Items with Index Term: automation

Number of items: 498.

A. Mohy, A.; Bassioni, H. A.; Elgendi, E. O. and Hassan, T. M. (2026) Modeling spatiotemporal hazard dynamics for construction safety using graph attention networks. Journal of Engineering, Design and Technology, ISSN 1726-0531

Aagaard, L K (2021) The meaning of convenience in smart home imaginaries: Tech industry insights. Buildings & Cities, 2(1), pp. 568-582. ISSN 2632-6655

Abbas, M A; Ajayi, S O; Oyegoke, A S and Alaka, H (2024) A cloud-based collaborative ecosystem for the automation of BIM execution plan (BEP). Journal of Engineering, Design and Technology, 22(4), pp. 1306-1324. ISSN 1726-0531

Abdelmassih, A; Faddoul, R and Geara, F (2023) Impact of autonomous solutions on earthmoving electrification using machine learning: Case study. Construction Innovation, 23(3), pp. 606-621. ISSN 1471-4175

Abdullahi, B; Ibrahim, Y M; Ibrahim, A and Bala, K (2020) Development of e-tendering evaluation system for Nigerian public sector. Journal of Engineering, Design and Technology, 18(1), pp. 122-149. ISSN 1726-0531

Abkar, M M A; Yunus, R; Harouache, A; Gamil, Y and Al-Shameri, A S A S (2025) The adoption of automation technology for the mitigation of material waste on construction sites in the Malaysian construction industry. International Journal of Construction Management, 25(5), pp. 530-541. ISSN 1562-3599

Abou-Zeid, A M K (1993) Data flow identification to support project automation/integration and productivity. PhD thesis, University of Wisconsin - Madison, USA.

AbouRizk, S and Mather, K (2000) Simplifying simulation modeling through integration with 3D CAD. Journal of Construction Engineering and Management, 126(6), pp. 475-483. ISSN 0733-9364

Abourizk, S (2010) Role of simulation in construction engineering and management. Journal of Construction Engineering and Management, 136(10), pp. 1140-1153. ISSN 0733-9364

Abourizk, S; Halpin, D; Mohamed, Y and Hermann, U (2011) Research in modeling and simulation for improving construction engineering operations. Journal of Construction Engineering and Management, 137(10), pp. 843-852. ISSN 1943-7862

Abrishami, S; Goulding, J; Pour, R F and Ganah, A (2015) Virtual generative BIM workspace for maximising AEC conceptual design innovation: A paradigm of future opportunities. Construction Innovation, 15(1), pp. 24-41. ISSN 1471-4175

Abrishami, S; Goulding, J and Rahimian, F (2021) Generative BIM workspace for AEC conceptual design automation: Prototype development. Engineering, Construction and Architectural Management, 28(2), pp. 482-509. ISSN 0969-9988

Abu-Hijleh, S F (1991) A model for variance-based exception reporting with user-defined criteria. PhD thesis, University of California, Berkeley, USA.

Ackerly, K and Brager, G (2013) Window signalling systems: Control strategies and occupant behaviour. Building Research & Information, 41(3), pp. 342-360. ISSN 0961-3218

Aftab, U; Hassan, M U; Ullah, F; Nasir, A R and Thaheem, M J (2026) BIM-based search and selection of construction material suppliers: A dedicated framework and prototype. Construction Innovation, 26(3), pp. 892-915. ISSN 1471-4175

Aghajamali, K; Nekouvaght Tak, A; Taghaddos, H; Mousaei, A; Behzadipour, S and Hermann, U (2023) Planning of mobile crane walking operations in congested industrial construction sites. Journal of Construction Engineering and Management, 149(7): 04023047, ISSN 0733-9364

Aghimien, D O; Aigbavboa, C O; Oke, A E and Thwala, W D (2020) Mapping out research focus for robotics and automation research in construction-related studies: A bibliometric approach. Journal of Engineering, Design and Technology, 18(5), pp. 1063-1079. ISSN 1726-0531

Ajayi, S O; Oyebiyi, F and Alaka, H A (2023) Facilitating compliance with BIM ISO 19650 naming convention through automation. Journal of Engineering, Design and Technology, 21(1), pp. 108-129. ISSN 1726-0531

Akande, I.; Opoko, A. P. and Adewolu, A. O. (2026) Exploring the relationships between emerging technologies and design process in Nigerian architectural firms. Engineering, Construction and Architectural Management, pp. 1-21. ISSN 0969-9988

Akinlolu, M; Haupt, T C; Edwards, D J and Simpeh, F (2022) A bibliometric review of the status and emerging research trends in construction safety management technologies. International Journal of Construction Management, 22(14), pp. 2699-2711. ISSN 1562-3599

Akomea-Frimpong, I; Dzagli, J R A D; Eluerkeh, K; Bonsu, F B; Opoku-Brafi, S; Gyimah, S; Asuming, N A S; Atibila, D W and Kukah, A S (2025) A systematic review of artificial intelligence in managing climate risks of PPP infrastructure projects. Engineering, Construction and Architectural Management, 32(4), pp. 2430-2454. ISSN 0969-9988

Akrawi, S G (1998) Sensing and real-time expert system for a masonry building robot. PhD thesis, City, University of London, UK.

Al Bunni, A (2020) Refurbishment of UK state school buildings: a strategy and framework for BIM-based digital twinning. PhD thesis, De Montfort University, UK.

Al-Fares, M A (1995) On the development of an integrated system for the automation of on-site reinforced concrete construction. PhD thesis, University of Wisconsin - Madison, USA.

Al-Hussein, M; Alkass, S and Moselhi, O (2005) Optimization algorithm for selection and on site location of mobile cranes. Journal of Construction Engineering and Management, 131(5), pp. 579-590. ISSN 0733-9364

Al-Hussein, M; Kumar, J; Sharma, V and Mah, D (2006) A knowledge-based automated development permit approval process in the housing industry. Engineering, Construction and Architectural Management, 13(3), pp. 290-306. ISSN 0969-9988

Al-Mohammad, M S; Haron, A T; Aloko, M N and Rahman, R A (2023) Factors affecting BIM implementation in post-conflict low-income economies: The case of Afghanistan. Journal of Engineering, Design and Technology, 21(1), pp. 299-318. ISSN 1726-0531

Al-Mohammad, M S; Haron, A T; Esa, M; Aloko, M N; Alhammadi, Y; Anandh, K S and Rahman, R A (2023) Factors affecting BIM implementation: Evidence from countries with different income levels. Construction Innovation, 23(3), pp. 683-710. ISSN 1471-4175

Al-Rugaib, T A (1996) Project information, office automation, and quality in building production process in Saudi Arabia. PhD thesis, Cardiff University, UK.

Al-Saeed, Y; Edwards, D J and Scaysbrook, S (2020) Automating construction manufacturing procedures using BIM digital objects (BDOs): Case study of knowledge transfer partnership project in UK. Construction Innovation, 20(3), pp. 345-377. ISSN 1471-4175

Albar, A M (2022) The design and development of an intelligent adaptive extrusion system for additive manufacturing robotics in construction using advanced cementitious materials. PhD thesis, Brunel University, UK.

Aliasgari, R; Fan, C; Li, X; Golabchi, A and Hamzeh, F (2024) MOCAP and ai-based automated physical demand analysis for workplace safety. Journal of Construction Engineering and Management, 150(7): 04024060, ISSN 0733-9364

Aliu, J; Oke, A E and Oni, S B (2024) Evaluating strategies to promote mechatronics deployment in AECO projects: A Nigerian construction practitioners' perspectives. International Journal of Construction Management, 24(14), pp. 1540-1549. ISSN 1562-3599

Alkaabi, J A (1994) Improved materials management using automatic identification techniques. PhD thesis, Loughborough University, UK.

Allam, A; Elbeltagi, E; Abouelsaad, M N and E. El Madawy, M (2026) Integrated BIM-GA approach for slab formwork design optimization. Construction Innovation, 26(2), pp. 631-651. ISSN 1471-4175

Allouche, E N (2001) A decision-support model for selection of a trenchless construction method. PhD thesis, University of Alberta, Canada.

Alnaggar, Ahmed Mohamed Mohamed Moustafa (2022) Digital transformation in asset management organisations: towards a data driven approach for life cycle asset management. PhD thesis, University College London, UK.

Alshawi, M and Hassan, Z (1999) Integrated models for construction planning: Object flow and relationship. Engineering, Construction and Architectural Management, 6(2), pp. 197-212. ISSN 0969-9988

Alumbugu, P O (2019) Construction material logistics management: the case of north-central Nigeria. PhD thesis, Nelson Mandela University, South Africa.

Alwisy, A; Bu Hamdan, S; Barkokebas, B; Bouferguene, A and Al-Hussein, M (2019) A BIM-based automation of design and drafting for manufacturing of wood panels for modular residential buildings. International Journal of Construction Management, 19(3), pp. 187-205. ISSN 1562-3599

Amarkhil, Q.; Alroomi, A. S. and Narimani, M. R. (2026) Leveraging BIM, EPS and constraint programming for automated scheduling: A methodology for structured scheduling data and combinatorial optimization. Engineering, Construction and Architectural Management, 33(3), pp. 1980-2006. ISSN 0969-9988

Amirudin, R B (1998) The application of a knowledge-based engineering approach to the structural design of steel framed office buildings. PhD thesis, University of Reading, UK.

Anthony, R; K. S, A; Prasanna, K and Sawhney, A (2025) An exploratory study on the application of digital twins in the Indian construction industry. International Journal of Construction Management, 25(9), pp. 996-1007. ISSN 1562-3599

Aouad, G F; Sun, M and Faraj, I (2002) Automatic generation of data representations for construction applications. Construction Innovation, 2(3), pp. 151-165. ISSN 1471-4175

Ariyachandra, M R M F and Brilakis, I (2020) Detection of railway masts in airborne lidar data. Journal of Construction Engineering and Management, 146(9): 04020105, ISSN 0733-9364

Assaad, R H; El-Adaway, I H; Hastak, M and Lascola Needy, K (2022) Quantification of the state of practice of offsite construction and related technologies: Current trends and future prospects. Journal of Construction Engineering and Management, 148(7): 04022055, ISSN 0733-9364

Atherinis, D; Bakowski, B; Velcek, M and Moon, S (2018) Developing and laboratory testing a smart system for automated falsework inspection in construction. Journal of Construction Engineering and Management, 144(3): 04017119, ISSN 0733-9364

Atuahene, B T; Kanjanabootra, S and Gajendra, T (2020) Benefits of big data application experienced in the construction industry: A case of an Australian construction company. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Augugliaro, F (2015) Physical interaction, aerial construction, and coordinated flight for flying machines. DSc thesis, ETH Zürich, Switzerland.

Ayman Anwar, R (2022) Enhancing the integration of sustainability assessment within dynamic BIM enabled design projects. PhD thesis, Northumbria University, UK.

Azzouz, A (2018) Current perspectives and future directions of BIM assessment methods. PhD thesis, University of Bath, UK.

Ağar, M (2024) A rule based expert system for delay analysis in construction projects. PhD thesis, Middle East Technical University, Turkey.

Back, W E (1994) Quantifying benefits of electronic technology applied to bulk materials management. PhD thesis, Clemson University, USA.

Bademosi, F and Issa, R R A (2021) Factors influencing adoption and integration of construction robotics and automation technology in the US. Journal of Construction Engineering and Management, 147(8): 04021075, ISSN 0733-9364

Bademosi, F M (2019) Robotics and automation in construction: Assessment of knowledge, skills and abilities necessary for talent cultivation in industry and education. PhD thesis, University of Florida, USA.

Badi, S. and Oyedokun, T. (2026) Antecedents and consequences of psychological ownership in tokenised real estate markets. Built Environment Project and Asset Management, 8, pp. 1-20. ISSN 2044-124X

Baghaei, M (2024) Developing a framework and understanding the key influencing factors for the implementation of the internet of things (IoT) in the UK construction sector. PhD thesis, University of Salford, UK.

Bai, L (2013) RFID sensor-driven structural condition monitoring in integrated building information modeling environment. PhD thesis, University of Maryland, College Park, USA.

Baienat, S. and Iordanova, I. (2026) Quantifying building adaptability and circular performance through BIM: The adaptation intensity index (AII), circular adaptability performance (CAP), and digital adaptability passport (DAP). Smart and Sustainable Built Environment, pp. 1-22. ISSN 2046-6099

Banerjee, S (2022) Developing an organization-wide knowledge repository with intelligent knowledge transference to enhance construction project outcomes. PhD thesis, North Carolina State University, USA.

Bayrak, T and Kaka, A (2004) Evaluation of digital photogrammetry and 3D CAD modelling applications in construction management. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Beach, T; Yeung, J; Ghoroghi, A and Rezgui, Y (2025) Moving automated compliance checking to the operational phase of the building life-cycle: analysis and feasibility study in the UK. International Journal of Construction Management, 25(7), pp. 840-849. ISSN 1562-3599

Bearup, W K (1995) An environment to support computer-assisted design review. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Beliveau, Y J; Dixit, S S; Dal, T and Morad, A A (1993) Multitask motion planning for material handling in construction. Journal of Construction Engineering and Management, 119(1), pp. 180-191. ISSN 0733-9364

Bernold, L E; Lorenc, S J and Luces, E (1997) Intelligent technology for truck crane accident prevention. Journal of Construction Engineering and Management, 123(3), pp. 276-284. ISSN 0733-9364

Bhagwat, K and Venkata Santosh Kumar, D (2022) A systematic review of construction safety research: Quantitative and qualitative content analysis approach. Built Environment Project and Asset Management, 12(2), pp. 243-261. ISSN 2044-124X

Bigdellou, S and Chen, Q (2026) Quantification of economic influences on technology adoption and diffusion in the construction industry. International Journal of Construction Management, 26(4), pp. 621-638. ISSN 1562-3599

Blyth, K; Lewis, J and Kaka, A (2004) Developing a framework for a standardized works programme for building projects. Construction Innovation, 4(4), pp. 193-210. ISSN 1471-4175

Boje, C P (2018) Knowledge representation, storage and retrieval for BIM supported building evacuation design. PhD thesis, Cardiff University, UK.

Bokor, O (2022) Improving labour productivity in construction. A hybrid machine learning approach. PhD thesis, University of Northumbria at Newcastle, UK.

Boles, W W; Maxwell, D A; Scott, W D; Heermann, P D; Yarborough, T and Underwood, J (1995) Construction automation and robotics–pathway to implementation. Journal of Construction Engineering and Management, 121(1), pp. 143-152. ISSN 0733-9364

Bonwetsch, T (2015) Robotically assembled brickwork: Manipulating assembly processes of discrete elements. DSc thesis, ETH Zürich, Switzerland.

Borges, Maria Luiza Abath Escorel (2025) Decision-making optimization method for construction site layout planning based on slp and BIM. PhD thesis, Universidade Estadual de Campinas, Brazil.

Boroujeni, K A (2023) Visual data analytic and robotics for automated construction performance monitoring. PhD thesis, North Carolina State University, USA.

Bosch-Sijtsema, P; Claeson-Jonsson, C; Johansson, M and Roupe, M (2021) The hype factor of digital technologies in AEC. Construction Innovation, 21(4), pp. 899-916. ISSN 1471-4175

Bosché, F; Turkan, Y; Haas, C T and Haas, R (2010) Fusing 4D modelling and laser scanning for construction schedule control. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Brandín, R and Abrishami, S (2021) Information traceability platforms for asset data lifecycle: Blockchain-based technologies. Smart and Sustainable Built Environment, 10(3), pp. 364-386. ISSN 2046-6099

Bridgewater, C (1992) A new approach to the design of buildings for automated construction. PhD thesis, University of Reading, UK.

Broadhurst, S J (2000) Non-man-entry sewer renovation robot characteristics. PhD thesis, Sheffield Hallam University, UK.

Bruno, Silvana (2019) The implementation of automatic diagnostics and monitoring towards diagnosis-aided historic building information modelling and management. PhD thesis, Politecnico di Bari, Italy.

Bruun, E P G (2024) Structural scaffold-free cooperative robotic fabrication. PhD thesis, Princeton University, USA.

Buhl, H; Andersen, M and Harty, J (2020) Construction industry 4.0: Entangling colliding practices. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Buhl, H; Andersen, M and Klitgaard, A (2019) Boundary objects: Supporting better collaborative practice and research. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Cable, J K; Jaselskis, E J; Walters, R C; Li, L and Bauer, C R (2009) Stringless Portland cement concrete paving. Journal of Construction Engineering and Management, 135(11), pp. 1253-1260. ISSN 0733-9364

Cai, K Q (2007) Business process model for process improvement: an investigation of the tendering process in aconstruction company. PhD thesis, University of Hong Kong, Hong Kong.

Cai, S; Ma, Z; Skibniewski, M J; Bao, S and Wang, H (2020) Construction automation and robotics for high-rise buildings: Development priorities and key challenges. Journal of Construction Engineering and Management, 146(8): 04020096, ISSN 0733-9364

Cai, S; Ma, Z; Skibniewski, M J and Guo, J (2020) Construction automation and robotics: From one-offs to follow-ups based on practices of Chinese construction companies. Journal of Construction Engineering and Management, 146(10): 05020013, ISSN 0733-9364

Caldwell, Scott A (2024) Empirical decision-making tools as applied to seaports in the industry 4.0 paradigm. PhD thesis, Liverpool John Moores University, UK.

Calvetti, D (2021) Electronic productivity performance monitoring of construction workers. PhD thesis, Universidade do Porto, Portugal.

Calvetti, D; Magalhães, P N M; Sujan, S F; Gonçalves, M C and Campos De Sousa, H J (2020) Challenges of upgrading craft workforce into Construction 4.0: Framework and agreements. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(4), pp. 158-165. ISSN 17514304

Candaş, A B (2022) Multipurpose semantic analysis of construction text documentation. PhD thesis, Middle East Technical University, Turkey.

Carvalho, J P A (2023) Integration of BIM in building sustainability assessment methods. PhD thesis, Universidade do Minho, Portugal.

Chambers, D (2022) Attuning smart home scripts to household and energy care. Buildings & Cities, 3(1), pp. 663-676. ISSN 2632-6655

Chasey, A D and Merchant, S (2000) Issues for construction of 300-mm fab. Journal of Construction Engineering and Management, 126(6), pp. 451-457. ISSN 0733-9364

Chen, C; Tang, L; Hancock, C M and Zhang, P (2019) Development of low-cost mobile laser scanning for 3D construction indoor mapping by using inertial measurement unit, ultra-wide band and 2D laser scanner. Engineering, Construction and Architectural Management, 26(7), pp. 1367-1386. ISSN 0969-9988

Chen, H and Chan, I Y S (2024) Effects of automation and transparency on human psychophysiological states and perceived system performance in construction safety automation: An electroencephalography experiment. Journal of Construction Engineering and Management, 150(7): 04024055, ISSN 0733-9364

Chen, Kaiwen (2020) Analysis and management of UAV-captured images towards automation of building facade inspections. PhD thesis, Virginia Tech, USA.

Chen, Qian (2020) A systematic approach to enabling digital supply chain coordination in construction projects. PhD thesis, ETH Zürich, Switzerland.

Chen, X; Chang-Richards, A Y; Pelosi, A; Jia, Y; Shen, X; Siddiqui, M K and Yang, N (2022) Implementation of technologies in the construction industry: A systematic review. Engineering, Construction and Architectural Management, 29(8), pp. 3181-3209. ISSN 0969-9988

Chen, Z; Li, T; Qin, L and Jiang, Y (2025) Vision-guided autonomous block loading in a dual-robot collaborative handling framework. Journal of Construction Engineering and Management, 151(5): 04025035, ISSN 0733-9364

Cho, Y K; Haas, C T; Sreenivasan, S V and Liapi, K (2004) Position error modeling for automated construction manipulators. Journal of Construction Engineering and Management, 130(1), pp. 50-58. ISSN 0733-9364

Cho, Y-K (2000) Human-assisted rapid workspace modeling for construction equipment operations. PhD thesis, University of Texas at Austin, USA.

Chua Ying Kit, J (1996) The human-machine interface (HMI) and re-bar detection aspects of a non-destructive testing (NDT) robot. PhD thesis, City, University of London, UK.

Chung, K H Y (2022) Data fusion, hedonic pricing, and blockchains: Lowering investment barriers for sustainable infrastructure. PhD thesis, University of Michigan, USA.

Coble, R J and Haupt, T C (2000) Effecting safety in affordable housing projects using automation. Journal of Construction Research, 1(1), pp. 1-8. ISSN 1609-9451

Codarin, Sara (2020) Innovative construction systems within building processes: An approach to large-scale robotic additive layer manufacturing for the conservation of cultural heritage. PhD thesis, University of Ferrara, Italy.

Cusumano, L; Farmakis, O; Granath, M; Olsson, N; Jockwer, R and Rempling, R (2025) Current benefits and future possibilities with digital field reporting. International Journal of Construction Management, 25(5), pp. 572-583. ISSN 1562-3599

Dadzie, J; Runeson, G and Ding, G (2020) Assessing determinants of sustainable upgrade of existing buildings: The case of sustainable technologies for energy efficiency. Journal of Engineering, Design and Technology, 18(1), pp. 270-292. ISSN 1726-0531

Danel, T; Lafhaj, Z; Puppala, A; BuHamdan, S; Lienard, S and Richard, P (2024) Identifying tower crane activities with data: The case of the concrete pouring. Engineering, Construction and Architectural Management, 31(2), pp. 939-956. ISSN 0969-9988

Darlow, G; Rotimi, J O B and Wajiha Mohsin, S (2022) Automation in New Zealand's offsite construction: A status update. Built Environment Project and Asset Management, 12(1), pp. 38-52. ISSN 2044-124X

Das, P; Perera, S; Senaratne, S and Osei-Kyei, R (2023) Paving the way for industry 4.0 maturity of construction enterprises: A state of the art review. Engineering, Construction and Architectural Management, 30(10), pp. 4665-4694. ISSN 0969-9988

Das, P; Perera, S; Senaratne, S and Osei-Kyei, R (2025) A smart modern construction enterprise maturity model for business scenarios leading to industry 4.0. Smart and Sustainable Built Environment, 14(1), pp. 23-49. ISSN 2046-6099

Davtalab, O (2018) A data driven software platform for process automation, planning and inspection of contour crafting large-scale robotic 3D printing system. PhD thesis, University of Southern California, USA.

Dawood, N N (1998) A framework of integrating design and production system for the off-site building product industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

De La Garza-Rodriguez, J M (1988) A knowledge engineering approach to the analysis and evaluation of schedules for mid-rise construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Delavar, M (2017) BIM assisted design process automation for pre-engineered buildings (PEB). PhD thesis, University of Western Ontario, Canada.

Desgagné-Lebeuf, A; Lehoux, N and Beauregard, R (2022) Scheduling tools for the construction industry: Overview and decision support system for tool selection. International Journal of Construction Management, 22(14), pp. 2687-2698. ISSN 1562-3599

Desta, S (2024) A qualitative analysis of Maryland smart homebuilders’ perception regarding the internet of things (IoT) adoption risks. PhD thesis, Capella University, USA.

Dixit, A; Chauhan, R and Shaw, R (2025) Application of smart systems and emerging technologies for disaster risk reduction and management in Nepal. International Journal of Disaster Resilience in the Built Environment, 16(3), pp. 328-343. ISSN 1759-5908

Dobrucali, E; Demirkesen, S; Sadikoglu, E; Zhang, C and Damci, A (2024) Investigating the impact of emerging technologies on construction safety performance. Engineering, Construction and Architectural Management, 31(3), pp. 1322-1347. ISSN 0969-9988

Doukari, O; Kassem, M; Scoditti, E; Aguejdad, R and Greenwood, D (2024) A BIM based tool for evaluating building renovation strategies: The case of three demonstration sites in different European countries. Construction Innovation, 24(1), pp. 365-383. ISSN 1471-4175

Dowsett, R; Harty, C and Davies, R (2017) Epistemological differences and new technology in construction. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Dowsett, R M; Green, M S and Harty, C F (2022) Speculation beyond technology: Building scenarios through storytelling. Buildings & Cities, 3(1), pp. 534-553. ISSN 2632-6655

Du Plessis, C and Sherratt, F (2020) Construction 4.0 and built assets in-use: Creating an e-topia or dystopia? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(4), pp. 182-189. ISSN 17514304

Duncheva, T and Bradley, F F (2019) Multifaceted productivity comparison of off-site timber manufacturing strategies in mainland Europe and the United Kingdom. Journal of Construction Engineering and Management, 145(8): 04019043, ISSN 0733-9364

Dunston, P S; Sinfield, J V and Lee, T Y (2007) Technology development decision economics for real-time rolling resistance monitoring of haul roads. Journal of Construction Engineering and Management, 133(5), pp. 393-402. ISSN 0733-9364

Dunston, P S and Wang, X (2005) Mixed reality-based visualization interfaces for architecture, engineering, and construction industry. Journal of Construction Engineering and Management, 131(12), pp. 1301-1309. ISSN 0733-9364

Dzeng, R J; Tserng, H P and Wang, W C (2005) Automating schedule review for expressway construction. Journal of Construction Engineering and Management, 131(1), pp. 127-136. ISSN 0733-9364

Dzeng, R-J (1995) Caseplan: A case-based planner and scheduler for construction using product modeling. PhD thesis, University of Michigan, USA.

Edward Back, W and Bell, L C (1995) Quantifying process benefits of electronic data management technologies. Journal of Construction Engineering and Management, 121(4), pp. 415-421. ISSN 0733-9364

Edwards, D J and Holt, G D (2009) Construction plant and equipment management research: Thematic review. Journal of Engineering, Design and Technology, 7(2), pp. 186-206. ISSN 1726-0531

Eiris, R; Albeaino, G; Gheisari, M; Benda, W and Faris, R (2021) Indrone: A 2D-based drone flight behavior visualization platform for indoor building inspection. Smart and Sustainable Built Environment, 10(3), pp. 438-456. ISSN 2046-6099

Ekanayake, B; Ahmadian Fard Fini, A; Wong, J K W and Smith, P (2024) A deep learning-based approach to facilitate the as-built state recognition of indoor construction works. Construction Innovation, 24(4), pp. 933-949. ISSN 1471-4175

El Ghazali, Y (2013) Implications of RFID in a supply chain: Process, knowledge management and performance. PhD thesis, Ecole Polytechnique, Montreal, Canada.

El-Deeb, K (2024) Energy performance assessment of venetian blinds in south-oriented residential spaces in hot arid desert climates. Construction Innovation, 24(6), pp. 1460-1482. ISSN 1471-4175

El-Gohary, N (2008) Semantic process modelling and integration for collaborative construction and infrastructure development. PhD thesis, University of Toronto, Canada.

Elazhary, M and El-adaway, I H (2025) Enhancing management of transportation projects: Integration factors for using smart contracts. Journal of Construction Engineering and Management, 151(12): 04025201, ISSN 0733-9364

Eldin, N N and Mayfield, J (2005) Determination of most economical scrapers fleet. Journal of Construction Engineering and Management, 131(10), pp. 1109-1114. ISSN 0733-9364

Elghaish, F and Abrishami, S (2020) Developing a framework to revolutionise the 4D BIM process: IPD-based solution. Construction Innovation, 20(3), pp. 401-420. ISSN 1471-4175

Entner, D; Prante, T; Vosgien, T; Zăvoianu, A C; Saminger-Platz, S; Schwarz, M and Fink, K (2019) Potential identification and industrial evaluation of an integrated design automation workflow. Journal of Engineering, Design and Technology, 17(6), pp. 1085-1109. ISSN 1726-0531

Erfani, A; Ma, Z; Cui, Q and Baecher, G B (2023) Ex post project risk assessment: Method and empirical study. Journal of Construction Engineering and Management, 149(2): 04022174, ISSN 0733-9364

Ernstsen, S N; Whyte, J; Thuesen, C and Maier, A (2021) How innovation champions frame the future: Three visions for digital transformation of construction. Journal of Construction Engineering and Management, 147(1): 1928, ISSN 0733-9364

Everett, J G (1991) Construction automation: Basic task selection and development of the cranium. PhD thesis, Massachusetts Institute of Technology, USA.

Everett, J G and Saito, H (1996) Construction automation: Demands and satisfiers in the United States and Japan. Journal of Construction Engineering and Management, 122(2), pp. 147-151. ISSN 0733-9364

Everett, J G and Slocum, A H (1994) Automation and robotics opportunities: Construction versus manufacturing. Journal of Construction Engineering and Management, 120(2), pp. 443-452. ISSN 0733-9364

Falorca, J F (2026) Thematic fields potentially impacting on building maintenance developments. Construction Innovation, 26(1), pp. 1-21. ISSN 1471-4175

Fan, S. L.; Lu, S. M.; Recha, F.; Ong, W. S. and Tseng, T. S. (2026) Automatic BIM-based formwork quantification system. Journal of Construction Engineering and Management, 152(7): 04026082, ISSN 0733-9364

Fan, H (2007) Leveraging operational data for intelligent decision support in construction equipment management. PhD thesis, University of Alberta, Canada.

Faraji, A; Homayoon Arya, S; Ghasemi, E; Rashidi, M; Perera, S; Tam, V and Rahnamayiezekavat, P (2024) A conceptual framework of decentralized blockchain integrated system based on building information modeling to steering digital administration of disputes in the IPD contracts. Construction Innovation, 24(1), pp. 384-406. ISSN 1471-4175

Fazeli, A; Banihashemi, S; Hajirasouli, A and Mohandes, S R (2024) Automated 4D BIM development: The resource specification and optimization approach. Engineering, Construction and Architectural Management, 31(5), pp. 1896-1922. ISSN 0969-9988

Feldmann, F G (2022) Novel perspectives on sustainable value creation: Challenging the status quo by implementing advanced technologies into supply chain processes. PhD thesis, Friedrich-Alexander-Universitaet Erlangen-Nuernberg, Germany.

Feng, Chen (2015) Camera marker networks for pose estimation and scene understanding in construction automation and robotics. PhD thesis, University of Michigan, USA.

Ferguson, M (2020) Improving mobile robot navigation with dynamic building information models and stochastic neural control. PhD thesis, Stanford University, USA.

Figueiredo, W C (1995) A KBES to analyze the environmental impact of proposed highway design alternatives. PhD thesis, University of Central Florida, USA.

Fisher, D J (1989) Piping erection constructability issues in a semiautomated environment. PhD thesis, University of Texas at Austin, USA.

Fisher, D J and O’Connor, J T (1991) Constructability for piping automation: Field operations. Journal of Construction Engineering and Management, 117(3), pp. 468-485. ISSN 0733-9364

Fisher, D J and Rajan, N (1996) Automated constructibility analysis of work-zone traffic-control planning. Journal of Construction Engineering and Management, 122(1), pp. 36-43. ISSN 0733-9364

Fleming, E; Callaghan, N and Craig, N (2019) Robotics and automation as a solution to bridging the UK housing gap. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Foskett, F. and Alwisy, A. (2026) Socio-industrial analysis of cross-sector robotics adoption obstacles for light-gauge steel construction. Engineering, Construction and Architectural Management, pp. 1-40. ISSN 0969-9988

Foskett, F. and Alwisy, A. (2026) Socio-industrial analysis of cross-sector robotics adoption obstacles for light-gauge steel construction. Engineering, Construction and Architectural Management, pp. 1-40. ISSN 0969-9988

Gan, V J L (2022) BIM-based building geometric modeling and automatic generative design for sustainable offsite construction. Journal of Construction Engineering and Management, 148(10): 04022111, ISSN 0733-9364

García de Soto, B; Adey, B T and Fernando, D (2017) A hybrid methodology to estimate construction material quantities at an early project phase. International Journal of Construction Management, 17(3), pp. 165-196. ISSN 1562-3599

García de Soto, B; Agustí-Juan, I; Joss, S and Hunhevicz, J (2022) Implications of construction 4.0 to the workforce and organizational structures. International Journal of Construction Management, 22(2), pp. 205-217. ISSN 1562-3599

Gardner, Stephen T (2024) Technical and interpersonal skills and characteristics of successful construction project managers. PhD thesis, Griffith University, Australia.

Gatton, T M (1991) Designing for construction automation: Advanced automation technologies for computer integrated construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Ghansah, F A; De-Graft, O-M and Ayarkwa, J (2021) Project management processes in the adoption of smart building technologies: A systematic review of constraints. Smart and Sustainable Built Environment, 10(2), pp. 208-226. ISSN 2046-6099

Ginigaddara, B; Perera, S; Feng, Y and Rahnamayiezekavat, P (2022) An evaluation of offsite construction skill profiles. Journal of Financial Management of Property and Construction, 27(1), pp. 16-28. ISSN 1366-4387

Gocmen, F C (2014) Infrastructure scaling and pricing. PhD thesis, Columbia University, USA.

Graser, K; Kahlert, A and Hall, D M (2021) Dfab house: Implications of a building-scale demonstrator for adoption of digital fabrication in AEC. Construction Management and Economics, 39(10), pp. 853-873. ISSN 01446193

Graser, Konrad (2023) From invention to innovation: Socio-technical processes in the adoption of digital fabrication to architecture, engineering and construction praxis. PhD thesis, ETH Zürich, Switzerland.

Grobler, F (1988) Object-oriented data representation for unified construction project information. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Gunay, H B; O'Brien, W; Beausoleil-Morrison, I and Huchuk, B (2014) On adaptive occupant-learning window blind and lighting controls. Building Research & Information, 42(6), pp. 739-756. ISSN 0961-3218

Gupta, P and Jha, K N (2024) Integration of blockchain in contract management for prevention of construction disputes: A systematic literature review and conceptual framework. International Journal of Construction Management, 24(10), pp. 1054-1065. ISSN 1562-3599

Gurgun, A P and Koc, K (2022) Administrative risks challenging the adoption of smart contracts in construction projects. Engineering, Construction and Architectural Management, 29(2), pp. 989-1015. ISSN 0969-9988

Günay, G (2025) Development of standards for modular construction: Learning from the freight container. PhD thesis, Middle East Technical University, Turkey.

Haas, C T and Kim, Y (2002) Automation in infrastructure construction. Construction Innovation, 2(3), pp. 191-210. ISSN 1471-4175

Habibi, S (2020) A review of ICT-based applications to monitor environmental parameters. Construction Innovation, 20(1), pp. 112-127. ISSN 1471-4175

Hamidavi, T (2020) Automatic integrated structural design and optimisation in BIM. PhD thesis, University of Portsmouth, UK.

Hamidavi, T; Abrishami, S; Ponterosso, P; Begg, D and Nanos, N (2020) OSD: A framework for the early stage parametric optimisation of the structural design in BIM-based platform. Construction Innovation, 20(2), pp. 149-169. ISSN 1471-4175

Hamledari, H; Sajedi, S; McCabe, B and Fischer, M (2021) Automation of inspection mission planning using 4D bims and in support of unmanned aerial vehicle-based data collection. Journal of Construction Engineering and Management, 147(3): 4020179, ISSN 0733-9364

Hansen, K L and Vanegas, J A (2003) Improving design quality through briefing automation. Building Research & Information, 31(5), pp. 379-386. ISSN 0961-3218

Harinarain, N; Caluza, S and Dondolo, S (2021) Bricklaying robots in the South African construction industry: The contractor's perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Hasan, S and Sacks, R (2023) Integrating BIM and multiple construction monitoring technologies for acquisition of project status information. Journal of Construction Engineering and Management, 149(7): 04023051, ISSN 0733-9364

Heesom, D and Mahdjoubi, L (2004) Trends of 4D CAD applications for construction planning. Construction Management and Economics, 22(2), pp. 171-182. ISSN 01446193

Hegazy, T M (1994) Integrated bid preparation with emphases on risk assessment using neural networks. PhD thesis, Concordia University, Canada.

Hemalattha, S and Vidjeapriya, R (2021) Developing an integrated framework for optimization of spatial requirements of construction equipment. Built Environment Project and Asset Management, 11(5), pp. 903-917. ISSN 2044-124X

Henriksen, T; Lo, S and Knaack, U (2016) The impact of a new mould system as part of a novel manufacturing process for complex geometry thin-walled gfrc. Architectural Engineering and Design Management, 12(3), pp. 231-249. ISSN 1745-2007

Ho, S P and Liu, L Y (2003) How to evaluate and invest in emerging A/E/C technologies under uncertainty. Journal of Construction Engineering and Management, 129(1), pp. 16-24. ISSN 0733-9364

Hornaday, W C; Haas, C T; O’Connor, J T and Wen, J (1993) Computer-aided planning for heavy lifts. Journal of Construction Engineering and Management, 119(3), pp. 498-515. ISSN 0733-9364

Howes, R (1983) Project management control utilising innovative forecasting and computerised data bases. PhD thesis, Brunel University, UK.

Hsieh, T-Y (1993) Functional requirements for large-scale manipulators in industrial construction. PhD thesis, University of Texas at Austin, USA.

Huang, Q; Chen, Y; Li, Y; Liu, S; Fan, Z; Chen, X and Chen, J (2026) Maco: An open-image data set with multiannotation strategies for building material counting. Journal of Construction Engineering and Management, 152(4): 04026008, ISSN 0733-9364

Huang, J (2025) Structure-aware 3D building reconstruction. PhD thesis, Delft University of Technology, Netherlands.

Huang, X; Bernd, D and Bernold, L E (1996) Innovative technology development for safe excavation. Journal of Construction Engineering and Management, 122(1), pp. 91-96. ISSN 0733-9364

Huang, Z; Mao, C; Wang, J and Sadick, A M (2022) Understanding the key takeaway of construction robots towards construction automation. Engineering, Construction and Architectural Management, 29(9), pp. 3664-3688. ISSN 0969-9988

Huchuk, B; Gunay, H B; O'Brien, W and Cruickshank, C A (2016) Model-based predictive control of office window shades. Building Research & Information, 44(4), pp. 445-455. ISSN 0961-3218

Hughes, P J; O’Connor, J T and Traver, A E (1989) Pipe manipulator enhancements for increased automation. Journal of Construction Engineering and Management, 115(3), pp. 412-423. ISSN 0733-9364

Hwang, Y; Kim, T; Ryu, J and Yang, K (2025) Collaborative bricklaying with a robotic arm using a head-mounted camera in construction. Journal of Construction Engineering and Management, 151(12): 04025204, ISSN 0733-9364

Ibañez-Guzmán, J (1995) Modelling of on-site work cells for the simulation of automated and semi-automated construction. Construction Management and Economics, 13(5), pp. 427-434. ISSN 01446193

IbañezGuzmán, J and Malcolm, A A (2002) Autonomous vehicles in the construction process. Construction Innovation, 2(3), pp. 211-224. ISSN 1471-4175

Ibrahim, Y M (2010) On the measurement of work in progress using computer vision: A computerised reporting model. Journal of Engineering, Design and Technology, 8(1), pp. 45-63. ISSN 1726-0531

Isaac, S and Navon, R (2008) Feasibility study of an automated tool for identifying the implications of changes in construction projects. Journal of Construction Engineering and Management, 134(2), pp. 139-145. ISSN 0733-9364

Isaac, S and Navon, R (2014) Can project monitoring and control be fully automated? Construction Management and Economics, 32(6), pp. 495-505. ISSN 01446193

Isikdag, U (2006) Towards the implementation of building information models in geospatial context. PhD thesis, University of Salford, UK.

Isikdag, U; Underwood, J; Aouad, G and Trodd, N (2007) Investigating the role of building information models as a part of an integrated data layer: A fire response management case. Architectural Engineering and Design Management, 3(2), pp. 124-142. ISSN 1745-2007

Ismail, Z A (2019) An integrated computerised maintenance management system (I-CMMS) for IBS building maintenance. International Journal of Building Pathology and Adaptation, 37(3), pp. 326-343. ISSN 23984708

Jacques de Sousa, L; Poças Martins, J; Sanhudo, L and Santos Baptista, J (2024) Automation of text document classification in the budgeting phase of the construction process: A systematic literature review. Construction Innovation, 24(7), pp. 292-318. ISSN 1471-4175

Jiang, Z; Han, Y; Cheng, Y; Wang, Z and Meng, H (2025) An improved yolov8-dyhead-wiseiou model for positioning and counting detection of grouting sleeves in a prefabricated wall. Journal of Construction Engineering and Management, 151(4): 04025016, ISSN 0733-9364

John, S. T.; Roy, B. K.; Sarkar, P. and Davis, R. (2020) IoT enabled real-time monitoring system for early-age compressive strength of concrete. Journal of Construction Engineering and Management, 146(2): 05019020, ISSN 0733-9364

Johnson, R; Clayton, M; Xia, G E; Woo, J H and Song, Y (2002) The strategic implications of e-commerce for the design and construction industry. Engineering, Construction and Architectural Management, 9(3), pp. 241-248. ISSN 0969-9988

Jolly Cyril, E (2026) Mediating effect of innovation on the relationship between project financing and construction cost efficiency: Innovation integrated cost efficiency perspective. Journal of Construction Engineering and Management, 152(1): 04025226, ISSN 0733-9364

Joyce, S (2016) Performance driven design systems in practice. EngD thesis, University of Bath, UK.

Jung, Y (1997) Information systems planning methodology for the construction industry. PhD thesis, University of Texas at Austin, USA.

Jung, Y and Kang, S (2007) Knowledge-based standard progress measurement for integrated cost and schedule performance control. Journal of Construction Engineering and Management, 133(1), pp. 10-21. ISSN 0733-9364

Kabbani, I A (1993) Decision support life cycle analysis system in building design. PhD thesis, University of Colorado at Boulder, USA.

Kakoto, T and Skibniewski, M (1991) Engineering decision support of automated shield tunneling. Journal of Construction Engineering and Management, 117(4), pp. 674-690. ISSN 0733-9364

Kalian, A A A (1998) Computer aided manufacturing for prefabricated concrete buildings. PhD thesis, Teesside University, UK.

Kamari, M and Ham, Y (2025) Advancing 3D object detection and segmentation in construction jobsites using an open vocabulary approach. Journal of Construction Engineering and Management, 151(10): 04025141, ISSN 0733-9364

Kamaruddin S S, M M F and Mahbub R, Y R M (2013) Perception towards cost implication of mechanisation and automation approach in IBS projects in Malaysia. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Kamel Hedayat Abad, M E (2017) Integration and interoperability of building envelope information and energy modeling. PhD thesis, Pennsylvania State University, USA.

Kangari, R and Halpin, D W (1990) Identification of factors influencing implementation of construction robotics. Construction Management and Economics, 8(1), pp. 89-104. ISSN 01446193

Kangari, R and Yoshida, T (1989) Prototype robotics in construction industry. Journal of Construction Engineering and Management, 115(2), pp. 284-301. ISSN 0733-9364

Kanoglu, A (2003) An integrated system for duration estimation in design/build projects and organizations. Engineering, Construction and Architectural Management, 10(4), pp. 272-282. ISSN 0969-9988

Kanoglu, A and Arditi, D (2001) A computer-based information system for architectural design offices. Construction Innovation, 1(1), pp. 15-29. ISSN 1471-4175

Karadag, I; Güzelci, O Z and Alaçam, S (2023) Edu-ai: A twofold machine learning model to support classroom layout generation. Construction Innovation, 23(4), pp. 898-914. ISSN 1471-4175

Karimidorabati, S; Haas, C T and Gray, J (2016) Evaluation of automation levels for construction change management. Engineering, Construction and Architectural Management, 23(5), pp. 554-570. ISSN 0969-9988

Karshenas, S and Haber, D (1990) Economic optimization of construction project scheduling. Construction Management and Economics, 8(2), pp. 135-146. ISSN 01446193

Karsten Winther, J; Nielsen, R; Schultz, C and Teizer, J (2021) Automated activity and progress analysis based on non-monotonic reasoning of construction operations. Smart and Sustainable Built Environment, 10(3), pp. 457-486. ISSN 2046-6099

Kartam, N A (1999) Design/construction integration: Issues and illustrative prototype. Engineering, Construction and Architectural Management, 6(3), pp. 299-314. ISSN 0969-9988

Kartarn, S; Ballard, G and Ibbs, C W (1997) Introducing a new concept and approach to modeling construction. Journal of Construction Engineering and Management, 123(1), pp. 89-97. ISSN 0733-9364

Karunaratne, Roshan (2022) Optimisation of prefabricated modular-integrated residential construction using hybrid customisation methods. PhD thesis, University of Melbourne, Australia.

Kataoka, M (2008) Automated generation of construction plans from primitive geometries. Journal of Construction Engineering and Management, 134(8), pp. 592-600. ISSN 0733-9364

Katsimpalis, E; Adey, B T and Haas, C T (2026) Automatically transforming virtual realitysimulations into project schedules. Journal of Construction Engineering and Management, 152(6): 04026059, ISSN 0733-9364

Kehily, D (2016) Leveraging building information modelling to address the barriers that prevent the widespread adoption of life cycle costing by quantity surveyors. PhD thesis, University of Salford, UK.

Khalid, M A; Hassan, M U; Ullah, F and Ahmed, K (2025) Integrated building information modeling and blockchain system for decentralized progress payments in construction projects. Journal of Engineering, Design and Technology, 23(5), pp. 1770-1796. ISSN 1726-0531

Khan, M; Khalid, R; Anjum, S; Tran, S V T and Park, C (2022) Fall prevention from scaffolding using computer vision and IoT-based monitoring. Journal of Construction Engineering and Management, 148(7): 04022051, ISSN 0733-9364

Khosrowshahi, F (2015) Enhanced project brief: Structured approach to client-designer interface. Engineering, Construction and Architectural Management, 22(5), pp. 474-492. ISSN 0969-9988

Kim, H; Orr, K; Shen, Z; Moon, H; Ju, K and Choi, W (2014) Highway alignment construction comparison using object-oriented 3D visualization modeling. Journal of Construction Engineering and Management, 140(10): 05014008, ISSN 0733-9364

Kim, T W and Fischer, M (2014) Automated generation of user activity-space pairs in space-use analysis. Journal of Construction Engineering and Management, 140(5): 04014007, ISSN 0733-9364

Kishk, M; Al-Hajj, A; Pollock, R and Aouad, G F (2002) A generic database for whole life costing applications in construction. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Klarin, A and Xiao, Q (2024) Automation in architecture, engineering and construction: A scientometric analysis and implications for management. Engineering, Construction and Architectural Management, 31(8), pp. 3308-3334. ISSN 0969-9988

Koch, C and Larsen, A (2018) Performance of retrofit with ICT of social housing: Proving technology optimists wrong? In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Kog, F and Yaman, H (2016) A multi-agent systems-based contractor pre-qualification model. Engineering, Construction and Architectural Management, 23(6), pp. 709-726. ISSN 0969-9988

Kor, M; Yitmen, I and Alizadehsalehi, S (2023) An investigation for integration of deep learning and digital twins towards construction 4.0. Smart and Sustainable Built Environment, 12(3), pp. 461-487. ISSN 2046-6099

Krishnamoorthi, S and Raphael, B (2022) A review of methodologies for performance evaluation of automated construction processes. Built Environment Project and Asset Management, 12(5), pp. 719-737. ISSN 2044-124X

Kwon, S-W (2003) Human-assisted fitting and matching of objects to sparse point clouds for rapid workspace modeling in construction automation. PhD thesis, University of Texas at Austin, USA.

Lachance, E; Lehoux, N and Blanchet, P (2023) A simulation model to analyze different automation scenarios in a mixed-assembly manufacturing line: Timber-frame prefabrication industry. Journal of Construction Engineering and Management, 149(10): 04023091, ISSN 0733-9364

Lai, H Y and Chiang, W H (2024) Generative design of terraced concert hall: A case study of Taipei music and library centre. Building Research & Information, 52(1-2), pp. 49-67. ISSN 0961-3218

Le, Y; Wang, Y; Luo, C and Peng, Y (2013) Integration of financial and contract management on the Shanghai Expo construction program. Journal of Construction Engineering and Management, 139(6), pp. 738-748. ISSN 0733-9364

Lee, D E and Shi, J J (2006) Construction business automation system. Journal of Construction Engineering and Management, 132(1), pp. 88-96. ISSN 0733-9364

Lee, D-E (2004) Construction business automation system (CBAS). PhD thesis, Illinois Institute of Technology, USA.

Lee, J-R (1997) The object-oriented project system for pavement construction management and visualization. PhD thesis, Ohio State University, USA.

Lee, S (2000) Spatial model and decentralized path planning for construction automation. PhD thesis, University of Wisconsin - Madison, USA.

Lee, S H (2009) Computational fieldwork support for efficient operation and maintenance of mechanical, electrical and plumbing systems. PhD thesis, Carnegie Mellon University, USA.

Lee, Y S; Rashidi, A; Talei, A; Arashpour, M and Pour Rahimian, F (2022) Integration of deep learning and extended reality technologies in construction engineering and management: A mixed review method. Construction Innovation, 22(3), pp. 671-701. ISSN 1471-4175

Lei, Z; Sadiq Altaf, M; Cheng, Z; Liu, H and Tang, S (2023) Measurement of information loss and transfer impacts of technology systems in offsite construction processes. Journal of Construction Engineering and Management, 149(9): 05023011, ISSN 0733-9364

Lei, Z; Taghaddos, H; Olearczyk, J; Al-Hussein, M and Hermann, U (2013) Automated method for checking crane paths for heavy lifts in industrial projects. Journal of Construction Engineering and Management, 139(10): 04013011, ISSN 0733-9364

Li, Y and Zhong, R Y (2026) Spatial-temporal traceability and coordination in modular integrated construction: A future framework with hybrid digital twin and reinforcement learning. International Journal of Construction Management, 26(5), pp. 875-904. ISSN 1562-3599

Li, D and Lu, M (2017) Automated generation of work breakdown structure and project network model for earthworks project planning: A flow network-based optimization approach. Journal of Construction Engineering and Management, 143(1): 04016086, ISSN 0733-9364

Li, J; Mao, L and Cao, J (2025) Process model for claim and payment management in a construction supply chain based on smart contracts. Journal of Construction Engineering and Management, 151(11): 04025172, ISSN 0733-9364

Li, M; Zheng, Q and Ashuri, B (2024) Application of artificial intelligence in design automation: A two-stage framework for structure configuration and design. Journal of Construction Engineering and Management, 150(8): 04024083, ISSN 0733-9364

Li, P; Tang, Y; Zheng, Z; Wang, Z and Zhuang, Y (2024) Semiautomated railway line information modeling based on asset management data. Journal of Construction Engineering and Management, 150(10): 04024130, ISSN 0733-9364

Li, S; Wang, J and Xu, Z (2025) Automated compliance checking for BIM models based on Chinese-NLP and knowledge graph: An integrative conceptual framework. Engineering, Construction and Architectural Management, 32(6), pp. 3832-3856. ISSN 0969-9988

Li, W X (2015) A performance management methodology for collaborative design and construction project teams. PhD thesis, Stanford University, USA.

Lim, E C (1996) The analysis of productivity in building construction. PhD thesis, Loughborough University, UK.

Lin, F.; Cheng, Y. and Zhang, J. (2026) Efficient rebar layout estimation enabled by a custom detection network and enhanced visual measurement. Journal of Construction Engineering and Management, 152(9): 04026152, ISSN 0733-9364

Lin Htet, N.; Peansupap, V. and Kaewmoracharoen, M. (2026) Influence of material attribute context and document layout variability on large language model performance in construction material specification. International Journal of Construction Management, 26(8), pp. 1669-1689. ISSN 1562-3599

Lindblad, H and Karrbom Gustavsson, T (2017) Receptiveness for change: The case of a public client. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Lines, B C and Smithwick, J B (2019) Best practices for organizational change management within electrical contractors. International Journal of Construction Education and Research, 15(2), pp. 136-159. ISSN 1557-8771

Linner, T and Bock, T (2012) Evolution of large-scale industrialisation and service innovation in Japanese prefabrication industry. Construction Innovation, 12(2), pp. 156-178. ISSN 1471-4175

Liou, F M and Huang, C P (2008) Automated approach to negotiations of BOT contracts with the consideration of project risk. Journal of Construction Engineering and Management, 134(1), pp. 18-24. ISSN 0733-9364

Liston, K M (2009) A mediated interaction approach to study the role of media use in team interaction. PhD thesis, Stanford University, USA.

Liu, J; Jiang, S; Sun, H; Liu, W and Xiao, B (2026) Quality inspection information extraction: Intelligent parsing of construction quality inspection specifications based on natural language processing. Journal of Construction Engineering and Management, 152(4): 04026027, ISSN 0733-9364

Liu, J; Li, W; Li, F and Zhao, X (2025) Chinese named entity recognition for bridge damage and defects based on text mining and natural language pretraining models. Journal of Construction Engineering and Management, 151(6): 04025060, ISSN 0733-9364

Liu, Lan (2020) Design guidance and development of construction stormwater technologies. PhD thesis, Auburn University, USA.

Llale, J; Setati, M; Mavund, S; Ndlovu, T; Root, D and Wembe, P (2019) Construction stakeholders' perceptions on the wider adoption of construction automation and robotics: An exploratory pre-study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Lou, E C W (2012) E-readiness in construction: readiness of UK construction organisations. PhD thesis, University of Salford, UK.

Louis, J (2016) Simulation analysis, monitoring, and control of operations. PhD thesis, Purdue University, USA.

Low, S P; Gao, S and Ng, E W L (2021) Future-ready project and facility management graduates in Singapore for industry 4.0: Transforming mindsets and competencies. Engineering, Construction and Architectural Management, 28(1), pp. 270-290. ISSN 0969-9988

Loy, W. W.; Belek Fialho Teixeira, M. and Franzè, A. P. (2026) Ar-guided modular robotic bricklaying: A proof-of-concept system for human-in-the-loop construction workflows. Construction Innovation, ISSN 1471-4175

Loyola, M (2019) A method for real-time error detection in low-cost environmental sensors data. Smart and Sustainable Built Environment, 8(4), pp. 338-350. ISSN 2046-6099

Lu, M; Shen, X and Chen, W (2009) Automated collection of mixer truck operations data in highly dense urban areas. Journal of Construction Engineering and Management, 135(1), pp. 17-23. ISSN 0733-9364

Lundkvist, R; Meiling, J and Vennström, A (2010) Digitalization of inspection data: A means for enhancing learning and continuous improvements? In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Ly, Reachsak (2025) Leveraging artificial intelligence and distributed ledger technologies toward smart and autonomous buildings. PhD thesis, Virginia Tech, USA.

Maaz, Z. N.; Jamaludin, A. F.; Mohd Rahim, F. A.; Rashidi, A. and Darmansah, N. F. (2026) Artificial intelligence capabilities in project cost management in the Malaysian construction industry: An exploratory study. Engineering, Construction and Architectural Management, pp. 1-22. ISSN 0969-9988

Maghrebi, M; Sammut, C and Waller, S T (2015) Feasibility study of automatically performing the concrete delivery dispatching through machine learning techniques. Engineering, Construction and Architectural Management, 22(5), pp. 573-590. ISSN 0969-9988

Manrique, J D; Al-Hussein, M; Bouferguene, A; Safouhi, H and Nasseri, R (2011) Combinatorial algorithm for optimizing wood waste in framing designs. Journal of Construction Engineering and Management, 137(3), pp. 188-197. ISSN 0733-9364

Mansouri, S; Castronovo, F and Akhavian, R (2020) Analysis of the synergistic effect of data analytics and technology trends in the AEC/FM industry. Journal of Construction Engineering and Management, 146(3): 04019113, ISSN 0733-9364

Mantha, B R K and García de Soto, B (2021) Assessment of the cybersecurity vulnerability of construction networks. Engineering, Construction and Architectural Management, 28(10), pp. 3078-3105. ISSN 0969-9988

Mao, Sheng (2016) Design and optimization of tunnel guidance systems for tunneling subject to constrained space and limited visibility. PhD thesis, University of Alberta, Canada.

Mariaca Clavel, Israel Simon (2025) Dynamic construction scheduling: Utilizing AI data automation in a BIM-integrated serious game framework. PhD thesis, University College London, UK.

Martinez, P; Livojevic, M; Jajal, P; Aldrich, D R; Al-Hussein, M and Ahmad, R (2020) Simulation-driven design of wood framing support systems for off-site construction machinery. Journal of Construction Engineering and Management, 146(7): 04020075, ISSN 0733-9364

Martinez Lagunas, A J and Nik-Bakht, M (2024) Process mining, modeling, and management in construction: A critical review of three decades of research coupled with a current industry perspective. Journal of Construction Engineering and Management, 150(11): 04024158, ISSN 0733-9364

Mathur, A (2019) Public costs and private benefits: The governance of energy efficiency in India. Building Research & Information, 47(1), pp. 123-126. ISSN 0961-3218

McCulloueh, B G and Gunn, P (1993) Construction field data acquisition with pen-based computers. Journal of Construction Engineering and Management, 119(2), pp. 374-384. ISSN 0733-9364

McKay, L J (2010) The effect of offsite construction on occupational health and safety. PhD thesis, Loughborough University, UK.

McNamara, A J and Sepasgozar, S M E (2020) Developing a theoretical framework for intelligent contract acceptance. Construction Innovation, 20(3), pp. 421-445. ISSN 1471-4175

McNamara, A J; Shirowzhan, S and M.E. Sepasgozar, S (2024) Investigating the determents of intelligent construction contract adoption: A refinement of the technology readiness index to inform an integrated technology acceptance model. Construction Innovation, 24(3), pp. 702-724. ISSN 1471-4175

Medjdoub, B and Chenini, M B (2015) A constraint-based parametric model to support building services design exploration. Architectural Engineering and Design Management, 11(2), pp. 123-136. ISSN 1745-2007

Mehdipoor, A; Iordanova, I and Al-Hussein, M (2025) Enhancing the manufacturing process in light-gauge steel off-site construction using semiautomation. Journal of Construction Engineering and Management, 151(6): 04025055, ISSN 0733-9364

Mekid, S and Bashmal, S (2019) Engineering manipulation at nanoscale: Further functional specifications. Journal of Engineering, Design and Technology, 17(3), pp. 572-590. ISSN 1726-0531

Meng, F and Cao, X (2025) An intelligent framework for rework risk identification in prefabricated construction processes based on compliance checking. Engineering, Construction and Architectural Management, 32(8), pp. 5066-5098. ISSN 0969-9988

Meng, Y (2023) Multi-objective optimal design and assessment framework of freeform timber structure oriented by robotic automation construction. PhD thesis, University of Sheffield, UK.

Mesrop, A (2021) Algorithmic design and evaluation of emergency shelters. Architectural Engineering and Design Management, 17(3-4), pp. 229-241. ISSN 1745-2007

Meyer, H W G (1991) Conceptual model for integrating business activity and data systems in the AEC industry. PhD thesis, University of Wisconsin - Madison, USA.

Mirzabeigi, S (2024) Integrated building envelope assessment towards automation of energy retrofits: Drone-based data acquisition, automated thermal anomaly detection, and workflow development. PhD thesis, State University of New York College of Environmental Science and Forestry, USA.

Mitchell Finnigan, S J (2020) Human-centred smart buildings: Reframing smartness through the lens of human-building interaction. PhD thesis, University of Newcastle upon Tyne, UK.

Mogollon, J D M (2009) Automation of design and drafting for wood frame structures and construction waste minimization. PhD thesis, University of Alberta, Canada.

Mohamed, Y; Borrego, D; Francisco, L; Al-Hussein, M; Abourizk, S and Hermann, U (2007) Simulation-based scheduling of module assembly yards: Case study. Engineering, Construction and Architectural Management, 14(3), pp. 293-311. ISSN 0969-9988

Mojahed, S (2005) A project improvement system for effective management of construction projects. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Mokhtar Azizi, Z; Cochrane, J; Thurairajah, N and Mokhtar Azizi, N S (2023) Remote working in construction: Assessing the affordance of digitisation. Built Environment Project and Asset Management, 13(1), pp. 5-19. ISSN 2044-124X

Moon, S and Bernold, L E (1998) Graphic-based human-machine interface for construction manipulator control. Journal of Construction Engineering and Management, 124(4), pp. 305-314. ISSN 0733-9364

Moon, S; Lee, G; Chi, S and Oh, H (2021) Automated construction specification review with named entity recognition using natural language processing. Journal of Construction Engineering and Management, 147(1): 04020147, ISSN 0733-9364

Moselhi, O; Fazio, P and Hason, S (1992) Automation of concrete slab-on-grade construction. Journal of Construction Engineering and Management, 118(4), pp. 731-748. ISSN 0733-9364

Moselhi, O; Hegazy, T and Fazio, P (1991) Neural networks as tools in construction. Journal of Construction Engineering and Management, 117(4), pp. 606-625. ISSN 0733-9364

Motlagh, K C (1992) Algorithms for computerised surface modelling and highway alignment design. PhD thesis, University of Strathclyde, UK.

Mousaei, A; Taghaddos, H; Nekouvaght Tak, A; Behzadipour, S and Hermann, U (2021) Optimized mobile crane path planning in discretized polar space. Journal of Construction Engineering and Management, 147(5): 04021036, ISSN 0733-9364

Mrad, F; Asem Abdul-Malak, M; Sadek, S and Khudr, Z (2002) Automated excavation in construction using robotics trajectory and envelop generation. Engineering, Construction and Architectural Management, 9(4), pp. 325-335. ISSN 0969-9988

Mrazovic, N and Fischer, M (2022) Assessment framework for additive manufacturing in the AEC industry. Journal of Construction Engineering and Management, 148(5): 04022013, ISSN 0733-9364

Mwanaki Alinaitwe, H (2008) Improvement of labour performance and productivity in Uganda's building industry. PhD thesis, Lund University, Sweden.

Naghshbandi, S N; Varga, L and Hu, Y (2022) Technology capabilities for an automated and connected earthwork roadmap. Construction Innovation, 22(4), pp. 768-788. ISSN 1471-4175

Navon, R and Berkovich, O (2005) Development and on-site evaluation of an automated materials management and control model. Journal of Construction Engineering and Management, 131(12), pp. 1328-1336. ISSN 0733-9364

Navon, R and Berkovich, O (2006) An automated model for materials management and control. Construction Management and Economics, 24(6), pp. 635-646. ISSN 1466433X

Navon, R and Goldschmidt, E (2003) Can labor inputs be measured and controlled automatically? Journal of Construction Engineering and Management, 129(4), pp. 437-445. ISSN 0733-9364

Navon, R; Kelly, P W and Johnston, D W (1993) Human factors in introducing on-site construction automation. Journal of Construction Engineering and Management, 119(4), pp. 801-812. ISSN 0733-9364

Navon, R and Kolton, O (2006) Model for automated monitoring of fall hazards in building construction. Journal of Construction Engineering and Management, 132(7), pp. 733-740. ISSN 0733-9364

Ng, Ming Shan (2022) Design for digital fabrication (dfdfab): Management for sustainable adoption of emerging technologies and innovations. PhD thesis, ETH Zürich, Switzerland.

Nielsen, Y and Sayar, T (2001) Web-based information flow modelling in construction. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Noruwa, B; Merschbrock, C; Arewa, A O and Agyekum-Mensah, G (2018) Institutional foundations of construction ICT: A view from the West midlands of England. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

O'Brien, S (2022) Critical infrastructure organisation management: an analysis of the transition to the Industry 4.0 era. PhD thesis, University of Cambridge, UK.

Obiaigwe, Innocent Onyeka (2025) Robotizing safety: Prospects and barriers of robotic technology adoption for construction injury prevention in the UK. PhD thesis, University of Salford, UK.

Ogunrinde, O (2020) Enhancing quality management in highway construction using emerging methods. PhD thesis, University of Alabama, USA.

Oguz Erkal, E D (2022) Predicting serious injury and fatality exposure in construction industry. PhD thesis, University of Colorado at Boulder, USA.

Oke, A E; Aliu, J; Fadamiro, P; Akanni, P; Jamir Singh, P S and Shaharudin Samsurijan, M (2025) Unpacking the strategies to promote the implementation of automation techniques in the construction industry. Construction Innovation, 25(2), pp. 381-399. ISSN 1471-4175

Oke, A E; Aliu, J; Fadamiro, P; Jamir Singh, P S; Samsurijan, M S and Yahaya, M (2024) Robotics and automation for sustainable construction: Microscoping the barriers to implementation. Smart and Sustainable Built Environment, 13(3), pp. 625-643. ISSN 2046-6099

Oke, A E; Aliu, J; Fadamiro, P; Leo-Olagbaye, F; Jamir Singh, P S and Samsurijan, M S (2023) Evaluating the drivers for the implementation of automation techniques in the Nigerian construction sector. Built Environment Project and Asset Management, 13(6), pp. 913-928. ISSN 2044-124X

Oke, A E; Aliu, J; Oni, S B and Ilesanmi, O O (2025) The complexities of embracing mechatronics in the Nigerian construction industry. Construction Innovation, 25(4), pp. 1188-1209. ISSN 1471-4175

Oke, A E and Arowoiya, V A (2021) Evaluation of internet of things (IoT) application areas for sustainable construction. Smart and Sustainable Built Environment, 10(3), pp. 387-402. ISSN 2046-6099

Oke, A E; Arowoiya, V A and Akomolafe, O T (2022) Influence of the internet of things' application on construction project performance. International Journal of Construction Management, 22(13), pp. 2517-2527. ISSN 1562-3599

Okpala, I; Nnaji, C and Gambatese, J (2023) Assessment tool for human-robot interaction safety risks during construction operations. Journal of Construction Engineering and Management, 149(1): 04022145, ISSN 0733-9364

Okpala, I U (2022) Robotics and automation in construction: Developing foundational insight and tools to support safe implementation. PhD thesis, University of Alabama, USA.

Olusola, J. and Phung, Q. (2026) A framework for adopting smart contracts in the Nigerian construction industry. International Journal of Construction Management, 26(7), pp. 1284-1298. ISSN 1562-3599

Omar, B (2012) Context-aware services delivery in the construction supply chain. PhD thesis, University of Reading, UK.

Omar, H (2020) Towards an automated photogrammetry-based approach for monitoring and controlling construction site activities. PhD thesis, University of the West of England, Bristol, UK.

Osuizugbo, I. C.; Awuzie, B. O. and Olorunlogbon, O. O. (2026) Assessing the proficiency and application of artificial intelligence skills among construction professionals in a developing country: Evidence from Nigeria. Journal of Engineering, Design and Technology, ISSN 1726-0531

Ovrawah, Victor (2025) Automated prefabrication in the Australian residential building sector: Current state of development and adoption barriers. PhD thesis, Bond University, Australia.

Owen, R; Amor, R; Palmer, M; Dickinson, J; Tatum, C B; Kazi, A S; Prins, M; Kiviniemi, A and East, B (2010) Challenges for integrated design and delivery solutions. Architectural Engineering and Design Management, 6(4), pp. 232-240. ISSN 1745-2007

Oyediran, A; Oke, A E; Ikuabe, M; Aliu, J; Adeosun, F E and Aigbavboa, C O (2025) Exploring application areas of cyber-physical systems in the construction industry: A case of Nigeria. International Journal of Construction Management, 25(15), pp. 1811-1823. ISSN 1562-3599

Pagdadis, S (1990) An advanced technologies assessment strategy for construction automation. PhD thesis, University of Texas at Austin, USA.

Panella, Fabio (2023) Automating inspection of tunnels with photogrammetry and deep learning. PhD thesis, University College London, UK.

Parisi, Fabio (2023) Automation and information approaches to support maintenance and production management in the construction industry. PhD thesis, Politecnico di Bari, Italy.

Parvar, J (2003) Neural networks decision support system (decision to bid). PhD thesis, University of Manchester, UK.

Patel, T; Bapat, H and Patel, D (2026) Assessing barriers of automation and robotics adoption in the Indian construction industry: A fuzzy DEMATEL approach. Construction Innovation, 26(3), pp. 935-957. ISSN 1471-4175

Patel, T.; Guo, B. H. W.; van der Walt, J. D. and Bapat, H. (2026) Vision-based automated road construction progress monitoring: Improved u-net segmentation approach. International Journal of Construction Management, 26(10), pp. 2154-2175. ISSN 1562-3599

Patel, T; Guo, B H W; van der Walt, J D and Zou, Y (2025) Unmanned ground vehicle (ugv) based automated construction progress measurement of road using LSTM. Engineering, Construction and Architectural Management, 32(9), pp. 5764-5791. ISSN 0969-9988

Paulson, B C (1985) Automation and robotics for construction. Journal of Construction Engineering and Management, 111(3), pp. 190-207. ISSN 0733-9364

Paulson, B C (1995) Computers and construction-midcareer reflections. Journal of Construction Engineering and Management, 121(2), pp. 197-200. ISSN 0733-9364

Perkinson, C L (2008) The use of computing technology in highway construction contractor companies as a total jobsite management tool (TJMT). PhD thesis, Florida International University, USA.

Pieters, W D and Tzoneva, R (2021) Investigation of an iec 61850 standard-based process bus implementation of a protection and control scheme for parallelly connected transformers. Journal of Engineering, Design and Technology, 19(4), pp. 850-875. ISSN 1726-0531

Pocobelli, D P (2021) Heritage building information model (BIM) for scientific data. PhD thesis, University College London, UK.

Potseluyko Amobi, L (2021) Improving business and technical operations within timber frame self-build housing sector by applying integrated VR/AR and BIM technologies. PhD thesis, Teesside University, UK.

Pradhananga, P; Elzomor, M and Santi Kasabdji, G (2021) Identifying the challenges to adopting robotics in the US construction industry. Journal of Construction Engineering and Management, 147(5): 0733, ISSN 0733-9364

Qi, T.; Liu, D.; Guo, Y.; Zhou, X.; Zhao, X.; Huang, X.; Wang, Y.; Jiang, Y.; Lu, L. and Wang, Z. (2025) Toward efficient and agent-scalable indoor pathfinding: Intelligent navigation-ability-driven indoor map generation using building information model. Architectural Engineering and Design Management, 21(5), pp. 1000-1021. ISSN 1745-2007

Rad, A A; Asnaashari, E; Knight, A and Hurst, A (2010) ICT utilization in administrative tasks in Iranian construction organizations. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Rahnamayie Zekavat, P (2014) Performance assessment of agile communication in construction. PhD thesis, University of New South Wales, Australia.

Rasheed, U; Ordaz, C; Xu, X; Hu, Y; Li, S; Sutton, T and Cai, J (2025) Understanding the impact of teleoperation technology on the construction industry: Adoption dynamics, workforce perception, and the role of broader workforce participation. Journal of Construction Engineering and Management, 151(7): 04025085, ISSN 0733-9364

Raviv, G; Shapira, A and Sacks, R (2022) Empirical investigation of the applicability of constructability methods to prevent design errors. Built Environment Project and Asset Management, 12(1), pp. 53-69. ISSN 2044-124X

Razkenari, M A (2019) Framework for measuring industrialized construction maturity. PhD thesis, University of Florida, USA.

Ren, S; Qiang, G; Tang, S; Zhang, C; Hyung-Joon, S and Wu, K (2024) An automatic design-feedback process for structural prefabricated components quantity take-off calculation using BIM. Architectural Engineering and Design Management, 20(2), pp. 287-302. ISSN 1745-2007

Renev, Ivan (2019) Automation of the conceptual design process in construction industry using ideas generation techniques. PhD thesis, Lappeenranta-Lahti University of Technology, Finland.

Revolinsky, J A (2000) An analysis model of sequencing of computer systems for the construction manager: A study of automation impacts on the construction industry. PhD thesis, Texas A&M University, USA.

Rho, J-J (1994) A systems engineering model for implementing automation technology into a construction process. PhD thesis, University of Houston, USA.

Richardson, S (2017) Embodied carbon assessment and decision making under uncertainty: case studies of UK supermarket construction. EngD thesis, University of Reading, UK.

Rihani, R A (2006) An investigation of critical success factors for robotic masonry. PhD thesis, North Carolina State University, USA.

Robson, A (2017) 'Cost as information' for construction supply chain improvements. PhD thesis, Birmingham City University, UK.

Robson, A; Boyd, D and Thurairajah, N (2015) Are contractors' cost accounting practices up to the job of establishing improvement in site operations? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Rockett, P and Hathway, E A (2017) Model-predictive control for non-domestic buildings: A critical review and prospects. Building Research & Information, 45(5), pp. 556-571. ISSN 0961-3218

Rojas Molina, E M (1997) Developing a web-centric process to support inspection. PhD thesis, University of Colorado at Boulder, USA.

Ruhl, V R (1997) Computer-aided design and manufacturing of complex-shaped concrete formwork. DDes thesis, Harvard University, USA.

Ruikar, K (2006) Business process implications of e-commerce in construction organisations. EngD thesis, Loughborough University, UK.

Russell, J S and Skibniewski, M J (1990) An ergonomic analysis framework for construction tasks. Construction Management and Economics, 8(3), pp. 329-338. ISSN 01446193

Ryu, J; Seo, J; Jebelli, H and Lee, S (2019) Automated action recognition using an accelerometer-embedded wristband-type activity tracker. Journal of Construction Engineering and Management, 145(1): 04018114, ISSN 0733-9364

Saad, A; Ajayi, S O and Alaka, H A (2023) Trends in BIM-based plugins development for construction activities: A systematic review. International Journal of Construction Management, 23(16), pp. 2756-2768. ISSN 1562-3599

Sacks, R (1997) Computer integrated construction: project data model representation and use. Unpublished PhD thesis, Technion Israel Institute of Technology, Israel.

Sacks, R; Navon, R; Brodetskaia, I and Shapira, A (2005) Feasibility of automated monitoring of lifting equipment in support of project control. Journal of Construction Engineering and Management, 131(5), pp. 604-614. ISSN 0733-9364

Sadeh, H; Zhang, R; Gaedicke, C; Shahbodaghlou, F; Lee, M J and Todorov, D (2026) Embracing generative AI in construction through a quantitative analysis and weighted score ranking of perceptions, applications, and complexities. Journal of Construction Engineering and Management, 152(5): 04026041, ISSN 0733-9364

Sadoughi, A; Kouhirostami, M; Kouhirostamkolaei, M; Qi, B and Costin, A (2024) Autonomous building design for manufacturing and assembly: A systematic review of design application, challenges, and opportunities. Journal of Construction Engineering and Management, 150(9): 03124006, ISSN 0733-9364

Sajjad, M; Jayasinghe, C and Perera, P (2024) Damage assessment automation for single storey detached masonry houses: a probabilistic approach. Building Research & Information, 52(5), pp. 551-563. ISSN 0961-3218

Salhab, D; Pourrahimian, E and Hamzeh, F (2026) Integrating ontologies and AI for enhanced workspace planning and knowledge management. Journal of Construction Engineering and Management, 152(4): 04026031, ISSN 0733-9364

Salih, F and El-Adaway, I H (2024) Quantifying the impact of technology utilization on schedule and cost performance in construction projects. Journal of Construction Engineering and Management, 150(8): 04024078, ISSN 0733-9364

Salim, M (1993) Process-oriented planning for the placement of reinforcing bars. PhD thesis, North Carolina State University, USA.

Samarasingha, D.; Ranadewa, K. A. T. O. and Parameswaran, A. (2026) Extended reality-integrated construction progress monitoring in the construction industry. Journal of Engineering, Design and Technology, 24(5), pp. 1135-1155. ISSN 1726-0531

Sandy, T (2018) High-accuracy mobile manipulation for on-site robotic building construction. DSc thesis, ETH Zürich, Switzerland.

Sanhudo, L P N (2021) Artificial intelligence for an enhanced as-is BIM energy analysis: Enabling an efficient energy retrofit through the automation of the scan-to-BIM process. PhD thesis, Universidade do Porto, Portugal.

Sanvido, V E and Medeiros, D J (1990) Applying computer-integrated manufacturing concepts to construction. Journal of Construction Engineering and Management, 116(2), pp. 365-379. ISSN 0733-9364

Sarkar, D; Bapat, H; Bhattacharjee, B and Jha, B (2025) Automation and optimization in daylight analysis and life cycle assessment for automated daylight monitoring device for a metro rail station box in Ahmedabad, India. International Journal of Construction Management, 25(1), pp. 124-138. ISSN 1562-3599

Sastry, M K S and Seekumar, L (2012) Automation of real time monitoring and controlling of a marine loading arm. Journal of Engineering, Design and Technology, 10(2), pp. 217-227. ISSN 1726-0531

Sathiya, P; Abdul Jaleel, M Y and Shanmugarajan, B (2012) Analysis of metallurgical and mechanical properties of laser welded super austenitic stainless steel. Journal of Engineering, Design and Technology, 10(1), pp. 110-127. ISSN 1726-0531

Scott, Denis James (2025) A proof of concept of a project bank account (PBA) blockchain payment application for the construction industry. PhD thesis, University College London, UK.

Seresht, N G and RazaviAlavi, S (2021) A framework to model the spread of infectious diseases on construction sites using hybrid agent-based modelling and Monte Carlo simulation. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Seward, D W (2002) Automating the construction workplace: Positioning and navigational factors. Construction Innovation, 2(3), pp. 167-189. ISSN 1471-4175

Shafaat, A (2016) Designing project systems in presence of variations. PhD thesis, Purdue University, USA.

Shahandashti, S M; Razavi, S N; Soibelman, L; Berges, M; Caldas, C H; Brilakis, I; Teizer, J; Vela, P A; Haas, C; Garrett, J; Akinci, B and Zhu, Z (2011) Data-fusion approaches and applications for construction engineering. Journal of Construction Engineering and Management, 137, pp. 863-869. ISSN 0733-9364

Shahtaheri, M; Nasir, H and Haas, C T (2015) Setting baseline rates for on-site work categories in the construction industry. Journal of Construction Engineering and Management, 141(5): 04014097, ISSN 0733-9364

Shan, Y; Goodrum, P M; Zhai, D; Haas, C and Caldas, C H (2011) The impact of management practices on mechanical construction productivity. Construction Management and Economics, 29(3), pp. 305-316. ISSN 1466433X

Sharma, V; Al-Hussein, M and Abourizk, S M (2006) Residential construction lot grading approval process optimization: Case study of city of Edmonton. Journal of Construction Engineering and Management, 132(12), pp. 1225-1233. ISSN 0733-9364

Sharqi, R I A (2017) Developing a system for health and safety enhancement and automation in construction sites. PhD thesis, Heriot-Watt University, UK.

Shehab, T; Moselhi, O and Nasr, E (2009) Barcode-assisted system for document management of construction projects. International Journal of Construction Education and Research, 5(1), pp. 45-60. ISSN 1557-8771

Shen, X; Lu, M and Chen, W (2011) Tunnel-boring machine positioning during microtunneling operations through integrating automated data collection with real-time computing. Journal of Construction Engineering and Management, 137(1), pp. 72-85. ISSN 0733-9364

Shrestha, K J; Jeong, H D and Gransberg, D D (2017) Multidimensional highway construction cost indexes using dynamic item basket. Journal of Construction Engineering and Management, 143(8): 04017036, ISSN 0733-9364

Siddula, M; Dai, F; Ye, Y and Fan, J (2016) Classifying construction site photos for roof detection: A machine-learning method towards automated measurement of safety performance on roof sites. Construction Innovation, 16(3), pp. 368-389. ISSN 1471-4175

Silveira, B F and Costa, D B (2024) Method for automating the processes of generating and using 4D BIM models integrated with location-based planning and Last Planner® System. Construction Innovation, 24(4), pp. 1005-1025. ISSN 1471-4175

Simmonds, D M (2015) Information technology and sustainability: An empirical study of the value of the building automation system. PhD thesis, University of South Florida, USA.

Singh, H; Elghaish, F and Brooks, T (2023) Automated workflows for design coordination: Supporting MEP systems. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Singh, J (2021) BIM-based automatic piping layout design and schedule optimization. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Singh, M M; Sawhney, A and Sharma, V (2017) Utilising building component data from BIM for formwork planning. Construction Economics and Building, 17(4), pp. 20-36. ISSN 2204-9029

Soliman-Junior, J; Tzortzopoulos, P and Kagioglou, M (2022) Designers' perspective on the use of automation to support regulatory compliance in healthcare building projects. Construction Management and Economics, 40(2), pp. 123-141. ISSN 01446193

Soman, R K and Whyte, J K (2020) Codification challenges for data science in construction. Journal of Construction Engineering and Management, 146(7): 04020072, ISSN 0733-9364

Sonkor, Muammer Semih (2026) A cybersecurity decision-support framework for technology integration in the built environment. PhD thesis, New York University Tandon School of Engineering, USA.

Sonkor, M S and García De Soto, B (2021) Operational technology on construction sites: A review from the cybersecurity perspective. Journal of Construction Engineering and Management, 147(12): 04021172, ISSN 0733-9364

Spencer, G R (1987) Integration of cost estimating with critical path scheduling. PhD thesis, Oklahoma State University, USA.

Stewart, P J (2000) Strategic IT maturity of construction companies. PhD thesis, Royal Melbourne Institute of Technology, Australia.

Stojanovic, V; Trapp, M; Richter, R; Hagedorn, B and Döllner, J (2018) Towards the generation of digital twins for facility management based on 3D point clouds. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Su, X (2013) A spatial temporal information model for construction planning. PhD thesis, Purdue University, USA.

Subsomboon, K (2004) A procurement and material management (PMM) system based on the fully integrated and automated project process (FIAPP). PhD thesis, Columbia University, USA.

Tam, C M; Tong, T K L and Wong, B W L (2007) An integrated system for earthmoving planning. Construction Management and Economics, 25(11), pp. 1127-1137. ISSN 01446193

Tan, R R and Chang, D S (1993) The formulation of performance indicators in evaluating the implementation of automation in the construction industry. Construction Management and Economics, 11(5), pp. 398-403. ISSN 01446193

Tang, S (2025) Natural language processing (NLP)-based framework for construction quantity take off from building information models. PhD thesis, Western Michigan University, USA.

Tanko, B L; Essah, E A; Elijah, O; Zakka, W P and Klufallah, M (2023) Bibliometric analysis, scientometrics and metasynthesis of internet of things (IoT) in smart buildings. Built Environment Project and Asset Management, 13(5), pp. 646-665. ISSN 2044-124X

Tatum, C B and Funke, A T (1988) Partially automated grading: Construction process innovation. Journal of Construction Engineering and Management, 114(1), pp. 19-35. ISSN 0733-9364

Taylor, M D (2003) Economic appraisal and risk analysis of construction automation. PhD thesis, Edinburgh Napier University, UK.

Taylor, M D and Wamuziri, S C (2002) Strategic construction mechatronics valuation: A real option-pricing approach. Journal of Financial Management of Property and Construction, 7(2), pp. 75-90. ISSN 1366-4387

Taylor, M D; Wamuziri, S C and Smith, I G N (2001) Strategic mechatronics investment: Understanding the managerial options. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Tehrani, B M; BuHamdan, S and Alwisy, A (2024) Robotics in industrialized construction: An activity-based ranking system for assembly manufacturing tasks. Engineering, Construction and Architectural Management, 31(6), pp. 2264-2285. ISSN 0969-9988

Teizer, J (2016) Right-time vs real-time pro-active construction safety and health system architecture. Construction Innovation, 16(3), pp. 253-280. ISSN 1471-4175

Thekinen, J D; Pandey, N; Mollaoglu, S; Duva, M; Frank, K and Zhao, D (2023) Detecting information bottlenecks in architecture engineering construction projects for integrative project management. Journal of Construction Engineering and Management, 149(12): 04023135, ISSN 0733-9364

Thomson, C P H (2016) From point cloud to building information model: capturing and processing survey data towards automation for high quality 3D models to aid a BIM process. PhD thesis, University College London, UK.

Tiruneh, Getaneh Gezahegne (2021) Hybrid neuro-fuzzy model for construction organizational competencies and performance. PhD thesis, University of Alberta, Canada.

Tong, P and Wilhelm, H C (2022) A strategy for integrating hillside dwelling design and automated construction techniques. Smart and Sustainable Built Environment, 11(2), pp. 387-403. ISSN 2046-6099

Tseng, A A; Tanaka, M; Leeladharan, B and Choi, J G (2003) Rotating laser-based system for full profile measurement. Construction Innovation, 3(2), pp. 97-110. ISSN 1471-4175

Turkan, Y; Bosché, F; Haas, C T and Haas, R (2013) Toward automated earned value tracking using 3D imaging tools. Journal of Construction Engineering and Management, 139(4), pp. 423-433. ISSN 0733-9364

Uddin, S M J (2023) Leveraging social media platforms and generative AI technologies for construction industry applications. PhD thesis, North Carolina State University, USA.

Uggla, G (2021) Model and reality: Connecting BIM and the built environment. PhD thesis, KTH Royal Institute of Technology, Sweden.

Ugwu, O O; Tah, J and Howes, R (1998) Optimizing construction method selection strategies in an integrated decision support environment: Results of application to earthworks operations. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Umer, M; Wetzel, E M and Powell, C (2026) Advancing toward automated material counting and localization using RFID, a boston dynamics spot robot, and a Bayesian filter algorithm. Journal of Construction Engineering and Management, 152(1): 04025213, ISSN 0733-9364

Umer, Muhammad (2025) Spotting inventory: Autonomous item localization on active construction sites using a boston dynamics spot® with Bayesian filtering and object detection. PhD thesis, Auburn University, USA.

Underwood, J (1995) Integrating design and construction to improve constructability through an effective usage of IT. PhD thesis, University of Salford, UK.

Usman, W. I.; Mazher, K. M.; Umer, W.; Wuni, I. Y.; Alshibani, A.; Ghaithan, A.; Nasir, A. R. and Mohammed, A. (2026) BIM-based construction accidents knowledge database management system: Centralized accessible information repository for enhanced learning from the past. Journal of Construction Engineering and Management, 152(9): 04026149, ISSN 0733-9364

Valinejadshoubi, M; Sacks, R; Valdivieso, F; Corneau-Gauvin, C and Kaptué, A (2025) Digital twin construction in practice: A case study of closed-loop production control integrating BIM, GIS, and IoT sensors. Journal of Construction Engineering and Management, 151(11): 05025014, ISSN 0733-9364

Van Nederveen, S; Beheshti, R and De Ridder, H (2010) Supplier-driven integrated design. Architectural Engineering and Design Management, 6(4), pp. 241-253. ISSN 1745-2007

Vyčítal, M (2019) On BIM based automatized nD modelling for construction management. PhD thesis, Czech Technical University, Czech Republic.

Wang, L.; Hwang, J.; Han, K. and Gupta, A. (2026) Generative AI-assisted compliance checking for construction requirements. Journal of Construction Engineering and Management, 152(8): 04026117, ISSN 0733-9364

Wang, Z; Yan, X; Liu, Q; Ma, X and Li, H (2026) Vision-based collision prevention on construction sites: Integrating trajectory prediction and uncertainty modeling. Journal of Construction Engineering and Management, 152(1): 04025214, ISSN 0733-9364

Wang, C H; Wang, M W and Huang, Y C (1998) Hierarchical indices for measuring the effectiveness of construction automation implementation. Construction Management and Economics, 16(3), pp. 257-267. ISSN 01446193

Wang, Liannian (2025) Advancing construction requirements management through 4D BIM and generative AI. PhD thesis, North Carolina State University, USA.

Wang, X (2024) Context-aware worker intent interpretation for human-robot collaboration in construction. PhD thesis, University of Wisconsin - Madison, USA.

Wang, Z and Rezazadeh Azar, E (2019) BIM-based draft schedule generation in reinforced concrete-framed buildings. Construction Innovation, 19(2), pp. 280-294. ISSN 1471-4175

Weber, R E (2024) Spatial computing for building performance and design. PhD thesis, Massachusetts Institute of Technology, USA.

Wei, Y; Choi, H and Lei, Z (2022) A generative design approach for modular construction in congested urban areas. Smart and Sustainable Built Environment, 11(4), pp. 1163-1181. ISSN 2046-6099

Weldu, Y W (2016) Automated generation and visualization of initial construction schedules from building information models. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

West, Omona-a (2024) Cloud-based digital technology platform for improving productivity performance of construction small medium enterprises. PhD thesis, Bond University, Australia.

Wong Chong, Oscar (2022) IFC-based system and methods to support analysis of robot-assisted offsite construction. PhD thesis, Purdue University, USA.

Woo, J (2021) A new blockchain framework for existing building energy performance measurement, reporting, and verification (MRV): A pathway for the building sector to participate in the carbon credit market. PhD thesis, University of Florida, USA.

Wu, J; Ye, Y and Du, J (2024) Autonomous drones in urban navigation: Autoencoder learning fusion for aerodynamics. Journal of Construction Engineering and Management, 150(7): 04024067, ISSN 0733-9364

Wu, Lingzi (2021) Enhancing data-driven applications in construction. PhD thesis, University of Alberta, Canada.

Xiao, Y (2017) Three-dimensional reconstruction and modeling using low-precision vision sensors for automation and robotics applications in construction. PhD thesis, University of Michigan, USA.

Xie, W; Zhao, T; Wang, H and Tang, J (2017) Construction techniques used to automatically pass standard box girders through special passenger-line tunnels. Journal of Construction Engineering and Management, 143(5): 05016027, ISSN 0733-9364

Xu, Lichao (2019) Geometric, semantic, and system-level scene understanding for improved construction and operation of the built environment. PhD thesis, University of Michigan, USA.

Xu, S; Wang, J; Wang, X; Shou, W and Ngo, T (2025) Defect modelling and correlation mapping for bridge inspection. Engineering, Construction and Architectural Management, 32(6), pp. 4174-4196. ISSN 0969-9988

Xu, X; Chen, K and Cai, H (2020) Automating utility permitting within highway right-of-way via a generic UML/OCL model and natural language processing. Journal of Construction Engineering and Management, 146(12): 1936, ISSN 0733-9364

Xu, Y and Turkan, Y (2020) BrIM and UAS for bridge inspections and management. Engineering, Construction and Architectural Management, 27(3), pp. 785-807. ISSN 0969-9988

Xu, Yuqing (2025) Enhancing reliability and efficiency of upfront embodied carbon assessment leveraging openbim, llm, DES, and blockchain. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Xue, X; Tan, X and Fan, H (2026) Mapping the trajectories of digital technology innovation in the construction industry: An integrated spnp and louvain approach. Engineering, Construction and Architectural Management, 33(1), pp. 477-508. ISSN 0969-9988

Yang, J (2022) Integrated decision support system for the selection and implementation of delay analysis in construction projects. PhD thesis, Illinois Institute of Technology, USA.

Yang, L; Li, Q and Pan, W (2024) A domain model for geometric modeling in support of the automated BIM modeling. Engineering, Construction and Architectural Management, 31(12), pp. 4897-4919. ISSN 0969-9988

Yang, Y and Pan, W (2021) Automated guided vehicles in modular integrated construction: potentials and future directions. Construction Innovation, 21(1), pp. 85-104. ISSN 1471-4175

Yap, J B H; Lee, K P H and Wang, C (2023) Safety enablers using emerging technologies in construction projects: Empirical study in Malaysia. Journal of Engineering, Design and Technology, 21(5), pp. 1414-1440. ISSN 1726-0531

Ye, Xuling (2025) Blockchain-based smart contract realization in BIM environment: Technical adoption for reliable and collaborative construction management. PhD thesis, Ruhr-Universität Bochum, Germany.

Yevu, S K; Owusu, E K; Chan, A P C; Oti-Sarpong, K; Wuni, I Y and Tetteh, M O (2023) Systematic review on the integration of building information modelling and prefabrication construction for low-carbon building delivery. Building Research & Information, 51(3), pp. 279-300. ISSN 0961-3218

Yin, D; Deng, X and Lu, K (2025) Automatic generation of pipelines from 2D CAD drawings to 3D IFC models using a parametric method. International Journal of Construction Management, 25(6), pp. 699-717. ISSN 1562-3599

Yu, H; Deng, X; Zhang, N and Zhang, X (2026) Is blockchain cost-effective in construction project management? A systematic review from the perspective of transaction cost. Engineering, Construction and Architectural Management, 33(1), pp. 28-52. ISSN 0969-9988

Yu, J; Wang, J; Shi, Q; Xu, J and Wang, J (2026) Exploring job competency related to intelligent construction in China using a text mining method. Engineering, Construction and Architectural Management, 33(1), pp. 318-335. ISSN 0969-9988

Yu, H; Deng, X and Zhang, N (2025) To what extent can smart contracts replace traditional contracts in construction project? Engineering, Construction and Architectural Management, 32(3), pp. 1393-1410. ISSN 0969-9988

Yu, H; Heesom, D; Oloke, D; Buckley, K and Proverbs, D (2007) A knowledge-based decision-support system for health and safety competence assessment. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Yu, W-d (1996) A neuro-fuzzy knowledge-based multi-criterion decision model for constructability analysis and improvement of construction technologies. PhD thesis, Purdue University, USA.

Zaeri, F; Rotimi, J O B; Hosseini, M R and Cox, J (2017) Implementation of the LPS using an excel spreadsheet: A case study from the New Zealand construction industry. Construction Innovation, 17(3), pp. 324-339. ISSN 1471-4175

Zaina, S M; Fadli, F and Hosseini, S M (2022) Evaluation of smart irrigation systems in hot-arid climates for green roofs and walls: Case of doha, qatar. Smart and Sustainable Built Environment, 11(2), pp. 346-367. ISSN 2046-6099

Zanni, M A (2017) Communication of sustainability information and assessment within BIM-enabled collaborative environment. PhD thesis, Loughborough University, UK.

Zhai, D (2010) The relationship between information technology and construction productivity. PhD thesis, University of Kentucky, USA.

Zhai, D; Goodrum, P M; Haas, C T and Caldas, C H (2009) Relationship between automation and integration of construction information systems and labor productivity. Journal of Construction Engineering and Management, 135(8), pp. 746-753. ISSN 0733-9364

Zhang, C (2017) Human-centered automation for resilience in acquiring construction field information. PhD thesis, Arizona State University, USA.

Zhang, F (2022) A hybrid structured deep neural network with word2vec for construction accident causes classification. International Journal of Construction Management, 22(6), pp. 1120-1140. ISSN 1562-3599

Zhang, L and El-Gohary, N (2023) Human-centred and BIM-integrated automated value analysis of buildings. International Journal of Construction Management, 23(11), pp. 1911-1923. ISSN 1562-3599

Zhang, N (2001) A computer-based environment for preliminary structural design, design collaboration and design automation of tall buildings. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Zhang, N; Wang, J; Al-Hussein, M and Yin, X (2023) BIM-based automated design of drainage systems for panelized residential buildings. International Journal of Construction Management, 23(15), pp. 2683-2698. ISSN 1562-3599

Zhang, Y; Chang, R; Mao, W; Zuo, J; Liu, L and Han, Y (2024) Challenges of automating interior construction progress monitoring. Journal of Construction Engineering and Management, 150(9): 03124004, ISSN 0733-9364

Zhao, J; Lam, K P; Biswas, T and Wang, H (2015) An online platform to automate LEED energy performance evaluation and submission process. Construction Innovation, 15(3), pp. 313-332. ISSN 1471-4175

wu, S; Lee, A; Koh, W W I; Aouad, G and fu, C (2004) An IFC-based space analysis for building accessibility layout for all users. Construction Innovation, 4(3), pp. 129-141. ISSN 1471-4175

This list was generated on Sat Aug 22 01:33:34 2026 UTC.