Items with Index Term: bid preparation

Number of items: 24.

Ashuri, B; Shahandashti, S M and Lu, J (2012) Empirical tests for identifying leading indicators of ENR construction cost index. Construction Management and Economics, 30(11), pp. 917-927. ISSN 1466433X

Charbel, G; Assaad, R H; Qiao, Y and Labi, S (2025) Predicting the level of competition and determining optimal bidding strategies for bundled projects: Integrating machine-learning algorithms and probabilistic modeling. Journal of Construction Engineering and Management, 151(11): 04025178, ISSN 0733-9364

Dikmen, I; Birgonul, M T and Arikan, A E (2006) Application of an integrated risk management system (IRMS) to an international construction project. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Dozzi, S P; Abourizk, S M and Schroeder, S L (1996) Utility-theory model for bid markup decisions. Journal of Construction Engineering and Management, 122(2), pp. 119-124. ISSN 0733-9364

Duzkale, A K (2013) Reducing uncertainty in bid preparation phase of cost estimating for structural steel. PhD thesis, Catholic University of America, USA.

Duzkale, A K and Lucko, G (2016) Exposing uncertainty in bid preparation of steel construction cost estimating: I. Conceptual framework and qualitative C-I-V-I-L classification. Journal of Construction Engineering and Management, 142(10): 04016049, ISSN 0733-9364

Duzkale, A K and Lucko, G (2016) Exposing uncertainty in bid preparation of steel construction cost estimating: II. Comparative analysis and quantitative C-I-V-I-L classification. Journal of Construction Engineering and Management, 142(10): 04016050, ISSN 0733-9364

Enshassi, A; Mohamed, S and Modough, Z (2013) Contractors' selection criteria: Opinions of Palestinian construction professionals. International Journal of Construction Management, 13(1), pp. 19-37. ISSN 1562-3599

Fayek, A (1998) Competitive bidding strategy model and software system for bid preparation. Journal of Construction Engineering and Management, 124(1), pp. 1-10. ISSN 0733-9364

Hasantha, M L; Waidyasekara, A S and Victar, H C (2025) Evaluation of time allocated for bid preparation in national competitive bidding in the Sri Lankan construction industry. Engineering, Construction and Architectural Management, 32(7), pp. 4310-4337. ISSN 0969-9988

Hegazy, T and Moselhi, O (1994) Estimator: A prototype of an integrated bid preparation system. Engineering, Construction and Architectural Management, 1(1), pp. 51-67. ISSN 0969-9988

Hegazy, T M (1994) Integrated bid preparation with emphases on risk assessment using neural networks. PhD thesis, Concordia University, Canada.

Ho, S P (2005) Bid compensation decision model for projects with costly bid preparation. Journal of Construction Engineering and Management, 131(2), pp. 151-159. ISSN 0733-9364

Latif, H M (2014) Case studies of Malaysian contractors' bidding process: ethical principles and practices. PhD thesis, University of Reading, UK.

Maftei, L and Harty, C (2014) Designers' perspectives on the use of immersive virtual reality technology in practice. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Maftei, L and Harty, C (2016) Challenging design perceptions in immersive virtual reality environments. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Maftei L, H C (2013) Accounting for users: Design team work in immersive virtual reality environments. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Neil, J M (1978) Construction cost estimating concepts and their application. PhD thesis, Texas A&M University, USA.

Pakgohar, A (2014) Hierarchical multi-project planning and supply chain management: an integrated framework. PhD thesis, University of Exeter, UK.

Pearl, R G; Bowen, P A and Hall, K A (1998) The compilation of a tender submission: The role of method statements and construction planning charts. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Pham, V H S and Phan, K A (2023) Elaboration of willingness to pay and compensation demanded for costly bid preparation. International Journal of Construction Management, 23(7), pp. 1131-1137. ISSN 1562-3599

Phythian, G J (1991) Applications of knowledge-based expert systems in recurrent competitive bidding. PhD thesis, Loughborough University, UK.

Shahandashti, S M and Ashuri, B (2013) Forecasting Engineering News-Record construction cost index using multivariate time series models. Journal of Construction Engineering and Management, 139(9), pp. 1237-1243. ISSN 0733-9364

Wang, J; Qu, Z and Skitmore, M (2026) Predicting construction cost index using a VMD-GRU framework with the mhsa mechanism. Journal of Construction Engineering and Management, 152(1): 04025236, ISSN 0733-9364

This list was generated on Sat Aug 22 01:53:07 2026 UTC.