Items with Index Term: automated process

Number of items: 17.

Al Omari, Mohammad K (2025) Application of the AI-enabled unmanned aerial systems in resolving highway construction claims. PhD thesis, University of Illinois at Chicago, USA.

Chang, J; Jaskula, K; Papadonikolaki, E; Rovas, D and Parlikad, A K (2024) Can blockchain prevent the deterioration of building handover information quality for higher education institutions? Built Environment Project and Asset Management, 14(4), pp. 509-528. ISSN 2044-124X

Chau, A D (2018) Conceptual cost estimation decision support system in university construction projects. PhD thesis, University of Alabama, USA.

Crippa, J; Araujo, A M F; Bem, D; Ugaya, C M L and Scheer, S (2020) A systematic review of BIM usage for life cycle impact assessment. Built Environment Project and Asset Management, 10(4), pp. 603-618. ISSN 2044-124X

Doukari, O; Kassem, M; Scoditti, E; Aguejdad, R and Greenwood, D (2024) A BIM based tool for evaluating building renovation strategies: The case of three demonstration sites in different European countries. Construction Innovation, 24(1), pp. 365-383. ISSN 1471-4175

Elrod, M T (2017) A novel approach to determining real-time risk probabilities in critical infrastructure industrial control systems. PhD thesis, Nova Southeastern University, USA.

Fazeli, A; Banihashemi, S; Hajirasouli, A and Mohandes, S R (2024) Automated 4D BIM development: The resource specification and optimization approach. Engineering, Construction and Architectural Management, 31(5), pp. 1896-1922. ISSN 0969-9988

Hwang, S; Park, M; Lee, H S and Kim, H (2012) Automated time-series cost forecasting system for construction materials. Journal of Construction Engineering and Management, 138(11), pp. 1259-1269. ISSN 0733-9364

Jelodar, M B; Wilkinson, S; Kalatehjari, R and Zou, Y (2022) Designing for construction procurement: An integrated decision support system for building information modelling. Built Environment Project and Asset Management, 12(1), pp. 111-127. ISSN 2044-124X

Jiang, L (2016) A constructability review ontology to support automated rule checking leveraging building information models. PhD thesis, Pennsylvania State University, USA.

Karimidorabati, S; Haas, C T and Gray, J (2016) Evaluation of automation levels for construction change management. Engineering, Construction and Architectural Management, 23(5), pp. 554-570. ISSN 0969-9988

Li, S; Wang, J and Xu, Z (2025) Automated compliance checking for BIM models based on Chinese-NLP and knowledge graph: An integrative conceptual framework. Engineering, Construction and Architectural Management, 32(6), pp. 3832-3856. ISSN 0969-9988

Mirahadi, S (2020) EvacuSafe: A smart evacuation management system for buildings. PhD thesis, University of Toronto, Canada.

Mokhtar Azizi, Z; Cochrane, J; Thurairajah, N and Mokhtar Azizi, N S (2023) Remote working in construction: Assessing the affordance of digitisation. Built Environment Project and Asset Management, 13(1), pp. 5-19. ISSN 2044-124X

Seed, L (2015) The dynamics of BIM adoption: a mixed methods study of BIM as an innovation within the United Kingdom construction industry. PhD thesis, University of Huddersfield, UK.

Singh, H; Elghaish, F and Brooks, T (2023) Automated workflows for design coordination: Supporting MEP systems. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Türkakın, O H; Manisalı, E and Arditi, D (2020) Delay analysis in construction projects with no updated work schedules. Engineering, Construction and Architectural Management, 27(10), pp. 2893-2909. ISSN 0969-9988

This list was generated on Sat Aug 22 02:09:19 2026 UTC.