-3599

Ramachandra, T; Rotimi, J O and Gunaratne, S (2014) Reasons for contractors' delay claims failures in Sri Lanka. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Rastegar, H; Arbab Shirani, B; Mirmohammadi, S H and Akhondi Bajegani, E (2021) Stochastic programming model for bidding price decision in construction projects. Journal of Construction Engineering and Management, 147(4): 02008, ISSN 0733-9364

Rawlinson, S and Raftery, J (1997) Price stability and the business cycle: UK construction bidding patterns 1970-91. Construction Management and Economics, 15(1), pp. 5-18. ISSN 01446193

Rethnam, O R; Palaniappan, S and Ashokkumar, V (2020) Life cycle cost analysis of 1mw power generation using roof-top solar PV panels. Built Environment Project and Asset Management, 10(1), pp. 124-139. ISSN 2044-124X

Ribeiro, J A N P (2013) Essays on the use of real options approach in construction projects and build-own-transfer projects. PhD thesis, Universidade do Porto, Portugal.

Robson, A (2017) 'Cost as information' for construction supply chain improvements. PhD thesis, Birmingham City University, UK.

Rojas, E M (2008) Single versus multiple prime contracting. Journal of Construction Engineering and Management, 134(10), pp. 758-765. ISSN 0733-9364

Rossi, Mônica Therezinha Bartie (2012) Social housing and associative management, evaluation of the programs promoted by the state government of São Paulo in the period of 1990 to 2008. PhD thesis, Universidade de São Paulo, Brazil.

Rowings, J E and Kaspar, S L (1991) Constructability of cable-stayed bridges. Journal of Construction Engineering and Management, 117(2), pp. 259-278. ISSN 0733-9364

Rueda-Benavides, J; Gransberg, D; Khalafalla, M and Mayorga, C (2024) Probabilistic cost-based decision-making matrix: IDIQ vs. DBB contracting. Construction Management and Economics, 42(1), pp. 1-15. ISSN 01446193

Runeson, G and Skitmore, M (1999) Tendering theory revisited. Construction Management and Economics, 17(3), pp. 285-296. ISSN 01446193

Ruokolainen, A and Plat, H T (1998) A system for allocating of private home owners' annual budget to housing. Journal of Financial Management of Property and Construction, 3(3), pp. 37-48. ISSN 1366-4387

Saini, V (2009) Endogenous asymmetries in dynamic procurement auctions. PhD thesis, Johns Hopkins University, USA.

Samarghandi, H; Tabatabaei, S M M; Taabayan, P; Hashemi, A M and Willoughby, K (2016) Studying the reasons for delay and cost overrun in construction projects: The case of Iran. Journal of Construction in Developing Countries, 21(1), pp. 51-84. ISSN 1823-6499

Sanda, Y N; Anigbogu, N A; Izam, Y D and Nuhu, L Y (2022) Managing stakeholder opportunism in public-private partnership (PPP) housing projects. Journal of Construction in Developing Countries, 27(1), pp. 213-228. ISSN 1823-6499

Santoso, D S and Bourpanus, N (2019) Moving to e-bidding: Examining the changes in the bidding process and the bid mark-up decisions of Thai contractors. Journal of Financial Management of Property and Construction, 24(1), pp. 2-18. ISSN 1366-4387

Sayed, A M Z; Assaf, S; Aldosary, A S; Hassanain, M A and Abdallah, A (2020) Drivers of e-bidding implementation in the Saudi Arabian construction industry. Built Environment Project and Asset Management, 10(1), pp. 16-27. ISSN 2044-124X

Seydel, J (2003) Evaluating and comparing bidding optimization effectiveness. Journal of Construction Engineering and Management, 129(3), pp. 285-292. ISSN 0733-9364

Seydel, J and Olson, D L (1990) Bids considering multiple criteria. Journal of Construction Engineering and Management, 116(4), pp. 609-623. ISSN 0733-9364

Seydel, J F (1991) Development and implementation of multiple criteria approaches to optimization in construction bidding. PhD thesis, Texas A&M University, USA.

Shafie, K (1995) Building refurbishment contracts bid decision knowledge and its applicationan a knowledge based decision support system (ADJUBID). PhD thesis, University of London, University College London, UK.

Shamshiri, A; Ryu, K R; Park, J Y and Choi, K (2023) Project phase-based contingency adjustment framework for infrastructure renewal projects. Journal of Construction Engineering and Management, 149(2): 04022176, ISSN 0733-9364

Shane, J S (2006) A fundamental study of scope definition in early highway project development. PhD thesis, University of Colorado at Boulder, USA.

Shankar, R and Tan, W (2024) Bid variability in public-private partnerships: Lessons from asset monetization through the toll-operate-transfer model in India. Journal of Construction Engineering and Management, 150(12): 05024015, ISSN 0733-9364

Sharma, M (2014) Architectural design quality in local authority private finance initiative sheltered housing projects: the development of an evaluation tool. PhD thesis, Northumbria University, UK.

Shash, A A (1998) Bidding practices of subcontractors in Colorado. Journal of Construction Engineering and Management, 124(3), pp. 219-231. ISSN 0733-9364

Shash, A A (1998) Subcontractors' bidding decisions. Journal of Construction Engineering and Management, 124(2), pp. 101-106. ISSN 0733-9364

Shash, A A and Abdul-Hadi, N H (1992) Factors affecting a contractor's mark-up size decision in Saudi Arabia. Construction Management and Economics, 10(5), pp. 415-429. ISSN 01446193

Shash, A A and Abdul-Hadi, N H (1993) The effect of contractor size on mark-up size decision in Saudi Arabia. Construction Management and Economics, 11(6), pp. 421-429. ISSN 01446193

Shawa, H H (1995) Project related finance for construction contractors operating in the United Arab Emirates. PhD thesis, Loughborough University, UK.

Sheffer, D A (2011) Innovation in modular industries: Implementing energy-efficient innovations in us buildings. PhD thesis, Stanford University, USA.

Shehab, T; Blampied, N; Nasr, E and Sindhu, L (2024) Ann-based estimation model for the preconstruction cost of pavement rehabilitation projects. International Journal of Construction Management, 24(8), pp. 894-901. ISSN 1562-3599

Sheykhi, R (2016) Risk-based decision making support for construction corporate resource management. PhD thesis, Florida International University, USA.

Shiue, F J; Lee, H Y; Zheng, M C; Khitam, A F K and Assefa, S (2021) An estimation model of construction project segmentation for optimum project pricing. Engineering, Construction and Architectural Management, 28(9), pp. 2361-2380. ISSN 0969-9988

Shojaei Kol Kachi, A (2017) Extending the portfolio and strategic planning horizon by the stochastic forecasting of unknown future projects: A FDOT case study. PhD thesis, University of Florida, USA.

Shokri-Ghasabeh, M and Chileshe, N (2014) Knowledge management: Barriers to capturing lessons learned from Australian construction contractors' perspectives. Construction Innovation, 14(1), pp. 108-134. ISSN 1471-4175

Shokri-Ghasabeh, M and Chileshe, N (2016) Critical factors influencing the bid/no bid decision in the Australian construction industry. Construction Innovation, 16(2), pp. 127-157. ISSN 1471-4175

Shr, J F and Chen, W T (2004) Setting maximum incentive for incentive/disincentive contracts for highway projects. Journal of Construction Engineering and Management, 130(1), pp. 84-93. ISSN 0733-9364

Shr, J F; Ran, B and Sung, C W (2004) Method to determine minimum contract bid for A + B+ I/D highway projects. Journal of Construction Engineering and Management, 130(4), pp. 509-516. ISSN 0733-9364

Shr, J-F (1999) Model development for cost-plus-time bidding applied to Florida department of transportation highway construction. PhD thesis, University of Wisconsin - Madison, USA.

Shrestha, R; Ko, T and Lee, J (2025) Quantifying project uncertainties: Leveraging historical bid and change order data for automated detection of cost and schedule impacts in new projects. Journal of Construction Engineering and Management, 151(4): 04025017, ISSN 0733-9364

Shrestha, Rabin (2024) Prediction of cost and schedule changes in transportation projects through historical bid and change order document analysis – using Oklahoma dot project cases. PhD thesis, University of Nevada, Las Vegas, USA.

Singh, A and Shoura, M M (1996) Optimizing bidding success and profitability in airport runway construction in French Polynesia. Construction Management and Economics, 14(6), pp. 507-530.

Skitmore, M (1991) The construction contract bidder homogeneity assumption: An empirical test. Construction Management and Economics, 9(5), pp. 403-429. ISSN 01446193

Skitmore, M (2004) Predicting the probability of winning sealed bid auctions: The effects of outliers on bidding models. Construction Management and Economics, 22(1), pp. 101-109. ISSN 01446193

Skitmore, M (2008) First and second price independent values sealed bid procurement auctions: Some scalar equilibrium results. Construction Management and Economics, 26(8), pp. 785-801. ISSN 1466433X

Skitmore, M; Drew, D and Ngai, S (2001) Bid-spread. Journal of Construction Engineering and Management, 127(2), pp. 149-153. ISSN 0733-9364

Skitmore, M and Runeson, G (2006) Bidding models: Testing the stationarity assumption. Construction Management and Economics, 24(8), pp. 791-803. ISSN 1466433X

Skitmore, R M (1986) A model of the construction project selection and bidding decision. PhD thesis, University of Salford, UK.

Skitmore, R M; Pettitt, A N and McVinish, R (2007) Gates' bidding model. Journal of Construction Engineering and Management, 133(11), pp. 855-863. ISSN 0733-9364

Smith, G R and Bohn, C M (1999) Small to medium contractor contingency and assumption of risk. Journal of Construction Engineering and Management, 125(2), pp. 101-108. ISSN 0733-9364

Somboonpisan, J and Limsawasd, C (2021) Environmental weight for bid evaluation to promote sustainability in highway construction projects. Journal of Construction Engineering and Management, 147(4): 04021013, ISSN 0733-9364

Soo, A and Oo, B L (2010) The effect of information feedback in construction bidding. Construction Economics and Building, 10(1-2), pp. 65-75. ISSN 2204-9029

Soo, A and Oo, B L (2014) The effect of construction demand on contract auctions: An experiment. Engineering, Construction and Architectural Management, 21(3), pp. 276-290. ISSN 0969-9988

Soo, Alexander (2015) The effect of construction demand on inexperienced bidders' bidding behaviour. PhD thesis, University of Sydney, Australia.

South, A J (2019) Stakeholder network dynamics and the governance of public-private partnerships. PhD thesis, Stanford University, USA.

Stenbeck, T (2007) Promoting innovation in transportation infrastructure maintenance: Incentives contracting and performance based specifications. PhD thesis, KTH Royal Institute of Technology, Sweden.

Stjern, M (1998) Uncertainty in construction contracting: A new approach for contractors. DrIng thesis, Norges Teknisk-Naturvitenskapelige Universitet, Norway.

Sturts, C S (2001) Value-bidding: An integrative approach utilizing conjoint analysis and classical bidding theory. PhD thesis, Columbia University, USA.

Sturts, C S and Griffis, F H (2005) Addressing pricing: Value bidding for engineers and consultants. Journal of Construction Engineering and Management, 131(6), pp. 621-630. ISSN 0733-9364

Su, Y (2017) Unified quantitative modeling for integrated multi-objective project management with singularity functions. PhD thesis, Catholic University of America, USA.

Su, Y and Lucko, G (2015) Synthetic cash flow model with singularity functions for unbalanced bidding scenarios. Construction Management and Economics, 33(1), pp. 35-54. ISSN 01446193

Subsomboon, K (2004) A procurement and material management (PMM) system based on the fully integrated and automated project process (FIAPP). PhD thesis, Columbia University, USA.

Sugrue, P K (1977) The design and evaluation of three competitive bidding models for application in the construction industry. PhD thesis, University of Massachusetts Amherst, USA.

Tam, V W Y and Shen, L Y (2010) On applications of an optimal price-time bidding model in Hong Kong foundation projects. Construction Innovation, 10(1), pp. 14-24. ISSN 1471-4175

Tamer, Z; Yoon, Y and Hastak, M (2012) Protocol for profitability analysis using internal entities in organizational structure of construction companies. Journal of Construction Engineering and Management, 138(12), pp. 1394-1402. ISSN 0733-9364

Tan, Y and Shen, L (2010) A fuzzy competence requirement (FCR) model for competitive bidding strategy. Construction Innovation, 10(1), pp. 75-88. ISSN 1471-4175

Tan, Y; Shen, L and Langston, C (2010) Contractors' competition strategies in bidding: Hong Kong study. Journal of Construction Engineering and Management, 136(10), pp. 1069-1077. ISSN 0733-9364

Tavakoli, A and Tulumen, S C (1990) Construction industry in Turkey. Construction Management and Economics, 8(1), pp. 77-87. ISSN 01446193

Tchorly, J T (2020) The development of a bidding and award process map for road PPP projects in Ghana. PhD thesis, University of Salford, UK.

Teo, H P (1990) Decision support and risk management system for competitive bidding in refurbishment work. PhD thesis, Heriot-Watt University, UK.

Thurnell, D and Lee, I (2009) Subcontractors perceptions regarding bid shopping in auckland, New Zealand. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Tiong, R L; Yeo, K T and McCarthy, S C (1992) Critical success factors in winning BOT contracts. Journal of Construction Engineering and Management, 118(2), pp. 217-228. ISSN 0733-9364

Titirla, M and Aretoulis, G (2019) Neural network models for actual duration of Greek highway projects. Journal of Engineering, Design and Technology, 17(6), pp. 1323-1339. ISSN 1726-0531

Tong, M K L (2011) The management of inter-organisational relationships and project based learning. PhD thesis, Glasgow Caledonian University, UK.

Toolanen, B (2008) Lean contracting relational contracting influenced by lean thinking. PhD thesis, Luleå University of Technology, Sweden.

Trost, S M (1998) A quantitative model for predicting the accuracy of early cost estimates for construction projects in the process industry. PhD thesis, Oklahoma State University, USA.

Trost, S M and Oberlender, G D (2003) Predicting accuracy of early cost estimates using factor analysis and multivariate regression. Journal of Construction Engineering and Management, 129(2), pp. 198-204. ISSN 0733-9364

Tutt D, H C (2013) Journeys through the cave: The use of 3D immersive environments for client engagement practices in hospital design. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Uduwage Don, N L S; Panuwatwanich, K and Waidyasekara, K G A S (2025) Multicriteria selection practices in public tender evaluation process: The case of Sri Lanka. Built Environment Project and Asset Management, 15(3), pp. 733-751. ISSN 2044-124X

Uher, T E (1996) Cost estimating practices in Australian construction. Engineering, Construction and Architectural Management, 3(1-2), pp. 83-95. ISSN 0969-9988

Uher, Thomas Edward (1990) The effect of risks and uncertainties on subcontract bid prices. Unpublished PhD thesis, University of New South Wales, Australia.

Ullal, A (2023) Construction conditions and practices during war in Afghanistan. Journal of Construction Engineering and Management, 149(5): 05023005, ISSN 0733-9364

Ullal, André (2018) Clear, Hold and Build: Conditions and practices characterising construction in conflict and post-conflict settings. PhD thesis, University of Melbourne, Australia.

Unsal, H I (2010) Modeling the hold-up problem and absorptive capacity of project networks. PhD thesis, Columbia University, USA.

Urquhart, S; Whyte, A and Lloyd, N (2017) The development of a more efficient internal tender procedure framework for Australian construction contractors. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Van Der Meulen, G J R and Money, A H (1984) The bidding game. Journal of Construction Engineering and Management, 110(2), pp. 153-164. ISSN 0733-9364

Vassallo, J M (2007) Implementation of quality criteria in tendering and regulating infrastructure management contracts. Journal of Construction Engineering and Management, 133(8), pp. 553-561. ISSN 0733-9364

Vasserman, S (2019) Essays on industrial organization. PhD thesis, Harvard University, USA.

Vogelius, P and Storgaard, K (2016) Cooperation in construction: The role of values. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Waara, F and Bröchner, J (2006) Price and nonprice criteria for contractor selection. Journal of Construction Engineering and Management, 132(8), pp. 797-804. ISSN 0733-9364

Wah, L W (2015) Impact of organisational culture on Malaysian international contractors’ bidding decisions. PhD thesis, University of Malaya, Malaysia.

Walker, D and Jacobsson, M (2014) A rationale for alliancing within a public-private partnership. Engineering, Construction and Architectural Management, 21(6), pp. 648-673. ISSN 0969-9988

Wamuziri, S (2009) Using electronic reverse auctions in project procurement: Perceptions of construction contractors. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Wamuziri, S and Abu-Shaaban, N (2005) Potential of reverse auctions in construction procurement. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Wang, C and Zhang, S (2025) The impact of trust and risk perception on contractors' bid/no-bid decision-making in China: A multiple mediation model. Engineering, Construction and Architectural Management, 32(10), pp. 6980-7005. ISSN 0969-9988

Wang, B; Zhang, S; Wang, X and Feng, Z (2018) The influence of quality benefit and marginal contribution on the optimal equity structure of the PPP projects: Balancing public and private benefits. Construction Management and Economics, 36(11), pp. 611-622. ISSN 01446193

Wang, J; Li, X; Memari, A; Skitmore, M; Zhong, Y and Ashuri, B (2023) Data-driven assessment on the corporate credit scoring mechanism for Chinese construction supervision companies. Construction Management and Economics, 41(11-12), pp. 961-975. ISSN 01446193

Wang, J; Li, X; Memari, A; Skitmore, M; Zhong, Y; Ashuri, B; Chen, J and Cao, J (2025) Assessing the implementation and effectiveness of China's social credit system of the construction industry: a case study of Nanjing. International Journal of Construction Management, 25(7), pp. 850-859. ISSN 1562-3599

Wang, W C (2004) Electronic-based procedure for managing unbalanced bids. Journal of Construction Engineering and Management, 130(3), pp. 455-460. ISSN 0733-9364

Wang, X; Liu, R; Ye, K and Tekka, R S (2020) Modelling the cost of collusion in the construction industry: A case of China. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Wang, Z; Liu, J and Guan, X (2022) Investigating the causal complexity of corruption in project-based organizations: A scenario analysis of bidding activity in the Chinese construction sector. Engineering, Construction and Architectural Management, 29(10), pp. 3893-3916. ISSN 0969-9988

Wanous, M (2000) A neurofuzzy expert system for competitive tendering in civil engineering. PhD thesis, University of Liverpool, UK.

Wanous, M; Boussabaine, A H and Lewis, J (1998) Tendering factors considered by Syrian contractors. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Wanous, M; Boussabaine, A H and Lewis, J (1999) A qualitative bidding model. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Wanous, M; Boussabaine, A H and Lewis, J (2000) To bid or not to bid: A parametric solution. Construction Management and Economics, 18(4), pp. 457-466. ISSN 01446193

Wanous, M; Boussabaine, H and Lewis, J (2004) A neurofuzzy decision-support model for mark-up estimation. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Wanous, M; Boussabaine, H A and Lewis, J (2003) A neural network bid/no bid model: The case for contractors in Syria. Construction Management and Economics, 21(7), pp. 737-744. ISSN 01446193

Watanabe, R; Watanabe, T and Skitmore, M (2025) Evaluating the implementation of innovative technology in japan's bidding system: A dynamic stackelberg game theoretical analysis. Construction Management and Economics, 43(9), pp. 657-684. ISSN 0144-6193

Watters, J S J (1985) The number of bidders, concentration ratios and markets in the highway construction industry. PhD thesis, University of Missouri - Columbia, USA.

White, A S (2005) Public sector tendering: Issues and analysis. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Whittaker, J D (1970) A study of competitive bidding with particular reference to the construction industry. PhD thesis, City, University of London, UK.

Williams, T P (2002) Predicting completed project cost using bidding data. Construction Management and Economics, 20(3), pp. 225-235. ISSN 01446193

Williams, T P (2005) Bidding ratios to predict highway project costs. Engineering, Construction and Architectural Management, 12(1), pp. 38-51. ISSN 0969-9988

Williams, T P (2007) Application of treemaps to the analysis of competitively bid project cost overruns. Construction Innovation, 7(4), pp. 340-356. ISSN 1471-4175

Williams Jr., G H (2003) An evaluation of public construction contracting methods for the public building sector in Oregon using data envelopment analysis. PhD thesis, Portland State University, USA.

Williamson, M; Wilson, O; Skitmore, R M and Runeson, G (2004) Client abuses of the competitive tendering system: some general principles and a case study. Journal of Construction Research, 5(1), pp. 61-73. ISSN 1609-9451

Wilson, O D and Sharpe, K (1988) Tenders and estimates: A probabilistic model. Construction Management and Economics, 6(3), pp. 225-245. ISSN 01446193

Witteveen, W and Dorée, A (2011) Quick and effective: An innovative procurement scheme for six Dutch highway projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Won, S J (2011) A general performance model for design-build highway pavement warranty decisions. PhD thesis, University of Colorado at Boulder, USA.

Wong, J T Y and Hui, E C M (2006) Construction project risks: Further considerations for constructors' pricing in Hong Kong. Construction Management and Economics, 24(4), pp. 425-438. ISSN 01446193

Wood, G; Davis, P and Lowe, J (2011) Concentration in the UK construction sector. Journal of Financial Management of Property and Construction, 16(3), pp. 232-248. ISSN 1366-4387

Wu, M L and Lo, H P (2009) Optimal strategy modeling for price-time biparameter construction bidding. Journal of Construction Engineering and Management, 135(4), pp. 298-306. ISSN 0733-9364

Xenidis, Y and Angelides, D (2005) The financial risks in build-operate-transfer projects. Construction Management and Economics, 23(4), pp. 431-441. ISSN 01446193

Yan, S (1992) Intermodal pricing and operations using network flow techniques. PhD thesis, Massachusetts Institute of Technology, USA.

Yasamis-Speroni, F; Lee, D E and Arditi, D (2012) Evaluating the quality performance of pavement contractors. Journal of Construction Engineering and Management, 138(10), pp. 1114-1124. ISSN 0733-9364

Yizhe, T and Youjie, L (1992) Unbalanced bidding on contracts with. Variation trends in client-provided quantities. Construction Management and Economics, 10(1), pp. 69-80. ISSN 01446193

Yu, B (2007) Essays on structural analysis of procurement auctions. PhD thesis, Ohio State University, USA.

Yu, W D; Chang, H K; Hsu, Y Y; Cheng, S T and Wang, K W (2020) Pretendering decision model for contractor selection of public procurement projects. Journal of Construction Engineering and Management, 146(11): 04020126, ISSN 0733-9364

Yu, W D; Wang, K W and Wang, M T (2013) Pricing strategy for best value tender. Journal of Construction Engineering and Management, 139(6), pp. 675-684. ISSN 0733-9364

Yuan, X X (2011) A correlated bidding model for markup size decisions. Construction Management and Economics, 29(11), pp. 1101-1119. ISSN 1466433X

Yuan, X X (2012) Bayesian method for the correlated competitive bidding model. Construction Management and Economics, 30(6), pp. 477-491. ISSN 1466433X

Zhang, L (2022) Risk management framework to guide off-site manufacturing process: a Chinese perspective. PhD thesis, University of Strathclyde, UK.

Zhang, R; Xing, J; Ye, K; Lu, W and Shan, Y (2019) Synchronicity of global construction cost indexes. Engineering, Construction and Architectural Management, 26(3), pp. 367-385. ISSN 0969-9988

Zhang, X; Yu, Y; He, W and Chen, Y (2021) Bidding decision-support model for construction projects based on projection pursuit learning method. Journal of Construction Engineering and Management, 147(7): 04021054, ISSN 0733-9364

Zhang, Y; Oo, B L and Lim, B T H (2023) Factors affecting contractors' bid or no-bid and mark-up decisions: A case of the jilin province, China. Construction Innovation, 23(5), pp. 1232-1254. ISSN 1471-4175

Zhang S J, C Y Q F Y C (2013) Risk attitude of Chinese contractors in bid/no bid decision-making of international projects: A preliminary study. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Zhao, J (2014) Performance modeling and optimization solutions for networking systems. PhD thesis, University of Hong Kong, Hong Kong.

Zhao, Y; Jing, H; Yu, M and Li, J (2025) Efficient project management of historical building groups: a BIM-based approach with critical chain method and 5D simulation. International Journal of Construction Management, 25(7), pp. 826-839. ISSN 1562-3599

Zhou, L (2009) Achieving sustainable development through the private finance initiative procurement process. PhD thesis, Oxford Brookes University, UK.

Zhou, X (2011) Managing commodity risks in highway contracts: Quantifying premiums, accounting for correlations among risk factors, and designing optimal price-adjustment contracts. PhD thesis, Texas A&M University, USA.

Zhou, X (2011) Three essays on construction procurement industry and public policies. PhD thesis, University of Oklahoma, USA.

de Neufville, R and King, D (1991) Risk and need-for-work premiums in contractor bidding. Journal of Construction Engineering and Management, 117(4), pp. 659-673. ISSN 0733-9364

This list was generated on Sat Aug 22 01:42:34 2026 UTC.